# Boeing Alert Requirements Bulletin B787-81205-SB570053-00 RB

Copy: Revision 001 ("RB -787-57A0053-01-compressed (rev 2)"), 195 pages: PDF https://openairdocs.org/files/sha256/ca/9a/ca9a460f0975c9cc913d77dc94cdc2690c2f642bafc18ec409583676f23aeef8; text https://openairdocs.org/service-documents/boeing/b787-81205-sb570053-00-rb/file/ca9a460f0975.md. Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2026-1322; AD 2026-22-05 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Boeing](https://openairdocs.org/service-documents/boeing.md)
- Type: Service bulletin (Alert Requirements Bulletin)
- Number: B787-81205-SB570053-00 RB
- Latest revision known: B787-81205-SB570053-00 RB, Issue 001, dated November 5, 2025 (OpenAirDocs)
- Page: https://openairdocs.org/service-documents/boeing/b787-81205-sb570053-00-rb

## ADs that cite it (1) (OpenAirDocs)

Newest first, with the revision each names, as OpenAirDocs read it from the AD's text.

- [AD 2026-22-05](https://openairdocs.org/ad/2026-22-05.md), effective Dec 7, 2026: Revision 001

Also cited in [1 proposed AD](https://openairdocs.org/service-documents/boeing/b787-81205-sb570053-00-rb/proposed.md).

## Text (195 pages)

Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2026-1322; AD 2026-22-05 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication. Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

ALERT
Alert Requirements Bulletin B787-81205-SB570053-00 RB WINGS - CENTER
WING - Side of Body Wing Joint Sealant Inspection and Adhesion Test
Copyright © 2025 The Boeing Company
Treatment of this data module and its content is governed by contract with Boeing. Rights to use this data module are licensed on a per
aircraft basis and such rights may not be transferable. For more information, contact The Boeing Company. Boeing, the Boeing signature,
the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner, BBJ, DC-8, DC-9, DC-10, KC-10, KC-46, KDC-10, MD-10,
MD-11, MD-80, MD-88, MD-90, P-8, Poseidon and Boeing liveries are all trademarks owned by The Boeing Company; and no trademark
license is granted in connection with this document unless provided in writing by Boeing.
EXPORT CONTROLLED
This technology or software is subject to the U.S. Export Administration Regulations (EAR), (15 C.F.R. Parts 730-774). No authorization
from the U.S. Department of Commerce is required for export, re-export, in-country transfer, or access EXCEPT to country group E:1 or
E:2 countries/persons per Supp.1 to Part 740 of the EAR.
ECCN: 9E991
B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
Page 1 of 195
Export Controlled ECCN: 9E991
See page 1 for details
3.0
B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 2

Table of Contents
Page
A. EFFECTIVITY ................................................ 3
1. Airplanes ................................................. 3
2. Spares Affected .............................................. 5
B. CONCURRENT REQUIREMENTS ..................................... 5
C. COMPLIANCE ................................................ 5
D. APPROVAL .................................................. 6
E. ACCOMPLISHMENT INSTRUCTIONS ................................... 7
1. General Information ........................................... 7
2. Work Instructions ............................................. 9
TASK 1 – LEFT WING SIDE OF BODY WING JOINT SEALANT DETAILED INSPECTION AND ADHESION
TEST [Group 1] ........................................... 1 2
TASK 2 – RIGHT WING SIDE OF BODY WING JOINT SEALANT DETAILED INSPECTION AND ADHESION
TEST [Group 1] ........................................... 2 7
TASK 3 – CENTER WING SECTION SIDE OF BODY WING JOINT SEALANT DETAILED INSPECTION AND
ADHESION TEST [Group 1] .................................... 4 2
TASK 4 – LEFT WING SIDE OF BODY WING JOINT SEALANT DETAILED INSPECTION AND ADHESION
TEST [Group 2] ........................................... 5 9
TASK 5 – RIGHT WING SIDE OF BODY WING JOINT SEALANT DETAILED INSPECTION AND ADHESION
TEST [Group 2] ........................................... 7 8
TASK 6 – CENTER WING SECTION SIDE OF BODY WING JOINT SEALANT DETAILED INSPECTION AND
ADHESION TEST [Group 2-4] ................................... 9 7
TASK 7 – LEFT WING SIDE OF BODY WING JOINT SEALANT DETAILED INSPECTION AND ADHESION
TEST [Group 3] .......................................... 1 1 2
TASK 8 – RIGHT WING SIDE OF BODY WING JOINT SEALANT DETAILED INSPECTION AND ADHESION
TEST [Group 3] .......................................... 1 3 1
TASK 9 – LEFT WING SIDE OF BODY WING JOINT SEALANT DETAILED INSPECTION AND ADHESION
TEST [Group 4] .......................................... 1 5 0
TASK 10 –RIGHT WING SIDE OF BODY WING JOINT SEALANT DETAILED INSPECTION AND ADHESION
TEST [Group 4] .......................................... 1 6 7
Appendix A – SEALANT DEFECT DEFINITIONS [Group 1-4] ....................... 1 8 3
Appendix C – SEALANT INSPECTION REQUIREMENTS [Group 1-4] .................. 1 8 6
Appendix F – SEALANT ADHESION TEST [Group 1-4] .......................... 1 9 1
B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
Page 2 of 195
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 3

THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN
IN EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND THIS DOCUMENT TO
Alert:
THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS DOCUMENT
TO THE NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR COMPLIANCE DOCUMENT.
THE BOEING PROCESSES USED TO CREATE THE SERVICE BULLETIN (SB) AND THE
REQUIREMENTS BULLETIN (RB) ENSURE THAT THE INFORMATION BETWEEN "RC START"
AND "RC END" IN THE SB ARE IDENTICAL TO THE INFORMATION IN THE SAME SECTIONS
(COMPLIANCE, WORK INSTRUCTIONS...) OF THE RB WHICH THE SB REFERS TO AS THE
RELATED DOCUMENT.
A. EFFECTIVITY
1. Airplanes
This bulletin is applicable to 787-8, 787-9, 787-10 Airplane(s), line number(s) 512, 517, 519, 521-
687, 689-886, 888-892, 894-897, 899-904, 906-912, 914-954, 956-970, 972-982, 984-989, 992-
996, 999, 1001-1007, 1012-1013, 1017-1018, 1021-1022, 1024-1025, 1029-1030, 1032, 1038,
1044, 1047-1048, 1054, 1056-1059, 1094-1095 in 4 Group(s). Where the effectivity is presented
with hyphens between line numbers, the airplane applicability means "through" and "inclusive",
e.g. line numbers 1-9 means line numbers 1 through 9 inclusive.
The Variable Numbers and Group information for the applicable airplanes is given below.
Table 1
DESCRIPTIONCONFIGURATIONGROUP
787-8 Airplanes with Cap Seal, Edge Seal, and Fillet Seal types- 1
787-9 and 787-10 Airplanes with Cap Seal, Edge Seal, and Fillet Seal
types along with Partial Injection Seals in the Side-of-Body lower
stringers 2 to 6
- 2
787-9 Airplanes with Cap Seal, Edge Seal, and Fillet Seal types along
with Full Injection Seals at the Side-of-Body lower stringers 2 to 6
- 3
787-9 and 787-10 Airplanes with Cap Seal, Edge Seal, and Fillet Seal
types along with Full Injection Seals at the Side-of-Body lower stringers
2 to 12 and 15
- 4
Airplane Models: 787-10, 787-8, 787-9
Table 2
GroupVariable Number
1ZA253 - ZA256
1ZA276 - ZA277
1ZA449
GroupVariable Number
1ZA458 - ZA459
1ZA675 - ZA677
1ZA697 - ZA698
GroupVariable Number
1ZA859 - ZA862
1ZA875 - ZA876
1ZA886 - ZA888
B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
Page 3 of 195
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 4

GroupVariable Number
1ZA918 - ZA920
1ZA949 - ZA950
1ZA954 - ZA959
1ZA963 - ZA966
1ZA968 - ZA972
1ZA990
2ZB010 - ZB011
4ZB012
2ZB040
4ZB041 - ZB043
2ZB054 - ZB057
4ZB058 - ZB060
2ZB103 - ZB109
4ZB110 - ZB121
4ZB133 - ZB136
2ZB186 - ZB187
4ZB188 - ZB191
2ZB217
2ZB219 - ZB220
2ZB229
3ZB241
2ZB242
2ZB247
4ZB248
2ZB251 - ZB254
4ZB255 - ZB258
2ZB261
4ZB262
2ZB265
4ZB266 - ZB268
2ZB269
GroupVariable Number
4ZB270 - ZB279
4ZB303 - ZB305
2ZB332
4ZB333 - ZB338
4ZB378 - ZB379
2ZB417 - ZB418
4ZB419 - ZB421
2ZB422 - ZB425
4ZB426 - ZB435
2ZB451 - ZB458
4ZB459 - ZB467
2ZB543
2ZB572 - ZB579
4ZB580 - ZB586
2ZB607 - ZB610
2ZB618
2ZB656 - ZB659
4ZB660 - ZB665
2ZB679
4ZB680 - ZB681
2ZB697 - ZB699
4ZB700 - ZB702
2ZB703 - ZB705
4ZB706 - ZB707
2ZB733
4ZB734 - ZB735
2ZB738 - ZB739
4ZB740
4ZB742 - ZB745
4ZB749 - ZB750
4ZB753 - ZB757
GroupVariable Number
2ZB766 - ZB767
4ZB768
4ZB771 - ZB775
2ZB779
4ZB780 - ZB781
2ZB789 - ZB791
4ZB792 - ZB805
4ZB810 - ZB811
2ZB813 - ZB815
4ZB816 - ZB821
2ZB828 - ZB831
4ZB832 - ZB841
4ZB858 - ZB863
4ZB874 - ZB876
4ZB890
4ZB893 - ZB902
4ZB908 - ZB918
4ZB922
4ZB924
4ZB926 - ZB927
4ZB934 - ZB943
4ZB967 - ZB971
4ZB977 - ZB978
4ZB980 - ZB986
4ZB990 - ZB991
4ZB993 - ZB997
2ZC001 - ZC003
4ZC004 - ZC015
2ZC036
4ZC037 - ZC048
4ZC061 - ZC069
B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
Page 4 of 195
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 5

GroupVariable Number
4ZC101 - ZC102
4ZC116 - ZC117
4ZC126 - ZC129
4ZC151 - ZC152
4ZC155 - ZC158
4ZC211 - ZC215
4ZC221 - ZC225
1ZD013 - ZD016
4ZE001 - ZE006
4ZE008
4ZE013
4ZE016 - ZE017
4ZE031 - ZE032
GroupVariable Number
4ZE040 - ZE045
4ZE085 - ZE086
4ZE090 - ZE091
4ZE095 - ZE096
4ZE100
4ZE105 - ZE106
4ZE110
4ZE115
4ZE150
4ZE165 - ZE166
4ZE170 - ZE171
4ZE195 - ZE198
4ZE220 - ZE234
GroupVariable Number
4ZE270
4ZE310 - ZE311
4ZE340 - ZE341
4ZE350 - ZE362
4ZE375
4ZE380 - ZE381
4ZE415 - ZE416
4ZE425 - ZE426
4ZE436 - ZE437
4ZE455 - ZE456
4ZE481
4ZE486
--
2. Spares Affected
None.
B. CONCURRENT REQUIREMENTS
None.
C. COMPLIANCE
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to Re-
quirements Bulletin B787-81205-SB570053-00 RB. The Airworthiness Directive will make the compliance
tasks and times given in Requirements Bulletin B787-81205-SB570053-00 RB mandatory.
Accomplish the required action, based on the applicable condition in Table 6 in accordance with the Accom-
plishment Instructions.
When more than one OPTION is given for a CONDITION, do only one of the OPTION numbers. When
more than one ACTION is given for a CONDITION number or an OPTION number, do all of the ACTION
numbers for that CONDITION number or OPTION number.
B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
Page 5 of 195
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 6

Table 6  Left, Right and Center Wing - Sealant Inspection and Adhesion Test
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
ActionCondition
-Within 48 months after
the Issue 001 date of
Requirements Bulletin
B787-81205-SB570053-
00 RB.
ACTION 1: Do a Detailed
Inspection (DET) for any
sealant defects and any
surface depression defects
on identified sealant in-
stalled in the left, right and
center wing side of body
area and between side of
body rib and rib 2.
All Airplanes
ACTION 2: Do an adhesion
test on identified sealants
installed in the left, right
and center wing side of
body area and between
side of body rib and rib 2.
--No further action requiredCONDITION 1: NO
SEALANT DEFECTS
FOUND, NO SURFACE
DEPRESSION DEFECTS
FOUND, AND ALL ADHE-
SION TESTS PASSED.
-Before further flight.Contact The Boeing Com-
pany for repair instructions
and do the repair.
CONDITION 2: ANY
SEALANT DEFECT
FOUND, ANY SURFACE
DEPRESSION DEFECT
FOUND, OR ANY ADHE-
SION TEST FAILS.
D. APPROVAL
This Requirements Bulletin was examined by the Federal Aviation Administration (FAA). The changes
specified in this document comply with the applicable regulations and are FAA approved, as well as European
Union Aviation Safety Agency (EASA) approved for all EASA approved airplanes listed in this Requirements
Bulletin effectivity. This document and its approval were based on the airplane in its original Boeing delivery
configuration or as modified by other Boeing changes.
If an airplane has a non-Boeing modification or repair that affects a component or system also affected by
this Requirements Bulletin, the operator is responsible for obtaining appropriate regulatory agency approval
before incorporating this Requirements Bulletin.
B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
Page 6 of 195
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 7

E.    ACCOMPLISHMENT INSTRUCTIONS
1. GENERAL INFORMATION
NOTE: 1. This is an Enhanced Required for Compliance document. There will be a separate Service
Bulletin (SB) and a separate Requirements Bulletin (RB). If an RB is mandated by an
Airworthiness Directive (AD), then all applicable requirements specified in the RB must
be done. In the RB, the "Refer to the listed procedures..." column of the table(s) in the
Work Instructions is for reference only. The procedures in that column are not required
by the AD and are for guidance only. For the related SB, some locations are marked RC
Start and RC End to identify the requirements that are restated from the RB. For the re-
lated SB, the areas between RC Start and RC End, including sub-steps and any Tasks
identified between RC Start and RC End, must be done to comply with the AD. Therefore,
an Alternative Method of Compliance (AMOC) is required for any deviations to steps be-
tween RC Start and RC End, including substeps and identified Tasks. For the related
SB, the steps not between RC Start and RC End may be deviated from using accepted
methods in accordance with the operator's maintenance or inspection program without
obtaining approval of an AMOC; this is provided that the steps between RC Start and RC
End, including sub-steps and identified Tasks, can still be done as specified, and the
airplane can be put back in an airworthy condition. Tasks not required for compliance are
omitted from the RB.
2. This is an Enhanced Required for Compliance document. The Boeing processes used
to create the Service Bulletin (SB) and the Requirements Bulletin (RB) ensure that the
information between "RC Start" and "RC End" in the SB are identical to the information
in the same sections (Compliance, Work Instructions...) of the RB which the SB refers to
as the related document.
3. These work instructions refer to procedures included in other Boeing documents. When
the words "refer to" are used and the operator has an accepted alternative procedure,
the accepted alternative procedure can be used. When the words "in accordance with"
are included in the instruction, the procedure in the Boeing document must be used.
4. The compliance times for the actions in WORK INSTRUCTIONS are in COMPLIANCE.
5. Use the approved fastener, process and material substitutions in accordance with SRM
Chapter 51.
6. A Detailed Inspection (DET) is defined as: An intensive examination of a specific item,
installation, or assembly to detect damage, failure, or irregularity. This could include tactile
assessment in which a component or assembly can be checked for tightness/security.
Available lighting is normally supplemented with a direct source of good lighting at an
intensity deemed appropriate. Inspection aids such as mirrors and magnifying lenses
may be necessary. Surface cleaning and elaborate access procedures may be required.
B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
Page 7 of 195
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 8

7. Boeing Service Letter 787-SL-51-001, Damage Reporting and Repair Plan/Design
Guidelines, is an acceptable procedure to request information from Boeing for additional
structural repair instructions. The Service Letter describes what information must be
provided to Boeing before a structural repair can be provided.
8. If it is necessary to remove more parts for access, you can remove those parts. If you
can get access without removing identified parts, it is not necessary to remove all of the
identified parts. Jacking and shoring limitations must be observed.
9. Where the work instructions include installation of a kept part, a new or serviceable part
with the same part number can be installed as an alternative to the kept part.
10. When more than one OPTION is given for a CONDITION, do only one of the OPTION
numbers. When more than one ACTION is given for a CONDITION or an OPTION, do
all of the ACTION numbers for CONDITION or OPTION.
11. Use of colors in Tasks is based on guidance from the S1000D International specification
for technical publications.
12. Unless shown differently, these dimensions and tolerances are used:
– Linear dimensions are in inches.
– Tolerance on linear dimensions, other than rivet and bolt edge margins, is plus or
minus 0.03 inch.
– Tolerance on rivet and bolt edge margin is plus or minus 0.05 inch.
– Angular tolerance is plus or minus 1 degree.
– Hole dimensions for standard solid rivets and fasteners are in SRM Chapter 51.
– Torque Values:
– Values for structural fasteners are given in 787 Structural Repair Manual, Chapter
51.
– Values for airframe maintenance tasks are included in Chapter 20 of 787 Aircraft
Maintenance Manual (AMM).
– Values for electrical maintenance tasks are included in Chapter 20 of Standard
Wiring Practices Manual (SWPM).
– Values for engine maintenance tasks are included in Chapter 70 of 787 Aircraft
Maintenance Manual (AMM).
– Non-standard torque values for maintenance tasks are included in the applicable
installation step.
13. Some Work Instructions are related to Critical Design Configuration Control Limitation
(CDCCL), required by Special Compliance Items/Airworthiness Limitation (SCI/AWL)
D011Z009-03-04. Strict adherence to Special Compliance Items/Airworthiness Limitation
is required.
B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
Page 8 of 195
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 9

2. WORK INSTRUCTIONS
A. Actions Required for Compliance
(1) Requirements:
Table 1  Left, Right and Center Wing - Sealant Inspection and Adhesion Test
Refer to the listed pro-
cedures in SB B787-
81205-SB570053-00 Is-
sue 001 or later ap-
proved issues as an
accepted procedure.
Method of Compliance:ActionCondition
PART 1: GET ACCESS-ACTION 1: Do a Detailed
Inspection (DET) for any
sealant defects and any
surface depression de-
fects on identified sealant
installed in the left, right
and center wing side of
body area and between
side of body rib and rib 2.
All Airplanes
-Group 1:
Task 1 - Left Wing Side of Body
Task 2 - Right Wing Side of Body
Task 3 - Center Wing Section Side
of Body
Group 2:
Task 4 - Left Wing Side of Body
Task 5 - Right Wing Side of Body
ACTION 2: Do an adhe-
sion test on identified
sealants installed in the
left, right and center wing
side of body area and
between side of body rib
and rib 2.
Task 6 - Center Wing Section Side
of Body
Group 3:
Task 7 - Left Wing Side of Body
Task 8 - Right Wing Side of Body
Task 6 - Center Wing Section Side
of Body
Group 4:
Task 9 - Left Wing Side of Body
Task 10 - Right Wing Side of Body
Task 6 - Center Wing Section Side
of Body
PART 2: CLOSE AC-
CESS
-No further action re-
quired.
CONDITION 1: NO
SEALANT DEFECTS
FOUND, NO SUR-
FACE DEPRESSION
DEFECTS FOUND,
AND ALL ADHESION
TESTS PASSED.
B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
Page 9 of 195
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 10

Table 1  Left, Right and Center Wing - Sealant Inspection and Adhesion Test
Refer to the listed pro-
cedures in SB B787-
81205-SB570053-00 Is-
sue 001 or later ap-
proved issues as an
accepted procedure.
Method of Compliance:ActionCondition
--Contact The Boeing
Company for repair in-
structions and do the re-
pair.
CONDITION 2: ANY
SEALANT DEFECT
FOUND, ANY SUR-
FACE DEPRESSION
DEFECT FOUND, OR
ANY ADHESION
TEST FAILS.
PART 2: CLOSE AC-
CESS
-
B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
Page 10 of 195
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 11

Task 1 – LEFT WING SIDE OF BODY WING JOINT SEALANT DETAILED
INSPECTION AND ADHESION TEST [Group 1: ]
THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN
IN EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND THIS DOCUMENT TO
Alert:
THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS DOCUMENT
TO THE NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR COMPLIANCE DOCUMENT.
THE BOEING PROCESSES USED TO CREATE THE SERVICE BULLETIN (SB) AND THE
REQUIREMENTS BULLETIN (RB) ENSURE THAT THE INFORMATION BETWEEN "RC START"
AND "RC END" IN THE SB ARE IDENTICAL TO THE INFORMATION IN THE SAME SECTIONS
(COMPLIANCE, WORK INSTRUCTIONS...) OF THE RB WHICH THE SB REFERS TO AS THE
RELATED DOCUMENT.
B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
Page 11 of 195
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 12 (OCR)

@ BOEING  B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
REQUIREMENTS BULLETIN
Procedure
This Task applies only to: Group 1.
LEFT WING
(TOP VIEW)
ICN-B787-A-000061-A-81205-20107-A-01-1
Task 1 Figure 1
B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
Page 12 of 195
Export Controlled ECCN: 9E991
See page 1 for details

### Page 13 (OCR)

@ BOEING  B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
REQUIREMENTS BULLETIN
INBD
LEFT WING
(BOTTOM VIEW)
ICN-B787-A-000061-A-81205-20108-A-01-1
Task 1 Figure 2
B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
Page 13 of 195
Export Controlled ECCN: 9E991
See page 1 for details

### Page 14 (OCR)

_BOEING  B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
REQUIREMENTS BULLETIN
UPPER SKIN
PANEL
ROTATED
UPPER  STRINGER 8  UPPER  (TYPICAL  DO 14 LOCATIONS
•STRINGER 9  (CAP SEALS COMMON
TO SKIN PANEL)
UPPER  UPPER
STRINGER 3  STRINGER 2
SIDE OF BODY
UPPER CHORD
SIDE OF BODY RIB
PWD  3 LOCATIONS DO  (CAP SEALS
PANEL)  COMMON TO SKIN  REAR SPAR
ICN-B787-A-000061-A-81205-20109-A-01-1
Task 1 Figure 3
B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
Page 14 of 195
Export Controlled ECCN: 9E991
See page 1 for details

### Page 15 (OCR)

@ BOEING  B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
REQUIREMENTS BULLETIN
UPPER
STRINGER 10
UPPER SKIN
PANEL
24 LOCATIONS®
¡CAP SEALS
COMMON TO
SKIN PANEL)
SIDE OF BODY
LIPPER CHORD
UPPER
STRINGER 18
SIDE OF BODY RIB
FRONT SPAR
ICN-B787-A-000061-A-81205-20110-A-01-1
Task 1 Figure 4
B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
Page 15 of 195
Export Controlled ECCN: 9E991
See page 1 for details

### Page 16 (OCR)

@ BOEING  B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
REQUIREMENTS BULLETIN
UPPER
STRINGER 17  GUSSET
6.0
RIB 2  FRONT SPAR  HER MINAL FITTING OO  SIDE OF BODY RIB
TERMINAL FITTING
INBO
FWD
INSPECTION ZONE
ICN-B787-A-000061-A-81205-20111-A-01-1
Task 1 Figure 5
B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
Page 16 of 195
Export Controlled ECCN: 9E991
See page 1 for details

### Page 17 (OCR)

@ BOEING  B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
REQUIREMENTS BULLETIN
UPPER
STRINGER 2
DO19 LOCATIONS
UPPER DRAG
BRACE FITTING -  - RIB 2
REAR SPAR-
ICN-B787-A-000061-A-81205-20364-A-01-1
Task 1 Figure 6
B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
Page 17 of 195
Export Controlled ECCN: 9E991
See page 1 for details

### Page 18 (OCR)

Ø BOEING  B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
REQUIREMENTS BULLETIN
FRONT SPAR -
LOWER
STRINGER 18  - SIDE OF BODY RIB
RIB 2  Oe11 LOCATIONS
LOWER
STRINGER 13
FWD
INED
ICN-B787-A-000061-A-81205-20365-A-01-1
Task 1 Figure 7
B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
Page 18 of 195
Export Controlled ECCN: 9E991
See page 1 for details

### Page 19 (OCR)

@BOEING  B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
REQUIREMENTS BULLETIN
LOWER  SIDE OF BODY RIB
STRINGER 13
RIB 2-  pas
001/1500
LOWER
STRINGER 7
FWD
INED
ICN-B787-A-000061-A-81205-20366-A-01-1
Task 1 Figure 8
B787-81205-SB570053-00 RB
ISSue 001, 05 Nov 2025 12:00:00 AM
Page 19 of 195
Export Controlled ECCN: 9E991
See page 1 for details

### Page 20 (OCR)

A BOEING  B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
REQUIREMENTS BULLETIN
7 LOCATIONS(112
REAR
SPAR
LOWER  RIB 2
STRINGER 2
SIDE OF
BODY RIB
LOWER
DRAG
BRACE
FITTING
STRINGER 6
INED
FWD
ICN-B787-A-000061-A-81205-20367-A-01-1
Task 1 Figure 9
B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
Page 20 of 195
Export Controlled ECCN: 9E991
See page 1 for details

### Page 21

ICN-B787-A-000061-A-81205-20447-A-01-1
Task 1 Figure 10
B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
Page 21 of 195
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 22 (OCR)

@BOEING  B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
REQUIREMENTS BULLETIN
SIDE OF BODY
LOWER CHORD
LOWER
STRINGER
LOWER SKIN  17 LOCATIONS
PANEL  (TYPICAL
RIB 2
LOWER  LOWER
STRINGER 2  STRINGER 18
SIDE OF BODY  SIDE OF
LOWER CHORD  BODY RIB
LEFT WING
(TOP VIEW)
ICN-B787-A-000061-A-81205-20448-A-01-1
Task 1 Figure 11
B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
Page 22 of 195
Export Controlled ECCN: 9E991
See page 1 for details

### Page 23 (OCR)

Q BOEING  B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
REQUIREMENTS BULLETIN
UPPER  SIDE OF
SKIN  BODY RIB
PANEL
INBO
FWD
RIB 2-
P0 D
FRONT
SPAR
12019  FRONT
SPAR
l0g
SIDE OF
RIB 2-  BODY RIB
coa  3898
LOWER SKIN-
PANEL
FWD
ICN-B787-A-000061-A-81205-20449-A-01-1
Task 1 Figure 12
B787-81205-SB570053-00 RB
ISsue 001, 05 Nov 2025 12:00:00 AM
Page 23 of 195
Export Controlled ECCN: 9E991
See page 1 for details

### Page 24 (OCR)

@ BOEING  B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
REQUIREMENTS BULLETIN
UPPER SKIN
PANEL
- UPPER DRAG
BRACE FITTING
SIDE OF
BODY RIB  • REAR SPAR
FWD
IBD
N
REAR SPAR
• LOWER DRAG
BRACE FITTING
BODY RIB  SIDE OF  • LOWER SKIN  PANEL
4BD
FWD  265
ICN-B787-A-000061-A-81205-20450-A-01-1
Task 1 Figure 13
1. The step numbers shown below agree with the numbers shown in the circle symbols in the Task. The QTY
numbers shown below are the number of parts necessary for this Task.
B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
Page 24 of 195
Export Controlled ECCN: 9E991
See page 1 for details

### Page 25

Table 1
More DataQtyIdentificationNameActionStep
*[1]--SEALANTInspect1
*[2]--SEALANTInspect2
*[3]*[4]--SEALANTInspect3
*[1]  Do a detailed inspection of all sealant types for any sealant defects. For inspection zones defined in the task figures, inspect all cap
seals within zone. Swaged Collars without cap seal within the indicated inspection zone do not require inspection. Any cap seals located
outside of the inspection zones do not require inspection. Sealant defects are defined in accordance with Appendix A. Refer to Appendix
B of B787-81205-SB570053-00 SB for sealant defect examples. Sealant inspection requirements are defined in accordance with Appendix
C. Sealant may be covered by fuel tank leveling compound, it is not required to remove fuel tank leveling compound to do the detailed
inspection. Refer to Appendix H of B787-81205-SB570053-00 SB for typical fuel tank leveling compound locations.
*[2]  Do a sealant adhesion test of the Cap Seal sealant types. For inspection zones defined in the task figures, do an adhesion test of all
cap seals within zone. Any cap seals located outside of the inspection zones do not require an adhesion test. Sealant adhesion test
requirements are defined in accordance with Appendix F. Adhesion tests are not required for any Cap Seals covered by fuel tank
leveling compound. Refer to Appendix H of B787-81205-SB570053-00 SB for typical fuel tank leveling compound locations.
*[3]  Do an adhesion test of Edge and Fillet Seal sealant types in accordance with Appendix F. Adhesion tests are not required for any
Edge or Fillet Seals covered by fuel tank leveling compound. Refer to Appendix H of B787-81205-SB570053-00 SB for typical fuel
tank leveling compound locations.
*[4]  Do a detailed inspection of the Edge and Fillet Seal sealant types for any surface depression defects. Surface depression defect is
defined in accordance with Appendix A. Surface depression inspection requirements are defined in accordance with Appendix C.
B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
Page 25 of 195
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 26

Task 2 – RIGHT WING SIDE OF BODY WING JOINT SEALANT DETAILED
INSPECTION AND ADHESION TEST [Group 1: ]
THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN
IN EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND THIS DOCUMENT TO
Alert:
THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS DOCUMENT
TO THE NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR COMPLIANCE DOCUMENT.
THE BOEING PROCESSES USED TO CREATE THE SERVICE BULLETIN (SB) AND THE
REQUIREMENTS BULLETIN (RB) ENSURE THAT THE INFORMATION BETWEEN "RC START"
AND "RC END" IN THE SB ARE IDENTICAL TO THE INFORMATION IN THE SAME SECTIONS
(COMPLIANCE, WORK INSTRUCTIONS...) OF THE RB WHICH THE SB REFERS TO AS THE
RELATED DOCUMENT.
B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
Page 26 of 195
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 27 (OCR)

@ BOEING  B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
REQUIREMENTS BULLETIN
Procedure
This Task applies only to: Group 1.
GEN  RIGHT WING
(TOP VIEW)
NBO
ICN-B787-A-000061-A-81205-20451-A-01-1
Task 2 Figure 1
B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
Page 27 of 195
Export Controlled ECCN: 9E991
See page 1 for details

### Page 28 (OCR)

@ BOEING  B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
REQUIREMENTS BULLETIN
INBD
RIGHT WING
(BOTTOM VIEW
ICN-B787-A-000061-A-81205-20452-A-01-1
Task 2 Figure 2
B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
Page 28 of 195
Export Controlled ECCN: 9E991
See page 1 for details

### Page 29 (OCR)

@ BOEING  B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
REQUIREMENTS BULLETIN
UPPER SKIN
ROTATED  •PANEL
OO14 LOCATIONS  (TYPICALI  STRINGER 8  UPPER  UPPER
CAP SEALS  STRINGER 9
COMMON TO
SKIN PANEL)
UPPER  UPPER
STRINGER2 STRINGER 3
SIDE OF BODY
UPPER CHORD
SIDE OF BODY RIB
11213 LOCATIONS
(CAP SEALS
COMMON TO
REAR SPAR  SKIN PANEL
ICN-B787-A-000061-A-81205-20453-A-01-1
Task 2 Figure 3
B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
Page 29 of 195
Export Controlled ECCN: 9E991
See page 1 for details

### Page 30 (OCR)

@ BOEING  B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
REQUIREMENTS BULLETIN
UPPER
STRINGER 10
- UPPER SKIN
I PANEL
DO 24 LOCATIONS
(CAP SEALS
COMMON TO
SKIN PANEL)
SIDE OF BODY
UPPER CHORD
UPPER
STRINGER 18
SIDE OF BODY RIB
FRONT SPAR
ICN-B787-A-000061-A-81205-20454-A-01-1
Task 2 Figure 4
B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
Page 30 of 195
Export Controlled ECCN: 9E991
See page 1 for details

### Page 31 (OCR)

@ BOEING  B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
REQUIREMENTS BULLETIN
UPPER
GUSSET  STRINGER 17
6.0
SIDE OF BODY RIB  YE UP TO EDGE OF  TERMINAL FITTING)  FRONT SPAR  RIB 2
TERMINAL FITTING
INBD
FWD
INSPECTION ZONE
ICN-B787-A-000061-A-81205-20455-A-01-1
Task 2 Figure 5
B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
Page 31 of 195
Export Controlled ECCN: 9E991
See page 1 for details

### Page 32 (OCR)

@ BOEING  B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
REQUIREMENTS BULLETIN
STRINGER 2
19 LOCATIONS 1C
RIB 2 -  UPPER DRAG
BRACE FITTING
- REAR SPAR
ICN-B787-A-000061-A-81205-20456-A-01-1
Task 2 Figure 6
B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
Page 32 of 195
Export Controlled ECCN: 9E991
See page 1 for details

### Page 33 (OCR)

@ BOEING  B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
REQUIREMENTS BULLETIN
•FRONT SPAR
LOWER
SIDE OF BODY RIB -  STRINGER 18
11 LOCATIONS®€  •RIB 2
LOWER
STRINGER 13
FWD
INBD
G
ICN-B787-A-000061-A-81205-20457-A-01-1
Task 2 Figure 7
B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
Page 33 of 195
Export Controlled ECCN: 9E991
See page 1 for details

### Page 34 (OCR)

A BOEING  B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
REQUIREMENTS BULLETIN
SIDE OF BODY RIB  LOWER  RIB 2
STRINGER 13
FWD
LOWER
STRINGER 7
INBD
ICN-B787-A-000061-A-81205-20458-A-01-1
Task 2 Figure 8
B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
Page 34 of 195
Export Controlled ECCN: 9E991
See page 1 for details

### Page 35 (OCR)

@ BOEING  B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
REQUIREMENTS BULLETIN
OE 7 LOCATIONS
REAR
SPAR
RIB 2  LOWER
STRINGER 2
SIDE OF
BODY RIB
LOWER
DRAG
BRACE
FITTING
•STRINGERS
FWD
ICN-B787-A-000061-A-81205-20459-A-01-1
Task 2 Figure 9
B787-81205-SB570053-00 RB
ISsue 001, 05 Nov 2025 12:00:00 AM
Page 35 of 195
Export Controlled ECCN: 9E991
See page 1 for details

### Page 36

ICN-B787-A-000061-A-81205-20460-A-01-1
Task 2 Figure 10
B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
Page 36 of 195
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 37 (OCR)

@ BOEING  B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
REQUIREMENTS BULLETIN
SIDE OF BODY
LOWER CHORD
LOWER
STRINGER
ÇWE
17 LOCATIONS  LOWER SKIN
(TYPICAL)  PANEL
RIB 2
LOWEF  LOWER
STRINGER 18  STRINGER 2
SIDE OF  SIDE OF BODY
BODY RIB  LOWER CHORD
RIGHT WING
(TOP VIEW)
ICN-B787-A-000061-A-81205-20461-A-01-1
Task 2 Figure 11
B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
Page 37 of 195
Export Controlled ECCN: 9E991
See page 1 for details

### Page 38 (OCR)

_BOEING  B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
REQUIREMENTS BULLETIN
SIDE OF  UPPER
BODY RIB  • SKIN
PANEL
1 RIB 2
FRONT
SPAR
FRONT  SPAR  Plos
SIDE OF
BODY RIB  • RIB 2
8888  DOD
DO.D  LOWER SKIN
-PANEL
FWD  00
ICN-B787-A-000061-A-81205-20462-A-01-1
Task 2 Figure 12
B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
Page 38 of 195
Export Controlled ECCN: 9E991
See page 1 for details

### Page 39 (OCR)

@ BOEING  B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
REQUIREMENTS BULLETIN
UPPER SKIN
PANEL
UPPER DRAG
BRACE FITTING
SIDE OF
REAR SPAR-  BODY RIB
FWD
NBD
REAR SPAR
LOWER DRAG
BRACE FITTING
3)
PANEL  LOWER SKIN  BODY RIB  SIDE OF
dal
INED
FWD
ICN-B787-A-000061-A-81205-20463-A-01-1
Task 2 Figure 13
1. The step numbers shown below agree with the numbers shown in the circle symbols in the Task. The QTY
numbers shown below are the number of parts necessary for this Task.
B787-81205-SB570053-00 RB
ISsue 001, 05 Nov 2025 12:00:00 AM
Page 39 of 195
Export Controlled ECCN: 9E991
See page 1 for details

### Page 40

Table 1
More DataQtyIdentificationNameActionStep
*[1]--SEALANTInspect1
*[2]--SEALANTInspect2
*[3]*[4]--SEALANTInspect3
*[1]  Do a detailed inspection of all sealant types for any sealant defects. For inspection zones defined in the task figures, inspect all cap
seals within zone. Swaged Collars without cap seal within the indicated inspection zone do not require inspection. Any cap seals located
outside of the inspection zones do not require inspection. Sealant defects are defined in accordance with Appendix A. Refer to Appendix
B of B787-81205-SB570053-00 SB for sealant defect examples. Sealant inspection requirements are defined in accordance with Appendix
C. Sealant may be covered by fuel tank leveling compound, it is not required to remove fuel tank leveling compound to do the detailed
inspection. Refer to Appendix H of B787-81205-SB570053-00 SB for typical fuel tank leveling compound locations.
*[2]  Do a sealant adhesion test of the Cap Seal sealant types. For inspection zones defined in the task figures, do an adhesion test of all
cap seals within zone. Any cap seals located outside of the inspection zones do not require an adhesion test. Sealant adhesion test
requirements are defined in accordance with Appendix F. Adhesion tests are not required for any Cap Seals covered by fuel tank
leveling compound. Refer to Appendix H of B787-81205-SB570053-00 SB for typical fuel tank leveling compound locations.
*[3]  Do an adhesion test of Edge and Fillet Seal sealant types in accordance with Appendix F. Adhesion tests are not required for any
Edge or Fillet Seals covered by fuel tank leveling compound. Refer to Appendix H of B787-81205-SB570053-00 SB for typical fuel
tank leveling compound locations.
*[4]  Do a detailed inspection of the Edge and Fillet Seal sealant types for any surface depression defects. Surface depression defect is
defined in accordance with Appendix A. Surface depression inspection requirements are defined in accordance with Appendix C.
B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
Page 40 of 195
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 41

Task 3 – CENTER WING SECTION SIDE OF BODY WING JOINT SEALANT
DETAILED INSPECTION AND ADHESION TEST [Group 1: ]
THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN
IN EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND THIS DOCUMENT TO
Alert:
THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS DOCUMENT
TO THE NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR COMPLIANCE DOCUMENT.
THE BOEING PROCESSES USED TO CREATE THE SERVICE BULLETIN (SB) AND THE
REQUIREMENTS BULLETIN (RB) ENSURE THAT THE INFORMATION BETWEEN "RC START"
AND "RC END" IN THE SB ARE IDENTICAL TO THE INFORMATION IN THE SAME SECTIONS
(COMPLIANCE, WORK INSTRUCTIONS...) OF THE RB WHICH THE SB REFERS TO AS THE
RELATED DOCUMENT.
B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
Page 41 of 195
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 42 (OCR)

@ BOEING  B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
REQUIREMENTS BULLETIN
Procedure
This Task applies only to: Group 1.
REAR
SPAR
FRONT
SPAR
CENTER SECTION
ICN-B787-A-000061-A-81205-20464-A-01-1
Task 3 Figure 1
B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
Page 42 of 195
Export Controlled ECCN: 9E991
See page 1 for details

### Page 43 (OCR)

@ BOEING  B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
REQUIREMENTS BULLETIN
UPPER  UPPER SKIN  UPPER
STRINGER 1  PANEL  STRINGER 4
00  SALE
REAR  0091
SPAR  SPANWISE
9 LOCATIONS ME  • INBD  SIDE OF  BEAM NO. 1
BODY RIB
UPPER  UPPER SKIN  UPPER
STRINGER 6  • PANEL  STRINGER 9
SPANWISE  SIDE OF  10 LOCATIONS DO  INBD  SPANWISE
BEAM NO. 1 BODY RIB  BEAM NO. 2
ICN-B787-A-000061-A-81205-20465-A-01-1
Task 3 Figure 2
B787-81205-SB570053-00 RB
ISSue 001, 05 Nov 2025 12:00:00 AM
Page 43 of 195
Export Controlled ECCN: 9E991
See page 1 for details

### Page 44 (OCR)

A BOEING  B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
REQUIREMENTS BULLETIN
UPPER  UPPER SKIN  UPPER
STRINGER 11  PANEL  STRINGER 14
SPANWISE
BEAM NO. 2
SIDE OF
BODY RIB
SPANWISE
BEAM NO. 3
INED
10 LOCATIONS DO
UPPER
STRINGER 16 UPPER SKIN
UPPER
STRINGER 18
FRONT
SPAR
INBD
SPANWISE  CO 12 LOCATIONS
BEAM NO. 3  SIDE OF
BODY RIB  FWD
ICN-B787-A-000061-A-81205-20466-A-01-1
Task 3 Figure 3
B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
Page 44 of 195
Export Controlled ECCN: 9E991
See page 1 for details

### Page 45 (OCR)

@ BOEING  B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
REQUIREMENTS BULLETIN
REAR SPAR  UPPER  UPPER
UPPER FLANGE  STRINGER 1  STRINGER 3
REAR SPAR  SIDE OF BODY RIB
INBD
INSPECTION ZONE
ICN-B787-A-000061-A-81205-20467-A-01-1
Task 3 Figure 4
B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
Page 45 of 195
Export Controlled ECCN: 9E991
See page 1 for details

### Page 46 (OCR)

@ BOEING  B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
REQUIREMENTS BULLETIN
UPPER
(DIRECTLY INBOARD  OF TERMINAL FITTING) OC  STRINGER 18
- TERMINAL FITTING
- FRONT SPAR
SIDE OF
BODY RIB
INBO
[FWD
ICN-B787-A-000061-A-81205-20468-A-01-1
Task 3 Figure 5
B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
Page 46 of 195
Export Controlled ECCN: 9E991
See page 1 for details

### Page 47 (OCR)

@ BOEING  B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
REQUIREMENTS BULLETIN
TERMINAL FITTING
REAR SPAR  SIDE OF
BODY RIB
10.7
LOWER
STRINGER 2  LOWER
STRINGER 4
SIDE OF
BODY RIB
SPANWISE  LOWER  LOWER
BEAM NO.1  STRINGER 6  STRINGER 9
INSPECTION ZONE
ICN-B787-A-000061-A-81205-20469-A-01-1
Task 3 Figure 6
B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
Page 47 of 195
Export Controlled ECCN: 9E991
See page 1 for details

### Page 48 (OCR)

B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
REQUIREMENTS BULLETIN
SPANWISE
BEAM NO.2
SIDE OF
BODY RIB
LOWER
STRINGER 11
LOWER
STRINGER 14
SIDE OF  -FRONT SPAR
BODY RIB
LOWER
STRINGER 18
• LOWER
• STRINGER 16
ICN-B787-A-000061-A-81205-20470-A-01-1
Task 3 Figure 7
B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
Page 48 of 195
Export Controlled ECCN: 9E991
See page 1 for details

### Page 49

ICN-B787-A-000061-A-81205-20471-A-01-1
Task 3 Figure 8
B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
Page 49 of 195
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 50 (OCR)

@ BOEING  B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
REQUIREMENTS BULLETIN
UPPER  UPPER SKIN  UPPER
STRINGER 4  PANEL  STRINGER 1
d
REAR
SPANWISE  SPAR
BEAM NO. 1
SIDE OF  INBD  OO9 LOCATIONS
BODY RIB
UPPER  UPPER SKIN UPPER
STRINGER 9  PANEL  STRINGER 6
SPANWISE  INBD  DO 10 LOCATIONS  SIDE OF  SPANWISE
BEAM NO, 2  BODY RIB BEAM NO. 1
ICN-B787-A-000061-A-81205-20472-A-01-1
Task 3 Figure 9
B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
Page 50 of 195
Export Controlled ECCN: 9E991
See page 1 for details

### Page 51 (OCR)

@ BOEING  B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
REQUIREMENTS BULLETIN
UPPER  UPPER SKIN  UPPER
STRINGER 14  PANEL  STRINGER 11
SPANWISE
BEAM NO. 2
SIDE OF
• BODY RIB
SPANWISE
BEAM NO. 3
INBD
DO 10 LOCATIONS
UPPER
UPPER SKIN STRINGER 16
UPPER  PANEL
STRINGER 18
FRONT
SPAR
* INBD  00
12 LOCATIONS DO  BEAM NO. 3 g  SPANWISE
FWD  SIDE OF  BODY RIB
ICN-B787-A-000061-A-81205-20473-A-01-1
Task 3 Figure 10
B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
Page 51 of 195
Export Controlled ECCN: 9E991
See page 1 for details

### Page 52 (OCR)

Ø BOEING  B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
REQUIREMENTS BULLETIN
UPPER  UPPER  REAR SPAR
STRINGER 3  STRINGER 1  UPPER FLANGE
SIDE OF BODY RIB  REAR SPAR
48D
INSPECTION ZONE
ICN-B787-A-000061-A-81205-20474-A-01-1
Task 3 Figure 11
B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
Page 52 of 195
Export Controlled ECCN: 9E991
See page 1 for details

### Page 53 (OCR)

_BOEING  B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
REQUIREMENTS BULLETIN
UPPER
STRINGER 18  DO I TERMINA FITTING)
TERMINAL FITTING -
FRONT SPAR -
SIDE OF
BODY RIB
INBD
WD
ICN-B787-A-000061-A-81205-20475-A-01-1
Task 3 Figure 12
B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
Page 53 of 195
Export Controlled ECCN: 9E991
See page 1 for details

### Page 54 (OCR)

@BOEING  B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
REQUIREMENTS BULLETIN
TERMINAL FITTING
SIDE OF  REAR SPAR
BODY RIB
10.7
LOWER
STRINGER 2
LOWER
STRINGER 4
SIDE OF
BODY RIB
LOWER  LOWER  SPANWISE
STRINGER 9  STRINGER BEAM NO.1
NED
INSPECTION ZONE  3097684
ICN-B787-A-000061-A-81205-20476-A-01-1
Task 3 Figure 13
B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
Page 54 of 195
Export Controlled ECCN: 9E991
See page 1 for details

### Page 55 (OCR)

@ BOEING  B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
REQUIREMENTS BULLETIN
•SPANWISE
SIDE OF  BEAM NO.2
BODY RIB
LOWER
• LOWER  STRINGER 11
STRINGER 14
FRONT SPAR ~  SIDE OF
BODY RIB
LOWER
STRINGER 18 -
LOWER
STRINGER 16
30º
ICN-B787-A-000061-A-81205-20477-A-01-1
Task 3 Figure 14
B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
Page 55 of 195
Export Controlled ECCN: 9E991
See page 1 for details

### Page 56

ICN-B787-A-000061-A-81205-20478-A-01-1
Task 3 Figure 15
1.  The step numbers shown below agree with the numbers shown in the circle symbols in the Task. The QTY
numbers shown below are the number of parts necessary for this Task.
Table 1
More DataQtyIdentificationNameActionStep
*[1]--SEALANTInspect1
*[2]--SEALANTInspect2
*[1]  Do a detailed inspection of all sealant types for any sealant defects. For inspection zones defined in the task figures, inspect all cap
seals within zone. Swaged Collars without cap seal within the indicated inspection zone do not require inspection. Any cap seals located
outside of the inspection zones do not require inspection. Sealant defects are defined in accordance with Appendix A. Refer to Appendix
B of B787-81205-SB570053-00 SB for sealant defect examples. Sealant inspection requirements are defined in accordance with Appendix
C. Sealant may be covered by fuel tank leveling compound, it is not required to remove fuel tank leveling compound to do the detailed
inspection. Refer to Appendix H of B787-81205-SB570053-00 SB for typical fuel tank leveling compound locations.
B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
Page 56 of 195
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 57

Table 1
*[2]  Do a sealant adhesion test of the Cap Seal sealant types. For inspection zones defined in the task figures, do an adhesion test of all
cap seals within zone. Any cap seals located outside of the inspection zones do not require an adhesion test. Sealant adhesion test
requirements are defined in accordance with Appendix F. Adhesion tests are not required for any Cap Seals covered by fuel tank
leveling compound. Refer to Appendix H of B787-81205-SB570053-00 SB for typical fuel tank leveling compound locations.
B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
Page 57 of 195
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 58

Task 4 – LEFT WING SIDE OF BODY WING JOINT SEALANT DETAILED
INSPECTION AND ADHESION TEST [Group 2: ]
THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN
IN EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND THIS DOCUMENT TO
Alert:
THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS DOCUMENT
TO THE NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR COMPLIANCE DOCUMENT.
THE BOEING PROCESSES USED TO CREATE THE SERVICE BULLETIN (SB) AND THE
REQUIREMENTS BULLETIN (RB) ENSURE THAT THE INFORMATION BETWEEN "RC START"
AND "RC END" IN THE SB ARE IDENTICAL TO THE INFORMATION IN THE SAME SECTIONS
(COMPLIANCE, WORK INSTRUCTIONS...) OF THE RB WHICH THE SB REFERS TO AS THE
RELATED DOCUMENT.
B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
Page 58 of 195
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 59 (OCR)

@ BOEING  B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
REQUIREMENTS BULLETIN
Procedure
This Task applies only to: Group 2.
LEFT WING
(TOP VIEW)
ICN-B787-A-000061-A-81205-20479-A-01-1
Task 4 Figure 1
B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
Page 59 of 195
Export Controlled ECCN: 9E991
See page 1 for details

### Page 60 (OCR)

| BOEING  B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
REQUIREMENTS BULLETIN
LINED
LEFT WING
(BOTTOM VIEW)
ICN-B787-A-000061-A-81205-20480-A-01-1
Task 4 Figure 2
B787-81205-SB570053-00 RB
Issue 001, 05 Nov 2025 12:00:00 AM
Page 60 of 195
Export Controlled ECCN: 9E991
See page 1 for details

The text continues at https://openairdocs.org/service-documents/boeing/b787-81205-sb570053-00-rb/file/ca9a460f0975.md?from=61

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
