# Boeing Alert Requirements Bulletin B787-81205-SB530108-00 RB

Copy: Revision 001 ("B787-81205-SB530108-00 RB Issue 001"), 21 pages: PDF https://openairdocs.org/files/sha256/58/0a/580a63c5e0cfb8b29856d6a8434ea928531a2b7cd3f2d4541ec48bf13b2b7eb3; text https://openairdocs.org/service-documents/boeing/b787-81205-sb530108-00-rb/file/580a63c5e0cf.md. Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2026-1330; AD 2026-20-01 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Boeing](https://openairdocs.org/service-documents/boeing.md)
- Type: Service bulletin (Alert Requirements Bulletin)
- Number: B787-81205-SB530108-00 RB
- Latest revision known: B787-81205-SB530108-00 RB, Issue 001, dated November 5, 2025 (OpenAirDocs)
- Page: https://openairdocs.org/service-documents/boeing/b787-81205-sb530108-00-rb

## ADs that cite it (1) (OpenAirDocs)

Newest first, with the revision each names, as OpenAirDocs read it from the AD's text.

- [AD 2026-20-01](https://openairdocs.org/ad/2026-20-01.md), effective Nov 2, 2026: Revision 001

Also cited in [1 proposed AD](https://openairdocs.org/service-documents/boeing/b787-81205-sb530108-00-rb/proposed.md).

## Text (21 pages)

Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2026-1330; AD 2026-20-01 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication. Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

ALERT
Alert Requirements Bulletin B787-81205-SB530108-00 RB FUSELAGE -
Main Deck Floor Structure - Cargo Liner Joint Sealing Tape - Inspection
Copyright © 2025 The Boeing Company
Treatment of this data module and its content is governed by contract with Boeing. Rights to use this data module are licensed on a per
aircraft basis and such rights may not be transferable. For more information, contact The Boeing Company. Boeing, the Boeing signature,
the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner, BBJ, DC-8, DC-9, DC-10, KC-10, KC-46, KDC-10, MD-10,
MD-11, MD-80, MD-88, MD-90, P-8, Poseidon and Boeing liveries are all trademarks owned by The Boeing Company; and no trademark
license is granted in connection with this document unless provided in writing by Boeing.
EXPORT CONTROLLED
This technology or software is subject to the U.S. Export Administration Regulations (EAR), (15 C.F.R. Parts 730-774). No authorization
from the U.S. Department of Commerce is required for export, re-export, in-country transfer, or access EXCEPT to country group E:1 or
E:2 countries/persons per Supp.1 to Part 740 of the EAR.
ECCN: 9E991
B787-81205-SB530108-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
Page 1 of 21
Export Controlled ECCN: 9E991
See page 1 for details
2.0
B787-81205-SB530108-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 2

Table of Contents
Page
A. EFFECTIVITY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
1. Airplanes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
2. Spares Affected . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
B. CONCURRENT REQUIREMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
C. COMPLIANCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
D. APPROVAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
E. ACCOMPLISHMENT INSTRUCTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
1. General Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
2. Work Instructions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
TASK 1 – FUSELAGE - FLOOR STRUCTURE - CARGO LINER JOINT SEALING TAPE - INSPECTION [Group
1] . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
TASK 2 – FUSELAGE - FLOOR STRUCTURE - CARGO LINER JOINT SEALING TAPE - INSTALLATION
[Group 1] . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
B787-81205-SB530108-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
Page 2 of 21
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530108-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 3

THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN
IN EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND THIS DOCUMENT TO
Alert:
THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS DOCUMENT
TO THE NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR COMPLIANCE DOCUMENT.
THE BOEING PROCESSES USED TO CREATE THE SERVICE BULLETIN (SB) AND THE
REQUIREMENTS BULLETIN (RB) ENSURE THAT THE INFORMATION BETWEEN "RC START"
AND "RC END" IN THE SB ARE IDENTICAL TO THE INFORMATION IN THE SAME SECTIONS
(COMPLIANCE, WORK INSTRUCTIONS...) OF THE RB WHICH THE SB REFERS TO AS THE
RELATED DOCUMENT.
A. EFFECTIVITY
1. Airplanes
This bulletin is applicable to 787-8, 787-9, 787-10 Airplane(s), line number(s) 413-687, 689-954,
956-970, 972-982, 984-989, 991-997, 999-1008, 1012-1013, 1016-1019, 1021-1027, 1029-1033,
1035, 1038-1041, 1044-1045, 1047-1048, 1051-1052, 1054-1064, 1066, 1069, 1071-1072, 1074-
1075, 1077, 1080-1082, 1085-1087, 1091-1095, 1098-1099, 1103, 1107, 1109, 1111-1115, 1117-
1119, 1121-1122, 1124-1127, 1129-1149, 1151, 1153-1155, 1157, 1159, 1161-1163, 1166-1167,
1169, 1171 in 1 Group(s). Where the effectivity is presented with hyphens between line numbers,
the airplane applicability means "through" and "inclusive", e.g. line numbers 1-9 means line numbers
1 through 9 inclusive.
The Variable Numbers and Group information for the applicable airplanes is given below. Refer
to CN-AA102547A for data about this change.
Table 1  
DESCRIPTIONCONFIGURATIONGROUP
787-8, 787-9 and 787-10 Airplanes.-1
787-8, 787-9, 787-10 Airplanes with Lavatory forward of Door 1 LS
and Galley forward of Door 1 RS.
1
787-8, 787-9, 787-10 Airplanes with Galley forward of Door 1 LS and
Galley forward of Door 1 RS.
2
787-8, 787-9, 787-10 Airplanes with Closet forward of Door 1 LS and
Galley forward of Door 1 RS.
3
Airplane Models: 787-10, 787-8, 787-9
Table 2
GroupVariable Number
1ZA144
1ZA154 - ZA156
GroupVariable Number
1ZA203 - ZA204
1ZA251 - ZA256
GroupVariable Number
1ZA276 - ZA277
1ZA449
B787-81205-SB530108-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
Page 3 of 21
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530108-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 4

GroupVariable Number
1ZA458 - ZA459
1ZA488 - ZA489
1ZA672 - ZA677
1ZA696 - ZA698
1ZA857 - ZA862
1ZA864
1ZA873 - ZA876
1ZA882 - ZA888
1ZA916 - ZA920
1ZA949 - ZA950
1ZA954 - ZA959
1ZA963 - ZA966
1ZA968 - ZA972
1ZA980 - ZA981
1ZA990
1ZB007 - ZB012
1ZB024 - ZB026
1ZB038 - ZB043
1ZB047 - ZB060
1ZB097 - ZB121
1ZB133 - ZB136
1ZB183 - ZB191
1ZB217
1ZB219 - ZB220
1ZB229
1ZB238 - ZB242
1ZB246 - ZB248
1ZB251 - ZB258
1ZB261 - ZB262
1ZB265 - ZB282
1ZB302 - ZB305
GroupVariable Number
1ZB332 - ZB338
1ZB371 - ZB379
1ZB415 - ZB435
1ZB446 - ZB467
1ZB541 - ZB543
1ZB547
1ZB567 - ZB587
1ZB606 - ZB610
1ZB616 - ZB618
1ZB647 - ZB649
1ZB656 - ZB666
1ZB676 - ZB681
1ZB688 - ZB707
1ZB733 - ZB735
1ZB738 - ZB740
1ZB742 - ZB745
1ZB749 - ZB750
1ZB753 - ZB757
1ZB763 - ZB768
1ZB771 - ZB775
1ZB778 - ZB821
1ZB828 - ZB841
1ZB858 - ZB863
1ZB874 - ZB876
1ZB887
1ZB890
1ZB893 - ZB902
1ZB908 - ZB918
1ZB922
1ZB924
1ZB926 - ZB927
GroupVariable Number
1ZB934 - ZB953
1ZB967 - ZB971
1ZB977 - ZB978
1ZB980 - ZB986
1ZB990 - ZB991
1ZB993 - ZB997
1ZC001 - ZC016
1ZC018 - ZC023
1ZC036 - ZC056
1ZC061 - ZC070
1ZC101 - ZC107
1ZC116 - ZC118
1ZC126 - ZC129
1ZC151 - ZC152
1ZC155 - ZC158
1ZC165
1ZC211 - ZC219
1ZC221 - ZC228
1ZC236
1ZC239 - ZC241
1ZD013 - ZD029
1ZD048 - ZD049
1ZE001 - ZE008
1ZE013
1ZE016 - ZE017
1ZE031 - ZE032
1ZE040 - ZE045
1ZE048
1ZE075
1ZE085 - ZE086
1ZE090 - ZE091
B787-81205-SB530108-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
Page 4 of 21
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530108-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 5

GroupVariable Number
1ZE095 - ZE097
1ZE100
1ZE105 - ZE108
1ZE110 - ZE112
1ZE115
1ZE150
1ZE165 - ZE166
1ZE170 - ZE171
GroupVariable Number
1ZE195 - ZE198
1ZE220 - ZE241
1ZE270 - ZE273
1ZE310 - ZE311
1ZE340 - ZE341
1ZE350 - ZE362
1ZE375
1ZE380 - ZE381
GroupVariable Number
1ZE415 - ZE417
1ZE419 - ZE420
1ZE425 - ZE428
1ZE435 - ZE437
1ZE455 - ZE456
1ZE481
1ZE486 - ZE488
--
2. Spares Affected
None.
B. CONCURRENT REQUIREMENTS
None.
C. COMPLIANCE
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to Re-
quirements Bulletin B787-81205-530108-00 RB. The Airworthiness Directive will make the compliance tasks
and times given in Requirements Bulletin B787-81205-530108-00 RB mandatory.
Do the required action(s), based on the applicable condition(s) in Table 4, in accordance with the Accom-
plishment Instructions.
Table 4  Main Deck Floor Structure - Cargo Liner Joint Sealing Tape Inspection
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
ActionCondition
-Within 12 months after
the Issue 001 date of
Requirements Bulletin
B787-81205-SB530108-
00 RB.
Do a Detailed Inspection
(DET) of the area located
between the monuments,
forward of Door 1 LS (Left
Side) and RS (Right Side),
and the outer walls, for any
missing cargo liner joint
sealing tape.
ALL AIRPLANES
--No further action is re-
quired.
CONDITION 1: NO MISS-
ING CARGO LINER JOINT
SEALING TAPE FOUND
B787-81205-SB530108-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
Page 5 of 21
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530108-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 6

Table 4  Main Deck Floor Structure - Cargo Liner Joint Sealing Tape Inspection
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
ActionCondition
-Within 12 months after
the Issue 001 date of
Requirements Bulletin
B787-81205-SB530108-
00 RB.
Install cargo liner joint
sealing tape at the affected
location.
CONDITION 2: ANY
MISSING CARGO LINER
JOINT SEALING TAPE
FOUND
D. APPROVAL
This Requirements Bulletin was examined by the Federal Aviation Administration (FAA). The changes
specified in this document comply with the applicable regulations and are FAA approved, as well as European
Union Aviation Safety Agency (EASA) approved for all EASA approved airplanes listed in this Requirements
Bulletin effectivity. This document and its approval were based on the airplane in its original Boeing delivery
configuration or as modified by other Boeing changes.
If an airplane has a non-Boeing modification or repair that affects a component or system also affected by
this Requirements Bulletin, the operator is responsible for obtaining appropriate regulatory agency approval
before incorporating this Requirements Bulletin.
B787-81205-SB530108-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
Page 6 of 21
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530108-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 7

E.    ACCOMPLISHMENT INSTRUCTIONS
1. GENERAL INFORMATION
NOTE: 1. This is an Enhanced Required for Compliance document. There will be a separate Service
Bulletin (SB) and a separate Requirements Bulletin (RB). If an RB is mandated by an
Airworthiness Directive (AD), then all applicable requirements specified in the RB must
be done. In the RB, the "Refer to the listed procedures..." column of the table(s) in the
Work Instructions is for reference only. The procedures in that column are not required
by the AD and are for guidance only. For the related SB, some locations are marked RC
Start and RC End to identify the requirements that are restated from the RB. For the re-
lated SB, the areas between RC Start and RC End, including sub-steps and any Tasks
identified between RC Start and RC End, must be done to comply with the AD. Therefore,
an Alternative Method of Compliance (AMOC) is required for any deviations to steps be-
tween RC Start and RC End, including substeps and identified Tasks. For the related
SB, the steps not between RC Start and RC End may be deviated from using accepted
methods in accordance with the operator's maintenance or inspection program without
obtaining approval of an AMOC; this is provided that the steps between RC Start and RC
End, including sub-steps and identified Tasks, can still be done as specified, and the
airplane can be put back in an airworthy condition. Tasks not required for compliance are
omitted from the RB.
2. This is an Enhanced Required for Compliance document. The Boeing processes used
to create the Service Bulletin (SB) and the Requirements Bulletin (RB) ensure that the
information between "RC Start" and "RC End" in the SB are identical to the information
in the same sections (Compliance, Work Instructions...) of the RB which the SB refers to
as the related document.
3. These work instructions refer to procedures included in other Boeing documents. When
the words "refer to" are used and the operator has an accepted alternative procedure,
the accepted alternative procedure can be used. When the words "in accordance with"
are included in the instruction, the procedure in the Boeing document must be used.
4. The compliance times for the actions in WORK INSTRUCTIONS are in COMPLIANCE.
5. Unless shown differently, these dimensions and tolerances are used:
– Linear dimensions are in inches
– Tolerance on linear dimensions, other than rivet and bolt edge margins, is plus or
minus 0.03 inch
– Tolerance on rivet and bolt edge margin is plus or minus 0.05 inch
– Angular tolerance is plus or minus 2 degrees
– Hole dimensions for standard solid rivets and fasteners are in Structural Repair
Manual (SRM) Chapter 51
– Torque Values:
B787-81205-SB530108-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
Page 7 of 21
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530108-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 8

– Values for structural fasteners are given in 787 SRM Chapter 51.
– Values for airframe maintenance tasks are included in Chapter 20 of 787 Aircraft
Maintenance Manual (AMM).
– Values for electrical maintenance tasks are included in Chapter 20 of Standard
Wiring Practices Manual (SWPM).
– Values for engine maintenance tasks are included in Chapter 70 of 787 Aircraft
Maintenance Manual (AMM).
– Non-standard torque values for maintenance tasks are included in the applicable
installation step.
6. A Detailed Inspection (DET) is defined as: An intensive examination of a specific item,
installation or assembly to detect damage, failure or irregularity. This could include tactile
assessment in which a component or assembly can be checked for tightness/security.
Available lighting is normally supplemented with a direct source of good lighting at an
intensity deemed appropriate. Inspection aids such as mirrors and magnifying lenses
may be necessary. Surface cleaning and elaborate access procedures may be required.
7. If it is necessary to remove more parts for access, you can remove those parts. If you
can get access without removing identified parts, it is not necessary to remove all of the
identified parts. Jacking and shoring limitations must be observed.
8. Where the work instructions include installation of a kept part, a new or serviceable part
with the same part number can be installed as an alternative to the kept part.
9. Use of colors in Tasks is based on guidance from the S1000D International specification
for technical publications.
2. WORK INSTRUCTIONS
A. Actions Required for Compliance
(1) Requirements:
B787-81205-SB530108-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
Page 8 of 21
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530108-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 9

Table 1  Main Deck Floor Structure – Cargo Liner Joint Sealing Tape Inspection
Refer to the listed proce-
dures in SB B787-81205-
SB530108-00 Issue 001
or later approved issues
as an accepted proce-
dure.
Method of ComplianceActionCondition
PART 1: PREPARATION
AND ACCESS
-Do a Detailed Inspection
(DET) of the area located
between the monuments,
forward of Door 1 LS (Left
Side) and RS (Right Side),
and the outer walls, for
missing cargo liner joint
sealing tape.
ALL AIRPLANES
-Task 1
PART 2: DOORWAY LIN-
ING INSTALLATION
-No further action is re-
quired.
CONDITION 1: NO MISS-
ING CARGO LINER
JOINT SEALING TAPE
FOUND
PART 3: MONUMENT
REMOVAL
-Install cargo liner joint
sealing tape at the affected
location.
CONDITION 2: ANY
MISSING CARGO LINER
JOINT SEALING TAPE
FOUND -Task 2
PART 4: MONUMENT IN-
STALLATION
-
B787-81205-SB530108-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
Page 9 of 21
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530108-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 10

Task 1 – FUSELAGE - FLOOR STRUCTURE - CARGO LINER JOINT SEALING
TAPE - INSPECTION [Group 1:]
THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN
IN EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND THIS DOCUMENT TO
Alert:
THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS DOCUMENT
TO THE NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR COMPLIANCE DOCUMENT.
THE BOEING PROCESSES USED TO CREATE THE SERVICE BULLETIN (SB) AND THE
REQUIREMENTS BULLETIN (RB) ENSURE THAT THE INFORMATION BETWEEN "RC START"
AND "RC END" IN THE SB ARE IDENTICAL TO THE INFORMATION IN THE SAME SECTIONS
(COMPLIANCE, WORK INSTRUCTIONS...) OF THE RB WHICH THE SB REFERS TO AS THE
RELATED DOCUMENT.
B787-81205-SB530108-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
Page 10 of 21
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530108-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 11 (OCR)

@ BOEING  B787-81205-SB530108-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
REQUIREMENTS BULLETIN
Procedure
This Task applies only to: Group 1.
000000
FWD
ICN-B787-A-000061-A-81205-20085-A-01-1
Task 1 Figure 1
B787-81205-SB530108-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
Page 11 of 21
Export Controlled ECCN: 9E991
See page 1 for details

### Page 12 (OCR)

_BOEING  B787-81205-SB530108-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
REQUIREMENTS BULLETIN
SMOKE DECOMPRESSION
PANEL
SHEAR
STRAP
DOOR SILL
LOWER CHORD
DOOR FORWARD
SCUFF PLATE  INBD
A-A
DETAILED INSPECTION (DET) AREA
ICN-B787-A-000061-A-81205-20086-A-01-1
Task 1 Figure 2
B787-81205-SB530108-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
Page 12 of 21
Export Controlled ECCN: 9E991
See page 1 for details

### Page 13 (OCR)

Q BOEING  B787-81205-SB530108-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
REQUIREMENTS BULLETIN
FWD
ICN-B787-A-000061-A-81205-20087-A-01-1
Task 1 Figure 3
B787-81205-SB530108-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
Page 13 of 21
Export Controlled ECCN: 9E991
See page 1 for details

### Page 14 (OCR)

O BOEING  B787-81205-SB530108-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
REQUIREMENTS BULLETIN
DOOR SILL
LOWER CHORD
SHEAR
STRAP
INBD
DOOR FORWARD
SCUFF PLATE
DETAILED INSPECTION (DET) AREA  B-B  3105276
ICN-B787-A-000061-A-81205-21273-A-01-1
Task 1 Figure 4
1. The step numbers shown below agree with the numbers shown in the circle symbols in the Task. The QTY
numbers shown below are the number of parts necessary for this Task.
B787-81205-SB530108-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
Page 14 of 21
Export Controlled ECCN: 9E991
See page 1 for details

### Page 15

Table 1  
More DataQtyIdentificationNameActionStep
*[1]*[2]-BMS5-146 TYPE 1,
CLASS 1, GRADE A
CARGO LINER JOINT
SEALING TAPE
Inspect1
*[1]  Do a Detailed Inspection (DET) of the area located between the monuments, forward of Door 1 LS (Left Side) and RS (Right Side),
and the outer walls, for any missing cargo liner joint sealing tape.
*[2]  A borescope can be used as an inspection aid.
B787-81205-SB530108-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
Page 15 of 21
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530108-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 16

Task 2 – FUSELAGE - FLOOR STRUCTURE - CARGO LINER JOINT SEALING
TAPE - INSTALLATION [Group 1:]
THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN
IN EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND THIS DOCUMENT TO
Alert:
THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS DOCUMENT
TO THE NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR COMPLIANCE DOCUMENT.
THE BOEING PROCESSES USED TO CREATE THE SERVICE BULLETIN (SB) AND THE
REQUIREMENTS BULLETIN (RB) ENSURE THAT THE INFORMATION BETWEEN "RC START"
AND "RC END" IN THE SB ARE IDENTICAL TO THE INFORMATION IN THE SAME SECTIONS
(COMPLIANCE, WORK INSTRUCTIONS...) OF THE RB WHICH THE SB REFERS TO AS THE
RELATED DOCUMENT.
B787-81205-SB530108-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
Page 16 of 21
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530108-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 17 (OCR)

@ BOEING  B787-81205-SB530108-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
REQUIREMENTS BULLETIN
Procedure
This Task applies only to: Group 1.
000000
FWD
3105282
ICN-B787-A-000061-A-81205-21274-A-01-1
Task 2 Figure 1
B787-81205-SB530108-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
Page 17 of 21
Export Controlled ECCN: 9E991
See page 1 for details

### Page 18 (OCR)

A BOEING  B787-81205-SB530108-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
REQUIREMENTS BULLETIN
SMOKE
DECOMPRESSION
PANEL
SHEAR
STRAP
DOOR SILL
LOWER CHORD
DOOR FORWARD
SCUFF PLATE  INBD
A-A
ICN-B787-A-000061-A-81205-21275-A-01-1
Task 2 Figure 2
B787-81205-SB530108-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
Page 18 of 21
Export Controlled ECCN: 9E991
See page 1 for details

### Page 19 (OCR)

@BOEING  B787-81205-SB530108-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
REQUIREMENTS BULLETIN
FWD
ICN-B787-A-000061-A-81205-21276-A-01-1
Task 2 Figure 3
B787-81205-SB530108-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
Page 19 of 21
Export Controlled ECCN: 9E991
See page 1 for details

### Page 20 (OCR)

@ BOEING  B787-81205-SB530108-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
REQUIREMENTS BULLETIN
DOOR SILL
LOWER CHORD
- SHEAR STRAP
INBD
DOOR FORWARD
SCUFF PLATE
B-B
3105286
ICN-B787-A-000061-A-81205-21277-A-01-1
Task 2 Figure 4
1. The step numbers shown below agree with the numbers shown in the circle symbols in the Task. The QTY
numbers shown below are the number of parts necessary for this Task.
B787-81205-SB530108-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
Page 20 of 21
Export Controlled ECCN: 9E991
See page 1 for details

### Page 21

Table 1  
More DataQtyIdentificationNameActionStep
*[1]--FLOOR PANEL OPEN-
ING
Clean1
*[2]*[3]-BMS5-146 TYPE 1,
CLASS 1, GRADE A
CARGO LINER JOINT
SEALING TAPE
Apply
*[1]  Clean the area where tape is being applied to. Use solvent to remove dust or debris before taping. Refer to SOPM 20-30-03 as an
accepted procedure.
*[2]  Apply the cargo liner joint sealing tape over the open gaps and securely adhere tape to adjacent horizontal structure with 0.50 - 1.5
inch overlap. Apply two layers of tape. Tape-to-tape overlaps must be 0.5 inch minimum.
*[3]  Make sure not to apply tape over the tops of monument floor fittings. The tape can be cut to fit around vertical structure as long as
there is no gap between the edge of the tape and the vertical structure.
B787-81205-SB530108-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
Page 21 of 21
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB530108-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
REQUIREMENTS BULLETIN

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
