# Boeing Alert Requirements Bulletin B787-81205-SB340038-00 RB

Copy: Revision 001 ("SB-B787-81205-SB34A0038-01 RB--"), 6 pages: PDF https://openairdocs.org/files/sha256/31/ea/31ea5fd4ee1ce6fd37f8334ecd3e6de898062de5a427449ecdbc2266d65b1bfc; text https://openairdocs.org/service-documents/boeing/b787-81205-sb340038-00-rb/file/31ea5fd4ee1c.md. Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2018-0902; AD 2019-01-04 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Boeing](https://openairdocs.org/service-documents/boeing.md)
- Type: Service bulletin (Alert Requirements Bulletin)
- Number: B787-81205-SB340038-00 RB
- Latest revision known: B787-81205-SB340038-00 RB, Issue 001, dated November 16, 2017 (OpenAirDocs)
- Page: https://openairdocs.org/service-documents/boeing/b787-81205-sb340038-00-rb

## ADs that cite it (1) (OpenAirDocs)

Newest first, with the revision each names, as OpenAirDocs read it from the AD's text.

- [AD 2019-01-04](https://openairdocs.org/ad/2019-01-04.md), effective Mar 22, 2019: Revision 001

Also cited in [1 proposed AD](https://openairdocs.org/service-documents/boeing/b787-81205-sb340038-00-rb/proposed.md).

## Text (6 pages)

Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2018-0902; AD 2019-01-04 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Alert Requirements Bulletin B787-81205-SB340038-00 RB NAVIGATION -
Flight Management Function - Flight Management System Operational
Program Software Block Point 3B Software Change
Copyright © 2017 Boeing. Unpublished Work. All rights reserved.
Treatment of this data module and its content is governed by contract with Boeing. Rights to use this data module are licensed on a per
aircraft basis and such rights may not be transferable. For more information, contact The Boeing Company. Boeing, the Boeing signature,
the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner, BBJ, DC-8, DC-9, DC-10, KC-10, KC-46, KDC-10, MD-10,
MD-11, MD-80, MD-88, MD-90, P-8, Poseidon and Boeing liveries are all trademarks owned by The Boeing Company; and no trademark
license is granted in connection with this document unless provided in writing by Boeing.
EXPORT CONTROLLED
Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15 CFR 300-774). An export license
may be required before it is used for development, production or use by foreign persons from specific countries. The controller of this data
has the individual responsibility to abide by all export laws.
ECCN: 9E991
B787-81205-SB340038-00 RB
Issue 001, 16 Nov 2017
Page 1 of 6
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
4.0
B787-81205-SB340038-00 RB
Issue 001, 16 Nov 2017
REQUIREMENTS BULLETIN

### Page 2

Table of Contents
Page
A. EFFECTIVITY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
1. Airplanes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
2. Spares Affected . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
B. CONCURRENT REQUIREMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
C. COMPLIANCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
D. APPROVAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
E. ACCOMPLISHMENT INSTRUCTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
1. General Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
2. Work Instructions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
B787-81205-SB340038-00 RB
Issue 001, 16 Nov 2017
Page 2 of 6
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB340038-00 RB
Issue 001, 16 Nov 2017
REQUIREMENTS BULLETIN

### Page 3

THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN
IN PARAGRAPH 1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND
Alert:
THIS DOCUMENT TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD,
SEND THIS DOCUMENT TO THE NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR
COMPLIANCE DOCUMENT. THE BOEING PROCESSES USED TO CREATE THE SERVICE
BULLETIN (SB) AND THE REQUIREMENTS BULLETIN (RB) ENSURE THAT THE INFORMATION
BETWEEN "RC START" AND "RC END" IN THE SB ARE IDENTICAL TO THE INFORMATION IN
THE SAME SECTIONS (COMPLIANCE, WORK INSTRUCTIONS...) OF THE RB WHICH THE SB
REFERS TO AS THE RELATED DOCUMENT.
A. EFFECTIVITY
1. Airplanes
This service bulletin is applicable to 787-8 and 787-9 Airplanes, line numbers 6-18, 20-586, and 588.
2. Spares Affected
None.
B. CONCURRENT REQUIREMENTS
The service bulletins listed below must be done before or at the same time as this service bulletin.
Group 1, Configuration 1:
Table 3  
Dependen-
cy
DescriptionService Bulletin and/or Document(s)Company
*[1]Flight Management Function Block Point
3 Software Change
SB B787-81205-SB340013-00 Issue 001
or Issue 002
Boeing
*[1]  Must be done before this service bulletin.
Group 1, Configuration 2:
None.
C. COMPLIANCE
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to require-
ments bulletin B787-81205-SB340038-00 RB. The Airworthiness Directive will make the compliance tasks
and times given in requirements bulletin B787-81205-SB340038-00 RB mandatory.
B787-81205-SB340038-00 RB
Issue 001, 16 Nov 2017
Page 3 of 6
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB340038-00 RB
Issue 001, 16 Nov 2017
REQUIREMENTS BULLETIN

### Page 4

Table 5  Table 1: Flight Management System Software Installation
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
-Within 12 months
after the Original
Issue date of the
Requirements Bul-
letin (RB).
Install new 34 Flight Man-
agement System Opera-
tional Program Software
(34 FMS OPS) Block Point
3B Software
All Airplanes
D. APPROVAL
This Requirements Bulletin was examined by the Federal Aviation Administration (FAA). The changes
specified in this document comply with the applicable regulations and are FAA approved, as well as European
Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/JAA approved
airplanes listed in the service bulletin effectivity. This document and its approval were based on the airplane
in its original Boeing delivery configuration or as modified by other Boeing changes.
If an airplane has a non-Boeing modification or repair that affects a component or system also affected by
this Requirements Bulletin, the operator is responsible for obtaining appropriate regulatory agency approval
before incorporating this Requirements Bulletin.
B787-81205-SB340038-00 RB
Issue 001, 16 Nov 2017
Page 4 of 6
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB340038-00 RB
Issue 001, 16 Nov 2017
REQUIREMENTS BULLETIN

### Page 5

E.    ACCOMPLISHMENT INSTRUCTIONS
1. GENERAL INFORMATION
NOTE: 4. These work instructions refer to procedures included in other Boeing documents. When
the words "refer to" are used and the operator has an accepted alternative procedure,
the accepted alternative procedure can be used. When the words "in accordance with"
are included in the instruction, the procedure in the Boeing document must be used.
5. Refer to 787 AMM 45-13-00 as an accepted procedure for the Onboard Data Load
Function (ODLF) and the software check.
6. Refer to 787 AMM 46-13-00 as an accepted procedure to stage software on a Mass
Storage Device (MSD).
8. This service bulletin includes functional test procedures for the systems changed by this
service bulletin. More functional tests can possibly be necessary in accordance with
standard maintenance practices because of interruption to other airplane systems.
10. This is an Enhanced Required for Compliance document. There will be a separate Service
Bulletin (SB) and a separate Requirements Bulletin (RB). If an RB is mandated by an
Airworthiness Directive (AD), then all applicable requirements specified in the RB must
be done. For the related SB, some locations are marked RC Start and RC End to identify
the requirements that are restated from the RB. For the related SB, the areas between
RC Start and RC End, including sub-steps and any tasks identified between RC Start
and RC End, must be done to comply with the AD. Therefore, an Alternative Method of
Compliance (AMOC) is required for any deviations to steps between RC Start and RC
End, including substeps and identified tasks. For the related SB, the steps not between
RC Start and RC End may be deviated from using accepted methods in accordance with
the operator's maintenance or inspection program without obtaining approval of an AMOC;
this is provided that the steps between RC Start and RC End, including sub-steps and
identified tasks, can still be done as specified, and the airplane can be put back in an
airworthy condition. Tasks not required for compliance are omitted from the RB.
11. This is an Enhanced Required for Compliance document. The Boeing processes used
to create the Service Bulletin (SB) and the Requirements Bulletin (RB) ensure that the
information between "RC Start" and "RC End" in the SB are identical to the information
in the same sections (Compliance, Work Instructions...) of the RB which the SB refers to
as the related document.
2. WORK INSTRUCTIONS
A. Actions Required for Compliance
Requirements(1)
B787-81205-SB340038-00 RB
Issue 001, 16 Nov 2017
Page 5 of 6
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB340038-00 RB
Issue 001, 16 Nov 2017
REQUIREMENTS BULLETIN

### Page 6

Table 1  Table 1: Block Point 3B Software Installation
Refer to the listed
procedures in SB
B787-81205-
SB340038-00 Is-
sue 001 or later
approved issues
as an accepted
procedure
Method of Compli-
ance
ActionCondition
PART 1: Block
Point 3B Software
Installation
Install 34 FMS
OPS Block Point
3B: part number
HNP5E-AL11-5011
and do Software
Checks to make
sure all software
was loaded correct-
ly to the following
locations:
Install new 34 Flight Man-
agement System Opera-
tional Program Software
(34 FMS OPS) Block Point
3B software
All Airplanes
CCR GPM-L5
CCR GPM-L6
CCR GPM-R5
B787-81205-SB340038-00 RB
Issue 001, 16 Nov 2017
Page 6 of 6
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB340038-00 RB
Issue 001, 16 Nov 2017
REQUIREMENTS BULLETIN

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
