# Boeing Alert Requirements Bulletin B787-81205-SB530090-00 RB

Copy: Revision 001 ("RB_SB-787-53A0090-01"), 31 pages: PDF https://openairdocs.org/files/sha256/dd/ed/ddeda637996c0a57fff5b09ebb59b080216f433d7b0350aaee91ad2414d5ec91; text https://openairdocs.org/service-documents/boeing/b787-81205-sb530090-00-rb/file/ddeda637996c.md. Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2025-1361; AD 2026-01-04 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Boeing](https://openairdocs.org/service-documents/boeing.md)
- Type: Service bulletin (Alert Requirements Bulletin)
- Number: B787-81205-SB530090-00 RB
- Latest revision known: B787-81205-SB530090-00 RB, Issue 001, dated February 24, 2025 (OpenAirDocs)
- Page: https://openairdocs.org/service-documents/boeing/b787-81205-sb530090-00-rb

## ADs that cite it (1) (OpenAirDocs)

Newest first, with the revision each names, as OpenAirDocs read it from the AD's text.

- [AD 2026-01-04](https://openairdocs.org/ad/2026-01-04.md), effective Feb 20, 2026: Revision 001

Also cited in [1 proposed AD](https://openairdocs.org/service-documents/boeing/b787-81205-sb530090-00-rb/proposed.md).

## Text (31 pages)

Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2025-1361; AD 2026-01-04 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication. Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

ALERT
Alert Requirements Bulletin B787-81205-SB530090-00 RB FUSELAGE -
Section 46 - Ram Air Turbine Forward Fitting Inspection and Replacement
Copyright © 2025 The Boeing Company
Treatment of this data module and its content is governed by contract with Boeing. Rights to use this data module are licensed on a per
aircraft basis and such rights may not be transferable. For more information, contact The Boeing Company. Boeing, the Boeing signature,
the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner, BBJ, DC-8, DC-9, DC-10, KC-10, KC-46, KDC-10, MD-10,
MD-11, MD-80, MD-88, MD-90, P-8, Poseidon and Boeing liveries are all trademarks owned by The Boeing Company; and no trademark
license is granted in connection with this document unless provided in writing by Boeing.
EXPORT CONTROLLED
This technology or software is subject to the U.S. Export Administration Regulations (EAR), (15 C.F.R. Parts 730-774). No authorization
from the U.S. Department of Commerce is required for export, re-export, in-country transfer, or access EXCEPT to country group E:1 or
E:2 countries/persons per Supp.1 to Part 740 of the EAR.
ECCN: 9E991
B787-81205-SB530090-00 RB
Issue 001, 24 Feb 2025 12:00:00 AM
Page 1 of 31
Export Controlled ECCN: 9E991
See page 1 for details
2.0
B787-81205-SB530090-00 RB
Issue 001, 24 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 2

Table of Contents
Page
A. EFFECTIVITY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
1. Airplanes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
2. Spares Affected . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
B. CONCURRENT REQUIREMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
C. COMPLIANCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
D. APPROVAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
E. ACCOMPLISHMENT INSTRUCTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
1. General Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
2. Work Instructions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
TASK 1 – RAM AIR TURBINE FORWARD FITTING INSPECTION [Group 1] . . . . . . . . . . . . . . . 10
TASK 2 – RAM AIR TURBINE FORWARD FITTING REMOVAL [Group 1] . . . . . . . . . . . . . . . . . 13
TASK 3 – RAM AIR TURBINE FORWARD FITTING OPEN HOLE INSPECTION [Group 1] . . . . . . . . 17
TASK 4 – RAM AIR TURBINE FORWARD FITTING INSTALLATION [Group 1] . . . . . . . . . . . . . . 21
Appendix A – PROCEDURE FOR X-RAY FLUORESCENCE SPECTROMETER INSPECTION [Group 1] . 27
B787-81205-SB530090-00 RB
Issue 001, 24 Feb 2025 12:00:00 AM
Page 2 of 31
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530090-00 RB
Issue 001, 24 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 3

THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN
IN PARAGRAPH 1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND
Alert:
THIS DOCUMENT TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD,
SEND THIS DOCUMENT TO THE NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR
COMPLIANCE DOCUMENT. THE BOEING PROCESSES USED TO CREATE THE SERVICE
BULLETIN (SB) AND THE REQUIREMENTS BULLETIN (RB) ENSURE THAT THE INFORMATION
BETWEEN "RC START" AND "RC END" IN THE SB ARE IDENTICAL TO THE INFORMATION IN
THE SAME SECTIONS (COMPLIANCE, WORK INSTRUCTIONS...) OF THE RB WHICH THE SB
REFERS TO AS THE RELATED DOCUMENT.
A. EFFECTIVITY
1. Airplanes
This bulletin is applicable to 787-9, 787-10 Airplane(s), line number(s) 749-755, 757-763, 765-768,
770-780, 782-820, 822 in 1 Group(s). Where the effectivity is presented with hyphens between
line numbers, the airplane applicability means "through" and "inclusive", e.g. line numbers 1-9
means line numbers 1 through 9 inclusive.
Table 1  
DESCRIPTIONCONFIGURATIONGROUP
787-9, 787-10 Airplanes installed with Ram Air Turbine (RAT) forward
fitting that is possibly commercially pure unalloyed titatium.
-1
Airplane Models: 787-10, 787-9
Table 2
GroupVariable Number
1ZB012
1ZB113 - ZB116
1ZB275 - ZB276
1ZB335
1ZB430 - ZB432
1ZB465 - ZB467
1ZB585
1ZB663 - ZB665
1ZB740
1ZB754
1ZB757
GroupVariable Number
1ZB772 - ZB773
1ZB800 - ZB804
1ZB835 - ZB837
1ZB861 - ZB863
1ZB876
1ZB896 - ZB898
1ZB908 - ZB909
1ZB922
1ZB924
1ZB935 - ZB936
1ZB967 - ZB968
GroupVariable Number
1ZB980 - ZB982
1ZB990
1ZB993
1ZB997
1ZC009
1ZC038 - ZC043
1ZC062 - ZC065
1ZC116
1ZE032
1ZE040 - ZE042
1ZE165
B787-81205-SB530090-00 RB
Issue 001, 24 Feb 2025 12:00:00 AM
Page 3 of 31
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530090-00 RB
Issue 001, 24 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 4

2. Spares Affected
None.
B. CONCURRENT REQUIREMENTS
None.
C. COMPLIANCE
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to Re-
quirements Bulletin B787-81205-SB530090-00 RB. The Airworthiness Directive will make the compliance
tasks and times given in Requirements Bulletin B787-81205-SB530090-00 RB mandatory.
Accomplish the required action, based on the applicable condition in Table 4 in accordance with the Accom-
plishment Instructions
When more than one OPTION is given for a CONDITION, do only one of the OPTION numbers. When
more than one ACTION is given for a CONDITION number or an OPTION number, do all of the ACTION
numbers for that CONDITION number or OPTION number.
Table 4  Ram Air Turbine (RAT) forward fitting at Station (STA) 1329 – Inspection and Replacement
Boeing Recommended Compli-
ance Time
ActionCondition
Within 36 months after the Issue 001
date of Requirements Bulletin B787-
81205-SB530090-00 RB.
Do a High Frequency Eddy Current
(HFEC) or handheld XRF Spectrom-
eter Inspection of RAT forward fitting
to determine titanium alloy material.
All Airplanes
-No further action required.CONDITION 1: ANY RAT FOR-
WARD FITTING FOUND THAT IS
Ti-6Al-4V ALLOY MATERIAL.
Before further flight.CONDITION 2 (ACTION 1): Remove
RAT forward fitting
CONDITION 2: ANY RAT FOR-
WARD FITTING FOUND THAT IS
NOT Ti-6Al-4V ALLOY MATERIAL
OR TITANIUM ALLOY CANNOT BE
DETERMINED.
Before further flightCONDITION 2 (ACTION 2): At all
fastener hole locations common to
titanium parts of the interfacing
structure of the affected RAT for-
ward fitting, do an open hole HFEC
inspection for any crack.
Before further flight.Replace RAT forward fitting with a
new RAT forward fitting (Ti-6Al-4V
alloy material).
CONDITION 2.1: NO CRACK
FOUND
B787-81205-SB530090-00 RB
Issue 001, 24 Feb 2025 12:00:00 AM
Page 4 of 31
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530090-00 RB
Issue 001, 24 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 5

Table 4  Ram Air Turbine (RAT) forward fitting at Station (STA) 1329 – Inspection and Replacement
Boeing Recommended Compli-
ance Time
ActionCondition
Before further flight.Contact the Boeing Company for
repair instructions and new RAT
Forward fitting installation instruc-
tions. Do the repair and install a new
RAT Forward fitting with Ti-6Al-4V
alloy material.
CONDITION 2.2: ANY CRACK
FOUND
D. APPROVAL
This Requirements Bulletin was examined by the Federal Aviation Administration (FAA). The changes
specified in this document comply with the applicable regulations and are FAA approved, as well as European
Union Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/JAA approved
airplanes listed in this Requirements Bulletin effectivity. This document and its approval were based on the
airplane in its original Boeing delivery configuration or as modified by other Boeing changes.
If an airplane has a non-Boeing modification or repair that affects a component or system also affected by
this Requirements Bulletin, the operator is responsible for obtaining appropriate regulatory agency approval
before incorporating this Requirements Bulletin.
B787-81205-SB530090-00 RB
Issue 001, 24 Feb 2025 12:00:00 AM
Page 5 of 31
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530090-00 RB
Issue 001, 24 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 6

E.    ACCOMPLISHMENT INSTRUCTIONS
1. GENERAL INFORMATION
KEEP THE WORK AREA, WIRES AND ELECTRICAL BUNDLES CLEAN OF METAL
PARTICLES OR CONTAMINATION WHEN YOU USE TOOLS. UNWANTED MATE-
RIAL, METAL PARTICLES OR CONTAMINATION CAUGHT IN WIRE BUNDLES
CAN CAUSE DAMAGE TO THE BUNDLES. DAMAGED WIRE BUNDLES CAN
CAUSE SPARKS OR OTHER ELECTRICAL DAMAGE.CAUTION
NOTE: 1. This is an Enhanced Required for Compliance document. There will be a separate Service
Bulletin (SB) and a separate Requirements Bulletin (RB). If an RB is mandated by an
Airworthiness Directive (AD), then all applicable requirements specified in the RB must
be done. In the RB, the "Refer to the listed procedures..." column of the table(s) in the
Work Instructions is for reference only. The procedures in that column are not required
by the AD and are for guidance only. For the related SB, some locations are marked RC
Start and RC End to identify the requirements that are restated from the RB. For the re-
lated SB, the areas between RC Start and RC End, including sub-steps and any figures
identified between RC Start and RC End, must be done to comply with the AD. Therefore,
an Alternative Method of Compliance (AMOC) is required for any deviations to steps be-
tween RC Start and RC End, including substeps and identified figures. For the related
SB, the steps not between RC Start and RC End may be deviated from using accepted
methods in accordance with the operator's maintenance or inspection program without
obtaining approval of an AMOC; this is provided that the steps between RC Start and RC
End, including sub-steps and identified figures, can still be done as specified, and the
airplane can be put back in an airworthy condition. Figures not required for compliance
are omitted from the RB.
2. This is an Enhanced Required for Compliance document. The Boeing processes used
to create the Service Bulletin (SB) and the Requirements Bulletin (RB) ensure that the
information between "RC Start" and "RC End" in the SB are identical to the information
in the same sections (Compliance, Work Instructions...) of the RB which the SB refers to
as the related document.
3. These work instructions refer to procedures included in other Boeing documents. When
the words "refer to" are used and the operator has an accepted alternative procedure,
the accepted alternative procedure can be used. When the words "in accordance with"
are included in the instruction, the procedure in the Boeing document must be used.
4. The compliance times for the actions in Work Instructions are in Compliance.
5. Unless shown differently, these dimensions and tolerances are used:
– Linear dimensions are in inches
B787-81205-SB530090-00 RB
Issue 001, 24 Feb 2025 12:00:00 AM
Page 6 of 31
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530090-00 RB
Issue 001, 24 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 7

– Tolerance on linear dimensions, other than rivet and bolt edge margins, is plus or
minus 0.03 inch
– Tolerance on rivet and bolt edge margin is plus or minus 0.05 inch
– Angular tolerance is plus or minus 2 degrees
– Hole dimensions for standard solid rivets and fasteners are in SRM Chapter 51
– Torque Values:
– Values for structural fasteners are given in 787 Structural Repair Manual, Chapter
51.
– Values for airframe maintenance tasks are included in Chapter 20 of 787 Aircraft
Maintenance Manual (AMM).
– Values for electrical maintenance tasks are included in Chapter 20 of Standard
Wiring Practices Manual (SWPM).
– Values for engine maintenance tasks are included in Chapter 70 of 787 Aircraft
Maintenance Manual (AMM).
– Non-standard torque values for maintenance tasks are included in the applicable
installation step.
6. Use the approved fastener, process and material substitutions in accordance with SRM
Chapter 51.
7. If the length of any fastener specified in this requirements bulletin does not meet the in-
stallation standards in SRM Chapter 51, then a fastener of the same specification, or an
approved substitute, with a length which meets the installation standards in SRM Chapter
51 may be used. In addition, washers may be installed for fastener grip length in accor-
dance with SRM Chapter 51. Refer to SOPM 20-50-01 for alternate full threaded fasteners
(screws) needed for installation in this requirements bulletin.
8. If it is necessary to remove more parts for access, you can remove those parts. If you
can get access without removing identified parts, it is not necessary to remove all of the
identified parts. Jacking and shoring limitations must be observed.
9. Where the work instructions include installation of a kept part, a new or serviceable part
with the same part number can be installed as an alternative to the kept part.
10. When more than one OPTION is given for a CONDITION, do only one of the OPTION
numbers. When more than one ACTION is given for a CONDITION number or an OPTION
number, do all of the ACTION numbers for that CONDITION number or OPTION number.
2. WORK INSTRUCTIONS
A. Actions Required for Compliance
(1) Requirements:
B787-81205-SB530090-00 RB
Issue 001, 24 Feb 2025 12:00:00 AM
Page 7 of 31
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530090-00 RB
Issue 001, 24 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 8

Table 1  Ram Air Turbine (RAT) forward fitting at Station (STA) 1329 – Inspection and Replacement
Refer to the listed proce-
dures in SB B787-81205-
SB530090-00 Issue 001
or later approved issues
as an accepted proce-
dure.
Method of ComplianceActionCondition
PART 1: OPEN ACCESS
FOR INSPECTION
-Do a High Frequency Eddy
Current (HFEC) or hand-
held XRF Spectrometer
Inspection of RAT forward
fitting to determine titanium
alloy material.
All Airplanes
-TASK 1
PART 2: CLOSE ACCESS
AFTER INSPECTION
-No further action required.CONDITION 1: ANY RAT
FORWARD FITTING
FOUND THAT IS Ti-6Al-
4V ALLOY MATERIAL.
PART 3: OPEN ACCESS
FOR REPLACEMENT
-CONDITION 2 (ACTION
1): Remove RAT forward
fitting
CONDITION 2: ANY RAT
FORWARD FITTING
FOUND THAT IS NOT Ti-
6Al-4V ALLOY MATERIAL
OR TITANIUM ALLOY
CANNOT BE DETER-
MINED
-TASK 2
-TASK 3CONDITION 2 (ACTION
2): At all fastener hole loca-
tions common to titanium
parts of the interfacing
structure of the affected
RAT Forward fitting, do an
open hole inspection for
any crack
-TASK 4Replace RAT forward fit-
ting with a new RAT for-
ward fitting (Ti-6Al-4V alloy
material).
CONDITION 2.1: NO
CRACK FOUND PART 4: CLOSE ACCESS
AFTER REPLACEMENT
-
--Contact the Boeing Compa-
ny for repair instructions
and new RAT Forward fit-
ting installation instruc-
tions. Do the repair and in-
stall a new RAT Forward
fitting with Ti-6Al-4V alloy
material.
CONDITION 2.2: ANY
CRACK FOUND PART 4: CLOSE ACCESS
AFTER REPLACEMENT
-
B787-81205-SB530090-00 RB
Issue 001, 24 Feb 2025 12:00:00 AM
Page 8 of 31
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530090-00 RB
Issue 001, 24 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 9

Task 1 – RAM AIR TURBINE FORWARD FITTING INSPECTION [Group 1:]
THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN
IN PARAGRAPH 1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND
Alert:
THIS DOCUMENT TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD,
SEND THIS DOCUMENT TO THE NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR
COMPLIANCE DOCUMENT. THE BOEING PROCESSES USED TO CREATE THE SERVICE
BULLETIN (SB) AND THE REQUIREMENTS BULLETIN (RB) ENSURE THAT THE INFORMATION
BETWEEN "RC START" AND "RC END" IN THE SB ARE IDENTICAL TO THE INFORMATION IN
THE SAME SECTIONS (COMPLIANCE, WORK INSTRUCTIONS...) OF THE RB WHICH THE SB
REFERS TO AS THE RELATED DOCUMENT.
B787-81205-SB530090-00 RB
Issue 001, 24 Feb 2025 12:00:00 AM
Page 9 of 31
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530090-00 RB
Issue 001, 24 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 10 (OCR)

Q BOEING  B787-81205-SB530090-00 RB
Issue 001, 24 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN
Procedure
This Task applies only to: Group 1.
STA
1329
FWD
ICN-B787-A-000061-A-81205-19881-A-01-1
Task 1 Figure 1
B787-81205-SB530090-00 RB
Issue 001, 24 Feb 2025 12:00:00 AM
Page 10 of 31
Export Controlled ECCN: 9E991
See page 1 for details

### Page 11

1.  The step numbers shown below agree with the numbers shown in the circle symbols in the Task. The QTY
numbers shown below are the number of parts necessary for this Task.
Table 1  
More DataQtyIdentificationNameActionStep
*[1]*[2]1464Z4951-1265RAT FITTING FOR-
WARD CA
Inspect1
*[1]  Do an X-Ray Fluorescence Spectrometer inspection of the Ram Air Turbine (RAT) forward fitting to determine the material in accordance
with Appendix A.
*[2]  As an option, do a High Frequency Eddy Current (HFEC) inspection of the RAT forward fitting to determine the material in accordance
with 787 NDT Manual Part 6, 51-00-13.
B787-81205-SB530090-00 RB
Issue 001, 24 Feb 2025 12:00:00 AM
Page 11 of 31
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530090-00 RB
Issue 001, 24 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 12

Task 2 – RAM AIR TURBINE FORWARD FITTING REMOVAL [Group 1:]
THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN
IN PARAGRAPH 1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND
Alert:
THIS DOCUMENT TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD,
SEND THIS DOCUMENT TO THE NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR
COMPLIANCE DOCUMENT. THE BOEING PROCESSES USED TO CREATE THE SERVICE
BULLETIN (SB) AND THE REQUIREMENTS BULLETIN (RB) ENSURE THAT THE INFORMATION
BETWEEN "RC START" AND "RC END" IN THE SB ARE IDENTICAL TO THE INFORMATION IN
THE SAME SECTIONS (COMPLIANCE, WORK INSTRUCTIONS...) OF THE RB WHICH THE SB
REFERS TO AS THE RELATED DOCUMENT.
B787-81205-SB530090-00 RB
Issue 001, 24 Feb 2025 12:00:00 AM
Page 12 of 31
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530090-00 RB
Issue 001, 24 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 13 (OCR)

A BOEING  B787-81205-SB530090-00 RB
Issue 001, 24 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN
Procedure
This Task applies only to: Group 1.
STA
1329
(STRUCTURE NOT SHOWN)  3062749
ICN-B787-A-000061-A-81205-19882-A-01-1
Task 2 Figure 1
B787-81205-SB530090-00 RB
Issue 001, 24 Feb 2025 12:00:00 AM
Page 13 of 31
Export Controlled ECCN: 9E991
See page 1 for details

### Page 14 (OCR)

BOEING  B787-81205-SB530090-00 RB
Issue 001, 24 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN
FWD
3062750
ICN-B787-A-000061-A-81205-19883-A-01-1
Task 2 Figure 2
1. The step numbers shown below agree with the numbers shown in the circle symbols in the Task. The QTY
numbers shown below are the number of parts necessary for this Task.
B787-81205-SB530090-00 RB
Issue 001, 24 Feb 2025 12:00:00 AM
Page 14 of 31
Export Controlled ECCN: 9E991
See page 1 for details

### Page 15

Table 1  
More DataQtyIdentificationNameActionStep
-28-COLLARRemove1
-6-WASHERRemove
*[1]6-BOLTRemove
*[2]*[3]*[4]1464Z4951-1265RAT FITTING FOR-
WARD CA
Remove
*[1]  Take the necessary precautions to ensure the structure is not damaged during fastener removal and reinstallation. Use of vibratory
tools, including rivet guns is not allowed. If a fastener cannot be pushed out of the hole with hand pressure, apply a non-impact torque
to rotate the fastener and facilitate removal. Ensure the collar is removed prior to applying this force.
*[2]  Clean fastener holes common to the fuselage skin and frame assembly. Refer to SOPM 20-30-03 as an accepted procedure.
*[3]  Remove any previously applied sealant along the mating surface of the RAT Forward Fitting and Fuselage skin. Refer to SOPM 20-
50-19 as an accepted procedure.
*[4]  Retain any shim(s) for possible reuse.
B787-81205-SB530090-00 RB
Issue 001, 24 Feb 2025 12:00:00 AM
Page 15 of 31
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530090-00 RB
Issue 001, 24 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 16

Task 3 – RAM AIR TURBINE FORWARD FITTING OPEN HOLE INSPECTION
[Group 1:]
THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN
IN PARAGRAPH 1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND
Alert:
THIS DOCUMENT TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD,
SEND THIS DOCUMENT TO THE NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR
COMPLIANCE DOCUMENT. THE BOEING PROCESSES USED TO CREATE THE SERVICE
BULLETIN (SB) AND THE REQUIREMENTS BULLETIN (RB) ENSURE THAT THE INFORMATION
BETWEEN "RC START" AND "RC END" IN THE SB ARE IDENTICAL TO THE INFORMATION IN
THE SAME SECTIONS (COMPLIANCE, WORK INSTRUCTIONS...) OF THE RB WHICH THE SB
REFERS TO AS THE RELATED DOCUMENT.
B787-81205-SB530090-00 RB
Issue 001, 24 Feb 2025 12:00:00 AM
Page 16 of 31
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530090-00 RB
Issue 001, 24 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 17 (OCR)

Q BOEING  B787-81205-SB530090-00 RB
Issue 001, 24 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN
Procedure
This Task applies only to: Group 1.
FWD
STA
1329
AFT CARGO COMPARTMENT
3082616
ICN-B787-A-000061-A-81205-20310-A-01-1
Task 3 Figure 1
B787-81205-SB530090-00 RB
Issue 001, 24 Feb 2025 12:00:00 AM
Page 17 of 31
Export Controlled ECCN: 9E991
See page 1 for details

### Page 18 (OCR)

Q BOEING  B787-81205-SB530090-00 RB
Issue 001, 24 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN
(SOME STRUCTURE NOT SHOWN)
(SOME STRUCTURE NOT SHOWN)
ICN-B787-A-000061-A-81205-20311-A-01-1
Task 3 Figure 2
1. The step numbers shown below agree with the numbers shown in the circle symbols in the Task. The QTY
numbers shown below are the number of parts necessary for this Task.
B787-81205-SB530090-00 RB
Issue 001, 24 Feb 2025 12:00:00 AM
Page 18 of 31
Export Controlled ECCN: 9E991
See page 1 for details

### Page 19

Table 1  
More DataQtyIdentificationNameActionStep
*[1]6461Z2278-()STA1329 KEEL AUX
SHEAR TIE S32R
Inspect1
*[1]  Do an open hole High Frequency Eddy Current (HFEC) inspection of titanium parts at fastener hole locations common to the interfacing
structure of the RAT Forward Fitting for any crack in accordance with 787 NDT Manual Part 6, 51-00-06.
B787-81205-SB530090-00 RB
Issue 001, 24 Feb 2025 12:00:00 AM
Page 19 of 31
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530090-00 RB
Issue 001, 24 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 20

Task 4 – RAM AIR TURBINE FORWARD FITTING INSTALLATION [Group
1:]
THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN
IN PARAGRAPH 1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND
Alert:
THIS DOCUMENT TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD,
SEND THIS DOCUMENT TO THE NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR
COMPLIANCE DOCUMENT. THE BOEING PROCESSES USED TO CREATE THE SERVICE
BULLETIN (SB) AND THE REQUIREMENTS BULLETIN (RB) ENSURE THAT THE INFORMATION
BETWEEN "RC START" AND "RC END" IN THE SB ARE IDENTICAL TO THE INFORMATION IN
THE SAME SECTIONS (COMPLIANCE, WORK INSTRUCTIONS...) OF THE RB WHICH THE SB
REFERS TO AS THE RELATED DOCUMENT.
B787-81205-SB530090-00 RB
Issue 001, 24 Feb 2025 12:00:00 AM
Page 20 of 31
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530090-00 RB
Issue 001, 24 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 21 (OCR)

A BOEING  B787-81205-SB530090-00 RB
Issue 001, 24 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN
Procedure
This Task applies only to: Group 1.
STA
1329
(STRUCTURE NOT SHOWN)
ICN-B787-A-000061-A-81205-20312-A-01-1
Task 4 Figure 1
B787-81205-SB530090-00 RB
Issue 001, 24 Feb 2025 12:00:00 AM
Page 21 of 31
Export Controlled ECCN: 9E991
See page 1 for details

### Page 22 (OCR)

OBOEING  B787-81205-SB530090-00 RB
Issue 001, 24 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN
2) 11 LOCATIONS  11 LOCATIONS
D
(VIEW INSIDE FUSELAGE  (VIEW INSIDE FOSELAGE
IN THE OUTBOARD DIRECTION)  IN THE OUTBOARD DIRECTION)
1 6 LOCATIONS
(TOP VIEW)
ICN-B787-A-000061-A-81205-20313-A-01-1
Task 4 Figure 2
B787-81205-SB530090-00 RB
Issue 001, 24 Feb 2025 12:00:00 AM
Page 22 of 31
Export Controlled ECCN: 9E991
See page 1 for details

### Page 23 (OCR)

Q BOEING  B787-81205-SB530090-00 RB
Issue 001, 24 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN
5) 3 LOCATIONS
3 LOCATIONS 5
4) 5 LOCATIONS
(VIEW INSIDE FUSELAGE
IN THE OUTBOARD DIRECTION
5 LOCATIONS (4
(VIEW INSIDE FUSELAGE
IN THE OUTBOARD DIRECTION)
3064892
ICN-B787-A-000061-A-81205-20314-A-01-1
Task 4 Figure 3
B787-81205-SB530090-00 RB
Issue 001, 24 Feb 2025 12:00:00 AM
Page 23 of 31
Export Controlled ECCN: 9E991
See page 1 for details

### Page 24

ICN-B787-A-000061-A-81205-20315-A-01-1
Task 4 Figure 4  
1.  The step numbers shown below agree with the numbers shown in the circle symbols in the Task. The QTY
numbers shown below are the number of parts necessary for this Task.
Table 1  
More DataQtyIdentificationNameActionStep
*[1]*[2]1464Z4951-1265RAT FITTING FOR-
WARD CA
Locate1
*[1]*[2]1464Z4952-201RAT INTERCOSTALLocate
*[3]*[4]28-HOLEDrill2
*[5]--SEALANTApply3
-1464Z4951-1265RAT FITTING FOR-
WARD CA
Install (New)
*[6]*[7]*[8]10BACB30NX8K10BOLT, PROTRUDING
HEAD, HEX DRIVE,
TENSION, 6AL-4V TI-
TANIUM (NOMINAL
AND OVERSIZE
Install (New)4
-10BACC30BH8KCOLLAR, PRELOAD,
TENSION, REDUCED
HEX, CRES
Install (New)
B787-81205-SB530090-00 RB
Issue 001, 24 Feb 2025 12:00:00 AM
Page 24 of 31
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530090-00 RB
Issue 001, 24 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 25

Table 1  
More DataQtyIdentificationNameActionStep
*[6]*[7]*[8]6BACB30NX8K11BOLT, PROTRUDING
HEAD, HEX DRIVE,
TENSION, 6AL-4V TI-
TANIUM (NOMINAL
AND OVERSIZE
Install (New)5
-6BACC30BH8KCOLLAR, PRELOAD,
TENSION, REDUCED
HEX, CRES
Install (New)
*[6]*[7]*[8]4BACB30NX8K14BOLT, PROTRUDING
HEAD, HEX DRIVE,
TENSION, 6AL-4V TI-
TANIUM (NOMINAL
AND OVERSIZE
Install (New)6
-4BACW10EG8CKWASHER, COUNTER-
SUNK, CRES AND
ALUMINUM ALLOY
(NOMINAL AND
OVERSIZE)
Install (New)
-4BACC30BH8KCOLLAR, PRELOAD,
TENSION, REDUCED
HEX, CRES
Install (New)
*[6]*[7]*[8]2BACB30NX8K11BOLT, PROTRUDING
HEAD, HEX DRIVE,
TENSION, 6AL-4V TI-
TANIUM (NOMINAL
AND OVERSIZE
Install (New)7
-2BACW10EG8CKWASHER, COUNTER-
SUNK, CRES AND
ALUMINUM ALLOY
(NOMINAL AND
OVERSIZE)
Install (New)
-2BACC30BH8KCOLLAR, PRELOAD,
TENSION, REDUCED
HEX, CRES
Install (New)
B787-81205-SB530090-00 RB
Issue 001, 24 Feb 2025 12:00:00 AM
Page 25 of 31
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530090-00 RB
Issue 001, 24 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 26

Table 1  
More DataQtyIdentificationNameActionStep
*[6]*[8]6BACB30NX8K4BOLT, PROTRUDING
HEAD, HEX DRIVE,
TENSION, 6AL-4V TI-
TANIUM (NOMINAL
AND OVERSIZE
Install (New)8
-6BACC30BH8KCOLLAR, PRELOAD,
TENSION, REDUCED
HEX, CRES
Install (New)
*[1]  Use existing holes to locate the RAT forward fitting for match drilling.
*[2]  Install any kept or new shim(s). Maximum gap prior to fastener installation 0.008 inch. Refer to SOPM 20-50-20, Type II as an accepted
procedure.
*[3]  Transfer the frame and intercostal holes into the fitting, taking precaution to fully include pilot and determinant assembly holes of the
fitting. Diameter 0.250 - 0.253 inches. Refer to 787-9 SRM 51-43-01 / 787-10 SRM 51-43-01 and SOPM 20-10-07 as accepted proce-
dures.
*[4]  Chamfer edges of fastener holes common to titanium members in the stackup. Refer to SOPM 20-10-07, Class 2, as an accepted
procedure.
*[5]  Apply faying surface seal with BMS5-45. Refer to SOPM 20-50-19 as an accepted procedure.
*[6]  Permanent straight shank fastener installation. Refer to 787-9 SRM 51-43-05 / 787-10 SRM 51-43-05 as an accepted procedure.
*[7]  Install fastener with BMS5-45 sealant. Refer to SOPM 20-50-19, Method 1, as an accepted procedure.
*[8]  Install fastener with head on the inboard side.
B787-81205-SB530090-00 RB
Issue 001, 24 Feb 2025 12:00:00 AM
Page 26 of 31
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530090-00 RB
Issue 001, 24 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 27

Appendix A –  PROCEDURE FOR X-RAY FLUORESCENCE SPECTROMETER
INSPECTION [Group 1:]
THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN
IN PARAGRAPH 1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND
Alert:
THIS DOCUMENT TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD,
SEND THIS DOCUMENT TO THE NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR
COMPLIANCE DOCUMENT. THE BOEING PROCESSES USED TO CREATE THE SERVICE
BULLETIN (SB) AND THE REQUIREMENTS BULLETIN (RB) ENSURE THAT THE INFORMATION
BETWEEN "RC START" AND "RC END" IN THE SB ARE IDENTICAL TO THE INFORMATION IN
THE SAME SECTIONS (COMPLIANCE, WORK INSTRUCTIONS...) OF THE RB WHICH THE SB
REFERS TO AS THE RELATED DOCUMENT.
Procedure
1. GENERAL
A. Use this procedure for verifying component composition of Ti-6Al-4V titanium alloy and commercially
pure titanium materials using a handheld X-ray fluorescence (XRF) spectrometer capable of analyzing
metallic materials.
B. Surfaces to be evaluated must be free from interference, with an approximate uninterrupted surface area
of 1 inch by 1 inch (as defined by device aperture dimensions).
C. Measurements must be taken with the XRF device perpendicular to the measurement surface, and the
device aperture fully covering inspection surface.
D. Operator must follow all applicable Radiation Health and Safety requirements as defined by their local,
state, and federal guidelines.
E. Operators must be enrolled in an applicable radiation exposure monitoring program and to be issued
personal dosimetry devices including, but not limited to, (2) finger rings. One finger ring for each hand.
F. Personnel performing x-ray fluorescence inspection in accordance with this procedure must be a qualified
XRF operator in accordance with all applicable training/procedures.
NOTE: XRF elemental analysis results will include the composition of any coating material and structure,
along with the base material. Therefore, alloy verification is dependent upon the presence of
elemental Vanadium (V) to determine material conformance.
B787-81205-SB530090-00 RB
Issue 001, 24 Feb 2025 12:00:00 AM
Page 27 of 31
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530090-00 RB
Issue 001, 24 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 28

2. EQUIPMENT / MATERIALS
A. X-Ray Fluorescence Instruments
(1) Instruments must have:
(a) An audible or visual indication of operation.
(b) Appropriate radiation hazard identification and documentation.
(c) A visual readout of the elemental measurements obtained.
(2) Instrument must:
(a) Be free of damage.
(b) Be handheld or portable, loaded with a metals library appropriate for detecting titanium and
vanadium.
(c) Be small enough to fit in the confined spaces required to perform the inspection and have the
ability to record, save and transfer result of the inspection.
(3) X-Ray Fluorescence Instruments:
(a) Refer to Material Information - Paragraph 6., Special Tooling Necessary to do this Service Bulletin
of Service Bulletin B787-81205-SB530090-00 for a list of recommended X-Ray Fluorescence
instruments approved for use.
B787-81205-SB530090-00 RB
Issue 001, 24 Feb 2025 12:00:00 AM
Page 28 of 31
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530090-00 RB
Issue 001, 24 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 29

NOTE: Other instruments are acceptable if they meet the requirements in Step 2.A.(1) and
2.A.(2).
(4) Reference Standards
(a) Use certified Commercially Pure Titanium (Ti-CP) and Ti-6Al-4V (Grade 5) alloy standards that
are NIST (National Institute of Standards and Technology) traceable or traceable by a nationally
accredited organization.
(b) Standards must be free from grease, oil, and foreign material contamination.
(5) Accessories
(a) Replacement film cover to cover the device aperture if required.
(b) Replacement fully charged device batteries.
(6) Preparation for Inspection
(a) Apply personally assigned radiation dosimetry devices in accordance with applicable Radiation
Health and Safety guidance.
(b) Read and review the requirements of this procedure and the device specific manufacturer sup-
plied operators manual.
(c) Identify the inspection area to determine access, required assistance and/or safety equipment,
or hazardous conditions.
(d) Verify access to the inspection surface to ensure instrument perpendicularity and full coverage
of device aperture.
(e) The ability to place instrument on sample surface may require movement of tubing, removal of
panels, or removal of select fasteners.
(f) Ensure all non-radiation certified personnel are a minimum 8 feet away from and out of the line
of sight of the inspection area.
(g) Apply applicable radiation hazard signage and barriers.
(h)
B787-81205-SB530090-00 RB
Issue 001, 24 Feb 2025 12:00:00 AM
Page 29 of 31
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530090-00 RB
Issue 001, 24 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 30

Select equipment that meets the requirements of EQUIPMENT/MATERIALS.
(i) Visually inspect instrument. If applicable, verify film cover fully covers the instrument aperture,
replace if damaged.
(j) Perform instrument system check in accordance with manufacturer's instructions.
(k) Verify instrument safety interlocks are operational.
(l) Ensure all instrument lights work properly including safety indicator lights.
(m) Perform analysis of "Check Standards" of known Ti-6Al-4V and Ti-CP to confirm materials under
evaluation and ability to differentiate elemental Vanadium (V) by following the STANDARDIZA-
TION procedure below.
FAILURE TO ENSURE SNOUT IS PERPENDICULAR TO SAMPLE AND/OR
APERTURE IS NOT FULLY COVERED CAN LEAD TO SCATTERING OF X-RAYS
POSING A SAFETY RISK.WARNING
(7) STANDARDIZATION
(a) Obtain the known Ti-CP and Ti-6Al-4V standards that meets the requirements of Reference
Standard.
(b) Place the instrument snout as perpendicular as possible to the reference standard and ensure
the aperture fully covers the test surface.
(c) Start test by pressing start trigger of instrument. X-rays will be emitting from instrument, maintain
contact between instrument and the sample until testing is complete.
(d) Following instrument operators manual, continue testing for 5-20 seconds or until audible/visual
indication to ensure adequate data collection.
(e) Verify results compared to a reference standard.
FAILURE TO ENSURE SNOUT IS PERPENDICULAR TO SAMPLE AND/OR
APERTURE IS NOT FULLY COVERED CAN LEAD TO SCATTERING OF X-RAYS
POSING A SAFETY RISK.WARNING
B787-81205-SB530090-00 RB
Issue 001, 24 Feb 2025 12:00:00 AM
Page 30 of 31
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530090-00 RB
Issue 001, 24 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 31

(8) INSPECTION
(a) Access parts to be inspected, following guidance in PREPARATION FOR INSPECTION.
(b) Place the instrument snout as perpendicular as possible to the part and ensure the aperture
fully covers the test surface.
(c) Start test by pressing start trigger of instrument. X-rays will be emitting from instrument, maintain
contact between instrument and the part until testing is complete.
(d) Following instrument operators manual, continue testing for 5-20 seconds or until audible/visual
indication to ensure adequate data collection.
(e) Record Vanadium content for each test.
(9) EVALUATION OF RESULTS
(a) Reject all parts that do not contain elemental Vanadium (V) with a composition range of 2.0%
to 6.0%, except as provided by Step 2.A.(9)(b).
(b) If elemental Vanadium (V) is detected outside of the above stated range, repeat test (1) addi-
tional time, and record the results for both inspections (retain XRF scan number for confirmation,
if applicable). If elemental Vanadium is detected inside the above stated range in the repeated
test, then the part is acceptable.
(c) Parts that contain elemental Vanadium (V) with a composition range of 2.0% to 6.0% are made
with Ti-6Al-4V material.
B787-81205-SB530090-00 RB
Issue 001, 24 Feb 2025 12:00:00 AM
Page 31 of 31
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530090-00 RB
Issue 001, 24 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
