# Boeing Service Bulletin B787-81205-SB280015-00

Copy: Revision 002 ("U.S. DOT/FAA - Service Bulletin  787-28-0015 Issue 002"), 29 pages: PDF https://openairdocs.org/files/sha256/e5/0b/e50b9b5981afa514e32bb6086759bbb2b490e79b586c0abea4caba1330ff9684; text https://openairdocs.org/service-documents/boeing/b787-81205-sb280015-00/file/e50b9b5981af.md. Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2014-0773; AD 2015-19-09 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Boeing](https://openairdocs.org/service-documents/boeing.md)
- Type: Service bulletin (Service Bulletin)
- Number: B787-81205-SB280015-00
- Latest revision known: B787-81205-SB280015-00, Issue 002, dated June 19, 2014 (OpenAirDocs)
- Page: https://openairdocs.org/service-documents/boeing/b787-81205-sb280015-00

## ADs that cite it (1) (OpenAirDocs)

Newest first, with the revision each names, as OpenAirDocs read it from the AD's text.

- [AD 2015-19-09](https://openairdocs.org/ad/2015-19-09.md), effective Nov 3, 2015: Revision 002

Also cited in [1 proposed AD](https://openairdocs.org/service-documents/boeing/b787-81205-sb280015-00/proposed.md).

## Text (29 pages)

Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2014-0773; AD 2015-19-09 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication. Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Service Bulletin B787-81205-SB280015-00 FUEL - Fuel Distribution - Fuel
Shutoff Valve Actuator Test and Replacement
Issue 002, 19 Jun 2014B787-81205-SB280015-00Publication:
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET
Copyright © 2014 Boeing. Unpublished Work. All rights reserved.
Treatment of this data module and its content is governed by contract with Boeing. Rights to use this data module are licensed on a per
aircraft basis and such rights may not be transferable. For more information, contact The Boeing Company. Boeing, the Boeing signature,
the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner, BBJ, DC-8, DC-9, DC-10, KC-10, KC-46, KDC-10, MD-10,
MD-11, MD-80, MD-88, MD-90, P-8, Poseidon and Boeing liveries are all trademarks owned by The Boeing Company; and no trademark
license is granted in connection with this document unless provided in writing by Boeing.
EXPORT CONTROLLED
Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15 CFR 300-774). An export license
may be required before it is used for development, production or use by foreign persons from specific countries. The controller of this data
has the individual responsibility to abide by all export laws.
ECCN: 9E991
The applicability information below is referenced at the lower left of each page to indicate the page applicability.
These references are valid for this print copy only.
PM Applicability (Publication Module applicability)
787-8 Airplanes. Refer to Data Module SB B787-A-28-00-0015-00A-932A-D, Paragraph 1., Effectivity for the
list of affected airplanes.
B787-81205-SB280015-00TITLE PAGE
Issue 002, 19 Jun 2014
Page 1 of 29
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
3.0
B787-81205-SB280015-00
Issue 002, 19 Jun 2014
AIRCRAFT SERVICE BULLETIN

### Page 2

Service Bulletin B787-81205-SB280015-00
Table of Contents
Page
Revision Transmittal Information  ........................................5
Summary  .....................................................6
PLANNING INFORMATION  ..........................................1 0
1. Effectivity  .............................................1 0
A. Airplanes  ...........................................1 0
B. Spares Affected  ........................................1 1
2. Concurrent Requirements  ....................................1 1
3. Reason  ..............................................1 1
4. Description  ............................................1 2
5. Compliance  ...........................................1 2
6. Approval  .............................................1 5
7. Manpower  ............................................1 5
8. Weight and Balance Changes  .................................1 6
9. Electrical Load Data  .......................................1 7
10. References  ...........................................1 7
A. Existing Data:  .........................................1 7
B. Data Supplied with this Service Bulletin:  ..........................1 7
C. Installation Requirement Modules Used in the Preparation of this Service Bulletin:  ...1 7
11. Publications Affected  ......................................1 7
12. Interchangeability and Intermixability of Parts  .........................1 7
13. Software Accomplishment Summary  ..............................1 7
MATERIAL INFORMATION  ..........................................1 8
1. Material - Price and Availability  .................................1 8
2. Industry Support Information  ..................................1 8
3. Parts Necessary for Each Airplane  ...............................1 8
A. Kits/Parts:  ...........................................1 8
B. Parts and Materials Supplied by the Operator:  .......................1 8
C. Parts Modified and Reidentified:  ...............................1 9
D. Parts Removed and Not Replaced:  .............................1 9
4. Parts Necessary to Change Spares  ..............................1 9
5. Special Tooling - Price and Availability  .............................1 9
6. Special Tooling Necessary to do this Service Bulletin  .....................1 9
ACCOMPLISHMENT INSTRUCTIONS  ...................................2 0
1. GENERAL INFORMATION  ...................................2 0
2. WORK INSTRUCTIONS  ....................................2 2
B787-81205-SB280015-00TABLE OF CONTENTS
Issue 002, 19 Jun 2014
Page 2 of 29
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB280015-00
Issue 002, 19 Jun 2014
AIRCRAFT SERVICE BULLETIN

### Page 3

Service Bulletin B787-81205-SB280015-00
List of Illustrations
Description
Group 1:
Table 1  List of Illustrations - Service Bulletin B787-81205-SB280015-00
Used InICN
B787-A-28-00-0015-00A-931C-D Issue 002ICN-B787-A-000061-A-81205-06437-A-01-1
B787-A-28-00-0015-00A-00AA-DApplicable To:
Issue 002, 19 Jun 2014End of data moduleModel 787
See Applicability of this data module
Page 3 of 29
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB280015-00
Issue 002, 19 Jun 2014
AIRCRAFT SERVICE BULLETIN

### Page 4

Service Bulletin B787-81205-SB280015-00
List of Effective Data Modules
Description
Group 1:
Table 1  List of Effective Data Modules - Service Bulletin B787-81205-SB280015-00
Issue DateIssue StatusIssueData Module – Information Name
2014-06-19Changed002B787-A-28-00-0015-00A-00AA-D – List of Illustrations
2014-06-19Changed002B787-A-28-00-0015-00A-00SA-D – List of Effective Data Modules
2014-06-19New001B787-A-28-00-0015-00A-931B-D – Revision Transmittal Information
2014-06-19Changed002B787-A-28-00-0015-00A-931C-D – Summary
2014-06-19Changed002B787-A-28-00-0015-00A-932A-D – PLANNING INFORMATION
2014-06-19Changed002B787-A-28-00-0015-00A-934A-D – MATERIAL INFORMATION
2014-06-19Changed002B787-A-28-00-0015-00A-933A-D – ACCOMPLISHMENT INSTRUCTIONS
B787-A-28-00-0015-00A-00SA-DApplicable To:
Issue 002, 19 Jun 2014End of data moduleModel 787
See Applicability of this data module
Page 4 of 29
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB280015-00
Issue 002, 19 Jun 2014
AIRCRAFT SERVICE BULLETIN

### Page 5

Service Bulletin B787-81205-SB280015-00
Revision Transmittal Information
References
TitleReference
AirplanesSB B787-A-28-00-0015-00A-932A-D Issue 002,
Paragraph 1.A.
Description
Group 1:
This revision includes all pages of the service bulletin.
1. COMPLIANCE INFORMATION RELATED TO THIS REVISION
No more work is necessary on airplanes changed or inspected in accordance with Issue 001 of this service
bulletin.
2. REASON FOR REVISION
This issue is sent to make these changes:
1. Change the compliance time for the terminating action from 60 months to 36 months.
2. Include the reference to the Eaton service bulletin 53-0037-28-01.
3. Include a note in the General Information section to inform operators that the external power is required
for the PART 2 : APU FUEL SHUTOFF VALVE ACTUATOR TEST.
4. Clarify the engine and APU fuel shutoff valve actuator test procedures.
As a part of a service bulletin validation program, the engine and APU fuel shutoff valve actuator tests in
this service bulletin were completed on airplane ZA188 before the release of Issue 002 of this service bulletin.
These sections were changed:
1. Planning Information - Paragraph 5, Compliance
2. Material Information - Paragraph 3, Parts Necessary for Each Airplane
3. Accomplishment Instructions - Paragraph 2, Work Instructions
Change marks are added, except in Data Module SB B787-A-28-00-0015-00A-932A-D, Paragraph 1.A.,
Airplanes and format changes, to show the location of all content changes.
3. REVISION HISTORY
Table 1  
January 30, 2014Issue 1:
June 19, 2014Issue 2:
B787-A-28-00-0015-00A-931B-DApplicable To:
Issue 001, 19 Jun 2014End of data moduleModel 787
See Applicability of this data module
Page 5 of 29
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB280015-00
Issue 002, 19 Jun 2014
AIRCRAFT SERVICE BULLETIN

### Page 6

Service Bulletin B787-81205-SB280015-00
Summary
References
TitleReference
Spares AffectedSB B787-A-28-00-0015-00A-932A-D Issue 002,
Paragraph 1.B.
ComplianceSB B787-A-28-00-0015-00A-932A-D Issue 002,
Paragraph 5.
Weight and Balance ChangesSB B787-A-28-00-0015-00A-932A-D Issue 002,
Paragraph 8.
Electrical Load DataSB B787-A-28-00-0015-00A-932A-D Issue 002,
Paragraph 9.
Publications AffectedSB B787-A-28-00-0015-00A-932A-D Issue 002,
Paragraph 11.
Kits/PartsSB B787-A-28-00-0015-00A-934A-D Issue 002,
Paragraph 3.A.
Parts and Materials Supplied by the OperatorSB B787-A-28-00-0015-00A-934A-D Issue 002,
Paragraph 3.B.
Special Tooling Necessary to do this Service BulletinSB B787-A-28-00-0015-00A-934A-D Issue 002,
Paragraph 6.
EffectivitySB B787-A-28-00-0015-00A-932A-D Issue 002,
Paragraph 1.
Industry Support InformationSB B787-A-28-00-0015-00A-934A-D Issue 002,
Paragraph 2.
ManpowerSB B787-A-28-00-0015-00A-932A-D Issue 002,
Paragraph 7.
Material - Price and AvailabilitySB B787-A-28-00-0015-00A-934A-D Issue 002,
Paragraph 1.
Description
Group 1:
1. CONCURRENT REQUIREMENTS
None.
B787-A-28-00-0015-00A-931C-DApplicable To:
Issue 002, 19 Jun 2014Model 787
See Applicability of this data module
Page 6 of 29
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB280015-00
Issue 002, 19 Jun 2014
AIRCRAFT SERVICE BULLETIN

### Page 7

2. BACKGROUND
This service bulletin gives instructions to test the engine and Auxiliary Power Unit (APU) fuel shutoff valve
actuators to make sure that the valve operation and indication are working correctly. This service bulletin
also provides the terminating action to replace the engine and APU fuel shutoff valve actuators and an option
to replace the fuel crossfeed and defuel/isolation valve actuators. Incorporation of this service bulletin prevents
possible operational disruptions.
The fuel shutoff valve actuator circuit design provides common input power through micro-switches to both
the motor and position indication. It was identified that the valve actuator circuitry has a potential latent failure
condition previously not identified during its development. The latent failure condition is with respect to the
potential for a stuck micro-switch which could lead to a disagreement between the valve command and po-
sition indication. In a case where a command is sent to change valve position and one of the internal micro-
switches is stuck in the depressed state, power would immediately provide indication that the valve transitioned
to its commanded state when in reality the motor never received power to rotate. Changes were made to
the actuator micro-switch circuit by the supplier to provide independence between the valve command and
indication functions which prevent the latent failure condition. Refer to Fleet Team Digest 787-FTD-28-13002
for additional information.
Boeing Service Related Problem (SRP) 787 SRP-28-0147 is related to this service bulletin.
As a part of a service bulletin validation program, the engine and APU fuel shutoff valve actuator tests in
this service bulletin were completed on airplane ZA188 before the release of Issue 002 of this service bulletin.
This table is provided to operators for planning purposes only. Refer to the applicable sections for more in-
formation.
Table 1  
Data Module ReferenceAffectedPlanning Data
Data Module SB B787-A-28-00-0015-00A-932A-
D, Paragraph 1.B., Spares Affected
NoSpares Affected
Data Module SB B787-A-28-00-0015-00A-932A-
D, Paragraph 5., Compliance
YesAD Related
Data Module SB B787-A-28-00-0015-00A-932A-
D, Paragraph 8., Weight and Balance Changes
NoWeight and Balance Changed
Data Module SB B787-A-28-00-0015-00A-932A-
D, Paragraph 9., Electrical Load Data
NoElectrical Load Changed
Data Module SB B787-A-28-00-0015-00A-932A-
D, Paragraph 11., Publications Affected
NoPublications Affected
Data Module SB B787-A-28-00-0015-00A-932A-
D, Paragraph 11., Publications Affected
NoAirplane Flight Operations Affected (Flight Crew
Operations Manual and/or FAA Approved Air-
plane Flight Manual)
Data Module SB B787-A-28-00-0015-00A-934A-
D, Paragraph 3.A., Kits/Parts
NoKits/Parts Required
B787-A-28-00-0015-00A-931C-DApplicable To:
Issue 002, 19 Jun 2014Model 787
See Applicability of this data module
Page 7 of 29
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB280015-00
Issue 002, 19 Jun 2014
AIRCRAFT SERVICE BULLETIN

### Page 8

Table 1  
Data Module ReferenceAffectedPlanning Data
Data Module SB B787-A-28-00-0015-00A-934A-
D, Paragraph 3.B., Parts and Materials Supplied
by the Operator
YesOperator Supplied Parts/Material
Data Module SB B787-A-28-00-0015-00A-934A-
D, Paragraph 6., Special Tooling Necessary to
do this Service Bulletin
NoSpecial Tooling Required
3. ACTION
(CN-AC36420A)
Testing: Do the engine and APU fuel shutoff valve actuator test and replace the valve actuator if necessary.
Terminating Action: Replace the engine and APU fuel shutoff valve actuators.
Option: Replace the fuel crossfeed and defuel/isolation valve actuators.
4. EFFECTIVITY
787-8 Airplanes. Refer to Data Module SB B787-A-28-00-0015-00A-932A-D, Paragraph 1., Effectivity for
the list of affected airplanes.
5. COMPLIANCE
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to this
service bulletin. The Airworthiness Directive will make the compliance tasks and times given in this service
bulletin mandatory.
Refer to Data Module SB B787-A-28-00-0015-00A-932A-D, Paragraph 5., Compliance.
6. INDUSTRY SUPPORT INFORMATION
Boeing warranty remedies are available for airplanes in warranty as of February 21, 2013. Please refer to
Data Module SB B787-A-28-00-0015-00A-934A-D, Paragraph 2., Industry Support Information. The warranty
remedies will expire eight years from the original release date of this service bulletin.
7. MANPOWER
Refer to Data Module SB B787-A-28-00-0015-00A-932A-D, Paragraph 7., Manpower.
8. MATERIAL INFORMATION
Operator Supplied Parts/Materials.
Refer to Data Module SB B787-A-28-00-0015-00A-934A-D, Paragraph 1., Material - Price and Availability.
B787-A-28-00-0015-00A-931C-DApplicable To:
Issue 002, 19 Jun 2014Model 787
See Applicability of this data module
Page 8 of 29
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB280015-00
Issue 002, 19 Jun 2014
AIRCRAFT SERVICE BULLETIN

### Page 9 (OCR)

@ BOEING  B787-81205-SB280015-00
Issue 002, 19 Jun 2014
AIRCRAFT SERVICE BULLETIN
TERMINATING ACTION:
TESTING:  REPLACE THE LEFT AND RIGHT ENGINE
DO ENGINE AND APU FUEL  FUEL SHUTOFF VALVE ACTUATOR
SHUTOFF VALVE ACTUATOR
TEST AND REPLACE THE
VALVE ACTUATOR IF NECESSARY
000000
OPTION:
REPLACE THE LEFT AND
RIGHT DEFUEL/ISOLATION
(LEFT VALVE ACTUATOR  VALVE ACTUATOR  TERMINATING ACTION:  REPLACE THE APU
S SHOWN AND RIGHT VALVE  FUEL SHUTOFF VALVE
ACTUATOR IS EQUIVALENT)  ACTUATOR  OPTION:
REPLACE THE FUEL
CROSSFEED VALVE
ACTUATOR
LEFT MAIN LANDING
GEAR WHEEL WELL
FWD
ICN-B787-A-000061-A-81205-06437-A-01-1
Figure 1
Applicable To:  B787-A-28-00-0015-00A-931C-D
Model 787  End of data module  Issue 002, 19 Jun 2014
See Applicability of this data module
Page 9 of 29
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.

### Page 10

Service Bulletin B787-81205-SB280015-00
PLANNING INFORMATION
References
TitleReference
Work InstructionsSB B787-A-28-00-0015-00A-933A-D Issue 002, Step 2.
CIRCUIT BREAKER INDICATION AND CONTROL787 AMM 24-00-02
ENGINE FUEL SHUTOFF VALVE ACTUATOR787 AMM 28-22-02
FUEL CROSSFEED VALVE ACTUATOR787 AMM 28-22-04
APU FUEL SHUTOFF VALVE ACTUATOR787 AMM 28-25-03
DEFUEL/ISOLATION VALVE ACTUATOR787 AMM 28-26-02
PRIMARY DISPLAY SYSTEM787 AMM 31-61-00
ONBOARD BOEING ELECTRONIC DISTRIBUTION
SYSTEM
787 AMM 46-13-00
Description
Group 1:
1. Effectivity
A. Airplanes
This service bulletin is for the airplanes shown below. An equivalent change is on subsequent production
airplanes. Refer to CN-AA36420 for data about this change.
Table 1  
DESCRIPTIONCONFIGURATIONGROUP
787-8 airplanes.-1
Airplane Models: 787-8
Table 2  
GroupVariable Number
1ZA100-ZA105
1ZA116-ZA122
1ZA135
1ZA176-ZA186
B787-A-28-00-0015-00A-932A-DApplicable To:
Issue 002, 19 Jun 2014Model 787
See Applicability of this data module
Page 10 of 29
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB280015-00
Issue 002, 19 Jun 2014
AIRCRAFT SERVICE BULLETIN

### Page 11

Table 2  
GroupVariable Number
1ZA233
1ZA235-ZA243
1ZA260-ZA264
1ZA270-ZA274
1ZA285-ZA292
1ZA317-ZA320
1ZA380-ZA387
1ZA430-ZA431
1ZA433-ZA434
1ZA450-ZA453
1ZA460-ZA468
1ZA506-ZA514
1ZA536-ZA540
1ZA561-ZA562
1ZA576-ZA577
B. Spares Affected
Examine your spares supply for the parts or components identified below. If any parts or components
are found, refer to Data Module SB B787-A-28-00-0015-00A-933A-D, Step 2., Work Instructions for
the recommended action.
Table 3  
NamePart Number
Valve Actuator53-0037
2. Concurrent Requirements
None.
3. Reason
This service bulletin gives instructions to test the engine and Auxiliary Power Unit (APU) fuel shutoff valve
actuators to make sure that the valve operation and indication are working correctly. This service bulletin
also provides the terminating action to replace the engine and APU fuel shutoff valve actuators and an
option to replace the fuel crossfeed and defuel/isolation valve actuators. Incorporation of this service bulletin
prevents possible operational disruptions.
The fuel shutoff valve actuator circuit design provides common input power through micro-switches to both
the motor and position indication. It was identified that the valve actuator circuitry has a potential latent
B787-A-28-00-0015-00A-932A-DApplicable To:
Issue 002, 19 Jun 2014Model 787
See Applicability of this data module
Page 11 of 29
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB280015-00
Issue 002, 19 Jun 2014
AIRCRAFT SERVICE BULLETIN

### Page 12

failure condition previously not identified during its development. The latent failure condition is with respect
to the potential for a stuck micro-switch which could lead to a disagreement between the valve command
and position indication. In a case where a command is sent to change valve position and one of the internal
micro-switches is stuck in the depressed state, power would immediately provide indication that the valve
transitioned to its commanded state when in reality the motor never received power to rotate. Changes
were made to the actuator micro-switch circuit by the supplier to provide independence between the valve
command and indication functions which prevent the latent failure condition. Refer to Fleet Team Digest
787-FTD-28-13002 for additional information.
Boeing Service Related Problem (SRP) 787 SRP-28-0147 is related to this service bulletin.
As a part of a service bulletin validation program, the engine and APU fuel shutoff valve actuator tests in
this service bulletin were completed on airplane ZA188 before the release of Issue 002 of this service bulletin.
Issue 002 is sent to make these changes:
1. Change the compliance time for the terminating action from 60 months to 36 months.
2. Include the reference to the Eaton service bulletin 53-0037-28-01.
3. Include a note in the General Information section to inform operators that the external power is required
for the PART 2 : APU FUEL SHUTOFF VALVE ACTUATOR TEST.
4. Clarify the engine and APU fuel shutoff valve actuator test procedures.
4. Description
Testing: Do the engine and APU fuel shutoff valve actuator test and replace the valve actuator if necessary.
Terminating Action: Replace the engine and APU fuel shutoff valve actuators.
Option: Replace the fuel crossfeed and defuel/isolation valve actuators.
Issue 002 - No more work is necessary on airplanes changed in accordance with Issue 001 of this service
bulletin.
The work in this service bulletin is done in the maintenance zone(s) given below.
Table 4  
Affected Maintenance Zones
ZoneModel
143, 552, 562787-8
5. Compliance
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to this
service bulletin. The Airworthiness Directive will make the compliance tasks and times given in this service
bulletin mandatory.
Do the required actions in accordance with Data Module SB B787-A-28-00-0015-00A-933A-D, Step 2.,
Work Instructions.
The Conditions, Actions and Compliance times shown apply to each fuel shutoff valve independently.
B787-A-28-00-0015-00A-932A-DApplicable To:
Issue 002, 19 Jun 2014Model 787
See Applicability of this data module
Page 12 of 29
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB280015-00
Issue 002, 19 Jun 2014
AIRCRAFT SERVICE BULLETIN

### Page 13

When more than one OPTION is given for a CONDITION, do only one of the OPTION numbers. When
more than one ACTION is given for a CONDITION number or an OPTION number, do all of the ACTION
numbers for that CONDITION number or OPTION number.
Table 5  TESTING: ENGINE FUEL SHUTOFF VALVE ACTUATOR TEST
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
-Within 3 months
after the Issue 002
date of this service
bulletin.
Do PART 1: ENGINE FU-
EL SHUTOFF VALVE AC-
TUATOR TEST.*[1]
All airplanes
10 days.*[2]-OPTION 1: Repeat PART1: ENGINE FUEL SHUT-
OFF VALVE ACTUATOR
TEST.
CONDITION 1: NO LA-
TENT FAILURE CONDI-
TION FOUND ON ALL
ENGINE FUEL SHUTOFF
VALVE ACTUATORS. --OPTION 2: Do PART 5:
TERMINATING ACTION -
ENGINE FUEL SHUTOFF
VALVE ACTUATOR RE-
PLACEMENT.*[2]
-Before further
flight.
OPTION 3 (ACTION 1): Do
PART 3: ENGINE FUEL
SHUTOFF VALVE ACTU-
ATOR REPLACEMENT for
any engine fuel shutoff
valve that has the latent
failure condition.
CONDITION 2: LATENT
FAILURE CONDITION
FOUND ON ANY ENGINE
FUEL SHUTOFF VALVE
ACTUATOR
-Within 10 days af-
ter PART 3: EN-
GINE FUEL
SHUTOFF VALVE
ACTUATOR RE-
PLACEMENT was
accomplished.
OPTION 3 (ACTION 2): Do
PART 1: ENGINE FUEL
SHUTOFF VALVE ACTU-
ATOR TEST.
-Before further
flight.
OPTION 4: Do PART 5:
TERMINATING ACTION -
ENGINE FUEL SHUTOFF
VALVE ACTUATOR RE-
PLACEMENT. *[2]
*[1]  Accomplishment of PART 5: TERMINATING ACTION - ENGINE FUEL SHUTOFF VALVE ACTUATOR REPLACEMENT
can be done instead of PART 1: ENGINE FUEL SHUTOFF VALVE ACTUATOR TEST.
*[2]  Accomplishment of PART 5: TERMINATING ACTION - ENGINE FUEL SHUTOFF VALVE ACTUATOR REPLACEMENT
is terminating action to the repeat test in PART 1.
B787-A-28-00-0015-00A-932A-DApplicable To:
Issue 002, 19 Jun 2014Model 787
See Applicability of this data module
Page 13 of 29
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB280015-00
Issue 002, 19 Jun 2014
AIRCRAFT SERVICE BULLETIN

### Page 14

Table 6  TESTING: APU FUEL SHUTOFF VALVE ACTUATOR TEST
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
-Within 3 months
after the Issue 002
date of this service
bulletin.
Do PART 2: APU FUEL
SHUTOFF VALVE ACTU-
ATOR TEST.*[1]
All airplanes
10 days. *[2]-OPTION 5: Repeat PART2: APU FUEL SHUTOFF
VALVE ACTUATOR TEST.
CONDITION 3: NO LA-
TENT FAILURE CONDI-
TION FOUND ON APU
FUEL SHUTOFF VALVE
ACTUATOR --OPTION 6: Do PART 6:TERMINATING ACTION -
APU FUEL SHUTOFF
VALVE ACTUATOR RE-
PLACEMENT.*[2]
-Before further
flight.
OPTION 7 (ACTION 1): Do
PART 4: APU FUEL
SHUTOFF VALVE ACTU-
ATOR REPLACEMENT.
CONDITION 4: LATENT
FAILURE CONDITION
FOUND ON APU FUEL
SHUTOFF VALVE ACTU-
ATOR -Within 10 days af-
ter PART 4: APU
FUEL SHUTOFF
VALVE ACTUA-
TOR REPLACE-
MENT was accom-
plished.
OPTION 7 (ACTION 2): Do
PART 2: APU FUEL
SHUTOFF VALVE ACTU-
ATOR TEST.
-Before further
flight.
OPTION 8: Do PART 6:
TERMINATING ACTION -
APU FUEL SHUTOFF
VALVE ACTUATOR RE-
PLACEMENT.*[2]
*[1]  Accomplishment of Do PART 6: TERMINATING ACTION - APU FUEL SHUTOFF VALVE ACTUATOR REPLACEMENT
can be done instead of PART 2: APU FUEL SHUTOFF VALVE ACTUATOR TEST.
*[2]  Accomplishment of PART 6: TERMINATING ACTION - APU FUEL SHUTOFF VALVE ACTUATOR REPLACEMENT
is terminating action to the repeat test in PART 2.
B787-A-28-00-0015-00A-932A-DApplicable To:
Issue 002, 19 Jun 2014Model 787
See Applicability of this data module
Page 14 of 29
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB280015-00
Issue 002, 19 Jun 2014
AIRCRAFT SERVICE BULLETIN

### Page 15

Table 7  TERMINATING ACTION: ENGINE AND APU FUEL SHUTOFF VALVE ACTUATOR 
REPLACEMENT
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
-Within 36 months
after the Issue 001
date of this service
bulletin.
Do PART 5: TERMINAT-
ING ACTION - ENGINE
FUEL SHUTOFF VALVE
ACTUATOR REPLACE-
MENT.
All airplanes
-Within 36 months
after the Issue 001
date of this service
bulletin.
Do PART 6: TERMINAT-
ING ACTION - APU FUEL
SHUTOFF VALVE ACTU-
ATOR REPLACEMENT.
Table 8  OPTION: FUEL CROSSFEED AND DEFUEL/ISOLATION VALVE ACTUATOR 
REPLACEMENT
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
-- *[1]Do PART 7: FUELCROSSFEED VALVE AC-
TUATOR REPLACE-
MENT.
All airplanes
--*[1]Do PART 8: DEFUEL/ISO-LATION VALVE ACTUA-
TOR REPLACEMENT.
*[1]  No compliance time is given. Boeing recommends this service bulletin be done to introduce improvements and prevent
possible operational disruptions.
6. Approval
This service bulletin was examined by the Federal Aviation Administration (FAA). The changes specified
in this service bulletin comply with the applicable regulations and are FAA approved, as well as European
Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/JAA approved air-
planes listed in the service bulletin effectivity. This service bulletin and its approval were based on the airplane
in its original Boeing delivery configuration or as modified by other approved Boeing changes.
If an airplane has a non-Boeing modification or repair that affects a component or system also affected by
this service bulletin, the operator is responsible for obtaining appropriate regulatory agency approval before
incorporating this service bulletin.
7. Manpower
The table below shows an estimate of the task hours necessary to do this inspection for each airplane.
This estimate is for direct labor only, done by an experienced crew. Adjust the estimate with operator task
hour data if necessary. The estimate does not include lost time. These are some examples of lost time:
– Time to adjust to the workplace
– Time to schedule the work
B787-A-28-00-0015-00A-932A-DApplicable To:
Issue 002, 19 Jun 2014Model 787
See Applicability of this data module
Page 15 of 29
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB280015-00
Issue 002, 19 Jun 2014
AIRCRAFT SERVICE BULLETIN

### Page 16

– Time to inspect the work
– Time to cure the materials
– Time to make the parts
– Time to find the tools
Table 9  TESTING: ENGINE AND APU FUEL SHUTOFF VALVE ACTUATOR TEST
Elapsed HoursTask HoursNumber of Per-
sons
Task
1.001.001Part 1
0.500.501Part 2
3.25*[1]3.25 *[1]1Part 3
3.25 *[2]3.25 *[2]1Part 4
1.501.50TOTAL FOR EACH AIRPLANE
*[1]  Part 3 replacement is dependant upon results of Part 1 test. The estimate given in Part 3 is for re-
moval, installation and test of the left or right engine fuel shutoff valve. If the work in Part 3 is nec-
essary, the estimate given in Part 3 must be added to obtain the required total for each airplane.
*[2]  Part 4 replacement is dependant upon results of Part 2 test. The estimate given in Part 4 is for re-
moval, installation and test of the APU fuel shutoff valve. If the work in Part 4 is necessary, the es-
timate given in Part 4 must be added to obtain the required total for each airplane.
Table 10  TERMINATING ACTION: ENGINE AND APU FUEL SHUTOFF VALVE 
ACTUATOR REPLACEMENT
Elapsed HoursTask HoursNumber of Per-
sons
Task
3.256.502Part 5
3.253.251Part 6
6.509.75TOTAL FOR EACH AIRPLANE
Table 11  OPTION: FUEL CROSSFEED AND DEFUEL/ISOLATION VALVE 
ACTUATOR REPLACEMENT
Elapsed HoursTask HoursNumber of Per-
sons
Task
3.253.251Part 7
3.256.502Part 8
6.509.75TOTAL FOR EACH AIRPLANE
8. Weight and Balance Changes
None.
B787-A-28-00-0015-00A-932A-DApplicable To:
Issue 002, 19 Jun 2014Model 787
See Applicability of this data module
Page 16 of 29
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB280015-00
Issue 002, 19 Jun 2014
AIRCRAFT SERVICE BULLETIN

### Page 17

9. Electrical Load Data
Not changed.
10. References
A. Existing Data:
1. Change Notice CN-AA36420D
2. Aircraft Maintenance Manual (AMM) 787 AMM 24-00-02, 787 AMM 28-22-02, 787 AMM 28-22-
04, 787 AMM 28-25-03, 787 AMM 28-26-02, 787 AMM 31-61-00, 787 AMM 46-13-00
3. Boeing Service Related Problem (SRP) 787 SRP-28-0147
4. 787 Fleet Team Digest 787-FTD-28-13002
5. Eaton Service Bulletin 53-0037-28-01
B. Data Supplied with this Service Bulletin:
None.
C. Installation Requirement Modules Used in the Preparation of this Service Bulletin:
None.
11. Publications Affected
Table 12  
Chapter-SectionPublication
28-21, 28-22, 28-25787 Wiring Diagram Manual
ZA1-33, ZA1-34, ZA5-21, ZA5-51, ZA5-52,
ZA5-61, ZA6-21, ZA6-51, ZA6-52, ZA6-61
787 Illustrated Parts Data
Damage Tolerance Based Structural Inspections:
Boeing has evaluated the repairs and/or changes in this service bulletin for effects on Fatigue Critical
Structure (FCS) and for changes to Damage Tolerance Inspections (DTI) required in the Maintenance
Program. This service bulletin does not affect FCS, therefore DTIs are not necessary.
12. Interchangeability and Intermixability of Parts
Accomplishment of this service bulletin does not affect interchangeability or intermixability of parts.
13. Software Accomplishment Summary
Not Affected.
B787-A-28-00-0015-00A-932A-DApplicable To:
Issue 002, 19 Jun 2014End of data moduleModel 787
See Applicability of this data module
Page 17 of 29
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB280015-00
Issue 002, 19 Jun 2014
AIRCRAFT SERVICE BULLETIN

### Page 18

Service Bulletin B787-81205-SB280015-00
MATERIAL INFORMATION
References
TitleReference
ReferencesSB B787-A-28-00-0015-00A-932A-D Issue 002,
Paragraph 10.
Description
Group 1:
1. Material - Price and Availability
The operator can supply the parts and materials shown in Paragraph 3., Parts Necessary for Each Airplane.
2. Industry Support Information
Boeing warranty remedies are available for 787 airplanes in warranty as of February 21, 2013. For task hour
and material reimbursement for airplanes in warranty as of that date, send a warranty claim to Boeing Fleet
Support Contracts - Warranty. The warranty remedies will expire eight years from the original release date
of this service bulletin.
3. Parts Necessary for Each Airplane
A. Kits/Parts:
None.
B. Parts and Materials Supplied by the Operator:
Table 1  
NotesExisting Part NumberNameQTYPart Number /
Specification
*[1] *[2]-Valve ActuatorAs
Re-
quired
53-0037
*[3] *[4]53-0037Valve Actuator353-0049
*[5] *[4]53-0037Valve Actuator353-0049
*[1]  The part is only necessary if the existing Engine or APU fuel shutoff valve actuator is found to have the latent failure condition
during the test in the TESTING section.
*[2]  Return the part with latent failure condition and order the part number directly from Eaton Aerospace Ltd, Abbey Park, Southampton
Rd, Titchfield Hamshire P014 4QA, United Kingdom
*[3]  The parts are necessary for the TERMINATING ACTION section
*[4]  Return the existing part and order the part number directly from Eaton Aerospace Ltd, Abbey Park, Southampton Rd, Titchfield
Hamshire P014 4QA, United Kingdom. Refer to the Eaton service bulletin 53-0037-28-01 for additional information.
B787-A-28-00-0015-00A-934A-DApplicable To:
Issue 002, 19 Jun 2014Model 787
See Applicability of this data module
Page 18 of 29
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB280015-00
Issue 002, 19 Jun 2014
AIRCRAFT SERVICE BULLETIN

### Page 19

Table 1  
NotesExisting Part NumberNameQTYPart Number /
Specification
*[5]  The parts are necessary for the OPTION section..
C. Parts Modified and Reidentified:
None.
D. Parts Removed and Not Replaced:
None.
4. Parts Necessary to Change Spares
None.
5. Special Tooling - Price and Availability
None.
6. Special Tooling Necessary to do this Service Bulletin
No special tools or equipment are necessary to do the change in this service bulletin. But, maintenance and
overhaul tools in the manuals given in Data Module SB B787-A-28-00-0015-00A-932A-D, Paragraph 10.,
References, can be necessary. Examine operator tool supply to make sure all necessary tools are available.
B787-A-28-00-0015-00A-934A-DApplicable To:
Issue 002, 19 Jun 2014End of data moduleModel 787
See Applicability of this data module
Page 19 of 29
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB280015-00
Issue 002, 19 Jun 2014
AIRCRAFT SERVICE BULLETIN

### Page 20

Service Bulletin B787-81205-SB280015-00
ACCOMPLISHMENT INSTRUCTIONS
References
TitleReference
ReferencesSB B787-A-28-00-0015-00A-932A-D Issue 002,
Paragraph 10.
ComplianceSB B787-A-28-00-0015-00A-932A-D Issue 002,
Paragraph 5.
ONBOARD BOEING ELECTRONIC DISTRIBUTION
SYSTEM
787 AMM 46-13-00
ENGINE FUEL FEED SYSTEM787 AMM 28-22-00
CIRCUIT BREAKER INDICATION AND CONTROL787 AMM 24-00-02
PRIMARY DISPLAY SYSTEM787 AMM 31-61-00
ENGINE FUEL SHUTOFF VALVE ACTUATOR787 AMM 28-22-02
APU FUEL SHUTOFF VALVE ACTUATOR787 AMM 28-25-03
FUEL CROSSFEED VALVE ACTUATOR787 AMM 28-22-04
DEFUEL/ISOLATION VALVE ACTUATOR787 AMM 28-26-02
Procedure
Group 1:
1. GENERAL INFORMATION
CAUTION: KEEP THE WORK AREA, WIRES AND ELECTRICAL BUNDLES CLEAN OF METAL PARTI-
CLES OR CONTAMINATION WHEN YOU USE TOOLS. UNWANTED MATERIAL, METAL
PARTICLES OR CONTAMINATION CAUGHT IN WIRE BUNDLES CAN CAUSE DAMAGE
TO THE BUNDLES. DAMAGED WIRE BUNDLES CAN CAUSE SPARKS OR OTHER
ELECTRICAL DAMAGE.
NOTE: 1. Manual titles are referred to by acronyms. Refer to Data Module SB B787-A-28-00-0015-00A-
932A-D, Paragraph 10., References, for definition of the acronyms.
2. Obey all of the warnings and cautions given in the specified manual sections.
3. Unless shown differently, these dimensions and tolerances are used:
– Linear dimensions are in inches
– Tolerance on linear dimensions, other than rivet and bolt edge margins, is plus or minus
0.03 inch
– Tolerance on rivet and bolt edge margin is plus or minus 0.05 inch
B787-A-28-00-0015-00A-933A-DApplicable To:
Issue 002, 19 Jun 2014Model 787
See Applicability of this data module
Page 20 of 29
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB280015-00
Issue 002, 19 Jun 2014
AIRCRAFT SERVICE BULLETIN

### Page 21

– Angular tolerance is plus or minus 2 degrees
– Hole dimensions for standard solid rivets and fasteners are in SRM Chapter 51
– Torque Values:
– Values for structural fasteners are given in 787 Structural Repair Manual, Chapter 51.
– Values for airframe maintenance tasks are included in Chapter 20 of 787 Airplane
Maintenance Manual (AMM).
– Values for electrical maintenance tasks are included in Chapter 20 of Standard Wiring
Practices Manual (SWPM).
– Values for engine maintenance tasks are included in Chapter 70 of 787 Airplane Main-
tenance Manual (AMM).
– Non-standard torque values for maintenance tasks are included in the applicable instal-
lation step.
4. These work instructions refer to procedures included in other Boeing documents. When the
words "refer to" are used and the operator has an accepted alternative procedure, the accepted
alternative procedure can be used. When the words "in accordance with" are included in the
instruction, the procedure in the Boeing document must be used.
5. Refer to 787 AMM 46-13-00 for onboard electronic distribution system maintenance practices
and operation as an accepted procedure.
6. If it is necessary to remove more parts for access, you can remove those parts. If you can get
access without removing identified parts, it is not necessary to remove all of the identified parts.
Jacking and shoring limitations must be observed.
7. This service bulletin includes functional test procedures for the systems changed by this service
bulletin. More functional tests can possibly be necessary in accordance with standard mainte-
nance practices because of interruption to other airplane systems.
8. If shading is used, shaded areas in Figures are to separate the non-critical and non-authoritative
information from the critical and authoritative information.
9. When more than one OPTION is given for a CONDITION, do only one of the OPTION numbers.
When more than one ACTION is given for a CONDITION number or an OPTION number, do
all of the ACTION numbers for that CONDITION number or OPTION number.
10. The compliance times for the actions in Step 2., Work Instructions are in Data Module SB B787-
A-28-00-0015-00A-932A-D, Paragraph 5., Compliance.
11. The CONDITIONS, ACTIONS and OPTIONS shown apply to each fuel shutoff valve actuator
independently.
12. Some steps in the Work Instructions are identified as Required for Compliance (RC). If this
service bulletin is mandated by an Airworthiness Directive (AD), then the steps identified as RC
must be done to comply with the AD. Alternative procedures for steps not identified with RC can
be used if the RC steps can still be done as specified, and the airplane can be put back in a
serviceable condition. If a step in the Work Instructions identified as RC has substeps, then all
of the substeps in the RC step must also be done. An Alternative Method of Compliance (AMOC)
is not necessary for deviations to steps that are not identified as RC and is a substep of an RC
step.
B787-A-28-00-0015-00A-933A-DApplicable To:
Issue 002, 19 Jun 2014Model 787
See Applicability of this data module
Page 21 of 29
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB280015-00
Issue 002, 19 Jun 2014
AIRCRAFT SERVICE BULLETIN

### Page 22

13. The external electrical ground power is required for the PART 2: APU FUEL SHUTOFF VALVE
ACTUATOR TEST. Refer to 787 AMM 28-22-00 as an accepted procedure.
2. WORK INSTRUCTIONS
A. Do the TESTING: ENGINE AND APU FUEL SHUTOFF VALVE ACTUATOR TEST or TERMINATING
ACTION: ENGINE AND APU FUEL SHUTOFF VALVE ACTUATOR REPLACEMENT.
(1) TESTING: ENGINE AND APU FUEL SHUTOFF VALVE ACTUATOR TEST
RC - Do PART 1: ENGINE FUEL SHUTOFF VALVE ACTUATOR TEST.(a)
1) CONDITION 1: NO LATENT FAILURE CONDITION FOUND ON ALL FUEL SHUTOFF
VALVE ACTUATORS
a) OPTION 1: Repeat PART 1: ENGINE FUEL SHUTOFF VALVE ACTUATOR TEST.
b) OPTION 2: Do PART 5: TERMINATING ACTION - ENGINE FUEL SHUTOFF VALVE
ACTUATOR REPLACEMENT to terminate the repeat test.
2) CONDITION 2: LATENT FAILURE CONDITION FOUND ON ANY ENGINE FUEL SHUTOFF
VALVE ACTUATOR
a) OPTION 3:
<1> OPTION 3 (ACTION 1): Do PART 3: ENGINE FUEL SHUTOFF VALVE ACTUATOR
REPLACEMENT for any engine fuel shutoff valve that has the latent failure condi-
tion.
<2> OPTION 3 (ACTION 2): Do PART 1: ENGINE FUEL SHUTOFF VALVE ACTUATOR
TEST.
b) OPTION 4: Do PART 5: TERMINATING ACTION - ENGINE FUEL SHUTOFF VALVE
ACTUATOR REPLACEMENT to terminate the repeat test.
(b) RC - Do PART 2: APU FUEL SHUTOFF VALVE ACTUATOR TEST.
1) CONDITION 3: NO LATENT FAILURE CONDITION FOUND ON APU FUEL SHUTOFF
VALVE ACTUATOR
a) OPTION 5: Repeat PART 2: APU FUEL SHUTOFF VALVE ACTUATOR TEST.
b) OPTION 6: Do PART 6: TERMINATING ACTION - APU FUEL SHUTOFF VALVE AC-
TUATOR REPLACEMENT to terminate the repeat test.
2) CONDITION 4: LATENT FAILURE CONDITION FOUND ON APU FUEL SHUTOFF VALVE
ACTUATOR
a) OPTION 7:
<1> OPTION 7 (ACTION 1): Do PART 4: APU FUEL SHUTOFF VALVE ACTUATOR
REPLACEMENT.
<2> OPTION 7 (ACTION 2): Do PART 2: APU FUEL SHUTOFF VALVE ACTUATOR
TEST.
b) OPTION 8: Do PART 6: TERMINATING ACTION - APU FUEL SHUTOFF VALVE AC-
TUATOR REPLACEMENT to terminate the repeat test.
B787-A-28-00-0015-00A-933A-DApplicable To:
Issue 002, 19 Jun 2014Model 787
See Applicability of this data module
Page 22 of 29
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB280015-00
Issue 002, 19 Jun 2014
AIRCRAFT SERVICE BULLETIN

### Page 23

(2) TERMINATING ACTION: ENGINE AND APU FUEL SHUTOFF VALVE ACTUATOR REPLACEMENT
(a) RC - Do PART 5: TERMINATING ACTION - ENGINE FUEL SHUTOFF VALVE ACTUATOR
REPLACEMENT.
(b) RC - Do PART 6: TERMINATING ACTION - APU FUEL SHUTOFF VALVE ACTUATOR RE-
PLACEMENT.
B. OPTION: FUEL CROSSFEED AND DEFUEL/ISOLATION VALVE ACTUATOR REPLACEMENT
Do PART 7: FUEL CROSSFEED VALVE ACTUATOR REPLACEMENT.(1)
(2) Do PART 8: DEFUEL/ISOLATION VALVE ACTUATOR REPLACEMENT.
C. Put the airplane back to a serviceable condition.
D. RC - PART 1: ENGINE FUEL SHUTOFF VALVE ACTUATOR TEST
Make sure that no active or latched Engine SOV messages exist.(1)
(2) Make sure that the following circuit breakers are closed using the Circuit Breaker Indication and
Control (CBIC). Refer to 787 AMM 24-00-02 as an accepted procedure.
Table 1  
NomenclatureCircuit Breaker Number
SPAR VLV/EEC RESET CHB CTRL-L ENGINECE7621813
SPAR VLV/EEC RESET CHB CTRL-R ENGINECE7621823
(3) Open the following circuit breakers using the CBIC. Refer to 787 AMM 24-00-02 as an accepted
procedure.
Table 2  
NomenclatureCircuit Breaker Number
ENG SOV - LCE2822803
ENG SOV - RCE2822804
FUEL SHUTOFF MODULECE2825804
(4) Open the following thermal circuit breakers and attach a DO-NOT-CLOSE tag.
Table 3  
GridPanelNomenclatureCircuit Breaker Number
E5P300IGNITION 1 CHAN A-L ENGINECT7411811
G15P400IGNITION 2 CHAN B-L ENGINECT7411812
F8P400IGNITION 1 CHAN A-R ENGINECT7411821
F5P300IGNITION 2 CHAN B-R ENGINECT7411822
(5) Make sure that the L and R FUEL CONTROL switches on the P8 Control Stand are in the CUTOFF
position.
B787-A-28-00-0015-00A-933A-DApplicable To:
Issue 002, 19 Jun 2014Model 787
See Applicability of this data module
Page 23 of 29
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB280015-00
Issue 002, 19 Jun 2014
AIRCRAFT SERVICE BULLETIN

### Page 24

(6) Make sure that the left and right Engine Fire handles on the P8 Control Stand are in normal stowed
position.
(7) Display the Fuel Management Maintenance page on the Central Maintenance Computing Function
(CMCF) . Refer to 787 AMM 31-61-00 as an accepted procedure.
(8) LEFT ENGINE FUEL SHUTOFF VALVE ACTUATOR TEST
(a) Display the circuit breaker status for the left engine fuel shutoff valve on the flight deck display
using CBIC. Refer to 787 AMM 24-00-02 as an accepted procedure.
(b) Close the circuit breaker CE2822803 using CBIC. Refer to 787 AMM 24-00-02 as an accepted
procedure.
(c) On the CBIC data display screen, open the data screen of the circuit breaker CE2822803 and
monitor the LOAD CURRENT value during this test. Refer to 787 AMM 24-00-02 as an accepted
procedure.
(d) Make sure that the STATUS for the L FUEL SPAR VALVE shown on the Fuel Management
Maintenance page is CLOSED.
(e) Set the L FUEL CONTROL switch on the P8 Control Stand to RUN position and make sure
the following is observed during the test. The valve may require up to 15 seconds to reach its
commanded position.
1) The COMMAND for the L FUEL SPAR VALVE shows as OPEN condition on the Fuel
Management Maintenance page.
2) The STATUS for the L FUEL SPAR VALVE shows as IN/TRANS and then OPEN on the
Fuel Management Maintenance page.
3) The LOAD CURRENT value for the circuit breaker CE2822803 changes to a value of 0.1
Amps or more during the valve transition.
(f) Set the L FUEL CONTROL switch on the P8 Control Stand to CUTOFF position and make
sure the following is observed during the test. The valve may require up to 15 seconds to reach
its commanded position.
1) The COMMAND for the L FUEL SPAR VALVE shows as CLOSE condition on the Fuel
Management Maintenance page.
2) The STATUS for the L FUEL SPAR VALVE shows as IN/TRANS and then CLOSE on the
Fuel Management Maintenance page.
3) The LOAD CURRENT for the circuit breaker CE2822803 changes to a value of 0.1 Amps
or more during the valve transition.
(g) Open the circuit breaker CE2822803 using CBIC. Refer to 787 AMM 24-00-02 as an accepted
procedure.
(h) The condition of the left engine fuel shutoff valve actuator is determined as follows:
1) If the LOAD CURRENT value for the circuit breaker changed, as required during the test,
the left engine fuel shutoff valve actuator has passed the test and does not have the latent
failure condition.
B787-A-28-00-0015-00A-933A-DApplicable To:
Issue 002, 19 Jun 2014Model 787
See Applicability of this data module
Page 24 of 29
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB280015-00
Issue 002, 19 Jun 2014
AIRCRAFT SERVICE BULLETIN

### Page 25

2) If the LOAD CURRENT for the circuit breaker did not change, as required during the test,
the left engine fuel shutoff valve actuator has failed this test and has the latent failure con-
dition.
(9) RIGHT ENGINE FUEL SHUTOFF VALVE ACTUATOR TEST
(a) Display the circuit breaker status for the right engine fuel shutoff valve on the flight deck display
using CBIC. Refer to 787 AMM 24-00-02 as an accepted procedure.
(b) Close the circuit breaker CE2822804 using CBIC. Refer to 787 AMM 24-00-02 as an accepted
procedure.
(c) On the CBIC data display screen, open the data screen of the circuit breaker CE2822804 to
monitor the LOAD CURRENT value during this test. Refer to 787 AMM 24-00-02 as an accepted
procedure.
(d) Make sure that the STATUS for the R FUEL SPAR VALVE on the Fuel Management Mainte-
nance page is CLOSED.
(e) Set the R FUEL CONTROL switch on the P8 Control Stand to RUN position and make sure
the following is observed during the test. The valve may require up to 15 seconds to reach its
commanded position.
1) The COMMAND for the R FUEL SPAR VALVE shows as OPEN condition on the Fuel
Management Maintenance page.
2) The STATUS for the R FUEL SPAR VALVE shows as IN/TRANS and then OPEN on the
Fuel Management Maintenance page.
3) The LOAD CURRENT value for the circuit breaker CE2822804 changes to a value of 0.1
Amps or more during the valve transition.
(f) Set the R FUEL CONTROL switch on the P8 Control Stand to CUTOFF position and make
sure the following is observed during the test. The valve may require up to 15 seconds to reach
its commanded position.
1) The COMMAND for the R FUEL SPAR VALVE shows as CLOSE on the Fuel Management
Maintenance page.
2) The STATUS for the R FUEL SPAR VALVE shows as IN/TRANS and then CLOSE on the
Fuel Management Maintenance page.
3) The LOAD CURRENT value for the circuit breaker CE2822804 changes to a value of 0.1
Amps or more during the valve transition.
(g) Open the circuit breaker CE2822804 using CBIC. Refer to 787 AMM 24-00-02 as an accepted
procedure.
(h) The condition of the right engine fuel shutoff valve actuator is determined as follows:
1) If the LOAD CURRENT value for the circuit breaker changed, as required during the test,
the right engine fuel shutoff valve actuator has passed the test and does not have the latent
failure condition.
B787-A-28-00-0015-00A-933A-DApplicable To:
Issue 002, 19 Jun 2014Model 787
See Applicability of this data module
Page 25 of 29
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB280015-00
Issue 002, 19 Jun 2014
AIRCRAFT SERVICE BULLETIN

### Page 26

2) If the LOAD CURRENT for the circuit breaker did not change, as required during the test,
the right engine fuel shutoff valve actuator has failed this test and has the latent failure
condition.
(10) Close the following circuit breakers using the CBIC. Refer to 787 AMM 24-00-02 as an accepted
procedure.
Table 4  
NomenclatureCircuit Breaker Number
ENG SOV - LCE2822803
ENG SOV - RCE2822804
FUEL SHUTOFF MODULECE2825804
(11) Close the following thermal circuit breakers and remove the DO-NOT-CLOSE tag.
Table 5  
GridPanelNomenclatureCircuit Breaker Number
E5P300IGNITION 1 CHAN A-L ENGINECT7411811
G15P400IGNITION 2 CHAN B-L ENGINECT7411812
F8P400IGNITION 1 CHAN A-R ENGINECT7411821
F5P300IGNITION 2 CHAN B-R ENGINECT7411822
E. RC - PART 2: APU FUEL SHUTOFF VALVE ACTUATOR TEST
Provide external electrical ground power to the airplane. Refer to 787 AMM 28-22-00 as an accepted
procedure.
(1)
(2) Make sure that no active or latched APU FUEL SOV messages exist.
(3) Make sure the following circuit breakers are opened using the Circuit Breaker Indication and Control
(CBIC). Refer to 787 AMM 24-00-02 as an accepted procedure.
Table 6  
NomenclatureCircuit Breaker Number
APU DC PUMPCE2825801
FUEL SHUTOFF MODULECE2825804
(4) Set the GND TEST switch on the Cargo Fire/Engine Control panel to ENABLE position.
(5) Make sure that the following circuit breakers are closed using the CBIC. Refer to 787 AMM 24-00-
02 as an accepted procedure.
Table 7  
NomenclatureCircuit Breaker Number
APU SOV CLOSECE2825802
APU SOV OPENCE2825803
B787-A-28-00-0015-00A-933A-DApplicable To:
Issue 002, 19 Jun 2014Model 787
See Applicability of this data module
Page 26 of 29
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB280015-00
Issue 002, 19 Jun 2014
AIRCRAFT SERVICE BULLETIN

### Page 27

(6) Make sure that the APU Fire handle on the P5 Overhead panel is in normal stowed position.
(7) Display the Fuel Management Maintenance page on the Central Maintenance Computing Function
(CMCF). Refer to 787 AMM 31-61-00 as an accepted procedure.
(8) Display the CE2825803 circuit breaker status for the APU fuel shutoff valve using the CBIC on the
flight deck display. Refer to 787 AMM 24-00-02 as an accepted procedure.
(9) Make sure that the STATUS for the APU FUEL FEED S/O VLV shown on the Fuel Management
Maintenance page is CLOSED.
(10) On the CBIC data display screen, open the data screen of the circuit breaker CE2825803 to monitor
the LOAD CURRENT value during this test. Refer to 787 AMM 24-00-02 as an accepted procedure.
(11) Make sure that the CMCF ground test passes after it is initiated.
ATA Chapter: 28 Fuel Quality Management Systems
Test Type: LRU Replacement Test
Name: APU FUEL SHUTOFF VALVE
Make sure the following is observed during the ground test.
(a) The STATUS for the APU FUEL FEED S/O VLV shows as IN/TRANS and then OPEN on the
Fuel Management Maintenance page during the CMCF ground test sequence.
(b) The LOAD CURRENT value for the circuit breaker CE2825803 changes to a value of 0.1 Amps
or more during the valve transition from IN/TRANS to OPEN.
NOTE: It is not necessary to observe the LOAD CURRENT value during the valve transition
from IN/TRANS to CLOSE. 
(12) After the ground test passes successfully, exit the data screen for the circuit breaker CE2825803
on the CBIC display. Refer to 787 AMM 24-00-02 as an accepted procedure.
(13) On the CBIC display, open the data screen for circuit breaker CE2825802 to monitor the LOAD
CURRENT value for the steps that follow.
(14) Make sure that the CMCF ground test passes after it is initiated
ATA Chapter: 28 Fuel Quality Management Systems
Test Type: LRU Replacement Test
Name: APU FUEL SHUTOFF VALVE
Make sure the following is observed during the ground test.
(a) The STATUS for the APU FUEL FEED S/O VLV shows the following sequence: IN/TRANS
and then OPEN and back to CLOSE on the Fuel Management Maintenance page during the
CMCF Ground Test sequence.
(b) The LOAD CURRENT value for the circuit breaker CE2825802 changes to a value of 0.1 Amps
or more during the valve transition from IN/TRANS to CLOSE.
B787-A-28-00-0015-00A-933A-DApplicable To:
Issue 002, 19 Jun 2014Model 787
See Applicability of this data module
Page 27 of 29
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB280015-00
Issue 002, 19 Jun 2014
AIRCRAFT SERVICE BULLETIN

### Page 28

NOTE: It is not necessary to observe the LOAD CURRENT value during the valve transition
from IN/TRANS to OPEN. 
(15) After the CMCF Ground Test passes successfully, exit the data screen for the circuit breaker
CE2825802 on CBIC display.
(16) Set the GND TEST switch on the Cargo Fire/Engine Control panel to NORM position.
(17) The condition of the APU fuel shutoff valve actuator is determined as follows:
(a) If the LOAD CURRENT value for the circuit breaker changed, as required during the test, the
APU fuel shutoff valve actuator has passed the test and does not have the latent failure condi-
tion.
(b) If the LOAD CURRENT for the circuit breaker did not change, as required during the test, the
APU fuel shutoff valve actuator has failed this test and has the latent failure condition.
(18) Close these circuit breakers using the Circuit Breaker Indication and Control (CBIC). Refer to 787
AMM 24-00-02 as an accepted procedure.
Table 8  
NomenclatureCircuit Breaker Number
APU DC PUMPCE2825801
FUEL SHUTOFF MODULECE2825804
F. PART 3: ENGINE FUEL SHUTOFF VALVE ACTUATOR REPLACEMENT
Remove the left or right engine fuel shutoff valve actuator. Refer to 787 AMM 28-22-02 as an accepted
procedure.
(1)
(2) Install a new or serviceable left or right engine fuel shutoff valve actuator with part number 53-0037
and do the installation test. Refer to 787 AMM 28-22-02 as an accepted procedure.
G. PART 4: APU FUEL SHUTOFF VALVE ACTUATOR REPLACEMENT
Remove the APU engine fuel shutoff valve actuator. Refer to 787 AMM 28-25-03 as an accepted
procedure.
(1)
(2) Install a new or serviceable APU fuel shutoff valve actuator with part number 53-0037 and do the
installation test. Refer to 787 AMM 28-25-03 as an accepted procedure.
H. RC - PART 5: TERMINATING ACTION - ENGINE FUEL SHUTOFF VALVE ACTUATOR REPLACEMENT
Remove the left and right engine fuel shutoff valve actuator. Refer to 787 AMM 28-22-02 as an ac-
cepted procedure.
(1)
(2) Install the new left and right engine fuel shutoff valve actuator with part number 53-0049 and do the
installation test. Refer to 787 AMM 28-22-02 as an accepted procedure.
I. RC - PART 6: TERMINATING ACTION - APU FUEL SHUTOFF VALVE ACTUATOR REPLACEMENT
Remove the APU engine fuel shutoff valve actuator. Refer to 787 AMM 28-25-03 as an accepted
procedure.
(1)
(2) Install the new APU fuel shutoff valve actuator with part number 53-0049 and do the installation test.
Refer to 787 AMM 28-25-03 as an accepted procedure.
B787-A-28-00-0015-00A-933A-DApplicable To:
Issue 002, 19 Jun 2014Model 787
See Applicability of this data module
Page 28 of 29
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB280015-00
Issue 002, 19 Jun 2014
AIRCRAFT SERVICE BULLETIN

### Page 29

J. PART 7: FUEL CROSSFEED VALVE ACTUATOR REPLACEMENT
Remove the fuel crossfeed valve actuator. Refer to 787 AMM 28-22-04 as an accepted procedure.(1)
(2) Install the fuel crossfeed valve actuator with part number 53-0049 and do the installation test. Refer
to 787 AMM 28-22-04 as an accepted procedure.
K. PART 8: DEFUEL/ISOLATION VALVE ACTUATOR REPLACEMENT
(1) Remove the left and right defuel/isolation valve actuators. Refer to 787 AMM 28-26-02 as an accepted
procedure.
(2) Install a new left or right defuel/isolation valve actuator with part number 53-0049 and do the instal-
lation test. Refer to 787 AMM 28-26-02as an accepted procedure.
B787-A-28-00-0015-00A-933A-DApplicable To:
Issue 002, 19 Jun 2014End of data moduleModel 787
See Applicability of this data module
Page 29 of 29
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB280015-00
Issue 002, 19 Jun 2014
AIRCRAFT SERVICE BULLETIN

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
