# Boeing Service Bulletin MD11-28-126: Boeing - Service Bulletin

- Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2013-0210; AD 2014-03-07 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Boeing Service Bulletin MD11-28-126](https://openairdocs.org/service-documents/boeing/md11-28-126.md)
- Title as filed: Boeing - Service Bulletin
- Pages: 244
- PDF: https://openairdocs.org/files/sha256/9b/89/9b8903cd73039fa2d4bd00ba12d437152654b64d839781a19ddaf788934d8909
- Page: https://openairdocs.org/service-documents/boeing/md11-28-126/file/9b8903cd7303

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Commercial 
Airplanes
MD11
Service Bulletin
Number: MD11-28-126
Original Issue: March 03, 2009
Revision 4: November 29, 2011
ATA System: 2811
SUBJECT: FUEL - Integral Fuel Tanks - Inspection and Sleeving Installation of Wire Assemblies
Routed Above the Center Upper Auxiliary Fuel Tank
Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15
CFR 730-774). An export license may be required before it is used for development, production or use by foreign
persons from specific countries. The controller of this data has the individual responsibility to abide by all export
laws.
9E991ECCN:
BOEING PROPRIETARY, CONFIDENTIAL, AND/OR TRADE SECRET
Copyright © 2009 The Boeing Company
Unpublished Work - All Rights Reserved
Boeing claims copyright in each page of this document only to the extent that the page contains copyrightable
subject matter. Boeing also claims copyright in this document as a compilation and/or collective work.
This document includes proprietary information owned by The Boeing Company and/or one or more third parties.
Treatment of the document and the information it contains is governed by contract with Boeing. For more
information, contact The Boeing Company, P.O. Box 3707, Seattle, Washington 98124.
Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner,
BBJ, DC-8, DC-9, DC-10, KC-10, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8A, Poseidon and the
Boeing livery are all trademarks owned by The Boeing Company; and no trademark license is granted in
connection with this document unless provided in writing by Boeing.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 4: November 29, 2011
1 of 244
2.0

### Page 2

BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 4: November 29, 2011
2 of 244
BOEING SERVICE BULLETIN MD11-28-126
BLANK PAGE

### Page 3

Table of Contents
Revision Transmittal Sheet ............................................ 5
Summary ...................................................... 7
1. PLANNING INFORMATION ........................................ 1 1
A. Effectivity ............................................... 1 1
1. Airplanes ............................................ 1 1
2. Spares Affected ........................................ 1 3
B. Concurrent Requirements ...................................... 1 3
C. Reason ................................................ 1 3
D. Description .............................................. 1 4
E. Compliance .............................................. 1 5
F. Approval ............................................... 1 6
G. Manpower .............................................. 1 6
H. Weight and Balance Changes .................................... 1 8
I. Electrical Load Data ......................................... 1 9
J. References .............................................. 1 9
1. Existing Data: ......................................... 1 9
2. Data supplied with this Service Bulletin: ........................... 2 0
3. Installation Drawings Used in the Preparation of this Service Bulletin: ........... 2 0
K. Publications Affected ........................................ 2 0
L. Interchangeability and Intermixability of Parts ........................... 2 0
2. MATERIAL INFORMATION ........................................ 2 1
A. Material - Price and Availability ................................... 2 1
B. Industry Support Information .................................... 2 2
C. Parts Necessary For Each Airplane ................................. 2 2
1. Kits/Parts: ........................................... 2 2
2. Parts and Materials Supplied by the Operator: ........................ 3 2
3. Parts Modified and Reidentified: ............................... 3 3
4. Parts Removed and Not Replaced: .............................. 3 3
D. Parts Necessary to Change Spares ................................. 3 3
E. Special Tooling - Price and Availability ............................... 3 3
F. Special Tooling Necessary to do this Service Bulletin ....................... 3 3
3. ACCOMPLISHMENT INSTRUCTIONS .................................. 3 5
A. GENERAL INFORMATION ..................................... 3 5
B. WORK INSTRUCTIONS ....................................... 3 8
FIGURE 1: CLAMPS AT FLOOR BEAMS, LEFT SIDE - REMOVAL [Group 1, Configuration 1] .... 5 1
FIGURE 2: BARRIER/SHIELD SLEEVING, LEFT SIDE - INSTALLATION [Group 1, Configuration 1] . 56
FIGURE 3: CLAMPS AND EXTRUDED CHANNEL, LEFT SIDE - INSTALLATION [Group 1, Configuration
1 ]  ................................................ 6 0
FIGURE 4: CLAMPS AT FLOOR BEAMS, RIGHT SIDE - REMOVAL [Group 1, Configuration 1; Group 3]
.................................................. 6 7
FIGURE 5: BARRIER/SHIELD SLEEVING, RIGHT SIDE - INSTALLATION [Group 1, Configuration 1; Group
3 ]  ................................................ 7 2
FIGURE 6: CLAMPS AND EXTRUDED CHANNEL, RIGHT SIDE - INSTALLATION [Group 1, Configuration
1; Group 3] ........................................... 7 5
FIGURE 7: CLAMPS AT FLOOR BEAMS, LEFT SIDE - REMOVAL [Group 2, Configuration 1] .... 8 1
FIGURE 8: BARRIER/SHIELD SLEEVING, LEFT SIDE - INSTALLATION [Group 2, Configuration 1] . 86
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 4: November 29, 2011
3 of 244
BOEING SERVICE BULLETIN MD11-28-126

### Page 4

FIGURE 9: CLAMPS AND EXTRUDED CHANNEL, LEFT SIDE - INSTALLATION [Group 2, Configuration
1 ]  ................................................ 8 9
FIGURE 10: CLAMPS AT FLOOR BEAMS, RIGHT SIDE - REMOVAL [Group 2, Configuration 1; Group 4]
.................................................. 9 6
FIGURE 11: BARRIER/SHIELD SLEEVING, RIGHT SIDE - INSTALLATION [Group 2, Configuration 1; Group
4 ]  ................................................ 1 0 1
FIGURE 12: CLAMPS AND EXTRUDED CHANNEL, RIGHT SIDE - INSTALLATION [Group 2, Configuration
1; Group 4] .......................................... 1 0 4
FIGURE 13: CLAMPS AT FLOOR BEAMS, LEFT SIDE - REMOVAL [Group 3] ............ 1 1 0
FIGURE 14: BARRIER/SHIELD SLEEVING, LEFT SIDE - INSTALLATION [Group 3] ......... 1 1 8
FIGURE 15: CLAMPS AND EXTRUDED CHANNEL, LEFT SIDE - INSTALLATION [Group 3] .... 1 2 3
FIGURE 16: CLAMPS AT FLOOR BEAMS, LEFT SIDE - REMOVAL [Group 4] ............ 1 3 2
FIGURE 17: BARRIER/SHIELD SLEEVING, LEFT SIDE - INSTALLATION [Group 4] ......... 1 3 9
FIGURE 18: CLAMPS AND EXTRUDED CHANNEL, LEFT SIDE - INSTALLATION [Group 4] .... 1 4 4
FIGURE 19: LEFT AND RIGHT SIDE WIRE BUNDLE - INSPECTION [Group 1, Configuration 2] . . . 153
FIGURE 20: LEFT AND RIGHT SIDE WIRE BUNDLE - INSPECTION [Group 2, Configuration 2] . . . 158
FIGURE 21: BARRIER/SHIELD SLEEVING AND CLAMPING INSTALLATION - LEFT AND RIGHT SIDE
[Group 1, Configuration 2] .................................. 1 6 3
FIGURE 22: BARRIER/SHIELD SLEEVING AND CLAMPING INSTALLATION - LEFT AND RIGHT SIDE
[Group 2, Configuration 2] .................................. 1 6 9
FIGURE 23: CLAMPS AT FLOOR BEAMS, LEFT SIDE - REMOVAL [Group 5, Configuration 1] . . . 176
FIGURE 24: BARRIER/SHIELD SLEEVING, LEFT SIDE - INSTALLATION [Group 5, Configuration 1] . 181
FIGURE 25: CLAMPS AND EXTRUDED CHANNEL, LEFT SIDE - INSTALLATION [Group 5, Configuration
1 ]  ................................................ 1 8 5
FIGURE 26: CLAMPS AT FLOOR BEAMS, RIGHT SIDE - REMOVAL [Group 5, Configuration 1] . . 192
FIGURE 27: BARRIER/SHIELD SLEEVING, RIGHT SIDE - INSTALLATION [Group 5, Configuration 1] . 197
FIGURE 28: CLAMPS AND EXTRUDED CHANNEL, RIGHT SIDE - INSTALLATION [Group 5, Configuration
1 ]  ................................................ 2 0 0
FIGURE 29: WIRE BUNDLE - INSPECTION [Group 5, Configuration 2] ................. 2 0 7
FIGURE 30: BARRIERSHIELD SLEEVEING, RIGHT SIDE - INSTALLATION [Group 5, Configuration 2] . 209
FIGURE 31: CLAMPS AND EXTRUDED CHANNEL, RIGHT SIDE - INSTALLATION [Group 5, Configuration
2 ]  ................................................ 2 1 2
FIGURE 32: CLAMPS AT FLOOR BEAMS, LEFT SIDE - REMOVAL [Group 6] ............ 2 1 6
FIGURE 33: BARRIER/SHIELD SLEEVING, LEFT SIDE - INSTALLATION [Group 6] ......... 2 2 1
FIGURE 34: CLAMPS AND EXTRUDED CHANNEL, LEFT SIDE - INSTALLATION [Group 6] .... 2 2 4
FIGURE 35: CLAMPS AT FLOOR BEAMS, RIGHT SIDE - REMOVAL [Group 6] ............ 2 3 1
FIGURE 36: BARRIER/SHIELD SLEEVING, RIGHT SIDE - INSTALLATION [Group 6] ........ 2 3 6
FIGURE 37: CLAMPS AND EXTRUDED CHANNEL, RIGHT SIDE - INSTALLATION [Group 6] .... 2 3 9
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 4: November 29, 2011
4 of 244
BOEING SERVICE BULLETIN MD11-28-126

### Page 5

Commercial 
Airplanes
MD11
Service Bulletin
Revision Transmittal SheetNumber: MD11-28-126Original Issue: March 03, 2009
Revision 4: November 29, 2011
ATA System: 2811
SUBJECT: FUEL - Integral Fuel Tanks - Inspection and Sleeving Installation of Wire Assemblies
Routed Above the Center Upper Auxiliary Fuel Tank
This revision includes all pages of the service bulletin.
COMPLIANCE INFORMATION RELATED TO THIS REVISION
Federal Aviation Administration (FAA) Airworthiness Directive 2009-26-16 is related to this service bulletin.
No More work is necessary on airplane(s) changed in accordance with Revision 3 of this service bulletin.
REASON FOR REVISION
This revision is sent to incorporate engineering released subsequent to Revision 3 of this service bulletin, which
adds sleeving clamping and extruded channel requirements to formerly Group 2 airplanes with wire assembly
run AES9501 - ENL and AES9601 - ENR.
These sections were changed:
1. In Paragraph 1.D., Description, added Group 6 description and maintenance zone data.
2. In Paragraph 1.G., Manpower, added Group 6 manpower data.
3. In Paragraph 1.H., Weight and Balance Changes, added Group 6 weight and balance data.
4. In Paragraph 1.J.3., Installation Drawings Used in the Preparation of this Service Bulletin, changed drawing
revision level.
5. In Paragraph 2.A., Material - Price and Availability, added kits.
6. In Paragraph 2.C.1., Kits/Parts, added kits.
7. In Paragraph 3.A., General Information, removed former note number 8 and renumbered all subsequent.
8. In Paragraph 3.B., Work Instructions, added Group 6 data.
9. Corrected typographical error in Figure 18.
10. Added Figures 32 through 37.
Vertical lines are put on the left edge of each page, except in Paragraph 1.A., Effectivity, to show the location
of important changes.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 4: November 29, 2011
5 of 244

### Page 6

Pages with no vertical lines have no important changes.
REVISION HISTORY
March 03, 2009Original Issue:
June 18, 2009Revision 1:
November 18, 2010Revision 2:
June 03, 2011Revision 3:
November 29, 2011Revision 4:
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 4: November 29, 2011
6 of 244
BOEING SERVICE BULLETIN MD11-28-126

### Page 7

Commercial 
Airplanes
MD11
Service Bulletin
SummaryNumber: MD11-28-126Original Issue: March 03, 2009
Revision 4: November 29, 2011
ATA System: 2811
SUBJECT: FUEL - Integral Fuel Tanks - Inspection and Sleeving Installation of Wire Assemblies
Routed Above the Center Upper Auxiliary Fuel Tank
CONCURRENT REQUIREMENTS
None.
BACKGROUND
Boeing Special Federal Aviation Regulation (SFAR) 88 engineering investigations have determined that wires
routed above the center upper auxiliary fuel tank are in close proximity to the upper surface of the tank. In
addition some wire harness mounts may have loosened, allowing the wires to contact the tank. This condition
may cause wire damage or chafing that can lead to possible arcing and sparking on the fuel tank upper surface.
Inspecting the wires will determine the condition of the wires. Installation of nonmetallic barrier/shield sleeving,
new clamps, and new extruded channels for wiring support will minimize the possibility of wires contacting the
fuel tank upper surface. If not corrected, wires contacting the center upper auxiliary fuel tank surface may become
damaged, and the possibility of arcing and sparking may lead to burn-through of the upper surface of the fuel
tank. Burn-through on the upper surface of the fuel tank could potentially result in a tank explosion.
This service bulletin resulted from the safety assessments conducted by Boeing under Special Federal Aviation
Regulation (SFAR) 88, Fuel Tank System Fault Tolerance Evaluation Requirements.
ACTION
Refer to Paragraph 1.D., Description.
EFFECTIVITY
MD-11 and MD-11F Airplane(s). Refer to Paragraph 1.A.1., Airplanes, for the list of affected airplane(s).
COMPLIANCE
Federal Aviation Administration (FAA) Airworthiness Directive 2009-26-16 is related to this service bulletin.
Boeing recommends that the inspection/change given in this service bulletin be done within 60 months after the
effective date of Federal Aviation Administration (FAA) Airworthiness Directive 2009-26-16.
INDUSTRY SUPPORT INFORMATION
Boeing warranty remedies are not available for the changes and/or repair procedures given in this service
bulletin.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 4: November 29, 2011
7 of 244

### Page 8

MANPOWER
Refer to Paragraph 1.G., Manpower .
MATERIAL INFORMATION
Boeing Supplied Kits/Parts.
Refer to Paragraph 2.A., Material - Price and Availability .
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 4: November 29, 2011
8 of 244
BOEING SERVICE BULLETIN MD11-28-126

### Page 9 (OCR)

BOEING SERVICE BULLETIN MD11-28-126
INSPECTION AND SLEEVING INSTALLATION OF
WIRE ASSEMBLIES ROUTED ABOVE THE CENTER
UPPER AUXILIARY FUEL TANK
2022707
Original Issue: March 03, 2009
Revision 4: November 29, 2011  BOEING PROPRIETARY -  MD11-28-126
Copyright © Unpublished Work - See page 1 for details.  9 of 244

### Page 10

BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 4: November 29, 2011
10 of 244
BOEING SERVICE BULLETIN MD11-28-126
BLANK PAGE

### Page 11

Commercial 
Airplanes
MD11
Service Bulletin
Number: MD11-28-126
Original Issue: March 03, 2009
Revision 4: November 29, 2011
ATA System: 2811
SUBJECT: FUEL - Integral Fuel Tanks - Inspection and Sleeving Installation of Wire Assemblies
Routed Above the Center Upper Auxiliary Fuel Tank
1.    PLANNING INFORMATION
A. Effectivity
1. Airplanes
This service bulletin is for the airplanes shown below.
When a Group 3 or Group 4 airplane shown below is modified to a freighter configuration by Boeing
Passenger to Freighter (P to F) engineering, it will become a Group 1 or Group 2 airplane
respectively.
DESCRIPTIONCONFIGURATIONGROUP
Applicable to MD-11/MD-11F airplanes with Wire Support Brackets
P/N AAP8000-559 and AAP8000-1527 and without Forward Auxiliary
Fuel Tank.
-1
Applicable to MD-11/MD-11F operators who have not accomplished
prior issues of this service bulletin.
1
Applicable to MD-11/MD-11F operators who have accomplished prior
issues of this service bulletin.
2
Applicable to MD-11/MD-11F airplanes without Wire Support Brackets
P/N AAP8000-559 and AAP8000-1527 and without Forward Auxiliary
Fuel Tank.
-2
Applicable to MD-11/MD-11F operators who have not accomplished
prior issues of this service bulletin.
1
Applicable to MD-11 operators who have accomplished prior issues
of this service bulletin.
2
Applicable to MD-11/MD-11F airplanes with Wire Support Brackets
P/N AAP8000-559 and AAP8000-1527 and with Forward Auxiliary
Fuel Tank.
-3
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 4: November 29, 2011
11 of 244

### Page 12

DESCRIPTIONCONFIGURATIONGROUP
Applicable to MD-11 airplanes without Wire Support Brackets P/N
AAP8000-559 and AAP8000-1527 and with Forward Auxiliary Fuel
Tank.
-4
Applicable to MD-11/MD-11F airplanes with Wire Support Brackets
P/N AAP8000-559 and AAP8000-1527 and without Forward Auxiliary
Fuel Tank.
-5
Applicable to MD-11/MD-11F operators who have not accomplished
prior issues of this service bulletin.
1
Applicable to MD-11/MD-11F operators who have accomplished prior
issues of this service bulletin.
2
Applicable to MD-11F airplanes without Wire Support Brackets P/N
AAP8000-559 and AAP8000-1527 and without Forward Auxiliary
Fuel Tank.
-6
Airplane Models:
MD-11, MD-11F
GroupFuselage Num-
ber
2447 - 449
2451 - 464
2466 - 487
6488
2489
6491
2492 - 517
2519 - 531
4532
2533 - 543
4544
2545 - 552
2554 - 564
6565
2566
6567
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 4: November 29, 2011
12 of 244
BOEING SERVICE BULLETIN MD11-28-126

### Page 13

GroupFuselage Num-
ber
2568 - 578
2580 - 587
1588 - 589
3590
1591 - 596
3597
1598 - 607
3608
5609
1610 - 615
5616 - 618
1619 - 624
5625 - 629
1630 - 636
5637
1638
5639 - 646
2. Spares Affected
None.
B. Concurrent Requirements
None.
C. Reason
Boeing Special Federal Aviation Regulation (SFAR) 88 engineering investigations have determined
that wires routed above the center upper auxiliary fuel tank are in close proximity to the upper surface
of the tank. In addition some wire harness mounts may have loosened, allowing the wires to contact
the tank. This condition may cause wire damage or chafing that can lead to possible arcing and sparking
on the fuel tank upper surface. Inspecting the wires will determine the condition of the wires. Installing
nonmetallic barrier/shield sleeving, new clamps, and new extruded channels for wiring support, will
minimize the possibility of wires contacting the fuel tank upper surface. If not corrected, wires contacting
the center upper auxiliary fuel tank surface may become damaged, the possibility of arcing and sparking
may lead to burn-through of the upper surface of the fuel tank. Burn-through on the upper surface of
the fuel tank could potentially result in a tank explosion.
This service bulletin resulted from the safety assessments conducted by Boeing under Special Federal
Aviation Regulation (SFAR) 88, Fuel Tank System Fault Tolerance Evaluation Requirements.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 4: November 29, 2011
13 of 244
BOEING SERVICE BULLETIN MD11-28-126

### Page 14

Revision 1 was sent to add parts that were omitted, correct part quantities of some parts and to change
airplane groupings. This revision corrects the no-work condition given in Information Notice MD11-28-126
IN 01.
Revision 2 was sent to incorporate engineering released subsequent to revision 1 of this service bulletin,
which adds a passenger configuration previously omitted and clarifies nonmetallic barrier/shield sleeving
and extruded channel requirements not accounted for in the previous release.
Revision 2 incorporates the changes given in Information Notice MD11-28-126 IN 02, MD11-28-126
IN 03 and MD11-28-126 IN 04 and corrects the no-work condition given in Information Notice
MD11-28-126 IN 05 and MD11-28-126 IN 06 and are included in this revision.
Revision 3 was sent to incorporate engineering released subsequent to Revision 2 of this service
bulletin, which adds sleeving and extruded channel requirements to formerly Group 1 airplanes with
wire assembly run AES9601 - ENR.
Revision 4 is sent to incorporate engineering released subsequent to Revision 3 of this service bulletin,
which adds sleeving clamping and extruded channel requirements to formerly Group 2 airplanes with
wire assembly run AES9501 - ENL and AES9601 - ENR.
D. Description
Group 1-2, Configuration 1; Group 3-4; Group 5, Configuration 1; Group 6:
This service bulletin gives instructions to do as follows:
1. Does a General Visual Inspection of the wires bundles to determine if wires touch the upper surface
of the center upper auxiliary fuel tank and marking locations as necessary.
2. Does a Detailed Inspection of the wires routed above the center upper auxiliary fuel tank for splices
and damage (such as chafing, arcing and broken insulation) to wire bundles and does corrective
action if necessary.
3. Does a Detailed Inspection of the upper surface of the center upper auxiliary fuel tank for damage
to the fuel barrier seal and damage to the fuel tank and does corrective action as necessary.
4. Installs a nonmetallic barrier/shield sleeving to the wire harnesses, new clamps, new attaching
hardware, and a new extruded channel, to raise the wire harnesses off the upper surface of the
center upper auxiliary fuel tank.
Group 1, Configuration 2:
This service bulletin gives instructions to do as follows:
1. A Detailed Inspection (DI) of wire bundles for splices, damage and fuel tank fuel barrier seal
damage on the center upper auxiliary fuel tank and corrects as necessary. Also installs nonmetallic
barrier/shield sleeving, extruded channels and replaces clamps in the locations that follow:
a. Passenger Configuration - From Y=1238.950 to 1256.000, Between X=81.00 to X=106.00
b. Passenger Configuration - From Y=1238.950 to 1256.800, Between X= -81.00 to X= -106.00
c. Passenger or Freighter - From Y=1238.950 to 1381.000, Between X=60.00 to X=70.00.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 4: November 29, 2011
14 of 244
BOEING SERVICE BULLETIN MD11-28-126

### Page 15

Group 2, Configuration 2:
This service bulletin gives instructions to do as follows:
1. A Detailed Inspection (DI) of wire bundles for splices, damage and fuel tank fuel barrier seal
damage on the center upper auxiliary fuel tank and corrects as necessary. Also installs nonmetallic
barrier/shield sleeving, extruded channels and replaces clamps in the locations that follow:
a. Passenger Configuration - From Y=1238.950 to 1275.250, Between X=81.00 to X=106.00
b. Passenger Configuration - From Y=1238.950 to 1275.250, Between X= -81.00 to X= -106.00.
Group 5, Configuration 2:
This service bulletin gives instructions to do as follows:
1. A Detailed Inspection (DI) of wire assembly run AES9601 - ENR for splices, damage and fuel tank
fuel barrier seal damage on the center upper auxiliary fuel tank and corrects as necessary. Also
installs nonmetallic barrier/shield sleeving, extruded channels and replaces clamps.
Revision 4 - No More work is necessary on airplane(s) changed in accordance with Revision 3 of this
service bulletin.
The work in this service bulletin is done in the maintenance zone(s) given below.
Group 1-3:
Affected Maintenance Zones
ZoneModel
131, 141, 142MD-11, MD-11F
Group 4:
Affected Maintenance Zones
ZoneModel
131, 141, 142MD-11
Group 5-6:
Affected Maintenance Zones
ZoneModel
131, 141, 142MD-11F
E. Compliance
Federal Aviation Administration (FAA) Airworthiness Directive 2009-26-16 is related to this service
bulletin.
Boeing recommends that the inspection/change given in this service bulletin be done within 60 months
after the effective date of Federal Aviation Administration (FAA) Airworthiness Directive 2009-26-16.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 4: November 29, 2011
15 of 244
BOEING SERVICE BULLETIN MD11-28-126

### Page 16

F. Approval
This service bulletin was examined by the Federal Aviation Administration (FAA). The changes specified
in this service bulletin comply with the applicable regulations and are FAA approved, as well as European
Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/JAA approved
airplanes listed in the service bulletin effectivity. This service bulletin and its approval were based on
the airplane in its original Boeing delivery configuration or as modified by other approved Boeing
changes.
If an airplane has a non-Boeing modification or repair that affects a component or system also affected
by this service bulletin, the operator is responsible for obtaining appropriate regulatory agency approval
before incorporating this service bulletin.
In addition, the Manager of the FAA Los Angeles Aircraft Certification Office approves the action (i.e.
inspection or modification) defined in this service bulletin as an alternative method of compliance to
the requirements of paragraph (g), (g1), (g2), (g3), (g4), (g5) and (h) of Federal Aviation Administration
(FAA) Airworthiness Directive 2009-26-16. All provisions of Federal Aviation Administration (FAA)
Airworthiness Directive 2009-26-16 that are not specifically referenced in the above statement remain
fully applicable and must be complied with.
G. Manpower
The table below shows an estimate of the task hours necessary to do this change for each airplane.
This estimate is for direct labor only, done by an experienced crew. Adjust the estimate with operator
task hour data if necessary. The estimate does not include lost time. These are some examples of lost
time:
— Time to adjust to the workplace
— Time to schedule the work
— Time to examine the work
— Time to cure the materials
— Time to make the parts
— Time to find the tools.
This service bulletin assumes that the area above the center upper auxiliary fuel tank is open and
access is available to all the floor beams for maintenance.
Group 1, Configuration 1:
Elapsed HoursTask HoursNumber of PersonsTask
17.034.02Figures 1 and 4
8.517.02Inspect
21.063.03Figures 2 and 5
20.561.53Figures 3 and 6
67.0175.5TOTAL FOR EACH AIRPLANE
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 4: November 29, 2011
16 of 244
BOEING SERVICE BULLETIN MD11-28-126

### Page 17

Group 1, Configuration 2:
Elapsed HoursTask HoursNumber of PersonsTask
2.02.01Figure 19
7.07.01Figure 21
9.09.0TOTAL FOR EACH AIRPLANE
Group 2, Configuration 1:
Elapsed HoursTask HoursNumber of PersonsTask
16.533.02Figures 7 and 10
8.517.02Inspect
21.063.03Figures 8 and 11
20.561.53Figures 9 and 12
66.5174.5TOTAL FOR EACH AIRPLANE
Group 2, Configuration 2:
Elapsed HoursTask HoursNumber of PersonsTask
1.51.51Figure 20
4.54.51Figure 22
6.06.0TOTAL FOR EACH AIRPLANE
Group 3:
Elapsed HoursTask HoursNumber of PersonsTask
17.034.02Figures 4 and 13
8.517.02Inspect
24.072.03Figures 5 and 14
24.072.03Figures 6 and 15
73.5195.0TOTAL FOR EACH AIRPLANE
Group 4:
Elapsed HoursTask HoursNumber of PersonsTask
16.533.02Figures 10 and 16
8.517.02Inspect
24.072.03Figures 11 and 17
24.072.03Figures 12 and 18
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 4: November 29, 2011
17 of 244
BOEING SERVICE BULLETIN MD11-28-126

### Page 18

Group 4:
Elapsed HoursTask HoursNumber of PersonsTask
73.0194.0TOTAL FOR EACH AIRPLANE
Group 5, Configuration 1:
Elapsed HoursTask HoursNumber of PersonsTask
18.036.02Figures 23 and 26
10.521.02Inspect
24.072.03Figures 24 and 27
23.570.53Figures 25 and 28
76.0175.5TOTAL FOR EACH AIRPLANE
Group 5, Configuration 2:
Elapsed HoursTask HoursNumber of PersonsTask
1.01.01Figure 29
4.04.01Figure 30
4.04.01Figure 31
9.09.0TOTAL FOR EACH AIRPLANE
Group 6:
Elapsed HoursTask HoursNumber of PersonsTask
17.535.02Figures 32 and 35
9.018.02Inspect
22.066.03Figures 33 and 36
21.564.53Figures 34 and 37
70.0183.5TOTAL FOR EACH AIRPLANE
H. Weight and Balance Changes
Group 1:
Moment Change
(MEW) IN.-LBS
Mfr's Empty Weight
(MEW) LBS
Approximate Sta-
tion (Inches)
Airplane
+ 40899.3+ 34.3+ 1192.4MD-11 and
MD-11F
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 4: November 29, 2011
18 of 244
BOEING SERVICE BULLETIN MD11-28-126

### Page 19

Group 2:
Moment Change
(MEW) IN.-LBS
Mfr's Empty Weight
(MEW) LBS
Approximate Sta-
tion (Inches)
Airplane
+ 39571.8+ 30.3+ 1306.0MD-11 and
MD-11F
Group 3:
Moment Change
(MEW) IN.-LBS
Mfr's Empty Weight
(MEW) LBS
Approximate Sta-
tion (Inches)
Airplane
+ 42362.2+ 32.5+ 1303.7MD-11 and
MD-11F
Group 4:
Moment Change
(MEW) IN.-LBS
Mfr's Empty Weight
(MEW) LBS
Approximate Sta-
tion (Inches)
Airplane
+ 39994.1+ 33.6+ 1190.3MD-11
Group 5:
Moment Change
(MEW) IN.-LBS
Mfr's Empty Weight
(MEW) LBS
Approximate Sta-
tion (Inches)
Airplane
+ 42148.0+ 35.3+ 1296.9MD-11 and
MD-11F
Group 6:
Moment Change
(MEW) IN.-LBS
Mfr's Empty Weight
(MEW) LBS
Approximate Sta-
tion (Inches)
Airplane
+ 40756.6+ 31.2+ 1306.3MD-11F
I. Electrical Load Data
Not changed.
J. References
1. Existing Data:
a. Structural Repair Manual (SRM) 51.
b. MD-11-1F Structural Repair Manual (SRM) 51-42-03.
c. MD-11-1P Structural Repair Manual (SRM) 51-42-03.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 4: November 29, 2011
19 of 244
BOEING SERVICE BULLETIN MD11-28-126

### Page 20

d. Standard Wiring Practices Manual (SWPM) 20-00-03, 20-00-06, 20-00-13, 20-10-01, 20-10-02,
20-10-03, and 20-10-10.
e. MD-11 Special Compliance Item (SCI), Critical Design Configuration Control Limitation
(CDCCL), 20-1, 20-5, 20-6, and 20-13.
f. FAA Airworthiness Directive (AD) 2009-26-16.
2. Data supplied with this Service Bulletin:
None.
3. Installation Drawings Used in the Preparation of this Service Bulletin:
ChangeTitleDocument Number
MWire Protection - Above Upper and
Forward Auxiliary Fuel Tank
SR11280054
AEO NWire Protection - Above Upper and
Forward Auxiliary Fuel Tank
SR11280054
This drawing was used to prepare this service bulletin. This drawing is not necessary to make the
specified changes, and is not supplied with this service bulletin. This drawing may not be applicable
to all airplane configurations or operators.
K. Publications Affected
1. Publications:
None.
2. Damage Tolerance Based Structural Inspections:
Boeing has evaluated the repairs and/or changes in this service bulletin for effects on Fatigue
Critical Structure (FCS) and for changes to Damage Tolerance Inspections (DTI) required in the
Maintenance Program. This service bulletin does not affect FCS, therefore DTIs are not necessary.
L. Interchangeability and Intermixability of Parts
Refer to Paragraph 2.C., Parts Necessary For Each Airplane, for interchangeability and intermixability
information.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 4: November 29, 2011
20 of 244
BOEING SERVICE BULLETIN MD11-28-126

### Page 21

2.    MATERIAL INFORMATION
A. Material - Price and Availability
Boeing can supply the kits shown in Paragraph 2.C., Parts Necessary for Each Airplane. Operators
are encouraged to share schedule requirements with Boeing for incorporation of the service bulletin.
The kits are subject to the terms and conditions of the Boeing standard purchase order acknowledgment.
Prices are in United States Dollars. Terms: Net 30 days.
Reference this service bulletin and submit your purchase order by one of these methods:
1. Order on-line via ATA Spec 2000 or The Boeing PART Page
2. Fax to (206) 662-7145
REFER TO THE BOEING PART PAGE ON MYBOEINGFLEET.COM OR CONTACT FIRST RESPONDER
AT FR@BOEING.COM FOR THE LATEST REORDER LEAD TIME (ROLT) AND PRICE INFORMATION
Unit Price as of the Revi-
sion 4 date of this Service
Bulletin (US Dollars)
ROLT as of the Revision 4
date of this Service Bulletin
(Calendar Days)
NameKit Number
$18,139.00120Service KitSB11280126-11
12,268.00120Service KitSB11280126-13
18,426.00120Service KitSB11280126-7
12,544.00120Service KitSB11280126-9
1,835.00120Supplemental KitSB11280126-17
1,622.00120Supplemental KitSB11280126-21
10,501.00120Service KitSB11280126-23
1,059.00120Supplemental KitSB11280126-25
17,327.00120Service KitSB11280126-27
NotesUnit Price as of the Revi-
sion 4 date of this Service
Bulletin (US Dollars
ROLT as of the Revision
4 date of this Service Bul-
letin (Calendar Days)
NameKit Number
(a)$1,964.00120Supplemental KitSB11280126-15
(b)1,114.00120Supplemental KitSB11280126-19
(c)1,902.00120Supplemental KitSB11280126-29
(a) Applicable to Group 1 operators who have SB11280126-3 Service Kit(s) in stock and have not accomplished
the prior issue service bulletin.
(b) Applicable to Group 2 operators who have SB11280126-5 Service Kit(s) in stock and have not accomplished
the prior issue service bulletin.
(c) Applicable to Group 6 operators who have SB11280126-13 Service Kit(s) in stock and have not accom-
plished the prior issue service bulletin.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 4: November 29, 2011
21 of 244
BOEING SERVICE BULLETIN MD11-28-126

### Page 22

B. Industry Support Information
Boeing warranty remedies are not available for the configuration changes and/or repair procedures
given in this service bulletin.
C. Parts Necessary For Each Airplane
1. Kits/Parts:
To get the kits/parts shown below, refer to Paragraph 2.A., Material - Price and Availability.
NOTE: One Service kit and the items shown in Paragraph 2.C.2., Parts and Materials Supplied
by the Operator, are necessary for each airplane. The Service Kit is divided into Figure
Kits for each installation figure shown in the table below.
Figure Kit
986532Top Kit
--1111SB11280126-11
11----SB11280126-13
------SB11280126-23
------SB11280126-27
--11--SB11280126-7
------SB11280126-9
Figure Kit
181715141211Top Kit
------SB11280126-11
----11SB11280126-13
------SB11280126-23
------SB11280126-27
--11--SB11280126-7
11--11SB11280126-9
Figure Kit
343328272524Top Kit
------SB11280126-11
------SB11280126-13
--1111SB11280126-23
11----SB11280126-27
------SB11280126-7
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 4: November 29, 2011
22 of 244
BOEING SERVICE BULLETIN MD11-28-126

### Page 23

Figure Kit
343328272524Top Kit
------SB11280126-9
Figure Kit
3736Top Kit
--SB11280126-11
--SB11280126-13
--SB11280126-23
11SB11280126-27
--SB11280126-7
--SB11280126-9
Group 1, Configuration 1:
KIT SB11280126-11
NOTES
Existing Part
NumberName
Figure
New Part Number
6532
QTY
(a)SCREW6143D0005-3-10
(a)SCREW3193D0005-3-12
(a)SCREW223D0005-3-16
(a)STA-STRAP2322799D0254-1-1-9
NUT1135MS21042L3
WASHER2984NAS1252-10L
EXTRUDED
CHANNEL
816NMC05118
(a)CLAMP8S7934111-10SA
(a)CLAMP12S7934111-1SA
(a)CLAMP46S7934111-3SA
(a)CLAMP8S7934111-4SA
(a)CLAMP138S7934111-5SA
(a)CLAMP7S7934111-6SA
(a)CLAMP8S7934111-8SA
SLEEVE2SR11280054-11
SLEEVE3SR11280054-13
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 4: November 29, 2011
23 of 244
BOEING SERVICE BULLETIN MD11-28-126

### Page 24

Group 1, Configuration 1:
KIT SB11280126-11
NOTES
Existing Part
NumberName
Figure
New Part Number
6532
QTY
SLEEVE1SR11280054-15
SLEEVE11SR11280054-19
SLEEVE11SR11280054-21
SLEEVE12SR11280054-29
SLEEVE48SR11280054-3
SLEEVE23SR11280054-37
SLEEVE411SR11280054-7
SLEEVE47SR11280054-9
(a) Or approved Equivalent. Refer to AEPL, Drawing 7595071.
Group 1, Configuration 2:
KIT SB11280126-17
NotesNameQTYNew Part Number
(a)SCREW23D0005-3-16
(a)STA-STRAP169D0254-1-1-9
NUT2MS21042L3
WASHER8NAS1252-10L
(a)CLAMP6S7934111-3SA
SLEEVE5SR11280054-37
SLEEVE1SR11280054-7
(a) Or approved Equivalent. Refer to AEPL, Drawing 7595071.
Group 2, Configuration 1:
KIT SB11280126-13
NOTES
Existing Part
NumberName
Figure
New Part Number
121198
QTY
(a)SCREW33303D0005-3-10
(a)SCREW19363D0005-3-12
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 4: November 29, 2011
24 of 244
BOEING SERVICE BULLETIN MD11-28-126

### Page 25

Group 2, Configuration 1:
KIT SB11280126-13
NOTES
Existing Part
NumberName
Figure
New Part Number
121198
QTY
(a)SCREW113D0005-3-16
(a)STA-STRAP67809D0254-1-1-9
NUT5367MS21042L3
WASHER127172NAS1252-10L
EXTRUDED
CHANNEL
916NMC05118
(a)CLAMP816S7934111-10SA
(a)CLAMP88S7934111-12SA
(a)CLAMP168S7934111-18SA
(a)CLAMP15S7934111-1SA
(a)CLAMP53S7934111-3SA
(a)CLAMP24S7934111-4SA
(a)CLAMP138S7934111-5SA
(a)CLAMP1623S7934111-6SA
(a)CLAMP8S7934111-7SA
SLEEVE1SR11280054-13
SLEEVE11SR11280054-15
SLEEVE11SR11280054-19
SLEEVE11SR11280054-21
SLEEVE12SR11280054-29
SLEEVE2SR11280054-3
SLEEVE3SR11280054-35
SLEEVE2SR11280054-37
SLEEVE11SR11280054-5
SLEEVE43SR11280054-7
SLEEVE3SR11280054-9
(a) Or approved Equivalent. Refer to AEPL, Drawing 7595071.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 4: November 29, 2011
25 of 244
BOEING SERVICE BULLETIN MD11-28-126

### Page 26

Group 2, Configuration 2:
KIT SB11280126-21
NotesNameQTYNew Part Number
(a)SCREW23D0005-3-16
(a)STA-STRAP149D0254-1-1-9
NUT2MS21042L3
WASHER8NAS1252-10L
EXTRUDED CHANNEL1NMC05118
(a)CLAMP3S7934111-1SA
(a)CLAMP3S7934111-3SA
SLEEVE3SR11280054-35
SLEEVE2SR11280054-37
(a) Or approved Equivalent. Refer to AEPL, Drawing 7595071.
Group 3:
KIT SB11280126-7
NOTES
Existing Part
NumberName
Figure
New Part Number
151465
QTY
(a)SCREW53D0005-08-12
(a)SCREW53D0005-08-14
(a)SCREW1463D0005-3-10
(a)SCREW1933D0005-3-12
(a)SCREW223D0005-3-16
(a)STA-STRAP2792329D0254-1-1-9
NUT3511MS21042L3
WASHER8429NAS1252-10L
WASHER10NAS1252-8L
EXTRUDED
CHANNEL
168NMC05118
(a)CLAMP8S7934111-10SA
(a)CLAMP12S7934111-1SA
(a)CLAMP5S7934111-2SA
(a)CLAMP64S7934111-3SA
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 4: November 29, 2011
26 of 244
BOEING SERVICE BULLETIN MD11-28-126

### Page 27

Group 3:
KIT SB11280126-7
NOTES
Existing Part
NumberName
Figure
New Part Number
151465
QTY
(a)CLAMP8S7934111-4SA
(a)CLAMP1313S7934111-5SA
(a)CLAMP7S7934111-6SA
(a)CLAMP8S7934111-8SA
SLEEVE2SR11280054-11
SLEEVE3SR11280054-13
SLEEVE1SR11280054-15
SLEEVE11SR11280054-19
SLEEVE11SR11280054-21
SLEEVE1SR11280054-25
SLEEVE31SR11280054-29
SLEEVE84SR11280054-3
SLEEVE32SR11280054-37
SLEEVE114SR11280054-7
SLEEVE74SR11280054-9
(a) Or approved Equivalent. Refer to AEPL, Drawing 7595071.
Group 4:
KIT SB11280126-9
NOTES
Existing Part
NumberName
Figure
New Part Number
18171211
QTY
(a)SCREW53D0005-08-12
(a)SCREW53D0005-08-14
(a)SCREW30333D0005-3-10
(a)SCREW36193D0005-3-12
(a)SCREW113D0005-3-16
(a)STA-STRAP80679D0254-1-1-9
NUT6753MS21042L3
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 4: November 29, 2011
27 of 244
BOEING SERVICE BULLETIN MD11-28-126

### Page 28

Group 4:
KIT SB11280126-9
NOTES
Existing Part
NumberName
Figure
New Part Number
18171211
QTY
WASHER172127NAS1252-10L
WASHER10NAS1252-8L
EXTRUDED
CHANNEL
169NMC05118
(a)CLAMP168S7934111-10SA
(a)CLAMP88S7934111-12SA
(a)CLAMP816S7934111-18SA
(a)CLAMP15S7934111-1SA
(a)CLAMP5S7934111-2SA
(a)CLAMP35S7934111-3SA
(a)CLAMP24S7934111-4SA
(a)CLAMP1313S7934111-5SA
(a)CLAMP2316S7934111-6SA
(a)CLAMP8S7934111-7SA
SLEEVE1SR11280054-13
SLEEVE11SR11280054-15
SLEEVE11SR11280054-19
SLEEVE11SR11280054-21
SLEEVE1SR11280054-25
SLEEVE31SR11280054-29
SLEEVE2SR11280054-3
SLEEVE3SR11280054-35
SLEEVE2SR11280054-37
SLEEVE11SR11280054-5
SLEEVE34SR11280054-7
SLEEVE3SR11280054-9
(a) Or approved Equivalent. Refer to AEPL, Drawing 7595071.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 4: November 29, 2011
28 of 244
BOEING SERVICE BULLETIN MD11-28-126

### Page 29

Group 5, Configuration 1:
KIT SB11280126-23
NOTES
Existing Part
NumberName
Figure
New Part Number
28272524
QTY
(a)SCREW6143D0005-3-10
(a)SCREW11193D0005-3-12
(a)SCREW223D0005-3-16
(a)STA-STRAP2402799D0254-1-1-9
NUT1935MS21042L3
WASHER5384NAS1252-10L
EXTRUDED
CHANNEL
916NMC05118
(a)CLAMP8S7934111-10SA
(a)CLAMP12S7934111-1SA
(a)CLAMP3S7934111-3SA
(a)CLAMP8S7934111-4SA
(a)CLAMP218S7934111-5SA
(a)CLAMP7S7934111-6SA
(a)CLAMP8S7934111-8SA
SLEEVE2SR11280054-11
SLEEVE3SR11280054-13
SLEEVE1SR11280054-15
SLEEVE11SR11280054-19
SLEEVE11SR11280054-21
SLEEVE2SR11280054-29
SLEEVE48SR11280054-3
SLEEVE511SR11280054-7
SLEEVE47SR11280054-9
(a) Or approved Equivalent. Refer to AEPL, Drawing 7595071.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 4: November 29, 2011
29 of 244
BOEING SERVICE BULLETIN MD11-28-126

### Page 30

Group 5, Configuration 2:
KIT SB11280126-25
NotesNameQTYNew Part Number
(a)SCREW83D0005-3-12
(a)STA-STRAP89D0254-1-1-9
NUT8MS21042L3
WASHER24NAS1252-10L
EXTRUDED CHANNEL1NMC05118
(a)CLAMP8S7934111-5SA
SLEEVE1SR11280054-7
(a) Or approved Equivalent. Refer to AEPL, Drawing 7595071.
Group 6:
KIT SB11280126-27
NOTES
Existing Part
NumberName
Figure
New Part Number
37363433
QTY
(a)SCREW25223D0005-3-10
(a)SCREW27443D0005-3-12
(a)STA-STRAP72889D0254-1-1-9
NUT5266MS21042L3
WASHER131176NAS1252-10L
EXTRUDED
CHANNEL
916NMC05118
(a)CLAMP816S7934111-10SA
(a)CLAMP88S7934111-12SA
(a)CLAMP168S7934111-18SA
(a)CLAMP12S7934111-1SA
(a)CLAMP23S7934111-3SA
(a)CLAMP24S7934111-4SA
(a)CLAMP2116S7934111-5SA
(a)CLAMP1623S7934111-6SA
(a)CLAMP8S7934111-7SA
SLEEVE1SR11280054-13
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 4: November 29, 2011
30 of 244
BOEING SERVICE BULLETIN MD11-28-126

### Page 31

Group 6:
KIT SB11280126-27
NOTES
Existing Part
NumberName
Figure
New Part Number
37363433
QTY
SLEEVE11SR11280054-15
SLEEVE11SR11280054-19
SLEEVE11SR11280054-21
SLEEVE12SR11280054-29
SLEEVE2SR11280054-3
SLEEVE11SR11280054-5
SLEEVE54SR11280054-7
SLEEVE3SR11280054-9
(a) Or approved Equivalent. Refer to AEPL, Drawing 7595071.
NOTE: The kit that follows is applicable to Group 1 operators who have SB11280126-3 Service
Kit(s) in stock and have not accomplished the prior issue service bulletin.
Kit SB11280126-15
NotesNameQTYNew Part Number
SLEEVE4SR11280054-3
SLEEVE4SR11280054-7
SLEEVE3SR11280054-9
WASHER51NAS1252-10L
(a)CLAMP6S7934111-3SA
(a)CLAMP3S7934111-5SA
(a)SCREW23D0005-3-10
(a)STA STRAP299D0254-1-1-9
(a)SCREW43D0005-3-16
NUT46MS21042L3
SLEEVE5SR11280054-37
(a) Or approved Equivalent. Refer to AEPL, Drawing 7595071.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 4: November 29, 2011
31 of 244
BOEING SERVICE BULLETIN MD11-28-126

### Page 32

NOTE: The kit that follows is applicable to Group 2 operators who have SB11280126-5 Service
Kit(s) in stock and have not accomplished the prior issue service bulletin.
Kit SB11280126-19
NotesNameQTYNew Part Number
WASHER127NAS1252-10L
EXTRUDED CHANNEL1NMC05118
(a)CLAMP3S7934111-1SA
(a)CLAMP3S7934111-3SA
(a)CLAMP1S7934111-5SA
(a)SCREW13D0005-3-12
(a)SCREW23D0005-3-16
NUT120MS21042L3
SLEEVE3SR11280054-35
SLEEVE2SR11280054-37
(a) Or approved Equivalent. Refer to AEPL, Drawing 7595071.
NOTE: The kit that follows is applicable to Group 6 operators who have SB11280126-13 Service
Kit(s) in stock and have not accomplished the prior issue service bulletin.
KIT SB11280126-29
NotesNameQTYNew Part Number
(a)SCREW163D0005-3-12
(a)STA-STRAP139D0254-1-1-9
WASHER8NAS1252-10L
(a)CLAMP16S7934111-5SA
SLEEVE2SR11280054-7
(a) Or approved Equivalent. Refer to AEPL, Drawing 7595071.
2. Parts and Materials Supplied by the Operator:
NotesNameQTYPart Number /
Specification
(a) Only required, if use
as optional part for
SR11280054-23.
Strap, Tiedown, Electrical Components
- Self-locking, Plastic
-9D0254-1-1-9
(b) 250 yard roll.Tape1SR11280054-23
(DMS 2089)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 4: November 29, 2011
32 of 244
BOEING SERVICE BULLETIN MD11-28-126

### Page 33

NotesNameQTYPart Number /
Specification
(b) 72 yards.(0.030 x 1.0 Inch) Elastomer Tape1SR11280054-27
(DMS 2186-2)
(a) Or approved Equivalent. Refer to AEPL, Drawing 7595071.
(b) Or approved Equivalent.
3. Parts Modified and Reidentified:
None.
4. Parts Removed and Not Replaced:
NotesQTYNameExisting Part Number
5CLAMPMS21919WDG1
(a) Keep the part if there are other uses for it.
D. Parts Necessary to Change Spares
None.
E. Special Tooling - Price and Availability
None.
F. Special Tooling Necessary to do this Service Bulletin
No special tools or equipment are necessary to do the change in this service bulletin. But, maintenance
and overhaul tools in the manuals given in Paragraph 1.J., References, can be necessary. Examine
operator tool supply to make sure all necessary tools are available.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 4: November 29, 2011
33 of 244
BOEING SERVICE BULLETIN MD11-28-126

### Page 34

BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 4: November 29, 2011
34 of 244
BOEING SERVICE BULLETIN MD11-28-126
BLANK PAGE

### Page 35

3.    ACCOMPLISHMENT INSTRUCTIONS
A. GENERAL INFORMATION
WARNING: IF ELECTRICAL POWER IS APPLIED TO THE AIRPLANE, MAKE SURE YOU OBEY
ALL PRECAUTIONS WHILE YOU DO WORK. IF YOU DO NOT OBEY THE
PRECAUTIONS, DEATH OR INJURY TO PERSONS, AND DAMAGE TO THE AIRPLANE
CAN OCCUR.
CAUTION: KEEP THE WORK AREA, WIRES AND ELECTRICAL BUNDLES CLEAN OF METAL
PARTICLES OR CONTAMINATION WHEN YOU USE TOOLS. UNWANTED MATERIAL,
METAL PARTICLES OR CONTAMINATION CAUGHT IN WIRE BUNDLES CAN CAUSE
DAMAGE TO THE BUNDLES. DAMAGED WIRE BUNDLES CAN CAUSE SPARKS OR
OTHER ELECTRICAL DAMAGE.
CAUTION: ELECTRICALLY GROUND THE AIRPLANE. THIS WILL HELP TO PREVENT DAMAGE
TO THE AIRPLANE OR EQUIPMENT.
NOTE: 1. Manual titles are referred to by acronyms. Refer to Paragraph 1.J., References, for
definition of the acronyms.
2. For equivalent parts, refer to AEPL, Drawing 7595071.
3. For approved fastener and process material substitutions, refer to MD-11 Structural
Repair Manual, Chapter 51.
4. If the length of any fastener specified in this service bulletin does not meet installation
standards given in Structural Repair Manual (SRM) Chapter 51, then a fastener of
the same specification, or an approved substitute, with a length which meets the
installation standards given in SRM Chapter 51 may be used. In addition, washers
may be installed for fastener grip length in accordance with SRM Chapter 51.
5. A 1/8-inch thick stack of the same type washers called for in this service bulletin is
the maximum thickness which may be used under fastener head or nut to counteract
accumulation of tolerances.
EXCEPTION: When the available fastener length increments are greater than
1/16-inch, a 3/16-inch thick stack of the same type washers may be used.
6. Unless shown differently, these dimensions and tolerances are used:
– Linear dimensions are in inches
– Tolerance on linear dimensions, other than rivet and bolt edge margins, is plus
or minus 0.03 inch.
– Tolerance on rivet and bolt edge margin is plus or minus 0.05 inch
– Angular tolerance is plus or minus 2 degrees
– Torque limits to tighten nuts and bolts are in SRM Chapter 51.
7. This service bulletin assumes that the area above the center upper auxiliary fuel tank
is open and access is available to all the floor beams for maintenance.
8. Obey all of the warnings and cautions given in the specified manual sections.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 4: November 29, 2011
35 of 244
BOEING SERVICE BULLETIN MD11-28-126

### Page 36

9. Power Feeder cable splices and all other wire splices located over the center auxiliary
fuel tanks between Stations 1218.950 and 1381.000 must be relocated and repaired
in accordance with the Work Instructions below.
10. Installation of Barrier/Shield Sleeving will start 2 inches (+/- 1 Inch) away from Station
1218.950 aft side and will end 2 inches (+/- 1 Inch) away from Station 1381.000
forward side.
11. If it is necessary to remove more parts for access, you can remove those parts. If
you can get access without removing identified parts, it is not necessary to remove
all of the identified parts. Jacking and shoring limitations must be observed.
12. Maximum electrical components and wire assemblies are shown. All electrical
components and wire assemblies are not required for all airplanes.
13. Install clamps to ensure a friction fit on wire bundles to prevent movement within the
clamp when moderate pressure is applied. It is permissible to use smaller or larger
size clamps of the same type in order to meet this requirement. Refer to SWPM
20-10-01 as an accepted procedure.
14. Rotate clamps if necessary to eliminate preloading of support brackets.
15. If a power feeder cable or wire splice is located within the area of the sleeving/tape
installations, the following instructions must be applied.
 Remove any existing protective covering (sleeving, tape or tubing) from affected
wire bundles.
 Clean all affected wire bundles. Refer to SWPM 20-10-10 as an accepted
procedure.
 Inspect and verify location of any wire splices within affected wire bundles.
 Existing and/or new wire splices shall be relocated/located as follows:
Wire splices located in an area where protective covering
(sleeving, tubing, or tape) is to be installed.
(a)
Relocate splice at least 6.0 inches beyond end(s) of where pro-
tective covering is to be installed. Select wire code 801 (DMS
2426, copper wires) or wire code 98 (DMS 2339, aluminum wires)
with appropriate length. Refer to SWPM 20-00-13 as an accepted
procedure. Cut and identify new cable. Refer to SWPM 20-00-03
as an accepted procedure.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 4: November 29, 2011
36 of 244
BOEING SERVICE BULLETIN MD11-28-126

### Page 37

Wire splices installed above fuel tank.(b)
Relocate spices involving 10 gauge and larger (10, 8, 6, or 4 wire
gauges) to locations at least 3 feet or 2 wire supports (whichever
is further) from the fuel tank boundaries. Select wire code 801
(DMS 2426, copper wires) or wire code 98 (DMS 2339, aluminum
wires) with appropriate length. Refer to SWPM 20-00-13 as an
accepted procedure. Cut and identify new cable. Refer to SWPM
20-00-03 as an accepted procedure.
16. Replacement or repair of wiring within 6.0 inches of fuel tanks and fuel pipes must
use existing or new wire routing and clipping established in accordance with this
service bulletin.
17. Do not use the "Boeing installed wire types" as replacement or repair wiring inside
or within 6.0 inches of the fuel tanks or fuel pipes. Use the "Boeing replacement wire
types" as replacement or repair wiring inside fuel tanks or within 6.0 inches of fuel
pipes. Refer to SWPM 20-00-13 as an accepted procedure.
18. Replacement or repair of wiring used within 6.0 inches of fuel tanks and fuel pipes
must use the exact same wire gauge as the type design.
19. Do an electrical continuity test as required after the repair or replacement of wires
and replacement of wire splices.
20. A General Visual Inspection is defined as: A visual examination of an interior or
exterior area, installation or assembly to detect obvious damage, failure or irregularity.
This level of inspection is made from within touching distance unless otherwise
specified. A mirror may be necessary to enhance visual access to all exposed surfaces
in the inspection area. This level of inspection is made under normally available
lighting conditions such as daylight, hangar lighting, flashlight or drop-light and may
require removal or opening of access panels or doors. Stands, ladders or platforms
may be required to gain proximity to the area being checked.
21. A Detailed Inspection is defined as: An intensive examination of a specific item,
installation, or assembly to detect damage, failure, or irregularity. Available lighting
is normally supplemented with a direct source of good lighting at an intensity deemed
appropriate. Inspection aids such as mirrors, magnifying lenses, etc. may be
necessary. Surface cleaning and elaborate access procedures may be required.
22. These work instructions refer to procedures included in other Boeing documents.
When the words "refer to" are used and the operator has an accepted alternative
procedure, the accepted alternative procedure can be used. When the words "in
accordance with" are included in the instruction, the procedure in the Boeing document
must be used.
23. Where the work instructions include installation of a kept part, a new or serviceable
part with the same part number can be installed as an alternative to the kept part.
The removed part can be discarded if a new or serviceable part is installed.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 4: November 29, 2011
37 of 244
BOEING SERVICE BULLETIN MD11-28-126

### Page 38

24. Refer to these SWPM chapters as accepted procedures for applicable operations:
SubjectChapter
Identification of Electrical Wire - CommercialSWPM 20-00-03
Inspection Instructions for Standard Wiring InstallationsSWPM 20-00-06
Electrical Wire CodesSWPM 20-00-13
Wiring Installation - Maintenance PracticesSWPM 20-10-01
Shielding - Maintenance PracticesSWPM 20-10-02
Wire Splicing - Maintenance PracticesSWPM 20-10-03
Wire Harness and Component - CleaningSWPM 20-10-10
25. It is permissible to select a smaller or larger diameter sleeving of the same type.
26. Installed clamp part numbers may be different than the part numbers listed in the
removal Figure(s).
27. The instructions in Paragraph 3.B., Work Instructions and the figures can include
operation of tools or test equipment. Boeing Engineering Tool Drawings, the Illustrated
Tool and Equipment Manual, and the Special Tool and Ground Handling Drawing
Index contain data on versions of the tools or test equipment that you can use. It is
permitted to use replaced tools. It is not permitted to use superseded tools.
28. If it is necessary to remove more parts for access, you can remove those parts. If
you can get access without removing identified parts, it is not necessary to remove
all of the identified parts. Jacking and shoring limitations must be observed.
29. Where the work instructions include installation of a kept part, a new or serviceable
part with the same part number can be installed as an alternative to the kept part.
B. WORK INSTRUCTIONS
Group 1, Configuration 1:
1. Do a General Visual Inspection of wire bundles routed above the center upper auxiliary fuel tank
between floor beams at Stations 1238.950 to 1361.000 to determine if wires touch the upper
surface of the center upper auxiliary fuel tank. Mark the location(s) where the wire bundle(s)
contacts the upper surface of the center upper auxiliary fuel tank as applicable.
2. Remove all wire harness clamps from overwing floor beams and remove all TC92 wire harness
mounts from wire bundles in accordance with the Figures listed in the table that follows:
FigureArea
1Left Side
4Right Side
3. Clean all affected wire bundles. Refer to SWPM 20-10-10 as an accepted procedure.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 4: November 29, 2011
38 of 244
BOEING SERVICE BULLETIN MD11-28-126

### Page 39

4. Do a Detailed Inspection of all wire bundles above the center upper auxiliary fuel tank between
Stations 1218.950 and 1381.000 for the presence of wire splices and damage (such as chafing,
arcing and broken insulation), and do a Detailed Inspection for damage (burn marks) on the upper
surface of the center upper auxiliary fuel tank/fuel vapor barrier seal.
NOTE: Pay special attention to areas where wires were in contact with the upper surface of the
center upper auxiliary fuel tank (marked in Step 1)
Condition 1 - No Damage and No Splices Found
Proceed to Step 5.
Condition 2 - Damage Found on Wire Bundles, No Damage to Upper Surface of Auxiliary Fuel
Tank/Fuel Vapor Barrier Seal.
Replace/repair damaged wires. Refer to SWPM 20-10-01 and SWPM 20-10-03 as accepted
procedures.
Condition 3 - Splices Found on Power Feeder Wires or Non-Power Feeder Wires
a. Remove and relocate each splice to a location at least 3 feet or 2 wire supports, whichever
is further, away from fuel tank boundaries. Refer to SWPM 20-10-01 and SWPM 20-10-03 as
accepted procedures.
b. Identify new wire. Refer to SWPM 20-00-03 as an accepted procedure.
Condition 4 - Damage Found on Wire Bundles and Damage Found on Fuel Vapor Barrier Seal of
Auxiliary Fuel Tank
a. Repair Fuel Vapor Barrier Seal in accordance with MD-11-1F SRM 51-42-03 or MD-11-1P
SRM 51-42-03.
b. Replace/repair damaged wire(s). Refer to SWPM 20-10-01 and SWPM 20-10-03 as accepted
procedures.
Condition 5 - Damage Found on Upper Surface of Auxiliary Fuel Tank
Contact Boeing for repair instructions and do the repair.
5. Install barrier/shield sleeving P/N SR11280054-(), in accordance with the Figures listed in the table
that follows:
FigureArea
2Left Side
5Right Side
6. Install new clamps, new attaching hardware and extruded channel in accordance with the Figures
listed in the table that follows:
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 4: November 29, 2011
39 of 244
BOEING SERVICE BULLETIN MD11-28-126

### Page 40

FigureArea
3Left Side
6Right Side
7. Put the airplane back to a serviceable condition.
Group 1, Configuration 2:
1. Gain access to wire bundles routed above the center auxiliary fuel tank. Refer to the table that
follows for approximate affected area:
Freighter ConfigurationPassenger Configuration
From Y=1238.950 to Y=1381.000, Between
X=60.00 to X=70.00
From Y=1238.950 to Y=1381.000, Between
X=60.00 to X=70.00
From Y=1238.950 to Y=1256.000, Between
X=81.00 to X=106.00
From Y=1238.950 to Y=1256.800, Between X=
- 81.00 to X= - 106.00
2. Do a Detailed Inspection of wire bundles above the center upper auxiliary fuel tank in accordance
with FIGURE 19.
Based on inspection findings, do as follows:
Condition 1 - No Damage and No Splices Found
Proceed to Step 3.
Condition 2 - Damage Found on Wire Bundles, No Damage to Upper Surface of Auxiliary Fuel
Tank / Fuel Vapor Barrier Seal.
Replace/repair damaged wires. Refer to SWPM 20-10-01 and SWPM 20-10-03 as accepted
procedures.
Condition 3 - Splices Found on Power Feeder Wires or Non-Power Feeder Wires
a. Remove and relocate each splice to a location at least 3 feet or 2 wire supports, whichever
is further, away from fuel tank boundaries. Refer to SWPM 20-10-01 and SWPM 20-10-03 as
accepted procedures.
b. Identify new wire. Refer to SWPM 20-00-03 as an accepted procedure.
Condition 4 - Damage Found on Wire Bundles and Damage Found on Fuel Vapor Barrier Seal of
Auxiliary Fuel Tank
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 4: November 29, 2011
40 of 244
BOEING SERVICE BULLETIN MD11-28-126

### Page 41

a. Repair Fuel Vapor Barrier Seal in accordance with MD-11-1F SRM 51-42-03 or MD-11-1P
SRM 51-42-03.
b. Repair/replace wire(s) causing damage. Refer to SWPM 20-10-01 and SWPM 20-10-03 as
accepted procedures.
Condition 5 - Damage Found on Upper Surface of Auxiliary Fuel Tank
Contact Boeing for repair instructions and do the repair.
3. Install barrier/shield sleeving and clamping in accordance with FIGURE 21.
4. Close access.
5. Put the airplane back to a serviceable condition.
Group 2, Configuration 1:
1. Do a General Visual Inspection of wire bundles routed above the center upper auxiliary fuel tank
between floor beams at Stations 1238.950 to 1361.000 to determine if wires touch the upper
surface of the center upper auxiliary fuel tank. Mark the location(s) where the wire bundle(s)
contacts the upper surface of the center upper auxiliary fuel tank as applicable.
2. Remove all wire harness clamps from overwing floor beams and remove all TC92 wire harness
mounts from wire bundles in accordance with the Figures listed in the table that follows:
FigureArea
7Left Side
10Right Side
3. Clean all affected wire bundles. Refer to SWPM 20-10-10 as an accepted procedure.
4. Do a Detailed Inspection of all wire bundles above the center upper auxiliary fuel tank between
Stations 1218.950 and 1381.000 for the presence of wire splices and damage (such as chafing,
arcing and broken insulation), and do a Detailed Inspection for damage (burn marks) on the upper
surface of the center upper auxiliary fuel tank/fuel vapor barrier seal.
NOTE: Pay special attention to areas where wires were in contact with the upper surface of the
center upper auxiliary fuel tank (marked in Step 1).
Condition 1 - No Damage and No Splices Found
Proceed to Step 5.
Condition 2 - Damage Found on Wire Bundles, No Damage to Upper Surface of Auxiliary Fuel
Tank/Fuel Vapor Barrier Seal.
Replace/repair damaged wires. Refer to SWPM 20-10-01 and SWPM 20-10-03 as accepted
procedures.
Condition 3 - Splices Found on Power Feeder Wires or Non-Power Feeder Wires
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 4: November 29, 2011
41 of 244
BOEING SERVICE BULLETIN MD11-28-126

### Page 42

a. Remove and relocate each splice to a location at least 3 feet or 2 wire supports, whichever
is further, away from fuel tank boundaries. Refer to SWPM 20-10-01 and SWPM 20-10-03 as
accepted procedures.
b. Identify new wire. Refer to SWPM 20-00-03 as an accepted procedure.
Condition 4 - Damage Found on Wire Bundles and Damage Found on Fuel Vapor Barrier Seal of
Auxiliary Fuel Tank
a. Repair Fuel Vapor Barrier Seal in accordance with MD-11-1F SRM 51-42-03 or MD-11-1P
SRM 51-42-03.
b. Replace/repair damaged wire(s). Refer to SWPM 20-10-01 and SWPM 20-10-03 as accepted
procedures.
Condition 5 - Damage Found on Upper Surface of Auxiliary Fuel Tank
Contact Boeing for repair instructions and do the repair.
5. Install barrier/shield sleeving P/N SR11280054-(), in accordance with the Figures listed in the table
that follows:
FigureArea
8Left Side
11Right Side
6. Install new clamps, new attaching hardware and extruded channel in accordance with the Figures
listed in the table that follows:
FigureArea
9Left Side
12Right Side
7. Put the airplane back to a serviceable condition.
Group 2, Configuration 2:
Passenger Configuration "Only"
1. Gain access to wire bundles routed above the center auxiliary fuel tank. Refer to the table that
follows for approximate affected area:
Passenger Configuration "Only"
From Y=1238.950 to Y=1275.250, Between X=81.00 to X=106.00
From Y=1238.950 to Y=1275.250, Between X= -70.00 to X= -106.00
2. Do a Detailed Inspection of wire bundles above the center upper auxiliary fuel tank in accordance
with FIGURE 20.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 4: November 29, 2011
42 of 244
BOEING SERVICE BULLETIN MD11-28-126

### Page 43

Based on inspection findings, do as follows:
Condition 1 - No Damage and No Splices Found
Proceed to Step 3.
Condition 2 - Damage Found on Wire Bundles, No Damage to Upper Surface of Auxiliary Fuel
Tank / Fuel Vapor Barrier Seal.
Replace/repair damaged wires. Refer to SWPM 20-10-01 and SWPM 20-10-03 as accepted
procedures.
Condition 3 - Splices Found on Power Feeder Wires or Non-Power Feeder Wires
a. Remove and relocate each splice to a location at least 3 feet or 2 wire supports, whichever
is further, away from fuel tank boundaries. Refer to SWPM 20-10-01 and SWPM 20-10-03 as
accepted procedures.
b. Identify new wire. Refer to SWPM 20-00-03 as an accepted procedure.
Condition 4 - Damage Found on Wire Bundles and Damage Found on Fuel Vapor Barrier Seal of
Auxiliary Fuel Tank
a. Repair Fuel Vapor Barrier Seal in accordance with MD-11-1F SRM 51-42-03 or MD-11-1P
SRM 51-42-03.
b. Repair/replace wire(s) causing damage. Refer to SWPM 20-10-01 and SWPM 20-10-03 as
accepted procedures.
Condition 5 - Damage Found on Upper Surface of Auxiliary Fuel Tank
Contact Boeing for repair instructions and do the repair.
3. Install barrier/shield sleeving and clamping in accordance with FIGURE 22.
4. Close access.
5. Put the airplane back to a serviceable condition.
Group 3:
1. Do a General Visual Inspection of wire bundles routed above the center upper auxiliary fuel tank
between floor beams at Stations 1039.000 to 1361.000 to determine if wires touch the upper
surface of the center upper auxiliary fuel tank. Mark the location(s) where the wire bundle(s)
contacts the upper surface of the center upper auxiliary fuel tank as applicable.
2. Remove wire harness clamps from overwing floor beams and remove all TC92 wire harness mounts
from wire bundles in accordance with the Figures listed in the table that follows:
FigureArea
13Left Side
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 4: November 29, 2011
43 of 244
BOEING SERVICE BULLETIN MD11-28-126

### Page 44

FigureArea
4Right Side
3. Clean all affected wire bundles. Refer to SWPM 20-10-10 as an accepted procedure.
4. Do a Detailed Inspection of all wire bundles above the center upper auxiliary fuel tank between
Stations 1039.000 and 1361.000 for the presence of wire splices and damage (such as chafing,
arcing and broken insulation), and do a Detailed Inspection for damage (burn marks) on the upper
surface of the center upper auxiliary fuel tank/fuel vapor barrier seal.
NOTE: Pay special attention to areas where wires were in contact with the upper surface of the
center upper auxiliary fuel tank (marked in Step 1)
Condition 1 - No Damage and No Splices Found
Proceed to Step 5.
Condition 2 - Damage Found on Wire Bundles, No Damage to Upper Surface of Auxiliary Fuel
Tank/Fuel Vapor Barrier Seal.
Replace/repair damaged wire(s). Refer to SWPM 20-10-01 and SWPM 20-10-03 as accepted
procedures.
Condition 3 - Splices Found on Power Feeder Wires or Non-Power Feeder Wires
a. Remove and relocate each splice to a location at least 3 feet or 2 wire supports, whichever
is further, away from fuel tank boundaries. Refer to SWPM 20-10-01 and SWPM 20-10-03 as
accepted procedures.
b. Identify new wire. Refer to SWPM 20-00-03 as an accepted procedure.
Condition 4 - Damage Found on Wire Bundles and Damage Found on Fuel Vapor Barrier Seal of
Auxiliary Fuel Tank
a. Repair Fuel Vapor Barrier Seal in accordance with MD-11-1F SRM 51-42-03 or MD-11-1P
SRM 51-42-03.
b. Replace/repair damaged wire(s). Refer to SWPM 20-10-01and SWPM 20-10-03 as accepted
procedures.
Condition 5 - Damage Found on Upper Surface of Auxiliary Fuel Tank
Contact Boeing for repair instructions and do the repair.
5. Install barrier/shield sleeving P/N SR11280054-(), in accordance with the Figures listed in the table
that follows:
FigureArea
14Left Side
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 4: November 29, 2011
44 of 244
BOEING SERVICE BULLETIN MD11-28-126

### Page 45

FigureArea
5Right Side
6. Install new clamps, new attaching hardware and extruded channel, in accordance with the Figures
listed in the table that follows:
FigureArea
15Left Side
6Right Side
7. Put the airplane back to a serviceable condition.
Group 4:
1. Do a General Visual Inspection of wire bundles routed above the center upper auxiliary fuel tank
between floor beams at Stations 1039.000 to 1361.000 to determine if wires touch the upper
surface of the center upper auxiliary fuel tank. Mark the location(s) where the wire bundle(s)
contacts the upper surface of the center upper auxiliary fuel tank as applicable.
2. Remove all wire harness clamps from overwing floor beams and remove all TC92 wire harness
mounts from wire bundles in accordance with the Figures in the table that follows:
FigureArea
16Left Side
10Right Side
3. Clean all affected wire bundles. Refer to SWPM 20-10-10 as an accepted procedure.
4. Do a Detailed Inspection of all wire bundles above the center upper auxiliary fuel tank between
Stations 1039.000 and 1361.000 for the presence of wire splices and damage (such as chafing,
arcing and broken insulation), and do a Detailed Inspection for damage (burn marks) on the upper
surface of the center upper auxiliary fuel tank/fuel vapor barrier seal.
NOTE: Pay special attention to areas where wires were in contact with the upper surface of the
center upper auxiliary fuel tank (marked in Step 1)
Condition 1 - No Damage and No Splices Found
Proceed to Step 5.
Condition 2 - Damage Found on Wire Bundles, No Damage to Upper Surface of Auxiliary Fuel
Tank/Fuel Vapor Barrier Seal.
Replace/repair damaged wires. Refer to SWPM 20-10-01 and SWPM 20-10-03 as accepted
procedures.
Condition 3 - Splices Found on Power Feeder Wires or Non-Power Feeder Wires
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 4: November 29, 2011
45 of 244
BOEING SERVICE BULLETIN MD11-28-126

### Page 46

a. Remove and relocate each splice to a location at least 3 feet or 2 wire supports, whichever
is further, away from fuel tank boundaries. Refer to SWPM 20-10-01 and SWPM 20-10-03 as
accepted procedures.
b. Identify new wire. Refer to SWPM 20-00-03 as an accepted procedure.
Condition 4 - Damage Found on Wire Bundles and Damage Found on Fuel Vapor Barrier Seal of
Auxiliary Fuel Tank
a. Repair Fuel Vapor Barrier Seal in accordance with MD-11-1F SRM 51-42-03 or MD-11-1P
SRM 51-42-03.
b. Replace/repair damaged wire(s). Refer to SWPM 20-10-01 and SWPM 20-10-03 as accepted
procedures.
Condition 5 - Damage Found on Upper Surface of Auxiliary Fuel Tank
Contact Boeing for repair instructions and do the repair.
5. Install barrier/shield sleeving P/N SR11280054-(), in accordance with the Figures listed in the table
that follows:
FigureArea
17Left Side
11Right Side
6. Install new clamps, new attaching hardware and extruded channel, in accordance with the Figures
listed in the table that follows:
FigureArea
18Left Side
12Right Side
7. Put the airplane back to a serviceable condition.
Group 5, Configuration 1:
1. Do a General Visual Inspection of wire bundles routed above the center upper auxiliary fuel tank
between floor beams at Stations 1238.950 to 1361.000 to determine if wires touch the upper
surface of the center upper auxiliary fuel tank. Mark the location(s) where the wire bundle(s)
contacts the upper surface of the center upper auxiliary fuel tank as applicable.
2. Remove all wire harness clamps from overwing floor beams and remove all TC92 wire harness
mounts from wire bundles in accordance with the Figures listed in the table that follows:
FigureArea
23Left Side
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 4: November 29, 2011
46 of 244
BOEING SERVICE BULLETIN MD11-28-126

### Page 47

FigureArea
26Right Side
3. Clean all affected wire bundles. Refer to SWPM 20-10-10 as an accepted procedure.
4. Do a Detailed Inspection of all wire bundles above the center upper auxiliary fuel tank between
Stations 1218.950 and 1381.000 for the presence of wire splices and damage (such as chafing,
arcing and broken insulation), and do a Detailed Inspection for damage (burn marks) on the upper
surface of the center upper auxiliary fuel tank/fuel vapor barrier seal.
NOTE: Pay special attention to areas where wires were in contact with the upper surface of the
center upper auxiliary fuel tank (marked in Step 1)
Condition 1 - No Damage and No Splices Found
Proceed to Step 5.
Condition 2 - Damage Found on Wire Bundles, No Damage to Upper Surface of Auxiliary Fuel
Tank/Fuel Vapor Barrier Seal.
Replace/repair damaged wires. Refer to SWPM 20-10-01 and SWPM 20-10-03 as accepted
procedures.
Condition 3 - Splices Found on Power Feeder Wires or Non-Power Feeder Wires
a. Remove and relocate each splice to a location at least 3 feet or 2 wire supports, whichever
is further, away from fuel tank boundaries. Refer to SWPM 20-10-01 and SWPM 20-10-03 as
accepted procedures.
b. Identify new wire. Refer to SWPM 20-00-03 as an accepted procedure.
Condition 4 - Damage Found on Wire Bundles and Damage Found on Fuel Vapor Barrier Seal of
Auxiliary Fuel Tank
a. Repair Fuel Vapor Barrier Seal in accordance with MD-11-1F SRM 51-42-03 or MD-11-1P
SRM 51-42-03.
b. Replace/repair damaged wire(s). Refer to SWPM 20-10-01 and SWPM 20-10-03 as accepted
procedures.
Condition 5 - Damage Found on Upper Surface of Auxiliary Fuel Tank
Contact Boeing for repair instructions and do the repair.
5. Install barrier/shield sleeving P/N SR11280054-(), in accordance with the Figures listed in the table
that follows:
FigureArea
24Left Side
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 4: November 29, 2011
47 of 244
BOEING SERVICE BULLETIN MD11-28-126

### Page 48

FigureArea
27Right Side
6. Install new clamps, new attaching hardware and extruded channel in accordance with the Figures
listed in the table that follows:
FigureArea
25Left Side
28Right Side
7. Put the airplane back to a serviceable condition.
Group 5, Configuration 2:
1. Gain access to wire bundle AES9601 run letter ENR routed above the center auxiliary fuel tank
from station Y=1238.950 to Y=1381.000 approximately X= -46.50.
2. Do a Detailed Inspection of wire bundle AES9601 run ENR above the center upper auxiliary fuel
tank in accordance with FIGURE 29.
Based on inspection findings, do as follows:
Condition 1 - No Damage and No Splices Found
Proceed to Step 3.
Condition 2 - Damage Found on Wire Bundles, No Damage to Upper Surface of Auxiliary Fuel
Tank / Fuel Vapor Barrier Seal.
Replace/repair damaged wires. Refer to SWPM 20-10-01 and SWPM 20-10-03 as accepted
procedures.
Condition 3 - Splices Found on Power Feeder Wires or Non-Power Feeder Wires
a. Remove and relocate each splice to a location at least 3 feet or 2 wire supports, whichever
is further, away from fuel tank boundaries. Refer to SWPM 20-10-01 and SWPM 20-10-03 as
accepted procedures.
b. Identify new wire. Refer to SWPM 20-00-03 as an accepted procedure.
Condition 4 - Damage Found on Wire Bundles and Damage Found on Fuel Vapor Barrier Seal of
Auxiliary Fuel Tank
a. Repair Fuel Vapor Barrier Seal in accordance with MD-11-1F SRM 51-42-03 or MD-11-1P
SRM 51-42-03.
b. Repair/replace wire(s) causing damage. Refer to SWPM 20-10-01 and SWPM 20-10-03 as
accepted procedures.
Condition 5 - Damage Found on Upper Surface of Auxiliary Fuel Tank
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 4: November 29, 2011
48 of 244
BOEING SERVICE BULLETIN MD11-28-126

### Page 49

Contact Boeing for repair instructions and do the repair.
3. Install barrier/shield sleeving, clamping and extruded channels in accordance with FIGURE 30
and FIGURE 31.
4. Close access.
5. Put the airplane back to a serviceable condition.
Group 6:
1. Do a General Visual Inspection of wire bundles routed above the center upper auxiliary fuel tank
between floor beams at Stations 1238.950 to 1361.000 to determine if wires touch the upper
surface of the center upper auxiliary fuel tank. Mark the location(s) where the wire bundle(s)
contacts the upper surface of the center upper auxiliary fuel tank as applicable.
2. Remove all wire harness clamps from overwing floor beams and remove all TC92 wire harness
mounts from wire bundles in accordance with the Figures listed in the table that follows:
FigureArea
32Left Side
35Right Side
3. Clean all affected wire bundles. Refer to SWPM 20-10-10 as an accepted procedure.
4. Do a Detailed Inspection of all wire bundles above the center upper auxiliary fuel tank between
Stations 1218.950 and 1381.000 for the presence of wire splices and damage (such as chafing,
arcing and broken insulation), and do a Detailed Inspection for damage (burn marks) on the upper
surface of the center upper auxiliary fuel tank/fuel vapor barrier seal.
NOTE: Pay special attention to areas where wires were in contact with the upper surface of the
center upper auxiliary fuel tank (marked in Step 1).
Condition 1 - No Damage and No Splices Found
Proceed to Step 5.
Condition 2 - Damage Found on Wire Bundles, No Damage to Upper Surface of Auxiliary Fuel
Tank/Fuel Vapor Barrier Seal.
Replace/repair damaged wires. Refer to SWPM 20-10-01 and SWPM 20-10-03 as accepted
procedures.
Condition 3 - Splices Found on Power Feeder Wires or Non-Power Feeder Wires
a. Remove and relocate each splice to a location at least 3 feet or 2 wire supports, whichever
is further, away from fuel tank boundaries. Refer to SWPM 20-10-01 and SWPM 20-10-03 as
accepted procedures.
b. Identify new wire. Refer to SWPM 20-00-03 as an accepted procedure.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 4: November 29, 2011
49 of 244
BOEING SERVICE BULLETIN MD11-28-126

### Page 50

Condition 4 - Damage Found on Wire Bundles and Damage Found on Fuel Vapor Barrier Seal of
Auxiliary Fuel Tank
a. Repair Fuel Vapor Barrier Seal in accordance with MD-11-1F SRM 51-42-03.
b. Replace/repair damaged wire(s). Refer to SWPM 20-10-01 and SWPM 20-10-03 as accepted
procedures.
Condition 5 - Damage Found on Upper Surface of Auxiliary Fuel Tank
Contact Boeing for repair instructions and do the repair.
5. Install barrier/shield sleeving P/N SR11280054-(), in accordance with the Figures listed in the table
that follows:
FigureArea
33Left Side
36Right Side
6. Install new clamps, new attaching hardware and extruded channel in accordance with the Figures
listed in the table that follows:
FigureArea
34Left Side
37Right Side
7. Put the airplane back to a serviceable condition.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 4: November 29, 2011
50 of 244
BOEING SERVICE BULLETIN MD11-28-126

### Page 51 (OCR)

BOEING SERVICE BULLETIN MD11-28-126
This Figure applies only to: Group 1, Configuration 1.
STA
1381.000
STA
1361.000
STA
1341.000
STA  STA
1305.250  1321.000
STA
1293.750
STA
1275.250
STA  B
1256.000
STA  B
1238.950
X=17.000*  H
PASSENGER
CONFIGURATION
X=81.000  ONLY
FIGURE 1: CLAMPS AT FLOOR BEAMS, LEFT SIDE - REMOVAL
(SHEET 1 OF 5)
Original Issue: March 03, 2009
Revision 4 November 29, 2011  MD11-28-126
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.  51 of 244

### Page 52 (OCR)

BOEING SERVICE BULLETIN MD11-28-126
X=75.250  X=30.000  X=17.000
Z=-19.000 -
B-B
(7 PLACES)
C
X=75.250  X=60.500 X=30.000  X=17.000
E
Z=-19.000 -
(16
D-D
FIGURE 1: CLAMPS AT FLOOR BEAMS, LEFT SIDE - REMOVAL
(SHEET 2 OF 5)
Original Issue: March 03, 2009
Revision 4 November 29, 2011  MD11-28-126
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.  52 of 244

### Page 53 (OCR)

BOEING SERVICE BULLETIN MD11-28-126
20)
E-E
(3 PLACES)  G-G  (24
PASSENGER CONFIGURATION ONLY
STA
1256.750 -
G
(22)  22
STA
1239.000
X=81.000  F-F
LOOKING DOWN
STA
1361.000_
FIGURE 1: CLAMPS AT FLOOR BEAMS, LEFT SIDE - REMOVAL
(SHEET 3 OF 5)
Original Issue: March 03, 2009
Revision 4 November 29, 2011  BOEING PROPRIETARY -  MD11-28-126
Copyright © Unpublished Work - See page 1 for details.  53 of 244

### Page 54 (OCR)

BOEING SERVICE BULLETIN MD11-28-126
STA
1381.000
STA  1361.000
1341.000
STA  STA
1305.250  1321.000
STA
1293.750
STA
1275.250
STA
1256.000
STA
1238.950
X=17.000
• PASSENGER
CONFIGURATION
X=81.000  ONLY
- MOUNT
TYPICAL  2013837
FIGURE 1: CLAMPS AT FLOOR BEAMS, LEFT SIDE - REMOVAL
(SHEET 4 OF 5)
Original Issue: March 03, 2009
Revision 4 November 29, 2011  BOEING PROPRIETARY -  MD11-28-126
Copyright © Unpublished Work - See page 1 for details.  54 of 244

### Page 55

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for this figure.
More DataQtyIdentificationNameTaskStep
EDE - (AGS9201)-S7934111-()CLAMPRemove1
EDC - (AES9103), (ACS9009)-S7934111-()CLAMPRemove2
EDC - (AES9111)-S7934111-()CLAMPRemove3
EBE - (AGS9201)-S7934111-()CLAMPRemove4
EBC - (AES9102), (AES9109)-S7934111-()CLAMPRemove5
EBC - (AES9111)-S7934111-()CLAMPRemove6
EBJ - (AES9111)-S7934111-()CLAMPRemove
EBJ - (AES9105)-S7934111-()CLAMPRemove7
EDJ - (AES9111)-S7934111-()CLAMPRemove8
EDJ - (AES9106)-S7934111-()CLAMPRemove9
EAN - (AES9111)-S7934111-()CLAMPRemove10
EAN - (AES9115)-S7934111-()CLAMPRemove11
EAJ - (AES9104)-S7934111-()CLAMPRemove12
EAC - (AES9101)-S7934111-()CLAMPRemove13
EAC - (AES9108), (AES9111)-S7934111-()CLAMPRemove14
EAE - (AGS9201)-S7934111-()CLAMPRemove15
NLL (AGS9121)8MS21919WDG3CLAMPRemove16
NLM (AGS9119)8MS21919WDG6CLAMPRemove17
ENL (AES9501)8NMC1001-2CLAMPRemove18
HEE (AGS9124)8MS25281R4CLAMPRemove19
EDC (AES9110)7MS25281R6CLAMPRemove20
EBC (AES9109)7MS25281R1CLAMPRemove21
EAC (AES9108)3MS25281R2CLAMPRemove22
EDC (AES9103)5MS25281R1CLAMPRemove23
EKW (AES9110)1MS25281R2CLAMPRemove24
EPA (AES9109)1MS25281R2CLAMPRemove25
EGY (AES9108)1MS25281R2CLAMPRemove26
-TC92MountRemove27
FIGURE 1: CLAMPS AT FLOOR BEAMS, LEFT SIDE - REMOVAL
(SHEET 5 OF 5)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 4 November 29, 2011
55 of 244
BOEING SERVICE BULLETIN MD11-28-126

### Page 56 (OCR)

BOEING SERVICE BULLETIN MD11-28-126
This Figure applies only to: Group 1, Configuration 1.
D
STA
1381.000
STA
1361.000
STA
1341.000
STA  STA
1305.250  1321.000
STA
1293.750
STA
1275.250
STA
1256.000
STA
1238.950
X=17.000
(23
PASSENGER
CONFIGURATION
ONLY
END SLEEVING 2.0/3.0
INCHES PAST CLAMP  2013839
FIGURE 2: BARRIER/SHIELD SLEEVING, LEFT SIDE - INSTALLATION
(SHEET 1 OF 4)
Original Issue: March 03, 2009
Revision 4 November 29, 2011  MD11-28-126
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.  56 of 244

### Page 57 (OCR)

BOEING SERVICE BULLETIN MD11-28-126
TIE TAPE (27-
0.50
(MAX.)
6.00
(MAX.)
TYPICAL SLEEVING
INSTALLATION
29) TIE TAPE
TIE TAPE (27)
0.50
28) TAPE  (MAX.)
6.00
(MAX.)
C
2013840
FIGURE 2: BARRIER/SHIELD SLEEVING, LEFT SIDE - INSTALLATION
(SHEET 2 OF 4)
Original Issue: March 03, 2009
Revision 4 November 29, 2011  MD11-28-126
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.  57 of 244

### Page 58

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for this figure.
More DataQtyIdentificationNameTaskStep
(a) EDE - (AGS9201)1SR11280054-9SLEEVEInstall (New)1
(a) EDC - (AES9110,
AES9103)
1SR11280054-15SLEEVEInstall (New)2
(a) EDC - (AES9111)1SR11280054-7SLEEVEInstall (New)3
(a) EBE - (AGS9201)1SR11280054-3SLEEVEInstall (New)4
(a) EBC - (AES9102,
AES9109)
1SR11280054-7SLEEVEInstall (New)5
(a) EBC - (AES9111)1SR11280054-7SLEEVEInstall (New)6
(a) EBJ - (AES9111)1SR11280054-7SLEEVEInstall (New)
(a) EBJ - (AES9105)1SR11280054-9SLEEVEInstall (New)7
(a) EDJ - (AES9111)1SR11280054-7SLEEVEInstall (New)8
(a) EDJ - (AES9106)1SR11280054-3SLEEVEInstall (New)9
(a) EAN - (AES9111)1SR11280054-3SLEEVEInstall (New)10
(a) EAN - (AES9115)1SR11280054-11SLEEVEInstall (New)11
(a) EAJ - (AES9104)1SR11280054-9SLEEVEInstall (New)12
(a) EAC - (AES9101)1SR11280054-3SLEEVEInstall (New)13
(a) EAC - (AES9108,
AES9111)
1SR11280054-7SLEEVEInstall (New)14
(a) EAE - (AGS9201)1SR11280054-7SLEEVEInstall (New)15
(a) NLL - (AGS9121)1SR11280054-9SLEEVEInstall (New)16
(a) NLM - (AGS9119)1SR11280054-7SLEEVEInstall (New)17
(a) ENL - (AES9501)1SR11280054-7SLEEVEInstall (New)18
(a) HEE - (AGS9124)1SR11280054-7SLEEVEInstall (New)19
EDC - (AES9110)1SR11280054-19SLEEVEInstall (New)20
EBC - (AES9109)1SR11280054-29SLEEVEInstall (New)21
EAC - (AES9108)1SR11280054-21SLEEVEInstall (New)22
EDC - (AES9103)1SR11280054-29SLEEVEInstall (New)23
EKW - (AES9110)1SR11280054-37SLEEVEInstall (New)24
EPA - (AES9109)1SR11280054-37SLEEVEInstall (New)25
EGY - (AES9108)1SR11280054-37SLEEVEInstall (New)26
FIGURE 2: BARRIER/SHIELD SLEEVING, LEFT SIDE - INSTALLATION
(SHEET 3 OF 4)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 4 November 29, 2011
58 of 244
BOEING SERVICE BULLETIN MD11-28-126

### Page 59

More DataQtyIdentificationNameTaskStep
Part number 9D0254-1-1-9
optional.
-SR11280054-23TIE TAPEInstall (New)27
-SR11280054-27TAPEInstall (New)28
Part number 9D0254-1-1-9
optional.
-SR11280054-23TIE TAPEInstall (New)29
(a) It is permissible to select smaller or larger sized sleeving of the same type. Refer to extra parts table
below for additional sleeving availability.
More DataQtyIdentificationName
1SR11280054-11SLEEVE
4SR11280054-3SLEEVE
1SR11280054-7SLEEVE
3SR11280054-9SLEEVE
FIGURE 2: BARRIER/SHIELD SLEEVING, LEFT SIDE - INSTALLATION
(SHEET 4 OF 4)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 4 November 29, 2011
59 of 244
BOEING SERVICE BULLETIN MD11-28-126

### Page 60 (OCR)

BOEING SERVICE BULLETIN MD11-28-126
This Figure applies only to: Group 1, Configuration 1.
STA
1381.000
STA
1361.000
STA
1341.000
STA  STA
1305.250  1321.000
STA
1293.750
STA
1275.250
STA
1256.000
STA
1238.950
X=17.000  H
• PASSENGER
CONFIGURATION
ONLY
X=81.000
2013995
FIGURE 3: CLAMPS AND EXTRUDED CHANNEL, LEFT SIDE - INSTALLATION
(SHEET 1 OF 7)
Original Issue: March 03, 2009
Revision 4 November 29, 2011  MD11-28-126
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.  60 of 244

The text continues at https://openairdocs.org/service-documents/boeing/md11-28-126/file/9b8903cd7303.md?from=61

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
