# Boeing Alert Requirements Bulletin DC10-54A111 RB: No revision named

- Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2020-1167; AD 2021-08-10 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Boeing Alert Requirements Bulletin DC10-54A111 RB](https://openairdocs.org/service-documents/boeing/dc10-54a111-rb.md)
- Title as filed: DC10-54A111 RB (1)
- Pages: 48
- PDF: https://openairdocs.org/files/sha256/24/d9/24d96f9361203324e4163494b543d88d531ecb26cd2b098ea10ec987eeef84bf
- Page: https://openairdocs.org/service-documents/boeing/dc10-54a111-rb/file/24d96f936120

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Commercial
Airplanes
DC10
Requirements Bulletin
ALERT
Number: DC10-54A111 RB
Original Issue: June 26, 2020
ATA System: 5405
SUBJECT: NACELLES/PYLONS - Wing Pylon - Aft Bulkhead Bracket Inspection
Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15
CFR 300-774). An export license may be required before it is used for development, production or use by foreign
persons from specific countries. The controller of this data has the individual responsibility to abide by all export
laws.
9E991ECCN:
Copyright © 2020 Boeing.
Unpublished Work. All Rights Reserved.
Treatment of this document and its content is governed by contract with Boeing. Rights to use this document
are licensed on a per aircraft basis and such rights may not be transferable. For more information, contact The
Boeing Company.
Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner,
BBJ, DC-8, DC-9, DC-10, KC-10, KC-46, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8, Poseidon and
Boeing liveries are all trademarks owned by The Boeing Company; and no trademark license is granted in
connection with this document unless provided in writing by Boeing.
Original Issue: June 26, 2020
DC10-54A111 RB
1 of 48
4.0

### Page 2

Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: June 26, 2020
DC10-54A111 RB
2 of 48
REQUIREMENTS BULLETIN DC10-54A111
ALERTALERT
BLANK PAGE

### Page 3

Table of Contents
1 . E F F E C T I V I T Y................................................ 5
A. Airplanes ................................................ 5
B . S p a r e s  A f f e c t e d............................................ 6
2. CONCURRENT REQUIREMENTS ..................................... 6
3 . C O M P L I A N C E ................................................ 6
4. APPROVAL ................................................. 8
5. ACCOMPLISHMENT INSTRUCTIONS .................................. 9
A . G e n e r a l  I n f o r m a t i o n .......................................... 9
B. Work Instructions ........................................... 1 1
FIGURE 1: LEFT WING PYLON - AFT BULKHEAD BRACKET - LOCKBOLT AND C OLLAR INSPECTION
.................................................. 1 4
FIGURE 2: RIGHT WING PYLON - AFT BULKHEAD BRACKET - LOCKBOLT AND COLLAR INSPECTION
.................................................. 1 7
FIGURE 3: LEFT WING PYLON - AFT BULKHEAD BRACKET - SURFACE AND OP EN HOLE ETHF
INSPECTION .......................................... 2 0
FIGURE 4: RIGHT WING PYLON - AFT BULKHEAD BRACKET - SURFACE AND O PEN HOLE ETHF
INSPECTION .......................................... 3 1
APPENDIX D: SURFACE INSPECTION PROCEDURE ........................... 4 2
APPENDIX E: OPEN HOLE INSPECTION PROCEDURE .......................... 4 6
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: June 26, 2020
DC10-54A111 RB
3 of 48
REQUIREMENTS BULLETIN DC10-54A111
ALERTALERT

### Page 4

Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: June 26, 2020
DC10-54A111 RB
4 of 48
REQUIREMENTS BULLETIN DC10-54A111
ALERTALERT
BLANK PAGE

### Page 5

Commercial
Airplanes
DC10
Requirements Bulletin
ALERT
Number: DC10-54A111 RB
Original Issue: June 26, 2020
ATA System: 5405
SUBJECT: NACELLES/PYLONS - Wing Pylon - Aft Bulkhead Bracket Inspection
THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN IN
PARAGRAPH 1.A., EFFECTIVITY . IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND THIS DOCUMENT
TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS DOCUMENT TO THE
NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR COMPLIANCE DOCUMENT.THE BOEING
PROCESSES USED TO CREATE THE SERVICE BULLETIN (SB) AND THE REQUIREMENTS BULLETIN
(RB) ENSURE THAT THE INFORMATION BETWEEN "RC START" AND "RC END" IN THE SB ARE IDENTICAL
TO THE INFORMATION IN THE SAME SECTIONS (COMPLIANCE, WORK INSTRUCTIONS…) OF THE RB
WHICH THE SB REFERS TO AS THE RELATED DOCUMENT.
1. Effectivity
A. Airplanes
This bulletin is applicable to DC-10-10, DC-10-15, DC-10-30, DC-10-40, DC-10-10F , DC-10-30F ,
DC-10-40F , DC-10-30F (KC-10A), DC-10-30F (KDC-10), MD-10-10F , MD-10-30F Airplane(s), line
number(s) 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26,
27, 28, 29, 30, 31, 32, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45-49, 50-59, 60-69, 70-79,
80-89, 90-99, 100-109, 110-119, 120-129, 130-139, 140-149, 150-159, 160-169, 170-179, 180-189,
190-199, 200-209, 210-219, 220-229, 230-239, 240-249, 250-259, 260-269, 270-279, 280-289,
290-299, 300-309, 310-319, 320-329, 330-339, 340-349, 350-359, 360-369, 370-379, 380-389,
390-399, 400-409, 410-419, 420-429, 430-439, 440-446 in 1 Group(s). Where the effectivity is
presented with hyphens between line numbers, the airplane applicability means "through" and
"inclusive", e.g. line numbers 1-9 means line numbers 1 through 9 inclusive.
DESCRIPTIONCONFIGURATIONGROUP
DC-10/MD-10 Airplanes.-1
Airplane Models:
DC-10-10, DC-10-10F , DC-10-15, DC-10-30, DC-10-30F , DC-10-30F (KC-10A), DC-10-30F
(KDC-10), DC-10-40, DC-10-40F , MD-10-10F , MD-10-30F
GroupFuselage Number
11 - 446
GroupFuselage Number
--
GroupFuselage Number
--
B. Spares Affected
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: June 26, 2020
DC10-54A111 RB
5 of 48

### Page 6

Examine your spares supply for the parts or components identified below. If any parts or components
are found, refer to Work Instructions for the recommended action.
Part NamePart Number
WING PYLON AFT BULKHEAD ASSYAUB7025-27
WING PYLON AFT BULKHEAD ASSYAUB7025-29
SPARES KITAUB7025-31
SPARES KITAUB7025-33
WING PYLON AFT BULKHEAD ASSYAUB7025-9
WING PYLON AFT BULKHEAD ASSYAUB7025-11
SPARES KITAUB7025-13
SPARES KITAUB7025-15
WING PYLON AFT BULKHEAD ASSYAUB7025-35
WING PYLON AFT BULKHEAD ASSYAUB7025-37
SPARES KITAUB7025-39
SPARES KITAUB7025-41
2. CONCURRENT REQUIREMENTS
None.
3. COMPLIANCE
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to
Requirements Bulletin DC10-54A111 RB. The Airworthiness Directive will make the compliance tasks and
times given in DC10-54A111 RB mandatory.
Accomplish the required actions, based on the applicable conditions in Table 1, in accordance with
Accomplishment Instructions.
When more than one OPTION is given for a CONDITION, do only one of the OPTION numbers. When
more than one ACTION is given for a CONDITION or an OPTION, do all of the ACTION numbers for that
CONDITION or OPTION.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: June 26, 2020
DC10-54A111 RB
6 of 48
REQUIREMENTS BULLETIN DC10-54A111
ALERTALERT

### Page 7

Table 1: Surface Eddy Current High Frequency (ETHF) Inspection and Open Hole ETHF Inspection of
the Left and Right Wing Pylon Aft Bulkhead Bracket
Repeat Interval
(Not to Exceed)
Compliance Time (Whichever
Occurs Later)
ActionCondition
-Within 1,700
flight cycles af-
ter the original
issue date of
Requirements
Bulletin DC10-
54A111 RB.
Before 19,000
total flight cy-
cles.
Do a general visual inspec-
tion of the left and right wing
pylon at the aft bulkhead
bracket for any lockbolt and
collar.
Airplanes with 42,299 total
flight cycles or less as of
the original issue date of
Requirements Bulletin
DC10-54A111 RB.
-Within 6
months after
the original is-
sue date of Re-
quirements
Bulletin DC10-
54A111 RB.
Before 44,000
total flight cy-
cles.
Do a general visual inspec-
tion of the left and right wing
pylon at the aft bulkhead
bracket for any lockbolt and
collar.
Airplanes with 42,300 total
flight cycles or more as of
the original issue date of
Requirements Bulletin
DC10-54A111 RB.
-Before further flight.CONDITION 1 (ACTION 1):
Contact The Boeing Compa-
ny for modification instruc-
tions and do the modification.
CONDITION 1: ANY
LOCKBOLT AND COL-
LAR FOUND AT THE
WING PYLON AFT
BULKHEAD BRACKET. -Before further flight.CONDITION 1 (ACTION 2):
Do a surface ETHF and open
hole ETHF inspection of the
left and right wing pylon aft
bulkhead bracket for any
crack.
-Before further flight.CONDITION 1.1 (ACTION 1):
Contact The Boeing Compa-
ny for repair or replacement
instructions and do the repair
or replacement.
CONDITION 1.1: ANY
CRACK FOUND AT THE
WING PYLON AFT
BULKHEAD BRACKET.
3,800 flight cycles.-CONDITION 1.1 (ACTION 2):
Repeat surface ETHF and
open hole ETHF inspection
of the left and right wing pylon
aft bulkhead bracket for any
crack.
3,800 flight cycles.-Repeat surface ETHF and
open hole ETHF inspection
of the left and right wing pylon
aft bulkhead bracket for any
crack.
CONDITION 1.2: NO
CRACK FOUND AT THE
WING PYLON AFT
BULKHEAD BRACKET.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: June 26, 2020
DC10-54A111 RB
7 of 48
REQUIREMENTS BULLETIN DC10-54A111
ALERTALERT

### Page 8

Table 1: Surface Eddy Current High Frequency (ETHF) Inspection and Open Hole ETHF Inspection of
the Left and Right Wing Pylon Aft Bulkhead Bracket
Repeat Interval
(Not to Exceed)
Compliance Time (Whichever
Occurs Later)
ActionCondition
-Before further flight.Do a surface ETHF and open
hole ETHF inspection of the
left and right wing pylon aft
bulkhead bracket for any
crack.
CONDITION 2: NO
LOCKBOLT AND COL-
LAR FOUND AT THE
WING PYLON AFT
BULKHEAD BRACKET.
-Before further flight.CONDITION 2.1 (ACTION 1):
Contact The Boeing Compa-
ny for repair or replacement
instructions and do the repair
or replacement.
CONDITION 2.1: ANY
CRACK FOUND AT THE
WING PYLON AFT
BULKHEAD BRACKET.
3,800 flight cycles.-CONDITION 2.1 (ACTION 2):
Repeat surface ETHF and
open hole ETHF inspection
of the left and right wing pylon
aft bulkhead bracket for any
crack.
3,800 flight cycles.-Repeat surface ETHF and
open hole ETHF inspection
of the left and right wing pylon
aft bulkhead bracket for any
crack.
CONDITION 2.2: NO
CRACK FOUND AT THE
WING PYLON AFT
BULKHEAD BRACKET.
4. APPROVAL
This Requirements Bulletin was examined by the Federal Aviation Administration (FAA). The changes
specified in this document comply with the applicable regulations and are FAA approved, as well as European
Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/JAA approved
airplanes listed in the service bulletin effectivity.This document and its approval were based on the airplane
in its original Boeing delivery configuration or as modified by other Boeing changes.
If an airplane has a non-Boeing modification or repair that affects a component or system also affected by
this Requirements Bulletin, the operator is responsible for obtaining appropriate regulatory agency approval
before incorporating this Requirements Bulletin.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: June 26, 2020
DC10-54A111 RB
8 of 48
REQUIREMENTS BULLETIN DC10-54A111
ALERTALERT

### Page 9

5.    ACCOMPLISHMENT INSTRUCTIONS
A. GENERAL INFORMATION
NOTE: 1. This is an Enhanced Required for Compliance document. There wi ll be a separate
Service Bulletin (SB) and a separate Requirements Bulletin (RB). If an RB is mandated
by an Airworthiness Directive (AD), then all applicable requirements specified in the
RB must be done. For the related SB, some locations are marked RC Start and RC
End to identify the requirements that are restated from the RB. For the related SB,
the areas between RC Start and RC End, including sub-steps and any figures
identified between RC Start and RC End, must be done to comply with the AD.
Therefore, an Alternative Method of Compliance (AMOC) is required for any deviations
to steps between RC Start and RC End, including substeps and identified figures.
For the related SB, the steps not between RC Start and RC End may be deviated
from using accepted methods in accordance with the operator's maintenance or
inspection program without obtaining approval of an AMOC; this is provided that the
steps between RC Start and RC End, including sub-steps and identified figures, can
still be done as specified, and the airplane can be put back in an airworthy condition.
Figures not required for compliance are omitted from the RB.
2. This is an Enhanced Required for Compliance document. The Boei ng processes
used to create the Service Bulletin (SB) and the Requirements Bulletin (RB) ensure
that the information between "RC Start" and "RC End" in the SB are identical to the
information in the same sections (Compliance, Work Instructions...) of the RB which
the SB refers to as the related document.
3. Use the approved fastener and process material substitutions,  in accordance with
DC-10 or MD-10 Structural Repair Manual, Chapter 51.
4. If the length of any fastener specified in this service bulle tin does not meet installation
standards given in Structural Repair Manual (SRM) Chapter 51, then a fastener of
the same specification, or an approved substitute, with a length which meets the
installation standards given in SRM Chapter 51 may be used. In addition, washers
may be installed for fastener grip length in accordance with SRM Chapter 51. Refer
to SOPM 20-50-01 for alternate full threaded fasteners (screws) needed for installation
in this service bulletin.
5. A 1/8-inch thick stack of the same type washers called for in  this service bulletin is
the maximum thickness which may be used under fastener head or nut to counteract
accumulation of tolerances.
EXCEPTION: When the available fastener length increments are greater than
1/16-inch, a 3/16-inch thick stack of the same type washers may be used.
6. Unless shown differently, these dimensions and tolerances are  used:
– Linear dimensions are in inches
– Tolerance on linear dimensions, other than rivet and bolt edge  margins, is plus
or minus 0.03 inch.
– Tolerance on rivet and bolt edge margin is plus or minus 0.05 inch
– Angular tolerance is plus or minus 2 degrees
– Hole dimensions for standard solid rivets are in DC-10 or MD-1 0 Structural
Repair Manual, Chapter 51.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: June 26, 2020
DC10-54A111 RB
9 of 48
REQUIREMENTS BULLETIN DC10-54A111
ALERTALERT

### Page 10

– Torque Values:
— Values for structural fasteners are given in DC-10 or MD-10 Structural
Repair Manual, Chapter 51.
— Values for airframe maintenance tasks are included in Chapter 20 of DC-10
or MD-10 Aircraft Maintenance Manual (AMM).
— Values for electrical maintenance tasks are included in Chapter 20 of
Standard Wiring Practices Manual (SWPM).
— Values for engine maintenance tasks are included in Chapter 70 of DC-10
or MD-10 Aircraft Maintenance Manual (AMM).
— Non-standard torque values for maintenance tasks are included in the
applicable installation step.
7. A General Visual Inspection is defined as: A visual examinatio n of an interior or
exterior area, installation or assembly to detect obvious damage, failure or irregularity.
This level of inspection is made from within touching distance unless otherwise
specified. A mirror may be necessary to enhance visual access to all exposed surfaces
in the inspection area. This level of inspection is made under normally available
lighting conditions such as daylight, hangar lighting, flashlight or drop-light and may
require removal or opening of access panels or doors. Stands, ladders or platforms
may be required to gain proximity to the area being checked.
8. These work instructions refer to procedures included in other  Boeing documents.
When the words "refer to" are used and the operator has an accepted alternative
procedure, the accepted alternative procedure can be used. When the words "in
accordance with" are included in the instruction, the procedure in the Boeing document
must be used.
9. If it is necessary to remove more parts for access, you can r emove those parts. If
you can get access without removing identified parts, it is not necessary to remove
all of the identified parts. Jacking and shoring limitations must be observed.
10. Where the work instructions  include installation of a kept part, a new or serviceable
part with the same part number can be installed as an alternative to the kept part.
11. When more than one OPTION is given for a CONDITION, do only one of the OPTION
numbers. When more than one ACTION is given for a CONDITION or an OPTION,
do all of the ACTION numbers for that CONDITION or OPTION.
12. The compliance times for the actions in WORK INSTRUCTIONS ar e in Compliance.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: June 26, 2020
DC10-54A111 RB
10 of 48
REQUIREMENTS BULLETIN DC10-54A111
ALERTALERT

### Page 11

B. WORK INSTRUCTIONS
Actions Required for Compliance:
1. Requirements
Table 1: Surface Eddy Current High Frequency (ETHF) Inspection and Open Hole ETHF Inspection of
the Left and Right Wing Pylon Aft Bulkhead Bracket
Refer to the listed proce-
dures in SB DC10-54A111
Original Issue or later ap-
proved revisions as an ac-
cepted procedure
Method Of Compli-
ance
ActionCondition
PART 1: OPEN ACCESS.-Do a general visual inspec-
tion of the left and right wing
pylon at the aft bulkhead
bracket for any lockbolt and
collar.
All airplanes
-FIGURE 1
-FIGURE 2
--CONDITION 1 (ACTION 1):
Contact The Boeing Compa-
ny for modification instruc-
tions and do the modification.
CONDITION 1: ANY
LOCKBOLT AND COL-
LAR FOUND AT THE
WING PYLON AFT
BULKHEAD BRACKET. PART 2: PREPARATION
FOR SURFACE ETHF IN-
SPECTION and PART 3:
PREPARATION FOR OPEN
HOLE ETHF INSPECTION.
-CONDITION 1 (ACTION 2):
Do a surface ETHF and open
hole ETHF inspection of the
left and right wing pylon aft
bulkhead bracket for any
crack. -FIGURE 3
-FIGURE 4
--CONDITION 1.1 (ACTION 1):
Contact The Boeing Compa-
ny for repair or replacement
instructions and do the repair
or replacement.
CONDITION 1.1: ANY
CRACK FOUND AT THE
WING PYLON AFT
BULKHEAD BRACKET.
PART 4: CLOSE ACCESS.-
PART 1: OPEN ACCESS,
PART 2: PREPARATION
FOR SURFACE ETHF IN-
SPECTION and PART 3:
PREPARATION FOR OPEN
HOLE ETHF INSPECTION.
-CONDITION 1.1 (ACTION 2):
Repeat surface ETHF and
open hole ETHF inspection
of the left and right wing pylon
aft bulkhead bracket for any
crack.
-FIGURE 3
-FIGURE 4
PART 4: CLOSE ACCESS.-
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: June 26, 2020
DC10-54A111 RB
11 of 48
REQUIREMENTS BULLETIN DC10-54A111
ALERTALERT

### Page 12

Table 1: Surface Eddy Current High Frequency (ETHF) Inspection and Open Hole ETHF Inspection of
the Left and Right Wing Pylon Aft Bulkhead Bracket
Refer to the listed proce-
dures in SB DC10-54A111
Original Issue or later ap-
proved revisions as an ac-
cepted procedure
Method Of Compli-
ance
ActionCondition
PART 1: OPEN ACCESS,
PART 2: PREPARATION
FOR SURFACE ETHF IN-
SPECTION and PART 3:
PREPARATION FOR OPEN
HOLE ETHF INSPECTION.
-Repeat surface ETHF and
open hole ETHF inspection
of the left and right wing pylon
aft bulkhead bracket for any
crack.
CONDITION 1.2: NO
CRACK FOUND AT THE
WING PYLON AFT
BULKHEAD BRACKET.
-FIGURE 3
-FIGURE 4
PART 4: CLOSE ACCESS.-
PART 2: PREPARATION
FOR SURFACE ETHF IN-
SPECTION and PART 3:
PREPARATION FOR OPEN
HOLE ETHF INSPECTION.
-Do a surface ETHF and open
hole ETHF inspection of the
left and right wing pylon aft
bulkhead bracket for any
crack.
CONDITION 2: NO
LOCKBOLT AND COL-
LAR FOUND AT THE
WING PYLON AFT
BULKHEAD BRACKET.
-FIGURE 3
-FIGURE 4
--CONDITION 2.1 (ACTION 1):
Contact The Boeing Compa-
ny for repair or replacement
instructions and do the repair
or replacement.
CONDITION 2.1: ANY
CRACK FOUND AT THE
WING PYLON AFT
BULKHEAD BRACKET.
PART 4: CLOSE ACCESS.-
PART 1: OPEN ACCESS,
PART 2: PREPARATION
FOR SURFACE ETHF IN-
SPECTION and PART 3:
PREPARATION FOR OPEN
HOLE ETHF INSPECTION.
-CONDITION 2.1 (ACTION 2):
Repeat surface ETHF and
open hole ETHF inspection
of the left and right wing pylon
aft bulkhead bracket for any
crack.
-FIGURE 3
-FIGURE 4
PART 4: CLOSE ACCESS.-
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: June 26, 2020
DC10-54A111 RB
12 of 48
REQUIREMENTS BULLETIN DC10-54A111
ALERTALERT

### Page 13

Table 1: Surface Eddy Current High Frequency (ETHF) Inspection and Open Hole ETHF Inspection of
the Left and Right Wing Pylon Aft Bulkhead Bracket
Refer to the listed proce-
dures in SB DC10-54A111
Original Issue or later ap-
proved revisions as an ac-
cepted procedure
Method Of Compli-
ance
ActionCondition
PART 1: OPEN ACCESS,
PART 2: PREPARATION
FOR SURFACE ETHF IN-
SPECTION and PART 3:
PREPARATION FOR OPEN
HOLE ETHF INSPECTION.
-Repeat surface ETHF and
open hole ETHF inspection
of the left and right wing pylon
aft bulkhead bracket for any
crack.
CONDITION 2.2: NO
CRACK FOUND AT THE
WING PYLON AFT
BULKHEAD BRACKET.
-FIGURE 3
-FIGURE 4
PART 4: CLOSE ACCESS.-
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: June 26, 2020
DC10-54A111 RB
13 of 48
REQUIREMENTS BULLETIN DC10-54A111
ALERTALERT

### Page 14 (OCR)

REQUIREMENTS BULLETIN DC10-54A111
ALERT  ALERT
WING TO PYLON AND AFT
FAIRINGS REMOVED FOR CLARITY
2917963
FIGURE 1: LEFT WING PYLON - AFT BULKHEAD BRACKET - LOCKBOLT AND COLLAR INSPECTION
(SHEET 1 OF 3)
Original Issue: June 26, 2020
Export Controlled ECCN: 9E991  DC10-54A111 RB
Copyright © Unpublished
Work - See page 1 for details.  14 of 48

### Page 15 (OCR)

REQUIREMENTS BULLETIN DC10-54A111
ALERT  ALERT
UPPER BOX  WEB
A
B
PYLON AFT
BULKHEAD
BRACKET
UPPER BOX
UPPER BOX  WEB
WEB
FWD  FWD
PYLON AFT  PYLON AFT
~ BULKHEAD  *BULKHEAD
BRACKET  BRACKET
SINGLE ROW OF FASTENERS  TWO ROWS OF FASTENERS
A-A  B-B
VIEW LOOKING DOWN
INSPECTION AREA
FIGURE 1: LEFT WING PYLON - AFT BULKHEAD BRACKET - LOCKBOLT AND COLLAR INSPECTION
(SHEET 2 OF 3)
Original Issue: June 26, 2020
Export Controlled ECCN: 9E991  Copyright © Unpublished  DC10-54A111 RB
Work - See page 1 for details.  15 of 48

### Page 16

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for this figure.
More DataQtyIdentificationNameTaskStep
(a)4-BOLTInspect1
(a) Do a general visual inspection of the wing pylon at the aft bulkhead bracket for any lockbolt and collar.
FIGURE 1: LEFT WING PYLON - AFT BULKHEAD BRACKET - LOCKBOLT AND COLLAR INSPECTION
(SHEET 3 OF 3)
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: June 26, 2020
DC10-54A111 RB
16 of 48
REQUIREMENTS BULLETIN DC10-54A111
ALERTALERT

### Page 17 (OCR)

REQUIREMENTS BULLETIN DC10-54A111
ALERT  ALERT
VING TO PYLON AND AF
AIRINGS REMOVED FOR CLARIT
2917975
FIGURE 2: RIGHT WING PYLON - AFT BULKHEAD BRACKET - LOCKBOLT AND COLLAR INSPECTION
(SHEET 1 OF 3)
Original Issue: June 26, 2020
Export Controlled ECCN: 9E991  Copyright © Unpublished  DC10-54A111 RB
Work - See page 1 for details.  17 of 48

### Page 18 (OCR)

REQUIREMENTS BULLETIN DC10-54A111
ALERT  ALERT
UPPER BOX
WEB
B
PYLON AFT
BULKHEAD
BRACKET
B
UPPER BOX
WEB
UPPER BOX
WEB
FWD
PYLON AFT  PYLON AFT
BULKHEAD  BULKHEAD
BRACKET  BRACKET
SINGLE ROW OF FASTENERS
A-A  VIEW LOOKING DOWN  2923355
INSPECTION AREA
FIGURE 2: RIGHT WING PYLON - AFT BULKHEAD BRACKET - LOCKBOLT AND COLLAR INSPECTION
(SHEET 2 OF 3)
Original Issue: June 26, 2020
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.  811081

### Page 19

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for this figure.
More DataQtyIdentificationNameTaskStep
(a)4-BOLTInspect1
(a) Do a general visual inspection of the wing pylon at the aft bulkhead bracket for any lockbolt and collar.
FIGURE 2: RIGHT WING PYLON - AFT BULKHEAD BRACKET - LOCKBOLT AND COLLAR INSPECTION
(SHEET 3 OF 3)
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: June 26, 2020
DC10-54A111 RB
19 of 48
REQUIREMENTS BULLETIN DC10-54A111
ALERTALERT

### Page 20 (OCR)

REQUIREMENTS BULLETIN DC10-54A111
ALERT  ALERT
WING TO PYLON AND AFT
FAIRINGS REMOVED FOR CLARITY
2916455
FIGURE 3: LEFT WING PYLON - AFT BULKHEAD BRACKET - SURFACE AND OPEN HOLE ETHF
INSPECTION
(SHEET 1 OF 11)
Original Issue: June 26, 2020
Export Controlled ECCN: 9E991  DC10-54A111 RB
Copyright © Unpublished
Work - See page 1 for details.  20 of 48

### Page 21 (OCR)

REQUIREMENTS BULLETIN DC10-54A111
ALERT  ALERT
PYLON AFT
BULKHEAD
BRACKET
UPPER BOX \  WEB
•PYLON AFT
BULKHEAD
2916665
FIGURE 3: LEFT WING PYLON - AFT BULKHEAD BRACKET - SURFACE AND OPEN HOLE ETHF
INSPECTION
(SHEET 2 OF 11)
Original Issue: June 26, 2020
Export Controlled ECCN: 9E991  DC10-54A111 RB
Copyright © Unpublished
Work - See page 1 for details.  21 of 48

### Page 22 (OCR)

REQUIREMENTS BULLETIN DC10-54A111
ALERT  ALERT
PYLON AFT
BULKHEAD
BRACKET
PYLON AFT
BULKHEAD
BRACKET  C  - B
F
3.00
MINIMUM
F
PYLON AFT
BULKHEAD
BRACKET
VIEW LOOKING AFT
A-A
ETHF INSPECTION  2933941
FIGURE 3: LEFT WING PYLON - AFT BULKHEAD BRACKET - SURFACE AND OPEN HOLE ETHF
INSPECTION
(SHEET 3 OF 11)
Original Issue: June 26, 2020
Export Controlled ECCN: 9E991  DC10-54A111 RB
Copyright © Unpublished
Work - See page 1 for details.  22 of 48

### Page 23 (OCR)

REQUIREMENTS BULLETIN DC10-54A111
ALERT  ALERT
UPPER BOX
WEB
• TYPICAL CRACK
SIDE WING
PYLON SKIN  FILLET
RADIUS
UPPER BOX
VIEW LOOKING UP AND INBOARD  WEB
(TYPICAL)
TYPICAL CRACK •
SIDE WING
4  PYLON SKIN
FILLET
RADIUS
VIEW LOOKING UP AND OUTBOARD
(TYPICAL)
ETHF INSPECTION
FIGURE 3: LEFT WING PYLON - AFT BULKHEAD BRACKET - SURFACE AND OPEN HOLE ETHF
INSPECTION
(SHEET 4 OF 11)
Original Issue: June 26, 2020
Export Controlled ECCN: 9E991  DC10-54A111 RB
Copyright © Unpublished
Work - See page 1 for details.  23 of 48

### Page 24 (OCR)

REQUIREMENTS BULLETIN DC10-54A111
ALERT  ALERT
TYPICAL  TYPICAL
CRACK  CRACK
PYLON AFT
BULKHEAD
BRACKET
PYLON AFT
BULKHEAD
BRACKET
TYPICAL
CRACK
TYPICAL
CRACK
B-B  FWD  FWD  C-C
ETHF INSPECTION  2916689
FIGURE 3: LEFT WING PYLON - AFT BULKHEAD BRACKET - SURFACE AND OPEN HOLE ETHF
INSPECTION
(SHEET 5 OF 11)
Original Issue: June 26, 2020
Export Controlled ECCN: 9E991  DC10-54A111 RB
Copyright © Unpublished
Work - See page 1 for details.  24 of 48

### Page 25 (OCR)

REQUIREMENTS BULLETIN DC10-54A111
ALERT  ALERT
UPPER
BOX WEB  BOX WEE
TYPICAL
CRACK  PYLON AFT
BULKHEAD
PYLON AFT  BRACKET
BULKHEAD
TYPICAL  BRACKET
CRACK
FWD  FWD
SINGLE ROW OF FASTENERS  TWO ROWS OF FASTENERS
(TYPICAL)  (TYPICAL)
VIEW LOOKING UP
D-D
ETHF INSPECTION  2923417
FIGURE 3: LEFT WING PYLON - AFT BULKHEAD BRACKET - SURFACE AND OPEN HOLE ETHF
INSPECTION
(SHEET 6 OF 11)
Original Issue: June 26, 2020
Export Controlled ECCN: 9E991  DC10-54A111 RB
Copyright © Unpublished
Work - See page 1 for details.  25 of 48

### Page 26 (OCR)

REQUIREMENTS BULLETIN DC10-54A111
ALERT  ALERT
TYPICAL  TYPICAL
CRACK  CRACK
4 LOCATIONS  4 LOCATIONS
PYLON AFT
BULKHEAD
BRACKET
PYLON AFT
BULKHEAD
BRACKET
E-E  FWD  FWD  F-F
ETHF INSPECTION  2927426
FIGURE 3: LEFT WING PYLON - AFT BULKHEAD BRACKET - SURFACE AND OPEN HOLE ETHF
INSPECTION
(SHEET 7 OF 11)
Original Issue: June 26, 2020
Export Controlled ECCN: 9E991  DC10-54A111 RB
Copyright © Unpublished
Work - See page 1 for details.  26 of 48

### Page 27 (OCR)

REQUIREMENTS BULLETIN DC10-54A111
ALERT  ALERT
000
(14 LOCATIONS)  (13 LOCATIONS)
UPPER  UPPER
BOX WEB
BOX WEB -
PYLON AFT
PYLON AFT  BULKHEAD
BRACKET  BULKHEAD  BRACKET
TYPICAL
CRACK  TYPICAL
CRACK
FWD
SINGLE ROW OF FASTENERS  TWO ROWS OF FASTENERS
(TYPICAL)  (TYPICAL)
VIEW LOOKING UP
G-G
/ ETHF INSPECTION  2927550
FIGURE 3: LEFT WING PYLON - AFT BULKHEAD BRACKET - SURFACE AND OPEN HOLE ETHF
INSPECTION
(SHEET 8 OF 11)
Original Issue: June 26, 2020
Export Controlled ECCN: 9E991  DC10-54A111 RB
Work - See page 1 for details.  Copyright © Unpublished  27 of 48

### Page 28

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for this figure.
More DataQtyIdentificationNameTaskStep
(a)(i)--AFT BULKHEAD
BRACKET
Inspect1
(b)(e)(i)--AFT BULKHEAD
BRACKET
Inspect2
(c)(e)(i)--AFT BULKHEAD
BRACKET
Inspect3
(d)(e)(i)--AFT BULKHEAD
BRACKET
Inspect4
FIGURE 3: LEFT WING PYLON - AFT BULKHEAD BRACKET - SURFACE AND OPEN HOLE ETHF
INSPECTION
(SHEET 9 OF 11)
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: June 26, 2020
DC10-54A111 RB
28 of 48
REQUIREMENTS BULLETIN DC10-54A111
ALERTALERT

### Page 29

More DataQtyIdentificationNameTaskStep
-2-NUTRemove / Keep5
-2-WASHERRemove / Keep
-2-WASHERRemove / Keep
(f)2-BOLTRemove / Keep
(g)(i)2-AFT BULKHEAD
BRACKET
Inspect6
Install fasteners wet
with 90-006 sealant
and 90-006-2 cata-
lyst or equivalent.
Reference DC-10,
MD-10 SRM 51.
2-BOLTInstall (Kept)7
Install washer under
bolt head.
2-WASHERInstall (Kept)
Install washer under
nut.
2-WASHERInstall (Kept)
-2-NUTInstall (Kept)
-2-NUTRemove8
-2-WASHERRemove
(f)2-BOLTRemove
(h)(i)2-AFT BULKHEAD
BRACKET
Inspect9
Install fasteners wet
with 90-006 sealant
and 90-006-2 cata-
lyst or equivalent.
Reference DC-10,
MD-10 SRM 51.
2-BOLTInstall (Kept)10
Install washer under
nut.
2-WASHERInstall (Kept)
-2-NUTInstall (Kept)
(a) Do a surface ETHF inspection of the wing pylon aft bulkhead bracket forward edge for any crack in accor-
dance with APPENDIX D.
(b) Do a surface ETHF inspection of the wing pylon aft bulkhead bracket flanges surface for any crack in
accordance with APPENDIX D.
(c) Do a surface ETHF inspection of the wing pylon aft bulkhead bracket, scan around fasteners for any crack
in accordance with APPENDIX D.
FIGURE 3: LEFT WING PYLON - AFT BULKHEAD BRACKET - SURFACE AND OPEN HOLE ETHF
INSPECTION
(SHEET 10 OF 11)
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: June 26, 2020
DC10-54A111 RB
29 of 48
REQUIREMENTS BULLETIN DC10-54A111
ALERTALERT

### Page 30

More DataQtyIdentificationNameTaskStep
(d) Do a surface ETHF inspection of the wing pylon aft bulkhead bracket fillet radii for any crack in accordance
with APPENDIX D.
(e) Structure attached to the aft pylon bracket and fastener hardware obstructing probe access does not have
to be detached from the aft pylon bracket.
(f) Remove sealant from inside of open holes. Remove sealant using nonmetallic brush or equivalent and
solvent. Refer to SOPM 20-10-24 for accepted equivalent solvents/procedures.
(g) Do an open hole ETHF inspection at the two forward hole locations for any crack in accordance with
APPENDIX E. Use the calibrated probe diameter range 0.250-0.312 or 0.312-0.375.
(h) Do an open hole ETHF inspection at the two aft hole locations for any crack in accordance with APPENDIX
E. Use the calibrated probe diameter range 0.312-0.375.
(i) Any indication from the surface ETHF inspection is considered a crack, which exhibits the same relative
phase angle and amplitude of 50 percent or greater than the indication obtained from the calibration notch
in the reference standard.
FIGURE 3: LEFT WING PYLON - AFT BULKHEAD BRACKET - SURFACE AND OPEN HOLE ETHF
INSPECTION
(SHEET 11 OF 11)
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: June 26, 2020
DC10-54A111 RB
30 of 48
REQUIREMENTS BULLETIN DC10-54A111
ALERTALERT

### Page 31 (OCR)

REQUIREMENTS BULLETIN DC10-54A111
ALERT  ALERT
VING TO PYLON AND AF
AIRINGS REMOVED FOR CLARIT'
2924492
FIGURE 4: RIGHT WING PYLON - AFT BULKHEAD BRACKET - SURFACE AND OPEN HOLE ETHF
INSPECTION
(SHEET 1 OF 11)
Original Issue: June 26, 2020
Export Controlled ECCN: 9E991  DC10-54A111 RB
Copyright © Unpublished
Work - See page 1 for details.  31 of 48

### Page 32 (OCR)

REQUIREMENTS BULLETIN DC10-54A111
ALERT  ALERT
PYLON AFT
BULKHEAD
BRACKET
• UPPER BOX
WEB
H
PYLON AFT
BULKHEAD
2923423
FIGURE 4: RIGHT WING PYLON - AFT BULKHEAD BRACKET - SURFACE AND OPEN HOLE ETHF
INSPECTION
(SHEET 2 OF 11)
Original Issue: June 26, 2020
Export Controlled ECCN: 9E991  DC10-54A111 RB
Copyright © Unpublished
Work - See page 1 for details.  32 of 48

### Page 33 (OCR)

REQUIREMENTS BULLETIN DC10-54A111
ALERT  ALERT
PYLON AFT
BULKHEAD
BRACKET
PYLON AFT
BULKHEAD
BRACKET
B
F  E
3.00
MINIMUM
PYLON AFT
BULKHEAD
BRACKET
VIEW LOOKING AFT
A-A
ETHF INSPECTION  2933947
FIGURE 4: RIGHT WING PYLON - AFT BULKHEAD BRACKET - SURFACE AND OPEN HOLE ETHF
INSPECTION
(SHEET 3 OF 11)
Original Issue: June 26, 2020
Export Controlled ECCN: 9E991  DC10-54A111 RB
Copyright © Unpublished
Work - See page 1 for details.  33 of 48

### Page 34 (OCR)

REQUIREMENTS BULLETIN DC10-54A111
ALERT  ALERT
UPPER BOX
WEB
TYPICAL CRACK •
FILLET  RADIUS  PYLON SKIN  SIDE WING
UPPER BOX
WEB
VIEW LOOKING UP AND INBOARD
(TYPICAL)
TYPICAL CRACK
SIDE WING
PYLON SKIN  FILLET
RADIUS
VIEW LOOKING UP AND OUTBOARL
ETHF INSPECTION  (TYPICAL)  2927760
FIGURE 4: RIGHT WING PYLON - AFT BULKHEAD BRACKET - SURFACE AND OPEN HOLE ETHF
INSPECTION
(SHEET 4 OF 11)
Original Issue: June 26, 2020
Export Controlled ECCN: 9E991  DC10-54A111 RB
Copyright © Unpublished
Work - See page 1 for details.  34 of 48

### Page 35 (OCR)

REQUIREMENTS BULLETIN DC10-54A111
ALERT  ALERT
TYPICAL  TYPICAL
CRACK  CRACK
PYLON AFT
BULKHEAD.
BRACKET
PYLON AFT
BULKHEAD
BRACKET
TYPICAL
CRACK  TYPICAL
CRACK
B-B  FWD  FWD  C-C
4 ETHF INSPECTION  2923424
FIGURE 4: RIGHT WING PYLON - AFT BULKHEAD BRACKET - SURFACE AND OPEN HOLE ETHF
INSPECTION
(SHEET 5 OF 11)
Original Issue: June 26, 2020
Export Controlled ECCN: 9E991  DC10-54A111 RB
Copyright © Unpublished
Work - See page 1 for details.  35 of 48

### Page 36 (OCR)

REQUIREMENTS BULLETIN DC10-54A111
ALERT  ALERT
UPPER
BOX WEB
UPPER
BOX WEE
PYLON AFT
PYLON AFT  BULKHEAD
BULKHEAD  BRACKET
BRACKET
TYPICAL
CRACK
FWD  FWD
SINGLE ROW OF FASTENERS  TWO ROWS OF FASTENERS
(TYPICAL)  (TYPICAL)
VIEW LOOKING UP
D-D
ETHF INSPECTION  2923425
FIGURE 4: RIGHT WING PYLON - AFT BULKHEAD BRACKET - SURFACE AND OPEN HOLE ETHF
INSPECTION
(SHEET 6 OF 11)
Original Issue: June 26, 2020
Export Controlled ECCN: 9E991  DC10-54A111 RB
Copyright © Unpublished
Work - See page 1 for details.  36 of 48

### Page 37 (OCR)

REQUIREMENTS BULLETIN DC10-54A111
ALERT  ALERT
TYPICAL  TYPICAL
CRACK  CRACK
4 LOCATIONS
(3)
4 LOCATIONS
PYLON AFT
BULKHEAD
BRACKET
PYLON AFT
BULKHEAD
BRACKET
E-E  FWD  F-F
4 ETHF INSPECTION  2927758
FIGURE 4: RIGHT WING PYLON - AFT BULKHEAD BRACKET - SURFACE AND OPEN HOLE ETHF
INSPECTION
(SHEET 7 OF 11)
Original Issue: June 26, 2020
Export Controlled ECCN: 9E991  DC10-54A111 RB
Copyright © Unpublished
Work - See page 1 for details.  37 of 48

### Page 38 (OCR)

REQUIREMENTS BULLETIN DC10-54A111
ALERT  ALERT
(13 LOCATIONS)
(14 LOCATIONS
UPPER
BOX WEB
•UPPER
BOX WEB
PYLON AFT  BULKHEAD  PYLON AFT  BULKHEAD
BRACKET  BRACKET
TYPICAL  TYPICAL
CRACK  CRACK
FWD  FWD
SINGLE ROW OF FASTENERS  TWO ROWS OF FASTENERS
(TYPICAL)  (TYPICAL)
VIEW LOOKING UP
G-G
ETHF INSPECTION  2927759
FIGURE 4: RIGHT WING PYLON - AFT BULKHEAD BRACKET - SURFACE AND OPEN HOLE ETHF
INSPECTION
(SHEET 8 OF 11)
Original Issue: June 26, 2020
Export Controlled ECCN: 9E991  DC10-54A111 RB
Copyright © Unpublished
Work - See page 1 for details.  38 of 48

### Page 39

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for this figure.
More DataQtyIdentificationNameTaskStep
(a)(i)--AFT BULKHEAD
BRACKET
Inspect1
(b)(e)(i)--AFT BULKHEAD
BRACKET
Inspect2
(c)(e)(i)--AFT BULKHEAD
BRACKET
Inspect3
(d)(e)(i)--AFT BULKHEAD
BRACKET
Inspect4
FIGURE 4: RIGHT WING PYLON - AFT BULKHEAD BRACKET - SURFACE AND OPEN HOLE ETHF
INSPECTION
(SHEET 9 OF 11)
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: June 26, 2020
DC10-54A111 RB
39 of 48
REQUIREMENTS BULLETIN DC10-54A111
ALERTALERT

### Page 40

More DataQtyIdentificationNameTaskStep
-2-NUTRemove / Keep5
-2-WASHERRemove / Keep
-2-WASHERRemove / Keep
(f)2-BOLTRemove / Keep
(g)(i)2-AFT BULKHEAD
BRACKET
Inspect6
Install fasteners wet
with 90-006 sealant
and 90-006-2 cata-
lyst or equivalent.
Reference DC-10,
MD-10 SRM 51.
2-BOLTInstall (Kept)7
Install washer under
bolt head.
2-WASHERInstall (Kept)
Install washer under
nut.
2-WASHERInstall (Kept)
-2-NUTInstall (Kept)
-2-NUTRemove8
-2-WASHERRemove
(f)2-BOLTRemove
(h)(i)2-AFT BULKHEAD
BRACKET
Inspect9
Install fasteners wet
with 90-006 sealant
and 90-006-2 cata-
lyst or equivalent.
Reference DC-10,
MD-10 SRM 51.
2-BOLTInstall (Kept)10
Install washer under
nut.
2-WASHERInstall (Kept)
-2-NUTInstall (Kept)
(a) Do a surface ETHF inspection of the wing pylon aft bulkhead bracket forward edge for any crack in accor-
dance with APPENDIX D.
(b) Do a surface ETHF inspection of the wing pylon aft bulkhead bracket flanges surface for any crack in
accordance with APPENDIX D.
(c) Do a surface ETHF inspection of the wing pylon aft bulkhead bracket, scan around fasteners for any crack
in accordance with APPENDIX D.
FIGURE 4: RIGHT WING PYLON - AFT BULKHEAD BRACKET - SURFACE AND OPEN HOLE ETHF
INSPECTION
(SHEET 10 OF 11)
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: June 26, 2020
DC10-54A111 RB
40 of 48
REQUIREMENTS BULLETIN DC10-54A111
ALERTALERT

### Page 41

More DataQtyIdentificationNameTaskStep
(d) Do a surface ETHF inspection of the wing pylon aft bulkhead bracket fillet radii for any crack in accordance
with APPENDIX D.
(e) Structure attached to the aft pylon bracket and fastener hardware obstructing probe access does not have
to be detached from the aft pylon bracket.
(f) Remove sealant from inside of open holes. Remove sealant using nonmetallic brush or equivalent and
solvent. Refer to SOPM 20-10-24 for accepted equivalent solvents/procedures.
(g) Do an open hole ETHF inspection at the two forward hole locations for any crack in accordance with
APPENDIX E. Use the calibrated probe diameter range 0.250-0.312 or 0.312-0.375.
(h) Do an open hole ETHF inspection at the two aft hole locations for any crack in accordance with APPENDIX
E. Use the calibrated probe diameter range 0.312-0.375.
(i) Any indication from the surface ETHF inspection is considered a crack, which exhibits the same relative
phase angle and amplitude of 50 percent or greater than the indication obtained from the calibration notch
in the reference standard.
FIGURE 4: RIGHT WING PYLON - AFT BULKHEAD BRACKET - SURFACE AND OPEN HOLE ETHF
INSPECTION
(SHEET 11 OF 11)
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: June 26, 2020
DC10-54A111 RB
41 of 48
REQUIREMENTS BULLETIN DC10-54A111
ALERTALERT

### Page 42

1. Surface inspection calibration:
a. Attach applicable probe into the Eddy Current instrument and set initial operating frequency:
180-200 kHz.
b. Place probe on the reference standard in an area away from EDM notch. Null/balance the instrument
and adjust for liftoff in accordance with the manufacturer's instructions.
c. Scan the applicable pencil probe over the EDM notch represent ative of the area to be inspected
and observe the Impedance Plane Display (IPD) for a crack-like indication. Scan direction is
perpendicular to the length of the notch.
d. Adjust horizontal, vertical, and rotation controls to achieve  the signal display.
Table 1: Calibration Procedure
NotesNotch for Calibra-tionApplicable Probe(c)Reference StandardScan Type
(a)(b)Notch 1
PAB90207, SPC-
737, SPC-751-B,
SPC-751-C,
PABM90C503-072
ECRS-551Surface
(a)(b)Notch 4, Notch 5,Notch 6, Notch 7SPC-751-A,PAB90207, SPC-737ECRS-551Fillet Radius
(a)(b)Notch 8
PAB90207, SPC-
737, SPC-751-B,
SPC-751-C,
PABM90C503-072,
SPC-760.370, SPC-
760.500
ECRS-551Around Fasteners
(a)(b)Notch 2, Notch 3
PAB90207, SPC-
737, SPC-751-B,
SPC-751-C,
PABM90C503-072
ECRS-551Edge
(a) It is acceptable to use an alternative reference standard for calibration purposes; with EDM notch of similar
length & depth parameters For example: the DAC GSET AL.01 refer to NDTSPM Part 06-20-01 Figure.
1, Sheets 1-3 as an accepted procedure.
(b) Refer to APPENDIX C for option for reference standard fabrication.
(c) Applicable probe from APPENDIX B equipment/material substitutions producing results equivalent to
those defined by this document may also be used. Refer to NDTSPM Part 01-00-03 and NDTSPM Part
06-00-03 for equipment/material information.
APPENDIX D:  SURFACE INSPECTION PROCEDURE
(SHEET 1 OF 4)
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: June 26, 2020
DC10-54A111 RB
42 of 48
REQUIREMENTS BULLETIN DC10-54A111
ALERTALERT

### Page 43 (OCR)

REQUIREMENTS BULLETIN DC10-54A111
ALERT  ALERT
ZERO-DROP
PROBE
NOTCH
NOTCH
90° PENCIL
PROBE
NOTCH
NOTCH  NOTCH
PENCIL
PROBE
SWIVEL
PROBE
NOTCH
NOTCH
NOTCH
RADIUS
PROBE
NOTCH CRACK
INSTRUMENT:  NORTEC 2000D
PROBE:  PAB90207
FREQUENCY:  180.0 KHz
GAIN HOIZ:  50.0 dB
GAIN VERT:  71.5 dB
ROTATION:  99°
PROBE DRIVE:  MID
FILTERS: LP  100
HP
NOTE:
SETTINGS LISTED WERE USED FOR THE
SETUP OF THE LISTED PROBE. THE LISTED
VALUES MAY VARY DEPENDING ON PROBE
USED. VALUES MAY ALSO VARY FROM
INSTRUMENT TO INSTRUMENT.
SIGNAL-TO-NOISE RATIO: 3:1 (MINIMUM)
NULL/BALANCE
LIFTOFF  IMPEDANCE PLANE DISPLAY (IPD)  INSTRUMENT CALIBRATION (PENCIL PROBE)  2924570
APPENDIX D: SURFACE INSPECTION PROCEDURE
(SHEET 2 OF 4)
Original Issue: June 26, 2020
Export Controlled ECCN: 9E991  Copyright © Unpublished  DC10-54A111 RB
Work - See page 1 for details.  43 of 48

### Page 44 (OCR)

REQUIREMENTS BULLETIN DC10-54A111
ALERT  ALERT
NOTCH CRACK
INSTRUMENT:  NORTEC 2000D
PROBE:  SPC-751-B
FREQUENCY:  180.0 KHz
GAIN HOIZ:  50.0 dB
GAIN VERT:  56.0 dB
ROTATION:  48°
PROBE DRIVE:  MID
FILTERS: LP  100
• HP
NOTE:
SETTINGS LISTED WERE USED FOR THE
SETUP OF THE LISTED PROBE. THE LISTEL
VALUES MAY VARY DEPENDING ON PROBE
USED. VALUES MAY ALSO VARY FROM
INSTRUMENT TO INSTRUMENT.
SIGNAL-TO-NOISE RATIO: 3:1 (MINIMUM)
→ NULL/BALANCE
IMPEDANCE PLANE DISPLAY (IPD)
INSTRUMENT CALIBRATION (ZERO DROP PROBE)
NOTCH CRACK
INSTRUMENT:  NORTEC 2000D
PROBE:  SPC-751-C
FREQUENCY:  65.0 KHz
GAIN HOIZ:  45.0 dB
GAIN VERT:  57.0 dB
ROTATION:  243°
PROBE DRIVE:  MID
FILTERS: LP  100
HP
NOTE:
SETTINGS LISTED WERE USED FOR THE
SETUP OF THE LISTED PROBE. THE LISTED
VALUES MAY VARY DEPENDING ON PROBE
USED. VALUES MAY ALSO VARY FROM
INSTRUMENT TO INSTRUMENT.
SIGNAL-TO-NOISE RATIO: 3:1 (MINIMUM)
• NULL/BALANCE
LIFTOFF  IMPEDANCE PLANE DISPLAY (IPD)
INSTRUMENT CALIBRATION (SWIVEL PROBE)  2917017
APPENDIX D: SURFACE INSPECTION PROCEDURE
(SHEET 3 OF 4)
Original Issue: June 26, 2020
Export Controlled ECCN: 9E991  DC10-54A111 RB
Copyright © Unpublished
Work - See page 1 for details.  44 of 48

### Page 45

2. Surface inspection procedure:
NOTE: Boeing recommends that a viewing aid be inserted inside the pylon in such a position as to
allow for viewing of the inspection area.
NOTE: The lift-off trace should move horizontally when lifting the probe off the surface. The defect
trace should rise at least three major scale divisions above that of liftoff and have approximately
a 90 degree angle of separation.
NOTE: Recalibrate the instrument as necessary prior to inspecting with each style of probe.
a. Place probe on the area of the bulkhead to be inspected. Null/balance the instrument. Readjust
rotation control as necessary so that liftoff will propagate similarly to that seen during calibration
step(s).
b. Scan the probe over an area to be inspected. Observe the applicable Impedance Plane Display
(IPD) for crack-like indication(s).
c. Repeat scanning, where accessible, of the indicated areas usi ng the applicable probe(s) until all
accessible areas have been inspected.
APPENDIX D:  SURFACE INSPECTION PROCEDURE
(SHEET 4 OF 4)
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: June 26, 2020
DC10-54A111 RB
45 of 48
REQUIREMENTS BULLETIN DC10-54A111
ALERTALERT

### Page 46

1. Open hole inspection calibration:
a. Select applicable rotating probe size; relative to the hole diameter to be inspected:
(1) a. Applicable rotating probe SO6R4 16/20-1WL and SO6R4 20/24-1WL or equivalent.
b. Connect probe into scanner and scanner to eddy current instrument and set operating frequency.
(Ref. frequency range within 300-500 kHz.)
c. Adjust instrument gain setting units to achieve the signal di splay shown.
d. Adjust instrument filter setting units to achieve the signal display shown.
e. Energize the scanner. Null/balance the probe in air. Lay the probe on the reference standard
surface away from edges and holes. Adjust rotation control until indication produced from probe
coil is horizontal on the Impedance Plane Display (IPD). (Increase synchronized gain until signal
is nearly 100 percent full screen on horizontal scale.)
f. With the scanner on, insert probe into the appropriate refere nce standard hole within the layer
containing the EDM notch. Observe the indication size and signature produced on the display as
the probe coil passes over the EDM notch. Adjust the vertical gain control until the indication is
about 80 percent full screen height. Adjust LP and HP filters to achieve the signal display shown.
APPENDIX E:  OPEN HOLE INSPECTION PROCEDURE
(SHEET 1 OF 3)
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: June 26, 2020
DC10-54A111 RB
46 of 48
REQUIREMENTS BULLETIN DC10-54A111
ALERTALERT

### Page 47 (OCR)

REQUIREMENTS BULLETIN DC10-54A111
ALERT  ALERT
NOTCH CRACK
NULL/BALANCE
AMPITUDE/TIME DISPLAY  PHASE/ANGLE (IP) DISPLAY
HOLES:  1/4 INCH DIA. HOLE  5/16 INCH DIA. HOLE
INSTRUMENT:  NORTEC 2000D  NORTEC 2000D
PROBE:  SO6R4 16/20 - 1WL  SO6R4 20/24 - 1WL
(0.250-0.312)  (0.312-0.375)
FREQUENCY:  300 KHZ  500 KHz
GAIN HOIZ:  51.0 dB  50 dB
GAIN VERT:  70.0 dB  66 dB
ROTATION:  205°  238°
PROBE DRIVE:  MID  MID
FILTERS: LP  325  400
HP  110  175
NOTE:
SETTINGS LISTED WERE USED FOR THE
SETUP OF THE LISTED PROBE. THE LISTED
VALUES MAY VARY DEPENDING ON PROBE
USED. VALUES MAY ALSO VARY FROM
INSTRUMENT TO INSTRUMENT.
SIGNAL-TO-NOISE RATIO: 3:1 (MINIMUM)  2917020
2. Open hole inspection procedure:
a. With the scanner on, insert probe appropriate for the hole diameter to be inspected. Observe the
instrument displays (both the Amplitude/Time and Phase displays) for any signal response that
would resemble a crack like indication.
b. Repeat calibration and inspection for additional holes and probe size.
APPENDIX E: OPEN HOLE INSPECTION PROCEDURE
(SHEET 2 OF 3)
Original Issue: June 26, 2020
Export Controlled ECCN: 9E991  DC10-54A111 RB
Copyright Unpublished
Work - See page 1 for details.  47 of 48

### Page 48 (OCR)

REQUIREMENTS BULLETIN DC10-54A111
ALERT  ALERT
FWD
FORWARD
FASTENER
HOLE
AFT
FASTENER
HOLE
RIGHT SIDE SHOWN LEFT SIDE OPPOSITE
2917026
APPENDIX E: OPEN HOLE INSPECTION PROCEDURE
(SHEET 3 OF 3)
Original Issue: June 26, 2020
Export Controlled ECCN: 9E991  Copyright © Unpublished  DC10-54A111 RB
Work - See page 1 for details.  48 of 48

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
