# Boeing Alert Requirements Bulletin B787-81205-SB530106-00 RB

Copy: Revision 001 ("B787-81205-SB530106-00 RB Issue 001 reduced"), 154 pages: PDF https://openairdocs.org/files/sha256/82/7b/827b9dac28b540042da7a782f9cb7489fbce5c24d6ad91021ef4cdfc7e968fec; text https://openairdocs.org/service-documents/boeing/b787-81205-sb530106-00-rb/file/827b9dac28b5.md. Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2026-8784, the docket of a proposed AD (Federal Register 2026-17056). Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Boeing](https://openairdocs.org/service-documents/boeing.md)
- Type: Service bulletin (Alert Requirements Bulletin)
- Number: B787-81205-SB530106-00 RB
- Latest revision known: B787-81205-SB530106-00 RB, Issue 001, dated February 4, 2026 (OpenAirDocs)
- Page: https://openairdocs.org/service-documents/boeing/b787-81205-sb530106-00-rb

Also cited in [1 proposed AD](https://openairdocs.org/service-documents/boeing/b787-81205-sb530106-00-rb/proposed.md).

## Text (154 pages)

Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2026-8784, the docket of a proposed AD (Federal Register 2026-17056). Not covered by OpenAirDocs’ CC0 dedication. Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

ALERT
Alert Requirements Bulletin B787-81205-SB530106-00 RB FUSELAGE -
Section 41 - Large Forward Cargo Door (LFCD) Surround Structure Upper
Split Frame Inspection and Replacement
Copyright © 2026 The Boeing Company
Treatment of this data module and its content is governed by contract with Boeing. Rights to use this data module are licensed on a per
aircraft basis and such rights may not be transferable. For more information, contact The Boeing Company. Boeing, the Boeing signature,
the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner, BBJ, DC-8, DC-9, DC-10, KC-10, KC-46, KDC-10, MD-10,
MD-11, MD-80, MD-88, MD-90, P-8, Poseidon and Boeing liveries are all trademarks owned by The Boeing Company; and no trademark
license is granted in connection with this document unless provided in writing by Boeing.
EXPORT CONTROLLED
This technology or software is subject to the U.S. Export Administration Regulations (EAR), (15 C.F.R. Parts 730-774). No authorization
from the U.S. Department of Commerce is required for export, re-export, in-country transfer, or access EXCEPT to country group E:1 or
E:2 countries/persons per Supp.1 to Part 740 of the EAR.
ECCN: 9E991
B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
Page 1 of 154
Export Controlled ECCN: 9E991
See page 1 for details
3.0
B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 2

Table of Contents
Page
A. EFFECTIVITY .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
1. Airplanes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
2. Spares Affected . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
B. CONCURRENT REQUIREMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
C. COMPLIANCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
D. APPROVAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
E. ACCOMPLISHMENT INSTRUCTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
1. General Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
2. Work Instructions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
TASK 1 – LARGE FORWARD CARGO DOOR (LFCD) SPLIT FRAME - INSPECTION [Group 1] . . . . . 9
TASK 2 – LARGE FORWARD CARGO DOOR (LFCD) SPLIT FRAME AT STA441 - REPLACEMENT [Group
1] . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
TASK 3 – LARGE FORWARD CARGO DOOR (LFCD) SPLIT FRAME AT STA465 - REPLACEMENT  [Group
1] . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 42
TASK 4 – LARGE FORWARD CARGO DOOR (LFCD) SPLIT FRAME AT STA489 - REPLACEMENT [Group
1] . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 69
TASK 5 – LARGE FORWARD CARGO DOOR (LFCD) SPLIT FRAME AT STA513 - REPLACEMENT [Group
1] . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 97
TASK 6 – LARGE FORWARD CARGO DOOR (LFCD) SPLIT FRAME AT STA537 - REPLACEMENT [Group
1] . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 124
Appendix A – LARGE FORWARD CARGO DOOR SPLIT FRAME - AFFECTED BATCH NUMBERS [Group
1] . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 151
B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
Page 2 of 154
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 3

THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN
IN EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND THIS DOCUMENT TO
Alert:
THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS DOCUMENT
TO THE NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR COMPLIANCE DOCUMENT.
THE BOEING PROCESSES USED TO CREATE THE SERVICE BULLETIN (SB) AND THE
REQUIREMENTS BULLETIN (RB) ENSURE THAT THE INFORMATION BETWEEN "RC START"
AND "RC END" IN THE SB ARE IDENTICAL TO THE INFORMATION IN THE SAME SECTIONS
(COMPLIANCE, WORK INSTRUCTIONS...) OF THE RB WHICH THE SB REFERS TO AS THE
RELATED DOCUMENT.
A.
EFFECTIVITY
1. Airplanes
This bulletin is applicable to 787-8 Airplane(s), line number(s) 1115, 1137, 1140, 1143, 1146, 1149,
1154, 1159, 1162 in 1 Group(s).
The Variable Numbers and Group information for the applicable airplanes is given below.
Table 1  
DESCRIPTIONCONFIGURATIONGROUP
787-8 airplanes.- 1
Airplane Models: 787-8
Table 2
GroupVariable Number
1ZA864
1ZA980 - ZA981
GroupVariable Number
1ZD026 - ZD029
1ZD048 - ZD049
GroupVariable Number
--
--
2. Spares Affected
None.
B.
CONCURRENT REQUIREMENTS
None.
B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
Page 3 of 154
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 4

C. COMPLIANCE
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to Re-
quirements Bulletin B787-81205-SB530106-00 RB. The Airworthiness Directive will make the compliance
tasks and times given in Requirements Bulletin B787-81205-SB530106-00 RB mandatory.
Accomplish the required actions, based on the applicable conditions in Table 4, in accordance with the
Accomplishment Instructions.
Table 4  Large Forward Cargo Door (LFCD) Split Frame Inspection And Replacement
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
ActionCondition
-Within 28 months after
the Issue 001 date of
Requirements Bulletin
B787-81205-SB530106-
00 RB.
Do an inspection of the
LFCD Split Frames for the
affected Batch numbers.
*[1]
All Airplanes
--No further action requiredCONDITION 1: NO SPLIT
FRAME FOUND WITH AN
AFFECTED BATCH NUM-
BER
-Before further flightReplace affected LFCD
Split Frame with a new
LFCD Split Frame with Ti-
6Al-4V alloy material.
CONDITION 2: ANY SPLIT
FRAME FOUND WITH AN
AFFECTED BATCH NUM-
BER OR BATCH NUM-
BERS CANNOT BE DE-
TERMINED
*[1]  
Refer to Appendix A for affected Batch numbers.
D. APPROVAL
This Requirements Bulletin was examined by the Federal Aviation Administration (FAA). This Requirements
Bulletin contains no information that changes the approved configuration of the airplane. The actions
specified in this Requirements Bulletin are FAA approved, as well as European Union Aviation Safety
Agency (EASA) approved for all EASA approved airplanes listed in the Requirements Bulletin effectivity.
This Requirements Bulletin and its approval were based on the airplane in its original Boeing delivery
configuration or as modified by other approved Boeing changes.
If an airplane has a non-Boeing modification or repair that affects a component or system also affected by
this Requirements Bulletin, the operator is responsible for obtaining appropriate regulatory agency approval
before incorporating this Requirements Bulletin.
B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
Page 4 of 154
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 5

E.    ACCOMPLISHMENT INSTRUCTIONS
1.
GENERAL INFORMATION
NOTE: 1. This is an Enhanced Required for Compliance document. There will be a separate Service
Bulletin (SB) and a separate Requirements Bulletin (RB). If an RB is mandated by an
Airworthiness Directive (AD), then all applicable requirements specified in the RB must
be done. In the RB, the "Refer to the listed procedures..." column of the table(s) in the
Work Instructions is for reference only. The procedures in that column are not required
by the AD and are for guidance only. For the related SB, some locations are marked RC
Start and RC End to identify the requirements that are restated from the RB. For the re-
lated SB, the areas between RC Start and RC End, including sub-steps and any Tasks
identified between RC Start and RC End, must be done to comply with the AD. Therefore,
an Alternative Method of Compliance (AMOC) is required for any deviations to steps be-
tween RC Start and RC End, including substeps and identified Tasks. For the related
SB, the steps not between RC Start and RC End may be deviated from using accepted
methods in accordance with the operator's maintenance or inspection program without
obtaining approval of an AMOC; this is provided that the steps between RC Start and RC
End, including sub-steps and identified Tasks, can still be done as specified, and the
airplane can be put back in an airworthy condition. Tasks not required for compliance are
omitted from the RB.
2.
This is an Enhanced Required for Compliance document. The Boeing processes used
to create the Service Bulletin (SB) and the Requirements Bulletin (RB) ensure that the
information between "RC Start" and "RC End" in the SB are identical to the information
in the same sections (Compliance, Work Instructions...) of the RB which the SB refers to
as the related document.
3. These work instructions refer to procedures included in other Boeing documents. When
the words "refer to" are used and the operator has an accepted alternative procedure,
the accepted alternative procedure can be used. When the words "in accordance with"
are included in the instruction, the procedure in the Boeing document must be used.
4. The compliance times for the actions in WORK INSTRUCTIONS are in COMPLIANCE.
5. Unless shown differently, these dimensions and tolerances are used:
– Linear dimensions are in inches
– Tolerance on linear dimensions, other than rivet and bolt edge margins, is plus or
minus 0.03 inch
– Tolerance on rivet and bolt edge margin is plus or minus 0.05 inch
– Angular tolerance is plus or minus 2 degrees
– Hole dimensions for standard solid rivets and fasteners are in Structural Repair
Manual (SRM) Chapter 51
– Torque Values:
B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
Page 5 of 154
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 6

– Values for structural fasteners are given in 787 SRM Chapter 51.
– Values for airframe maintenance tasks are included in Chapter 20 of 787 Aircraft
Maintenance Manual (AMM).
– Values for electrical maintenance tasks are included in Chapter 20 of Standard
Wiring Practices Manual (SWPM).
– Values for engine maintenance tasks are included in Chapter 70 of 787 Aircraft
Maintenance Manual (AMM).
– Non-standard torque values for maintenance tasks are included in the applicable
installation step.
6.
Use the approved fastener, process and material substitutions in accordance with SRM
Chapter 51.
7. If the length of any fastener specified in this service bulletin does not meet the installation
standards in SRM Chapter 51, then a fastener of the same specification, or an approved
substitute, with a length which meets the installation standards in SRM Chapter 51 may
be used. Refer to SOPM 20-50-01 for ADJUSTMENT OF GRIP LENGTH and USE OF
WASHERS as an accepted procedure.
8. If it is necessary to remove more parts for access, you can remove those parts. If you
can get access without removing identified parts, it is not necessary to remove all of the
identified parts. Jacking and shoring limitations must be observed.
9. Only remove and replace one frame at a time. Do not remove any fasteners from any
other frame.
10. Where the work instructions include installation of a kept part, a new or serviceable part
with the same part number can be installed as an alternative to the kept part.
11. Do not use any kept bolts, screws, nuts, or washers with damage that impairs fit, form,
or function. Refer to SOPM 20-50-01 GENERAL.
12. Use of colors in Tasks is based on guidance from the S1000D International specification
for technical publications.
2. WORK INSTRUCTIONS
A. Actions Required for Compliance
Requirements:(1)
B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
Page 6 of 154
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 7

Table 1  Large Forward Cargo Door (LFCD) Split Frame Inspection And Replacement
Refer to the listed
procedures in SB
B787-81205-
SB530106-00 Is-
sue 001 or later
approved issues
as an accepted
procedure.
Method Of ComplianceActionCondition
PART 1: OPEN
ACCESS
--All Airplanes
-Task 1Do an inspection of the
LFCD Split Frames for the
affected Batch numbers.*[1]
PART 2: CLOSE
ACCESS
-No further action requiredCONDITION 1: NO SPLIT
FRAME FOUND WITH AN
AFFECTED BATCH NUM-
BER
-Task 2Replace affected LFCD
Split Frame with a new
LFCD Split Frame with Ti-
6Al-4V alloy material.
CONDITION 2: ANY SPLIT
FRAME FOUND WITH AN
AFFECTED BATCH NUM-
BER OR BATCH NUM-
BERS CANNOT BE DE-
TERMINED
Task 3
Task 4
Task 5
Task 6
PART 2: CLOSE
ACCESS
-
*[1]  
Refer to Appendix A for affected Batch numbers.
B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
Page 7 of 154
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 8

Task 1 – LARGE FORWARD CARGO DOOR (LFCD) SPLIT FRAME -
INSPECTION [Group 1:]
THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN
IN EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND THIS DOCUMENT TO
Alert:
THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS DOCUMENT
TO THE NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR COMPLIANCE DOCUMENT.
THE BOEING PROCESSES USED TO CREATE THE SERVICE BULLETIN (SB) AND THE
REQUIREMENTS BULLETIN (RB) ENSURE THAT THE INFORMATION BETWEEN "RC START"
AND "RC END" IN THE SB ARE IDENTICAL TO THE INFORMATION IN THE SAME SECTIONS
(COMPLIANCE, WORK INSTRUCTIONS...) OF THE RB WHICH THE SB REFERS TO AS THE
RELATED DOCUMENT.
B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
Page 8 of 154
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 9 (OCR)

Q BOEING  B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
REQUIREMENTS BULLETIN
Procedure
This Task applies only to: Group 1.
00000000000  2000000000000000000000000000
STA
489
LARGE FORWARD CARGO DOOR (LFCD)
UPPER SPLIT FRAMES
3106734
ICN-B787-A-000061-A-81205-21262-A-01-1
Task 1 Figure 1
B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
Page 9 of 154
Export Controlled ECCN: 9E991
See page 1 for details

### Page 10

1.  The step numbers shown below agree with the numbers shown in the circle symbols in the Task. The QTY
numbers shown below are the number of parts necessary for this Task.
Table 1  
More DataQtyIdentificationNameActionStep
*[1]1418Z5451-12LFCD UPPER SPLIT
FRAME - STA441
Inspect1
*[1]1418Z5451-11LFCD UPPER SPLIT
FRAME - STA465
Inspect
*[1]1418Z5451-14LFCD UPPER SPLIT
FRAME - STA489
Inspect
*[1]1418Z5451-13LFCD UPPER SPLIT
FRAME - STA513
Inspect
*[1]1418Z5451-15LFCD UPPER SPLIT
FRAME - STA537
Inspect
*[1]  
Do an inspection of the LFCD Split Frames for the affected Batch number. Refer to Appendix A for affected Batch numbers.
B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
Page 10 of 154
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 11

Task 2 – LARGE FORWARD CARGO DOOR (LFCD) SPLIT FRAME AT
STA441 - REPLACEMENT [Group 1:]
THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN
IN EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND THIS DOCUMENT TO
Alert:
THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS DOCUMENT
TO THE NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR COMPLIANCE DOCUMENT.
THE BOEING PROCESSES USED TO CREATE THE SERVICE BULLETIN (SB) AND THE
REQUIREMENTS BULLETIN (RB) ENSURE THAT THE INFORMATION BETWEEN "RC START"
AND "RC END" IN THE SB ARE IDENTICAL TO THE INFORMATION IN THE SAME SECTIONS
(COMPLIANCE, WORK INSTRUCTIONS...) OF THE RB WHICH THE SB REFERS TO AS THE
RELATED DOCUMENT.
B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
Page 11 of 154
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 12 (OCR)

A BOEING  B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
REQUIREMENTS BULLETIN
Procedure
This Task applies only to: Group 1.
00000000000  2000000000000000000000000
STA
441
STA
465
STA
489
LARGE FORWARD CARGO DOOR (LFCD)  3106738
UPPER SPLIT FRAMES
ICN-B787-A-000061-A-81205-21263-A-01-1
Task 2 Figure 1
B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
Page 12 of 154
Export Controlled ECCN: 9E991
See page 1 for details

### Page 13 (OCR)

A BOEING  B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
REQUIREMENTS BULLETIN
RADIUS FILLER
INTERCOSTAL  STA
441
• LFCD UPPER
SPLIT FRAME
812
3106741
ICN-B787-A-000061-A-81205-21264-A-01-1
Task 2 Figure 2
B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
Page 13 of 154
Export Controlled ECCN: 9E991
See page 1 for details

### Page 14 (OCR)

@ BOEING  B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
REQUIREMENTS BULLETIN
STA
LFCD UPPER  441
SPLIT FRAME
8 6 LOCATIONS
® 2 LOCATIONS
WIHS
5) 4 LOCATIONS
DOUBLE PIN
JOINT FITTING
WIHS
3106747
ICN-B787-A-000061-A-81205-21265-A-01-1
Task 2 Figure 3
B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
Page 14 of 154
Export Controlled ECCN: 9E991
See page 1 for details

### Page 15 (OCR)

@ BOEING  B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
REQUIREMENTS BULLETIN
INBD
DOUBLE PIN
JOINT FITTING  A-A
SEAT TRACK
DOUBLE PIN
JOINT FITTING
INBD
B-B  3108032
ICN-B787-A-000061-A-81205-21266-A-01-1
Task 2 Figure 4
B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
Page 15 of 154
Export Controlled ECCN: 9E991
See page 1 for details

### Page 16 (OCR)

@ BOEING  B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
REQUIREMENTS BULLETIN
STA
441  ® 8 LOCATIONS
STRAP-SPLICE -
8) 4 LOCATIONS
4 LOCATIONS (6
8) 5 LOCATIONS
BRACKET
3106767
ICN-B787-A-000061-A-81205-21267-A-01-1
Task 2 Figure 5
B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
Page 16 of 154
Export Controlled ECCN: 9E991
See page 1 for details

### Page 17 (OCR)

@ BOEING  B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
REQUIREMENTS BULLETIN
STA
441
LFCD UPPER
SPLIT FRAME
5) 4 LOCATIONS
3106846
ICN-B787-A-000061-A-81205-21268-A-01-1
Task 2 Figure 6
B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
Page 17 of 154
Export Controlled ECCN: 9E991
See page 1 for details

### Page 18 (OCR)

O BOEING  B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
REQUIREMENTS BULLETIN
STA
441
3108037
ICN-B787-A-000061-A-81205-21269-A-01-1
Task 2 Figure 7
B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
Page 18 of 154
Export Controlled ECCN: 9E991
See page 1 for details

### Page 19 (OCR)

@ BOEING  B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
REQUIREMENTS BULLETIN
RADIUS FILLER
SILL UPPER
CLIP
VIEW IN THE AFT DIRECTION
C-C
3110871
ICN-B787-A-000061-A-81205-21270-A-01-1
Task 2 Figure 8
B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
Page 19 of 154
Export Controlled ECCN: 9E991
See page 1 for details

### Page 20 (OCR)

@BOEING  B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
REQUIREMENTS BULLETIN
STA
13) & LOCATIONS
5 LOCATIONS
>13 4 LOCATIONS
4 LOCATIONS (11
13) 4 LOCATIONS
ICN-B787-A-000061-A-81205-21271-A-01-1
Task 2 Figure 9
B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
Page 20 of 154
Export Controlled ECCN: 9E991
See page 1 for details

### Page 21 (OCR)

@ BOEING  B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
REQUIREMENTS BULLETIN
STA
441
3108039
ICN-B787-A-000061-A-81205-21272-A-01-1
Task 2 Figure 10
B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
Page 21 of 154
Export Controlled ECCN: 9E991
See page 1 for details

### Page 22 (OCR)

_BOEING  B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
REQUIREMENTS BULLETIN
STA
441
13
ICN-B787-A-000061-A-81205-21559-A-01-1
Task 2 Figure 11
B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
Page 22 of 154
Export Controlled ECCN: 9E991
See page 1 for details

### Page 23 (OCR)

@ BOEING  B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
REQUIREMENTS BULLETIN
STA
441
16)
3108042
ICN-B787-A-000061-A-81205-21560-A-01-1
Task 2 Figure 12
B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
Page 23 of 154
Export Controlled ECCN: 9E991
See page 1 for details

### Page 24 (OCR)

_BOEING  B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
REQUIREMENTS BULLETIN
STA
441
3108583
ICN-B787-A-000061-A-81205-21561-A-01-1
Task 2 Figure 13
B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
Page 24 of 154
Export Controlled ECCN: 9E991
See page 1 for details

### Page 25 (OCR)

Q BOEING  B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
REQUIREMENTS BULLETIN
(24
3108045
ICN-B787-A-000061-A-81205-21562-A-01-1
Task 2 Figure 14
B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
Page 25 of 154
Export Controlled ECCN: 9E991
See page 1 for details

### Page 26 (OCR)

Q BOEING  B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
REQUIREMENTS BULLETIN
STA
441
RADIUS FILLER
30
SILL UPPER  OUTBOARD  INBOARD
CLIP
(28
LFCD UPPER
SPLIT FRAME
INTERCOSTAL
ICN-B787-A-000061-A-81205-21563-A-01-1
Task 2 Figure 15
B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
Page 26 of 154
Export Controlled ECCN: 9E991
See page 1 for details

### Page 27 (OCR)

O BOEING  B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
REQUIREMENTS BULLETIN
STA
441
32) (37
SHIM
1(33)
3108047
ICN-B787-A-000061-A-81205-21564-A-01-1
Task 2 Figure 16
B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
Page 27 of 154
Export Controlled ECCN: 9E991
See page 1 for details

### Page 28 (OCR)

Q BOEING  B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
REQUIREMENTS BULLETIN
STA
441
SHIM
SHIM
3108591
ICN-B787-A-000061-A-81205-21565-A-01-1
Task 2 Figure 17
B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
Page 28 of 154
Export Controlled ECCN: 9E991
See page 1 for details

### Page 29 (OCR)

@ BOEING  B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
REQUIREMENTS BULLETIN
INBD
D-D
E-E  INBD  3108593
ICN-B787-A-000061-A-81205-21566-A-01-1
Task 2 Figure 18
1. The step numbers shown below agree with the numbers shown in the circle symbols in the Task. The QTY
numbers shown below are the number of parts necessary for this Task.
B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
Page 29 of 154
Export Controlled ECCN: 9E991
See page 1 for details

### Page 30

Table 1  
More DataQtyIdentificationNameActionStep
*[1]18-FASTENERRemove / Keep1
- 2-SHIMRemove / Keep
- 2-FASTENERRemove2
- 1415Z3111-26DOUBLE PIN JOINT
FITTING
Remove / Keep
*[1]7-FASTENERRemove3
- 1418Z5442-2SILL UPR CLIP
STA441
Remove / Keep
- 1BACF3H09DF024BGRADIUS FILLERRemove
*[1]2-FASTENERRemove / Keep4
- 1BACB20AW1-90BRACKETRemove / Keep
*[1]8-FASTENERRemove5
*[1]4-FASTENERRemove6
*[2]5-FASTENERRemove / Keep7
- 1418Z4041-5STRAP - SPLICE, UPR
SPLIT FRAME, LFCD
Remove / Keep
*[2]25-FASTENERRemove8
- 1418Z5451-12LFCD UPPER SPLIT
FRAME - STA441
Remove
*[3]1418Z5451-12LFCD UPPER SPLIT
FRAME - STA441
Install (New)9
*[3]4-FASTENER (TEMPO-
RARY)
Install (Temporary)
- 1418Z5442-2SILL UPR CLIP
STA441
Install (Temporary)
- 1BACF3H09DF024BGRADIUS FILLERInstall (Temporary)
- 1418Z4041-5STRAP - SPLICE, UPR
SPLIT FRAME, LFCD
Install (Kept)10
*[4]5BACB30NX10K7BOLT, PERMANENT
HEX DRIVE
Install (Kept)
*[4]*[5]5BACW10EG10CUWASHERInstall (Kept)
*[4]5BACN11BH5KNUT, SELF-LOCKINGInstall (Kept)
B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
Page 30 of 154
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 31

Table 1  
More DataQtyIdentificationNameActionStep
*[6]13-HOLEDrill 11
- 13-HOLEDeburr
*[6]2-HOLEDrill 12
- 2-HOLEDeburr
*[7]22-HOLEDrill 13
- 22-HOLEDeburr
*[8]1BACB30VT8K7BOLT, PROTRUDING
HEAD, HEX DRIVE, 95
KSI SHEAR, 6AL-4V
TITANIUM,
LIGHTWEIGHT (NO
Install (New)14
*[8]1BACN11AJ4CK
(BACN11AJ4CS OP-
TIONAL)
NUT, SELF-LOCKING,
HEXAGON, COUNTER-
BORED, CRES (FOR
LIGHTWEIGHT HEX
DRIVE BOLTS)
Install (New)
*[8]4BACB30VT8K4BOLT, PROTRUDING
HEAD, HEX DRIVE, 95
KSI SHEAR, 6AL-4V
TITANIUM,
LIGHTWEIGHT (NO
Install (New)15
*[8]4BACN11AJ4CK
(BACN11AJ4CS OP-
TIONAL)
NUT, SELF-LOCKING,
HEXAGON, COUNTER-
BORED, CRES (FOR
LIGHTWEIGHT HEX
DRIVE BOLTS)
Install (New)
B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
Page 31 of 154
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 32

Table 1  
More DataQtyIdentificationNameActionStep
*[9]2BACB30NM4K10BOLT, HEX HEAD, 160
KSI MIN TENSILE,
LONG THREAD, 6AL-
4V TITANIUM, NON-
LOCKING AN
Install (New)16
*[5]*[8]2BACW10BP4CKWASHER, PLAIN AND
COUNTERSUNK
(NOMINAL, .0156 AND
.0312 OVERSIZE) AL-
LOY STEEL AN
Install (New)
*[8]*[9]2BACW10BP4NPKWASHER, PLAIN AND
COUNTERSUNK
(NOMINAL, .0156 AND
.0312 OVERSIZE) AL-
LOY STEEL AN
Install (New)
*[8]2BACN11Z4CKNUT, SELF-LOCKING,
12 POINT, 180 KSI
TENSILE, 450 F AND
900 F
Install (New)
*[10]1BACB30YM10K10BOLT, 100 DEG TEN-
SION HEAD, HEX
DRIVE, 125 KSI
SHEAR, NICKEL AL-
LOY 718 (NOMINAL
Install (New)17
*[4]*[11]2BACW10BP5PKWASHER, PLAIN AND
COUNTERSUNK
(NOMINAL, .0156 AND
.0312 OVERSIZE) AL-
LOY STEEL AN
Install (New)
*[4]*[12]1BACN11Z5CK
(BACN11Z5CB OP-
TIONAL)
NUT, SELF-LOCKING,
12 POINT, 180 KSI
TENSILE, 450 F AND
900 F
Install (New)
B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
Page 32 of 154
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 33

Table 1  
More DataQtyIdentificationNameActionStep
*[10]1BACB30NY10K10BOLT, 100 DEG TEN-
SION HEAD, HEX
DRIVE, 160 KSI MIN
TENSILE, 6AL-4V TITA-
NIUM, (NO
Install (New)18
*[4]1BACN11BH5KNUT, SELF-LOCKING,
REDUCED HEXAGON,
COUNTERBORED,
3AL-2.5V TITANIUM
Install (New)
*[10]1BACB30NY10K9BOLT, 100 DEG TEN-
SION HEAD, HEX
DRIVE, 160 KSI MIN
TENSILE, 6AL-4V TITA-
NIUM (NOM
Install (New)19
*[4]1BACN11BH5KNUT, SELF-LOCKING,
REDUCED HEXAGON,
COUNTERBORED,
3AL-2.5V TITANIUM
Install (New)
*[10]2BACB30NY10K6BOLT, 100 DEG TEN-
SION HEAD, HEX
DRIVE, 160 KSI MIN
TENSILE, 6AL-4V TITA-
NIUM (NOM
Install (New)20
*[4]2BACN11BH5KNUT, SELF-LOCKING,
REDUCED HEXAGON,
COUNTERBORED,
3AL-2.5V TITANIUM
Install (New)
*[10]2BACB30NY8K6BOLT, 100 DEG TEN-
SION HEAD, HEX
DRIVE, 160 KSI MIN
TENSILE, 6AL-4V TITA-
NIUM (NOM
Install (New)21
*[4]2BACN11BH4KNUT, SELF-LOCKING,
REDUCED HEXAGON,
COUNTERBORED,
3AL-2.5V TITANIUM
Install (New)
B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
Page 33 of 154
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 34

Table 1  
More DataQtyIdentificationNameActionStep
*[10]2BACB30NY8K5BOLT, 100 DEG TEN-
SION HEAD, HEX
DRIVE, 160 KSI MIN
TENSILE, 6AL-4V TITA-
NIUM (NOM
Install (New)22
*[4]2BACN11BH4KNUT, SELF-LOCKING,
REDUCED HEXAGON,
COUNTERBORED,
3AL-2.5V TITANIUM
Install (New)
*[4]4BACB30NX8K6BOLT, PROTRUDING
HEAD, HEX DRIVE,
TENSION, 6AL-4V TI-
TANIUM (NOMINAL
AND OVERSIZE
Install (New)23
*[4]4BACN11BH4KNUT, SELF-LOCKING,
REDUCED HEXAGON,
COUNTERBORED,
3AL-2.5V TITANIUM
Install (New)
*[4]8BACB30NX8K9BOLT, PROTRUDING
HEAD, HEX DRIVE,
TENSION, 6AL-4V TI-
TANIUM (NOMINAL
AND OVERSIZE
Install (New)24
*[4]8BACN11BH4KNUT, SELF-LOCKING,
REDUCED HEXAGON,
COUNTERBORED,
3AL-2.5V TITANIUM
Install (New)
*[8]1BACB30NX8K4BOLT, PROTRUDING
HEAD, HEX DRIVE,
TENSION, 6AL-4V TI-
TANIUM (NOMINAL
AND OVERSIZE
Install (New)25
*[8]1BACW10EG8CUWASHER, COUNTER-
SUNK, CRES AND
ALUMINUM ALLOY
(NOMINAL AND
OVERSIZE)
Install (New)
*[8]1BACN11BH4KNUT, SELF-LOCKING,
REDUCED HEXAGON,
COUNTERBORED,
3AL-2.5V TITANIUM
Install (New)
B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
Page 34 of 154
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 35

Table 1  
More DataQtyIdentificationNameActionStep
*[8]3BACB30NX8K5BOLT, PROTRUDING
HEAD, HEX DRIVE,
TENSION, 6AL-4V TI-
TANIUM (NOMINAL
AND OVERSIZE
Install (New)26
*[8]3BACW10EG8CUWASHER, COUNTER-
SUNK, CRES AND
ALUMINUM ALLOY
(NOMINAL AND
OVERSIZE)
Install (New)
*[8]3BACN11BH4KNUT, SELF-LOCKING,
REDUCED HEXAGON,
COUNTERBORED,
3AL-2.5V TITANIUM
Install (New)
- 1BACB20AW1-90BRACKETInstall (Kept)27
*[13]2BACB30VT6K9BOLT, PROTRUDING
HEAD, HEX DRIVE, 95
KSI SHEAR, 6AL-4V
TITANIUM,
LIGHTWEIGHT (NO
Install (New)
*[4]*[11]2BACW10BP3APUWASHER, PLAIN AND
COUNTERSUNK
(NOMINAL, .0156 AND
.0312 OVERSIZE) AL-
LOY STEEL AN
Install (New)
*[4]2BACN11AJ3CKNUT, SELF-LOCKING,
HEXAGON, COUNTER-
BORED, CRES (FOR
LIGHTWEIGHT HEX
DRIVE BOLTS)
Install (New)
B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
Page 35 of 154
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 36

Table 1  
More DataQtyIdentificationNameActionStep
*[14]*[15]1BACF3H09DF024BGRADIUS FILLERInstall (New)28
*[15]1418Z5442-2SILL UPR CLIP
STA441
Install (Kept)
*[4]*[5]*[10]*[13]*[16]*[15]*[17]1BACB30VT8K5BOLT, PROTRUDING
HEAD, HEX DRIVE, 95
KSI SHEAR, 6AL-4V
TITANIUM,
LIGHTWEIGHT (NO
Install (New)
*[4]*[5]*[10]*[13]*[16]*[15]*[18]1BACB30VT8K7BOLT, PROTRUDING
HEAD, HEX DRIVE, 95
KSI SHEAR, 6AL-4V
TITANIUM,
LIGHTWEIGHT (NO
Install (New)
*[4]*[5]*[10]*[13]*[16]*[15]2BACN11AJ4CKNUT, SELF-LOCKING,
HEXAGON, COUNTER-
BORED, CRES (FOR
LIGHTWEIGHT HEX
DRIVE BOLTS)
Install (New)
*[8]*[10]*[15]2BACB30VT8K9BOLT, PROTRUDING
HEAD, HEX DRIVE, 95
KSI SHEAR, 6AL-4V
TITANIUM,
LIGHTWEIGHT (NO
Install (New)29
*[8]*[16]*[15]2BACN11AJ4CKNUT, SELF-LOCKING,
HEXAGON, COUNTER-
BORED, CRES (FOR
LIGHTWEIGHT HEX
DRIVE BOLTS)
Install (New)
*[8]*[10]*[15]3BACB30VT8K5BOLT, PROTRUDING
HEAD, HEX DRIVE, 95
KSI SHEAR, 6AL-4V
TITANIUM,
LIGHTWEIGHT (NO
Install (New)30
*[8]*[15]3BACN11AJ4CKNUT, SELF-LOCKING,
HEXAGON, COUNTER-
BORED, CRES (FOR
LIGHTWEIGHT HEX
DRIVE BOLTS)
Install (New)
B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
Page 36 of 154
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 37

Table 1  
More DataQtyIdentificationNameActionStep
- 1-FASTENER (TEMPO-
RARY)
Remove31
*[6]1-HOLEDrill
- 1-HOLEDeburr
- 3-FASTENER (TEMPO-
RARY)
Remove32
*[7]3-HOLEDrill
- 3-HOLEDeburr
*[8]1BACB30VT8K7BOLT, PROTRUDING
HEAD, HEX DRIVE, 95
KSI SHEAR, 6AL-4V
TITANIUM,
LIGHTWEIGHT (NO
Install (New)33
*[8]1BACN11AJ4CK
(BACN11AJ4CS OP-
TIONAL)
NUT, SELF-LOCKING,
HEXAGON, COUNTER-
BORED, CRES (FOR
LIGHTWEIGHT HEX
DRIVE BOLTS)
Install (New)
*[10]1BACB31G6B16BOLT, 100 DEG TEN-
SION HEAD, TORX
PLUS RECESS, NICK-
EL ALLOY 718 (NOMI-
NAL AND OVER
Install (New)34
*[4]*[11]1BACW10BP6PKWASHER, PLAIN AND
COUNTERSUNK
(NOMINAL, .0156 AND
.0312 OVERSIZE) AL-
LOY STEEL AN
Install (New)
*[4]1BACN10HR6CBNUT, SELF-LOCKING,
12 POINT, 220 KSI
TENSILE, HIGH RELIA-
BILITY, 450 F AND 900
F
Install (New)
*[19]1-SHIMInstall (New)
B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
Page 37 of 154
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 38

Table 1  
More DataQtyIdentificationNameActionStep
*[10]1BACB31G6B15BOLT, 100 DEG TEN-
SION HEAD, TORX
PLUS RECESS, NICK-
EL ALLOY 718 (NOMI-
NAL AND OVER
Install (New)35
*[4]*[11]1BACW10BP6PKWASHER, PLAIN AND
COUNTERSUNK
(NOMINAL, .0156 AND
.0312 OVERSIZE) AL-
LOY STEEL AN
Install (New)
*[4]1BACN10HR6CBNUT, SELF-LOCKING,
12 POINT, 220 KSI
TENSILE, HIGH RELIA-
BILITY, 450 F AND 900
F
Install (New)
*[10]1BACB30NY10K7BOLT, 100 DEG TEN-
SION HEAD, HEX
DRIVE, 160 KSI MIN
TENSILE, 6AL-4V TITA-
NIUM (NOM
Install (New)36
*[4]1BACN11BH5KNUT, SELF-LOCKING,
REDUCED HEXAGON,
COUNTERBORED,
3AL-2.5V TITANIUM
Install (New)
*[10]1BACB30NY8K5BOLT, 100 DEG TEN-
SION HEAD, HEX
DRIVE, 160 KSI MIN
TENSILE, 6AL-4V TITA-
NIUM (NOM
Install (New)37
*[4]1BACN11BH4KNUT, SELF-LOCKING,
REDUCED HEXAGON,
COUNTERBORED,
3AL-2.5V TITANIUM
Install (New)
- 1415Z3111-26DOUBLE PIN JOINT
FITTING
Install (Kept)38
*[13]*[20]2BACB30US9K16BOLTInstall (New)
*[13]*[20]2BACN10HR9CSNUT, SELF-LOCKING,
12 POINT, 220 KSI
TENSILE, HIGH RELIA-
BILITY, 450 F AND 900
F
Install (New)
B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
Page 38 of 154
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 39

Table 1  
More DataQtyIdentificationNameActionStep
*[13]2BACB30NM4K5BOLTInstall (Kept)39
*[11]*[13]2BACW10BP4PKWASHER, PLAIN AND
COUNTERSUNK
Install (Kept)
*[13]2BACN11Z4CKNUTInstall (Kept)
*[21]1BACS40V011C049SHIMInstall (Kept)40
*[10]*[13]4BACB30NX8K7BOLT, PROTRUDING
HEAD, HEX DRIVE, 95
KSI SHEAR, 6AL-4V
TITANIUM,
LIGHTWEIGHT (NO
Install (Kept)
*[4]*[5]*[13]*[22]4BACW10EG8CKWASHER, CSKInstall (Kept)
*[4]*[13]*[22]4BACN11BH4KNUT, SELF-LOCKING,
REDUCED HEXAGON,
COUNTERBORED,
3AL-2.5V TITANIUM
Install (Kept)
*[21]1BACS40V011C049SHIMInstall (Kept)41
*[10]*[13]3BACB30NX8K7BOLT, HEX DRIVEInstall (Kept)
*[4]*[5]*[13]*[22]3BACW10EG8CKWASHER, CSKInstall (Kept)
*[4]*[13]*[22]3BACN11BH4KNUT, SELF-LOCKING,
REDUCED HEXAGON,
COUNTERBORED,
3AL-2.5V TITANIUM
Install (Kept)
*[10]*[13]1BACB30NX10K7BOLT, 100 DEG TEN-
SION HEAD, HEX
DRIVE, 160 KSI MIN
TENSILE, 6AL-4V TITA-
NIUM (NOM
Install (Kept)42
*[4]*[5]*[13]*[22]1BACW10EG10CKWASHER, CSKInstall (Kept)
*[4]*[13]*[22]1BACN11BH5KNUT, SELF-LOCKING,
REDUCED HEXAGON,
COUNTERBORED,
3AL-2.5V TITANIUM
Install (Kept)
B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
Page 39 of 154
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 40

Table 1  
More DataQtyIdentificationNameActionStep
*[10]*[13]7BACB30NX8K4BOLT, PROTRUDING
HEAD, HEX DRIVE,
TENSION, 6AL-4V TI-
TANIUM (NOMINAL
AND OVERSIZE
Install (Kept)43
*[4]*[13]*[22]7BACN11BH4KNUT, SELF-LOCKING,
REDUCED HEXAGON,
COUNTERBORED,
3AL-2.5V TITANIUM
Install (Kept)
*[10]*[13]1BACB30NX10K4BOLT, HEX DRIVEInstall (Kept)44
*[4]*[13]*[22]1BACN11BH5KNUT, SELF-LOCKING,
REDUCED HEXAGON,
COUNTERBORED,
3AL-2.5V TITANIUM
Install (Kept)
*[1]  
Record fastener stack-up and orientation.
*[2]  Remove fastener in accordance with 787-8 SRM 51-43-05.
*[3]  Install temporary fasteners in the pilot holes in the new split frame.
*[4]  Refer to SOPM 20-50-18 as an accepted procedure for fastener installation.
*[5]  Install washer under head of bolt.
*[6]  Match drill holes to surrounding structure. Refer to 787-8 SRM 51-41-05 as an accepted procedure.
*[7]  Match drill holes to surrounding structure. Refer to SOPM 20-50-18 as an accepted procedure.
*[8]  Refer to 787-8 SRM 51-41-05 as an accepted procedure for fastener installation.
*[9]  Wet install bolt with BMS5-45 sealant. Refer to SOPM 20-50-19 , Method 1 as an accepted procedure.
*[10]  Wet install bolt with BMS5-45 sealant. Refer to SOPM 20-50-19 , Method 2 as an accepted procedure.
*[11]  Install washer under nut.
*[12]  Torque nut to 175 in-lbs, a torque between 170 in-lbs and 180 in-lbs is acceptable. Refer to SOPM 20-50-18 as an accepted procedure.
*[13]  Use recorded stack-up and orientation information. Refer to SOPM 20-50-01 as an accepted procedure for fastener installation.
*[14]  Shim as required, refer to SOPM 20-50-20 , Type V as an accepted procedure. Maximum allowable gap between faying surfaces prior
to fastener pull-up is 0.006 inches measured at the fastener centerline. Apply a corrosion protection fay surface seal with BMS5-45
sealant, refer to SOPM 20-50-19 as an accepted procedure. Make sure the squeeze-out is visible and continuous around the edge of
the shim.
*[15]  Apply a corrosion protection Fay Surface Seal with BMS5-45 sealant. Refer to SOPM 20-50-19 as an accepted procedure.
*[16]  Fillet Seal nut with BMS5-142, TYPE II sealant. Refer to SOPM 20-50-19 as an accepted procedure.
*[17]  Install bolt BACB30VT8K5 in the inboard location.
*[18]  Install bolt BACB30VT8K7 in the outboard location.
*[19]  Shim as required using metallic laminated shim stock, BAC1534-15T, -33T, -62T or BAC1534-15C, -33C, -62C or equivalent BAC40R(*),
refer to SOPM 20-50-20 , Type I as an accepted procedure. Pre-fit the assembly using a maximum clamp-up force of 5 lbs per linear
foot applied along the fastener center line. Maximum shim thickness must not exceed 0.062 inches. Laminated portion of shim must
have a maximum thickness of 0.030 inches. Maximum gap prior to fastener installation must be 0.008 inches. Maintain a minimum
edge distance of 2x the fastener diameter on the shim.
*[20]  It is acceptable to bond the anti-rotation ring into the hex pocket of the fitting with BMS5-45, Type 44 sealant to aid installation. Refer
to SOPM 20-50-18 as an accepted procedure. Make sure sealant does not squeeze-out into the teeth of the anti-rotation ring. Use
any combination of spacers to make sure there is a maximum gap of 0.008 inches before fastener installation. Make sure spacer tabs
have a 0.05 inch minimum clearance from adjacent structure.
*[21]  Install shim between the double pin joint fitting and the floor beam. Refer to SOPM 20-50-20 as an accepted procedure. Shim thickness
must not exceed 0.06 inches.
*[22]  Brush Seal nut and washer with BMS5-45 sealant. Refer to SOPM 20-50-19 as an accepted procedure.
B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
Page 40 of 154
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 41

Task 3 – LARGE FORWARD CARGO DOOR (LFCD) SPLIT FRAME AT
STA465 - REPLACEMENT  [Group 1:]
THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN
IN EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND THIS DOCUMENT TO
Alert:
THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS DOCUMENT
TO THE NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR COMPLIANCE DOCUMENT.
THE BOEING PROCESSES USED TO CREATE THE SERVICE BULLETIN (SB) AND THE
REQUIREMENTS BULLETIN (RB) ENSURE THAT THE INFORMATION BETWEEN "RC START"
AND "RC END" IN THE SB ARE IDENTICAL TO THE INFORMATION IN THE SAME SECTIONS
(COMPLIANCE, WORK INSTRUCTIONS...) OF THE RB WHICH THE SB REFERS TO AS THE
RELATED DOCUMENT.
B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
Page 41 of 154
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 42 (OCR)

A BOEING  B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
REQUIREMENTS BULLETIN
Procedure
This Task applies only to: Group 1.
00000000000  0000000000000000000  0000000000
STA
465
STA
489
LARGE FORWARD CARGO DOOR (LFCD)  3106854
UPPER SPLIT FRAMES
ICN-B787-A-000061-A-81205-21567-A-01-1
Task 3 Figure 1
Issue 001, 04 Feb 2026 12:00:00 AM
Page 42 of 154
Export Controlled ECCN: 9E991
See page 1 for details

### Page 43 (OCR)

@BOEING  B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
REQUIREMENTS BULLETIN
STA
465
_LFCD UPPER
SPLIT FRAME
3106860
ICN-B787-A-000061-A-81205-21568-A-01-1
Task 3 Figure 2
B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
Page 43 of 154
Export Controlled ECCN: 9E991
See page 1 for details

### Page 44 (OCR)

@ BOEING  B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
REQUIREMENTS BULLETIN
STA
LFCD UPPER  465
SPLIT FRAME
6 LOCATIONS
SEAT
TRACK
NUT PLATE
ASSEMBLY
- SHIM
DOUBLE
PIN JOINT.
FITTING
SHIM
8 LOCATIONS 1  5 LOCATIONS
SHIM
3106865
ICN-B787-A-000061-A-81205-21569-A-01-1
Task 3 Figure 3
B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
Page 44 of 154
Export Controlled ECCN: 9E991
See page 1 for details

### Page 45 (OCR)

@ BOEING  B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
REQUIREMENTS BULLETIN
INBD
DOUBLE PIN
JOINT FITTING  A-A
- SEAT TRACK
DOUBLE PIN
JOINT FITTING
RADIUS FILLER
INBD
B-B  3108975
ICN-B787-A-000061-A-81205-21570-A-01-1
Task 3 Figure 4
B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
Page 45 of 154
Export Controlled ECCN: 9E991
See page 1 for details

### Page 46 (OCR)

@ BOEING  B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
REQUIREMENTS BULLETIN
STA  € 8 LOCATIONS
465  € 4 LOCATIONS
5 LOCATIONS A
STRAP SPLICE
4 LOCATIONS ®
(5) 5 LOCATIONS
3106871
ICN-B787-A-000061-A-81205-21571-A-01-1
Task 3 Figure 5
B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
Page 46 of 154
Export Controlled ECCN: 9E991
See page 1 for details

### Page 47 (OCR)

@ BOEING  B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
REQUIREMENTS BULLETIN
STA
465
LFCD UPPER
SPLIT FRAME
) 5 LOCATIONS
NAND INED
3106902
ICN-B787-A-000061-A-81205-21572-A-01-1
Task 3 Figure 6
B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
Page 47 of 154
Export Controlled ECCN: 9E991
See page 1 for details

### Page 48 (OCR)

B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
REQUIREMENTS BULLETIN
STA
465
ICN-B787-A-000061-A-81205-21573-A-01-1
Task 3 Figure 7
B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
Page 48 of 154
Export Controlled ECCN: 9E991
See page 1 for details

### Page 49 (OCR)

@ BOEING  B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
REQUIREMENTS BULLETIN
STA
465
5 LOCATIONS T
3108465
ICN-B787-A-000061-A-81205-21574-A-01-1
Task 3 Figure 8
B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
Page 49 of 154
Export Controlled ECCN: 9E991
See page 1 for details

### Page 50 (OCR)

O BOEING  B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
REQUIREMENTS BULLETIN
STA
465
5 LOCATIONS
ICN-B787-A-000061-A-81205-21575-A-01-1
Task 3 Figure 9
B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
Page 50 of 154
Export Controlled ECCN: 9E991
See page 1 for details

### Page 51 (OCR)

@ BOEING  B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
REQUIREMENTS BULLETIN
STA
465
(8) 4 LOCATIONS
ICN-B787-A-000061-A-81205-21576-A-01-1
Task 3 Figure 10
B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
Page 51 of 154
Export Controlled ECCN: 9E991
See page 1 for details

### Page 52 (OCR)

@BOEING  B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
REQUIREMENTS BULLETIN
STA
465
9) 8 LOCATIONS
® 4 LOCATIONS
4 LOCATIONS (8
g 4 LOCATIONS
3107134
ICN-B787-A-000061-A-81205-21577-A-01-1
Task 3 Figure 11
B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
Page 52 of 154
Export Controlled ECCN: 9E991
See page 1 for details

### Page 53 (OCR)

@ BOEING  B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
REQUIREMENTS BULLETIN
12)
ICN-B787-A-000061-A-81205-21578-A-01-1
Task 3 Figure 12
B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
Page 53 of 154
Export Controlled ECCN: 9E991
See page 1 for details

### Page 54 (OCR)

P BOEING  B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
REQUIREMENTS BULLETIN
STA
465
15)
3108471
ICN-B787-A-000061-A-81205-21579-A-01-1
Task 3 Figure 13
B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
Page 54 of 154
Export Controlled ECCN: 9E991
See page 1 for details

### Page 55 (OCR)

@ BOEING  B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
REQUIREMENTS BULLETIN
STA
465  22) 8 LOCATIONS
23 4 LOCATIONS
3 LOCATIONS (21
3107137
ICN-B787-A-000061-A-81205-21580-A-01-1
Task 3 Figure 14
B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
Page 55 of 154
Export Controlled ECCN: 9E991
See page 1 for details

### Page 56 (OCR)

B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
REQUIREMENTS BULLETIN
STA
465
(24 26)
25
3107396
ICN-B787-A-000061-A-81205-21581-A-01-1
Task 3 Figure 15
B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
Page 56 of 154
Export Controlled ECCN: 9E991
See page 1 for details

### Page 57 (OCR)

O BOEING  B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
REQUIREMENTS BULLETIN
STA
465
29
SHIM
ICN-B787-A-000061-A-81205-21582-A-01-1
Task 3 Figure 16
B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
Page 57 of 154
Export Controlled ECCN: 9E991
See page 1 for details

### Page 58 (OCR)

@_BOEING  B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
REQUIREMENTS BULLETIN
STA
465
4 LOCATIONS 34
SHIM
4 LOCATIONS (35
T C.
SHIM
3107398
ICN-B787-A-000061-A-81205-21583-A-01-1
Task 3 Figure 17
B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
Page 58 of 154
Export Controlled ECCN: 9E991
See page 1 for details

### Page 59 (OCR)

@ BOEING  B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
REQUIREMENTS BULLETIN
D-D  INBD  3107404
ICN-B787-A-000061-A-81205-21584-A-01-1
Task 3 Figure 18
1. The step numbers shown below agree with the numbers shown in the circle symbols in the Task. The QTY
numbers shown below are the number of parts necessary for this Task.
B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
Page 59 of 154
Export Controlled ECCN: 9E991
See page 1 for details

### Page 60

Table 1  
More DataQtyIdentificationNameActionStep
*[1]18-FASTENERRemove / Keep1
- 2-FILLER, RADIUSRemove / Keep
- 2-SHIMRemove / Keep
- 2-FASTENERRemove2
- 1415Z3111-20DOUBLE PIN JOINT
FITTING
Remove / Keep
*[1]14-FASTENERRemove3
*[2]5-FASTENERRemove / Keep4
- 1418Z4041-5STRAP - SPLICE, UPR
SPLIT FRAME, LFCD
Remove / Keep
*[2]25-FASTENERRemove5
- 1418Z5383-19NUTPLATE ASSEM-
BLY
Remove / Keep
- --SHIMRemove
- 1418Z5451-11LFCD UPPER SPLIT
FRAME - STA465
Remove
*[3]1418Z5451-11LFCD UPPER SPLIT
FRAME - STA465
Install (New)6
*[3]4-FASTENER (TEMPO-
RARY)
Install (Temporary)
- 1418Z4041-5STRAP - SPLICE, UPR
SPLIT FRAME, LFCD
Install (Kept)7
*[4]5BACB30NX10K7BOLT, HEX DRIVEInstall (Kept)
*[4]*[5]5BACW10EG10CUWASHERInstall (Kept)
*[4]5BACN11BH5KNUT, SELF-LOCKINGInstall (Kept)
*[6]13-HOLEDrill 8
- 13-HOLEDeburr
*[7]22-HOLEDrill 9
- 22-HOLEDeburr
B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
Page 60 of 154
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530106-00 RB
Issue 001, 04 Feb 2026 12:00:00 AM
REQUIREMENTS BULLETIN

The text continues at https://openairdocs.org/service-documents/boeing/b787-81205-sb530106-00-rb/file/827b9dac28b5.md?from=61

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
