# Boeing Alert Requirements Bulletin B787-81205-SB530091-00 RB

## Copies (2)

Copies the FAA filed in AD dockets on regulations.gov, newest revision first. A newer revision may exist.

- Revision 001, part 1 of 2 ("RB_B787-81205-SB530091-00_Issue001_Part1"), 80 pages: PDF https://openairdocs.org/files/sha256/82/12/821297ce959811d339679f8843b7072759d47ec1a70eba819e4c104256e235d6; text https://openairdocs.org/service-documents/boeing/b787-81205-sb530091-00-rb/file/821297ce9598.md. Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2025-0749; AD 2025-23-06 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Revision 001, part 2 of 2 ("RB_B787-81205-SB530091-00_Issue001_Part2"), 68 pages: PDF https://openairdocs.org/files/sha256/75/06/75069931b32d868666647a5a556bd6300bb8935124abe369242d6d29c5e7eed3; text https://openairdocs.org/service-documents/boeing/b787-81205-sb530091-00-rb/file/75069931b32d.md. Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2025-0749; AD 2025-23-06 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Boeing](https://openairdocs.org/service-documents/boeing.md)
- Type: Service bulletin (Alert Requirements Bulletin)
- Number: B787-81205-SB530091-00 RB
- Latest revision known: B787-81205-SB530091-00 RB, Issue 001, dated February 7, 2025 (OpenAirDocs)
- Page: https://openairdocs.org/service-documents/boeing/b787-81205-sb530091-00-rb

## ADs that cite it (1) (OpenAirDocs)

Newest first, with the revision each names, as OpenAirDocs read it from the AD's text.

- [AD 2025-23-06](https://openairdocs.org/ad/2025-23-06.md), effective Jan 13, 2026: Revision 001

Also cited in [1 proposed AD](https://openairdocs.org/service-documents/boeing/b787-81205-sb530091-00-rb/proposed.md).

## Text (80 pages)

Revision 001, part 1 of 2, the newest copy. Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2025-0749; AD 2025-23-06 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication. Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

ALERT
Alert Requirements Bulletin B787-81205-SB530091-00 RB FUSELAGE -
Section 45 - Pressure Deck Splice Fittings Inspection and Replacement
Copyright © 2025 The Boeing Company
Treatment of this data module and its content is governed by contract with Boeing. Rights to use this data module are licensed on a per
aircraft basis and such rights may not be transferable. For more information, contact The Boeing Company. Boeing, the Boeing signature,
the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner, BBJ, DC-8, DC-9, DC-10, KC-10, KC-46, KDC-10, MD-10,
MD-11, MD-80, MD-88, MD-90, P-8, Poseidon and Boeing liveries are all trademarks owned by The Boeing Company; and no trademark
license is granted in connection with this document unless provided in writing by Boeing.
EXPORT CONTROLLED
This technology or software is subject to the U.S. Export Administration Regulations (EAR), (15 C.F.R. Parts 730-774). No authorization
from the U.S. Department of Commerce is required for export, re-export, in-country transfer, or access EXCEPT to country group E:1 or
E:2 countries/persons per Supp.1 to Part 740 of the EAR.
ECCN: 9E991
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
Page 1 of 148
Export Controlled ECCN: 9E991
See page 1 for details
3.0
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 2

Table of Contents
Page
A. EFFECTIVITY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
1. Airplanes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
2. Spares Affected . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
B. CONCURRENT REQUIREMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
C. COMPLIANCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
D. APPROVAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
E. ACCOMPLISHMENT INSTRUCTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
1. General Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
2. Work Instructions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
TASK 1 – SECTION 45 - STA 1137 LEFT SIDE STUB BEAM HORIZONTAL PRESSURE DECK (HPD) ATTACH
FITTING INSPECTION [Group 1] . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20
TASK 2 – SECTION 45 - STA 1137 LEFT SIDE STUB BEAM HORIZONTAL PRESSURE DECK (HPD) ATTACH
FITTING REMOVAL [Group 1] . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24
TASK 3 – SECTION 45 - STA 1137 LEFT SIDE STUB BEAM HORIZONTAL PRESSURE DECK (HPD) ATTACH
FITTING INTERFACING STRUCTURE OPEN HOLE HFEC INSPECTION [Group 1] . . . . . 28
TASK 4 – SECTION 45 - STA 1137 LEFT SIDE STUB BEAM HORIZONTAL PRESSURE DECK (HPD) ATTACH
FITTING INSTALLATION [Group 1] . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32
TASK 5 – SECTION 45 - STA 1137 RIGHT SIDE STUB BEAM HORIZONTAL PRESSURE DECK (HPD)
ATTACH FITTING INSPECTION [Group 1-2, 4] . . . . . . . . . . . . . . . . . . . . . . . . . . 41
TASK 6 – SECTION 45 - STA 1137 RIGHT SIDE STUB BEAM HORIZONTAL PRESSURE DECK (HPD)
ATTACH FITTING REMOVAL [Group 1-2, 4] . . . . . . . . . . . . . . . . . . . . . . . . . . . 45
TASK 7 – SECTION 45 - STA 1137 RIGHT SIDE STUB BEAM HORIZONTAL PRESSURE DECK (HPD)
ATTACH FITTING INTERFACING STRUCTURE OPEN HOLE HFEC INSPECTION [Group 1-2, 4]
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 49
TASK 8 – SECTION 45 - STA 1137 RIGHT SIDE STUB BEAM HORIZONTAL PRESSURE DECK (HPD)
ATTACH FITTING INSTALLATION [Group 1-2, 4] . . . . . . . . . . . . . . . . . . . . . . . . 53
TASK 9 – SECTION 45 - STA 1185 LEFT SIDE STUB BEAM HORIZONTAL PRESSURE DECK (HPD) ATTACH
FITTING INSPECTION [Group 3] . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 62
TASK 10 – SECTION 45 - STA 1185 LEFT SIDE STUB BEAM HORIZONTAL PRESSURE DECK (HPD)
ATTACH FITTING REMOVAL [Group 3] . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 65
TASK 11 – SECTION 45 - STA 1185 LEFT SIDE STUB BEAM HORIZONTAL PRESSURE DECK (HPD)
ATTACH FITTING INTERFACING STRUCTURE OPEN HOLE HFEC INSPECTION [Group 3] . 69
TASK 12 – SECTION 45 - STA 1185 LEFT SIDE STUB BEAM HORIZONTAL PRESSURE DECK (HPD)
ATTACH FITTING INSTALLATION [Group 3] . . . . . . . . . . . . . . . . . . . . . . . . . . . 73
TASK 13 – SECTION 45 - STA 1185 RIGHT SIDE STUB BEAM HORIZONTAL PRESSURE DECK (HPD)
ATTACH FITTING INSPECTION [Group 1-2] . . . . . . . . . . . . . . . . . . . . . . . . . . . 81
TASK 14 – SECTION 45 - STA 1185 RIGHT SIDE STUB BEAM HORIZONTAL PRESSURE DECK (HPD)
ATTACH FITTING REMOVAL [Group 1-2] . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 84
TASK 15 – SECTION 45 - STA 1185 RIGHT SIDE STUB BEAM HORIZONTAL PRESSURE DECK (HPD)
ATTACH FITTING INTERFACING STRUCTURE OPEN HOLE HFEC INSPECTION [Group 1-2]
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 88
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
Page 2 of 148
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 3

TASK 16 – SECTION 45 - STA 1185 RIGHT SIDE STUB BEAM HORIZONTAL PRESSURE DECK (HPD)
ATTACH FITTING INSTALLATION [Group 1-2] . . . . . . . . . . . . . . . . . . . . . . . . . . 92
TASK 17 – SECTION 45 - STA 1185 LEFT SIDE STUB BEAM HORIZONTAL PRESSURE DECK (HPD)
UPPER SPLICE INSPECTION [Group 1] . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 100
TASK 18 – SECTION 45 - STA 1185 LEFT SIDE STUB BEAM HORIZONTAL PRESSURE DECK (HPD)
UPPER SPLICE REMOVAL [Group 1] . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 104
TASK 19 – SECTION 45 - STA 1185 LEFT SIDE STUB BEAM HORIZONTAL PRESSURE DECK (HPD)
UPPER SPLICE INTERFACING STRUCTURE OPEN HOLE HFEC INSPECTION [Group 1] . 108
TASK 20 – SECTION 45 - STA 1185 LEFT SIDE STUB BEAM HORIZONTAL PRESSURE DECK (HPD)
UPPER SPLICE INSTALLATION [Group 1] . . . . . . . . . . . . . . . . . . . . . . . . . . . 112
TASK 21 – SECTION 45 - STA 1137 RIGHT SIDE STUB BEAM HORIZONTAL PRESSURE DECK (HPD)
ATTACH FITTING INSPECTION [Group 5] . . . . . . . . . . . . . . . . . . . . . . . . . . . 120
TASK 22 – SECTION 45 - STA 1137 RIGHT SIDE STUB BEAM HORIZONTAL PRESSURE DECK (HPD)
ATTACH FITTING REMOVAL [Group 5] . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 124
TASK 23 – SECTION 45 - STA 1137 RIGHT SIDE STUB BEAM HORIZONTAL PRESSURE DECK (HPD)
ATTACH FITTING INTERFACING STRUCTURE OPEN HOLE HFEC INSPECTION [Group 5] . 128
TASK 24 – SECTION 45 - STA 1137 RIGHT SIDE STUB BEAM HORIZONTAL PRESSURE DECK (HPD)
ATTACH FITTING INSTALLATION [Group 5] . . . . . . . . . . . . . . . . . . . . . . . . . . 132
Appendix A – PROCEDURE FOR X-RAY FLUORESCENCE SPECTROMETER INSPECTION [Group 1-5]
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 140
Appendix B – SECTION 45 - STA 1185 LEFT SIDE STUB BEAM HORIZONTAL PRESSURE DECK (HPD)
UPPER SPLICE - HOLES TRANSFER [Group 1] . . . . . . . . . . . . . . . . . . . . . . 145
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
Page 3 of 148
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 4

THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN
IN PARAGRAPH 1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND
Alert:
THIS DOCUMENT TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD,
SEND THIS DOCUMENT TO THE NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR
COMPLIANCE DOCUMENT. THE BOEING PROCESSES USED TO CREATE THE SERVICE
BULLETIN (SB) AND THE REQUIREMENTS BULLETIN (RB) ENSURE THAT THE INFORMATION
BETWEEN "RC START" AND "RC END" IN THE SB ARE IDENTICAL TO THE INFORMATION IN
THE SAME SECTIONS (COMPLIANCE, WORK INSTRUCTIONS...) OF THE RB WHICH THE SB
REFERS TO AS THE RELATED DOCUMENT.
A. EFFECTIVITY
1. Airplanes
This bulletin is applicable to 787-9, 787-10 Airplane(s), line number(s) 427, 430-433, 435-436,
438-439, 442-447, 449-456, 458-459, 461-464, 466-469, 471-473, 475, 477-481, 483-488, 490-
494, 496-498, 500-504, 507, 509-510, 512, 514-518, 520-521, 523-531, 533-534, 536-539, 541-
545, 547-550, 597 in 5 Group(s). Where the effectivity is presented with hyphens between line
numbers, the airplane applicability means "through" and "inclusive", e.g. line numbers 1-9 means
line numbers 1 through 9 inclusive.
Table 1  
DESCRIPTIONCONFIGURATIONGROUP
787-9 Airplanes installed with pressure deck area fittings that are
possibly commercially pure unalloyed titanium at four locations on the
left side and right side at Stations (STA) 1137 and 1185.
-1
787-9 Airplanes installed with pressure deck area fittings that are
possibly commercially pure unalloyed titanium at two locations on the
right side at Stations (STAs) 1137 and 1185.
-2
787-9 Airplanes installed with pressure deck area fittings that are
possibly commercially pure unalloyed titanium at one location on the
left side at Station (STA) 1185.
-3
787-9 Airplanes installed with pressure deck area fittings that are
possibly commercially pure unalloyed titanium at one location on the
right side at Station (STA) 1137.
-4
787-10 Airplanes installed with pressure deck area fittings that are
possibly commercially pure unalloyed titanium at one location on the
right side at Station (STA) 1137.
-5
Airplane Models: 787-10, 787-9
Table 2
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
Page 4 of 148
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 5

GroupVariable Number
4ZB007 - ZB009
4ZB024 - ZB026
2ZB039
4ZB040
4ZB048 - ZB054
1ZB098
4ZB099 - ZB103
4ZB183 - ZB186
4ZB217
4ZB229
4ZB238 - ZB240
3ZB242
4ZB246
GroupVariable Number
4ZB251
4ZB332
4ZB372 - ZB377
4ZB416 - ZB417
4ZB422 - ZB423
4ZB446 - ZB451
4ZB541 - ZB542
4ZB547
4ZB569 - ZB574
4ZB607 - ZB608
4ZB617
4ZB648 - ZB649
4ZB656 - ZB657
GroupVariable Number
4ZB676 - ZB679
4ZB688 - ZB696
4ZB703
4ZB738 - ZB739
2ZB763
4ZB764 - ZB765
4ZB778
4ZB782 - ZB783
4ZB785 - ZB788
4ZB812 - ZB814
5ZC001
5ZC036
--
2. Spares Affected
None.
B. CONCURRENT REQUIREMENTS
None.
C. COMPLIANCE
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to this
Requirements Bulletin. The Airworthiness Directive will make the compliance tasks and times given in Re-
quirements Bulletin B787-81205-SB530091-00 RB mandatory.
Do the required actions based on the applicable condition(s) in Table 7 and 8, in accordance with Accom-
plishment Instructions.
When more than one OPTION is given for a CONDITION, do only one of the OPTION numbers. When
more than one ACTION is given for a CONDITION number or an OPTION number, do all of the ACTION
numbers for that CONDITION number or OPTION number.
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
Page 5 of 148
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 6

Group 1:
Table 7  Stub Beam Horizontal Pressure Deck (HPD) Attach Fitting(s) and Upper Splice Fitting - Inspection and 
Replacement
Boeing Recommended Compli-
ance Time
ActionCondition
Within 48 months after the Issue 001
date of Requirements Bulletin B787-
81205-SB530091 RB.
Do a High Frequency Eddy Current
(HFEC) inspection or handheld X-
Ray Fluorescence (XRF) Spectrom-
eter inspection of the affected Stub
Beam HPD Attach fitting(s) and Up-
per Splice fitting to determine titani-
um alloy material.
All Airplanes
-No further action required at that
Stub Beam HPD Attach fitting or
Upper Splice fitting location.
CONDITION 1: ANY STUB BEAM
HPD ATTACH FITTING OR UPPER
SPLICE FITTING FOUND THAT IS
Ti-6Al-4V ALLOY MATERIAL
Before further flightCONDITION 2 (ACTION 1): Remove
all affected Stub Beam HPD Attach
fittings and all affected Upper Splice
fittings.
CONDITION 2: ANY STUB BEAM
HPD ATTACH FITTING OR UPPER
SPLICE FITTING FOUND THAT IS
NOT Ti-6Al-4V ALLOY MATERIAL
OR TITANIUM ALLOY CANNOT BE
DETERMINED Before further flightCONDITION 2 (ACTION 2): At allfastener hole locations common to
the interfacing structure of all affect-
ed Stub Beam HPD Attach fittings
and all affected Upper Splice fittings,
do an open hole HFEC inspection
for any crack.
Before further flightReplace all affected Stub Beam
HPD Attach fittings with new Stub
Beam HPD Attach fittings made of
Ti-6Al-4V alloy material and replace
all affected Upper Splice fittings with
new Upper Splice fittings made of
Ti-6Al-4V alloy material.
CONDITION 2.1: NO CRACK
FOUND
Before further flightContact the Boeing Company for
repair instructions and for installation
instructions for new fittings with Ti-
6Al-4V alloy material (Stub Beam
HPD Attach fittings and Upper
Splice fittings, as applicable). Do the
repair and installation.
CONDITION 2.2: ANY CRACK
FOUND
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
Page 6 of 148
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 7

Group 2-5:
Table 8  Stub Beam Horizontal Pressure Deck (HPD) Attach Fitting(s) - Inspection and Replacement
Boeing Recommended Compli-
ance Time
ActionCondition
Within 48 months after the Issue 001
date of Requirements Bulletin B787-
81205-SB530091 RB.
Do a High Frequency Eddy Current
(HFEC) inspection or handheld X-
Ray Fluorescence (XRF) Spectrom-
eter inspection of the affected Stub
Beam HPD Attach fitting(s) to deter-
mine titanium alloy material.
All Airplanes
-No further action required at that
Stub Beam HPD Attach fitting loca-
tion.
CONDITION 1: ANY STUB BEAM
HPD ATTACH FITTING FOUND
THAT IS Ti-6Al-4V ALLOY MATERI-
AL
Before further flight.CONDITION 2 (ACTION 1): Remove
affected Stub Beam HPD Attach fit-
ting.
CONDITION 2: ANY STUB BEAM
HPD ATTACH FITTING FOUND
THAT IS NOT Ti-6Al-4V ALLOY
MATERIAL OR TITANIUM ALLOY
CANNOT BE DETERMINED Before further flight.CONDITION 2 (ACTION 2): At allfastener hole locations common to
the interfacing structure of the affect-
ed Stub Beam HPD Attach fitting,
do an open hole HFEC inspection
for any crack.
Before further flight.Replace affected Stub Beam HPD
Attach fitting with a new Stub Beam
HPD Attach fitting (Ti-6Al-4V alloy
material).
CONDITION 2.1: NO CRACK
FOUND
Before further flight.Contact the Boeing Company for
repair instructions and new Stub
Beam HPD Attach fitting installation
instructions. Do the repair and install
a new Stub Beam HPD Attach fitting
with Ti-6Al-4V alloy material.
CONDITION 2.2: ANY CRACK
FOUND
D. APPROVAL
This Requirements Bulletin was examined by the Federal Aviation Administration (FAA). The changes
specified in this document comply with the applicable regulations and are FAA approved, as well as European
Union Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/JAA approved
airplanes listed in this Requirements Bulletin effectivity. This document and its approval were based on the
airplane in its original Boeing delivery configuration or as modified by other Boeing changes.
If an airplane has a non-Boeing modification or repair that affects a component or system also affected by
this Requirements Bulletin, the operator is responsible for obtaining appropriate regulatory agency approval
before incorporating this Requirements Bulletin.
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
Page 7 of 148
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 8

E.    ACCOMPLISHMENT INSTRUCTIONS
1. GENERAL INFORMATION
KEEP THE WORK AREA, WIRES AND ELECTRICAL BUNDLES CLEAN OF METAL
PARTICLES OR CONTAMINATION WHEN YOU USE TOOLS. UNWANTED MATE-
RIAL, METAL PARTICLES OR CONTAMINATION CAUGHT IN WIRE BUNDLES
CAN CAUSE DAMAGE TO THE BUNDLES. DAMAGED WIRE BUNDLES CAN
CAUSE SPARKS OR OTHER ELECTRICAL DAMAGE.CAUTION
NOTE: 1. This is an Enhanced Required for Compliance document. There will be a separate Service
Bulletin (SB) and a separate Requirements Bulletin (RB). If an RB is mandated by an
Airworthiness Directive (AD), then all applicable requirements specified in the RB must
be done. In the RB, the "Refer to the listed procedures..." column of the table(s) in the
Work Instructions is for reference only. The procedures in that column are not required
by the AD and are for guidance only. For the related SB, some locations are marked RC
Start and RC End to identify the requirements that are restated from the RB. For the re-
lated SB, the areas between RC Start and RC End, including sub-steps and any figures
identified between RC Start and RC End, must be done to comply with the AD. Therefore,
an Alternative Method of Compliance (AMOC) is required for any deviations to steps be-
tween RC Start and RC End, including substeps and identified figures. For the related
SB, the steps not between RC Start and RC End may be deviated from using accepted
methods in accordance with the operator's maintenance or inspection program without
obtaining approval of an AMOC; this is provided that the steps between RC Start and RC
End, including sub-steps and identified figures, can still be done as specified, and the
airplane can be put back in an airworthy condition. Figures not required for compliance
are omitted from the RB.
2. This is an Enhanced Required for Compliance document. The Boeing processes used
to create the Service Bulletin (SB) and the Requirements Bulletin (RB) ensure that the
information between "RC Start" and "RC End" in the SB are identical to the information
in the same sections (Compliance, Work Instructions...) of the RB which the SB refers to
as the related document.
3. These work instructions refer to procedures included in other Boeing documents. When
the words "refer to" are used and the operator has an accepted alternative procedure,
the accepted alternative procedure can be used. When the words "in accordance with"
are included in the instruction, the procedure in the Boeing document must be used.
4. The compliance times for the actions in Work Instructions are in Compliance .
5. Unless shown differently, these dimensions and tolerances are used:
– Linear dimensions are in inches
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
Page 8 of 148
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 9

– Tolerance on linear dimensions, other than rivet and bolt edge margins, is plus or
minus 0.03 inch
– Tolerance on rivet and bolt edge margin is plus or minus 0.05 inch
– Angular tolerance is plus or minus 2 degrees
– Hole dimensions for standard solid rivets and fasteners are in SRM Chapter 51
– Torque Values:
– Values for structural fasteners are given in 787 Structural Repair Manual, Chapter
51.
– Values for airframe maintenance tasks are included in Chapter 20 of 787 Aircraft
Maintenance Manual (AMM).
– Values for electrical maintenance tasks are included in Chapter 20 of Standard
Wiring Practices Manual (SWPM).
– Values for engine maintenance tasks are included in Chapter 70 of 787 Aircraft
Maintenance Manual (AMM).
– Non-standard torque values for maintenance tasks are included in the applicable
installation step.
6. Use the approved fastener, process and material substitutions in accordance with SRM
Chapter 51.
7. If the length of any fastener specified in this requirements bulletin does not meet the in-
stallation standards in SRM Chapter 51, then a fastener of the same specification, or an
approved substitute, with a length which meets the installation standards in SRM Chapter
51 may be used. In addition, washers may be installed for fastener grip length in accor-
dance with SRM Chapter 51. Refer to SOPM 20-50-01 for alternate full threaded fasteners
(screws) needed for installation in this requirements bulletin.
8. Use of colors in Tasks is based on guidance from the S1000D International specification
for technical publications.
9. When more than one OPTION is given for a CONDITION, do only one of the OPTION
numbers. When more than one ACTION is given for a CONDITION number or an OPTION
number, do all of the ACTION numbers for that CONDITION number or OPTION number.
10. If it is necessary to remove more parts for access, you can remove those parts. If you
can get access without removing identified parts, it is not necessary to remove all of the
identified parts.
11. Where the work instructions include installation of a kept part, a new or serviceable part
with the same part number can be installed as an alternative to the kept part.
12. If multiple nonconforming parts are identified, do the applicable on-condition corrective
action one at a time for each location to minimize effects on surrounding aircraft structure.
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
Page 9 of 148
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 10

2. WORK INSTRUCTIONS
A. Actions Required for Compliance
Requirements:(1)
Group 1:
Table 1  Stub Beam Horizontal Pressure Deck (HPD) Attach Fitting(s) and Upper Splice Fitting at Station (STA) 
1137 and 1185 Left and Right Side - Inspection and Replacement:
Refer to the listed proce-
dures in SB B787-81205-
SB530091-00 Issue 001
or later approved issues
as an accepted proce-
dure.
Method of ComplianceActionCondition
PART 1: OPEN ACCESS
FOR INSPECTION AT
STA 1137 AND STA 1185.
-Do a High Frequency Eddy
Current (HFEC) inspection
or handheld X-Ray Fluores-
cence (XRF) Spectrometer
inspection of the affected
Stub Beam HPD Attach fit-
ting(s) and Upper Splice
fitting to determine titanium
alloy material.
All Airplanes
-Task 1
Task 5
Task 13
Task 17
PART 2: CLOSE ACCESS
AFTER INSPECTION AT
STA 1137 AND STA 1185.
-No further action required
at that Stub Beam HPD
Attach fitting or Upper
Splice fitting location.
CONDITION 1: ANY STUB
BEAM HPD ATTACH FIT-
TING OR UPPER SPLICE
FITTING FOUND THAT IS
Ti-6Al-4V ALLOY MATERI-
AL.
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
Page 10 of 148
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 11

Group 1:
Table 1  Stub Beam Horizontal Pressure Deck (HPD) Attach Fitting(s) and Upper Splice Fitting at Station (STA) 
1137 and 1185 Left and Right Side - Inspection and Replacement:
Refer to the listed proce-
dures in SB B787-81205-
SB530091-00 Issue 001
or later approved issues
as an accepted proce-
dure.
Method of ComplianceActionCondition
PART 3: OPEN ACCESS
FOR REPLACEMENT AT
REQUIRED STA 1137
AND STA 1185 LOCA-
TIONS.
-CONDITION 2 (ACTION
1): Remove all affected
Stub Beam HPD Attach fit-
tings and all affected Up-
per Splice fittings.
CONDITION 2: ANY STUB
BEAM HPD ATTACH FIT-
TING OR UPPER SPLICE
FITTING FOUND THAT IS
NOT Ti-6Al-4V ALLOY
MATERIAL OR TITANIUM
ALLOY CANNOT BE DE-
TERMINED.
-Task 2
Task 6
Task 14
Task 18
-Task 3CONDITION 2 (ACTION
2): At all fastener hole loca-
tions common to the inter-
facing structure of all affect-
ed Stub Beam HPD Attach
fittings and all affected Up-
per Splice fittings, do an
open hole HFEC inspec-
tion for any crack.
Task 7
Task 15
Task 19
-Task 4Replace all affected Stub
Beam HPD Attach fittings
with new Stub Beam HPD
Attach fittings made of Ti-
6Al-4V alloy material and
replace all affected Upper
Splice fittings with new
Upper Splice fittings made
of Ti-6Al-4V alloy material.
CONDITION 2.1: NO
CRACK FOUND. Task 8
Task 16
Task 20
PART 4: CLOSE ACCESS
AFTER REPLACEMENT
AT REQUIRED STA 1137
AND STA 1185 LOCA-
TIONS.
-
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
Page 11 of 148
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 12

Group 1:
Table 1  Stub Beam Horizontal Pressure Deck (HPD) Attach Fitting(s) and Upper Splice Fitting at Station (STA) 
1137 and 1185 Left and Right Side - Inspection and Replacement:
Refer to the listed proce-
dures in SB B787-81205-
SB530091-00 Issue 001
or later approved issues
as an accepted proce-
dure.
Method of ComplianceActionCondition
--Contact the Boeing Compa-
ny for repair instructions
and for installation instruc-
tions for new fittings with
Ti-6Al-4V alloy material
(Stub Beam HPD Attach
fittings and Upper Splice
fittings, as applicable). Do
the repair and installation.
CONDITION 2.2: ANY
CRACK FOUND. PART 4: CLOSE ACCESS
AFTER REPLACEMENT
AT REQUIRED STA 1137
AND STA 1185 LOCA-
TIONS.
-
Group 2:
Table 2  Stub Beam Horizontal Pressure Deck (HPD) Attach Fittings at Station (STA) 1137 and 1185 Right Side - 
Inspection and Replacement:
Refer to the listed proce-
dures in SB B787-81205-
SB530091-00 Issue 001
or later approved issues
as an accepted proce-
dure.
Method of ComplianceActionCondition
PART 1: OPEN ACCESS
FOR INSPECTION AT
STA 1137 AND STA 1185.
-Do a High Frequency Eddy
Current (HFEC) inspection
or handheld X-Ray Fluores-
cence (XRF) Spectrometer
inspection of the affected
Stub Beam HPD attach fit-
ting(s) to determine titani-
um alloy material.
All Airplanes
-Task 5
Task 13
PART 2: CLOSE ACCESS
AFTER INSPECTION AT
STA 1137 AND STA 1185.
-No further action required
at that Stub Beam HPD
Attach fitting location.
CONDITION 1: ANY STUB
BEAM HPD ATTACH FIT-
TING FOUND THAT IS Ti-
6Al-4V ALLOY MATERIAL.
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
Page 12 of 148
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 13

Group 2:
Table 2  Stub Beam Horizontal Pressure Deck (HPD) Attach Fittings at Station (STA) 1137 and 1185 Right Side - 
Inspection and Replacement:
Refer to the listed proce-
dures in SB B787-81205-
SB530091-00 Issue 001
or later approved issues
as an accepted proce-
dure.
Method of ComplianceActionCondition
PART 3: OPEN ACCESS
FOR REPLACEMENT AT
REQUIRED STA 1137
AND STA 1185 LOCA-
TIONS.
-CONDITION 2 (ACTION
1): Remove affected Stub
Beam HPD Attach fitting.
CONDITION 2: ANY STUB
BEAM HPD ATTACH FIT-
TING FOUND THAT IS
NOT Ti-6Al-4V ALLOY
MATERIAL OR TITANIUM
ALLOY CANNOT BE DE-
TERMINED. -Task 6Task 14
-Task 7CONDITION 2 (ACTION
2): At all fastener hole loca-
tions common to the inter-
facing structure of the af-
fected Stub Beam HPD
Attach fitting, do an open
hole HFEC inspection for
any crack.
Task 15
-Task 8Replace affected Stub
Beam HPD Attach fitting
with a new Stub Beam
HPD Attach fitting (Ti-6Al-
4V alloy material).
CONDITION 2.1: NO
CRACK FOUND. Task 16
PART 4: CLOSE ACCESS
AFTER REPLACEMENT
AT REQUIRED STA 1137
AND STA 1185 LOCA-
TIONS.
-
--Contact the Boeing Compa-
ny for repair instructions
and new Stub Beam HPD
Attach fitting installation
instructions. Do the repair
and install a new Stub
Beam HPD Attach fitting
with Ti-6Al-4V alloy materi-
al.
CONDITION 2.2: ANY
CRACK FOUND. PART 4: CLOSE ACCESS
AFTER REPLACEMENT
AT REQUIRED STA 1137
AND STA 1185 LOCA-
TIONS.
-
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
Page 13 of 148
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 14

Group 3:
Table 3  Stub Beam Horizontal Pressure Deck (HPD) Attach Fitting at Station (STA) 1185 Left Side - Inspection and
 Replacement:
Refer to the listed proce-
dures in SB B787-81205-
SB530091-00 Issue 001
or later approved issues
as an accepted proce-
dure.
Method of ComplianceActionCondition
PART 1: OPEN ACCESS
FOR INSPECTION AT
STA 1185.
-Do a High Frequency Eddy
Current (HFEC) inspection
or handheld X-Ray Fluores-
cence (XRF) Spectrometer
inspection of the affected
Stub Beam HPD Attach fit-
ting to determine titanium
alloy material.
All Airplanes
-Task 9
PART 2: CLOSE ACCESS
AFTER INSPECTION AT
STA 1185.
-No further action required
at that Stub Beam HPD
Attach fitting location.
CONDITION 1: ANY STUB
BEAM HPD ATTACH FIT-
TING FOUND THAT IS Ti-
6Al-4V ALLOY MATERIAL.
PART 3: OPEN ACCESS
FOR REPLACEMENT AT
STA 1185.
-CONDITION 2 (ACTION
1): Remove affected Stub
Beam HPD Attach fitting.
CONDITION 2: ANY STUB
BEAM HPD ATTACH FIT-
TING FOUND THAT IS
NOT Ti-6Al-4V ALLOY
MATERIAL OR TITANIUM
ALLOY CANNOT BE DE-
TERMINED.
-Task 10
-Task 11CONDITION 2 (ACTION
2): At all fastener hole loca-
tions common to the inter-
facing structure of the af-
fected Stub Beam HPD
Attach fitting, do an open
hole HFEC inspection for
any crack.
-Task 12Replace affected Stub
Beam HPD Attach fitting
with a new Stub Beam
HPD Attach fitting (Ti-6Al-
4V alloy material).
CONDITION 2.1: NO
CRACK FOUND. PART 4: CLOSE ACCESS
AFTER REPLACEMENT
AT STA 1185.
-
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
Page 14 of 148
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 15

Group 3:
Table 3  Stub Beam Horizontal Pressure Deck (HPD) Attach Fitting at Station (STA) 1185 Left Side - Inspection and
 Replacement:
Refer to the listed proce-
dures in SB B787-81205-
SB530091-00 Issue 001
or later approved issues
as an accepted proce-
dure.
Method of ComplianceActionCondition
--Contact the Boeing Compa-
ny for repair instructions
and new Stub Beam HPD
Attach fitting installation
instructions. Do the repair
and install a new Stub
Beam HPD Attach fitting
with Ti-6Al-4V alloy materi-
al.
CONDITION 2.2: ANY
CRACK FOUND. PART 4: CLOSE ACCESS
AFTER REPLACEMENT
AT STA 1185.
-
Group 4:
Table 4  Stub Beam Horizontal Pressure Deck (HPD) Attach Fitting at Station (STA) 1137 Right Side - Inspection 
and Replacement:
Refer to the listed proce-
dures in SB B787-81205-
SB530091-00 Issue 001
or later approved issues
as an accepted proce-
dure.
Method of ComplianceActionCondition
PART 1: OPEN ACCESS
FOR INSPECTION AT
STA 1137.
-Do a High Frequency Eddy
Current (HFEC) inspection
or handheld X-Ray Fluores-
cence (XRF) Spectrometer
inspection of the affected
Stub Beam HPD Attach fit-
ting to determine titanium
alloy material.
All Airplanes
-Task 5
PART 2: CLOSE ACCESS
AFTER INSPECTION AT
STA 1137.
-No further action required
at that Stub Beam HPD
Attach fitting location.
CONDITION 1: ANY STUB
BEAM HPD ATTACH FIT-
TING FOUND THAT IS Ti-
6Al-4V ALLOY MATERIAL.
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
Page 15 of 148
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 16

Group 4:
Table 4  Stub Beam Horizontal Pressure Deck (HPD) Attach Fitting at Station (STA) 1137 Right Side - Inspection 
and Replacement:
Refer to the listed proce-
dures in SB B787-81205-
SB530091-00 Issue 001
or later approved issues
as an accepted proce-
dure.
Method of ComplianceActionCondition
PART 3: OPEN ACCESS
FOR REPLACEMENT AT
STA 1137.
-CONDITION 2 (ACTION
1): Remove affected Stub
Beam HPD Attach fitting.
CONDITION 2: ANY STUB
BEAM HPD ATTACH FIT-
TING FOUND THAT IS
NOT Ti-6Al-4V ALLOY
MATERIAL OR TITANIUM
ALLOY CANNOT BE DE-
TERMINED.
-Task 6
-Task 7CONDITION 2 (ACTION
2): At all fastener hole loca-
tions common to the inter-
facing structure of the af-
fected Stub Beam HPD
Attach fitting, do an open
hole HFEC inspection for
any crack.
-Task 8Replace affected Stub
Beam HPD Attach fitting
with a new Stub Beam
HPD Attach fitting (Ti-6Al-
4V alloy material).
CONDITION 2.1: NO
CRACK FOUND. PART 4: CLOSE ACCESS
AFTER REPLACEMENT
AT STA 1137.
-
--Contact the Boeing Compa-
ny for repair instructions
and new Stub Beam HPD
Attach fitting installation
instructions. Do the repair
and install a new Stub
Beam HPD Attach fitting
with Ti-6Al-4V alloy materi-
al.
CONDITION 2.2: ANY
CRACK FOUND. PART 4: CLOSE ACCESS
AFTER REPLACEMENT
AT STA 1137.
-
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
Page 16 of 148
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 17

Group 5:
Table 5  Stub Beam Horizontal Pressure Deck (HPD) Attach Fitting at Station (STA) 1137 Right Side - Inspection 
and Replacement:
Refer to the listed proce-
dures in SB B787-81205-
SB530091-00 Issue 001
or later approved issues
as an accepted proce-
dure.
Method of ComplianceActionCondition
PART 1: OPEN ACCESS
FOR INSPECTION AT
STA 1137.
-Do a High Frequency Eddy
Current (HFEC) inspection
or handheld X-Ray Fluores-
cence (XRF) Spectrometer
inspection of the affected
Stub Beam HPD Attach fit-
ting to determine titanium
alloy material.
All Airplanes
-Task 21
PART 2: CLOSE ACCESS
AFTER INSPECTION AT
STA 1137.
-No further action required
at that Stub Beam HPD
Attach fitting location.
CONDITION 1: ANY STUB
BEAM HPD ATTACH FIT-
TING FOUND THAT IS Ti-
6Al-4V ALLOY MATERIAL.
PART 3: OPEN ACCESS
FOR REPLACEMENT AT
STA 1137.
-CONDITION 2 (ACTION
1): Remove affected Stub
Beam HPD Attach fitting.
CONDITION 2: ANY STUB
BEAM HPD ATTACH FIT-
TING FOUND THAT IS
NOT Ti-6Al-4V ALLOY
MATERIAL OR TITANIUM
ALLOY CANNOT BE DE-
TERMINED.
-Task 22
-Task 23CONDITION 2 (ACTION
2): At all fastener hole loca-
tions common to the inter-
facing structure of the af-
fected Stub Beam HPD
Attach fitting, do an open
hole HFEC inspection for
any crack.
-Task 24Replace affected Stub
Beam HPD Attach fitting
with a new Stub Beam
HPD Attach fitting (Ti-6Al-
4V alloy material).
CONDITION 2.1: NO
CRACK FOUND. PART 4: CLOSE ACCESS
AFTER REPLACEMENT
AT STA 1137.
-
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
Page 17 of 148
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 18

Group 5:
Table 5  Stub Beam Horizontal Pressure Deck (HPD) Attach Fitting at Station (STA) 1137 Right Side - Inspection 
and Replacement:
Refer to the listed proce-
dures in SB B787-81205-
SB530091-00 Issue 001
or later approved issues
as an accepted proce-
dure.
Method of ComplianceActionCondition
--Contact the Boeing Compa-
ny for repair instructions
and new Stub Beam HPD
Attach fitting installation
instructions. Do the repair
and install a new Stub
Beam HPD Attach fitting
with Ti-6Al-4V alloy materi-
al.
CONDITION 2.2: ANY
CRACK FOUND. PART 4: CLOSE ACCESS
AFTER REPLACEMENT
AT STA 1137.
-
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
Page 18 of 148
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 19

Task 1 – SECTION 45 - STA 1137 LEFT SIDE STUB BEAM HORIZONTAL
PRESSURE DECK (HPD) ATTACH FITTING INSPECTION [Group 1: ]
THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN
IN PARAGRAPH 1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND
Alert:
THIS DOCUMENT TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD,
SEND THIS DOCUMENT TO THE NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR
COMPLIANCE DOCUMENT. THE BOEING PROCESSES USED TO CREATE THE SERVICE
BULLETIN (SB) AND THE REQUIREMENTS BULLETIN (RB) ENSURE THAT THE INFORMATION
BETWEEN "RC START" AND "RC END" IN THE SB ARE IDENTICAL TO THE INFORMATION IN
THE SAME SECTIONS (COMPLIANCE, WORK INSTRUCTIONS...) OF THE RB WHICH THE SB
REFERS TO AS THE RELATED DOCUMENT.
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
Page 19 of 148
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 20

Procedure
This Task applies only to: Group 1.
ICN-B787-A-000061-A-81205-20222-A-01-1
Task 1 Figure 1
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
Page 20 of 148
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 21

ICN-B787-A-000061-A-81205-20223-A-01-1
Task 1 Figure 2  
1.  The step numbers shown below agree with the numbers shown in the circle symbols in the Task. The QTY
numbers shown below are the number of parts necessary for this Task.
Table 1  
More DataQtyIdentificationNameActionStep
*[1]*[2]1404Z3216-201STUB BEAM HPD AT-
TACH FITTING
Inspect1
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
Page 21 of 148
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 22

Table 1  
*[1]  Do an X-Ray Fluorescence (XRF) Spectrometer inspection of the stub beam HPD attach fitting to determine the material in accordance
with Appendix A.
*[2]  As an option, do a High Frequency Eddy Current (HFEC) inspection of the stub beam HPD attach fitting to determine the material in
accordance with 787 NDT Manual Part 6, 51-00-13.
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
Page 22 of 148
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 23

Task 2 – SECTION 45 - STA 1137 LEFT SIDE STUB BEAM HORIZONTAL
PRESSURE DECK (HPD) ATTACH FITTING REMOVAL [Group 1: ]
THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN
IN PARAGRAPH 1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND
Alert:
THIS DOCUMENT TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD,
SEND THIS DOCUMENT TO THE NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR
COMPLIANCE DOCUMENT. THE BOEING PROCESSES USED TO CREATE THE SERVICE
BULLETIN (SB) AND THE REQUIREMENTS BULLETIN (RB) ENSURE THAT THE INFORMATION
BETWEEN "RC START" AND "RC END" IN THE SB ARE IDENTICAL TO THE INFORMATION IN
THE SAME SECTIONS (COMPLIANCE, WORK INSTRUCTIONS...) OF THE RB WHICH THE SB
REFERS TO AS THE RELATED DOCUMENT.
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
Page 23 of 148
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 24

Procedure
This Task applies only to: Group 1.
ICN-B787-A-000061-A-81205-20224-A-01-1
Task 2 Figure 1
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
Page 24 of 148
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 25 (OCR)

A BOEING  B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN
STA
UPPER SPLICE  1137
17 LOCATIONS (1
- STUB BEAM FRAME
+
+ + + +
STUB
BEAM
RUNOUT
PRESSURE  CHORD
DECK WEB  SPLICE
HOSE
RUNOUT  BRACKET
BRACKET
+ 8 LOCATIONS
STA  3063171
1137
ICN-B787-A-000061-A-81205-20225-A-01-1
Task 2 Figure 2
1. The step numbers shown below agree with the numbers shown in the circle symbols in the Task. The QTY
numbers shown below are the number of parts necessary for this Task.
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
Page 25 of 148
Export Controlled ECCN: 9E991
See page 1 for details

### Page 26

Table 1  
More DataQtyIdentificationNameActionStep
-25-BOLTRemove1
-25-WASHERRemove
-25-NUTRemove
*[1]*[2]*[3]1404Z3216-201STUB BEAM HPD AT-
TACH FITTING
Remove
*[4]*[5]1459Z2014-( )HPD LGS SYSTEM
HOSE BRACKET
Disconnect
*[4]*[5]1459Z2014-()HPD LGS SYSTEM
RUNOUT BRACKET
Disconnect
*[1]  Clean fastener holes common to the hose and runout brackets, stub beam runout, and pressure deck web. Refer to SOPM 20-30-03
as an accepted procedure.
*[2]  Remove any previously applied sealant along the mating surface of the stub beam runout and the stub beam HPD attach fitting. Refer
to SOPM 20-50-19 as an accepted procedure.
*[3]  Retain shim(s) for possible reuse.
*[4]  This step is only required if more access is needed.
*[5]  If disconnected, remove any previously applied sealant along the mating surface of the bracket. Refer to SOPM 20-50-19 as an ac-
cepted procedure.
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
Page 26 of 148
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 27

Task 3 – SECTION 45 - STA 1137 LEFT SIDE STUB BEAM HORIZONTAL
PRESSURE DECK (HPD) ATTACH FITTING INTERFACING STRUCTURE
OPEN HOLE HFEC INSPECTION [Group 1: ]
THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN
IN PARAGRAPH 1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND
Alert:
THIS DOCUMENT TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD,
SEND THIS DOCUMENT TO THE NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR
COMPLIANCE DOCUMENT. THE BOEING PROCESSES USED TO CREATE THE SERVICE
BULLETIN (SB) AND THE REQUIREMENTS BULLETIN (RB) ENSURE THAT THE INFORMATION
BETWEEN "RC START" AND "RC END" IN THE SB ARE IDENTICAL TO THE INFORMATION IN
THE SAME SECTIONS (COMPLIANCE, WORK INSTRUCTIONS...) OF THE RB WHICH THE SB
REFERS TO AS THE RELATED DOCUMENT.
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
Page 27 of 148
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 28

Procedure
This Task applies only to: Group 1.
ICN-B787-A-000061-A-81205-20226-A-01-1
Task 3 Figure 1
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
Page 28 of 148
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 29 (OCR)

A BOEING  B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN
STA
UPPER SPLICE  1137
3 LOCATIONS (1)
• STUB BEAM FRAME
STUB'
BEAM
RUNOUT  DECK WEB  PRESSURE  2) 9 LOCATIONS
CHORD
SPLICE
BRACKET  RUNOUT  HOSE  BRACKET
3 LOCATIONS +
STA  3063172
1137
ICN-B787-A-000061-A-81205-20227-A-01-1
Task 3 Figure 2
1. The step numbers shown below agree with the numbers shown in the circle symbols in the Task. The QTY
numbers shown below are the number of parts necessary for this Task.
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
Page 29 of 148
Export Controlled ECCN: 9E991
See page 1 for details

### Page 30

Table 1  
More DataQtyIdentificationNameActionStep
*[1]6454Z2501-( )HPD STUB BEAM
RUNOUT
Inspect1
*[2]9442Z3111-( )STUB BEAM FRAME
STA1137
Inspect2
*[1]  Do an open hole High Frequency Eddy Current (HFEC) inspection of aluminum parts at all fastener hole locations common to the in-
terfacing structure of the stub beam HPD attach fitting for any crack in accordance with 787 NDT Manual Part 6, 51-00-02.
*[2]  Do an open hole High Frequency Eddy Current (HFEC) inspection of titanium parts at all fastener hole locations common to the inter-
facing structure of the stub beam HPD attach fitting for any crack in accordance with 787 NDT Manual Part 6, 51-00-06.
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
Page 30 of 148
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 31

Task 4 – SECTION 45 - STA 1137 LEFT SIDE STUB BEAM HORIZONTAL
PRESSURE DECK (HPD) ATTACH FITTING INSTALLATION [Group 1: ]
THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN
IN PARAGRAPH 1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND
Alert:
THIS DOCUMENT TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD,
SEND THIS DOCUMENT TO THE NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR
COMPLIANCE DOCUMENT. THE BOEING PROCESSES USED TO CREATE THE SERVICE
BULLETIN (SB) AND THE REQUIREMENTS BULLETIN (RB) ENSURE THAT THE INFORMATION
BETWEEN "RC START" AND "RC END" IN THE SB ARE IDENTICAL TO THE INFORMATION IN
THE SAME SECTIONS (COMPLIANCE, WORK INSTRUCTIONS...) OF THE RB WHICH THE SB
REFERS TO AS THE RELATED DOCUMENT.
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
Page 31 of 148
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 32

Procedure
This Task applies only to: Group 1.
ICN-B787-A-000061-A-81205-20228-A-01-1
Task 4 Figure 1
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
Page 32 of 148
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 33 (OCR)

A BOEING  B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN
STA
UPPER SPLICE  1137
‚STUB BEAM FRAME
2) (9 LOCATIONS)
FASTENER GROUP A
STUB
BEAM
RUNOUT
HOSE
PRESSURE  CHORD  BRACKET
DECK WEB  SPLICE
RUNOUT
BRACKET
(6 LOCATIONS) (
FASTENER GROUP B
4 LOCATIONS
STUB FRAME NOT SHOWN FOR CLARITY
A-A
ICN-B787-A-000061-A-81205-20229-A-01-1
Task 4 Figure 2
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
Page 33 of 148
Export Controlled ECCN: 9E991
See page 1 for details

### Page 34

ICN-B787-A-000061-A-81205-20230-A-01-1
Task 4 Figure 3  
1.  The step numbers shown below agree with the numbers shown in the circle symbols in the Task. The QTY
numbers shown below are the number of parts necessary for this Task.
Table 1  
More DataQtyIdentificationNameActionStep
*[1]*[2]*[3]1404Z3216-203STUB BEAM HPD AT-
TACH FITTING
Locate1
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
Page 34 of 148
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 35

Table 1  
More DataQtyIdentificationNameActionStep
*[4]*[5] Fastener
group A
9404Z3216-203STUB BEAM HPD AT-
TACH FITTING
Drill2
*[4]*[6] Fastener
group B
6404Z3216-203STUB BEAM HPD AT-
TACH FITTING
Drill
*[4]*[7] Fastener
group C
10404Z3216-203STUB BEAM HPD AT-
TACH FITTING
Drill
*[8]-BMS 5-45SEALANTApply3
*[9]1404Z3216-203STUB BEAM HPD AT-
TACH FITTING
Install (New)4
*[10]*[11]4BACB30NX12K8BOLT, PROTRUDING
HEAD, HEX DRIVE,
TENSION, 6AL-4V TI-
TANIUM (NOMINAL
AND OVERSIZE
Install (New)
*[10]*[12]4BACW10EG12CKWASHER, COUNTER-
SUNK, CRES AND
ALUMINUM ALLOY
(NOMINAL AND
OVERSIZE)
Install (New)
*[10]4BACN10YT6KNUT, SELF-LOCKING,
HEXAGON, COUNTER-
BORED, CRES
Install (New)
*[10]*[11]5BACB30NX12K11BOLT, PROTRUDING
HEAD, HEX DRIVE,
TENSION, 6AL-4V TI-
TANIUM (NOMINAL
AND OVERSIZE
Install (New)5
*[10]*[12]5BACW10EG12CKWASHER, COUNTER-
SUNK, CRES AND
ALUMINUM ALLOY
(NOMINAL AND
OVERSIZE)
Install (New)
*[10]5BACN10YT6KNUT, SELF-LOCKING,
HEXAGON, COUNTER-
BORED, CRES
Install (New)
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
Page 35 of 148
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 36

Table 1  
More DataQtyIdentificationNameActionStep
*[10]*[13]*[14]*[15]*[16]*[17]*[18]2BACB30NX12K7BOLT, PROTRUDING
HEAD, HEX DRIVE,
TENSION, 6AL-4V TI-
TANIUM (NOMINAL
AND OVERSIZE
Install (New)6
*[10]*[12]*[16]*[17]2BACW10EG12CKWASHER, COUNTER-
SUNK, CRES AND
ALUMINUM ALLOY
(NOMINAL AND
OVERSIZE)
Install (New)
*[10]*[16]*[17]2BACN10YT6KNUT, SELF-LOCKING,
HEXAGON, COUNTER-
BORED, CRES
Install (New)
*[10]*[11]*[13]*[14]*[16]*[17]*[18]4BACB30NX12K7BOLT, PROTRUDING
HEAD, HEX DRIVE,
TENSION, 6AL-4V TI-
TANIUM (NOMINAL
AND OVERSIZE
Install (New)7
*[10]*[12]*[16]*[17]4BACW10EG12CKWASHER, COUNTER-
SUNK, CRES AND
ALUMINUM ALLOY
(NOMINAL AND
OVERSIZE)
Install (New)
*[10]*[16]*[17]4BACN10YT6KNUT, SELF-LOCKING,
HEXAGON, COUNTER-
BORED, CRES
Install (New)
*[15]*[19]4BACB30NX12K9BOLT, PROTRUDING
HEAD, HEX DRIVE,
TENSION, 6AL-4V TI-
TANIUM (NOMINAL
AND OVERSIZE
Install (New)8
*[12]*[19]4BACW10EG12CKWASHER, COUNTER-
SUNK, CRES AND
ALUMINUM ALLOY
(NOMINAL AND
OVERSIZE)
Install (New)
*[19]4BACN10YT6KNUT, SELF-LOCKING,
HEXAGON, COUNTER-
BORED, CRES
Install (New)
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
Page 36 of 148
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 37

Table 1  
More DataQtyIdentificationNameActionStep
*[15]*[19]2BACB30NX12K11BOLT, PROTRUDING
HEAD, HEX DRIVE,
TENSION, 6AL-4V TI-
TANIUM (NOMINAL
AND OVERSIZE
Install (New)9
*[12]*[19]2BACW10EG12CKWASHER, COUNTER-
SUNK, CRES AND
ALUMINUM ALLOY
(NOMINAL AND
OVERSIZE)
Install (New)
*[19]2BACN10YT6KNUT, SELF-LOCKING,
HEXAGON, COUNTER-
BORED, CRES
Install (New)
*[20]*[21]*[22]*[23]*[24]1459Z2014-()HPD LGS SYSTEM
RUNOUT BRACKET
Install (Kept)10
*[14]*[15]*[19]*[20]*[21]*[22]*[23]2BACB30NX12K13BOLT, PROTRUDING
HEAD, HEX DRIVE,
TENSION, 6AL-4V TI-
TANIUM (NOMINAL
AND OVERSIZE
Install (New)
*[12]*[19]*[20]*[21]*[22]*[23]2BACW10EG12CKWASHER, COUNTER-
SUNK, CRES AND
ALUMINUM ALLOY
(NOMINAL AND
OVERSIZE)
Install (New)
*[19]*[20]*[21]*[22]*[23]2BACN10YT6KNUT, SELF-LOCKING,
HEXAGON, COUNTER-
BORED, CRES
Install (New)
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
Page 37 of 148
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 38

Table 1  
More DataQtyIdentificationNameActionStep
*[20]*[21]*[22]*[23]*[24]1459Z2014-( )HPD LGS SYSTEM
HOSE BRACKET
Install (Kept)11
*[14]*[15]*[19]*[20]*[21]*[22]*[23]2BACB30NX12K13BOLT, PROTRUDING
HEAD, HEX DRIVE,
TENSION, 6AL-4V TI-
TANIUM (NOMINAL
AND OVERSIZE
Install (New)
*[12]*[19]*[20]*[21]*[22]*[23]2BACW10EG12CKWASHER, COUNTER-
SUNK, CRES AND
ALUMINUM ALLOY
(NOMINAL AND
OVERSIZE)
Install (New)
*[19]*[20]*[21]*[22]*[23]2BACN10YT6KNUT, SELF-LOCKING,
HEXAGON, COUNTER-
BORED, CRES
Install (New)
*[1]  Use existing structure to locate and clamp the stub beam HPD attach fitting. Locate first to the stub beam frame vertical web, and then
the stub beam runout to index and locate the part for match drilling.
*[2]  Make sure the interfacing gap between the stub beam HPD attach fitting and the pressure deck web horizontal surfaces are less than
or equal to 0.005 inches. If the horizontal gap is greater than 0.005 inches, install shim PN: BACF3AB()BA()GF or kept shim. Maximum
shim thickness 0.075 inches. Refer to SOPM 20-50-20 as an accepted procedure.
*[3]  Make sure the interfacing gap between the stub beam HPD attach fitting and the stub beam runout vertical surfaces are less than or
equal to 0.005 inches. If the vertical gap is greater than 0.005 inches, install shim PN: BACF3AB()BA()GF or kept shim. Maximum
shim thickness 0.075 inches. Refer to SOPM 20-50-20 as an accepted procedure.
*[4]  Chamfer edges of drilled fastener holes 0.005 - 0.015 inches X 0.005 - 0.015 inches with a surface roughness of 125 microinches Ra
or better.
*[5]  Use existing structure to match drill holes for fastener installation. Diameter 0.375 - 0.377 inches. with a surface roughness of 63 mi-
croinches Ra or better. Refer to 787-9 SRM 51-41-05 Rev 28 or later revisions published on MyBoeingFleet and SOPM 20-10-07 as
accepted procedures.
*[6]  Use existing structure to match drill holes for fastener installation. Diameter 0.375 - 0.378 inches. with a surface roughness of 63 mi-
croinches Ra or better. Refer to 787-9 SRM 51-41-05 Rev 28 or later revisions published on MyBoeingFleet and SOPM 20-10-07 as
accepted procedures.
*[7]  Use existing structure to match drill holes for fastener installation. Diameter 0.375 - 0.378 inches. with a surface roughness of 63 mi-
croinches Ra or better. Refer to 787-9 SRM 51-43-05 Rev 28 or later revisions published on MyBoeingFleet and SOPM 20-10-07 as
accepted procedures.
*[8]  Apply a prepack seal with BMS 5-45 along the top inboard edge above the stub beam HPD attach fitting intersection on the stub beam
runout. It is optional to apply an injection seal with BMS 5-45 instead of a prepack seal. Refer to SOPM 20-50-19 as an accepted
procedure.
*[9]  Apply faying surface seal between mating surfaces of stub beam HPD attach fitting and stub beam runout including both sides of
shims with BMS 5-45. Refer to SOPM 20-50-19 as an accepted procedure
*[10]  Refer to 787-9 SRM 51-41-05 Rev 28 or later revisions published on MyBoeingFleet as an accepted procedure.
*[11]  Install fasteners with head on near side.
*[12]  Install washer under the head of the fastener.
*[13]  Re-torque required, refer to 787-9 SRM 51-41-05 Rev 28 or later revisions published on MyBoeingFleet as an accepted procedure.
*[14]  Install fasteners with BMS 5-45 sealant. Refer to SOPM 20-50-19 Method 3 as an accepted procedure.
*[15]  Install fasteners with head on far side.
*[16]  Apply chemical conversion coating to any bared aluminum surfaces. Refer to SOPM 20-43-03 (BAC5719) Type II, Class A as an ac-
cepted procedure.
*[17]  Clean and reactivate primer on areas to be painted. Refer to SOPM 20-41-02 as an accepted procedure.
*[18]  Apply one coat of BMS 10-11 Type I, yellow primer to fastener heads, collars, scratches and bared surfaces. Overspray shall be limited
to reactivated areas. Refer to SOPM 20-41-02 as an accepted procedure.
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
Page 38 of 148
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 39

Table 1  
*[19]  Refer to 787-9 SRM 51-43-05 Rev 28 or later revisions published on MyBoeingFleet as an accepted procedure.
*[20]  To touch up any scratches and bared surfaces of primered aluminum parts, prepare surfaces of coatings immediately adjacent to areas
to be touched up. Refer to SOPM 20-44-04 as an accepted procedure.
*[21]  Apply chemical conversion coating to any bared aluminum surfaces. Refer to SOPM 20-43-03 (BAC5719) as an accepted procedure.
*[22]  Apply BMS 10-79, Type III primer to all scratches, unpainted areas and bare fastener ends. Refer to SOPM 20-44-04 as an accepted
procedure.
*[23]  Apply BMS 10-60, Type II, white gloss enamel. Dry film thickness shall be 0.0007 to 0.0012 inches (0.7 - 1.2 mils). Refer to SOPM
20-41-01 for finish codes (F-19.79-70846). Touch up any sealant squeeze out after application. Primer application prior to enamel
application is optional over sealant.
*[24]  If removed, apply faying surface seal to the mating surfaces of the HPD LGS system hose bracket and HPD LGS system runout
bracket with BMS 5-45. Refer to SOPM 20-50-19 as an accepted procedure.
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
Page 39 of 148
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 40

Task 5 – SECTION 45 - STA 1137 RIGHT SIDE STUB BEAM HORIZONTAL
PRESSURE DECK (HPD) ATTACH FITTING INSPECTION [Group 1-2, 4: ]
THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN
IN PARAGRAPH 1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND
Alert:
THIS DOCUMENT TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD,
SEND THIS DOCUMENT TO THE NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR
COMPLIANCE DOCUMENT. THE BOEING PROCESSES USED TO CREATE THE SERVICE
BULLETIN (SB) AND THE REQUIREMENTS BULLETIN (RB) ENSURE THAT THE INFORMATION
BETWEEN "RC START" AND "RC END" IN THE SB ARE IDENTICAL TO THE INFORMATION IN
THE SAME SECTIONS (COMPLIANCE, WORK INSTRUCTIONS...) OF THE RB WHICH THE SB
REFERS TO AS THE RELATED DOCUMENT.
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
Page 40 of 148
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 41

Procedure
This Task applies only to: Group 1-2, 4.
ICN-B787-A-000061-A-81205-20231-A-01-1
Task 5 Figure 1
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
Page 41 of 148
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 42

ICN-B787-A-000061-A-81205-20232-A-01-1
Task 5 Figure 2  
1.  The step numbers shown below agree with the numbers shown in the circle symbols in the Task. The QTY
numbers shown below are the number of parts necessary for this Task.
Table 1  
More DataQtyIdentificationNameActionStep
*[1]*[2]1404Z3216-202STUB BEAM HPD AT-
TACH FITTING
Inspect1
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
Page 42 of 148
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 43

Table 1  
*[1]  Do an X-Ray Fluorescence (XRF) Spectrometer inspection of the stub beam HPD attach fitting to determine the material in accordance
with Appendix A.
*[2]  As an option, do a High Frequency Eddy Current (HFEC) inspection of the stub beam HPD attach fitting to determine the material in
accordance with 787 NDT Manual Part 6, 51-00-13.
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
Page 43 of 148
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 44

Task 6 – SECTION 45 - STA 1137 RIGHT SIDE STUB BEAM HORIZONTAL
PRESSURE DECK (HPD) ATTACH FITTING REMOVAL [Group 1-2, 4: ]
THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN
IN PARAGRAPH 1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND
Alert:
THIS DOCUMENT TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD,
SEND THIS DOCUMENT TO THE NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR
COMPLIANCE DOCUMENT. THE BOEING PROCESSES USED TO CREATE THE SERVICE
BULLETIN (SB) AND THE REQUIREMENTS BULLETIN (RB) ENSURE THAT THE INFORMATION
BETWEEN "RC START" AND "RC END" IN THE SB ARE IDENTICAL TO THE INFORMATION IN
THE SAME SECTIONS (COMPLIANCE, WORK INSTRUCTIONS...) OF THE RB WHICH THE SB
REFERS TO AS THE RELATED DOCUMENT.
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
Page 44 of 148
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 45

Procedure
This Task applies only to: Group 1-2, 4.
ICN-B787-A-000061-A-81205-20233-A-01-1
Task 6 Figure 1
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
Page 45 of 148
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 46 (OCR)

OBOEING  B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN
STA
1137  UPPER SPLICE
1) 17 LOCATIONS
STUB BEAM FRAME
+
STUB
BEAM
RUNOUT
HOSE  CHORD  PRESSURE
BRACKET  SPLICE  DECK WEB
RUNOUT
BRACKET
STA
1137
8 LOCATIONS
3063412
ICN-B787-A-000061-A-81205-20234-A-01-1
Task 6 Figure 2
1. The step numbers shown below agree with the numbers shown in the circle symbols in the Task. The QTY
numbers shown below are the number of parts necessary for this Task.
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
Page 46 of 148
Export Controlled ECCN: 9E991
See page 1 for details

### Page 47

Table 1  
More DataQtyIdentificationNameActionStep
-25-BOLTRemove1
-25-WASHERRemove
-25-NUTRemove
*[1]*[2]*[3]1404Z3216-202STUB BEAM HPD AT-
TACH FITTING
Remove
*[4]*[5]1459Z2014-( )HPD LGS SYSTEM
HOSE BRACKET
Disconnect
*[4]*[5]1459Z2014-()HPD LGS SYSTEM
RUNOUT BRACKET
Disconnect
*[1]  Clean fastener holes common to the hose and runout brackets, stub beam runout, and pressure deck web. Refer to SOPM 20-30-03
as an accepted procedure.
*[2]  Remove any previously applied sealant along the mating surface of the stub beam runout and the stub beam HPD attach fitting. Refer
to SOPM 20-50-19 as an accepted procedure.
*[3]  Retain shim(s) for possible reuse.
*[4]  This step is only required if more access is needed.
*[5]  If disconnected, remove any previously applied sealant along the mating surface of the bracket. Refer to SOPM 20-50-19 as an ac-
cepted procedure.
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
Page 47 of 148
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 48

Task 7 – SECTION 45 - STA 1137 RIGHT SIDE STUB BEAM HORIZONTAL
PRESSURE DECK (HPD) ATTACH FITTING INTERFACING STRUCTURE
OPEN HOLE HFEC INSPECTION [Group 1-2, 4: ]
THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN
IN PARAGRAPH 1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND
Alert:
THIS DOCUMENT TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD,
SEND THIS DOCUMENT TO THE NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR
COMPLIANCE DOCUMENT. THE BOEING PROCESSES USED TO CREATE THE SERVICE
BULLETIN (SB) AND THE REQUIREMENTS BULLETIN (RB) ENSURE THAT THE INFORMATION
BETWEEN "RC START" AND "RC END" IN THE SB ARE IDENTICAL TO THE INFORMATION IN
THE SAME SECTIONS (COMPLIANCE, WORK INSTRUCTIONS...) OF THE RB WHICH THE SB
REFERS TO AS THE RELATED DOCUMENT.
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
Page 48 of 148
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 49

Procedure
This Task applies only to: Group 1-2, 4.
ICN-B787-A-000061-A-81205-20235-A-01-1
Task 7 Figure 1
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
Page 49 of 148
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 50 (OCR)

Q BOEING  B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN
STA
1137  UPPER SPLICE
1 3 LOCATIONS
STUB BEAM FRAME
9 LOCATIONS (2  PRESSURE  DECK WEB  STUB  BEAM
RUNOUT
BRACKET  HOSE  CHORD  SPLICE
RUNOUT
BRACKET
STA
1137
1) 3 LOCATIONS
ICN-B787-A-000061-A-81205-20236-A-01-1
Task 7 Figure 2
1. The step numbers shown below agree with the numbers shown in the circle symbols in the Task. The QTY
numbers shown below are the number of parts necessary for this Task.
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
Page 50 of 148
Export Controlled ECCN: 9E991
See page 1 for details

### Page 51

Table 1  
More DataQtyIdentificationNameActionStep
*[1]6454Z2501-( )HPD STUB BEAM
RUNOUT
Inspect1
*[2]9442Z3111-( )STUB BEAM FRAME
STA1137
Inspect2
*[1]  Do an open hole High Frequency Eddy Current (HFEC) inspection of aluminum parts at all fastener hole locations common to the in-
terfacing structure of the stub beam HPD attach fitting for any crack in accordance with 787 NDT Manual Part 6, 51-00-02.
*[2]  Do an open hole High Frequency Eddy Current (HFEC) inspection of titanium parts at all fastener hole locations common to the inter-
facing structure of the stub beam HPD attach fitting for any crack in accordance with 787 NDT Manual Part 6, 51-00-06.
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
Page 51 of 148
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 52

Task 8 – SECTION 45 - STA 1137 RIGHT SIDE STUB BEAM HORIZONTAL
PRESSURE DECK (HPD) ATTACH FITTING INSTALLATION [Group 1-2, 4:
]
THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN
IN PARAGRAPH 1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND
Alert:
THIS DOCUMENT TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD,
SEND THIS DOCUMENT TO THE NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR
COMPLIANCE DOCUMENT. THE BOEING PROCESSES USED TO CREATE THE SERVICE
BULLETIN (SB) AND THE REQUIREMENTS BULLETIN (RB) ENSURE THAT THE INFORMATION
BETWEEN "RC START" AND "RC END" IN THE SB ARE IDENTICAL TO THE INFORMATION IN
THE SAME SECTIONS (COMPLIANCE, WORK INSTRUCTIONS...) OF THE RB WHICH THE SB
REFERS TO AS THE RELATED DOCUMENT.
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
Page 52 of 148
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 53

Procedure
This Task applies only to: Group 1-2, 4.
ICN-B787-A-000061-A-81205-20237-A-01-1
Task 8 Figure 1
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
Page 53 of 148
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 54 (OCR)

A BOEING  B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN
STA
1137  UPPER SPLICE
STUB BEAM FRAME
(9 LOCATIONS)
FASTENER GROUP A
(5)  BEAM  STUB
RUNOUT
HOSE
BRACKET  CHORD  PRESSURE
SPLICE  DECK WEB
RUNOUT
BRACKET
) (6 LOCATIONS)
FASTENER GROUP B
14 LOCATIONS
-WD
STUB FRAME NOT SHOWN FOR CLARITY
A-A
ICN-B787-A-000061-A-81205-20238-A-01-1
Task 8 Figure 2
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
Page 54 of 148
Export Controlled ECCN: 9E991
See page 1 for details

### Page 55

ICN-B787-A-000061-A-81205-20239-A-01-1
Task 8 Figure 3  
1.  The step numbers shown below agree with the numbers shown in the circle symbols in the Task. The QTY
numbers shown below are the number of parts necessary for this Task.
Table 1  
More DataQtyIdentificationNameActionStep
*[1]*[2]*[3]1404Z3216-204STUB BEAM HPD AT-
TACH FITTING
Locate1
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
Page 55 of 148
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 56

Table 1  
More DataQtyIdentificationNameActionStep
*[4]*[5] Fastener
group A
9404Z3216-204STUB BEAM HPD AT-
TACH FITTING
Drill2
*[4]*[6] Fastener
group B
6404Z3216-204STUB BEAM HPD AT-
TACH FITTING
Drill
*[4]*[7] Fastener
group C
10404Z3216-204STUB BEAM HPD AT-
TACH FITTING
Drill
*[8]-BMS 5-45SEALANTApply3
*[9]1404Z3216-204STUB BEAM HPD AT-
TACH FITTING
Install (New)4
*[10]*[11]4BACB30NX12K8BOLT, PROTRUDING
HEAD, HEX DRIVE,
TENSION, 6AL-4V TI-
TANIUM (NOMINAL
AND OVERSIZE
Install (New)
*[10]*[12]4BACW10EG12CKWASHER, COUNTER-
SUNK, CRES AND
ALUMINUM ALLOY
(NOMINAL AND
OVERSIZE)
Install (New)
*[10]4BACN10YT6KNUT, SELF-LOCKING,
HEXAGON, COUNTER-
BORED, CRES
Install (New)
*[10]*[11]5BACB30NX12K11BOLT, PROTRUDING
HEAD, HEX DRIVE,
TENSION, 6AL-4V TI-
TANIUM (NOMINAL
AND OVERSIZE
Install (New)5
*[10]*[12]5BACW10EG12CKWASHER, COUNTER-
SUNK, CRES AND
ALUMINUM ALLOY
(NOMINAL AND
OVERSIZE)
Install (New)
*[10]5BACN10YT6KNUT, SELF-LOCKING,
HEXAGON, COUNTER-
BORED, CRES
Install (New)
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
Page 56 of 148
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 57

Table 1  
More DataQtyIdentificationNameActionStep
*[10]*[13]*[14]*[15]*[16]*[17]*[18]2BACB30NX12K7BOLT, PROTRUDING
HEAD, HEX DRIVE,
TENSION, 6AL-4V TI-
TANIUM (NOMINAL
AND OVERSIZE
Install (New)6
*[10]*[12]*[16]*[17]2BACW10EG12CKWASHER, COUNTER-
SUNK, CRES AND
ALUMINUM ALLOY
(NOMINAL AND
OVERSIZE)
Install (New)
*[10]*[16]*[17]2BACN10YT6KNUT, SELF-LOCKING,
HEXAGON, COUNTER-
BORED, CRES
Install (New)
*[10]*[11]*[13]*[14]*[16]*[17]*[18]4BACB30NX12K7BOLT, PROTRUDING
HEAD, HEX DRIVE,
TENSION, 6AL-4V TI-
TANIUM (NOMINAL
AND OVERSIZE
Install (New)7
*[10]*[12]*[16]*[17]4BACW10EG12CKWASHER, COUNTER-
SUNK, CRES AND
ALUMINUM ALLOY
(NOMINAL AND
OVERSIZE)
Install (New)
*[10]*[16]*[17]4BACN10YT6KNUT, SELF-LOCKING,
HEXAGON, COUNTER-
BORED, CRES
Install (New)
*[15]*[19]4BACB30NX12K9BOLT, PROTRUDING
HEAD, HEX DRIVE,
TENSION, 6AL-4V TI-
TANIUM (NOMINAL
AND OVERSIZE
Install (New)8
*[12]*[19]4BACW10EG12CKWASHER, COUNTER-
SUNK, CRES AND
ALUMINUM ALLOY
(NOMINAL AND
OVERSIZE)
Install (New)
*[19]4BACN10YT6KNUT, SELF-LOCKING,
HEXAGON, COUNTER-
BORED, CRES
Install (New)
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
Page 57 of 148
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 58

Table 1  
More DataQtyIdentificationNameActionStep
*[15]*[19]2BACB30NX12K11BOLT, PROTRUDING
HEAD, HEX DRIVE,
TENSION, 6AL-4V TI-
TANIUM (NOMINAL
AND OVERSIZE
Install (New)9
*[12]*[19]2BACW10EG12CKWASHER, COUNTER-
SUNK, CRES AND
ALUMINUM ALLOY
(NOMINAL AND
OVERSIZE)
Install (New)
*[19]2BACN10YT6KNUT, SELF-LOCKING,
HEXAGON, COUNTER-
BORED, CRES
Install (New)
*[20]*[21]*[22]*[23]*[24]1459Z2014-()HPD LGS SYSTEM
RUNOUT BRACKET
Install (Kept)10
*[14]*[15]*[19]*[20]*[21]*[22]*[23]2BACB30NX12K13BOLT, PROTRUDING
HEAD, HEX DRIVE,
TENSION, 6AL-4V TI-
TANIUM (NOMINAL
AND OVERSIZE
Install (New)
*[12]*[19]*[20]*[21]*[22]*[23]2BACW10EG12CKWASHER, COUNTER-
SUNK, CRES AND
ALUMINUM ALLOY
(NOMINAL AND
OVERSIZE)
Install (New)
*[19]*[20]*[21]*[22]*[23]2BACN10YT6KNUT, SELF-LOCKING,
HEXAGON, COUNTER-
BORED, CRES
Install (New)
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
Page 58 of 148
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 59

Table 1  
More DataQtyIdentificationNameActionStep
*[20]*[21]*[22]*[23]*[24]1459Z2014-( )HPD LGS SYSTEM
HOSE BRACKET
Install (Kept)11
*[14]*[15]*[19]*[20]*[21]*[22]*[23]2BACB30NX12K13BOLT, PROTRUDING
HEAD, HEX DRIVE,
TENSION, 6AL-4V TI-
TANIUM (NOMINAL
AND OVERSIZE
Install (New)
*[12]*[19]*[20]*[21]*[22]*[23]2BACW10EG12CKWASHER, COUNTER-
SUNK, CRES AND
ALUMINUM ALLOY
(NOMINAL AND
OVERSIZE)
Install (New)
*[19]*[20]*[21]*[22]*[23]2BACN10YT6KNUT, SELF-LOCKING,
HEXAGON, COUNTER-
BORED, CRES
Install (New)
*[1]  Use existing structure to locate and clamp the stub beam HPD attach fitting. Locate first to the stub beam frame vertical web, and then
the stub beam runout to index and locate the part for match drilling.
*[2]  Make sure the interfacing gap between the stub beam HPD attach fitting and the pressure deck web horizontal surfaces are less than
or equal to 0.005 inches. If the horizontal gap is greater than 0.005 inches, install shim PN: BACF3AB()BA()GF or kept shim. Maximum
shim thickness 0.075 inches. Refer to SOPM 20-50-20 as an accepted procedure.
*[3]  Make sure the interfacing gap between the stub beam HPD attach fitting and the stub beam runout vertical surfaces are less than or
equal to 0.005 inches. If the vertical gap is greater than 0.005 inches, install shim PN: BACF3AB()BA()GF or kept shim. Maximum
shim thickness 0.075 inches. Refer to SOPM 20-50-20 as an accepted procedure.
*[4]  Chamfer edges of drilled fastener holes 0.005 - 0.015 inches X 0.005 - 0.015 inches with a surface roughness of 125 microinches Ra
or better.
*[5]  Use existing structure to match drill holes for fastener installation. Diameter 0.375 - 0.377 inches. with a surface roughness of 63 mi-
croinches Ra or better. Refer to 787-9 SRM 51-41-05 Rev 28 or later revisions published on MyBoeingFleet and SOPM 20-10-07 as
accepted procedures.
*[6]  Use existing structure to match drill holes for fastener installation. Diameter 0.375 - 0.378 inches. with a surface roughness of 63 mi-
croinches Ra or better. Refer to 787-9 SRM 51-41-05 Rev 28 or later revisions published on MyBoeingFleet and SOPM 20-10-07 as
accepted procedures.
*[7]  Use existing structure to match drill holes for fastener installation. Diameter 0.375 - 0.378 inches. with a surface roughness of 63 mi-
croinches Ra or better. Refer to 787-9 SRM 51-43-05 Rev 28 or later revisions published on MyBoeingFleet and SOPM 20-10-07 as
accepted procedures.
*[8]  Apply a prepack seal with BMS 5-45 along the top inboard edge above the stub beam HPD attach fitting intersection on the stub beam
runout. It is optional to apply an injection seal with BMS 5-45 instead of a prepack seal. Refer to SOPM 20-50-19 as an accepted
procedure.
*[9]  Apply faying surface seal between mating surfaces of stub beam HPD attach fitting and stub beam runout including both sides of
shims with BMS 5-45. Refer to SOPM 20-50-19 as an accepted procedure
*[10]  Refer to 787-9 SRM 51-41-05 Rev 28 or later revisions published on MyBoeingFleet as an accepted procedure.
*[11]  Install fasteners with head on near side.
*[12]  Install washer under the head of the fastener.
*[13]  Re-torque required, refer to 787-9 SRM 51-41-05 Rev 28 or later revisions published on MyBoeingFleet as an accepted procedure.
*[14]  Install fasteners with BMS 5-45 sealant. Refer to SOPM 20-50-19 Method 3 as an accepted procedure.
*[15]  Install fasteners with head on far side.
*[16]  Apply chemical conversion coating to any bared aluminum surfaces. Refer to SOPM 20-43-03 (BAC5719) Type II, Class A as an ac-
cepted procedure.
*[17]  Clean and reactivate primer on areas to be painted. Refer to SOPM 20-41-02 as an accepted procedure.
*[18]  Apply one coat of BMS 10-11 Type I, yellow primer to fastener heads, collars, scratches and bared surfaces. Overspray shall be limited
to reactivated areas. Refer to SOPM 20-41-02 as an accepted procedure.
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
Page 59 of 148
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 60

Table 1  
*[19]  Refer to 787-9 SRM 51-43-05 Rev 28 or later revisions published on MyBoeingFleet as an accepted procedure.
*[20]  To touch up any scratches and bared surfaces of primered aluminum parts, prepare surfaces of coatings immediately adjacent to areas
to be touched up. Refer to SOPM 20-44-04 as an accepted procedure.
*[21]  Apply chemical conversion coating to any bared aluminum surfaces. Refer to SOPM 20-43-03 (BAC5719) as an accepted procedure.
*[22]  Apply BMS 10-79, Type III primer to all scratches, unpainted areas and bare fastener ends. Refer to SOPM 20-44-04 as an accepted
procedure.
*[23]  Apply BMS 10-60, Type II, white gloss enamel. Dry film thickness shall be 0.0007 to 0.0012 inches (0.7 - 1.2 mils). Refer to SOPM
20-41-01 for finish codes (F-19.79-70846). Touch up any sealant squeeze out after application. Primer application prior to enamel
application is optional over sealant.
*[24]  If removed, apply faying surface seal to the mating surfaces of the HPD LGS system hose bracket and HPD LGS system runout
bracket with BMS 5-45. Refer to SOPM 20-50-19 as an accepted procedure.
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
Page 60 of 148
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530091-00 RB
Issue 001, 07 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN

The text continues at https://openairdocs.org/service-documents/boeing/b787-81205-sb530091-00-rb/file/821297ce9598.md?from=61

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
