# Boeing Service Bulletin B787-81205-SB320045-00

Copy: Revision 001 ("SB-787-32A0045-01--"), 134 pages: PDF https://openairdocs.org/files/sha256/c4/17/c41729c8cf0be4b4a7c89dc26492fa1491491cf944704051cff526e0f10f8602; text https://openairdocs.org/service-documents/boeing/b787-81205-sb320045-00/file/c41729c8cf0b.md. Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2021-0457, the docket of AD 2022-02-14. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Boeing](https://openairdocs.org/service-documents/boeing.md)
- Type: Service bulletin (Service Bulletin)
- Number: B787-81205-SB320045-00
- Latest revision known: B787-81205-SB320045-00, Issue 001, dated November 9, 2020 (OpenAirDocs)
- Page: https://openairdocs.org/service-documents/boeing/b787-81205-sb320045-00

## ADs that cite it (1) (OpenAirDocs)

Newest first, with the revision each names, as OpenAirDocs read it from the AD's text.

- [AD 2022-02-14](https://openairdocs.org/ad/2022-02-14.md), effective Mar 30, 2022: Revision 001

Also cited in [1 proposed AD](https://openairdocs.org/service-documents/boeing/b787-81205-sb320045-00/proposed.md).

## Text (134 pages)

Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2021-0457, the docket of AD 2022-02-14. Not covered by OpenAirDocs’ CC0 dedication. Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Alert Service Bulletin B787-81205-SB320045-00 LANDING GEAR - Main
Landing Gear - Truck Beam and Inner Cylinder Pivot Joint Inspection and
Lubrication
Issue 001, 09 Nov 2020B787-81205-SB320045-00Publication:
Copyright © 2020 Boeing. Unpublished Work. All rights reserved.
Treatment of this data module and its content is governed by contract with Boeing. Rights to use this data module are licensed on a per
aircraft basis and such rights may not be transferable. For more information, contact The Boeing Company. Boeing, the Boeing signature,
the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner, BBJ, DC-8, DC-9, DC-10, KC-10, KC-46, KDC-10, MD-10,
MD-11, MD-80, MD-88, MD-90, P-8, Poseidon and Boeing liveries are all trademarks owned by The Boeing Company; and no trademark
license is granted in connection with this document unless provided in writing by Boeing.
EXPORT CONTROLLED
Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15 CFR 300-774). An export license
may be required before it is used for development, production or use by foreign persons from specific countries. The controller of this data
has the individual responsibility to abide by all export laws.
ECCN: 9E991
The applicability information below is referenced at the lower left of each page to indicate the page applicability.
These references are valid for this print copy only.
PM Applicability (Publication Module applicability)
787-8, 787-9, 787-10 Airplanes. Refer to Data Module SB B787-A-32-00-0045-00A-932A-D, Paragraph 1.,
Effectivity for the list of affected airplanes.
B787-81205-SB320045-00TITLE PAGE
Issue 001, 09 Nov 2020
Page 1 of 96
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
5.0
B787-81205-SB320045-00
Issue 001, 09 Nov 2020
AIRCRAFT SERVICE BULLETIN

### Page 2

Alert Service Bulletin B787-81205-SB320045-00
Table of Contents
Page
Summary  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
PLANNING INFORMATION  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
1. Effectivity  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
A. Airplanes  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
B. Spares Affected  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
2. Concurrent Requirements  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
3. Reason  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
4. Description  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
5. Compliance  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18
6. Approval  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28
7. Manpower  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29
8. Weight and Balance Changes  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31
9. Electrical Load Data  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31
10. References  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31
A. Existing Data:  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31
B. Data Supplied with this Service Bulletin:  . . . . . . . . . . . . . . . . . . . . . . . . . . 32
C. Installation Requirement Modules Used in the Preparation of this Service Bulletin:  . . . 32
11. Publications Affected  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32
12. Interchangeability and Intermixability of Parts  . . . . . . . . . . . . . . . . . . . . . . . . . 32
13. Software Accomplishment Summary  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32
MATERIAL INFORMATION  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33
1. Material - Price and Availability  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33
2. Industry Support Information  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 36
3. Parts Necessary for Each Airplane  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37
A. Kits/Parts:  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37
B. Parts and Materials Supplied by the Operator:  . . . . . . . . . . . . . . . . . . . . . . . 37
C. Parts Modified and Reidentified:  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 38
D. Parts Removed and Not Replaced:  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 38
4. Parts Necessary to Change Spares  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 38
5. Special Tooling - Price and Availability  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 38
6. Special Tooling Necessary to do this Service Bulletin  . . . . . . . . . . . . . . . . . . . . . 39
ACCOMPLISHMENT INSTRUCTIONS  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 40
1. GENERAL INFORMATION  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 41
2. WORK INSTRUCTIONS  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 43
Task 1 – LEFT AND RIGHT MLG TRUCK BEAM AND INNER CYLINDER PIVOT JOINT - LUBRICATION
[Group 1-2:] . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59
Task 2 – LEFT AND RIGHT MLG TRUCK BEAM AND INNER CYLINDER PIVOT JOINT - PIVOT PIN
INSPECTION [Group 1-2:] . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 61
Task 3 – LEFT AND RIGHT MLG TRUCK BEAM AND INNER CYLINDER PIVOT JOINT - INNER CYLINDER
BUSHING INSPECTION [Group 1-2:] . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 64
B787-81205-SB320045-00TABLE OF CONTENTS
Issue 001, 09 Nov 2020
Page 2 of 96
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB320045-00
Issue 001, 09 Nov 2020
AIRCRAFT SERVICE BULLETIN

### Page 3

Task 4 – LEFT AND RIGHT MLG TRUCK BEAM AND INNER CYLINDER PIVOT JOINT - INNER CYLINDER
LUG BORE INSPECTION [Group 1-2:] . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 67
Task 5 – LEFT AND RIGHT MLG TRUCK BEAM AND INNER CYLINDER PIVOT JOINT - INNER CYLINDER
BUSHING INSTALLATION [Group 1: ]. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 70
Task 6 – LEFT AND RIGHT MLG TRUCK BEAM AND INNER CYLINDER PIVOT JOINT - INNER CYLINDER
BUSHING INSTALLATION [Group 2: ]. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 74
Appendix A – LOGIC DIAGRAM - LEFT AND RIGHT MAIN LANDING GEAR (MLG) TRUCK BEAM AND
INNER CYLINDER PIVOT JOINT - LUBRICATION [Group 1-2:] . . . . . . . . . . . . . . . 78
Appendix B – LOGIC DIAGRAM - LEFT AND RIGHT MLG TRUCK BEAM AND INNER CYLINDER PIVOT
JOINT - PIVOT PIN INSPECTION [Group 1, Configuration 1: ]. . . . . . . . . . . . . . . . 80
Appendix C – LOGIC DIAGRAM - LEFT AND RIGHT MLG TRUCK BEAM AND INNER CYLINDER PIVOT
JOINT - INNER CYLINDER BUSHING INSPECTION [Group 1, Configuration 1: ] . . . . . 83
Appendix D – LOGIC DIAGRAM - LEFT AND RIGHT MLG TRUCK BEAM AND INNER CYLINDER PIVOT
JOINT - PIVOT PIN AND INNER CYLINDER LUG BORE INSPECTION [Group 1,
Configuration 2; Group 2: ] . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 88
Appendix E – LOGIC DIAGRAM - LEFT AND RIGHT MLG TRUCK BEAM AND INNER CYLINDER PIVOT
JOINT - INNER CYLINDER BUSHING AND INNER CYLINDER LUG BORE INSPECTION
[Group 1, Configuration 2; Group 2: ] . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 91
Appendix F – PART DEMAND INTENT FORM [Group 1-2:] . . . . . . . . . . . . . . . . . . . . . . . . . 95
B787-81205-SB320045-00TABLE OF CONTENTS
Issue 001, 09 Nov 2020
Page 3 of 96
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB320045-00
Issue 001, 09 Nov 2020
AIRCRAFT SERVICE BULLETIN

### Page 4

Alert Service Bulletin B787-81205-SB320045-00
List of Illustrations
THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN
IN PARAGRAPH 1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND
Alert:
THIS DOCUMENT TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD,
SEND THIS DOCUMENT TO THE NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR
COMPLIANCE DOCUMENT. THE BOEING PROCESSES USED TO CREATE THE SERVICE
BULLETIN (SB) AND THE REQUIREMENTS BULLETIN (RB) ENSURE THAT THE INFORMATION
BETWEEN "RC START" AND "RC END" IN THE SB ARE IDENTICAL TO THE INFORMATION IN
THE SAME SECTIONS (COMPLIANCE, WORK INSTRUCTIONS...) OF THE RB WHICH THE SB
REFERS TO AS THE RELATED DOCUMENT.
Description
Group 1-2:
Table 1  List of Illustrations - Alert Service Bulletin B787-81205-SB320045-00
Used InICN
B787-A-32-00-0045-00A-931C-D Issue 001ICN-B787-A-000061-A-81205-18107-A-01-1
B787-A-32-00-0045-01A-933B-D Issue 001ICN-B787-A-000061-A-81205-18108-A-01-1
B787-A-32-00-0045-02A-933B-D Issue 001ICN-B787-A-000061-A-81205-18109-A-01-1
B787-A-32-00-0045-03A-933B-D Issue 001ICN-B787-A-000061-A-81205-18110-A-01-1
B787-A-32-00-0045-03A-933B-D Issue 001ICN-B787-A-000061-A-81205-18111-A-01-1
B787-A-32-00-0045-04A-933B-D Issue 001ICN-B787-A-000061-A-81205-18112-A-01-1
B787-A-32-00-0045-05A-933B-D Issue 001ICN-B787-A-000061-A-81205-18113-A-01-1
B787-A-32-00-0045-05A-933B-D Issue 001ICN-B787-A-000061-A-81205-18114-A-01-1
B787-A-32-00-0045-06A-933B-D Issue 001ICN-B787-A-000061-A-81205-18115-A-01-1
B787-A-32-00-0045-06A-933B-D Issue 001ICN-B787-A-000061-A-81205-18116-A-01-1
B787-A-32-00-0045-0AA-931D-D Issue 001ICN-B787-A-000061-A-81205-18117-A-01-1
B787-A-32-00-0045-0BA-931D-D Issue 001ICN-B787-A-000061-A-81205-18118-A-01-1
B787-A-32-00-0045-0CA-931D-D Issue 001ICN-B787-A-000061-A-81205-18119-A-01-1
B787-A-32-00-0045-0CA-931D-D Issue 001ICN-B787-A-000061-A-81205-18120-A-01-1
B787-A-32-00-0045-0DA-931D-D Issue 001ICN-B787-A-000061-A-81205-18121-A-01-1
B787-A-32-00-0045-0EA-931D-D Issue 001ICN-B787-A-000061-A-81205-18122-A-01-1
B787-A-32-00-0045-00A-00AA-DApplicable To:
Issue 001, 09 Nov 2020Model 787
See Applicability of this data module
Page 4 of 96
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB320045-00
Issue 001, 09 Nov 2020
AIRCRAFT SERVICE BULLETIN

### Page 5

Table 1  List of Illustrations - Alert Service Bulletin B787-81205-SB320045-00
Used InICN
B787-A-32-00-0045-0EA-931D-D Issue 001ICN-B787-A-000061-A-81205-18123-A-01-1
B787-A-32-00-0045-0FA-931D-D Issue 001ICN-B787-A-000061-A-81205-18124-A-01-1
B787-A-32-00-0045-00A-00AA-DApplicable To:
Issue 001, 09 Nov 2020End of data moduleModel 787
See Applicability of this data module
Page 5 of 96
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB320045-00
Issue 001, 09 Nov 2020
AIRCRAFT SERVICE BULLETIN

### Page 6

Alert Service Bulletin B787-81205-SB320045-00
List of Effective Data Modules
THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN
IN PARAGRAPH 1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND
Alert:
THIS DOCUMENT TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD,
SEND THIS DOCUMENT TO THE NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR
COMPLIANCE DOCUMENT. THE BOEING PROCESSES USED TO CREATE THE SERVICE
BULLETIN (SB) AND THE REQUIREMENTS BULLETIN (RB) ENSURE THAT THE INFORMATION
BETWEEN "RC START" AND "RC END" IN THE SB ARE IDENTICAL TO THE INFORMATION IN
THE SAME SECTIONS (COMPLIANCE, WORK INSTRUCTIONS...) OF THE RB WHICH THE SB
REFERS TO AS THE RELATED DOCUMENT.
Description
Group 1-2:
Table 1  List of Effective Data Modules - Alert Service Bulletin B787-81205-SB320045-00
Issue DateIssue StatusIssueData Module – Information Name
2020
12:00:00
AM-11-09
New001B787-A-32-00-0045-00A-00AA-D – List of Illustrations
2020
12:00:00
AM-11-09
New001B787-A-32-00-0045-00A-00SA-D – List of Effective Data Modules
2020
12:00:00
AM-11-09
New001B787-A-32-00-0045-00A-931C-D – Summary
2020
12:00:00
AM-11-09
New001B787-A-32-00-0045-00A-932A-D – PLANNING INFORMATION
2020
12:00:00
AM-11-09
New001B787-A-32-00-0045-00A-934A-D – MATERIAL INFORMATION
2020
12:00:00
AM-11-09
New001B787-A-32-00-0045-00A-933A-D – ACCOMPLISHMENT INSTRUCTIONS
2020
12:00:00
AM-11-09
New001B787-A-32-00-0045-01A-933B-D – Task 1 – LEFT AND RIGHT MLG
TRUCK BEAM AND INNER CYLINDER PIVOT JOINT - LUBRICATION
[Group 1-2:]
B787-A-32-00-0045-00A-00SA-DApplicable To:
Issue 001, 09 Nov 2020Model 787
See Applicability of this data module
Page 6 of 96
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB320045-00
Issue 001, 09 Nov 2020
AIRCRAFT SERVICE BULLETIN

### Page 7

Table 1  List of Effective Data Modules - Alert Service Bulletin B787-81205-SB320045-00
Issue DateIssue StatusIssueData Module – Information Name
2020
12:00:00
AM-11-09
New001B787-A-32-00-0045-02A-933B-D – Task 2 – LEFT AND RIGHT MLG
TRUCK BEAM AND INNER CYLINDER PIVOT JOINT - PIVOT PIN IN-
SPECTION [Group 1-2:]
2020
12:00:00
AM-11-09
New001B787-A-32-00-0045-03A-933B-D – Task 3 – LEFT AND RIGHT MLG
TRUCK BEAM AND INNER CYLINDER PIVOT JOINT - INNER CYLINDER
BUSHING INSPECTION [Group 1-2:]
2020
12:00:00
AM-11-09
New001B787-A-32-00-0045-04A-933B-D – Task 4 – LEFT AND RIGHT MLG
TRUCK BEAM AND INNER CYLINDER PIVOT JOINT - INNER CYLINDER
LUG BORE INSPECTION [Group 1-2:]
2020
12:00:00
AM-11-09
New001B787-A-32-00-0045-05A-933B-D – Task 5 – LEFT AND RIGHT MLG
TRUCK BEAM AND INNER CYLINDER PIVOT JOINT - INNER CYLINDER
BUSHING INSTALLATION [Group 1: ]
2020
12:00:00
AM-11-09
New001B787-A-32-00-0045-06A-933B-D – Task 6 – LEFT AND RIGHT MLG
TRUCK BEAM AND INNER CYLINDER PIVOT JOINT - INNER CYLINDER
BUSHING INSTALLATION [Group 2: ]
2020
12:00:00
AM-11-09
New001B787-A-32-00-0045-0AA-931D-D – Appendix A – LOGIC DIAGRAM - LEFT
AND RIGHT MAIN LANDING GEAR (MLG) TRUCK BEAM AND INNER
CYLINDER PIVOT JOINT - LUBRICATION [Group 1-2:]
2020
12:00:00
AM-11-09
New001B787-A-32-00-0045-0BA-931D-D – Appendix B – LOGIC DIAGRAM - LEFT
AND RIGHT MLG TRUCK BEAM AND INNER CYLINDER PIVOT JOINT
- PIVOT PIN INSPECTION [Group 1, Configuration 1: ]
2020
12:00:00
AM-11-09
New001B787-A-32-00-0045-0CA-931D-D – Appendix C – LOGIC DIAGRAM -
LEFT AND RIGHT MLG TRUCK BEAM AND INNER CYLINDER PIVOT
JOINT - INNER CYLINDER BUSHING INSPECTION [Group 1, Configura-
tion 1: ]
2020
12:00:00
AM-11-09
New001B787-A-32-00-0045-0DA-931D-D – Appendix D – LOGIC DIAGRAM -
LEFT AND RIGHT MLG TRUCK BEAM AND INNER CYLINDER PIVOT
JOINT - PIVOT PIN AND INNER CYLINDER LUG BORE INSPECTION
[Group 1, Configuration 2; Group 2: ]
2020
12:00:00
AM-11-09
New001B787-A-32-00-0045-0EA-931D-D – Appendix E – LOGIC DIAGRAM - LEFT
AND RIGHT MLG TRUCK BEAM AND INNER CYLINDER PIVOT JOINT
- INNER CYLINDER BUSHING AND INNER CYLINDER LUG BORE IN-
SPECTION [Group 1, Configuration 2; Group 2: ]
2020
12:00:00
AM-11-09
New001B787-A-32-00-0045-0FA-931D-D – Appendix F – PART DEMAND INTENT
FORM [Group 1-2:]
B787-A-32-00-0045-00A-00SA-DApplicable To:
Issue 001, 09 Nov 2020End of data moduleModel 787
See Applicability of this data module
Page 7 of 96
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB320045-00
Issue 001, 09 Nov 2020
AIRCRAFT SERVICE BULLETIN

### Page 8

Alert Service Bulletin B787-81205-SB320045-00
Summary
THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN
IN PARAGRAPH 1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND
Alert:
THIS DOCUMENT TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD,
SEND THIS DOCUMENT TO THE NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR
COMPLIANCE DOCUMENT. THE BOEING PROCESSES USED TO CREATE THE SERVICE
BULLETIN (SB) AND THE REQUIREMENTS BULLETIN (RB) ENSURE THAT THE INFORMATION
BETWEEN "RC START" AND "RC END" IN THE SB ARE IDENTICAL TO THE INFORMATION IN
THE SAME SECTIONS (COMPLIANCE, WORK INSTRUCTIONS...) OF THE RB WHICH THE SB
REFERS TO AS THE RELATED DOCUMENT.
References
TitleReference
Spares AffectedSB B787-A-32-00-0045-00A-932A-D Issue 001,
Paragraph 1.B.
Weight and Balance ChangesSB B787-A-32-00-0045-00A-932A-D Issue 001,
Paragraph 8.
Electrical Load DataSB B787-A-32-00-0045-00A-932A-D Issue 001,
Paragraph 9.
Publications AffectedSB B787-A-32-00-0045-00A-932A-D Issue 001,
Paragraph 11.
Kits/PartsSB B787-A-32-00-0045-00A-934A-D Issue 001,
Paragraph 3.A.
Parts and Materials Supplied by the OperatorSB B787-A-32-00-0045-00A-934A-D Issue 001,
Paragraph 3.B.
Special Tooling Necessary to do this Service BulletinSB B787-A-32-00-0045-00A-934A-D Issue 001,
Paragraph 6.
EffectivitySB B787-A-32-00-0045-00A-932A-D Issue 001,
Paragraph 1.
ComplianceSB B787-A-32-00-0045-00A-932A-D Issue 001,
Paragraph 5.
Industry Support InformationSB B787-A-32-00-0045-00A-934A-D Issue 001,
Paragraph 2.
ManpowerSB B787-A-32-00-0045-00A-932A-D Issue 001,
Paragraph 7.
B787-A-32-00-0045-00A-931C-DApplicable To:
Issue 001, 09 Nov 2020Model 787
See Applicability of this data module
Page 8 of 96
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB320045-00
Issue 001, 09 Nov 2020
AIRCRAFT SERVICE BULLETIN

### Page 9

TitleReference
Material - Price and AvailabilitySB B787-A-32-00-0045-00A-934A-D Issue 001,
Paragraph 1.
Alert Service Bulletin
B787-81205-SB320045-00 – Appendix F – PART
DEMAND INTENT FORM [Group 1-2:]
SB B787-A-32-00-0045-0FA-931D-D Issue 001
Description
Group 1-2:
1. CONCURRENT REQUIREMENTS
None.
2. BACKGROUND
Accomplishment of this service bulletin will detect and prevent heat damage and possible cracks in the Main
Landing Gear (MLG) truck beam - inner cylinder pivot pins and inner cylinder bushings. If this service bulletin
is not done, the pivot pin could fracture, leading to loss of all or part of the pivot pin assembly and subsequent
loss of the MLG truck and loss of directional control during take off or landing.
Fleet sampling inspection of some airplanes found cracks in the left and right MLG Pivot Pins on one of the
airplanes. The pins exhibited cracking of the High Velocity Oxygen Fuel (HVOF) tungsten carbide - cobalt
- chrome coating. Removal of the outer diameter coating disclosed cracking of the custom 465 CRES sub-
strate. The cause of the cracking was determined to be heat damage due to in-service friction.
This Service Bulletin gives instructions to lubricate and inspect the MLG truck beam pivot pins and inner
cylinder bushings, and where necessary to repair and/or replace damaged pivot pins and bushings. The
new copper-nickel-tin bushing material provides improved frictional performance.
Boeing Service Related Problem (SRP) 787 SRP-32-0232 is related to this service bulletin.
This table is provided to operators for planning purposes only. Refer to the applicable sections for more in-
formation.
Table 1  
Data Module ReferenceAffectedPlanning Data
Data Module SB B787-A-32-00-0045-00A-932A-
D, Paragraph 1.B., Spares Affected
YesSpares Affected
Refer to Requirements Bulletin B787-81205-
SB320045-00 RB
YesAD Related
Data Module SB B787-A-32-00-0045-00A-932A-
D, Paragraph 8., Weight and Balance Changes
YesWeight and Balance Changed
Data Module SB B787-A-32-00-0045-00A-932A-
D, Paragraph 9., Electrical Load Data
NoElectrical Load Changed
Data Module SB B787-A-32-00-0045-00A-932A-
D, Paragraph 11., Publications Affected
YesPublications Affected
B787-A-32-00-0045-00A-931C-DApplicable To:
Issue 001, 09 Nov 2020Model 787
See Applicability of this data module
Page 9 of 96
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB320045-00
Issue 001, 09 Nov 2020
AIRCRAFT SERVICE BULLETIN

### Page 10

Table 1  
Data Module ReferenceAffectedPlanning Data
Data Module SB B787-A-32-00-0045-00A-932A-
D, Paragraph 11., Publications Affected
NoAirplane Flight Operations Affected (Flight Crew
Operations Manual and/or FAA Approved Air-
plane Flight Manual)
Data Module SB B787-A-32-00-0045-00A-934A-
D, Paragraph 3.A., Kits/Parts
YesKits/Parts Required
Data Module SB B787-A-32-00-0045-00A-934A-
D, Paragraph 3.B., Parts and Materials Supplied
by the Operator
YesOperator Supplied Parts/Material
Data Module SB B787-A-32-00-0045-00A-934A-
D, Paragraph 6., Special Tooling Necessary to
do this Service Bulletin
YesSpecial Tooling Required
3. ACTION
(CN-AA80990C)
Get access to the left and right MLG truck beam and inner cylinder joint and lubricate both the left and right
Main Landing Gear (MLG) truck beam and inner cylinder pivot joint with MIL-PRF-32014 grease. Do a detailed
and Fluorescent Penetrant Inspection (FPI) of the pivot pin OD surface, and do a detailed inspection of the
inner cylinder bushing ID surface for heat damage and friction damage. If any heat damage or any friction
damage is found, do the applicable on-condition corrective actions.
4. EFFECTIVITY
787-8, 787-9, and 787-10 Airplanes. Refer to Data Module SB B787-A-32-00-0045-00A-932A-D, Paragraph
1., Effectivity for the list of affected airplanes.
5. COMPLIANCE
Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to Requirements
Bulletin B787-81205-SB320045-00 RB. The Airworthiness Directive will make the compliance tasks and
times given in Requirements Bulletin B787-81205-SB320045-00 RB mandatory
Refer to Data Module SB B787-A-32-00-0045-00A-932A-D, Paragraph 5., Compliance.
6. INDUSTRY SUPPORT INFORMATION
Boeing warranty remedies are available for airplanes in warranty as of March 14, 2019. Please refer to Data
Module SB B787-A-32-00-0045-00A-934A-D, Paragraph 2., Industry Support Information. The warranty
remedies will expire eight years from the original release date of this service bulletin.
7. MANPOWER
Refer to Data Module SB B787-A-32-00-0045-00A-932A-D, Paragraph 7., Manpower.
8. MATERIAL INFORMATION
Boeing Supplied Parts.
B787-A-32-00-0045-00A-931C-DApplicable To:
Issue 001, 09 Nov 2020Model 787
See Applicability of this data module
Page 10 of 96
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB320045-00
Issue 001, 09 Nov 2020
AIRCRAFT SERVICE BULLETIN

### Page 11

Refer to Data Module SB B787-A-32-00-0045-00A-934A-D, Paragraph 1., Material - Price and Availability.
Operators are encouraged to complete the survey provided in Data Module Appendix F, SB B787-A-32-00-
0045-0FA-931D-D of this service bulletin to help Boeing predict the quantity and timing of the Boeing Supplied
Parts.
B787-A-32-00-0045-00A-931C-DApplicable To:
Issue 001, 09 Nov 2020Model 787
See Applicability of this data module
Page 11 of 96
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB320045-00
Issue 001, 09 Nov 2020
AIRCRAFT SERVICE BULLETIN

### Page 12 (OCR)

BOEING  B787-81205-SB320045-00
Issue 001, 09 Nov 2020
AIRCRAFT SERVICE BULLETIN
MAIN LANDING GEAR TRUCK BEAM
(TYPICAL)
GET ACCESS TO THE LEFT AND RIGHT MLG TRUCK
BEAM AND INNER CYLINDER JOINT AND LUBRICATE
BOTH THE LEFT AND RIGHT MAIN LANDING GEAR
(MLG) TRUCK BEAM AND INNER CYLINDER PIVOT
JOINT WITH MIL-PRF-32014 GREASE. DO A DETAILED
AND FLUORE  SCENT PENETRANT INSPECTION (FPI)
OF THE PI  PIN OD SURFACE, AND DO A
DETAILED  INSPEC  ION OF THE INNER CYLINDER
BUSH  ID SURFACE FOR HEAT DAMAGE AND
FRICTION DA  MAGE.  IF ANY HEAT DAMAGE OR ANY
FRICTION DAMAGE IS FOUND, DO THE APPLICABLE
ON-CONDITION CORRECTIVE ACTIONS.
PIVOT PIN
INNER CYLINDER
BUSHING
LEFT MAIN LANDING GEAR SHOWN
(RIGHT MAIN LANDING GEAR SIMILAR)
ICN-B787-A-000061-A-81205-18107-A-01-1
Figure 1 SUMMARY
Applicable To:  B787-A-32-00-0045-00A-931C-D
Model 787  End of data module  Issue 001, 09 Nov 2020
See Applicability of this data module
Page 12 of 96
EXPORT CONTROLLED ECCN: 9E991
See title page for details.

### Page 13

Alert Service Bulletin B787-81205-SB320045-00
PLANNING INFORMATION
THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN
IN PARAGRAPH 1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND
Alert:
THIS DOCUMENT TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD,
SEND THIS DOCUMENT TO THE NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR
COMPLIANCE DOCUMENT. THE BOEING PROCESSES USED TO CREATE THE SERVICE
BULLETIN (SB) AND THE REQUIREMENTS BULLETIN (RB) ENSURE THAT THE INFORMATION
BETWEEN "RC START" AND "RC END" IN THE SB ARE IDENTICAL TO THE INFORMATION IN
THE SAME SECTIONS (COMPLIANCE, WORK INSTRUCTIONS...) OF THE RB WHICH THE SB
REFERS TO AS THE RELATED DOCUMENT.
References
TitleReference
Alert Service Bulletin
B787-81205-SB320045-00 – Task 1 – LEFT AND
SB B787-A-32-00-0045-01A-933B-D Issue 001
RIGHT MLG TRUCK BEAM AND INNER CYLINDER
PIVOT JOINT - LUBRICATION [Group 1-2:]
Alert Service Bulletin
B787-81205-SB320045-00 – Task 2 – LEFT AND
SB B787-A-32-00-0045-02A-933B-D Issue 001
RIGHT MLG TRUCK BEAM AND INNER CYLINDER
PIVOT JOINT - PIVOT PIN INSPECTION [Group
1-2:]
Alert Service Bulletin
B787-81205-SB320045-00 – Task 3 – LEFT AND
SB B787-A-32-00-0045-03A-933B-D Issue 001
RIGHT MLG TRUCK BEAM AND INNER CYLINDER
PIVOT JOINT - INNER CYLINDER BUSHING
INSPECTION [Group 1-2:]
Alert Service Bulletin
B787-81205-SB320045-00 – Task 4 – LEFT AND
SB B787-A-32-00-0045-04A-933B-D Issue 001
RIGHT MLG TRUCK BEAM AND INNER CYLINDER
PIVOT JOINT - INNER CYLINDER LUG BORE
INSPECTION [Group 1-2:]
Alert Service Bulletin
B787-81205-SB320045-00 – Task 5 – LEFT AND
SB B787-A-32-00-0045-05A-933B-D Issue 001
RIGHT MLG TRUCK BEAM AND INNER CYLINDER
PIVOT JOINT - INNER CYLINDER BUSHING
INSTALLATION [Group 1: ]
Alert Service Bulletin
B787-81205-SB320045-00 – Task 6 – LEFT AND
SB B787-A-32-00-0045-06A-933B-D Issue 001
B787-A-32-00-0045-00A-932A-DApplicable To:
Issue 001, 09 Nov 2020Model 787
See Applicability of this data module
Page 13 of 96
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB320045-00
Issue 001, 09 Nov 2020
AIRCRAFT SERVICE BULLETIN

### Page 14

TitleReference
RIGHT MLG TRUCK BEAM AND INNER CYLINDER
PIVOT JOINT - INNER CYLINDER BUSHING
INSTALLATION [Group 2: ]
Parts Necessary for Each AirplaneSB B787-A-32-00-0045-00A-934A-D Issue 001,
Paragraph 3.
MACHINING OF TITANIUMSOPM 20-10-07
PENETRANT METHODS OF INSPECTIONSOPM 20-20-02
STRIPPING OF PROTECTIVE FINISHESSOPM 20-30-02
GENERAL CLEANING PROCEDURESSOPM 20-30-03
BEARING AND BUSHING REPLACEMENTSOPM 20-50-03
APPLICATION OF STENCILS, INSIGNIA, SILK
SCREEN, PART NUMBERING AND
IDENTIFICATION MARKINGS
SOPM 20-50-10
GENERAL SEALINGSOPM 20-50-19
JACKING787 AMM 07-11-01
MAIN LANDING GEAR SHOCK STRUT
MAINTENANCE
787 AMM 12-15-01
LUBRICATION787 AMM 12-21-00
MAIN LANDING GEAR AND ACTUATING
MECHANISM MAINTENANCE
787 AMM 12-21-14
HYDRAULIC SYSTEM787 AMM 29-11-00
LANDING GEAR DOOR SAFETY787 AMM 32-00-15
LANDING GEAR DOWNLOCK PINS787 AMM 32-00-30
MAIN LANDING GEAR TRUCK ASSEMBLY787 AMM 32-11-18
Description
Group 1-2:
1. Effectivity
A. Airplanes
RC: Start
This bulletin is applicable to 787-8, 787-9, 787-10 Airplane(s), line number(s) 6-1064 in 2 Group(s). Where
the effectivity is presented with hyphens between line numbers, the airplane applicability means "through"
and "inclusive", e.g. line numbers 1-9 means line numbers 1 through 9 inclusive.
B787-A-32-00-0045-00A-932A-DApplicable To:
Issue 001, 09 Nov 2020Model 787
See Applicability of this data module
Page 14 of 96
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB320045-00
Issue 001, 09 Nov 2020
AIRCRAFT SERVICE BULLETIN

### Page 15

The Variable Numbers and Group information for the applicable airplanes is given below.
RC: End
An equivalent change is on subsequent production airplanes. Refer to CN-AA80990C for data about this
change.
RC: Start
Table 1  
DESCRIPTIONCONFIGURATIONGROUP
787-8 Airplanes delivered with Aluminum-Nickel-Bronze bushings in-
stalled.
-1
787-8 Airplanes that have not upgraded to Copper-Nickel-Tin bushings.1
787-8 Airplanes that have upgraded to Copper-Nickel-Tin bushings.2
787-9, 787-10 Airplanes delivered with Copper-Nickel-Tin bushings
installed.
-2
Airplane Models: 787-10, 787-8, 787-9
Table 2
GroupVariable Number
1ZA006
1ZA100-ZA105
1ZA116-ZA124
1ZA135-ZA144
1ZA152-ZA156
1ZA175-ZA189
1ZA195-ZA204
1ZA215-ZA225
1ZA230-ZA256
1ZA260-ZA277
1ZA285-ZA296
1ZA317-ZA324
1ZA327
1ZA334-ZA335
1ZA341-ZA342
1ZA380-ZA389
GroupVariable Number
1ZA430-ZA439
1ZA445-ZA489
1ZA506-ZA516
1ZA536-ZA545
1ZA560-ZA567
1ZA576-ZA580
1ZA586
1ZA588-ZA593
1ZA610-ZA617
1ZA650-ZA652
1ZA655-ZA663
1ZA665-ZA677
1ZA680-ZA685
1ZA695-ZA698
1ZA715-ZA716
1ZA718-ZA719
GroupVariable Number
1ZA740-ZA741
1ZA768-ZA769
1ZA778-ZA779
1ZA783-ZA784
1ZA817-ZA831
1ZA839
1ZA841-ZA842
1ZA846-ZA848
1ZA853-ZA863
1ZA873-ZA876
1ZA881-ZA888
1ZA916-ZA920
1ZA949-ZA950
1ZA954-ZA959
1ZA963-ZA966
1ZA968-ZA972
B787-A-32-00-0045-00A-932A-DApplicable To:
Issue 001, 09 Nov 2020Model 787
See Applicability of this data module
Page 15 of 96
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB320045-00
Issue 001, 09 Nov 2020
AIRCRAFT SERVICE BULLETIN

### Page 16

GroupVariable Number
1ZA990
2ZB001-ZB012
2ZB021-ZB043
2ZB047-ZB061
2ZB077-ZB081
2ZB097-ZB121
2ZB127-ZB136
2ZB167-ZB191
2ZB197-ZB198
2ZB217
2ZB219-ZB220
2ZB224-ZB229
2ZB234-ZB242
2ZB246-ZB248
2ZB251-ZB258
2ZB261-ZB262
2ZB265-ZB282
2ZB299
2ZB302-ZB305
2ZB332-ZB338
2ZB362-ZB379
2ZB407-ZB435
2ZB446-ZB467
2ZB536-ZB543
2ZB545-ZB547
2ZB558-ZB586
2ZB603-ZB618
2ZB646-ZB649
2ZB656-ZB665
2ZB676-ZB681
2ZB688-ZB707
GroupVariable Number
2ZB733-ZB735
2ZB738-ZB740
2ZB742-ZB745
2ZB749-ZB751
2ZB753-ZB757
2ZB763-ZB769
2ZB771-ZB775
2ZB778-ZB821
2ZB828-ZB845
2ZB858-ZB863
2ZB874-ZB876
2ZB887
2ZB890
2ZB893-ZB904
2ZB908-ZB922
2ZB924
2ZB926-ZB927
2ZB934-ZB947
2ZB967-ZB971
2ZB977-ZB978
2ZB980-ZB991
2ZB993-ZB997
2ZC001-ZC016
2ZC036-ZC048
2ZC061-ZC070
2ZC101-ZC104
2ZC116-ZC118
2ZC126-ZC129
2ZC151-ZC152
2ZC155-ZC160
2ZC211-ZC217
GroupVariable Number
2ZC221-ZC225
2ZC236
1ZD001-ZD009
1ZD012-ZD019
2ZE001-ZE008
2ZE013-ZE014
2ZE016-ZE017
2ZE031-ZE032
2ZE040-ZE045
2ZE075
2ZE085-ZE086
2ZE090-ZE091
2ZE095-ZE096
2ZE100
2ZE105-ZE106
2ZE110
2ZE115
2ZE150
2ZE165-ZE166
2ZE170-ZE171
2ZE195-ZE198
2ZE220-ZE234
2ZE270-ZE272
2ZE310-ZE313
2ZE340-ZE341
2ZE350-ZE362
2ZE375
2ZE380-ZE381
2ZE415-ZE418
2ZE425-ZE426
2ZE455-ZE456
B787-A-32-00-0045-00A-932A-DApplicable To:
Issue 001, 09 Nov 2020Model 787
See Applicability of this data module
Page 16 of 96
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB320045-00
Issue 001, 09 Nov 2020
AIRCRAFT SERVICE BULLETIN
Table 2

### Page 17

GroupVariable Number
2ZE481
GroupVariable Number
2ZE486-ZE487
GroupVariable Number
--
RC: End
RC: Start
B. Spares Affected
Group 1, Configuration 1:
Examine your spares supply for 512Z2001-1, -2, or -3 Inner Cylinder Assemblies. If any of these Inner
Cylinder Assemblies are found, remove the Aluminum-Nickel-Bronze Inner Cylinder Bushings 512Z3002-
1 and replace with Copper-Nickel-Tin Inner Cylinder Bushings 512Z3002-2. Refer to CMM 32-11-74
as an accepted procedure.
Identify on the part that the change given in this bulletin was done. Use the rubber stamp (Code RO)
or ink jet (Code J) method. Refer to SOPM 20-50-10 as an accepted procedure.
Group 1, Configuration 2 and Group 2: None
RC: End
RC: Start
2. Concurrent Requirements
None.
RC: End
3. Reason
Accomplishment of this service bulletin will detect and prevent heat damage and possible cracks in the
Main Landing Gear (MLG) truck beam - inner cylinder pivot pins and inner cylinder bushings. If this service
bulletin is not done, the pivot pin could fracture, leading to loss of all or part of the pivot pin assembly and
subsequent loss of the MLG truck and loss of directional control during take off or landing.
Fleet sampling inspection of some airplanes found cracks in the left and right MLG Pivot Pins on one of
the airplanes. The pins exhibited cracking of the High Velocity Oxygen Fuel (HVOF) tungsten carbide -
cobalt - chrome coating. Removal of the outer diameter coating disclosed cracking of the custom 465 CRES
substrate. The cause of the cracking was determined to be heat damage due to in-service friction.
This Service Bulletin gives instructions to lubricate and inspect the MLG truck beam pivot pins and inner
cylinder bushings, and where necessary to repair and/or replace damaged pivot pins and bushings. The
new copper-nickel-tin bushing material provides improved frictional performance.
Boeing Service Related Problem (SRP) 787 SRP-32-0232 is related to this service bulletin.
4. Description
Get access to the left and right MLG truck beam and inner cylinder joint and lubricate both the left and right
Main Landing Gear (MLG) truck beam and inner cylinder pivot joint with MIL-PRF-32014 grease. Do a detailed
and Fluorescent Penetrant Inspection (FPI) of the pivot pin OD surface, and do a detailed inspection of the
inner cylinder bushing ID surface for heat damage and friction damage. If any heat damage or any friction
damage is found, do the applicable on-condition corrective actions.
B787-A-32-00-0045-00A-932A-DApplicable To:
Issue 001, 09 Nov 2020Model 787
See Applicability of this data module
Page 17 of 96
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB320045-00
Issue 001, 09 Nov 2020
AIRCRAFT SERVICE BULLETIN
Table 2

### Page 18

The work in this service bulletin is done in the maintenance zone(s) given below.
Group 1:
Table 3  
Affected Maintenance Zones
ZoneModel
731, 741787-8
Group 2:
Table 4  
Affected Maintenance Zones
ZoneModel
731, 741787-10, 787-9
Group 1-2:
RC: Start
5. Compliance
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to Re-
quirements Bulletin B787-81205-SB320045-00 RB. The Airworthiness Directive will make the compliance
tasks and times given in Requirements Bulletin B787-81205-SB320045-00 RB mandatory.
Accomplish the required actions, based on applicable conditions in Table 5, Table 6, Table 7, Table 8, and
Table 9 in accordance with Accomplishment Instructions.
When more than one OPTION is given for a CONDITION, do only one of the OPTION numbers. When
more than one ACTION is given for a CONDITION number or an OPTION number, do all of the ACTION
numbers for that CONDITION number or OPTION number.
B787-A-32-00-0045-00A-932A-DApplicable To:
Issue 001, 09 Nov 2020Model 787
See Applicability of this data module
Page 18 of 96
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB320045-00
Issue 001, 09 Nov 2020
AIRCRAFT SERVICE BULLETIN

### Page 19

Table 5  LEFT AND RIGHT MAIN LANDING GEAR (MLG) TRUCK BEAM AND INNER CYLINDER PIVOT 
JOINT - LUBRICATION
Repeat Interval
(Not to Exceed)
Compliance Time (Whichever Occurs
Later)
ActionCondition
50 flight cycles or 25
days whichever oc-
curs later
Within 120 days after
the date of issuance
of the original stan-
dard certificate of
airworthiness or the
original export certifi-
cate of airworthiness
Within 120 days after
the Issue 001 date of
the Requirements
Bulletin B787-81205-
SB320045-00 RB
ACTION 1: Lubricate
both the left and right
Main Landing Gear
(MLG) truck beam
and inner cylinder
pivot joint with MIL-
PRF-32014 grease
All Airplanes
-Within 24 months af-
ter the date of is-
suance of the origi-
nal standard certifi-
cate of airworthiness
or the original export
certificate of airworthi-
ness
Within 24 months af-
ter the Issue 001
date of the Require-
ments Bulletin B787-
81205 SB320045-00
RB
ACTION 2: Review
maintenance pro-
gram documentation
to verify that it in-
cludes lubrication
tasks for the left and
right MLG Truck
Beam and Inner
Cylinder Pivot Joint
with MIL-PRF-32014
grease at intervals
not to exceed 50
flight cycles or 25
days whichever oc-
curs later.
B787-A-32-00-0045-00A-932A-DApplicable To:
Issue 001, 09 Nov 2020Model 787
See Applicability of this data module
Page 19 of 96
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB320045-00
Issue 001, 09 Nov 2020
AIRCRAFT SERVICE BULLETIN

### Page 20

Table 5  LEFT AND RIGHT MAIN LANDING GEAR (MLG) TRUCK BEAM AND INNER CYLINDER PIVOT 
JOINT - LUBRICATION
Repeat Interval
(Not to Exceed)
Compliance Time (Whichever Occurs
Later)
ActionCondition
-Within 24 months af-
ter the date of is-
suance of the origi-
nal standard certifi-
cate of airworthiness
or the original export
certificate of airworthi-
ness.
Within 24 months af-
ter the Issue 001
date of the Require-
ments Bulletin B787-
81205-SB320045-00
RB.
Update the mainte-
nance program docu-
mentation to incorpo-
rate lubrication tasks
for the left and right
MLG Truck Beam
and Inner Cylinder
Pivot Joint with MIL-
PRF-32014 grease
at intervals not to
exceed 50 flight cy-
cles or 25 days,
whichever occurs
later.
CONDITION 1:
MAINTENANCE
PROGRAM DOCU-
MENTATION DOES
NOT INCLUDE PIV-
OT JOINT LUBRICA-
TION WITH MIL-
PRF-32014
GREASE AT INTER-
VALS NOT TO EX-
CEED 50 FLIGHT
CYCLES OR 25
DAYS WHICHEVER
OCCURS LATER
---No further action re-
quired.
CONDITION 2:
MAINTENANCE
PROGRAM DOCU-
MENTATION IN-
CLUDES PIVOT
JOINT LUBRICA-
TION WITH MIL-
PRF-32014
GREASE AT INTER-
VALS NOT TO EX-
CEED 50 FLIGHT
CYCLES OR 25
DAYS WHICHEVER
OCCURS LATER.
B787-A-32-00-0045-00A-932A-DApplicable To:
Issue 001, 09 Nov 2020Model 787
See Applicability of this data module
Page 20 of 96
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB320045-00
Issue 001, 09 Nov 2020
AIRCRAFT SERVICE BULLETIN

### Page 21

Group 1, Configuration 1:
Table 6  LEFT AND RIGHT MLG TRUCK BEAM AND INNER CYLINDER PIVOT JOINT - PIVOT PIN 
INSPECTION
Repeat Interval
(Not to Exceed)
Compliance Time (Whichever Occurs
Later)
ActionCondition
-Within 36 months af-
ter the date of is-
suance of the origi-
nal standard certifi-
cate of airworthiness
or the original export
certificate of airworthi-
ness
Within 24 months af-
ter the Issue 001
date of the Require-
ments Bulletin B787-
81205-SB320045-00
RB
Do a detailed and
Fluorescent Pene-
trant Inspection (FPI)
of both the left and
right MLG Pivot Pin
OD surface for fric-
tion and heat dam-
age.
All Airplanes
36 Months
*[1]
-Repeat the detailed
and Fluorescent
Penetrant Inspection
(FPI) of the Pivot Pin
outer diameter (OD)
surface for heat and
friction damage
CONDITION 1: NO
HEAT DAMAGE
AND NO FRICTION
DAMAGE FOUND
ON THE PIVOT PIN
OD SURFACE
-Before further flightDo a detailed and
FPI inspection on the
inner cylinder lug
bore for heat and
friction damage
CONDITION 2: ANY
HEAT DAMAGE OR
ANY FRICTION
DAMAGE IS FOUND
ON THE PIVOT PIN
OD SURFACE
-Before further flightACTION 1: Install a
new Pivot Pin
CONDITION 2.1: NO
HEAT DAMAGE
AND NO FRICTION
DAMAGE FOUND
ON THE INNER
CYLINDER LUG
BORE
36 Months
*[1]
-ACTION 2: Repeat
the detailed and FPI
inspections for both
the left and right
MLG pivot pin OD
surface for friction
and heat damage.
B787-A-32-00-0045-00A-932A-DApplicable To:
Issue 001, 09 Nov 2020Model 787
See Applicability of this data module
Page 21 of 96
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB320045-00
Issue 001, 09 Nov 2020
AIRCRAFT SERVICE BULLETIN

### Page 22

Table 6  LEFT AND RIGHT MLG TRUCK BEAM AND INNER CYLINDER PIVOT JOINT - PIVOT PIN 
INSPECTION
Repeat Interval
(Not to Exceed)
Compliance Time (Whichever Occurs
Later)
ActionCondition
-Before further flightContact Boeing for
repair instructions
and do the repairs
CONDITION 2.2:
ANY HEAT DAM-
AGE OR ANY FRIC-
TION DAMAGE IS
FOUND ON THE IN-
NER CYLINDER
LUG BORE
-Before further flightACTION 1: Install a
new Pivot Pin
36 Months
*[1]
-ACTION 2: Repeat
the detailed and FPI
inspections for both
the left and right
MLG pivot pin OD
surface for friction
and heat damage.
*[1]  Installation of defect-free Pivot Pin and concurrent or prior replacement of Aluminum-Nickel-Bronze inner cylinder bushings with
Copper-Nickel-Tin inner cylinder bushings and incorporation of the increased lubrication interval (not to exceed the time specified in
Compliance Section, Table 5) with MIL-PRF-32014 grease is terminating action to the repeat inspections for that side of the MLG.
B787-A-32-00-0045-00A-932A-DApplicable To:
Issue 001, 09 Nov 2020Model 787
See Applicability of this data module
Page 22 of 96
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB320045-00
Issue 001, 09 Nov 2020
AIRCRAFT SERVICE BULLETIN

### Page 23

Group 1, Configuration 1:
Table 7  LEFT AND RIGHT MLG TRUCK BEAM AND INNER CYLINDER PIVOT JOINT - INNER CYLINDER 
BUSHING INSPECTION
Repeat Interval
(Not to Exceed)
Compliance Time (Whichever Occurs
Later)
ActionCondition
-Within 36 months af-
ter the date of is-
suance of the origi-
nal standard certifi-
cate of airworthiness
or the original export
certificate of airworthi-
ness
Within 24 months af-
ter the Issue 001
date of the Require-
ments Bulletin B787-
81205-SB320045-00
RB
Do a detailed inspec-
tion of both the left
and right MLG inner
cylinder bushing in-
ner diameter (ID)
surface for excessive
wear, cracks and
smearing of bushing
material
All Airplanes
-Before further flightACTION 1: Apply lu-
brication using MIL-
PRF-32014 grease
and make sure lubri-
cation passages are
clear
CONDITION 1: NO
INNER CYLINDER
BUSHING ID EX-
CESSIVE WEAR,
NO CRACK AND NO
SMEARING FOUND
36 Months
*[1]
-ACTION 2: Repeat
the detailed inspec-
tion for both the left
and right MLG inner
cylinder bushing in-
ner diameter (ID)
surface for excessive
wear, cracks and
smearing of bushing
material
-Before further flightDo a detailed FPI in-
spection of the inner
cylinder lug bore for
heat and friction
damage
CONDITION 2: ANY
INNER CYLINDER
BUSHING ID EX-
CESSIVE WEAR,
CRACK OR ANY
SMEARING FOUND
B787-A-32-00-0045-00A-932A-DApplicable To:
Issue 001, 09 Nov 2020Model 787
See Applicability of this data module
Page 23 of 96
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB320045-00
Issue 001, 09 Nov 2020
AIRCRAFT SERVICE BULLETIN

### Page 24

Table 7  LEFT AND RIGHT MLG TRUCK BEAM AND INNER CYLINDER PIVOT JOINT - INNER CYLINDER 
BUSHING INSPECTION
Repeat Interval
(Not to Exceed)
Compliance Time (Whichever Occurs
Later)
ActionCondition
*[1]*[2]Before further flightACTION 1 (OPTION
1): Install new Alu-
minum-Nickel-
Bronze Inner Cylin-
der Bushing(s)
CONDITION 2.1: NO
HEAT DAMAGE
AND NO FRICTION
DAMAGE FOUND
ON THE INNER
CYLINDER LUG
BORE -Before further flightACTION 1 (OPTION2): Install new Cop-
per-Nickel-Tin Inner
Cylinder Bushing(s)
*[1]*[2]
-Before further flightOPTION 1 and OP-
TION 2 (ACTION 2):
Apply lubrication us-
ing MIL-PRF-32014
grease and make
sure lubrication pas-
sages are clear
36 Months
*[1]
-OPTION 1 AND OP-
TION 2 (ACTION 3):
Repeat the detailed
inspection for both
the left and right
MLG inner cylinder
bushing ID surface
for excessive wear,
cracks and smearing
of bushing material
-Before further flightContact Boeing for
repair instructions
and do the repairs.
CONDITION 2.2:
ANY HEAT DAM-
AGE OR ANY FRIC-
TION DAMAGE IS
FOUND ON THE IN-
NER CYLINDER
LUG BORE
36 Months
*[1]
-ACTION 1: Repeat
the detailed inspec-
tion for both the left
and right MLG inner
cylinder bushing ID
surface for excessive
wear, cracks and
smearing of bushing
material
*[1]  Installation of Copper-Nickel-Tin inner cylinder bushings and concurrent or prior incorporation of the increased lubrication interval (not
to exceed the time specified in Compliance Section, Table 5) with MIL-PRF-32014 grease constitutes terminating action to the repeat
inspections for that side of the MLG.
B787-A-32-00-0045-00A-932A-DApplicable To:
Issue 001, 09 Nov 2020Model 787
See Applicability of this data module
Page 24 of 96
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB320045-00
Issue 001, 09 Nov 2020
AIRCRAFT SERVICE BULLETIN

### Page 25

Table 7  LEFT AND RIGHT MLG TRUCK BEAM AND INNER CYLINDER PIVOT JOINT - INNER CYLINDER 
BUSHING INSPECTION
Repeat Interval
(Not to Exceed)
Compliance Time (Whichever Occurs
Later)
ActionCondition
*[2]  Installation of Copper-Nickel-Tin bushings is one way interchangeable. Aluminum-Nickel-Bronze inner cylinder bushings can no longer
be installed for that side of the MLG.
Group 1, Configuration 2; Group 2:
Table 8  LEFT AND RIGHT MLG TRUCK BEAM AND INNER CYLINDER PIVOT JOINT - PIVOT PIN 
INSPECTION
Repeat Interval
(Not to Exceed)
Compliance Time (Whichever Occurs
Later)
ActionCondition
-Within 72 months af-
ter the date of is-
suance of the origi-
nal standard certifi-
cate of airworthiness
or the original export
certificate of airworthi-
ness
Within 24 months af-
ter the Issue 001
date of the Require-
ments Bulletin B787-
81205-SB320045-00
RB
Do a detailed and
Fluorescent Pene-
trant Inspection (FPI)
of both the left and
right MLG Pivot Pin
OD surface for fric-
tion and heat dam-
age.
All Airplanes
72 Months
*[1]
-Repeat the detailed
and Fluorescent
Penetrant Inspec-
tion(FPI) of the Pivot
Pin outer diameter
(OD) surface for heat
and friction damage
CONDITION 1: NO
HEAT DAMAGE
AND NO FRICTION
DAMAGE FOUND
ON THE PIVOT PIN
OD SURFACE
-Before further flightDo a detailed and
FPI inspection on the
inner cylinder lug
bore for heat and
friction damage.
CONDITION 2: ANY
HEAT DAMAGE OR
ANY FRICTION
DAMAGE IS FOUND
ON THE PIVOT PIN
OD SURFACE
-Before further flightACTION 1: Install a
new Pivot Pin
CONDITION 2.1: NO
HEAT DAMAGE
AND NO FRICTION
DAMAGE FOUND
ON THE INNER
CYLINDER LUG
BORE
72 Months
*[1]
-ACTION 2: Repeat
the detailed and FPI
inspections for both
the left and right
MLG pivot pin OD
surface for friction
and heat damage
B787-A-32-00-0045-00A-932A-DApplicable To:
Issue 001, 09 Nov 2020Model 787
See Applicability of this data module
Page 25 of 96
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB320045-00
Issue 001, 09 Nov 2020
AIRCRAFT SERVICE BULLETIN

### Page 26

Table 8  LEFT AND RIGHT MLG TRUCK BEAM AND INNER CYLINDER PIVOT JOINT - PIVOT PIN 
INSPECTION
Repeat Interval
(Not to Exceed)
Compliance Time (Whichever Occurs
Later)
ActionCondition
-Before further flightContact Boeing for
repair instructions
and do the repairs
CONDITION 2.2:
ANY HEAT DAM-
AGE OR ANY FRIC-
TION DAMAGE IS
FOUND ON THE IN-
NER CYLINDER
LUG BORE
-Before further flightACTION 1: Install a
new Pivot Pin
72 Months
*[1]
ACTION 2: Repeat
the detailed and FPI
inspections for both
the left and right
MLG pivot pin OD
surface for friction
and heat damage
*[1]  Installation of defect-free Pivot Pin and Copper-Nickel-Tin inner cylinder bushings and concurrent or prior incorporation of the increased
lubrication interval (not to exceed the time specified in Compliance Section, Table 5) with MIL-PRF-32014 grease is terminating action
to the repeat inspections for that side of the MLG.
B787-A-32-00-0045-00A-932A-DApplicable To:
Issue 001, 09 Nov 2020Model 787
See Applicability of this data module
Page 26 of 96
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB320045-00
Issue 001, 09 Nov 2020
AIRCRAFT SERVICE BULLETIN

### Page 27

Group 1, Configuration 2; Group 2:
Table 9  LEFT AND RIGHT MLG TRUCK BEAM AND INNER CYLINDER PIVOT JOINT - INNER CYLINDER 
BUSHING INSPECTION
Repeat Interval
(Not to Exceed)
Compliance Time (Whichever Occurs
Later)
ActionCondition
-Within 72 months af-
ter the date of is-
suance of the origi-
nal standard certifi-
cate of airworthiness
or the original export
certificate of airworthi-
ness
Within 24 months af-
ter the Issue 001
date of the Require-
ments Bulletin B787-
81205-SB320045-00
RB
Do a detailed inspec-
tion of both the left
and right MLG inner
cylinder bushing in-
ner diameter (ID)
surface for excessive
wear, cracks and
smearing of bushing
material
All Airplanes
-Before further flightACTION 1: Apply lu-
brication using MIL-
PRF-32014 and
make sure lubrica-
tion passages are
clear.
CONDITION 1: NO
INNER CYLINDER
BUSHING ID EX-
CESSIVE WEAR,
NO CRACK AND NO
SMEARING FOUND
72 Months
*[1]
-ACTION 2: Repeat
the detailed inspec-
tion for both the left
and right MLG inner
cylinder bushing in-
ner diameter (ID)
surface for excessive
wear, cracks and
smearing of bushing
material
-Before further flightDo a detailed and
FPI inspection of the
inner cylinder lug
bore for heat and
friction damage.
CONDITION 2: ANY
INNER CYLINDER
BUSHING ID EX-
CESSIVE WEAR,
CRACK OR ANY
SMEARING FOUND
B787-A-32-00-0045-00A-932A-DApplicable To:
Issue 001, 09 Nov 2020Model 787
See Applicability of this data module
Page 27 of 96
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB320045-00
Issue 001, 09 Nov 2020
AIRCRAFT SERVICE BULLETIN

### Page 28

Table 9  LEFT AND RIGHT MLG TRUCK BEAM AND INNER CYLINDER PIVOT JOINT - INNER CYLINDER 
BUSHING INSPECTION
Repeat Interval
(Not to Exceed)
Compliance Time (Whichever Occurs
Later)
ActionCondition
-Before further flightACTION 1: Install
new Copper-Nickel-
Tin Inner Cylinder
Bushing(s)
CONDITION 2.1: NO
HEAT DAMAGE
AND NO FRICTION
DAMAGE FOUND
ON THE INNER
CYLINDER LUG
BORE
-Before further flightACTION 2: apply lu-
brication using MIL-
PRF-32014 and
make sure lubrica-
tion passages are
clear.
72 Months
*[1]
-ACTION 3: Repeat
the detailed inspec-
tions for both the left
and right MLG inner
cylinder bushing ID
surface for excessive
wear, cracks and
smearing of bushing
material
-Before further flightContact Boeing for
repair instructions
and do the repairs
CONDITION 2.2:
ANY HEAT DAM-
AGE OR ANY FRIC-
TION DAMAGE
FOUND ON THE IN-
NER CYLINDER
LUG BORE
72 Months
*[1]
-ACTION 1: Repeat
the detailed inspec-
tion for both the left
and right MLG inner
cylinder bushing ID
surface for excessive
wear, cracks and
smearing of bushing
material
*[1]  Installation of Copper-Nickel-Tin inner cylinder bushings and concurrent or prior incorporation of the increased lubrication interval (not
to exceed the time specified in Compliance Section, Table 5) with MIL-PRF-32014 grease constitutes terminating action to the repeat
inspections for that side of the MLG.
RC: End
Group 1-2:
6. Approval
This service bulletin was examined by the Boeing Company Organization Designation Authorization(ODA).
The changes specified in this service bulletin comply with the applicable regulations and are FAA approved,
as well as European Union Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for
all EASA/JAA approved airplanes listed in the service bulletin effectivity. This service bulletin and its approval
B787-A-32-00-0045-00A-932A-DApplicable To:
Issue 001, 09 Nov 2020Model 787
See Applicability of this data module
Page 28 of 96
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB320045-00
Issue 001, 09 Nov 2020
AIRCRAFT SERVICE BULLETIN

### Page 29

were based on the airplane in its original Boeing delivery configuration or as modified by other approved
Boeing changes.
If an airplane has a non-Boeing modification or repair that affects a component or system also affected by
this service bulletin, the operator is responsible for obtaining appropriate regulatory agency approval before
incorporating this service bulletin.
7. Manpower
The table below shows an estimate of the task hours necessary to do this inspection and repair for each
MLG. This estimate is for direct labor only, done by an experienced crew. Adjust the estimate with operator
task hour data if necessary. The estimate does not include lost time. These are some examples of lost
time:
– Time to adjust to the workplace
– Time to schedule the work
– Time to inspect the work
– Time to cure the materials
– Time to make the parts
– Time to find the tools
Table 10  LEFT AND RIGHT MLG TRUCK BEAM AND INNER CYLINDER PIVOT
 JOINT - LUBRICATION
Elapsed HoursTask HoursNumber of Per-
sons
Task
111Data Module Task
1, SB B787-A-32-
00-0045-01A-933B-
D
11TOTAL FOR EACH AIRPLANE
Group 1:
Table 11  LEFT AND RIGHT MLG TRUCK BEAM AND INNER CYLINDER PIVOT
 JOINT - INSPECTION
Elapsed HoursTask HoursNumber of Per-
sons
Task
2.4125Get Access
2.2594Pivot Pin Removal
221Data Module Task
2, SB B787-A-32-
00-0045-02A-933B-
D
221Data Module Task
3, SB B787-A-32-
00-0045-03A-933B-
D
B787-A-32-00-0045-00A-932A-DApplicable To:
Issue 001, 09 Nov 2020Model 787
See Applicability of this data module
Page 29 of 96
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB320045-00
Issue 001, 09 Nov 2020
AIRCRAFT SERVICE BULLETIN

### Page 30

Table 11  LEFT AND RIGHT MLG TRUCK BEAM AND INNER CYLINDER PIVOT
 JOINT - INSPECTION
Elapsed HoursTask HoursNumber of Per-
sons
Task
221Data Module Task
4, SB B787-A-32-
00-0045-04A-933B-
D
2.52.51Data Module Task
5, SB B787-A-32-
00-0045-05A-933B-
D
2.2594Pivot Pin Installa-
tion
2.4125Close Access
17.850.5TOTAL FOR EACH AIRPLANE
Group 2:
Table 12  LEFT AND RIGHT MLG TRUCK BEAM AND INNER CYLINDER PIVOT
 JOINT - INSPECTION
Elapsed HoursTask HoursNumber of Per-
sons
Task
2.4125Get Access
2.2594Pivot Pin Removal
221Data Module Task
2, SB B787-A-32-
00-0045-02A-933B-
D
221Data Module Task
3, SB B787-A-32-
00-0045-03A-933B-
D
221Data Module Task
4, SB B787-A-32-
00-0045-04A-933B-
D
2.52.51Data Module Task
6, SB B787-A-32-
00-0045-06A-933B-
D
2.2594Pivot Pin Installa-
tion
B787-A-32-00-0045-00A-932A-DApplicable To:
Issue 001, 09 Nov 2020Model 787
See Applicability of this data module
Page 30 of 96
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB320045-00
Issue 001, 09 Nov 2020
AIRCRAFT SERVICE BULLETIN

### Page 31

Table 12  LEFT AND RIGHT MLG TRUCK BEAM AND INNER CYLINDER PIVOT
 JOINT - INSPECTION
Elapsed HoursTask HoursNumber of Per-
sons
Task
2.4125Close Access
17.850.5TOTAL FOR EACH AIRPLANE
Group 1-2:
8. Weight and Balance Changes
Group 1, Configuration 1: 787-8
Weight and Balance changes affected by incorporation of this service bulletin are dependent on the inspec-
tion, number of flight cycles, condition, type, number and location of repairs done on each particular airplane.
Weight and Balance are to be calculated by the operator by weighing parts installed or removed. Operators
should make necessary revisions to the appropriate weight and balance report..
Group 1, Configuration 2: 787-8
Weight and Balance changes affected by incorporation of this service bulletin are dependent on the inspec-
tion, number of flight cycles, condition, type, number and location of repairs done on each particular airplane.
Weight and Balance are to be calculated by the operator by weighing parts installed or removed. Operators
should make necessary revisions to the appropriate weight and balance report.
Group 2: 787-9
Weight and Balance changes affected by incorporation of this service bulletin are dependent on the inspec-
tion, number of flight cycles, condition, type, number and location of repairs done on each particular airplane.
Weight and Balance are to be calculated by the operator by weighing parts installed or removed. Operators
should make necessary revisions to the appropriate weight and balance report.
Group 2: 787-10
Weight and Balance changes affected by incorporation of this service bulletin are dependent on the inspec-
tion, number of flight cycles, condition, type, number and location of repairs done on each particular airplane.
Weight and Balance are to be calculated by the operator by weighing parts installed or removed. Operators
should make necessary revisions to the appropriate weight and balance report.
9. Electrical Load Data
Not changed.
10. References
A. Existing Data:
1. Change Notice CN-AA80990C
2. Aircraft Maintenance Manual (AMM) 787 AMM 07-11-01, 787 AMM 12-15-01, 787 AMM 12-21-
00, 787 AMM 12-21-14, 787 AMM 29-11-00, 787 AMM 32-00-15, 787 AMM 32-00-30, 787 AMM
32-11-18
3. Boeing Service Related Problem (SRP) 787 SRP-32-0232
B787-A-32-00-0045-00A-932A-DApplicable To:
Issue 001, 09 Nov 2020Model 787
See Applicability of this data module
Page 31 of 96
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB320045-00
Issue 001, 09 Nov 2020
AIRCRAFT SERVICE BULLETIN

### Page 32

4. Boeing Service Bulletin B787-81205-SB320045-00 RB
5. Component Maintenance Manual (CMM) 787-8 CMM 32-11-74, CMM 32-11-79
6. Component Maintenance Manual (CMM) 787-9 CMM 32-13-06, CMM 32-12-20
7. Component Maintenance Manual (CMM) 787-10 CMM 32-10-37, CMM 32-10-36
8. Standard Overhaul Practices Manual (SOPM) SOPM 20-10-07, SOPM 20-20-02, SOPM 20-30-
02, SOPM 20-30-03, SOPM 20-50-03, SOPM 20-50-10, SOPM 20-50-19
B. Data Supplied with this Service Bulletin:
None.
C. Installation Requirement Modules Used in the Preparation of this Service Bulletin:
None.
11. Publications Affected
Table 13  
Chapter-SectionPublication
32-00787 Maintenance Planning Data
Damage Tolerance Based Structural Inspections:
Boeing has evaluated the repairs or changes in this service bulletin for effects on Fatigue Critical Structure
(FCS) and for changes to Damage Tolerance Inspections (DTI) required in the Maintenance Program. This
service bulletin does not affects FCS, therefore DTIs are not necessary.
12. Interchangeability and Intermixability of Parts
Refer to Data Module SB B787-A-32-00-0045-00A-934A-D, Paragraph 3., Parts Necessary for Each Airplane,
for interchangeability and intermixability information.
13. Software Accomplishment Summary
Not Affected.
B787-A-32-00-0045-00A-932A-DApplicable To:
Issue 001, 09 Nov 2020End of data moduleModel 787
See Applicability of this data module
Page 32 of 96
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB320045-00
Issue 001, 09 Nov 2020
AIRCRAFT SERVICE BULLETIN

### Page 33

Alert Service Bulletin B787-81205-SB320045-00
MATERIAL INFORMATION
THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN
IN PARAGRAPH 1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND
Alert:
THIS DOCUMENT TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD,
SEND THIS DOCUMENT TO THE NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR
COMPLIANCE DOCUMENT. THE BOEING PROCESSES USED TO CREATE THE SERVICE
BULLETIN (SB) AND THE REQUIREMENTS BULLETIN (RB) ENSURE THAT THE INFORMATION
BETWEEN "RC START" AND "RC END" IN THE SB ARE IDENTICAL TO THE INFORMATION IN
THE SAME SECTIONS (COMPLIANCE, WORK INSTRUCTIONS...) OF THE RB WHICH THE SB
REFERS TO AS THE RELATED DOCUMENT.
References
TitleReference
Alert Service Bulletin
B787-81205-SB320045-00 – Appendix F – PART
DEMAND INTENT FORM [Group 1-2:]
SB B787-A-32-00-0045-0FA-931D-D Issue 001
ReferencesSB B787-A-32-00-0045-00A-932A-D Issue 001,
Paragraph 10.
Alert Service Bulletin
B787-81205-SB320045-00 – Task 5 – LEFT AND
SB B787-A-32-00-0045-05A-933B-D Issue 001
RIGHT MLG TRUCK BEAM AND INNER CYLINDER
PIVOT JOINT - INNER CYLINDER BUSHING
INSTALLATION [Group 1: ]
Description
Group 1-2:
1. Material - Price and Availability
Boeing can supply the parts shown in Paragraph 3., Parts Necessary for Each Airplane. Operators are en-
couraged to share schedule requirements with Boeing for incorporation of the service bulletin. The parts are
subject to the terms and conditions of the Boeing standard purchase order acknowledgment. Prices are in
United States Dollars. Terms: Net 30 days.
Reference this service bulletin and submit your purchase order by one of these methods:
1. Order on-line via ATA Spec 2000 or The Boeing PART Page
2. Fax to (206) 662-7145
REFER TO THE BOEING PART PAGE ON MYBOEINGFLEET.COM OR CONTACT FIRST RESPONDER
AT FR@BOEING.COM FOR THE LATEST REORDER LEAD TIME (ROLT) AND PRICE INFORMATION.
B787-A-32-00-0045-00A-934A-DApplicable To:
Issue 001, 09 Nov 2020Model 787
See Applicability of this data module
Page 33 of 96
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB320045-00
Issue 001, 09 Nov 2020
AIRCRAFT SERVICE BULLETIN

### Page 34

NOTE:
B787-A-32-00-0045-00A-934A-DApplicable To:
Issue 001, 09 Nov 2020Model 787
See Applicability of this data module
Page 34 of 96
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB320045-00
Issue 001, 09 Nov 2020
AIRCRAFT SERVICE BULLETIN

### Page 35

Group 1:
Table 1  
Unit Price as of the
Issue 001 date of
this Service Bul-
letin (US Dollars)
ROLT as of the Is-
sue 001 date of this
Service Bulletin
(Calendar Days)
QTYDateNamePart Number
5968.00223224October, 20, 2020BUSH - INNER
CYLINDER TO
BOGIE
512Z3002-2
5968.00223144January, 20, 2021BUSH - INNER
CYLINDER TO
BOGIE
5968.00223240April, 20, 2021BUSH - INNER
CYLINDER TO
BOGIE
5968.00223240July, 20, 2021BUSH - INNER
CYLINDER TO
BOGIE
5968.00223240October, 20, 2021BUSH - INNER
CYLINDER TO
BOGIE
5968.00223120January, 20, 2022BUSH - INNER
CYLINDER TO
BOGIE
5968.00223120April, 20, 2022BUSH - INNER
CYLINDER TO
BOGIE
5968.00223120July, 20, 2022BUSH - INNER
CYLINDER TO
BOGIE
5968.00223120October, 20, 2022BUSH - INNER
CYLINDER TO
BOGIE
5968.00223264January, 20, 2023BUSH - INNER
CYLINDER TO
BOGIE
5968.00223264April, 20, 2023BUSH - INNER
CYLINDER TO
BOGIE
5968.00223264July, 20, 2023BUSH - INNER
CYLINDER TO
BOGIE
B787-A-32-00-0045-00A-934A-DApplicable To:
Issue 001, 09 Nov 2020Model 787
See Applicability of this data module
Page 35 of 96
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB320045-00
Issue 001, 09 Nov 2020
AIRCRAFT SERVICE BULLETIN

### Page 36

Table 1  
Unit Price as of the
Issue 001 date of
this Service Bul-
letin (US Dollars)
ROLT as of the Is-
sue 001 date of this
Service Bulletin
(Calendar Days)
QTYDateNamePart Number
5968.00223120October, 20, 2023BUSH - INNER
CYLINDER TO
BOGIE
97,517.0042020September, 16,
2020
PIVOT PIN COM-
PONENT ASSEM-
BLY
515Z2003-3
5968.00*[1]40November, 16, 2020REPAIR BUSH-
ING, INNER
CYLINDER PIVOT
512Z5002-1
5968.00*[1]40December, 18, 2020REPAIR BUSH-
ING, INNER
CYLINDER PIVOT
*[1]  At the time the bulletin published the data is not available
Group 2:
Table 2  
Unit Price as of the
Issue 001 date of
this Service Bul-
letin (US Dollars)
ROLT as of the Is-
sue 001 date of this
Service Bulletin
(Calendar Days)
QTYDateNamePart Number
5968.002926September, 16,
2020
BUSH - INNER
CYLINDER TO
BOGIE
512Z3002-501
97,517.002238September, 16,
2020
PIVOT PIN COM-
PONENT ASSEM-
BLY
515Z2003-501
5968.00*[1]20November, 16, 2020REPAIR BUSH-
ING, INNER
CYLINDER PIVOT
512Z5002-501
*[1]  At the time the bulletin published the data is not available
Group 1-2:
Operators are encouraged to complete the survey provided in Data Module Appendix F, SB B787-A-32-00-
0045-0FA-931D-D of this service bulletin to help Boeing predict the quantity and timing of the Boeing Supplied
Parts.
2. Industry Support Information
Boeing warranty remedies are available for 787 airplanes in warranty as of March 14, 2019. Boeing has also
elected to provide remedies for airplanes out of warranty as of March 14, 2019. For man-hour reimbursement
B787-A-32-00-0045-00A-934A-DApplicable To:
Issue 001, 09 Nov 2020Model 787
See Applicability of this data module
Page 36 of 96
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB320045-00
Issue 001, 09 Nov 2020
AIRCRAFT SERVICE BULLETIN

### Page 37

for airplanes in or out of warranty as of that date, send a warranty claim to BCA Contracts - Warranty. The
part(s) for airplanes in or out of warranty as of that date will be supplied at no charge. Send a purchase order
for the part(s) to Boeing Material Management. Please refer to this service bulletin number and reference
the airplane variable numbers in your purchase order. The warranty remedies will expire eight years from
the original release date of this service bulletin.
If tooling is required to accomplish this service bulletin for airplanes in or out of warranty Boeing will loan
the required tooling at no charge.
3. Parts Necessary for Each Airplane
A. Kits/Parts:
To get the end item parts shown below, refer to Paragraph 1., Material - Price and Availability.
NOTE: The parts shown in Paragraph 3.B., Parts and Materials Supplied by the Operator, are necessary
for each main landing gear. 
Group 1:
Table 3  
NotesExisting Part NumberNameQTYPart Number
*[2]515Z2003-1, or -2, or -3PIVOT PIN COMPONENT ASSEM-
BLY
*[1]515Z2003-( )
*[2]*[3]*[4]512Z3002-1, or -2BUSH - INNER CYLINDER TO
BOGIE
*[1]512Z3002-2
*[1]  Total quantity of parts required depends on inspection results.
*[2]  See the Qualified Products List at the end of the Boeing Material Specification (BMS) for supplier data.
*[3]  512Z5002-1 Oversize Bushing may be required. Refer to 787-8 CMM 32-11-74.
*[4]  Usage of Aluminum-Nickel-Bronze bushing on airplanes LN 1065 and on is not permitted.
Group 2:
Table 4  
NotesExisting Part NumberNameQTYPart Number
*[2]515Z2003-501PIVOT PIN COMPONENT ASSEM-
BLY
*[1]515Z2003-( )
*[2]*[3]512Z3002-501BUSH - INNER CYLINDER TO
BOGIE
*[1]512Z3002-501
*[1]  Total quantity of parts required depends on inspection results.
*[2]  See the Qualified Products List at the end of the Boeing Material Specification (BMS) for supplier data.
*[3]  512Z5002-501 Oversize Bushing may be required. Refer to 787-9 CMM 32-13-06, 787-10 CMM 32-10-37.
Group 1-2:
B. Parts and Materials Supplied by the Operator:
The following parts or materials are necessary to do the change in this service bulletin. Parts and mate-
rials in the manuals given in Data Module SB B787-A-32-00-0045-00A-932A-D, Paragraph 10., Refer-
B787-A-32-00-0045-00A-934A-DApplicable To:
Issue 001, 09 Nov 2020Model 787
See Applicability of this data module
Page 37 of 96
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB320045-00
Issue 001, 09 Nov 2020
AIRCRAFT SERVICE BULLETIN

### Page 38

ences, can also be necessary. Examine operator part and material supply to make sure all necessary
parts and materials are available.
Table 5  
NotesNameQTYPart Number /
Specification
*[1]*[2]CORROSION INHIBITING MATE-
RIAL, NON-DRYING PASTE
1 pintBMS3-38
*[1]*[2]GREASE, AIRCRAFT, GENERAL
PURPOSE
1 pintBMS3-33
*[1]*[2]LOW DENSITY SEALANT1 pintBMS5-142, Type
2
*[1]*[3]*[2]PRIMER1 pintBMS10-11, Type
1
*[1]*[2]GREASE - AIRCRAFT AND IN-
STRUMENT
1 pintMIL-PRF-32014
*[1]*[2]LOCKWIRE2MS20995C32
*[1]*[2]LOCKWIRE6MS20995C47
*[1]  See the Qualified Products List at the end of the Boeing Material Specification (BMS) for sup-
plier data.
*[2]  May be purchased from: Boeing Distribution Incorporated (Cage 22819) 2750 Regent Boulevard,
Dallas, Texas 75261 Website: https://shop.boeing.com/aviation-supply.
*[3]  Some primers contain Strontium Chromate and will not be available in the European Union
after January 2019 without an authorization. EU operators are encouraged to ensure their
suppliers are authorized to provide the material after the sunset date and that downstream
users comply with the risk mitigation measures and operational conditions.
C. Parts Modified and Reidentified:
Refer to Data Module Task 5, SB B787-A-32-00-0045-05A-933B-D.
D. Parts Removed and Not Replaced:
None.
4. Parts Necessary to Change Spares
None.
5. Special Tooling - Price and Availability
Boeing can supply the tool(s) shown in Paragraph 6., Special Tooling Necessary to do this Service Bulletin.
Operators are encouraged to share schedule requirements with Boeing for incorporation of the service bulletin
by e-mail to ServiceBulletinRentalLoanTools@boeing.com. The tool(s) are subject to the terms and conditions
of the Boeing standard purchase order acknowledgement. Prices are in United States Dollars. Terms: Net
30 days.
B787-A-32-00-0045-00A-934A-DApplicable To:
Issue 001, 09 Nov 2020Model 787
See Applicability of this data module
Page 38 of 96
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB320045-00
Issue 001, 09 Nov 2020
AIRCRAFT SERVICE BULLETIN

### Page 39

Reference this service bulletin number and submit purchase order by one of the methods:
1. Order on-line via ATA Spec 2000 or Boeing Part Page
2. Fax to (206) 662-8237
Rental Data:
Table 6  
Daily Price as of
the Original Issue
001 date of this
Service Bulletin
(US Dollars)
ROLT as of
the Issue 001
date of this
Service Bul-
letin (Calen-
dar Days)
QTYDateNameTool Kit Number
63,285.002473October 14,
2020
MISCELLANEOUS TOOL-
BUSHING REMOVAL/RE-
PLACE/HONING, MLG
INNER CYLINDER FORK
MIT955Z1011MLG
6. Special Tooling Necessary to do this Service Bulletin
To get the tools shown below, refer to Paragraph 5., Special Tooling - Price and Availability. Maintenance
and overhaul tools in the manuals given in Data Module SB B787-A-32-00-0045-00A-932A-D, Paragraph
10., References, can also be necessary. Examine operator tool supply to make sure all necessary tools are
available.
Table 7  
NameTool Kit Number
MISCELLANEOUS TOOL-
BUSHING REMOVAL/RE-
PLACE/HONING, MLG INNER
CYLINDER FORK
MIT955Z1011MLG
B787-A-32-00-0045-00A-934A-DApplicable To:
Issue 001, 09 Nov 2020End of data moduleModel 787
See Applicability of this data module
Page 39 of 96
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB320045-00
Issue 001, 09 Nov 2020
AIRCRAFT SERVICE BULLETIN

### Page 40

Alert Service Bulletin B787-81205-SB320045-00
ACCOMPLISHMENT INSTRUCTIONS
THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN
IN PARAGRAPH 1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND
Alert:
THIS DOCUMENT TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD,
SEND THIS DOCUMENT TO THE NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR
COMPLIANCE DOCUMENT. THE BOEING PROCESSES USED TO CREATE THE SERVICE
BULLETIN (SB) AND THE REQUIREMENTS BULLETIN (RB) ENSURE THAT THE INFORMATION
BETWEEN "RC START" AND "RC END" IN THE SB ARE IDENTICAL TO THE INFORMATION IN
THE SAME SECTIONS (COMPLIANCE, WORK INSTRUCTIONS...) OF THE RB WHICH THE SB
REFERS TO AS THE RELATED DOCUMENT.
References
TitleReference
ReferencesSB B787-A-32-00-0045-00A-932A-D Issue 001,
Paragraph 10.
ComplianceSB B787-A-32-00-0045-00A-932A-D Issue 001,
Paragraph 5.
GENERAL CLEANING PROCEDURESSOPM 20-30-03
STRIPPING OF PROTECTIVE FINISHESSOPM 20-30-02
MACHINING OF TITANIUMSOPM 20-10-07
GENERAL SEALINGSOPM 20-50-19
APPLICATION OF STENCILS, INSIGNIA, SILK
SCREEN, PART NUMBERING AND
IDENTIFICATION MARKINGS
SOPM 20-50-10
LANDING GEAR DOWNLOCK PINS787 AMM 32-00-30
LANDING GEAR DOOR SAFETY787 AMM 32-00-15
HYDRAULIC SYSTEM787 AMM 29-11-00
MAIN LANDING GEAR TRUCK ASSEMBLY787 AMM 32-11-18
JACKING787 AMM 07-11-01
MAIN LANDING GEAR AND ACTUATING
MECHANISM MAINTENANCE
787 AMM 12-21-14
B787-A-32-00-0045-00A-933A-DApplicable To:
Issue 001, 09 Nov 2020Model 787
See Applicability of this data module
Page 40 of 96
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB320045-00
Issue 001, 09 Nov 2020
AIRCRAFT SERVICE BULLETIN

### Page 41

TitleReference
LUBRICATION787 AMM 12-21-00
MAIN LANDING GEAR SHOCK STRUT
MAINTENANCE
787 AMM 12-15-01
Procedure
Group 1-2:
1. GENERAL INFORMATION
KEEP THE WORK AREA, WIRES AND ELECTRICAL BUNDLES CLEAN OF METAL
PARTICLES OR CONTAMINATION WHEN YOU USE TOOLS. UNWANTED MATERIAL,
METAL PARTICLES OR CONTAMINATION CAUGHT IN WIRE BUNDLES CAN CAUSE
DAMAGE TO THE BUNDLES. DAMAGED WIRE BUNDLES CAN CAUSE SPARKS OR
OTHER ELECTRICAL DAMAGE.
CAUTION
NOTE: RC: Start
1. This is an Enhanced Required for Compliance document. There will be a separate Service
Bulletin (SB) and a separate Requirements Bulletin (RB). If an RB is mandated by an Airworthi-
ness Directive (AD), then all applicable requirements specified in the RB must be done. For the
related SB, some locations are marked RC Start and RC End to identify the requirements that
are restated from the RB. For the related SB, the areas between RC Start and RC End, including
sub-steps and any figures identified between RC Start and RC End, must be done to comply
with the AD. Therefore, an Alternative Method of Compliance (AMOC) is required for any devi-
ations to steps between RC Start and RC End, including substeps and identified figures. For
the related SB, the steps not between RC Start and RC End may be deviated from using accepted
methods in accordance with the operator's maintenance or inspection program without obtaining
approval of an AMOC; this is provided that the steps between RC Start and RC End, including
sub-steps and identified figures, can still be done as specified, and the airplane can be put back
in an airworthy condition. Figures not required for compliance are omitted from the RB.
2. This is an Enhanced Required for Compliance document. The Boeing processes used to create
the Service Bulletin (SB) and the Requirements Bulletin (RB) ensure that the information between
"RC Start" and "RC End" in the SB are identical to the information in the same sections (Com-
pliance, Work Instructions...) of the RB which the SB refers to as the related document.
3. These work instructions refer to procedures included in other Boeing documents. When the
words "refer to" are used and the operator has an accepted alternative procedure, the accepted
alternative procedure can be used. When the words "in accordance with" are included in the
instruction, the procedure in the Boeing document must be used.
4. The compliance times for the actions in Work Instructions are in the Compliance section.
5. When more than one OPTION is given for a CONDITION, do only one of the OPTION numbers.
When more than one ACTION is given for a CONDITION number or an OPTION number, do
all of the ACTION numbers for that CONDITION number or OPTION number.
B787-A-32-00-0045-00A-933A-DApplicable To:
Issue 001, 09 Nov 2020Model 787
See Applicability of this data module
Page 41 of 96
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB320045-00
Issue 001, 09 Nov 2020
AIRCRAFT SERVICE BULLETIN

### Page 42

6. The instructions in Work Instructions and the Tasks can include operation of tools or test
equipment. Boeing Engineering Tool Drawings, the Illustrated Tool and Equipment Manual, and
the Special Tool and Ground Handling Drawing Index contain data on versions of the tools or
test equipment that you can use. It is permitted to use replaced tools. It is not permitted to use
superseded tools.
7. A Detailed Inspection is defined as: An intensive examination of a specific item,installation or
assembly to detect damage, failure or irregularity. This could include tactile assessment in which
a component or assembly can be checked for tightness/security. Available lighting is normally
supplemented with a direct source of good lighting at an intensity deemed appropriate. Inspection
aids such as mirrors and magnifying lenses may be necessary. Surface cleaning and elaborate
access procedures may be required.
8. Heat damage is defined as ladder cracks, spalling, pull-outs, cracks, chips, flakes, lifting, or
color changes.
9. Friction damage is defined as material transfer on the part surface or other contaminants found.
RC: End
10. Manual titles are referred to by acronyms. Refer to Data Module SB B787-A-32-00-0045-00A-
932A-D, Paragraph 10., References, for definition of the acronyms.
11. Obey all of the warnings and cautions given in the specified manual sections.
RC: Start
12. Unless shown differently, these dimensions and tolerances are used:
– Linear dimensions are in inches
– Tolerance on linear dimensions, other than rivet and bolt edge margins, is plus or minus
0.03 inch
– Tolerance on rivet and bolt edge margin is plus or minus 0.05 inch
– Angular tolerance is plus or minus 2 degrees
– Hole dimensions for standard solid rivets and fasteners are in SRM Chapter 51
– Torque Values:
– Values for structural fasteners are given in 787 Structural Repair Manual, Chapter 51.
– Values for airframe maintenance tasks are included in Chapter 20 of 787 Aircraft Main-
tenance Manual (AMM).
– Values for electrical maintenance tasks are included in Chapter 20 of Standard Wiring
Practices Manual (SWPM).
– Values for engine maintenance tasks are included in Chapter 70 of 787 Aircraft Mainte-
nance Manual (AMM).
– Non-standard torque values for maintenance tasks are included in the applicable instal-
lation step.
13. If it is necessary to remove more parts for access, you can remove those parts. If you can get
access without removing identified parts, it is not necessary to remove all of the identified parts.
Jacking and shoring limitations must be observed.
B787-A-32-00-0045-00A-933A-DApplicable To:
Issue 001, 09 Nov 2020Model 787
See Applicability of this data module
Page 42 of 96
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB320045-00
Issue 001, 09 Nov 2020
AIRCRAFT SERVICE BULLETIN

### Page 43

14. Where the work instructions include installation of a kept part, a new or serviceable part with
the same part number can be installed as an alternative to the kept part.
RC: End
15. Refer to Appendix A, B and C for logic diagrams(s). Logic diagrams are provided as an aid only.
Information contained in Data Module SB B787-A-32-00-0045-00A-932A-D, Paragraph 5.,
Compliance, is the primary source for compliance times. Information in Step 2., Work Instructions,
is the primary source for tasks required for compliance.
16. Use of colors in Tasks is based on guidance from the S1000D International specification for
technical publications.
2. WORK INSTRUCTIONS
RC: Start
A. Actions Required for Compliance
Requirements(1)
Table 1  LEFT AND RIGHT MAIN LANDING GEAR (MLG) TRUCK BEAM AND INNER CYLINDER PIVOT 
JOINT - LUBRICATION
Refer to the listed proce-
dures in SB B787-81205-
SB320045-00 Issue 001
or later approved issues
as an accepted proce-
dure.
Method of ComplianceActionCondition
Task 1-Lubricate both the left and
right Main Landing Gear
(MLG) truck beam and in-
ner cylinder pivot joint with
MIL-PRF-32014 grease.
All Airplanes
--Review maintenance pro-
gram documentation to
verify that it includes lubri-
cation tasks for the left
and right MLG Truck
Beam and Inner Cylinder
Pivot Joint with MIL-PRF-
32014 grease at intervals
not to exceed 50 flight cy-
cles or 25 days whichever
comes later.
B787-A-32-00-0045-00A-933A-DApplicable To:
Issue 001, 09 Nov 2020Model 787
See Applicability of this data module
Page 43 of 96
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB320045-00
Issue 001, 09 Nov 2020
AIRCRAFT SERVICE BULLETIN

### Page 44

Table 1  LEFT AND RIGHT MAIN LANDING GEAR (MLG) TRUCK BEAM AND INNER CYLINDER PIVOT 
JOINT - LUBRICATION
Refer to the listed proce-
dures in SB B787-81205-
SB320045-00 Issue 001
or later approved issues
as an accepted proce-
dure.
Method of ComplianceActionCondition
--Update the maintenance
program documentation to
incorporate lubrication
tasks for the left and right
MLG Truck Beam and In-
ner Cylinder Pivot Joint
with MIL-PRF-32014
grease at intervals not to
exceed 50 flight cycles or
25 days, whichever occurs
later.
CONDITION 1: MAINTE-
NANCE PROGRAM
DOCUMENTATION
DOES NOT INCLUDE
PIVOT JOINT LUBRICA-
TION WITH MIL-PRF-
32014 GREASE AT IN-
TERVALS NOT TO EX-
CEED 50 FLIGHT CY-
CLES OR 25 DAYS
WHICHEVER OCCURS
LATER.
--No further action required.CONDITION 2: MAINTE-
NANCE PROGRAM
DOCUMENTATION IN-
CLUDES PIVOT JOINT
LUBRICATION WITH MIL-
PRF-32014 GREASE AT
INTERVALS NOT TO EX-
CEED 50 FLIGHT CY-
CLES OR 25 DAYS
WHICHEVER OCCURS
LATER.
B787-A-32-00-0045-00A-933A-DApplicable To:
Issue 001, 09 Nov 2020Model 787
See Applicability of this data module
Page 44 of 96
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB320045-00
Issue 001, 09 Nov 2020
AIRCRAFT SERVICE BULLETIN

### Page 45

Group 1, Configuration 1:
Table 2  LEFT AND RIGHT MLG TRUCK BEAM AND INNER CYLINDER PIVOT JOINT - PIVOT PIN 
INSPECTION
Refer to the listed proce-
dures in SB B787-81205-
SB320045-00 Issue 001
or later approved issues
as an accepted proce-
dure.
Method of ComplianceActionCondition
PART 1: GET ACCESS
TO THE MLG TRUCK
BEAM AND INNER
CYLINDER PIVOT JOINT
--All Airplanes
PART 2: MLG TRUCK
BEAM AND INNER
CYLINDER PIVOT JOINT
- PIVOT PIN REMOVAL
--
-Task 2Do a detailed and Fluores-
cent Penetrant Inspection
(FPI) of both the left and
right MLG Pivot Pin OD
surface for friction and
heat damage.
PART 4: MLG TRUCK
BEAM AND INNER
CYLINDER PIVOT JOINT
- PIVOT PIN INSTALLA-
TION
--CONDITION 1: NO HEAT
DAMAGE AND NO FRIC-
TION DAMAGE FOUND
ON THE PIVOT PIN OD
SURFACE
PART 6: RESTORE AC-
CESS TO THE MLG
TRUCK BEAM AND IN-
NER CYLINDER PIVOT
JOINT
--
*[1]Task 2Repeat the detailed and
Fluorescent Penetrant In-
spection(FPI) of the Pivot
Pin outer diameter
(OD)surface for heat and
friction damage
-Task 4Do a detailed and FPI in-
spection on the inner
cylinder lug bore for heat
and friction damage
CONDITION 2: ANY
HEAT DAMAGE OR ANY
FRICTION DAMAGE IS
FOUND ON THE PIVOT
PIN OD SURFACE
B787-A-32-00-0045-00A-933A-DApplicable To:
Issue 001, 09 Nov 2020Model 787
See Applicability of this data module
Page 45 of 96
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB320045-00
Issue 001, 09 Nov 2020
AIRCRAFT SERVICE BULLETIN

### Page 46

Table 2  LEFT AND RIGHT MLG TRUCK BEAM AND INNER CYLINDER PIVOT JOINT - PIVOT PIN 
INSPECTION
Refer to the listed proce-
dures in SB B787-81205-
SB320045-00 Issue 001
or later approved issues
as an accepted proce-
dure.
Method of ComplianceActionCondition
PART 4: MLG TRUCK
BEAM AND INNER
CYLINDER PIVOT JOINT
- PIVOT PIN INSTALLA-
TION
-ACTION 1: Install a new
Pivot Pin
CONDITION 2.1: NO
HEAT DAMAGE AND NO
FRICTION DAMAGE
FOUND ON THE INNER
CYLINDER LUG BORE
PART 5: MLG TRUCK
BEAM AND INNER
CYLINDER PIVOT JOINT-
INNER CYLINDER
BUSHING INSTALLA-
TION
--
PART 6: RESTORE AC-
CESS TO THE MLG
TRUCK BEAM AND IN-
NER CYLINDER PIVOT
JOINT
--
*[1]Task 2ACTION 2: Repeat the
detailed and FPI inspec-
tions for both the left and
right MLG pivot pin OD
surface for friction and
heat damage
--Contact Boeing for repair
instructions and do the re-
pairs.
CONDITION 2.2: ANY
HEAT DAMAGE OR ANY
FRICTION DAMAGE IS
FOUND ON THE INNER
CYLINDER LUG BORE PART 4: MLG TRUCKBEAM AND INNER
CYLINDER PIVOT JOINT
- PIVOT PIN INSTALLA-
TION
-ACTION 1: Install a new
Pivot Pin
*[1]Task 2ACTION 2: Repeat the
detailed and FPI inspec-
tions for both the left and
right MLG pivot pin OD
surface for friction and
heat damage
B787-A-32-00-0045-00A-933A-DApplicable To:
Issue 001, 09 Nov 2020Model 787
See Applicability of this data module
Page 46 of 96
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB320045-00
Issue 001, 09 Nov 2020
AIRCRAFT SERVICE BULLETIN

### Page 47

Table 2  LEFT AND RIGHT MLG TRUCK BEAM AND INNER CYLINDER PIVOT JOINT - PIVOT PIN 
INSPECTION
Refer to the listed proce-
dures in SB B787-81205-
SB320045-00 Issue 001
or later approved issues
as an accepted proce-
dure.
Method of ComplianceActionCondition
*[1]  Installation of defect-free Pivot Pin and concurrent or prior replacement of Aluminum-Nickel-Bronze inner cylinder bushings with
Copper-Nickel-Tin inner cylinder bushings and incorporation of the increased lubrication interval (not to exceed the time specified in
Compliance Section, Table 5) with MIL-PRF-32014 grease is terminating action to the repeat inspections for that side of the MLG.
Group 1, Configuration 1:
Table 3  LEFT AND RIGHT MLG TRUCK BEAM AND INNER CYLINDER PIVOT JOINT - INNER CYLINDER 
BUSHING INSPECTION
Refer to the listed proce-
dures in SB B787-81205-
SB320045-00 Issue 001
or later approved issues
as an accepted proce-
dure.
Method of ComplianceActionCondition
PART 1: GET ACCESS
TO THE MLG TRUCK
BEAM AND INNER
CYLINDER PIVOT JOINT
--All Airplanes
PART 2: MLG TRUCK
BEAM AND INNER
CYLINDER PIVOT JOINT
- PIVOT PIN REMOVAL
--
-Task 3Do a detailed inspection of
both the left and right MLG
inner cylinder bushing in-
ner diameter (ID) surface
for excessive wear, cracks
and smearing of bushing
material
B787-A-32-00-0045-00A-933A-DApplicable To:
Issue 001, 09 Nov 2020Model 787
See Applicability of this data module
Page 47 of 96
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB320045-00
Issue 001, 09 Nov 2020
AIRCRAFT SERVICE BULLETIN

### Page 48

Table 3  LEFT AND RIGHT MLG TRUCK BEAM AND INNER CYLINDER PIVOT JOINT - INNER CYLINDER 
BUSHING INSPECTION
Refer to the listed proce-
dures in SB B787-81205-
SB320045-00 Issue 001
or later approved issues
as an accepted proce-
dure.
Method of ComplianceActionCondition
Task 1-ACTION 1: Apply lubrica-
tion using MIL-PRF-32014
grease and make sure lu-
brication passages are
clear
CONDITION 1: NO INNER
CYLINDER BUSHING ID
EXCESSIVE WEAR, NO
CRACK AND NO
SMEARING FOUND
PART 3: MLG TRUCK
BEAM AND INNER
CYLINDER PIVOT JOINT
- INSPECT INNER
CYLINDER BUSHING
LUBE PASSAGE
--
PART 4: MLG TRUCK
BEAM AND INNER
CYLINDER PIVOT JOINT
- PIVOT PIN INSTALLA-
TION
--
PART 6: RESTORE AC-
CESS TO THE MLG
TRUCK BEAM AND IN-
NER CYLINDER PIVOT
JOINT
--
*[1]Task 3ACTION 2: Repeat the
detailed inspection for
both the left and right MLG
inner cylinder bushing in-
ner diameter (ID)surface
for excessive wear, cracks
and smearing of bushing
material
-Task 4Do a detailed and FPI in-
spection of the inner cylin-
der lug bore for heat and
friction damage
CONDITION 2: ANY IN-
NER CYLINDER BUSH-
ING ID EXCESSIVE
WEAR, CRACK OR ANY
SMEARING FOUND
B787-A-32-00-0045-00A-933A-DApplicable To:
Issue 001, 09 Nov 2020Model 787
See Applicability of this data module
Page 48 of 96
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB320045-00
Issue 001, 09 Nov 2020
AIRCRAFT SERVICE BULLETIN

### Page 49

Table 3  LEFT AND RIGHT MLG TRUCK BEAM AND INNER CYLINDER PIVOT JOINT - INNER CYLINDER 
BUSHING INSPECTION
Refer to the listed proce-
dures in SB B787-81205-
SB320045-00 Issue 001
or later approved issues
as an accepted proce-
dure.
Method of ComplianceActionCondition
Task 5-ACTION 1 (OPTION 1):
Install new Aluminum-
Nickel-Bronze Inner Cylin-
der Bushing(s)
ACTION 1 (OPTION 2):
Install new Copper-Nickel-
Tin Inner Cylinder Bush-
ing(s).
*[1]*[2]
CONDITION 2.1: NO
HEAT DAMAGE AND NO
FRICTION DAMAGE
FOUND ON THE INNER
CYLINDER LUG BORE
Task 1-OPTION 1 and OPTION 2
(ACTION 2): Apply lubrica-
tion using MIL-PRF-32014
grease and make sure lu-
brication passages are
clear
PART 3: MLG TRUCK
BEAM AND INNER
CYLINDER PIVOT JOINT
- INSPECT INNER
CYLINDER BUSHING
LUBE PASSAGE
--
PART 4: MLG TRUCK
BEAM AND INNER
CYLINDER PIVOT JOINT
- PIVOT PIN INSTALLA-
TION
--
PART 6: RESTORE AC-
CESS TO THE MLG
TRUCK BEAM AND IN-
NER CYLINDER PIVOT
JOINT
--
*[1]Task 3
B787-A-32-00-0045-00A-933A-DApplicable To:
Issue 001, 09 Nov 2020Model 787
See Applicability of this data module
Page 49 of 96
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB320045-00
Issue 001, 09 Nov 2020
AIRCRAFT SERVICE BULLETIN

### Page 50

Table 3  LEFT AND RIGHT MLG TRUCK BEAM AND INNER CYLINDER PIVOT JOINT - INNER CYLINDER 
BUSHING INSPECTION
Refer to the listed proce-
dures in SB B787-81205-
SB320045-00 Issue 001
or later approved issues
as an accepted proce-
dure.
Method of ComplianceActionCondition
OPTION 1 and OPTION 2
(ACTION 3):Repeat the
detailed inspection for
both the left and right MLG
inner cylinder bushing ID
surface for excessive
wear, cracks and smear-
ing of bushing material
--Contact Boeing for repair
instructions and do the re-
pairs.
CONDITION 2.2: ANY
HEAT DAMAGE OR
FRICTION DAMAGE IS
FOUND ON THE INNER
CYLINDER LUG BORE *[1]Task 3ACTION 1: Repeat thedetailed inspection for
both the left and right MLG
inner cylinder bushing ID
surface for excessive
wear, cracks and smear-
ing of bushing material
*[1]  Installation of Copper-Nickel-Tin inner cylinder bushings and concurrent or prior incorporation of the increased lubrication interval (not
to exceed the time specified in Compliance Section, Table 5) with MIL-PRF-32014 grease constitutes terminating action to the repeat
inspections for that side of the MLG.
*[2]  Installation of Copper-Nickel-Tin bushings is one way interchangeable. Aluminum-Nickel-Bronze inner cylinder bushings can no longer
be installed for that side of the MLG.
B787-A-32-00-0045-00A-933A-DApplicable To:
Issue 001, 09 Nov 2020Model 787
See Applicability of this data module
Page 50 of 96
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB320045-00
Issue 001, 09 Nov 2020
AIRCRAFT SERVICE BULLETIN

### Page 51

Group 1, Configuration 2; Group 2:
Table 4  LEFT AND RIGHT MLG TRUCK BEAM AND INNER CYLINDER PIVOT JOINT - PIVOT PIN 
INSPECTION
Refer to the listed proce-
dures in SB B787-81205-
SB320045-00 Issue 001
or later approved issues
as an accepted proce-
dure.
Method of ComplianceActionCondition
PART 1: GET ACCESS
TO THE MLG TRUCK
BEAM AND INNER
CYLINDER PIVOT JOINT
--All Airplanes
PART 2: MLG TRUCK
BEAM AND INNER
CYLINDER PIVOT JOINT
- PIVOT PIN REMOVAL
--
-Task 2Do a detailed and Fluores-
cent Penetrant Inspection
(FPI) of both the left and
right MLG Pivot Pin OD
surface for friction and
heat damage.
PART 4: MLG TRUCK
BEAM AND INNER
CYLINDER PIVOT JOINT
- PIVOT PIN INSTALLA-
TION
--CONDITION 1: NO HEAT
DAMAGE AND NO FRIC-
TION DAMAGE FOUND
ON THE PIVOT PIN OD
SURFACE
PART 6: RESTORE AC-
CESS TO THE MLG
TRUCK BEAM AND IN-
NER CYLINDER PIVOT
JOINT
--
*[1]Task 2Repeat the detailed and
Fluorescent Penetrant In-
spection(FPI) of the Pivot
Pin outer diameter(OD)
surface for heat and fric-
tion damage
-Task 4Do a detailed and FPI in-
spection on the inner
cylinder lug bore for heat
and friction damage.
CONDITION 2: ANY
HEAT DAMAGE OR ANY
FRICTION DAMAGE IS
FOUND ON THE PIVOT
PIN OD SURFACE
B787-A-32-00-0045-00A-933A-DApplicable To:
Issue 001, 09 Nov 2020Model 787
See Applicability of this data module
Page 51 of 96
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB320045-00
Issue 001, 09 Nov 2020
AIRCRAFT SERVICE BULLETIN

### Page 52

Table 4  LEFT AND RIGHT MLG TRUCK BEAM AND INNER CYLINDER PIVOT JOINT - PIVOT PIN 
INSPECTION
Refer to the listed proce-
dures in SB B787-81205-
SB320045-00 Issue 001
or later approved issues
as an accepted proce-
dure.
Method of ComplianceActionCondition
PART 4: MLG TRUCK
BEAM AND INNER
CYLINDER PIVOT JOINT
- PIVOT PIN INSTALLA-
TION
-ACTION 1: Install a new
Pivot Pin
CONDITION 2.1: NO
HEAT DAMAGE AND NO
FRICTION DAMAGE
FOUND ON THE INNER
CYLINDER LUG BORE
PART 5: MLG TRUCK
BEAM AND INNER
CYLINDER PIVOT JOINT-
INNER CYLINDER
BUSHING INSTALLA-
TION
--
PART 6: RESTORE AC-
CESS TO THE MLG
TRUCK BEAM AND IN-
NER CYLINDER PIVOT
JOINT
--
*[1]Task 2ACTION 2: Repeat the
detailed and FPI inspec-
tions for both the left and
right MLG pivot pin OD
surface for friction and
heat damage
--Contact Boeing for repair
instructions and do the re-
pairs.
CONDITION 2.2: ANY
HEAT DAMAGE OR ANY
FRICTION DAMAGE IS
FOUND ON THE INNER
CYLINDER LUG BORE PART 4: MLG TRUCKBEAM AND INNER
CYLINDER PIVOT JOINT
- PIVOT PIN INSTALLA-
TION
-ACTION 1: Install a new
Pivot Pin
*[1]Task 2ACTION 2: Repeat the
detailed and FPI inspec-
tions for both the left and
right MLG pivot pin OD
surface for friction and
heat damage
B787-A-32-00-0045-00A-933A-DApplicable To:
Issue 001, 09 Nov 2020Model 787
See Applicability of this data module
Page 52 of 96
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB320045-00
Issue 001, 09 Nov 2020
AIRCRAFT SERVICE BULLETIN

### Page 53

Table 4  LEFT AND RIGHT MLG TRUCK BEAM AND INNER CYLINDER PIVOT JOINT - PIVOT PIN 
INSPECTION
Refer to the listed proce-
dures in SB B787-81205-
SB320045-00 Issue 001
or later approved issues
as an accepted proce-
dure.
Method of ComplianceActionCondition
*[1]  Installation of defect-free Pivot Pin and Copper-Nickel-Tin inner cylinder bushings and concurrent or prior incorporation of the increased
lubrication interval ( not to exceed the time specified in Compliance Section, Table 5) with MIL-PRF-32014 grease is terminating action
to the repeat inspections for that side of the MLG.
Group 1, Configuration 2; Group 2:
Table 5  LEFT AND RIGHT MLG TRUCK BEAM AND INNER CYLINDER PIVOT JOINT - INNER CYLINDER 
BUSHING INSPECTION
Refer to the listed proce-
dures in SB B787-81205-
SB320045-00 Issue 001
or later approved issues
as an accepted proce-
dure.
Method of ComplianceActionCondition
PART 1: GET ACCESS
TO THE MLG TRUCK
BEAM AND INNER
CYLINDER PIVOT JOINT
--All Airplanes
PART 2: MLG TRUCK
BEAM AND INNER
CYLINDER PIVOT JOINT
- PIVOT PIN REMOVAL
--
-Task 3Do a detailed inspection of
both the left and right MLG
inner cylinder bushing in-
ner diameter (ID) surface
for excessive wear, cracks
and smearing of bushing
material
B787-A-32-00-0045-00A-933A-DApplicable To:
Issue 001, 09 Nov 2020Model 787
See Applicability of this data module
Page 53 of 96
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB320045-00
Issue 001, 09 Nov 2020
AIRCRAFT SERVICE BULLETIN

### Page 54

Table 5  LEFT AND RIGHT MLG TRUCK BEAM AND INNER CYLINDER PIVOT JOINT - INNER CYLINDER 
BUSHING INSPECTION
Refer to the listed proce-
dures in SB B787-81205-
SB320045-00 Issue 001
or later approved issues
as an accepted proce-
dure.
Method of ComplianceActionCondition
Task 1-ACTION 1: Apply lubrica-
tion using MIL-PRF-32014
grease and make sure lu-
brication passages are
clear.
CONDITION 1: NO INNER
CYLINDER BUSHING ID
EXCESSIVE WEAR, NO
CRACK AND NO
SMEARING FOUND
PART 3: MLG TRUCK
BEAM AND INNER
CYLINDER PIVOT JOINT
- INSPECT INNER
CYLINDER BUSHING
LUBE PASSAGE
--
PART 4: MLG TRUCK
BEAM AND INNER
CYLINDER PIVOT JOINT
- PIVOT PIN INSTALLA-
TION
--
PART 6: RESTORE AC-
CESS TO THE MLG
TRUCK BEAM AND IN-
NER CYLINDER PIVOT
JOINT
--
*[1]Task 3ACTION 2: Repeat the
detailed inspection for
both the left and right MLG
inner cylinder bushing in-
ner diameter (ID)surface
for excessive wear, cracks
and smearing of bushing
material
-Task 4Do a detailed and FPI in-
spection of the inner cylin-
der lug bore for heat and
friction damage.
CONDITION 2: ANY IN-
NER CYLINDER BUSH-
ING ID EXCESSIVE
WEAR, CRACK OR ANY
SMEARING FOUND
B787-A-32-00-0045-00A-933A-DApplicable To:
Issue 001, 09 Nov 2020Model 787
See Applicability of this data module
Page 54 of 96
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB320045-00
Issue 001, 09 Nov 2020
AIRCRAFT SERVICE BULLETIN

### Page 55

Table 5  LEFT AND RIGHT MLG TRUCK BEAM AND INNER CYLINDER PIVOT JOINT - INNER CYLINDER 
BUSHING INSPECTION
Refer to the listed proce-
dures in SB B787-81205-
SB320045-00 Issue 001
or later approved issues
as an accepted proce-
dure.
Method of ComplianceActionCondition
Task 6-ACTION 1: Install new
Copper-Nickel-Tin Inner
Cylinder Bushing(s).
CONDITION 2.1: NO
HEAT DAMAGE AND NO
FRICTION DAMAGE
FOUND ON THE INNER
CYLINDER LUG BORE Task 1-ACTION 2: Apply lubrica-tion using MIL-PRF-32014
grease and make sure lu-
brication passages are
clear.
PART 3: MLG TRUCK
BEAM AND INNER
CYLINDER PIVOT JOINT
- INSPECT INNER
CYLINDER BUSHING
LUBE PASSAGE
--
PART 4: MLG TRUCK
BEAM AND INNER
CYLINDER PIVOT JOINT
- PIVOT PIN INSTALLA-
TION
--
PART 6: RESTORE AC-
CESS TO THE MLG
TRUCK BEAM AND IN-
NER CYLINDER PIVOT
JOINT
--
*[1]Task 3ACTION 3: Repeat the
detailed inspections for
both the left and right MLG
inner cylinder bushing ID
surface for excessive
wear, cracks and smear-
ing of bushing material
B787-A-32-00-0045-00A-933A-DApplicable To:
Issue 001, 09 Nov 2020Model 787
See Applicability of this data module
Page 55 of 96
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB320045-00
Issue 001, 09 Nov 2020
AIRCRAFT SERVICE BULLETIN

### Page 56

Table 5  LEFT AND RIGHT MLG TRUCK BEAM AND INNER CYLINDER PIVOT JOINT - INNER CYLINDER 
BUSHING INSPECTION
Refer to the listed proce-
dures in SB B787-81205-
SB320045-00 Issue 001
or later approved issues
as an accepted proce-
dure.
Method of ComplianceActionCondition
--Contact Boeing for repair
instructions and do the re-
pairs.
CONDITION 2.2: ANY
HEAT DAMAGE OR ANY
FRICTION DAMAGE
FOUND ON THE INNER
CYLINDER LUG BORE *[1]Task 3ACTION 1: Repeat thedetailed inspection for
both the left and right MLG
inner cylinder bushing ID
surface for excessive
wear, cracks and smear-
ing of bushing material
*[1]  Installation of Copper-Nickel-Tin inner cylinder bushings and concurrent or prior incorporation of the increased lubrication interval (not
to exceed the time specified in Compliance Section, Table 5) with MIL-PRF-32014 grease constitutes terminating action to the repeat
inspections for that side of the MLG.
RC: End
Group 1-2:
B. Procedures:
PART 1: GET ACCESS TO THE MLG TRUCK BEAM AND INNER CYLINDER PIVOT JOINT
MOVE THE DOOR SAFETY HANDLES TO THE SAFE POSITION. THE DOORS
OPEN AND CLOSE QUICKLY. THE MOVEMENT OF THE DOORS CAN CAUSE
INJURIES TO PERSONNEL AND DAMAGE TO EQUIPMENT.
WARNING
USE EQUIPMENT TO HOLD THE MAIN LANDING GEAR TRUCK BEFORE
YOU REMOVE THE PIVOT PIN. MOVEMENT OF THE MAIN LANDING GEAR
TRUCK CAN CAUSE INJURY TO PERSONS OR DAMAGE TO EQUIPMENT.
WARNING
(1)
(a) Make sure the downlock pins are installed in the left and right Main Landing Gear (MLG). Refer
to 787 AMM 32-00-30 as an accepted procedure.
(b) Deactivate and lock the left and right MLG doors. Refer to 787 AMM 32-00-15 as an accepted
procedure.
(c) Deactivate and depressurize the central hydraulic system. Refer to 787 AMM 29-11-00 as an
accepted procedure.
(d) Deflate the shock strut for the left and right MLG. Refer to 787 AMM 32-11-18 as an accepted
procedure.
B787-A-32-00-0045-00A-933A-DApplicable To:
Issue 001, 09 Nov 2020Model 787
See Applicability of this data module
Page 56 of 96
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB320045-00
Issue 001, 09 Nov 2020
AIRCRAFT SERVICE BULLETIN

### Page 57

(e) Install support for landing gear torsion link and retention straps for shock strut as necessary.
Refer to 787 AMM 32-11-18 as an accepted procedure.
(f) Lift the airplane on jacks until the wheels are off the ground. Refer to 787 AMM 07-11-01 as an
accepted procedure.
(g) Jack the MLG truck axles as necessary to remove load from pivot pins. Refer to 787 AMM 32-
11-18 as an accepted procedure.
NOTE: Aircraft jacking must be to a suitable height to articulate the truck beam assy "Toes
Down" to remove pivot pin staking pin. 
(2) PART 2: MLG TRUCK BEAM AND INNER CYLINDER PIVOT JOINT - PIVOT PIN REMOVAL
Remove the left and right MLG Pivot Pins. Use the MLG bogie pivot pin removal equipment.
Refer to 787 AMM 32-11-18 as an accepted procedure.
(a)
(3) PART 3: MLG TRUCK BEAM AND INNER CYLINDER PIVOT JOINT - INSPECT INNER CYLINDER
BUSHING LUBE PASSAGE
(a) Remove the dried grease and apply grease at Inner Cylinder lubrication fitting. Refer to 787
AMM 12-21-14 as an accepted procedure.
NOTE: Make sure grease is visible at inner cylinder Bushing ID. 
(4) PART 4: MLG TRUCK BEAM AND INNER CYLINDER PIVOT JOINT - PIVOT PIN INSTALLATION
Install new or kept left and right MLG Pivot Pins. Use the MLG bogie pivot pin removal equipment.
Refer to 787 AMM 32-11-18 as an accepted procedure.
(a)
NOTE: If necessary, move the jacks to make the installation of the pivot pin easier. 
(5) PART 5: MLG TRUCK BEAM AND INNER CYLINDER PIVOT JOINT - INNER CYLINDER BUSHING
INSTALLATION
(a) Clean inner cylinder lug bore of contaminants and grease. Refer to SOPM 20-30-03 and SOPM
20-30-02 as accepted procedures.
(b) Apply BMS10-11, Type 1 primer to the contact surfaces. Refer to SOPM 20-10-07 as an accepted
procedure.
(c) Install new or kept inner cylinder bushing. Refer to 787-8 CMM 32-11-74, 787-9 CMM 32-13-06
or 787-10 CMM 32-10-37 as accepted procedures.
(d) Apply BMS5-142, Type 2 sealant. Refer to SOPM 20-50-19 as an accepted procedure.
(e) Apply MIL-PRF-32014 grease. Refer to 787 AMM 12-21-14 and 787 AMM 12-21-00 as accepted
procedures.
(f) For Group 1 Configuration 1 airplanes: Re-identify the Inner Cylinder Assembly if Cu-Ni-Sn
bushings are installed. There is no equivalent Boeing part number for the changed part. Identify
on the part that the change given in this bulletin was done. Use the rubber stamp (Code RO)
or ink jet (Code J) method. Refer to SOPM 20-50-10 as an accepted procedure.
B787-A-32-00-0045-00A-933A-DApplicable To:
Issue 001, 09 Nov 2020Model 787
See Applicability of this data module
Page 57 of 96
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB320045-00
Issue 001, 09 Nov 2020
AIRCRAFT SERVICE BULLETIN

### Page 58

(6) PART 6: RESTORE ACCESS TO THE MLG TRUCK BEAM AND INNER CYLINDER PIVOT JOINT
MAKE SURE THE LANDING GEAR DOWNLOCK PINS ARE INSTALLED. THIS
WILL PREVENT ACCIDENTAL RETRACTION OF THE LANDING GEAR, INJURY
TO PERSONS, AND DAMAGE TO EQUIPMENT.
WARNING
MOVE THE DOOR SAFETY HANDLES TO THE SAFE POSITION. THE DOORS
OPEN AND CLOSE QUICKLY. THE MOVEMENT OF THE DOORS CAN CAUSE
INJURIES TO PERSONNEL AND DAMAGE TO EQUIPMENT.
WARNING
(a) Remove the MLG truck jacks as necessary. Refer to 787 AMM 32-11-18 as an accepted proce-
dure.
(b) Lower the airplane from its jacked position. Refer to Lower the Airplane from Jacks - Handling,
787 AMM 07-11-01, as an accepted procedure.
(c) Remove support for landing gear torsion link and retention straps for shock strut. Refer to 787
AMM 32-11-18 as an accepted procedure.
(d) Inflate the shock strut for the left and right MLG. Refer to 787 AMM 32-11-18 as an accepted
procedure.
(e) Do shock strut servicing procedure for each MLG. Refer 787 AMM 12-15-01 to as an accepted
procedure.
(f) Activate the central hydraulic system. Refer to 787 AMM 29-11-00 as an accepted procedure.
(g) Activate the left and right MLG doors. Refer to 787 AMM 32-00-15 as an accepted procedure.
(h) Remove the downlock pins. Refer 787 AMM 32-00-30, as an accepted procedure.
(i) Put the airplane back to a serviceable condition.
B787-A-32-00-0045-00A-933A-DApplicable To:
Issue 001, 09 Nov 2020End of data moduleModel 787
See Applicability of this data module
Page 58 of 96
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB320045-00
Issue 001, 09 Nov 2020
AIRCRAFT SERVICE BULLETIN

### Page 59

Alert Service Bulletin B787-81205-SB320045-00
Task 1 – LEFT AND RIGHT MLG TRUCK BEAM AND INNER CYLINDER
PIVOT JOINT - LUBRICATION [Group 1-2:]
THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN
IN PARAGRAPH 1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND
Alert:
THIS DOCUMENT TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD,
SEND THIS DOCUMENT TO THE NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR
COMPLIANCE DOCUMENT. THE BOEING PROCESSES USED TO CREATE THE SERVICE
BULLETIN (SB) AND THE REQUIREMENTS BULLETIN (RB) ENSURE THAT THE INFORMATION
BETWEEN "RC START" AND "RC END" IN THE SB ARE IDENTICAL TO THE INFORMATION IN
THE SAME SECTIONS (COMPLIANCE, WORK INSTRUCTIONS...) OF THE RB WHICH THE SB
REFERS TO AS THE RELATED DOCUMENT.
References
TitleReference
MAIN LANDING GEAR AND ACTUATING
MECHANISM MAINTENANCE
787 AMM 12-21-14
LUBRICATION787 AMM 12-21-00
Preliminary Requirements
Required Conditions
Data Module/Technical PublicationAction/Condition
B787-A-32-00-0045-00A-933A-D Issue 001Alert Service Bulletin B787-81205-SB320045-00 -
ACCOMPLISHMENT INSTRUCTIONS
B787-A-32-00-0045-01A-933B-DApplicable To:
Issue 001, 09 Nov 2020Model 787
See Applicability of this data module
Page 59 of 96
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB320045-00
Issue 001, 09 Nov 2020
AIRCRAFT SERVICE BULLETIN

### Page 60

Procedure
This Task applies to Group 1-2:
ICN-B787-A-000061-A-81205-18108-A-01-1
Figure 1  LEFT AND RIGHT MLG TRUCK BEAM AND INNER CYLINDER PIVOT JOINT - LUBRICATION
1. Table 1  
More DataQtyIdentificationNameActionStep
*[1]-MIL-PRF-32014GREASEApply1
*[1]  Apply MIL-PRF-32014 grease. Refer to 787 AMM 12-21-14 and 787 AMM 12-21-00 as accepted procedures.
B787-A-32-00-0045-01A-933B-DApplicable To:
Issue 001, 09 Nov 2020End of data moduleModel 787
See Applicability of this data module
Page 60 of 96
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB320045-00
Issue 001, 09 Nov 2020
AIRCRAFT SERVICE BULLETIN

The text continues at https://openairdocs.org/service-documents/boeing/b787-81205-sb320045-00/file/c41729c8cf0b.md?from=61

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
