# Boeing Alert Requirements Bulletin B787-81205-SB550011-00 RB

Copy: Revision 001 ("RB B787-81205-SB550011-00 - Issue 001"), 80 pages: PDF https://openairdocs.org/files/sha256/36/73/367330fafec7ce602f0e3d2c46de8b5dcf165f8b73268aec1776c181b7b4827f; text https://openairdocs.org/service-documents/boeing/b787-81205-sb550011-00-rb/file/367330fafec7.md. Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2021-0844; AD 2022-09-08 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Boeing](https://openairdocs.org/service-documents/boeing.md)
- Type: Service bulletin (Alert Requirements Bulletin)
- Number: B787-81205-SB550011-00 RB
- Latest revision known: B787-81205-SB550011-00 RB, Issue 001, dated May 18, 2021 (OpenAirDocs)
- Page: https://openairdocs.org/service-documents/boeing/b787-81205-sb550011-00-rb

## ADs that cite it (1) (OpenAirDocs)

Newest first, with the revision each names, as OpenAirDocs read it from the AD's text.

- [AD 2022-09-08](https://openairdocs.org/ad/2022-09-08.md), effective Jul 7, 2022: Revision 001

## Text (80 pages)

Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2021-0844; AD 2022-09-08 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication. Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Alert Requirements Bulletin B787-81205-SB550011-00 RB STABILIZERS -
Vertical Fin Main Box Rear Spar - Inspection
Copyright © 2021 Boeing. Unpublished Work. All rights reserved.
Treatment of this data module and its content is governed by contract with Boeing. Rights to use this data module are licensed on a per
aircraft basis and such rights may not be transferable. For more information, contact The Boeing Company. Boeing, the Boeing signature,
the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner, BBJ, DC-8, DC-9, DC-10, KC-10, KC-46, KDC-10, MD-10,
MD-11, MD-80, MD-88, MD-90, P-8, Poseidon and Boeing liveries are all trademarks owned by The Boeing Company; and no trademark
license is granted in connection with this document unless provided in writing by Boeing.
EXPORT CONTROLLED
Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15 CFR 300-774). An export license
may be required before it is used for development, production or use by foreign persons from specific countries. The controller of this data
has the individual responsibility to abide by all export laws.
ECCN: 9E991
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00
AM
Page 1 of 80
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
40
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 2

Table of Contents
Page
A .E F F E C T I V I T Y  ................................................ 3
1. Airplanes ................................................. 3
2 . S p a r e s  A f f e c t e d  .............................................. 5
B. CONCURRENT REQUIREMENTS ..................................... 5
C .C O M P L I A N C E  ................................................ 5
D. APPROVAL ................................................. 1 0
E. ACCOMPLISHMENT INSTRUCTIONS .................................. 1 1
1. General Information ........................................... 1 1
2. Work Instructions ............................................ 1 2
TASK 2 – LEFT SIDE - MAIN BOX SKIN PANEL AND REAR SPAR ROOT FITTING - INSPECTION [Group
1 - 3 ]  .................................................. 2 6
TASK 3 – LEFT SIDE - MAIN BOX SKIN PANEL AND REAR SPAR FLANGE - GAP MEASUREMENT [Group
1 - 3 ]  .................................................. 3 1
TASK 4 – LEFT SIDE - MAIN BOX SKIN PANEL AND REAR SPAR FLANGE - SHIM INSTALLATION [Group
1 - 3 ]  .................................................. 3 5
TASK 5 – LEFT SIDE - MAIN BOX SKIN PANEL - FASTENER INSTALLATION [Group 1] ........ 3 9
TASK 6 – LEFT SIDE - MAIN BOX SKIN PANEL - FASTENER INSTALLATION [Group 2] ........ 4 4
TASK 7 – LEFT SIDE - MAIN BOX SKIN PANEL - FASTENER INSTALLATION [Group 3] ........ 4 9
TASK 11 –RIGHT SIDE - MAIN BOX SKIN PANEL AND REAR SPAR ROOT FITTING - INSPECTION [Group
1 - 3 ]  .................................................. 5 4
TASK 12 –RIGHT SIDE - MAIN BOX SKIN PANEL AND REAR SPAR FLANGE - GAP MEASUREMENT [Group
1 - 3 ]  .................................................. 5 9
TASK 13 –RIGHT SIDE - MAIN BOX SKIN PANEL AND REAR SPAR FLANGE - SHIM INSTALLATION [Group
1 - 3 ]  .................................................. 6 3
TASK 14 –RIGHT SIDE - MAIN BOX SKIN PANEL - FASTENER INSTALLATION [Group 1] ....... 6 7
TASK 15 –RIGHT SIDE - MAIN BOX SKIN PANEL - FASTENER INSTALLATION [Group 2] ....... 7 2
TASK 16 –RIGHT SIDE - MAIN BOX SKIN PANEL - FASTENER INSTALLATION [Group 3] ....... 7 7
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00
AM
Page 2 of 80
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 3

THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN
IN PARAGRAPH 1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND
Alert:
THIS DOCUMENT TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD,
SEND THIS DOCUMENT TO THE NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR
COMPLIANCE DOCUMENT. THE BOEING PROCESSES USED TO CREATE THE SERVICE
BULLETIN (SB) AND THE REQUIREMENTS BULLETIN (RB) ENSURE THAT THE INFORMATION
BETWEEN "RC START" AND "RC END" IN THE SB ARE IDENTICAL TO THE INFORMATION IN
THE SAME SECTIONS (COMPLIANCE, WORK INSTRUCTIONS...) OF THE RB WHICH THE SB
REFERS TO AS THE RELATED DOCUMENT.
A. EFFECTIVITY
1. Airplanes
This bulletin is applicable to 787-8, 787-9, 787-10 Airplane(s), line number(s) 6-687, 689-873, 875-
885, 889-890, 895-897 in 3 Group(s). Where the effectivity is presented with hyphens between
line numbers, the airplane applicability means "through" and "inclusive", e.g. line numbers 1-9
means line numbers 1 through 9 inclusive.
Table 1  
DESCRIPTIONCONFIGURATIONGROUP
787-8 airplanes with main box shimming requirements not met.- 1
787-8 airplanes with main box shimming requirements not met and
different fastener options.
- 2
787-9 and 787-10 airplanes with main box shimming requirements not
met.
- 3
Airplane Models: 787-10, 787-8, 787-9
Table 2
GroupVariable Number
1ZA006
1ZA100 - ZA105
1ZA116 - ZA119
2ZA120 - ZA124
1ZA135
2ZA136 - ZA144
2ZA152 - ZA156
1ZA175 - ZA184
2ZA185 - ZA189
GroupVariable Number
2ZA195 - ZA204
2ZA215 - ZA225
1ZA230 - ZA243
2ZA244 - ZA256
1ZA260 - ZA264
2ZA265 - ZA269
1ZA270 - ZA274
2ZA275 - ZA277
1ZA285 - ZA290
GroupVariable Number
2ZA291 - ZA296
1ZA317 - ZA318
2ZA319 - ZA324
2ZA327
2ZA334 - ZA335
2ZA341 - ZA342
1ZA380 - ZA384
2ZA385 - ZA389
1ZA430 - ZA434
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00
AM
Page 3 of 80
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 4

GroupVariable Number
2ZA435 - ZA439
2ZA445 - ZA459
1ZA460 - ZA464
2ZA465 - ZA489
1ZA506 - ZA512
2ZA513 - ZA516
1ZA536 - ZA538
2ZA539 - ZA545
2ZA560 - ZA567
2ZA576 - ZA580
2ZA586
2ZA588 - ZA593
2ZA610 - ZA617
2ZA650 - ZA652
2ZA655 - ZA663
2ZA665 - ZA677
2ZA680 - ZA685
2ZA695 - ZA698
2ZA715 - ZA716
2ZA718 - ZA719
2ZA740 - ZA741
2ZA768 - ZA769
2ZA778 - ZA779
2ZA783 - ZA784
2ZA817 - ZA831
2ZA839
1ZA841
2ZA842
2ZA846 - ZA848
2ZA853 - ZA862
2ZA873 - ZA876
GroupVariable Number
2ZA881 - ZA888
2ZA916 - ZA920
2ZA949 - ZA950
2ZA954 - ZA956
2ZA958
2ZA972
3ZB001 - ZB012
3ZB021 - ZB043
3ZB047 - ZB060
3ZB077 - ZB081
3ZB097 - ZB119
3ZB127 - ZB136
3ZB167 - ZB191
3ZB197 - ZB198
3ZB217
3ZB219 - ZB220
3ZB224 - ZB229
3ZB234 - ZB242
3ZB246 - ZB248
3ZB251 - ZB258
3ZB261 - ZB262
3ZB265 - ZB276
3ZB299
3ZB302 - ZB305
3ZB332 - ZB337
3ZB362 - ZB379
3ZB407 - ZB418
3ZB422 - ZB432
3ZB446 - ZB467
3ZB536 - ZB543
3ZB545 - ZB547
GroupVariable Number
3ZB558 - ZB586
3ZB603 - ZB618
3ZB646 - ZB649
3ZB656 - ZB665
3ZB676 - ZB681
3ZB688 - ZB707
3ZB733 - ZB735
3ZB738 - ZB740
3ZB742 - ZB743
3ZB749 - ZB750
3ZB753 - ZB757
3ZB763 - ZB768
3ZB771 - ZB775
3ZB778 - ZB805
3ZB812 - ZB821
3ZB828 - ZB841
3ZB858 - ZB863
3ZB874 - ZB876
3ZB893 - ZB901
3ZB908 - ZB917
3ZB922
3ZB924
3ZB926 - ZB927
3ZB934 - ZB936
3ZB967 - ZB968
3ZB980 - ZB984
3ZB990
3ZB993 - ZB997
3ZC001 - ZC014
3ZC036 - ZC044
3ZC061 - ZC066
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00
AM
Page 4 of 80
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 5

GroupVariable Number
3ZC116 - ZC117
3ZC126 - ZC127
3ZC151
3ZC155 - ZC156
3ZC211
1ZD001 - ZD009
GroupVariable Number
1ZD012
3ZE001 - ZE006
3ZE013
3ZE031 - ZE032
3ZE040 - ZE042
3ZE085 - ZE086
GroupVariable Number
3ZE090 - ZE091
3ZE095 - ZE096
3ZE150
3ZE165 - ZE166
3ZE195 - ZE198
3ZE220 - ZE224
2. Spares Affected
None.
B. CONCURRENT REQUIREMENTS
None.
C. COMPLIANCE
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to Re-
quirements Bulletin B787-81205-SB550011-00 RB. The Airworthiness Directive will make the compliance
tasks and times given in Requirements Bulletin B787-81205-SB550011-00 RB mandatory.
When more than one OPTION is given for a CONDITION, do only one of the OPTION numbers. When
more than one ACTION is given for a CONDITION number or an OPTION number, do all of the ACTION
numbers for that CONDITION number or OPTION number.
Accomplish the required actions, based on the applicable conditions in Table 5 and Table 6, in accordance
with Accomplishment Instructions.
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00
AM
Page 5 of 80
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 6

Table 5  Left Side Vertical Fin Main Box Rear Spar - Ultrasonic Test and High Frequency Eddy Current (HFEC) In-
spection
Repeat Interval (Not
to Exceed)
Boeing Recommended Compliance Time
(Whichever Occurs First)
ActionCondition
-Within 12 years after
the date of issuance
of the original certifi-
cate of airworthiness
or the original export
certificate of airworthi-
ness.
Before 18,000 total
flight cycles.
ACTION 1: Do an Ul-
trasonic Test of the
left side skin panel
for any crack and
any delamination.
All airplanes.
ACTION 2: Do an
open hole HFEC in-
spection of the left
side rear spar root
fitting at the fastener
holes common to the
skin panel and rear
spar root fitting inter-
face for any crack.
ACTION 3: Do a sur-
face HFEC inspec-
tion of all visible left
side rear spar root
fitting surface areas
for any crack.
-Before further flight.CONDITION 1 (AC-
TION 1): Contact
The Boeing Compa-
ny for repair instruc-
tions and do the re-
pair.
CONDITION 1: ANY
CRACK OR ANY
DELAMINATION
FOUND
-Before further flight.CONDITION 1 (AC-
TION 2): Measure
the gap between the
left side skin panel
and the rear spar
flange.
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00
AM
Page 6 of 80
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 7

Table 5  Left Side Vertical Fin Main Box Rear Spar - Ultrasonic Test and High Frequency Eddy Current (HFEC) In-
spection
Repeat Interval (Not
to Exceed)
Boeing Recommended Compliance Time
(Whichever Occurs First)
ActionCondition
-Before further flight.CONDITION 1.1
(ACTION 1): Install
new shim between
the left side skin
panel and the rear
spar flange.
CONDITION 1.1:
GAP MEASURE-
MENT NOT WITHIN
SPECIFIED LIMITS
-Before further flight.CONDITION 1.1
(ACTION 2): Install
new fasteners in the
vertical fin main box
rear spar.
-Before further flight.Install new fasteners
in the vertical fin
main box rear spar.
CONDITION 1.2:
GAP MEASURE-
MENT WITHIN
SPECIFIED LIMITS
-Before further flight.Measure the gap be-
tween the left side
skin panel and the
rear spar flange.
CONDITION 2: NO
CRACK AND NO
DELAMINATION
FOUND
-Before further flight.CONDITION 2.1
(ACTION 1): Install
new shim between
the left side skin
panel and the rear
spar flange.
CONDITION 2.1:
GAP MEASURE-
MENT NOT WITHIN
SPECIFIED LIMITS
-Before further flight.CONDITION 2.1
(ACTION 2): Install
new fasteners in the
vertical fin main box
rear spar.
-Before further flight.Install new fasteners
in the vertical fin
main box rear spar.
CONDITION 2.2:
GAP MEASURE-
MENT WITHIN
SPECIFIED LIMITS
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00
AM
Page 7 of 80
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 8

Table 6  Right Side Vertical Fin Main Box Rear Spar - Ultrasonic Test and High Frequency Eddy Current (HFEC) 
Inspection
Repeat Interval (Not
to Exceed)
Boeing Recommended Compliance Time
(Whichever Occurs First)
ActionCondition
-Within 12 years after
the date of issuance
of the original certifi-
cate of airworthiness
or the original export
certificate of airworthi-
ness.
Before 18,000 total
flight cycles.
ACTION 1: Do an Ul-
trasonic Test of the
right side skin panel
for any crack and
any delamination.
All airplanes.
ACTION 2: Do an
open hole HFEC in-
spection of the right
side rear spar root
fitting at the fastener
holes common to the
skin panel and rear
spar root fitting inter-
face for any crack.
ACTION 3: Do a sur-
face HFEC inspec-
tion of all visible right
side rear spar root
fitting surface areas
for any crack.
-Before further flight.CONDITION 3 (AC-
TION 1): Contact
The Boeing Compa-
ny for repair instruc-
tions and do the re-
pair.
CONDITION 3: ANY
CRACK OR ANY
DELAMINATION
FOUND
-Before further flight.CONDITION 3 (AC-
TION 2): Measure
the gap between the
right side skin panel
and the rear spar
flange.
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00
AM
Page 8 of 80
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 9

Table 6  Right Side Vertical Fin Main Box Rear Spar - Ultrasonic Test and High Frequency Eddy Current (HFEC) 
Inspection
Repeat Interval (Not
to Exceed)
Boeing Recommended Compliance Time
(Whichever Occurs First)
ActionCondition
-Before further flight.CONDITION 3.1
(ACTION 1): Install
new shim between
the right side skin
panel and the rear
spar flange.
CONDITION 3.1:
GAP MEASURE-
MENT NOT WITHIN
SPECIFIED LIMITS
-Before further flight.CONDITION 3.1
(ACTION 2): Install
new fasteners in the
vertical fin main box
rear spar.
-Before further flight.Install new fasteners
in the vertical fin
main box rear spar.
CONDITION 3.2:
GAP MEASURE-
MENT WITHIN
SPECIFIED LIMITS
-Before further flight.Measure the gap be-
tween the right side
skin panel and the
rear spar flange.
CONDITION 4: NO
CRACK AND NO
DELAMINATION
FOUND
-Before further flight.CONDITION 4.1
(ACTION 1): Install
new shim between
the right side skin
panel and the rear
spar flange.
CONDITION 4.1:
GAP MEASURE-
MENT NOT WITHIN
SPECIFIED LIMITS
-Before further flight.CONDITION 4.1
(ACTION 2): Install
new fasteners in the
vertical fin main box
rear spar.
-Before further flight.Install new fasteners
in the vertical fin
main box rear spar.
CONDITION 4.2:
GAP MEASURE-
MENT WITHIN
SPECIFIED LIMITS
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00
AM
Page 9 of 80
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 10

D. APPROVAL
This Requirements Bulletin was examined by the Federal Aviation Administration (FAA). The changes
specified in this document comply with the applicable regulations and are FAA approved, as well as European
Union Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/JAA approved
airplanes listed in this Requirements Bulletin effectivity. This document and its approval were based on the
airplane in its original Boeing delivery configuration or as modified by other Boeing changes.
If an airplane has a non-Boeing modification or repair that affects a component or system also affected by
this Requirements Bulletin, the operator is responsible for obtaining appropriate regulatory agency approval
before incorporating this Requirements Bulletin.
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00
AM
Page 10 of 80
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 11

E.    ACCOMPLISHMENT INSTRUCTIONS
1. GENERAL INFORMATION
NOTE: 1. This is an Enhanced Required for Compliance document. There will be a separate Service
Bulletin (SB) and a separate Requirements Bulletin (RB). If an RB is mandated by an
Airworthiness Directive (AD), then all applicable requirements specified in the RB must
be done. For the related SB, some locations are marked RC Start and RC End to identify
the requirements that are restated from the RB. For the related SB, the areas between
RC Start and RC End, including sub-steps and any figures identified between RC Start
and RC End, must be done to comply with the AD. Therefore, an Alternative Method of
Compliance (AMOC) is required for any deviations to steps between RC Start and RC
End, including substeps and identified figures. For the related SB, the steps not between
RC Start and RC End may be deviated from using accepted methods in accordance with
the operator's maintenance or inspection program without obtaining approval of an AMOC;
this is provided that the steps between RC Start and RC End, including sub-steps and
identified figures, can still be done as specified, and the airplane can be put back in an
airworthy condition. Figures not required for compliance are omitted from the RB.
2. This is an Enhanced Required for Compliance document. The Boeing processes used
to create the Service Bulletin (SB) and the Requirements Bulletin (RB) ensure that the
information between "RC Start" and "RC End" in the SB are identical to the information
in the same sections (Compliance, Work Instructions...) of the RB which the SB refers to
as the related document.
3. These work instructions refer to procedures included in other Boeing documents. When
the words "refer to" are used and the operator has an accepted alternative procedure,
the accepted alternative procedure can be used. When the words "in accordance with"
are included in the instruction, the procedure in the Boeing document must be used.
4. The compliance times for the actions in Work Instructions are in Compliance.
5. If the length of any fastener specified in this service bulletin does not meet the installation
standards in SRM Chapter 51, then a fastener of the same specification, or an approved
substitute, with a length which meets the installation standards in SRM Chapter 51 may
be used. In addition, washers may be installed for fastener grip length in accordance with
SRM Chapter 51. Refer to SOPM 20-50-01 for alternate full threaded fasteners (screws)
needed for installation in this service bulletin.
6. If it is necessary to remove more parts for access, you can remove those parts. If you
can get access without removing identified parts, it is not necessary to remove all of the
identified parts. Jacking and shoring limitations must be observed.
7. Where the work instructions include installation of a kept part, a new or serviceable part
with the same part number can be installed as an alternative to the kept part.
8. When more than one OPTION is given for a CONDITION, do only one of the OPTION
numbers.When more than one ACTION is given for a CONDITION number or an OPTION
number, do all of the ACTION numbers for that CONDITION number or OPTION number.
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00
AM
Page 11 of 80
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 12

11. Unless shown differently, these dimensions and tolerances are used:
– Linear dimensions are in inches
– Tolerance on linear dimensions, other than rivet and bolt edge margins, is plus or
minus 0.03 inch
– Tolerance on rivet and bolt edge margin is plus or minus 0.05 inch
– Angular tolerance is plus or minus 2 degrees
– Hole dimensions for standard solid rivets and fasteners are in SRM Chapter 51
– Torque Values:
– Values for structural fasteners are given in 787 Structural Repair Manual, Chapter
51.
– Values for airframe maintenance tasks are included in Chapter 20 of 787 Aircraft
Maintenance Manual (AMM).
– Values for electrical maintenance tasks are included in Chapter 20 of Standard
Wiring Practices Manual (SWPM).
– Values for engine maintenance tasks are included in Chapter 70 of 787 Aircraft
Maintenance Manual (AMM).
– Non-standard torque values for maintenance tasks are included in the applicable
installation step.
12. Use the approved fastener, process and material substitutions in accordance with SRM
Chapter 51.
2. WORK INSTRUCTIONS
A. Actions Required for Compliance.
(1) Requirements
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00
AM
Page 12 of 80
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 13

Group 1:
Table 1  Left Side Vertical Fin Skin Panel and Rear Spar Root Fitting - Ultrasonic Test and High Frequency Eddy 
Current (HFEC) Inspection
Refer to the listed proce-
dures in SB B787-81205-
SB550011-00 Issue 001
or later approved issues
as an accepted proce-
dure.
Method of ComplianceActionCondition
PART 1: LEFT SIDE
OPEN ACCESS
-ACTION 1: Do an Ultrason-
ic Test of the left side skin
panel for any crack and
any delamination.
All airplanes.
-Task 2
-Task 2ACTION 2: Do an open
hole HFEC inspection of
the left side rear spar root
fitting at the fastener holes
common to the skin panel
and rear spar root fitting
interface for any crack.
-Task 2ACTION 3: Do a surface
HFEC inspection of all visi-
ble left side rear spar root
fitting surface areas for any
crack.
--CONDITION 1 (ACTION
1): Contact The Boeing
Company for repair instruc-
tions and do the repair.
CONDITION 1: ANY
CRACK OR ANY DELAMI-
NATION FOUND
-Task 3CONDITION 1 (ACTION
2): Measure the gap be-
tween the left side skin
panel and the rear spar
flange.
-Task 4CONDITION 1.1 (ACTION
1): Install new shim be-
tween the left side skin
panel and the rear spar
flange.
CONDITION 1.1: GAP
MEASUREMENT NOT
WITHIN SPECIFIED LIM-
ITS
-Task 5CONDITION 1.1 (ACTION
2): Install new fasteners in
the vertical fin main box
rear spar.
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00
AM
Page 13 of 80
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 14

Group 1:
Table 1  Left Side Vertical Fin Skin Panel and Rear Spar Root Fitting - Ultrasonic Test and High Frequency Eddy 
Current (HFEC) Inspection
Refer to the listed proce-
dures in SB B787-81205-
SB550011-00 Issue 001
or later approved issues
as an accepted proce-
dure.
Method of ComplianceActionCondition
-Task 5Install new fasteners in the
vertical fin main box rear
spar.
CONDITION 1.2: GAP
MEASUREMENT WITHIN
SPECIFIED LIMITS
-Task 3Measure the gap between
the left side skin panel and
the rear spar flange.
CONDITION 2: NO
CRACK AND NO DELAM-
INATION FOUND
-Task 4CONDITION 2.1 (ACTION
1): Install new shim be-
tween the left side skin
panel and the rear spar
flange.
CONDITION 2.1: GAP
MEASUREMENT NOT
WITHIN SPECIFIED LIM-
ITS
-Task 5CONDITION 2.1 (ACTION
2): Install new fasteners in
the vertical fin main box
rear spar.
-Task 5Install new fasteners in the
vertical fin main box rear
spar.
CONDITION 2.2: GAP
MEASUREMENT WITHIN
SPECIFIED LIMITS PART 2: LEFT CLOSEACCESS-
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00
AM
Page 14 of 80
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 15

Group 2:
Table 2  Left Side Vertical Fin Skin Panel and Rear Spar Root Fitting - Ultrasonic Test and High Frequency Eddy 
Current (HFEC) Inspection
Refer to the listed proce-
dures in SB B787-81205-
SB550011-00 Issue 001
or later approved issues
as an accepted proce-
dure.
Method of ComplianceActionCondition
PART 1: LEFT SIDE
OPEN ACCESS
-ACTION 1: Do an Ultrason-
ic Test of the left side skin
panel for any crack and
any delamination.
All airplanes.
-Task 2
-Task 2ACTION 2: Do an open
hole HFEC inspection of
the left side rear spar root
fitting at the fastener holes
common to the skin panel
and rear spar root fitting
interface for any crack.
-Task 2ACTION 3: Do a surface
HFEC inspection of all visi-
ble left side rear spar root
fitting surface areas for any
crack.
--CONDITION 1 (ACTION
1): Contact The Boeing
Company for repair instruc-
tions and do the repair.
CONDITION 1: ANY
CRACK OR ANY DELAMI-
NATION FOUND
-Task 3CONDITION 1 (ACTION
2): Measure the gap be-
tween the left side skin
panel and the rear spar
flange.
-Task 4CONDITION 1.1 (ACTION
1): Install new shim be-
tween the left side skin
panel and the rear spar
flange.
CONDITION 1.1: GAP
MEASUREMENT NOT
WITHIN SPECIFIED LIM-
ITS
-Task 6CONDITION 1.1 (ACTION
2): Install new fasteners in
the vertical fin main box
rear spar.
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00
AM
Page 15 of 80
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 16

Group 2:
Table 2  Left Side Vertical Fin Skin Panel and Rear Spar Root Fitting - Ultrasonic Test and High Frequency Eddy 
Current (HFEC) Inspection
Refer to the listed proce-
dures in SB B787-81205-
SB550011-00 Issue 001
or later approved issues
as an accepted proce-
dure.
Method of ComplianceActionCondition
-Task 6Install new fasteners in the
vertical fin main box rear
spar.
CONDITION 1.2: GAP
MEASUREMENT WITHIN
SPECIFIED LIMITS
-Task 3Measure the gap between
the left side skin panel and
the rear spar flange.
CONDITION 2: NO
CRACK AND NO DELAM-
INATION FOUND
-Task 4CONDITION 2.1 (ACTION
1): Install new shim be-
tween the left side skin
panel and the rear spar
flange.
CONDITION 2.1: GAP
MEASUREMENT NOT
WITHIN SPECIFIED LIM-
ITS
-Task 6CONDITION 2.1 (ACTION
2): Install new fasteners in
the vertical fin main box
rear spar.
-Task 6Install new fasteners in the
vertical fin main box rear
spar.
CONDITION 2.2: GAP
MEASUREMENT WITHIN
SPECIFIED LIMITS PART 2: LEFT CLOSEACCESS-
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00
AM
Page 16 of 80
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 17

Group 3:
Table 3  Left Side Vertical Fin Skin Panel and Rear Spar Root Fitting - Ultrasonic Test and High Frequency Eddy 
Current (HFEC) Inspection
Refer to the listed proce-
dures in SB B787-81205-
SB550011-00 Issue 001
or later approved issues
as an accepted proce-
dure.
Method of ComplianceActionCondition
PART 1: LEFT SIDE
OPEN ACCESS
-ACTION 1: Do an Ultrason-
ic Test of the left side skin
panel for any crack and
any delamination.
All airplanes.
-Task 2
-Task 2ACTION 2: Do an open
hole HFEC inspection of
the left side rear spar root
fitting at the fastener holes
common to the skin panel
and rear spar root fitting
interface for any crack.
-Task 2ACTION 3: Do a surface
HFEC inspection of all visi-
ble left side rear spar root
fitting surface areas for any
crack.
--CONDITION 1 (ACTION
1): Contact The Boeing
Company for repair instruc-
tions and do the repair.
CONDITION 1: ANY
CRACK OR ANY DELAMI-
NATION FOUND
-Task 3CONDITION 1 (ACTION
2): Measure the gap be-
tween the left side skin
panel and the rear spar
flange.
-Task 4CONDITION 1.1 (ACTION
1): Install new shim be-
tween the left side skin
panel and the rear spar
flange.
CONDITION 1.1: GAP
MEASUREMENT NOT
WITHIN SPECIFIED LIM-
ITS
-Task 7CONDITION 1.1 (ACTION
2): Install new fasteners in
the vertical fin main box
rear spar.
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00
AM
Page 17 of 80
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 18

Group 3:
Table 3  Left Side Vertical Fin Skin Panel and Rear Spar Root Fitting - Ultrasonic Test and High Frequency Eddy 
Current (HFEC) Inspection
Refer to the listed proce-
dures in SB B787-81205-
SB550011-00 Issue 001
or later approved issues
as an accepted proce-
dure.
Method of ComplianceActionCondition
-Task 7Install new fasteners in the
vertical fin main box rear
spar.
CONDITION 1.2: GAP
MEASUREMENT WITHIN
SPECIFIED LIMITS
-Task 3Measure the gap between
the left side skin panel and
the rear spar flange.
CONDITION 2: NO
CRACK AND NO DELAM-
INATION FOUND
-Task 4CONDITION 2.1 (ACTION
1): Install new shim be-
tween the left side skin
panel and the rear spar
flange.
CONDITION 2.1: GAP
MEASUREMENT NOT
WITHIN SPECIFIED LIM-
ITS
-Task 7CONDITION 2.1 (ACTION
2): Install new fasteners in
the vertical fin main box
rear spar.
-Task 7Install new fasteners in the
vertical fin main box rear
spar.
CONDITION 2.2: GAP
MEASUREMENT WITHIN
SPECIFIED LIMITS PART 2: LEFT CLOSEACCESS-
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00
AM
Page 18 of 80
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 19

Group 1:
Table 4  Right Side Vertical Fin Skin Panel and Rear Spar Root Fitting - Ultrasonic Test and High Frequency Eddy
 Current (HFEC) Inspection
Refer to the listed proce-
dures in SB B787-81205-
SB550011-00 Issue 001
or later approved issues
as an accepted proce-
dure.
Method of ComplianceActionCondition
PART 3: RIGHT SIDE
OPEN ACCESS
-ACTION 1: Do an Ultrason-
ic Test of the right side
skin panel for any crack
and any delamination.
All airplanes.
-Task 11
-Task 11ACTION 2: Do an open
hole HFEC inspection of
the right side rear spar root
fitting at the fastener holes
common to the skin panel
and rear spar root fitting
interface for any crack.
-Task 11ACTION 3: Do a surface
HFEC inspection of all visi-
ble right side rear spar root
fitting surface areas for any
crack.
--CONDITION 1 (ACTION
1): Contact The Boeing
Company for repair instruc-
tions and do the repair.
CONDITION 3: ANY
CRACK OR ANY DELAMI-
NATION FOUND
-Task 12CONDITION 1 (ACTION
2): Measure the gap be-
tween the right side skin
panel and the rear spar
flange.
-Task 13CONDITION 1.1 (ACTION
1): Install new shim be-
tween the right side skin
panel and the rear spar
flange.
CONDITION 3.1: GAP
MEASUREMENT NOT
WITHIN SPECIFIED LIM-
ITS
-Task 14CONDITION 1.1 (ACTION
2): Install new fasteners in
the vertical fin main box
rear spar.
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00
AM
Page 19 of 80
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 20

Group 1:
Table 4  Right Side Vertical Fin Skin Panel and Rear Spar Root Fitting - Ultrasonic Test and High Frequency Eddy
 Current (HFEC) Inspection
Refer to the listed proce-
dures in SB B787-81205-
SB550011-00 Issue 001
or later approved issues
as an accepted proce-
dure.
Method of ComplianceActionCondition
-Task 14Install new fasteners in the
vertical fin main box rear
spar.
CONDITION 3.2: GAP
MEASUREMENT WITHIN
SPECIFIED LIMITS
-Task 12Measure the gap between
the right side skin panel
and the rear spar flange.
CONDITION 4: NO
CRACK AND NO DELAM-
INATION FOUND
-Task 13CONDITION 2.1 (ACTION
1): Install new shim be-
tween the right side skin
panel and the rear spar
flange.
CONDITION 4.1: GAP
MEASUREMENT NOT
WITHIN SPECIFIED LIM-
ITS
-Task 14CONDITION 2.1 (ACTION
2): Install new fasteners in
the vertical fin main box
rear spar.
-Task 14Install new fasteners in the
vertical fin main box rear
spar.
CONDITION 4.2: GAP
MEASUREMENT WITHIN
SPECIFIED LIMITS PART 4: RIGHT CLOSEACCESS-
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00
AM
Page 20 of 80
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 21

Group 2:
Table 5  Right Side Vertical Fin Skin Panel and Rear Spar Root Fitting - Ultrasonic Test and High Frequency Eddy
 Current (HFEC) Inspection
Refer to the listed proce-
dures in SB B787-81205-
SB550011-00 Issue 001
or later approved issues
as an accepted proce-
dure.
Method of ComplianceActionCondition
PART 3: RIGHT SIDE
OPEN ACCESS
-ACTION 1: Do an Ultrason-
ic Test of the right side
skin panel for any crack
and any delamination.
All airplanes.
-Task 11
-Task 11ACTION 2: Do an open
hole HFEC inspection of
the right side rear spar root
fitting at the fastener holes
common to the skin panel
and rear spar root fitting
interface for any crack.
-Task 11ACTION 3: Do a surface
HFEC inspection of all visi-
ble right side rear spar root
fitting surface areas for any
crack.
--CONDITION 1 (ACTION
1): Contact The Boeing
Company for repair instruc-
tions and do the repair.
CONDITION 3: ANY
CRACK OR ANY DELAMI-
NATION FOUND
-Task 12CONDITION 1 (ACTION
2): Measure the gap be-
tween the right side skin
panel and the rear spar
flange.
-Task 13CONDITION 1.1 (ACTION
1): Install new shim be-
tween the right side skin
panel and the rear spar
flange.
CONDITION 3.1: GAP
MEASUREMENT NOT
WITHIN SPECIFIED LIM-
ITS
-Task 15CONDITION 1.1 (ACTION
2): Install new fasteners in
the vertical fin main box
rear spar.
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00
AM
Page 21 of 80
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 22

Group 2:
Table 5  Right Side Vertical Fin Skin Panel and Rear Spar Root Fitting - Ultrasonic Test and High Frequency Eddy
 Current (HFEC) Inspection
Refer to the listed proce-
dures in SB B787-81205-
SB550011-00 Issue 001
or later approved issues
as an accepted proce-
dure.
Method of ComplianceActionCondition
-Task 15Install new fasteners in the
vertical fin main box rear
spar.
CONDITION 3.2: GAP
MEASUREMENT WITHIN
SPECIFIED LIMITS
-Task 12Measure the gap between
the right side skin panel
and the rear spar flange.
CONDITION 4: NO
CRACK AND NO DELAM-
INATION FOUND
-Task 13CONDITION 2.1 (ACTION
1): Install new shim be-
tween the right side skin
panel and the rear spar
flange.
CONDITION 4.1: GAP
MEASUREMENT NOT
WITHIN SPECIFIED LIM-
ITS
-Task 15CONDITION 2.1 (ACTION
2): Install new fasteners in
the vertical fin main box
rear spar.
-Task 15Install new fasteners in the
vertical fin main box rear
spar.
CONDITION 4.2: GAP
MEASUREMENT WITHIN
SPECIFIED LIMITS PART 4: RIGHT CLOSEACCESS-
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00
AM
Page 22 of 80
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 23

Group 3:
Table 6  Right Side Vertical Fin Skin Panel and Rear Spar Root Fitting - Ultrasonic Test and High Frequency Eddy
 Current (HFEC) Inspection
Refer to the listed proce-
dures in SB B787-81205-
SB550011-00 Issue 001
or later approved issues
as an accepted proce-
dure.
Method of ComplianceActionCondition
PART 3: RIGHT SIDE
OPEN ACCESS
-ACTION 1: Do an Ultrason-
ic Test of the right side
skin panel for any crack
and any delamination.
All airplanes.
-Task 11
-Task 11ACTION 2: Do an open
hole HFEC inspection of
the right side rear spar root
fitting at the fastener holes
common to the skin panel
and rear spar root fitting
interface for any crack.
-Task 11ACTION 3: Do a surface
HFEC inspection of all visi-
ble right side rear spar root
fitting surface areas for any
crack.
--CONDITION 1 (ACTION
1): Contact The Boeing
Company for repair instruc-
tions and do the repair.
CONDITION 3: ANY
CRACK OR ANY DELAMI-
NATION FOUND
-Task 12CONDITION 1 (ACTION
2): Measure the gap be-
tween the right side skin
panel and the rear spar
flange.
-Task 13CONDITION 1.1 (ACTION
1): Install new shim be-
tween the right side skin
panel and the rear spar
flange.
CONDITION 3.1: GAP
MEASUREMENT NOT
WITHIN SPECIFIED LIM-
ITS
-Task 16CONDITION 1.1 (ACTION
2): Install new fasteners in
the vertical fin main box
rear spar.
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00
AM
Page 23 of 80
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 24

Group 3:
Table 6  Right Side Vertical Fin Skin Panel and Rear Spar Root Fitting - Ultrasonic Test and High Frequency Eddy
 Current (HFEC) Inspection
Refer to the listed proce-
dures in SB B787-81205-
SB550011-00 Issue 001
or later approved issues
as an accepted proce-
dure.
Method of ComplianceActionCondition
-Task 16Install new fasteners in the
vertical fin main box rear
spar.
CONDITION 3.2: GAP
MEASUREMENT WITHIN
SPECIFIED LIMITS
-Task 12Measure the gap between
the right side skin panel
and the rear spar flange.
CONDITION 4: NO
CRACK AND NO DELAM-
INATION FOUND
-Task 13CONDITION 2.1 (ACTION
1): Install new shim be-
tween the right side skin
panel and the rear spar
flange.
CONDITION 4.1: GAP
MEASUREMENT NOT
WITHIN SPECIFIED LIM-
ITS
-Task 16CONDITION 2.1 (ACTION
2): Install new fasteners in
the vertical fin main box
rear spar.
-Task 16Install new fasteners in the
vertical fin main box rear
spar.
CONDITION 4.2: GAP
MEASUREMENT WITHIN
SPECIFIED LIMITS PART 4: RIGHT CLOSEACCESS-
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00
AM
Page 24 of 80
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 25

Task 2 – LEFT SIDE - MAIN BOX SKIN PANEL AND REAR SPAR ROOT
FITTING - INSPECTION [Group 1-3:]
THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN
IN PARAGRAPH 1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND
Alert:
THIS DOCUMENT TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD,
SEND THIS DOCUMENT TO THE NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR
COMPLIANCE DOCUMENT. THE BOEING PROCESSES USED TO CREATE THE SERVICE
BULLETIN (SB) AND THE REQUIREMENTS BULLETIN (RB) ENSURE THAT THE INFORMATION
BETWEEN "RC START" AND "RC END" IN THE SB ARE IDENTICAL TO THE INFORMATION IN
THE SAME SECTIONS (COMPLIANCE, WORK INSTRUCTIONS...) OF THE RB WHICH THE SB
REFERS TO AS THE RELATED DOCUMENT.
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00
AM
Page 25 of 80
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 26 (OCR)

A BOEING  B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00 AM
REQUIREMENTS BULLETIN
Procedure
This Task applies only to: Group 1-3.
00000  MAIN BOX
SKIN PANEL
TE RIB 1
2955124
ICN-B787-A-000061-A-81205-18214-A-01-1
Figure 1
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00
AM
Page 26 of 80
EXPORT CONTROLLED ECCN: 9E991
See title page for details.

### Page 27 (OCR)

@ BOEING  B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00 AM
REQUIREMENTS BULLETIN
23 LOCATIONS
MAIN BOX
SKIN PANEL
TE RIB 1
INSPECTION  AWD
AREA
ICN-B787-A-000061-A-81205-18215-A-01-1
Figure 2
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00
Page 27 of 80
EXPORT CONTROLLED ECCN: 9E991
See title page for details.

### Page 28 (OCR)

_BOEING  B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00 AM
REQUIREMENTS BULLETIN
REAR SPAR
FWD
REAR SPAR ROOT FITTING
INSPECTION  2957706
AREA
ICN-B787-A-000061-A-81205-18216-A-01-1
Figure 3
1. The step numbers shown below agree with the numbers shown in the circle symbols in the Task. The QTY
numbers shown below are the number of parts necessary for this Task.
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00
Page 28 of 80
EXPORT CONTROLLED ECCN: 9E991
See title page for details.

### Page 29

Table 1  
More DataQtyIdentificationNameActionStep
-23-FASTENERRemove1
*[1]1-SKIN PANELInspect2
*[2]23-FASTENER HOLEInspect3
*[3]1-REAR SPAR ROOT
FITTING
Inspect4
*[1]  Do a Ultrasonic Test inspection of the skin panel for any crack and any delamination. Refer to 787 NDT Manual Part 4, 51-00-06 as
an accepted procedure.
*[2]  Do an open-hole HFEC inspection of the rear spar root fitting at the fastener holes common to the skin panel and rear spar root fitting
interface for any crack. Refer to 787 NDT Manual Part 6, 51-00-06 as an accepted procedure.
*[3]  Do a surface HFEC inspection of all visible rear spar root fitting surface areas for any crack. Refer to 787 NDT Manual Part 6, 51-00-
05 as an accepted procedure.
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00
AM
Page 29 of 80
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 30

Task 3 – LEFT SIDE - MAIN BOX SKIN PANEL AND REAR SPAR FLANGE
- GAP MEASUREMENT [Group 1-3:]
THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN
IN PARAGRAPH 1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND
Alert:
THIS DOCUMENT TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD,
SEND THIS DOCUMENT TO THE NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR
COMPLIANCE DOCUMENT. THE BOEING PROCESSES USED TO CREATE THE SERVICE
BULLETIN (SB) AND THE REQUIREMENTS BULLETIN (RB) ENSURE THAT THE INFORMATION
BETWEEN "RC START" AND "RC END" IN THE SB ARE IDENTICAL TO THE INFORMATION IN
THE SAME SECTIONS (COMPLIANCE, WORK INSTRUCTIONS...) OF THE RB WHICH THE SB
REFERS TO AS THE RELATED DOCUMENT.
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00
AM
Page 30 of 80
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 31 (OCR)

A BOEING  B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00 AM
REQUIREMENTS BULLETIN
Procedure
This Task applies only to: Group 1-3.
00000  MAIN BOX
SKIN PANEL
TE RIB 1
ICN-B787-A-000061-A-81205-18217-A-01-1
Figure 1
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00
AM
Page 31 of 80
EXPORT CONTROLLED ECCN: 9E991
See title page for details.

### Page 32 (OCR)

_BOEING  B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00 AM
REQUIREMENTS BULLETIN
REAR
SPAR
FLANGE
0.006  • REAR
INCH  (MAX)  FITTING  SPAR  ROOT
MAIN BOX
SKIN PANEL -
• MAIN BOX
REAR SPAR
, TE RIB 1
VIEW LOOKING FORWARD  INBD
A-A
ICN-B787-A-000061-A-81205-18218-A-01-1
Figure 2
1. The step numbers shown below agree with the numbers shown in the circle symbols in the Task. The QTY
numbers shown below are the number of parts necessary for this Task.
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00
Page 32 of 80
EXPORT CONTROLLED ECCN: 9E991
See title page for details.

### Page 33

Table 1  
More DataQtyIdentificationNameActionStep
*[1]1-GAPMeasure1
*[1]  Measure the gap between the skin panel and the rear spar flange. A maximum gap of 0.006 inch is permitted, when a maximum
clamping force of 5lbs/inch is applied. Refer to SOPM 20-50-20 Type II as an accepted procedure.
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00
AM
Page 33 of 80
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 34

Task 4 – LEFT SIDE - MAIN BOX SKIN PANEL AND REAR SPAR FLANGE
- SHIM INSTALLATION [Group 1-3:]
THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN
IN PARAGRAPH 1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND
Alert:
THIS DOCUMENT TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD,
SEND THIS DOCUMENT TO THE NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR
COMPLIANCE DOCUMENT. THE BOEING PROCESSES USED TO CREATE THE SERVICE
BULLETIN (SB) AND THE REQUIREMENTS BULLETIN (RB) ENSURE THAT THE INFORMATION
BETWEEN "RC START" AND "RC END" IN THE SB ARE IDENTICAL TO THE INFORMATION IN
THE SAME SECTIONS (COMPLIANCE, WORK INSTRUCTIONS...) OF THE RB WHICH THE SB
REFERS TO AS THE RELATED DOCUMENT.
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00
AM
Page 34 of 80
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 35 (OCR)

A BOEING  B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00 AM
REQUIREMENTS BULLETIN
Procedure
This Task applies only to: Group 1-3.
00000  MAIN BOX
SKIN PANEL
TE RIB 1
ICN-B787-A-000061-A-81205-18219-A-01-1
Figure 1
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00
AM
Page 35 of 80
EXPORT CONTROLLED ECCN: 9E991
See title page for details.

### Page 36 (OCR)

_BOEING  B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00 AM
REQUIREMENTS BULLETIN
SHIM O  MAIN BOX
- REAR SPAR
, TE RIB 1
MAIN BOX
SKIN PANEL-
VIEW LOOKING FORWARD  INBD
A-A
ICN-B787-A-000061-A-81205-18220-A-01-1
Figure 2
1. The step numbers shown below agree with the numbers shown in the circle symbols in the Task. The QTY
numbers shown below are the number of parts necessary for this Task.
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00
Page 36 of 80
EXPORT CONTROLLED ECCN: 9E991
See title page for details.

### Page 37

Table 1  
More DataQtyIdentificationNameActionStep
*[1]1BACS40V038H180SHIMInstall (New)1
*[1]  Shim to maintain gap requirements. Maximum shim thickness 0.062 solid/laminate total, and 0.030 laminate portion. Maintain a minimum
edge distance of 2x fastener diameter. Refer to SOPM 20-50-20, Type II as an accepted procedure.
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00
AM
Page 37 of 80
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 38

Task 5 – LEFT SIDE - MAIN BOX SKIN PANEL - FASTENER INSTALLATION
[Group 1: ]
THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN
IN PARAGRAPH 1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND
Alert:
THIS DOCUMENT TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD,
SEND THIS DOCUMENT TO THE NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR
COMPLIANCE DOCUMENT. THE BOEING PROCESSES USED TO CREATE THE SERVICE
BULLETIN (SB) AND THE REQUIREMENTS BULLETIN (RB) ENSURE THAT THE INFORMATION
BETWEEN "RC START" AND "RC END" IN THE SB ARE IDENTICAL TO THE INFORMATION IN
THE SAME SECTIONS (COMPLIANCE, WORK INSTRUCTIONS...) OF THE RB WHICH THE SB
REFERS TO AS THE RELATED DOCUMENT.
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00
AM
Page 38 of 80
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 39 (OCR)

A BOEING  B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00 AM
REQUIREMENTS BULLETIN
Procedure
This Task applies only to: Group 1.
00000  MAIN BOX
SKIN PANEL
TE RIB 1
ICN-B787-A-000061-A-81205-18221-A-01-1
Figure 1
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00
AM
Page 39 of 80
EXPORT CONTROLLED ECCN: 9E991
See title page for details.

### Page 40 (OCR)

_BOEING  B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00 AM
REQUIREMENTS BULLETIN
1 23 LOCATIONS
MAIN BOX
SKIN PANEL
9115
- TE RIB 1
2962378
ICN-B787-A-000061-A-81205-18222-A-01-1
Figure 2
1. The step numbers shown below agree with the numbers shown in the circle symbols in the Task. The QTY
numbers shown below are the number of parts necessary for this Task.
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00
Page 40 of 80
EXPORT CONTROLLED ECCN: 9E991
See title page for details.

### Page 41 (OCR)

@ BOEING  B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00 AM
REQUIREMENTS BULLETIN
Table 1
Step  Action  Name  Identification  Qty  More Data
1  Install (New)  FASTENER  23  Refer to fastener
code table.
Apply  PRIMER  BMS10-11  1
FASTENER
DIAMETER
(OPTIONAL)
LETTER CODE  HEAD LOCATION
N = NEAR SIDE
FLUID TIGHT  D  6F  F = FAR SIDE  (OPTIONAL)
C
COUNTERSINK  FASTENER
LENGTH/GRIP
(OPTIONAL)
EXAMPLE OF FASTENER SYMBOL
ICN-B787-A-000061-A-81205-18223-A-01-1
Figure 3
2. The codes shown below agree with the letter shown in the upper left corner of the fastener symbols in the
Task. A number in the lower right corner gives the grip length of the fastener. The QTY numbers shown below
are the number of fasteners necessary for this Task.
Table 2
Code  Name  Identification  Qty  Hole Dia  More Data
BOLT  BACB30NY14K19  4  0.4375-0.4405  *[1]*[2]
NUT  BACN10YT7K  4
BOLT  BACB30NY14K19X  4  0.4530-0.4560  *[1]*[2]*[3]
BOLT  BACB30YM10B10  2  0.3125-0.3155  *[1]*[2]*[4]*[5]
COLLAR  BACC30CP10K  2
BOLT  BACB30YM10B10X  0.3280-0.3310  *[1]*[2]*[3]*[4]*[5]
C  BOLT  BACB30NY12K()  0.3750-0.3780  *[1]*[2]
COLLAR  BACC30BH12K  9
BOLT  BACB30NY12K( )X  9  0.3910-0.3940  *[1]*[2]*[3]
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00
AM
Page 41 of 80
EXPORT CONTROLLED ECCN: 9E991
See title page for details.

### Page 42

Table 2  
More DataHole DiaQtyIdentificationNameCode
*[1]*[2]*[4]*[6]0.3750-0.37804BACB30YM12K18BOLTD
-- 4BACC30CP12KCOLLAR
*[1]*[2]*[3]*[4]*[6]0.3910-0.39404BACB30YM12K18XBOLT
*[1]*[2]0.3750-0.37804BACB30NY12K14BOLTE
-- 4BACC30CP12KCOLLAR
*[1]*[2]*[3]0.3910-0.39404BACB30NY12K14XBOLT
*[1]  Refer to 787-8 SRM 51-43-05 as an accepted procedure.
*[2]  Fastener heads must be flush within -0.005 inch to +0.002 inch. Permanent fasteners below -0.005 inch must be filled with BMS 5-142
aerodynamic sealant. Refer to SOPM 20-50-11 as an accepted procedure.
*[3]  1/64 oversize, if required.
*[4]  Install wet with BMS5-45 sealant Method 3. Refer to SOPM 20-50-19 as an accepted procedure.
*[5]  Electrical bond path. No fastener substitution permitted.
*[6]  Apply one coat of primer, except if the fastener is cap sealed. Refer to SOPM 20-43-03, Type II, Class A as an accepted p rocedure.
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00
AM
Page 42 of 80
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 43

Task 6 – LEFT SIDE - MAIN BOX SKIN PANEL - FASTENER INSTALLATION
[Group 2: ]
THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN
IN PARAGRAPH 1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND
Alert:
THIS DOCUMENT TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD,
SEND THIS DOCUMENT TO THE NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR
COMPLIANCE DOCUMENT. THE BOEING PROCESSES USED TO CREATE THE SERVICE
BULLETIN (SB) AND THE REQUIREMENTS BULLETIN (RB) ENSURE THAT THE INFORMATION
BETWEEN "RC START" AND "RC END" IN THE SB ARE IDENTICAL TO THE INFORMATION IN
THE SAME SECTIONS (COMPLIANCE, WORK INSTRUCTIONS...) OF THE RB WHICH THE SB
REFERS TO AS THE RELATED DOCUMENT.
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00
AM
Page 43 of 80
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 44 (OCR)

OBOEING  B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00 AM
REQUIREMENTS BULLETIN
Procedure
This Task applies only to: Group 2.
00000  MAIN BO)
SKIN PANE
TE RIB 1
ICN-B787-A-000061-A-81205-18224-A-01-1
Figure 1
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00
AM
Page 44 of 80
EXPORT CONTROLLED ECCN: 9E991
See title page for details.

### Page 45 (OCR)

@ BOEING  B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00 AM
REQUIREMENTS BULLETIN
1 23 LOCATIONS
MAIN BOX
SKIN PANEL
TE RIB 1
ICN-B787-A-000061-A-81205-18225-A-01-1
Figure 2
1. The step numbers shown below agree with the numbers shown in the circle symbols in the Task. The QTY
numbers shown below are the number of parts necessary for this Task.
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00
Page 45 of 80
EXPORT CONTROLLED ECCN: 9E991
See title page for details.

### Page 46

Table 1  
More DataQtyIdentificationNameActionStep
Refer to fastener
code table.
23-FASTENERInstall (New)1
- 1BMS10-11PRIMERApply
ICN-B787-A-000061-A-81205-18223-A-01-1
Figure 3  
2.  The codes shown below agree with the letter shown in the upper left corner of the fastener symbols in the
Task. A number in the lower right corner gives the grip length of the fastener. The QTY numbers shown below
are the number of fasteners necessary for this Task.
Table 2  
More DataHole DiaQtyIdentificationNameCode
*[1]*[2]0.4375-0.44054BACB30NY14K19BOLTA
-- 4BACN10YT7KNUT
*[1]*[2]*[3]0.4530-0.45604BACB30NY14K19XBOLT
*[1]*[2]*[4]*[5]0.3125-0.31552BACB30YM10B10BOLTB
-- 2BACC30CP10KCOLLAR
*[1]*[2]*[3]*[4]*[5]0.3280-0.33102BACB30YM10B10XBOLT
*[1]*[2]0.3750-0.37809BACB30NY12K( )BOLTC
-- 9BACC30BH12K
(BACN10YT6K option-
al)
COLLAR
*[1]*[2]*[3]0.3910-0.39409BACB30NY12K( )XBOLT
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00
AM
Page 46 of 80
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 47

Table 2  
More DataHole DiaQtyIdentificationNameCode
*[1]*[2]*[4]*[6]0.3750-0.37804BACB30YM12K18BOLTD
-- 4BACC30CP12KCOLLAR
*[1]*[2]*[3]*[4]*[6]0.3910-0.39404BACB30YM12K18XBOLT
*[1]*[2]0.3750-0.37804BACB30NY12K14BOLTE
-- 4BACC30BH12K
(BACN10YT6K option-
al)
COLLAR
*[1]*[2]*[3]0.3910-0.39404BACB30NY12K14XBOLT
*[1]  Refer to 787-8 SRM 51-43-05 as an accepted procedure.
*[2]  Fastener heads must be flush within -0.005 inch to +0.002 inch. Permanent fasteners below -0.005 inch must be filled with BMS 5-142
aerodynamic sealant. Refer to SOPM 20-50-11 as an accepted procedure.
*[3]  1/64 oversize, if required.
*[4]  Install wet with BMS5-45 sealant Method 3. Refer to SOPM 20-50-19 as an accepted procedure.
*[5]  Electrical bond path. No fastener substitution permitted.
*[6]  Apply one coat of primer, except if the fastener is cap sealed. Refer to SOPM 20-43-03, Type II, Class A as an accepted p rocedure.
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00
AM
Page 47 of 80
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 48

Task 7 – LEFT SIDE - MAIN BOX SKIN PANEL - FASTENER INSTALLATION
[Group 3: ]
THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN
IN PARAGRAPH 1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND
Alert:
THIS DOCUMENT TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD,
SEND THIS DOCUMENT TO THE NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR
COMPLIANCE DOCUMENT. THE BOEING PROCESSES USED TO CREATE THE SERVICE
BULLETIN (SB) AND THE REQUIREMENTS BULLETIN (RB) ENSURE THAT THE INFORMATION
BETWEEN "RC START" AND "RC END" IN THE SB ARE IDENTICAL TO THE INFORMATION IN
THE SAME SECTIONS (COMPLIANCE, WORK INSTRUCTIONS...) OF THE RB WHICH THE SB
REFERS TO AS THE RELATED DOCUMENT.
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00
AM
Page 48 of 80
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 49 (OCR)

A BOEING  B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00 AM
REQUIREMENTS BULLETIN
Procedure
This Task applies only to: Group 3.
00000  MAIN BOX
SKIN PANEL
TE RIB 1
ICN-B787-A-000061-A-81205-18226-A-01-1
Figure 1
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00
AM
Page 49 of 80
EXPORT CONTROLLED ECCN: 9E991
See title page for details.

### Page 50 (OCR)

_BOEING  B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00 AM
REQUIREMENTS BULLETIN
1 23 LOCATIONS
MAIN BOX
SKIN PANEL
9115
- TE RIB 1
ICN-B787-A-000061-A-81205-18227-A-01-1
Figure 2
1. The step numbers shown below agree with the numbers shown in the circle symbols in the Task. The QTY
numbers shown below are the number of parts necessary for this Task.
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00
Page 50 of 80
EXPORT CONTROLLED ECCN: 9E991
See title page for details.

### Page 51 (OCR)

@ BOEING  B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00 AM
REQUIREMENTS BULLETIN
Table 1
Step  Action  Name  Identification  Qty  More Data
1  Install (New)  FASTENER  23  Refer to fastener
code table.
Apply  PRIMER  BMS10-11  1
FASTENER
DIAMETER
(OPTIONAL)
LETTER CODE  HEAD LOCATION
N = NEAR SIDE
FLUID TIGHT  D  6F  F = FAR SIDE  (OPTIONAL)
C
COUNTERSINK  FASTENER
LENGTH/GRIP
(OPTIONAL)
EXAMPLE OF FASTENER SYMBOL
ICN-B787-A-000061-A-81205-18223-A-01-1
Figure 3
2. The codes shown below agree with the letter shown in the upper left corner of the fastener symbols in the
Task. A number in the lower right corner gives the grip length of the fastener. The QTY numbers shown below
are the number of fasteners necessary for this Task.
Table 2
Code  Name  Identification  Qty  Hole Dia  More Data
BOLT  BACB30NY14K19  4  0.4375-0.4405  *[1]*[2]
NUT  BACN10YT7K  4
BOLT  BACB30NY14K19X  4  0.4530-0.4560  *[1]*[2]*[3]
BOLT  BACB30YM10B10  2  0.3125-0.3155  *[1]*[2]*[4]*[5]
COLLAR  BACC30CP10K  2
BOLT  BACB30YM10B10X  0.3280-0.3310  *[1]*[2]*[3]*[4]*[5]
C  BOLT  BACB30NY12K()  0.3750-0.3780  *[1]*[2]
NUT  BACN10YT6K  9
BOLT  BACB30NY12K( )X  9  0.3910-0.3940  *[1]*[2]*[3]
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00
AM
Page 51 of 80
EXPORT CONTROLLED ECCN: 9E991
See title page for details.

### Page 52

Table 2  
More DataHole DiaQtyIdentificationNameCode
*[1]*[2]*[4]*[6]0.3750-0.37804BACB30YM12K18BOLTD
-- 4BACC30CP12KCOLLAR
*[1]*[2]*[3]*[4]*[6]0.3910-0.39404BACB30YM12K18XBOLT
*[1]*[2]0.3750-0.37804BACB30NY12K14BOLTE
-- 4BACC30BH12K
(BACN10YT6K option-
al)
COLLAR
*[1]*[2]*[3]0.3910-0.39404BACB30NY12K14XBOLT
*[1]  Refer to 787-9 SRM 51-43-05 or 787-10 SRM 51-43-05 as an accepted procedure.
*[2]  Fastener heads must be flush within -0.005 inch to +0.002 inch. Permanent fasteners below -0.005 inch must be filled with BMS 5-142
aerodynamic sealant. Refer to SOPM 20-50-11 as an accepted procedure.
*[3]  1/64 oversize, if required.
*[4]  Install wet with BMS5-45 sealant Method 3. Refer to SOPM 20-50-19 as an accepted procedure.
*[5]  Electrical bond path. No fastener substitution permitted.
*[6]  Apply one coat of primer, except if the fastener is cap sealed. Refer to SOPM 20-43-03, Type II, Class A as an accepted p rocedure.
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00
AM
Page 52 of 80
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 53

Task 11 – RIGHT SIDE - MAIN BOX SKIN PANEL AND REAR SPAR ROOT
FITTING - INSPECTION [Group 1-3:]
THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN
IN PARAGRAPH 1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND
Alert:
THIS DOCUMENT TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD,
SEND THIS DOCUMENT TO THE NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR
COMPLIANCE DOCUMENT. THE BOEING PROCESSES USED TO CREATE THE SERVICE
BULLETIN (SB) AND THE REQUIREMENTS BULLETIN (RB) ENSURE THAT THE INFORMATION
BETWEEN "RC START" AND "RC END" IN THE SB ARE IDENTICAL TO THE INFORMATION IN
THE SAME SECTIONS (COMPLIANCE, WORK INSTRUCTIONS...) OF THE RB WHICH THE SB
REFERS TO AS THE RELATED DOCUMENT.
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00
AM
Page 53 of 80
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 54 (OCR)

@ BOEING  B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00 AM
REQUIREMENTS BULLETIN
Procedure
This Task applies only to: Group 1-3.
MAIN BOX  00000
SKIN PANEL
TE RIB 1
/D
ICN-B787-A-000061-A-81205-18231-A-01-1
Figure 1
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00
Page 54 of 80
EXPORT CONTROLLED ECCN: 9E991
See title page for details.

### Page 55 (OCR)

@ BOEING  B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00 AM
REQUIREMENTS BULLETIN
23 LOCATIONS
MAIN BOX
SKIN PANEL
TE RIB 1
- INSPECTION
AREA
ICN-B787-A-000061-A-81205-18232-A-01-1
Figure 2
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00
Page 55 of 80
EXPORT CONTROLLED ECCN: 9E991
See title page for details.

### Page 56 (OCR)

_BOEING  B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00 AM
REQUIREMENTS BULLETIN
• REAR SPAR
REAR SPAR ROOT FITTING
INSPECTION  2957718
AREA
ICN-B787-A-000061-A-81205-18233-A-01-1
Figure 3
1. The step numbers shown below agree with the numbers shown in the circle symbols in the Task. The QTY
numbers shown below are the number of parts necessary for this Task.
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00
Page 56 of 80
EXPORT CONTROLLED ECCN: 9E991
See title page for details.

### Page 57

Table 1  
More DataQtyIdentificationNameActionStep
-23-FASTENERRemove1
*[1]1-SKIN PANELInspect2
*[2]23-FASTENER HOLEInspect3
*[3]1-REAR SPAR ROOT
FITTING
Inspect4
*[1]  Do a Ultrasonic Test inspection of the skin panel for any crack and any delamination. Refer to 787 NDT Manual Part 4, 51-00-06 as
an accepted procedure.
*[2]  Do an open-hole HFEC inspection of the rear spar root fitting at the fastener holes common to the skin panel and rear spar root fitting
interface for any crack. Refer to 787 NDT Manual Part 6, 51-00-06 as an accepted procedure.
*[3]  Do a surface HFEC inspection of all visible rear spar root fitting surface areas for any crack. Refer to 787 NDT Manual Part 6, 51-00-
05 as an accepted procedure.
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00
AM
Page 57 of 80
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 58

Task 12 – RIGHT SIDE - MAIN BOX SKIN PANEL AND REAR SPAR FLANGE
- GAP MEASUREMENT [Group 1-3:]
THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN
IN PARAGRAPH 1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND
Alert:
THIS DOCUMENT TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD,
SEND THIS DOCUMENT TO THE NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR
COMPLIANCE DOCUMENT. THE BOEING PROCESSES USED TO CREATE THE SERVICE
BULLETIN (SB) AND THE REQUIREMENTS BULLETIN (RB) ENSURE THAT THE INFORMATION
BETWEEN "RC START" AND "RC END" IN THE SB ARE IDENTICAL TO THE INFORMATION IN
THE SAME SECTIONS (COMPLIANCE, WORK INSTRUCTIONS...) OF THE RB WHICH THE SB
REFERS TO AS THE RELATED DOCUMENT.
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00
AM
Page 58 of 80
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 59 (OCR)

O BOEING  B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00 AM
REQUIREMENTS BULLETIN
Procedure
This Task applies only to: Group 1-3.
MAIN BOX  00000
SKIN PANEL
TE RIB 1
-WD
ICN-B787-A-000061-A-81205-18234-A-01-1
Figure 1
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00
Page 59 of 80
EXPORT CONTROLLED ECCN: 9E991
See title page for details.

### Page 60 (OCR)

O BOEING  B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00 AM
REQUIREMENTS BULLETIN
MAIN BOX
REAR SPAR
REAR
SPAR
FLANGE
TE RIB 1-  SPAR  REAR  ROOT  FITTING  0.006  INCH  (MAX)
MAIN BOX
• SKIN PANEL
INBD  VIEW LOOKING FORWARD
A-A  2962298
ICN-B787-A-000061-A-81205-18235-A-01-1
Figure 2
1. The step numbers shown below agree with the numbers shown in the circle symbols in the Task. The QTY
numbers shown below are the number of parts necessary for this Task.
B787-81205-SB550011-00 RB
Issue 001, 18 May 2021 12:00:00
Page 60 of 80
EXPORT CONTROLLED ECCN: 9E991
See title page for details.

The text continues at https://openairdocs.org/service-documents/boeing/b787-81205-sb550011-00-rb/file/367330fafec7.md?from=61

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
