# Boeing Service Bulletin B787-81205-SB320028-00

Copy: Revision 001 ("SB-787-81205-SB320028-00-Issue01--"), 21 pages: PDF https://openairdocs.org/files/sha256/4f/88/4f882fab9a60594a2fbb0d7284bfef6f653a3bf765a329c22dc04e8fdb0ebff2; text https://openairdocs.org/service-documents/boeing/b787-81205-sb320028-00/file/4f882fab9a60.md. Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2017-0553; AD 2018-07-19 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Boeing](https://openairdocs.org/service-documents/boeing.md)
- Type: Service bulletin (Service Bulletin)
- Number: B787-81205-SB320028-00
- Latest revision known: B787-81205-SB320028-00, Issue 001, dated October 31, 2016 (OpenAirDocs)
- Page: https://openairdocs.org/service-documents/boeing/b787-81205-sb320028-00

## ADs that cite it (1) (OpenAirDocs)

Newest first, with the revision each names, as OpenAirDocs read it from the AD's text.

- [AD 2018-07-19](https://openairdocs.org/ad/2018-07-19.md), effective May 21, 2018: Revision 001

Also cited in [1 proposed AD](https://openairdocs.org/service-documents/boeing/b787-81205-sb320028-00/proposed.md).

## Text (21 pages)

Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2017-0553; AD 2018-07-19 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication. Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Service Bulletin B787-81205-SB320028-00 LANDING GEAR - PARKING
BRAKE SYSTEM - Parking Brake and Alternate Pitch Trim Module Change
Issue 001, 31 Oct 2016B787-81205-SB320028-00Publication:
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET
Copyright © 2016 Boeing. Unpublished Work. All rights reserved.
Treatment of this data module and its content is governed by contract with Boeing. Rights to use this data module are licensed on a per
aircraft basis and such rights may not be transferable. For more information, contact The Boeing Company. Boeing, the Boeing signature,
the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner, BBJ, DC-8, DC-9, DC-10, KC-10, KC-46, KDC-10, MD-10,
MD-11, MD-80, MD-88, MD-90, P-8, Poseidon and Boeing liveries are all trademarks owned by The Boeing Company; and no trademark
license is granted in connection with this document unless provided in writing by Boeing.
EXPORT CONTROLLED
Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15 CFR 300-774). An export license
may be required before it is used for development, production or use by foreign persons from specific countries. The controller of this data
has the individual responsibility to abide by all export laws.
ECCN: 9E991
The applicability information below is referenced at the lower left of each page to indicate the page applicability.
These references are valid for this print copy only.
PM Applicability (Publication Module applicability)
787-8 and 787-9 Airplanes. Refer to Data Module SB B787-A-32-00-0028-00A-932A-D, Paragraph 1., Effectivity
for the list of affected airplanes.
B787-81205-SB320028-00TITLE PAGE
Issue 001, 31 Oct 2016
Page 1 of 21
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
3.0
B787-81205-SB320028-00
Issue 001, 31 Oct 2016
AIRCRAFT SERVICE BULLETIN

### Page 2

Service Bulletin B787-81205-SB320028-00
Table of Contents
Page
Summary  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
PLANNING INFORMATION  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
1. Effectivity  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
A. Airplanes  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
B. Spares Affected  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
2. Concurrent Requirements  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
3. Reason  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
4. Description  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
5. Compliance  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
6. Approval  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
7. Manpower  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
8. Weight and Balance Changes  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
9. Electrical Load Data  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
10. References  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
A. Existing Data:  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
B. Data Supplied with this Service Bulletin:  . . . . . . . . . . . . . . . . . . . . . . . . . . 16
C. Installation Requirement Modules Used in the Preparation of this Service Bulletin:  . . . 16
11. Publications Affected  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16
12. Interchangeability and Intermixability of Parts  . . . . . . . . . . . . . . . . . . . . . . . . . 16
13. Software Accomplishment Summary  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16
MATERIAL INFORMATION  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
1. Material - Price and Availability  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
2. Industry Support Information  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
3. Parts Necessary for Each Airplane  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
A. Kits/Parts:  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
B. Parts and Materials Supplied by the Operator:  . . . . . . . . . . . . . . . . . . . . . . . 17
C. Parts Modified and Reidentified:  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18
D. Parts Removed and Not Replaced:  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18
4. Parts Necessary to Change Spares  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18
5. Special Tooling - Price and Availability  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18
6. Special Tooling Necessary to do this Service Bulletin  . . . . . . . . . . . . . . . . . . . . . 18
ACCOMPLISHMENT INSTRUCTIONS  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
1. GENERAL INFORMATION  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
2. WORK INSTRUCTIONS  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21
B787-81205-SB320028-00TABLE OF CONTENTS
Issue 001, 31 Oct 2016
Page 2 of 21
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB320028-00
Issue 001, 31 Oct 2016
AIRCRAFT SERVICE BULLETIN

### Page 3

Service Bulletin B787-81205-SB320028-00
List of Illustrations
BOEING RECOMMENDS THAT EACH OPERATOR EXAMINE THIS SERVICE BULLETIN
IMMEDIATELY.
Special Attention:
Description
Group 1:
Table 1  List of Illustrations - Service Bulletin B787-81205-SB320028-00
Used InICN
B787-A-32-00-0028-00A-931C-D Issue 001ICN-B787-A-000061-A-81205-12475-A-01-1
B787-A-32-00-0028-00A-00AA-DApplicable To:
Issue 001, 31 Oct 2016End of data moduleModel 787
See Applicability of this data module
Page 3 of 21
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB320028-00
Issue 001, 31 Oct 2016
AIRCRAFT SERVICE BULLETIN

### Page 4

Service Bulletin B787-81205-SB320028-00
List of Effective Data Modules
BOEING RECOMMENDS THAT EACH OPERATOR EXAMINE THIS SERVICE BULLETIN
IMMEDIATELY.
Special Attention:
Description
Group 1:
Table 1  List of Effective Data Modules - Service Bulletin B787-81205-SB320028-00
Issue DateIssue StatusIssueData Module – Information Name
2016-10-31New001B787-A-32-00-0028-00A-00AA-D – List of Illustrations
2016-10-31New001B787-A-32-00-0028-00A-00SA-D – List of Effective Data Modules
2016-10-31New001B787-A-32-00-0028-00A-931C-D – Summary
2016-10-31New001B787-A-32-00-0028-00A-932A-D – PLANNING INFORMATION
2016-10-31New001B787-A-32-00-0028-00A-934A-D – MATERIAL INFORMATION
2016-10-31New001B787-A-32-00-0028-00A-933A-D – ACCOMPLISHMENT INSTRUCTIONS
B787-A-32-00-0028-00A-00SA-DApplicable To:
Issue 001, 31 Oct 2016End of data moduleModel 787
See Applicability of this data module
Page 4 of 21
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB320028-00
Issue 001, 31 Oct 2016
AIRCRAFT SERVICE BULLETIN

### Page 5

Service Bulletin B787-81205-SB320028-00
Summary
BOEING RECOMMENDS THAT EACH OPERATOR EXAMINE THIS SERVICE BULLETIN
IMMEDIATELY.
Special Attention:
References
TitleReference
Spares AffectedSB B787-A-32-00-0028-00A-932A-D Issue 001,
Paragraph 1.B.
ComplianceSB B787-A-32-00-0028-00A-932A-D Issue 001,
Paragraph 5.
Weight and Balance ChangesSB B787-A-32-00-0028-00A-932A-D Issue 001,
Paragraph 8.
Electrical Load DataSB B787-A-32-00-0028-00A-932A-D Issue 001,
Paragraph 9.
Publications AffectedSB B787-A-32-00-0028-00A-932A-D Issue 001,
Paragraph 11.
Kits/PartsSB B787-A-32-00-0028-00A-934A-D Issue 001,
Paragraph 3.A.
Parts and Materials Supplied by the OperatorSB B787-A-32-00-0028-00A-934A-D Issue 001,
Paragraph 3.B.
Special Tooling Necessary to do this Service BulletinSB B787-A-32-00-0028-00A-934A-D Issue 001,
Paragraph 6.
EffectivitySB B787-A-32-00-0028-00A-932A-D Issue 001,
Paragraph 1.
ManpowerSB B787-A-32-00-0028-00A-932A-D Issue 001,
Paragraph 7.
Material - Price and AvailabilitySB B787-A-32-00-0028-00A-934A-D Issue 001,
Paragraph 1.
Description
Group 1:
1. CONCURRENT REQUIREMENTS
None.
B787-A-32-00-0028-00A-931C-DApplicable To:
Issue 001, 31 Oct 2016Model 787
See Applicability of this data module
Page 5 of 21
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB320028-00
Issue 001, 31 Oct 2016
AIRCRAFT SERVICE BULLETIN

### Page 6

2. BACKGROUND
This service bulletin is sent to instruct operators to install the new Parking Brake and Alternate Pitch Trim
Module (PBM). The current PBM may be unintentionally disengaged, fail to set, fail to release, or become
jammed. The new PBM cannot be disengaged without depressing the brake pedals, will incorporate changes
in the assembly that eliminate jammed solenoid errors, and will introduce a better design. If the changes in
this service bulletin are not done, operators may experience error messages, jammed PBM solenoid, unin-
tended parking brake release, and may be unable to set or release the parking brake, which could result in
damage to the airplane and hazards to persons or property on the ground.
The 787 fleet has experienced in-service delays due to reliability issues with the current PBM. It is possible
for the parking brake to release from the set position without depressing the brake pedals if the lever is
bumped. Difficulty setting the parking brake has occurred when the timing between pulling the lever and
depressing the brake pedals is not correct. It is also possible for the brakes to remain set after the lever has
returned to the released position. Any of these conditions may occur without a maintenance message.
The new PBM will reduce friction in the assembly to allow the solenoid to retract under all pilot loads. Improved
design in the new PBM will eliminate the 32-38007 maintenance message due to switch hysteresis. The
new PBM will also increase the parking brake lever travel before the interlock is encountered, to increase
the timing margin to engage the parking brake when the pilots pull on the lever as they push on the brake
pedals. This change will make setting the parking brake on the 787 more like the 777 operation.
NOTE: New PBM 4260-0037-5 is obtained by removing the existing PBM and sending the unit directly to
the supplier. As an alternative, new PBM can be obtained directly from the supplier. 
Boeing Service Related Problem (SRP) 787 SRP-32-0199 is related to this service bulletin.
Boeing Fleet Team Digest (FTD) 787-FTD-32-14007 is related to this service bulletin.
This table is provided to operators for planning purposes only. Refer to the applicable sections for more in-
formation.
Table 1  
Data Module ReferenceAffectedPlanning Data
Data Module SB B787-A-32-00-0028-00A-932A-
D, Paragraph 1.B., Spares Affected
YesSpares Affected
Data Module SB B787-A-32-00-0028-00A-932A-
D, Paragraph 5., Compliance
YesAD Related
Data Module SB B787-A-32-00-0028-00A-932A-
D, Paragraph 8., Weight and Balance Changes
NoWeight and Balance Changed
Data Module SB B787-A-32-00-0028-00A-932A-
D, Paragraph 9., Electrical Load Data
NoElectrical Load Changed
Data Module SB B787-A-32-00-0028-00A-932A-
D, Paragraph 11., Publications Affected
YesPublications Affected
Data Module SB B787-A-32-00-0028-00A-932A-
D, Paragraph 11., Publications Affected
YesAirplane Flight Operations Affected (Flight Crew
Operations Manual and/or FAA Approved Air-
plane Flight Manual)
B787-A-32-00-0028-00A-931C-DApplicable To:
Issue 001, 31 Oct 2016Model 787
See Applicability of this data module
Page 6 of 21
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB320028-00
Issue 001, 31 Oct 2016
AIRCRAFT SERVICE BULLETIN

### Page 7

Table 1  
Data Module ReferenceAffectedPlanning Data
Data Module SB B787-A-32-00-0028-00A-934A-
D, Paragraph 3.A., Kits/Parts
YesKits/Parts Required
Data Module SB B787-A-32-00-0028-00A-934A-
D, Paragraph 3.B., Parts and Materials Supplied
by the Operator
YesOperator Supplied Parts/Material
Data Module SB B787-A-32-00-0028-00A-934A-
D, Paragraph 6., Special Tooling Necessary to
do this Service Bulletin
NoSpecial Tooling Required
3. ACTION
(CN-AA50583D)
Replace the Parking Brake and Alternate Pitch Trim Module (PBM).
NOTE: Parking Brake and Alternate Pitch Trim Module (PBM) 4260-0037-5 is obtained by removing the
existing PBM and sending the unit directly to the supplier. As an alternative, new PBM can be ob-
tained directly from the supplier. 
4. EFFECTIVITY
787-8 and 787-9 Airplanes. Refer to Data Module SB B787-A-32-00-0028-00A-932A-D, Paragraph 1., Ef-
fectivity for the list of affected airplanes.
5. COMPLIANCE
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to this
service bulletin. The Airworthiness Directive will make the compliance tasks and times given in this service
bulletin mandatory.
Boeing recommends that the change given in this service bulletin be done within 60 months after the Issue
001 date of this service bulletin.
6. INDUSTRY SUPPORT INFORMATION
Boeing warranty remedies are not available for the configuration changes given in this service bulletin.
7. MANPOWER
Refer to Data Module SB B787-A-32-00-0028-00A-932A-D, Paragraph 7., Manpower.
8. MATERIAL INFORMATION
Refer to Data Module SB B787-A-32-00-0028-00A-934A-D, Paragraph 1., Material - Price and Availability.
B787-A-32-00-0028-00A-931C-DApplicable To:
Issue 001, 31 Oct 2016Model 787
See Applicability of this data module
Page 7 of 21
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB320028-00
Issue 001, 31 Oct 2016
AIRCRAFT SERVICE BULLETIN

### Page 8 (OCR)

Q BOEING  B787-81205-SB320028-00
Issue 001, 31 Oct 2016
AIRCRAFT SERVICE BULLETIN
FWD
FLIGHT COMPARTMENT
CHANGE EXISTING PARKING
BRAKE MODULE
CONTROL STAND
2524413
ICN-B787-A-000061-A-81205-12475-A-01-1
Applicable To:  B787-A-32-00-0028-00A-931C-D
Model 787  Issue 001, 31 Oct 2016
See Applicability of this data module
Page 8 of 21
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.

### Page 9

Figure 1  
B787-A-32-00-0028-00A-931C-DApplicable To:
Issue 001, 31 Oct 2016End of data moduleModel 787
See Applicability of this data module
Page 9 of 21
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB320028-00
Issue 001, 31 Oct 2016
AIRCRAFT SERVICE BULLETIN

### Page 10

Service Bulletin B787-81205-SB320028-00
PLANNING INFORMATION
BOEING RECOMMENDS THAT EACH OPERATOR EXAMINE THIS SERVICE BULLETIN
IMMEDIATELY.
Special Attention:
References
TitleReference
Parts Modified and ReidentifiedSB B787-A-32-00-0028-00A-934A-D Issue 001,
Paragraph 3.C.
Parts Necessary for Each AirplaneSB B787-A-32-00-0028-00A-934A-D Issue 001,
Paragraph 3.
BOLT AND NUT INSTALLATIONSOPM 20-50-01
Standard Wiring Practices ManualSWPM 20-10-11
Standard Wiring Practices ManualSWPM 20-10-12
Standard Wiring Practices ManualSWPM 20-10-19
PARKING BRAKE AND ALTERNATE PITCH TRIM
MODULE
787 AMM 32-44-01
Description
Group 1:
1. Effectivity
A. Airplanes
This service bulletin is applicable to 787-8 and 787-9 Airplanes, line numbers 4-462 in 1 Group. The
Variable Numbers and Group information for the applicable airplanes is given below. An equivalent
change is on subsequent production airplanes. Refer to CN-AA50583D for data about this change.
Table 1  
DESCRIPTIONCONFIGURATIONGROUP
787-8 and 787-9 Airplanes with Rockwell Collins P/N 4260-0037-3 or
Rockwell Collins P/N 4260-0037-4 Parking Brake and Alternate Pitch
Trim Module (PBM) installed.
-1
Airplane Models: 787-8, 787-9
B787-A-32-00-0028-00A-932A-DApplicable To:
Issue 001, 31 Oct 2016Model 787
See Applicability of this data module
Page 10 of 21
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB320028-00
Issue 001, 31 Oct 2016
AIRCRAFT SERVICE BULLETIN

### Page 11

Table 2  
GroupVariable Number
1ZA004-ZA006
1ZA100-ZA105
1ZA116-ZA124
1ZA135-ZA144
1ZA152-ZA155
1ZA175-ZA189
1ZA195-ZA204
1ZA215-ZA225
1ZA230-ZA250
1ZA260-ZA275
1ZA285-ZA296
1ZA317-ZA324
1ZA327
1ZA334-ZA335
1ZA341-ZA342
1ZA380-ZA389
1ZA430-ZA439
1ZA445-ZA448
1ZA450-ZA457
1ZA460-ZA489
1ZA506-ZA516
1ZA536-ZA545
1ZA560-ZA567
1ZA576-ZA580
1ZA586
1ZA588-ZA593
1ZA610-ZA617
1ZA650-ZA652
1ZA655-ZA663
1ZA665-ZA672
B787-A-32-00-0028-00A-932A-DApplicable To:
Issue 001, 31 Oct 2016Model 787
See Applicability of this data module
Page 11 of 21
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB320028-00
Issue 001, 31 Oct 2016
AIRCRAFT SERVICE BULLETIN

### Page 12

Table 2  
GroupVariable Number
1ZA680-ZA685
1ZA695
1ZA715-ZA716
1ZA718-ZA719
1ZA740-ZA741
1ZA768-ZA769
1ZA778-ZA779
1ZA783-ZA784
1ZA817-ZA831
1ZA839
1ZA841-ZA842
1ZA846-ZA848
1ZA853-ZA857
1ZA881-ZA882
1ZA916-ZA917
1ZB001-ZB007
1ZB021-ZB025
1ZB027-ZB039
1ZB047-ZB051
1ZB077-ZB081
1ZB097-ZB100
1ZB127-ZB132
1ZB167-ZB184
1ZB197-ZB198
1ZB224-ZB228
1ZB234-ZB238
1ZB299
1ZB302
1ZB362-ZB374
1ZB407-ZB416
B787-A-32-00-0028-00A-932A-DApplicable To:
Issue 001, 31 Oct 2016Model 787
See Applicability of this data module
Page 12 of 21
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB320028-00
Issue 001, 31 Oct 2016
AIRCRAFT SERVICE BULLETIN

### Page 13

Table 2  
GroupVariable Number
1ZB536-ZB540
1ZB545-ZB546
1ZB558-ZB570
1ZB603-ZB606
1ZB611-ZB617
1ZB646-ZB648
1ZB688
1ZB763
1ZB778
1ZB782-ZB783
1ZD001-ZD009
B. Spares Affected
Examine your spares supply for the parts or components identified below . If any parts or components
are found, refer to Data Module SB B787-A-32-00-0028-00A-934A-D, Paragraph 3.C., Parts Modified
and Reidentified for the recommended action.
Table 3  
NamePart Number
Parking Brake/Alternate Pitch Trim AssemblyRockwell Collins P/N 4260-0037-3
Parking Brake/Alternate Pitch Trim AssemblyRockwell Collins P/N 4260-0037-4
2. Concurrent Requirements
None.
3. Reason
This service bulletin is sent to instruct operators to install the new Parking Brake and Alternate Pitch Trim
Module (PBM). The current PBM may be unintentionally disengaged, fail to set, fail to release, or become
jammed. The new PBM cannot be disengaged without depressing the brake pedals, will incorporate changes
in the assembly that eliminate jammed solenoid errors, and will introduce a better design. If the changes
in this service bulletin are not done, operators may experience error messages, jammed PBM solenoid,
unintended parking brake release, and may be unable to set or release the parking brake, which could result
in damage to the airplane and hazards to persons or property on the ground.
The 787 fleet has experienced in-service delays due to reliability issues with the current PBM. It is possible
for the parking brake to release from the set position without depressing the brake pedals if the lever is
bumped. Difficulty setting the parking brake has occurred when the timing between pulling the lever and
B787-A-32-00-0028-00A-932A-DApplicable To:
Issue 001, 31 Oct 2016Model 787
See Applicability of this data module
Page 13 of 21
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB320028-00
Issue 001, 31 Oct 2016
AIRCRAFT SERVICE BULLETIN

### Page 14

depressing the brake pedals is not correct. It is also possible for the brakes to remain set after the lever
has returned to the released position. Any of these conditions may occur without a maintenance message.
The new PBM will reduce friction in the assembly to allow the solenoid to retract under all pilot loads. Im-
proved design in the new PBM will eliminate the 32-38007 maintenance message due to switch hysteresis.
The new PBM will also increase the parking brake lever travel before the interlock is encountered, to increase
the timing margin to engage the parking brake when the pilots pull on the lever as they push on the brake
pedals. This change will make setting the parking brake on the 787 more like the 777 operation.
NOTE: New PBM 4260-0037-5 is obtained by removing the existing PBM and sending the unit directly to
the supplier. As an alternative, new PBM can be obtained directly from the supplier. 
Boeing Service Related Problem (SRP) 787 SRP-32-0199 is related to this service bulletin.
Boeing Fleet Team Digest (FTD) 787-FTD-32-14007 is related to this service bulletin.
4. Description
Replace the Parking Brake and Alternate Pitch Trim Module (PBM).
NOTE: Parking Brake and Alternate Pitch Trim Module (PBM) 4260-0037-5 is obtained by removing the
existing PBM and sending the unit directly to the supplier. As an alternative, new PBM can be
obtained directly from the supplier. 
The work in this service bulletin is done in the maintenance zone(s) given below.
Table 4  
Affected Maintenance Zones
ZoneModel
211787-8, 787-9
5. Compliance
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to this
service bulletin. The Airworthiness Directive will make the compliance tasks and times given in this service
bulletin mandatory.
Boeing recommends that the change given in this service bulletin be done within 60 months after the Issue
001 date of this service bulletin.
6. Approval
This service bulletin was examined by the Federal Aviation Administration (FAA). The changes specified
in this service bulletin comply with the applicable regulations and are FAA approved, as well as European
Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/JAA approved air-
planes listed in the service bulletin effectivity. This service bulletin and its approval were based on the airplane
in its original Boeing delivery configuration or as modified by other approved Boeing changes.
If an airplane has a non-Boeing modification or repair that affects a component or system also affected by
this service bulletin, the operator is responsible for obtaining appropriate regulatory agency approval before
incorporating this service bulletin.
B787-A-32-00-0028-00A-932A-DApplicable To:
Issue 001, 31 Oct 2016Model 787
See Applicability of this data module
Page 14 of 21
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB320028-00
Issue 001, 31 Oct 2016
AIRCRAFT SERVICE BULLETIN

### Page 15

7. Manpower
The table below shows an estimate of the task hours necessary to do this change for each airplane. This
estimate is for direct labor only, done by an experienced crew. Adjust the estimate with operator task hour
data if necessary. The estimate does not include lost time. These are some examples of lost time:
– Time to adjust to the workplace
– Time to schedule the work
– Time to inspect the work
– Time to cure the materials
– Time to make the parts
– Time to find the tools
The time to make the change to the change in accordance with Rockwell Collins Service Bulletin 4260-
0037-27-502 is not included.
Table 5  
Elapsed HoursTask HoursNumber of Per-
sons
Task
1.001.001Open Access
1.401.401Change
0.600.601Test
1.001.001Close Access
4.004.00TOTAL FOR EACH AIRPLANE
8. Weight and Balance Changes
None.
9. Electrical Load Data
Not changed.
10. References
A. Existing Data:
1. Change Notice CN-AA50583D
2. Aircraft Maintenance Manual (AMM) 787 AMM 32-44-01
3. Boeing Fleet Team Digest (FTD) 787-FTD-32-14007
4. Boeing Service Related Problem (SRP) 787 SRP-32-0199
5. Rockwell Collins Service Bulletin 4260-0037-27-502
6. Standard Overhaul Practices Manual (SOPM) SOPM 20-50-01
7. Standard Wiring Practices Manual (SWPM) SWPM 20-10-11, SWPM 20-10-12, SWPM 20-10-19
B787-A-32-00-0028-00A-932A-DApplicable To:
Issue 001, 31 Oct 2016Model 787
See Applicability of this data module
Page 15 of 21
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB320028-00
Issue 001, 31 Oct 2016
AIRCRAFT SERVICE BULLETIN

### Page 16

B. Data Supplied with this Service Bulletin:
None.
C. Installation Requirement Modules Used in the Preparation of this Service Bulletin:
None.
11. Publications Affected
Table 6  
Chapter-SectionPublication
FCOM Bulletins787 Flight Crew Operations Manual
32-00787 Fault Isolation Manual
27-41, 32-44787 Illustrated Parts Data
Damage Tolerance Based Structural Inspections:
Boeing has evaluated the repairs and/or changes in this service bulletin for effects on Fatigue Critical
Structure (FCS) and for changes to Damage Tolerance Inspections (DTI) required in the Maintenance
Program. This service bulletin does not affect FCS, therefore DTIs are not necessary.
12. Interchangeability and Intermixability of Parts
Refer to Data Module SB B787-A-32-00-0028-00A-934A-D, Paragraph 3., Parts Necessary for Each Airplane,
for interchangeability and intermixability information.
13. Software Accomplishment Summary
Not Affected.
B787-A-32-00-0028-00A-932A-DApplicable To:
Issue 001, 31 Oct 2016End of data moduleModel 787
See Applicability of this data module
Page 16 of 21
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB320028-00
Issue 001, 31 Oct 2016
AIRCRAFT SERVICE BULLETIN

### Page 17

Service Bulletin B787-81205-SB320028-00
MATERIAL INFORMATION
BOEING RECOMMENDS THAT EACH OPERATOR EXAMINE THIS SERVICE BULLETIN
IMMEDIATELY.
Special Attention:
Description
Group 1:
1. Material - Price and Availability
The operator can supply the parts and materials shown in Paragraph 3., Parts Necessary for Each Airplane,
if needed. Refer to Rockwell Collins Service Bulletin 4260-0037-27-502.
2. Industry Support Information
Boeing warranty remedies are not available for the changes given in this service bulletin.
3. Parts Necessary for Each Airplane
A. Kits/Parts:
None.
B. Parts and Materials Supplied by the Operator:
Table 1  
NotesExisting Part
Number
NameQTYPart Number /
Specification
*[1] *[2] *[3]4260-0037-3 or
4260-0037-4
Parking Brake and Al-
ternate Pitch Trim
Module
14260-0037-5
*[1]  Existing Parking Brake and Alternate Pitch Trim Module must be changed by Rockwell Collins authorized represen-
tative or service center.
Rockwell Collins
Customer Response Center, M/S 133-100
400 Collins Road NE
Cedar Rapids, IA 52498-0001
TELEPHONE: 1.888.265.5467
INTERNATIONAL: 1.319.265.5467
FAX NO: 1.319.295.4941
Email: response@rockwellcollins.com
*[2]  Alternatively, a new Parking Brake and Alternate Pitch Trim Module may be purchased directly from the supplier.
*[3]  Rockwell Collins P/N 4260-0037-5 may not be replaced with Rockwell Collins P/N 4260-0037-3 or Rockwell Collins
P/N 4260-0037-4.
B787-A-32-00-0028-00A-934A-DApplicable To:
Issue 001, 31 Oct 2016Model 787
See Applicability of this data module
Page 17 of 21
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB320028-00
Issue 001, 31 Oct 2016
AIRCRAFT SERVICE BULLETIN

### Page 18

C. Parts Modified and Reidentified:
Table 2  
NotesNew Rockwell
Collins Part Num-
ber
NameQTYExisting Rock-
well Collins Part
Number
*[1] *[2] *[3]4260-0037-5Parking Brake and Al-
ternate Pitch Trim
Module
14260-0037-3 or
4260-0037-4
*[1]  Existing Parking Brake and Alternate Pitch Trim Module must be changed by Rockwell Collins authorized represen-
tative or service center.
Rockwell Collins
Customer Response Center, M/S 133-100
400 Collins Road NE
Cedar Rapids, IA 52498-0001
TELEPHONE: 1.888.265.5467
INTERNATIONAL: 1.319.265.5467
FAX NO: 1.319.295.4941
Email: response@rockwellcollins.com
*[2]  Alternatively, a new Parking Brake and Alternate Pitch Trim Module may be purchased directly from the supplier.
*[3]  Rockwell Collins P/N 4260-0037-5 may not be replaced with Rockwell Collins P/N 4260-0037-3 or Rockwell Collins
P/N 4260-0037-4.
D. Parts Removed and Not Replaced:
None.
4. Parts Necessary to Change Spares
None.
5. Special Tooling - Price and Availability
None.
6. Special Tooling Necessary to do this Service Bulletin
None.
B787-A-32-00-0028-00A-934A-DApplicable To:
Issue 001, 31 Oct 2016End of data moduleModel 787
See Applicability of this data module
Page 18 of 21
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB320028-00
Issue 001, 31 Oct 2016
AIRCRAFT SERVICE BULLETIN

### Page 19

Service Bulletin B787-81205-SB320028-00
ACCOMPLISHMENT INSTRUCTIONS
BOEING RECOMMENDS THAT EACH OPERATOR EXAMINE THIS SERVICE BULLETIN
IMMEDIATELY.
Special Attention:
References
TitleReference
ReferencesSB B787-A-32-00-0028-00A-932A-D Issue 001,
Paragraph 10.
ComplianceSB B787-A-32-00-0028-00A-932A-D Issue 001,
Paragraph 5.
Standard Wiring Practices ManualSWPM 20-10-11
Standard Wiring Practices ManualSWPM 20-10-12
Standard Wiring Practices ManualSWPM 20-10-19
BOLT AND NUT INSTALLATIONSOPM 20-50-01
PARKING BRAKE AND ALTERNATE PITCH TRIM
MODULE
787 AMM 32-44-01
Procedure
Group 1:
1. GENERAL INFORMATION
CAUTION: KEEP THE WORK AREA, WIRES AND ELECTRICAL BUNDLES CLEAN OF METAL PARTI-
CLES OR CONTAMINATION WHEN YOU USE TOOLS. UNWANTED MATERIAL, METAL
PARTICLES OR CONTAMINATION CAUGHT IN WIRE BUNDLES CAN CAUSE DAMAGE
TO THE BUNDLES. DAMAGED WIRE BUNDLES CAN CAUSE SPARKS OR OTHER
ELECTRICAL DAMAGE.
NOTE: 1. Manual titles are referred to by acronyms. Refer to Data Module SB B787-A-32-00-0028-00A-
932A-D, Paragraph 10., References, for definition of the acronyms.
2. Obey all of the warnings and cautions given in the specified manual sections.
3. Unless shown differently, these dimensions and tolerances are used:
– Linear dimensions are in inches
– Tolerance on linear dimensions, other than rivet and bolt edge margins, is plus or minus
0.03 inch
– Tolerance on rivet and bolt edge margin is plus or minus 0.05 inch
– Angular tolerance is plus or minus 2 degrees
B787-A-32-00-0028-00A-933A-DApplicable To:
Issue 001, 31 Oct 2016Model 787
See Applicability of this data module
Page 19 of 21
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB320028-00
Issue 001, 31 Oct 2016
AIRCRAFT SERVICE BULLETIN

### Page 20

– Hole dimensions for standard solid rivets and fasteners are in SRM Chapter 51
– Torque Values:
– Values for structural fasteners are given in 787 Structural Repair Manual, Chapter 51.
– Values for airframe maintenance tasks are included in Chapter 20 of 787 Aircraft Main-
tenance Manual (AMM).
– Values for electrical maintenance tasks are included in Chapter 20 of Standard Wiring
Practices Manual (SWPM).
– Values for engine maintenance tasks are included in Chapter 70 of 787 Aircraft Mainte-
nance Manual (AMM).
– Non-standard torque values for maintenance tasks are included in the applicable instal-
lation step.
4. Use the approved fastener, process and material substitutions in accordance with SRM Chapter
51.
5. Refer to the SWPM 20-10-11 and SWPM 20-10-12 for the wire installation procedures, and
SWPM 20-10-19 for the wire separation requirements, as accepted procedures.
6. The necessary conditions for selection of clamp type and size are included in SWPM 20-10-12.
If any wire bundle support clamp specified in this service bulletin does not make a correct fit on
the wire bundle, refer to SWPM 20-10-12 as an accepted procedure to select a clamp that fits
correctly.
7. If the length of any fastener specified in this service bulletin does not meet the installation
standards in SRM Chapter 51, then a fastener of the same specification, or an approved substi-
tute, with a length which meets the installation standards in SRM Chapter 51 may be used. In
addition, washers may be installed for fastener grip length in accordance with SRM Chapter 51.
Refer to SOPM 20-50-01 for alternate full threaded fasteners (screws) needed for installation
in this service bulletin.
8. These work instructions refer to procedures included in other Boeing documents. When the
words "refer to" are used and the operator has an accepted alternative procedure, the accepted
alternative procedure can be used. When the words "in accordance with" are included in the
instruction, the procedure in the Boeing document must be used.
9. The instructions in Step 2., Work Instructions and the Tasks can include operation of tools or
test equipment. Boeing Engineering Tool Drawings, the Illustrated Tool and Equipment Manual,
and the Special Tool and Ground Handling Drawing Index contain data on versions of the tools
or test equipment that you can use. It is permitted to use replaced tools. It is not permitted to
use superseded tools.
10. If it is necessary to remove more parts for access, you can remove those parts. If you can get
access without removing identified parts, it is not necessary to remove all of the identified parts.
Jacking and shoring limitations must be observed.
11. This service bulletin includes functional test procedures for the systems changed by this service
bulletin. More functional tests can possibly be necessary in accordance with standard mainte-
nance practices because of interruption to other airplane systems.
12. The compliance times for the actions in Step 2., Work Instructions are in Data Module SB B787-
A-32-00-0028-00A-932A-D, Paragraph 5., Compliance.
B787-A-32-00-0028-00A-933A-DApplicable To:
Issue 001, 31 Oct 2016Model 787
See Applicability of this data module
Page 20 of 21
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB320028-00
Issue 001, 31 Oct 2016
AIRCRAFT SERVICE BULLETIN

### Page 21

13. Some steps in the Work Instructions are labeled as Required for Compliance (RC). If this service
bulletin is mandated by an Airworthiness Directive (AD), then the steps labeled as RC, including
sub-steps under an RC step and any figures identified in an RC step, must be done to comply
with the AD. An Alternative Method of Compliance (AMOC) is required for any deviations to RC
steps, including sub-steps and identified figures. Steps not labeled as RC may be deviated from
using accepted methods in accordance with the operator's maintenance or inspection program
without obtaining approval of an AMOC. This is provided that the RC steps, including sub-steps
and identified figures, can still be done as specified, and the airplane can be put back in an air-
worthy condition.
2. WORK INSTRUCTIONS
A. Get access to the flight deck.
B. Remove the existing Parking Brake and Alternate Pitch Trim Module (PBM) in accordance with 787 AMM
32-44-01.
C. RC - Install PBM Rockwell Collins P/N 4260-0037-5 in accordance with 787 AMM 32-44-01.
D. RC - Do the PBM installation test in accordance with 787 AMM 32-44-01.
E. Put the airplane back to a serviceable condition.
B787-A-32-00-0028-00A-933A-DApplicable To:
Issue 001, 31 Oct 2016End of data moduleModel 787
See Applicability of this data module
Page 21 of 21
EXPORT CONTROLLED ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET. See title page for details.
B787-81205-SB320028-00
Issue 001, 31 Oct 2016
AIRCRAFT SERVICE BULLETIN

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
