# Boeing Alert Service Bulletin MD11-28A150: No revision named

- Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2017-0500; AD 2018-01-01 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Boeing Alert Service Bulletin MD11-28A150](https://openairdocs.org/service-documents/boeing/md11-28a150.md)
- Title as filed: SB-MD11-28A150-00 October 6 2016 - BOEING
- Pages: 96
- PDF: https://openairdocs.org/files/sha256/3c/7f/3c7f831e1363e27c0197ebbb2a08069daef89f886e9029066aac61d740593cd3
- Page: https://openairdocs.org/service-documents/boeing/md11-28a150/file/3c7f831e1363

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Commercial 
Airplanes
MD11
Service Bulletin
ALERT
Number: MD11-28A150
Original Issue: October 06, 2016
ATA System: 2822
SUBJECT: FUEL - Distribution - Tail Tank Transfer Pump Wire Assemblies - Inspection, Repair
and Replacement
Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15
CFR 300-774). An export license may be required before it is used for development, production or use by foreign
persons from specific countries. The controller of this data has the individual responsibility to abide by all export
laws.
9E991ECCN:
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET
Copyright © 2016 Boeing.
Unpublished Work. All Rights Reserved.
Treatment of this document and its content is governed by contract with Boeing. Rights to use this document
are licensed on a per aircraft basis and such rights may not be transferable. For more information, contact The
Boeing Company.
Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner,
BBJ, DC-8, DC-9, DC-10, KC-10, KC-46, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8, Poseidon and
Boeing liveries are all trademarks owned by The Boeing Company; and no trademark license is granted in
connection with this document unless provided in writing by Boeing.
Original Issue: October 06, 2016
MD11-28A150
1 of 96
2.0

### Page 2

Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 06, 2016
MD11-28A150
2 of 96
BOEING SERVICE BULLETIN MD11-28A150
ALERTALERT
BLANK PAGE

### Page 3

Table of Contents
S u m m a r y  ...................................................... 5
1. PLANNING INFORMATION ........................................ 9
A . E f f e c t i v i t y  ................................................ 9
1. Airplanes ............................................. 9
2 . S p a r e s  A f f e c t e d  ........................................ 1 0
B. Concurrent Requirements ...................................... 1 0
C. Reason ................................................ 1 1
D. Description .............................................. 1 1
E. Compliance .............................................. 1 1
F . A p p r o v a l  ............................................... 1 2
G. Manpower .............................................. 1 3
H. Weight and Balance Changes .................................... 1 4
I. Electrical Load Data ......................................... 1 4
J . R e f e r e n c e s  .............................................. 1 4
1. Existing Data: ......................................... 1 4
2. Data Supplied with this Service Bulletin: ........................... 1 5
3. Installation Drawings Used in the Preparation of this Service Bulletin: ........... 1 5
K. Publications Affected ........................................ 1 5
L. Interchangeability and Intermixability of Parts ........................... 1 5
M. Software Accomplishment Summary ................................ 1 5
2. MATERIAL INFORMATION ........................................ 1 7
A. Material - Price and Availability ................................... 1 7
B. Industry Support Information .................................... 1 7
C. Parts Necessary for Each Airplane ................................. 1 7
1 . K i t s / P a r t s  ............................................ 1 7
2. Parts and Materials Supplied by the Operator ........................ 2 1
3. Parts Modified and Reidentified ................................ 2 1
4. Parts Removed and Not Replaced .............................. 2 2
D. Parts Necessary to Change Spares ................................. 2 2
E. Special Tooling - Price and Availability ............................... 2 2
F. Special Tooling Necessary to do this Service Bulletin ....................... 2 2
3. ACCOMPLISHMENT INSTRUCTIONS .................................. 2 3
A. GENERAL INFORMATION ..................................... 2 3
B. WORK INSTRUCTIONS ....................................... 2 6
FIGURE 1: TAIL TANK TRANSFER PUMP WIRE ASSEMBLIES - DETAILED INSPECTION ..... 2 9
FIGURE 2: TAIL TANK TRANSFER PUMP WIRE ASSEMBLY - REPAIR "SINGLE Y" WIRE HARNESS
BREAKOUT ........................................... 3 2
FIGURE 3: TAIL TANK TRANSFER PUMP WIRE ASSEMBLY - REPAIR "SHOWERHEAD" WIRE HARNESS
BREAKOUT ........................................... 3 9
FIGURE 4: TAIL TANK TRANSFER PUMP WIRE ASSEMBLY - REPAIR "DOUBLE Y" WIRE HARNESS
BREAKOUT ........................................... 4 5
FIGURE 5: TAIL TANK TRANSFER PUMP WIRE ASSEMBLIES - REMOVAL ............. 5 1
FIGURE 6: TAIL TANK TRANSFER PUMP WIRE ASSEMBLIES - INSTALLATION [Group 1] ..... 5 8
FIGURE 7: TAIL TANK TRANSFER PUMP WIRE ASSEMBLIES - INSTALLATION [Group 2] ..... 6 7
APPENDIX A: WIRE HARNESS INSPECTION LOCATIONS ........................ 7 6
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 06, 2016
MD11-28A150
3 of 96
BOEING SERVICE BULLETIN MD11-28A150
ALERTALERT

### Page 4

APPENDIX B: WIRE HARNESS PLASTIC FERRULE PART NUMBER AND LOCATION DIAGRAM . . . 77
APPENDIX C: CLAMP INSTALLATION .................................... 7 8
APPENDIX D: EXTRUDED CHANNEL AND STRAP INSTALLATIONS ................... 7 9
APPENDIX E: HARDWARE INSTALLATION ................................. 8 0
APPENDIX F: SINGLE OVERBRAID GROUNDING TO SINGLE COUPLER INSTALLATION ...... 8 1
APPENDIX G: GROUND STUD INSTALLATION ............................... 8 2
APPENDIX H: WIRE TERMINATION TABLES - REMOVAL ........................ 8 3
APPENDIX I: WIRE TERMINATION TABLES - INSTALLATION ...................... 8 6
APPENDIX J: IN-LINE FUSE INSTALLATION ................................ 8 9
APPENDIX K: LOGIC DIAGRAM ....................................... 9 4
APPENDIX L: PART DEMAND INTENT ................................... 9 6
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 06, 2016
MD11-28A150
4 of 96
BOEING SERVICE BULLETIN MD11-28A150
ALERTALERT

### Page 5

Commercial 
Airplanes
MD11
Service Bulletin
ALERT
SummaryNumber: MD11-28A150Original Issue: October 06, 2016
ATA System: 2822
SUBJECT: FUEL - Distribution - Tail Tank Transfer Pump Wire Assemblies - Inspection, Repair
and Replacement
THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN IN
PARAGRAPH 1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND THIS DOCUMENT
TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS DOCUMENT TO THE
NEW OWNER.
CONCURRENT REQUIREMENTS
None.
BACKGROUND
This service bulletin provides instructions to do a Detailed Inspection of the Tail Tank Transfer Pump Wire
Assemblies, AJS9013 and AJS9014, to find if metallic transitions are installed at the wire harness breakouts. If
the metallic transitions are installed, no further action is required. If the metallic transitions are not installed, the
operator has the option to replace the wire assemblies or repair the wire assemblies. If this service bulletin is
not done, missing metallic transitions can cause damage and arcing of wires, which could result in engine fuel
starvation.
During troubleshooting for a Tail Pump Off level 1 message which appeared during cruise, maintenance found
wire damage to fourteen wires installed adjacent to the tail fuel tank front spar. These wires were broken and/or
had insulation damage. Wire bundle damage was found at the Tail Tank L Trans Pump, ALT Eng Feed Pump,
Tail Tank L Trans Pump Press SW and Tail Tank ALT Eng Feed Pump SW 1. The root cause of the damage
was metallic transitions missing at the wire harness breakouts.
Boeing Fleet Team Digest (FTD) MD-11 FTD 28-15001 is related to this service bulletin.
This table is provided to operators for planning purposes only. Refer to the applicable sections for more
information.
ReferenceAffectedPlanning Data
Paragraph 1.A.2., Spares AffectedNoSpares Affected
Paragraph 1.E., Compliance and Paragraph
1.F., Approval
YesAD Related
Paragraph 1.H., Weight and Balance ChangesYesWeight and Balance Change
Paragraph 1.I., Electrical Load DataNoElectrical Load Changed
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 06, 2016
MD11-28A150
5 of 96

### Page 6

ReferenceAffectedPlanning Data
Paragraph 1.K., Publications AffectedYesPublications Affected
Paragraph 1.K., Publications AffectedNoAirplane Flight Operations Affected (Flight Crew
Operations Manual and/or FAA Approved Air-
plane Flight Manual)
Paragraph 2.C.1., Kits/PartsYesKits/Parts Required
Paragraph 2.C.2., Parts and Materials Supplied
by the Operator
YesOperator Supplied Parts/Material
Paragraph 2.F., Special Tooling Necessary to
do this Service Bulletin
NoSpecial Tooling Required
ACTION
Do a Detailed Inspection of the Tail Tank Transfer Pump Wire Assemblies to find if metallic transitions are
installed at the wire harness breakouts. If all of the metallic transitions are installed, no further action is required.
If any of the metallic transitions are not installed, repair or replace the affected wire assemblies.
EFFECTIVITY
MD-11 and MD-11F Airplanes. Refer to Paragraph 1.A.1., Airplanes, for the list of affected airplanes.
COMPLIANCE
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to this service
bulletin. The Airworthiness Directive will make the compliance tasks and times given in this service bulletin
mandatory.
Refer to Paragraph 1.E., Compliance.
INDUSTRY SUPPORT INFORMATION
At the time of release of this service bulletin, warranty remedies have not been determined. A subsequent
revision or Information Notice will address the warranty remedies available, if any.
MANPOWER
Refer to Paragraph 1.G., Manpower.
MATERIAL INFORMATION
Boeing Supplied Kits/Parts.
Refer to Paragraph 2.A., Material - Price and Availability.
Operators are encouraged to complete the survey provided in APPENDIX L of this service bulletin to help Boeing
predict the quantity and timing of the Boeing Supplied Kits/Parts.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 06, 2016
MD11-28A150
6 of 96
BOEING SERVICE BULLETIN MD11-28A150
ALERTALERT

### Page 7 (OCR)

BOEING SERVICE BULLETIN MD11-28A150
ALERT  ALERT
DO A DETAILED INSPECTION OF TAIL TANK TRANSFER PUMP WIRE ASSEMBLIES TO FIND
IF METALLIC TRANSITIONS ARE INSTALLED AT THE WIRE HARNESS BREAKOUTS. IF ALL
ANY OF THE METAL TRANSITIONS NONSTALLED PERIORCE TED IF
AFFECTED WIRE ASSEMBLIES.  2499474
Original Issue: October 06, 2016
Export Controlled ECCN: 9E991 - BOEING  MD11-28A150
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.  7 of 96

### Page 8

Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 06, 2016
MD11-28A150
8 of 96
BOEING SERVICE BULLETIN MD11-28A150
ALERTALERT
BLANK PAGE

### Page 9

Commercial 
Airplanes
MD11
Service Bulletin
ALERT
Number: MD11-28A150
Original Issue: October 06, 2016
ATA System: 2822
SUBJECT: FUEL - Distribution - Tail Tank Transfer Pump Wire Assemblies - Inspection, Repair
and Replacement
THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN IN
PARAGRAPH 1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND THIS DOCUMENT
TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS DOCUMENT TO THE
NEW OWNER.
1.    PLANNING INFORMATION
A. Effectivity
1. Airplanes
This service bulletin is for the airplanes shown below.
DESCRIPTIONCONFIGURATIONGROUP
MD-11 and MD-11F Airplanes after Fuselage Number 460 that use
WSP1381-501 at Wire Assy - AJS9013 and WSP1382-501 at Wire
Assy - AJS9014 as replacements.
-1
MD-11F Airplanes after Fuselage Number 460 that use WSP1381-502
at Wire Assy - AJS9013 and WSP1382-501 at Wire Assy - AJS9014
as replacements.
-2
Airplane Models:
MD-11, MD-11F
GroupFuselage Num-
ber
1461 - 464
1466 - 467
2468
1469
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 06, 2016
MD11-28A150
9 of 96

### Page 10

GroupFuselage Num-
ber
1470
2471
1472 - 473
2474
1475 - 479
1480 - 489
1491 - 499
2500
1501 - 507
2508
1509
1510 - 517
1519
1520 - 529
1530 - 539
1540 - 549
1550 - 552
1554 - 559
1560 - 569
1570 - 579
1580 - 589
1590 - 599
1600 - 609
1610 - 619
1620 - 629
1630 - 639
1640 - 646
2. Spares Affected
None.
B. Concurrent Requirements
None.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 06, 2016
MD11-28A150
10 of 96
BOEING SERVICE BULLETIN MD11-28A150
ALERTALERT

### Page 11

C. Reason
This service bulletin provides instructions to do a Detailed Inspection of the Tail Tank Transfer Pump
Wire Assemblies, AJS9013 and AJS9014, to find if metallic transitions are installed at the wire harness
breakouts. If the metallic transitions are installed, no further action is required. If the metallic transitions
are not installed, the operator has the option to replace the wire assemblies or repair the wire assemblies.
If this service bulletin is not done, missing metallic transitions can cause damage and arcing of wires,
which could result in engine fuel starvation.
During troubleshooting for a Tail Pump Off level 1 message which appeared during cruise, maintenance
found wire damage to fourteen wires installed adjacent to the tail fuel tank front spar. These wires were
broken and/or had insulation damage. Wire bundle damage was found at the Tail Tank L Trans Pump,
ALT Eng Feed Pump, Tail Tank L Trans Pump Press SW and Tail Tank ALT Eng Feed Pump SW 1.
The root cause of the damage was metallic transitions missing at the wire harness breakouts.
Boeing Fleet Team Digest (FTD) MD-11 FTD 28-15001 is related to this service bulletin.
D. Description
Do a Detailed Inspection of the Tail Tank Transfer Pump Wire Assemblies to find if metallic transitions
are installed at the wire harness breakouts. If all of the metallic transitions are installed, no further action
is required. If any of the metallic transitions are not installed, repair or replace the affected wire
assemblies.
The work in this service bulletin is done in the maintenance zone(s) given below.
Group 1:
Affected Maintenance Zones
ZoneModel
352MD-11, MD-11F
Group 2:
Affected Maintenance Zones
ZoneModel
352MD-11F
E. Compliance
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to
this service bulletin. The Airworthiness Directive will make the compliance tasks and times given in this
service bulletin mandatory.
When more than one OPTION is given for a CONDITION, do only one of the OPTION numbers. When
more than one ACTION is given for a CONDITION number or an OPTION number, do all of the ACTION
numbers for that CONDITION number or OPTION number.
Do the required actions in accordance with Paragraph 3. Accomplishment Instructions.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 06, 2016
MD11-28A150
11 of 96
BOEING SERVICE BULLETIN MD11-28A150
ALERTALERT

### Page 12

A logic diagram showing compliance tasks and compliance times is included as an aid in APPENDIX
K.
Table 1: DETAILED INSPECTION OF THE TAIL TANK TRANSFER PUMP WIRE ASSEMBLIES AJS9013
AND AJS9014 TO DETERMINE IF METALLIC TRANSITIONS ARE INSTALLED AT WIRE ASSEMBLY
BREAKOUTS
Repeat Inter-
val (Not to Ex-
ceed)
Compliance TimeActionCondition
-Within 27 months after
the original issue date
of this service bulletin.
Do PART 1: DETAILED INSPECTION
OF THE TAIL TANK TRANSFER PUMP
WIRE ASSEMBLIES FOR INSTALLED
METALLIC TRANSITIONS.
All Airplanes
--No further work is necessary for this
condition.
CONDITION 1: ALL
METALLIC TRANSITIONS
INSTALLED
-Before further flight.OPTION 1 (ACTION 1): Do PART 2:
REPAIR TAIL TANK TRANSFER PUMP
WIRE ASSEMBLIES for each affected
wire harness breakout.
CONDITION 2: ANY
METALLIC TRANSITION
NOT INSTALLED
-Within 24 months after
PART 2: REPAIR TAIL
TANK TRANSFER
PUMP WIRE ASSEM-
BLIES for each affected
wire harness breakout
was accomplished.
OPTION 1 (ACTION 2): Do PART 3:
REPLACEMENT OF TAIL TANK
TRANSFER PUMP WIRE ASSEMBLIES
for each affected wire assembly.
-Before further flight.OPTION 2: Do PART 3: REPLACE-
MENT OF TAIL TANK TRANSFER
PUMP WIRE ASSEMBLIES for each
affected wire assembly.
F. Approval
This service bulletin was examined by the Federal Aviation Administration (FAA). The changes specified
in this service bulletin comply with the applicable regulations and are FAA approved, as well as European
Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/JAA approved
airplanes listed in the service bulletin effectivity. This service bulletin and its approval were based on
the airplane in its original Boeing delivery configuration or as modified by other approved Boeing
changes.
If an airplane has a non-Boeing modification or repair that affects a component or system also affected
by this service bulletin, the operator is responsible for obtaining appropriate regulatory agency approval
before incorporating this service bulletin.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 06, 2016
MD11-28A150
12 of 96
BOEING SERVICE BULLETIN MD11-28A150
ALERTALERT

### Page 13

G. Manpower
The table below shows an estimate of the task hours necessary to do this inspection and repair for
each airplane. This estimate is for direct labor only, done by an experienced crew. Adjust the estimate
with operator task hour data if necessary. The estimate does not include lost time. These are some
examples of lost time:
• Time to adjust to the workplace
• Time to schedule the work
• Time to inspect the work
• Time to cure the materials
• Time to make the parts
• Time to find the tools
PART 1: DETAILED INSPECTION OF THE TAIL TANK TRANSFER PUMP WIRE ASSEMBLIES
FOR INSTALLED METALLIC TRANSITIONS.
Elapsed HoursTask HoursNumber of PersonsTask
0.300.602Open Access
0.500.501FIGURE 1
0.200.201Close Access
1.001.30TOTAL FOR EACH AIRPLANE
PART 2: REPAIR TAIL TANK TRANSFER PUMP WIRE ASSEMBLIES
Elapsed HoursTask HoursNumber of PersonsTask
0.300.602Open Access
2.252.251FIGURE 2
0.750.751FIGURE 3
0.750.751FIGURE 4
0.200.201Close Access
2.004.002Test
6.258.55TOTAL FOR EACH AIRPLANE
Group 1:
PART 3: REPLACEMENT OF TAIL TANK TRANSFER PUMP WIRE ASSEMBLIES
Elapsed HoursTask HoursNumber of PersonsTask
0.300.602Open Access
1.251.251FIGURE 5
1.751.751FIGURE 6
0.200.201Close Access
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 06, 2016
MD11-28A150
13 of 96
BOEING SERVICE BULLETIN MD11-28A150
ALERTALERT

### Page 14

Group 1:
PART 3: REPLACEMENT OF TAIL TANK TRANSFER PUMP WIRE ASSEMBLIES
Elapsed HoursTask HoursNumber of PersonsTask
2.004.002Test
5.507.80TOTAL FOR EACH AIRPLANE
Group 2:
PART 3: REPLACEMENT OF TAIL TANK TRANSFER PUMP WIRE ASSEMBLIES
Elapsed HoursTask HoursNumber of PersonsTask
0.300.602Open Access
1.251.251FIGURE 5
1.751.751FIGURE 7
0.200.201Close Access
2.004.002Test
5.507.80TOTAL FOR EACH AIRPLANE
H. Weight and Balance Changes
PART 2: REPAIR TAIL TANK TRANSFER PUMP WIRE ASSEMBLIES
Moment Change
(MEW) IN.-LBS
Mfr's Empty
Weight (MEW)
LBS
Approximate Sta-
tion (Inches)Airplane
+ 4861.3+ 2.4+ 2038.2MD-11, MD-11F
PART 3: REPLACEMENT OF TAIL TANK TRANSFER PUMP WIRE ASSEMBLIES
Moment Change
(MEW) IN.-LBS
Mfr's Empty
Weight (MEW)
LBS
Approximate Sta-
tion (Inches)Airplane
+ 5515.2+ 2.7+ 2040.8MD-11, MD-11F
I. Electrical Load Data
Not changed.
J. References
1. Existing Data:
a. Critical Design Configuration Control Limitation (CDCCL) 20-15
b. Standard Overhaul Practices Manual (SOPM) 20-50-01
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 06, 2016
MD11-28A150
14 of 96
BOEING SERVICE BULLETIN MD11-28A150
ALERTALERT

### Page 15

c. Standard Wiring Practices Manual (SWPM) 20-00-03, 20-00-09, 20-00-13, 20-00-16, 20-10-01,
20-10-02, 20-10-03, 20-10-04, 20-10-06, 20-10-13, 20-10-17, 20-20-02, 20-20-03, 20-31-00,
20-50-01
d. MD-11 Aircraft Maintenance Manual (AMM) 06-33-00, 22-00-03, 22-22-00, 26-21-00, 27-33-00,
27-40-00, 27-45-01, 28-08-01, 28-21-02, 28-44-01, 29-00-00, 30-22-00, 36-12-01
e. MD-11 Fleet Team Digest (FTD) 28-15001
f. MD-11 Structural Repair Manual (SRM) 51
g. MD-11 Wiring Diagram Manual (WDM) 28-21-02, 28-21-03, 28-22-05, 28-43-02, 28-44-05
2. Data Supplied with this Service Bulletin:
None.
3. Installation Drawings Used in the Preparation of this Service Bulletin:
ChangeTitleDocument Number
NewWIRE ASSY INSTL - AJS9013 AND
AJS9014
SR11280092
AEO, AWIRE ASSY INSTL - AJS9013 AND
AJS9014
SR11280092
The table above lists applicable drawings used to prepare this service bulletin. The drawings are
not necessary to make the specified changes, and are not supplied with this service bulletin. The
drawings may not be applicable to all airplane configurations or operators.
K. Publications Affected
1. Publications:
Chapter-SectionPublication
28-21, 28-22, 28-43, 28-44Wiring Diagram Manual
2. Damage Tolerance Based Structural Inspections:
Boeing has evaluated the repairs and/or changes in this service bulletin for effects on Fatigue
Critical Structure (FCS) and for changes to Damage Tolerance Inspections (DTI) required in the
Maintenance Program. This service bulletin does not affect FCS, therefore DTIs are not necessary.
L. Interchangeability and Intermixability of Parts
Refer to Paragraph 2.C., Parts Necessary for Each Airplane, for interchangeability and intermixability
information.
M. Software Accomplishment Summary
Not affected.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 06, 2016
MD11-28A150
15 of 96
BOEING SERVICE BULLETIN MD11-28A150
ALERTALERT

### Page 16

Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 06, 2016
MD11-28A150
16 of 96
BOEING SERVICE BULLETIN MD11-28A150
ALERTALERT
BLANK PAGE

### Page 17

2.    MATERIAL INFORMATION
A. Material - Price and Availability
Boeing can supply the kits shown in Paragraph 2.C., Parts Necessary for Each Airplane. Operators
are encouraged to share schedule requirements with Boeing for incorporation of the service bulletin.
The kits are subject to the terms and conditions of the Boeing standard purchase order acknowledgment.
Prices are in United States Dollars. Terms: Net 30 days.
Reference this service bulletin and submit your purchase order by one of these methods:
1. Order on-line via ATA Spec 2000 or The Boeing PART Page
2. Fax to (206) 662-7145
REFER TO THE BOEING PART PAGE ON MYBOEINGFLEET.COM OR CONTACT FIRST RESPONDER
AT FR@BOEING.COM FOR THE LATEST REORDER LEAD TIME (ROLT) AND PRICE INFORMATION
Unit Price as of
the original issue
date of this Ser-
vice Bulletin (US
Dollars)
ROLT as of the
original issue
date of this Ser-
vice Bulletin (Cal-
endar Days)
NameKit Number
$57,514.00120Service KitSB11280150-3
$57,526.00120Service KitSB11280150-5
Operators are encouraged to complete the survey provided in APPENDIX L of this service bulletin to
help Boeing predict the quantity and timing of the Boeing Supplied Kits/Parts.
B. Industry Support Information
At the time of release of this service bulletin, warranty remedies have not been determined. A subsequent
revision or Information Notice will address the warranty remedies available, if any.
C. Parts Necessary for Each Airplane
1. Kits/Parts
To get the kits/parts shown below, refer to Paragraph 2.A., Material - Price and Availability.
NOTE: One top kit and the items shown in Paragraph 2.C.2., Parts and Materials Supplied by
the Operator, are necessary for each airplane.
Group 1:
SB11280150-3 Service Kit
NotesExisting Part NumberNameQTYNew Part Number
COUPLER8AAN7236-1
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 06, 2016
MD11-28A150
17 of 96
BOEING SERVICE BULLETIN MD11-28A150
ALERTALERT

### Page 18

Group 1:
SB11280150-3 Service Kit
NotesExisting Part NumberNameQTYNew Part Number
SR11280092-3 is made
from AAN7237-1 in
FIGURE 6.
AAN7237-1BUSHING4SR11280092-3
WIRE ASSY - AJS90131WSP1381-501
WIRE ASSY - AJS90141WSP1382-501
CLAMP4AN742D16
NUT101MS21042L3
CLAMP9MS21919WDG10
CLAMP46MS21919WDG6
JUMPER4MS25083-5BB5
O-RING1MS29513-030
LOCKWASHER12MS35338-43
SCREW2NAS1096-3-10
SCREW1NAS1096-3-12
WASHER12NAS1149F0332P
WASHER215NAS1252-10L
SPACER1NAS43DD3-16FC
SPACER1NAS43DD3-72FC
SPACER2NAS43DD3-88FC
(a)CLAMP10S7934111-10SA
(a)CLAMP5S7934111-14SA
(a)CLAMP1S7934111-24SA
(a)CLAMP8S7934111-4SA
(a)CLAMP22S7934111-6SA
(a)CLAMP3S7934111-8SA
(a)SCREW163D0005-3-10
(a)SCREW293D0005-3-12
(a)SCREW13D0005-3-16
(a)SCREW13D0005-3-30
(a)SCREW23D0005-3-36
(a)SCREW773D0005-3-8
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 06, 2016
MD11-28A150
18 of 96
BOEING SERVICE BULLETIN MD11-28A150
ALERTALERT

### Page 19

Group 1:
SB11280150-3 Service Kit
NotesExisting Part NumberNameQTYNew Part Number
(a)NUT-CLIP23D0039-14
(a)FERRULE159D0067-3
(a)FERRULE ASSY99D0067-4
(a)FERRULE ASSY39D0067-5
(a)FERRULE59D0067-6
(a)CLAMP, LOOP329D0180-1
(a)BAND, RETAINING369D0180-2
(a)STA-STRAP169D0254-1-1-9
(a) Or approved equivalent. Refer to AEPL Drawing 7595071.
Group 2:
SB11280150-5 Service Kit
NotesExisting Part NumberNameQTYNew Part Number
COUPLER8AAN7236-1
SR11280092-3 is made
from AAN7237-1 in
FIGURE 7.
AAN7237-1BUSHING4SR11280092-3
WIRE ASSY - AJS90131WSP1381-502
WIRE ASSY - AJS90141WSP1382-501
CLAMP4AN742D16
NUT101MS21042L3
CLAMP9MS21919WDG10
CLAMP46MS21919WDG6
JUMPER4MS25083-5BB5
O-RING1MS29513-030
LOCKWASHER12MS35338-43
SCREW2NAS1096-3-10
SCREW1NAS1096-3-12
WASHER12NAS1149F0332P
WASHER215NAS1252-10L
SPACER1NAS43DD3-16FC
SPACER1NAS43DD3-72FC
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 06, 2016
MD11-28A150
19 of 96
BOEING SERVICE BULLETIN MD11-28A150
ALERTALERT

### Page 20

Group 2:
SB11280150-5 Service Kit
NotesExisting Part NumberNameQTYNew Part Number
SPACER2NAS43DD3-88FC
(a)CLAMP10S7934111-10SA
(a)CLAMP5S7934111-14SA
(a)CLAMP1S7934111-24SA
(a)CLAMP8S7934111-4SA
(a)CLAMP22S7934111-6SA
(a)CLAMP3S7934111-8SA
(a)SCREW163D0005-3-10
(a)SCREW293D0005-3-12
(a)SCREW13D0005-3-16
(a)SCREW13D0005-3-30
(a)SCREW23D0005-3-36
(a)SCREW773D0005-3-8
(a)NUT-CLIP23D0039-14
(a)FERRULE159D0067-3
(a)FERRULE ASSY99D0067-4
(a)FERRULE ASSY39D0067-5
(a)FERRULE59D0067-6
(a)CLAMP, LOOP329D0180-1
(a)BAND, RETAINING369D0180-2
(a)STA-STRAP169D0254-1-1-9
(a) Or approved equivalent. Refer to AEPL Drawing 7595071.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 06, 2016
MD11-28A150
20 of 96
BOEING SERVICE BULLETIN MD11-28A150
ALERTALERT

### Page 21

2. Parts and Materials Supplied by the Operator
The following parts or materials are necessary to do the change in this service bulletin. Parts and
materials in the manuals given in Paragraph 1.J., References, can also be necessary. Examine
operator part and material supply to make sure all necessary parts and materials are available.
NotesNameQTYPart Number / Specification
(a)ADHESIVE TEFLON TAPE8
ROLLS
HM350 ADHESIVE TEFLON
TAPE (DPM 2306-1)
OR AN EQUIVALENT 528R OR
DPM 2306-4 (1 INCH WIDTH)
EQUIVALENT
(b)1 BAG
(c)INSULATION TAPE9
ROLLS
600T SELF-ADHESIVE INSULA-
TION TAPE (DMS 2186, TYPE
2) OR AN EQUIVALENT
(d)GLASS FIBER TYING TAPE1
ROLL
190L0F21G/A GLASS FIBER
TYING TAPE (DMS 2089) OR
AN EQUIVALENT
(e)TUBULAR BRAID WIRE1
ROLL
100-001A375 TUBULAR BRAID
WIRE OR 100-001-A250 (DPM
6148) OR EQUIVALENT
(f)BRAID WIRE SHIELDING TAPE3
ROLLS
SCOTCH 24 (DPM 6149 1
INCH WIDE) OR AN EQUIVA-
LENT
(a) Can be purchased from: CHR Industries Incorporated An ARMCO Company, 407 East
Street, New Haven, Connecticut 06511, CAGE Code: 71643
(b) Can be purchased from: Tape and Film Converters, 1290 Northwood Ave, Brea, California
92821, CAGE Code: Not Available
(c) Can be purchased from: Moxness Products Incorporated, 1914 Indiana Street, P.O. Box
085050, Racine, Wisconsin 53405-36409, CAGE Code: 07099
(d) Can be purchased from: Western Filament Incorporated, 630 Hollingsworth Drive, Grand
Junction, Colorado 81505-1000, CAGE Code: 00768
(e) Can be purchased from: Glenair Incorporated, 1211 Air Way, Glendale, California 91201-
2497, CAGE Code: 06324
(f) Can be purchased from: 3M Electrical Products Division, Saint Paul, Minnesota 55144,
CAGE Code: Not Available
3. Parts Modified and Reidentified
The parts shown below are changed as shown in this service bulletin. The quantity (QTY) is the
number of parts changed on each airplane.
NotesNew Part NumberNameQTYExisting Part
Number
SR11280092-3BUSHING4AAN7237-1
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 06, 2016
MD11-28A150
21 of 96
BOEING SERVICE BULLETIN MD11-28A150
ALERTALERT

### Page 22

4. Parts Removed and Not Replaced
None.
D. Parts Necessary to Change Spares
None.
E. Special Tooling - Price and Availability
None.
F. Special Tooling Necessary to do this Service Bulletin
No special tools or equipment are necessary to do the change in this service bulletin. But, maintenance
and overhaul tools in the manuals given in Paragraph 1.J., References, can be necessary. Examine
operator tool supply to make sure all necessary tools are available.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 06, 2016
MD11-28A150
22 of 96
BOEING SERVICE BULLETIN MD11-28A150
ALERTALERT

### Page 23

3.    ACCOMPLISHMENT INSTRUCTIONS
A. GENERAL INFORMATION
WARNING: WHILE YOU DO WORK IN THE TAILCONE AREA, MAKE SURE THAT YOU OBEY
ALL SAFETY PRECAUTIONS. IF YOU DO NOT OBEY THE PRECAUTIONS, DEATH
OR INJURY TO PERSONS CAN OCCUR.
WARNING: IF ELECTRICAL POWER IS APPLIED TO THE AIRPLANE, MAKE SURE YOU OBEY
ALL PRECAUTIONS WHILE YOU DO WORK. IF YOU DO NOT OBEY THE
PRECAUTIONS, DEATH OR INJURY TO PERSONS, AND DAMAGE TO THE AIRPLANE
CAN OCCUR.
CAUTION: ELECTRICALLY GROUND THE AIRPLANE. THIS WILL HELP TO PREVENT DAMAGE
TO THE AIRPLANE OR EQUIPMENT.
CAUTION: KEEP THE WORK AREA, WIRES AND ELECTRICAL BUNDLES CLEAN OF METAL
PARTICLES OR CONTAMINATION WHEN YOU USE TOOLS. UNWANTED MATERIAL,
METAL PARTICLES OR CONTAMINATION CAUGHT IN WIRE BUNDLES CAN CAUSE
DAMAGE TO THE BUNDLES. DAMAGED WIRE BUNDLES CAN CAUSE SPARKS OR
OTHER ELECTRICAL DAMAGE.
NOTE: 1. Manual titles are referred to by acronyms. Refer to Paragraph 1.J., References, for
definition of the acronyms.
2. Equivalent parts are listed in the AEPL, Drawing 7595071.
3. Use the approved fastener and process material substitutions, in accordance with
MD-11 SRM 51.
4. If the length of any fastener specified in this service bulletin does not meet installation
standards given in Structural Repair Manual (SRM) Chapter 51, then a fastener of
the same specification, or an approved substitute, with a length which meets the
installation standards given in SRM Chapter 51 may be used. In addition, washers
may be installed for fastener grip length in accordance with SRM Chapter 51. Refer
to SOPM 20-50-01 for alternate full threaded fasteners (screws) needed for installation
in this service bulletin.
5. A 1/8-inch thick stack of the same type washers called for in this service bulletin is
the maximum thickness which may be used under fastener head or nut to counteract
accumulation of tolerances.
EXCEPTION: When the available fastener length increments are greater than
1/16-inch, a 3/16-inch thick stack of the same type washers may be used.
6. Unless shown differently, these dimensions and tolerances are used:
– Linear dimensions are in inches
– Tolerance on linear dimensions, other than rivet and bolt edge margins, is plus
or minus 0.03 inch.
– Tolerance on rivet and bolt edge margin is plus or minus 0.05 inch
– Angular tolerance is plus or minus 2 degrees
– Hole dimensions for standard solid rivets are in MD-11 SRM 51.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 06, 2016
MD11-28A150
23 of 96
BOEING SERVICE BULLETIN MD11-28A150
ALERTALERT

### Page 24

– Torque Values:
— Values for structural fasteners are given in MD-11 Structural Repair Manual,
Chapter 51.
— Values for airframe maintenance tasks are included in Chapter 20 of MD-11
Aircraft Maintenance Manual (AMM).
— Values for electrical maintenance tasks are included in Chapter 20 of
Standard Wiring Practices Manual (SWPM).
— Values for engine maintenance tasks are included in Chapter 70 of MD-11
Aircraft Maintenance Manual (AMM).
— Non-standard torque values for maintenance tasks are included in the
applicable installation step.
7. Refer to the SWPM 20-10-01 as accepted wire installation procedures.
Refer to these SWPM chapters for applicable operations, as accepted procedures:
TitleChapter
IDENTIFICATION OF ELECTRICAL WIRE - COMMERCIALSWPM 20-00-03
GENERAL MAINTENANCE PRACTICES - ELECTRICALSWPM 20-00-09
ELECTRICAL WIRE CODESSWPM 20-00-13
ELECTRICAL WIRE END TERMINATION CODES AND TOOL
CODES
SWPM 20-00-16
WIRING INSTALLATION - MAINTENANCE PRACTICESSWPM 20-10-01
SHIELDING - MAINTENANCE PRACTICESSWPM 20-10-02
WIRE SPLICING - MAINTENANCE PRACTICESSWPM 20-10-03
HEAT SHRINKABLE TUBING - MAINTENANCE PRACTICESSWPM 20-10-06
MD-11 FUEL QUANTITY GAGING SYSTEM (FQGS) HAR-
NESS REPAIR
SWPM 20-10-13
BRAIDED ELECTRICAL WIRESWPM 20-10-17
GENERAL INSTALLATIONS HARDWARE - MAINTENANCE
PRACTICES
SWPM 20-20-03
ELECTRICAL CONNECTORS - MAINTENANCE PRACTICESSWPM 20-31-00
ELECTRICAL BONDING - MAINTENANCE PRACTICESSWPM 20-50-01
8. Obey all of the warnings and cautions given in the specified manual sections.
9. Refer to APPENDIX A for wire harness inspection locations.
10. Refer to APPENDIX B for wire harness plastic ferrule part numbers and locations.
11. Refer to APPENDIX C for clamp installation.
12. Refer to APPENDIX D for hardware installation.
13. Refer to APPENDIX E for extruded channel and strap installation.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 06, 2016
MD11-28A150
24 of 96
BOEING SERVICE BULLETIN MD11-28A150
ALERTALERT

### Page 25

14. Refer to APPENDIX F for single overbraid grounding to single coupler installation.
15. Refer to APPENDIX G for ground stud installation.
16. Refer to APPENDIX H and APPENDIX I for wire termination tables.
17. Refer to APPENDIX J for the in-line fuse installation.
18. Refer to APPENDIX K for logic diagram. Logic diagrams are provided as an aid only.
Information contained in Paragraph 1.E., Compliance is the primary source for
compliance times. Information contained in Paragraph 3.B., Work Instructions is the
primary source for tasks required for compliance.
19. Refer to APPENDIX L for part demand intent.
20. A Detailed Inspection is defined as: An intensive examination of a specific item,
installation, or assembly to detect damage, failure, or irregularity. Available lighting
is normally supplemented with a direct source of good lighting at an intensity deemed
appropriate. Inspection aids such as mirrors, magnifying lenses, etc. may be
necessary. Surface cleaning and elaborate procedures may be required.
21. These work instructions refer to procedures included in other Boeing documents.
When the words "refer to" are used and the operator has an accepted alternative
procedure, the accepted alternative procedure can be used. When the words "in
accordance with" are included in the instruction, the procedure in the Boeing document
must be used.
22. If it is necessary to remove more parts for access, you can remove those parts. If
you can get access without removing identified parts, it is not necessary to remove
all of the identified parts. Jacking and shoring limitations must be observed.
23. Where the work instructions include installation of a kept part, a new or serviceable
part with the same part number can be installed as an alternative to the kept part.
24. This service bulletin includes functional test procedures for the systems changed by
this service bulletin. More functional tests can possibly be necessary in accordance
with standard maintenance practices because of interruption to other airplane systems.
25. Use of colors in Figures is based on guidance from the ATA e-Business Program
(ATA) iSpec 2200.
26. When more than one OPTION is given for a CONDITION, do only one of the OPTION
numbers. When more than one ACTION is given for a CONDITION number or an
OPTION number, do all of the ACTION numbers for that CONDITION number or
OPTION number.
27. The compliance times for the actions in Paragraph 3.B., WORK INSTRUCTIONS
are in Paragraph 1.E., Compliance.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 06, 2016
MD11-28A150
25 of 96
BOEING SERVICE BULLETIN MD11-28A150
ALERTALERT

### Page 26

28. Some steps in the Work Instructions are labeled as Required for Compliance (RC).
If this service bulletin is mandated by an Airworthiness Directive (AD), then the steps
labeled as RC, including sub-steps under an RC step and any figures identified in
an RC step, must be done to comply with the AD. If a step or sub-step is labeled
"RC Exempt," then the RC requirement is removed from that step or sub-step. An
Alternative Method of Compliance (AMOC) is required for any deviations to RC steps,
including sub-steps and identified figures. Steps not labeled as RC may be deviated
from using accepted methods in accordance with the operator's maintenance or
inspection program without obtaining approval of an AMOC. This is provided that
the RC steps, including sub-steps and identified figures, can still be done as specified,
and the airplane can be put back in an airworthy condition.
B. WORK INSTRUCTIONS
1. Open Access as follows:
a. Pressurize hydraulic systems. Refer to MD-11 AMM 29-00-00 as an accepted procedure.
b. Position horizontal stabilizer between 3 and 14 degrees aircraft nose up to provide maximum
clearance. Refer to MD-11 AMM 27-40-00 as an accepted procedure.
c. Depressurize hydraulic systems. Refer to MD-11 AMM 29-00-00 as an accepted procedure.
d. Open access door 311AB. Refer to MD-11 AMM 06-33-00 as an accepted procedure.
2. RC - Do PART 1: DETAILED INSPECTION OF THE TAIL TANK TRANSFER PUMP WIRE
ASSEMBLIES FOR INSTALLED METALLIC TRANSITIONS.
a. CONDITION 1: ALL METALLIC TRANSITIONS INSTALLED
(1) No further work is necessary for this condition.
b. CONDITION 2: ANY METALLIC TRANSITION NOT INSTALLED
(1) OPTION 1:
(a) OPTION 1 (ACTION 1): Do PART 2: REPAIR TAIL TANK TRANSFER PUMP WIRE
ASSEMBLIES for each affected wire harness breakout.
(b) OPTION 1 (ACTION 2): Do PART 3: REPLACE TAIL TANK TRANSFER PUMP
WIRE ASSEMBLIES for each affected wire assembly.
(2) OPTION 2:
(a) Do PART 3: REPLACEMENT TAIL TANK TRANSFER PUMP WIRE ASSEMBLIES
for each affected wire assembly.
3. Close access door 311AB. Refer to MD-11 AMM 06-33-00 as an accepted procedure.
4. Put the airplane back to a serviceable condition.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 06, 2016
MD11-28A150
26 of 96
BOEING SERVICE BULLETIN MD11-28A150
ALERTALERT

### Page 27

PART 1: DETAILED INSPECTION OF THE TAIL TANK TRANSFER PUMP WIRE ASSEMBLIES
FOR INSTALLED METALLIC TRANSITIONS.
1. RC- Do a Detailed Inspection of tail tank transfer pump wire assemblies AJS9013 and AJS9014
in accordance with FIGURE 1.
PART 2: REPAIR TAIL TANK TRANSFER PUMP WIRE ASSEMBLIES
1. RC - Repair the "single Y" wire harness breakouts in accordance with FIGURE 2.
2. RC - Repair the "showerhead" wire harness breakout in accordance with FIGURE 3.
3. RC - Repair the "double Y" wire harness breakout in accordance with FIGURE 4.
4. RC - Do the tests, procedures and checks in accordance with PART 4.
PART 3: REPLACEMENT OF TAIL TANK TRANSFER PUMP WIRE ASSEMBLIES
1. RC - Replace the tail tank transfer pump wire assemblies that were repaired in PART 2 or found
without metallic transitions in PART 1 with new tail tank transfer pump wire assemblies that have
metallic transitions as follows:
a. RC Exempt - Remove the tail tank transfer pump wire assemblies in accordance with FIGURE
5.
(1) If one of the wire assemblies was found with all metallic transitions in PART 1, do not
remove it. Remove only the affected wire assembly.
b. Install the new tail tank transfer pump wire assemblies in accordance with the applicable figure
below:
(1) Group 1:
Use FIGURE 6
(2) Group 2:
Use FIGURE 7
2. RC - Do the tests, procedures and checks in accordance with PART 4.
PART 4: TESTS, PROCEDURES AND CHECKS OF TAIL TANK TRANSFER PUMPS AND
ALTERNATE FEED PUMP
1. Do the tests, procedures and checks listed below.
a. RC Exempt - SYSTEM, ELEVATOR - ADJUSTMENT/TEST, refer to MD-11 AMM 27-33-00
as an accepted procedure.
b. RC Exempt - AUTOMATIC PITCH TRIM - DESCRIPTION AND OPERATION, refer to MD-11
AMM 22-22-00 as an accepted procedure.
c. RC Exempt - SYSTEM, ENGINE AND AUXILIARY POWER UNIT FIRE EXTINGUISHER
LINE ROUTING AND LEAK CHECK - TEST, refer to MD-11 AMM 26-21-00 as an accepted
procedure.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 06, 2016
MD11-28A150
27 of 96
BOEING SERVICE BULLETIN MD11-28A150
ALERTALERT

### Page 28

d. RC Exempt - ACTUATOR, ELEVATOR LOAD FEEL - ADJUSTMENT/TEST, refer to MD-11
AMM 22-00-03 as an accepted procedure.
e. RC Exempt - LINEAR - VARIABLE - DIFFERENTIAL - TRANSDUCER, HORIZONTAL
STABILIZER POSITION - ALTERNATE ADJUSTMENT/TEST, refer to MD-11 AMM 27-45-01
as an accepted procedure.
f. CONTROLLER, FUEL SYSTEM - ADJUSTMENT/TEST, refer to MD-11 AMM 28-08-01 as
an accepted procedure.
g. OPERATIONAL TEST OF THE FILL SHUTOFF VALVE CONTROLLER, refer to MD-11 AMM
28-21-02 as an accepted procedure.
h. SWITCH, PUMP LOW PRESSURE - ADJUSTMENT/TEST, refer to MD-11 AMM 28-44-01
as an accepted procedure.
i. RC Exempt - ANTI - ICE SYSTEM, ENGINE NOSE COWL - ADJUSTMENT/TEST, refer to
MD-11 AMM 30-22-00 as an accepted procedure.
j. RC Exempt - VALVE, PNEUMATIC PRESSURE REGULATOR - ADJUSTMENT/TEST, refer
to MD-11 AMM 36-12-01 as an accepted procedure.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 06, 2016
MD11-28A150
28 of 96
BOEING SERVICE BULLETIN MD11-28A150
ALERTALERT

### Page 29 (OCR)

BOEING SERVICE BULLETIN MD11-28A150
ALERT  ALERT
D
2500214
FIGURE 1: TAIL TANK TRANSFER PUMP WIRE ASSEMBLIES - DETAILED INSPECTION
(SHEET 1 OF 3)
Original Issue: October 06, 2016
PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  MD11-28A15(
Work - See page 1 for details.  29 of 96

### Page 30 (OCR)

BOEING SERVICE BULLETIN MD11-28A150
ALERT  ALERT
ID
SHOWERHEAD
SINGLE Y
DOUBLE Y
TYPICAL
2500215
FIGURE 1: TAIL TANK TRANSFER PUMP WIRE ASSEMBLIES - DETAILED INSPECTION
(SHEET 2 OF 3)
Original Issue: October 06, 2016
PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  MD11-28A150
Work - See page 1 for details.  30 of 96

### Page 31

The step numbers shown below agree with the numbers shown in the circle symbols in the figure.
More DataQtyIdentificationNameTaskStep
Refer to APPENDIX
A as aid for inspec-
tion of harness
breakout locations.
(a)
1AJS9013WIRE ASSEMBLYInspect1
Refer to APPENDIX
A as aid for inspec-
tion of harness
breakout locations.
(a)
1AJS9014WIRE ASSEMBLYInspect2
(a) Do a Detailed Inspection to find if metallic transitions are installed.
FIGURE 1: TAIL TANK TRANSFER PUMP WIRE ASSEMBLIES - DETAILED INSPECTION
(SHEET 3 OF 3)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 06, 2016
MD11-28A150
31 of 96
BOEING SERVICE BULLETIN MD11-28A150
ALERTALERT

### Page 32 (OCR)

BOEING SERVICE BULLETIN MD11-28A150
ALERT  ALERT
® C BEFORE
D AFTER
BEFORE C
AFTER D
BEFORE
AFTER
1C BEFORE
D AFTER
2504387
FIGURE 2: TAIL TANK TRANSFER PUMP WIRE ASSEMBLY - REPAIR "SINGLE Y" WIRE HARNESS
BREAKOUT
(SHEET 1 OF 7)
Original Issue: October 06, 2016
PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  MD11-28A150
Work - See page 1 for details.  32 of 96

### Page 33 (OCR)

BOEING SERVICE BULLETIN MD11-28A150
ALERT  ALERT
O1 C BEFORE
D  I AFTER
e C  BEFORE
AFTER
(3
FIGURE 2: TAIL TANK TRANSFER PUMP WIRE ASSEMBLY - REPAIR "SINGLE Y" WIRE HARNESS
BREAKOUT
(SHEET 2 OF 7)
Original Issue: October 06, 2016
Export Controlled ECCN: 9E991 - BOEING  MD11-28A150
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.  33 of 96

### Page 34 (OCR)

BOEING SERVICE BULLETIN MD11-28A150
ALERT  ALERT
FIRST LAYER
SECOND LAYER
4.00
4.00  4.00
1.00
0.50
2504389
FIGURE 2: TAIL TANK TRANSFER PUMP WIRE ASSEMBLY - REPAIR SINGLE Y" WIRE HARNESS
BREAKOUT
(SHEET 3 OF 7)
Original Issue: October 06, 2016
PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  MD11-28A150
Work - See page 1 for details.  34 of 96

### Page 35 (OCR)

BOEING SERVICE BULLETIN MD11-28A150
ALERT  ALERT
- 1.25  1.00
(12
START WRAP HERE AND
FOLLOW ARROWS
12 END WRAP HERE
2504390
FIGURE 2: TAIL TANK TRANSFER PUMP WIRE ASSEMBLY - REPAIR "SINGLE Y" WIRE HARNESS
BREAKOUT
(SHEET 4 OF 7)
Original Issue: October 06, 2016
Export Controlled ECCN: 9E991 - BOEING  MD11-28A150
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.  35 of 96

### Page 36

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for a "single Y" wire harness breakout.
More DataQtyIdentificationNameTaskStep
-AJS9013WIRE ASSEMBLYLocate1
-AJS9014WIRE ASSEMBLYLocate2
(a)--TapeRemove3
(a)--Lightning Protective
Wire Braid Shielding
Remove
(b)--Tubular BraidPush4
(c)--InsulationInspect5
Tubing can be slid
over one to one end
of the wire before
crimping the splice.
(c)
--ConductorInspect
FIGURE 2: TAIL TANK TRANSFER PUMP WIRE ASSEMBLY - REPAIR "SINGLE Y" WIRE HARNESS
BREAKOUT
(SHEET 5 OF 7)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 06, 2016
MD11-28A150
36 of 96
BOEING SERVICE BULLETIN MD11-28A150
ALERTALERT

### Page 37

More DataQtyIdentificationNameTaskStep
(d)-DPM 2306-1  (DPM
2306-4 or 528R option-
al)
Teflon TapeApply6
(e)-DMS 2186 , TYPE 2600T SELF - ADHE-
SIVE INSULATION
TAPE
Apply
(e)-DMS 2089FIBERGLASS TIE
TAPE
Apply
Refer to APPENDIX
B for wire harness
plastic ferrule part
numbers and loca-
tions. (f)
--Plastic StrapRemove7
Refer to APPENDIX
B for wire harness
plastic ferrule part
numbers and loca-
tions. (f)
--Plastic FerrulePut / Hold8
Refer to APPENDIX
B for wire harness
plastic ferrule part
numbers and loca-
tions. (f)
--Plastic FerruleInsert9
(g)-100-001-A250  (100-
001A375 optional)
Tubular Braid WireCut10
(h)39D0180-1  (9D0180-2
optional)
METAL BANDInstall (New)11
(i)-DPM 6149BRAID WIRE SHIELD-
ING TAPE
Apply12
(j)-DMS 2186 , TYPE 2600T SELF - ADHE-
SIVE INSULATION
TAPE
Apply13
-DMS 2089FIBERGLASS TIE
TAPE
Apply
(a) Remove the tape and the lightning protective wire braid shielding at breakout to expose the wires.
(b) Push the tubular braid back 4.00 to 4.50 inches to expose the wire. Temporarily secure ends of the braid
with the plastic strap material. Unwrap teflon tape from the breakout to expose 3.00 to 3.25 inches of the
wire on all three legs.
(c) Do a Detailed Inspection of the wiring for insulation and conductor damage. If any insulation damage is
found, repair. Refer to SWPM 20-10-01 as an accepted procedure. If any conductor damage is found,
cut damaged area, splice and insulate. Refer to SWPM 20-10-03 as an accepted procedure.
FIGURE 2: TAIL TANK TRANSFER PUMP WIRE ASSEMBLY - REPAIR "SINGLE Y" WIRE HARNESS
BREAKOUT
(SHEET 6 OF 7)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 06, 2016
MD11-28A150
37 of 96
BOEING SERVICE BULLETIN MD11-28A150
ALERTALERT

### Page 38

More DataQtyIdentificationNameTaskStep
(d) Measure and mark 4.00 inches from the breakout. Wrap the wires, 10 to 40 percent overlap slightly
stretching the tape when applying. Any tape length and width can be used to make sure it is easy to wrap.
(e) Wrap the wires slightly stretching the tape while wrapping with a 50 percent overlap covering the white
line on tape. Maintain tape surfaces clean while wrapping. Wrap across the breakout at all leg ends until
there are no exposed wires. Secure the last turn of wrapping with fiberglass tie tape using knot 5 clove
hitch with extra loop. Refer to SWPM 20-10-01 and SWPM 20-10-02 as accepted procedures.
(f) Remove the plastic strap from the tubular braid and push back over exposed wires 0.50 to 1.00 inch from
the breakout. Position two halves of the plastic ferrule over the wires and hold together with fiberglass
tying tape. Slide the plastic ferrule underneath and flush with the tubular braid end. Sharp protruding
strands ends should not extend onto the wire harness.
(g) Cut three 4.00 to 4.25 inch lengths of 1/4 or 3/8 inch diameter tubular braid wire and fold over the ends
0.25 to 0.50 inch to prevent sharp protruding strands. Position ends of the three jumpers over plastic ferrules
and wire bundle tubular braid.
(h) Install the straight metal band over the jumper and the tubular braid in the middle of the plastic ferrule.
Install using tool code STA. Refer to SWPM 20-10-17 as an accepted procedure.
(i) Apply 1.00 to 1.25 inch behind the metal band. Use one continuous wrap from the main leg and up and
down each smaller leg 1.00 to 1.25 inch behind the metal band. Then wrap back over the main leg, ending
at the starting point. When the wrap is completed, all three legs should be fully wrapped with two layers
of the shielding tape.
(j) Apply the silicone tape 6.00 to 6.25 inches from the harness breakout with a 50 percent overlap on each
leg. Wrap across the harness breakout until there is no exposed wire mesh tape. Secure the last turn of
each wrapping with glass fiber tying tape using knot 5 clove hitch with extra loop. Refer to SWPM 20-10-
01 and SWPM 20-10-02 as accepted procedures.
FIGURE 2: TAIL TANK TRANSFER PUMP WIRE ASSEMBLY - REPAIR "SINGLE Y" WIRE HARNESS
BREAKOUT
(SHEET 7 OF 7)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 06, 2016
MD11-28A150
38 of 96
BOEING SERVICE BULLETIN MD11-28A150
ALERTALERT

### Page 39 (OCR)

BOEING SERVICE BULLETIN MD11-28A150
ALERT  ALERT
• BEFORE
C AFTER
2504392
FIGURES; TAIL TANK TRANSFER PUMP WREAKOUT - REPAIR "SHOWERHEAD" WIRE HARNESS
(SHEET 1 OF 6)
Original Issue: October 06, 2016
Export Controlled ECCN: 9E991 - BOEING  MD11-28A150
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.  39 of 96

### Page 40 (OCR)

BOEING SERVICE BULLETIN MD11-28A150
ALERT  ALERT
FIRST LAYER
SECOND LAYER
4.00
.00
1.00  0.50  2504393
FIGURE 3: TAIL TANK TRANSFER PUMP WIRE ASSEMBLY - REPAIR "SHOWERHEAD" WIRE HARNESS
BREAKOUT
(SHEET 2 OF 6)
Original Issue: October 06, 2016
Export Controlled ECCN: 9E991 - BOEING  PROPRIETARY - Copyright © Unpublished  MD11-28A150
Work - See page 1 for details.  40 of 96

### Page 41 (OCR)

BOEING SERVICE BULLETIN MD11-28A150
ALERT  ALERT
1.30
START WRAP HERE AND
FOLLOW ARROWS
11) END WRAP HERE
2504394
FIGURE 3: TAIL TANK TRANSFER PUMP WIRE ASSEMBLY - REPAIR "SHOWERHEAD" WIRE HARNESS
BREAKOUT
(SHEET 3 OF 6)
Original Issue: October 06, 2016
Export Controlled ECCN: 9E991 - BOEING  MD11-28A150
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.  41 of 96

### Page 42

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for a single "showerhead" wire harness breakout.
More DataQtyIdentificationNameTaskStep
-AJS9013WIRE ASSEMBLYLocate1
(a)--TapeRemove2
(a)--Lightning Protective
Wire Braid Shielding
Remove
(b)--Tubular BraidPush3
(c)--InsulationInspect4
Tubing can be slid
over one to one end
of the wire before
crimping the splice.
(c)
--ConductorInspect
FIGURE 3: TAIL TANK TRANSFER PUMP WIRE ASSEMBLY - REPAIR "SHOWERHEAD" WIRE HARNESS
BREAKOUT
(SHEET 4 OF 6)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 06, 2016
MD11-28A150
42 of 96
BOEING SERVICE BULLETIN MD11-28A150
ALERTALERT

### Page 43

More DataQtyIdentificationNameTaskStep
(d)-DPM 2306-1  (DPM
2306-4 or 528R option-
al)
Teflon TapeApply5
(e)-DMS 2186 , TYPE 2600T SELF - ADHE-
SIVE INSULATION
TAPE
Apply
(e)-DMS 2089FIBERGLASS TIE
TAPE
Apply
Refer to APPENDIX
B for wire harness
plastic ferrule part
numbers and loca-
tions. (f)
--Plastic StrapRemove6
Refer to APPENDIX
B for wire harness
plastic ferrule part
numbers and loca-
tions. (f)
--Plastic FerrulePut / Hold7
Refer to APPENDIX
B for wire harness
plastic ferrule part
numbers and loca-
tions. (f)
--Plastic FerruleInsert8
(g)-100-001-A250  (100-
001A375 optional)
Tubular Braid WireCut9
(h)49D0180-1  (9D0180-2
optional)
METAL BANDInstall (New)10
(i)-DPM 6149BRAID WIRE SHIELD-
ING TAPE
Apply11
(j)-DMS 2186 , TYPE 2600T SELF - ADHE-
SIVE INSULATION
TAPE
Apply12
-DMS 2089FIBERGLASS TIE
TAPE
Apply
(a) Remove the tape and the lightning protective wire braid shielding at breakout to expose the wires.
(b) Push the tubular braid back 4.00 to 4.50 inches to expose the wire. Temporarily secure ends of the braid
with plastic strap material. Unwrap teflon tape from junction to expose 3.00 to 3.25 inches of the wire on
all four legs.
(c) Do a Detailed Inspection of the wiring for insulation and conductor damage. If any insulation damage is
found, repair. Refer to SWPM 20-10-01 as an accepted procedure. If any conductor damage is found,
cut damaged area, splice and insulate. Refer to SWPM 20-10-03 as an accepted procedure.
FIGURE 3: TAIL TANK TRANSFER PUMP WIRE ASSEMBLY - REPAIR "SHOWERHEAD" WIRE HARNESS
BREAKOUT
(SHEET 5 OF 6)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 06, 2016
MD11-28A150
43 of 96
BOEING SERVICE BULLETIN MD11-28A150
ALERTALERT

### Page 44

More DataQtyIdentificationNameTaskStep
(d) Measure and mark 4.00 inches from the breakout. Wrap the wires, 10 to 40 percent overlap slightly
stretching the tape when applying. Any tape length and width can be used to make sure it is easy to wrap.
(e) Wrap the wires slightly stretching the tape while wrapping with a 50 percent overlap covering the white
line on tape. Maintain tape surfaces clean while wrapping. Wrap across the breakout at all leg ends until
there are no exposed wires. Secure the last turn of wrapping with fiberglass tie tape using knot 5 clove
hitch with extra loop. Refer to SWPM 20-10-01 and SWPM 20-10-02 as accepted procedures.
(f) Remove the plastic strap from the tubular braid and push back over exposed wires 0.50 to 1.00 inch from
the breakout. Position two halves of the plastic ferrule over the wires and hold together with fiberglass
tying tape. Slide the plastic ferrule underneath and flush with the tubular braid end. Sharp protruding
strands ends should not extend onto the wire harness.
(g) Cut four 4.00 to 4.25 inch lengths of 1/4 or 3/8 inch diameter tubular braid wire and fold over the ends
0.25 to 0.50 inch to prevent sharp protruding strands. Position ends of the four jumpers over plastic ferrules
and wire bundle tubular braid.
(h) Install the straight metal band over the jumper and the tubular braid in the middle of the plastic ferrule.
Install using tool code STA. Refer to SWPM 20-10-17 as an accepted procedure.
(i) Apply 1.00 to 1.25 inch behind the metal band. Use one continuous wrap from the main leg and up and
down each smaller leg 1.00 to 1.25 inch behind the metal band. Then wrap back over the main leg, ending
at the starting point. When wrap is completed, all four legs should be fully wrapped with two layers of
shielding tape.
(j) Apply the silicone tape 6.00 to 6.25 inches from the harness breakout with a 50 percent overlap on each
leg. Wrap across the harness breakout until there is no exposed wire mesh tape. Secure the last turn of
each wrapping with glass fiber tying tape using knot 5 clove hitch with extra loop. Refer to SWPM 20-10-
01 and SWPM 20-10-02 as accepted procedures.
FIGURE 3: TAIL TANK TRANSFER PUMP WIRE ASSEMBLY - REPAIR "SHOWERHEAD" WIRE HARNESS
BREAKOUT
(SHEET 6 OF 6)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 06, 2016
MD11-28A150
44 of 96
BOEING SERVICE BULLETIN MD11-28A150
ALERTALERT

### Page 45 (OCR)

BOEING SERVICE BULLETIN MD11-28A150
ALERT  ALERT
BEFORE B
AFTER C
FIGURE 4: TAIL TANK TRANSFER PUMP WIRE ASSEMBLY - REPAIR "DOUBLE Y" WIRE HARNESS
BREAKOUT
(SHEET 1 OF 6)
Original Issue: October 06, 2016
Export Controlled ECCN: 9E991 - BOEING  MD11-28A150
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.  45 of 96

### Page 46 (OCR)

BOEING SERVICE BULLETIN MD11-28A150
ALERT  ALERT
FIRST LAYER
SECOND LAYER
4.00
.00
1.00  0.50  2524355
FIGURE 4: TAIL TANK TRANSFER PUMP WIRE ASSEMBLY - REPAIR "DOUBLE Y" WIRE HARNESS
BREAKOUT
(SHEET 2 OF 6)
Original Issue: October 06, 2016
Export Controlled ECCN: 9E991 - BOEING  PROPRIETARY - Copyright © Unpublished  MD11-28A150
Work - See page 1 for details.  46 of 96

### Page 47 (OCR)

BOEING SERVICE BULLETIN MD11-28A150
ALERT  ALERT
1.30
START WRAP HERE AND
FOLLOW ARROWS
11) END WRAP HERE
FIGURE 4: TAIL TANK TRANSFER PUMP WIRE ASSEMBLY - REPAIR "DOUBLE Y" WIRE HARNESS
BREAKOUT
(SHEET 3 OF 6)
Original Issue: October 06, 2016
Export Controlled ECCN: 9E991 - BOEING  MD11-28A150
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.  47 of 96

### Page 48

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for a "double Y" wire harness breakout.
More DataQtyIdentificationNameTaskStep
-AJS9014WIRE ASSEMBLYLocate1
(a)--TapeRemove2
(a)--Lightning Protective
Wire Braid Shielding
Remove
(b)--Tubular BraidPush3
(c)--InsulationInspect4
Tubing can be slid
over one to one end
of the wire before
crimping the splice.
(c)
--ConductorInspect
FIGURE 4: TAIL TANK TRANSFER PUMP WIRE ASSEMBLY - REPAIR "DOUBLE Y" WIRE HARNESS
BREAKOUT
(SHEET 4 OF 6)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 06, 2016
MD11-28A150
48 of 96
BOEING SERVICE BULLETIN MD11-28A150
ALERTALERT

### Page 49

More DataQtyIdentificationNameTaskStep
(d)-DPM 2306-1  (DPM
2306-4 or 528R option-
al)
Teflon TapeApply5
(e)-DMS 2186 , TYPE 2600T SELF - ADHE-
SIVE INSULATION
TAPE
Apply
(e)-DMS 2089FIBERGLASS TIE
TAPE
Apply
Refer to APPENDIX
B for wire harness
plastic ferrule part
numbers and loca-
tions. (f)
--Plastic StrapRemove6
Refer to APPENDIX
B for wire harness
plastic ferrule part
numbers and loca-
tions. (f)
--Plastic FerrulePut / Hold7
Refer to APPENDIX
B for wire harness
plastic ferrule part
numbers and loca-
tions. (f)
--Plastic FerruleInsert8
(g)-100-001-A250  (100-
001A375 optional)
Tubular Braid WireCut9
(h)49D0180-1  (9D0180-2
optional)
METAL BANDInstall (New)10
(i)-DPM 6149BRAID WIRE SHIELD-
ING TAPE
Apply11
(j)-DMS 2186 , TYPE 2600T SELF - ADHE-
SIVE INSULATION
TAPE
Apply12
-DMS 2089FIBERGLASS TIE
TAPE
Apply
(a) Remove the tape and the lightning protective wire braid shielding at breakout to expose the wires.
(b) Push the tubular braid back 4.00 to 4.50 inches to expose the wire. Temporarily secure ends of the braid
with plastic strap material. Unwrap teflon tape from junction to expose 3.00 to 3.25 inches of the wire on
all four legs.
(c) Do a Detailed Inspection of the wiring for insulation and conductor damage. If any insulation damage is
found, repair. Refer to SWPM 20-10-01 as an accepted procedure. If any conductor damage is found,
cut damaged area, splice and insulate. Refer to SWPM 20-10-03 as an accepted procedure.
FIGURE 4: TAIL TANK TRANSFER PUMP WIRE ASSEMBLY - REPAIR "DOUBLE Y" WIRE HARNESS
BREAKOUT
(SHEET 5 OF 6)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 06, 2016
MD11-28A150
49 of 96
BOEING SERVICE BULLETIN MD11-28A150
ALERTALERT

### Page 50

More DataQtyIdentificationNameTaskStep
(d) Measure and mark 4.00 inches from the breakout. Wrap the wires, 10 to 40 percent overlap slightly
stretching the tape when applying. Any tape length and width can be used to make sure it is easy to wrap.
(e) Wrap the wires slightly stretching the tape while wrapping with a 50 percent overlap covering the white
line on tape. Maintain tape surfaces clean while wrapping. Wrap across the breakout at all leg ends until
there are no exposed wires. Secure the last turn of wrapping with fiberglass tie tape using knot 5 clove
hitch with extra loop. Refer to SWPM 20-10-01 and SWPM 20-10-02 as accepted procedures.
(f) Remove the plastic strap from the tubular braid and push back over exposed wires 0.50 to 1.00 inch from
the breakout. Position two halves of the plastic ferrule over the wires and hold together with fiberglass
tying tape. Slide the plastic ferrule underneath and flush with the tubular braid end. Sharp protruding
strands ends should not extend onto the wire harness.
(g) Cut four 4.00 to 4.25 inch lengths of 1/4 or 3/8 inch diameter tubular braid wire and fold over the ends
0.25 to 0.50 inch to prevent sharp protruding strands. Position ends of the four jumpers over plastic ferrules
and wire bundle tubular braid.
(h) Install the straight metal band over the jumper and the tubular braid in the middle of the plastic ferrule.
Install using tool code STA. Refer to SWPM 20-10-17 as an accepted procedure.
(i) Apply 1.00 to 1.25 inch behind the metal band. Use one continuous wrap from the main leg and up and
down each smaller leg 1.00 to 1.25 inch behind the metal band. Then wrap back over the main leg, ending
at the starting point. When wrap is completed, all four legs should be fully wrapped with two layers of
shielding tape.
(j) Apply the silicone tape 6.00 to 6.25 inches from the harness breakout with a 50 percent overlap on each
leg. Wrap across the harness breakout until there is no exposed wire mesh tape. Secure the last turn of
each wrapping with glass fiber tying tape using knot 5 clove hitch with extra loop. Refer to SWPM 20-10-
01 and SWPM 20-10-02 as accepted procedures.
FIGURE 4: TAIL TANK TRANSFER PUMP WIRE ASSEMBLY - REPAIR "DOUBLE Y" WIRE HARNESS
BREAKOUT
(SHEET 6 OF 6)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 06, 2016
MD11-28A150
50 of 96
BOEING SERVICE BULLETIN MD11-28A150
ALERTALERT

### Page 51 (OCR)

BOEING SERVICE BULLETIN MD11-28A150
ALERT  ALERT
AND F
G
2504396
FIGURE 5: TAIL TANK TRANSFER PUMP WIRE ASSEMBLIES - REMOVAL
(SHEET 1 OF 7)
Original Issue: October 06, 2016
PROPRIETARY - Copyright ® Unpublished  Export Controlled ECCN: 9E991 - BOEING  MD11-28A150
Work - See page 1 for details.  51 of 96

### Page 52 (OCR)

BOEING SERVICE BULLETIN MD11-28A150
ALERT  ALERT
4 8 LOCATIONS
2504397
FIGURE 5: TAIL TANK TRANSFER PUMP WIRE ASSEMBLIES - REMOVAL
(SHEET 2 OF 7)
Original Issue: October 06, 2016
Export Controlled ECCN: 9E991 - BOEING  MD11-28A150
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.  52 of 96

### Page 53 (OCR)

BOEING SERVICE BULLETIN MD11-28A150
ALERT  ALERT
•XCH= -20
FRONT SPAR PLANE TRACE
A-A  FWD  2504398
FIGURE 5: TAIL TANK TRANSFER PUMP WIRE ASSEMBLIES - REMOVAL
(SHEET 3 OF 7)
Original Issue: October 06, 2016
PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  MD11-28A150
Work - See page 1 for details.  53 of 96

### Page 54 (OCR)

BOEING SERVICE BULLETIN MD11-28A150
ALERT
992-ES
000900
B-B  2504400
FIGURE 5: TAIL TANK TRANSFER PUMP WIRE ASSEMBLIES - REMOVAL
(SHEET 4 OF 7)
Original Issue: October 06, 2016
Export Controlled ECCN: 9E991 - BOEING  PROPRIETARY - Copyright © Unpublished  MD11-28A150
Work - See page 1 for details.  54 of 96

### Page 55 (OCR)

BOEING SERVICE BULLETIN MD11-28A150
ALERT  ALERT
STA 2007
2504401
FIGURE 5: TAIL TANK TRANSFER PUMP WIRE ASSEMBLIES - REMOVAL
(SHEET 5 OF 7)
Original Issue: October 06, 2016
PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  Work - See page 1 for details.  MD11-28A150  55 of 96

### Page 56 (OCR)

BOEING SERVICE BULLETIN MD11-28A150
ALERT  ALERT
GNDS:
7005D
7007D
7013D
7014D
7040A
7041A
7042A
7043A
7119D
7120D
7121D
7122D
S3-721
60L-ES
S3-740
EMPENNAGE UPPER
HORIZONTAL PANEL
STA 2122.81
G
2504402
FIGURE 5: TAIL TANK TRANSFER PUMP WIRE ASSEMBLIES - REMOVAL
(SHEET 6 OF 7)
Original Issue: October 06, 2016
Export Controlled ECCN: 9E991 - BOEING  PROPRIETARY - Copyright © Unpublished  MD11-28A150
Work - See page 1 for details.  56 of 96

### Page 57

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for the removal of the two wire assemblies.
More DataQtyIdentificationNameTaskStep
1SR11280052-13BRACKETRemove / Keep1
Make sure that the
wire assembly was
repaired or has
missing transitions.
If not, do not remove
it.
1AJS9013WIRE ASSEMBLYIdentify2
Remove all associat-
ed clamps and hard-
ware. (a)
1AJS9013WIRE ASSEMBLYRemove
Make sure that the
wire assembly was
repaired or has
missing transitions.
If not, do not remove
it.
1AJS9014WIRE ASSEMBLYIdentify3
Remove all associat-
ed clamps and hard-
ware. (a)
1AJS9014WIRE ASSEMBLYRemove
8SR11280052-17EXTRUDED CHANNELRemove / Keep4
39D0230-3L080824BRACKETRemove / Keep
39D0230-3L080832BRACKETRemove / Keep
(a)1J013-92-12AWIRE IDCut5
(a)1J013-93-12BWIRE IDCut
(a)1J013-94-12CWIRE IDCut
(a) Remove the wire assemblies and terminate the wires. Refer to APPENDIX H for termination locations.
FIGURE 5: TAIL TANK TRANSFER PUMP WIRE ASSEMBLIES - REMOVAL
(SHEET 7 OF 7)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 06, 2016
MD11-28A150
57 of 96
BOEING SERVICE BULLETIN MD11-28A150
ALERTALERT

### Page 58 (OCR)

BOEING SERVICE BULLETIN MD11-28A150
ALERT  ALERT
This Figure applies only to: Group 1.
G AND H
AND
CATIONS
2504403
FIGURE 6: TAIL TANK TRANSFER PUMP WIRE ASSEMBLIES - INSTALLATION
(SHEET 1 OF 9)
Original Issue: October 06, 2016
Export Controlled ECCN: 9E991 - BOEING  MD11-28A150
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.  58 of 96

### Page 59 (OCR)

BOEING SERVICE BULLETIN MD11-28A150
ALERT  ALERT
S3-765
2504405
FIGURE 6: TAIL TANK TRANSFER PUMP WIRE ASSEMBLIES - INSTALLATION
(SHEET 2 OF 9)
Original Issue: October 06, 2016
PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  MD11-28A150
Work - See page 1 for details.  59 of 96

### Page 60 (OCR)

BOEING SERVICE BULLETIN MD11-28A150
ALERT  ALERT
g) 2 LOCATIONS
GND
12113)  P1-9111
P1-9108  GND
GND
S3-758
S3-764
S3-755
P1-9109
S3-759  P1-3201
S3-756
P1-3200
P1-3202
S3-765
GND
2504406
FIGURE 6: TAIL TANK TRANSFER PUMP WIRE ASSEMBLIES - INSTALLATION
(SHEET 3 OF 9)
Original Issue: October 06, 2016
Export Controlled ECCN: 9E991 - BOEING  MD11-28A150
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.  60 of 96

The text continues at https://openairdocs.org/service-documents/boeing/md11-28a150/file/3c7f831e1363.md?from=61

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
