# Boeing Alert Requirements Bulletin B787-81205-SB570041-00 RB

Copy: Revision 001 ("787-81205-570041-01--RB"), 21 pages: PDF https://openairdocs.org/files/sha256/f3/62/f3621a3c1752c9b1955010ccf63e5efc5fbc827d96d0097260adb16a2ee4da2e; text https://openairdocs.org/service-documents/boeing/b787-81205-sb570041-00-rb/file/f3621a3c1752.md. Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2019-0871; AD 2020-03-22 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Boeing](https://openairdocs.org/service-documents/boeing.md)
- Type: Service bulletin (Alert Requirements Bulletin)
- Number: B787-81205-SB570041-00 RB
- Latest revision known: B787-81205-SB570041-00 RB, Issue 001, dated March 7, 2019 (OpenAirDocs)
- Page: https://openairdocs.org/service-documents/boeing/b787-81205-sb570041-00-rb

## ADs that cite it (1) (OpenAirDocs)

Newest first, with the revision each names, as OpenAirDocs read it from the AD's text.

- [AD 2020-03-22](https://openairdocs.org/ad/2020-03-22.md), effective Apr 2, 2020: Revision 001

Also cited in [1 proposed AD](https://openairdocs.org/service-documents/boeing/b787-81205-sb570041-00-rb/proposed.md).

## Text (21 pages)

Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2019-0871; AD 2020-03-22 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication. Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Alert Requirements Bulletin B787-81205-SB570041-00 RB WINGS - Center
Wing - Overwing Beam Frame Tie Rod Assemblies and Stub Beam
Inspection
Copyright © 2019 Boeing. Unpublished Work. All rights reserved.
Treatment of this data module and its content is governed by contract with Boeing. Rights to use this data module are licensed on a per
aircraft basis and such rights may not be transferable. For more information, contact The Boeing Company. Boeing, the Boeing signature,
the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner, BBJ, DC-8, DC-9, DC-10, KC-10, KC-46, KDC-10, MD-10,
MD-11, MD-80, MD-88, MD-90, P-8, Poseidon and Boeing liveries are all trademarks owned by The Boeing Company; and no trademark
license is granted in connection with this document unless provided in writing by Boeing.
EXPORT CONTROLLED
Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15 CFR 300-774). An export license
may be required before it is used for development, production or use by foreign persons from specific countries. The controller of this data
has the individual responsibility to abide by all export laws.
ECCN: 9E991
B787-81205-SB570041-00 RB
Issue 001, 07 Mar 2019
Page 1 of 21
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
2.0
B787-81205-SB570041-00 RB
Issue 001, 07 Mar 2019
REQUIREMENTS BULLETIN

### Page 2

Table of Contents
Page
A. EFFECTIVITY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
1. Airplanes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
2. Spares Affected . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
B. CONCURRENT REQUIREMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
C. COMPLIANCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
D. APPROVAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
E. ACCOMPLISHMENT INSTRUCTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
1. General Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
2. Work Instructions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
TASK 1 – LEFT SIDE - CENTERWING OVERWING BEAM - FRAME TIE ROD ASSEMBLY HFEC INSPECTION
AND STUB BEAM UT INSPECTION  [Group 1] . . . . . . . . . . . . . . . . . . . . . . . . . . 14
TASK 2 – RIGHT SIDE - CENTERWING OVERWING BEAM - FRAME TIE ROD ASSEMBLY HFEC
INSPECTION AND STUB BEAM UT INSPECTION  [Group 1] . . . . . . . . . . . . . . . . . . 18
B787-81205-SB570041-00 RB
Issue 001, 07 Mar 2019
Page 2 of 21
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB570041-00 RB
Issue 001, 07 Mar 2019
REQUIREMENTS BULLETIN

### Page 3

THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN
IN PARAGRAPH 1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND
Alert:
THIS DOCUMENT TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD,
SEND THIS DOCUMENT TO THE NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR
COMPLIANCE DOCUMENT. THE BOEING PROCESSES USED TO CREATE THE SERVICE
BULLETIN (SB) AND THE REQUIREMENTS BULLETIN (RB) ENSURE THAT THE INFORMATION
BETWEEN "RC START" AND "RC END" IN THE SB ARE IDENTICAL TO THE INFORMATION IN
THE SAME SECTIONS (COMPLIANCE, WORK INSTRUCTIONS...) OF THE RB WHICH THE SB
REFERS TO AS THE RELATED DOCUMENT.
A. EFFECTIVITY
1. Airplanes
This bulletin is applicable to 787-8 Airplane(s), line number(s) 6-125, 127-132, 134-138, 140-145, 147-
168, 170-180, 182-201, 203-212, 214-217, 219-222, 224-228, 230-235, 237-239, 241-245, 247-252,
254-255, 257-258, 260-262, 264-266, 268, 270-271, 273-274, 277-279, 281-283, 285, 287-292, 294,
298-301, 304, 306-307, 311-312, 314-315, 317, 320-322, 325-326, 328, 330-331, 335-336, 339-340,
343-344, 347, 349, 352, 354, 358-359, 364, 367, 372, 375, 378, 384-385, 387, 389, 394, 397, 410,
415, 420, 423, 428-429, 434, 437, 440-441, 448, 457, 460, 470, 474, 476, 482, 489, 495, 499, 505-
506, 508, 511, 513, 519, 522, 532, 535, 540, 546, 552, 557, 559, 568, 573, 579, 583, 592, 595, 599,
609, 618, 625, 627, 652, 660, 708, 719, 726, 733, 756, 764, 769 in 1 Group(s). Where the effectivity
is presented with hyphens between line numbers, the airplane applicability means "through" and "inclu-
sive", e.g. line numbers 1-9 means line numbers 1 through 9 inclusive.
2. Spares Affected
None.
B. CONCURRENT REQUIREMENTS
None.
C. COMPLIANCE
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to Re-
quirements Bulletin B787-81205-SB570041-00 RB. The Airworthiness Directive will make the compliance
tasks and times given in Requirements Bulletin B787-81205-SB570041-00 RB mandatory.
When more than one OPTION is given for a CONDITION, do only one of the OPTION numbers. When
more than one ACTION is given for a CONDITION or an OPTION, do all of the ACTION numbers for that
CONDITION or OPTION.
Accomplish the required actions, based on the applicable conditions in Tables 4 and 5 in accordance with
the Accomplishment Instructions.
B787-81205-SB570041-00 RB
Issue 001, 07 Mar 2019
Page 3 of 21
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB570041-00 RB
Issue 001, 07 Mar 2019
REQUIREMENTS BULLETIN

### Page 4

Table 4  LEFT SIDE - CENTERWING OVERWING BEAM - FRAME TIE ROD ASSEMBLY HIGH FREQUENCY 
EDDY CURRENT (HFEC) AND STUB BEAM ULTRASONIC (UT) INSPECTIONS
Repeat Interval (Not
to Exceed)
Compliance Time (Whichever Occurs
Later)
ActionCondition
-Within 1,200 Flight
Cycles or 300 days
after the Issue 001
date of Require-
ments Bulletin B787-
81205-SB570041-00
RB, whichever oc-
curs first
Before 12,000 Total
Flight Cycles
Do HFEC inspection
of the left side Frame
Tie Rod Assemblies,
which include lugs,
rods, and clevises, at
STA 1017, STA
1041, STA 1065,
STA 1077 (Canted)
and STA 1089 (Hori-
zontal); and UT in-
spection of the left
side Stub Beam Up-
per Chord at STA
1113 for any crack.
All Airplanes
Before further flightACTION 1: Contact
The Boeing Compa-
ny for repair instruc-
tions and do the re-
pair.
CONDITION 1: ANY
CRACK FOUND
B787-81205-SB570041-00 RB
Issue 001, 07 Mar 2019
Page 4 of 21
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB570041-00 RB
Issue 001, 07 Mar 2019
REQUIREMENTS BULLETIN

### Page 5

Table 4  LEFT SIDE - CENTERWING OVERWING BEAM - FRAME TIE ROD ASSEMBLY HIGH FREQUENCY 
EDDY CURRENT (HFEC) AND STUB BEAM ULTRASONIC (UT) INSPECTIONS
Repeat Interval (Not
to Exceed)
Compliance Time (Whichever Occurs
Later)
ActionCondition
The repeat inspec-
tion must be done in
accordance with the
repeat intervals given
in 1, 2, 3, and 4,
whichever occurs
first:
-ACTION 2: Repeat
the HFEC inspection
of the left side Frame
Tie Rod Assemblies,
which include lugs,
rods, and clevises, at
STA 1017, STA
1041, STA 1065,
STA 1077 (Canted)
and STA 1089 (Hori-
zontal); and UT in-
spection of the left
side Stub Beam Up-
per Chord at STA
1113 for any crack in
the repaired and un-
repaired areas.
1. 33,750 Flight
Hours.
2. 6,000 Flight Cy-
cles.
3. Before the result
of 7084.33 -
(0.120481 x FH)
- FC is less than
or equal to zero
4. Before the result
of 8711.65 -
(0.184049 x FH)
- FC is less than
or equal to zero
FC = Flight Cycles
since the most recent
inspection
FH = Flight Hours
since the most recent
inspection
B787-81205-SB570041-00 RB
Issue 001, 07 Mar 2019
Page 5 of 21
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB570041-00 RB
Issue 001, 07 Mar 2019
REQUIREMENTS BULLETIN

### Page 6

Table 4  LEFT SIDE - CENTERWING OVERWING BEAM - FRAME TIE ROD ASSEMBLY HIGH FREQUENCY 
EDDY CURRENT (HFEC) AND STUB BEAM ULTRASONIC (UT) INSPECTIONS
Repeat Interval (Not
to Exceed)
Compliance Time (Whichever Occurs
Later)
ActionCondition
The repeat inspec-
tion must be done in
accordance with the
repeat intervals given
in 1, 2, 3, and 4,
whichever occurs
first:
-Repeat the HFEC in-
spection of the left
side Frame Tie Rod
Assemblies, which
include lugs, rods,
and clevises, at STA
1017, STA 1041,
STA 1065, STA 1077
(Canted) and STA
1089 (Horizontal);
and UT inspection of
the left side Stub
Beam Upper Chord
at STA 1113 for any
crack.
CONDITION 2: NO
CRACK FOUND
1. 33,750 Flight
Hours.
2. 6,000 Flight Cy-
cles.
3. Before the result
of 7084.33 -
(0.120481 x FH)
- FC is less than
or equal to zero
4. Before the result
of 8711.65 -
(0.184049 x FH)
- FC is less than
or equal to zero
FC = Flight Cycles
since the most recent
inspection
FH = Flight Hours
since the most recent
inspection
B787-81205-SB570041-00 RB
Issue 001, 07 Mar 2019
Page 6 of 21
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB570041-00 RB
Issue 001, 07 Mar 2019
REQUIREMENTS BULLETIN

### Page 7

Table 5  RIGHT SIDE - CENTERWING OVERWING BEAM - FRAME TIE ROD ASSEMBLY HIGH FREQUENCY 
EDDY CURRENT (HFEC) AND STUB BEAM ULTRASONIC (UT) INSPECTIONS
Repeat Interval (Not
to Exceed)
Compliance Time (Whichever Occurs
Later)
ActionCondition
-Within 1,200 Flight
Cycles or 300 days
after the Issue 001
date of Require-
ments Bulletin B787-
81205-SB570041-00
RB, whichever oc-
curs first
Before 12,000 Total
Flight Cycles
Do HFEC inspection
of the right side
Frame Tie Rod As-
semblies, which in-
clude lugs, rods, and
clevises, at STA
1017, STA 1041,
STA 1065, STA 1077
(Canted) and STA
1089 (Horizontal);
and UT inspection of
the right side Stub
Beam Upper Chord
at STA 1113 for any
crack.
All Airplanes
Before further flightACTION 1: Contact
The Boeing Compa-
ny for repair instruc-
tions and do the re-
pair.
CONDITION 3: ANY
CRACK FOUND
B787-81205-SB570041-00 RB
Issue 001, 07 Mar 2019
Page 7 of 21
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB570041-00 RB
Issue 001, 07 Mar 2019
REQUIREMENTS BULLETIN

### Page 8

Table 5  RIGHT SIDE - CENTERWING OVERWING BEAM - FRAME TIE ROD ASSEMBLY HIGH FREQUENCY 
EDDY CURRENT (HFEC) AND STUB BEAM ULTRASONIC (UT) INSPECTIONS
Repeat Interval (Not
to Exceed)
Compliance Time (Whichever Occurs
Later)
ActionCondition
The repeat inspec-
tion must be done in
accordance with the
repeat intervals given
in 1, 2, 3, and 4,
whichever occurs
first:
-ACTION 2: Repeat
the HFEC inspection
of the right side
Frame Tie Rod As-
semblies, which in-
clude lugs, rods, and
clevises, at STA
1017, STA 1041,
STA 1065, STA 1077
(Canted) and STA
1089 (Horizontal);
and UT inspection of
the right side Stub
Beam Upper Chord
at STA 1113 for any
crack in the repaired
and unrepaired ar-
eas.
1. 33,750 Flight
Hours.
2. 6,000 Flight Cy-
cles.
3. Before the result
of 7084.33 -
(0.120481 x FH)
- FC is less than
or equal to zero
4. Before the result
of 8711.65 -
(0.184049 x FH)
- FC is less than
or equal to zero
FC = Flight Cycles
since the most recent
inspection
FH = Flight Hours
since the most recent
inspection
B787-81205-SB570041-00 RB
Issue 001, 07 Mar 2019
Page 8 of 21
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB570041-00 RB
Issue 001, 07 Mar 2019
REQUIREMENTS BULLETIN

### Page 9

Table 5  RIGHT SIDE - CENTERWING OVERWING BEAM - FRAME TIE ROD ASSEMBLY HIGH FREQUENCY 
EDDY CURRENT (HFEC) AND STUB BEAM ULTRASONIC (UT) INSPECTIONS
Repeat Interval (Not
to Exceed)
Compliance Time (Whichever Occurs
Later)
ActionCondition
The repeat inspec-
tion must be done in
accordance with the
repeat intervals given
in 1, 2, 3, and 4,
whichever occurs
first:
-Repeat the HFEC in-
spection of the right
side Frame Tie Rod
Assemblies, which
include lugs, rods,
and clevises, at STA
1017, STA 1041,
STA 1065, STA 1077
(Canted) and STA
1089 (Horizontal);
and UT inspection of
the right side Stub
Beam Upper Chord
at STA 1113 for any
crack.
CONDITION 4: NO
CRACK FOUND
1. 33,750 Flight
Hours.
2. 6,000 Flight Cy-
cles.
3. Before the result
of 7084.33 -
(0.120481 x FH)
- FC is less than
or equal to zero
4. Before the result
of 8711.65 -
(0.184049 x FH)
- FC is less than
or equal to zero
FC = Flight Cycles
since the most recent
inspection
FH = Flight Hours
since the most recent
inspection
D. APPROVAL
This Requirements Bulletin was examined by the Federal Aviation Administration (FAA). The changes
specified in this document comply with the applicable regulations and are FAA approved, as well as European
Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/JAA approved
airplanes listed in the service bulletin effectivity. This document and its approval were based on the airplane
in its original Boeing delivery configuration or as modified by other Boeing changes.
If an airplane has a non-Boeing modification or repair that affects a component or system also affected by
this Requirements Bulletin, the operator is responsible for obtaining appropriate regulatory agency approval
before incorporating this Requirements Bulletin.
B787-81205-SB570041-00 RB
Issue 001, 07 Mar 2019
Page 9 of 21
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB570041-00 RB
Issue 001, 07 Mar 2019
REQUIREMENTS BULLETIN

### Page 10

E.    ACCOMPLISHMENT INSTRUCTIONS
1. GENERAL INFORMATION
NOTE: 1. This is an Enhanced Required for Compliance document. There will be a separate Service
Bulletin (SB) and a separate Requirements Bulletin (RB). If an RB is mandated by an
Airworthiness Directive (AD), then all applicable requirements specified in the RB must
be done. For the related SB, some locations are marked RC Start and RC End to identify
the requirements that are restated from the RB. For the related SB, the areas between
RC Start and RC End, including sub-steps and any tasks identified between RC Start
and RC End, must be done to comply with the AD. Therefore, an Alternative Method of
Compliance (AMOC) is required for any deviations to steps between RC Start and RC
End, including sub steps and identified tasks. For the related SB, the steps not between
RC Start and RC End may be deviated from using accepted methods in accordance with
the operator's maintenance or inspection program without obtaining approval of an AMOC;
this is provided that the steps between RC Start and RC End, including sub-steps and
identified tasks, can still be done as specified, and the airplane can be put back in an
airworthy condition. Tasks not required for compliance are omitted from the RB.
2. This is an Enhanced Required for Compliance document. The Boeing processes used
to create the Service Bulletin (SB) and the Requirements Bulletin (RB) ensure that the
information between "RC Start" and "RC End" in the SB are identical to the information
in the same sections (Compliance, Work Instructions...) of the RB which the SB refers to
as the related document.
3. These work instructions refer to procedures included in other Boeing documents. When
the words "refer to" are used and the operator has an accepted alternative procedure,
the accepted alternative procedure can be used. When the words "in accordance with"
are included in the instruction, the procedure in the Boeing document must be used.
4. Boeing Service Letter 787 SL 51-00-00, Damage Reporting and Repair Plan/Design
Guidelines, is an acceptable procedure to request information from Boeing for additional
structural repair instructions. The Service Letter describes what information must be
provided to Boeing before a structural repair can be provided.
5. If it is necessary to remove more parts for access, you can remove those parts. If you
can get access without removing identified parts, it is not necessary to remove all of the
identified parts. Jacking and shoring limitations must be observed.
6. Where the work instructions include installation of a kept part, a new or serviceable part
with the same part number can be installed as an alternative to the kept part.
7. When more than one OPTION is given for a CONDITION, do only one of the OPTION
numbers. When more than one ACTION is given for a CONDITION or an OPTION, do
all of the ACTION numbers for that CONDITION or OPTION.
8. The compliance times for the actions in WORK INSTRUCTIONS are in Compliance.
9. Unless shown differently, these dimensions and tolerances are used:
B787-81205-SB570041-00 RB
Issue 001, 07 Mar 2019
Page 10 of 21
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB570041-00 RB
Issue 001, 07 Mar 2019
REQUIREMENTS BULLETIN

### Page 11

– Linear dimensions are in inches
– Tolerance on linear dimensions, other than rivet and bolt edge margins, is plus or
minus 0.03 inch
– Tolerance on rivet and bolt edge margin is plus or minus 0.05 inch
– Angular tolerance is plus or minus 2 degrees
– Hole dimensions for standard solid rivets and fasteners are in SRM Chapter 51
– Torque Values:
– Values for structural fasteners are given in 787 Structural Repair Manual, Chapter
51.
– Values for airframe maintenance tasks are included in Chapter 20 of 787 Aircraft
Maintenance Manual (AMM).
– Values for electrical maintenance tasks are included in Chapter 20 of Standard
Wiring Practices Manual (SWPM).
– Values for engine maintenance tasks are included in Chapter 70 of 787 Aircraft
Maintenance Manual (AMM).
– Non-standard torque values for maintenance tasks are included in the applicable
installation step.
2. WORK INSTRUCTIONS
A. Actions Required for Compliance
(1) Requirements
Table 1  LEFT SIDE - CENTERWING OVERWING BEAM - FRAME TIE ROD ASSEMBLY HIGH FREQUENCY
 EDDY CURRENT (HFEC) AND STUB BEAM ULTRASONIC (UT) INSPECTIONS
Refer to the listed
procedures in SB
B787-81205-
SB570041-00 Issue
001 or later approved
issues as an accepted
procedure
Method of Compli-
ance
ActionCondition
PART 1: OPEN AC-
CESS
-Do HFEC inspection of the left
side Frame Tie Rod Assem-
blies, which include lugs, rods,
and clevises, at STA 1017, STA
1041, STA 1065, STA 1077
(Canted) and STA 1089 (Hori-
zontal); and UT inspection of the
left side Stub Beam Upper
Chord at STA 1113 for any
crack.
All Airplanes
-Task 1
B787-81205-SB570041-00 RB
Issue 001, 07 Mar 2019
Page 11 of 21
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB570041-00 RB
Issue 001, 07 Mar 2019
REQUIREMENTS BULLETIN

### Page 12

Table 1  LEFT SIDE - CENTERWING OVERWING BEAM - FRAME TIE ROD ASSEMBLY HIGH FREQUENCY
 EDDY CURRENT (HFEC) AND STUB BEAM ULTRASONIC (UT) INSPECTIONS
Refer to the listed
procedures in SB
B787-81205-
SB570041-00 Issue
001 or later approved
issues as an accepted
procedure
Method of Compli-
ance
ActionCondition
--ACTION 1: Contact The Boeing
Company for repair instructions
and do the repair.
CONDITION 1: ANY
CRACK FOUND
-Task 1ACTION 2: Repeat the HFEC
inspection of the left side Frame
Tie Rod Assemblies, which in-
clude lugs, rods, and clevises,
at STA 1017, STA 1041, STA
1065, STA 1077 (Canted) and
STA 1089 (Horizontal); and UT
inspection of the left side Stub
Beam Upper Chord at STA
1113 for any crack in the re-
paired and unrepaired areas.
PART 2: CLOSE AC-
CESS
-
-Task 1Repeat the HFEC inspection of
the left side Frame Tie Rod As-
semblies, which include lugs,
rods, and clevises, at STA 1017,
STA 1041, STA 1065, STA
1077 (Canted) and STA 1089
(Horizontal); and UT inspection
of the left side Stub Beam Up-
per Chord at STA 1113 for any
crack.
CONDITION 2: NO
CRACK FOUND PART 2: CLOSE AC-
CESS
-
B787-81205-SB570041-00 RB
Issue 001, 07 Mar 2019
Page 12 of 21
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB570041-00 RB
Issue 001, 07 Mar 2019
REQUIREMENTS BULLETIN

### Page 13

Table 2  RIGHT SIDE - CENTERWING OVERWING BEAM - FRAME TIE ROD ASSEMBLY HIGH FREQUENCY
 EDDY CURRENT (HFEC) AND STUB BEAM ULTRASONIC (UT) INSPECTIONS
Refer to the listed
procedures in SB
B787-81205-
SB570041-00 Issue
001 or later approved
issues as an accepted
procedure
Method of Compli-
ance
ActionCondition
PART 1: OPEN AC-
CESS
-Do HFEC inspection of the right
side Frame Tie Rod Assem-
blies, which include lugs, rods,
and clevises, at STA 1017, STA
1041, STA 1065, STA 1077
(Canted) and STA 1089 (Hori-
zontal); and UT inspection of the
right side Stub Beam Upper
Chord at STA 1113 for any
crack.
All Airplanes
-Task 2
--ACTION 1: Contact The Boeing
Company for repair instructions
and do the repair.
CONDITION 3: ANY
CRACK FOUND
-Task 2ACTION 2: Repeat the HFEC
inspection of the right side
Frame Tie Rod Assemblies,
which include lugs, rods, and
clevises, at STA 1017, STA
1041, STA 1065, STA 1077
(Canted) and STA 1089 (Hori-
zontal); and UT inspection of the
right side Stub Beam Upper
Chord at STA 1113 for any
crack in the repaired and unre-
paired areas.
PART 2: CLOSE AC-
CESS
-
-Task 2Repeat the HFEC inspection of
the right side Frame Tie Rod
Assemblies, which include lugs,
rods, and clevises, at STA 1017,
STA 1041, STA 1065, STA
1077 (Canted) and STA 1089
(Horizontal); and UT inspection
of the right side Stub Beam Up-
per Chord at STA 1113 for any
crack.
CONDITION 4: NO
CRACK FOUND PART 2: CLOSE AC-
CESS
-
B787-81205-SB570041-00 RB
Issue 001, 07 Mar 2019
Page 13 of 21
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB570041-00 RB
Issue 001, 07 Mar 2019
REQUIREMENTS BULLETIN

### Page 14

Task 1 – LEFT SIDE - CENTERWING OVERWING BEAM - FRAME TIE ROD
ASSEMBLY HFEC INSPECTION AND STUB BEAM UT INSPECTION [Group
1:]
THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN
IN PARAGRAPH 1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND
Alert:
THIS DOCUMENT TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD,
SEND THIS DOCUMENT TO THE NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR
COMPLIANCE DOCUMENT. THE BOEING PROCESSES USED TO CREATE THE SERVICE
BULLETIN (SB) AND THE REQUIREMENTS BULLETIN (RB) ENSURE THAT THE INFORMATION
BETWEEN "RC START" AND "RC END" IN THE SB ARE IDENTICAL TO THE INFORMATION IN
THE SAME SECTIONS (COMPLIANCE, WORK INSTRUCTIONS...) OF THE RB WHICH THE SB
REFERS TO AS THE RELATED DOCUMENT.
Procedure
This Task applies only to: Group 1.
FRAME TIE ROD ASSEMBLY HFEC INSPECTION AND STUB BEAM UT INSPECTION
B787-81205-SB570041-00 RB
Issue 001, 07 Mar 2019
Page 14 of 21
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB570041-00 RB
Issue 001, 07 Mar 2019
REQUIREMENTS BULLETIN

### Page 15 (OCR)

Q BOEING  B787-81205-SB570041-00 RB
Issue 001, 07 Mar 2019
REQUIREMENTS BULLETIN
STA
1113
STA  STA
1077  1089
STA
1065
STA
STA  1041
1017  2849684
ICN-B787-A-000061-A-81205-16413-A-01-1
FRAME TIE ROD ASSEMBLY HFEC INSPECTION AND STUB BEAM UT INSPECTION
B787-81205-SB570041-00 RB
Issue 001, 07 Mar 2019
Page 15 of 21
EXPORT CONTROLLED ECCN: 9E991
See title page for details.

### Page 16 (OCR)

BOEING  B787-81205-SB570041-00 RB
Issue 001, 07 Mar 2019
REQUIREMENTS BULLETIN
• LBL
66
ILBL  90
• LBL
102
STA  A-A  STA
1017  1089
INSPECTION AREA OF STUB  2849692
BEAM UPPER CHORD
ICN-B787-A-000061-A-81205-16414-A-01-1
Figure 2
1. The step numbers shown below agree with the numbers shown in the circle symbols in the Task. The QTY
numbers shown below are the number of parts necessary for each airplane.
B787-81205-SB570041-00 RB
Issue 001, 07 Mar 2019
Page 16 of 21
EXPORT CONTROLLED ECCN: 9E991
See title page for details.

### Page 17

Table 1  
More DataQtyIdentificationNameActionStep
*[1]6-FRAME TIE ROD AS-
SY - LUG
Inspect1
*[1]4-FRAME TIE ROD AS-
SY - CLEVIS
Inspect2
*[1]5-FRAME TIE ROD AS-
SY - STRUT/ROD
Inspect3
*[2]1-STUB BEAM - UPPER
CHORD
Inspect4
*[1]  Do a High Frequency Eddy Current (HFEC) inspection for any crack in accordance with 787 NDT Manual Part 6, 57-10-03 Temporary
Revision (TR) 06-1006 dated Nov 15/2018, or 787 NDT Manual Part 6, 57-10-03 that incorporates 787 NDT Manual Part 6, 57-10-03
Temporary Revision (TR) 06-1006 dated Nov 15/2018 or later Boeing approved revisions.
*[2]  Do a Ultrasonic (UT) Inspection for any crack in the fastener holes in accordance with 787 NDT Manual Part 4, 57-10-02.
B787-81205-SB570041-00 RB
Issue 001, 07 Mar 2019
Page 17 of 21
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB570041-00 RB
Issue 001, 07 Mar 2019
REQUIREMENTS BULLETIN

### Page 18

Task 2 – RIGHT SIDE - CENTERWING OVERWING BEAM - FRAME TIE ROD
ASSEMBLY HFEC INSPECTION AND STUB BEAM UT INSPECTION [Group
1:]
THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN
IN PARAGRAPH 1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND
Alert:
THIS DOCUMENT TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD,
SEND THIS DOCUMENT TO THE NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR
COMPLIANCE DOCUMENT. THE BOEING PROCESSES USED TO CREATE THE SERVICE
BULLETIN (SB) AND THE REQUIREMENTS BULLETIN (RB) ENSURE THAT THE INFORMATION
BETWEEN "RC START" AND "RC END" IN THE SB ARE IDENTICAL TO THE INFORMATION IN
THE SAME SECTIONS (COMPLIANCE, WORK INSTRUCTIONS...) OF THE RB WHICH THE SB
REFERS TO AS THE RELATED DOCUMENT.
Procedure
This Task applies only to: Group 1.
FRAME TIE ROD ASSEMBLY HFEC INSPECTION AND STUB BEAM UT INSPECTION
B787-81205-SB570041-00 RB
Issue 001, 07 Mar 2019
Page 18 of 21
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB570041-00 RB
Issue 001, 07 Mar 2019
REQUIREMENTS BULLETIN

### Page 19 (OCR)

OBOEING  B787-81205-SB570041-00 RB
Issue 001, 07 Mar 2019
REQUIREMENTS BULLETIN
STA
1113
STA  STA
1089
STA
1065
STA
1041  STA
1017
ICN-B787-A-000061-A-81205-16415-A-01-1
Figure 1
FRAME TIE ROD ASSEMBLY HFEC INSPECTION AND STUB BEAM UT INSPECTION
B787-81205-SB570041-00 RB
Issue 001, 07 Mar 2019
Page 19 of 21
EXPORT CONTROLLED ECCN: 9E991
See title page for details.

### Page 20 (OCR)

A BOEING  B787-81205-SB570041-00 RB
Issue 001, 07 Mar 2019
REQUIREMENTS BULLETIN
RBL-
66
RBL
90
RBL
102
STA  1089  A-A  1017  STA
INSPECTION AREA OF STUB  2850282
BEAM UPPER CHORD
ICN-B787-A-000061-A-81205-16416-A-01-1
Figure 2
1. The step numbers shown below agree with the numbers shown in the circle symbols in the Task. The QTY
numbers shown below are the number of parts necessary for each airplane.
B787-81205-SB570041-00 RB
Issue 001, 07 Mar 2019
Page 20 of 21
EXPORT CONTROLLED ECCN: 9E991
See title page for details.

### Page 21

Table 1  
More DataQtyIdentificationNameActionStep
*[1]6-FRAME TIE ROD AS-
SY - LUG
Inspect1
*[1]4-FRAME TIE ROD AS-
SY - CLEVIS
Inspect2
*[1]5-FRAME TIE ROD AS-
SY - STRUT/ROD
Inspect3
*[2]1-STUB BEAM - UPPER
CHORD
Inspect4
*[1]  Do a High Frequency Eddy Current (HFEC) inspection for any crack in accordance with 787 NDT Manual Part 6, 57-10-03 Temporary
Revision (TR) 06-1006 dated Nov 15/2018, or 787 NDT Manual Part 6, 57-10-03 that incorporates 787 NDT Manual Part 6, 57-10-03
Temporary Revision (TR) 06-1006 dated Nov 15/2018 or later Boeing approved revisions.
*[2]  Do a Ultrasonic (UT) Inspection for any crack in the fastener holes in accordance with 787 NDT Manual Part 4, 57-10-02.
B787-81205-SB570041-00 RB
Issue 001, 07 Mar 2019
Page 21 of 21
EXPORT CONTROLLED ECCN: 9E991
See title page for details.
B787-81205-SB570041-00 RB
Issue 001, 07 Mar 2019
REQUIREMENTS BULLETIN

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
