# Boeing Alert Requirements Bulletin B787-81205-SB340053-00 RB

Copy: Revision 001 ("SB B787-81205-SB340053-00 RB"), 12 pages: PDF https://openairdocs.org/files/sha256/d9/6d/d96d79e3699e428227bd2ae8f933d752b9ad521ed18ab33f2a6afb422581945b; text https://openairdocs.org/service-documents/boeing/b787-81205-sb340053-00-rb/file/d96d79e3699e.md. Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2023-2227; AD 2024-16-07 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Boeing](https://openairdocs.org/service-documents/boeing.md)
- Type: Service bulletin (Alert Requirements Bulletin)
- Number: B787-81205-SB340053-00 RB
- Latest revision known: B787-81205-SB340053-00 RB, Issue 001, dated November 16, 2022 (OpenAirDocs)
- Page: https://openairdocs.org/service-documents/boeing/b787-81205-sb340053-00-rb

## ADs that cite it (1) (OpenAirDocs)

Newest first, with the revision each names, as OpenAirDocs read it from the AD's text.

- [AD 2024-16-07](https://openairdocs.org/ad/2024-16-07.md), effective Oct 23, 2024: Revision 001

Also cited in [1 proposed AD](https://openairdocs.org/service-documents/boeing/b787-81205-sb340053-00-rb/proposed.md).

## Text (12 pages)

Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2023-2227; AD 2024-16-07 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

ALERT
Alert Requirements Bulletin B787-81205-SB340053-00 RB NAVIGATION -
Flight Management Function - Thrust Management Block Point 4.1 Software
Change
Copyright © 2022 Boeing. Unpublished Work. All rights reserved.
Treatment of this data module and its content is governed by contract with Boeing. Rights to use this data module are licensed on a per
aircraft basis and such rights may not be transferable. For more information, contact The Boeing Company. Boeing, the Boeing signature,
the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner, BBJ, DC-8, DC-9, DC-10, KC-10, KC-46, KDC-10, MD-10,
MD-11, MD-80, MD-88, MD-90, P-8, Poseidon and Boeing liveries are all trademarks owned by The Boeing Company; and no trademark
license is granted in connection with this document unless provided in writing by Boeing.
EXPORT CONTROLLED
This technology or software is subject to the U.S. Export Administration Regulations (EAR), (15 C.F.R. Parts 730-774). No authorization
from the U.S. Department of Commerce is required for export, re-export, in-country transfer, or access EXCEPT to country group E:1 or
E:2 countries/persons per Supp.1 to Part 740 of the EAR.
ECCN: 9E991
B787-81205-SB340053-00 RB
Issue 001, 16 Nov 2022 12:00:00 AM
Page 1 of 12
EXPORT CONTROLLED ECCN: 9E991
See page 1 for details.
7.0
B787-81205-SB340053-00 RB
Issue 001, 16 Nov 2022 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 2

Table of Contents
Page
A. EFFECTIVITY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
1. Airplanes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
2. Spares Affected . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
B. CONCURRENT REQUIREMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
C. COMPLIANCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
D. APPROVAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
E. ACCOMPLISHMENT INSTRUCTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
1. General Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
2. Work Instructions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
B787-81205-SB340053-00 RB
Issue 001, 16 Nov 2022 12:00:00 AM
Page 2 of 12
EXPORT CONTROLLED ECCN: 9E991
See page 1 for details.
B787-81205-SB340053-00 RB
Issue 001, 16 Nov 2022 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 3

THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN
IN PARAGRAPH 1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND
Alert:
THIS DOCUMENT TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD,
SEND THIS DOCUMENT TO THE NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR
COMPLIANCE DOCUMENT. THE BOEING PROCESSES USED TO CREATE THE SERVICE
BULLETIN (SB) AND THE REQUIREMENTS BULLETIN (RB) ENSURE THAT THE INFORMATION
BETWEEN "RC START" AND "RC END" IN THE SB ARE IDENTICAL TO THE INFORMATION IN
THE SAME SECTIONS (COMPLIANCE, WORK INSTRUCTIONS...) OF THE RB WHICH THE SB
REFERS TO AS THE RELATED DOCUMENT.
A. EFFECTIVITY
1. Airplanes
This bulletin is applicable to 787-8, 787-9, 787-10 Airplane(s), line number(s) 6-687, 689-886, 888-
897, 899-912, 914-954, 956-970, 972-982, 984-989, 992-996, 999, 1001-1008, 1012-1013, 1017-
1018, 1021-1022, 1024-1025, 1029-1030, 1032, 1038, 1044, 1047-1048, 1054, 1056-1059, 1094-
1095, 1098, 1130 in 3 Group(s). Where the effectivity is presented with hyphens between line
numbers, the airplane applicability means "through" and "inclusive", e.g. line numbers 1-9 means
line numbers 1 through 9 inclusive.
The Variable Numbers and Group information for the applicable airplanes is given below.
Table 1  
DESCRIPTIONCONFIGURATIONGROUP
787-8 and 787-9 Airplanes not delivered with Flight Management
System Block Point 4 software.
-1
787-10 Airplanes not delivered with Flight Management System Block
Point 4 software.
-2
787-8, 787-9 and 787-10 Airplanes delivered with Flight Management
System Block Point 4 software.
-3
Airplane Models: 787-10, 787-8, 787-9
Table 2
GroupVariable Number
1ZA006
1ZA100 - ZA105
1ZA116 - ZA124
1ZA135 - ZA144
1ZA152 - ZA156
1ZA175 - ZA189
GroupVariable Number
1ZA195 - ZA204
1ZA215 - ZA225
1ZA230 - ZA256
1ZA260 - ZA277
1ZA285 - ZA296
1ZA317 - ZA324
GroupVariable Number
1ZA327
1ZA334 - ZA335
1ZA341 - ZA342
1ZA380 - ZA389
1ZA430 - ZA439
1ZA445 - ZA489
B787-81205-SB340053-00 RB
Issue 001, 16 Nov 2022 12:00:00 AM
Page 3 of 12
EXPORT CONTROLLED ECCN: 9E991
See page 1 for details.
B787-81205-SB340053-00 RB
Issue 001, 16 Nov 2022 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 4

GroupVariable Number
1ZA506 - ZA516
1ZA536 - ZA545
1ZA560 - ZA567
1ZA576 - ZA580
1ZA586
1ZA588 - ZA593
1ZA610 - ZA617
1ZA650 - ZA652
1ZA655 - ZA663
1ZA665 - ZA677
1ZA680 - ZA685
1ZA695 - ZA698
1ZA715 - ZA716
1ZA718 - ZA719
1ZA740 - ZA741
1ZA768 - ZA769
1ZA778 - ZA779
1ZA783 - ZA784
1ZA817 - ZA831
1ZA839
1ZA841 - ZA842
1ZA846 - ZA848
1ZA853 - ZA862
1ZA873 - ZA874
3ZA875 - ZA876
1ZA881 - ZA888
1ZA916 - ZA920
1ZA949 - ZA950
1ZA954 - ZA955
3ZA956 - ZA957
1ZA958
GroupVariable Number
3ZA959
3ZA963 - ZA966
3ZA968 - ZA971
1ZA972
3ZA990
1ZB001 - ZB012
1ZB021 - ZB043
1ZB047 - ZB060
1ZB077 - ZB081
1ZB097 - ZB113
3ZB114 - ZB121
1ZB127 - ZB134
3ZB135 - ZB136
1ZB167 - ZB191
1ZB197 - ZB198
1ZB217
1ZB219 - ZB220
1ZB224 - ZB229
1ZB234 - ZB242
1ZB246 - ZB248
1ZB251 - ZB258
1ZB261 - ZB262
1ZB265 - ZB276
3ZB277 - ZB279
1ZB299
1ZB302 - ZB305
1ZB332 - ZB335
3ZB336 - ZB338
1ZB362 - ZB379
1ZB407 - ZB418
3ZB419 - ZB421
GroupVariable Number
1ZB422 - ZB430
3ZB431 - ZB435
1ZB446 - ZB465
3ZB466 - ZB467
1ZB536 - ZB543
1ZB545 - ZB547
1ZB558 - ZB584
3ZB585 - ZB586
1ZB603 - ZB618
1ZB646 - ZB649
1ZB656 - ZB664
3ZB665
1ZB676 - ZB681
1ZB688 - ZB707
1ZB733 - ZB735
1ZB738 - ZB740
1ZB742 - ZB743
3ZB744 - ZB745
3ZB749 - ZB750
1ZB753 - ZB756
3ZB757
1ZB763 - ZB768
1ZB771 - ZB772
3ZB773 - ZB774
1ZB775
1ZB778 - ZB802
3ZB803 - ZB805
3ZB807 - ZB808
3ZB810 - ZB811
1ZB812 - ZB820
3ZB821
B787-81205-SB340053-00 RB
Issue 001, 16 Nov 2022 12:00:00 AM
Page 4 of 12
EXPORT CONTROLLED ECCN: 9E991
See page 1 for details.
B787-81205-SB340053-00 RB
Issue 001, 16 Nov 2022 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 5

GroupVariable Number
1ZB828 - ZB836
3ZB837 - ZB841
1ZB858 - ZB862
3ZB863
1ZB874 - ZB876
3ZB890
1ZB893 - ZB897
3ZB898 - ZB902
1ZB908
3ZB909
1ZB910 - ZB914
3ZB915 - ZB918
3ZB922
1ZB924
3ZB926 - ZB927
1ZB934 - ZB936
3ZB937 - ZB943
3ZB967 - ZB971
3ZB977 - ZB978
1ZB980 - ZB981
3ZB982 - ZB986
3ZB990 - ZB991
1ZB993
3ZB994 - ZB996
1ZB997
2ZC001 - ZC008
GroupVariable Number
3ZC009 - ZC015
3ZC036
2ZC037 - ZC039
3ZC040 - ZC048
2ZC061 - ZC065
3ZC066 - ZC069
3ZC101 - ZC102
3ZC106
3ZC116 - ZC117
3ZC126 - ZC129
3ZC151 - ZC152
3ZC155 - ZC158
3ZC211 - ZC216
3ZC219
3ZC221 - ZC225
1ZD001 - ZD009
1ZD012
3ZD013 - ZD016
1ZE001
3ZE002
1ZE003
3ZE004 - ZE006
3ZE008
1ZE013
3ZE016 - ZE017
1ZE031 - ZE032
GroupVariable Number
3ZE040 - ZE045
3ZE085 - ZE086
3ZE090 - ZE091
3ZE095 - ZE096
3ZE100
3ZE105 - ZE106
3ZE110
3ZE115
3ZE150
3ZE165 - ZE166
3ZE170 - ZE171
3ZE195 - ZE198
3ZE220 - ZE234
3ZE270
3ZE310 - ZE311
3ZE340 - ZE341
3ZE350 - ZE362
3ZE375
3ZE380 - ZE381
3ZE415 - ZE416
3ZE425 - ZE426
3ZE436 - ZE437
3ZE455 - ZE456
3ZE481
3ZE486
--
2. Spares Affected
None.
B787-81205-SB340053-00 RB
Issue 001, 16 Nov 2022 12:00:00 AM
Page 5 of 12
EXPORT CONTROLLED ECCN: 9E991
See page 1 for details.
B787-81205-SB340053-00 RB
Issue 001, 16 Nov 2022 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 6

B. CONCURRENT REQUIREMENTS
Group 1-2:
The bulletin(s) listed below must be done before this bulletin.
Group 1:
Table 3  
DescriptionService BulletinCompany
NAVIGATION - Flight Management Function - Block Point 4
Software Change
SB B787-81205-SB340035-00
RB Issue 001
Boeing
Group 2:
Table 4  
DescriptionService BulletinCompany
NAVIGATION - Flight Management Function - Block Point 4
Software Change
SB B787-81205-SB340037-00
RB Issue 001
Boeing
Group 3:
None.
C. COMPLIANCE
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to Re-
quirements Bulletin B787-81205-SB340053-00 RB. The Airworthiness Directive will make the compliance
tasks and times given in Requirements Bulletin B787-81205-SB340053-00 RB mandatory.
Accomplish the required actions, based on the applicable conditions in Table 8 and Table 9 in accordance
with Accomplishment Instructions.
B787-81205-SB340053-00 RB
Issue 001, 16 Nov 2022 12:00:00 AM
Page 6 of 12
EXPORT CONTROLLED ECCN: 9E991
See page 1 for details.
B787-81205-SB340053-00 RB
Issue 001, 16 Nov 2022 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 7

Group 1-2:
Table 8  Thrust Management Block Point 4.1 Software Installation
Repeat Interval (Not to
Exceed)
Boeing Recommeded
Compliace Time
ActionCondition
-At the time specified in
Compliance of the CON-
CURRENT REQUIRE-
MENT bulletin, or before
accomplishing the action
in ACTION 2, whichever
occurs first.
ACTION 1: Do all applica-
ble ACCOMPLISHMENT
INSTRUCTIONS actions
identified in the bulletin
specified in CONCUR-
RENT REQUIREMENTS.
All Airplanes
Within 6 months after the
Issue 001 date of Require-
ments Bulletin B787-
81205-SB340053-00 RB
or within 6 months after the
date of Issuance of the
original standard certificate
of airworthiness or the
original export certificate
of airworthiness, whichever
occurs later.
ACTION 2: Install 34
Thrust Management (TM)
Operational Program Soft-
ware (OPS) Part Number
HNP55-AL12-5008 or later
approved software Part
Number to data load desti-
nation Common Comput-
ing Resource (CCR) Gen-
eral Processing Module
(GPM) GPM-L5 and GPM-
R5.
ACTION 3: Do the soft-
ware configuration check
and make sure that soft-
ware 34 TM OPS part
number HNP55-AL12-
5008 or later approved
software part number is
shown as installed in CCR
GPM-L5 and GPM-R5. If
software 34 TM OPS part
number HNP55-AL12-
5008 or later approved
software part number is
not shown as installed in
CCR GPM-L5 and GPM-
R5, do corrective action(s)
until the software part
number is shown as in-
stalled in CCR GPM-L5
and GPM-R5.
B787-81205-SB340053-00 RB
Issue 001, 16 Nov 2022 12:00:00 AM
Page 7 of 12
EXPORT CONTROLLED ECCN: 9E991
See page 1 for details.
B787-81205-SB340053-00 RB
Issue 001, 16 Nov 2022 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 8

Group 3:
Table 9  Thrust Management Block Point 4.1 Software Installation
Repeat Interval (Not to
Exceed)
Boeing Recommeded
Compliace Time
ActionCondition
-Within 6 months after the
Issue 001 date of Require-
ments Bulletin B787-
81205-SB340053-00 RB
or within 6 months after the
date of Issuance of the
original standard certificate
of airworthiness or the
original export certificate
of airworthiness, whichever
occurs later.
ACTION 1: Install 34
Thrust Management (TM)
Operational Program Soft-
ware (OPS) Part Number
HNP55-AL12-5008 or later
approved software Part
Number to data load desti-
nation Common Comput-
ing Resource (CCR) Gen-
eral Processing Module
(GPM) GPM-L5 and GPM-
R5.
All Airplanes
ACTION 2: Do the soft-
ware configuration check
and make sure that soft-
ware 34 TM OPS part
number HNP55-AL12-
5008 or later approved
software part number is
shown as installed in CCR
GPM-L5 and GPM-R5. If
software 34 TM OPS part
number HNP55-AL12-
5008 or later approved
software part number is
not shown as installed in
CCR GPM-L5 and GPM-
R5, do corrective action(s)
until the software part
number is shown as in-
stalled in CCR GPM-L5
and GPM-R5.
D. APPROVAL
This Requirements Bulletin was examined by the Federal Aviation Administration (FAA). The changes
specified in this document comply with the applicable regulations and are FAA approved, as well as European
Union Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/JAA approved
airplanes listed in this Requirements Bulletin effectivity. This document and its approval were based on the
airplane in its original Boeing delivery configuration or as modified by other Boeing changes.
B787-81205-SB340053-00 RB
Issue 001, 16 Nov 2022 12:00:00 AM
Page 8 of 12
EXPORT CONTROLLED ECCN: 9E991
See page 1 for details.
B787-81205-SB340053-00 RB
Issue 001, 16 Nov 2022 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 9

If an airplane has a non-Boeing modification or repair that affects a component or system also affected by
this Requirements Bulletin, the operator is responsible for obtaining appropriate regulatory agency approval
before incorporating this Requirements Bulletin.
B787-81205-SB340053-00 RB
Issue 001, 16 Nov 2022 12:00:00 AM
Page 9 of 12
EXPORT CONTROLLED ECCN: 9E991
See page 1 for details.
B787-81205-SB340053-00 RB
Issue 001, 16 Nov 2022 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 10

E.    ACCOMPLISHMENT INSTRUCTIONS
1. GENERAL INFORMATION
NOTE: 1. This is an Enhanced Required for Compliance document. There will be a separate Service
Bulletin (SB) and a separate Requirements Bulletin (RB). If an RB is mandated by an
Airworthiness Directive (AD), then all applicable requirements specified in the RB must
be done. For the related SB, some locations are marked RC Start and RC End to identify
the requirements that are restated from the RB. For the related SB, the areas between
RC Start and RC End, including sub-steps and any figures identified between RC Start
and RC End, must be done to comply with the AD. Therefore, an Alternative Method of
Compliance (AMOC) is required for any deviations to steps between RC Start and RC
End, including substeps and identified figures. For the related SB, the steps not between
RC Start and RC End may be deviated from using accepted methods in accordance with
the operator's maintenance or inspection program without obtaining approval of an AMOC;
this is provided that the steps between RC Start and RC End, including sub-steps and
identified figures, can still be done as specified, and the airplane can be put back in an
airworthy condition. Figures not required for compliance are omitted from the RB.
2. This is an Enhanced Required for Compliance document. The Boeing processes used
to create the Service Bulletin (SB) and the Requirements Bulletin (RB) ensure that the
information between "RC Start" and "RC End" in the SB are identical to the information
in the same sections (Compliance, Work Instructions...) of the RB which the SB refers to
as the related document.
3. These work instructions refer to procedures included in other Boeing documents. When
the words "refer to" are used and the operator has an accepted alternative procedure,
the accepted alternative procedure can be used. When the words "in accordance with"
are included in the instruction, the procedure in the Boeing document must be used.
4. The compliance times for the actions in Work Instructions are in Compliance.
5. Later approved software is only software that is approved by Boeing as a replacement
for the software specified in this bulletin and approved as part of the type design by the
Federal Aviation Administration (FAA) after issuance of this bulletin Original Issue date.
2. WORK INSTRUCTIONS
A. Actions Required for Compliance
Requirements(1)
B787-81205-SB340053-00 RB
Issue 001, 16 Nov 2022 12:00:00 AM
Page 10 of 12
EXPORT CONTROLLED ECCN: 9E991
See page 1 for details.
B787-81205-SB340053-00 RB
Issue 001, 16 Nov 2022 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 11

Group 1-2:
Table 1  Thrust Management Block Point 4.1 Software Installation
Refer to the listed proce-
dures in SB B787-81205-
SB340053-00 Issue 001 or
later approved issues as an
accepted procedure
Method of Compli-
ance
ActionCondition
--ACTION 1: Do all applicable ACCOM-
PLISHMENT INSTRUCTIONS actions
identified in the bulletin specified in
CONCURRENT REQUIREMENTS.
All Airplanes
PART 1: PREPARE AIR-
PLANE AND STAGE SOFT-
WARE TO MASS STORAGE
DEVICES
-ACTION 2: Install 34 Thrust Manage-
ment (TM) Operational Program Soft-
ware (OPS) Part Number HNP55-
AL12-5008 or later approved software
Part Number to data load destination
Common Computing Resource (CCR)
General Processing Module (GPM)
GPM-L5 and GPM-R5.
PART 2: INSTALL NEW
SOFTWARE
PART 2: INSTALL NEW
SOFTWARE
-ACTION 3: Do the software configura-
tion check and make sure that soft-
ware 34 TM OPS part number HNP55-
AL12-5008 or later approved software
part number is shown as installed in
CCR GPM-L5 and GPM-R5. If soft-
ware 34 TM OPS part number HNP55-
AL12-5008 or later approved software
part number is not shown as installed
in CCR GPM-L5 and GPM-R5, do
corrective action(s) until the software
part number is shown as installed in
CCR GPM-L5 and GPM-R5.
PART 3: PERFORM SYSTEM
TESTS
B787-81205-SB340053-00 RB
Issue 001, 16 Nov 2022 12:00:00 AM
Page 11 of 12
EXPORT CONTROLLED ECCN: 9E991
See page 1 for details.
B787-81205-SB340053-00 RB
Issue 001, 16 Nov 2022 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 12

Group 3:
Table 2  Thrust Management Block Point 4.1 Software Installation
Refer to the listed proce-
dures in SB B787-81205-
SB340053-00 Issue 001 or
later approved issues as an
accepted procedure
Method of Compli-
ance
ActionCondition
PART 1: PREPARE AIR-
PLANE AND STAGE SOFT-
WARE TO MASS STORAGE
DEVICES
-ACTION 1: Install 34 Thrust Manage-
ment (TM) Operational Program Soft-
ware (OPS) Part Number HNP55-
AL12-5008 or later approved software
Part Number to data load destination
Common Computing Resource (CCR)
General Processing Module (GPM)
GPM-L5 and GPM-R5.
All Airplanes
PART 2: INSTALL NEW
SOFTWARE
PART 2: INSTALL NEW
SOFTWARE
-ACTION 2: Do the software configura-
tion check and make sure that soft-
ware 34 TM OPS part number HNP55-
AL12-5008 or later approved software
part number is shown as installed in
CCR GPM-L5 and GPM-R5. If soft-
ware 34 TM OPS part number HNP55-
AL12-5008 or later approved software
part number is not shown as installed
in CCR GPM-L5 and GPM-R5, do
corrective action(s) until the software
part number is shown as installed in
CCR GPM-L5 and GPM-R5.
PART 3: PERFORM SYSTEM
TESTS
B787-81205-SB340053-00 RB
Issue 001, 16 Nov 2022 12:00:00 AM
Page 12 of 12
EXPORT CONTROLLED ECCN: 9E991
See page 1 for details.
B787-81205-SB340053-00 RB
Issue 001, 16 Nov 2022 12:00:00 AM
REQUIREMENTS BULLETIN

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
