# Boeing Alert Requirements Bulletin B787-81205-SB320045-00 RB

Copy: Revision 001 ("RB B787-81205-SB320045-00"), 38 pages: PDF https://openairdocs.org/files/sha256/17/dc/17dc6b64a6e5fcfa44c9ae3ee0f53f50b0a91fbab05d3637e535ca6b4dec8d3d; text https://openairdocs.org/service-documents/boeing/b787-81205-sb320045-00-rb/file/17dc6b64a6e5.md. Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2021-0457; AD 2022-02-14 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Boeing](https://openairdocs.org/service-documents/boeing.md)
- Type: Service bulletin (Alert Requirements Bulletin)
- Number: B787-81205-SB320045-00 RB
- Latest revision known: B787-81205-SB320045-00 RB, Issue 001, dated November 9, 2020 (OpenAirDocs)
- Page: https://openairdocs.org/service-documents/boeing/b787-81205-sb320045-00-rb

## ADs that cite it (1) (OpenAirDocs)

Newest first, with the revision each names, as OpenAirDocs read it from the AD's text.

- [AD 2022-02-14](https://openairdocs.org/ad/2022-02-14.md), effective Mar 30, 2022: Revision 001

Also cited in [1 proposed AD](https://openairdocs.org/service-documents/boeing/b787-81205-sb320045-00-rb/proposed.md).

## Text (38 pages)

Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2021-0457; AD 2022-02-14 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication. Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Alert Requirements Bulletin B787-81205-SB320045-00 RB LANDING GEAR
- Main Landing Gear - Truck Beam and Inner Cylinder Pivot Joint Inspection
and Lubrication
Copyright © 2020 Boeing. Unpublished Work. All rights reserved.
Treatment of this data module and its content is governed by contract with Boeing. Rights to use this data module are licensed on a per
aircraft basis and such rights may not be transferable. For more information, contact The Boeing Company. Boeing, the Boeing signature,
the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner, BBJ, DC-8, DC-9, DC-10, KC-10, KC-46, KDC-10, MD-10,
MD-11, MD-80, MD-88, MD-90, P-8, Poseidon and Boeing liveries are all trademarks owned by The Boeing Company; and no trademark
license is granted in connection with this document unless provided in writing by Boeing.
EXPORT CONTROLLED
Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15 CFR 300-774). An export license
may be required before it is used for development, production or use by foreign persons from specific countries. The controller of this data
has the individual responsibility to abide by all export laws.
ECCN: 9E991
B787-81205-SB320045-00 RB
Issue 001, 09 Nov 2020 12:00:00 AM
Page 1 of 38
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
5.0
B787-81205-SB320045-00 RB
Issue 001, 09 Nov 2020 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 2

Table of Contents
Page
A .E F F E C T I V I T Y  ................................................ 3
1. Airplanes ................................................. 3
2 . S p a r e s  A f f e c t e d  ............................................. .5
B. CONCURRENT REQUIREMENTS ..................................... 5
C .C O M P L I A N C E  ................................................ 5
D. APPROVAL ................................................. 1 4
E. ACCOMPLISHMENT INSTRUCTIONS .................................. 1 5
1. General Information ........................................... 1 5
2. Work Instructions ............................................ 1 6
TASK 2 – LEFT AND RIGHT MLG TRUCK BEAM AND INNER CYLINDER PIVOT JOINT - PIVOT PIN
INSPECTION [Group 1-2] ...................................... 3 0
TASK 3 – LEFT AND RIGHT MLG TRUCK BEAM AND INNER CYLINDER PIVOT JOINT - INNER CYLINDER
BUSHING INSPECTION [Group 1-2] ................................ 3 3
TASK 4 – LEFT AND RIGHT MLG TRUCK BEAM AND INNER CYLINDER PIVOT JOINT - INNER CYLINDER
LUG BORE INSPECTION [Group 1-2] ............................... 3 6
B787-81205-SB320045-00 RB
Issue 001, 09 Nov 2020 12:00:00 AM
Page 2 of 38
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB320045-00 RB
Issue 001, 09 Nov 2020 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 3

THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN
IN PARAGRAPH 1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND
Alert:
THIS DOCUMENT TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD,
SEND THIS DOCUMENT TO THE NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR
COMPLIANCE DOCUMENT. THE BOEING PROCESSES USED TO CREATE THE SERVICE
BULLETIN (SB) AND THE REQUIREMENTS BULLETIN (RB) ENSURE THAT THE INFORMATION
BETWEEN "RC START" AND "RC END" IN THE SB ARE IDENTICAL TO THE INFORMATION IN
THE SAME SECTIONS (COMPLIANCE, WORK INSTRUCTIONS...) OF THE RB WHICH THE SB
REFERS TO AS THE RELATED DOCUMENT.
A. EFFECTIVITY
1. Airplanes
This bulletin is applicable to 787-8, 787-9, 787-10 Airplane(s), line number(s) 6-1064 in 2 Group(s).
Where the effectivity is presented with hyphens between line numbers, the airplane applicability
means "through" and "inclusive", e.g. line numbers 1-9 means line numbers 1 through 9 inclusive.
The Variable Numbers and Group information for the applicable airplanes is given below.
Table 1  
DESCRIPTIONCONFIGURATIONGROUP
787-8 Airplanes delivered with Aluminum-Nickel-Bronze bushings in-
stalled.
-1
787-8 Airplanes that have not upgraded to Copper-Nickel-Tin bushings.1
787-8 Airplanes that have upgraded to Copper-Nickel-Tin bushings.2
787-9, 787-10 Airplanes delivered with Copper-Nickel-Tin bushings
installed.
-2
Airplane Models: 787-10, 787-8, 787-9
Table 2
GroupVariable Number
1ZA006
1ZA100 - ZA105
1ZA116 - ZA124
1ZA135 - ZA144
1ZA152 - ZA156
1ZA175 - ZA189
1ZA195 - ZA204
1ZA215 - ZA225
GroupVariable Number
1ZA230 - ZA256
1ZA260 - ZA277
1ZA285 - ZA296
1ZA317 - ZA324
1ZA327
1ZA334 - ZA335
1ZA341 - ZA342
1ZA380 - ZA389
GroupVariable Number
1ZA430 - ZA439
1ZA445 - ZA489
1ZA506 - ZA516
1ZA536 - ZA545
1ZA560 - ZA567
1ZA576 - ZA580
1ZA586
1ZA588 - ZA593
B787-81205-SB320045-00 RB
Issue 001, 09 Nov 2020 12:00:00 AM
Page 3 of 38
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB320045-00 RB
Issue 001, 09 Nov 2020 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 4

GroupVariable Number
1ZA610 - ZA617
1ZA650 - ZA652
1ZA655 - ZA663
1ZA665 - ZA677
1ZA680 - ZA685
1ZA695 - ZA698
1ZA715 - ZA716
1ZA718 - ZA719
1ZA740 - ZA741
1ZA768 - ZA769
1ZA778 - ZA779
1ZA783 - ZA784
1ZA817 - ZA831
1ZA839
1ZA841 - ZA842
1ZA846 - ZA848
1ZA853 - ZA863
1ZA873 - ZA876
1ZA881 - ZA888
1ZA916 - ZA920
1ZA949 - ZA950
1ZA954 - ZA959
1ZA963 - ZA966
1ZA968 - ZA972
1ZA990
2ZB001 - ZB012
2ZB021 - ZB043
2ZB047 - ZB061
2ZB077 - ZB081
2ZB097 - ZB121
2ZB127 - ZB136
GroupVariable Number
2ZB167 - ZB191
2ZB197 - ZB198
2ZB217
2ZB219 - ZB220
2ZB224 - ZB229
2ZB234 - ZB242
2ZB246 - ZB248
2ZB251 - ZB258
2ZB261 - ZB262
2ZB265 - ZB282
2ZB299
2ZB302 - ZB305
2ZB332 - ZB338
2ZB362 - ZB379
2ZB407 - ZB435
2ZB446 - ZB467
2ZB536 - ZB543
2ZB545 - ZB547
2ZB558 - ZB586
2ZB603 - ZB618
2ZB646 - ZB649
2ZB656 - ZB665
2ZB676 - ZB681
2ZB688 - ZB707
2ZB733 - ZB735
2ZB738 - ZB740
2ZB742 - ZB745
2ZB749 - ZB751
2ZB753 - ZB757
2ZB763 - ZB769
2ZB771 - ZB775
GroupVariable Number
2ZB778 - ZB821
2ZB828 - ZB845
2ZB858 - ZB863
2ZB874 - ZB876
2ZB887
2ZB890
2ZB893 - ZB904
2ZB908 - ZB922
2ZB924
2ZB926 - ZB927
2ZB934 - ZB947
2ZB967 - ZB971
2ZB977 - ZB978
2ZB980 - ZB991
2ZB993 - ZB997
2ZC001 - ZC016
2ZC036 - ZC048
2ZC061 - ZC070
2ZC101 - ZC104
2ZC116 - ZC118
2ZC126 - ZC129
2ZC151 - ZC152
2ZC155 - ZC160
2ZC211 - ZC217
2ZC221 - ZC225
2ZC236
1ZD001 - ZD009
1ZD012 - ZD019
2ZE001 - ZE008
2ZE013 - ZE014
2ZE016 - ZE017
B787-81205-SB320045-00 RB
Issue 001, 09 Nov 2020 12:00:00 AM
Page 4 of 38
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB320045-00 RB
Issue 001, 09 Nov 2020 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 5

GroupVariable Number
2ZE031 - ZE032
2ZE040 - ZE045
2ZE075
2ZE085 - ZE086
2ZE090 - ZE091
2ZE095 - ZE096
2ZE100
2ZE105 - ZE106
2ZE110
GroupVariable Number
2ZE115
2ZE150
2ZE165 - ZE166
2ZE170 - ZE171
2ZE195 - ZE198
2ZE220 - ZE234
2ZE270 - ZE272
2ZE310 - ZE313
2ZE340 - ZE341
GroupVariable Number
2ZE350 - ZE362
2ZE375
2ZE380 - ZE381
2ZE415 - ZE418
2ZE425 - ZE426
2ZE455 - ZE456
2ZE481
2ZE486 - ZE487
--
2. Spares Affected
Group 1, Configuration 1:
Examine your spares supply for 512Z2001-1, -2, or -3 Inner Cylinder Assemblies. If any of these
Inner Cylinder Assemblies are found, remove the Aluminum-Nickel-Bronze Inner Cylinder Bushings
512Z3002-1 and replace with Copper-Nickel-Tin Inner Cylinder Bushings 512Z3002-2. Refer to
CMM 32-11-74 as an accepted procedure.
Identify on the part that the change given in this bulletin was done. Use the rubber stamp (Code
RO) or ink jet (Code J) method. Refer to SOPM 20-50-10 as an accepted procedure.
Group 1, Configuration 2 and Group 2: None
B. CONCURRENT REQUIREMENTS
None.
C. COMPLIANCE
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to Re-
quirements Bulletin B787-81205-SB320045-00 RB. The Airworthiness Directive will make the compliance
tasks and times given in Requirements Bulletin B787-81205-SB320045-00 RB mandatory.
Accomplish the required actions, based on applicable conditions in Table 5, Table 6, Table 7, Table 8, and
Table 9 in accordance with Accomplishment Instructions.
When more than one OPTION is given for a CONDITION, do only one of the OPTION numbers. When
more than one ACTION is given for a CONDITION number or an OPTION number, do all of the ACTION
numbers for that CONDITION number or OPTION number.
B787-81205-SB320045-00 RB
Issue 001, 09 Nov 2020 12:00:00 AM
Page 5 of 38
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB320045-00 RB
Issue 001, 09 Nov 2020 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 6

Table 5  LEFT AND RIGHT MAIN LANDING GEAR (MLG) TRUCK BEAM AND INNER CYLINDER PIVOT JOINT
 - LUBRICATION
Repeat Interval (Not
to Exceed)
Compliance Time (Whichever Occurs
Later)
ActionCondition
50 flight cycles or 25
days whichever oc-
curs later
Within 120 days after
the date of issuance
of the original stan-
dard certificate of air-
worthiness or the
original export certifi-
cate of airworthiness
Within 120 days after
the Issue 001 date of
the Requirements
Bulletin B787-81205-
SB320045-00 RB
ACTION 1: Lubricate
both the left and right
Main Landing Gear
(MLG) truck beam
and inner cylinder
pivot joint with MIL-
PRF-32014 grease
All Airplanes
-Within 24 months af-
ter the date of is-
suance of the original
standard certificate
of airworthiness or
the original export
certificate of airworthi-
ness
Within 24 months af-
ter the Issue 001
date of the Require-
ments Bulletin B787-
81205 SB320045-00
RB
ACTION 2: Review
maintenance pro-
gram documentation
to verify that it in-
cludes lubrication
tasks for the left and
right MLG Truck
Beam and Inner
Cylinder Pivot Joint
with MIL-PRF-32014
grease at intervals
not to exceed 50
flight cycles or 25
days whichever oc-
curs later.
-Within 24 months af-
ter the date of is-
suance of the original
standard certificate
of airworthiness or
the original export
certificate of airworthi-
ness.
Within 24 months af-
ter the Issue 001
date of the Require-
ments Bulletin B787-
81205-SB320045-00
RB.
Update the mainte-
nance program docu-
mentation to incorpo-
rate lubrication tasks
for the left and right
MLG Truck Beam
and Inner Cylinder
Pivot Joint with MIL-
PRF-32014 grease
at intervals not to ex-
ceed 50 flight cycles
or 25 days, whichev-
er occurs later.
CONDITION 1:
MAINTENANCE
PROGRAM DOCU-
MENTATION DOES
NOT INCLUDE PIV-
OT JOINT LUBRICA-
TION WITH MIL-
PRF-32014
GREASE AT INTER-
VALS NOT TO EX-
CEED 50 FLIGHT
CYCLES OR 25
DAYS WHICHEVER
OCCURS LATER
B787-81205-SB320045-00 RB
Issue 001, 09 Nov 2020 12:00:00 AM
Page 6 of 38
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB320045-00 RB
Issue 001, 09 Nov 2020 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 7

Table 5  LEFT AND RIGHT MAIN LANDING GEAR (MLG) TRUCK BEAM AND INNER CYLINDER PIVOT JOINT
 - LUBRICATION
Repeat Interval (Not
to Exceed)
Compliance Time (Whichever Occurs
Later)
ActionCondition
---No further action re-
quired.
CONDITION 2:
MAINTENANCE
PROGRAM DOCU-
MENTATION IN-
CLUDES PIVOT
JOINT LUBRICA-
TION WITH MIL-
PRF-32014
GREASE AT INTER-
VALS NOT TO EX-
CEED 50 FLIGHT
CYCLES OR 25
DAYS WHICHEVER
OCCURS LATER.
Group 1, Configuration 1:
Table 6  LEFT AND RIGHT MLG TRUCK BEAM AND INNER CYLINDER PIVOT JOINT - PIVOT PIN INSPECTION
Repeat Interval (Not
to Exceed)
Compliance Time (Whichever Occurs
Later)
ActionCondition
-Within 36 months af-
ter the date of is-
suance of the original
standard certificate
of airworthiness or
the original export
certificate of airworthi-
ness
Within 24 months af-
ter the Issue 001
date of the Require-
ments Bulletin B787-
81205-SB320045-00
RB
Do a detailed and
Fluorescent Pene-
trant Inspection (FPI)
of both the left and
right MLG Pivot Pin
OD surface for fric-
tion and heat dam-
age.
All Airplanes
36 Months-Repeat the detailed
and Fluorescent
Penetrant Inspection
(FPI) of the Pivot Pin
outer diameter (OD)
surface for heat and
friction damage
CONDITION 1: NO
HEAT DAMAGE
AND NO FRICTION
DAMAGE FOUND
ON THE PIVOT PIN
OD SURFACE
*[1]
-Before further flightDo a detailed and
FPI inspection on the
inner cylinder lug
bore for heat and
friction damage
CONDITION 2: ANY
HEAT DAMAGE OR
ANY FRICTION
DAMAGE IS FOUND
ON THE PIVOT PIN
OD SURFACE
B787-81205-SB320045-00 RB
Issue 001, 09 Nov 2020 12:00:00 AM
Page 7 of 38
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB320045-00 RB
Issue 001, 09 Nov 2020 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 8

Group 1, Configuration 1:
Table 6  LEFT AND RIGHT MLG TRUCK BEAM AND INNER CYLINDER PIVOT JOINT - PIVOT PIN INSPECTION
Repeat Interval (Not
to Exceed)
Compliance Time (Whichever Occurs
Later)
ActionCondition
-Before further flightACTION 1: Install a
new Pivot Pin
CONDITION 2.1: NO
HEAT DAMAGE
AND NO FRICTION
DAMAGE FOUND
ON THE INNER
CYLINDER LUG
BORE
36 Months
*[1]
-ACTION 2: Repeat
the detailed and FPI
inspections for both
the left and right
MLG pivot pin OD
surface for friction
and heat damage.
-Before further flightContact Boeing for
repair instructions
and do the repairs
CONDITION 2.2:
ANY HEAT DAM-
AGE OR ANY FRIC-
TION DAMAGE IS
FOUND ON THE IN-
NER CYLINDER
LUG BORE
-Before further flightACTION 1: Install a
new Pivot Pin
36 Months-ACTION 2: Repeat
the detailed and FPI
inspections for both
the left and right
MLG pivot pin OD
surface for friction
and heat damage.
*[1]
*[1]  Installation of defect-free Pivot Pin and concurrent or prior replacement of Aluminum-Nickel-Bronze inner cylinder bushings with Copper-
Nickel-Tin inner cylinder bushings and incorporation of the increased lubrication interval (not to exceed the time specified in Compliance
Section, Table 5) with MIL-PRF-32014 grease is terminating action to the repeat inspections for that side of the MLG.
Group 1, Configuration 1:
Table 7  LEFT AND RIGHT MLG TRUCK BEAM AND INNER CYLINDER PIVOT JOINT - INNER CYLINDER 
BUSHING INSPECTION
Repeat Interval (Not
to Exceed)
Compliance Time (Whichever Occurs
Later)
ActionCondition
-Within 36 months af-
ter the date of is-
suance of the original
standard certificate
of airworthiness or
the original export
certificate of airworthi-
ness
Within 24 months af-
ter the Issue 001
date of the Require-
ments Bulletin B787-
81205-SB320045-00
RB
Do a detailed inspec-
tion of both the left
and right MLG inner
cylinder bushing in-
ner diameter (ID)
surface for excessive
wear, cracks and
smearing of bushing
material
All Airplanes
B787-81205-SB320045-00 RB
Issue 001, 09 Nov 2020 12:00:00 AM
Page 8 of 38
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB320045-00 RB
Issue 001, 09 Nov 2020 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 9

Group 1, Configuration 1:
Table 7  LEFT AND RIGHT MLG TRUCK BEAM AND INNER CYLINDER PIVOT JOINT - INNER CYLINDER 
BUSHING INSPECTION
Repeat Interval (Not
to Exceed)
Compliance Time (Whichever Occurs
Later)
ActionCondition
-Before further flightACTION 1: Apply lu-
brication using MIL-
PRF-32014 grease
and make sure lubri-
cation passages are
clear
CONDITION 1: NO
INNER CYLINDER
BUSHING ID EXCES-
SIVE WEAR, NO
CRACK AND NO
SMEARING FOUND
36 Months-ACTION 2: Repeat
the detailed inspec-
tion for both the left
and right MLG inner
cylinder bushing in-
ner diameter (ID)
surface for excessive
wear, cracks and
smearing of bushing
material
*[1]
-Before further flightDo a detailed FPI in-
spection of the inner
cylinder lug bore for
heat and friction
damage
CONDITION 2: ANY
INNER CYLINDER
BUSHING ID EXCES-
SIVE WEAR,
CRACK OR ANY
SMEARING FOUND
B787-81205-SB320045-00 RB
Issue 001, 09 Nov 2020 12:00:00 AM
Page 9 of 38
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB320045-00 RB
Issue 001, 09 Nov 2020 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 10

Group 1, Configuration 1:
Table 7  LEFT AND RIGHT MLG TRUCK BEAM AND INNER CYLINDER PIVOT JOINT - INNER CYLINDER 
BUSHING INSPECTION
Repeat Interval (Not
to Exceed)
Compliance Time (Whichever Occurs
Later)
ActionCondition
*[1]*[2]Before further flightACTION 1 (OPTION
1): Install new Alu-
minum-Nickel-
Bronze Inner Cylin-
der Bushing(s)
CONDITION 2.1: NO
HEAT DAMAGE
AND NO FRICTION
DAMAGE FOUND
ON THE INNER
CYLINDER LUG
BORE -Before further flightACTION 1 (OPTION2): Install new Cop-
per-Nickel-Tin Inner
Cylinder Bushing(s)
*[1]*[2]
-Before further flightOPTION 1 and OP-
TION 2 (ACTION 2):
Apply lubrication us-
ing MIL-PRF-32014
grease and make
sure lubrication pas-
sages are clear
36 Months-OPTION 1 AND OP-
TION 2 (ACTION 3):
Repeat the detailed
inspection for both
the left and right
MLG inner cylinder
bushing ID surface
for excessive wear,
cracks and smearing
of bushing material
*[1]
-Before further flightContact Boeing for
repair instructions
and do the repairs.
CONDITION 2.2:
ANY HEAT DAM-
AGE OR ANY FRIC-
TION DAMAGE IS
FOUND ON THE IN-
NER CYLINDER
LUG BORE
36 Months
*[1]
-ACTION 1: Repeat
the detailed inspec-
tion for both the left
and right MLG inner
cylinder bushing ID
surface for excessive
wear, cracks and
smearing of bushing
material
B787-81205-SB320045-00 RB
Issue 001, 09 Nov 2020 12:00:00 AM
Page 10 of 38
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB320045-00 RB
Issue 001, 09 Nov 2020 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 11

Group 1, Configuration 1:
Table 7  LEFT AND RIGHT MLG TRUCK BEAM AND INNER CYLINDER PIVOT JOINT - INNER CYLINDER 
BUSHING INSPECTION
*[1]  Installation of Copper-Nickel-Tin inner cylinder bushings and concurrent or prior incorporation of the increased lubrication interval (not
to exceed the time specified in Compliance Section, Table 5) with MIL-PRF-32014 grease constitutes terminating action to the repeat
inspections for that side of the MLG.
*[2]  Installation of Copper-Nickel-Tin bushings is one way interchangeable. Aluminum-Nickel-Bronze inner cylinder bushings can no longer
be installed for that side of the MLG.
Group 1, Configuration 2; Group 2:
Table 8  LEFT AND RIGHT MLG TRUCK BEAM AND INNER CYLINDER PIVOT JOINT - PIVOT PIN INSPECTION
Repeat Interval (Not
to Exceed)
Compliance Time (Whichever Occurs
Later)
ActionCondition
-Within 72 months af-
ter the date of is-
suance of the original
standard certificate
of airworthiness or
the original export
certificate of airworthi-
ness
Within 24 months af-
ter the Issue 001
date of the Require-
ments Bulletin B787-
81205-SB320045-00
RB
Do a detailed and
Fluorescent Pene-
trant Inspection (FPI)
of both the left and
right MLG Pivot Pin
OD surface for fric-
tion and heat dam-
age.
All Airplanes
72 Months-Repeat the detailed
and Fluorescent
Penetrant Inspec-
tion(FPI) of the Pivot
Pin outer diameter
(OD) surface for heat
and friction damage
CONDITION 1: NO
HEAT DAMAGE
AND NO FRICTION
DAMAGE FOUND
ON THE PIVOT PIN
OD SURFACE
*[1]
-Before further flightDo a detailed and
FPI inspection on the
inner cylinder lug
bore for heat and
friction damage.
CONDITION 2: ANY
HEAT DAMAGE OR
ANY FRICTION
DAMAGE IS FOUND
ON THE PIVOT PIN
OD SURFACE
-Before further flightACTION 1: Install a
new Pivot Pin
CONDITION 2.1: NO
HEAT DAMAGE
AND NO FRICTION
DAMAGE FOUND
ON THE INNER
CYLINDER LUG
BORE
72 Months
*[1]
-ACTION 2: Repeat
the detailed and FPI
inspections for both
the left and right
MLG pivot pin OD
surface for friction
and heat damage
B787-81205-SB320045-00 RB
Issue 001, 09 Nov 2020 12:00:00 AM
Page 11 of 38
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB320045-00 RB
Issue 001, 09 Nov 2020 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 12

Group 1, Configuration 2; Group 2:
Table 8  LEFT AND RIGHT MLG TRUCK BEAM AND INNER CYLINDER PIVOT JOINT - PIVOT PIN INSPECTION
Repeat Interval (Not
to Exceed)
Compliance Time (Whichever Occurs
Later)
ActionCondition
-Before further flightContact Boeing for
repair instructions
and do the repairs
CONDITION 2.2:
ANY HEAT DAM-
AGE OR ANY FRIC-
TION DAMAGE IS
FOUND ON THE IN-
NER CYLINDER
LUG BORE
-Before further flightACTION 1: Install a
new Pivot Pin
72 MonthsACTION 2: Repeat
the detailed and FPI
inspections for both
the left and right
MLG pivot pin OD
surface for friction
and heat damage
*[1]
*[1]  Installation of defect-free Pivot Pin and Copper-Nickel-Tin inner cylinder bushings and concurrent or prior incorporation of the increased
lubrication interval (not to exceed the time specified in Compliance Section, Table 5) with MIL-PRF-32014 grease is terminating action
to the repeat inspections for that side of the MLG.
Group 1, Configuration 2; Group 2:
Table 9  LEFT AND RIGHT MLG TRUCK BEAM AND INNER CYLINDER PIVOT JOINT - INNER CYLINDER 
BUSHING INSPECTION
Repeat Interval (Not
to Exceed)
Compliance Time (Whichever Occurs
Later)
ActionCondition
-Within 72 months af-
ter the date of is-
suance of the original
standard certificate
of airworthiness or
the original export
certificate of airworthi-
ness
Within 24 months af-
ter the Issue 001
date of the Require-
ments Bulletin B787-
81205-SB320045-00
RB
Do a detailed inspec-
tion of both the left
and right MLG inner
cylinder bushing in-
ner diameter (ID)
surface for excessive
wear, cracks and
smearing of bushing
material
All Airplanes
B787-81205-SB320045-00 RB
Issue 001, 09 Nov 2020 12:00:00 AM
Page 12 of 38
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB320045-00 RB
Issue 001, 09 Nov 2020 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 13

Group 1, Configuration 2; Group 2:
Table 9  LEFT AND RIGHT MLG TRUCK BEAM AND INNER CYLINDER PIVOT JOINT - INNER CYLINDER 
BUSHING INSPECTION
Repeat Interval (Not
to Exceed)
Compliance Time (Whichever Occurs
Later)
ActionCondition
-Before further flightACTION 1: Apply lu-
brication using MIL-
PRF-32014 and
make sure lubrication
passages are clear.
CONDITION 1: NO
INNER CYLINDER
BUSHING ID EXCES-
SIVE WEAR, NO
CRACK AND NO
SMEARING FOUND 72 Months-ACTION 2: Repeat
the detailed inspec-
tion for both the left
and right MLG inner
cylinder bushing in-
ner diameter (ID)
surface for excessive
wear, cracks and
smearing of bushing
material
*[1]
-Before further flightDo a detailed and
FPI inspection of the
inner cylinder lug
bore for heat and
friction damage.
CONDITION 2: ANY
INNER CYLINDER
BUSHING ID EXCES-
SIVE WEAR,
CRACK OR ANY
SMEARING FOUND
-Before further flightACTION 1: Install
new Copper-Nickel-
Tin Inner Cylinder
Bushing(s)
CONDITION 2.1: NO
HEAT DAMAGE
AND NO FRICTION
DAMAGE FOUND
ON THE INNER
CYLINDER LUG
BORE
-Before further flightACTION 2: apply lu-
brication using MIL-
PRF-32014 and
make sure lubrication
passages are clear.
72 Months-ACTION 3: Repeat
the detailed inspec-
tions for both the left
and right MLG inner
cylinder bushing ID
surface for excessive
wear, cracks and
smearing of bushing
material
*[1]
B787-81205-SB320045-00 RB
Issue 001, 09 Nov 2020 12:00:00 AM
Page 13 of 38
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB320045-00 RB
Issue 001, 09 Nov 2020 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 14

Group 1, Configuration 2; Group 2:
Table 9  LEFT AND RIGHT MLG TRUCK BEAM AND INNER CYLINDER PIVOT JOINT - INNER CYLINDER 
BUSHING INSPECTION
Repeat Interval (Not
to Exceed)
Compliance Time (Whichever Occurs
Later)
ActionCondition
-Before further flightContact Boeing for
repair instructions
and do the repairs
CONDITION 2.2:
ANY HEAT DAM-
AGE OR ANY FRIC-
TION DAMAGE
FOUND ON THE IN-
NER CYLINDER
LUG BORE
72 Months
*[1]
-ACTION 1: Repeat
the detailed inspec-
tion for both the left
and right MLG inner
cylinder bushing ID
surface for excessive
wear, cracks and
smearing of bushing
material
*[1]  Installation of Copper-Nickel-Tin inner cylinder bushings and concurrent or prior incorporation of the increased lubrication interval (not
to exceed the time specified in Compliance Section, Table 5) with MIL-PRF-32014 grease constitutes terminating action to the repeat
inspections for that side of the MLG.
D. APPROVAL
This Requirements Bulletin was examined by the Federal Aviation Administration (FAA). The changes
specified in this document comply with the applicable regulations and are FAA approved, as well as European
Union Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/JAA approved
airplanes listed in this Requirements Bulletin effectivity. This document and its approval were based on the
airplane in its original Boeing delivery configuration or as modified by other approved Boeing changes.
If an airplane has a non-Boeing modification or repair that affects a component or system also affected by
this Requirements Bulletin, the operator is responsible for obtaining appropriate regulatory agency approval
before incorporating this Requirements Bulletin.
B787-81205-SB320045-00 RB
Issue 001, 09 Nov 2020 12:00:00 AM
Page 14 of 38
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB320045-00 RB
Issue 001, 09 Nov 2020 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 15

E.    ACCOMPLISHMENT INSTRUCTIONS
1. GENERAL INFORMATION
NOTE: 1. This is an Enhanced Required for Compliance document. There will be a separate Service
Bulletin (SB) and a separate Requirements Bulletin (RB). If an RB is mandated by an
Airworthiness Directive (AD), then all applicable requirements specified in the RB must
be done. For the related SB, some locations are marked RC Start and RC End to identify
the requirements that are restated from the RB. For the related SB, the areas between
RC Start and RC End, including sub-steps and any figures identified between RC Start
and RC End, must be done to comply with the AD. Therefore, an Alternative Method of
Compliance (AMOC) is required for any deviations to steps between RC Start and RC
End, including substeps and identified figures. For the related SB, the steps not between
RC Start and RC End may be deviated from using accepted methods in accordance with
the operator's maintenance or inspection program without obtaining approval of an AMOC;
this is provided that the steps between RC Start and RC End, including sub-steps and
identified figures, can still be done as specified, and the airplane can be put back in an
airworthy condition. Figures not required for compliance are omitted from the RB.
2. This is an Enhanced Required for Compliance document. The Boe ing processes used
to create the Service Bulletin (SB) and the Requirements Bulletin (RB) ensure that the
information between "RC Start" and "RC End" in the SB are identical to the information
in the same sections (Compliance, Work Instructions...) of the RB which the SB refers to
as the related document.
3. These work instructions refer to procedures included in other  Boeing documents. When
the words "refer to" are used and the operator has an accepted alternative procedure,
the accepted alternative procedure can be used. When the words "in accordance with"
are included in the instruction, the procedure in the Boeing document must be used.
4. The compliance times for the actions in Work Instructions are in the Compliance section.
5. When more than one OPTION is given for a CONDITION, do only o ne of the OPTION
numbers. When more than one ACTION is given for a CONDITION number or an OPTION
number, do all of the ACTION numbers for that CONDITION number or OPTION number.
6. The instructions in Work Instructions and the Tasks can include operation of tools or test
equipment. Boeing Engineering Tool Drawings, the Illustrated Tool and Equipment
Manual, and the Special Tool and Ground Handling Drawing Index contain data on versions
of the tools or test equipment that you can use. It is permitted to use replaced tools. It is
not permitted to use superseded tools.
7. A Detailed Inspection is defined as: An intensive examination of a specific item,installation
or assembly to detect damage, failure or irregularity. This could include tactile assessment
in which a component or assembly can be checked for tightness/security. Available
lighting is normally supplemented with a direct source of good lighting at an intensity
deemed appropriate. Inspection aids such as mirrors and magnifying lenses may be
necessary. Surface cleaning and elaborate access procedures may be required.
B787-81205-SB320045-00 RB
Issue 001, 09 Nov 2020 12:00:00 AM
Page 15 of 38
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB320045-00 RB
Issue 001, 09 Nov 2020 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 16

8. Heat damage is defined as ladder cracks, spalling, pull-outs, cracks, chips, flakes, lifting,
or color changes.
9. Friction damage is defined as material transfer on the part surface or other contaminants
found.
12. Unless shown differently, these dimensions and tolerances are used:
– Linear dimensions are in inches
– Tolerance on linear dimensions, other than rivet and bolt edge  margins, is plus or
minus 0.03 inch
– Tolerance on rivet and bolt edge margin is plus or minus 0.05 inch
– Angular tolerance is plus or minus 2 degrees
– Hole dimensions for standard solid rivets and fasteners are in  SRM Chapter 51
– Torque Values:
– Values for structural fasteners are given in 787 Structural Repair Manual, Chapter
51.
– Values for airframe maintenance tasks are included in Chapter 20 of 787 Aircraft
Maintenance Manual (AMM).
– Values for electrical maintenance tasks are included in Chapte r 20 of Standard
Wiring Practices Manual (SWPM).
– Values for engine maintenance tasks are included in Chapter 70  of 787 Aircraft
Maintenance Manual (AMM).
– Non-standard torque values for maintenance tasks are included in the applicable
installation step.
13. If it is necessary to remove more parts for access, you can remove those parts. If you
can get access without removing identified parts, it is not necessary to remove all of the
identified parts. Jacking and shoring limitations must be observed.
14. Where the work instructions include installation of a kept part, a new or serviceable part
with the same part number can be installed as an alternative to the kept part.
2. WORK INSTRUCTIONS
A. Actions Required for Compliance
(1) Requirements
B787-81205-SB320045-00 RB
Issue 001, 09 Nov 2020 12:00:00 AM
Page 16 of 38
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB320045-00 RB
Issue 001, 09 Nov 2020 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 17

Table 1  LEFT AND RIGHT MAIN LANDING GEAR (MLG) TRUCK BEAM AND INNER CYLINDER PIVOT JOINT
 - LUBRICATION
Refer to the listed proce-
dures in SB B787-81205-
SB320045-00 Issue 001
or later approved issues
as an accepted proce-
dure.
Method of ComplianceActionCondition
Task 1-Lubricate both the left and
right Main Landing Gear
(MLG) truck beam and in-
ner cylinder pivot joint with
MIL-PRF-32014 grease.
All Airplanes
--Review maintenance pro-
gram documentation to
verify that it includes lubri-
cation tasks for the left and
right MLG Truck Beam and
Inner Cylinder Pivot Joint
with MIL-PRF-32014
grease at intervals not to
exceed 50 flight cycles or
25 days whichever comes
later.
--Update the maintenance
program documentation to
incorporate lubrication
tasks for the left and right
MLG Truck Beam and In-
ner Cylinder Pivot Joint
with MIL-PRF-32014
grease at intervals not to
exceed 50 flight cycles or
25 days, whichever occurs
later.
CONDITION 1: MAINTE-
NANCE PROGRAM DOC-
UMENTATION DOES
NOT INCLUDE PIVOT
JOINT LUBRICATION
WITH MIL-PRF-32014
GREASE AT INTERVALS
NOT TO EXCEED 50
FLIGHT CYCLES OR 25
DAYS WHICHEVER OC-
CURS LATER.
--No further action required.CONDITION 2: MAINTE-
NANCE PROGRAM DOC-
UMENTATION INCLUDES
PIVOT JOINT LUBRICA-
TION WITH MIL-PRF-
32014 GREASE AT INTER-
VALS NOT TO EXCEED
50 FLIGHT CYCLES OR
25 DAYS WHICHEVER
OCCURS LATER.
B787-81205-SB320045-00 RB
Issue 001, 09 Nov 2020 12:00:00 AM
Page 17 of 38
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB320045-00 RB
Issue 001, 09 Nov 2020 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 18

Group 1, Configuration 1:
Table 2  LEFT AND RIGHT MLG TRUCK BEAM AND INNER CYLINDER PIVOT JOINT - PIVOT PIN INSPECTION
Refer to the listed proce-
dures in SB B787-81205-
SB320045-00 Issue 001
or later approved issues
as an accepted proce-
dure.
Method of ComplianceActionCondition
PART 1: GET ACCESS
TO THE MLG TRUCK
BEAM AND INNER
CYLINDER PIVOT JOINT
--All Airplanes
PART 2: MLG TRUCK
BEAM AND INNER
CYLINDER PIVOT JOINT
- PIVOT PIN REMOVAL
--
-Task 2Do a detailed and Fluores-
cent Penetrant Inspection
(FPI) of both the left and
right MLG Pivot Pin OD
surface for friction and
heat damage.
PART 4: MLG TRUCK
BEAM AND INNER
CYLINDER PIVOT JOINT
- PIVOT PIN INSTALLA-
TION
--CONDITION 1: NO HEAT
DAMAGE AND NO FRIC-
TION DAMAGE FOUND
ON THE PIVOT PIN OD
SURFACE
PART 6: RESTORE AC-
CESS TO THE MLG
TRUCK BEAM AND IN-
NER CYLINDER PIVOT
JOINT
--
*[1]Task 2Repeat the detailed and
Fluorescent Penetrant In-
spection(FPI) of the Pivot
Pin outer diameter
(OD)surface for heat and
friction damage
-Task 4Do a detailed and FPI in-
spection on the inner
cylinder lug bore for heat
and friction damage
CONDITION 2: ANY HEAT
DAMAGE OR ANY FRIC-
TION DAMAGE IS FOUND
ON THE PIVOT PIN OD
SURFACE
B787-81205-SB320045-00 RB
Issue 001, 09 Nov 2020 12:00:00 AM
Page 18 of 38
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB320045-00 RB
Issue 001, 09 Nov 2020 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 19

Group 1, Configuration 1:
Table 2  LEFT AND RIGHT MLG TRUCK BEAM AND INNER CYLINDER PIVOT JOINT - PIVOT PIN INSPECTION
Refer to the listed proce-
dures in SB B787-81205-
SB320045-00 Issue 001
or later approved issues
as an accepted proce-
dure.
Method of ComplianceActionCondition
PART 4: MLG TRUCK
BEAM AND INNER
CYLINDER PIVOT JOINT
- PIVOT PIN INSTALLA-
TION
-ACTION 1: Install a new
Pivot Pin
CONDITION 2.1: NO
HEAT DAMAGE AND NO
FRICTION DAMAGE
FOUND ON THE INNER
CYLINDER LUG BORE
PART 5: MLG TRUCK
BEAM AND INNER
CYLINDER PIVOT JOINT-
INNER CYLINDER BUSH-
ING INSTALLATION
--
PART 6: RESTORE AC-
CESS TO THE MLG
TRUCK BEAM AND IN-
NER CYLINDER PIVOT
JOINT
--
*[1]Task 2ACTION 2: Repeat the de-
tailed and FPI inspections
for both the left and right
MLG pivot pin OD surface
for friction and heat dam-
age
--Contact Boeing for repair
instructions and do the re-
pairs.
CONDITION 2.2: ANY
HEAT DAMAGE OR ANY
FRICTION DAMAGE IS
FOUND ON THE INNER
CYLINDER LUG BORE PART 4: MLG TRUCKBEAM AND INNER
CYLINDER PIVOT JOINT
- PIVOT PIN INSTALLA-
TION
-ACTION 1: Install a new
Pivot Pin
*[1]Task 2ACTION 2: Repeat the de-
tailed and FPI inspections
for both the left and right
MLG pivot pin OD surface
for friction and heat dam-
age
B787-81205-SB320045-00 RB
Issue 001, 09 Nov 2020 12:00:00 AM
Page 19 of 38
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB320045-00 RB
Issue 001, 09 Nov 2020 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 20

Group 1, Configuration 1:
Table 2  LEFT AND RIGHT MLG TRUCK BEAM AND INNER CYLINDER PIVOT JOINT - PIVOT PIN INSPECTION
*[1]  Installation of defect-free Pivot Pin and concurrent or prior replacement of Aluminum-Nickel-Bronze inner cylinder bushings with Copper-
Nickel-Tin inner cylinder bushings and incorporation of the increased lubrication interval (not to exceed the time specified in Compliance
Section, Table 5) with MIL-PRF-32014 grease is terminating action to the repeat inspections for that side of the MLG.
Group 1, Configuration 1:
Table 3  LEFT AND RIGHT MLG TRUCK BEAM AND INNER CYLINDER PIVOT JOINT - INNER CYLINDER 
BUSHING INSPECTION
Refer to the listed proce-
dures in SB B787-81205-
SB320045-00 Issue 001
or later approved issues
as an accepted proce-
dure.
Method of ComplianceActionCondition
PART 1: GET ACCESS
TO THE MLG TRUCK
BEAM AND INNER
CYLINDER PIVOT JOINT
--All Airplanes
PART 2: MLG TRUCK
BEAM AND INNER
CYLINDER PIVOT JOINT
- PIVOT PIN REMOVAL
--
-Task 3Do a detailed inspection of
both the left and right MLG
inner cylinder bushing in-
ner diameter (ID) surface
for excessive wear, cracks
and smearing of bushing
material
B787-81205-SB320045-00 RB
Issue 001, 09 Nov 2020 12:00:00 AM
Page 20 of 38
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB320045-00 RB
Issue 001, 09 Nov 2020 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 21

Group 1, Configuration 1:
Table 3  LEFT AND RIGHT MLG TRUCK BEAM AND INNER CYLINDER PIVOT JOINT - INNER CYLINDER 
BUSHING INSPECTION
Refer to the listed proce-
dures in SB B787-81205-
SB320045-00 Issue 001
or later approved issues
as an accepted proce-
dure.
Method of ComplianceActionCondition
Task 1-ACTION 1: Apply lubrica-
tion using MIL-PRF-32014
grease and make sure lu-
brication passages are
clear
CONDITION 1: NO INNER
CYLINDER BUSHING ID
EXCESSIVE WEAR, NO
CRACK AND NO SMEAR-
ING FOUND
PART 3: MLG TRUCK
BEAM AND INNER
CYLINDER PIVOT JOINT
- INSPECT INNER
CYLINDER BUSHING
LUBE PASSAGE
--
PART 4: MLG TRUCK
BEAM AND INNER
CYLINDER PIVOT JOINT
- PIVOT PIN INSTALLA-
TION
--
PART 6: RESTORE AC-
CESS TO THE MLG
TRUCK BEAM AND IN-
NER CYLINDER PIVOT
JOINT
--
*[1]Task 3ACTION 2: Repeat the de-
tailed inspection for both
the left and right MLG in-
ner cylinder bushing inner
diameter (ID)surface for
excessive wear, cracks
and smearing of bushing
material
-Task 4Do a detailed and FPI in-
spection of the inner cylin-
der lug bore for heat and
friction damage
CONDITION 2: ANY IN-
NER CYLINDER BUSH-
ING ID EXCESSIVE
WEAR, CRACK OR ANY
SMEARING FOUND
B787-81205-SB320045-00 RB
Issue 001, 09 Nov 2020 12:00:00 AM
Page 21 of 38
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB320045-00 RB
Issue 001, 09 Nov 2020 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 22

Group 1, Configuration 1:
Table 3  LEFT AND RIGHT MLG TRUCK BEAM AND INNER CYLINDER PIVOT JOINT - INNER CYLINDER 
BUSHING INSPECTION
Refer to the listed proce-
dures in SB B787-81205-
SB320045-00 Issue 001
or later approved issues
as an accepted proce-
dure.
Method of ComplianceActionCondition
Task 5-ACTION 1 (OPTION 1):
Install new Aluminum-
Nickel-Bronze Inner Cylin-
der Bushing(s)
CONDITION 2.1: NO
HEAT DAMAGE AND NO
FRICTION DAMAGE
FOUND ON THE INNER
CYLINDER LUG BORE ACTION 1 (OPTION 2):
Install new Copper-Nickel-
Tin Inner Cylinder Bush-
ing(s).
*[1]*[2]
Task 1-OPTION 1 and OPTION 2
(ACTION 2): Apply lubrica-
tion using MIL-PRF-32014
grease and make sure lu-
brication passages are
clear
PART 3: MLG TRUCK
BEAM AND INNER
CYLINDER PIVOT JOINT
- INSPECT INNER
CYLINDER BUSHING
LUBE PASSAGE
--
PART 4: MLG TRUCK
BEAM AND INNER
CYLINDER PIVOT JOINT
- PIVOT PIN INSTALLA-
TION
--
PART 6: RESTORE AC-
CESS TO THE MLG
TRUCK BEAM AND IN-
NER CYLINDER PIVOT
JOINT
--
*[1]Task 3
B787-81205-SB320045-00 RB
Issue 001, 09 Nov 2020 12:00:00 AM
Page 22 of 38
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB320045-00 RB
Issue 001, 09 Nov 2020 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 23

Group 1, Configuration 1:
Table 3  LEFT AND RIGHT MLG TRUCK BEAM AND INNER CYLINDER PIVOT JOINT - INNER CYLINDER 
BUSHING INSPECTION
Refer to the listed proce-
dures in SB B787-81205-
SB320045-00 Issue 001
or later approved issues
as an accepted proce-
dure.
Method of ComplianceActionCondition
OPTION 1 and OPTION 2
(ACTION 3):Repeat the
detailed inspection for both
the left and right MLG in-
ner cylinder bushing ID
surface for excessive
wear, cracks and smearing
of bushing material
--Contact Boeing for repair
instructions and do the re-
pairs.
CONDITION 2.2: ANY
HEAT DAMAGE OR
FRICTION DAMAGE IS
FOUND ON THE INNER
CYLINDER LUG BORE
*[1]Task 3ACTION 1: Repeat the de-
tailed inspection for both
the left and right MLG in-
ner cylinder bushing ID
surface for excessive
wear, cracks and smearing
of bushing material
*[1]  Installation of Copper-Nickel-Tin inner cylinder bushings and concurrent or prior incorporation of the increased lubrication interval (not
to exceed the time specified in Compliance Section, Table 5) with MIL-PRF-32014 grease constitutes terminating action to the repeat
inspections for that side of the MLG.
*[2]  Installation of Copper-Nickel-Tin bushings is one way interchangeable. Aluminum-Nickel-Bronze inner cylinder bushings can no longer
be installed for that side of the MLG.
B787-81205-SB320045-00 RB
Issue 001, 09 Nov 2020 12:00:00 AM
Page 23 of 38
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB320045-00 RB
Issue 001, 09 Nov 2020 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 24

Group 1, Configuration 2; Group 2:
Table 4  LEFT AND RIGHT MLG TRUCK BEAM AND INNER CYLINDER PIVOT JOINT - PIVOT PIN INSPECTION
Refer to the listed proce-
dures in SB B787-81205-
SB320045-00 Issue 001
or later approved issues
as an accepted proce-
dure.
Method of ComplianceActionCondition
PART 1: GET ACCESS
TO THE MLG TRUCK
BEAM AND INNER
CYLINDER PIVOT JOINT
--All Airplanes
PART 2: MLG TRUCK
BEAM AND INNER
CYLINDER PIVOT JOINT
- PIVOT PIN REMOVAL
--
-Task 2Do a detailed and Fluores-
cent Penetrant Inspection
(FPI) of both the left and
right MLG Pivot Pin OD
surface for friction and
heat damage.
PART 4: MLG TRUCK
BEAM AND INNER
CYLINDER PIVOT JOINT
- PIVOT PIN INSTALLA-
TION
--CONDITION 1: NO HEAT
DAMAGE AND NO FRIC-
TION DAMAGE FOUND
ON THE PIVOT PIN OD
SURFACE
PART 6: RESTORE AC-
CESS TO THE MLG
TRUCK BEAM AND IN-
NER CYLINDER PIVOT
JOINT
--
*[1]Task 2Repeat the detailed and
Fluorescent Penetrant In-
spection(FPI) of the Pivot
Pin outer diameter(OD)
surface for heat and fric-
tion damage
-Task 4Do a detailed and FPI in-
spection on the inner
cylinder lug bore for heat
and friction damage.
CONDITION 2: ANY HEAT
DAMAGE OR ANY FRIC-
TION DAMAGE IS FOUND
ON THE PIVOT PIN OD
SURFACE
B787-81205-SB320045-00 RB
Issue 001, 09 Nov 2020 12:00:00 AM
Page 24 of 38
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB320045-00 RB
Issue 001, 09 Nov 2020 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 25

Group 1, Configuration 2; Group 2:
Table 4  LEFT AND RIGHT MLG TRUCK BEAM AND INNER CYLINDER PIVOT JOINT - PIVOT PIN INSPECTION
Refer to the listed proce-
dures in SB B787-81205-
SB320045-00 Issue 001
or later approved issues
as an accepted proce-
dure.
Method of ComplianceActionCondition
PART 4: MLG TRUCK
BEAM AND INNER
CYLINDER PIVOT JOINT
- PIVOT PIN INSTALLA-
TION
-ACTION 1: Install a new
Pivot Pin
CONDITION 2.1: NO
HEAT DAMAGE AND NO
FRICTION DAMAGE
FOUND ON THE INNER
CYLINDER LUG BORE
PART 5: MLG TRUCK
BEAM AND INNER
CYLINDER PIVOT JOINT-
INNER CYLINDER BUSH-
ING INSTALLATION
--
PART 6: RESTORE AC-
CESS TO THE MLG
TRUCK BEAM AND IN-
NER CYLINDER PIVOT
JOINT
--
*[1]Task 2ACTION 2: Repeat the de-
tailed and FPI inspections
for both the left and right
MLG pivot pin OD surface
for friction and heat dam-
age
--Contact Boeing for repair
instructions and do the re-
pairs.
CONDITION 2.2: ANY
HEAT DAMAGE OR ANY
FRICTION DAMAGE IS
FOUND ON THE INNER
CYLINDER LUG BORE PART 4: MLG TRUCKBEAM AND INNER
CYLINDER PIVOT JOINT
- PIVOT PIN INSTALLA-
TION
-ACTION 1: Install a new
Pivot Pin
*[1]Task 2ACTION 2: Repeat the de-
tailed and FPI inspections
for both the left and right
MLG pivot pin OD surface
for friction and heat dam-
age
B787-81205-SB320045-00 RB
Issue 001, 09 Nov 2020 12:00:00 AM
Page 25 of 38
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB320045-00 RB
Issue 001, 09 Nov 2020 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 26

Group 1, Configuration 2; Group 2:
Table 4  LEFT AND RIGHT MLG TRUCK BEAM AND INNER CYLINDER PIVOT JOINT - PIVOT PIN INSPECTION
*[1]  Installation of defect-free Pivot Pin and Copper-Nickel-Tin inner cylinder bushings and concurrent or prior incorporation of the increased
lubrication interval ( not to exceed the time specified in Compliance Section, Table 5) with MIL-PRF-32014 grease is terminating action
to the repeat inspections for that side of the MLG.
Group 1, Configuration 2; Group 2:
Table 5  LEFT AND RIGHT MLG TRUCK BEAM AND INNER CYLINDER PIVOT JOINT - INNER CYLINDER 
BUSHING INSPECTION
Refer to the listed proce-
dures in SB B787-81205-
SB320045-00 Issue 001
or later approved issues
as an accepted proce-
dure.
Method of ComplianceActionCondition
PART 1: GET ACCESS
TO THE MLG TRUCK
BEAM AND INNER
CYLINDER PIVOT JOINT
--All Airplanes
PART 2: MLG TRUCK
BEAM AND INNER
CYLINDER PIVOT JOINT
- PIVOT PIN REMOVAL
--
-Task 3Do a detailed inspection of
both the left and right MLG
inner cylinder bushing in-
ner diameter (ID) surface
for excessive wear, cracks
and smearing of bushing
material
B787-81205-SB320045-00 RB
Issue 001, 09 Nov 2020 12:00:00 AM
Page 26 of 38
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB320045-00 RB
Issue 001, 09 Nov 2020 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 27

Group 1, Configuration 2; Group 2:
Table 5  LEFT AND RIGHT MLG TRUCK BEAM AND INNER CYLINDER PIVOT JOINT - INNER CYLINDER 
BUSHING INSPECTION
Refer to the listed proce-
dures in SB B787-81205-
SB320045-00 Issue 001
or later approved issues
as an accepted proce-
dure.
Method of ComplianceActionCondition
Task 1-ACTION 1: Apply lubrica-
tion using MIL-PRF-32014
grease and make sure lu-
brication passages are
clear.
CONDITION 1: NO INNER
CYLINDER BUSHING ID
EXCESSIVE WEAR, NO
CRACK AND NO SMEAR-
ING FOUND
PART 3: MLG TRUCK
BEAM AND INNER
CYLINDER PIVOT JOINT
- INSPECT INNER
CYLINDER BUSHING
LUBE PASSAGE
--
PART 4: MLG TRUCK
BEAM AND INNER
CYLINDER PIVOT JOINT
- PIVOT PIN INSTALLA-
TION
--
PART 6: RESTORE AC-
CESS TO THE MLG
TRUCK BEAM AND IN-
NER CYLINDER PIVOT
JOINT
--
*[1]Task 3ACTION 2: Repeat the de-
tailed inspection for both
the left and right MLG in-
ner cylinder bushing inner
diameter (ID)surface for
excessive wear, cracks
and smearing of bushing
material
-Task 4Do a detailed and FPI in-
spection of the inner cylin-
der lug bore for heat and
friction damage.
CONDITION 2: ANY IN-
NER CYLINDER BUSH-
ING ID EXCESSIVE
WEAR, CRACK OR ANY
SMEARING FOUND
B787-81205-SB320045-00 RB
Issue 001, 09 Nov 2020 12:00:00 AM
Page 27 of 38
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB320045-00 RB
Issue 001, 09 Nov 2020 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 28

Group 1, Configuration 2; Group 2:
Table 5  LEFT AND RIGHT MLG TRUCK BEAM AND INNER CYLINDER PIVOT JOINT - INNER CYLINDER 
BUSHING INSPECTION
Refer to the listed proce-
dures in SB B787-81205-
SB320045-00 Issue 001
or later approved issues
as an accepted proce-
dure.
Method of ComplianceActionCondition
Task 6-ACTION 1: Install new
Copper-Nickel-Tin Inner
Cylinder Bushing(s).
CONDITION 2.1: NO
HEAT DAMAGE AND NO
FRICTION DAMAGE
FOUND ON THE INNER
CYLINDER LUG BORE Task 1-ACTION 2: Apply lubrica-tion using MIL-PRF-32014
grease and make sure lu-
brication passages are
clear.
PART 3: MLG TRUCK
BEAM AND INNER
CYLINDER PIVOT JOINT
- INSPECT INNER
CYLINDER BUSHING
LUBE PASSAGE
--
PART 4: MLG TRUCK
BEAM AND INNER
CYLINDER PIVOT JOINT
- PIVOT PIN INSTALLA-
TION
--
PART 6: RESTORE AC-
CESS TO THE MLG
TRUCK BEAM AND IN-
NER CYLINDER PIVOT
JOINT
--
*[1]Task 3ACTION 3: Repeat the de-
tailed inspections for both
the left and right MLG in-
ner cylinder bushing ID
surface for excessive
wear, cracks and smearing
of bushing material
B787-81205-SB320045-00 RB
Issue 001, 09 Nov 2020 12:00:00 AM
Page 28 of 38
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB320045-00 RB
Issue 001, 09 Nov 2020 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 29

Group 1, Configuration 2; Group 2:
Table 5  LEFT AND RIGHT MLG TRUCK BEAM AND INNER CYLINDER PIVOT JOINT - INNER CYLINDER 
BUSHING INSPECTION
Refer to the listed proce-
dures in SB B787-81205-
SB320045-00 Issue 001
or later approved issues
as an accepted proce-
dure.
Method of ComplianceActionCondition
--Contact Boeing for repair
instructions and do the re-
pairs.
CONDITION 2.2: ANY
HEAT DAMAGE OR ANY
FRICTION DAMAGE
FOUND ON THE INNER
CYLINDER LUG BORE
*[1]Task 3ACTION 1: Repeat the de-
tailed inspection for both
the left and right MLG in-
ner cylinder bushing ID
surface for excessive
wear, cracks and smearing
of bushing material
*[1]  Installation of Copper-Nickel-Tin inner cylinder bushings and concurrent or prior incorporation of the increased lubrication interval (not
to exceed the time specified in Compliance Section, Table 5) with MIL-PRF-32014 grease constitutes terminating action to the repeat
inspections for that side of the MLG.
B787-81205-SB320045-00 RB
Issue 001, 09 Nov 2020 12:00:00 AM
Page 29 of 38
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB320045-00 RB
Issue 001, 09 Nov 2020 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 30

Task 2 – LEFT AND RIGHT MLG TRUCK BEAM AND INNER CYLINDER
PIVOT JOINT - PIVOT PIN INSPECTION [Group 1-2:]
THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN
IN PARAGRAPH 1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND
Alert:
THIS DOCUMENT TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD,
SEND THIS DOCUMENT TO THE NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR
COMPLIANCE DOCUMENT. THE BOEING PROCESSES USED TO CREATE THE SERVICE
BULLETIN (SB) AND THE REQUIREMENTS BULLETIN (RB) ENSURE THAT THE INFORMATION
BETWEEN "RC START" AND "RC END" IN THE SB ARE IDENTICAL TO THE INFORMATION IN
THE SAME SECTIONS (COMPLIANCE, WORK INSTRUCTIONS...) OF THE RB WHICH THE SB
REFERS TO AS THE RELATED DOCUMENT.
Procedure
This Task applies only to: Group 1-2.
LEFT AND RIGHT MLG TRUCK BEAM AND INNER CYLINDER PIVOT JOINT - PIVOT PIN INSPECTION
B787-81205-SB320045-00 RB
Issue 001, 09 Nov 2020 12:00:00 AM
Page 30 of 38
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB320045-00 RB
Issue 001, 09 Nov 2020 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 31 (OCR)

Q BOEING  B787-81205-SB320045-00 RB
Issue 001, 09 Nov 2020 12:00:00 AM
REQUIREMENTS BULLETIN
O 2 LOCATIONS
MAIN LANDING GEAR TRUCK BEAM
LEFT MAIN LANDING GEAR SHOWN
(RIGHT MAIN LANDING GEAR SIMILAR)
2935489
ICN-B787-A-000061-A-81205-18109-A-01-1
Figure 1
1. The step numbers shown below agree with the numbers shown in the circle symbols in the Task. The QTY
numbers shown below are the number of parts necessary for this task.
B787-81205-SB320045-00 RB
Issue 001, 09 Nov 2020 12:00:00 AM
Page 31 of 38
EXPORT CONTROLLED ECCN: 9E991
See title page for details.

### Page 32

Table 1  
More DataQtyIdentificationNameActionStep
*[1]2515Z2003-( )PIVOT PIN COMPO-
NENT ASSEMBLY
Inspect1
*[1]  Do a detailed and Fluorescent Penetrant Inspection of the  Pivot Pin OD surface for heat and friction damage. Refer to SOPM 20-20-
02 as an accepted procedure.
B787-81205-SB320045-00 RB
Issue 001, 09 Nov 2020 12:00:00 AM
Page 32 of 38
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB320045-00 RB
Issue 001, 09 Nov 2020 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 33

Task 3 – LEFT AND RIGHT MLG TRUCK BEAM AND INNER CYLINDER
PIVOT JOINT - INNER CYLINDER BUSHING INSPECTION [Group 1-2:]
THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN
IN PARAGRAPH 1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND
Alert:
THIS DOCUMENT TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD,
SEND THIS DOCUMENT TO THE NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR
COMPLIANCE DOCUMENT. THE BOEING PROCESSES USED TO CREATE THE SERVICE
BULLETIN (SB) AND THE REQUIREMENTS BULLETIN (RB) ENSURE THAT THE INFORMATION
BETWEEN "RC START" AND "RC END" IN THE SB ARE IDENTICAL TO THE INFORMATION IN
THE SAME SECTIONS (COMPLIANCE, WORK INSTRUCTIONS...) OF THE RB WHICH THE SB
REFERS TO AS THE RELATED DOCUMENT.
Procedure
This Task applies only to: Group 1-2.
LEFT AND RIGHT MLG TRUCK BEAM AND INNER CYLINDER PIVOT JOINT - INNER CYLINDER BUSHING
INSPECTION
B787-81205-SB320045-00 RB
Issue 001, 09 Nov 2020 12:00:00 AM
Page 33 of 38
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB320045-00 RB
Issue 001, 09 Nov 2020 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 34 (OCR)

Q BOEING  B787-81205-SB320045-00 RB
Issue 001, 09 Nov 2020 12:00:00 AM
REQUIREMENTS BULLETIN
MAIN LANDING GEAR TRUCK BEAM
(TYPICAL)
LUBE PASSAGE
LEFT MAIN LANDING GEAR SHOWN
(RIGHT MAIN LANDING GEAR SIMILAR)
ICN-B787-A-000061-A-81205-18110-A-01-1
Figure 1
LEFT AND RIGHT MLG TRUCK BEAM AND INNER CYLINDER PIVOT JOINT - INNER CYLINDER BUSHING
INSPECTION
B787-81205-SB320045-00 RB
Issue 001, 09 Nov 2020 12:00:00 AM
Page 34 of 38
EXPORT CONTROLLED ECCN: 9E991
See title page for details.

### Page 35

ICN-B787-A-000061-A-81205-18111-A-01-1
Figure 2  
1.  The step numbers shown below agree with the numbers shown in the circle symbols in the Task. The QTY
numbers shown below are the number of parts necessary for this task.
Table 1  
More DataQtyIdentificationNameActionStep
*[1]8512Z3002-( )BUSH - INNER CYLIN-
DER TO BOGIE
Inspect1
*[1]  Do a detailed inspection of both the left and right MLG i nner cylinder bushing inner diameter (ID) surface for excessive wear, cracks
and smearing of bushing material. MLG inner cylinder bushing inner diameter (ID) design dimensional limits can be found in 787-8
CMM 32-11-79 or 787-9 CMM 32-12-20 or 787-10 CMM 32-10-36 'FITS AND CLEARANCES'.
B787-81205-SB320045-00 RB
Issue 001, 09 Nov 2020 12:00:00 AM
Page 35 of 38
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB320045-00 RB
Issue 001, 09 Nov 2020 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 36

Task 4 – LEFT AND RIGHT MLG TRUCK BEAM AND INNER CYLINDER
PIVOT JOINT - INNER CYLINDER LUG BORE INSPECTION [Group 1-2:]
THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN
IN PARAGRAPH 1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND
Alert:
THIS DOCUMENT TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD,
SEND THIS DOCUMENT TO THE NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR
COMPLIANCE DOCUMENT. THE BOEING PROCESSES USED TO CREATE THE SERVICE
BULLETIN (SB) AND THE REQUIREMENTS BULLETIN (RB) ENSURE THAT THE INFORMATION
BETWEEN "RC START" AND "RC END" IN THE SB ARE IDENTICAL TO THE INFORMATION IN
THE SAME SECTIONS (COMPLIANCE, WORK INSTRUCTIONS...) OF THE RB WHICH THE SB
REFERS TO AS THE RELATED DOCUMENT.
Procedure
This Task applies only to: Group 1-2.
LEFT AND RIGHT MLG TRUCK BEAM AND INNER CYLINDER PIVOT JOINT - INNER CYLINDER LUG
BORE INSPECTION
B787-81205-SB320045-00 RB
Issue 001, 09 Nov 2020 12:00:00 AM
Page 36 of 38
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB320045-00 RB
Issue 001, 09 Nov 2020 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 37 (OCR)

A BOEING  B787-81205-SB320045-00 RB
Issue 001, 09 Nov 2020 12:00:00 AM
REQUIREMENTS BULLETIN
MAIN LANDING GEAR TRUCK BEAM
LEFT MAIN LANDING GEAR SHOWN
(RIGHT MAIN LANDING GEAR SIMILAR)
ICN-B787-A-000061-A-81205-18112-A-01-1
Figure 1
1. The step numbers shown below agree with the numbers shown in the circle symbols in the Task. The QTY
numbers shown below are the number of parts necessary for this task.
B787-81205-SB320045-00 RB
Issue 001, 09 Nov 2020 12:00:00 AM
Page 37 of 38
EXPORT CONTROLLED ECCN: 9E991
See title page for details.

### Page 38

Table 1  
More DataQtyIdentificationNameActionStep
*[1]-512Z3001-( )INNER CYLINDERInspect1
*[1]  Do a detailed and FPI inspection of the inner cylinder lug bore inner diameter coating, chamfer, and face surfaces for heat and friction
damage. Refer to SOPM 20-20-02 as an accepted procedure.
B787-81205-SB320045-00 RB
Issue 001, 09 Nov 2020 12:00:00 AM
Page 38 of 38
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB320045-00 RB
Issue 001, 09 Nov 2020 12:00:00 AM
REQUIREMENTS BULLETIN

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
