# Boeing Alert Requirements Bulletin B787-81205-SB270055-00 RB

Copy: Revision 002 ("B787-81205-SB270055-00 RB Issue 002reduced"), 37 pages: PDF https://openairdocs.org/files/sha256/54/1d/541da3d9dd0e76adcf47f09ef3ccb4579289e77b743973e553a82038fab75e76; text https://openairdocs.org/service-documents/boeing/b787-81205-sb270055-00-rb/file/541da3d9dd0e.md. Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2026-2712; AD 2026-20-10 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Boeing](https://openairdocs.org/service-documents/boeing.md)
- Type: Service bulletin (Alert Requirements Bulletin)
- Number: B787-81205-SB270055-00 RB
- Latest revision known: B787-81205-SB270055-00 RB, Issue 002, dated November 25, 2024 (OpenAirDocs)
- Page: https://openairdocs.org/service-documents/boeing/b787-81205-sb270055-00-rb

## ADs that cite it (1) (OpenAirDocs)

Newest first, with the revision each names, as OpenAirDocs read it from the AD's text.

- [AD 2026-20-10](https://openairdocs.org/ad/2026-20-10.md), effective Nov 12, 2026: Revisions 001 and 002

Also cited in [1 proposed AD](https://openairdocs.org/service-documents/boeing/b787-81205-sb270055-00-rb/proposed.md).

## Text (37 pages)

Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2026-2712; AD 2026-20-10 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication. Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

ALERT
Alert Requirements Bulletin B787-81205-SB270055-00 RB FLIGHT
CONTROLS - Leading Edge Slat System - Leading Edge Outboard Lockout
Actuator Change
Copyright © 2024 The Boeing Company
Treatment of this data module and its content is governed by contract with Boeing. Rights to use this data module are licensed on a per
aircraft basis and such rights may not be transferable. For more information, contact The Boeing Company. Boeing, the Boeing signature,
the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner, BBJ, DC-8, DC-9, DC-10, KC-10, KC-46, KDC-10, MD-10,
MD-11, MD-80, MD-88, MD-90, P-8, Poseidon and Boeing liveries are all trademarks owned by The Boeing Company; and no trademark
license is granted in connection with this document unless provided in writing by Boeing.
EXPORT CONTROLLED
This technology or software is subject to the U.S. Export Administration Regulations (EAR), (15 C.F.R. Parts 730-774). No authorization
from the U.S. Department of Commerce is required for export, re-export, in-country transfer, or access EXCEPT to country group E:1 or
E:2 countries/persons per Supp.1 to Part 740 of the EAR.
ECCN: 9E991
B787-81205-SB270055-00 RB
Issue 002, 25 Nov 2024 12:00:00 AM
Page 1 of 37
Export Controlled ECCN: 9E991
See page 1 for details
2.0
B787-81205-SB270055-00 RB
Issue 002, 25 Nov 2024 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 2

Table of Contents
Page
Revision Transmittal Information  ........................................ 3
A. EFFECTIVITY ................................................ 5
1. Airplanes ................................................. 5
2. Spares Affected .............................................. 7
B. CONCURRENT REQUIREMENTS ..................................... 7
C. COMPLIANCE ................................................ 7
D. APPROVAL .................................................. 9
E. ACCOMPLISHMENT INSTRUCTIONS .................................. 1 0
1. General Information ........................................... 1 0
2. Work Instructions ............................................ 1 1
TASK 1 – SLAT 2 LEADING EDGE OUTBOARD LOCKOUT ACTUATOR INSTALLATION [Group 1] . . 15
TASK 2 – SLAT 2 LEADING EDGE OUTBOARD LOCKOUT ACTUATOR INSTALLATION [Group 2] . . 21
TASK 3 – SLAT 11 LEADING EDGE OUTBOARD LOCKOUT ACTUATOR INSTALLATION [Group 1] . 27
TASK 4 – SLAT 11 LEADING EDGE OUTBOARD LOCKOUT ACTUATOR INSTALLATION [Group 2] . 33
B787-81205-SB270055-00 RB
Issue 002, 25 Nov 2024 12:00:00 AM
Page 2 of 37
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB270055-00 RB
Issue 002, 25 Nov 2024 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 3

Alert Requirements Bulletin B787-81205-SB270055-00 RB FLIGHT
CONTROLS - Leading Edge Slat System - Leading Edge Outboard Lockout
Actuator Change
Revision Transmittal Information
THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN
IN PARAGRAPH 1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND
Alert:
THIS DOCUMENT TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD,
SEND THIS DOCUMENT TO THE NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR
COMPLIANCE DOCUMENT. THE BOEING PROCESSES USED TO CREATE THE SERVICE
BULLETIN (SB) AND THE REQUIREMENTS BULLETIN (RB) ENSURE THAT THE INFORMATION
BETWEEN "RC START" AND "RC END" IN THE SB ARE IDENTICAL TO THE INFORMATION IN
THE SAME SECTIONS (COMPLIANCE, WORK INSTRUCTIONS...) OF THE RB WHICH THE SB
REFERS TO AS THE RELATED DOCUMENT.
This revision includes all pages of the requirements bulletin.
1. COMPLIANCE INFORMATION RELATED TO THIS REVISION
Effects of this revision on Airplanes on which Issue 001 was previously done:
None.
2. REASON FOR REVISION
This issue is sent to add line number (LN) 1174 to the bulletin effectivity and add European Union Aviation
Safety Agency (EASA)/Joint Aviation Authorities (JAA) approval statement.
These sections were changed:
- In the Effectivity, added LN 1174 to the bulletin effectivity.
- In Approval, changed approval paragraph to add EASA/JAA approval statement.
- In Task 1 thru Task 4, changed Figure 1 annotation.
- In Task 1 thru Task 4, updated Marker installation location footnote.
3. REVISION HISTORY
Table 1  
Service BulletinService BulletinRequirement BulletinRequirement Bulletin
787-27A0055787-27A0055787-27A0055 RB787-27A0055 RB
Issue DateIssue Date
December 12, 2023Issue 1:December 12, 2023Issue 1:
B787-81205-SB270055-00 RB
Issue 002, 25 Nov 2024 12:00:00 AM
Page 3 of 37
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB270055-00 RB
Issue 002, 25 Nov 2024 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 4

Table 1  
November 25, 2024Issue 2:November 25, 2024Issue 2:
B787-81205-SB270055-00 RB
Issue 002, 25 Nov 2024 12:00:00 AM
Page 4 of 37
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB270055-00 RB
Issue 002, 25 Nov 2024 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 5

THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN
IN PARAGRAPH 1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND
Alert:
THIS DOCUMENT TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD,
SEND THIS DOCUMENT TO THE NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR
COMPLIANCE DOCUMENT. THE BOEING PROCESSES USED TO CREATE THE SERVICE
BULLETIN (SB) AND THE REQUIREMENTS BULLETIN (RB) ENSURE THAT THE INFORMATION
BETWEEN "RC START" AND "RC END" IN THE SB ARE IDENTICAL TO THE INFORMATION IN
THE SAME SECTIONS (COMPLIANCE, WORK INSTRUCTIONS...) OF THE RB WHICH THE SB
REFERS TO AS THE RELATED DOCUMENT.
A. EFFECTIVITY
1. Airplanes
This bulletin is applicable to 787-8, 787-9, 787-10 Airplane(s), line number(s) 6-687, 689-954, 956-
970, 972-982, 984-989, 991-997, 999-1008, 1012-1013, 1016-1019, 1021-1027, 1029-1032, 1035,
1038-1041, 1044-1045, 1047-1048, 1051, 1054-1064, 1066, 1069, 1071-1072, 1074-1075, 1077,
1080-1082, 1085-1087, 1091-1095, 1098-1099, 1103, 1107, 1109, 1111-1115, 1117-1119, 1121-
1122, 1124-1127, 1129-1149, 1151, 1153-1155, 1157, 1159, 1161-1163, 1166-1167, 1174 in 2
Group(s). Where the effectivity is presented with hyphens between line numbers, the airplane
applicability means "through" and "inclusive", e.g. line numbers 1-9 means line numbers 1 through
9 inclusive.
NOTE: The Variable Number table below includes affected airplanes available as of the issue
date of this bulletin. Affected airplane Variable Numbers added to MyBoeingFleet.com
after the issue date of this bulletin will be shown using the Maintenance Performance
Toolbox EFFECTIVITY search function result.
Table 1  
DESCRIPTIONCONFIGURATIONGROUP
787-8, 787-9 and 787-10 Airplanes with a Geared Rotary Actuator
(GRA) installed at outboard slat 2 and 11 that do not have a fastener
hole on the inner track rib.
- 1
787-8, 787-9 and 787-10 Airplanes with a Geared Rotary Actuator
(GRA) installed at outboard slat 2 and 11 that have an existing fastener
hole on the inner track rib.
- 2
Airplane Models: 787-10, 787-8, 787-9
Table 2
GroupVariable Number
1ZA006
1ZA100 - ZA105
1ZA116 - ZA124
GroupVariable Number
1ZA135 - ZA144
1ZA152 - ZA156
1ZA175 - ZA189
GroupVariable Number
1ZA195 - ZA204
1ZA215 - ZA225
1ZA230 - ZA256
B787-81205-SB270055-00 RB
Issue 002, 25 Nov 2024 12:00:00 AM
Page 5 of 37
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB270055-00 RB
Issue 002, 25 Nov 2024 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 6

GroupVariable Number
1ZA260 - ZA277
1ZA285 - ZA296
1ZA317 - ZA324
1ZA327
1ZA334 - ZA335
1ZA341 - ZA342
1ZA380 - ZA389
1ZA430 - ZA439
1ZA445 - ZA489
1ZA506 - ZA516
1ZA536 - ZA545
1ZA560 - ZA567
1ZA576 - ZA580
1ZA586
1ZA588 - ZA593
1ZA610 - ZA617
1ZA650 - ZA652
1ZA655 - ZA663
1ZA665 - ZA677
1ZA680 - ZA685
1ZA695 - ZA698
1ZA715 - ZA716
1ZA718 - ZA719
1ZA740 - ZA741
1ZA768 - ZA769
1ZA778 - ZA779
1ZA783 - ZA784
1ZA817 - ZA831
1ZA839
1ZA841 - ZA842
1ZA846 - ZA848
GroupVariable Number
1ZA853 - ZA862
2ZA864
1ZA873 - ZA876
1ZA881 - ZA888
1ZA916 - ZA920
1ZA949 - ZA950
1ZA954 - ZA959
1ZA963 - ZA966
1ZA968 - ZA972
1ZA980
2ZA981
1ZA990
1ZB001 - ZB012
1ZB021 - ZB043
1ZB047 - ZB060
1ZB077 - ZB081
1ZB097 - ZB121
1ZB127 - ZB136
1ZB167 - ZB191
1ZB197 - ZB198
1ZB217
1ZB219 - ZB220
1ZB224 - ZB229
1ZB234 - ZB242
1ZB246 - ZB248
1ZB251 - ZB258
1ZB261 - ZB262
1ZB265 - ZB282
1ZB299
1ZB302 - ZB305
1ZB332 - ZB338
GroupVariable Number
1ZB362 - ZB379
1ZB407 - ZB435
1ZB446 - ZB467
1ZB536 - ZB543
1ZB545 - ZB547
1ZB558 - ZB587
2ZB588
1ZB603 - ZB618
1ZB646 - ZB649
1ZB656 - ZB666
1ZB676 - ZB681
1ZB688 - ZB707
1ZB733 - ZB735
1ZB738 - ZB740
1ZB742 - ZB745
1ZB749 - ZB750
1ZB753 - ZB757
1ZB763 - ZB768
1ZB771 - ZB775
1ZB778 - ZB821
1ZB828 - ZB841
1ZB858 - ZB863
1ZB874 - ZB876
1ZB887
1ZB890
1ZB893 - ZB902
1ZB908 - ZB918
1ZB922
1ZB924
1ZB926 - ZB927
1ZB934 - ZB952
B787-81205-SB270055-00 RB
Issue 002, 25 Nov 2024 12:00:00 AM
Page 6 of 37
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB270055-00 RB
Issue 002, 25 Nov 2024 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 7

GroupVariable Number
1ZB967 - ZB971
1ZB977 - ZB978
1ZB980 - ZB986
1ZB990 - ZB991
1ZB993 - ZB997
1ZC001 - ZC016
1ZC018 - ZC021
2ZC022
1ZC036 - ZC056
1ZC061 - ZC070
1ZC101 - ZC107
1ZC116 - ZC118
1ZC126 - ZC129
1ZC151 - ZC152
1ZC155 - ZC158
1ZC165
1ZC211 - ZC219
1ZC221 - ZC227
2ZC228
1ZC239 - ZC241
GroupVariable Number
1ZD001 - ZD009
1ZD012 - ZD029
1ZD048 - ZD049
1ZE001 - ZE006
1ZE008
1ZE013
1ZE016 - ZE017
1ZE031 - ZE032
1ZE040 - ZE045
1ZE048
1ZE075
1ZE085 - ZE086
1ZE090 - ZE091
1ZE095 - ZE096
2ZE097
1ZE100
1ZE105 - ZE108
1ZE110 - ZE112
1ZE115
1ZE150
GroupVariable Number
1ZE165 - ZE166
1ZE170 - ZE171
1ZE195 - ZE198
1ZE220 - ZE239
2ZE240 - ZE241
1ZE270 - ZE273
1ZE310 - ZE311
1ZE340 - ZE341
1ZE350 - ZE362
1ZE375
1ZE380 - ZE381
1ZE415 - ZE417
1ZE419 - ZE420
1ZE425 - ZE428
1ZE435 - ZE437
1ZE455 - ZE456
1ZE481
1ZE486 - ZE488
--
--
2. Spares Affected
None.
B. CONCURRENT REQUIREMENTS
None.
C. COMPLIANCE
Federal Aviation Administration (FAA) Airworthiness Directive AD 2019-20-07 is related to Requirements
Bulletin B787-81205-SB270055-00 RB. The effective date of AD 2019-20-07 is October 11, 2019.
The FAA will possibly release an additional Airworthiness Directive related to Requirements Bulletin B787-
81205-SB270055-00 RB. The additional Airworthiness Directive will make the compliance tasks and times
given in Requirements Bulletin B787-81205-SB270055-00 RB mandatory.
B787-81205-SB270055-00 RB
Issue 002, 25 Nov 2024 12:00:00 AM
Page 7 of 37
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB270055-00 RB
Issue 002, 25 Nov 2024 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 8

Accomplish the required action, based on the applicable condition in Table 4 and Table 5 in accordance
with the Accomplishment Instructions.
Table 4  Leading Edge Outboard Lockout Actuator Installation at Slat 2 and Slat 11 Outboard Locations
Repeat Interval (Not
to Exceed)
Boeing Recommended Compliance TimeActionCondition
-Whichever occurs later;At Leading Edge Slat
2 and Slat 11 out-
board locations, re-
place the leading
edge outboard
Geared Rotary Actu-
ator (GRA) with
Leading Edge Out-
board Lockout Actua-
tor (LEOLA).
All Airplanes
1. Within 36 months after the Issue 001 date
of Requirements Bulletin B787-81205-
SB270055-00 RB.
2. Within 36 months after the date of is-
suance of the original standard certificate
of airworthiness or the original export certifi-
cate of airworthiness.
Table 5  Maintenance Program Review
Repeat Interval (Not
to Exceed)
Boeing Recommended Compliance TimeActionCondition
-Whichever occurs later;Do a review of opera-
tor's maintenance
program to deter-
mine incorporation of
Certification Mainte-
nance Requirements
(CMRs) document
D011Z009-03-03
CMR Item Number
27-CMR-14 "Func-
tionally check the
Leading Edge Power
Drive Unit Half Sys-
tem Torque Brake."
All Airplanes
1. Within 36 months after the Issue 001 date
of Requirements Bulletin B787-81205-
SB270055-00 RB.
2. Within 36 months after the date of is-
suance of the original standard certificate
of airworthiness or the original export certifi-
cate of airworthiness.
-Whichever occurs later;Incorporate CMRs
document
D011Z009-03-03
CMR Item Number
27-CMR-14 into the
operator's mainte-
nance program.
CONDITION 1:
CMRs document
D011Z009-03-03
CMR Item Number
27-CMR-14 is not in-
corporated into the
operator's mainte-
nance program.
1. Within 36 months after the Issue 001 date
of Requirements Bulletin B787-81205-
SB270055-00 RB.
2. Within 36 months after the date of is-
suance of the original standard certificate
of airworthiness or the original export certifi-
cate of airworthiness.
B787-81205-SB270055-00 RB
Issue 002, 25 Nov 2024 12:00:00 AM
Page 8 of 37
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB270055-00 RB
Issue 002, 25 Nov 2024 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 9

Table 5  Maintenance Program Review
Repeat Interval (Not
to Exceed)
Boeing Recommended Compliance TimeActionCondition
--No further action re-
quired.
CONDITION 2:
CMRs document
D011Z009-03-03
CMR Item Number
27-CMR-14 is incor-
porated into the oper-
ator's maintenance
program.
D. APPROVAL
This Requirements Bulletin was examined by the Federal Aviation Administration (FAA). The changes
specified in this document comply with the applicable regulations and are FAA approved, as well as European
Union Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/JAA approved
airplanes listed in this Requirements Bulletin effectivity. This document and its approval were based on the
airplane in its original Boeing delivery configuration or as modified by other Boeing changes.
If an airplane has a non-Boeing modification or repair that affects a component or system also affected by
this Requirements Bulletin, the operator is responsible for obtaining appropriate regulatory agency approval
before incorporating this Requirements Bulletin.
In addition, the Manager of the FAA Continued Operational Safety Branch approves the (1) action (i.e.,
inspection or modification) defined in this Requirements Bulletin, (2) incorporation of the Airplane Flight
Manual (AFM) Certificate Limitations Chapter revision associated with this bulletin, and (3) incorporation of
Certification Maintenance Requirement (CMR) Item Number 27-CMR-14 into an operator's maintenance
or inspection program as an Alternative Method of Compliance (AMOC) to accomplishing the requirements
of paragraphs (g), (i), and (j) of AD 2019-20-07. All provisions of AD 2019-20-07 that are not specifically
referenced in the above statement remain fully applicable and must be complied with accordingly.
B787-81205-SB270055-00 RB
Issue 002, 25 Nov 2024 12:00:00 AM
Page 9 of 37
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB270055-00 RB
Issue 002, 25 Nov 2024 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 10

E.    ACCOMPLISHMENT INSTRUCTIONS
1. GENERAL INFORMATION
NOTE: 1. This is an Enhanced Required for Compliance document. There will be a separate Service
Bulletin (SB) and a separate Requirements Bulletin (RB). If an RB is mandated by an
Airworthiness Directive (AD), then all applicable requirements specified in the RB must
be done. In the RB, the "Refer to the listed procedures..." column of the table(s) in the
Work Instructions is for reference only. The procedures in that column are not required
by the AD and are for guidance only. For the related SB, some locations are marked RC
Start and RC End to identify the requirements that are restated from the RB. For the re-
lated SB, the areas between RC Start and RC End, including sub-steps and any figures
identified between RC Start and RC End, must be done to comply with the AD. Therefore,
an Alternative Method of Compliance (AMOC) is required for any deviations to steps be-
tween RC Start and RC End, including substeps and identified figures. For the related
SB, the steps not between RC Start and RC End may be deviated from using accepted
methods in accordance with the operator's maintenance or inspection program without
obtaining approval of an AMOC; this is provided that the steps between RC Start and RC
End, including sub-steps and identified figures, can still be done as specified, and the
airplane can be put back in an airworthy condition. Figures not required for compliance
are omitted from the RB.
2. This is an Enhanced Required for Compliance document. The Boeing processes used
to create the Service Bulletin (SB) and the Requirements Bulletin (RB) ensure that the
information between "RC Start" and "RC End" in the SB are identical to the information
in the same sections (Compliance, Work Instructions...) of the RB which the SB refers to
as the related document.
3. These work instructions refer to procedures included in other Boeing documents. When
the words "refer to" are used and the operator has an accepted alternative procedure,
the accepted alternative procedure can be used. When the words "in accordance with"
are included in the instruction, the procedure in the Boeing document must be used.
4. The compliance times for the actions in Work Instructions are in Compliance.
5. Unless shown differently, these dimensions and tolerances are used:
– Linear dimensions are in inches
– Tolerance on linear dimensions, other than rivet and bolt edge margins, is plus or
minus 0.03 inch
– Tolerance on rivet and bolt edge margin is plus or minus 0.05 inch
– Angular tolerance is plus or minus 2 degrees
– Hole dimensions for standard solid rivets and fasteners are in SRM Chapter 51
– Torque Values:
– Values for structural fasteners are given in 787 Structural Repair Manual, Chapter
51.
– Values for airframe maintenance tasks are included in Chapter 20 of 787 Aircraft
Maintenance Manual (AMM).
B787-81205-SB270055-00 RB
Issue 002, 25 Nov 2024 12:00:00 AM
Page 10 of 37
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB270055-00 RB
Issue 002, 25 Nov 2024 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 11

– Values for electrical maintenance tasks are included in Chapter 20 of Standard
Wiring Practices Manual (SWPM).
– Values for engine maintenance tasks are included in Chapter 70 of 787 Aircraft
Maintenance Manual (AMM).
– Non-standard torque values for maintenance tasks are included in the applicable
installation step.
6. Use the approved fastener, process and material substitutions in accordance with SRM
Chapter 51.
7. If the length of any fastener specified in this service bulletin does not meet the installation
standards in SRM Chapter 51, then a fastener of the same specification, or an approved
substitute, with a length which meets the installation standards in SRM Chapter 51 may
be used. In addition, washers may be installed for fastener grip length in accordance with
SRM Chapter 51. Refer to SOPM 20-50-01 for alternate full threaded fasteners (screws)
needed for installation in this service bulletin.
8. If it is necessary to remove more parts for access, you can remove those parts. If you
can get access without removing identified parts, it is not necessary to remove all of the
identified parts. Jacking and shoring limitations must be observed.
9. If shading is used, shaded areas in Tasks are to separate the non-critical and non-author-
itative information from the critical and authoritative information.
10. Use of colors in Tasks is based on guidance from the S1000D International specification
for technical publications.
2. WORK INSTRUCTIONS
A. Actions Required for Compliance
(1) Requirements
B787-81205-SB270055-00 RB
Issue 002, 25 Nov 2024 12:00:00 AM
Page 11 of 37
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB270055-00 RB
Issue 002, 25 Nov 2024 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 12

Table 1  Leading Edge Outboard Lockout Actuator Installation at Slat 2 and Slat 11 Outboard Locations
Refer to the listed proce-
dures in SB B787-81205-
SB270055-00 Issue 001
or later approved issues
as an accepted proce-
dure
Method of ComplianceActionCondition
PART 1: PREPARE FOR
ACCESS
-At Leading Edge Slat 2
outboard location, replace
the leading edge outboard
Geared Rotary Actuator
(GRA) with Leading Edge
Outboard Lockout Actuator
(LEOLA).
All Airplanes
PART 2: LEADING EDGE
SLAT 2 OUTBOARD
OPEN ACCESS
PART 3: LEADING EDGE
SLAT 2 OUTBOARD
GEARED ROTARY ACTU-
ATOR (GRA) REMOVAL
-Group 1:
Task 1
Group 2:
Task 2
PART 1: PREPARE FOR
ACCESS
-At Leading Edge Slat 11
outboard location, replace
the leading edge outboard
GRA with LEOLA. PART 4: LEADING EDGESLAT 11 OUTBOARD
OPEN ACCESS
PART 5: LEADING EDGE
SLAT 11 OUTBOARD
GEARED ROTARY ACTU-
ATOR (GRA) REMOVAL
-Group 1:
Task 3
Group 2:
Task 4
PART 6: RIGGING,
CLOSE ACCESS AND
TEST
--
B787-81205-SB270055-00 RB
Issue 002, 25 Nov 2024 12:00:00 AM
Page 12 of 37
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB270055-00 RB
Issue 002, 25 Nov 2024 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 13

Table 2  Maintenance Program Review
Refer to the listed proce-
dures in SB B787-81205-
SB270055-00 Issue 001
or later approved issues
as an accepted proce-
dure
Method of ComplianceActionCondition
--Do a review of operator's
maintenance program to
determine incorporation of
Certification Maintenance
Requirements (CMRs)
document D011Z009-03-
03 CMR Item Number 27-
CMR-14 "Functionally
check the Leading Edge
Power Drive Unit Half Sys-
tem Torque Brake." into
the operators' mainte-
nance program.
All Airplanes
--Incorporate CMRs docu-
ment D011Z009-03-03
CMR Item Number 27-
CMR-14 into the operator's
maintenance program.
CONDITION 1: CMRs
document D011Z009-03-
03 CMR Item Number 27-
CMR-14 is not incorporat-
ed into the operator's
maintenance program.
--No further action required.CONDITION 2: CMRs
document D011Z009-03-
03 CMR Item Number 27-
CMR-14 is incorporated
into the operator's mainte-
nance program.
B787-81205-SB270055-00 RB
Issue 002, 25 Nov 2024 12:00:00 AM
Page 13 of 37
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB270055-00 RB
Issue 002, 25 Nov 2024 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 14

Task 1 – SLAT 2 LEADING EDGE OUTBOARD LOCKOUT ACTUATOR
INSTALLATION [Group 1: ]
THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN
IN PARAGRAPH 1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND
Alert:
THIS DOCUMENT TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD,
SEND THIS DOCUMENT TO THE NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR
COMPLIANCE DOCUMENT. THE BOEING PROCESSES USED TO CREATE THE SERVICE
BULLETIN (SB) AND THE REQUIREMENTS BULLETIN (RB) ENSURE THAT THE INFORMATION
BETWEEN "RC START" AND "RC END" IN THE SB ARE IDENTICAL TO THE INFORMATION IN
THE SAME SECTIONS (COMPLIANCE, WORK INSTRUCTIONS...) OF THE RB WHICH THE SB
REFERS TO AS THE RELATED DOCUMENT.
B787-81205-SB270055-00 RB
Issue 002, 25 Nov 2024 12:00:00 AM
Page 14 of 37
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB270055-00 RB
Issue 002, 25 Nov 2024 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 15 (OCR)

@ BOEING  B787-81205-SB270055-00 RB
Issue 002, 25 Nov 2024 12:00:00 AM
REQUIREMENTS BULLETIN
Procedure
This Task applies only to: Group 1.
.........
000000000
WS
1055
FWD
LEADING EDGE OUTBOARD SLAT 2
INBD
ICN-B787-A-000061-A-81205-19079-A-02-1
Figure 1
B787-81205-SB270055-00 RB
Issue 002, 25 Nov 2024 12:00:00 AM
Page 15 of 37
Export Controlled ECCN: 9E991
See page 1 for details

### Page 16 (OCR)

_BOEING  B787-81205-SB270055-00 RB
Issue 002, 25 Nov 2024 12:00:00 AM
REQUIREMENTS BULLETIN
INNER MAIN
TRACK RIB
OUTER MAIN TRACK RIB REMOVED FOR CLARITY
2984698
ICN-B787-A-000061-A-81205-19080-A-01-1
Figure 2
B787-81205-SB270055-00 RB
Issue 002, 25 Nov 2024 12:00:00 AM
Page 16 of 37
Export Controlled ECCN: 9E991
See page 1 for details

### Page 17 (OCR)

O_BOEING  B787-81205-SB270055-00 RB
Issue 002, 25 Nov 2024 12:00:00 AM
REQUIREMENTS BULLETIN
00
VIEW LOOKING OUTBOARD
A-A
ICN-B787-A-000061-A-81205-19081-A-01-1
Figure 3
B787-81205-SB270055-00 RB
Issue 002, 25 Nov 2024 12:00:00 AM
Page 17 of 37
Export Controlled ECCN: 9E991
See page 1 for details

### Page 18 (OCR)

_BOEING  B787-81205-SB270055-00 RB
Issue 002, 25 Nov 2024 12:00:00 AM
REQUIREMENTS BULLETIN
LEADING EDGE G  OUTBOARD
LOCKOUT
ACTUATOR
4
MARKER
4 LOCATIONS
OUTER MAIN TRACK RIB REMOVED FOR CLARITY
ICN-B787-A-000061-A-81205-19082-A-01-1
Figure 4
1. The step numbers shown below agree with the numbers shown in the circle symbols in the Task. The QTY
numbers shown below are the number of parts necessary for the leading edge outboard lockout actuator instal-
lation.
B787-81205-SB270055-00 RB
Issue 002, 25 Nov 2024 12:00:00 AM
Page 18 of 37
Export Controlled ECCN: 9E991
See page 1 for details

### Page 19

Table 1  
More DataQtyIdentificationNameActionStep
*[1]*[2]1-HOLEDrill1
*[1]*[3]*[4]*[5]1BACB30NX5HK4BOLTInstall (New)2
*[1]*[4]*[5]1BACC30AB5ACOLLARInstall (New)
*[6]1E900-194LEADING EDGE OUT-
BOARD LOCKOUT AC-
TUATOR
Install (New)3
*[1]*[6]4BACB30NX8K7BOLTInstall (New)
*[1]*[6]4BACW10BP4PKWASHERInstall (New)
*[1]*[6]4BACN10YR4CDNUTInstall (New)
*[5]*[7]1643Z9102-2MARKERInstall (New)4
*[1]  Use the approved fastener, process and material substitutions in accordance with SRM Chapter 51-41.
*[2]  Use Tool MIT162Z1832 for hole location. Hole diameter 0.164-0.168 inch. Break sharp edges. Refer to the relevant SRM 51-41-05 as
an accepted procedure. Treat scratches and other surfaces bared by application of chemical conversion coating, Type II, Class A.
Refer to SOPM 20-43-03 as an accepted procedure.
*[3]  Install fastener head on inboard side of rib as shown in figure. Wet install with BMS 5-45 sealant. Refer to SOPM 20-50-19 Method 2
as an accepted procedure. Fair Sealant Squeeze-out Flush with the fastener head.
*[4]  Clean surface and reactivate primer, and apply one coat of BMS 10-11 Type I, Yellow Primer to fastener heads, collars, scratches,
and bared surfaces. Refer to SOPM 20-41-02 as an accepted procedure or for substitution material.
*[5]  Use of acceptable materials and process substitutions are allowed. See the Qualified Products List at the end of the Boeing Material
Specification (BMS), or applicable SRM or SOPM, for supplier data or suitable substitution.
*[6]  Refer to 787 AMM 27-81-04 as an accepted procedure.
*[7]  Install marker at location shown. It is acceptable to install marker above existing marker. Prepare surface, install marker and apply
Type 41 edge seal or overcoat to marker. Refer to SOPM 20-50-05 and SOPM 20-44-01 as accepted procedures.
B787-81205-SB270055-00 RB
Issue 002, 25 Nov 2024 12:00:00 AM
Page 19 of 37
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB270055-00 RB
Issue 002, 25 Nov 2024 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 20

Task 2 – SLAT 2 LEADING EDGE OUTBOARD LOCKOUT ACTUATOR
INSTALLATION [Group 2: ]
THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN
IN PARAGRAPH 1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND
Alert:
THIS DOCUMENT TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD,
SEND THIS DOCUMENT TO THE NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR
COMPLIANCE DOCUMENT. THE BOEING PROCESSES USED TO CREATE THE SERVICE
BULLETIN (SB) AND THE REQUIREMENTS BULLETIN (RB) ENSURE THAT THE INFORMATION
BETWEEN "RC START" AND "RC END" IN THE SB ARE IDENTICAL TO THE INFORMATION IN
THE SAME SECTIONS (COMPLIANCE, WORK INSTRUCTIONS...) OF THE RB WHICH THE SB
REFERS TO AS THE RELATED DOCUMENT.
B787-81205-SB270055-00 RB
Issue 002, 25 Nov 2024 12:00:00 AM
Page 20 of 37
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB270055-00 RB
Issue 002, 25 Nov 2024 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 21 (OCR)

@ BOEING  B787-81205-SB270055-00 RB
Issue 002, 25 Nov 2024 12:00:00 AM
REQUIREMENTS BULLETIN
Procedure
This Task applies only to: Group 2.
.........
19  000000000
WS
1055
FWD
LEADING EDGE OUTBOARD SLAT 2
INBD
ICN-B787-A-000061-A-81205-19083-A-02-1
Figure 1
B787-81205-SB270055-00 RB
Issue 002, 25 Nov 2024 12:00:00 AM
Page 21 of 37
Export Controlled ECCN: 9E991
See page 1 for details

### Page 22 (OCR)

_BOEING  B787-81205-SB270055-00 RB
Issue 002, 25 Nov 2024 12:00:00 AM
REQUIREMENTS BULLETIN
INNER MAIN
TRACK RIB
OUTER MAIN TRACK RIB REMOVED FOR CLARITY
3043632
ICN-B787-A-000061-A-81205-19084-A-01-1
Figure 2
B787-81205-SB270055-00 RB
Issue 002, 25 Nov 2024 12:00:00 AM
Page 22 of 37
Export Controlled ECCN: 9E991
See page 1 for details

### Page 23 (OCR)

OBOEING  B787-81205-SB270055-00 RB
Issue 002, 25 Nov 2024 12:00:00 AM
REQUIREMENTS BULLETIN
100
VIEW LOOKING OUTBOARD
A-A
3043634
ICN-B787-A-000061-A-81205-19085-A-01-1
Figure 3
B787-81205-SB270055-00 RB
Issue 002, 25 Nov 2024 12:00:00 AM
Page 23 of 37
Export Controlled ECCN: 9E991
See page 1 for details

### Page 24 (OCR)

_BOEING  B787-81205-SB270055-00 RB
Issue 002, 25 Nov 2024 12:00:00 AM
REQUIREMENTS BULLETIN
LEADING EDGE 2  OUTBOARD
LOCKOUT
ACTUATOR
MARKER
4 LOCATIONS
OUTER MAIN TRACK RIB REMOVED FOR CLARITY
ICN-B787-A-000061-A-81205-19086-A-01-1
Figure 4
1. The step numbers shown below agree with the numbers shown in the circle symbols in the Task. The QTY
numbers shown below are the number of parts necessary for the leading edge outboard lockout actuator instal-
B787-81205-SB270055-00 RB
Issue 002, 25 Nov 2024 12:00:00 AM
Page 24 of 37
Export Controlled ECCN: 9E991
See page 1 for details

### Page 25

Table 1  
More DataQtyIdentificationNameActionStep
*[1]*[2]*[3]*[4]1BACB30NX5HK4BOLTInstall (New)1
*[1]*[3]*[4]1BACC30AB5ACOLLARInstall (New)
*[5]1E900-194LEADING EDGE OUT-
BOARD LOCKOUT AC-
TUATOR
Install (New)2
*[1]*[5]4BACB30NX8K7BOLTInstall (New)
*[1]*[5]4BACW10BP4PKWASHERInstall (New)
*[1]*[5]4BACN10YR4CDNUTInstall (New)
*[4]*[6]1643Z9102-2MARKERInstall (New)3
*[1]  Use the approved fastener, process and material substitutions in accordance with SRM Chapter 51-41.
*[2]  Install fastener head on inboard side of rib as shown in figure. Wet install with BMS 5-45 sealant. Refer to SOPM 20-50-19 Method 2
as an accepted procedure. Fair Sealant Squeeze-out Flush with the fastener head.
*[3]  Clean surface and reactivate primer, and apply one coat of BMS 10-11 Type I, Yellow Primer to fastener heads, collars, scratches,
and bared surfaces. Refer to SOPM 20-41-02 as an accepted procedure or for substitution material.
*[4]  Use of acceptable materials and process substitutions are allowed. See the Qualified Products List at the end of the Boeing Material
Specification (BMS), or applicable SRM or SOPM, for supplier data or suitable substitution.
*[5]  Refer to 787 AMM 27-81-04 as an accepted procedure.
*[6]  Install marker at location shown. It is acceptable to install marker above existing marker. Prepare surface, install marker and apply
Type 41 edge seal or overcoat to marker. Refer to SOPM 20-50-05 and SOPM 20-44-01 as accepted procedures.
B787-81205-SB270055-00 RB
Issue 002, 25 Nov 2024 12:00:00 AM
Page 25 of 37
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB270055-00 RB
Issue 002, 25 Nov 2024 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 26

Task 3 – SLAT 11 LEADING EDGE OUTBOARD LOCKOUT ACTUATOR
INSTALLATION [Group 1: ]
THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN
IN PARAGRAPH 1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND
Alert:
THIS DOCUMENT TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD,
SEND THIS DOCUMENT TO THE NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR
COMPLIANCE DOCUMENT. THE BOEING PROCESSES USED TO CREATE THE SERVICE
BULLETIN (SB) AND THE REQUIREMENTS BULLETIN (RB) ENSURE THAT THE INFORMATION
BETWEEN "RC START" AND "RC END" IN THE SB ARE IDENTICAL TO THE INFORMATION IN
THE SAME SECTIONS (COMPLIANCE, WORK INSTRUCTIONS...) OF THE RB WHICH THE SB
REFERS TO AS THE RELATED DOCUMENT.
B787-81205-SB270055-00 RB
Issue 002, 25 Nov 2024 12:00:00 AM
Page 26 of 37
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB270055-00 RB
Issue 002, 25 Nov 2024 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 27 (OCR)

Q BOEING  B787-81205-SB270055-00 RB
Issue 002, 25 Nov 2024 12:00:00 AM
REQUIREMENTS BULLETIN
Procedure
This Task applies only to: Group 1.
10000 000000000
WS
1055
FWD
LEADING EDGE OUTBOARD SLAT 11
NBD
ICN-B787-A-000061-A-81205-19087-A-02-1
Figure 1
B787-81205-SB270055-00 RB
Issue 002, 25 Nov 2024 12:00:00 AM
Page 27 of 37
Export Controlled ECCN: 9E991
See page 1 for details

### Page 28 (OCR)

@ BOEING  B787-81205-SB270055-00 RB
Issue 002, 25 Nov 2024 12:00:00 AM
REQUIREMENTS BULLETIN
INNER MAIN
TRACK RIB
OUTER MAIN TRACK RIB REMOVED FOR CLARITY
B
ICN-B787-A-000061-A-81205-19088-A-01-1
Figure 2
B787-81205-SB270055-00 RB
Issue 002, 25 Nov 2024 12:00:00 AM
Page 28 of 37
Export Controlled ECCN: 9E991
See page 1 for details

### Page 29 (OCR)

O_BOEING  B787-81205-SB270055-00 RB
Issue 002, 25 Nov 2024 12:00:00 AM
REQUIREMENTS BULLETIN
VIEW LOOKING OUTBOARD
A-A
ICN-B787-A-000061-A-81205-19089-A-01-1
Figure 3
B787-81205-SB270055-00 RB
Issue 002, 25 Nov 2024 12:00:00 AM
Page 29 of 37
Export Controlled ECCN: 9E991
See page 1 for details

### Page 30 (OCR)

@ BOEING  B787-81205-SB270055-00 RB
Issue 002, 25 Nov 2024 12:00:00 AM
REQUIREMENTS BULLETIN
3 LEADING EDGE
OUTBOARD
LOCKOUT
ACTUATOR
MARKER
4 LOCATIONS
OUTER MAIN TRACK RIB REMOVED FOR CLARITY
ICN-B787-A-000061-A-81205-19090-A-01-1
Figure 4
1. The step numbers shown below agree with the numbers shown in the circle symbols in the Task. The QTY
numbers shown below are the number of parts necessary for the leading edge outboard lockout actuator instal-
B787-81205-SB270055-00 RB
Issue 002, 25 Nov 2024 12:00:00 AM
Page 30 of 37
Export Controlled ECCN: 9E991
See page 1 for details

### Page 31

Table 1  
More DataQtyIdentificationNameActionStep
*[1]*[2]1-HOLEDrill1
*[1]*[3]*[4]*[5]1BACB30NX5HK4BOLTInstall (New)2
*[1]*[4]*[5]1BACC30AB5ACOLLARInstall (New)
*[6]1E900-194LEADING EDGE OUT-
BOARD LOCKOUT AC-
TUATOR
Install (New)3
*[1]*[6]4BACB30NX8K7BOLTInstall (New)
*[1]*[6]4BACW10BP4PKWASHERInstall (New)
*[1]*[6]4BACN10YR4CDNUTInstall (New)
*[5]*[7]1643Z9102-2MARKERInstall (New)4
*[1]  Use the approved fastener, process and material substitutions in accordance with SRM Chapter 51-41.
*[2]  Use Tool MIT162Z1832 for hole location. Hole diameter 0.164-0.168 inch. Break sharp edges. Refer to the relevant SRM 51-41-05 as
an accepted procedure. Treat scratches and other surfaces bared by application of chemical conversion coating, Type II, Class A.
Refer to SOPM 20-43-03 as an accepted procedure.
*[3]  Install fastener head on inboard side of rib as shown in figure. Wet install with BMS 5-45 sealant. Refer to SOPM 20-50-19 Method 2
as an accepted procedure. Fair Sealant Squeeze-out Flush with the fastener head.
*[4]  Clean surface and reactivate primer, and apply one coat of BMS 10-11 Type I, Yellow Primer to fastener heads, collars, scratches,
and bared surfaces. Refer to SOPM 20-41-02 as an accepted procedure or for substitution material.
*[5]  Use of acceptable materials and process substitutions are allowed. See the Qualified Products List at the end of the Boeing Material
Specification (BMS), or applicable SRM or SOPM, for supplier data or suitable substitution.
*[6]  Refer to 787 AMM 27-81-04 as an accepted procedure.
*[7]  Install marker at location shown. It is acceptable to install marker above existing marker. Prepare surface, install marker and apply
Type 41 edge seal or overcoat to marker. Refer to SOPM 20-50-05 and SOPM 20-44-01 as accepted procedures.
B787-81205-SB270055-00 RB
Issue 002, 25 Nov 2024 12:00:00 AM
Page 31 of 37
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB270055-00 RB
Issue 002, 25 Nov 2024 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 32

Task 4 – SLAT 11 LEADING EDGE OUTBOARD LOCKOUT ACTUATOR
INSTALLATION [Group 2: ]
THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN
IN PARAGRAPH 1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND
Alert:
THIS DOCUMENT TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD,
SEND THIS DOCUMENT TO THE NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR
COMPLIANCE DOCUMENT. THE BOEING PROCESSES USED TO CREATE THE SERVICE
BULLETIN (SB) AND THE REQUIREMENTS BULLETIN (RB) ENSURE THAT THE INFORMATION
BETWEEN "RC START" AND "RC END" IN THE SB ARE IDENTICAL TO THE INFORMATION IN
THE SAME SECTIONS (COMPLIANCE, WORK INSTRUCTIONS...) OF THE RB WHICH THE SB
REFERS TO AS THE RELATED DOCUMENT.
B787-81205-SB270055-00 RB
Issue 002, 25 Nov 2024 12:00:00 AM
Page 32 of 37
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB270055-00 RB
Issue 002, 25 Nov 2024 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 33 (OCR)

Q BOEING  B787-81205-SB270055-00 RB
Issue 002, 25 Nov 2024 12:00:00 AM
REQUIREMENTS BULLETIN
Procedure
This Task applies only to: Group 2.
10000 000000000
WS
1055
FWD
LEADING EDGE OUTBOARD SLAT 11
NBD
ICN-B787-A-000061-A-81205-19091-A-02-1
Figure 1
B787-81205-SB270055-00 RB
Issue 002, 25 Nov 2024 12:00:00 AM
Page 33 of 37
Export Controlled ECCN: 9E991
See page 1 for details

### Page 34 (OCR)

@ BOEING  B787-81205-SB270055-00 RB
Issue 002, 25 Nov 2024 12:00:00 AM
REQUIREMENTS BULLETIN
INNER MAIN
TRACK RIB
OUTER MAIN TRACK RIB REMOVED FOR CLARITY
B
3043637
ICN-B787-A-000061-A-81205-19399-A-01-1
Figure 2
B787-81205-SB270055-00 RB
Issue 002, 25 Nov 2024 12:00:00 AM
Page 34 of 37
Export Controlled ECCN: 9E991
See page 1 for details

### Page 35 (OCR)

O_BOEING  B787-81205-SB270055-00 RB
Issue 002, 25 Nov 2024 12:00:00 AM
REQUIREMENTS BULLETIN
VIEW LOOKING OUTBOARD
A-A
ICN-B787-A-000061-A-81205-19400-A-01-1
Figure 3
B787-81205-SB270055-00 RB
Issue 002, 25 Nov 2024 12:00:00 AM
Page 35 of 37
Export Controlled ECCN: 9E991
See page 1 for details

### Page 36 (OCR)

OBOEING  B787-81205-SB270055-00 RB
Issue 002, 25 Nov 2024 12:00:00 AM
REQUIREMENTS BULLETIN
2 LEADING EDGE
OUTBOARD
LOCKOUT
ACTUATOR
MARKER
4 LOCATIONS
OUTER MAIN TRACK RIB REMOVED FOR CLARITY
ICN-B787-A-000061-A-81205-19401-A-01-1
Figure 4
1. The step numbers shown below agree with the numbers shown in the circle symbols in the Task. The QTY
numbers shown below are the number of parts necessary for the leading edge outboard lockout actuator instal-
B787-81205-SB270055-00 RB
Issue 002, 25 Nov 2024 12:00:00 AM
Page 36 of 37
Export Controlled ECCN: 9E991
See page 1 for details

### Page 37

Table 1  
More DataQtyIdentificationNameActionStep
*[1]*[2]*[3]*[4]1BACB30NX5HK4BOLTInstall (New)1
*[1]*[3]*[4]1BACC30AB5ACOLLARInstall (New)
*[5]1E900-194LEADING EDGE OUT-
BOARD LOCKOUT AC-
TUATOR
Install (New)2
*[1]*[5]4BACB30NX8K7BOLTInstall (New)
*[1]*[5]4BACW10BP4PKWASHERInstall (New)
*[1]*[5]4BACN10YR4CDNUTInstall (New)
*[4]*[6]1643Z9102-2MARKERInstall (New)3
*[1]  Use the approved fastener, process and material substitutions in accordance with SRM Chapter 51-41.
*[2]  Install fastener head on inboard side of rib as shown in figure. Wet install with BMS 5-45 sealant. Refer to SOPM 20-50-19 Method 2
as an accepted procedure. Fair Sealant Squeeze-out Flush with the fastener head.
*[3]  Clean surface and reactivate primer, and apply one coat of BMS 10-11 Type I, Yellow Primer to fastener heads, collars, scratches,
and bared surfaces. Refer to SOPM 20-41-02 as an accepted procedure or for substitution material.
*[4]  Use of acceptable materials and process substitutions are allowed. See the Qualified Products List at the end of the Boeing Material
Specification (BMS), or applicable SRM or SOPM, for supplier data or suitable substitution.
*[5]  Refer to 787 AMM 27-81-04 as an accepted procedure.
*[6]  Install marker at location shown. It is acceptable to install marker above existing marker. Prepare surface, install marker and apply
Type 41 edge seal or overcoat to marker. Refer to SOPM 20-50-05 and SOPM 20-44-01 as accepted procedures.
B787-81205-SB270055-00 RB
Issue 002, 25 Nov 2024 12:00:00 AM
Page 37 of 37
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB270055-00 RB
Issue 002, 25 Nov 2024 12:00:00 AM
REQUIREMENTS BULLETIN

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
