# Boeing Service Bulletin B787-81205-SB270026-00

## Copies (2)

Copies the FAA filed in AD dockets on regulations.gov, newest revision first. A newer revision may exist.

- Revision 001 ("U.S. DOT/FAA - SB B787-81205-SB270026-00 Issue 001"), 77 pages: PDF https://openairdocs.org/files/sha256/22/c9/22c9675af017bf782ee90a3f83a4215e73f75eee4d6438d0260ed39ea8033f19; text https://openairdocs.org/service-documents/boeing/b787-81205-sb270026-00/file/22c9675af017.md. Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2015-3142; AD 2016-25-02 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- SB-787-27A0026-02 ("SB-787-27A0026-02"), 80 pages: PDF https://openairdocs.org/files/sha256/9c/7f/9c7f62c83a231c0b5ffc0ce4efaa19d253726bde61fe39c5502aa8be3dbfca7b; text https://openairdocs.org/service-documents/boeing/b787-81205-sb270026-00/file/9c7f62c83a23.md. Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2015-3142; AD 2016-25-02 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Boeing](https://openairdocs.org/service-documents/boeing.md)
- Type: Service bulletin (Service Bulletin)
- Number: B787-81205-SB270026-00
- Latest revision known: B787-81205-SB270026-00, Issue 002, dated June 13, 2016 (OpenAirDocs)
- Page: https://openairdocs.org/service-documents/boeing/b787-81205-sb270026-00

## ADs that cite it (1) (OpenAirDocs)

Newest first, with the revision each names, as OpenAirDocs read it from the AD's text.

- [AD 2016-25-02](https://openairdocs.org/ad/2016-25-02.md), effective Jan 20, 2017: Revisions 001 and 002

Also cited in [1 proposed AD](https://openairdocs.org/service-documents/boeing/b787-81205-sb270026-00/proposed.md).

## Text (77 pages)

Revision 001, the newest copy. Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2015-3142; AD 2016-25-02 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication. Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Alert Service Bulletin B787-81205-SB270026-00 FLIGHT CONTROLS - Flight
Controls - Hydraulic Power Control Unit Particle Deposit Prevention -
Elevator and Aileron Power Control Unit Test
Issue 001, 25 Nov 2014B787-81205-SB270026-00Publication:
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET
Copyright © 2014 Boeing. Unpublished Work. All rights reserved.
Treatment of this data module and its content is governed by contract with Boeing. Rights to use this data module are licensed on a per
aircraft basis and such rights may not be transferable. For more information, contact The Boeing Company. Boeing, the Boeing signature,
the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner, BBJ, DC-8, DC-9, DC-10, KC-10, KC-46, KDC-10, MD-10,
MD-11, MD-80, MD-88, MD-90, P-8, Poseidon and Boeing liveries are all trademarks owned by The Boeing Company; and no trademark
license is granted in connection with this document unless provided in writing by Boeing.
EXPORT CONTROLLED
Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15 CFR 300-774). An export license
may be required before it is used for development, production or use by foreign persons from specific countries. The controller of this data
has the individual responsibility to abide by all export laws.
ECCN: 9E991
The applicability information below is referenced at the lower left of each page to indicate the page applicability.
These references are valid for this print copy only.
PM Applicability (Publication Module applicability)
787-8 Airplanes. Refer to Data Module SB B787-A-27-00-0026-00A-932A-D, Paragraph 1., Effectivity for the
list of affected airplanes.
B787-81205-SB270026-00TITLE PAGE
Issue 001, 25 Nov 2014
Page 1 of 77
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
3.0
B787-81205-SB270026-00
Issue 001, 25 Nov 2014
AIRCRAFT SERVICE BULLETIN

### Page 2

Alert Service Bulletin B787-81205-SB270026-00
Table of Contents
Page
Summary  .....................................................7
PLANNING INFORMATION  ..........................................1 1
1. Effectivity  .............................................1 3
A. Airplanes  ...........................................1 3
B. Spares Affected  ........................................1 5
2. Concurrent Requirements  ....................................1 5
3. Reason  ..............................................1 5
4. Description  ............................................1 6
5. Compliance  ...........................................1 6
6. Approval  .............................................2 2
7. Manpower  ............................................2 2
8. Weight and Balance Changes  .................................2 5
9. Electrical Load Data  .......................................2 6
10. References  ...........................................2 6
A. Existing Data:  .........................................2 6
B. Data Supplied with this Service Bulletin:  ..........................2 6
C. Installation Requirement Modules Used in the Preparation of this Service Bulletin:  ...2 6
11. Publications Affected  ......................................2 6
12. Interchangeability and Intermixability of Parts  .........................2 6
13. Software Accomplishment Summary  ..............................2 6
MATERIAL INFORMATION  ..........................................2 7
1. Material - Price and Availability  .................................2 7
2. Industry Support Information  ..................................2 7
3. Parts Necessary for Each Airplane  ...............................2 7
A. Kits/Parts:  ...........................................2 7
B. Parts and Materials Supplied by the Operator:  .......................2 7
C. Parts Modified and Reidentified:  ...............................2 8
D. Parts Removed and Not Replaced:  .............................2 8
4. Parts Necessary to Change Spares  ..............................2 8
5. Special Tooling - Price and Availability  .............................2 8
6. Special Tooling Necessary to do this Service Bulletin  .....................2 8
ACCOMPLISHMENT INSTRUCTIONS  ...................................3 0
1. GENERAL INFORMATION  ...................................3 1
2. WORK INSTRUCTIONS  ....................................3 3
Appendix A – LOGIC DIAGRAM FOR PARAGRAPH 1.E. COMPLIANCE: TABLE 5 LEFT, RIGHT AND
CENTER HYDRAULIC SYSTEM FLUID MARKER INSTALLATION [Group 1-2:] ......5 6
Appendix B – LOGIC DIAGRAM FOR PARAGRAPH 1.E. COMPLIANCE: TABLE 6 LEFT HYDRAULIC
SYSTEM FLUID TEST [Group 1, Configuration 2; Group 2: ] .................5 9
Appendix C – LOGIC DIAGRAM FOR PARAGRAPH 1.E. COMPLIANCE: TABLE 7 RIGHT HYDRAULIC
SYSTEM FLUID TEST [Group 1, Configuration 2; Group 2: ] .................6 2
B787-81205-SB270026-00TABLE OF CONTENTS
Issue 001, 25 Nov 2014
Page 2 of 77
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB270026-00
Issue 001, 25 Nov 2014
AIRCRAFT SERVICE BULLETIN

### Page 3

Appendix D – LOGIC DIAGRAM FOR PARAGRAPH 1.E. COMPLIANCE: TABLE 8 CENTER HYDRAULIC
SYSTEM FLUID TEST AND LEFT AND RIGHT ELEVATOR AND AILERON POWER
CONTROL UNIT INTERNAL FLOW TEST [Group 1, Configuration 2; Group 2: ] ......6 5
Appendix E – LOGIC DIAGRAM FOR PARAGRAPH 1.E. COMPLIANCE: TABLE 9 WORK PACKAGE
5 AND WORK PACKAGE 6 CONDITIONS AND ACTIONS [Group 1, Configuration 2;
Group 2: ] ............................................6 8
Appendix F – LOGIC DIAGRAM FOR PARAGRAPH 1.E. COMPLIANCE: TABLE 10 WORK PACKAGE
7 AND WORK PACKAGE 8 CONDITIONS AND ACTIONS [Group 1, Configuration 2;
Group 2: ] ............................................7 1
Appendix G – TEST SCREENS [Group 1, Configuration 2; Group 2: ] ....................7 4
B787-81205-SB270026-00TABLE OF CONTENTS
Issue 001, 25 Nov 2014
Page 3 of 77
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB270026-00
Issue 001, 25 Nov 2014
AIRCRAFT SERVICE BULLETIN

### Page 4

Alert Service Bulletin B787-81205-SB270026-00
List of Illustrations
THIS ALERT SERVICE BULLETIN IS SENT TO THE OPERATORS OF RECORD OF THE
AIRPLANES SHOWN IN DATA MODULE SB B787-A-27-00-0026-00A-932A-D, PARAGRAPH 1.,
Alert:
EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND THIS SERVICE BULLETIN
TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS SERVICE
BULLETIN TO THE NEW OWNER.
Description
Group 1-2:
Table 1  List of Illustrations - Alert Service Bulletin B787-81205-SB270026-00
Used InICN
B787-A-27-00-0026-00A-931C-D Issue 001ICN-B787-A-000061-A-81205-09065-A-01-1
B787-A-27-00-0026-0AA-931D-D Issue 001ICN-B787-A-000061-A-81205-09066-A-01-1
B787-A-27-00-0026-0BA-931D-D Issue 001ICN-B787-A-000061-A-81205-09067-A-01-1
B787-A-27-00-0026-0CA-931D-D Issue 001ICN-B787-A-000061-A-81205-09068-A-01-1
B787-A-27-00-0026-0DA-931D-D Issue 001ICN-B787-A-000061-A-81205-09069-A-01-1
B787-A-27-00-0026-0EA-931D-D Issue 001ICN-B787-A-000061-A-81205-09070-A-01-1
B787-A-27-00-0026-0FA-931D-D Issue 001ICN-B787-A-000061-A-81205-09071-A-01-1
B787-A-27-00-0026-0GA-931D-D Issue 001ICN-B787-A-000061-A-81205-09072-A-01-1
B787-A-27-00-0026-0GA-931D-D Issue 001ICN-B787-A-000061-A-81205-09073-A-01-1
B787-A-27-00-0026-0GA-931D-D Issue 001ICN-B787-A-000061-A-81205-09074-A-01-1
B787-A-27-00-0026-00A-00AA-DApplicable To:
Issue 001, 25 Nov 2014End of data moduleModel 787
See Applicability of this data module
Page 4 of 77
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB270026-00
Issue 001, 25 Nov 2014
AIRCRAFT SERVICE BULLETIN

### Page 5

Alert Service Bulletin B787-81205-SB270026-00
List of Effective Data Modules
THIS ALERT SERVICE BULLETIN IS SENT TO THE OPERATORS OF RECORD OF THE
AIRPLANES SHOWN IN DATA MODULE SB B787-A-27-00-0026-00A-932A-D, PARAGRAPH 1.,
Alert:
EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND THIS SERVICE BULLETIN
TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS SERVICE
BULLETIN TO THE NEW OWNER.
Description
Group 1-2:
Table 1  List of Effective Data Modules - Alert Service Bulletin B787-81205-SB270026-00
Issue DateIssue StatusIssueData Module – Information Name
2014-11-25New001B787-A-27-00-0026-00A-00AA-D – List of Illustrations
2014-11-25New001B787-A-27-00-0026-00A-00SA-D – List of Effective Data Modules
2014-11-25New001B787-A-27-00-0026-00A-931C-D – Summary
2014-11-25New001B787-A-27-00-0026-00A-932A-D – PLANNING INFORMATION
2014-11-25New001B787-A-27-00-0026-00A-934A-D – MATERIAL INFORMATION
2014-11-25New001B787-A-27-00-0026-00A-933A-D – ACCOMPLISHMENT INSTRUCTIONS
2014-11-25New001B787-A-27-00-0026-0AA-931D-D – Appendix A – LOGIC DIAGRAM FOR
PARAGRAPH 1.E. COMPLIANCE: TABLE 5 LEFT, RIGHT AND CENTER
HYDRAULIC SYSTEM FLUID MARKER INSTALLATION [Group 1-2:]
2014-11-25New001B787-A-27-00-0026-0BA-931D-D – Appendix B – LOGIC DIAGRAM FOR
PARAGRAPH 1.E. COMPLIANCE: TABLE 6 LEFT HYDRAULIC SYSTEM
FLUID TEST [Group 1, Configuration 2; Group 2: ]
2014-11-25New001B787-A-27-00-0026-0CA-931D-D – Appendix C – LOGIC DIAGRAM FOR
PARAGRAPH 1.E. COMPLIANCE: TABLE 7 RIGHT HYDRAULIC SYSTEM
FLUID TEST [Group 1, Configuration 2; Group 2: ]
2014-11-25New001B787-A-27-00-0026-0DA-931D-D – Appendix D – LOGIC DIAGRAM FOR
PARAGRAPH 1.E. COMPLIANCE: TABLE 8 CENTER HYDRAULIC
SYSTEM FLUID TEST AND LEFT AND RIGHT ELEVATOR AND AILERON
POWER CONTROL UNIT INTERNAL FLOW TEST [Group 1, Configuration
2; Group 2: ]
2014-11-25New001B787-A-27-00-0026-0EA-931D-D – Appendix E – LOGIC DIAGRAM FOR
PARAGRAPH 1.E. COMPLIANCE: TABLE 9 WORK PACKAGE 5 AND
WORK PACKAGE 6 CONDITIONS AND ACTIONS [Group 1, Configuration
2; Group 2: ]
B787-A-27-00-0026-00A-00SA-DApplicable To:
Issue 001, 25 Nov 2014Model 787
See Applicability of this data module
Page 5 of 77
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB270026-00
Issue 001, 25 Nov 2014
AIRCRAFT SERVICE BULLETIN

### Page 6

Table 1  List of Effective Data Modules - Alert Service Bulletin B787-81205-SB270026-00
Issue DateIssue StatusIssueData Module – Information Name
2014-11-25New001B787-A-27-00-0026-0FA-931D-D – Appendix F – LOGIC DIAGRAM FOR
PARAGRAPH 1.E. COMPLIANCE: TABLE 10 WORK PACKAGE 7 AND
WORK PACKAGE 8 CONDITIONS AND ACTIONS [Group 1, Configuration
2; Group 2: ]
2014-11-25New001B787-A-27-00-0026-0GA-931D-D – Appendix G – TEST SCREENS [Group
1, Configuration 2; Group 2: ]
B787-A-27-00-0026-00A-00SA-DApplicable To:
Issue 001, 25 Nov 2014End of data moduleModel 787
See Applicability of this data module
Page 6 of 77
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB270026-00
Issue 001, 25 Nov 2014
AIRCRAFT SERVICE BULLETIN

### Page 7

Alert Service Bulletin B787-81205-SB270026-00
Summary
THIS ALERT SERVICE BULLETIN IS SENT TO THE OPERATORS OF RECORD OF THE
AIRPLANES SHOWN IN DATA MODULE SB B787-A-27-00-0026-00A-932A-D, PARAGRAPH 1.,
Alert:
EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND THIS SERVICE BULLETIN
TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS SERVICE
BULLETIN TO THE NEW OWNER.
References
TitleReference
Spares AffectedSB B787-A-27-00-0026-00A-932A-D Issue 001,
Paragraph 1.B.
ComplianceSB B787-A-27-00-0026-00A-932A-D Issue 001,
Paragraph 5.
Weight and Balance ChangesSB B787-A-27-00-0026-00A-932A-D Issue 001,
Paragraph 8.
Electrical Load DataSB B787-A-27-00-0026-00A-932A-D Issue 001,
Paragraph 9.
Publications AffectedSB B787-A-27-00-0026-00A-932A-D Issue 001,
Paragraph 11.
Kits/PartsSB B787-A-27-00-0026-00A-934A-D Issue 001,
Paragraph 3.A.
Parts and Materials Supplied by the OperatorSB B787-A-27-00-0026-00A-934A-D Issue 001,
Paragraph 3.B.
Special Tooling Necessary to do this Service BulletinSB B787-A-27-00-0026-00A-934A-D Issue 001,
Paragraph 6.
EffectivitySB B787-A-27-00-0026-00A-932A-D Issue 001,
Paragraph 1.
ManpowerSB B787-A-27-00-0026-00A-932A-D Issue 001,
Paragraph 7.
Material - Price and AvailabilitySB B787-A-27-00-0026-00A-934A-D Issue 001,
Paragraph 1.
B787-A-27-00-0026-00A-931C-DApplicable To:
Issue 001, 25 Nov 2014Model 787
See Applicability of this data module
Page 7 of 77
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB270026-00
Issue 001, 25 Nov 2014
AIRCRAFT SERVICE BULLETIN

### Page 8

TitleReference
HYDRAULIC POWER - Hydraulic System - HyJet V
Marker Installation
SB B787-81205-SB290022-00 Issue 001
FLIGHT CONTROLS - Elevator Control System -
Elevator Power Control Unit Electro-Hydraulic Servo
Valve Rate Restriction Test
SB B787-81205-SB270016-00
Description
Group 1-2:
1. CONCURRENT REQUIREMENTS
Table 1  Boeing Service Bulletins Dependencies
NoteDependency TypeDescriptionService Bulletin Issue
PrerequisiteHYDRAULIC POWER - Hydraulic System - Hy-
Jet V Marker Installation
SB B787-81205-SB290022-00
Issue 001, or later approved Is-
sue
2. BACKGROUND
787-8 operators have experienced multiple occurrences of EICAS status message FLIGHT CONTROL SYS
with a correlated Power Control Unit (PCU) internal fault maintenance message. Boeing and Moog (787
actuation system supplier) determined the messages are due to the accumulation of very fine particle deposits
within the PCU's Electro Hydraulic Servo Valve (EHSV) that cause degraded performance due to reduced
EHSV internal hydraulic supply pressures. Failures have only occurred on airplanes that have operated with
Skydrol LD-4 hydraulic fluid. Changing the hydraulic fluid to HyJet V will significantly reduce the rate of
particle deposits in EHSVs. This service bulletin instructs operators to change their hydraulic fluid to HyJet
V and to perform an internal flow test of the left and right elevator and aileron inboard PCUs to make sure
the flow is not restricted. If the PCUs do not pass the test, replace them. If this service bulletin is not accom-
plished, the particle deposits can cause the flight control hydraulic PCUs to fail, which could lead to reduced
controllability of the airplane.
Accomplishment of this service bulletin terminates SB B787-81205-SB270016-00.
This table is provided to operators for planning purposes only. Refer to the applicable sections for more in-
formation.
Table 2  
Data Module ReferenceAffectedPlanning Data
Data Module SB B787-A-27-00-0026-00A-932A-
D, Paragraph 1.B., Spares Affected
NoSpares Affected
Data Module SB B787-A-27-00-0026-00A-932A-
D, Paragraph 5., Compliance
YesAD Related
Data Module SB B787-A-27-00-0026-00A-932A-
D, Paragraph 8., Weight and Balance Changes
NoWeight and Balance Changed
B787-A-27-00-0026-00A-931C-DApplicable To:
Issue 001, 25 Nov 2014Model 787
See Applicability of this data module
Page 8 of 77
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB270026-00
Issue 001, 25 Nov 2014
AIRCRAFT SERVICE BULLETIN

### Page 9

Table 2  
Data Module ReferenceAffectedPlanning Data
Data Module SB B787-A-27-00-0026-00A-932A-
D, Paragraph 9., Electrical Load Data
NoElectrical Load Changed
Data Module SB B787-A-27-00-0026-00A-932A-
D, Paragraph 11., Publications Affected
YesPublications Affected
Data Module SB B787-A-27-00-0026-00A-932A-
D, Paragraph 11., Publications Affected
NoAirplane Flight Operations Affected (Flight Crew
Operations Manual and/or FAA Approved Air-
plane Flight Manual)
Data Module SB B787-A-27-00-0026-00A-934A-
D, Paragraph 3.A., Kits/Parts
YesKits/Parts Required
Data Module SB B787-A-27-00-0026-00A-934A-
D, Paragraph 3.B., Parts and Materials Supplied
by the Operator
YesOperator Supplied Parts/Material
Data Module SB B787-A-27-00-0026-00A-934A-
D, Paragraph 6., Special Tooling Necessary to
do this Service Bulletin
YesSpecial Tooling Required
Boeing Service Related Problem (SRP) 787 SRP-27-0227 is related to this service bulletin.
3. ACTION
(CN-AA40116J)
Do these work packages:
1. WORK PACKAGE 1: MARKER INSTALLATION
Group 1, Configuration 2; Group 2:
2. WORK PACKAGE 2: LEFT HYDRAULIC SYSTEM FLUID TEST
Group 1, Configuration 2; Group 2:
3. WORK PACKAGE 3: RIGHT HYDRAULIC SYSTEM FLUID TEST
Group 1, Configuration 2; Group 2:
4. WORK PACKAGE 4: CENTER HYDRAULIC SYSTEM FLUID TEST AND LEFT AND RIGHT ELEVATOR
AND AILERON POWER CONTROL UNIT INTERNAL FLOW TEST
Group 1-2:
4. EFFECTIVITY
787-8 Airplanes. Refer to Data Module SB B787-A-27-00-0026-00A-932A-D, Paragraph 1., Effectivity for
the list of affected airplanes.
5. COMPLIANCE
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to this
service bulletin. The Airworthiness Directive will make the compliance tasks and times given in this service
bulletin mandatory.
B787-A-27-00-0026-00A-931C-DApplicable To:
Issue 001, 25 Nov 2014Model 787
See Applicability of this data module
Page 9 of 77
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB270026-00
Issue 001, 25 Nov 2014
AIRCRAFT SERVICE BULLETIN

### Page 10

Refer to Data Module SB B787-A-27-00-0026-00A-932A-D, Paragraph 5., Compliance.
6. INDUSTRY SUPPORT INFORMATION
Boeing Industry Support information is provided in Program Letter BPL 6-1151-787-PGM-206, dated August
15, 2014. Additional copies of program letters are available from Boeing Fleet Support Contracts - Warranty.
7. MANPOWER
Refer to Data Module SB B787-A-27-00-0026-00A-932A-D, Paragraph 7., Manpower.
8. MATERIAL INFORMATION
Operator Supplied Parts/Materials.
Refer to Data Module SB B787-A-27-00-0026-00A-934A-D, Paragraph 1., Material - Price and Availability.
ICN-B787-A-000061-A-81205-09065-A-01-1
Figure 1  
B787-A-27-00-0026-00A-931C-DApplicable To:
Issue 001, 25 Nov 2014End of data moduleModel 787
See Applicability of this data module
Page 10 of 77
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB270026-00
Issue 001, 25 Nov 2014
AIRCRAFT SERVICE BULLETIN

### Page 11

Alert Service Bulletin B787-81205-SB270026-00
PLANNING INFORMATION
THIS ALERT SERVICE BULLETIN IS SENT TO THE OPERATORS OF RECORD OF THE
AIRPLANES SHOWN IN PARAGRAPH 1., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED
Alert:
OR SOLD, SEND THIS SERVICE BULLETIN TO THE NEW OPERATOR. IF APPLICABLE SPARES
HAVE BEEN SOLD, SEND THIS SERVICE BULLETIN TO THE NEW OWNER.
References
TitleReference
Work InstructionsSB B787-A-27-00-0026-00A-933A-D Issue 001, Step 2.
Alert Service Bulletin
B787-81205-SB270026-00 – Appendix A – LOGIC
SB B787-A-27-00-0026-0AA-931D-D Issue 001
DIAGRAM FOR PARAGRAPH 1.E. COMPLIANCE:
TABLE 5 LEFT, RIGHT AND CENTER HYDRAULIC
SYSTEM FLUID MARKER INSTALLATION [Group
1-2:]
Alert Service Bulletin
B787-81205-SB270026-00 – Appendix B – LOGIC
SB B787-A-27-00-0026-0BA-931D-D Issue 001
DIAGRAM FOR PARAGRAPH 1.E. COMPLIANCE:
TABLE 6 LEFT HYDRAULIC SYSTEM FLUID TEST
[Group 1, Configuration 2; Group 2: ]
Alert Service Bulletin
B787-81205-SB270026-00 – Appendix C – LOGIC
SB B787-A-27-00-0026-0CA-931D-D Issue 001
DIAGRAM FOR PARAGRAPH 1.E. COMPLIANCE:
TABLE 7 RIGHT HYDRAULIC SYSTEM FLUID TEST
[Group 1, Configuration 2; Group 2: ]
Alert Service Bulletin
B787-81205-SB270026-00 – Appendix D – LOGIC
SB B787-A-27-00-0026-0DA-931D-D Issue 001
DIAGRAM FOR PARAGRAPH 1.E. COMPLIANCE:
TABLE 8 CENTER HYDRAULIC SYSTEM FLUID
TEST AND LEFT AND RIGHT ELEVATOR AND
AILERON POWER CONTROL UNIT INTERNAL
FLOW TEST [Group 1, Configuration 2; Group 2: ]
Alert Service Bulletin
B787-81205-SB270026-00 – Appendix E – LOGIC
SB B787-A-27-00-0026-0EA-931D-D Issue 001
DIAGRAM FOR PARAGRAPH 1.E. COMPLIANCE:
TABLE 9 WORK PACKAGE 5 AND WORK
B787-A-27-00-0026-00A-932A-DApplicable To:
Issue 001, 25 Nov 2014Model 787
See Applicability of this data module
Page 11 of 77
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB270026-00
Issue 001, 25 Nov 2014
AIRCRAFT SERVICE BULLETIN

### Page 12

TitleReference
PACKAGE 6 CONDITIONS AND ACTIONS [Group
1, Configuration 2; Group 2: ]
Alert Service Bulletin
B787-81205-SB270026-00 – Appendix F – LOGIC
SB B787-A-27-00-0026-0FA-931D-D Issue 001
DIAGRAM FOR PARAGRAPH 1.E. COMPLIANCE:
TABLE 10 WORK PACKAGE 7 AND WORK
PACKAGE 8 CONDITIONS AND ACTIONS [Group
1, Configuration 2; Group 2: ]
HYDRAULIC POWER - Hydraulic System - HyJet V
Marker Installation
SB B787-81205-SB290022-00 Issue 001
FLIGHT CONTROLS - Elevator Control System -
Elevator Power Control Unit Electro-Hydraulic Servo
Valve Rate Restriction Test
SB B787-81205-SB270016-00
JACKING787 AMM 07-11-01
HYDRAULIC SYSTEMS787 AMM 12-12-01
TUBE787 AMM 20-10-09
PRIMARY FLIGHT CONTROL FUNCTION787 AMM 27-02-00
AILERON POWER CONTROL UNIT787 AMM 27-11-19
ELEVATOR POWER CONTROL UNIT787 AMM 27-31-09
HYDRAULIC SYSTEM787 AMM 29-11-00
RAM AIR TURBINE SYSTEM787 AMM 29-21-00
LANDING GEAR DOOR SAFETY787 AMM 32-00-15
LANDING GEAR DOWNLOCK PINS787 AMM 32-00-30
CENTRAL MAINTENANCE COMPUTING
FUNCTION
787 AMM 45-11-00
HORIZONTAL STABILIZER TRAILING EDGE SKIN
PANELS
787 AMM 55-16-01
FIXED TRAILING EDGE PANELS787 AMM 57-51-10
HYDRAULIC POWER - Main - Hydraulic Fluid
Replacement
SB B787-81205-SB290010-00
HYDRAULIC POWER - Hydraulic System - HyJet V
Marker Installation
SB B787-81205-SB290022-00
B787-A-27-00-0026-00A-932A-DApplicable To:
Issue 001, 25 Nov 2014Model 787
See Applicability of this data module
Page 12 of 77
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB270026-00
Issue 001, 25 Nov 2014
AIRCRAFT SERVICE BULLETIN

### Page 13

Description
Group 1-2:
1. Effectivity
A. Airplanes
This service bulletin is applicable to 787-8 Airplanes, line numbers 4-9, 20-21 and 23-190 in 2 Group(s).
The Variable Numbers and Group information for the applicable airplanes is given below. An equivalent
change is on subsequent production airplanes. Refer to CN-AA40116 for data about this change.
Table 1  
DESCRIPTIONCONFIGURATIONGROUP
Airplanes delivered with HyJet V hydraulic fluid.-1
Airplanes that have only been serviced with HyJet V.1
Airplanes that have been serviced with hydraulic fluids other than
HyJet V or hydraulic fluid used during system servicing cannot be
determined.
2
Airplanes delivered with Skydrol LD-4.-2
Airplanes that have accomplished Boeing service bulletin B787-81205-
SB29-0010-00 Issue 001 to replace the hydraulic fluid with HyJet V.
1
Airplanes that have not accomplished Boeing service bulletin B787-
81205-SB29-0010-00 Issue 001 to replace the hydraulic fluid with
HyJet V.
2
Airplane Models: 787-8
Table 2  
GroupVariable Number
1ZA004-ZA006
2ZA100-ZA105
2ZA116-ZA120
1ZA121-ZA124
2ZA135
1ZA136
1ZA175-ZA176
2ZA177-ZA185
1ZA186-ZA189
1ZA215-ZA220
1ZA230-ZA232
B787-A-27-00-0026-00A-932A-DApplicable To:
Issue 001, 25 Nov 2014Model 787
See Applicability of this data module
Page 13 of 77
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB270026-00
Issue 001, 25 Nov 2014
AIRCRAFT SERVICE BULLETIN

### Page 14

Table 2  
GroupVariable Number
2ZA233
1ZA234-ZA235
2ZA236-ZA241
1ZA242-ZA245
1ZA260
2ZA261-ZA264
1ZA265-ZA267
2ZA270-ZA273
1ZA274-ZA275
2ZA285-ZA290
1ZA291-ZA295
2ZA317-ZA319
1ZA320
1ZA327
1ZA334
2ZA380
1ZA381-ZA383
2ZA384
1ZA385-ZA389
1ZA430
2ZA431
1ZA432-ZA437
1ZA445-ZA448
2ZA450-ZA451
1ZA452-ZA456
2ZA460-ZA465
1ZA466-ZA474
2ZA506-ZA513
1ZA514-ZA516
2ZA536-ZA538
B787-A-27-00-0026-00A-932A-DApplicable To:
Issue 001, 25 Nov 2014Model 787
See Applicability of this data module
Page 14 of 77
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB270026-00
Issue 001, 25 Nov 2014
AIRCRAFT SERVICE BULLETIN

### Page 15

Table 2  
GroupVariable Number
1ZA539-ZA541
1ZA560-ZA565
2ZA576
1ZA577-ZA580
1ZA586
1ZA588
1ZA610-ZA612
1ZA650-ZA651
1ZA655-ZA656
1ZA778
B. Spares Affected
None.
2. Concurrent Requirements
Table 3  Boeing Service Bulletins Dependencies
NoteDependency TypeDescriptionService Bulletin Issue
PrerequisiteHYDRAULIC POWER - Hydraulic System - Hy-
Jet V Marker Installation
SB B787-81205-SB290022-00
Issue 001, or later approved Is-
sue
3. Reason
787-8 operators have experienced multiple occurrences of EICAS status message FLIGHT CONTROL
SYS with a correlated Power Control Unit (PCU) internal fault maintenance message. Boeing and Moog
(787 actuation system supplier) determined the messages are due to the accumulation of very fine particle
deposits within the PCU's Electro Hydraulic Servo Valve (EHSV) that cause degraded performance due
to reduced EHSV internal hydraulic supply pressures. Failures have only occurred on airplanes that have
operated with Skydrol LD-4 hydraulic fluid. Changing the hydraulic fluid to HyJet V will significantly reduce
the rate of particle deposits in EHSVs. This service bulletin instructs operators to change their hydraulic
fluid to HyJet V and to perform an internal flow test of the left and right elevator and aileron inboard PCUs
to make sure the flow is not restricted. If the PCUs do not pass the test, replace them. If this service bulletin
is not accomplished, the particle deposits can cause the flight control hydraulic PCUs to fail, which could
lead to reduced controllability of the airplane.
Accomplishment of this service bulletin terminates SB B787-81205-SB270016-00.
Boeing Service Related Problem (SRP) 787 SRP-27-0227 is related to this service bulletin.
B787-A-27-00-0026-00A-932A-DApplicable To:
Issue 001, 25 Nov 2014Model 787
See Applicability of this data module
Page 15 of 77
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB270026-00
Issue 001, 25 Nov 2014
AIRCRAFT SERVICE BULLETIN

### Page 16

4. Description
Do these work packages:
1. WORK PACKAGE 1: MARKER INSTALLATION
Group 1, Configuration 2; Group 2:
2. WORK PACKAGE 2: LEFT HYDRAULIC SYSTEM FLUID TEST
Group 1, Configuration 2; Group 2:
3. WORK PACKAGE 3: RIGHT HYDRAULIC SYSTEM FLUID TEST
Group 1, Configuration 2; Group 2:
4. WORK PACKAGE 4: CENTER HYDRAULIC SYSTEM FLUID TEST AND LEFT AND RIGHT ELEVATOR
AND AILERON POWER CONTROL UNIT INTERNAL FLOW TEST
Group 1-2:
The work in this service bulletin is done in the maintenance zone(s) given below.
Table 4  
Affected Maintenance Zones
ZoneModel
197, 335, 336, 345, 346, 434, 444, 561, 567,
661, 667
787-8
5. Compliance
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to this
service bulletin. The Airworthiness Directive will make the compliance tasks and times given in this service
bulletin mandatory.
Do the required actions in accordance with Data Module SB B787-A-27-00-0026-00A-933A-D, Step 2.,
Work Instructions.
When more than one OPTION is given for a CONDITION, do only one of the OPTION numbers. When
more than one ACTION is given for a CONDITION number or an OPTION number, do all of the ACTION
numbers for that CONDITION number or OPTION number.
Logic diagrams showing compliance tasks and compliance times are included as an aid in Data Module
Appendix A, SB B787-A-27-00-0026-0AA-931D-D, Data Module Appendix B, SB B787-A-27-00-0026-0BA-
931D-D, Data Module Appendix C, SB B787-A-27-00-0026-0CA-931D-D, Data Module Appendix D, SB
B787-A-27-00-0026-0DA-931D-D, Data Module Appendix E, SB B787-A-27-00-0026-0EA-931D-D and
Data Module Appendix F, SB B787-A-27-00-0026-0FA-931D-D.
B787-A-27-00-0026-00A-932A-DApplicable To:
Issue 001, 25 Nov 2014Model 787
See Applicability of this data module
Page 16 of 77
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB270026-00
Issue 001, 25 Nov 2014
AIRCRAFT SERVICE BULLETIN

### Page 17

Table 5  Left, Right and Center Hydraulic System Fluid Marker Installation
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
-Within 36 months
after the Issue 001
date of this service
bulletin.
Do WORK PACKAGE 1:
MARKER INSTALLATION.*[1]
*[2]
All Airplanes
*[1]  No further action required for Group 1, Configuration 1 after WORK PACKAGE 1 is done. Accomplishment of this service bull etin
terminates SB B787-81205-SB270016-00.
*[2]  No further action required for Group 1, Configuration 2 and Group 2 after WORK PACKAGE 1 thru WORK PACKAGE 4 are done.
See Tables 5, 6, 7 and 8. Accomplishment of this service bulletin terminates SB B787-81205-SB270016-00.
Group 1, Configuration 2; Group 2:
Table 6  Left Hydraulic System Fluid Test
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
-Within 36 months
after the Issue 001
date of this service
bulletin.
Do WORK PACKAGE 2: LEFT
HYDRAULIC SYSTEM FLUID
TEST. *[1]
All Airplanes
--No further action required for
WORK PACKAGE 2. *[2]
CONDITION 1: PASSES THE
HYDRAULIC FLUID TEST
-Within 36 months
after the Issue 001
date of this service
bulletin.
CONDITION 2 (ACTION 1): Do
PART 4: REPLACE HY-
DRAULIC FLUID and do PART
2: CYCLE HYDRAULIC FLUID.
CONDITION 2: DOES NOT
PASS THE HYDRAULIC FLUID
TEST
-Within 36 months
after the Issue 001
date of this service
bulletin.*[3]
CONDITION 2 (ACTION 2): Do
PART 3: HYDRAULIC FLUID
TEST until CONDITION 1 is
met.
*[1]  It is acceptable to put the airplane back to a serviceable condition and return the airplane to service before the test results are received.
*[2]  No further action required for Group 1, Configuration 2 and Group 2 after WORK PACKAGE 1 thru WORK PACKAGE 4 are done.
See Tables 5, 6, 7 and 8. Accomplishment of this service bulletin terminates SB B787-81205-SB270016-00.
*[3]  CONDITION 2 (ACTION 2) can be done any time between CONDITION 2 (ACTION 1) and the Compliance Time.
B787-A-27-00-0026-00A-932A-DApplicable To:
Issue 001, 25 Nov 2014Model 787
See Applicability of this data module
Page 17 of 77
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB270026-00
Issue 001, 25 Nov 2014
AIRCRAFT SERVICE BULLETIN

### Page 18

Group 1, Configuration 2; Group 2:
Table 7  Right Hydraulic System Fluid Test
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
-Within 36 months
after the Issue 001
date of this service
bulletin.
Do WORK PACKAGE 3: RIGHT
HYDRAULIC SYSTEM FLUID
TEST. *[1]
All Airplanes
--No further action required for
WORK PACKAGE 3. *[2]
CONDITION 3: PASSES THE
HYDRAULIC FLUID TEST
-Within 36 months
after the Issue 001
date of this service
bulletin.
CONDITION 4 (ACTION 1): Do
PART 4: REPLACE HY-
DRAULIC FLUID and do PART
2: CYCLE HYDRAULIC FLUID.
CONDITION 4: DOES NOT
PASS THE HYDRAULIC FLUID
TEST
-Within 36 months
after the Issue 001
date of this service
bulletin. *[3]
CONDITION 4 (ACTION 2): Do
PART 3: HYDRAULIC FLUID
TEST until CONDITION 3 is
met.
*[1]  It is acceptable to put the airplane back to a serviceable condition and return the airplane to service before the test results are received.
*[2]  No further action required for Group 1, Configuration 2 and Group 2 after WORK PACKAGE 1 thru WORK PACKAGE 4 are done.
See Tables 5, 6 7 and 8. Accomplishment of this service bulletin terminates SB B787-81205-SB270016-00.
*[3]  CONDITION 4 (ACTION 2) can be done any time between CONDITION 4 (ACTION 1) and the Compliance Time.
B787-A-27-00-0026-00A-932A-DApplicable To:
Issue 001, 25 Nov 2014Model 787
See Applicability of this data module
Page 18 of 77
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB270026-00
Issue 001, 25 Nov 2014
AIRCRAFT SERVICE BULLETIN

### Page 19

Group 1, Configuration 2; Group 2:
Table 8  Center Hydraulic System Fluid Test and Left and Right Elevator and Aileron Power Control Unit 
Internal Flow Test
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
-Within 36 months
after the Issue 001
date of this service
bulletin.
Do WORK PACKAGE 4: CEN-
TER HYDRAULIC SYSTEM
FLUID TEST AND LEFT AND
RIGHT ELEVATOR AND
AILERON POWER CONTROL
UNIT INTERNAL FLOW TEST.
*[1]
All Airplanes
-Within 36 months
after the Issue 001
date of this service
bulletin.
CONDITION 5 (ACTION 1): Do
WORK PACKAGE 5: LEFT EL-
EVATOR INBOARD POWER
CONTROL UNIT INTERNAL
FLOW TEST. *[3] *[4] *[5]
CONDITION 5: PASSES THE
HYDRAULIC FLUID TEST *[2]
-Within 36 months
after the Issue 001
date of this service
bulletin.
CONDITION 5 (ACTION 2): Do
WORK PACKAGE 6: RIGHT
ELEVATOR INBOARD POWER
CONTROL UNIT INTERNAL
FLOW TEST. *[3] *[4] *[5]
-Within 36 months
after the Issue 001
date of this service
bulletin.
CONDITION 5 (ACTION 3): Do
WORK PACKAGE 7: LEFT
AILERON INBOARD POWER
CONTROL UNIT INTERNAL
FLOW TEST. *[3] *[4] *[6]
Within 36 months
after the Issue 001
date of this service
bulletin.
CONDITION 5 (ACTION 4): Do
WORK PACKAGE 8: RIGHT
AILERON INBOARD POWER
CONTROL UNIT INTERNAL
FLOW TEST. *[3] *[4] *[6]
-Within 36 months
after the Issue 001
date of this service
bulletin.
CONDITION 6 (ACTION 1): Do
PART 4: REPLACE HY-
DRAULIC FLUID and do PART
2: CYCLE HYDRAULIC FLUID.
CONDITION 6: DOES NOT
PASS THE HYDRAULIC FLUID
TEST
-Within 36 months
after the Issue 001
date of this service
bulletin. *[7]
CONDITION 6 (ACTION 2): Do
PART 3: HYDRAULIC FLUID
TEST until CONDITION 5 is
met.
*[1]  It is acceptable to put the airplane back to a serviceable condition and return the airplane to service before the test results are received.
*[2]  CONDITION 5 (ACTION 1) thru CONDITION 5 (ACTION 4) can be done in any sequence. It is acceptable to put the airplane back
to a serviceable condition and return the airplane to service after each action independently.
B787-A-27-00-0026-00A-932A-DApplicable To:
Issue 001, 25 Nov 2014Model 787
See Applicability of this data module
Page 19 of 77
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB270026-00
Issue 001, 25 Nov 2014
AIRCRAFT SERVICE BULLETIN

### Page 20

Table 8  Center Hydraulic System Fluid Test and Left and Right Elevator and Aileron Power Control Unit 
Internal Flow Test
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
*[3]  No further action required for WORK PACKAGE 4 after CONDITION 5 (ACTION 1) thru CONDITION 5 (ACTION 4) are done.
*[4]  No further action required for Group 1, Configuration 2 and Group 2 after WORK PACKAGE 1 thru WORK PACKAGE 4 are done.
See Tables 5, 6, 7 and 8. Accomplishment of this service bulletin terminates SB B787-81205-SB270016-00.
*[5]  See table 9 for disposition of WORK PACKAGE 5 and WORK PACKAGE 6 conditions and actions.
*[6]  See table 10 for disposition of WORK PACKAGE 7 and WORK PACKAGE 8 conditions and actions.
*[7]  CONDITION 6 (ACTION 2) can be done any time between CONDITION 6 (ACTION 1) and the Compliance Time.
Group 1, Configuration 2; Group 2:
The Conditions, Actions and Compliance times shown in Table 9 apply to each WORK PACKAGE, 5 and
6, independently.
Group 1, Configuration 2; Group 2:
Table 9  WORK PACKAGE 5 and WORK PACKAGE 6 Conditions and Actions
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
--No further action required for
the applicable work package.
CONDITION 5.1: THE ELEVA-
TOR INBOARD POWER CON-
TROL UNIT HAS LESS THAN
300 FLIGHT HOURS IN SER-
VICE
-Within 36 months
after the Issue 001
date of this service
bulletin.
OPTION 1: Do PART 5: ELEVA-
TOR INBOARD POWER CON-
TROL UNIT INTERNAL FLOW
TEST.
CONDITION 5.2: THE ELEVA-
TOR INBOARD POWER CON-
TROL UNIT HAS 300 FLIGHT
HOURS OR MORE IN SER-
VICE -Within 36 months
after the Issue 001
date of this service
bulletin.
OPTION 2: Do PART 7: RE-
PLACE THE POWER CON-
TROL UNIT. No further action
required for the applicable work
package.
B787-A-27-00-0026-00A-932A-DApplicable To:
Issue 001, 25 Nov 2014Model 787
See Applicability of this data module
Page 20 of 77
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB270026-00
Issue 001, 25 Nov 2014
AIRCRAFT SERVICE BULLETIN

### Page 21

Table 9  WORK PACKAGE 5 and WORK PACKAGE 6 Conditions and Actions
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
--No further action required for
the applicable work package.
CONDITION 5.2.1: THE INTER-
NAL FLOW THROUGH THE
ELEVATOR INBOARD POWER
CONTROL UNIT IS GREATER
THAN OR EQUAL TO 0.094
GALLONS PER MINUTE AND
IS LESS THAN OR EQUAL TO
0.560 GALLONS PER MINUTE
-Within 36 months
after the Issue 001
date of this service
bulletin.
Do PART 7: REPLACE THE
POWER CONTROL UNIT. No
further action required for the
applicable work package.
CONDITION 5.2.2: THE INTER-
NAL FLOW THROUGH THE
ELEVATOR INBOARD POWER
CONTROL UNIT IS LESS
THAN 0.094 GALLONS PER
MINUTE OR IS GREATER
THAN 0.560 GALLONS PER
MINUTE
Group 1, Configuration 2; Group 2:
The Conditions, Actions and Compliance times shown in Table 10 apply to apply to each WORK PACKAGE,
7 and 8, independently.
Group 1, Configuration 2; Group 2:
Table 10  WORK PACKAGE 7 and WORK PACKAGE 8 Conditions and Actions
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
--No further action required for
the applicable work package.
CONDITION 5.3: THE
AILERON INBOARD POWER
CONTROL UNIT HAS LESS
THAN 300 FLIGHT HOURS IN
SERVICE
-Within 36 months
after the Issue 001
date of this service
bulletin.
OPTION 3: Do PART 6:
AILERON INBOARD POWER
CONTROL UNIT INTERNAL
FLOW TEST.
CONDITION 5.4: THE
AILERON INBOARD POWER
CONTROL UNIT HAS 300
FLIGHT HOURS OR MORE IN
SERVICE -Within 36 months
after the Issue 001
date of this service
bulletin.
OPTION 4: Do PART 7: RE-
PLACE THE POWER CON-
TROL UNIT. No further action
required for the applicable work
package.
B787-A-27-00-0026-00A-932A-DApplicable To:
Issue 001, 25 Nov 2014Model 787
See Applicability of this data module
Page 21 of 77
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB270026-00
Issue 001, 25 Nov 2014
AIRCRAFT SERVICE BULLETIN

### Page 22

Table 10  WORK PACKAGE 7 and WORK PACKAGE 8 Conditions and Actions
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
--No further action required for
the applicable work package.
CONDITION 5.4.1: THE INTER-
NAL FLOW THROUGH THE
AILERON INBOARD POWER
CONTROL UNIT IS GREATER
THAN OR EQUAL TO 0.094
GALLONS PER MINUTE AND
IS LESS THAN OR EQUAL TO
0.297 GALLONS PER MINUTE
-Within 36 months
after the Issue 001
date of this service
bulletin.
Do PART 7: REPLACE THE
POWER CONTROL UNIT. No
further action required for the
applicable work package.
CONDITION 5.4.2: THE INTER-
NAL FLOW THROUGH THE
AILERON INBOARD POWER
CONTROL UNIT IS LESS
THAN 0.094 GALLONS PER
MINUTE OR IS GREATER
THAN 0.297 GALLONS PER
MINUTE
Group 1-2:
6. Approval
This service bulletin was examined by the Federal Aviation Administration (FAA). The changes specified
in this service bulletin comply with the applicable regulations and are FAA approved, as well as European
Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/JAA approved air-
planes listed in the service bulletin effectivity. This service bulletin and its approval were based on the airplane
in its original Boeing delivery configuration or as modified by other approved Boeing changes.
If an airplane has a non-Boeing modification or repair that affects a component or system also affected by
this service bulletin, the operator is responsible for obtaining appropriate regulatory agency approval before
incorporating this service bulletin.
7. Manpower
The table below shows an estimate of the task hours necessary to do this change for each airplane. This
estimate is for direct labor only, done by an experienced crew. Adjust the estimate with operator task hour
data if necessary. The estimate does not include lost time. These are some examples of lost time:
– Time to adjust to the workplace
– Time to schedule the work
– Time to inspect the work
– Time to cure the materials
– Time to make the parts
– Time to find the tools
B787-A-27-00-0026-00A-932A-DApplicable To:
Issue 001, 25 Nov 2014Model 787
See Applicability of this data module
Page 22 of 77
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB270026-00
Issue 001, 25 Nov 2014
AIRCRAFT SERVICE BULLETIN

### Page 23

Table 11  WORK PACKAGE 1: MARKER INSTALLATION
Elapsed HoursTask HoursNumber of PersonsTask
*[1]*[1]*[1]Install markers in accordance with
SB B787-81205-SB290022-00 Issue
001 or later approved Issue.
*[1] *[2]*[1] *[2]TOTAL FOR EACH AIRPLANE
*[1]  Refer to SB B787-81205-SB290022-00 Issue 001 or later approved issue.
*[2]  Task Hours and Elapsed Hours do not include the time to find airplane configuration.
WORK PACKAGE 1 must be done first or at the same time as WORK PACKAGE 2, WORK PACKAGE 3
or WORK PACKAGE 4.
Group 1, Configuration 2; Group 2:
Table 12  WORK PACKAGE 2: LEFT HYDRAULIC SYSTEM FLUID TEST
Elapsed HoursTask HoursNumber of PersonsTask
4.50 *[1]13.50 *[1]3PART 1 *[1]
1.50 *[1]3.00 *[1]2PART 2 *[1]
0.501.002PART 3
4.50 *[2]13.50 *[2]3PART 4 *[2]
0.501.00TOTAL FOR EACH AIRPLANE
*[1]  Add Task Hours and Elapsed Hours for Group 2, Configuration 2.
*[2]  Add Task Hours and Elapsed Hours for CONDITION 2.
Group 1, Configuration 2; Group 2:
Table 13  WORK PACKAGE 3: RIGHT HYDRAULIC SYSTEM FLUID TEST
Elapsed HoursTask HoursNumber of PersonsTask
4.50 *[1]13.50 *[1]3PART 1 *[1]
1.50 *[1]3.00 *[1]2 *[1]PART 2 *[1]
0.501.002PART 3
4.50 *[2]13.50 *[2]3PART 4 *[2]
0.501.00TOTAL FOR EACH AIRPLANE
*[1]  Add Task Hours and Elapsed Hours for Group 2, Configuration 2.
*[2]  Add Task Hours and Elapsed Hours for CONDITION 4.
B787-A-27-00-0026-00A-932A-DApplicable To:
Issue 001, 25 Nov 2014Model 787
See Applicability of this data module
Page 23 of 77
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB270026-00
Issue 001, 25 Nov 2014
AIRCRAFT SERVICE BULLETIN

### Page 24

Group 1, Configuration 2; Group 2:
Table 14  WORK PACKAGE 4: CENTER HYDRAULIC SYSTEM FLUID TEST AND LEFT 
AND RIGHT ELEVATOR AND AILERON POWER CONTROL UNIT INTERNAL FLOW TEST
Elapsed HoursTask HoursNumber of PersonsTask
5.50 *[1]16.50 *[1]3PART 1 *[1]
3.75 *[1]7.50 *[1]2PART 2 *[1]
0.501.002PART 3
5.50 *[2]16.50 *[2]3PART 4 *[2]
*[3]*[3]WORK PACKAGE 5 *[3]
*[3]*[3]WORK PACKAGE 6 *[3]
*[3]*[3]WORK PACKAGE 7 *[3]
*[3]*[3]WORK PACKAGE 8 *[3]
0.50 *[3]1.00 *[3]TOTAL FOR AIRPLANE
*[1]  Add Task Hours and Elapsed Hours for Group 2, Configuration 2.
*[2]  Add Task Hours and Elapsed Hours for CONDITION 6.
*[3]  See Tables 15 thru 18. Add Task Hours and Elapsed Hours for WORK PACKAGE 5 thru WORK PACKAGE 8.
Group 1, Configuration 2; Group 2:
Table 15  WORK PACKAGE 5: LEFT ELEVATOR INBOARD POWER CONTROL UNIT 
INTERNAL FLOW TEST
Elapsed HoursTask HoursNumber of PersonsTask
2.00 *[1]4.00 *[1]2PART 5 *[1]
14.50 *[2]29.00 *[2]2PART 7 *[2]
*[3]*[3]TOTAL FOR AIRPLANE
*[1]  Add Task Hours and Elapsed Hours for OPTION 1.
*[2]  Add Task Hours and Elapsed Hours for CONDITION 5.2.2 or OPTION 2.
*[3]  Task Hours and Elapsed Hours do not include the time to find power control unit time in service.
B787-A-27-00-0026-00A-932A-DApplicable To:
Issue 001, 25 Nov 2014Model 787
See Applicability of this data module
Page 24 of 77
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB270026-00
Issue 001, 25 Nov 2014
AIRCRAFT SERVICE BULLETIN

### Page 25

Group 1, Configuration 2; Group 2:
Table 16  WORK PACKAGE 6: RIGHT ELEVATOR INBOARD POWER CONTROL UNIT 
INTERNAL FLOW TEST
Elapsed HoursTask HoursNumber of PersonsTask
2.00 *[1]4.00 *[1]2PART 5 *[1]
14.50 *[2]29.00 *[2]2PART 7 *[2]
*[3]*[3]TOTAL FOR AIRPLANE
*[1]  Add Task Hours and Elapsed Hours for OPTION 1.
*[2]  Add Task Hours and Elapsed Hours for CONDITION 5.2.2 or OPTION 2.
*[3]  Task Hours and Elapsed Hours do not include the time to find power control unit time in service.
Group 1, Configuration 2; Group 2:
Table 17  WORK PACKAGE 7: LEFT AILERON INBOARD POWER CONTROL UNIT INTERNAL
 FLOW TEST
Elapsed HoursTask HoursNumber of PersonsTask
2.00 *[1]4.00 *[1]2PART 6 *[1]
14.50 *[2]29.00 *[2]2PART 7 *[2]
*[3]*[3]TOTAL FOR AIRPLANE
*[1]  Add Task Hours and Elapsed Hours for OPTION 3.
*[2]  Add Task Hours and Elapsed Hours for CONDITION 5.4.2 or OPTION 4.
*[3]  Task Hours and Elapsed Hours do not include the time to find power control unit time in service.
Group 1, Configuration 2; Group 2:
Table 18  WORK PACKAGE 8: RIGHT AILERON INBOARD POWER CONTROL UNIT 
INTERNAL FLOW TEST
Elapsed HoursTask HoursNumber of PersonsTask
2.00 *[1]4.00 *[1]2PART 6 *[1]
14.50 *[2]29.00 *[2]2PART 7 *[2]
*[3]*[3]TOTAL FOR AIRPLANE
*[1]  Add Task Hours and Elapsed Hours for OPTION 3.
*[2]  Add Task Hours and Elapsed Hours for CONDITION 5.4.2 or OPTION 4.
*[3]  Task Hours and Elapsed Hours do not include the time to find power control unit time in service.
Group 1-2:
8. Weight and Balance Changes
None.
B787-A-27-00-0026-00A-932A-DApplicable To:
Issue 001, 25 Nov 2014Model 787
See Applicability of this data module
Page 25 of 77
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB270026-00
Issue 001, 25 Nov 2014
AIRCRAFT SERVICE BULLETIN

### Page 26

9. Electrical Load Data
Not changed.
10. References
A. Existing Data:
1. Change Notice CN-AA40116J
2. Aircraft Maintenance Manual (AMM) 787 AMM 07-11-01, 787 AMM 12-12-01, 787 AMM 20-10-
09, 787 AMM 27-02-00, 787 AMM 27-11-19, 787 AMM 27-31-09, 787 AMM 29-11-00, 787 AMM
29-21-00, 787 AMM 32-00-15, 787 AMM 32-00-30, 787 AMM 45-11-00, 787 AMM 55-16-01, 787
AMM 57-51-10
3. Boeing Program Letter (BPL) BPL 6-1151-787-PGM-206, dated August 15, 2014
4. Boeing Service Bulletin (SB) SB B787-81205-SB270016-00, SB B787-81205-SB290010-00, SB
B787-81205-SB290022-00
5. Boeing Service Related Problem (SRP) 787 SRP-27-0227
B. Data Supplied with this Service Bulletin:
None.
C. Installation Requirement Modules Used in the Preparation of this Service Bulletin:
None.
11. Publications Affected
Table 19  
Chapter-SectionPublication
12-12, 20-10, 27-51, 27-81, 29-11, 29-18,
29-21, 29-31, 29-32, 32-32, 32-34, 32-35,
32-51, 54-64, G71-00, G78-31, G78-34,
R78-31, R78-34
787 Maintenance Manual
27-10787 Fault Isolation Manual
Damage Tolerance Based Structural Inspections:
Boeing has evaluated the repairs and/or changes in this service bulletin for effects on Fatigue Critical
Structure (FCS) and for changes to Damage Tolerance Inspections (DTI) required in the Maintenance
Program. This service bulletin does not affect FCS, therefore DTIs are not necessary.
12. Interchangeability and Intermixability of Parts
Accomplishment of this service bulletin does not affect interchangeability or intermixability of parts.
13. Software Accomplishment Summary
Not Affected.
B787-A-27-00-0026-00A-932A-DApplicable To:
Issue 001, 25 Nov 2014End of data moduleModel 787
See Applicability of this data module
Page 26 of 77
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB270026-00
Issue 001, 25 Nov 2014
AIRCRAFT SERVICE BULLETIN

### Page 27

Alert Service Bulletin B787-81205-SB270026-00
MATERIAL INFORMATION
THIS ALERT SERVICE BULLETIN IS SENT TO THE OPERATORS OF RECORD OF THE
AIRPLANES SHOWN IN DATA MODULE SB B787-A-27-00-0026-00A-932A-D, PARAGRAPH 1.,
Alert:
EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND THIS SERVICE BULLETIN
TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS SERVICE
BULLETIN TO THE NEW OWNER.
References
TitleReference
ReferencesSB B787-A-27-00-0026-00A-932A-D Issue 001,
Paragraph 10.
Description
Group 1-2:
1. Material - Price and Availability
The operator can supply the parts and materials shown in Paragraph 3., Parts Necessary for Each Airplane.
As an alternative, operators can purchase the parts from Boeing Spares. This service bulletin does not show
the Boeing price and supply data.
2. Industry Support Information
Boeing Industry Support information is provided in Program Letter BPL 6-1151-787-PGM-206, dated August
15, 2014. Additional copies of program letters are available from Boeing Fleet Support Contracts - Warranty.
3. Parts Necessary for Each Airplane
A. Kits/Parts:
None.
B. Parts and Materials Supplied by the Operator:
Table 1  
NotesNameQTYPart Number /
Specification
Group 1, Configuration 2
and Group 2 only. *[1]
Hydraulic Fluid350 gal-
lons
HyJet V
B787-A-27-00-0026-00A-934A-DApplicable To:
Issue 001, 25 Nov 2014Model 787
See Applicability of this data module
Page 27 of 77
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB270026-00
Issue 001, 25 Nov 2014
AIRCRAFT SERVICE BULLETIN

### Page 28

Table 1  
NotesNameQTYPart Number /
Specification
*[1]  ExxonMobil Oil Corporation.
Address:
Anderol Specialty Lubricants, a Division of Chemtura
215 Merry Lane
East Hanover, NJ 07936
For procurement, contact ExxonMobil Oil Corporation.
C. Parts Modified and Reidentified:
None.
D. Parts Removed and Not Replaced:
None.
4. Parts Necessary to Change Spares
None.
5. Special Tooling - Price and Availability
Boeing can supply the tool(s) shown in Paragraph 6., Special Tooling Necessary to do this Service Bulletin.
Operators are encouraged to share schedule requirements with Boeing for incorporation of the service bulletin
by e-mail to ServiceBulletinRentalLoanTools@boeing.com. The tool(s) are subject to the terms and conditions
of the Boeing standard purchase order acknowledgement. Prices are in United States Dollars. Terms: Net
30 days.
Reference this service bulletin number and submit purchase order by one of the methods:
1. Order on-line via ATA Spec 2000 or Boeing Part Page
2. Fax to (206) 662-8237
Table 2  Rental Data:
Daily Price as of
the Issue 001
date of this Ser-
vice Bulletin (US
Dollars)
NameTool Kit Number
$340.00HYDRAULIC FLUID CHECK
TOOLTSF036Z0229 *[1]
*[1]  Group 1, Configuration 2 and Group 2 only.
6. Special Tooling Necessary to do this Service Bulletin
To get the tools shown below, refer to Paragraph 5., Special Tooling - Price and Availability. Maintenance
and overhaul tools in the manuals given in Data Module SB B787-A-27-00-0026-00A-932A-D, Paragraph
10., References, can also be necessary. Examine operator tool supply to make sure all necessary tools are
available.
B787-A-27-00-0026-00A-934A-DApplicable To:
Issue 001, 25 Nov 2014Model 787
See Applicability of this data module
Page 28 of 77
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB270026-00
Issue 001, 25 Nov 2014
AIRCRAFT SERVICE BULLETIN

### Page 29

Table 3  
NameTool Kit Number
HYDRAULIC FLUID CHECK
TOOLTSF036Z0229 *[1]
*[1]  Group 1, Configuration 2 and Group 2 only.
B787-A-27-00-0026-00A-934A-DApplicable To:
Issue 001, 25 Nov 2014End of data moduleModel 787
See Applicability of this data module
Page 29 of 77
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB270026-00
Issue 001, 25 Nov 2014
AIRCRAFT SERVICE BULLETIN

### Page 30

Alert Service Bulletin B787-81205-SB270026-00
ACCOMPLISHMENT INSTRUCTIONS
THIS ALERT SERVICE BULLETIN IS SENT TO THE OPERATORS OF RECORD OF THE
AIRPLANES SHOWN IN DATA MODULE SB B787-A-27-00-0026-00A-932A-D, PARAGRAPH 1.,
Alert:
EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND THIS SERVICE BULLETIN
TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS SERVICE
BULLETIN TO THE NEW OWNER.
References
TitleReference
ReferencesSB B787-A-27-00-0026-00A-932A-D Issue 001,
Paragraph 10.
ManpowerSB B787-A-27-00-0026-00A-932A-D Issue 001,
Paragraph 7.
ComplianceSB B787-A-27-00-0026-00A-932A-D Issue 001,
Paragraph 5.
Alert Service Bulletin
B787-81205-SB270026-00 – Appendix G – TEST
SCREENS [Group 1, Configuration 2; Group 2: ]
SB B787-A-27-00-0026-0GA-931D-D Issue 001
HYDRAULIC POWER - Hydraulic System - HyJet V
Marker Installation
SB B787-81205-SB290022-00 Issue 001
HYDRAULIC SYSTEM787 AMM 29-11-00
JACKING787 AMM 07-11-01
RAM AIR TURBINE SYSTEM787 AMM 29-21-00
LANDING GEAR DOWNLOCK PINS787 AMM 32-00-30
LANDING GEAR DOOR SAFETY787 AMM 32-00-15
HYDRAULIC SYSTEMS787 AMM 12-12-01
PRIMARY FLIGHT CONTROL FUNCTION787 AMM 27-02-00
HORIZONTAL STABILIZER TRAILING EDGE SKIN
PANELS
787 AMM 55-16-01
TUBE787 AMM 20-10-09
CENTRAL MAINTENANCE COMPUTING
FUNCTION
787 AMM 45-11-00
B787-A-27-00-0026-00A-933A-DApplicable To:
Issue 001, 25 Nov 2014Model 787
See Applicability of this data module
Page 30 of 77
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB270026-00
Issue 001, 25 Nov 2014
AIRCRAFT SERVICE BULLETIN

### Page 31

TitleReference
FIXED TRAILING EDGE PANELS787 AMM 57-51-10
AILERON POWER CONTROL UNIT787 AMM 27-11-19
ELEVATOR POWER CONTROL UNIT787 AMM 27-31-09
Procedure
Group 1-2:
1. GENERAL INFORMATION
CAUTION: KEEP THE WORK AREA, WIRES AND ELECTRICAL BUNDLES CLEAN OF METAL PARTI-
CLES OR CONTAMINATION WHEN YOU USE TOOLS. UNWANTED MATERIAL, METAL
PARTICLES OR CONTAMINATION CAUGHT IN WIRE BUNDLES CAN CAUSE DAMAGE
TO THE BUNDLES. DAMAGED WIRE BUNDLES CAN CAUSE SPARKS OR OTHER
ELECTRICAL DAMAGE.
NOTE: 1. Manual titles are referred to by acronyms. Refer to Data Module SB B787-A-27-00-0026-00A-
932A-D, Paragraph 10., References, for definition of the acronyms.
2. Obey all of the warnings and cautions given in the specified manual sections.
3. The work instructions are divided into work packages. Task Hours and Elapsed Hours for each
package are given in Data Module SB B787-A-27-00-0026-00A-932A-D, Paragraph 7., Manpower.
You can do each work package independently. WORK PACKAGE 1 must be done first or at
the same time as WORK PACKAGE 2, WORK PACKAGE 3 or WORK PACKAGE 4.
4. Unless shown differently, these dimensions and tolerances are used:
– Linear dimensions are in inches
– Tolerance on linear dimensions, other than rivet and bolt edge margins, is plus or minus
0.03 inch
– Tolerance on rivet and bolt edge margin is plus or minus 0.05 inch
– Angular tolerance is plus or minus 2 degrees
– Hole dimensions for standard solid rivets and fasteners are in SRM Chapter 51
– Torque Values:
– Values for structural fasteners are given in 787 Structural Repair Manual, Chapter 51.
– Values for airframe maintenance tasks are included in Chapter 20 of 787 Aircraft Main-
tenance Manual (AMM).
– Values for electrical maintenance tasks are included in Chapter 20 of Standard Wiring
Practices Manual (SWPM).
– Values for engine maintenance tasks are included in Chapter 70 of 787 Aircraft Mainte-
nance Manual (AMM).
– Non-standard torque values for maintenance tasks are included in the applicable instal-
lation step.
5. Use the approved fastener, process and material substitutions in accordance with SRM Chapter
51.
B787-A-27-00-0026-00A-933A-DApplicable To:
Issue 001, 25 Nov 2014Model 787
See Applicability of this data module
Page 31 of 77
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB270026-00
Issue 001, 25 Nov 2014
AIRCRAFT SERVICE BULLETIN

### Page 32

6. A Detailed Inspection is defined as: An intensive examination of a specific item, installation, or
assembly to detect damage, failure, or irregularity. Available lighting is normally supplemented
with a direct source of good lighting at an intensity deemed appropriate. Inspection aids such
as mirrors, magnifying lenses, etc. may be necessary. Surface cleaning and elaborate procedures
may be required.
7. These work instructions refer to procedures included in other Boeing documents. When the
words "refer to" are used and the operator has an accepted alternative procedure, the accepted
alternative procedure can be used. When the words "in accordance with" are included in the
instruction, the procedure in the Boeing document must be used.
8. The instructions in Step 2., Work Instructions and the Tasks can include operation of tools or
test equipment. Boeing Engineering Tool Drawings, the Illustrated Tool and Equipment Manual,
and the Special Tool and Ground Handling Drawing Index contain data on versions of the tools
or test equipment that you can use. It is permitted to use replaced tools. It is not permitted to
use superseded tools.
9. If it is necessary to remove more parts for access, you can remove those parts. If you can get
access without removing identified parts, it is not necessary to remove all of the identified parts.
Jacking and shoring limitations must be observed.
10. Where the work instructions include installation of a kept part, a new or serviceable part with
the same part number can be installed as an alternative to the kept part.
11. This service bulletin includes functional test procedures for the systems changed by this service
bulletin. More functional tests can possibly be necessary in accordance with standard mainte-
nance practices because of interruption to other airplane systems.
12. Refer to Appendix A , Appendix B, Appendix C, Appendix D, Appendix E and Appendix F for
logic diagrams(s). Logic diagrams are provided as an aid only. Information contained in Data
Module SB B787-A-27-00-0026-00A-932A-D, Paragraph 5., Compliance, is the primary source
for compliance times. Information in Step 2., Work Instructions, is the primary source for tasks
required for compliance.
13. Use of colors in Tasks is based on guidance from the S1000D International specification for
technical publications.
14. When more than one OPTION is given for a CONDITION, do only one of the OPTION numbers.
When more than one ACTION is given for a CONDITION number or an OPTION number, do
all of the ACTION numbers for that CONDITION number or OPTION number.
15. The compliance times for the actions in Step 2., Work Instructions are in Data Module SB B787-
A-27-00-0026-00A-932A-D, Paragraph 5., Compliance.
16. The CONDITIONS, ACTIONS and OPTIONS shown apply to each WORK PACKAGE, 5 and
6, independently.
17. The CONDITIONS, ACTIONS and OPTIONS shown apply to each WORK PACKAGE, 7 and
8, independently.
18. Some steps in the Work Instructions are identified as Required for Compliance (RC). If this
service bulletin is mandated by an Airworthiness Directive (AD), then the steps identified as RC
must be done to comply with the AD. Alternative procedures for steps not identified with RC can
B787-A-27-00-0026-00A-933A-DApplicable To:
Issue 001, 25 Nov 2014Model 787
See Applicability of this data module
Page 32 of 77
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB270026-00
Issue 001, 25 Nov 2014
AIRCRAFT SERVICE BULLETIN

### Page 33

be used if the RC steps can still be done as specified, and the airplane can be put back in a
serviceable condition. An Alternative Method of Compliance (AMOC) is not necessary for devi-
ations to steps that are not identified as RC.
2. WORK INSTRUCTIONS
A. WORK PACKAGE 1: MARKER INSTALLATION
RC - Install markers in accordance with SB B787-81205-SB290022-00 Issue 001 or later approved
issue.
(1)
(2) Put the airplane back to a serviceable condition.
Group 1, Configuration 2; Group 2:
B. WORK PACKAGE 2: LEFT HYDRAULIC SYSTEM FLUID TEST
Group 2, Configuration 2:
(1) Do PART 1: INITIAL HYDRAULIC FLUID REPLACEMENT and do PART 2: CYCLE HYDRAULIC
FLUID.
Group 1, Configuration 2; Group 2:
(2) Do PART 3: HYDRAULIC FLUID TEST. Boeing will provide the test results to the operator through
the Boeing Communication System. It is acceptable to put the airplane back to a serviceable condition
and return the airplane to service before the test results are received.
(a) CONDITION 1: PASSES THE HYDRAULIC FLUID TEST
No further action required for WORK PACKAGE 2.1)
(b) CONDITION 2: DOES NOT PASS THE HYDRAULIC FLUID TEST
1) CONDITION 2 (ACTION 1): Do PART 4: REPLACE HYDRAULIC FLUID and do PART 2:
CYCLE HYDRAULIC FLUID.
2) CONDITION 2 (ACTION 2): Do PART 3: HYDRAULIC FLUID TEST until CONDITION 1
is met.
(3) Put the airplane back to a serviceable condition.
Group 1, Configuration 2; Group 2:
C. WORK PACKAGE 3: RIGHT HYDRAULIC SYSTEM FLUID TEST
Group 2, Configuration 2:
(1) Do PART 1: INITIAL HYDRAULIC FLUID REPLACEMENT and do PART 2: CYCLE HYDRAULIC
FLUID.
Group 1, Configuration 2; Group 2:
(2) Do PART 3: HYDRAULIC FLUID TEST. Boeing will provide the test results to the operator through
the Boeing Communication System. It is acceptable to put the airplane back to a serviceable condition
and return the airplane to service before the test results are received.
(a) CONDITION 3: PASSES THE HYDRAULIC FLUID TEST
No further action required for WORK PACKAGE 3.1)
B787-A-27-00-0026-00A-933A-DApplicable To:
Issue 001, 25 Nov 2014Model 787
See Applicability of this data module
Page 33 of 77
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB270026-00
Issue 001, 25 Nov 2014
AIRCRAFT SERVICE BULLETIN

### Page 34

(b) CONDITION 4: DOES NOT PASS THE HYDRAULIC FLUID TEST
1) CONDITION 4 (ACTION 1): Do PART 4: REPLACE HYDRAULIC FLUID and do PART 2:
CYCLE HYDRAULIC FLUID.
2) CONDITION 4 (ACTION 2): Do PART 3: HYDRAULIC FLUID TEST until CONDITION 3
is met.
(3) Put the airplane back to a serviceable condition.
Group 1, Configuration 2; Group 2:
D. WORK PACKAGE 4: CENTER HYDRAULIC SYSTEM FLUID TEST AND LEFT AND RIGHT ELEVATOR
AND AILERON POWER CONTROL UNIT INTERNAL FLOW TEST
Group 2, Configuration 2:
(1) Do PART 1: INITIAL HYDRAULIC FLUID REPLACEMENT and do PART 2: CYCLE HYDRAULIC
FLUID.
Group 1, Configuration 2; Group 2:
(2) Do PART 3: HYDRAULIC FLUID TEST. Boeing will provide the test results to the operator through
the Boeing Communication System. It is acceptable to put the airplane back to a serviceable condition
and return the airplane to service before the test results are received.
(a) CONDITION 5: PASSES THE HYDRAULIC FLUID TEST
CONDITION 5 (ACTION 1) thru CONDITION 5 (ACTION 4) can be done in any sequence. It is
acceptable to put the airplane back to a serviceable condition and return the airplane to service
after each action independently.
1) CONDITION 5 (ACTION 1): Do WORK PACKAGE 5: LEFT ELEVATOR INBOARD POWER
CONTROL UNIT INTERNAL FLOW TEST.
2) CONDITION 5 (ACTION 2): Do WORK PACKAGE 6: RIGHT ELEVATOR INBOARD
POWER CONTROL UNIT INTERNAL FLOW TEST.
3) CONDITION 5 (ACTION 3): Do WORK PACKAGE 7: LEFT AILERON INBOARD POWER
CONTROL UNIT INTERNAL FLOW TEST.
4) CONDITION 5 (ACTION 4): Do WORK PACKAGE 8: RIGHT AILERON INBOARD POWER
CONTROL UNIT INTERNAL FLOW TEST.
5) No further action required for WORK PACKAGE 4 after CONDITION 5 (ACTION 1) thru
CONDITION 5 (ACTION 4) are done.
(b) CONDITION 6: DOES NOT PASS THE HYDRAULIC FLUID TEST
1) CONDITION 6 (ACTION 1): Do PART 4: REPLACE HYDRAULIC FLUID and do PART 2:
CYCLE HYDRAULIC FLUID.
2) CONDITION 6 (ACTION 2): Do PART 3: HYDRAULIC FLUID TEST until CONDITION 5
is met.
(3) Put the airplane back to a serviceable condition.
Group 1, Configuration 2; Group 2:
E. WORK PACKAGE 5: LEFT ELEVATOR INBOARD POWER CONTROL UNIT INTERNAL FLOW TEST
Check maintenance records to find the left elevator inboard power control unit time in service.(1)
(a) CONDITION 5.1: THE ELEVATOR INBOARD POWER CONTROL UNIT HAS LESS THAN
300 FLIGHT HOURS IN SERVICE
1) No further action required for WORK PACKAGE 5.
B787-A-27-00-0026-00A-933A-DApplicable To:
Issue 001, 25 Nov 2014Model 787
See Applicability of this data module
Page 34 of 77
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB270026-00
Issue 001, 25 Nov 2014
AIRCRAFT SERVICE BULLETIN

### Page 35

(b) CONDITION 5.2: THE ELEVATOR INBOARD POWER CONTROL UNIT HAS 300 FLIGHT
HOURS OR MORE IN SERVICE
1) Do one of these options:
a) OPTION 1:
Do PART 5: ELEVATOR INBOARD POWER CONTROL UNIT INTERNAL FLOW TEST.
<1> CONDITION 5.2.1: THE INTERNAL FLOW THROUGH THE ELEVATOR
INBOARD POWER CONTROL UNIT IS GREATER THAN OR EQUAL TO 0.094
GALLONS PER MINUTE AND IS LESS THAN OR EQUAL TO 0.560 GALLONS
PER MINUTE
<a> No further action required for WORK PACKAGE 5.
<2> CONDITION 5.2.2: THE INTERNAL FLOW THROUGH THE ELEVATOR
INBOARD POWER CONTROL UNIT IS LESS THAN 0.094 GALLONS PER
MINUTE OR IS GREATER THAN 0.560 GALLONS PER MINUTE
<a> Do PART 7: REPLACE THE POWER CONTROL UNIT.
<b> No further action required for WORK PACKAGE 5.
b) OPTION 2:
Do PART 7: REPLACE THE POWER CONTROL UNIT.
<1> No further action required for WORK PACKAGE 5.
(2) Put the airplane back to a serviceable condition.
Group 1, Configuration 2; Group 2:
F. WORK PACKAGE 6: RIGHT ELEVATOR INBOARD POWER CONTROL UNIT INTERNAL FLOW
TEST
(1) Check maintenance records to find the right elevator inboard power control unit time in service.
(a) CONDITION 5.1: THE ELEVATOR INBOARD POWER CONTROL UNIT HAS LESS THAN
300 FLIGHT HOURS IN SERVICE
1) No further action required for WORK PACKAGE 6.
(b) CONDITION 5.2: THE ELEVATOR INBOARD POWER CONTROL UNIT HAS 300 FLIGHT
HOURS OR MORE IN SERVICE
1) Do one of these options:
a) OPTION 1:
Do PART 5: ELEVATOR INBOARD POWER CONTROL UNIT INTERNAL FLOW TEST.
<1> CONDITION 5.2.1: THE INTERNAL FLOW THROUGH THE ELEVATOR
INBOARD POWER CONTROL UNIT IS GREATER THAN OR EQUAL TO 0.094
GALLONS PER MINUTE AND IS LESS THAN OR EQUAL TO 0.560 GALLONS
PER MINUTE
<a> No further action required for WORK PACKAGE 6.
<2> CONDITION 5.2.2: THE INTERNAL FLOW THROUGH THE ELEVATOR
INBOARD POWER CONTROL UNIT IS LESS THAN 0.094 GALLONS PER
MINUTE OR IS GREATER THAN 0.560 GALLONS PER MINUTE
<a> Do PART 7: REPLACE THE POWER CONTROL UNIT.
<b> No further action required for WORK PACKAGE 6.
B787-A-27-00-0026-00A-933A-DApplicable To:
Issue 001, 25 Nov 2014Model 787
See Applicability of this data module
Page 35 of 77
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB270026-00
Issue 001, 25 Nov 2014
AIRCRAFT SERVICE BULLETIN

### Page 36

b) OPTION 2:
Do PART 7: REPLACE THE POWER CONTROL UNIT.
<1> No further action required for WORK PACKAGE 6.
(2) Put the airplane back to a serviceable condition.
Group 1, Configuration 2; Group 2:
G. WORK PACKAGE 7: LEFT AILERON INBOARD POWER CONTROL UNIT INTERNAL FLOW TEST
Check maintenance records to find the left aileron inboard power control unit time in service.(1)
(a) CONDITION 5.3: THE AILERON INBOARD POWER CONTROL UNIT HAS LESS THAN 300
FLIGHT HOURS IN SERVICE
1) No further action required for WORK PACKAGE 7.
(b) CONDITION 5.4: THE AILERON INBOARD POWER CONTROL UNIT HAS 300 FLIGHT
HOURS OR MORE IN SERVICE
1) Do one of these options:
a) OPTION 3:
Do PART 6: AILERON INBOARD POWER CONTROL UNIT INTERNAL FLOW TEST.
<1> CONDITION 5.4.1: THE INTERNAL FLOW THROUGH THE AILERON INBOARD
POWER CONTROL UNIT IS GREATER THAN OR EQUAL TO 0.094 GALLONS
PER MINUTE AND IS LESS THAN OR EQUAL TO 0.297 GALLONS PER MINUTE
<a> No further action required for WORK PACKAGE 7.
<2> CONDITION 5.4.2: THE INTERNAL FLOW THROUGH THE AILERON INBOARD
POWER CONTROL UNIT IS LESS THAN 0.094 GALLONS PER MINUTE OR IS
GREATER THAN 0.297 GALLONS PER MINUTE
<a> Do PART 7: REPLACE THE POWER CONTROL UNIT.
<b> No further action required for WORK PACKAGE 7.
b) OPTION 4:
Do PART 7: REPLACE THE POWER CONTROL UNIT.
<1> No further action required for WORK PACKAGE 7.
(2) Put the airplane back to a serviceable condition.
Group 1, Configuration 2; Group 2:
H. WORK PACKAGE 8: RIGHT AILERON INBOARD POWER CONTROL UNIT INTERNAL FLOW TEST
Check maintenance records to find the right aileron inboard power control unit time in service.(1)
(a) CONDITION 5.3: THE AILERON INBOARD POWER CONTROL UNIT HAS LESS THAN 300
FLIGHT HOURS IN SERVICE
1) No further action required for WORK PACKAGE 8.
(b) CONDITION 5.4: THE AILERON INBOARD POWER CONTROL UNIT HAS 300 FLIGHT
HOURS OR MORE IN SERVICE
1) Do one of these options:
a) OPTION 3:
Do PART 6: AILERON INBOARD POWER CONTROL UNIT INTERNAL FLOW TEST.
B787-A-27-00-0026-00A-933A-DApplicable To:
Issue 001, 25 Nov 2014Model 787
See Applicability of this data module
Page 36 of 77
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB270026-00
Issue 001, 25 Nov 2014
AIRCRAFT SERVICE BULLETIN

### Page 37

<1> CONDITION 5.4.1: THE INTERNAL FLOW THROUGH THE AILERON INBOARD
POWER CONTROL UNIT IS GREATER THAN OR EQUAL TO 0.094 GALLONS
PER MINUTE AND IS LESS THAN OR EQUAL TO 0.297 GALLONS PER MINUTE
<a> No further action required for WORK PACKAGE 8.
<2> CONDITION 5.4.2: THE INTERNAL FLOW THROUGH THE AILERON INBOARD
POWER CONTROL UNIT IS LESS THAN 0.094 GALLONS PER MINUTE OR IS
GREATER THAN 0.297 GALLONS PER MINUTE
<a> Do PART 7: REPLACE THE POWER CONTROL UNIT.
<b> No further action required for WORK PACKAGE 8.
b) OPTION 4:
Do PART 7: REPLACE THE POWER CONTROL UNIT.
<1> No further action required for WORK PACKAGE 8.
(2) Put the airplane back to a serviceable condition.
Group 2, Configuration 2:
I. PART 1: INITIAL HYDRAULIC FLUID REPLACEMENT
RC - Replace the hydraulic fluid with HyJet V. Refer to 787 AMM 29-11-00 Hydraulic System Fluid
- Replacement as an accepted procedure.
(1)
(a) For WORK PACKAGE 2: Do the left hydraulic system.
(b) For WORK PACKAGE 3: Do the right hydraulic system.
(c) For WORK PACKAGE 4: Do the center hydraulic system. Leave the airplane on jacks after re-
placing the hydraulic fluid.
Group 2, Configuration 2:
J. PART 2: CYCLE HYDRAULIC FLUID
Do these steps to cycle the hydraulic fluid :(1)
(a) For WORK PACKAGE 2 and WORK PACKAGE 3: Do one of these options:
1) OPTION 5: Put the airplane back to a serviceable condition and fly 1 or more flight cycles.
2) OPTION 6: Do these steps to operate the flight surfaces and thrust reversers:
a) Make sure all hydraulic carts are disconnected.
b) Make sure that these circuit breakers are closed on the circuit breaker indication and
control (CBIC) panel:
Table 1  WORK PACKAGE 2:
CBDesignation
CE2711305AIL REU LOB PWR
CE2761413AUTO SPDBRK ACT CTRLR PWR
CE2731307ELEV REU LOB PWR
CE2711206FLAPERON REU LIB PWR
CE2711306FLAPERON REU ROB PWR
B787-A-27-00-0026-00A-933A-DApplicable To:
Issue 001, 25 Nov 2014Model 787
See Applicability of this data module
Page 37 of 77
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB270026-00
Issue 001, 25 Nov 2014
AIRCRAFT SERVICE BULLETIN

### Page 38

Table 1  WORK PACKAGE 2:
CBDesignation
CE2721308RUD REU MID PWR
CE7834811T/R DIRECTIONAL CTRL VLV-L ENGINE
CE7834813T/R LEVEL INTLK-L ENGINE
CE7834814T/R TRK LOCK VLV-L ENGINE
Table 2  WORK PACKAGE 3:
CBDesignation
CE2711405AIL REU ROB PWR
CE2761413AUTO SPDBRK ACT CTRLR PWR
CE2731407ELEV REU ROB PWR
CE2711406FLAPERON REU LOB PWR
CE2721408RUD REU LWR PWR
CE7834821T/R DIRECTIONAL CTRL VLV-R ENGINE
CE7834823T/R LEVEL INTLK-R ENGINE
CE7834824T/R TRK LOCK VLV-R ENGINE
c) Pressurize the hydraulic system with the engine-driven pump (EDP). For WORK
PACKAGE 2, do the left EDP. For WORK PACKAGE 3, do the right EDP. Refer to 787
AMM 29-11-00 Hydraulic System (with an Engine-Driven Pump) - Pressurization as an
accepted procedure.
WARNING: KEEP ALL PERSONS AND EQUIPMENT AWAY FROM THE FLIGHT CON-
TROL SURFACES AND THE FLIGHT CONTROL DRIVE MECHANISMS.
THESE COMPONENTS WILL MOVE. THIS CAN CAUSE INJURIES TO
PERSONS AND DAMAGE TO EQUIPMENT.
d) RC - Operate the elevator with the EDP. Do these steps 3 times:
<1> Use the flight controls synoptic page to make sure that the elevator moves fully.
<2> Push the control column fully forward.
<3> Push the control column fully aft.
<4> Push the control column to the neutral position.
e) Pressurize the hydraulic system with an electric motor pump (EMP). For WORK PACK-
AGE 2, do the left EMP. For WORK PACKAGE 3, do the right EMP. Refer to 787 AMM
29-11-00 Hydraulic System (with an Electric Motor Pump) - Pressurization as an accepted
procedure.
B787-A-27-00-0026-00A-933A-DApplicable To:
Issue 001, 25 Nov 2014Model 787
See Applicability of this data module
Page 38 of 77
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB270026-00
Issue 001, 25 Nov 2014
AIRCRAFT SERVICE BULLETIN

### Page 39

WARNING: KEEP ALL PERSONS AND EQUIPMENT AWAY FROM THE FLIGHT CON-
TROL SURFACES AND THE FLIGHT CONTROL DRIVE MECHANISMS.
THESE COMPONENTS WILL MOVE. THIS CAN CAUSE INJURIES TO
PERSONS AND DAMAGE TO EQUIPMENT.
f) RC - Operate the elevator with the EMP. Do these steps 9 times:
<1> Use the flight controls synoptic page to make sure that the elevator moves fully.
<2> Push the control column fully forward.
<3> Push the control column fully aft.
<4> Push the control column to the neutral position.
WARNING: KEEP ALL PERSONS AND EQUIPMENT AWAY FROM THE FLIGHT CON-
TROL SURFACES AND THE FLIGHT CONTROL DRIVE MECHANISMS.
THESE COMPONENTS WILL MOVE. THIS CAN CAUSE INJURIES TO
PERSONS AND DAMAGE TO EQUIPMENT.
g) RC - Operate the rudder with the EMP. Do these steps 15 times:
<1> Use the flight controls synoptic page to make sure that the rudder moves fully.
<2> Push the right rudder pedal fully forward.
<3> Push the left rudder pedal fully forward.
<4> Let the rudder pedals move to the neutral position.
WARNING: KEEP ALL PERSONS AND EQUIPMENT AWAY FROM THE FLIGHT CON-
TROL SURFACES AND THE FLIGHT CONTROL DRIVE MECHANISMS.
THESE COMPONENTS WILL MOVE. THIS CAN CAUSE INJURIES TO
PERSONS AND DAMAGE TO EQUIPMENT.
h) RC - Operate the flaperons with the EMP. Do these steps 5 times:
<1> Use the flight controls synoptic page to make sure that the flaperons moves fully.
<2> Turn the control wheel from the neutral position to fully right.
<3> Turn the control wheel from fully right to fully left.
<4> Turn the control wheel from fully left to the neutral position.
WARNING: KEEP ALL PERSONS AND EQUIPMENT AWAY FROM THE FLIGHT CON-
TROL SURFACES AND THE FLIGHT CONTROL DRIVE MECHANISMS.
THESE COMPONENTS WILL MOVE. THIS CAN CAUSE INJURIES TO
PERSONS AND DAMAGE TO EQUIPMENT.
i) RC - Operate the spoilers with the EMP. Do these steps 11 times:
<1> Use the flight controls synoptic page to make sure that the spoilers moves fully.
<2> Move the speedbrake lever from the DOWN position to the UP position.
<3> Move the speedbrake lever from the UP position to the DOWN position.
B787-A-27-00-0026-00A-933A-DApplicable To:
Issue 001, 25 Nov 2014Model 787
See Applicability of this data module
Page 39 of 77
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB270026-00
Issue 001, 25 Nov 2014
AIRCRAFT SERVICE BULLETIN

### Page 40

WARNING: KEEP ALL PERSONS AND EQUIPMENT AWAY FROM THE FLIGHT CON-
TROL SURFACES AND THE FLIGHT CONTROL DRIVE MECHANISMS.
THESE COMPONENTS WILL MOVE. THIS CAN CAUSE INJURIES TO
PERSONS AND DAMAGE TO EQUIPMENT.
j) RC - Operate the ailerons with the EMP. Do these steps 15 times:
<1> Use the flight controls synoptic page to make sure that the ailerons moves fully.
<2> Turn the control wheel from the neutral position to fully right.
<3> Turn the control wheel from fully right to fully left.
<4> Turn the control wheel from fully left to the neutral position.
k) To operate the thrust reverser, have one person push and hold the TEST ENABLE switch
in the TEST position.
NOTE: The TEST ENABLE switch is at the 7 o'clock position on the aft bulkhead of
the inlet cowl. 
NOTE: If your release the test enable switch, it will cause the EEC to immediately close
the isolation valve and stop the movement of the translating sleeves. No
movement of the translating sleeves can occur unless you push and hold the
test enable switch. 
WARNING: KEEP ALL PERSONNEL AND EQUIPMENT AWAY FROM THE AREA THAT
IS AFT OF THE APPLICABLE THRUST REVERSER. IF YOU IGNORE THIS
INSTRUCTION, INJURIES TO PERSONNEL AND DAMAGE TO EQUIPMENT
CAN OCCUR WHEN THE THRUST REVERSER EXTENDS.
WARNING: MAKE SURE THAT THE AREA AROUND THE SPOILERS IS CLEAR OF
PERSONS AND EQUIPMENT. THE SPOILERS CAN MOVE QUICKLY. THIS
CAN CAUSE INJURIES TO PERSONS OR DAMAGE TO EQUIPMENT.
CAUTION: DO NOT OPEN THE THRUST REVERSER IF THE TRANSLATING SLEEVES
ARE EXTENDED. THE EXTENDED SLEEVES CAN HIT THE STRUT PAN-
ELS. DAMAGE TO EQUIPMENT CAN OCCUR.
CAUTION: DO NOT EXTEND THE THRUST REVERSER SLEEVE IF THE THRUST
REVERSER IS OPEN. DAMAGE TO THE THRUST REVERSER AND ADJA-
CENT STRUCTURES CAN OCCUR.
l) RC - Operate the thrust reverser with the EMP. Do these steps 4 times:
<1> Make sure that the thrust reversers deploy and stow fully.
<2> While one person holds the TEST ENABLE switch, move the left reverse thrust
lever up and aft until it engages the interlock stop.
NOTE: The extend time of the translating sleeves is 3 seconds. 
<3> While one person holds the TEST ENABLE switch, move the left reverse thrust
lever forward and down to the retract position.
B787-A-27-00-0026-00A-933A-DApplicable To:
Issue 001, 25 Nov 2014Model 787
See Applicability of this data module
Page 40 of 77
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB270026-00
Issue 001, 25 Nov 2014
AIRCRAFT SERVICE BULLETIN

### Page 41

NOTE: The retract time of the translating sleeves is less than 8 seconds. 
<a> Hold the TEST ENABLE switch until 12 to 15 seconds after the translating
sleeves retract fully
(b) For WORK PACKAGE 4: Do one of these options:
1) OPTION 7: Do these steps to fly 1 or more flight cycles:
a) Lower the airplane from jacks. Refer to 787 AMM 07-11-01 Lift the Airplane on Jacks -
Handling as an accepted procedure
b) Put the airplane back to a serviceable condition and fly 1 or more flight cycles.
2) OPTION 8: Do these steps to operate the flight surfaces, ram air turbine (RAT) and landing
gear:
a) Make sure all hydraulic carts are disconnected.
b) Make sure that these circuit breakers are closed on the circuit breaker indication and
control (CBIC) panel:
Table 3  WORK PACKAGE 4:
CBDesignation
CE3231801MLG BYPASS VLV-ENABLE 1
CE3231802MLG BYPASS VLV-ENABLE 2
CE3231803NLG BYPASS VLV-ENABLE 1
CE3231804NLG BYPASS VLV-ENABLE 2
CE2711106AIL REU LIB PWR
CE2711205AIL REU RIB PWR
CE2761413AUTO SPDBRK ACT CTRLR PWR
CE2731108ELEV REU LIB PWR
CE2731207ELEV REU RIB PWR
CE2711107FLAPERON REU RIB PWR
CE2721109RUD REU UPR PWR
CK2761501ELECT ACTR-SPLR 10
CK2761503ELECT ACTR-SPLR 11
CK2761504ELECT ACTR-SPLR 4
CK2761502ELECT ACTR-SPLR 5
CE2911831ALTN EXTEND ISLN VLV CLOSE-1
CE2911832ALTN EXTEND ISLN VLV CLOSE-2
CE2911819HYD ISLN VLV-NLG OPEN 1
CE2911820HYD ISLN VLV-NLG OPEN 2
B787-A-27-00-0026-00A-933A-DApplicable To:
Issue 001, 25 Nov 2014Model 787
See Applicability of this data module
Page 41 of 77
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB270026-00
Issue 001, 25 Nov 2014
AIRCRAFT SERVICE BULLETIN

### Page 42

c) Pressurize the hydraulic system with the C2 electric motor pump (EMP). Refer to 787
AMM 29-11-00 Hydraulic System (with an Electric Motor Pump) - Pressurization as an
accepted procedure.
d) RC - Do these steps to operate the elevator with the C2 EMP:
<1> Use the flight controls synoptic page to make sure that the elevator moves fully.
<2> Push the control column fully forward.
<3> Push the control column fully aft.
<4> Push the control column to the neutral position.
e) Pressurize the hydraulic system with the C1 EMP. Refer to 787 AMM 29-11-00 Hydraulic
System (with an Electric Motor Pump) - Pressurization as an accepted procedure.
f) RC - Operate the Ram Air Turbine (RAT) with the C1 EMP. Do these steps 4 times:
<1> Extend the RAT. Do not install the RAT protective cover or the RAT blade protective
cover. Refer to 787 AMM 29-21-00 Ram Air Turbine Extension - Operation as an
accepted procedure.
<2> Retract the RAT. Refer to 787 AMM 29-21-00 Ram Air Turbine Retraction - Oper-
ation as an accepted procedure.
WARNING: KEEP ALL PERSONS AND EQUIPMENT AWAY FROM THE FLIGHT CON-
TROL SURFACES AND THE FLIGHT CONTROL DRIVE MECHANISMS.
THESE COMPONENTS WILL MOVE. THIS CAN CAUSE INJURIES TO
PERSONS AND DAMAGE TO EQUIPMENT.
g) RC - Operate the elevators with the C1 EMP. Do these steps 6 times:
<1> Use the flight controls synoptic page to make sure that the elevators moves fully.
<2> Push the control column fully forward.
<3> Push the control column fully aft.
<4> Push the control column to the neutral position.
WARNING: KEEP ALL PERSONS AND EQUIPMENT AWAY FROM THE FLIGHT CON-
TROL SURFACES AND THE FLIGHT CONTROL DRIVE MECHANISMS.
THESE COMPONENTS WILL MOVE. THIS CAN CAUSE INJURIES TO
PERSONS AND DAMAGE TO EQUIPMENT.
h) RC - Operate the rudder with the C1 EMP. Do these steps 15 times:
<1> Use the flight controls synoptic page to make sure that the rudder moves fully.
<2> Push the right rudder pedal fully forward.
<3> Push the left rudder pedal fully forward.
<4> Let the rudder pedals move to the neutral position.
B787-A-27-00-0026-00A-933A-DApplicable To:
Issue 001, 25 Nov 2014Model 787
See Applicability of this data module
Page 42 of 77
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB270026-00
Issue 001, 25 Nov 2014
AIRCRAFT SERVICE BULLETIN

### Page 43

WARNING: KEEP ALL PERSONS AND EQUIPMENT AWAY FROM THE FLIGHT CON-
TROL SURFACES AND THE FLIGHT CONTROL DRIVE MECHANISMS.
THESE COMPONENTS WILL MOVE. THIS CAN CAUSE INJURIES TO
PERSONS AND DAMAGE TO EQUIPMENT.
i) RC - Operate the flaperons with the C1 EMP. Do these steps 6 times:
<1> Use the flight controls synoptic page to make sure that the flaperons moves fully.
<2> Turn the control wheel from the neutral position to fully right.
<3> Turn the control wheel from fully right to fully left.
<4> Turn the control wheel from fully left to the neutral position.
WARNING: KEEP ALL PERSONS AND EQUIPMENT AWAY FROM THE FLIGHT CON-
TROL SURFACES AND THE FLIGHT CONTROL DRIVE MECHANISMS.
THESE COMPONENTS WILL MOVE. THIS CAN CAUSE INJURIES TO
PERSONS AND DAMAGE TO EQUIPMENT.
j) RC - Operate the spoilers with the C1 EMP. Do these steps 12 times:
<1> Use the flight controls synoptic page to make sure that the spoilers moves fully.
<2> Move the speedbrake lever from the DOWN position to the UP position.
<3> Move the speedbrake lever from the UP position to the DOWN position.
WARNING: KEEP ALL PERSONS AND EQUIPMENT AWAY FROM THE FLIGHT CON-
TROL SURFACES AND THE FLIGHT CONTROL DRIVE MECHANISMS.
THESE COMPONENTS WILL MOVE. THIS CAN CAUSE INJURIES TO
PERSONS AND DAMAGE TO EQUIPMENT.
k) RC - Operate the ailerons with the C1 EMP. Do these steps 15 times:
<1> Use the flight controls synoptic page to make sure that the ailerons moves fully.
<2> Turn the control wheel from the neutral position to fully right.
<3> Turn the control wheel from fully right to fully left.
<4> Turn the control wheel from fully left to the neutral position.
WARNING: KEEP ALL PERSONS AND EQUIPMENT AWAY FROM THE FLIGHT CON-
TROL SURFACES AND THE FLIGHT CONTROL DRIVE MECHANISMS.
THESE COMPONENTS WILL MOVE. THIS CAN CAUSE INJURIES TO
PERSONS AND DAMAGE TO EQUIPMENT.
l) RC - Do these steps to operate the flaps with the C1 EMP.
<1> Move the flap lever from the UP detent to the 5 detent.
<2> Move the flap lever from the 5 detent to the UP detent.
m) With landing gear pins removed and door safety valves in the STOW position, retract
the landing gear.
B787-A-27-00-0026-00A-933A-DApplicable To:
Issue 001, 25 Nov 2014Model 787
See Applicability of this data module
Page 43 of 77
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB270026-00
Issue 001, 25 Nov 2014
AIRCRAFT SERVICE BULLETIN

### Page 44

n) Extend the landing gear using the alternate extend system.
o) RC - Retract and extend the landing gear 2 times using the landing gear lever.
p) Do these steps to operate the landing gear with the C1 EMP:
<1> If the downlock pins are installed in the nose or main landing gear, remove them.
Refer to 787 AMM 32-00-30 Landing Gear Downlock Pins - Removal as an accepted
procedure.
WARNING: MAKE SURE THE AREA AROUND THE LANDING GEAR AND ITS
DOORS ARE CLEAR OF PERSONS AND EQUIPMENT DURING A
LANDING GEAR RETRACTION AND EXTENSION TEST. THIS WILL
HELP PREVENT INJURY TO PERSONS AND DAMAGE TO EQUIP-
MENT.
<2> Activate the landing gear doors. Refer to 787 AMM 32-00-15 Landing Gear Door
- Activation as an accepted procedure.
WARNING: MAKE SURE THE AREA AROUND THE LANDING GEAR AND ITS
DOORS ARE CLEAR OF PERSONS AND EQUIPMENT DURING A
LANDING GEAR RETRACTION AND EXTENSION TEST. THIS WILL
HELP PREVENT INJURY TO PERSONS AND DAMAGE TO EQUIP-
MENT.
<3> Move the control lever for the landing gear to the UP position.
WARNING: MAKE SURE THE AREA AROUND THE LANDING GEAR AND ITS
DOORS ARE CLEAR OF PERSONS AND EQUIPMENT DURING A
LANDING GEAR RETRACTION AND EXTENSION TEST. THIS WILL
HELP PREVENT INJURY TO PERSONS AND DAMAGE TO EQUIP-
MENT.
<4> Do these steps to extend the landing gear:
<a> Push and hold the ALTN GEAR switch on the P2 panel to DOWN to extend
the landing gear.
<b> Move the control lever for the landing gear to the DOWN position.
WARNING: MAKE SURE THE AREA AROUND THE LANDING GEAR AND ITS
DOORS ARE CLEAR OF PERSONS AND EQUIPMENT DURING A
LANDING GEAR RETRACTION AND EXTENSION TEST. THIS WILL
HELP PREVENT INJURY TO PERSONS AND DAMAGE TO EQUIP-
MENT.
<5> RC - Operate the landing gear. Do these steps 2 times:
<a> Move the control lever for the landing gear to the UP position.
<b> Move the control lever for the landing gear to the DOWN position.
B787-A-27-00-0026-00A-933A-DApplicable To:
Issue 001, 25 Nov 2014Model 787
See Applicability of this data module
Page 44 of 77
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB270026-00
Issue 001, 25 Nov 2014
AIRCRAFT SERVICE BULLETIN

### Page 45

WARNING: MAKE SURE THE AREA AROUND THE LANDING GEAR AND ITS
DOORS ARE CLEAR OF PERSONS AND EQUIPMENT DURING A
LANDING GEAR RETRACTION AND EXTENSION TEST. THIS WILL
HELP PREVENT INJURY TO PERSONS AND DAMAGE TO EQUIP-
MENT.
<6> Move the control lever for the landing gear to the UP position.
q) Move the door safety valve handles to the SAFE position. Refer to 787 AMM 32-00-15
Landing Gear Door - Deactivation as an accepted procedure
r) Install the downlock pins in the nose and main landing gear. Refer to 787 AMM 32-00-
30 Landing Gear Downlock Pins - Installation as an accepted procedure
s) Lower the airplane from jacks. Refer to 787 AMM 07-11-01 Lift the Airplane on Jacks -
Handling as an accepted procedure.
Group 1, Configuration 2; Group 2:
K. PART 3: HYDRAULIC FLUID TEST
RC - Take a 16 ounce or more sample of the hydraulic fluid. It is acceptable to take two 8 ounce
bottle samples from the same hydraulic system. Refer to 787 AMM 29-11-00, Hydraulic Fluid Sampling
- Inspection, as an accepted procedure.
(1)
(2) Label each sample with the following information:
(a) airplane
(b) flight cycles
(c) flight hours
(d) hydraulic system sampled (left, right or center)
(3) Ship the hydraulic fluid sample to the following address:
The Boeing Company
2-10 Bldg, Door S25 Seattle Receive
7701 14th Avenue South
Seattle, WA 98108-4002 USA
Route To: Will Call
Attention: Steve Millett (Composition Testing)
NOTE: Multiple hydraulic fluid samples can be shipped in the same shipping container as long as
the bottles are properly labeled and contained to prevent cross contamination. 
(4) Send a message to Boeing through the Boeing Communication System with the following information:
(a) MODEL: 787-8
(b) ATA: 2700-00
(c) SUBJECT: 787 Hydraulic Fluid Test
B787-A-27-00-0026-00A-933A-DApplicable To:
Issue 001, 25 Nov 2014Model 787
See Applicability of this data module
Page 45 of 77
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB270026-00
Issue 001, 25 Nov 2014
AIRCRAFT SERVICE BULLETIN

### Page 46

(d) Shipping information including airway bill number and courier company
(e) Airplane, flight cycles, flight hours and system of fluid arriving in shipment.
Group 1, Configuration 2; Group 2:
L. PART 4: REPLACE HYDRAULIC FLUID
RC - Do one of these options:(1)
(a) OPTION 9: Replace the hydraulic fluid with HyJet V. Refer to 787 AMM 29-11-00 Hydraulic
System Fluid - Replacement as an accepted procedure.
1) For WORK PACKAGE 2: Do the left hydraulic system.
2) For WORK PACKAGE 3: Do the right hydraulic system.
3) For WORK PACKAGE 4: Do the center hydraulic system. Leave the airplane on jacks after
replacing the hydraulic fluid.
(b) OPTION 10: Drain and fill the hydraulic system reservoir. Refer to 787 AMM 12-12-01 Hydraulic
Reservoir - Drain Liquid and 787 AMM 12-12-01 Hydraulic Reservoir (Task Selection) - Servicing
as accepted procedures.
1) For WORK PACKAGE 2: Do the left hydraulic system.
2) For WORK PACKAGE 3: Do the right hydraulic system.
3) For WORK PACKAGE 4: Do the center hydraulic system.
Group 1, Configuration 2; Group 2:
M. PART 5: ELEVATOR INBOARD POWER CONTROL UNIT INTERNAL FLOW TEST
Do these steps for the elevator inboard power control unit (PCU) internal flow test. For WORK
PACKAGE 5, do the left elevator. For WORK PACKAGE 6, do the right elevator. The elevator inboard
(1)
PCU internal flow test can be done for WORK PACKAGE 5 and WORK PACKAGE 6 at the same
time.
(2) Prepare for the test and install tool TSF036Z0229:
(a) Use the pitch trim switches on the captain's or first officer's control wheel to move the stabilizer
to the 4 unit position.
(b) On the control stand, put the L2 and R2 STAB CUTOUT switches to the CUTOUT position.
1) Attach a DO NOT OPERATE tag on the L2 and R2 STAB CUTOUT switches.
(c) Depressurize the center hydraulic system and reservoir. Refer to 787 AMM 29-11-00 as an ac-
cepted procedure.
(d) Put the FLIGHT CONTROL SURFACE switch for the TAIL in the LOCK position and install a
DO NOT OPERATE tag on the switch. Refer to 787 AMM 27-02-00 Flight Control Surface Lock
Switches - Operation as an accepted procedure.
(e) Remove Flight Control Electronic (FCE) cabinet power.
B787-A-27-00-0026-00A-933A-DApplicable To:
Issue 001, 25 Nov 2014Model 787
See Applicability of this data module
Page 46 of 77
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB270026-00
Issue 001, 25 Nov 2014
AIRCRAFT SERVICE BULLETIN

### Page 47

1) Open these circuit breakers and lock with DO NOT CLOSE tags on the circuit breaker indi-
cation and control (CBIC) panel:
Table 4  
CBDesignation
CE2709811FCE CABINET-C1 BACKUP
CE2709831FCE CABINET-L BACKUP
CE2709821FCE CABINET-C2 BACKUP
CE2709841FCE CABINET-R BACKUP
(f) Gain access to the elevator PCUs:
1) For WORK PACKAGE 5, open panel 335CB - Horizontal Stabilizer TE Panel and 335FBX
- Horizontal Stabilizer TE Seal - Mid. Refer to 787 AMM 55-16-01 Horizontal Stabilizer
Trailing Edge Skin Panel - Removal as an accepted procedure.
2) For WORK PACKAGE 6, open panel 345CB - Horizontal Stabilizer TE Panel and 345FBX
- Horizontal Stabilizer TE Seal - Mid. Refer to 787 AMM 55-16-01 Horizontal Stabilizer
Trailing Edge Skin Panel - Removal as an accepted procedure.
(g) RC - Remove and keep the hydraulic return line between the elevator inboard PCU and the rib
hinge. Refer to 787 AMM 20-10-09 Tube Assembly - Flareless - Removal as an accepted pro-
cedure.
(h) RC - Install tool TSF036Z0229 between the elevator inboard PCU and rib hinge.
(i) Make sure the hose between the tool TSF036Z0229 and the PCU is connected to the tee fitting
on the tool furthest away from the ball valve.
CAUTION: IF THE BALL VALVE OF TOOL TSF036Z0229 IS NOT OPEN WHEN THE HYDRAULIC
SYSTEM IS PRESSURIZED, THE HIGH FLOW RATES CAN DAMAGE THE TOOL.
(j) Make sure the ball valve on the tool is in the open position.
(k) Supply FCE cabinet power.
1) Unlock these DO NOT CLOSE tags and close these circuit breakers on the CBIC panel:
Table 5  
CBDesignation
CE2709811FCE CABINET-C1 BACKUP
CE2709831FCE CABINET-L BACKUP
CE2709821FCE CABINET-C2 BACKUP
CE2709841FCE CABINET-R BACKUP
(l) Put the FLIGHT CONTROL SURFACE switch for the TAIL in the NORM position and remove
the DO NOT OPERATE tag. Refer to 787 AMM 27-02-00 Flight Control Surface Lock Switches
- Operation as an accepted procedure.
B787-A-27-00-0026-00A-933A-DApplicable To:
Issue 001, 25 Nov 2014Model 787
See Applicability of this data module
Page 47 of 77
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB270026-00
Issue 001, 25 Nov 2014
AIRCRAFT SERVICE BULLETIN

### Page 48

(m) On the control stand, put the L2 and R2 STAB CUTOUT switches to the NORM position and
remove the DO NOT OPERATE tags.
(n) Do these steps to pressurize the center hydraulic system and inspect the tool TSF036Z0229
connections for leaks:
1) Pressurize the center hydraulic system. Refer to 787 AMM 29-11-00 as an accepted proce-
dure.
2) Operate the elevators. Do these steps 7 times:
a) Use the flight controls synoptic page to make sure that the elevators moves fully.
b) Push the control column fully forward.
c) Push the control column fully aft.
d) Push the control column to the neutral position.
3) Do a detailed visual inspection for hydraulic fluid leaks at the tool TSF036Z0229 connections.
If leaks are found, fix them.
(o) For the center hydraulic system, turn the applicable switch on the hydraulic system control
panel (P5) to the OFF position:
1) HYDRAULIC PRIMARY C1 ELEC
2) HYDRAULIC PRIMARY C2 ELEC
(3) Test Procedure:
(a) Make sure page 2 of the Flight Controls Maintenance Pages is showing. Refer to Data Module
Appendix G, SB B787-A-27-00-0026-0GA-931D-D Figure 1 for illustration of this screen.
WARNING: KEEP ALL PERSONS AND EQUIPMENT AWAY FROM THE FLIGHT CONTROL
SURFACES AND THE FLIGHT CONTROL DRIVE MECHANISMS. THESE COMPO-
NENTS WILL MOVE. THIS CAN CAUSE INJURIES TO PERSONS AND DAMAGE
TO EQUIPMENT.
(b) Start the applicable Central Maintenance Computing Function (CMCF) ground test: 27 Primary
Flight Control System, LRU Replacement, Left or Right Elevator Major Rig. Refer to 787 AMM
45-11-00 Start a Ground Test - Software Operation as an accepted procedure.
(c) After the test starts, continue through the test procedure until the GROUND TESTS screen
shows the following. Refer to Data Module Appendix G, SB B787-A-27-00-0026-0GA-931D-D
Figure 2 for illustration of this screen.
"The surface may now be ramped through 20 warm up/bleed cycles."
(d) Prepare to monitor the DELTA PRESS readout for the elevator inboard PCU on Page 2 of the
Flight Controls Maintenance Pages. Refer to Data Module Appendix G, SB B787-A-27-00-0026-
0GA-931D-D Figure 1 for illustration of this screen.
(e) On the GROUND TESTS screen, select the SKIP WARMUP AND BLEED and then click the
CONTINUE buttons. Refer to Data Module Appendix G, SB B787-A-27-00-0026-0GA-931D-D
Figure 2 for illustration of this screen.
B787-A-27-00-0026-00A-933A-DApplicable To:
Issue 001, 25 Nov 2014Model 787
See Applicability of this data module
Page 48 of 77
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB270026-00
Issue 001, 25 Nov 2014
AIRCRAFT SERVICE BULLETIN

### Page 49

(f) When the DELTA PRESS for the elevator inboard PCU is between -4400 psi and -5500 psi on
Page 2 of the Flight Controls Maintenance Pages, push the STOP TEST button on the GROUND
TESTS screen.
NOTE: A warning screen will show, do not push any additional buttons at this time. 
(g) Make sure the DELTA PRESS readout for the elevator inboard PCU on Page 2 of the Flight
Controls Maintenance Pages remains between -4400 psi and -5500 psi.
CAUTION: IF YOU DO NOT OBEY THIS STEP CORRECTLY, YOU WILL HAVE TO RE-
RIG THE SURFACE.
1) If the GROUND TESTS screen shows "Select position adjustments below until the elevator
being rigged is at the external alignment feature", the STOP TEST button was not pushed
in time. Refer to Data Module Appendix G, SB B787-A-27-00-0026-0GA-931D-D Figure 3
for illustration of this screen. Push the STOP TEST button and start the Test Procedure
again. Do not push CONTINUE on this GROUND TESTS screen. If you push CONTINUE,
you will need to re-rig the surface.
2) If the DELTA PRESS is not between -4400 psi and -5500 psi, Push the STOP TEST button
on the GROUND TESTS screen and start the Test Procedure again.
(h) RC - Close the ball valve on tool TSF036Z0229.
(i) RC- Read and record the flow through the indicator of tool TSF036Z0229 ten or more minutes
after the ball valve is closed.
(j) Open the ball valve on tool TSF036Z0229.
(k) Push the STOP TEST button on the GROUND TESTS warning screen.
(4) Remove the tool:
(a) On the control stand, put the L2 and R2 STAB CUTOUT switches to the CUTOUT position.
1) Attach a DO NOT OPERATE tag on the L2 and R2 STAB CUTOUT switches.
(b) Depressurize the center hydraulic system and reservoir. Refer to 787 AMM 29-11-00 as an ac-
cepted procedure.
(c) Put the FLIGHT CONTROL SURFACE switch for the TAIL in the LOCK position and install a
DO NOT OPERATE tag on the switch. Refer to 787 AMM 27-02-00 Flight Control Surface Lock
Switches - Operation as an accepted procedure.
(d) Remove FCE cabinet power.
1) Open these circuit breakers and lock with DO NOT CLOSE tags on the CBIC panel:
Table 6  
CBDesignation
CE2709811FCE CABINET-C1 BACKUP
CE2709831FCE CABINET-L BACKUP
CE2709821FCE CABINET-C2 BACKUP
CE2709841FCE CABINET-R BACKUP
B787-A-27-00-0026-00A-933A-DApplicable To:
Issue 001, 25 Nov 2014Model 787
See Applicability of this data module
Page 49 of 77
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB270026-00
Issue 001, 25 Nov 2014
AIRCRAFT SERVICE BULLETIN

### Page 50

(e) RC - Disconnect and remove tool TSF036Z0229 between the elevator inboard PCU and the rib
hinge.
(f) RC - Install the kept hydraulic return line between the elevator inboard PCU and rib hinge. Refer
to 787 AMM 20-10-09 Tube Assembly - Flareless - Installation as an accepted procedure.
(g) Supply FCE cabinet power.
1) Unlock these DO NOT CLOSE tags and close these circuit breakers on the CBIC panel:
Table 7  
CBDesignation
CE2709811FCE CABINET-C1 BACKUP
CE2709831FCE CABINET-L BACKUP
CE2709821FCE CABINET-C2 BACKUP
CE2709841FCE CABINET-R BACKUP
(h) Put the FLIGHT CONTROL SURFACE switch for the TAIL in the NORM position and remove
the DO NOT OPERATE tag. Refer to 787 AMM 27-02-00 Flight Control Surface Lock Switches
- Operation as an accepted procedure.
(i) On the control stand, put the L2 and R2 STAB CUTOUT switches to the NORM position and
remove the DO NOT OPERATE tag.
(j) Do these steps to pressurize the hydraulic system and inspect the hydraulic return line to elevator
inboard PCU connection for leaks where the tool was installed:
1) Pressurize the center hydraulic system. Refer to 787 AMM 29-11-00 as an accepted proce-
dure.
2) Operate the elevators. Do these steps 7 times:
a) Use the flight controls synoptic page to make sure that the elevators moves fully.
b) Push the control column fully forward.
c) Push the control column fully aft.
d) Push the control column to the neutral position.
3) Do a detailed visual inspection for hydraulic fluid leaks at the elevator inboard PCU hydraulic
return line connections. If leaks are found, fix them.
(k) Close access to the elevator PCUs:
1) For WORK PACKAGE 5, close panel 335CB - Horizontal Stabilizer TE Panel and 335FBX
- Horizontal Stabilizer TE Seal - Mid. Refer to 787 AMM 55-16-01 Horizontal Stabilizer
Trailing Edge Skin Panel - Installation as an accepted procedure.
2) For WORK PACKAGE 6, close panel 345CB - Horizontal Stabilizer TE Panel and 345FBX
- Horizontal Stabilizer TE Seal - Mid. Refer to 787 AMM 55-16-01 Horizontal Stabilizer
Trailing Edge Skin Panel - Installation as an accepted procedure.
B787-A-27-00-0026-00A-933A-DApplicable To:
Issue 001, 25 Nov 2014Model 787
See Applicability of this data module
Page 50 of 77
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB270026-00
Issue 001, 25 Nov 2014
AIRCRAFT SERVICE BULLETIN

### Page 51

Group 1, Configuration 2; Group 2:
N. PART 6: AILERON INBOARD POWER CONTROL UNIT INTERNAL FLOW TEST
Do these steps for the aileron inboard power control unit (PCU) internal flow test. For WORK
PACKAGE 7, do the left aileron. For WORK PACKAGE 8, do the right aileron. The aileron inboard
(1)
PCU internal flow test can be done at the same time for WORK PACKAGE 7 and WORK PACKAGE
8.
(2) Prepare for the test and install tool TSF036Z0229:
(a) Depressurize the center hydraulic system and reservoir. Refer to 787 AMM 29-11-00 as an ac-
cepted procedure.
(b) Put the FLIGHT CONTROL SURFACE switch for the WINGS in the LOCK position and install
a DO NOT OPERATE tag. Refer to 787 AMM 27-02-00 Flight Control Surface Lock Switches -
Operation as an accepted procedure.
(c) Remove Flight Control Electronic (FCE) cabinet power.
1) Open these circuit breakers and lock with DO NOT CLOSE tags on the circuit breaker indi-
cation and control (CBIC) panel:
Table 8  
CBDesignation
CE2709811FCE CABINET-C1 BACKUP
CE2709831FCE CABINET-L BACKUP
CE2709821FCE CABINET-C2 BACKUP
CE2709841FCE CABINET-R BACKUP
(d) Gain access to the aileron PCUs:
1) For WORK PACKAGE 7, open panel 561YB and 561ZB - Wing Lower Fixed Trailing Edge
Panel. Refer to 787 AMM 57-51-10 Wing Trailing Edge Panel - Removal as an accepted
procedure.
2) For WORK PACKAGE 8, open panel 661YB and 661ZB - Wing Lower Fixed Trailing Edge
Panel. Refer to 787 AMM 57-51-10 Wing Trailing Edge Panel - Removal as an accepted
procedure.
(e) RC - Remove and keep the hydraulic return line between the aileron inboard PCU and the rear
spar. Refer to 787 AMM 20-10-09 Tube Assembly - Flareless - Removal as an accepted proce-
dure.
(f) RC - Install tool TSF036Z0229 between the aileron inboard PCU and the rear spar.
(g) Make sure the hose between the tool TSF036Z0229 and the PCU is connected to the tee fitting
on the tool furthest away from the ball valve.
CAUTION: IF THE BALL VALVE OF TOOL TSF036Z0229 IS NOT OPEN WHEN THE HYDRAULIC
SYSTEM IS PRESSURIZED, THE HIGH FLOW RATES CAN DAMAGE THE TOOL.
(h) Make sure the ball valve on the tool is in the open position.
B787-A-27-00-0026-00A-933A-DApplicable To:
Issue 001, 25 Nov 2014Model 787
See Applicability of this data module
Page 51 of 77
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB270026-00
Issue 001, 25 Nov 2014
AIRCRAFT SERVICE BULLETIN

### Page 52

(i) Supply FCE cabinet power.
1) Unlock these DO NOT CLOSE tags and close these circuit breakers on the CBIC panel:
Table 9  
CBDesignation
CE2709811FCE CABINET-C1 BACKUP
CE2709831FCE CABINET-L BACKUP
CE2709821FCE CABINET-C2 BACKUP
CE2709841FCE CABINET-R BACKUP
(j) Put the FLIGHT CONTROL SURFACE switch for the WINGS in the NORM position and remove
the DO NOT OPERATE tag. Refer to 787 AMM 27-02-00 Flight Control Surface Lock Switches
- Operation as an accepted procedure.
(k) Do these steps to pressurize the center hydraulic system and inspect the tool TSF036Z0229
connections for leaks:
1) Pressurize the center hydraulic system. Refer to 787 AMM 29-11-00 as an accepted proce-
dure.
2) Operate the ailerons. Do these steps 7 times:
a) Use the flight controls synoptic page to make sure that the ailerons moves fully.
b) Turn the control wheel from the neutral position to fully right.
c) Turn the control wheel from fully right to fully left.
d) Turn the control wheel from fully left to the neutral position.
3) Do a detailed visual inspection for hydraulic fluid leaks at the tool TSF036Z0229 connections.
If leaks are found, fix them.
(l) For the center hydraulic system, turn the applicable switch on the hydraulic system control
panel (P5) to the OFF position:
1) HYDRAULIC PRIMARY C1 ELEC
2) HYDRAULIC PRIMARY C2 ELEC
(3) Test Procedure:
(a) Make sure page 2 of the Flight Controls Maintenance Pages is showing. Refer to Data Module
Appendix G, SB B787-A-27-00-0026-0GA-931D-D Figure 1 for illustration of this screen.
B787-A-27-00-0026-00A-933A-DApplicable To:
Issue 001, 25 Nov 2014Model 787
See Applicability of this data module
Page 52 of 77
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB270026-00
Issue 001, 25 Nov 2014
AIRCRAFT SERVICE BULLETIN

### Page 53

WARNING: KEEP ALL PERSONS AND EQUIPMENT AWAY FROM THE FLIGHT CONTROL
SURFACES AND THE FLIGHT CONTROL DRIVE MECHANISMS. THESE COMPO-
NENTS WILL MOVE. THIS CAN CAUSE INJURIES TO PERSONS AND DAMAGE
TO EQUIPMENT.
(b) Start the applicable Central Maintenance Computing Function (CMCF) ground test: 27 Primary
Flight Control System, LRU Replacement, Left or Right Aileron Major Rig. Refer to 787 AMM
45-11-00 Start a Ground Test - Software Operation as an accepted procedure.
(c) After the test starts, continue through the test procedure until the GROUND TESTS screen
shows the following. Refer to Data Module Appendix G, SB B787-A-27-00-0026-0GA-931D-D
Figure 2 for illustration of this screen.
"The surface may now be ramped through 20 warm up/bleed cycles"
(d) Prepare to monitor the DELTA PRESS readout for the aileron inboard PCU on Page 2 of the
Flight Controls Maintenance Pages. Refer to Data Module Appendix G, SB B787-A-27-00-0026-
0GA-931D-D Figure 1 for illustration of this screen.
(e) On the GROUND TESTS screen, select the SKIP WARMUP AND BLEED and then click the
CONTINUE buttons. Refer to Data Module Appendix G, SB B787-A-27-00-0026-0GA-931D-D
Figure 2 for illustration of this screen.
(f) When the DELTA PRESS for the aileron inboard PCU is between -4400 psi and -5500 psi on
Page 2 of the Flight Controls Maintenance Pages, push the STOP TEST button on the GROUND
TESTS screen.
NOTE: A warning screen will show, do not push any additional buttons at this time. 
(g) Make sure the DELTA PRESS readout for the aileron inboard PCU on Page 2 of the Flight
Controls Maintenance Pages remains between -4400 psi and -5500 psi.
CAUTION: IF YOU DO NOT OBEY THIS STEP CORRECTLY, YOU WILL HAVE TO RE-
RIG THE SURFACE.
1) If the GROUND TESTS screen shows "Select position adjustments below until the aileron
being rigged is at the external alignment feature", the STOP TEST button was not pushed
in time. Refer to Data Module Appendix G, SB B787-A-27-00-0026-0GA-931D-D Figure 3
for illustration of this screen. Push the STOP TEST button and start the Test Procedure
again. Do not push CONTINUE on this GROUND TESTS screen. If you push CONTINUE,
you will need to re-rig the surface.
2) If the DELTA PRESS is not between -4400 psi and -5500 psi, Push the STOP TEST button
on the GROUND TESTS screen and start the Test Procedure again.
(h) RC - Close the ball valve on tool TSF036Z0229.
(i) RC - Read and record the flow through the indicator of tool TSF036Z0229 ten or more minutes
after the ball valve is closed.
(j) Open the ball valve on tool TSF036Z0229.
(k) Push the STOP TEST button on the GROUND TESTS warning screen.
(4) Remove the tool:
B787-A-27-00-0026-00A-933A-DApplicable To:
Issue 001, 25 Nov 2014Model 787
See Applicability of this data module
Page 53 of 77
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB270026-00
Issue 001, 25 Nov 2014
AIRCRAFT SERVICE BULLETIN

### Page 54

(a) Make sure the center hydraulic system and reservoir is depressurized. Refer to 787 AMM 27-
11-19 Aileron Power Control Unit Removal, as an accepted procedure.
(b) Make sure the FLIGHT CONTROL SURFACE switch for the WINGS is in the LOCK position
and a DO NOT OPERATE tag is installed. Refer to 787 AMM 27-11-19 Aileron Power Control
Unit - Removal, as an accepted procedure.
(c) Remove FCE cabinet power.
1) Open these circuit breakers and lock with DO NOT CLOSE tags on the CBIC panel:
Table 10  
CBDesignation
CE2709811FCE CABINET-C1 BACKUP
CE2709831FCE CABINET-L BACKUP
CE2709821FCE CABINET-C2 BACKUP
CE2709841FCE CABINET-R BACKUP
(d) RC - Disconnect and remove tool TSF036Z0229 between the aileron inboard PCU and the rear
spar.
(e) RC - Install the kept hydraulic return line between the aileron inboard PCU and rear spar. Refer
to 787 AMM 20-10-09 Tube Assembly - Flareless - Installation as an accepted procedure.
(f) Supply FCE cabinet power.
1) Unlock these DO NOT CLOSE tags and close these circuit breakers on the CBIC panel:
Table 11  
CBDesignation
CE2709811FCE CABINET-C1 BACKUP
CE2709831FCE CABINET-L BACKUP
CE2709821FCE CABINET-C2 BACKUP
CE2709841FCE CABINET-R BACKUP
(g) Put the FLIGHT CONTROL SURFACE switch for the WINGS in the NORM position and remove
the DO NOT OPERATE tag. Refer to 787 AMM 27-11-19 Aileron Power Control Unit - Removal,
as an accepted procedure.
(h) Do these steps to pressurize the hydraulic system and inspect the hydraulic return line to aileron
inboard PCU connection for leaks where the tool was installed:
1) Pressurize the center hydraulic system. Refer to 787 AMM 29-11-00 as an accepted proce-
dure.
2) Operate the ailerons. Do these steps 7 times:
a) Use the flight controls synoptic page to make sure that the ailerons moves fully.
B787-A-27-00-0026-00A-933A-DApplicable To:
Issue 001, 25 Nov 2014Model 787
See Applicability of this data module
Page 54 of 77
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB270026-00
Issue 001, 25 Nov 2014
AIRCRAFT SERVICE BULLETIN

### Page 55

b) Turn the control wheel from the neutral position to fully right.
c) Turn the control wheel from fully right to fully left.
d) Turn the control wheel from fully left to the neutral position.
3) Do a detailed visual inspection for hydraulic fluid leaks at the aileron inboard PCU hydraulic
return line connections. If leaks are found, fix them.
(i) Close access to the aileron PCUs:
1) For WORK PACKAGE 7, close panel 561YB and 561ZB - Wing Lower Fixed Trailing Edge
Panel. Refer to 787 AMM 57-51-10 Wing Trailing Edge Panel - Installation as an accepted
procedure.
2) For WORK PACKAGE 8, close panel 661YB and 661ZB - Wing Lower Fixed Trailing Edge
Panel. Refer to 787 AMM 57-51-10 Wing Trailing Edge Panel - Installation as an accepted
procedure.
Group 1, Configuration 2; Group 2:
O. PART 7: REPLACE THE POWER CONTROL UNIT
(1) RC - For WORK PACKAGE 5, replace the left elevator inboard power control unit. Refer to 787 AMM
27-31-09 as an accepted procedure.
(2) RC - For WORK PACKAGE 6, replace the right elevator inboard power control unit. Refer to 787
AMM 27-31-09 as an accepted procedure.
(3) RC - For WORK PACKAGE 7, replace the left aileron inboard power control unit. Refer to 787 AMM
27-11-19 as an accepted procedure.
(4) RC - For WORK PACKAGE 8, replace the right aileron inboard power control unit. Refer to 787 AMM
27-11-19 as an accepted procedure.
B787-A-27-00-0026-00A-933A-DApplicable To:
Issue 001, 25 Nov 2014End of data moduleModel 787
See Applicability of this data module
Page 55 of 77
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB270026-00
Issue 001, 25 Nov 2014
AIRCRAFT SERVICE BULLETIN

### Page 56

Alert Service Bulletin B787-81205-SB270026-00
Appendix A – LOGIC DIAGRAM FOR PARAGRAPH 1.E. COMPLIANCE:
TABLE 5 LEFT, RIGHT AND CENTER HYDRAULIC SYSTEM FLUID MARKER
INSTALLATION [Group 1-2:]
THIS ALERT SERVICE BULLETIN IS SENT TO THE OPERATORS OF RECORD OF THE
AIRPLANES SHOWN IN DATA MODULE SB B787-A-27-00-0026-00A-932A-D, PARAGRAPH 1.,
Alert:
EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND THIS SERVICE BULLETIN
TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS SERVICE
BULLETIN TO THE NEW OWNER.
References
TitleReference
ComplianceSB B787-A-27-00-0026-00A-932A-D Issue 001,
Paragraph 5.
Work InstructionsSB B787-A-27-00-0026-00A-933A-D Issue 001, Step 2.
FLIGHT CONTROLS - Elevator Control System -
Elevator Power Control Unit Electro-Hydraulic Servo
Valve Rate Restriction Test
SB B787-81205-SB270016-00
Procedure
Group 1-2:
1. Logic diagrams are provided as an aid only. Information contained in Data Module SB B787-A-27-
00-0026-00A-932A-D, Paragraph 5., Compliance, is the primary source for compliance times. Infor-
NOTE:
mation in Data Module SB B787-A-27-00-0026-00A-933A-D, Step 2., Work Instructions, is the pri-
mary source for tasks required for compliance. 
The table below gives the description for the parts and conditions called out in the logic diagram.
Table 1  Description Table
DescriptionTitle
MARKER INSTALLATIONWORK PACKAGE 1
B787-A-27-00-0026-0AA-931D-DApplicable To:
Issue 001, 25 Nov 2014Model 787
See Applicability of this data module
Page 56 of 77
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB270026-00
Issue 001, 25 Nov 2014
AIRCRAFT SERVICE BULLETIN

### Page 57

The table below gives the description for the flag notes called out in the logic diagram.
Table 2  Flag Notes
More DataFlag Note
No further action required for Group 1, Configuration 1 after WORK PACKAGE 1 is done.
Accomplishment of this service bulletin terminates SB B787-81205-SB270016-00. (TER-
MINATING ACTION)
[1]
No further action required for Group 1, Configuration 2 and Group 2 after WORK PACKAGE
1 thru WORK PACKAGE 4 are done. See Appendix A, B, C and D. Accomplishment of
this service bulletin terminates SB B787-81205-SB270016-00. (TERMINATING ACTION)
[2]
B787-A-27-00-0026-0AA-931D-DApplicable To:
Issue 001, 25 Nov 2014Model 787
See Applicability of this data module
Page 57 of 77
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB270026-00
Issue 001, 25 Nov 2014
AIRCRAFT SERVICE BULLETIN

### Page 58 (OCR)

B787-81205-SB270026-00
Issue 001, 25 Nov 2014
AIRCRAFT SERVICE BULLETIN
LOGIC DIAGRAM FOR PARAGRAPH 1.E. COMPLIANCE: TABLE 5 LEFT, RIGHT AND CENTER
HYDRAULIC SYSTEM FLUID MARKER INSTALLATION
WITHIN 36 MONTHS AFTER
THE ISSUE 001 DATE OF
THIS SERVICE BULLETIN
[1]  > DO WORK PACKAGE 1
2351290
ICN-B787-A-000061-A-81205-09066-A-01-1
Figure 1
Applicable To:  B787-A-27-00-0026-0AA-931D-D
Model 787  End of data module  Issue 001, 25 Nov 2014
See Applicability of this data module
Page 58 of 77
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.

### Page 59

Alert Service Bulletin B787-81205-SB270026-00
Appendix B – LOGIC DIAGRAM FOR PARAGRAPH 1.E. COMPLIANCE:
TABLE 6 LEFT HYDRAULIC SYSTEM FLUID TEST [Group 1, Configuration
2; Group 2: ]
THIS ALERT SERVICE BULLETIN IS SENT TO THE OPERATORS OF RECORD OF THE
AIRPLANES SHOWN IN DATA MODULE SB B787-A-27-00-0026-00A-932A-D, PARAGRAPH 1.,
Alert:
EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND THIS SERVICE BULLETIN
TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS SERVICE
BULLETIN TO THE NEW OWNER.
References
TitleReference
ComplianceSB B787-A-27-00-0026-00A-932A-D Issue 001,
Paragraph 5.
Work InstructionsSB B787-A-27-00-0026-00A-933A-D Issue 001, Step 2.
FLIGHT CONTROLS - Elevator Control System -
Elevator Power Control Unit Electro-Hydraulic Servo
Valve Rate Restriction Test
SB B787-81205-SB270016-00
Procedure
Group 1, Configuration 2; Group 2:
1. Logic diagrams are provided as an aid only. Information contained in Data Module SB B787-A-27-
00-0026-00A-932A-D, Paragraph 5., Compliance, is the primary source for compliance times. Infor-
NOTE:
mation in Data Module SB B787-A-27-00-0026-00A-933A-D, Step 2., Work Instructions, is the pri-
mary source for tasks required for compliance. 
The table below gives the description for the parts and conditions called out in the logic diagram.
Table 1  Description Table
DescriptionTitle
LEFT HYDRAULIC SYSTEM FLUID TESTWORK PACKAGE 2
CYCLE HYDRAULIC FLUIDPART 2
HYDRAULIC FLUID TESTPART 3
REPLACE HYDRAULIC FLUIDPART 4
PASSES THE HYDRAULIC FLUID TESTCONDITION 1
DOES NOT PASS THE HYDRAULIC FLUID TESTCONDITION 2
B787-A-27-00-0026-0BA-931D-DApplicable To:
Issue 001, 25 Nov 2014Model 787
See Applicability of this data module
Page 59 of 77
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB270026-00
Issue 001, 25 Nov 2014
AIRCRAFT SERVICE BULLETIN

### Page 60

The table below gives the description for the flag notes called out in the logic diagram.
Table 2  Flag Notes
More DataFlag Note
It is acceptable to put the airplane back to a serviceable condition and return the airplane
to service before the test results are received.
[1]
No further action required for Group 1, Configuration 2 and Group 2 after WORK PACKAGE
1 thru WORK PACKAGE 4 are done. See Appendix A, B, C and D. Accomplishment of
this service bulletin terminates SB B787-81205-SB270016-00. (TERMINATING ACTION)
[2]
CONDITION 2 (ACTION 2) can be done any time between CONDITION 2 (ACTION 1)
and the Compliance Time.
[3]
B787-A-27-00-0026-0BA-931D-DApplicable To:
Issue 001, 25 Nov 2014Model 787
See Applicability of this data module
Page 60 of 77
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB270026-00
Issue 001, 25 Nov 2014
AIRCRAFT SERVICE BULLETIN

The text continues at https://openairdocs.org/service-documents/boeing/b787-81205-sb270026-00/file/22c9675af017.md?from=61

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
