# Boeing Service Bulletin DC9-A53-144: Revision 2

- Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2013-0706, the docket of AD 2013-25-12. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Boeing Service Bulletin DC9-A53-144](https://openairdocs.org/service-documents/boeing/dc9-a53-144.md)
- Title as filed: U.S. DOT/FAA - SB-DC9-A53-144-r2
- Pages: 34
- PDF: https://openairdocs.org/files/sha256/39/93/39933a202d8403d92e46648555ea91e203c2c6520910c1e71e2ddcface7dcd0b
- Page: https://openairdocs.org/service-documents/boeing/dc9-a53-144/file/39933a202d84

## Text

This text is OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1 (OCR)

DOUGLAS AIRCRAFT COMPANY  MCDONNELL DOUGLAS  ALERT
D C-9  OONPORATION
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
BULLETIN A53-144
FUSELAGE - Main Frame - Inspect/Repair Aft Fuselage Ventral Pressure Bulkhead
Web.
This page transmits Revision 2 for DC-9 Service Bulletin A53-144 to incorporate
the following changes:
NOTE: This revision constitutes a complete reissue.
Reason for Revision:  To incorporate engineering released subsequent to prior
issues of this Service Bulletin which adds eddy current
inspection instructions.
No additional work is required by this revision for
aircraft modified per prior issue of this Service Bulletin.
Pages 2  Revised Service Bulletin effectivity to reflect current operators of
and 3:  affected aircraft.
Pages 4  Revised Description.
thru 7:
Revised Compliance.
Added eddy current inspection to Manpower requirements.
Revised Approval paragraph.
Page 10:  Changed referenced Service Bulletin to 53-166, was 53-139.
Changed identification of service sketch to 3110 "g", was 3110 "New".
Pages 1.  Added eddy current as an authorized procedure for inspection.
thru 13:  Added change letter "g" to service sketch 3110.
Pages 17  Changed unit net prices to reflect current pricing policy.
and 18:
Revision Sequence
Original Date  May 16/80
Revision 1  September 8/80
Revision 2  February 23/84
OJH
JEM-1
May 16/80  Bulletin A53-144
Revision 2 February 23/84  Page 1 of 1

### Page 2 (OCR)

DOUGLAS AIRCRAFT COMPANY  • ALERT
MCDONNELL DOUGLAS
OC-S  COMFORATION
Long Beach, Calilornia 90801  3855 Lakewood Boulevard  BULLETIN A53-144
SERVICE BULLETIN
FUSELAGE - Main Frame - Inspect/Repair Aft Fuselage Ventral Pressure Bulkhead
web.
NOTE
This Service Bulletin is applicable only to aircraft
equipped with the aft ventral pressure. bulkhead.
This Service Bulletin is issued as a partial
record-type change. Engineering drawings or aperture
cards are furnished in lieu of illustrations.
Operators with aircraft listed under Group I of
this Service Bulletin which have five-leaf doublers
incorporated per 0C-9 Service Bulletin 53-49, are to
accomplish instructions outlined for Group Il
aircraft for purposes of this Service Bulletin.
This Service Bulletin supersedes. but does not cancel
the requirements of DC-9 Service Bulletin 53-49.
Accomplishment of the following constitutes closing
action for this Service Bulletin:
1. Repair and/or replace AD4 rivets with AD5 rivets
at all horizontal stiffeners, in firex wye
support vertical stiffeners, and in scallops of
upper diagonal doublers.
2. Install/replace five-leaf doublers at upper and
lower ends of firex wye support vertical
stiffeners using ADS rivets.
1. Planning Information:
A. Effectivity:
(1) Aircraft Affected•
Model DC-9, Series 10, 30, and 40
MCDONNELL DOUGLAS CORPORATION (MOC) PROPRIETARY RIGHTS ARE INCLUDED IN THE INFORMATION DISCLOSED
HEREIN AND RECIPIENT BY ACCEPTING THIS DOCUMENT AGREES THAT THE INFORMATION IS PROPRIETARY TO MOC
MOC AUTHORIZES RECIPIENT TO REPRODUCE SUCH INFORMATION IN OTHER DOCUMENTS CREATED FOR INTERNAL
USE IF THESE DOCUMENTS ARE PROTECTED SIMILARLY BY A PROPRIETARY LEGEND
May 16/80  Bulletin A53-144
Revision 2 February 23/84  Page 1 of 19

### Page 3 (OCR)

ALERT  MCDONNELL DOUGLAS.  SERVICE BULLETIN  ALERT
Operator  Factory Serial No.  Operator  Factory Serial No.
Group I
AL  47026  Oz  45772  and  45773
47050  thru  47052  45798  and  45799
47001
AM  45785  47027  thru  47029
47006  47033
AO  47080  RC  45787
45827
AZ  47038  and  47039  47063  and  47064
47073
CO  45786  47078
EA  47098  TN  47007
47009
GB  45717
VE  45710
800L*  47025
IB  LEOLD  LOLD  XZD  45826  47011
YA  45732
IH  45724
47003 and 47004
IW  45841  ZN3  47012
ML  47005  47014
NY  47067  ZRS  45797
47094
ZS8  47013
00  47010
47015  ZVB  47000
ZAH  45731
Group II
AL  47099  AZ  47046 and  47047
47130  47101
47146  47128  and  47129
AM  47106  CO  45788
47062
AO  47091  and  47092  47110  thru 47112
AY  47044  and  47045  EA  47120
Bulletin A53-144  May 16/80
Page 2  Revision 2 February 23/84

### Page 4 (OCR)

ALERT  MCDONNELL DOUGL  SERVICE BULLETIN  ALERT
Operator  Factory Serial No.  Operator  Factory Serial No.
Group II (cont)
IB  47084  RC  47031
47088  thru 47090  (cont)  47083
47093  47086
47312  47103
47149
KL  47102  47153
47131  thru 47133  47155  and  47156
47190  47160
47204 and  47205
NY  45789
47113  SK  47114 and 47115
OD  47152  SR  45790
OZ  47030  VE  47104  and  47105
47035
47107  thru  47109  ZBM  47087
47172  47154
47248
47251  ZCA  47061
RC  45828  •ZN3  47055
47016  thru  47018.
This modification was incorporated prior to delivery on all DC-9
and C-9 series aircraft, manufacturer's fuselage number 268 and
subsequent, as applicable.
(2)  Spares Affected:
None.
Reason:
Recent tests revealed fatigue cracks in the bulkhead web area under
the firex wye support vertical stiffeners, horizontal stiffeners,
and upper diagonal doublers due to cyclic loading. Crack activity
has been detected during test of components at approximately 72,000
pressurization cycles. Cracks which are not corrected could progress
and cause web failure resulting in loss of pressurization.  Inspection
of the forward and aft sides of the aft fuselage pressure bulkhead will
determine condition of web. Accomplishment of this Service Bulletin
will ensure structural integrity and enhance web service life.
May 16/80  Bulletin A53-144
Revision 2 February 23/84  Pade 3

### Page 5 (OCR)

ALERT  MCDONNELL DOUGLAS  SERVICE BULLETIN ALERT
C. Description:
This Service Bulletin accomplishes the following on the forward and
aft sides of the aft fuselage pressure bulkhead.
Group I
Visually inspects bulkhead web for cracks at upper and lower ends of
firex wye support vertical stiffeners.
or
Performs eddy current or fluorescent penetrant inspection of bulkhead
web for cracks at upper and lower ends and at attach rivet holes for
firex wye support vertical stiffeners, at rivet holes for horizontal
stiffeners, and at rivet holes for scallops of upper diagonal doublers,
and accomplishes the following:
Condition 1 (No Cracks)
Repetitively inspects until five-leaf doublers are installed with AD5
rivets at upper and lower ends of firex wye support vertical stiffeners
and all AD4 rivets in firex wye support vertical stiffeners, in
horizontal stiffeners, and in scallops of upper diagonal doublers are
replaced with ADS rivets.
Conditions 2 thru 16 (Cracks)
Removes doublers, as applicable, and installs reinforcing doublers and
shims..
Group !!
Performs eddy current or fluorescent penetrant inspection of bulkhead
web at rivet holes for scallops of five-leaf doublers at upper and lower
ends and along attach rivets for firex wye support vertical stiffeners,
along rivet holes for horizontal stiffeners, and at rivet holes for
scallops of upper diagonal doublers, and accomplishes the following:
Condition L No Cracks)
Replaces existing five-leaf doublers at upper and lower ends of firex
wye support vertical stiffeners using AD5 rivets and replaces all AD4
rivets in firex wye vertical stiffeners, in horizontal stiffeners, and
in scallops of upper diagonal doublers with AD5 rivets.
Conditions 2 thru 16 (Cracks)
Removes doublers, as applicable, and installs reinforcing doublers and
shims.
Bulletin A53-144  May 16/80
Page 4  Revision 2 February 23/84

### Page 6 (OCR)

ALERT  MCDONNELL DOUGLA  SERVICE BULLETIN ALERT
D. Compliance:
It is recommended that this inspection/repair/modifcation be
accomplished as follows:
Repetitive
Initial  Inspection
Accumulated  Inspection  Intervals  Special
Group  Landings  (Landings)*  (Landings) **  Instructions
Less than  4000  4000  1/ 2/ 5/
40,000
More than  2000  1/ 3/ 5/
40,000
More than  1000  4/ 51
60,000
More than  4000  5/ 6/
40,000
More than  1000  5/ 6/
60,000
*Indicates after issue date of this Service Bulletin or after
aircraft reaches next higher accumulated landings increment.
**Indicates after completion of initial inspection.
1/ Visually inspect bulkhead web for cracks at upper and lower ends
of firex wye support vertical stiffeners.
If no cracks are found, repetitively inspect until five-leaf
doublers are installed with ADS rivets at upper and lower ends
of firex wye support vertical stiffeners.
3/ If no cracks are found, perform eddy current or fluorescent
penetrant inspection, accomplish repairs if required, and accomplish
modifications as described in special instructions 4/ and 6/ within
2000 landings after initial visual inspection.
41  Remove appropriate AD4 rivets and perform eddy current or
fluorescent penetrant inspection of bulkhead web for cracks at
rivet holes at upper and lower ends and at attach holes for firex.
wye support vertical stiffeners, at rivet holes for horizontal
stiffeners, and at rivet holes for scallops of upper diagonal
doublers.  If no cracks are found, install five-leaf doublers at
upper and lower ends of vertical stiffeners with AD5 rivets and
replace all AD4 rivets in stiffeners and in scallops of upper
diagonal doublers with AD5 rivets.
May 16/80  Bulletin A5:-144
Revision 2 February 23/84  Pege 5

### Page 7 (OCR)

ALERT  MCDONNELL DOUGLAS →  SERVICE BULLETIN ALERT
Remove appropriate AD4 rivets and perform eddy current or
fluorescent penetrant inspection of bulkhead web for cracks
at rivet holes for scallops of five-leaf doublers at upper and
lower ends and at attach rivet holes for firex wye support vertical
stiffeners, at rivet holes for horizontal stiffeners, and at rivet
holes in scallops of upper diagonal doublers. If no cracks are
found, replace existing five-leaf doublers using ADS rivets and
replace all AD4 rivets in stiffeners and in scallops of upper
diagonal doublers with AD5 rivets.
6/ Repair cracks per appropriate condition shown in paragraph 2,
Table I or II.
NOTE:  Accomplishment of the following constitutes closing action
for this Service Bulletin:
(1) Repair and/or replace AD4 rivets with AD5 rivets at all
horizontal stiffeners, in firex wye support vertical
stiffeners, and in scallops of upper diagonal doublers.
(2) Install/replace five-leaf doublers at upper and lower ends
of firex wye support vertical stiffeners using ADS rivets.
E. Approval:
The resultant modification described in paragraph 1.C has been shown
to comply with the applicable Federal Aviation Regulations and Revision
2 is approved by the Manager, Los Angeles Area Aircraft certification
Office, FAA Northwest Mountain Region, on February 10, 1904.
F. Manpower:
Groups I
The visual inspection may be accomplished in the following approximate
man-hours or elapsed hours per aircraft:
Work Phases  Man-Hours
Gain Access  8.0
Inspect  1.0
Close Up  9.5
Total Man-Hours  18.5
Total Elapsed Hours  7.5
Bulletin A53-144  May 16/80
Page 6  Revision 2 February 23/84

### Page 8 (OCR)

ALERT MCDONNELL DOVaLA  SERVICE BULLETIN  ALERT
Group ! or I!
The eddy current or fluorescent penetrant inspection may be accomplished
in the following approximate man-hours or elapsed hours per aircraft:
Work Phases  Man-Hours
Gain Access  47.0
Inspect  32.0
Close Up  53.5
Functional Check  0.5
Total Man-Hours  133.0
Total Elapsed Hours  36.3
The repairs or mdifications may be accomplished in the following
approximate man-hours or elapsed hours per aircraft:
Man-Hours
Conditions
3 and 4 and 5 and 7 and  8  9 and I1  13 and
Work Phases  15  12  16  10  14
Modify (Aircraft) 61.6
Repair  30.0  40.0  43.1  41.7  16.0  24.1 14.6 26.2 44.2
Total Man-Hours 61.6  30.0 40.0  43.1  41.7  16.0  24.1 14.6 26.2 44.2
Total Elapsed 30.8  15.0 20.0  21.6  20.8  8.0  12.0  7.3 13.1  22.1
Hours
NOTE:  Man-hour estimates are calculated based on the assumption
that the aircraft/unit has been placed in a maintenance
status. The man-hour/elapsed time estimates do not include:
1. Preparation for the modification: Examples; defueling,
purging, placing work stands, opening standard access
doors, obtaining tools, and jacking when not essential
to the modification.
Nonproductive elapsed time: Examples; sealant or
adhesive cure time, cleaning, paint drying time, lunch
and/or rest periods, and quality assurance inspections.
3. Administrative functions:  engineering liaison, parts requisition, shite change  coordination, and report writing.  Examples; planning,
Operators should take the above into consideration when
scheduling this modification.
May 16/80  Bulletin A53-144
Revision 2 February 23/84  Page 7

### Page 9 (OCR)

ALERT  MCDONNELL DOUGLAS  SERVICE BULLETIN  ALERT
G. Material - Cost and Availability:
(2)  Aircraft:
Parts required to accomplish this modification are listed in
paragraph 3.A and are to be procured as indicated. Parts with
unit net prices are proprietary parts and must be purchased as
end item spares from the Douglas Aircraft Company under the spare
parts article of the purchase agreement. unit net prices are
subject to change by current pricing policies. Parts will b
available in approximately 15 days after receipt of purchase order.
The purchase order must specify this Service Bulletin number and
only parts listed herein. Direct purchase order to:
Douglas Aircraft Company
P.O. Box 1771
Long Beach, California 90801
Attn: Parts Sales - Commercial 7-21.
(DC-9 Alert Service Bulletin A53-144)
(2) Spares:
Not applicable.
H. Tooling - Price and Availability:
None.
I. Weight and Balance:
Group I or Il
This modification will increase the weight of the aircraft as follows:
APPROXIMATE STATION  MFR'S EMPTY  MOMENT CHANGE  INDEX UNIT
SERIES  LOCATION OF  WEIGHT (MEW)  CHANGE
CONDITION  AIRCRAFT  WEIGHT INCREASE  INCREASE LBS  IN.-LBS  (MEW)
10  None  None  None  None
30  None  None  None  None
40  None  None  None  None
2  10  817.0  +1.4  +332  +0.3
30  996.0  +1.4  +423  +0.4
40  1072.0  +1.4  +476  +0.5
10  817.0  +1.5  +356  +0.4
30  996.0  +1.5  +453  +0.5
40  1072.0  +1.5  +510  +0.5
Bulletin A53-144  May 16/80
Page 8  Revision 2 February 23/84

### Page 10 (OCR)

ALERT  MCDONNELL DOUGI  SERVICE BULLETIN  ALERT
APPROXIMATE STATION  MFR'S EMPTY  MOMENT CHANGE  INDEX UNIT
SERIES  -OCATION OF  WEIGHT (MEW)  (MEW)  CHANGE
CONDITION  AIRCRAFT  WEIGHT INCREASE  INCREASE LBS  IN.-LBS  (MEW)
10  817.0  +2.0  +474  +0.5
30  996.0  +2.0  +604  +0.6
40  1072.0  - +2.0  +680  +0.7
10  817.0  +1.7  +403  +0.4
and 12
30  996.0  +107  +513  +0.5
40  1072.0  +1.7  +578  +0.6
7  10  817.0  +0.6  +142  +0.1
30  996.0  +0.6  +181  +0.2
40  1072.0  +0.6  +204  +0.2
8  10  817.0  +1.0  +237  +0.2
30  996.0  + 1.0  +302  +0.3
40  1072.0.  +1.0  +340  +0.3
9 and  10  817.0  +0.5  +119  +o.i
10
30  996.0  +0.5  +151  +0.2
40  1072.0  +0.5  +170  +0.2
10  817.0  +1.2  +284  +0.3
30  996.0  +1.2  +362  +0.4
40  1072.0  +1.2  +408  +0.4
13 thru  10  817.0  +1.8  +427  +0.4
15
30  996.0  +1.8  +544  +0.5
40  1072.0  +1.8  +612  +0.6
16  10  817.0  +0.7  +166  +0.2
30  996.0  +0.7  +211  +0.2
40  1072.0  +0.7  +238  +0.2
May 16/80  Bulletin A53-144
Revision 2 February 23/84  Page 9

### Page 11 (OCR)

ALERT MCDONNELL DOUGLA  SERVICE BULLETIN  ALERT
J. References:
(1) This Service Bulletin supersedes but does not cancel the
requirements of DC-9 Service Bulletin 53-49.
(2) This Service Bulletin may be accomplished in conjunction with
DC-9 Service Bulletin 53-166 for convenience of maintenance.
(3) Data used in preparation of this Service Bulletin:
Data Identification  Change  Type of Data
DMS 2082  Douglas Material Specification
DPM 3279  Douglas Process Material
J060111  New  Service Rework Drawing
MM Chapters 6, 21, 25,  Maintenance Manual
26, 52, and 53
3109  New  Service Sketch (Attached)
3110  Service Sketch (Attached)
(4)  Service rework drawing J060111 "New" is supplied in support of
this Service Bulletin.
NOTE: One reproducible and two copies or aperture
cards of service rework drawing J060111 "New"
are being furnished to each affected operator.
Publications Affected:
The modification outlined in this Service Bulletin affects the DAC
DC-9 Weight and Balance charts.
Bulletin A53-144  May 16/80
Page 10  Revision 2 February 23/84

### Page 12 (OCR)

ALERT MCDONNELL DOUGLA  - SERVICE BULLETIN  ALERT
2. Accomplishment Instructions:
WARNING: TO AVOID INJURY TO PERSONNEL OR DAMAGE TO
EQUIPMENT, MAKE CERTAIN ADEQUATE PRECAUTIONS
ARE TAKEN WHILE PERFORMING ANY WORK IF
ELECTRICAL POWER IS APPLIED TO THE AIRCRAFT.
CAUTION: ELECTRICALLY GROUND THE AIRCRAFT.
NOTE: Chapters within parentheses refer to sections
of the Maintenance Manual.
Conditions relative to service rework drawing J06011l configurations
are as follows:
Condition  Drawing J060111  Condition  Drawing J060111
-1  10  -521
-503  -501
-507  12  -505
-511  13  - 509
-515  14  -513
-527  15  -517
-519  16  -525
-523
Groups I
Visual Inspection
A.  Remove and retain firex bottles and attaching parts.  See chapter
26-20-1, paragraph entitled, "Removal/Installation Fire Extinguishing
Containers.i)
Roll back or remove and retain insulation material from aft side of
ventried, teresa/i statation insulation 8125225."  paragraph
Visually inspect upper and lower ends of firex wye support vertical
stiffeners as shown on service sketch 3109 (attached) and accomplish
the following:
Condition 1 (No Cracks)
Perform repetitive visual inspection until five-leaf doublers are
installed with AD5 rivets as shown on service sketch 3110B (attached).
Condition 2, 3, and 4 (Cracks)
Accomplish required repairs per applicable condition in Table I.
May 16/80  Bulletin A53-144
Revision 2 February 23/84  Page 11

### Page 13 (OCR)

ALERT MODONNELL DOUGLAS  SERVICE BULLETIN  ALERT
Eddy Current Or Fluorescent Penetrant Inspection
A. Remove and retain passenger aft entrance door and attaching parts. (See
chapter 52-12-0, paragraph entitled, Removal/Installation Passenger Aft
Entrance Door.i)
8. Remove and retain lavatory equipment and attaching parts. (See chapter
25-41-0, paragraph entitled, "Removal/Installation Lavatory Equipment.")
C. Remove and retain firex bottles and attaching parts. (See chapter
26-20-1, paragraph entitled, Removal/Installation Fire Extinguishing
Containers.")
D. Remove and retain access panels 5911 or 5911A, 5912 or 5912A, and
sidewall panels as required. (See chapter 6-12-0.)
E. Remove and retain air-conditioning pressure regulator valve and
. attaching parts. (See chapter 21-31-1, paragraph entitled,
'Removal/Installation Air-Conditioning Pressure Regulator Valve."
F. Remove and retain air-conditioning flow control valve and attaching
parts. (See chapter 21-31-2, paragraph entitled, "Removal/Installation
Air-Conditioning Flow Control Valve.)
G. Remove and retain insulation material from forward and aft sides of
ventral aft pressure bulkhead. (See chapter 25-20-0, paragrapr
entitled, Kemoval/Installation Insulation Blankets.")
H. Perform eddy current or fluorescent penetrant inspection of ventral aft
pressure bulkhead as shown on service sketch 3110B (attached) and
accomplish the following:
Condition 1 - (No Cracks)
Install five-leaf doublers and replace AD4 rivets with ADS rivets as
shown on service sketch 31108 (attached).
Conditions 2 thru 16 (Cracks)
Accomplish required repairs per applicable condition in Tables I and II.
I. Reinstall insulation material.
J. Reinstall firex bottles and attaching parts.
K. Reinstall air-conditioning pressure regulator valve
L. Reinstall air-conditioning flow control valve.
M. Test air-conditioning flow control valve. (See chapter 21-31-2,
paragraph entitled, Adjustment Test Air-Conditioning Flow Control
Valve.")
Bulletin A53-144  May 16/80
Page 12  Revision 2 February 23/84

### Page 14 (OCR)

ALERT MCDONNELL DOUaL  - SERVICE BULLETIN ALERT
N. Test pressure regulator valve.  (See chapter 21-31-1, paragraph entitled
"Adjustment/Test Air-Conditioning Pressure Regulator Valve.")
0. Reinstall lavatory equipment and attaching parts.
P. Reinstall passenger aft entrance door and attaching parts.
Q. Reinstall access and sidewall panels.
Group II
Eddy Current Or Fluorescent Penetrant Inspection
A. Remove and retain passenger aft entrance door and attaching parts. (See
chapter 52-12-0, paragraph entitled, "Removal/Installation Passenger Aft
Entrance Door.")
B. Remove and retain lavatory equipment and attaching parts. (See chapter
26-20-1, paragraph entitled, "Removal/Installation Lavatory Equipment.")
C. Remove and retain firex bottles and attaching parts. (See chapter
26-20-1, paragraph entitled, "Removal/Installation Fire Extinguishing
Containers.")
D. Remove and retain access panels 5911 or 5911A, 5912 or 5912A, and
sidewall panels as required. (See chapter 6-12-0.)
E. Remove and retain air-conditioning pressure regulator valve and
attaching parts. (See chapter z1-31-l, paragrapn entitled,
"Removal/Installation Air-Conditioning Pressure Regulator Valve.".
F. Remove and retain air-conditioning flow control valve and attaching
parts. (See chapter 21-31-2, paragraph entitled, Removal/Installatior
Air-Conditioning Flow Control Valve...
G. Remove and retain insulation material from forward and aft sides of
ventral aft pressure bulkhead. (See chapter 25-20-0, paragrapn
entitled, "Removal/Installation Insulation Blankets.")
H. Perform eddy current or fluorescent penetrant inspection of ventral aft
pressure bulkhead as shown on service sketch 31108 (attached) and
Condition 1 - (No Cracks)
Replace existing five-leaf doublers with AD5 rivets as shown on service
sketch 3110B (attached).
May 16/80  Bulletin A53-144
Revision 2 February 23/84  Page 13

### Page 15 (OCR)

ALERT  MCDONNELL DOUGL  SERVICE BULLETIN  ALERT
Conditions 2 thru 16 (Cracks)
Accomplish required repairs per applicable condition in Tables I and II.
I. Reinstall insulation material.
J. Reinstall firex bottles and attaching parts.
K. Reinstall air-conditioning pressure regulator valve.
L. Reinstall air-conditioning flow control valve.
M. Test air-conditioning flow control valve. (See chapter 21-31-2,
paragraph entitled, "Adjustment Test Air-Conditioning Flow Control
Valve.")
N. Test pressure regulator valve.  (See chapter 21-31-1, paragraph entitleo
"Adjustment/Test Air-Conditioning Pressure Regulator Valve.")
0. Reinstall lavatory equipment and attaching parts.
P. Reinstall passenger aft entrance door and attaching parts.
Q. Reinstall access and sidewall panels.
Bulletin A53-144  May 16/80
Page 14  Revision 2 February 23/84

### Page 16 (OCR)

ALERT  MCDONNELL DOUGL  SERVICE BULLETIN  ALERT
TABLE I
CONFIGURATION
REFERENCE
DRAWING
CONDITION  OPERATION  PART NO.  QTY  KEY WORD  J060111  ZONE  SPECIAL INSTRUCTIUNS
REMOVE  5910130-121  2  FIVE-FINGER  DOUBLER  3 ANO  15  APPLY A FAYING SURFACE  SEAL OF PR-1422 SEALANT
TO AFFECTED PARTS PRIOR
INSTALL  J060111-3 NTD  1110  SPLICE DOUBLER  TO INSTALLATION.
J060111-23 NTD  DOUBLER
J060111-43 NTD  SHIM
J060111-47 NTD  SHIM
REMOVE  *4917913-1  1  SUPPORT ASSY  - 503  3 AND
OR  15
4917913-513
5910130-121  4  FIVE-FINGER
DOUBLER
TRIM  5910130-103  DOUBLER
INSTALL  J060111-7 NTD  SPLICE DOUBLER
J060111-27 NTD  1  DOUBLER
**4917913-1  J060111-47 NTO  1  SUPPORT ASSY  SHIM  BOND SUPPORT ASSEMBLY
4917913-513  OR  TO STRUCTURE USING EC-2216  ADHESIVE OR EQUIVALENT.
REMOVE  5910130-121  2  FIVE-FINGER  DOUBLER  -507  3 AND  20
TRIM  5910130-101  DOUBLER
INSTALL  J060111-11 NTD  -179  SPLICE DOUBLER
J060111-31 NTD  DOUBLER
J060111-47 NTD  SHIM
TRIM  5910130-99  1  DOUBLER  SEAL OF PR-1422 SEALANT TO  APPLY A FAYING SURFACE
INSTALL  J060111-35 NTD  J060111-15 NTO  DOUBLER  SPLICE DOUBLER  -511  3 AND  20  INSTALLATION.  AFFECTEL PARTS PRIOR TU
J060111-47 NTO  SHIM
6  REMOVE  *4917913-1  1  SUPPORT ASSY  -515
OR
4917913-505
TRIM  5910130-97  DOUBLER
INSTALL  J060111-19 NTO  SPLICE DOUBLER
J060111-39 NTO  DOUBLER
J060111-47 NTO  SHIM
**4917913-1  SUPPORT ASSY  BOND SUPPORT ASSEMBLY TO
OR  STRUCTURF USING EC-2216
4917913-505  ADHESIVE OR EQUIVALENT.
REMOVE  5910130-81  DOUBLER  APPLY A FAYING SURFACE
SEAL OF PR-1422 SEALANT TO
INSTALL  J060111-59 NTD  DOUBLER  - 527  31  AFFECTED PARTS PRIOR TO
J060111-61 NTO  SPLICE DOUBLER  INSTALLATION.
8  REMOVE  5910130-121  FIVE-FINGER  -519  26
DOUBLER
INSTALL  J060111-49 NTO  DOUBLER
J060111-51 NTD  SPLICE DOUBLER
9  REMOVE  5910130-121  2  FIVE-FINGER  -523  29
DOUBLER
INSTALL  J060111-55 NTD  SPLICE DOUBLER
J060111-57 NTO  DOUBLER
10  REMOVE  5910130-121  2  FIVE-FINGER  -521  28
DOUBLER
INSTALL  J060111-53 NTO  DOUBLER
J060111-55 NTO  SPLICE DOUBLER
*RETAIN FOR REINSTALLATION
*RETAINED PART
May 16/80  Bulletin A53-144
Revision 2 Februarv 23/94  Page 15

### Page 17 (OCR)

ALERT  MCDONNELL DOUGL  SERVICE BULLETIN  ALERT
TABLE II
CONFIGURATION
REFERENCE
DRAWING
CONDITION  OPERATION  PART NO.  jOTY  KEY WORD  J060111  ZONE  SPECIAL INSTRUCTIONS
11  TRIM  5910130-107  1  DOUBLER  -501  3 ALO  APPLY A FAYING SURFACE
SEAL OF PR-1422 SEALANT TO
INSTALL  J060111-5 NT0  SPLICE DOUBLER  AFFECTED PARTS PRIOR TO
J060111-25 NTD  DOUBLER  INSTALLATION.
J060111-45 NTO  1  SHIM
J060111-47 NTO  2  SHIM
REMOVE  *4917913-1  1  SUPPORT ASSY  -505  3 AND
OR
4917913-513
INSTALL  J060111-9 NTO  SPLICE DOUBLER
J060111-29 NTD  DOUBLER
J060111-47 NTD  SHIM
**4917913-1  1  SUPPORT ASSY  BONO SUPPORT ASSEMBLY TO
OR  STRUCTURE USING EC-2216
4917913-513  ADHESIVE OR EQUIVALENT.
13  REMOVE  *4917913-1  SUPPORT ASSY  -509  3 AND
OR  10
4917913-513
TRIM  5910130-102  DOUBLER
INSTALL  J060111-13 NTO  SPLICE DOUBLER
J:60111-33 NTU  DOUBLER
J060111-47 NTO  SHIM
**4917913-1  1  SUPPORT ASSY  BOND SUPPORT ASSEMBLY TO
OR  STRUCTURE USING EC-2216
4917913-513  ADHESIVE OR EQUIVALENT.
14  REMOVE  *4917913-1  SUPPORT ASSY  APPLY A FAYING SURFACE
SEAL OF PR-1422 SEALANT TO
TRIM  5910130-100  DOUBLER  -513  3 AND  AFFECTED PARTS PRIOR TO
10  INSTALLATION.
INSTALL  J060111-17 NTD  SPLICE DOUBLER
• 060111-37 NTD  DOUBLER
J060111-47 NTD  2  SHIM
**4917913-1  1  SUPPORT ASSY  BOND SUPPORT ASSEMBLY TO
STRUCTURE USING EC-2216
ADHESIVE OR EQUIVALENT.
15  TRIM  5910130-98  1  DOUBLER  -517  3 AND
10
INSTALL  C060111-21 NTO  SPLICE DOUBLER
:060111-41 NTO  DOUBLER.
J060111-47 NTD  SHIM
15  REMOVE  5910130-79  1  DOUBLER
TRIM  5910130-13  DOUBLER  -525  31
OR
5910130-133
INSTALL  J060111-63 NTD  DOUBLER
J060111-65 NTO  SPLICE DOUBLER
*RETAIN FOR ALINSTALLATION
**RETAINED PART
Bulletin A53-144  May 16/80
Page 16  Revision 2 February 23/84

### Page 18 (OCR)

ALERT  SERVICE BULLETIN  ALERT
3. Material Information:
A. The basis for the following material data is per aircraft.
(1) Parts to be purchased as end item spares.
NOTE: NTD parts are furnished with pilot holes omitted
and trim-on-assembly material added as applicable.
Group I or II  Unit
Qty Per Condition  Net
Part No.  1 2 3  8 9  10  11  12  13  15  16  Price  Key Word
J060111-11 NTD  $108.00  Splice Doubler
J060111-13 NTD  109.00  Splice Doubler
J060111-15 NTD  108.00  Splice Doubler
J060111-17 NTD  109.00  Splice Doubler
J060111-19  NTO  107.00  Splice Doubler
J060111-21 NTD  109.00  Splice Doubler
J060111-23  NTD  106.00  Doubler
J060111-25  NTD  105.00  Doubler
J060111-27  NTD  105.00  Doubler
J060111-29 NTD  J060111-3 NTD  108.00  104.00  Doubler  Splice Doubler
J060111-31 NTD  108.00  Doubler
J060111-33 NTD  108.00  Doubler
J060111-35 NTD  108.00  Doubler
J060111-37 NTD  108.00  Doubler
J060111-39 NTD  106.00  Doubler
J060111-41 NTD  108.00  Doubler
J060111-43 NTD  77.50  Shin
J060111-45 NTD  41.30  Shim
J060111-47 NTD  42.90  Shim
J060111-49 NTO  106.00  Doubler
J060111-5 NTD  103.00  Splice Doubler
J060111-53 NTD  J060111-51 NTD  101.00  97.10  Splice Doubler  Doubler
J060111-55 NTD  94.60  Splice Doubler
J060111-57 NTD  101.00  Doubler
J060111-59 NTD  102.00  Doubler
J060111-61 NTD  95.20  Splice Doubler
J060111-63 NTD  1  94.60  Doubler
J060111-65 NTD  95.90  Splice Doubler
Bulletin A53-144
May 16/80
Page 17
Revision 2 February 23/84

### Page 19 (OCR)

ALERT  SERVICE BULLETIN  ALERT
Group I or II  Unit
Uty Per Condition  Net
Part No.  1 2 3 4  10  11  12 13  14  16  Price  Key Word
J060111-7 NTD  $106.00  Splice Doubler
J060111-9 NTD  108.00  Splice Doubler
5910130-121 NTD  29.60 Five-Finger Doubler
or
5910130-349 NTD
(2) Parts and Material to be procured from operator's stock or sources indicated.
NOTE: FSCM indicates Federal Supply Code for Manufacturers.
Part/Material  1 2 3  Supplier
EC-2216 Adhesive  2 Oz  Minnesota Mining and
or  Manufacturing Company
Equivalent  Adhesives, Coatings and
(DPM 3279)  Sealers Division
3M Center
St. Paul, Minnesota 55101
HLT336-6-5 Pin  73197  Hi-Shear Corporation
HLT336-6-6 Pin  2600 Skypark Drive
HLT336-6-7 Pin  Torrance, California 90509
HLT636-6-3 Pin
HLT636-6-4 Pin
HLT636-6-5 Pin  1
MS20426AD5-6 Rivet  12
MS20426AD6-7 Rivet  12
MS20470AD5-5 Rivet  MS20426AD6-8 Rivet  56 40 44 48 40 10  26 44 48 48 44 10
MS20470AD5-6 Rivet
MS20470AD5-7 Rivet  25 38 44 38 42 15  25 40 44 48 46
MS20470AD5-8 Rivet
MS20470AD6-7 Rivet  130 150 182 174 178 32  102 60 60  199 176 192 198 192 26
MS20470AD6-8 Rivet
MS20470AD6-9 Rivet
MS21042L3 Nut  16  19  17 17 17  16 17 1 17 17
NAS1252-10L Washer  16  19
PR-1422 Sealant  1 Pt 1 Pt 1 Pt 1 Pt 1 Pt 1 Pt 1 Pt 1 Pt 1 Pt 1 Pt 1 Pt 1 Pt 1 Pt 1 Pt 1 Pt  83574  Products Research and
or  Chemical Corporation
Equivalent  5430 San Fernando Road
(DMS2082)  Glendale, California 91203
Bulletin A53-144  May 16/80
Page 18  Revision ? February 23/84

### Page 20 (OCR)

ALERT  MCDONNELL DOUGLAS  SERVICE BULLETIN  ALERT
(3) Parts removed. Discard.
NOTE: Not applicable to conditions 5, 6, and 11 thru 15.
Group I or II
Qty Per Condition
Part No.  2  Key Word
5910130-121  2  4 2  2  Five-Finger
Doubler
5910130-79  Doubler
5910130-81  1  Doubler
8. The basis for the following material data is per spares.
None.
OJH
JEM
May 16/80  Bulletin A53-144
Rovicinn 2 Fohriaru 23/94  Page 19

### Page 21 (OCR)

DC-9 VENTRAL BULKHEAD
1. GENERAL
THE FOLLOWING VISUAL INSPECTION PROCEDURE IS INTENDED TO ASSIST OPERATORS
IN DETECTION OF CRACKS AT THE ATTACH POINTS OF THE WYE SUPPORT (FIREX) TO
THE VENTRAL AFT PRESSURE BULKHEAD WEB. (SEE FIGURE 1.)
2. TEST EQUIPMENT/MATERIALS
FLASHLIGHT
3 X TO 5 X GLASS
1,1,1, TRICHLOROETHANE SOLVENT, OR EQUIVALENT
3. VISUAL CHECK
A. CLEAN AREA INDICATED IN FIGURE L OF DIRT, GREASE, AND FOREIGN MATERIALS
USING LINT FREE WIPERS AND 1,L,L, TRICHLORDETHANE SOLVENT, OR EQUIVALENT.  DO NUT SPRAY SOLVENT DIRECTLY ON BULKHEAD. LET SOLVENT DRY FOR 5 MINUTES.
B. USING FLASHLIGHT AND 3 X TO 5 X GLASS, INSPECT AREAS NOTED IN FIGURE 1
FOR CRACKS.
4. DISPOSITION:
MARK AND RECORD LENGTH AND LOCATION OF ALL CRACKS FOUND. REPORT DETAILS TO
DAC. DIRECT INFORMATION TO:
DOUGLAS AIRCRAFT COMPANY
P.O. BOX 1771
LONG BEACH, CALIFORNIA 90801
ATTN: MANAGER, CUSTOMER SERVICE 7-21
(SERVICE BULLETIN A53-144)
REF: DC-9  S/B A53-144
WOL  TITLE  VISUAL INSPECTION OF VENTRAL
AFT PRESSURE BULKHEAD
SCALE  NONE  APPR. A. HUTCHISON 5/13/30  SERVICE SKETCH
MODEL  APPR  J. CHIM  513/72  3109
LONG BEACH, CALIF. 90801  DC -9  OrTSuM. S/Imenti v/13-ge  SHEET 1 OF 2

### Page 22 (OCR)

5917691-7
STIFFENER
(REF)  5917691-5
5917691-13  STIFFENER
STIFFENER  (REF)
(REF) -
TYPICAL CRACK
LOCATIONS
9915558
HORIZONTAL
STIFFENER
(TYP)  5917691-11
STIFFENER
(REF)
VIEW LOOKING AFT
VENTRAL BULKHEAD
VERTICAL
STIFFENER
9915558
HORIZONTAL
STIFFENER
(TYP)
VIEW LOOKING FORWARD
REF: DC-9 S/8 A53-144
FIGURE 1.  VISUAL INSPECTION AREA_
VENTRAL BULKHEAD  SERVICE SKETCH  SHEET _
NO.  3109  OF -  2

### Page 23 (OCR)

DC-9 VENTRAL BULKHEAD
GENERAL
THE FOLLOWING FLUORESCENT PENETRANT OR EDDY CURRENT PROCEDURE IS INTENDED TO
ASSIST OPERATORS IN DETECTION OF CRACKS IN THE VENTRAL AFT PRESSURE BULKHEAD
WEB AT SELECTED HORIZONTAL AND VERTICAL STIFFENERS AND DOUBLERS. (SEE
FIGURE 1.)
NOTE: EITHER WATER WASHABLE OR SOLVENT REMOVABLE
FLUORESCENT PENETRANT IS ACCEPTABLE.
2.  TEST EQUIPMENT
HIGH SENSITIVITY WATER WASHABLE FLUORESCENT FENETRANTS MAY BE PURCHASED
FROM:
DMS 1908  DMS 1908  MANUFACTURERS
GRADE 3  GRADE 4  NAME & ADDRESS
MANUFACTURERS  MANUFACTURERS
DESIGNATION  DESIGNATION
P-133, P-133 A  P-134  SHANNON. LUMINOUS MATERIALS CO.
7356 SANTA MONICA BOULEVARD
LOS ANGELES, CALIFORNIA 90046
ZL-16, ZL-178,  ZL-54  MAGNAFLUX CORP
ZL -60B  6800 EAST WASHINGTUN BOULEVARD
LOS ANGELES, CALIFORNIA 90040
DUBL-CHEK, HM3,  HM-405  SHERMIN, ING.
НМЗА  5007 EAST WASHINGTON BOULEVARD
LOS ANGELES, CALIFORNIA 90040
FLUOROCHEK  NONE  TURCO PRODUCTS, INC.
WP -100MD  DIVISION OF PUREX CORP., LTD
P. O. 80X 6200
CARSON, CALIFORNIA 90749
F-4A-B  F-4A-C  EISHEN KAGARU CO., LIU
1-2-13 HIGASHI-SHINBASHI
MINATO-KU, TOKYO, JAPAN
0D-2800-1  0D-2800-2  TOKOSHU TORYO CO., LTD
1, NISHI 4-CHOME
OMORI, OMTA-KL
TOKYO, JAPAN
REF :  DC-9 S/8 A53-144
TITLE
DOUOLAS A  WY  FLUORESCENT PENETRANT INSPECTION OF
VENTRAL AFT PRESSURE BULKHEAD
мово  SCALE  APPR. A HUTCHIS:101 3/60  SERVICE SKETCH
MODEL  APPR I CHISAT  3110B
LONG BEACH, CALIF. 90801  OFTSUM. Sclimenti  5-13-80  SHEET 1 OF 1
DAC 08-729 (12-68)

### Page 24 (OCR)

DMS 1908  DMS 1908  MANUFACTURERS
GRADE :  GRADE 4  NAME & ADDRESS
N-BP  N-4P  NIPPON OILS AND FAT CO.
• LTD 5 YURAKU-CHO 1-CHOME
CHIYODA-KU, TOKYO
100 JAPAN
BIO-PEN  BIO-PEN  OXY METAL INDUSTRIES
P6F-3  P6F-4  LIDYLITE DIVISION
5640 KNOTT AVENUE
BUENA PARK, CALIFORNIA 90620
B. HIGH SENSITIVITY SOLVENT REMOVABLE PENETRANT MAY BE PURCHASED FROM:
SUPPLIERS
MAGNAFLUX CORPORATION  TURCO PRODUCTS,  SHERWIN, INCORPORATED
6800 EAST WASHINGTON  DIVISION OF PUREX  5007 EAST WASHINGTON
BOULEVARD  CORPORATION LIMITED  BOULEVARD
LOS ANGELES, CALIF.  P.O. BOX 6200  LOS ANGELES,
90040  CARSON CALIF. 90740  CALIFORNIA 90040
MATERIALS.  PART NO.
FLUORESCENT  LL-22A, OR LL-23A,  FLUOR-CHECK  DUBL-CHEK CLEANER
PENETRANT  OR ZL-30A  R-REMOVER  DR-61
MONAQUEOUS  ZP-9  FLUOR-CHECK  D-100
SPRAY  DEVELOPER
DEVELOPER
C. ASSOCIATED EQUIPMENT/MATERIALS
BLACK LIGHT, PORTABLE
SUPER LIGHT, BLACK LIGHT
COTTON SWABS
1,1,1, TRICHLOROETHANE
SOLVENT, OR EQUIVALENT
MAGNAFLUX CORP.
L.A., CA, ULTRAVIOLET
PRODUCTS, SAN GABRIEL, CA
OR URESCO, INC., DOWNEY, CA
HUFF'S WESTERN
INDUSTRIAL EQUIP. CO.
DOWNEY, CA
REF: DC-9 S/B A53-144
SERVICE SKETCH  SHEET
NO. -  31108  OF  12

### Page 25 (OCR)

D. EDDY CURRENT INSTRUMENTS:
NORTEC NDT-3, NDT-6, NDT-8,  NORTEC CORPORATION
NDT-16, OR NDT-18  421 NORTH QUAY
KENNEWICK, WASHINGTON 99336
MIZ-10A, EM3300  OR  AUTOMATION INDUSTRIES INCORPORATED  MATERIALS EVALUATION GROUP
SHELTER ROCK ROAD
DANBURY, CONNECTICUT 06810
ED520, ED-530  MAGNAFLUX CORPORATION
OR  7300 WEST LAWRENCE AVENUE
CHICAGO, ILLINOIS 60656
EQUIVALENT
E. EDDY CURRENT PROBES:
VM501-4  VM PRODUCTS
VM501-5  7420 PARK AVENUE
VM501-6  TACOMA, WASHINGTON 98408
(100-300 KHZ)
OR
EQUIVALENT
(SEE FIGURE 2)
F. EDDY CURRENT REFERENCE STANDARD:
VM501RS  VM PRODUCTS
OR  7420 PARK AVENUE
EQUIVALENT  TACOMA, WASHINGTON  98408
(SEE FIGURE 2)
REF: DC-9  S/B A53-144
SERVICE SKETCH  SHEET.
NO.  3110B  OF  12

### Page 26 (OCR)

3. INSPECTION/MODIFICATION
A. REMOVE AD4 RIVETS IN HORIZONTAL STIFFENERS. (SEE FIGURE 1.)
CAUTION: SEE NOTE IN FIGURE 1.
REMOVE ALL AD4 RIVETS ATTACHING FIREX WYE SUPPORT VERTICAL STIFFENERS AND
SCALLOPS OF UPPER DIAGONAL DOUBLERS AND REMOVE ALL AD4 RIVETS ATTACHING
FIVE-LEAF DOUBLERS TO BULKHEAD WEB. (SEE FIGURE 1.)
C. PERFORM PENETRANT INSPECTION PER PARAGRAPH 4.A. OR 4.B.OR EDDY CURRENT
INSPECTION PER PARAGRAPH 5. IF INSPECTION AROUND OPEN HOLES REVEALS NO
CRACKS, ACCOMPLISH THE FOLLOWING:
(1)  INSTALL/REPLACE FIVE-LEAF DOUBLERS WITH NEW 5910130-121 OR -349
DOUBLERS USING ADS RIVETS.
ENLARGE OPEN HOLES USING A NO. 20 DRILL AND INSTALL AD5 RIVETS IN
HORIZONTAL STIFFENERS, VERTICAL STIFFENERS, AND UPPER DIAGONAL
DOUBLERS.
IF PENETRANT OR EDDY CURRENT INSPECTION REVEALS CRACKS, ENLARGE
HOLE USING A NO. 20 DRILL AND REINSPECT. IF CRACK INDICATION STILL
EXISTS, ENLARGE HOLE USING A 3/16 DRILL AND REINSPECT. IF CRACKS
STILL EXIST, REPORT DETAILS TO DAC PER PARAGRAPH 6.
PENETRANT INSPECTION
A. HIGH SENSITIVITY WATER WASHABLE PENETRANT.
INSPECT FORWARD OR AFT SIDE OF VENTRAL BULKHEAD AS APPLICABLE,
WHERE SKIN IS EXPOSED BEHIND NOTED STIFFENERS (SEE FIGURE 1.)
CLEAN AREA AROUND REMOVED FASTENER HOLES, WHERE BULKHEAD SKIN IS
EXPOSED, OF DIRT, GREASE, AND FOREIGN MATERIALS USING LINT FREE
WIPERS AND 1,1,1, TRICHLOROETHANE SOLVENT, OR EQUIVALENT.
SPRAY SOLVENT DIRECTLY ON BULKHEAD. LET SOLVENT EVAPORATE FOR 5
MINUTES.
CAUTION:  AVOID GETTING PENETRANT MATERIALS OR SOLVENTS ON
RUBBER PARTS. OBSERVE ALL SAFETY PRECAUTIONS WHEN
WORKING WITH SOLVENTS OR ELECTRICAL EQUIPMENT.
(3) APPLY HIGH SENSITIVITY, WATER WASHABLE FLUORESCENT PENETRANT
WITH COTTON SWABS OR SMALL BRUSH AROUND PERIPHERY OF HOLES TO
BE INSPECTED. ALLOW 10 MINUTES MINIMUM FOR PENETRATION TIME.
NOTE: DO NOT SATURATE COTTON SWAB WITH PENETRANT MATERIAL WHEN
PERFORMING INSPECTION. DAMPEN END OF COTTON SWAB WITH
ENOUGH MATERIAL TO INSPECT 5 OR 6 HOLES, THEN DISCARL
SWAB. EXTREME CARE SHOULD BE TAKEN TO APPLY PENETRANT
AROUND PERIPHERY OF HOLES WITHOUT GETTING PENETRANT
INSIDE OF HOLE. FAYING SURFACE WILL ENTRAP PENETRANT
AND CAUSE EXCESSIVE BACKGROUND FLUORESCENCE.
REF: DC-9 S/B A53-144
SERVICE SKETCH  SHEET
NO.:  31108  OF  12

### Page 27 (OCR)

(4)  REMOVE EXCESS PENETRANT BY WIPING FIRST WITH A CLEAN, DRY, WIPER
FOLLOWED BY A WATER DAMPENED WIPER. REMOVE RESIDUAL MOISTURE WITH A
CLEAN, DRY, WIPER. WIPERS ARE TO BE LINT FREE PAPER OR CLOTH
MATERIALS. DISCARD CONTAMINATED WIPERS.
(5) APPLY A LIGHT FILM COAT OF NONAQUEOUS WET DEVELOPER OVER AREA TO BE
INSPECTED AND ALLOW FIVE (5) MINUTES MINIMUM DEVELOPMENT TIME.
(6) USING BLACK LIGHT, INSPECT FOR CRACKS AROUND PERIPHERY OF HOLES.
NOTE: ALL BLACK LIGHT İNSPECTIONS MUST BE OBSERVED IN
DARKENED AREA.
(7) WHEN INSPECTION IS COMPLETED, REMOVE DEVELOPER WITH CLEAK WATER ANU
ANY RESIDUAL FLUORESCENT PENETRANT WITH 1,1,1, TRICALOROETHANE
SOLVENT, OR EQUIVALENT.
E. HIGH SENSITIVITY SOLVENT REMOVABLE PENETRANT.
(1) CLEAN THE AREA TO BE INSPECTED USING CLEAN LINT FREE WIPERS AND
MINİMUM OF S MINUTES. SOLE FIGURE SUVALENT. ALLOW TO DRY FOR A
(2)  APPLY SOLVENT-REMOVABLE FLUORESCENT PENETRANT TO INSPECTIOV AREA
USING CLEAN, LINT FREE WIPERS OR A SMALL BRUSH. ALLOW 10 MINUTES
FOR PENETRANT DWELL TIME.
NOTE:  DO NOT SATURATE COTTON SWAB WITH PENETRANT MATERIAL WHEN
PERFORMING INSPECTION. DAMPEN END OF COTTON SWAB WITH
ENOUGH MATERIAL TO INSPECT 5 OR 6 HOLES, THEN DISCARD
EXTREME CARE SHOULD BE TAKEN TO APPLY PENETRANT
AROUND PERIPHERY OF HOLES WITHOUT GETTING PENETRANT
INSIDE OF HOLE. FAYING SURFACE WILL ENTRAP PENETRANT AND
CAUSE EXCESSIVE BACKGROUND FLUORESCENCE..
(3) RE CLEAN MESS SEIGHTLY DAMPENED WEH SOLVENT. ALLOW SOLVET YOHITH
EVAPORATE FOR 5 MINUTES MINIMUM. DISCARD CONTAMINATED WIPERS.
(4) APPLY A LIGHT UNIFORM COAT OF NONAQUEOUS DEVELOPER TO INSPECTION
AREA AND ALLOW 5 MINUTES MINIMUM DEVELOPMENT TIME.
(5) USING BLACK LIGHT, INSPECT FOR CRACKS AROUND PERIPHERY OF HOLES.
NOTE: ALL BLACK LIGHT INSPECTIONS MUST BE OBSERVED
IN A DARKENED AREA.
(б)  WHEN INSPECTION IS COMPLETED, REMOVE DEVELOPER WITH CLEAR VATER AND
ANY RESIDUAL FLUORESCENT PENETRANT WITH 1,1,1, TRICHLOROETHANE
SOLVENT, OR EQUIVALENT.
REF:  DC-9 S/B A53-144
SERVICE SKETCH  SHEET  5
NO.  3110B  OF  12

### Page 28 (OCR)

5. EDDY CURRENT INSPECTION
TEST SET-UP:
(1) CONNECT PROBE TO INSTRUMENT AND SET FREQUENCY BETWEEN 100 AND
300 KHZ FOR SURFACE PROBES. (SEE FIGURE 2.)
(2) SELECT EDDY CURRENT REFERENCE STANDARD AND PLACE PROBE IN THE
UNCRACKED AD4 HOLE. CALIBRATE INSTRUMENT IN ACCORDANCE WITH
MANUFACTURER'S INSTRUCTIONS. (SEE REFERENCE STANDARD IN FIGURE 2.)
(3) PLACE PROBE IN NOTCHED AD4 HOLE AND ADJUST BALANCE AND/OR LIFT-OFF
CONTROLS SO THAT LIFTING THE PROBE FROM THE HOLE OR WOBBLING THE
PROBE IN THE HOLE PRODUCES MINIMUM LIFT-OFF. BALANCE INSTRUEMENT SO
THAT LIFT-OFF WILL DRIVE THE METER IN ONE DIRECTION AND PASSING THE
COIL OVER THE NOTCH WILL DRIVE THE METER IN THE OPPOSITE DIRECTION.
(4) ROTATE COIL OVER REFERENCE NOTCH AND ADJUST SENSITIVITY TO PRODUCE A
MINIMUM OF 50 PERCENT FULL-SCALE DEFLECTION.
NOTE: ON INSTRUEMENTS WITH OSCILLOSCOPE READOUTS,
ADJUST THE HORIZONTAL AND VERTICAL GAIN
AND SENSITIVITY CONTROLS TO PRODUCE A NOTCH
RESPONSE OF 50 PERCENT FULL-SCALE DEFLECTION.
(SEE FIGURE 3.)
B. AIRCRAFT PREPARATION:
(1) VERIFY THAT THE RIVETS ARE REMOVED BEFORE BEGINNING EXAMINATION.
(2) VERIFY THAT THE EXAMINATION AREA AROUND THE RIVET HOLE IS CLEAN
AND FREE OF CRACKED AND LOOSE PAINT, NICKS, AND BURRS.
C. EDDY CURRENT TESTING:
(1) EXAMINE THE RIVET HOLES (SCAN EACH 360°) ON THE BULKHEAD WEB ALONG
THE LENGTH OF THE HORIZONTAL STIFFENERS FROM THE AFT SIDE ABOVE THE
FRP. (SEE FIGURE 1.)
(2)  EXAMINE THE UPPER DIAGONAL SCALLOPED DOUBLER ATTACHMENT RIVET HOLES
IN THE BULKHEAD WEB FROM THE FORWARD SIDE. (SEE FIGURE 1.)
EXAMINE THE FIREX WYE SUPPORT VERTICAL STIFFENERS AND FIVE-LEAF
DOUBLERS TO BULKHEAD WEB ATTACHMENT RIVET HOLES FROM THE AFT SIDE.
(SEE FIGURE 1 DETAILS A AND B.)
MARK AND RECORD ALL AREAS SHOWING A METER OR
OSCILLOSCOPE READING IN EXCESS OF 25 PERCENT
FULL-SCALE DEFLECTION. CRACK LENGTH MAY BE
DETERMINED BY FLUORESCENT PENETRANT INSPECTION.
REF: DC-9 S/B A53-144
SERVICE SKETCH  SHEET
NO.  31108  OF _  12

### Page 29 (OCR)

6. DISPOSITION:
MARK AND RECORD LENGTH AND LOCATION OF ALL CRACKS FOUND. REPURT DETAILS TO
DAC. DIRECT INFORMATION TO:
DOUGLAS AIRCRAFT COMPANY
P.O. BOX 1771
LONG BEACH, CALIFORNIA 90801
ATTN: MANAGER, CUSTOMER SERVICE 7-21'
(SERVICE BULLETIN A53-144) .
REF:  DC-9 S/B A53-144
SERVICE SKETCH  SHEET
NO.  31108  OF  12

### Page 30 (OCR)

STA
Y=817 (SERIES 10 AND 20)
Y=996 (SERIES 30)
Y=1072 (SERIES 40)  PERFORM PENETRANT OR EDDY
Y=1167 (SERIES 50)  CURRENT INSPECTION FROM
AFT SIDE OF BULKHEAD WITH
ATTACHMENTS REMOVED (SEE
PARAGRAPH 3 "INSPECTION")
NOTE:  PERFORM PENETRANT OR EDDY CURRENT  INSPECTION AT UPPER DIAGONAL SCALLOPED
DOUBLERS FROM FORWARD SIDE OF BULKHEAD
WITH MOTED ATTACHMENTS REMOYED.
REMOVE RIVETS IN ALTERNATE STIFFENERS
AND REPLACE OR REPAIR BEFORE REMOVING
ADDITIONAL RIVETS.  FROM MORE THAN TWO STIFFENERS EACH SIDE  DO NOT REMOVE RIVETS
AT ONE TIME
EXERCISE CARE DURING ALL RIVET REMOVAL TO
AVOID CRACKING AND BUCKLING OF  STIFFENERS.
VISUALLY INSPECT FOR CRACKED STIFFENERS
AND REPAIR OR REPLACE.
HORIZONTAL  HORIZONTAL STIFFENER
STIFFENERS  RIVET REQUIREMENTS
9915558
- 505  -503  STIFFENER  CONFIG.  RIVET P/N  QTY
-509  -507  -503  MS20426AD5-6  2
MS20470AD5-6  27
-511  -505  MS20426AD5-6
-513  MS20470AD5-6  24
-517  -515  -509  -507  MS20470AD5-6  MS20426AD5-6  42  2
-521  -519  MS20470A05-6  40
-511  MS20470AD5-6  45
FRP -  C O c  - FRP  -513  MS20426AD5-6  MS20470A05-6  44  2
-515  MS20426AD5-6  4
MS20470AD5-6  38
-517  MS20470AD5-6  48
-519  MS20470AD5-6  42
-521  MS2047'JAD5-6  46
•SEE PARAGRAPH 3
"INSPECTION" (TYP)
VIEW LOOKING AFT
REF:  DC-9 S/B A53-144
SERVICE SKETCH  SHEET
FIGURE 1.  DC-9 VENTRAL AFT  NO.  31108  OF _  12
PRESSURE BULKHEAD.

### Page 31 (OCR)

*NOTE:  SEE PARAGRAPH 3.
"INSPECTION"
*5910130-79
SCALLOPED DOUBLERS
(REF)
•
MS20470AD5-5
RIVET (11 PLACES)
*5910130-81
SCALLOPED  *5917691-5
DOUBLERS  *5917691-7  STIFFENER
(REF)  STIFFENER  (REF)
(REF)-
MS20470AD5-5
RIVET  *5917691-13
(10 PLACES)  STIFFENER
(REF)
*5917691-11
STIFFENER
(REF)
MS20470AD5-5
RIVET (11 REQD)
(TYP AT 5917691-5,
-7, -11, AND -13
STIFFENERS)
VIEW LOOKING AFT
REF:  DC-9 S/B A53-144
SERVICE SKETCH  SHEET
NO.  3110B  OF -  12

### Page 32 (OCR)

NOTE:  FASTENERS A THROUGH F MUST  MS20470AD5-6
BE REMOVED,  THEN FIVE-LEAF  RIVET
DOUBLER MUST BE REMOVED TO  (4 PLACES)
PERFORM PENETRANT OR EDDY
CURRENT INSPECTION AT FASTENER  • HORIZONTAL
LOCATIONS A, B, C, D, E, AND F.  STIFFENERS
NOTE:  MUST BE PERFORMED ON AFT  INSPECTION FOR RIVET HOLES  FORWARD SIDE  -507, -511
SIDE OF BULKHEAD.
- 5910130-121 OR -349
FIVE-LEAF DOUBLER :
AFT SIDE
(TYP 4 PLACES)
MS20470AD5-5
MS20470AD5-5  RIVET
RIVET  VIEW A
• LOOKING FORWARD
5910130-121 OR -349
FIVE-LEAF DOUBLER
AFT SIDE
(TYP 4 PLACES)
CERTAIN CONFIGURATIONS MAY REQUIRE
TRIMMING TO CLEAR EXISTING DOUBLER.
• HORIZONTAL
STIFFENERS
- 503, -507
FORWARD SIDE.
- MS20470AD5-6
RIVET
(4 PLACES)
VIEW B
LOOKING FORWARD  REF:  DC-9 S/B A53-144
SERVICE SKETCH  SHEET
NO.  31108  OF .  12

### Page 33 (OCR)

NOTES:  MAKE FROM 2014-T651 OR 2024-T651 MATERIAL
0.42 - .048 INCH THICK.
PAINT REFERENCE STANDARD WITH FR PRIMER.
VM5 01 RS  •5
AD5  AD 6  REFERENCE STANDARD  SIB A53-144  DC-9  :5
.1562  • 1875
AD4  1.0
.125
• EDM NOTCH
C.025 LONG BY
.OOS WIDE )
THRU THICKNESS
(3 PLACES)
PILOT
AD4
PILOT
<.5  COIL  VN501-4
TEFLON TAPE
(OPTIONAL  VM501-5
• .125  (MAX)  1.75  - AD5
- PILOT
PROBE
VM501-6
ADG
- COIL  • COIL
-. 75 DIA
(MAX)
FIGURE 2
CRACK REFERENCE STANDARD
AND SURFACE PROBE
REF: DC-9 S/B A53-144
SERVICE SKETCH  SHEET .  11
NO.  31108  OF  12

### Page 34 (OCR)

CRT PRESENTATION EM3300
CRACK
INDICATION-
LIFTOFF
RESPONSE
NOTES: 1.  100 kHz
2.  NOTCH RESPONSE FROM REFERENCE STANDARD.
3.  LIFT-OFF RESPONSE MAY BE ROTATED 90° TO
HORIZONTAL PLANE.
FIGURE 3
REF: DC-9 S/B A53-144
SERVICE SKETCH  SHEET.  12
NO.  3110B  OF  12

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
