# Boeing Service Bulletin MD11-28-126: SB-MD11-28-126-06--BOEING

- Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2017-0770; AD 2018-07-20 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Boeing Service Bulletin MD11-28-126](https://openairdocs.org/service-documents/boeing/md11-28-126.md)
- Title as filed: SB-MD11-28-126-06--BOEING
- Pages: 252
- PDF: https://openairdocs.org/files/sha256/f3/8d/f38d9bab1714a5c768dcc54685ea637d098e703ec6d6c91618be9d364752a897
- Page: https://openairdocs.org/service-documents/boeing/md11-28-126/file/f38d9bab1714

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Commercial 
Airplanes
MD11
Service Bulletin
Number: MD11-28-126
Original Issue: March 03, 2009
Revision 6: July 01, 2016
ATA System: 2811
SUBJECT: FUEL - Integral Fuel Tanks - Inspection and Sleeving Installation of Wire Assemblies
Routed Above the Center Upper Auxiliary Fuel Tank
Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15
CFR 300-774). An export license may be required before it is used for development, production or use by foreign
persons from specific countries. The controller of this data has the individual responsibility to abide by all export
laws.
9E991ECCN:
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET
Copyright © 2009 Boeing.
Unpublished Work. All Rights Reserved.
Treatment of this document and its content is governed by contract with Boeing. Rights to use this document
are licensed on a per aircraft basis and such rights may not be transferable. For more information, contact The
Boeing Company.
Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner,
BBJ, DC-8, DC-9, DC-10, KC-10, KC-46, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8, Poseidon and
Boeing liveries are all trademarks owned by The Boeing Company; and no trademark license is granted in
connection with this document unless provided in writing by Boeing.
Original Issue: March 03, 2009
MD11-28-126Revision 6: July 01, 2016
1 of 252
2.0

### Page 2

Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 6: July 01, 2016
2 of 252
BOEING SERVICE BULLETIN MD11-28-126
BLANK PAGE

### Page 3

Table of Contents
Revision Transmittal Sheet ............................................ 5
S u m m a r y  ...................................................... 7
1. PLANNING INFORMATION ........................................ 1 1
A . E f f e c t i v i t y  ............................................... 1 1
1. Airplanes ............................................ 1 1
2 . S p a r e s  A f f e c t e d  ........................................ 1 4
B. Concurrent Requirements ...................................... 1 4
C. Reason ................................................ 1 4
D. Description .............................................. 1 5
E. Compliance .............................................. 1 7
F . A p p r o v a l  ............................................... 1 8
G. Manpower .............................................. 1 8
H. Weight and Balance Changes .................................... 2 1
I. Electrical Load Data ......................................... 2 2
J . R e f e r e n c e s  .............................................. 2 2
1. Existing Data: ......................................... 2 2
2. Data Supplied with this Service Bulletin: ........................... 2 2
3. Installation Drawings Used in the Preparation of this Service Bulletin: ........... 2 2
K. Publications Affected ........................................ 2 2
L. Interchangeability and Intermixability of Parts ........................... 2 3
M. Software Accomplishment Summary ................................ 2 3
2. MATERIAL INFORMATION ........................................ 2 5
A. Material - Price and Availability ................................... 2 5
B. Industry Support Information .................................... 2 6
C. Parts Necessary for Each Airplane ................................. 2 6
1 . K i t s / P a r t s :  ........................................... 2 6
2. Parts and Materials Supplied by the Operator: ........................ 3 6
3. Parts Modified and Reidentified: ............................... 3 7
4. Parts Removed and Not Replaced: .............................. 3 7
D. Parts Necessary to Change Spares ................................. 3 7
E. Special Tooling - Price and Availability ............................... 3 7
F. Special Tooling Necessary to do this Service Bulletin ....................... 3 7
3. ACCOMPLISHMENT INSTRUCTIONS .................................. 3 9
A. GENERAL INFORMATION ..................................... 3 9
B. WORK INSTRUCTIONS ....................................... 4 2
FIGURE 1: CLAMPS AT FLOOR BEAMS, LEFT SIDE - REMOVAL [Group 1, Configuration 1] .... 5 6
FIGURE 2: BARRIER/SHIELD SLEEVING, LEFT SIDE - INSTALLATION [Group 1, Configuration 1] . 61
FIGURE 3: CLAMPS AND EXTRUDED CHANNEL, LEFT SIDE - INSTALLATION [Group 1, Configuration
1 ]  ................................................ 6 5
FIGURE 4: CLAMPS AT FLOOR BEAMS, RIGHT SIDE - REMOVAL [Group 1, Configuration 1; Group 3]
.................................................. 7 2
FIGURE 5: BARRIER/SHIELD SLEEVING, RIGHT SIDE - INSTALLATION [Group 1, Configuration 1; Group
3 ]  ................................................ 7 7
FIGURE 6: CLAMPS AND EXTRUDED CHANNEL, RIGHT SIDE - INSTALLATION [Group 1, Configuration
1; Group 3] ........................................... 8 0
FIGURE 7: CLAMPS AT FLOOR BEAMS, LEFT SIDE - REMOVAL [Group 2, Configuration 1] .... 8 6
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 6: July 01, 2016
3 of 252
BOEING SERVICE BULLETIN MD11-28-126

### Page 4

FIGURE 8: BARRIER/SHIELD SLEEVING, LEFT SIDE - INSTALLATION [Group 2, Configuration 1] . 91
FIGURE 9: CLAMPS AND EXTRUDED CHANNEL, LEFT SIDE - INSTALLATION [Group 2, Configuration
1 ]  ................................................ 9 4
FIGURE 10: CLAMPS AT FLOOR BEAMS, RIGHT SIDE - REMOVAL [Group 2, Configuration 1; Group 4]
................................................. 1 0 1
FIGURE 11: BARRIER/SHIELD SLEEVING, RIGHT SIDE - INSTALLATION [Group 2, Configuration 1; Group
4 ]  ................................................ 1 0 6
FIGURE 12: CLAMPS AND EXTRUDED CHANNEL, RIGHT SIDE - INSTALLATION [Group 2, Configuration
1; Group 4] .......................................... 1 0 9
FIGURE 13: CLAMPS AT FLOOR BEAMS, LEFT SIDE - REMOVAL [Group 3] ............ 1 1 5
FIGURE 14: BARRIER/SHIELD SLEEVING, LEFT SIDE - INSTALLATION [Group 3] ......... 1 2 3
FIGURE 15: CLAMPS AND EXTRUDED CHANNEL, LEFT SIDE - INSTALLATION [Group 3] .... 1 2 8
FIGURE 16: CLAMPS AT FLOOR BEAMS, LEFT SIDE - REMOVAL [Group 4] ............ 1 3 7
FIGURE 17: BARRIER/SHIELD SLEEVING, LEFT SIDE - INSTALLATION [Group 4] ......... 1 4 4
FIGURE 18: CLAMPS AND EXTRUDED CHANNEL, LEFT SIDE - INSTALLATION [Group 4] .... 1 4 9
FIGURE 19: LEFT AND RIGHT SIDE WIRE BUNDLE - INSPECTION [Group 1, Configuration 2] . . . 158
FIGURE 20: LEFT AND RIGHT SIDE WIRE BUNDLE - INSPECTION [Group 2, Configuration 2] . . . 163
FIGURE 21: BARRIER/SHIELD SLEEVING AND CLAMPING INSTALLATION - LEFT AND RIGHT SIDE
[Group 1, Configuration 2] .................................. 1 6 8
FIGURE 22: BARRIER/SHIELD SLEEVING AND CLAMPING INSTALLATION - LEFT AND RIGHT SIDE
[Group 2, Configuration 2] .................................. 1 7 4
FIGURE 23: CLAMPS AT FLOOR BEAMS, LEFT SIDE - REMOVAL [Group 5, Configuration 1] . . . 181
FIGURE 24: BARRIER/SHIELD SLEEVING, LEFT SIDE - INSTALLATION [Group 5, Configuration 1] . 186
FIGURE 25: CLAMPS AND EXTRUDED CHANNEL, LEFT SIDE - INSTALLATION [Group 5, Configuration
1 ]  ................................................ 1 8 9
FIGURE 26: CLAMPS AT FLOOR BEAMS, RIGHT SIDE - REMOVAL [Group 5, Configuration 1] . . 196
FIGURE 27: BARRIER/SHIELD SLEEVING, RIGHT SIDE - INSTALLATION [Group 5, Configuration 1] . 201
FIGURE 28: CLAMPS AND EXTRUDED CHANNEL, RIGHT SIDE - INSTALLATION [Group 5, Configuration
1 ]  ................................................ 2 0 4
FIGURE 29: WIRE BUNDLE - INSPECTION [Group 5, Configuration 2] ................. 2 1 0
FIGURE 30: BARRIER SHIELD SLEEVING, RIGHT SIDE - INSTALLATION [Group 5, Configuration 2] . 212
FIGURE 31: CLAMPS AND EXTRUDED CHANNEL, RIGHT SIDE - INSTALLATION [Group 5, Configuration
2 ]  ................................................ 2 1 5
FIGURE 32: CLAMPS AT FLOOR BEAMS, LEFT SIDE - REMOVAL [Group 6] ............ 2 1 9
FIGURE 33: BARRIER/SHIELD SLEEVING, LEFT SIDE - INSTALLATION [Group 6] ......... 2 2 4
FIGURE 34: CLAMPS AND EXTRUDED CHANNEL, LEFT SIDE - INSTALLATION [Group 6] .... 2 2 7
FIGURE 35: CLAMPS AT FLOOR BEAMS, RIGHT SIDE - REMOVAL [Group 6] ............ 2 3 4
FIGURE 36: BARRIER/SHIELD SLEEVING, RIGHT SIDE - INSTALLATION [Group 6] ........ 2 3 9
FIGURE 37: CLAMPS AND EXTRUDED CHANNEL, RIGHT SIDE - INSTALLATION [Group 6] .... 2 4 2
APPENDIX A: TYPICAL APPLICATION OF DMS 2379, TYPE 4, CLASS 4 SLEEVING (ROUNDIT 2000NX)
FOR INSTALLATION ..................................... 2 4 8
APPENDIX B: TYPICAL JOINING OF TWO PIECES OF DMS2379, TYPE 4 CLASS 4 SLEEVING . . . 249
APPENDIX C: TYPICAL DMS 2379, TYPE 4, CLASS 4 SLEEVING AT BREAKOUTS .......... 2 5 0
APPENDIX D: PART DEMAND ........................................ 2 5 2
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 6: July 01, 2016
4 of 252
BOEING SERVICE BULLETIN MD11-28-126

### Page 5

Commercial 
Airplanes
MD11
Service Bulletin
Revision Transmittal SheetNumber: MD11-28-126Original Issue: March 03, 2009
Revision 6: July 01, 2016
ATA System: 2811
SUBJECT: FUEL - Integral Fuel Tanks - Inspection and Sleeving Installation of Wire Assemblies
Routed Above the Center Upper Auxiliary Fuel Tank
This revision includes all page of the service bulletin.
COMPLIANCE INFORMATION RELATED TO THIS REVISION
Federal Aviation Administration (FAA) Airworthiness Directive AD 2014-03-07 is related to this service bulletin.
Effects of this Revision on airplanes on which Original Issue, Revision 1, Revision 2, Revision 3, Revision 4 or
Revision 5 was previously done:
See Paragraph 1.D., Description for more information.
REASON FOR REVISION
This Revision is sent to add the instructions for the additional "General Visual Inspection of the additional center
upper auxiliary fuel tank locations of the wires bundles" for Group 1, 2, 5, Configuration 2 airplanes to Paragraph
3.B., Work Instructions. Revision 5 of this service bulletin added the requirement for the additional Inspection
but did not include the information in Paragraph 3.B., Work Instructions.
This revision is also sent to tell operators that Administration (FAA) Airworthiness Directive AD 2014-03-07
supersedes Airworthiness Directive AD 2009-26-16.
These sections are changed:
Summary Background: Added Planning Data table.
Summary Action: Changed to match Paragraph 1.D., Description.
Summary Compliance: Latest standards applied and reference to AD 2009-26-16 removed.
Summary Material Information: Changed to add reference to part demand intent appendix.
Paragraph 1.E., Compliance: Latest standards applied and reference to AD 2009-26-16 removed.
Paragraph 1.F., Approval: Changed to remove AMOC paragraph related to AD 2009-26-16 and updated AMOC
paragraph related to AD 2014-03-07.
Paragraph 1.J., References: Airworthiness Directive AD 2009-26-16 removed from the reference list.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 6: July 01, 2016
5 of 252

### Page 6

Paragraph 2.A., Material - Price and Availability: Changed to update price information and to add reference to
part demand intent appendix.
Paragraph 3.B., Work Instructions: Changed to add new General Visual Inspection requirements for Groups 1,
2 and 5, Configuration 2 airplanes.
APPENDIX D: Part demand intent added.
Vertical lines are put on the left edge of each page, except in Paragraph 1.A., Effectivity and format changes,
to show the location of all content changes.
Pages with no vertical lines have no changes.
REVISION HISTORY
March 03, 2009Original Issue:
June 18, 2009Revision 1:
November 18, 2010Revision 2:
June 03, 2011Revision 3:
November 29, 2011Revision 4:
July 29, 2014Revision 5:
July 01, 2016Revision 6:
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 6: July 01, 2016
6 of 252
BOEING SERVICE BULLETIN MD11-28-126

### Page 7

Commercial 
Airplanes
MD11
Service Bulletin
SummaryNumber: MD11-28-126Original Issue: March 03, 2009
Revision 6: July 01, 2016
ATA System: 2811
SUBJECT: FUEL - Integral Fuel Tanks - Inspection and Sleeving Installation of Wire Assemblies
Routed Above the Center Upper Auxiliary Fuel Tank
CONCURRENT REQUIREMENTS
None.
BACKGROUND
Boeing Special Federal Aviation Regulation (SFAR) 88 engineering investigations have determined that wires
routed above the center upper auxiliary fuel tank are in close proximity to the upper surface of the tank. In
addition some wire harness mounts may have loosened, allowing the wires to contact the tank. This condition
may cause wire damage or chafing that can lead to possible arcing and sparking on the fuel tank upper surface.
Inspecting the wires will determine the condition of the wires. Installation of nonmetallic barrier/shield sleeving,
new clamps, and new extruded channels for wiring support will minimize the possibility of wires contacting the
fuel tank upper surface. If not corrected, wires contacting the center upper auxiliary fuel tank surface may become
damaged, and the possibility of arcing and sparking may lead to burn-through of the upper surface of the fuel
tank. Burn-through on the upper surface of the fuel tank could potentially result in a tank explosion.
This service bulletin resulted from the safety assessments conducted by Boeing under Special Federal Aviation
Regulation (SFAR) 88, Fuel Tank System Fault Tolerance Evaluation Requirements.
This table is provided to operators for planning purposes only. Refer to the applicable sections for more
information.
ReferenceAffectedPlanning Data
Paragraph 1.A.2., Spares AffectedNoSpares Affected
Paragraph 1.E., Compliance and Paragraph
1.F., Approval
YesAD Related
Paragraph 1.H., Weight and Balance ChangesYesWeight and Balance Change
Paragraph 1.I., Electrical Load DataNoElectrical Load Changed
Paragraph 1.K., Publications AffectedNoPublications Affected
Paragraph 1.K., Publications AffectedNoAirplane Flight Operations Affected (Flight Crew
Operations Manual and/or FAA Approved Air-
plane Flight Manual)
Paragraph 2.C.1., Kits/PartsYesKits/Parts Required
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 6: July 01, 2016
7 of 252

### Page 8

ReferenceAffectedPlanning Data
Paragraph 2.C.2., Parts and Materials Supplied
by the Operator
YesOperator Supplied Parts/Material
Paragraph 2.F., Special Tooling Necessary to
do this Service Bulletin
NoSpecial Tooling Required
ACTION
Group 1-2, Configuration 1; Group 3-4; Group 5, Configuration 1; Group 6:
This service bulletin gives instructions to do as follows:
1. Does a General Visual Inspection of the wires bundles to determine if wires touch the upper surface
of the center upper auxiliary fuel tank and marking locations as necessary.
2. Does a Detailed Inspection of the wires routed above the center upper auxiliary fuel tank for splices
and damage (such as chafing, arcing and broken insulation) to wire bundles and does corrective action
if necessary.
3. Does a Detailed Inspection of the upper surface of the center upper auxiliary fuel tank for damage to
the fuel barrier seal and damage to the fuel tank and does corrective action as necessary.
4. Installs a nonmetallic barrier/shield sleeving to the wire harnesses, new clamps, new attaching hardware,
and a new extruded channel, to raise the wire harnesses off the upper surface of the center upper
auxiliary fuel tank.
Group 1, Configuration 2:
This service bulletin gives instructions to do as follows:
1. Does General Visual Inspection of the additional center upper auxiliary fuel tank locations of the wires
bundles to determine if wires touch the upper surface of the additional center upper auxiliary fuel tank
and corrective actions as necessary.
2. A Detailed Inspection (DI) of wire bundles for splices, damage and fuel tank fuel barrier seal damage
on the center upper auxiliary fuel tank and corrects as necessary. Also installs nonmetallic barrier/shield
sleeving, extruded channels and replaces clamps in the locations that follow:
a. Passenger Configuration - From Y=1238.950 to 1256.000, Between X=81.00 to X=106.00
b. Passenger Configuration - From Y=1238.950 to 1256.800, Between X= -81.00 to X= -106.00
c. Passenger or Freighter - From Y=1238.950 to 1381.000, Between X=60.00 to X=70.00.
Group 2, Configuration 2:
This service bulletin gives instructions to do as follows:
1. Does General Visual Inspection of the additional center upper auxiliary fuel tank locations of the wires
bundles to determine if wires touch the upper surface of the additional center upper auxiliary fuel tank
and corrective actions as necessary.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 6: July 01, 2016
8 of 252
BOEING SERVICE BULLETIN MD11-28-126

### Page 9

2. A Detailed Inspection (DI) of wire bundles for splices, damage and fuel tank fuel barrier seal damage
on the center upper auxiliary fuel tank and corrects as necessary. Also installs nonmetallic barrier/shield
sleeving, extruded channels and replaces clamps in the locations that follow:
a. Passenger Configuration - From Y=1238.950 to 1275.250, Between X=81.00 to X=106.00
b. Passenger Configuration - From Y=1238.950 to 1275.250, Between X= -81.00 to X= -106.00.
Group 5, Configuration 2:
This service bulletin gives instructions to do as follows:
1. Does General Visual Inspection of the additional center upper auxiliary fuel tank locations of the wires
bundles to determine if wires touch the upper surface of the additional center upper auxiliary fuel tank
and corrective actions as necessary.
2. A Detailed Inspection (DI) of wire assembly run AES9601 - ENR for splices, damage and fuel tank fuel
barrier seal damage on the center upper auxiliary fuel tank and corrects as necessary. Also installs
nonmetallic barrier/shield sleeving, extruded channels and replaces clamps.
a. Passenger or Freighter - From Y=1238.950 to 1381.000, Between X= 60.00 to X= 70.00.
EFFECTIVITY
MD-11 and MD-11F Airplane(s). Refer to Paragraph 1.A.1., Airplanes, for the list of affected airplane(s).
COMPLIANCE
Federal Aviation Administration (FAA) Airworthiness DirectiveAD 2014-03-07 is related to this service bulletin.
The effective date of AD 2014-03-07 is March 26, 2014.
Boeing recommends that the inspection/change given in this service bulletin be done within 60 months after the
effective date of Federal Aviation Administration (FAA) Airworthiness Directive AD 2014-03-07 .
INDUSTRY SUPPORT INFORMATION
Boeing warranty remedies are not available for the changes and/or repair procedures given in this service
bulletin.
MANPOWER
Refer to Paragraph 1.G., Manpower
MATERIAL INFORMATION
Boeing Supplied Kits/Parts.
Refer to Paragraph 2.A., Material - Price and Availability
Operators are encouraged to complete the survey provided in APPENDIX D of this service bulletin to help Boeing
predict the quantity and timing of the Boeing Supplied Kits/Parts.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 6: July 01, 2016
9 of 252
BOEING SERVICE BULLETIN MD11-28-126

### Page 10 (OCR)

BOEING SERVICE BULLETIN MD11-28-126
D
D
INSPECTION AND SLEEVING INSTALLATION OF
WIRE ASSEMBLIES ROUTED ABOVE THE CENTER
UPPER AUXILIARY FUEL TANK
2022707
Original Issue: March 03, 2009
Revision 6: July 01, 2016  PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  MD11-28-126
Work - See page 1 for details.  10 of 252

### Page 11

Commercial 
Airplanes
MD11
Service Bulletin
Number: MD11-28-126
Original Issue: March 03, 2009
Revision 6: July 01, 2016
ATA System: 2811
SUBJECT: FUEL - Integral Fuel Tanks - Inspection and Sleeving Installation of Wire Assemblies
Routed Above the Center Upper Auxiliary Fuel Tank
1.    PLANNING INFORMATION
A. Effectivity
1. Airplanes
This service bulletin is for the airplanes shown below.
When a Group 3 or Group 4 airplane shown below is modified to a freighter configuration by Boeing
Passenger to Freighter (P to F) engineering, it will become a Group 1 or Group 2 airplane
respectively.
DESCRIPTIONCONFIGURATIONGROUP
Applicable to MD-11/MD-11F airplanes with Wire Support Brackets
P/N AAP8000-559 and AAP8000-1527 and without Forward Auxiliary
Fuel Tank.
-1
Applicable to MD-11/MD-11F operators who have not accomplished
prior issues of this service bulletin.
1
Applicable to MD-11/MD-11F operators who have accomplished prior
issues of this service bulletin.
2
Applicable to MD-11/MD-11F airplanes without Wire Support Brackets
P/N AAP8000-559 and AAP8000-1527 and without Forward Auxiliary
Fuel Tank.
-2
Applicable to MD-11/MD-11F operators who have not accomplished
prior issues of this service bulletin.
1
Applicable to MD-11 operators who have accomplished prior issues
of this service bulletin.
2
Applicable to MD-11/MD-11F airplanes with Wire Support Brackets
P/N AAP8000-559 and AAP8000-1527 and with Forward Auxiliary
Fuel Tank.
-3
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 6: July 01, 2016
11 of 252

### Page 12

DESCRIPTIONCONFIGURATIONGROUP
Applicable to MD-11 airplanes without Wire Support Brackets P/N
AAP8000-559 and AAP8000-1527 and with Forward Auxiliary Fuel
Tank.
-4
Applicable to MD-11/MD-11F airplanes with Wire Support Brackets
P/N AAP8000-559 and AAP8000-1527 and without Forward Auxiliary
Fuel Tank.
-5
Applicable to MD-11/MD-11F operators who have not accomplished
prior issues of this service bulletin.
1
Applicable to MD-11/MD-11F operators who have accomplished prior
issues of this service bulletin.
2
Applicable to MD-11F airplanes without Wire Support Brackets P/N
AAP8000-559 and AAP8000-1527 and without Forward Auxiliary
Fuel Tank.
-6
Airplane Models:
MD-11, MD-11F
GroupFuselage Num-
ber
2447 - 449
2451 - 459
2460 - 464
2466 - 469
2470 - 479
2480 - 487
6488
2489
6491
2492 - 499
2500 - 509
2510 - 517
2519
2520 - 529
2530 - 531
4532
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 6: July 01, 2016
12 of 252
BOEING SERVICE BULLETIN MD11-28-126

### Page 13

GroupFuselage Num-
ber
2533 - 539
2540 - 543
4544
2545 - 549
2550 - 552
2554 - 559
2560 - 564
6565
2566
6567
2568 - 569
2570 - 579
2580 - 587
1588 - 589
3590
1591 - 596
3597
1598 - 599
1600 - 607
3608
5609
1610 - 615
5616 - 618
1619
1620 - 624
5625 - 629
1630 - 636
5637
1638
5639
5640 - 646
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 6: July 01, 2016
13 of 252
BOEING SERVICE BULLETIN MD11-28-126

### Page 14

2. Spares Affected
None.
B. Concurrent Requirements
None.
C. Reason
Boeing Special Federal Aviation Regulation (SFAR) 88 engineering investigations have determined
that wires routed above the center upper auxiliary fuel tank are in close proximity to the upper surface
of the tank. In addition some wire harness mounts may have loosened, allowing the wires to contact
the tank. This condition may cause wire damage or chafing that can lead to possible arcing and sparking
on the fuel tank upper surface. Inspecting the wires will determine the condition of the wires. Installing
nonmetallic barrier/shield sleeving, new clamps, and new extruded channels for wiring support, will
minimize the possibility of wires contacting the fuel tank upper surface. If not corrected, wires contacting
the center upper auxiliary fuel tank surface may become damaged, the possibility of arcing and sparking
may lead to burn-through of the upper surface of the fuel tank. Burn-through on the upper surface of
the fuel tank could potentially result in a tank explosion.
This service bulletin resulted from the safety assessments conducted by Boeing under Special Federal
Aviation Regulation (SFAR) 88, Fuel Tank System Fault Tolerance Evaluation Requirements.
Revision 1 was sent to add parts that were omitted, correct part quantities of some parts and to change
airplane groupings. This revision corrects the no-work condition given in Information Notice MD11-28-126
IN 01.
Revision 2 was sent to incorporate engineering released subsequent to revision 1 of this service bulletin,
which adds a passenger configuration previously omitted and clarifies nonmetallic barrier/shield sleeving
and extruded channel requirements not accounted for in the previous release.
Revision 2 incorporates the changes given in Information Notice MD11-28-126 IN 02, MD11-28-126
IN 03 and MD11-28-126 IN 04 and corrects the no-work condition given in Information Notice
MD11-28-126 IN 05 and MD11-28-126 IN 06 and are included in this revision.
Revision 3 was sent to incorporate engineering released subsequent to Revision 2 of this service
bulletin, which adds sleeving and extruded channel requirements to formerly Group 1 airplanes with
wire assembly run AES9601 - ENR.
Revision 4 was sent to incorporate engineering released subsequent to Revision 3 of this service
bulletin, which adds sleeving clamping and extruded channel requirements to formerly Group 2 airplanes
with wire assembly run AES9501 - ENL and AES9601 - ENR.
Revision 5 was sent to incorporate engineering released subsequent to Revision 4 of this service
bulletin, which requires additional inspections, corrects wire assembly running letter and figures to
match airplane configuration, changes general notes, and added airplane fuselage number 579 to
Group 2 airplane effectivity.
The data given in Alternative Method of Compliance Notice MD11-28-126 R04 AMOC 1 is included in
this revision.
The data given in Information Notice MD11-28-126 IN 07 is included in this revision.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 6: July 01, 2016
14 of 252
BOEING SERVICE BULLETIN MD11-28-126

### Page 15

Revision 6 is sent to add the instructions for the additional "General Visual Inspection of the additional
center upper auxiliary fuel tank locations of the wires bundles" for Group 1, 2, 5, Configuration 2 airplanes
to Paragraph 3.B., Work Instructions. Revision 5 of this service bulletin added the requirement for the
additional Inspection but did not include the information in Paragraph 3.B., Work Instructions. This
revision is also sent to tell operators that Administration (FAA) Airworthiness Directive AD 2014-03-07
supersedes Airworthiness Directive AD 2009-26-16.
D. Description
Group 1-2, Configuration 1; Group 3-4; Group 5, Configuration 1; Group 6:
This service bulletin gives instructions to do as follows:
1. Does a General Visual Inspection of the wires bundles to determine if wires touch the upper surface
of the center upper auxiliary fuel tank and marking locations as necessary.
2. Does a Detailed Inspection of the wires routed above the center upper auxiliary fuel tank for splices
and damage (such as chafing, arcing and broken insulation) to wire bundles and does corrective
action if necessary.
3. Does a Detailed Inspection of the upper surface of the center upper auxiliary fuel tank for damage
to the fuel barrier seal and damage to the fuel tank and does corrective action as necessary.
4. Installs a nonmetallic barrier/shield sleeving to the wire harnesses, new clamps, new attaching
hardware, and a new extruded channel, to raise the wire harnesses off the upper surface of the
center upper auxiliary fuel tank.
Group 1, Configuration 2:
This service bulletin gives instructions to do as follows:
1. Does General Visual Inspection of the additional center upper auxiliary fuel tank locations of the
wires bundles to determine if wires touch the upper surface of the additional center upper auxiliary
fuel tank and corrective actions as necessary.
2. A Detailed Inspection (DI) of wire bundles for splices, damage and fuel tank fuel barrier seal
damage on the center upper auxiliary fuel tank and corrects as necessary. Also installs nonmetallic
barrier/shield sleeving, extruded channels and replaces clamps in the locations that follow:
a. Passenger Configuration - From Y=1238.950 to 1256.000, Between X=81.00 to X=106.00
b. Passenger Configuration - From Y=1238.950 to 1256.800, Between X= -81.00 to X= -106.00
c. Passenger or Freighter - From Y=1238.950 to 1381.000, Between X=60.00 to X=70.00.
Group 2, Configuration 2:
This service bulletin gives instructions to do as follows:
1. Does General Visual Inspection of the additional center upper auxiliary fuel tank locations of the
wires bundles to determine if wires touch the upper surface of the additional center upper auxiliary
fuel tank and corrective actions as necessary.
2. A Detailed Inspection (DI) of wire bundles for splices, damage and fuel tank fuel barrier seal
damage on the center upper auxiliary fuel tank and corrects as necessary. Also installs nonmetallic
barrier/shield sleeving, extruded channels and replaces clamps in the locations that follow:
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 6: July 01, 2016
15 of 252
BOEING SERVICE BULLETIN MD11-28-126

### Page 16

a. Passenger Configuration - From Y=1238.950 to 1275.250, Between X=81.00 to X=106.00
b. Passenger Configuration - From Y=1238.950 to 1275.250, Between X= -81.00 to X= -106.00.
Group 5, Configuration 2:
This service bulletin gives instructions to do as follows:
1. Does General Visual Inspection of the additional center upper auxiliary fuel tank locations of the
wires bundles to determine if wires touch the upper surface of the additional center upper auxiliary
fuel tank and corrective actions as necessary.
2. A Detailed Inspection (DI) of wire assembly run AES9601 - ENR for splices, damage and fuel tank
fuel barrier seal damage on the center upper auxiliary fuel tank and corrects as necessary. Also
installs nonmetallic barrier/shield sleeving, extruded channels and replaces clamps.
a. Passenger or Freighter - From Y=1238.950 to 1381.000, Between X= 60.00 to X= 70.00.
Effects of Revision 6 on airplanes on which the Original Issue or Revision 1 thru 5 was previously done:
ActionConditionGroup
Do a general visual inspection
of the additional center upper
auxiliary fuel tank locations of
the wire bundles to determine if
wires touch the upper surface
of the additional center upper
auxiliary fuel tank and correct
as necessary.
Have accomplished the Original
Issue, or Revision 1, 2, 3, 4 or
5 of this service bulletin.
1, 2
Do a detailed inspection of wire
bundles for splices, damage and
fuel tank fuel barrier seal dam-
age on the center upper auxil-
iary fuel tank and correct as
necessary. Install non-metallic
barrier/shield sleeving, extruded
channels and replace clamps.
None.Have accomplished the Original
Issue, or Revision 1, 2, 3, 4, or
5 of this service bulletin.
3, 4, 6
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 6: July 01, 2016
16 of 252
BOEING SERVICE BULLETIN MD11-28-126

### Page 17

ActionConditionGroup
Do a general visual inspection
of the additional center upper
auxiliary fuel tank locations of
the wire bundles to determine if
wires touch the upper surface
of the additional center upper
auxiliary fuel tank and correct
as necessary.
Have accomplished the Original
Issue, or Revision 1, 2, 3, 4 or
5 of this service bulletin.
5
Do a detailed inspection of wire
assembly run AES9601 - ENR
for splices, damage and fuel
tank fuel barrier seal damage
on the center upper auxiliary fu-
el tank and correct as neces-
sary. Install non-metallic barri-
er/shield sleeving, extruded
channels and replace clamps.
The work in this service bulletin is done in the maintenance zone(s) given below.
Group 1-3:
Affected Maintenance Zones
ZoneModel
131, 141, 142MD-11, MD-11F
Group 4:
Affected Maintenance Zones
ZoneModel
131, 141, 142MD-11
Group 5-6:
Affected Maintenance Zones
ZoneModel
131, 141, 142MD-11F
E. Compliance
Federal Aviation Administration (FAA) Airworthiness Directive AD 2014-03-07 is related to this service
bulletin. The effective date of AD 2014-03-07 is March 26, 2014.
Boeing recommends that the inspection/change given in this service bulletin be done within 60 months
after the effective date of Federal Aviation Administration (FAA) Airworthiness Directive AD 2014-03-07.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 6: July 01, 2016
17 of 252
BOEING SERVICE BULLETIN MD11-28-126

### Page 18

F. Approval
This service bulletin was examined by the Federal Aviation Administration (FAA). The changes specified
in this service bulletin comply with the applicable regulations and are FAA approved, as well as European
Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/JAA approved
airplanes listed in the service bulletin effectivity. This service bulletin and its approval were based on
the airplane in its original Boeing delivery configuration or as modified by other approved Boeing
changes.
If an airplane has a non-Boeing modification or repair that affects a component or system also affected
by this service bulletin, the operator is responsible for obtaining appropriate regulatory agency approval
before incorporating this service bulletin.
In addition, the Manager of the FAA Los Angeles Aircraft Certification Office approves the action (i.e.
inspection or modification) defined in this service bulletin as an alternative method of compliance
(AMOC) to the requirements of paragraph (g), (h), (m)(3)(i) and (m)(4)(i) of Federal Aviation
Administration (FAA) Airworthiness Directive AD 2014-03-07. All provisions of Federal Aviation
Administration (FAA) Airworthiness Directive AD 2014-03-07 that are not specifically referenced in the
above statement remain fully applicable and must be complied with.
G. Manpower
The table below shows an estimate of the task hours necessary to do this change for each airplane.
This estimate is for direct labor only, done by an experienced crew. Adjust the estimate with operator
task hour data if necessary. The estimate does not include lost time. These are some examples of lost
time:
— Time to adjust to the workplace
— Time to schedule the work
— Time to examine the work
— Time to cure the materials
— Time to make the parts
— Time to find the tools.
This service bulletin assumes that the area above the center upper auxiliary fuel tank is open and
access is available to all the floor beams for maintenance.
Group 1, Configuration 1:
Elapsed HoursTask HoursNumber of PersonsTask
17.0034.002FIGURE 1 and FIG-
URE 4
8.5017.002Inspect
21.0063.003FIGURE 2 and FIG-
URE 5
20.5061.503FIGURE 3 and FIG-
URE 6
67.50175.50TOTAL FOR EACH AIRPLANE
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 6: July 01, 2016
18 of 252
BOEING SERVICE BULLETIN MD11-28-126

### Page 19

Group 1, Configuration 2:
Elapsed HoursTask HoursNumber of PersonsTask
2.002.001FIGURE 19
7.007.001FIGURE 21
3.003.001Inspect
12.0012.00TOTAL FOR EACH AIRPLANE
Group 2, Configuration 1:
Elapsed HoursTask HoursNumber of PersonsTask
16.5033.002FIGURE 7 and FIG-
URE 10
8.5017.002Inspect
21.0063.003FIGURE 8 and FIG-
URE 11
20.5061.503FIGURE 9 and FIG-
URE 12
66.50174.50TOTAL FOR EACH AIRPLANE
Group 2, Configuration 2:
Elapsed HoursTask HoursNumber of PersonsTask
1.501.501FIGURE 20
4.504.501FIGURE 22
3.003.001Inspect
9.009.00TOTAL FOR EACH AIRPLANE
Group 3:
Elapsed HoursTask HoursNumber of PersonsTask
17.0034.002FIGURE 4 and FIG-
URE 13
8.5017.002Inspect
24.0072.003FIGURE 5 and FIG-
URE 14
24.0072.003FIGURE 6 and FIG-
URE 15
73.50195.00TOTAL FOR EACH AIRPLANE
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 6: July 01, 2016
19 of 252
BOEING SERVICE BULLETIN MD11-28-126

### Page 20

Group 4:
Elapsed HoursTask HoursNumber of PersonsTask
16.5033.002FIGURE 10 and
FIGURE 16
8.5017.002Inspect
24.0072.003FIGURE 11 and
FIGURE 17
24.0072.003FIGURE 12 and
FIGURE 18
73.00194.00TOTAL FOR EACH AIRPLANE
Group 5, Configuration 1:
Elapsed HoursTask HoursNumber of PersonsTask
18.0036.002FIGURE 23 and
FIGURE 26
10.5021.002Inspect
24.0072.003FIGURE 24 and
FIGURE 27
23.5070.503FIGURE 25 and
FIGURE 28
76.00175.50TOTAL FOR EACH AIRPLANE
Group 5, Configuration 2:
Elapsed HoursTask HoursNumber of PersonsTask
1.001.001FIGURE 29
4.004.001FIGURE 30
4.004.001FIGURE 31
4.004.001Inspect
13.0013.00TOTAL FOR EACH AIRPLANE
Group 6:
Elapsed HoursTask HoursNumber of PersonsTask
17.5035.002FIGURE 32 and
FIGURE 35
9.0018.002Inspect
22.0066.003FIGURE 33 and
FIGURE 36
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 6: July 01, 2016
20 of 252
BOEING SERVICE BULLETIN MD11-28-126

### Page 21

Group 6:
Elapsed HoursTask HoursNumber of PersonsTask
21.5064.503FIGURE 34 and
FIGURE 37
70.00183.50TOTAL FOR EACH AIRPLANE
H. Weight and Balance Changes
Group 1:
Moment Change
(MEW) IN.-LBS
Mfr's Empty Weight
(MEW) LBS
Approximate Sta-
tion (Inches)
Airplane
+ 40899.3+ 34.3+ 1192.4MD-11 and
MD-11F
Group 2:
Moment Change
(MEW) IN.-LBS
Mfr's Empty Weight
(MEW) LBS
Approximate Sta-
tion (Inches)
Airplane
+ 39571.8+ 30.3+ 1306.0MD-11 and
MD-11F
Group 3:
Moment Change
(MEW) IN.-LBS
Mfr's Empty Weight
(MEW) LBS
Approximate Sta-
tion (Inches)
Airplane
+ 42362.2+ 32.5+ 1303.7MD-11 and
MD-11F
Group 4:
Moment Change
(MEW) IN.-LBS
Mfr's Empty Weight
(MEW) LBS
Approximate Sta-
tion (Inches)
Airplane
+ 39994.1+ 33.6+ 1190.3MD-11
Group 5:
Moment Change
(MEW) IN.-LBS
Mfr's Empty Weight
(MEW) LBS
Approximate Sta-
tion (Inches)
Airplane
+ 42148.0+ 35.3+ 1296.9MD-11 and
MD-11F
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 6: July 01, 2016
21 of 252
BOEING SERVICE BULLETIN MD11-28-126

### Page 22

Group 6:
Moment Change
(MEW) IN.-LBS
Mfr's Empty Weight
(MEW) LBS
Approximate Sta-
tion (Inches)
Airplane
+ 40756.6+ 31.2+ 1306.3MD-11F
I. Electrical Load Data
Not changed.
J. References
1. Existing Data:
a. Federal Aviation Administration (FAA) Airworthiness Directive (AD) 2014-03-07
b. Standard Wiring Practices Manual (SWPM) 20-00-03, 20-00-06, 20-00-13, 20-10-01, 20-10-02,
20-10-03, 20-10-10
c. MD-11-1F Structural Repair Manual (SRM) 51-42-03
d. MD-11-1P Structural Repair Manual (SRM) 51-42-03
e. MD-11 Special Compliance Item (SCI), Critical Design Configuration Control Limitation
(CDCCL), 20-1, 20-5, 20-6, and 20-13
2. Data Supplied with this Service Bulletin:
None.
3. Installation Drawings Used in the Preparation of this Service Bulletin:
ChangeTitleDocument Number
RWire Protection - Above Upper and
Forward Auxiliary Fuel Tank
SR11280054
This drawing was used to prepare this service bulletin. This drawing is not necessary to make the
specified changes, and is not supplied with this service bulletin. This drawing may not be applicable
to all airplane configurations or operators.
K. Publications Affected
1. Publications:
None.
2. Damage Tolerance Based Structural Inspections:
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 6: July 01, 2016
22 of 252
BOEING SERVICE BULLETIN MD11-28-126

### Page 23

Boeing has evaluated the repairs and/or changes in this service bulletin for effects on Fatigue
Critical Structure (FCS) and for changes to Damage Tolerance Inspections (DTI) required in the
Maintenance Program. This service bulletin does not affect FCS, therefore DTIs are not necessary.
L. Interchangeability and Intermixability of Parts
Refer to Paragraph 2.C., Parts Necessary for Each Airplane, for interchangeability and intermixability
information.
M. Software Accomplishment Summary
Not affected.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 6: July 01, 2016
23 of 252
BOEING SERVICE BULLETIN MD11-28-126

### Page 24

Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 6: July 01, 2016
24 of 252
BOEING SERVICE BULLETIN MD11-28-126
BLANK PAGE

### Page 25

2.    MATERIAL INFORMATION
A. Material - Price and Availability
Boeing can supply the kits shown in Paragraph 2.C., Parts Necessary for Each Airplane. Operators
are encouraged to share schedule requirements with Boeing for incorporation of the service bulletin.
The kits are subject to the terms and conditions of the Boeing standard purchase order acknowledgment.
Prices are in United States Dollars. Terms: Net 30 days.
Reference this service bulletin and submit your purchase order by one of these methods:
1. Order on-line via ATA Spec 2000 or The Boeing PART Page
2. Fax to (206) 662-7145
REFER TO THE BOEING PART PAGE ON MYBOEINGFLEET.COM OR CONTACT FIRST RESPONDER
AT FR@BOEING.COM FOR THE LATEST REORDER LEAD TIME (ROLT) AND PRICE INFORMATION
Unit Price as of the Revi-
sion 6 date of this Service
Bulletin (US Dollars)
ROLT as of the Revision 4
date of this Service Bulletin
(Calendar Days)
NameKit Number
$8,648.00120Service KitSB11280126-11
$7,418.00120Service KitSB11280126-13
$8,822.00120Service KitSB11280126-7
$7,606.00120Service KitSB11280126-9
$257.00120Supplemental KitSB11280126-17
$173.00120Supplemental KitSB11280126-21
$8,912.00120Service KitSB11280126-23
$399.00120Supplemental KitSB11280126-25
$7,898.00120Service KitSB11280126-27
NotesUnit Price as of the Revi-
sion 6 date of this Service
Bulletin (US Dollars
ROLT as of the Revision
4 date of this Service Bul-
letin (Calendar Days)
NameKit Number
(a)$1,332.00120Supplemental KitSB11280126-15
(b)$266.00120Supplemental KitSB11280126-19
(c)$637.00120Supplemental KitSB11280126-29
(a) Applicable to Group 1 operators who have SB11280126-3 Service Kit(s) in stock and have not accomplished
the prior issue service bulletin.
(b) Applicable to Group 2 operators who have SB11280126-5 Service Kit(s) in stock and have not accomplished
the prior issue service bulletin.
(c) Applicable to Group 6 operators who have SB11280126-13 Service Kit(s) in stock and have not accom-
plished the prior issue service bulletin.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 6: July 01, 2016
25 of 252
BOEING SERVICE BULLETIN MD11-28-126

### Page 26

Operators are encouraged to complete the survey provided in APPENDIX D of this service bulletin to
help Boeing predict the quantity and timing of the Boeing Supplied Kits.
B. Industry Support Information
Boeing warranty remedies are not available for the configuration changes and/or repair procedures
given in this service bulletin.
C. Parts Necessary for Each Airplane
1. Kits/Parts:
To get the kits/parts shown below, refer to Paragraph 2.A., Material - Price and Availability.
NOTE: One Service kit and the items shown in Paragraph 2.C.2., Parts and Materials Supplied
by the Operator, are necessary for each airplane. The Service Kit is divided into Figure
Kits for each installation figure shown in the table below.
Figure Kit
986532Top Kit
--1111SB11280126-11
11----SB11280126-13
------SB11280126-23
------SB11280126-27
--11--SB11280126-7
------SB11280126-9
Figure Kit
181715141211Top Kit
------SB11280126-11
----11SB11280126-13
------SB11280126-23
------SB11280126-27
--11--SB11280126-7
11--11SB11280126-9
Figure Kit
343328272524Top Kit
------SB11280126-11
------SB11280126-13
--1111SB11280126-23
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 6: July 01, 2016
26 of 252
BOEING SERVICE BULLETIN MD11-28-126

### Page 27

Figure Kit
343328272524Top Kit
11----SB11280126-27
------SB11280126-7
------SB11280126-9
Figure Kit
3736Top Kit
--SB11280126-11
--SB11280126-13
--SB11280126-23
11SB11280126-27
--SB11280126-7
--SB11280126-9
Group 1, Configuration 1:
KIT SB11280126-11
NOTES
Existing Part
NumberName
Figure
New Part Number
6532
QTY
(a)SCREW6143D0005-3-10
(a)SCREW3193D0005-3-12
(a)SCREW223D0005-3-16
(a)STA-STRAP2322799D0254-1-1-9
NUT1135MS21042L3
WASHER2984NAS1252-10L
EXTRUDED
CHANNEL
816NMC05118
(a)CLAMP8S7934111-10SA
(a)CLAMP12S7934111-1SA
(a)CLAMP46S7934111-3SA
(a)CLAMP8S7934111-4SA
(a)CLAMP138S7934111-5SA
(a)CLAMP7S7934111-6SA
(a)CLAMP8S7934111-8SA
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 6: July 01, 2016
27 of 252
BOEING SERVICE BULLETIN MD11-28-126

### Page 28

Group 1, Configuration 1:
KIT SB11280126-11
NOTES
Existing Part
NumberName
Figure
New Part Number
6532
QTY
SLEEVE2SR11280054-11
SLEEVE3SR11280054-13
SLEEVE1SR11280054-15
SLEEVE11SR11280054-19
SLEEVE11SR11280054-21
SLEEVE12SR11280054-29
SLEEVE48SR11280054-3
SLEEVE23SR11280054-37
SLEEVE411SR11280054-7
SLEEVE47SR11280054-9
(a) Or approved Equivalent. Refer to AEPL, Drawing 7595071.
Group 1, Configuration 2:
KIT SB11280126-17
NotesNameQTYNew Part Number
(a)SCREW23D0005-3-16
(a)STA-STRAP169D0254-1-1-9
NUT2MS21042L3
WASHER8NAS1252-10L
(a)CLAMP6S7934111-3SA
SLEEVE5SR11280054-37
SLEEVE1SR11280054-7
(a) Or approved Equivalent. Refer to AEPL, Drawing 7595071.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 6: July 01, 2016
28 of 252
BOEING SERVICE BULLETIN MD11-28-126

### Page 29

Group 2, Configuration 1:
KIT SB11280126-13
NOTES
Existing Part
NumberName
Figure
New Part Number
121198
QTY
(a)SCREW33303D0005-3-10
(a)SCREW19363D0005-3-12
(a)SCREW113D0005-3-16
(a)STA-STRAP67809D0254-1-1-9
NUT5367MS21042L3
WASHER127172NAS1252-10L
EXTRUDED
CHANNEL
916NMC05118
(a)CLAMP816S7934111-10SA
(a)CLAMP88S7934111-12SA
(a)CLAMP168S7934111-18SA
(a)CLAMP15S7934111-1SA
(a)CLAMP53S7934111-3SA
(a)CLAMP24S7934111-4SA
(a)CLAMP138S7934111-5SA
(a)CLAMP1623S7934111-6SA
(a)CLAMP8S7934111-7SA
SLEEVE1SR11280054-13
SLEEVE11SR11280054-15
SLEEVE11SR11280054-19
SLEEVE11SR11280054-21
SLEEVE12SR11280054-29
SLEEVE2SR11280054-3
SLEEVE3SR11280054-35
SLEEVE2SR11280054-37
SLEEVE11SR11280054-5
SLEEVE43SR11280054-7
SLEEVE3SR11280054-9
(a) Or approved Equivalent. Refer to AEPL, Drawing 7595071.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 6: July 01, 2016
29 of 252
BOEING SERVICE BULLETIN MD11-28-126

### Page 30

Group 2, Configuration 2:
KIT SB11280126-21
NotesNameQTYNew Part Number
(a)SCREW23D0005-3-16
(a)STA-STRAP149D0254-1-1-9
NUT2MS21042L3
WASHER8NAS1252-10L
EXTRUDED CHANNEL1NMC05118
(a)CLAMP3S7934111-1SA
(a)CLAMP3S7934111-3SA
SLEEVE3SR11280054-35
SLEEVE2SR11280054-37
(a) Or approved Equivalent. Refer to AEPL, Drawing 7595071.
Group 3:
KIT SB11280126-7
NOTES
Existing Part
NumberName
Figure
New Part Number
151465
QTY
(a)SCREW53D0005-08-12
(a)SCREW53D0005-08-14
(a)SCREW1463D0005-3-10
(a)SCREW1933D0005-3-12
(a)SCREW223D0005-3-16
(a)STA-STRAP2792329D0254-1-1-9
NUT3511MS21042L3
WASHER8429NAS1252-10L
WASHER10NAS1252-8L
EXTRUDED
CHANNEL
168NMC05118
(a)CLAMP8S7934111-10SA
(a)CLAMP12S7934111-1SA
(a)CLAMP5S7934111-2SA
(a)CLAMP64S7934111-3SA
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 6: July 01, 2016
30 of 252
BOEING SERVICE BULLETIN MD11-28-126

### Page 31

Group 3:
KIT SB11280126-7
NOTES
Existing Part
NumberName
Figure
New Part Number
151465
QTY
(a)CLAMP8S7934111-4SA
(a)CLAMP1313S7934111-5SA
(a)CLAMP7S7934111-6SA
(a)CLAMP8S7934111-8SA
SLEEVE2SR11280054-11
SLEEVE3SR11280054-13
SLEEVE1SR11280054-15
SLEEVE11SR11280054-19
SLEEVE11SR11280054-21
SLEEVE1SR11280054-25
SLEEVE31SR11280054-29
SLEEVE84SR11280054-3
SLEEVE32SR11280054-37
SLEEVE114SR11280054-7
SLEEVE74SR11280054-9
(a) Or approved Equivalent. Refer to AEPL, Drawing 7595071.
Group 4:
KIT SB11280126-9
NOTES
Existing Part
NumberName
Figure
New Part Number
18171211
QTY
(a)SCREW53D0005-08-12
(a)SCREW53D0005-08-14
(a)SCREW30333D0005-3-10
(a)SCREW36193D0005-3-12
(a)SCREW113D0005-3-16
(a)STA-STRAP80679D0254-1-1-9
NUT6753MS21042L3
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 6: July 01, 2016
31 of 252
BOEING SERVICE BULLETIN MD11-28-126

### Page 32

Group 4:
KIT SB11280126-9
NOTES
Existing Part
NumberName
Figure
New Part Number
18171211
QTY
WASHER172127NAS1252-10L
WASHER10NAS1252-8L
EXTRUDED
CHANNEL
169NMC05118
(a)CLAMP168S7934111-10SA
(a)CLAMP88S7934111-12SA
(a)CLAMP816S7934111-18SA
(a)CLAMP15S7934111-1SA
(a)CLAMP5S7934111-2SA
(a)CLAMP35S7934111-3SA
(a)CLAMP24S7934111-4SA
(a)CLAMP1313S7934111-5SA
(a)CLAMP2316S7934111-6SA
(a)CLAMP8S7934111-7SA
SLEEVE1SR11280054-13
SLEEVE11SR11280054-15
SLEEVE11SR11280054-19
SLEEVE11SR11280054-21
SLEEVE1SR11280054-25
SLEEVE31SR11280054-29
SLEEVE2SR11280054-3
SLEEVE3SR11280054-35
SLEEVE2SR11280054-37
SLEEVE11SR11280054-5
SLEEVE34SR11280054-7
SLEEVE3SR11280054-9
(a) Or approved Equivalent. Refer to AEPL, Drawing 7595071.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 6: July 01, 2016
32 of 252
BOEING SERVICE BULLETIN MD11-28-126

### Page 33

Group 5, Configuration 1:
KIT SB11280126-23
NOTES
Existing Part
NumberName
Figure
New Part Number
28272524
QTY
(a)SCREW6143D0005-3-10
(a)SCREW11193D0005-3-12
(a)SCREW223D0005-3-16
(a)STA-STRAP2402799D0254-1-1-9
NUT1935MS21042L3
WASHER5384NAS1252-10L
EXTRUDED
CHANNEL
916NMC05118
(a)CLAMP8S7934111-10SA
(a)CLAMP12S7934111-1SA
(a)CLAMP3S7934111-3SA
(a)CLAMP8S7934111-4SA
(a)CLAMP218S7934111-5SA
(a)CLAMP7S7934111-6SA
(a)CLAMP8S7934111-8SA
SLEEVE2SR11280054-11
SLEEVE3SR11280054-13
SLEEVE1SR11280054-15
SLEEVE11SR11280054-19
SLEEVE11SR11280054-21
SLEEVE2SR11280054-29
SLEEVE48SR11280054-3
SLEEVE511SR11280054-7
SLEEVE47SR11280054-9
(a) Or approved Equivalent. Refer to AEPL, Drawing 7595071.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 6: July 01, 2016
33 of 252
BOEING SERVICE BULLETIN MD11-28-126

### Page 34

Group 5, Configuration 2:
KIT SB11280126-25
NotesNameQTYNew Part Number
(a)SCREW83D0005-3-12
(a)STA-STRAP89D0254-1-1-9
NUT8MS21042L3
WASHER24NAS1252-10L
EXTRUDED CHANNEL1NMC05118
(a)CLAMP8S7934111-5SA
SLEEVE1SR11280054-7
(a) Or approved Equivalent. Refer to AEPL, Drawing 7595071.
Group 6:
KIT SB11280126-27
NOTES
Existing Part
NumberName
Figure
New Part Number
37363433
QTY
(a)SCREW25223D0005-3-10
(a)SCREW27443D0005-3-12
(a)STA-STRAP72889D0254-1-1-9
NUT5266MS21042L3
WASHER131176NAS1252-10L
EXTRUDED
CHANNEL
916NMC05118
(a)CLAMP816S7934111-10SA
(a)CLAMP88S7934111-12SA
(a)CLAMP168S7934111-18SA
(a)CLAMP12S7934111-1SA
(a)CLAMP23S7934111-3SA
(a)CLAMP24S7934111-4SA
(a)CLAMP2116S7934111-5SA
(a)CLAMP1623S7934111-6SA
(a)CLAMP8S7934111-7SA
SLEEVE1SR11280054-13
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 6: July 01, 2016
34 of 252
BOEING SERVICE BULLETIN MD11-28-126

### Page 35

Group 6:
KIT SB11280126-27
NOTES
Existing Part
NumberName
Figure
New Part Number
37363433
QTY
SLEEVE11SR11280054-15
SLEEVE11SR11280054-19
SLEEVE11SR11280054-21
SLEEVE12SR11280054-29
SLEEVE2SR11280054-3
SLEEVE11SR11280054-5
SLEEVE54SR11280054-7
SLEEVE3SR11280054-9
(a) Or approved Equivalent. Refer to AEPL, Drawing 7595071.
NOTE: The kit that follows is applicable to Group 1 operators who have SB11280126-3 Service
Kit(s) in stock and have not accomplished the prior issue service bulletin.
Kit SB11280126-15
NotesNameQTYNew Part Number
SLEEVE4SR11280054-3
SLEEVE4SR11280054-7
SLEEVE3SR11280054-9
WASHER51NAS1252-10L
(a)CLAMP6S7934111-3SA
(a)CLAMP3S7934111-5SA
(a)SCREW23D0005-3-10
(a)STA STRAP299D0254-1-1-9
(a)SCREW43D0005-3-16
NUT46MS21042L3
SLEEVE5SR11280054-37
(a) Or approved Equivalent. Refer to AEPL, Drawing 7595071.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 6: July 01, 2016
35 of 252
BOEING SERVICE BULLETIN MD11-28-126

### Page 36

NOTE: The kit that follows is applicable to Group 2 operators who have SB11280126-5 Service
Kit(s) in stock and have not accomplished the prior issue service bulletin.
Kit SB11280126-19
NotesNameQTYNew Part Number
WASHER127NAS1252-10L
EXTRUDED CHANNEL1NMC05118
(a)CLAMP3S7934111-1SA
(a)CLAMP3S7934111-3SA
(a)CLAMP1S7934111-5SA
(a)SCREW13D0005-3-12
(a)SCREW23D0005-3-16
NUT120MS21042L3
SLEEVE3SR11280054-35
SLEEVE2SR11280054-37
(a) Or approved Equivalent. Refer to AEPL, Drawing 7595071.
NOTE: The kit that follows is applicable to Group 6 operators who have SB11280126-13 Service
Kit(s) in stock and have not accomplished the prior issue service bulletin.
KIT SB11280126-29
NotesNameQTYNew Part Number
(a)SCREW163D0005-3-12
(a)STA-STRAP139D0254-1-1-9
WASHER8NAS1252-10L
(a)CLAMP16S7934111-5SA
SLEEVE2SR11280054-7
(a) Or approved Equivalent. Refer to AEPL, Drawing 7595071.
2. Parts and Materials Supplied by the Operator:
NotesNameQTYPart Number /
Specification
(a) Only required, if use
as optional part for
SR11280054-23.
Strap, Tiedown, Electrical Components
- Self-locking, Plastic
-9D0254-1-1-9
(b) 250 yard roll.Tape1SR11280054-23
(DMS 2089)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 6: July 01, 2016
36 of 252
BOEING SERVICE BULLETIN MD11-28-126

### Page 37

NotesNameQTYPart Number /
Specification
(b) 72 yards.(0.030 x 1.0 Inch) Elastomer Tape1SR11280054-27
(DMS 2186-2)
(a) Or approved Equivalent. Refer to AEPL, Drawing 7595071.
(b) Or approved Equivalent.
3. Parts Modified and Reidentified:
None.
4. Parts Removed and Not Replaced:
NotesQTYNameExisting Part Number
5CLAMPMS21919WDG1
(a) Keep the part if there are other uses for it.
D. Parts Necessary to Change Spares
None.
E. Special Tooling - Price and Availability
None.
F. Special Tooling Necessary to do this Service Bulletin
No special tools or equipment are necessary to do the change in this service bulletin. But, maintenance
and overhaul tools in the manuals given in Paragraph 1.J., References, can be necessary. Examine
operator tool supply to make sure all necessary tools are available.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 6: July 01, 2016
37 of 252
BOEING SERVICE BULLETIN MD11-28-126

### Page 38

Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 6: July 01, 2016
38 of 252
BOEING SERVICE BULLETIN MD11-28-126
BLANK PAGE

### Page 39

3.    ACCOMPLISHMENT INSTRUCTIONS
A. GENERAL INFORMATION
WARNING: IF ELECTRICAL POWER IS APPLIED TO THE AIRPLANE, MAKE SURE YOU OBEY
ALL PRECAUTIONS WHILE YOU DO WORK. IF YOU DO NOT OBEY THE
PRECAUTIONS, DEATH OR INJURY TO PERSONS, AND DAMAGE TO THE AIRPLANE
CAN OCCUR.
CAUTION: KEEP THE WORK AREA, WIRES AND ELECTRICAL BUNDLES CLEAN OF METAL
PARTICLES OR CONTAMINATION WHEN YOU USE TOOLS. UNWANTED MATERIAL,
METAL PARTICLES OR CONTAMINATION CAUGHT IN WIRE BUNDLES CAN CAUSE
DAMAGE TO THE BUNDLES. DAMAGED WIRE BUNDLES CAN CAUSE SPARKS OR
OTHER ELECTRICAL DAMAGE.
CAUTION: ELECTRICALLY GROUND THE AIRPLANE. THIS WILL HELP TO PREVENT DAMAGE
TO THE AIRPLANE OR EQUIPMENT.
NOTE: 1. Manual titles are referred to by acronyms. Paragraph 1.J., References, for definition
of the acronyms.
2. For equivalent parts, refer to AEPL, Drawing 7595071.
3. For approved fastener and process material substitutions, refer to MD-11 Structural
Repair Manual, Chapter 51.
4. If the length of any fastener specified in this service bulletin does not meet installation
standards given in Structural Repair Manual (SRM) Chapter 51, then a fastener of
the same specification, or an approved substitute, with a length which meets the
installation standards given in SRM Chapter 51 may be used. In addition, washers
may be installed for fastener grip length in accordance with SRM Chapter 51.
5. A 1/8-inch thick stack of the same type washers called for in this service bulletin is
the maximum thickness which may be used under fastener head or nut to counteract
accumulation of tolerances.
EXCEPTION: When the available fastener length increments are greater than
1/16-inch, a 3/16-inch thick stack of the same type washers may be used.
6. Unless shown differently, these dimensions and tolerances are used:
– Linear dimensions are in inches
– Tolerance on linear dimensions, other than rivet and bolt edge margins, is plus
or minus 0.03 inch.
– Tolerance on rivet and bolt edge margin is plus or minus 0.05 inch
– Angular tolerance is plus or minus 2 degrees
– Torque limits to tighten nuts and bolts are in SRM Chapter 51.
7. This service bulletin assumes that the area above the center upper auxiliary fuel tank
is open and access is available to all the floor beams for maintenance.
8. Obey all of the warnings and cautions given in the specified manual sections.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 6: July 01, 2016
39 of 252
BOEING SERVICE BULLETIN MD11-28-126

### Page 40

9. Power Feeder cable (wire gauge 10 and larger) splices and all other wire splices
located over the center auxiliary fuel tanks between Stations 1218.950 and 1381.000
must be relocated and repaired in accordance with the Work Instructions below.
10. Installation of Barrier/Shield Sleeving will start 2 inches (+/- 1 Inch) away from Station
1218.950 aft side and will end 2 inches (+/- 1 Inch) away from Station 1381.000
forward side, unless otherwise specified, remove existing sleeving or spiral wrap
prior to installation of sleeving. Apply SR11280054-27 tape over each end of the
DMS 2379, type 4, class 4 sleeving. The tape overlap shall extend 1 to 2 inches onto
the end of sleeving and 1 or 2 inches onto the wire bundle. Secure the last end of
the tape wrap using SR11280054-23 tie tape.
11. Maximum electrical components, wire support brackets and wire assemblies are
shown. All electrical components, wire support brackets and wire assemblies are not
required for all airplanes. This modification does not add or remove any wires or wire
support brackets. Brackets illustrated in this service bulletin may not match the
brackets that installed in the airplane. Brackets show in this service bulletin are for
illustration only.
12. Install clamps to ensure a friction fit on wire bundles to prevent movement within the
clamp when moderate pressure is applied. It is permissible to use smaller or larger
size clamps of the same type in order to meet this requirement. Refer to SWPM
20-10-01 as an accepted procedure.
13. Rotate clamps if necessary to eliminate preloading of support brackets.
14. For Conditions 2, 3, and 4, if a power feeder cable (wire gauge 10 and larger) or any
of wire splices are located within the area of the sleeving/tape installations and/or if
wire repair splice would be required as a result of inspection, the following instructions
must be applied.
– Remove any existing protective covering (sleeving, tape or tubing) from affected
wire bundles.
– Clean all affected wire bundles. Refer to SWPM 20-10-10 as an accepted
procedure.
– Note the location of any wire splices within affected wire bundles.
– Note the power feeder cables and wires damaged and determine if new splices
to the power feeder cables or wires is necessary.
– Existing and/or new wire splices shall be relocated/located as follows:
Wires smaller than 10 gauge with splices located in an area where
protective covering (sleeving, tubing, or tape) is to be installed.
(a)
Relocate splice at least 6.0 inches beyond end(s) of where pro-
tective covering is to be installed. Use the Boeing replacement
wire types. Refer to SWPM 20-00-13 as an accepted procedure.
Cut and identify new cable. Refer to SWPM 20-00-03 as an ac-
cepted procedure.
Wires 10 gauge and larger with splices installed above fuel tank.(b)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 6: July 01, 2016
40 of 252
BOEING SERVICE BULLETIN MD11-28-126

### Page 41

Relocate spices involving 10 gauge and larger (10, 8, 6, or 4 wire
gauges) to locations at least 3 feet or 2 wire supports (whichever
is further) from the fuel tank boundaries. Use the Boeing replace-
ment wire types. Refer to SWPM 20-00-13 as an accepted proce-
dure. Cut and identify new cable. Refer to SWPM 20-00-03 as
an accepted procedure.
15. Replacement or repair of wiring within 6.0 inches of fuel tanks and fuel pipes must
use existing or new wire routing and clipping established in accordance with this
service bulletin.
16. Do not use the "Boeing installed wire types" as replacement or repair wiring inside
or within 6.0 inches of the fuel tanks or fuel pipes. Use the "Boeing replacement wire
types" as replacement or repair wiring inside fuel tanks or within 6.0 inches of fuel
pipes. Refer to SWPM 20-00-13 as an accepted procedure.
17. Replacement or repair of wiring used within 6.0 inches of fuel tanks and fuel pipes
must use the exact same wire gauge as the type design.
18. Do an electrical continuity test as required after the repair or replacement of wires
and replacement of wire splices.
19. A General Visual Inspection is defined as: A visual examination of an interior or
exterior area, installation or assembly to detect obvious damage, failure or irregularity.
This level of inspection is made from within touching distance unless otherwise
specified. A mirror may be necessary to enhance visual access to all exposed surfaces
in the inspection area. This level of inspection is made under normally available
lighting conditions such as daylight, hangar lighting, flashlight or drop-light and may
require removal or opening of access panels or doors. Stands, ladders or platforms
may be required to gain proximity to the area being checked.
20. A Detailed Inspection is defined as: An intensive examination of a specific item,
installation, or assembly to detect damage, failure, or irregularity. Available lighting
is normally supplemented with a direct source of good lighting at an intensity deemed
appropriate. Inspection aids such as mirrors, magnifying lenses, etc. may be
necessary. Surface cleaning and elaborate access procedures may be required.
21. These work instructions refer to procedures included in other Boeing documents.
When the words "refer to" are used and the operator has an accepted alternative
procedure, the accepted alternative procedure can be used. When the words "in
accordance with" are included in the instruction, the procedure in the Boeing document
must be used.
22. Refer to these SWPM chapters as accepted procedures for applicable operations:
SubjectChapter
Identification of Electrical Wire - CommercialSWPM 20-00-03
Inspection Instructions for Standard Wiring InstallationsSWPM 20-00-06
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 6: July 01, 2016
41 of 252
BOEING SERVICE BULLETIN MD11-28-126

### Page 42

SubjectChapter
Electrical Wire CodesSWPM 20-00-13
Wiring Installation - Maintenance PracticesSWPM 20-10-01
Shielding - Maintenance PracticesSWPM 20-10-02
Wire Splicing - Maintenance PracticesSWPM 20-10-03
Wire Harness and Component - CleaningSWPM 20-10-10
23. It is permissible to select a smaller or larger diameter sleeving of the same type.
24. Installed clamp part numbers may be different than the part numbers listed in the
removal Figure(s).
25. The instructions in Paragraph 3.B., Work Instructions and the figures can include
operation of tools or test equipment. Boeing Engineering Tool Drawings, the Illustrated
Tool and Equipment Manual, and the Special Tool and Ground Handling Drawing
Index contain data on versions of the tools or test equipment that you can use. It is
permitted to use replaced tools. It is not permitted to use superseded tools.
26. If it is necessary to remove more parts for access, you can remove those parts. If
you can get access without removing identified parts, it is not necessary to remove
all of the identified parts. Jacking and shoring limitations must be observed.
27. Where the work instructions include installation of a kept part, a new or serviceable
part with the same part number can be installed as an alternative to the kept part.
28. Refer to APPENDIX A for typical application of DMS 2379, Type 4, Class 4 sleeving
(Roundit 2000 NX) for installation.
29. Refer to APPENDIX B for typical joining of two pieces of DMS2379, Type 4 sleeving.
30. Refer to APPENDIX C for typical application of DMS 2379, Type 4 Class 4 sleeving
(Roundit 2000 NX) at breakouts.
B. WORK INSTRUCTIONS
Group 1, Configuration 1:
1. Do a General Visual Inspection of wire bundles routed above the center upper auxiliary fuel tank
between floor beams at Stations 1238.950 to 1361.000 to determine if wires touch the upper
surface of the center upper auxiliary fuel tank. Mark the location(s) where the wire bundle(s)
contacts the upper surface of the center upper auxiliary fuel tank as applicable.
2. Remove all wire harness clamps from overwing floor beams and remove all TC92 wire harness
mounts from wire bundles in accordance with the Figures listed in the table that follows:
FigureArea
FIGURE 1Left Side
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 6: July 01, 2016
42 of 252
BOEING SERVICE BULLETIN MD11-28-126

### Page 43

FigureArea
FIGURE 4Right Side
3. Clean all affected wire bundles. Refer to SWPM 20-10-10 as an accepted procedure.
4. Do a Detailed Inspection of all wire bundles above the center upper auxiliary fuel tank between
Stations 1218.950 and 1381.000 for the presence of wire splices and damage (such as chafing,
arcing and broken insulation), and do a Detailed Inspection for damage (burn marks) on the upper
surface of the center upper auxiliary fuel tank/fuel vapor barrier seal.
NOTE: Pay special attention to areas where wires were in contact with the upper surface of the
center upper auxiliary fuel tank (marked in Step 1).
Based on the inspection finding do as follows:
a. Condition 1 - No Damage and No Splices Found:
(1) Proceed to step 5.
b. Condition 2 - Damage Found on Wire Bundles, No Damage to Upper Surface of Auxiliary Fuel
Tank/Fuel Vapor Barrier Seal:
(1) Replace/repair damaged wires. Refer to SWPM 20-10-01 and SWPM 20-10-03 as
accepted procedures.
c. Condition 3 - Splices Found on Power Feeder Wires or Non-Power Feeder Wires:
(1) Remove and relocate each splice to a location at least 3 feet or 2 wire supports, whichever
is further, away from fuel tank boundaries. Refer to SWPM 20-10-01 and SWPM 20-10-03
as accepted procedures.
(2) Identify new wire. Refer to SWPM 20-00-03 as an accepted procedure.
d. Condition 4 - Damage Found on Wire Bundles and Damage Found on Fuel Vapor Barrier
Seal of Auxiliary Fuel Tank:
(1) Repair Fuel Vapor Barrier Seal in accordance with MD-11-1F SRM 51-42-03 or MD-11-1P
SRM 51-42-03.
(2) Replace/repair damaged wire(s). Refer to SWPM 20-10-01 and SWPM 20-10-03 as
accepted procedures.
e. Condition 5 - Damage Found on Upper Surface of Auxiliary Fuel Tank,
(1) Contact Boeing for repair instructions and do the repair.
5. Install barrier/shield sleeving P/N SR11280054-(), in accordance with the Figures listed in the table
that follows:
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 6: July 01, 2016
43 of 252
BOEING SERVICE BULLETIN MD11-28-126

### Page 44

FigureArea
FIGURE 2Left Side
FIGURE 5Right Side
6. Install new clamps, new attaching hardware and extruded channel in accordance with the Figures
listed in the table that follows:
FigureArea
FIGURE 3Left Side
FIGURE 6Right Side
7. Put the airplane back to a serviceable condition.
Group 1, Configuration 2:
1. Gain access to wire bundles routed above the center auxiliary fuel tank. Refer to the table that
follows for approximate affected area:
Freighter ConfigurationPassenger Configuration
From Y=1238.950 to Y=1381.000, Between
X=60.00 to X=70.00
From Y=1238.950 to Y=1381.000, Between
X=60.00 to X=70.00
From Y=1238.950 to Y=1256.000, Between
X=81.00 to X=106.00
From Y=1238.950 to Y=1256.800, Between X=
- 81.00 to X= - 106.00
2. Do a general Visual Inspection of wire bundles routed above the center upper auxiliary fuel tank
between floor beams to determine if wires touch the upper surface of the center upper auxiliary
fuel tank. Mark the location(s) where the wire bundle(s) contacts the upper surface of the center
upper auxiliary fuel tank as applicable.
3. Do a detailed Inspection of wire bundles above the center upper auxiliary fuel tank in accordance
with FIGURE 19.
NOTE: Pay special attention to areas where wires were in contact with the upper surface of the
center upper auxiliary fuel tank during the General Visual Inspection.
Based on the inspection finding do as follows:
a. Condition 1 - No Damage and No Splices Found:
(1) Proceed to Step 4.
b. Condition 2 - Damage Found on Wire Bundles, No Damage to Upper Surface of Auxiliary Fuel
Tank/Fuel Vapor Barrier Seal:
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 6: July 01, 2016
44 of 252
BOEING SERVICE BULLETIN MD11-28-126

### Page 45

(1) Replace/repair damaged wires. Refer to SWPM 20-10-01 and SWPM 20-10-03 as
accepted procedures.
c. Condition 3 - Splices Found on Power Feeder Wires or Non-Power Feed Wires:
(1) Remove and relocate each splice to a location at least 3 feet or 2 wire supports, whichever
is further away from fuel tank boundaries. Refer to SWPM 20-10-01 and SWPM 20-10-03
as accepted procedures.
(2) Identify new wire. Refer to SWPM 20-00-03 as an accepted procedure.
d. Condition 4 - Damage Found on Wire Bundles and Damage Found on Fuel Vapor Barrier
Seal of Auxiliary Fuel Tank:
(1) Repair Fuel Vapor Barrier Seal in accordance with MD-11-1F SRM 51-42-03 or MD-11-1P
SRM 51-42-03.
(2) Repair/replace wire(s) causing damage. Refer to SWPM 20-10-01 and SWPM 20-10-03
as accepted procedures.
e. Condition 5 - Damage Found on Upper Surface of Auxiliary Fuel Tank:
(1) Contact Boeing for repair instructions and do the repair.
4. Install barrier/shield sleeving and clamping in accordance with FIGURE 21.
5. Close access.
6. Put the airplane back to a serviceable condition.
Group 2, Configuration 1:
1. Do a General Visual Inspection of wire bundles routed above the center upper auxiliary fuel tank
between floor beams at Stations 1238.950 to 1361.000 to determine if wires touch the upper
surface of the center upper auxiliary fuel tank. Mark the location(s) where the wire bundle(s)
contacts the upper surface of the center upper auxiliary fuel tank as applicable.
2. Remove all wire harness clamps from overwing floor beams and remove all TC92 wire harness
mounts from wire bundles in accordance with the Figures listed in the table that follows:
FigureArea
FIGURE 7Left Side
FIGURE 10Right Side
3. Clean all affected wire bundles. Refer to SWPM 20-10-10 as an accepted procedure.
4. Do a Detailed Inspection of all wire bundles above the center upper auxiliary fuel tank between
Stations 1218.950 and 1381.000 for the presence of wire splices and damage (such as chafing,
arcing and broken insulation), and do a Detailed Inspection for damage (burn marks) on the upper
surface of the center upper auxiliary fuel tank/fuel vapor barrier seal.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 6: July 01, 2016
45 of 252
BOEING SERVICE BULLETIN MD11-28-126

### Page 46

NOTE: Pay special attention to areas where wires were in contact with the upper surface of the
center upper auxiliary fuel tank (marked in Step 1).
Based on the inspection finding do as follows:
a. Condition 1 - No Damage and No Splices Found:
(1) Proceed to step 5.
b. Condition 2 - Damage Found on Wire Bundles, No Damage to Upper Surface of Auxiliary Fuel
Tank/Fuel Vapor Barrier Seal:
(1) Replace/repair damaged wires. Refer to SWPM 20-10-01 and SWPM 20-10-03 as
accepted procedures.
c. Condition 3 - Splices Found on Power Feeder Wires or Non-Power Feeder Wires:
(1) Remove and relocate each splice to a location at least 3 feet or 2 wire supports, whichever
is further, away from fuel tank boundaries. Refer to SWPM 20-10-01 and SWPM 20-10-03
as accepted procedures.
(2) Identify new wire. Refer to SWPM 20-00-03 as an accepted procedure.
d. Condition 4 - Damage Found on Wire Bundles and Damage Found on Fuel Vapor Barrier
Seal of Auxiliary Fuel Tank:
(1) Repair Fuel Vapor Barrier Seal in accordance with MD-11-1F SRM 51-42-03 or MD-11-1P
SRM 51-42-03.
(2) Replace/repair damaged wire(s). Refer to SWPM 20-10-01 and SWPM 20-10-03 as
accepted procedures.
e. Condition 5 - Damage Found on Upper Surface of Auxiliary Fuel Tank:
(1) Contact Boeing for repair instructions and do the repair.
5. Install barrier/shield sleeving P/N SR11280054-(), in accordance with the Figures listed in the table
that follows:
FigureArea
FIGURE 8Left Side
FIGURE 11Right Side
6. Install new clamps, new attaching hardware and extruded channel in accordance with the Figures
listed in the table that follows:
FigureArea
FIGURE 9Left Side
FIGURE 12Right Side
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 6: July 01, 2016
46 of 252
BOEING SERVICE BULLETIN MD11-28-126

### Page 47

7. Put the airplane back to a serviceable condition.
Group 2, Configuration 2:
Passenger Configuration "Only"
1. Gain access to wire bundles routed above the center auxiliary fuel tank. Refer to the table that
follows for approximate affected area:
Passenger Configuration "Only"
From Y=1238.950 to Y=1275.250, Between X=81.00 to X=106.00
From Y=1238.950 to Y=1275.250, Between X= -70.00 to X= -106.00
2. Do a General Visual Inspection of wire bundles routed above the center upper auxiliary fuel tank
between floor beams to determine if wires touch the upper surface of the center upper auxiliary
fuel tank. Mark the location(s) where the wire bundle(s) contacts the upper surface of the center
upper auxiliary fuel tank as applicable.
3. Do a detailed Inspection of wire bundles above the center upper auxiliary fuel tank in accordance
with FIGURE 20.
NOTE: Pay special attention to areas where wires were in contact with the upper surface of the
center upper auxiliary fuel tank during the General Visual Inspection.
Based on inspection finding, do as follows:
a. Condition 1 - No Damage and No Splices Found:
(1) Proceed to Step 4.
b. Condition 2 - Damage Found on Wire Bundles, No Damage to Upper Surface of Auxiliary Fuel
Tank / Fuel Vapor Barrier Seal:
(1) Replace/repair damaged wires. Refer to SWPM 20-10-01 and SWPM 20-10-03 as
accepted procedures.
c. Condition 3 - Splices Found on Power Feeder Wires or Non-Power Feeder Wires:
(1) Remove and relocate each splice to a location at least 3 feet or 2 wire supports, whichever
is further, away from fuel tank boundaries. Refer to SWPM 20-10-01 and SWPM 20-10-03
as accepted procedures.
(2) Identify new wire. Refer to SWPM 20-00-03 as an accepted procedure.
d. Condition 4 - Damage Found on Wire Bundles and Damage Found on Fuel Vapor Barrier
Seal of Auxiliary Fuel Tank:
(1) Repair Fuel Vapor Barrier Seal in accordance with MD-11-1F SRM 51-42-03 or MD-11-1P
SRM 51-42-03.
(2) Repair/replace wire(s) causing damage. Refer to SWPM 20-10-01 and SWPM 20-10-03
as accepted procedures.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 6: July 01, 2016
47 of 252
BOEING SERVICE BULLETIN MD11-28-126

### Page 48

e. Condition 5 - Damage Found on Upper Surface of Auxiliary Fuel Tank:
(1) Contact Boeing for repair instructions and do the repair.
4. Install barrier/shield sleeving and clamping in accordance with FIGURE 22.
5. Close access.
6. Put the airplane back to a serviceable condition.
Group 3:
1. Do a General Visual Inspection of wire bundles routed above the center upper auxiliary fuel tank
between floor beams at Stations 1039.000 to 1361.000 to determine if wires touch the upper
surface of the center upper auxiliary fuel tank. Mark the location(s) where the wire bundle(s)
contacts the upper surface of the center upper auxiliary fuel tank as applicable.
2. Remove wire harness clamps from overwing floor beams and remove all TC92 wire harness mounts
from wire bundles in accordance with the Figures listed in the table that follows:
FigureArea
FIGURE 13Left Side
FIGURE 4Right Side
3. Clean all affected wire bundles. Refer to SWPM 20-10-10 as an accepted procedure.
4. Do a Detailed Inspection of all wire bundles above the center upper auxiliary fuel tank between
Stations 1039.000 and 1361.000 for the presence of wire splices and damage (such as chafing,
arcing and broken insulation), and do a Detailed Inspection for damage (burn marks) on the upper
surface of the center upper auxiliary fuel tank/fuel vapor barrier seal.
NOTE: Pay special attention to areas where wires were in contact with the upper surface of the
center upper auxiliary fuel tank (marked in Step 1).
Based on inspection finding, do as follows:
a. Condition 1 - No Damage and No Splices Found:
(1) Proceed to Step 5.
b. Condition 2 - Damage Found on Wire Bundles, No Damage to Upper Surface of Auxiliary Fuel
Tank/Fuel Vapor Barrier Seal:
(1) Replace/repair damaged wire(s). Refer to SWPM 20-10-01 and SWPM 20-10-03 as
accepted procedures.
c. Condition 3 - Splices Found on Power Feeder Wires or Non-Power Feeder Wires:
(1) Remove and relocate each splice to a location at least 3 feet or 2 wire supports, whichever
is further, away from fuel tank boundaries. Refer to SWPM 20-10-01 and SWPM 20-10-03
as accepted procedures.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 6: July 01, 2016
48 of 252
BOEING SERVICE BULLETIN MD11-28-126

### Page 49

(2) Identify new wire. Refer to SWPM 20-00-03 as an accepted procedure.
d. Condition 4 - Damage Found on Wire Bundles and Damage Found on Fuel Vapor Barrier
Seal of Auxiliary Fuel Tank:
(1) Repair Fuel Vapor Barrier Seal in accordance with MD-11-1F SRM 51-42-03 or MD-11-1P
SRM 51-42-03.
(2) Replace/repair damaged wire(s). Refer to SWPM 20-10-01 and SWPM 20-10-03 as
accepted procedures.
e. Condition 5 - Damage Found on Upper Surface of Auxiliary Fuel Tank:
(1) Contact Boeing for repair instructions and do the repair.
5. Install barrier/shield sleeving P/N SR11280054-(), in accordance with the Figures listed in the table
that follows:
FigureArea
FIGURE 14Left Side
FIGURE 5Right Side
6. Install new clamps, new attaching hardware and extruded channel, in accordance with the Figures
listed in the table that follows:
FigureArea
FIGURE 15Left Side
FIGURE 6Right Side
7. Put the airplane back to a serviceable condition.
Group 4:
1. Do a General Visual Inspection of wire bundles routed above the center upper auxiliary fuel tank
between floor beams at Stations 1039.000 to 1361.000 to determine if wires touch the upper
surface of the center upper auxiliary fuel tank. Mark the location(s) where the wire bundle(s)
contacts the upper surface of the center upper auxiliary fuel tank as applicable.
2. Remove all wire harness clamps from overwing floor beams and remove all TC92 wire harness
mounts from wire bundles in accordance with the Figures in the table that follows:
FigureArea
FIGURE 16Left Side
FIGURE 10Right Side
3. Clean all affected wire bundles. Refer to SWPM 20-10-10 as an accepted procedure.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 6: July 01, 2016
49 of 252
BOEING SERVICE BULLETIN MD11-28-126

### Page 50

4. Do a Detailed Inspection of all wire bundles above the center upper auxiliary fuel tank between
Stations 1039.000 and 1361.000 for the presence of wire splices and damage (such as chafing,
arcing and broken insulation), and do a Detailed Inspection for damage (burn marks) on the upper
surface of the center upper auxiliary fuel tank/fuel vapor barrier seal.
NOTE: Pay special attention to areas where wires were in contact with the upper surface of the
center upper auxiliary fuel tank (marked in Step 1).
Based on inspection finding, do as follows:
a. Condition 1 - No Damage and No Splices Found:
(1) Proceed to Step 5.
b. Condition 2 - Damage Found on Wire Bundles, No Damage to Upper Surface of Auxiliary Fuel
Tank/Fuel Vapor Barrier Seal:
(1) Replace/repair damaged wires. Refer to SWPM 20-10-01 and SWPM 20-10-03 as
accepted procedures.
c. Condition 3 - Splices Found on Power Feeder Wires or Non-Power Feeder Wires:
(1) Remove and relocate each splice to a location at least 3 feet or 2 wire supports, whichever
is further, away from fuel tank boundaries. Refer to SWPM 20-10-01 and SWPM 20-10-03
as accepted procedures.
(2) Identify new wire. Refer to SWPM 20-00-03 as an accepted procedure.
d. Condition 4 - Damage Found on Wire Bundles and Damage Found on Fuel Vapor Barrier
Seal of Auxiliary Fuel Tank;
(1) Repair Fuel Vapor Barrier Seal in accordance with MD-11-1F SRM 51-42-03 or MD-11-1P
SRM 51-42-03.
(2) Replace/repair damaged wire(s). Refer to SWPM 20-10-01 and SWPM 20-10-03 as
accepted procedures.
e. Condition 5 - Damage Found on Upper Surface of Auxiliary Fuel Tank:
(1) Contact Boeing for repair instructions and do the repair.
5. Install barrier/shield sleeving P/N SR11280054-(), in accordance with the Figures listed in the table
that follows:
FigureArea
FIGURE 17Left Side
FIGURE 11Right Side
6. Install new clamps, new attaching hardware and extruded channel, in accordance with the Figures
listed in the table that follows:
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 6: July 01, 2016
50 of 252
BOEING SERVICE BULLETIN MD11-28-126

### Page 51

FigureArea
FIGURE 18Left Side
FIGURE 12Right Side
7. Put the airplane back to a serviceable condition.
Group 5, Configuration 1:
1. Do a General Visual Inspection of wire bundles routed above the center upper auxiliary fuel tank
between floor beams at Stations 1238.950 to 1361.000 to determine if wires touch the upper
surface of the center upper auxiliary fuel tank. Mark the location(s) where the wire bundle(s)
contacts the upper surface of the center upper auxiliary fuel tank as applicable.
2. Remove all wire harness clamps from overwing floor beams and remove all TC92 wire harness
mounts from wire bundles in accordance with the Figures listed in the table that follows:
FigureArea
FIGURE 23Left Side
FIGURE 26Right Side
3. Clean all affected wire bundles. Refer to SWPM 20-10-10 as an accepted procedure.
4. Do a Detailed Inspection of all wire bundles above the center upper auxiliary fuel tank between
Stations 1218.950 and 1381.000 for the presence of wire splices and damage (such as chafing,
arcing and broken insulation), and do a Detailed Inspection for damage (burn marks) on the upper
surface of the center upper auxiliary fuel tank/fuel vapor barrier seal.
NOTE: Pay special attention to areas where wires were in contact with the upper surface of the
center upper auxiliary fuel tank (marked in Step 1).
Based on inspection finding, do as follows:
a. Condition 1 - No Damage and No Splices Found:
(1) Proceed to Step 5.
b. Condition 2 - Damage Found on Wire Bundles, No Damage to Upper Surface of Auxiliary Fuel
Tank/Fuel Vapor Barrier Seal:
(1) Replace/repair damaged wires. Refer to SWPM 20-10-01 and SWPM 20-10-03 as
accepted procedures.
c. Condition 3 - Splices Found on Power Feeder Wires or Non-Power Feeder Wires:
(1) Remove and relocate each splice to a location at least 3 feet or 2 wire supports, whichever
is further, away from fuel tank boundaries. Refer to SWPM 20-10-01 and SWPM 20-10-03
as accepted procedures.
(2) Identify new wire. Refer to SWPM 20-00-03 as an accepted procedure.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 6: July 01, 2016
51 of 252
BOEING SERVICE BULLETIN MD11-28-126

### Page 52

d. Condition 4 - Damage Found on Wire Bundles and Damage Found on Fuel Vapor Barrier
Seal of Auxiliary Fuel Tank:
(1) Repair Fuel Vapor Barrier Seal in accordance with MD-11-1F SRM 51-42-03 or MD-11-1P
SRM 51-42-03.
(2) Replace/repair damaged wire(s). Refer to SWPM 20-10-01 and SWPM 20-10-03 as
accepted procedures.
e. Condition 5 - Damage Found on Upper Surface of Auxiliary Fuel Tank:
(1) Contact Boeing for repair instructions and do the repair.
5. Install barrier/shield sleeving P/N SR11280054-(), in accordance with the Figures listed in the table
that follows:
FigureArea
FIGURE 24Left Side
FIGURE 27Right Side
6. Install new clamps, new attaching hardware and extruded channel in accordance with the Figures
listed in the table that follows:
FigureArea
FIGURE 25Left Side
FIGURE 28Right Side
7. Put the airplane back to a serviceable condition.
Group 5, Configuration 2:
1. Gain access to wire bundle AES9601 run letter ENR routed above the center auxiliary fuel tank
from station Y=1238.950 to Y=1381.000 approximately X= -46.50.
2. Do a Visual Inspection of wire bundles routed above the center upper auxiliary fuel tank between
floor beams to determine if wires touch the upper surface of the center.
3. Do a Detailed Inspection of wire bundle AES9601 run ENR above the center upper auxiliary fuel
tank in accordance with FIGURE 29.
NOTE: Pay special attention to areas where wires were in contact with the upper surface of the
center upper auxiliary fuel tank during the General Visual Inspection.
Based on inspection finding, do as follows:
a. Condition 1 - No Damage and No Splices Found:
(1) Proceed to step 4.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 6: July 01, 2016
52 of 252
BOEING SERVICE BULLETIN MD11-28-126

### Page 53

b. Condition 2 - Damage Found on Wire Bundles, No Damage to Upper Surface of Auxiliary Fuel
Tank / Fuel Vapor Barrier Seal:
(1) Replace/repair damaged wires. Refer to SWPM 20-10-01 and SWPM 20-10-03 as
accepted procedures.
c. Condition 3 - Splices Found on Power Feeder Wires or Non-Power Feeder Wires:
(1) Remove and relocate each splice to a location at least 3 feet or 2 wire supports, which
ever is further, away from fuel tank boundaries. Refer to SWPM 20-10-01 and SWPM
20-10-03 as accepted procedures.
(2) Identify new wire. Refer to SWPM 20-00-03 as an accepted procedure.
d. Condition 4 - Damage Found on Wire Bundles and Damage Found on Fuel Vapor Barrier
Seal of Auxiliary Fuel Tank:
(1) Repair Fuel Vapor Barrier Seal in accordance with MD-11-1F SRM 51-42-03 or
MD-11-1PSRM 51-42-03.
(2) Repair/replace wire(s) causing damage. Refer to SWPM 20-10-01 and SWPM 20-10-03
as accepted procedures.
e. Condition 5 - Damage Found on Upper Surface of Auxiliary Fuel Tank:
(1) Contact Boeing for repair instructions and do the repair.
4. Install barrier/shield sleeving, clamping and extruded channels in accordance with FIGURE 30
and FIGURE 31.
5. Close access.
6. Put the airplane back to a serviceable condition.
Group 6:
1. Do a General Visual Inspection of wire bundles routed above the center upper auxiliary fuel tank
between floor beams at Stations 1238.950 to 1361.000 to determine if wires touch the upper
surface of the center upper auxiliary fuel tank. Mark the location(s) where the wire bundle(s)
contacts the upper surface of the center upper auxiliary fuel tank as applicable.
2. Remove all wire harness clamps from overwing floor beams and remove all TC92 wire harness
mounts from wire bundles in accordance with the Figures listed in the table that follows:
FigureArea
FIGURE 32Left Side
FIGURE 35Right Side
3. Clean all affected wire bundles. Refer to SWPM 20-10-10 as an accepted procedure.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 6: July 01, 2016
53 of 252
BOEING SERVICE BULLETIN MD11-28-126

### Page 54

4. Do a Detailed Inspection of all wire bundles above the center upper auxiliary fuel tank between
Stations 1218.950 and 1381.000 for the presence of wire splices and damage (such as chafing,
arcing and broken insulation), and do a Detailed Inspection for damage (burn marks) on the upper
surface of the center upper auxiliary fuel tank/fuel vapor barrier seal.
NOTE: Pay special attention to areas where wires were in contact with the upper surface of the
center upper auxiliary fuel tank (marked in Step 1).
Based on inspection finding, do as follows:
a. Condition 1 - No Damage and No Splices Found:
(1) Proceed to Step 5.
b. Condition 2 - Damage Found on Wire Bundles, No Damage to Upper Surface of Auxiliary Fuel
Tank/Fuel Vapor Barrier Seal:
(1) Replace/repair damaged wires. Refer to SWPM 20-10-01 and SWPM 20-10-03 as
accepted procedures.
c. Condition 3 - Splices Found on Power Feeder Wires or Non-Power Feeder Wires:
(1) Remove and relocate each splice to a location at least 3 feet or 2 wire supports, whichever
is further, away from fuel tank boundaries. Refer to SWPM 20-10-01 and SWPM 20-10-03
as accepted procedures.
(2) Identify new wire. Refer to SWPM 20-00-03 as an accepted procedure.
d. Condition 4 - Damage Found on Wire Bundles and Damage Found on Fuel Vapor Barrier
Seal of Auxiliary Fuel Tank:
(1) Repair Fuel Vapor Barrier Seal in accordance with MD-11-1F SRM 51-42-03.
(2) Replace/repair damaged wire(s). Refer to SWPM 20-10-01 and SWPM 20-10-03 as
accepted procedures.
e. Condition 5 - Damage Found on Upper Surface of Auxiliary Fuel Tank:
(1) Contact Boeing for repair instructions and do the repair.
5. Install barrier/shield sleeving P/N SR11280054-(), in accordance with the Figures listed in the table
that follows:
FigureArea
FIGURE 33Left Side
FIGURE 36Right Side
6. Install new clamps, new attaching hardware and extruded channel in accordance with the Figures
listed in the table that follows:
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 6: July 01, 2016
54 of 252
BOEING SERVICE BULLETIN MD11-28-126

### Page 55

FigureArea
FIGURE 34Left Side
FIGURE 37Right Side
7. Put the airplane back to a serviceable condition.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 6: July 01, 2016
55 of 252
BOEING SERVICE BULLETIN MD11-28-126

### Page 56 (OCR)

BOEING SERVICE BULLETIN MD11-28-126
This Figure applies only to: Group 1, Configuration 1.
>
D
STA
1381.000
STA
1361.000
STA
1341.000
STA  STA  B
1305.250  1321.000
B
STA 1293.750.  STA  B
STA  1256.000~  STA  1275.250~  B
1238.950
X=17.000*
→F
- PASSENGER
CONFIGURATION
X=81.000  ONLY
2013828
FIGURE 1: CLAMPS AT FLOOR BEAMS, LEFT SIDE - REMOVAL
(SHEET 1 OF 5)
Original Issue: March 03, 2009
Revision 6 July 01, 2016  Export Controlled ECCN: 9E991 - BOEING  MD11-28-126
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.  56 of 252

### Page 57 (OCR)

BOEING SERVICE BULLETIN MD11-28-126
X=75.250  X=30.000  X=17.000
Z=-19.000
B-B
(7 PLACES)
X=75.250  X=60.500  X=30.000  X=17.000
→ E  E
Z=-19.000 -
→ E
D-D
FIGURE 1: CLAMPS AT FLOOR BEAMS, LEFT SIDE - REMOVAL
(SHEET 2 OF 5)
Original Issue: March 03, 2009
Revision 6 July 01, 2016  PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  MD11-28-126
Work - See page 1 for details.  57 of 252

### Page 58 (OCR)

BOEING SERVICE BULLETIN MD11-28-126
ОДО
25)
E-E
(3 PLACES)  G-G
PASSENGER CONFIGURATION ONLY
STA
1256.750 -
TG
22
STA
1239.000
X=81.000  F-F
LOOKING DOWN
STA
1361.000
2013834
FIGURE 1: CLAMPS AT FLOOR BEAMS, LEFT SIDE - REMOVAL
(SHEET 3 OF 5)
Original Issue: March 03, 2009
Revision 6 July 01, 2016  Export Controlled ECCN: 9E991 - BOEING  PROPRIETARY - Copyright © Unpublished  MD11-28-126
Work - See page 1 for details.  58 of 252

### Page 59 (OCR)

BOEING SERVICE BULLETIN MD11-28-126
STA
1381.000
STA
STA  1361.000
1341.000
STA  STA
1305.250  1321.000
STA
1293.750
STA
1275.250
STA
1256.000
STA
1238.950
X=17.000
PASSENGER
CONFIGURATION
X=81.000  ONLY
~ MOUNT
TYPICAL  2013837
FIGURE 1: CLAMPS AT FLOOR BEAMS, LEFT SIDE - REMOVAL
(SHEET 4 OF 5)
Original Issue: March 03, 2009
Revision 6 July 01, 2016  Export Controlled ECCN: 9E991 - BOEING  MD11-28-126
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.  59 of 252

### Page 60

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for this figure.
More DataQtyIdentificationNameTaskStep
EDE - (AGS9201)-S7934111-()CLAMPRemove1
EDC - (AES9103), (ACS9009)-S7934111-()CLAMPRemove2
EDC - (AES9111)-S7934111-()CLAMPRemove3
EBE - (AGS9201)-S7934111-()CLAMPRemove4
EBC - (AES9102), (AES9109)-S7934111-()CLAMPRemove5
EBC - (AES9111)-S7934111-()CLAMPRemove6
EBJ - (AES9111)-S7934111-()CLAMPRemove
EBJ - (AES9105)-S7934111-()CLAMPRemove7
EDJ - (AES9111)-S7934111-()CLAMPRemove8
EDJ - (AES9106)-S7934111-()CLAMPRemove9
EAN - (AES9111)-S7934111-()CLAMPRemove10
EAN - (AES9115)-S7934111-()CLAMPRemove11
EAJ - (AES9104)-S7934111-()CLAMPRemove12
EAC - (AES9101)-S7934111-()CLAMPRemove13
EAC - (AES9108), (AES9111)-S7934111-()CLAMPRemove14
EAE - (AGS9201)-S7934111-()CLAMPRemove15
NLL (AGS9121)8MS21919WDG3CLAMPRemove16
NLM (AGS9119)8MS21919WDG6CLAMPRemove17
ENL (AES9501)8NMC1001-2CLAMPRemove18
HEE (AGS9124)8MS25281R4CLAMPRemove19
EDC (AES9110)7MS25281R6CLAMPRemove20
EBC (AES9109)7MS25281R1CLAMPRemove21
EAC (AES9108)3MS25281R2CLAMPRemove22
EDC (AES9103)5MS25281R1CLAMPRemove23
EKW (AES9110)1MS25281R2CLAMPRemove24
EPA (AES9109)1MS25281R2CLAMPRemove25
EGY (AES9108)1MS25281R2CLAMPRemove26
-TC92MountRemove27
FIGURE 1: CLAMPS AT FLOOR BEAMS, LEFT SIDE - REMOVAL
(SHEET 5 OF 5)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 03, 2009
MD11-28-126Revision 6 July 01, 2016
60 of 252
BOEING SERVICE BULLETIN MD11-28-126

The text continues at https://openairdocs.org/service-documents/boeing/md11-28-126/file/f38d9bab1714.md?from=61

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
