# Boeing Alert Requirements Bulletin B787-81205-SB540024-00 RB

Copy: Revision 001 ("787-54A0024-01 RB"), 53 pages: PDF https://openairdocs.org/files/sha256/e6/07/e6076e140ce3275722382e4e7359a525f7dd0dfe6b5b292d40b8290affa554dc; text https://openairdocs.org/service-documents/boeing/b787-81205-sb540024-00-rb/file/e6076e140ce3.md. Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2024-0231; AD 2024-13-05 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Boeing](https://openairdocs.org/service-documents/boeing.md)
- Type: Service bulletin (Alert Requirements Bulletin)
- Number: B787-81205-SB540024-00 RB
- Latest revision known: B787-81205-SB540024-00 RB, Issue 001, dated September 22, 2023 (OpenAirDocs)
- Page: https://openairdocs.org/service-documents/boeing/b787-81205-sb540024-00-rb

## ADs that cite it (1) (OpenAirDocs)

Newest first, with the revision each names, as OpenAirDocs read it from the AD's text.

- [AD 2024-13-05](https://openairdocs.org/ad/2024-13-05.md), effective Sep 24, 2024: Revision 001

Also cited in [1 proposed AD](https://openairdocs.org/service-documents/boeing/b787-81205-sb540024-00-rb/proposed.md).

## Text (53 pages)

Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2024-0231; AD 2024-13-05 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication. Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

ALERT
Alert Requirements Bulletin B787-81205-SB540024-00
RB NACELLE/PYLONS - General - Rolls-Royce Engines Left and Right Inlet
Aft Compartment Engine Anti-Ice Duct Inspection
Copyright © 2023 The Boeing Company
Treatment of this data module and its content is governed by contract with Boeing. Rights to use this data module are licensed on a per
aircraft basis and such rights may not be transferable. For more information, contact The Boeing Company. Boeing, the Boeing signature,
the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner, BBJ, DC-8, DC-9, DC-10, KC-10, KC-46, KDC-10, MD-10,
MD-11, MD-80, MD-88, MD-90, P-8, Poseidon and Boeing liveries are all trademarks owned by The Boeing Company; and no trademark
license is granted in connection with this document unless provided in writing by Boeing.
EXPORT CONTROLLED
This technology or software is subject to the U.S. Export Administration Regulations (EAR), (15 C.F.R. Parts 730-774). No authorization
from the U.S. Department of Commerce is required for export, re-export, in-country transfer, or access EXCEPT to country group E:1 or
E:2 countries/persons per Supp.1 to Part 740 of the EAR.
ECCN: 9E991
B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
Page 1 of 53
Export Controlled ECCN: 9E991
See page 1 for details
4.0
B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 2

Table of Contents
Page
A. EFFECTIVITY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
1. Airplanes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
2. Spares Affected . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
B. CONCURRENT REQUIREMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
C. COMPLIANCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
D. APPROVAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
E. ACCOMPLISHMENT INSTRUCTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18
1. General Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18
2. Work Instructions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
TASK 1 – LEFT ENGINE INLET CAVITY AFT COMPARTMENT METALLIC COMPONENTS - GENERAL
VISUAL INSPECTION [Group 1; Group 2, Configuration 1] . . . . . . . . . . . . . . . . . . . . 34
TASK 2 – RIGHT ENGINE INLET CAVITY AFT COMPARTMENT METALLIC COMPONENTS - GENERAL
VISUAL INSPECTION [Group 1; Group 2, Configuration 1] . . . . . . . . . . . . . . . . . . . . 39
TASK 3 – LEFT ENGINE INLET CAVITY UPPER AND LOWER COMPOSITE PANELS - GENERAL VISUAL
INSPECTION [Group 1; Group 2, Configuration 1] . . . . . . . . . . . . . . . . . . . . . . . . 44
TASK 4 – RIGHT ENGINE INLET CAVITY UPPER AND LOWER COMPOSITE PANELS - GENERAL VISUAL
INSPECTION [Group 1; Group 2, Configuration 1] . . . . . . . . . . . . . . . . . . . . . . . . 49
B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
Page 2 of 53
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 3

THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN
IN PARAGRAPH 1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND
Alert:
THIS DOCUMENT TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD,
SEND THIS DOCUMENT TO THE NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR
COMPLIANCE DOCUMENT. THE BOEING PROCESSES USED TO CREATE THE SERVICE
BULLETIN (SB) AND THE REQUIREMENTS BULLETIN (RB) ENSURE THAT THE INFORMATION
BETWEEN "RC START" AND "RC END" IN THE SB ARE IDENTICAL TO THE INFORMATION IN
THE SAME SECTIONS (COMPLIANCE, WORK INSTRUCTIONS...) OF THE RB WHICH THE SB
REFERS TO AS THE RELATED DOCUMENT.
A. EFFECTIVITY
1. Airplanes
This bulletin is applicable to 787-8, 787-9, 787-10 Airplane(s), line number(s) 7-10, 12-16, 18, 22,
24, 31, 40-42, 47-48, 51, 56, 59, 61, 63, 66-69, 74, 78, 80, 83, 86-88, 97, 101-102, 107-108, 110-
114, 118, 120-121, 126, 128, 130, 132-133, 136, 140, 146-149, 153, 156, 161, 165-166, 169, 173,
177-179, 183, 185, 187, 190, 193, 195, 197, 199, 202-203, 205-206, 209-210, 213, 217-218, 226,
228, 234, 236, 239-240, 242-244, 246, 256, 259, 267, 272, 276, 279-280, 284, 287, 294-296, 299,
308-310, 313-316, 319, 322, 325, 327, 329, 331, 335, 337-338, 341, 345-347, 349-351, 357-358,
360-361, 367, 369-370, 373-375, 377, 382, 386, 392, 396-397, 399-401, 403-404, 406, 408, 414-
415, 418-419, 421, 424, 426, 428, 431, 433, 435-437, 442, 447, 450-451, 454-456, 460-462, 467-
468, 471-472, 474-476, 479, 481-482, 484, 487-488, 490-491, 493, 497, 504-505, 508-509, 513,
521, 524, 528, 532, 534-535, 538, 550, 552, 556-557, 559, 565, 568, 571, 573, 576, 581-584, 588-
590, 593, 599-600, 602-605, 607-609, 612, 616, 619, 621-625, 627, 629, 633, 636, 638-639, 645,
647, 651, 656, 658, 660, 662, 664-666, 671-675, 678, 680-682, 685-686, 688-689, 691, 693-695,
697-698, 700-701, 707-710, 714-715, 717, 719, 721, 732-733, 735, 739, 741, 749, 751, 755-756,
760, 762, 765, 769, 771-772, 794, 803-804, 809, 813, 816, 823, 827, 829, 834-839, 843-844, 846,
849, 851-853, 855-856, 861, 863, 869-870, 875, 877-878, 882, 884-885, 888, 896, 901, 904, 907,
914, 919-920, 922, 925, 928, 935, 938, 947, 952, 955-956, 968, 971, 973, 978, 982-985, 988, 992,
995, 997, 1000, 1003, 1006, 1011, 1015, 1023, 1026, 1028, 1033, 1036, 1039-1040, 1042, 1046-
1047, 1056, 1060, 1062, 1065, 1068, 1070, 1072, 1076, 1080, 1082-1083, 1085-1086, 1090, 1092,
1098, 1110, 1112, 1120, 1144, 1148, 1155, 1162-1163, 1166, 1169-1170, 1175, 1178-1179, 1182-
1183, 1185, 1187-1188, 1190, 1192-1197, 1199-1200, 1202, 1204-1205, 1209, 1213-1214, 1230-
9900 in 2 Group(s). Where the effectivity is presented with hyphens between line numbers, the
airplane applicability means "through" and "inclusive", e.g. line numbers 1-9 means line numbers
1 through 9 inclusive.
The Variable Numbers and Group information for the applicable airplanes is given below.
NOTE: The Variable Number table below includes affected airplanes available as of the issue
date of this bulletin. Affected airplane Variable Numbers added to MyBoeingFleet.com
after the issue date of this bulletin will be shown using the Maintenance Performance
Toolbox EFFECTIVITY search function result.
B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
Page 3 of 53
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 4

Table 1  
DESCRIPTIONCONFIGURATIONGROUP
787-8, 787-9, 787-10 Airplanes equipped with Rolls-Royce engines,
with the original standard certificate of airworthiness or the original
export certificate of airworthiness issued on or before the Issue 001
date of this bulletin.
-1
787-8, 787-9, 787-10 Airplanes with the original standard certificate
of airworthiness or the original export certificate of airworthiness issued
after the Issue 001 date of this bulletin.
-2
787 airplanes equipped with Rolls-Royce engines.1
787 airplanes equipped with General Electric engines.2
Airplane Models: 787-10, 787-8, 787-9
Table 2
GroupVariable Number
1ZA100 - ZA105
1ZA116 - ZA124
1ZA135 - ZA144
1ZA270 - ZA277
1ZA445 - ZA459
1ZA506 - ZA516
1ZA536 - ZA545
1ZA576 - ZA580
1ZA588 - ZA593
1ZA650 - ZA652
1ZA665 - ZA677
1ZA778 - ZA779
1ZA839
1ZA842
1ZA853 - ZA862
2ZA863 - ZA864
1ZA881 - ZA888
1ZA949 - ZA950
1ZA958 - ZA959
GroupVariable Number
1ZA963 - ZA966
1ZB001 - ZB012
1ZB027 - ZB043
1ZB047 - ZB060
2ZB061
1ZB127 - ZB136
1ZB197 - ZB198
1ZB219 - ZB220
1ZB224 - ZB229
1ZB251 - ZB258
1ZB265 - ZB268
1ZB362 - ZB379
1ZB407 - ZB421
1ZB611 - ZB618
1ZB646 - ZB649
1ZB688 - ZB702
1ZB733 - ZB735
1ZB742 - ZB743
1ZB749 - ZB750
GroupVariable Number
2ZB751
1ZB753 - ZB757
1ZB766 - ZB767
1ZB818 - ZB821
1ZB828 - ZB841
2ZB842 - ZB845
1ZB858 - ZB863
1ZB874 - ZB876
1ZB890
2ZB958
1ZB990 - ZB991
1ZB997
1ZC001 - ZC015
2ZC016 - ZC017
1ZC018 - ZC022
2ZC023 - ZC026
1ZC101 - ZC107
2ZC108 - ZC112
1ZC116 - ZC118
B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
Page 4 of 53
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 5

GroupVariable Number
2ZC292
1ZD001 - ZD008
2ZD038
1ZE003 - ZE006
2ZE007
1ZE008
2ZE009 - ZE010
1ZE013
2ZE014
1ZE016 - ZE017
2ZE018 - ZE019
1ZE075
GroupVariable Number
1ZE085 - ZE086
1ZE090 - ZE091
1ZE095 - ZE097
2ZE098
1ZE100
1ZE115
1ZE150
1ZE195 - ZE198
1ZE270
2ZE271
1ZE272 - ZE273
1ZE310 - ZE311
GroupVariable Number
2ZE312 - ZE314
2ZE369
1ZE375
1ZE380
2ZE381
1ZE425 - ZE428
2ZE481
1ZE486 - ZE488
2ZE494
2ZE506 - ZE520
2ZE546
2ZE586
2. Spares Affected
Examine your spares supply for the parts or components identified below in Table 3. If any parts
or components are found, refer to Accomplishment Instructions - Step 2., Work Instructions for
the recommended action.
Table 3  
Part Number
725Z1100-11
725Z1100-13
725Z1100-15
725Z1100-17
725Z1100-19
725Z1100-101
725Z1100-103
B. CONCURRENT REQUIREMENTS
Certain actions in the service bulletin specified below must be done as specified in Compliance and the
Accomplishment Instructions.
Table 4  
DescriptionService BulletinCompany
NACELLE - INLET - NACELLE ANTI-
ICE INSPECTION
787-R71-034 Rev 00Collins Aerospace
B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
Page 5 of 53
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 6

C. COMPLIANCE
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to Re-
quirements Bulletin B787-81205-SB540024-00 RB. The Airworthiness Directive will make the compliance
tasks and times given in the Requirements Bulletin B787-81205-SB540024-00 RB mandatory.
Do the required actions, based on the applicable conditions in Table 6, Table 7, Table 8, Table 9, and Table
10, in accordance with Accomplishment Instructions.
When more than one OPTION is given for a CONDITION, do only one of the OPTION numbers. When
more than one ACTION is given for a CONDITION number or an OPTION number, do all of the ACTION
numbers for that CONDITION number or OPTION number.
The Conditions, Actions and Compliance times shown apply to each engine inlet cowl assembly indepen-
dently.
B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
Page 6 of 53
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 7

Group 1:
Table 6  LEFT AND RIGHT INLET COWL ENGINE ANTI-ICE DUCT - MEL INCORPORATION AND MAINTE-
NANCE RECORDS CHECK
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
ActionCondition
-Within 120 days after the
Issue 001 date of Re-
quirements Bulletin
B787-81205-SB540024
RB.
ACTION 1: Incorporate the
Dispatch Deviation Guide
(DDG) 30-21-01-02 update
into the Operators' Mini-
mum Equipment List (MEL)
that includes a General Vi-
sual Inspection (GVI) of the
engine inlet cavity for heat
damage and applicable
corrective actions at the
completion of the dispatch
interval period in accor-
dance with Boeing Require-
ments Bulletin B787-
81205-SB540024-00 RB
Issue 001 and Collins Ser-
vice Bulletin 787-R71-034
Rev 00 or later approved
revisions.
All Airplanes.
-Within 30 months after
the Issue 001 date of
Requirements Bulletin
B787-81205-SB540024
RB.
ACTION 2: Do a mainte-
nance records check to
determine if MEL 30-21-01-
02 or MEL 30-21-01-07
dispatch deviation has
been accomplished on any
engine inlets prior to the
incorporation of the DDG
update specified in AC-
TION 1..
--No Further Action required.CONDITION 1: MEL 30-
21-01-02 OR MEL 30-21-
01-07 DISPATCH DEVIA-
TION HAS NOT BEEN
ACCOMPLISHED ON ANY
ENGINE INLET.
B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
Page 7 of 53
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 8

Group 1:
Table 6  LEFT AND RIGHT INLET COWL ENGINE ANTI-ICE DUCT - MEL INCORPORATION AND MAINTE-
NANCE RECORDS CHECK
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
ActionCondition
-At the times specified in
Table 7.
CONDITION 2 (OPTION
1): Do the actions specified
in Table 7.
CONDITION 2: MEL 30-
21-01-02 OR MEL 30-21-
01-07 DISPATCH DEVIA-
TION HAS BEEN ACCOM-
PLISHED ON ANY EN-
GINE INLET PRIOR TO
THE INCORPORATION
OF THE DDG UPDATE
OR MEL 30-21-01-02 OR
MEL 30-21-01-07 DIS-
PATCH DEVIATION CAN-
NOT BE DETERMINED.
-Within 30 months after
the Issue 001 date of
Requirements Bulletin
B787-81205-SB540024
RB.
CONDITION 2 (OPTION
2): Replace affected en-
gine inlet with a new or
serviceable engine inlet.
*[1]
*[1]  A serviceable engine inlet is defined as an engine inlet that has been inspected and applicable corrective actions have been done
in accordance with Requirements Bulletin B787-81205-SB540024 RB.
Group 1:
Table 7  LEFT AND RIGHT INLET COWL - INLET AFT COMPARTMENT - ENGINE ANTI-ICE DUCT INSPEC-
TION
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
ActionCondition
-Within 30 months after
the Issue 001 date of
Requirements Bulletin
B787-81205-SB540024
RB.
ACTION 1: Do a general
visual inspection of the af-
fected engine inlet cavity
between the forward and
aft bulkhead in the area
surrounding the Engine
Anti-Ice Inlet (EAI) duct for
heat damage to metallic
components. *[1]
Airplanes on which MEL
30-21-01-02 or MEL 30-21-
01-07 dispatch deviation
has been accomplished on
any engine inlet prior to the
incorporation of the DDG
update or MEL 30-21-01-
02 or MEL 30-21-01-07
dispatch deviation cannot
be determined.
-ACTION 2: Do a general
visual inspection of the af-
fected engine inlet cavity
composite panels for heat
damage. *[2]
--No further action.CONDITION 3: NO HEAT
DAMAGE FOUND.
B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
Page 8 of 53
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 9

Group 1:
Table 7  LEFT AND RIGHT INLET COWL - INLET AFT COMPARTMENT - ENGINE ANTI-ICE DUCT INSPEC-
TION
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
ActionCondition
-Before Further Flight.Measure conductivity and
do a hardness test of the
affected area.*[3]
CONDITION 4: ANY EN-
GINE INLET AFT COM-
PARTMENT METALLIC
COMPONENTS HEAT
DAMAGE FOUND.
-Before Further Flight.Install new periseal and aft
seal.
CONDITION 4.1: CON-
DUCTIVITY AND HARD-
NESS TEST FOUND
WITHIN CONDUCTIVITY
AND HARDNESS AC-
CEPTED LIMITS.
-Before Further Flight.CONDITION 4.2 OPTION
1 (ACTION 1): Contact The
Boeing Company for repair
instructions and do the re-
pair.
CONDITION 4.2: ANY
CONDUCTIVITY OR ANY
HARDNESS TEST
FOUND OUTSIDE AC-
CEPTED LIMITS.
-Before Further Flight.CONDITION 4.2 OPTION
1 (ACTION 2): Install new
periseal and aft seal.
-Before Further Flight.CONDITION 4.2 (OPTION
2): Replace affected en-
gine inlet with a new or
serviceable engine inlet.
*[4]
-Before Further Flight.CONDITION 5 OPTION 1
(ACTION 1): Contact The
Boeing Company for repair
instructions and do the re-
pair.
CONDITION 5: ANY
COMPOSITE PANEL
HEAT DAMAGE FOUND.
-Before Further Flight.CONDITION 5 OPTION 1
(ACTION 2): Install new
periseal and aft seal.
-Before Further Flight.CONDITION 5 (OPTION
2): Replace affected en-
gine inlet with a new or
serviceable engine inlet.
*[4]
B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
Page 9 of 53
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 10

Group 1:
Table 7  LEFT AND RIGHT INLET COWL - INLET AFT COMPARTMENT - ENGINE ANTI-ICE DUCT INSPEC-
TION
*[1]  Heat damage as defined in 787-8 SRM 51-11-03 Rev 46 or 787-9 SRM 51-11-03 Rev 28 or 787-10 SRM 51-11-03 Rev 14.
*[2]  Heat damage as defined in 787-8 SRM 51-13-03 Rev 46 or 787-9 SRM 51-13-03 Rev 28 or 787-10 SRM 51-13-03 Rev 14.
*[3]  Conductivity and Hardness accepted limits are defined in Collins Aerospace Service Bulletin 787-R71-034 Rev 00, Table 4.2.
*[4]  A serviceable inlet is defined as an inlet that has been inspected and applicable corrective actions have been done in accordance
with Requirements Bulletin B787-81205-SB540024-00 RB.
Group 2, Configuration 1:
Table 8  LEFT AND RIGHT INLET COWL ENGINE ANTI-ICE DUCT - INCORPORATE DISPATCH DEVIATION
 GUIDE (DDG)
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
ActionCondition
-Within 120 days after the
date of issuance of the
original standard certifi-
cate of airworthiness or
the original export certifi-
cate of airworthiness.
Review operators Minimum
Equipment List (MEL) to
verify that the Dispatch
Deviation Guide (DDG) 30-
21-01-02 update that in-
cludes a General Visual
Inspection (GVI) of the en-
gine inlet cavity for heat
damage and applicable
corrective actions at the
completion of the dispatch
interval period in accor-
dance with Boeing Require-
ments Bulletin B787-
81205-SB540024-00 RB
Issue 001 and Collins Ser-
vice Bulletin 787-R71-034
Rev 00 or later approved
revisions was incorporated.
All Airplanes.
B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
Page 10 of 53
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 11

Group 2, Configuration 1:
Table 8  LEFT AND RIGHT INLET COWL ENGINE ANTI-ICE DUCT - INCORPORATE DISPATCH DEVIATION
 GUIDE (DDG)
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
ActionCondition
-Within 120 days after the
date of issuance of the
original standard certifi-
cate of airworthiness or
the original export certifi-
cate of airworthiness.
ACTION 1: Incorporate the
Dispatch Deviation Guide
(DDG) 30-21-01-02 update
into the Operators' Mini-
mum Equipment List (MEL)
that includes a General Vi-
sual Inspection (GVI) of the
engine inlet cavity for heat
damage and applicable
corrective actions at the
completion of the dispatch
interval period in accor-
dance with Boeing Require-
ments Bulletin B787-
81205-SB540024-00 RB
Issue 001 and Collins Ser-
vice Bulletin 787-R71-034
Rev 00 or later approved
revisions.
CONDITION 6: THE DDG
30-21-01-02 UPDATE FOR
A GENERAL VISUAL IN-
SPECTION (GVI) OF THE
ENGINE INLET CAVITY
FOR HEAT DAMAGE AND
APPLICABLE CORREC-
TIVE ACTIONS AT THE
COMPLETION OF THE
DISPATCH INTERVAL
PERIOD IN ACCOR-
DANCE WITH BOEING
REQUIREMENTS BUL-
LETIN B787-81205-
SB540024-00 RB ISSUE
001 AND COLLINS SER-
VICE BULLETIN 787-R71-
034 REV 00 OR LATER
APPROVED REVISIONS
WAS NOT INCORPORAT-
ED INTO THE OPERA-
TORS' MINIMUM EQUIP-
MENT LIST (MEL).
-ACTION 2: Do a mainte-
nance records check to
determine if Minimum
Equipment List (MEL) 30-
21-01-02 or MEL 30-21-01-
07 dispatch deviation has
been accomplished on any
engine inlets prior to the
incorporation of the DDG
update specified in AC-
TION 1.
B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
Page 11 of 53
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 12

Group 2, Configuration 1:
Table 8  LEFT AND RIGHT INLET COWL ENGINE ANTI-ICE DUCT - INCORPORATE DISPATCH DEVIATION
 GUIDE (DDG)
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
ActionCondition
-Within 120 days after the
date of issuance of the
original standard certifi-
cate of airworthiness or
the original export certifi-
cate of airworthiness.
Do a maintenance records
check to determine if Mini-
mum Equipment List (MEL)
30-21-01-02 or MEL 30-21-
01-07 dispatch deviation
has been accomplished on
any engine inlets prior to
the incorporation of the
DDG update.
CONDITION 7: THE DDG
30-21-01-02 UPDATE FOR
A GENERAL VISUAL IN-
SPECTION (GVI) OF THE
ENGINE INLET CAVITY
FOR HEAT DAMAGE AND
APPLICABLE CORREC-
TIVE ACTIONS AT THE
COMPLETION OF THE
DISPATCH INTERVAL
PERIOD IN ACCOR-
DANCE WITH BOEING
REQUIREMENTS BUL-
LETIN B787-81205-
SB540024-00 RB ISSUE
001 AND COLLINS SER-
VICE BULLETIN 787-R71-
034 REV 00 OR LATER
APPROVED REVISIONS
WAS INCORPORATED
INTO THE OPERATORS'
MINIMUM EQUIPMENT
LIST (MEL).
--No further action.CONDITION 8: MEL 30-
21-01-02 OR MEL 30-21-
01-07 DISPATCH DEVIA-
TION HAS NOT BEEN
ACCOMPLISHED ON ANY
ENGINE INLET.
-At the times specified in
Table 9.
CONDITION 9 (OPTION
1) Do the actions specified
in Table 9.
CONDITION 9: MEL 30-
21-01-02 OR MEL 30-21-
01-07 DISPATCH DEVIA-
TION HAS BEEN ACCOM-
PLISHED ON ANY EN-
GINE INLET PRIOR TO
THE INCORPORATION
OF THE DDG UPDATE
OR MEL 30-21-01-02 OR
MEL 30-21-01-07 DIS-
PATCH DEVIATION CAN-
NOT BE DETERMINED.
-Within 120 days after the
date of issuance of the
original standard certifi-
cate of airworthiness or
the original export certifi-
cate of airworthiness.
CONDITION 9 (OPTION
2) Replace affected engine
inlet with a new or service-
able engine inlet. *[1]
B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
Page 12 of 53
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 13

Group 2, Configuration 1:
Table 8  LEFT AND RIGHT INLET COWL ENGINE ANTI-ICE DUCT - INCORPORATE DISPATCH DEVIATION
 GUIDE (DDG)
*[1]  A serviceable inlet is defined as an inlet that has been inspected and applicable corrective actions have been done in accordance
with Requirements Bulletin B787-81205-SB540024-00 RB.
Group 2, Configuration 1:
Table 9  LEFT AND RIGHT INLET COWL - INLET AFT COMPARTMENT - ENGINE ANTI-ICE DUCT INSPEC-
TION
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
ActionCondition
-Within 120 days after the
date of issuance of the
original standard certifi-
cate of airworthiness or
the original export certifi-
cate of airworthiness.
ACTION 1: Do a general
visual inspection of the af-
fected engine inlet cavity
between the forward and
aft bulkhead in the area
surrounding the EAI duct
for heat damage to metallic
components. *[1]
Airplanes on which MEL
30-21-01-02 or MEL 30-21-
01-07 dispatch deviation
has been accomplished on
any engine inlet prior to the
incorporation of the DDG
update or MEL 30-21-01-
02 or MEL 30-21-01-07
dispatch deviation cannot
be determined. -ACTION 2: Do a general
visual inspection of the af-
fected engine inlet cavity
composite panels for heat
damage. *[2]
--No further action.CONDITION 10: NO HEAT
DAMAGE FOUND.
-Before Further Flight.Measure conductivity and
do a hardness test of the
affected area.*[3]
CONDITION 11: ANY EN-
GINE INLET AFT COM-
PARTMENT METALLIC
COMPONENTS HEAT
DAMAGE FOUND.
-Before Further Flight.Install new periseal and aft
seal.
CONDITION 11.1: CON-
DUCTIVITY AND HARD-
NESS TEST FOUND
WITHIN CONDUCTIVITY
AND HARDNESS AC-
CEPTED LIMITS.
B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
Page 13 of 53
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 14

Group 2, Configuration 1:
Table 9  LEFT AND RIGHT INLET COWL - INLET AFT COMPARTMENT - ENGINE ANTI-ICE DUCT INSPEC-
TION
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
ActionCondition
-Before Further Flight.CONDITION 11.2 OPTION
1 (ACTION 1): Contact The
Boeing Company for repair
instructions and do the re-
pair.
CONDITION 11.2: ANY
CONDUCTIVITY OR ANY
HARDNESS TEST
FOUND OUTSIDE AC-
CEPTED LIMITS.
-Before Further Flight.CONDITION 11.2 OPTION
1 (ACTION 2): Install new
periseal and aft seal.
-Before Further Flight.CONDITION 11.2 (OP-
TION 2): Replace affected
engine inlet with a new or
serviceable engine inlet.
*[4]
-Before Further Flight.CONDITION 12 OPTION
1 (ACTION 1): Contact The
Boeing Company for repair
instructions and do the re-
pair.
CONDITION 12: ANY
COMPOSITE PANEL
HEAT DAMAGE FOUND.
-Before Further Flight.CONDITION 12 OPTION
1 (ACTION 2): Install new
periseal and aft seal.
-Before Further Flight.CONDITION 12 (OPTION
2): Replace affected en-
gine inlet with a new or
serviceable engine inlet.
*[4]
*[1]  Heat damage as defined in 787-8 SRM 51-11-03 Rev 46 or 787-9 SRM 51-11-03 Rev 28 or 787-10 SRM 51-11-03 Rev 14.
*[2]  Heat damage as defined in 787-8 SRM 51-13-03 Rev 46 or 787-9 SRM 51-13-03 Rev 28 or 787-10 SRM 51-13-03 Rev 14.
*[3]  Conductivity and Hardness accepted limits are defined in Collins Aerospace Service Bulletin 787-R71-034 Rev 00, Table 4.2.
*[4]  A serviceable inlet is defined as an inlet that has been inspected and applicable corrective actions have been done in accordance
with Requirements Bulletin B787-81205-SB540024-00 RB.
B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
Page 14 of 53
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 15

Group 1; Group 2, Configuration 1:
Table 10  LEFT AND RIGHT INLET COWL - INLET AFT COMPARTMENT - ENGINE ANTI-ICE DUCT INSPEC-
TION FOR MEL COMPLETION
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
ActionCondition
-At the completion of the
dispatch interval period.
ACTION 1: Do a general
visual inspection of the af-
fected engine inlet cavity
between the forward and
aft bulkhead in the area
surrounding the EAI duct
for heat damage to metallic
components. *[2]
Airplanes on which MEL
30-21-01-02 dispatch devi-
ation was done on any en-
gine inlet after incorpora-
tion of the DDG 30-21-01-
02 update for General Visu-
al Inspection (GVI) of the
engine inlet cavity for heat
damage and applicable
corrective actions at the
completion of the dispatch
interval period in accor-
dance with Boeing Require-
ments Bulletin B787-
81205-SB540024-00 RB
Issue 001 and Collins Ser-
vice Bulletin 787-R71-034
Rev 00 or later approved
revisions into the MEL.*[1]
-ACTION 2: Do a general
visual inspection of the af-
fected engine inlet cavity
composite panels for heat
damage. *[3]
-At the completion of the
dispatch interval period.
ACTION 1: Do a general
visual inspection of the af-
fected engine inlet cavity
between the forward and
aft bulkhead in the area
surrounding the EAI duct
for heat damage to metallic
components. *[2]
Airplanes on which MEL
30-21-01-07 dispatch devi-
ation was done on any en-
gine inlet after incorpora-
tion of the DDG 30-21-01-
02 update for General Visu-
al Inspection (GVI) of the
engine inlet cavity for heat
damage and applicable
corrective actions at the
completion of the dispatch
interval period in accor-
dance with Boeing Require-
ments Bulletin B787-
81205-SB540024-00 RB
Issue 001 and Collins Ser-
vice Bulletin 787-R71-034
Rev 00 or later approved
revisions into the MEL.*[1]
-ACTION 2: Do a general
visual inspection of the af-
fected engine inlet cavity
composite panels for heat
damage. *[3]
--No further action.CONDITION 13: NO HEAT
DAMAGE FOUND.
B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
Page 15 of 53
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 16

Group 1; Group 2, Configuration 1:
Table 10  LEFT AND RIGHT INLET COWL - INLET AFT COMPARTMENT - ENGINE ANTI-ICE DUCT INSPEC-
TION FOR MEL COMPLETION
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
ActionCondition
-Before Further Flight.Measure conductivity and
do a hardness test of the
affected area.*[4]
CONDITION 14: ANY EN-
GINE INLET AFT COM-
PARTMENT METALLIC
COMPONENTS HEAT
DAMAGE FOUND.
-Before Further Flight.Install new periseal and aft
seal.
CONDITION 14.1: CON-
DUCTIVITY AND HARD-
NESS TEST FOUND
WITHIN CONDUCTIVITY
AND HARDNESS AC-
CEPTED LIMITS.
-Before Further Flight.CONDITION 14.2 OPTION
1 (ACTION 1): Contact The
Boeing Company for repair
instructions and do the re-
pair.
CONDITION 14.2: ANY
CONDUCTIVITY OR ANY
HARDNESS TEST
FOUND OUTSIDE AC-
CEPTED LIMITS.
-Before Further Flight.CONDITION 14.2 OPTION
1 (ACTION 2): Install new
periseal and aft seal.
-Before Further Flight.CONDITION 14.2 (OP-
TION 2): Replace affected
engine inlet with a new or
serviceable engine inlet.
*[5]
-Before Further Flight.CONDITION 15 OPTION
1 (ACTION 1): Contact The
Boeing Company for repair
instructions and do the re-
pair.
CONDITION 15: ANY
COMPOSITE PANEL
HEAT DAMAGE FOUND.
-Before Further Flight.CONDITION 15 OPTION
1 (ACTION 2): Install new
periseal and aft seal.
-Before Further Flight.CONDITION 15 (OPTION
2): Replace affected en-
gine inlet with a new or
serviceable engine inlet.
*[5]
B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
Page 16 of 53
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 17

Group 1; Group 2, Configuration 1:
Table 10  LEFT AND RIGHT INLET COWL - INLET AFT COMPARTMENT - ENGINE ANTI-ICE DUCT INSPEC-
TION FOR MEL COMPLETION
*[1]  This table must be completed every Dispatch Deviation
*[2]  Heat damage as defined in 787-8 SRM 51-11-03 Rev 46 or 787-9 SRM 51-11-03 Rev 28 or 787-10 SRM 51-11-03 Rev 14.
*[3]  Heat damage as defined in 787-8 SRM 51-13-03 Rev 46 or 787-9 SRM 51-13-03 Rev 28 or 787-10 SRM 51-13-03 Rev 14.
*[4]  Conductivity and Hardness accepted limits are defined in Collins Aerospace Service Bulletin 787-R71-034 Rev 00, Table 4.2.
*[5]  A serviceable inlet is defined as an inlet that has been inspected and applicable corrective actions have been done in accordance
with Requirements Bulletin B787-81205-SB540024-00 RB.
Group 2, Configuration 2:
No further action required.
D. APPROVAL
This Requirements Bulletin was examined by the Federal Aviation Administration (FAA). The changes
specified in this document comply with the applicable regulations and are FAA approved, as well as European
Union Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/JAA approved
airplanes listed in this Requirements Bulletin effectivity. This document and its approval were based on the
airplane in its original Boeing delivery configuration or as modified by other Boeing changes.
If an airplane has a non-Boeing modification or repair that affects a component or system also affected by
this Requirements Bulletin, the operator is responsible for obtaining appropriate regulatory agency approval
before incorporating this Requirements Bulletin.
B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
Page 17 of 53
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 18

E.    ACCOMPLISHMENT INSTRUCTIONS
1. GENERAL INFORMATION
NOTE: 1. This is an Enhanced Required for Compliance document. There will be a separate Service
Bulletin (SB) and a separate Requirements Bulletin (RB). If an RB is mandated by an
Airworthiness Directive (AD), then all applicable requirements specified in the RB must
be done. In the RB, the "Refer to the listed procedures..." column of the table(s) in the
Work Instructions is for reference only. The procedures in that column are not required
by the AD and are for guidance only. For the related SB, some locations are marked RC
Start and RC End to identify the requirements that are restated from the RB. For the re-
lated SB, the areas between RC Start and RC End, including sub-steps and any figures
identified between RC Start and RC End, must be done to comply with the AD. Therefore,
an Alternative Method of Compliance (AMOC) is required for any deviations to steps be-
tween RC Start and RC End, including substeps and identified figures. For the related
SB, the steps not between RC Start and RC End may be deviated from using accepted
methods in accordance with the operator's maintenance or inspection program without
obtaining approval of an AMOC; this is provided that the steps between RC Start and RC
End, including sub-steps and identified figures, can still be done as specified, and the
airplane can be put back in an airworthy condition. Figures not required for compliance
are omitted from the RB.
2. This is an Enhanced Required for Compliance document. The Boeing processes used
to create the Service Bulletin (SB) and the Requirements Bulletin (RB) ensure that the
information between "RC Start" and "RC End" in the SB are identical to the information
in the same sections (Compliance, Work Instructions...) of the RB which the SB refers to
as the related document.
3. These work instructions refer to procedures included in other Boeing documents. When
the words "refer to" are used and the operator has an accepted alternative procedure,
the accepted alternative procedure can be used. When the words "in accordance with"
are included in the instruction, the procedure in the Boeing document must be used.
4. The compliance times for the actions in Work Instructions are in Compliance.
5. A General Visual Inspection is defined as: A visual examination of an interior or exterior
area, installation or assembly to detect obvious damage, failure or irregularity. This level
of inspection is made from within touching distance unless otherwise specified. A mirror
may be necessary to ensure visual access to all surfaces in the inspection area. This
level of inspection is made under normal available lighting conditions such as daylight,
hangar lighting, flashlight or drop-light and may require removal or opening of access
panels or doors. Stands, ladders or platforms may be required to gain proximity to the
area being checked.
6. Boeing Service Letter 787-SL-51-001, Damage Reporting and Repair Plan/Design
Guidelines, is an acceptable procedure to request information from Boeing for additional
structural repair instructions. The Service Letter describes what information must be
provided to Boeing before a structural repair can be provided
B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
Page 18 of 53
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 19

7. Obey all of the warnings and cautions given in the specified manual sections.
8. When more than one OPTION is given for a CONDITION, do only one of the OPTION
numbers. When more than one ACTION is given for a CONDITION number or an OPTION
number, do all of the ACTION numbers for that CONDITION number or OPTION number.
9. Unless shown differently, these dimensions and tolerances are used:
– Linear dimensions are in inches
– Tolerance on linear dimensions, other than rivet and bolt edge margins, is plus or
minus 0.03 inch
– Tolerance on rivet and bolt edge margin is plus or minus 0.05 inch
– Angular tolerance is plus or minus 2 degrees
– Hole dimensions for standard solid rivets and fasteners are in SRM Chapter 51
– Torque Values:
– Values for structural fasteners are given in 787 Structural Repair Manual, Chapter
51.
– Values for airframe maintenance tasks are included in Chapter 20 of 787 Aircraft
Maintenance Manual (AMM).
– Values for electrical maintenance tasks are included in Chapter 20 of Standard
Wiring Practices Manual (SWPM).
– Values for engine maintenance tasks are included in Chapter 70 of 787 Aircraft
Maintenance Manual (AMM).
– Non-standard torque values for maintenance tasks are included in the applicable
installation step.
10. Use the approved fastener, process and material substitutions in accordance with SRM
Chapter 51.
11. If it is necessary to remove more parts for access, you can remove those parts. If you
can get access without removing identified parts, it is not necessary to remove all of the
identified parts. Jacking and shoring limitations must be observed.
12. Where the work instructions include installation of a kept part, a new or serviceable part
with the same part number can be installed as an alternative to the kept part.
2. WORK INSTRUCTIONS
A. Action Required for Compliance
Requirement(1)
B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
Page 19 of 53
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 20

Group 1:
Table 1  LEFT AND RIGHT INLET COWL ENGINE ANTI-ICE DUCT - MEL INCORPORATION AND MAINTE-
NANCE RECORDS CHECK
Refer to the listed
procedures in SB
B787-81205-
SB540024-00 Is-
sue 001 or later
approved issues
as an accepted
procedure.
Method of ComplianceActionCondition
--ACTION 1: Incorporate the
Dispatch Deviation Guide
(DDG) 30-21-01-02 update
into the Operators' Mini-
mum Equipment List (MEL)
that includes a General Vi-
sual Inspection (GVI) of the
engine inlet cavity for heat
damage and applicable
corrective actions at the
completion of the dispatch
interval period in accor-
dance with Boeing Require-
ments Bulletin B787-
81205-SB540024-00 RB
Issue 001 and Collins Ser-
vice Bulletin 787-R71-034
Rev 00 or later approved
revisions.
All Airplanes
--ACTION 2: Do a mainte-
nance records check to
determine if MEL 30-21-01-
02 or MEL 30-21-01-07
dispatch deviation has
been accomplished on any
engine inlets prior to the
incorporation of the DDG
update specified in AC-
TION 1
--No Further Action required.CONDITION 1: MEL 30-
21-01-02 OR MEL 30-21-
01-07 DISPATCH DEVIA-
TION HAS NOT BEEN
ACCOMPLISHED ON ANY
ENGINE INLET.
B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
Page 20 of 53
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 21

Group 1:
Table 1  LEFT AND RIGHT INLET COWL ENGINE ANTI-ICE DUCT - MEL INCORPORATION AND MAINTE-
NANCE RECORDS CHECK
Refer to the listed
procedures in SB
B787-81205-
SB540024-00 Is-
sue 001 or later
approved issues
as an accepted
procedure.
Method of ComplianceActionCondition
--CONDITION 2 (OPTION
1): Do the actions specified
in Table 2.
CONDITION 2: MEL 30-
21-01-02 OR MEL 30-21-
01-07 DISPATCH DEVIA-
TION HAS BEEN ACCOM-
PLISHED ON ANY EN-
GINE INLET PRIOR TO
THE INCORPORATION
OF THE DDG UPDATE
OR MEL 30-21-01-02 OR
MEL 30-21-01-07 DIS-
PATCH DEVIATION CAN-
NOT BE DETERMINED.
PART 1: OPEN
ACCESS
-CONDITION 2 (OPTION
2): Replace affected en-
gine inlet with a new or
serviceable engine inlet.
*[1]
PART 2 - RE-
PLACE INLET
-
PART 4: CLOSE
ACCESS
-
*[1]  A serviceable engine inlet is defined as an engine inlet that has been inspected and applicable corrective actions have been done
in accordance with Requirements Bulletin B787-81205-SB540024 RB.
B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
Page 21 of 53
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 22

Group 1:
Table 2  LEFT AND RIGHT INLET COWL - INLET AFT COMPARTMENT - ENGINE ANTI-ICE DUCT INSPEC-
TION
Refer to the listed
procedures in SB
B787-81205-
SB540024-00 Is-
sue 001 or later
approved issues
as an accepted
procedure.
Method of ComplianceActionCondition
PART 1: OPEN
ACCESS
-ACTION 1: Do a general
visual inspection of the af-
fected engine inlet cavity
between the forward and
aft bulkhead in the area
surrounding the Engine
Anti-Ice Inlet (EAI) duct for
heat damage to metallic
components. *[1]
Airplanes on which MEL
30-21-01-02 or MEL 30-21-
01-07 dispatch deviation
has been accomplished on
any engine inlet prior to the
incorporation of the DDG
update or MEL 30-21-01-
02 or MEL 30-21-01-07
dispatch deviation cannot
be determined.
-Left Engine Inlet: Task 1
Right Engine Inlet: Task
2
-Left Engine Inlet: Task 3ACTION 2: Do a general
visual inspection of the af-
fected engine inlet cavity
composite panels for heat
damage. *[2]
Right Engine Inlet: Task
4
--No further action.CONDITION 3: NO HEAT
DAMAGE FOUND. PART 4: CLOSE
ACCESS
-
-In accordance with AC-
COMPLISHMENT IN-
STRUCTIONS PARA-
GRAPH 3.D.(2).a of
Collins Aerospace Ser-
vice Bulletin 787-R71-
034 Rev 00.
Measure conductivity and
do a hardness test of the
affected area.*[3]
CONDITION 4: ANY EN-
GINE INLET AFT COM-
PARTMENT METALLIC
COMPONENTS HEAT
DAMAGE FOUND.
PART 3: SEAL IN-
STALLATION
-Install new periseal and aft
seal.
CONDITION 4.1: CON-
DUCTIVITY AND HARD-
NESS TEST FOUND
WITHIN CONDUCTIVITY
AND HARDNESS AC-
CEPTED LIMITS.
PART 4: CLOSE
ACCESS
-
B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
Page 22 of 53
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 23

Group 1:
Table 2  LEFT AND RIGHT INLET COWL - INLET AFT COMPARTMENT - ENGINE ANTI-ICE DUCT INSPEC-
TION
Refer to the listed
procedures in SB
B787-81205-
SB540024-00 Is-
sue 001 or later
approved issues
as an accepted
procedure.
Method of ComplianceActionCondition
--CONDITION 4.2 OPTION
1 (ACTION 1): Contact The
Boeing Company for repair
instructions and do the re-
pair.
CONDITION 4.2: ANY
CONDUCTIVITY OR ANY
HARDNESS TEST
FOUND OUTSIDE AC-
CEPTED LIMITS.
PART 3: SEAL IN-
STALLATION
-CONDITION 4.2 OPTION
1 (ACTION 2): Install new
periseal and aft seal. PART 4: CLOSE
ACCESS
-
PART 2: REPLACE
INLET
-CONDITION 4.2 OPTION
2: Replace affected engine
inlet with a new or service-
able engine inlet. *[4] PART 4: CLOSEACCESS-
--CONDITION 5 OPTION 1
(ACTION 1): Contact The
Boeing Company for repair
instructions and do the re-
pair.
CONDITION 5: ANY
COMPOSITE PANEL
HEAT DAMAGE FOUND.
PART 3: SEAL IN-
STALLATION
-CONDITION 5 OPTION 1
(ACTION 2): Install new
periseal and aft seal. PART 4: CLOSE
ACCESS
-
PART 2: REPLACE
INLET
-CONDITION 5 OPTION 2:
Replace affected engine
inlet with a new or service-
able engine inlet. *[4] PART 4: CLOSEACCESS-
*[1]  Heat damage as defined in 787-8 SRM 51-11-03 Rev 46 or 787-9 SRM 51-11-03 Rev 28 or 787-10 SRM 51-11-03 Rev 14.
*[2]  Heat damage as defined in 787-8 SRM 51-13-03 Rev 46 or 787-9 SRM 51-13-03 Rev 28 or 787-10 SRM 51-13-03 Rev 14.
*[3]  Conductivity and Hardness accepted limits are defined in Collins Aerospace Service Bulletin 787-R71-034 Rev 00, Table 4.2.
*[4]  A serviceable engine inlet is defined as an engine inlet that has been inspected and applicable corrective actions have been done
in accordance with Requirements Bulletin B787-81205-SB540024-00 RB.
B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
Page 23 of 53
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 24

Group 2, Configuration 1:
Table 3  LEFT AND RIGHT INLET COWL ENGINE ANTI-ICE INLET - INCORPORATE DISPATCH DEVIATION
 GUIDE
Refer to the listed
procedures in SB
B787-81205-
SB540024-00 Is-
sue 001 or later
approved issues
as an accepted
procedure.
Method of ComplianceActionCondition
--Review operators Minimum
Equipment List (MEL) to
verify that the Dispatch
Deviation Guide (DDG) 30-
21-01-02 update that in-
cludes a General Visual
Inspection (GVI) of the en-
gine inlet cavity for heat
damage and applicable
corrective actions at the
completion of the dispatch
interval period in accor-
dance with Boeing Require-
ments Bulletin B787-
81205-SB540024-00 RB
Issue 001 and Collins Ser-
vice Bulletin 787-R71-034
Rev 00 or later approved
revisions was incorporated.
All Airplanes.
B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
Page 24 of 53
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 25

Group 2, Configuration 1:
Table 3  LEFT AND RIGHT INLET COWL ENGINE ANTI-ICE INLET - INCORPORATE DISPATCH DEVIATION
 GUIDE
Refer to the listed
procedures in SB
B787-81205-
SB540024-00 Is-
sue 001 or later
approved issues
as an accepted
procedure.
Method of ComplianceActionCondition
--ACTION 1: Incorporate the
Dispatch Deviation Guide
(DDG) 30-21-01-02 update
into the Operators' Mini-
mum Equipment List (MEL)
that includes a General Vi-
sual Inspection (GVI) of the
engine inlet cavity for heat
damage and applicable
corrective actions at the
completion of the dispatch
interval period in accor-
dance with Boeing Require-
ments Bulletin B787-
81205-SB540024-00 RB
Issue 001 and Collins Ser-
vice Bulletin 787-R71-034
Rev 00 or later approved
revisions.
CONDITION 6: THE DDG
30-21-01-02 UPDATE FOR
A GENERAL VISUAL IN-
SPECTION (GVI) OF THE
ENGINE INLET CAVITY
FOR HEAT DAMAGE AND
APPLICABLE CORREC-
TIVE ACTIONS AT THE
COMPLETION OF THE
DISPATCH INTERVAL
PERIOD IN ACCOR-
DANCE WITH BOEING
REQUIREMENTS BUL-
LETIN B787-81205-
SB540024-00 RB ISSUE
001 AND COLLINS SER-
VICE BULLETIN 787-R71-
034 REV 00 OR LATER
APPROVED REVISIONS
WAS NOT INCORPORAT-
ED INTO THE OPERA-
TORS' MINIMUM EQUIP-
MENT LIST (MEL).
--ACTION 2: Do a mainte-
nance records check to
determine if Minimum
Equipment List (MEL) 30-
21-01-02 or MEL 30-21-01-
07 dispatch deviation has
been accomplished on any
engine inlets prior to the
incorporation of the DDG
update specified in AC-
TION 1.
B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
Page 25 of 53
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 26

Group 2, Configuration 1:
Table 3  LEFT AND RIGHT INLET COWL ENGINE ANTI-ICE INLET - INCORPORATE DISPATCH DEVIATION
 GUIDE
Refer to the listed
procedures in SB
B787-81205-
SB540024-00 Is-
sue 001 or later
approved issues
as an accepted
procedure.
Method of ComplianceActionCondition
--Do a maintenance records
check to determine if Mini-
mum Equipment List (MEL)
30-21-01-02 or MEL 30-21-
01-07 dispatch deviation
has been accomplished on
any engine inlets prior to
the incorporation of the
DDG update.
CONDITION 7: THE DDG
30-21-01-02 UPDATE FOR
A GENERAL VISUAL IN-
SPECTION (GVI) OF THE
ENGINE INLET CAVITY
FOR HEAT DAMAGE AND
APPLICABLE CORREC-
TIVE ACTIONS AT THE
COMPLETION OF THE
DISPATCH INTERVAL
PERIOD IN ACCOR-
DANCE WITH BOEING
REQUIREMENTS BUL-
LETIN B787-81205-
SB540024-00 RB ISSUE
001 AND COLLINS SER-
VICE BULLETIN 787-R71-
034 REV 00 OR LATER
APPROVED REVISIONS
WAS INCORPORATED
INTO THE OPERATORS'
MINIMUM EQUIPMENT
LIST (MEL).
--No further action.CONDITION 8: MEL 30-
21-01-02 OR MEL 30-21-
01-07 DISPATCH DEVIA-
TION HAS NOT BEEN
ACCOMPLISHED ON ANY
ENGINE INLET.
B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
Page 26 of 53
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 27

Group 2, Configuration 1:
Table 3  LEFT AND RIGHT INLET COWL ENGINE ANTI-ICE INLET - INCORPORATE DISPATCH DEVIATION
 GUIDE
Refer to the listed
procedures in SB
B787-81205-
SB540024-00 Is-
sue 001 or later
approved issues
as an accepted
procedure.
Method of ComplianceActionCondition
--CONDITION 9 (OPTION
1) Do the actions specified
in Table 4.
CONDITION 9: MEL 30-
21-01-02 OR MEL 30-21-
01-07 DISPATCH DEVIA-
TION HAS BEEN ACCOM-
PLISHED ON ANY EN-
GINE INLET PRIOR TO
THE INCORPORATION
OF THE DDG UPDATE
OR MEL 30-21-01-02 OR
MEL 30-21-01-07 DIS-
PATCH DEVIATION CAN-
NOT BE DETERMINED.
PART 1: OPEN
ACCESS
-CONDITION 9 (OPTION
2) Replace affected engine
inlet with a new or service-
able engine inlet. *[1] PART 2: REPLACEINLET-
PART 4: CLOSE
ACCESS
-
*[1]  A serviceable engine inlet is defined as an engine inlet that has been inspected and applicable corrective actions have been done
in accordance with Requirements Bulletin B787-81205-SB540024-00 RB.
B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
Page 27 of 53
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 28

Group 2, Configuration 1:
Table 4  LEFT AND RIGHT INLET COWL - INLET AFT COMPARTMENT - ENGINE ANTI-ICE DUCT INSPEC-
TION
Refer to the listed
procedures in SB
B787-81205-
SB540024-00 Is-
sue 001 or later
approved issues
as an accepted
procedure.
Method of ComplianceActionCondition
PART 1: OPEN
ACCESS
-ACTION 1: Do a general
visual inspection of the af-
fected engine inlet cavity
between the forward and
aft bulkhead in the area
surrounding the Engine
Anti-Ice Inlet (EAI) duct for
heat damage to metallic
components. *[1]
Airplanes on which MEL
30-21-01-02 or MEL 30-21-
01-07 dispatch deviation
has been accomplished on
any engine inlet prior to the
incorporation of the DDG
update or MEL 30-21-01-
02 or MEL 30-21-01-07
dispatch deviation cannot
be determined.
-Left Engine Inlet: Task 1
Right Engine Inlet: Task
2
-Left Engine Inlet: Task 3ACTION 2: Do a general
visual inspection of the af-
fected engine inlet cavity
composite panels for heat
damage. *[2]
Right Engine Inlet: Task
4
--No further action.CONDITION 10: NO HEAT
DAMAGE FOUND. PART 4: CLOSE
ACCESS
-
-In accordance with AC-
COMPLISHMENT IN-
STRUCTIONS PARA-
GRAPH 3.D.(2).a of
Collins Aerospace Ser-
vice Bulletin 787-R71-
034 Rev 00.
Measure conductivity and
do a hardness test of the
affected area.*[3]
CONDITION 11: ANY EN-
GINE INLET AFT COM-
PARTMENT METALLIC
COMPONENTS HEAT
DAMAGE FOUND.
PART 3: SEAL IN-
STALLATION
-Install new periseal and aft
seal.
CONDITION 11.1: CON-
DUCTIVITY AND HARD-
NESS TEST FOUND
WITHIN CONDUCTIVITY
AND HARDNESS AC-
CEPTED LIMITS.
PART 4: CLOSE
ACCESS
-
B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
Page 28 of 53
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 29

Group 2, Configuration 1:
Table 4  LEFT AND RIGHT INLET COWL - INLET AFT COMPARTMENT - ENGINE ANTI-ICE DUCT INSPEC-
TION
Refer to the listed
procedures in SB
B787-81205-
SB540024-00 Is-
sue 001 or later
approved issues
as an accepted
procedure.
Method of ComplianceActionCondition
--CONDITION 11.2 OPTION
1 (ACTION 1): Contact The
Boeing Company for repair
instructions and do the re-
pair
CONDITION 11.2: ANY
CONDUCTIVITY OR ANY
HARDNESS TEST
FOUND OUTSIDE AC-
CEPTED LIMITS.
PART 3: SEAL IN-
STALLATION
-CONDITION 11.2 OPTION
1 (ACTION 2): Install new
periseal and aft seal. PART 4: CLOSE
ACCESS
-
PART 2: REPLACE
INLET
-CONDITION 11.2 OPTION
2: Replace affected engine
inlet with a new or service-
able engine inlet. *[4] PART 4: CLOSEACCESS-
--CONDITION 12 OPTION
1 (ACTION 1): Contact The
Boeing Company for repair
instructions and do the re-
pair.
CONDITION 12: ANY
COMPOSITE PANEL
HEAT DAMAGE FOUND.
PART 3: SEAL IN-
STALLATION
-CONDITION 12 OPTION
1 (ACTION 2): Install new
periseal and aft seal. PART 4: CLOSE
ACCESS
-
PART 2: REPLACE
INLET
-CONDITION 12 OPTION
2: Replace affected engine
inlet with a new or service-
able engine inlet. *[4] PART 4: CLOSEACCESS-
*[1]  Heat damage as defined in 787-8 SRM 51-11-03 Rev 46 or 787-9 SRM 51-11-03 Rev 28 or 787-10 SRM 51-11-03 Rev 14.
*[2]  Heat damage as defined in 787-8 SRM 51-13-03 Rev 46 or 787-9 SRM 51-13-03 Rev 28 or 787-10 SRM 51-13-03 Rev 14.
*[3]  Conductivity and Hardness accepted limits are defined in Collins Aerospace Service Bulletin 787-R71-034 Rev 00, Table 4.2.
*[4]  A serviceable engine inlet is defined as an engine inlet that has been inspected and applicable corrective actions have been done
in accordance with Requirements Bulletin B787-81205-SB540024-00 RB.
B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
Page 29 of 53
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 30

Group 1; Group 2, Configuration 1:
Table 5  LEFT AND RIGHT INLET COWL - INLET AFT COMPARTMENT - ENGINE ANTI-ICE DUCT INSPEC-
TION FOR MEL COMPLETION
Refer to the listed
procedures in SB
B787-81205-
SB540024-00 Is-
sue 001 or later
approved issues
as an accepted
procedure.
Method of ComplianceActionCondition
PART 1: OPEN
ACCESS
-ACTION 1: Do a general
visual inspection of the af-
fected engine inlet cavity
between the forward and
aft bulkhead in the area
surrounding the Engine
Anti-Ice Inlet (EAI) duct for
heat damage to metallic
components. *[2]
Airplanes on which MEL
30-21-01-02 dispatch devi-
ation was done on any en-
gine inlet after incorpora-
tion of the DDG 30-21-01-
02 update for General Visu-
al Inspection (GVI) of the
engine inlet cavity for heat
damage and applicable
corrective actions at the
completion of the dispatch
interval period in accor-
dance with Boeing Require-
ments Bulletin B787-
81205-SB540024-00 RB
Issue 001 and Collins Ser-
vice Bulletin 787-R71-034
Rev 00 or later approved
revisions into the MEL.*[1]
-Left Engine Inlet: Task 1
Right Engine Inlet: Task
2
-Left Engine Inlet: Task 3
Right Engine Inlet: Task
4
ACTION 2: Do a general
visual inspection of the af-
fected engine inlet cavity
composite panels for heat
damage. *[3]
B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
Page 30 of 53
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 31

Group 1; Group 2, Configuration 1:
Table 5  LEFT AND RIGHT INLET COWL - INLET AFT COMPARTMENT - ENGINE ANTI-ICE DUCT INSPEC-
TION FOR MEL COMPLETION
Refer to the listed
procedures in SB
B787-81205-
SB540024-00 Is-
sue 001 or later
approved issues
as an accepted
procedure.
Method of ComplianceActionCondition
PART 1: OPEN
ACCESS
-ACTION 1: Do a general
visual inspection of the af-
fected engine inlet cavity
between the forward and
aft bulkhead in the area
surrounding the Engine
Anti-Ice Inlet (EAI) duct for
heat damage to metallic
components.*[2]
Airplanes on which MEL
30-21-01-07 dispatch devi-
ation was done on any en-
gine inlet after incorpora-
tion of the DDG 30-21-01-
02 update for General Visu-
al Inspection (GVI) of the
engine inlet cavity for heat
damage and applicable
corrective actions at the
completion of the dispatch
interval period in accor-
dance with Boeing Require-
ments Bulletin B787-
81205-SB540024-00 RB
Issue 001 and Collins Ser-
vice Bulletin 787-R71-034
Rev 00 or later approved
revisions into the MEL.*[1]
-Left Engine Inlet: Task 1
Right Engine Inlet: Task
2
-Left Engine Inlet: Task 3
Right Engine Inlet: Task
4
ACTION 2: Do a general
visual inspection of the af-
fected engine inlet cavity
composite panels for heat
damage.*[3]
--No further action.CONDITION 13: NO HEAT
DAMAGE FOUND. PART 4: CLOSE
ACCESS
-
-In accordance with AC-
COMPLISHMENT IN-
STRUCTIONS PARA-
GRAPH 3.D.(2).a of
Collins Aerospace Ser-
vice Bulletin 787-R71-
034 Rev 00.
Measure conductivity and
do a hardness test of the
affected area.
CONDITION 14: ANY EN-
GINE INLET AFT COM-
PARTMENT METALLIC
COMPONENTS HEAT
DAMAGE FOUND.
B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
Page 31 of 53
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 32

Group 1; Group 2, Configuration 1:
Table 5  LEFT AND RIGHT INLET COWL - INLET AFT COMPARTMENT - ENGINE ANTI-ICE DUCT INSPEC-
TION FOR MEL COMPLETION
Refer to the listed
procedures in SB
B787-81205-
SB540024-00 Is-
sue 001 or later
approved issues
as an accepted
procedure.
Method of ComplianceActionCondition
PART 3: SEAL IN-
STALLATION
-Install new periseal and aft
seal.
CONDITION 14.1: CON-
DUCTIVITY AND HARD-
NESS TEST FOUND
WITHIN CONDUCTIVITY
AND HARDNESS AC-
CEPTED LIMITS. *[4]
PART 4: CLOSE
ACCESS
-
--CONDITION 14.2 OPTION
1 (ACTION 1): Contact The
Boeing Company for repair
instructions and do the re-
pair
CONDITION 14.2: ANY
CONDUCTIVITY OR ANY
HARDNESS TEST
FOUND OUTSIDE AC-
CEPTED LIMITS. *[4]
PART 3: SEAL IN-
STALLATION
-CONDITION 14.2 OPTION
1 (ACTION 2): Install new
periseal and aft seal. PART 4: CLOSE
ACCESS
-
PART 2: REPLACE
INLET
-CONDITION 14.2 OPTION
2: Replace affected engine
inlet with a new or service-
able engine inlet. *[5] PART 4: CLOSEACCESS-
B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
Page 32 of 53
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 33

Group 1; Group 2, Configuration 1:
Table 5  LEFT AND RIGHT INLET COWL - INLET AFT COMPARTMENT - ENGINE ANTI-ICE DUCT INSPEC-
TION FOR MEL COMPLETION
Refer to the listed
procedures in SB
B787-81205-
SB540024-00 Is-
sue 001 or later
approved issues
as an accepted
procedure.
Method of ComplianceActionCondition
--CONDITION 15 OPTION
1 (ACTION 1): Contact The
Boeing Company for repair
instructions and do the re-
pair.
CONDITION 15: ANY
COMPOSITE PANEL
HEAT DAMAGE FOUND.
PART 3: SEAL IN-
STALLATION
-CONDITION 15 OPTION
1 (ACTION 2): Install new
periseal and aft seal. PART 4: CLOSE
ACCESS
-
PART 2: REPLACE
INLET
-CONDITION 15 OPTION
2: Replace affected engine
inlet with a new or service-
able engine inlet. *[5] PART 4: CLOSEACCESS-
*[1]  This table must be completed every Dispatch Deviation.
*[2]  Heat damage as defined in 787-8 SRM 51-11-03 Rev 46 or 787-9 SRM 51-11-03 Rev 28 or 787-10 SRM 51-11-03 Rev 14.
*[3]  Heat damage as defined in 787-8 SRM 51-13-03 Rev 46 or 787-9 SRM 51-13-03 Rev 28 or 787-10 SRM 51-13-03 Rev 14.
*[4]  Conductivity and Hardness accepted limits are defined in Collins Aerospace Service Bulletin 787-R71-034 Rev 00, Table 4.2.
*[5]  A serviceable engine inlet is defined as an engine inlet that has been inspected and applicable corrective actions have been done
in accordance with Requirements Bulletin B787-81205-SB540024-00 RB.
Group 2, Configuration 2:
No further action required.
B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
Page 33 of 53
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 34

Task 1 – LEFT ENGINE INLET CAVITY AFT COMPARTMENT METALLIC
COMPONENTS - GENERAL VISUAL INSPECTION [Group 1; Group 2,
Configuration 1: ]
THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN
IN PARAGRAPH 1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND
Alert:
THIS DOCUMENT TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD,
SEND THIS DOCUMENT TO THE NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR
COMPLIANCE DOCUMENT. THE BOEING PROCESSES USED TO CREATE THE SERVICE
BULLETIN (SB) AND THE REQUIREMENTS BULLETIN (RB) ENSURE THAT THE INFORMATION
BETWEEN "RC START" AND "RC END" IN THE SB ARE IDENTICAL TO THE INFORMATION IN
THE SAME SECTIONS (COMPLIANCE, WORK INSTRUCTIONS...) OF THE RB WHICH THE SB
REFERS TO AS THE RELATED DOCUMENT.
Procedure
This Task applies only to: Group 1; Group 2, Configuration 1.
LEFT ENGINE INLET CAVITY AFT COMPARTMENT METALLIC COMPONENTS - GENERAL VISUAL
INSPECTION
B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
Page 34 of 53
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 35 (OCR)

A BOEING  B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
REQUIREMENTS BULLETIN
ENGINE ANT
ICE DUCT
INLET CAVITY
ACCESS
INLET AFT'
COMPARTMENT
LEFT INLET COWL
3034384
ICN-B787-A-000061-A-81205-19137-A-01-1
Figure 1
LEFT ENGINE INLET CAVITY AFT COMPARTMENT METALLIC COMPONENTS - GENERAL VISUAL
INSPECTION
B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
Page 35 of 53
Export Controlled ECCN: 9E991
See page 1 for details

### Page 36 (OCR)

@BOEING  B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
REQUIREMENTS BULLETIN
ENGINE ANTI
ICE DUCT
SEAL
HOUSING
B
INLET CAVITY
(BARREL)  EAI DUCT AND INLET CAVITY
INLET AFT BULKHEAD
(VIEW LOOKING REAR)  3035100
1Z/1 GENERAL VISUAL  INSPECTION  A-A
ICN-B787-A-000061-A-81205-19138-A-01-1
Figure 2
LEFT ENGINE INLET CAVITY AFT COMPARTMENT METALLIC COMPONENTS - GENERAL VISUAL
INSPECTION
Page 36 of 53
Export Controlled ECCN: 9E991
See page 1 for details

### Page 37

ICN-B787-A-000061-A-81205-19139-A-01-1
Figure 3  
1.  The step numbers shown below agree with the numbers shown in the circle symbols in the Task. The QTY
numbers shown below are the number of parts necessary for this Task.
Table 1  
More DataQtyIdentificationNameActionStep
*[1]*[2]--ASSEMBLY,
BULKHEAD - IN-
LET AFT
Inspect1
*[1]*[2]--LIPSKIN AFT
EXTENSION
Inspect2
*[1]*[2]--ATTACH
FRAME, LIP-
SKIN AFT EX-
TENSION
Inspect3
*[1]*[2]--ATTACH
FRAME,
P20/T20 PANEL
Inspect4
B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
Page 37 of 53
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 38

Table 1  
*[1]  Do a general visual inspection of the affected engine inlet cavity between the forward and aft bulkhead in the area surrounding the
Engine Anti-Ice Inlet (EAI) duct for heat damage to metallic components.
*[2]  Heat damage as defined in 787-8 SRM 51-11-03 Rev 46 or 787-9 SRM 51-11-03 Rev 28 or 787-10 SRM 51-11-03 Rev 14.
B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
Page 38 of 53
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 39

Task 2 – RIGHT ENGINE INLET CAVITY AFT COMPARTMENT METALLIC
COMPONENTS - GENERAL VISUAL INSPECTION [Group 1; Group 2,
Configuration 1: ]
THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN
IN PARAGRAPH 1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND
Alert:
THIS DOCUMENT TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD,
SEND THIS DOCUMENT TO THE NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR
COMPLIANCE DOCUMENT. THE BOEING PROCESSES USED TO CREATE THE SERVICE
BULLETIN (SB) AND THE REQUIREMENTS BULLETIN (RB) ENSURE THAT THE INFORMATION
BETWEEN "RC START" AND "RC END" IN THE SB ARE IDENTICAL TO THE INFORMATION IN
THE SAME SECTIONS (COMPLIANCE, WORK INSTRUCTIONS...) OF THE RB WHICH THE SB
REFERS TO AS THE RELATED DOCUMENT.
Procedure
This Task applies only to: Group 1; Group 2, Configuration 1.
RIGHT ENGINE INLET CAVITY AFT COMPARTMENT METALLIC COMPONENTS - GENERAL VISUAL
INSPECTION
B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
Page 39 of 53
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 40 (OCR)

A BOEING  B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
REQUIREMENTS BULLETIN
ENGINE ANTI
ICE DUCT
INLET CAVITY
' ACCESS
INLET AFT •
COMPARTMENT
RIGHT INLET COWL
ICN-B787-A-000061-A-81205-19150-A-01-1
Figure 1
RIGHT ENGINE INLET CAVITY AFT COMPARTMENT METALLIC COMPONENTS - GENERAL VISUAL
INSPECTION
B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
Page 40 of 53
Export Controlled ECCN: 9E991
See page 1 for details

### Page 41 (OCR)

Q BOEING  B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
REQUIREMENTS BULLETIN
ENGINE ANTI
ICE DUCT
SEAL
HOUSING
INLET CAVITY  B
(BARREL)  EAI DUCT AND INLET CAVITY
INLET AFT BULKHEAD
A GENERAL VISUAL  INSPECTION  (VIEW LOOKING REAR  A-A  3037181
ICN-B787-A-000061-A-81205-19151-A-01-1
Figure 2
RIGHT ENGINE INLET CAVITY AFT COMPARTMENT METALLIC COMPONENTS - GENERAL VISUAL
INSPECTION
B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
Page 41 of 53
Export Controlled ECCN: 9E991
See page 1 for details

### Page 42

ICN-B787-A-000061-A-81205-19152-A-01-1
Figure 3  
1.  The step numbers shown below agree with the numbers shown in the circle symbols in the Task. The QTY
numbers shown below are the number of parts necessary for this Task.
Table 1  
More DataQtyIdentificationNameActionStep
*[1]*[2]--ASSEMBLY,
BULKHEAD - IN-
LET AFT
Inspect1
*[1]*[2]--LIPSKIN AFT
EXTENSION
Inspect2
*[1]*[2]--ATTACH
FRAME, LIP-
SKIN AFT EX-
TENSION
Inspect3
*[1]*[2]--ATTACH
FRAME,
P20/T20 PANEL
Inspect4
B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
Page 42 of 53
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 43

Table 1  
*[1]  Do a general visual inspection of the affected engine inlet cavity between the forward and aft bulkhead in the area surrounding the
Engine Anti-Ice Inlet (EAI) duct for heat damage to metallic components.
*[2]  Heat damage as defined in 787-8 SRM 51-11-03 Rev 46 or 787-9 SRM 51-11-03 Rev 28 or 787-10 SRM 51-11-03 Rev 14.
B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
Page 43 of 53
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 44

Task 3 – LEFT ENGINE INLET CAVITY UPPER AND LOWER COMPOSITE
PANELS - GENERAL VISUAL INSPECTION [Group 1; Group 2, Configuration
1: ]
THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN
IN PARAGRAPH 1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND
Alert:
THIS DOCUMENT TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD,
SEND THIS DOCUMENT TO THE NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR
COMPLIANCE DOCUMENT. THE BOEING PROCESSES USED TO CREATE THE SERVICE
BULLETIN (SB) AND THE REQUIREMENTS BULLETIN (RB) ENSURE THAT THE INFORMATION
BETWEEN "RC START" AND "RC END" IN THE SB ARE IDENTICAL TO THE INFORMATION IN
THE SAME SECTIONS (COMPLIANCE, WORK INSTRUCTIONS...) OF THE RB WHICH THE SB
REFERS TO AS THE RELATED DOCUMENT.
Procedure
This Task applies only to: Group 1; Group 2, Configuration 1.
LEFT ENGINE INLET CAVITY UPPER AND LOWER COMPOSITE PANELS - GENERAL VISUAL INSPECTION
B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
Page 44 of 53
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 45 (OCR)

A BOEING  B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
REQUIREMENTS BULLETIN
ENGINE ANT
ICE DUCT
INLET CAVITY
ACCESS
INLET AFT'
COMPARTMENT
LEFT INLET COWL
3034485
ICN-B787-A-000061-A-81205-19157-A-01-1
Figure 1
LEFT ENGINE INLET CAVITY UPPER AND LOWER COMPOSITE PANELS - GENERAL VISUAL INSPECTION
B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
Page 45 of 53
Export Controlled ECCN: 9E991
See page 1 for details

### Page 46 (OCR)

@ BOEING  B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
REQUIREMENTS BULLETIN
ENGINE ANTI
ICE DUCT
SEAL
HOUSING
4 COMPOSITE  PANEL
BULKHEAD
INLET CAVITY
(BARREL)  EAI DUCT AND INLET CAVITY
COMPOSITE
INNER BARREL  COMPOSITE
INNER BARREL
INNER BARREL
GENERAL VISUAL  INSPECTION  A-A
ICN-B787-A-000061-A-81205-19158-A-01-1
Figure 2
LEFT ENGINE INLET CAVITY UPPER AND LOWER COMPOSITE PANELS - GENERAL VISUAL INSPECTION
B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
Page 46 of 53
Export Controlled ECCN: 9E991
See page 1 for details

### Page 47

ICN-B787-A-000061-A-81205-19159-A-01-1
Figure 3  
1.  The step numbers shown below agree with the numbers shown in the circle symbols in the Task. The QTY
numbers shown below are the number of parts necessary for this Task.
Table 1  
More DataQtyIdentificationNameActionStep
*[1]*[2]--COMPOSITE,
INNER BARREL
Inspect1
*[1]*[2]--COMPOSITE,
OUTER BARREL
Inspect2
*[1]*[2]--P20/T20 AC-
CESS PANEL
Inspect3
B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
Page 47 of 53
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 48

Table 1  
More DataQtyIdentificationNameActionStep
*[1]*[2]--COMPOSITE
PANEL, BULK-
HEAD- INLET
AFT
Inspect4
*[1]  Do a general visual inspection of the affected engine inlet cavity composite components for heat damage.
*[2]  Heat damage as defined in 787-8 SRM 51-13-03 Rev 46 or 787-9 SRM 51-13-03 Rev 28 or 787-10 SRM 51-13-03 Rev 14.
B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
Page 48 of 53
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 49

Task 4 – RIGHT ENGINE INLET CAVITY UPPER AND LOWER COMPOSITE
PANELS - GENERAL VISUAL INSPECTION [Group 1; Group 2, Configuration
1: ]
THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN
IN PARAGRAPH 1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND
Alert:
THIS DOCUMENT TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD,
SEND THIS DOCUMENT TO THE NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR
COMPLIANCE DOCUMENT. THE BOEING PROCESSES USED TO CREATE THE SERVICE
BULLETIN (SB) AND THE REQUIREMENTS BULLETIN (RB) ENSURE THAT THE INFORMATION
BETWEEN "RC START" AND "RC END" IN THE SB ARE IDENTICAL TO THE INFORMATION IN
THE SAME SECTIONS (COMPLIANCE, WORK INSTRUCTIONS...) OF THE RB WHICH THE SB
REFERS TO AS THE RELATED DOCUMENT.
Procedure
This Task applies only to: Group 1; Group 2, Configuration 1.
RIGHT ENGINE INLET CAVITY UPPER AND LOWER COMPOSITE PANELS - GENERAL VISUAL
INSPECTION
B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
Page 49 of 53
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 50 (OCR)

A BOEING  B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
REQUIREMENTS BULLETIN
ENGINE ANTI
ICE DUCT
INLET CAVITY
' ACCESS
INLET AFT •
COMPARTMENT
RIGHT INLET COWL
3037182
ICN-B787-A-000061-A-81205-19160-A-01-1
Figure 1
RIGHT ENGINE INLET CAVITY UPPER AND LOWER COMPOSITE PANELS - GENERAL VISUAL
INSPECTION
B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
Page 50 of 53
Export Controlled ECCN: 9E991
See page 1 for details

### Page 51 (OCR)

@ BOEING  B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
REQUIREMENTS BULLETIN
ENGINE ANTI
ICE DUCT
SEAL
HOUSING
) COMPOSITE
PANEL
BULKHEAD
B
INLET CAVITY  B
(BARREL)  EAI DUCT AND INLET CAVITY
COMPOSITE
INNER BARREL  COMPOSITE
INNER BARREL
INNER BARREL  3037183
GENERAL VISUAL  INSPECTION  A-A
ICN-B787-A-000061-A-81205-19161-A-01-1
Figure 2
RIGHT ENGINE INLET CAVITY UPPER AND LOWER COMPOSITE PANELS - GENERAL VISUAL
INSPECTION
B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
Page 51 of 53
Export Controlled ECCN: 9E991
See page 1 for details

### Page 52

ICN-B787-A-000061-A-81205-19162-A-01-1
Figure 3  
1.  The step numbers shown below agree with the numbers shown in the circle symbols in the Task. The QTY
numbers shown below are the number of parts necessary for this Task.
Table 1  
More DataQtyIdentificationNameActionStep
*[1]*[2]--COMPOSITE,
INNER BARREL
Inspect1
*[1]*[2]--COMPOSITE,
OUTER BARREL
Inspect2
*[1]*[2]--P20/T20 AC-
CESS PANEL
Inspect3
B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
Page 52 of 53
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 53

Table 1  
More DataQtyIdentificationNameActionStep
*[1]*[2]--COMPOSITE
PANEL, BULK-
HEAD- INLET
AFT
Inspect4
*[1]  Do a general visual inspection of the affected engine inlet cavity composite components for heat damage.
*[2]  Heat damage as defined in 787-8 SRM 51-13-03 Rev 46 or 787-9 SRM 51-13-03 Rev 28 or 787-10 SRM 51-13-03 Rev 14.
B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
Page 53 of 53
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB540024-00 RB
Issue 001, 22 Sep 2023 12:00:00 AM
REQUIREMENTS BULLETIN

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
