# Boeing Service Bulletin MD90-28-013: Revision 1

- Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2015-0249; AD 2016-03-06 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Boeing Service Bulletin MD90-28-013](https://openairdocs.org/service-documents/boeing/md90-28-013.md)
- Title as filed: BOEING SB-MD90-28-013-01--
- Pages: 140
- PDF: https://openairdocs.org/files/sha256/ba/b8/bab8798abb3910df1db64f743bf4392b8804f0c599575dbb4b2f174c15ddabec
- Page: https://openairdocs.org/service-documents/boeing/md90-28-013/file/bab8798abb39

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Commercial 
Airplanes
MD90
Service Bulletin
Number: MD90-28-013
Original Issue: September 27, 2013
Revision 1: August 27, 2015
ATA System: 2800
SUBJECT: FUEL - Fuel Systems - Install Ground Fault Interrupter Relays and Change Fuel Pump
System Wiring
Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15
CFR 300-774). An export license may be required before it is used for development, production or use by foreign
persons from specific countries. The controller of this data has the individual responsibility to abide by all export
laws.
9E991ECCN:
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET
Copyright © 2013 Boeing.
Unpublished Work. All Rights Reserved.
Treatment of this document and its content is governed by contract with Boeing. Rights to use this document
are licensed on a per aircraft basis and such rights may not be transferable. For more information, contact The
Boeing Company.
Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner,
BBJ, DC-8, DC-9, DC-10, KC-10, KC-46, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8, Poseidon and
Boeing liveries are all trademarks owned by The Boeing Company; and no trademark license is granted in
connection with this document unless provided in writing by Boeing.
Original Issue: September 27, 2013
MD90-28-013Revision 1: August 27, 2015
1 of 140
2.0

### Page 2

Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 27, 2013
MD90-28-013Revision 1: August 27, 2015
2 of 140
BOEING SERVICE BULLETIN MD90-28-013
BLANK PAGE

### Page 3

Table of Contents
Revision Transmittal Sheet ............................................ 5
S u m m a r y  ...................................................... 7
1. PLANNING INFORMATION ........................................ 1 1
A . E f f e c t i v i t y  ............................................... 1 1
1. Airplanes ............................................ 1 1
2 . S p a r e s  A f f e c t e d  ........................................ 1 3
B. Concurrent Requirements ...................................... 1 4
C. Reason ................................................ 1 4
D. Description .............................................. 1 4
E. Compliance .............................................. 1 5
F . A p p r o v a l  ............................................... 1 5
G. Manpower .............................................. 1 5
H. Weight and Balance Changes .................................... 1 7
I. Electrical Load Data ......................................... 1 7
J . R e f e r e n c e s  .............................................. 2 2
1. Existing Data: ......................................... 2 2
2. Data Supplied with this Service Bulletin: ........................... 2 2
3. Installation Drawings Used in the Preparation of this Service Bulletin: ........... 2 2
4 . P r o c e s s  D a t a :  ......................................... 2 3
K. Publications Affected ........................................ 2 3
L. Interchangeability and Intermixability of Parts ........................... 2 3
M. Software Accomplishment Summary ................................ 2 3
2. MATERIAL INFORMATION ........................................ 2 5
A. Material - Price and Availability ................................... 2 5
B. Industry Support Information .................................... 2 5
C. Parts Necessary for Each Airplane ................................. 2 5
1 . K i t s / P a r t s  ............................................ 2 5
2. Parts and Materials Supplied by the Operator ........................ 3 1
3. Parts Modified and Reidentified ................................ 3 1
4. Parts Removed and Not Replaced .............................. 3 2
D. Parts Necessary to Change Spares ................................. 3 2
E. Special Tooling - Price and Availability ............................... 3 2
F. Special Tooling Necessary to do this Service Bulletin ....................... 3 3
3. ACCOMPLISHMENT INSTRUCTIONS .................................. 3 5
A. GENERAL INFORMATION ..................................... 3 5
B. WORK INSTRUCTIONS ....................................... 3 7
FIGURE 1: REMOVE RELAYS R2-218 AND R2-219 - FORWARD CARGO COMPARTMENT, LEFT SIDE
[Group 3] ............................................ 4 3
FIGURE 2: INSTALL BRACKETS AND TRACK - E/E COMPARTMENT, AFT LEFT RADIO RACK [Group
1 - 2 ]  ............................................... 4 5
FIGURE 3: INSTALL BRACKETS AND TRACK - E/E COMPARTMENT, AFT LEFT RADIO RACK [Group
3 ]  ................................................ 4 9
FIGURE 4: REMOVE RELAYS R2-336, R2-337 AND RECEPTACLES R5-406, R5-407 - ELECTRICAL
POWER CENTER [Group 2] .................................. 5 3
F I G U R E  5 : C E N T E R  T A N K  F U E L  B O O S T  W I R E  C H A N G E S  [ G r o u p  1 ]  ................. 5 5
F I G U R E  6 : C E N T E R  T A N K  F U E L  B O O S T  W I R E  C H A N G E S  [ G r o u p  2 ]  ................. 6 2
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 27, 2013
MD90-28-013Revision 1: August 27, 2015
3 of 140
BOEING SERVICE BULLETIN MD90-28-013

### Page 4

FIGURE 7: CENTER AND AUX FUEL BOOST AND TRANSFER WIRE CHANGES [Group 3] .... 6 8
FIGURE 8: INSTALL GFI RELAYS AND RECEPTACLES - E/E COMPARTMENT, AFT LEFT RADIO RACK
[Group 1] ............................................ 8 1
FIGURE 9: INSTALL GFI RELAYS AND RECEPTACLES - E/E COMPARTMENT, AFT LEFT RADIO RACK
[Group 2] ............................................ 8 4
FIGURE 10: INSTALL GFI RELAYS AND RECEPTACLES - E/E COMPARTMENT, AFT LEFT RADIO RACK
[Group 3] ............................................ 8 7
APPENDIX A: GFI CENTER FUEL TANK PUMPS CONTROL CIRCUIT, AND CENTER FUEL TANK PUMPS
LOW PRESSURE INDICATION SYSTEM TEST PROCEDURES  [Group 1] ........ 9 2
APPENDIX B: GFI CENTER FUEL TANK PUMPS CONTROL CIRCUIT, AND CENTER FUEL TANK PUMPS
LOW PRESSURE INDICATION SYSTEM TEST PROCEDURES [Group 2] ....... 1 0 5
APPENDIX C: GFI CENTER/AUX FUEL TANK PUMPS CONTROL CIRCUIT, AND CENTER/AUX FUEL TANK
PUMPS LOW PRESSURE INDICATION SYSTEM TEST PROCEDURES [Group 3] . . . 119
APPENDIX D: BOEING PART DEMAND INTENT ............................. 1 4 0
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 27, 2013
MD90-28-013Revision 1: August 27, 2015
4 of 140
BOEING SERVICE BULLETIN MD90-28-013

### Page 5

Commercial 
Airplanes
MD90
Service Bulletin
Revision Transmittal SheetNumber: MD90-28-013Original Issue: September 27, 2013
Revision 1: August 27, 2015
ATA System: 2800
SUBJECT: FUEL - Fuel Systems - Install Ground Fault Interrupter Relays and Change Fuel Pump
System Wiring
This revision includes all pages of the service bulletin.
COMPLIANCE INFORMATION RELATED TO THIS REVISION
Federal Aviation Administration (FAA) Airworthiness Directive AD 2012-18-05 is related to this service bulletin.
Effects of this Revision on airplanes on which Original Issue was previously done:
None.
REASON FOR REVISION
This revision is sent to incorporate engineering released after the original issue of this service bulletin to address
the no work conditions due to Ground Fault Interrupter (GFI) panel washers, GFI panel mounting holes too
small, wire assembly routing and process issues encountered during validation of the original issue of this service
bulletin.
The data given in Information Notice MD90-28-013 IN 01 is included in this revision.
As a part of a service bulletin validation program, this installation was completed on airplane fuselage number
2097 by Service Bulletin MD90-28-013 Original Issue before the release of Revision 1 of this service bulletin.
The installation/change completed on airplane fuselage number 2097 by Service Bulletin MD90-28-013 Original
Issue is equivalent to the release of Revision 1 of this service bulletin. Airplane fuselage number 2097 has the
configuration of a Group 1 airplane.
These sections were changed:
1. In Background, added Boeing Fleet Team Digest (FTD) statement.
2. In Background, added Summary Evaluation Table.
3. In Paragraph 1.C., Reason, added statements.
4. In Paragraph 1.D., Description, added Compliance statement.
5. In Paragraph 1.G., Manpower, updated Manpower.
6. In Paragraph 1.H., Weight and Balance Changes, updated Group 1 through Group 3, information.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 27, 2013
MD90-28-013Revision 1: August 27, 2015
5 of 140

### Page 6

7. In Paragraph 1.J.1., Existing Data: added additional references.
8. In Paragraph 1.J.2.a., Drawings: changed drawing revision.
9. In Paragraph 1.J.3., Installation Drawings Used in the preparation of this Service Bulletin: changed
drawing revision.
10. In Paragraph 1.K.1., Publications: updated information.
11. In Paragraph 2.A., Material - Price and Availability, added survey information.
12. In Paragraph 2.C.1., Kits/Parts, Group 1 through Group 3, Service KIt, updated information.
13. In Paragraph 2.C.2., Parts and Materials Supplied by the Operator, added part information.
14. In Paragraph 2.C.3., Parts Modified and Reidentified, Group 1 through Group 3, added parts.
15. In Paragraph 3.A., General Information, Note: added new note.
16. In paragraph 3.B., Work Instructions, Group 1 through Group 3, added instructions.
17. In Figure 5 through Figure 7, added a reference.
18. In Figure 8, changed view A and B and added view C.
19. In Figure 8, changed part number and added footnotes (b), (c), (d) and (e).
20. In Figure 9, changed view A and B and added view C.
21. In Figure 9, changed part number and added footnotes (b), (c), (d) and (e).
22. In Figure 10, changed view A and B and added view C.
23. In Figure 10, changed part number and added footnotes (b), (c), (d) and (e).
24. Added Appendix D.
Vertical lines are put on the left edge of each page, except in Paragraph 1.A., Effectivity and format changes,
to show the location of all content changes.
Pages with no vertical lines have no changes.
REVISION HISTORY
September 27, 2013Original Issue:
August 27, 2015Revision 1:
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 27, 2013
MD90-28-013Revision 1: August 27, 2015
6 of 140
BOEING SERVICE BULLETIN MD90-28-013

### Page 7

Commercial 
Airplanes
MD90
Service Bulletin
SummaryNumber: MD90-28-013Original Issue: September 27, 2013
Revision 1: August 27, 2015
ATA System: 2800
SUBJECT: FUEL - Fuel Systems - Install Ground Fault Interrupter Relays and Change Fuel Pump
System Wiring
CONCURRENT REQUIREMENTS
None.
BACKGROUND
Frictional heating or sparking may develop from fuel pump failure, wear of fuel pump rotating components, or
ingestion of debris by the pump. Electrical faults in a fuel pump may result in electrical arc burn through of a fuel
pump. Frictional heating or sparking and electrical arc burn through in fuel pump inlets or priming system outlets
exposed (i.e. not covered by fuel) to the tank ullage in combination with the ullage being flammable, may result
in a fuel tank ignition event. A fuel tank ignition event could develop with a pump running in an empty tank if the
normal shutoff command is delayed or as a result of control system failures that keep the pump in a latent
uncommanded running condition. Center wing fuel tanks and auxiliary fuel tank may be subject to this condition
since they are normally pumped dry over the course of a flight. If not corrected frictional heating or sparking,
electrical arc burn through, or a fuel tank pump running in an empty fuel tank may result in a fuel tank ignition
event.
This service bulletin is the result of the safety assessments conducted by Boeing under a Special Federal Aviation
Regulation (SFAR) 88, Fuel Tank System Fault Tolerance Evaluation Requirements.
Boeing Fleet Team Digest (FTD) MD90 FTD 28-03001 and MD90 FTD 28-12002 are related to this service
bulletin.
This table is provided to operators for planning purposes only. Refer to the applicable sections for more
information.
ReferenceAffectedPlanning Data
Paragraph 1.A.2., Spares AffectedNoSpares Affected
Paragraph 1.E., Compliance and Paragraph
1.F., Approval
YesAD Related
Paragraph 1.H., Weight and Balance ChangesYesWeight and Balance Change
Paragraph 1.I., Electrical Load DataYesElectrical Load Changed
Paragraph 1.K., Publications AffectedYesPublications Affected
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 27, 2013
MD90-28-013Revision 1: August 27, 2015
7 of 140

### Page 8

ReferenceAffectedPlanning Data
Paragraph 1.K., Publications AffectedYesAirplane Flight Operations Affected (Flight Crew
Operations Manual and/or FAA Approved Air-
plane Flight Manual)
Paragraph 2.C.1., Kits/PartsYesKits/Parts Required
Paragraph 2.C.2., Parts and Materials Supplied
by the Operator
YesOperator Supplied Parts/Material
Paragraph 2.F., Special Tooling Necessary to
do this Service Bulletin
NoSpecial Tooling Required
ACTION
This service bulletin installs Ground Fault Interrupter (GFI) relays and cuts/coils/stows wires to center wing and
auxiliary fuel tank pump motor neutral circuits.
EFFECTIVITY
MD90-30 Airplanes. Refer to Paragraph 1.A.1., Airplanes, for the list of affected airplanes.
COMPLIANCE
Federal Aviation Administration (FAA) Airworthiness Directive AD 2012-18-05 is related to this service bulletin.
Boeing recommends that the change given in this service bulletin be done within 60 months after the effective
date of AD 2012-18-05.
INDUSTRY SUPPORT INFORMATION
Boeing warranty remedies are not available for the configuration changes given in this service bulletin.
MANPOWER
Elapsed HoursTotal Task HoursGroup
31.058.01
24.445.32
73.7142.73
MATERIAL INFORMATION
Boeing Supplied Kits/Parts.
Refer to Paragraph 2.A., Material - Price and Availability.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 27, 2013
MD90-28-013Revision 1: August 27, 2015
8 of 140
BOEING SERVICE BULLETIN MD90-28-013

### Page 9 (OCR)

BOEING SERVICE BULLETIN MD90-28-013
INSTALL GROUND FAULT INTERRUPTER RELAYS
AND CHANGE FUEL PUMP SYSTEM WIRING
1885979
Original Issue: September 27, 2013
Revision 1: August 27, 2015  Export Controlled ECCN: 9E991 - BOEING  PROPRIETARY - Copyright © Unpublished  MD90-28-013
Work - See page 1 for details.  9 of 140

### Page 10

Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 27, 2013
MD90-28-013Revision 1: August 27, 2015
10 of 140
BOEING SERVICE BULLETIN MD90-28-013
BLANK PAGE

### Page 11

Commercial 
Airplanes
MD90
Service Bulletin
Number: MD90-28-013
Original Issue: September 27, 2013
Revision 1: August 27, 2015
ATA System: 2800
SUBJECT: FUEL - Fuel Systems - Install Ground Fault Interrupter Relays and Change Fuel Pump
System Wiring
1.    PLANNING INFORMATION
A. Effectivity
1. Airplanes
This service bulletin is for the airplanes shown below.
DESCRIPTIONCONFIGURATIONGROUP
Airplanes that install GFI relays for center fuel tank boost pumps
which are affected by SR90280011-7001 drawing configuration.
-1
Airplanes that install GFI relays for center fuel tank boost pumps
which are affected by SR90280011-7003 drawing configuration.
-2
Airplanes that install GFI relays for center fuel tank and forward
auxiliary fuel tank boost pumps which are affected by
SR90280011-7005 drawing configuration.
-3
Airplane Models:
MD-90-30
GroupFuselage Num-
ber
12094 - 2099
12100
12115
12117
12120
12122 - 2123
12125 - 2126
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 27, 2013
MD90-28-013Revision 1: August 27, 2015
11 of 140

### Page 12

GroupFuselage Num-
ber
12129
12131
12133
12136
12138
12140 - 2144
12146 - 2147
12149 - 2150
12153 - 2154
12156 - 2159
12161 - 2166
12169 - 2171
12173
12175
12177
12179
12181 - 2182
12184
12186
12190
22191
12193 - 2195
12197 - 2198
12200
12202 - 2203
22205
12207
22209
12210 - 2212
22213
22215 - 2216
12217
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 27, 2013
MD90-28-013Revision 1: August 27, 2015
12 of 140
BOEING SERVICE BULLETIN MD90-28-013

### Page 13

GroupFuselage Num-
ber
22219
12220
22221
12222
22223
12224
22225 - 2227
12228
22229 - 2232
12233
22235
12236
22237
12238
12240
12242
32243
12245 - 2246
12248
22250 - 2251
12253
22255 - 2257
12258 - 2259
22260
12261
22262 - 2263
22288 - 2290
14001 - 4002
2. Spares Affected
None.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 27, 2013
MD90-28-013Revision 1: August 27, 2015
13 of 140
BOEING SERVICE BULLETIN MD90-28-013

### Page 14

B. Concurrent Requirements
None.
C. Reason
Frictional heating or sparking may develop from fuel pump failure, wear of fuel pump rotating
components, or ingestion of debris by the pump. Electrical faults in a fuel pump may result in electrical
arc burn through of a fuel pump. Frictional heating or sparking and electrical arc burn through in fuel
pump inlets or priming system outlets exposed (i.e. not covered by fuel) to the tank ullage in combination
with the ullage being flammable, may result in a fuel tank ignition event. A fuel tank ignition event could
develop with a pump running in an empty tank if the normal shutoff command is delayed or as a result
of control system failures that keep the pump in a latent uncommanded running condition. Center wing
fuel tanks and auxiliary fuel tank may be subject to this condition since they are normally pumped dry
over the course of a flight. If not corrected frictional heating or sparking, electrical arc burn through, or
a fuel tank pump running in an empty fuel tank may result in a fuel tank ignition event.
Revision 1 is sent to incorporate engineering released after the original issue of this service bulletin to
address the no work conditions due to Ground Fault Interrupter (GFI) panel washers, GFI panel mounting
holes too small, wire assembly routing and process issues encountered during validation of the original
issue of this service bulletin.
This service bulletin is the result of the safety assessments conducted by Boeing under a Special
Federal Aviation Regulation (SFAR) 88, Fuel Tank System Fault Tolerance Evaluation Requirements.
Boeing Fleet Team Digest (FTD) MD90 FTD 28-03001 and MD90 FTD 28-12002 are related to this
service bulletin.
The data given in Information Notice MD90-28-013 IN 01 is included in this revision.
As a part of a service bulletin validation program, this installation was completed on airplane fuselage
number 2097 by Service Bulletin MD90-28-013 Original Issue before the release of Revision 1 of this
service bulletin. The installation completed on airplane fuselage number 2097 by Service Bulletin
MD90-28-013 Original Issue is equivalent to the release of Revision 1 of this service bulletin. Airplane
fuselage number 2097 has the configuration of a Group 1 airplane.
D. Description
Revision 1 - Effects of this Revision on airplanes on which Original Issue was previously done:
None.
This service bulletin installs Ground Fault Interrupter (GFI) relays and cuts/coils/stows wires to center
wing and auxiliary fuel tank pump motor neutral circuits.
The work in this service bulletin is done in the maintenance zone(s) given below.
Affected Maintenance Zones
ZoneModel
112, 114, 115, 121, 211, 221MD-90-30
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 27, 2013
MD90-28-013Revision 1: August 27, 2015
14 of 140
BOEING SERVICE BULLETIN MD90-28-013

### Page 15

E. Compliance
Federal Aviation Administration (FAA) Airworthiness Directive AD 2012-18-05 is related to this service
bulletin.
Boeing recommends that the change given in this service bulletin be done within 60 months after the
effective date of AD 2012-18-05.
F. Approval
This service bulletin was examined by the Federal Aviation Administration (FAA). The changes specified
in this service bulletin comply with the applicable regulations and are FAA approved. This service
bulletin and its approval were based on the airplane in its original Boeing delivery configuration or as
modified by other approved Boeing changes.
In addition, the Manager of the FAA Los Angeles Aircraft Certification Office approves the action (i.e.
inspection or modification) defined in this service bulletin as an Alternative Method of Compliance to
the requirements of paragraph (g)(1) and (2) of AD 2012-18-05. All provisions of AD 2012-18-05 that
are not specifically referenced in the above statement remain fully applicable and must be complied
with.
If an airplane has a non-Boeing modification or repair that affects a component or system also affected
by this service bulletin, the operator is responsible for obtaining appropriate regulatory agency approval
before incorporating this service bulletin.
G. Manpower
The table below shows an estimate of the task hours necessary to do this change for each airplane.
This estimate is for direct labor only, done by an experienced crew. Adjust the estimate with operator
task hour data if necessary. The estimate does not include lost time. These are some examples of lost
time:
• Time to adjust to the workplace
• Time to schedule the work
• Time to inspect the work
• Time to cure the materials
• Time to make the parts
• Time to find the tools.
Group 1:
Elapsed HoursTask HoursNumber of PersonsTask
2.52.51Open Access
0.30.31FIGURE 2
23.547.02Route and Clip Wire
2.95.82FIGURE 5
0.60.61FIGURE 8
2.52.51Close Access
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 27, 2013
MD90-28-013Revision 1: August 27, 2015
15 of 140
BOEING SERVICE BULLETIN MD90-28-013

### Page 16

Group 1:
Elapsed HoursTask HoursNumber of PersonsTask
0.61.22Test
32.959.9TOTAL FOR EACH AIRPLANE
Group 2:
Elapsed HoursTask HoursNumber of PersonsTask
2.02.01Open Access
0.30.31FIGURE 2
0.50.51FIGURE 4
17.535.02Route and Clip Wire
2.55.02FIGURE 6
0.60.61FIGURE 9
2.02.01Close Access
0.91.82Test
26.347.2TOTAL FOR EACH AIRPLANE
Group 3:
Elapsed HoursTask HoursNumber of PersonsTask
2.52.51Open Access
0.20.21FIGURE 1
0.50.51FIGURE 3
62.0124.02Route and Clip Wire
5.210.42FIGURE 7
1.01.01FIGURE 10
2.52.51Close Access
1.83.62Test
75.7144.7TOTAL FOR EACH AIRPLANE
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 27, 2013
MD90-28-013Revision 1: August 27, 2015
16 of 140
BOEING SERVICE BULLETIN MD90-28-013

### Page 17

H. Weight and Balance Changes
Group 1:
Moment Change
(MEW) IN.-LBS
Mfr's Empty
Weight (MEW)
LBS
Approximate Sta-
tion (Inches)Airplane
+257.6+0.7+ 368.0MD-90-30
Group 2:
Moment Change
(MEW) IN.-LBS
Mfr's Empty
Weight (MEW)
LBS
Approximate Sta-
tion (Inches)Airplane
-87.3-0.5+ 174.6MD-90-30
Group 3:
Moment Change
(MEW) IN.-LBS
Mfr's Empty
Weight (MEW)
LBS
Approximate Sta-
tion (Inches)Airplane
+571.9+3.5+ 163.4MD-90-30
I. Electrical Load Data
1. Direct Current (DC) Load Changes
a. Add DC loads by amounts shown below:
Group 1-2:
No DC loads added.
Group 3:
UNITS
%OPR
1
100
E/NE
E
UNIT
LOAD
AMPS
0.112
NOTES
(B1-903)
SUPPLIER
Leach In-
ternational
EQUIPMENT NAME
PART NUMBER
GFI FWD AUX Tank Fuel
XFR Pump A
KDG-X4L-001
ITEM
R2-
1496
CHAP
280
BUS
1L
AVERAGE AMPS% TIME OPR
15/30 M2/5 M5 S15/30 M2/5 MCONDITION
00000LOADING
00000START
00000TAXI
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 27, 2013
MD90-28-013Revision 1: August 27, 2015
17 of 140
BOEING SERVICE BULLETIN MD90-28-013

### Page 18

Group 3:
UNITS
%OPR
1
100
E/NE
E
UNIT
LOAD
AMPS
0.112
NOTES
(B1-903)
SUPPLIER
Leach In-
ternational
EQUIPMENT NAME
PART NUMBER
GFI FWD AUX Tank Fuel
XFR Pump A
KDG-X4L-001
ITEM
R2-
1496
CHAP
280
BUS
1L
AVERAGE AMPS% TIME OPR
15/30 M2/5 M5 S15/30 M2/5 MCONDITION
0.1120.1120.112100100TAKEOFF & CLIMB
0.1120.1120.112100100CRUISE COLD
0.1120.1120.112100100CRUISE HOT
0.0560.0560.1125050DESCENT & LAND
00000EMERGENCY
00000GROUND SERVICE
Group 3:
UNITS
%OPR
1
100
E/NE
E
UNIT
LOAD
AMPS
0.112
NOTES
(B1-904)
SUPPLIER
Leach In-
ternational
EQUIPMENT NAME
PART NUMBER
GFI FWD AUX Tank Fuel
XFR Pump B
KDG-X4L-001
ITEM
R2-
1497
CHAP
280
BUS
2R
AVERAGE AMPS% TIME OPR
15/30 M2/5 M5 S15/30 M2/5 MCONDITION
00000LOADING
00000START
00000TAXI
0.1120.1120.112100100TAKEOFF & CLIMB
0.1120.1120.112100100CRUISE COLD
0.1120.1120.112100100CRUISE HOT
0.0560.0560.1125050DESCENT & LAND
00000EMERGENCY
00000GROUND SERVICE
b. Delete DC loads by amounts shown below:
Group 1-2:
No DC loads deleted.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 27, 2013
MD90-28-013Revision 1: August 27, 2015
18 of 140
BOEING SERVICE BULLETIN MD90-28-013

### Page 19

Group 3:
UNITS
%OPR
1
100
E/NE
E
UNIT
LOAD
AMPS
0.37
NOTES
(B1-907)
SUPPLIER
Leach In-
ternational
EQUIPMENT NAME
PART NUMBER
FWD AUX Tank Fuel XFR
Pump A
5D0281-1
ITEM
R2-218
CHAP
280
BUS
1L
AVERAGE AMPS% TIME OPR
15/30 M2/5 M5 S15/30 M2/5 MCONDITION
00000LOADING
00000START
00000TAXI
0.370.370.37100100TAKEOFF & CLIMB
0.370.370.37100100CRUISE COLD
0.370.370.37100100CRUISE HOT
0.190.190.375050DESCENT & LAND
00000EMERGENCY
00000GROUND SERVICE
Group 3:
UNITS
%OPR
1
100
E/NE
E
UNIT
LOAD
AMPS
0.37
NOTES
(B1-908)
SUPPLIER
Leach In-
ternational
EQUIPMENT NAME
PART NUMBER
FWD AUX Tank Fuel XFR
Pump B
5D0281-1
ITEM
R2-219
CHAP
280
BUS
2R
AVERAGE AMPS% TIME OPR
15/30 M2/5 M5 S15/30 M2/5 MCONDITION
00000LOADING
00000START
00000TAXI
0.370.370.37100100TAKEOFF & CLIMB
0.370.370.37100100CRUISE COLD
0.370.370.37100100CRUISE HOT
0.190.190.375050DESCENT & LAND
00000EMERGENCY
00000GROUND SERVICE
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 27, 2013
MD90-28-013Revision 1: August 27, 2015
19 of 140
BOEING SERVICE BULLETIN MD90-28-013

### Page 20

2. Alternating Current (AC) Load Changes
a. Add AC loads by amounts shown below:
UNITS
%OPR
1
100
E/NE/M
PHASE
E
A
VAC
PF
115
1
UNIT
LOAD
(W)
5.75
NOTES
(B1-922)
SUPPLIER
Leach In-
ternational
EQUIPMENT NAME
PART NUMBER
Center FWD Boost Pump
GFI Relay
KDAG-X4F-001
ITEM
R2-
1494
CHAP
280
BUS
1L
AVERAGE WATTS% TIME OPR
15/30 M2/5 M5 S15/30 M2/5 MCONDITION
0.1150.3455.7526LOADING
00000START
00000TAXI
5.755.755.75100100TAKEOFF & CLIMB
5.755.755.75100100CRUISE COLD
5.755.755.75100100CRUISE HOT
2.92.95.755050DESCENT & LAND
00000EMERGENCY
00000GROUND SERVICE
UNITS
%OPR
1
100
E/NE/M
PHASE
E
A
VAC
PF
115
1
UNIT
LOAD
(W)
5.75
NOTES
(B1-923)
SUPPLIER
Leach In-
ternational
EQUIPMENT NAME
PART NUMBER
Center AFT Boost Pump
GFI Relay
KDAG-X4F-001
ITEM
R2-
1495
CHAP
280
BUS
2R
AVERAGE WATTS% TIME OPR
15/30 M2/5 M5 S15/30 M2/5 MCONDITION
0.1150.3455.7526LOADING
00000START
00000TAXI
5.755.755.75100100TAKEOFF & CLIMB
5.755.755.75100100CRUISE COLD
5.755.755.75100100CRUISE HOT
2.92.95.755050DESCENT & LAND
00000EMERGENCY
00000GROUND SERVICE
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 27, 2013
MD90-28-013Revision 1: August 27, 2015
20 of 140
BOEING SERVICE BULLETIN MD90-28-013

### Page 21

b. Delete AC loads shown below:
Group 1, 3:
No AC loads deleted.
Group 2:
UNITS
%OPR
1
100
E/NE/M
PHASE
E
A
VAC
PF
115
1
UNIT
LOAD
(W)
11.5
NOTES
(B1-922)
SUPPLIER
Leach In-
ternational
EQUIPMENT NAME
PART NUMBER
CNTR FWD BOOST PUMP
5D0024-1
ITEM
R2-
336
CHAP
280
BUS
1L
AVERAGE WATTS% TIME OPR
15/30 M2/5 M5 S15/30 M2/5 MCONDITION
00000LOADING
00000START
00000TAXI
11.511.511.5100100TAKEOFF & CLIMB
11.511.511.5100100CRUISE COLD
11.511.511.5100100CRUISE HOT
5.755.755.755050DESCENT & LAND
00000EMERGENCY
00000GROUND SERVICE
Group 2:
UNITS
%OPR
1
100
E/NE/M
PHASE
E
A
VAC
PF
115
1
UNIT
LOAD
(W)
11.5
NOTES
(B1-923)
SUPPLIER
Leach In-
ternational
EQUIPMENT NAME
PART NUMBER
CNTR AFT BOOST PUMP
5D0024-1
ITEM
R2-
337
CHAP
280
BUS
2R
AVERAGE WATTS% TIME OPR
15/30 M2/5 M5 S15/30 M2/5 MCONDITION
00000LOADING
00000START
00000TAXI
11.511.511.5100100TAKEOFF & CLIMB
11.511.511.5100100CRUISE COLD
11.511.511.5100100CRUISE HOT
5.755.755.755050DESCENT & LAND
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 27, 2013
MD90-28-013Revision 1: August 27, 2015
21 of 140
BOEING SERVICE BULLETIN MD90-28-013

### Page 22

Group 2:
UNITS
%OPR
1
100
E/NE/M
PHASE
E
A
VAC
PF
115
1
UNIT
LOAD
(W)
11.5
NOTES
(B1-923)
SUPPLIER
Leach In-
ternational
EQUIPMENT NAME
PART NUMBER
CNTR AFT BOOST PUMP
5D0024-1
ITEM
R2-
337
CHAP
280
BUS
2R
AVERAGE WATTS% TIME OPR
15/30 M2/5 M5 S15/30 M2/5 MCONDITION
00000EMERGENCY
00000GROUND SERVICE
J. References
1. Existing Data:
a. Federal Aviation Administration (FAA) Airworthiness Directive (AD) 2012-18-05.
b. Standard Wiring Practices Manual (SWPM) 20-00-00, 20-00-09, 20-00-16, 20-10-01, 20-10-02,
20-10-04, 20-20-02, 20-20-03, 20-31-00, 20-40-01 and 20-50-01.
c. MD-90 Aircraft Maintenance Manual (AMM) MD90 AMM 06-31-00, 06-32-00, 08-10-00,
12-11-03, 12-11-07, 24-00-00, 25-23-01, 25-50-01, 27-50-00, 31-00-02, 31-14-00, 32-00-00,
32-11-01 and 52-63-00 .
d. Structural Repair Manual (SRM) Chapter 51.
e. Boeing Fleet Team Digest (FTD) 28-03001 and MD90 FTD 28-12002.
2. Data Supplied with this Service Bulletin:
a. Drawings:
ADCNDCN/REVSheetTitleDrawing No
--DWGELEC INSTL - CTR & AUX TANKS FUEL
BOOST & TRANSFER
SR90280010
-GDWGSFAR 88 FUEL PUMP FRICTIONAL
HEATING
SR90280011
-CDWGCTR & AUX TANKS FUEL BOOST &
TRANSFER
SR90280012
3. Installation Drawings Used in the Preparation of this Service Bulletin:
ChangeTitleDocument Number
-ELEC INSTL - CTR & AUX TANKS
FUEL BOOST & TRANSFER
SR90280010
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 27, 2013
MD90-28-013Revision 1: August 27, 2015
22 of 140
BOEING SERVICE BULLETIN MD90-28-013

### Page 23

ChangeTitleDocument Number
GSFAR 88 FUEL PUMP FRICTIONAL
HEATING
SR90280011
CCTR & AUX TANKS FUEL BOOST
& TRANSFER
SR90280012
These drawings were used to prepare this service bulletin. These drawings are necessary to make
the specified changes, and are supplied with this service bulletin. These drawings may not be
applicable to all airplane configurations or operators.
4. Process Data:
Douglas Process Specifications referred to on the drawings are not given in this service bulletin
since these procedures are frequently used as standard shop practices.
K. Publications Affected
1. Publications:
Chapter-SectionPublication
Section 1 and 3FAA Approved Airplane Flight Manual
FCOM Advisory Bulletin 2-007Flight Crew Operations Manual
24-50, 25-57Illustrated Parts Catalog
28-22Aircraft Maintenance Manual
MDC-92K9145 (CDCCL 28-8)Special Compliance Item Report
28-22Fault Isolation Manual
28-21, 28-24, 28-25, 28-42Wiring Diagram Manual
25-57, 28-22, 28-23, 28-25, 91-12System Schematic Manual
2. Damage Tolerance Based Structural Inspections:
Boeing has evaluated the repairs and/or changes in this service bulletin for effects on Fatigue
Critical Structure (FCS) and for changes to Damage Tolerance Inspections (DTI) required in the
Maintenance Program. This service bulletin does not affect FCS, therefore DTIs are not necessary.
L. Interchangeability and Intermixability of Parts
Refer to Paragraph 2.C., Parts Necessary for Each Airplane, for interchangeability and intermixability
information.
NOTE: This service bulletin replaces existing relays with GFI relays. After accomplishment of this
service bulletin airplanes cannot revert to the previously installed non-GFI relays.
M. Software Accomplishment Summary
Not affected.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 27, 2013
MD90-28-013Revision 1: August 27, 2015
23 of 140
BOEING SERVICE BULLETIN MD90-28-013

### Page 24

Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 27, 2013
MD90-28-013Revision 1: August 27, 2015
24 of 140
BOEING SERVICE BULLETIN MD90-28-013
BLANK PAGE

### Page 25

2.    MATERIAL INFORMATION
A. Material - Price and Availability
Boeing can supply the kits shown in Paragraph 2.C., Parts Necessary for Each Airplane . Operators
are encouraged to share schedule requirements with Boeing for incorporation of the service bulletin.
The kits are subject to the terms and conditions of the Boeing standard purchase order acknowledgment.
Prices are in United States Dollars. Terms: Net 30 days.
Reference this service bulletin and submit your purchase order by one of these methods:
1. Order on-line via ATA Spec 2000 or The Boeing PART Page
2. Fax to (206) 662-7145
REFER TO THE BOEING PART PAGE ON MYBOEINGFLEET.COM OR CONTACT FIRST RESPON-
DER AT FR@BOEING.COM FOR THE LATEST REORDER LEAD TIME (ROLT) AND PRICE INFOR-
MATION
Unit Price as of the original is-
sue date of this Service Bulletin
(US Dollars)
ROLT as of the original issue
date of this Service Bulletin
(Calendar Days)
NameKit Number
$12,392.00150Service KitSB90280013-3
$13,043.00150Service KitSB90280013-5
$36,978.00150Service KitSB90280013-7
Operators are encouraged to complete the survey provided in APPENDIX D of this service bulletin to
help Boeing predict the quantity and timing of the Boeing Supplied Kits/Parts.
B. Industry Support Information
Boeing warranty remedies are not available for the configuration changes given in this service bulletin.
C. Parts Necessary for Each Airplane
1. Kits/Parts
To get the kits/parts shown below, refer to Paragraph 2.A., Material - Price and Availability.
NOTE: One top kit and the items shown in Paragraph 2.C.2., Parts and Materials Supplied by
the Operator, are necessary for each airplane.
Group 1:
SB90280013-3 Service Kit
NotesNameQTYNew Part Number
(a)WIRE KIT1SB90280013-101
(b)TERM BLOCK25D0010-15
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 27, 2013
MD90-28-013Revision 1: August 27, 2015
25 of 140
BOEING SERVICE BULLETIN MD90-28-013

### Page 26

Group 1:
SB90280013-3 Service Kit
NotesNameQTYNew Part Number
(b)END CLAMP25D0101-2
(b)TERM BLOCK L95D0107-3
(b)TRACK19D0090-12U
(b)STRAP69D0254-1-1-9
BRACKET2ABN7294-629
MOUNT6CSCS-M
GFI RELAY2KDAG-X4F-001
NUT2MS21042L08
NUT4MS21042L3
SCREW2MS35206-242
LOCKWASHER1MS35338-43
SCREW1NAS1096-3-11
SCREW4NAS1096-3-6
WASHER1NAS1149F0332P
WASHER4NAS1252-10L
(b)WASHER2S124682-3D8-3
RELAY SOCKET2SO-1061-8916
(c) (d)WASHER8NAS620C10 (.063
Thickness)
(a) Refer to SB90280013-101 Wire Kit table for Wire Kit contents.
(b) Or approved equivalent. Refer to AEPL Drawing 7595071.
(c) Boeing furnished part.
(d) NAS620C10L Washers are furnished with Relay Socket and are not
used in this installation. Keep the washers if there are other uses for
them.
Group 1:
SB90280013-101 Wire Kit
NotesNameQTYNew Part Number
(a)WIRE CODE 801175
FT.
D2426-1C-16NM
(a)WIRE CODE 801369
FT.
D2426-1C-18NM
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 27, 2013
MD90-28-013Revision 1: August 27, 2015
26 of 140
BOEING SERVICE BULLETIN MD90-28-013

### Page 27

Group 1:
SB90280013-101 Wire Kit
NotesNameQTYNew Part Number
(a)WIRE CODE 80196 FT.D2426-1C-20NM
(a)WIRE CODE 80157 FT.D2426-1C-24NM
(b)TERM LUG, T/C 88825D0086-17
(b)TERM LUG, T/C 88965D0086-18
(b)TERM LUG, T/C 89025D0086-19
PIN, T/C 113128DC38-16P
PIN, T/C 112610DC38-20P
SOCKET, T/C 7066LRC16M-32DJ5
SOCKET, T/C 6041LRC22M-1DE5
SOCKET, T/C 12688M39029/92-533
SOCKET, T/C 1266B12M39029/92-535
(b)SOCKET, T/C
602/702
5S00023-20S
(a) Or approved alternate. Refer to SWPM 20-00-13.
(b) Or approved equivalent. Refer to AEPL Drawing 7595071.
Group 2:
SB90280013-5 Service Kit
NotesNameQTYNew Part Number
(a)WIRE KIT1SB90280013-102
(b)TERM BLOCK15D0010-15
(b)END CLAMP25D0101-2
(b)TERM BLOCK L105D0107-3
(b)TRACK19D0090-12U
(b)STRAP69D0254-1-1-9
BRACKET2ABN7294-629
NUT2AN315-3R
MOUNT6CSCS-M
GFI RELAY2KDAG-X4F-001
NUT2MS21042L08
NUT4MS21042L3
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 27, 2013
MD90-28-013Revision 1: August 27, 2015
27 of 140
BOEING SERVICE BULLETIN MD90-28-013

### Page 28

Group 2:
SB90280013-5 Service Kit
NotesNameQTYNew Part Number
SCREW2MS35206-242
LOCKWASHER2MS35338-43
SCREW1NAS1096-3-11
SCREW4NAS1096-3-6
WASHER3NAS1149F0332P
WASHER4NAS1252-10L
(b)WASHER2S124682-3D8-3
RELAY SOCKET2SO-1061-8916
(c) (d)WASHER8NAS620C10 (.063
Thickness)
(a) Refer to SB90280013-102 Wire Kit table for Wire Kit contents.
(b) Or approved equivalent. Refer to AEPL Drawing 7595071.
(c) Boeing furnished part.
(d) NAS620C10L Washers are furnished with Relay Socket and are not
used in this installation. Keep the washers if there are other uses for
them.
Group 2:
SB90280013-102 Wire Kit
NotesNameQTYNew Part Number
(a)WIRE CODE 801175
FT.
D2426-1C-16NM
(a)WIRE CODE 801115
FT.
D2426-1C-18NM
(a)WIRE CODE 801210
FT.
D2426-1C-20NM
(b)TERM LUG, T/C 76225D0086-6
PIN, T/C 113132DC38-16P
PIN, T/C 11268DC38-20P
SOCKET, T/C 12688M39029/92-533
SOCKET, T/C 1266B12M39029/92-535
(b)SOCKET, T/C
602/702
6S00023-20S
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 27, 2013
MD90-28-013Revision 1: August 27, 2015
28 of 140
BOEING SERVICE BULLETIN MD90-28-013

### Page 29

Group 2:
SB90280013-102 Wire Kit
NotesNameQTYNew Part Number
PIN, T/C 61212YHMM16-3F50
(a) Or approved alternate. Refer to SWPM 20-00-13.
(b) Or approved equivalent. Refer to AEPL Drawing 7595071.
Group 3:
SB90280013-7 Service Kit
NotesNameQTYNew Part Number
(a)WIRE KIT1SB90280013-103
(b)TERM BLOCK25D0010-15
(b)END CLAMP45D0101-2
(b)TERM BLOCK25D0107-1
(b)TERM BLOCK L185D0107-3
(b)TRACK29D0090-12U
(b)STRAP69D0254-1-1-9
BRACKET3ABN7294-629
MOUNT6CSCS-M
GFI RELAY2KDAG-X4F-001
GFI RELAY2KDG-X4L-001
NUT4MS21042L08
NUT6MS21042L3
SCREW4MS35206-242
LOCKWASHER1MS35338-43
SCREW1NAS1096-3-11
SCREW6NAS1096-3-6
WASHER1NAS1149F0332P
WASHER6NAS1252-10L
RELAY SOCKET2RSE500311
(b)WASHER4S124682-3D8-3
RELAY SOCKET2SO-1061-8916
(c) (d)WASHER8NAS620C10 (.063
Thickness)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 27, 2013
MD90-28-013Revision 1: August 27, 2015
29 of 140
BOEING SERVICE BULLETIN MD90-28-013

### Page 30

Group 3:
SB90280013-7 Service Kit
NotesNameQTYNew Part Number
(a) Refer to SB90280013-103 Wire Kit table for Wire Kit contents.
(b) Or approved equivalent. Refer to AEPL Drawing 7595071.
(c) Boeing furnished part.
(d) NAS620C10L Washers are furnished with Relay Socket and are not
used in this installation. Keep the washers if there are other uses for
them.
Group 3:
SB90280013-103 Wire Kit
NotesNameQTYNew Part Number
(a)WIRE CODE 801350
FT.
D2426-1C-16NM
(a)WIRE CODE 801369
FT.
D2426-1C-18NM
(a)WIRE CODE 8011003
FT.
D2426-1C-20NM
(a)WIRE CODE 80157 FT.D2426-1C-24NM
(b)TERM LUG, T/C 88825D0086-17
(b)TERM LUG, T/C 88965D0086-18
(b)TERM LUG, T/C 89025D0086-19
(b)TERM LUG, T/C 761105D0086-5
(b)TERM LUG, T/C 76285D0086-6
PIN, T/C 113162DC38-16P
PIN, T/C 112610DC38-20P
SOCKET, T/C 70612LRC16M-32DJ5
SOCKET, T/C 6041LRC22M-1DE5
SOCKET, T/C 126816M39029/92-533
SOCKET, T/C 1266B24M39029/92-535
(b)PIN, T/C 601/70116S00023-20P
(b)SOCKET, T/C
602/702
19S00023-20S
(a) Or approved alternate. Refer to SWPM 20-00-13.
(b) Or approved equivalent. Refer to AEPL Drawing 7595071.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 27, 2013
MD90-28-013Revision 1: August 27, 2015
30 of 140
BOEING SERVICE BULLETIN MD90-28-013

### Page 31

2. Parts and Materials Supplied by the Operator
NotesNameQTYPart Number / Specifica-
tion
(a)Tie TapeAs Required18XTZ, 23XTZ
(DMS 2089)
or
Equivalent
(b)Chemical Conversion CoatingAs RequiredAlodine 1200S
(DPM 1453-5)
or
Equivalent
End Cap2CYW20
(b)Primer, Fluid ResistantAs RequiredKoropon 515-700 with Cata-
lyst 910-704
(DMS 1786)
or
Equivalent
(c) (d)StrapAs Required9D0254-1-1-9
(PLT2S-9)(SST2S)
or
Equivalent
SpacerAs Required2712453-BN
SleeveAs RequiredDMS 2109
(a) Can be purchased from: Gudebrod Incorporated, 274 Shoemaker Road, Pottstown,
Pennsylvania, 19464, CAGE 82110.
(b) Can be purchased from: Henkel Corporation, 32100 Stephenson Highway, Madison
Heights, Michigan, 48071, CAGE 1N6B3.
(c) Can be purchased from: Panduit Corporation, 17301 Ridgeland Avenue, Tinley Park,
Illinois, 60477, CAGE 06383.
(d) Or approved equivalent. Refer to AEPL Drawing 7595071.
3. Parts Modified and Reidentified
Group 1:
NameNew Part
Number
NameQTYExisting Part Number
BracketSR90280011-3Clip Assembly17927157-707
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 27, 2013
MD90-28-013Revision 1: August 27, 2015
31 of 140
BOEING SERVICE BULLETIN MD90-28-013

### Page 32

Group 2:
New Part NumberNameQTYExisting Part Num-
ber
SR90280011-5Bracket17961078-795
Group 3:
New Part NumberNameQTYExisting Part Num-
ber
SR90280011-7Bracket17927157-707
4. Parts Removed and Not Replaced
Group 1:
None.
Group 2:
NotesQTYNameExisting Part Number
R2-336 and R2-337 (a)
(b)
2RELAY5D0024-1
R5-406 and R5-407 (a)
(b)
2RELAY SOCKET5D0020-10
(a) Keep the part if there are other uses for it.
(b) Or approved equivalent. Refer to AEPL Drawing 7595071.
Group 3:
NotesQTYNameExisting Part Number
R2-218 and R2-219 (a)
(b)
2RELAY5D0281-1
(a)1BRACKETABN7294-627
(a) Keep the part if there are other uses for it.
(b) Or approved equivalent. Refer to AEPL Drawing 7595071.
D. Parts Necessary to Change Spares
None.
E. Special Tooling - Price and Availability
None.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 27, 2013
MD90-28-013Revision 1: August 27, 2015
32 of 140
BOEING SERVICE BULLETIN MD90-28-013

### Page 33

F. Special Tooling Necessary to do this Service Bulletin
No special tools or equipment are necessary to do the change in this service bulletin. But, maintenance
and overhaul tools in the manuals given in Paragraph 1.J., References, can be necessary. Examine
operator tool supply to make sure all necessary tools are available.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 27, 2013
MD90-28-013Revision 1: August 27, 2015
33 of 140
BOEING SERVICE BULLETIN MD90-28-013

### Page 34

Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 27, 2013
MD90-28-013Revision 1: August 27, 2015
34 of 140
BOEING SERVICE BULLETIN MD90-28-013
BLANK PAGE

### Page 35

3.    ACCOMPLISHMENT INSTRUCTIONS
A. GENERAL INFORMATION
WARNING: IF ELECTRICAL POWER IS APPLIED TO THE AIRPLANE, MAKE SURE YOU OBEY
ALL PRECAUTIONS WHILE YOU DO WORK. IF YOU DO NOT OBEY THE
PRECAUTIONS, DEATH OR INJURY TO PERSONS, AND DAMAGE TO THE AIRPLANE
CAN OCCUR.
CAUTION: ELECTRICALLY GROUND THE AIRPLANE. THIS WILL HELP TO PREVENT DAMAGE
TO THE AIRPLANE OR EQUIPMENT.
CAUTION: KEEP THE WORK AREA, WIRES AND ELECTRICAL BUNDLES CLEAN OF METAL
PARTICLES OR CONTAMINATION WHEN YOU USE TOOLS. UNWANTED MATERIAL,
METAL PARTICLES OR CONTAMINATION CAUGHT IN WIRE BUNDLES CAN CAUSE
DAMAGE TO THE BUNDLES. DAMAGED WIRE BUNDLES CAN CAUSE SPARKS OR
OTHER ELECTRICAL DAMAGE.
NOTE: 1. Manual titles are referred to by acronyms. Refer to Paragraph 1.J., References, for
definition of the acronyms.
2. Equivalent parts are listed in the AEPL, Drawing 7595071.
3. Use the approved fastener and process material substitutions, in accordance with
Structural Repair Manual (SRM) 51.
4. If the length of any fastener specified in this service bulletin does not meet installation
standards given in SRM Chapter 51, then a fastener of the same specification, or
an approved substitute, with a length which meets the installation standards given
in SRM Chapter 51 may be used. In addition, washers may be installed for fastener
grip length in accordance with SRM Chapter 51.
5. A 1/8-inch thick stack of the same type washers called for in this service bulletin is
the maximum thickness which may be used under fastener head or nut to counteract
accumulation of tolerances.
EXCEPTION: When the available fastener length increments are greater than
1/16-inch, a 3/16-inch thick stack of the same type washers may be used.
6. Unless shown differently, these dimensions and tolerances are used:
– Linear dimensions are in inches
– Tolerance on linear dimensions, other than rivet and bolt edge margins, is plus
or minus 0.03 inch.
– Tolerance on rivet and bolt edge margin is plus or minus 0.05 inch
– Angular tolerance is plus or minus 2 degrees
– Hole dimensions for standard solid rivets and fasteners are in Structural Repair
Manual (SRM) Chapter 51
– Torque limits to tighten nuts and bolts are in SRM Chapter 51.
7. Refer to these SWPM chapters for applicable operations, as accepted procedures:
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 27, 2013
MD90-28-013Revision 1: August 27, 2015
35 of 140
BOEING SERVICE BULLETIN MD90-28-013

### Page 36

TitleChapter
General - Maintenance Safety PracticesSWPM 20-00-00
General Maintenance Practices - ElectricalSWPM 20-00-09
Electrical Wire CodesSWPM 20-00-13
Electrical Wire End Termination Codes and Tool CodesSWPM 20-00-16
Wiring Installation - Maintenance PracticesSWPM 20-10-01
Shielding - Maintenance PracticesSWPM 20-10-02
Coil and Stow - Maintenance PracticesSWPM 20-10-04
Terminal Blocks - Maintenance PracticesSWPM 20-20-02
General Installations Hardware - Maintenance PracticesSWPM 20-20-03
Electrical Connectors - Maintenance PracticesSWPM 20-31-00
Power Distribution Bus - Maintenance PracticesSWPM 20-40-01
Electrical Bonding - Maintenance PracticesSWPM 20-50-01
8. Obey all of the warnings and cautions given in the specified manual sections.
9. Review and understand all general notes of Service Rework Drawing SR90280011
sheets 3.0, 3.1, 3.2, 3.3, 3.4 and 3.5.
10. If an existing clamp specified in this service bulletin is too large or too small, a smaller
or larger clamp with the same basic part number can be used to provide a snug fit.
11. Mark electrical item numbers on structure adjacent to part. Refer to SWPM 20-00-09
as an accepted procedure.
12. The modules on a terminal block are controlled by the wire data. Verify/Install terminal
block modules and end clamps to agree with the wire data, refer to SWPM 20-20-02
as an accepted procedure.
Use the following parts as required:
Part NumberTerminal Block ID Letter
5D0010-15B
5D0010-13J
5D0107-3L
5D0106-1CC
5D0107-1DD
5D0010-11HH
5D0101-2EE (End Clamp)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 27, 2013
MD90-28-013Revision 1: August 27, 2015
36 of 140
BOEING SERVICE BULLETIN MD90-28-013

### Page 37

13. Install terminal block at noted position. If noted position is occupied with a spare
terminal block replace it with a specified terminal block. If specified terminal block is
same type as existing spare terminal block it is not necessary to replace the terminal
block.
14. Perform continuity checks on changed wires after completion of electrical wiring
changes.
15. These work instructions refer to procedures included in other Boeing documents.
When the words "refer to" are used and the operator has an accepted alternative
procedure, the accepted alternative procedure can be used. When the words "in
accordance with" are included in the instruction, the procedure in the Boeing document
must be used.
16. If it is necessary to remove more parts for access, you can remove those parts. If
you can get access without removing identified parts, it is not necessary to remove
all of the identified parts. Jacking and shoring limitations must be observed.
17. Where the work instructions include installation of a kept part, a new or serviceable
part with the same part number can be installed as an alternative to the kept part.
18. This service bulletin includes functional test procedures for the systems changed by
this service bulletin. More functional tests can possibly be necessary in accordance
with standard maintenance practices because of interruption to other airplane systems.
19. Use DMS 2109 Sleeve as required. Refer to SWPM 20-10-01.
B. WORK INSTRUCTIONS
Group 1:
1. Remove electrical power from the airplane. Refer to MD90 AMM 24-00-00 as an accepted
procedure.
2. Gain access to areas of change as follows:
a. Open access doors listed in the table as follows: Refer to MD90 AMM 06-31-00.
LocationAccess Door
Electrical/Electronics (E/E) Compartment110BL
Forward Accessory Compartment115AZ
Right Wing Leading Edge610BB
b. Open Equipment Panel Cover Assembly. Refer to MD90 AMM 06-31-00 as an accepted
procedure.
c. Open Forward Stairwell Door. Refer to MD90 AMM 52-63-00 as an accepted procedure.
d. Open overhead circuit breaker panel and overhead switch panel. Refer to MD90 AMM 31-00-02
as an accepted procedure.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 27, 2013
MD90-28-013Revision 1: August 27, 2015
37 of 140
BOEING SERVICE BULLETIN MD90-28-013

### Page 38

e. Remove and keep left cockpit sidewall panels. Refer to MD90 AMM 06-32-00 as an accepted
procedure.
f. Remove and keep left console. Refer to MD90 AMM 31-14-00 as an accepted procedure.
g. Remove and keep forward cargo compartment left outboard side panel 121AL and attaching
parts. Refer to MD90 AMM 25-50-01 as an accepted procedure.
h. Remove and keep cargo compartment ceiling panels between stations Y=218.000 and
Y=256.000. Refer to MD90 AMM 25-50-01 as an accepted procedure.
i. Remove and keep forward cabin attendant's seat and attaching parts. Refer to MD90 AMM
25-23-01 as an accepted procedure.
j. Remove and keep aft Electrical Power Center (EPC) panel 221CL and attaching parts. Refer
to MD90 AMM 06-32-00.
3. Install brackets and track in accordance with FIGURE 2.
4. Enlarge holes and identify as Bracket, install Ground Fault Interrupter (GFI) relays and receptacles
in accordance with FIGURE 8.
5. Route and clip wire in accordance with Service Rework Drawing SR90280011 sheets 6.0, 7.0,
7.2, 7.5, 7.6, 7.7, 7.8, 7.9, 8.0, 8.2, 8.3, 8.4, 9.0, 9.1, 10.0, 10.1, 10.2, 10.3, 10.4, 11.0, 11.1 and
11.10.
6. Make wire changes in accordance with FIGURE 5.
7. Close access to areas of change as follows:
a. Replace kept aft EPC panel 221CL and attaching parts. Refer to MD90 AMM 06-32-00.
b. Replace kept forward cabin attendant's seat and attaching parts. Refer to MD90 AMM 25-23-01
as an accepted procedure.
c. Replace kept cargo compartment ceiling panels between stations Y=218.000 and Y=256.000.
Refer to MD90 AMM 25-50-01 as an accepted procedure.
d. Replace kept forward cargo compartment left outboard side panel 121AL and attaching parts.
Refer to MD90 AMM 25-50-01 as an accepted procedure.
e. Replace kept left console. Refer to MD90 AMM 31-14-00 as an accepted procedure.
f. Replace kept left cockpit sidewall panels. Refer to MD90 AMM 06-32-00 as an accepted
procedure.
g. Close Forward Stairwell Door. Refer to MD90 AMM 52-63-00 as an accepted procedure.
h. Close Equipment Panel Cover Assembly. Refer to MD90 AMM 06-31-00 as an accepted
procedure.
i. Close overhead circuit breaker panel and overhead switch panel. Refer to MD90 AMM 31-00-02
as an accepted procedure.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 27, 2013
MD90-28-013Revision 1: August 27, 2015
38 of 140
BOEING SERVICE BULLETIN MD90-28-013

### Page 39

j. Close access doors listed in the table as follows: Refer to MD90 AMM 06-31-00.
LocationAccess Door
Electrical/Electronics (E/E) Compartment110BL
Forward Accessory Compartment115AZ
Right Wing Leading Edge610BB
8. Do GFI Center Fuel Tank Pumps Control Circuit, and Center Fuel Tank Pumps Low Pressure
Indication System Test Procedures in accordance with APPENDIX A.
9. Put the airplane back to a serviceable condition.
Group 2:
1. Remove electrical power from the airplane. Refer to MD90 AMM 24-00-00 as an accepted
procedure.
2. Gain access to areas of change as follows:
a. Open access doors listed in the following table. Refer to MD90 AMM 06-31-00.
LocationAccess Door
Electrical/Electronics (E/E) Compartment110BL
Forward Accessory Compartment115AZ
Right Wing Leading Edge610BB
b. Open Equipment Panel Cover Assembly. Refer to MD90 AMM 06-31-00 as an accepted
procedure.
c. Open Forward Stairwell Door. Refer to MD90 AMM 52-63-00 as an accepted procedure.
d. Remove and keep left console. Refer to MD90 AMM 31-14-00 as an accepted procedure.
e. Remove and keep forward cabin attendant's seat and attaching parts. Refer to MD90 AMM
25-23-01 as an accepted procedure.
f. Remove and keep aft Electrical Power Center (EPC) panel 221CL and attaching parts. Refer
to MD90 AMM 06-32-00.
3. Remove relays R2-336 and R2-337 and corresponding relay sockets R5-406 and R5-407 in
accordance with FIGURE 4.
4. Install brackets and track in accordance with FIGURE 2.
5. Enlarge holes and identify as Bracket, install Ground Fault Interrupter (GFI) relays and receptacles
in accordance with FIGURE 9.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 27, 2013
MD90-28-013Revision 1: August 27, 2015
39 of 140
BOEING SERVICE BULLETIN MD90-28-013

### Page 40

6. Route and clip wire in accordance with Service Rework Drawing SR90280011 sheets 6.0, 7.0,
7.3, 7.5, 7.6, 7.8, 8.0, 8.1, 8.2, 8.4, 9.0, 10.0, 10.1, 10.2 and 11.10.
7. Make wire changes in accordance with FIGURE 6.
8. Close access to areas of change as follows:
a. Replace kept aft EPC panel 221CL and attaching parts. Refer to MD90 AMM 06-32-00.
b. Replace kept forward cabin attendant's seat and attaching parts. Refer to MD90 AMM 25-23-01
as an accepted procedure.
c. Replace kept left console. Refer to MD90 AMM 31-14-00 as an accepted procedure.
d. Close Forward Stairwell Door. Refer to MD90 AMM 52-63-00 as an accepted procedure.
e. Close Equipment Panel Cover Assembly. Refer to MD90 AMM 06-31-00 as an accepted
procedure.
f. Close access doors listed in the table as follows: Refer to MD90 AMM 06-31-00.
LocationAccess Door
Electrical/Electronics (E/E) Compartment110BL
Forward Accessory Compartment115AZ
Right Wing Leading Edge610BB
9. Do GFI Center Fuel Tank Pumps Control Circuit, and Center Fuel Tank Pumps Low Pressure
Indication System Test Procedures in accordance with APPENDIX B.
10. Put the airplane back to a serviceable condition.
Group 3:
1. Remove electrical power from the airplane. Refer to MD90 AMM 24-00-00 as an accepted
procedure.
2. Gain access to areas of change as follows:
a. Open access doors listed in the table as follows: Refer to MD90 AMM 06-31-00.
LocationAccess Door
Electrical/Electronics (E/E) Compartment110BL
Forward Accessory Compartment115AZ
Right Wing Leading Edge610BB
b. Open Equipment Panel Cover Assembly. Refer to MD90 AMM 06-31-00 as an accepted
procedure.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 27, 2013
MD90-28-013Revision 1: August 27, 2015
40 of 140
BOEING SERVICE BULLETIN MD90-28-013

### Page 41

c. Open Forward Stairwell Door. Refer to MD90 AMM 52-63-00 as an accepted procedure.
d. Open overhead circuit breaker panel and overhead switch panel. Refer to MD90 AMM 31-00-02
as an accepted procedure.
e. Remove and keep left cockpit sidewall panels. Refer to MD90 AMM 06-32-00 as an accepted
procedure.
f. Remove and keep left console. Refer to MD90 AMM 31-14-00 as an accepted procedure.
g. Gain access to forward cargo compartment. Remove and keep forward cargo compartment
left outboard side panel 121AL and attaching parts. Refer to MD90 AMM 25-50-01 as an
accepted procedure.
h. Remove and keep cargo compartment ceiling panels between stations Y=218.000 and
Y=879.000. Refer to MD90 AMM 25-50-01 as an accepted procedure.
i. Remove and keep cargo compartment aft panel at station Y=879.000. Refer to MD90 AMM
25-50-01 as an accepted procedure.
j. Remove and keep forward cabin attendant's seat and attaching parts. Refer to MD90 AMM
25-23-01 as an accepted procedure.
k. Remove and keep aft Electrical Power Center (EPC) panel 221CL and attaching parts. Refer
to MD90 AMM 06-32-00.
3. Remove Relays R2-218 and R2-219 in accordance with FIGURE 1.
4. Remove bracket, install brackets and track in accordance with FIGURE 3.
5. Enlarge holes and identify as Bracket, install Ground Fault Interrupter (GFI) relays and receptacles
in accordance with FIGURE 10.
6. Route and clip wire in accordance with Service Rework Drawing SR90280011 sheets 6.0, 7.0,
7.4, 7.5, 7.6, 7.7, 7.8, 7.9, 8.0, 8.2, 8.3, 8.4, 9.0, 9.1, 10.0, 10.1, 10.2, 10.3, 10.4, 11.0, 11.1, 11.2,
11.3, 11.4, 11.8, 11.9 and 11.10.
7. Make wire changes in accordance with FIGURE 7.
8. Close access to areas of change as follows:
a. Replace kept aft EPC panel 221CL and attaching parts. Refer to MD90 AMM 06-32-00.
b. Replace kept forward cabin attendant's seat and attaching parts. Refer to MD90 AMM 25-23-01
as an accepted procedure.
c. Replace kept cargo compartment aft panel at station Y=879.000. Refer to MD90 AMM 25-50-01
as an accepted procedure.
d. Replace kept cargo compartment ceiling panels between stations Y=218.000 and Y=879.000.
Refer to MD90 AMM 25-50-01 as an accepted procedure.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 27, 2013
MD90-28-013Revision 1: August 27, 2015
41 of 140
BOEING SERVICE BULLETIN MD90-28-013

### Page 42

e. Replace kept forward cargo compartment left outboard side panel 121AL and attaching parts.
Refer to MD90 AMM 25-50-01 as an accepted procedure.
f. Replace kept left console. Refer to MD90 AMM 31-14-00 as an accepted procedure.
g. Replace kept left cockpit sidewall panels. Refer to MD90 AMM 06-32-00 as an accepted
procedure.
h. Close Forward Stairwell Door. Refer to MD90 AMM 52-63-00 as an accepted procedure.
i. Close Equipment Panel Cover Assembly. Refer to MD90 AMM 06-31-00 as an accepted
procedure.
j. Close overhead circuit breaker panel and overhead switch panel. Refer to MD90 AMM 31-00-02
as an accepted procedure.
k. Close access doors listed in the table as follows: Refer to MD90 AMM 06-31-00.
LocationAccess Door
Electrical/Electronics (E/E) Compartment110BL
Forward Accessory Compartment115AZ
Right Wing Leading Edge610BB
9. Restore electrical power to the airplane. Refer to MD90 AMM 24-00-00 as an accepted procedure.
10. Do GFI Center/Aux Fuel Tank Pumps Control Circuit, and Center/Aux Fuel Tank Pumps Low
Pressure Indication System Test Procedures in accordance with APPENDIX C.
11. Put the airplane back to a serviceable condition.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 27, 2013
MD90-28-013Revision 1: August 27, 2015
42 of 140
BOEING SERVICE BULLETIN MD90-28-013

### Page 43 (OCR)

BOEING SERVICE BULLETIN MD90-28-013
This Figure applies only to: Group 3.
STA
408
000000000000000
Z=-6.00
R2-218  • R2-219
100  DICK
FWD
STA  STA  1877252
408  389
FIGURE 1: REMOVE RELAYS R2-218 AND R2-219 - FORWARD CARGO COMPARTMENT, LEFT SIDE
(SHEET 1 OF 2)
Original Issue: September 27, 2013
Revision 1 August 27, 2015  PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  MD90-28-013
Work - See page 1 for details.  43 of 140

### Page 44

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for this figure.
MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
8NAS1096-2-8ScrewRemove1
8NAS1149DN816HWasher
R2-218, R2-219 (a)25D0281-1Relay
(a) Or approved equivalent. Refer to AEPL Drawing 7595071.
FIGURE 1: REMOVE RELAYS R2-218 AND R2-219 - FORWARD CARGO COMPARTMENT, LEFT SIDE
(SHEET 2 OF 2)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 27, 2013
MD90-28-013Revision 1 August 27, 2015
44 of 140
BOEING SERVICE BULLETIN MD90-28-013

### Page 45 (OCR)

BOEING SERVICE BULLETIN MD90-28-013
This Figure applies only to: Group 1-2.
STA
200
000000000000000
STA  STA  STA
218  200  160
Z=-15.00
Z=-24.250
• Z=-34.00
FWD
LOOKING OUTBOARD
FIGURE 2: INSTALL BRACKETS AND TRACK - E/E COMPARTMENT, AFT LEFT RADIO RACK
(SHEET 1 OF 4)
Original Issue: September 27, 2013
Revision 1 August 27, 2015  PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  MD90-28-013
Work - See page 1 for details.  45 of 140

### Page 46 (OCR)

BOEING SERVICE BULLETIN MD90-28-013
STA
200
(REP
27.05
24.250
D000
WD
1877256
FIGURE 2: INSTALL BRACKETS AND TRACK - E/E COMPARTMENT, AFT LEFT RADIO RACK
(SHEET 2 OF 4)
Original Issue: September 27, 2013
Revision 1 August 27, 2015  PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  MD90-28-013
Work - See page 1 for details.  46 of 140

### Page 47 (OCR)

BOEING SERVICE BULLETIN MD90-28-013
(REF)  (REF
3.94
Z=-24.250
FWD
- D  S30-236
X=34.000
Z=-24.250
D-D  1952279
FIGURE 2: INSTALL BRACKETS AND TRACK - E/E COMPARTMENT, AFT LEFT RADIO RACK
(SHEET 3 OF 4)
Original Issue: September 27, 2013
Revision 1 August 27, 2015  Export Controlled ECCN: 9E991 - BOEING  MD90-28-013
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.  47 of 140

### Page 48

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for this figure.
MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
(a)2ABN7294-629BracketInstall/New1
4NAS1096-3-6Screw2
4NAS1252-10LWasher
4MS21042L3Nut
(b)19D0090-12UTrackInstall/New3
2MS35206-242Screw4
2S124682-3D8-3Washer
2MS21042L08Nut
(a) Electrical bond between surfaces common to bracket and mating structure. Refer to SWPM 20-50-01 as
an accepted procedure.
(b) Item number S30-236 must be adjacent and visible after equipment is installed. Refer to SWPM 20-00-
09 as an accepted procedure.
FIGURE 2: INSTALL BRACKETS AND TRACK - E/E COMPARTMENT, AFT LEFT RADIO RACK
(SHEET 4 OF 4)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 27, 2013
MD90-28-013Revision 1 August 27, 2015
48 of 140
BOEING SERVICE BULLETIN MD90-28-013

### Page 49 (OCR)

BOEING SERVICE BULLETIN MD90-28-013
This Figure applies only to: Group 3.
STA
200
000000000000000
STA  STA  STA
218  200  160
Z=-15.00
Z=-24.250
• Z=-34.00
FWD
LOOKING OUTBOARD
FIGURE 3: INSTALL BRACKETS AND TRACK - E/E COMPARTMENT, AFT LEFT RADIO RACK
(SHEET 1 OF 4)
Original Issue: September 27, 2013
Revision 1 August 27, 2015  PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  MD90-28-013
Work - See page 1 for details.  49 of 140

### Page 50 (OCR)

BOEING SERVICE BULLETIN MD90-28-013
STA
200
(REF
Z=-24.250
00600000.060...050.00
0000000000  0000  0000
FWD
BEFORE
STA
200
REF
Z=-24.250
000000000
AFTER  1877266
FIGURE 3: INSTALL BRACKETS AND TRACK - E/E COMPARTMENT, AFT LEFT RADIO RACK
(SHEET 2 OF 4)
Original Issue: September 27, 2013
Revision 1 August 27, 2015  Export Controlled ECCN: 9E991 - BOEING  MD90-28-013
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.  50 of 140

### Page 51 (OCR)

BOEING SERVICE BULLETIN MD90-28-013
(REF)  (REF)  (REP
3.28  3.94  1.25
Z=-24.250
•QLOOOOOOD  +000000
D  S30-236
X=34.000
Z=-24.250 -
D-D  1952397
FIGURE 3: INSTALL BRACKETS AND TRACK - E/E COMPARTMENT, AFT LEFT RADIO RACK
(SHEET 3 OF 4)
Original Issue: September 27, 2013
Revision 1 August 27, 2015  Export Controlled ECCN: 9E991 - BOEING  MD90-28-013
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.  51 of 140

### Page 52

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for this figure.
MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
2NAS1096-3-7ScrewRemove1
2NAS1252-10LWasher
2MS21042L3Nut
1ABN7294-627Bracket
(a)3ABN7294-629BracketInstall/New2
6NAS1096-3-6Screw3
6NAS1252-10LWasher
6MS21042L3Nut
(b) (c)29D0090-12UTrackInstall/New4
4MS35206-242Screw5
4S124682-3D8-3Washer
4MS21042L08Nut
(a) Electrical bond between surfaces common to bracket and mating structure. Refer to SWPM 20-50-01 as
an accepted procedure.
(b) Item numbers S30-236 and S30-237 must be adjacent and visible after equipment is installed. Refer to
SWPM 20-00-09 as an accepted procedure.
(c) Or approved equivalent. Refer to AEPL Drawing 7595071.
FIGURE 3: INSTALL BRACKETS AND TRACK - E/E COMPARTMENT, AFT LEFT RADIO RACK
(SHEET 4 OF 4)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 27, 2013
MD90-28-013Revision 1 August 27, 2015
52 of 140
BOEING SERVICE BULLETIN MD90-28-013

### Page 53 (OCR)

BOEING SERVICE BULLETIN MD90-28-013
This Figure applies only to: Group 2.
ELECTRICAL POWER CENTER  1883728
FIGURE 4: REMOVE RELAYS R2-336, R2-337 AND RECEPTACLES R5-406, R5-407 - ELECTRICAL POWER
CENTER
(SHEET 1 OF 2)
Original Issue: September 27, 2013
Revision 1 August 27, 2015  Export Controlled ECCN: 9E991 - BOEING  MD90-28-013
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.  53 of 140

### Page 54

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for this figure.
MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
(a) (b)15D0024-1RELAY (R2-336)Remove1
15D0020-10RECEPTACLE (R5-
406)
(a) (b)15D0024-1RELAY (R2-337)Remove2
15D0020-10RECEPTACLE (R5-
407)
(a) And attaching hardware.
(b) Or approved equivalent. Refer to AEPL Drawing 7595071.
FIGURE 4: REMOVE RELAYS R2-336, R2-337 AND RECEPTACLES R5-406, R5-407 - ELECTRICAL POWER
CENTER
(SHEET 2 OF 2)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 27, 2013
MD90-28-013Revision 1 August 27, 2015
54 of 140
BOEING SERVICE BULLETIN MD90-28-013

### Page 55 (OCR)

BOEING SERVICE BULLETIN MD90-28-013
This Figure applies only to: Group 1.
R5-611 R2-583  CENTER FWD BOOST  PUMP CONTRO
4 Q601C18C+7  Q5H18B +  - *Q4H18C →  (RAF)(RAB)  - *0254X18  (RAF)  = *0258K18  + *012P18C +7  / Q13P18B //  AFT RIGHT RADIO RACK - TOP SHELF
P1-2272 R5-24  STA 148 R  6DD  4DD  5DD +  S3-501  STA 200
Q258G20  150 IN  0254W20  150 IN.  0254S24  Q264C24  (RAF)(RAB)  *0603D18  + *O14R18A -  (RAF)  *014718  017/// 012R18C+  + Q13R18B +/
Of Q601B18C  + Q602B18B  Q13N18B  Q5J18B +  + Q4J180 +  CENTER FWD BOOST PUMP  OVERHEAD SWITCH PANEL  COILED AND STORED WIRES  C2 +  R2-578 R5-606  AUTO CENTER  FWD BOOST PUMP
• ADDED WIRE OR NEW ROUTING
S1-36  + DELETED WIRE OR FORMER ROUTING
EXISTING WIRE
*NOTED WIRES ARE EXISTING, REROUTED AND
REIDENTIFIED WIRES
**NOTED WIRES Q7B20N AND Q8B20N SHALL BE
CUT, CAPPED AND STOWED BETWEEN THE
TWO SUPPORT CLAMPS AS SHOWN ON
DRAWING SR90280011, SHEET 11.10
FIGURE 5: CENTER TANK FUEL BOOST WIRE CHANGES
(SHEET 1 OF 7)
Original Issue: September 27, 2013
Revision 1 August 27, 2015  PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  MD90-28-013
Work - See page 1 for details.  55 of 140

### Page 56 (OCR)

BOEING SERVICE BULLETIN MD90-28-013
R5-610 R2-582  CENTER AFT BOOST  PUMP CONTROL
+ Q608C18C  +/ Q607C18B  7/Q2H188 -  (RAF)(RAB)  *0253X18  1-0606C18A  3DD +/ / *O9P18C +  2DD + / 010P18B +7  (RAF)  • *0258L18 •  AFT RIGHT RADIO RACK - TOP SHELF
P1-2272 R5-2472  STA 148 R  4DD  S3-501  STA 200
Q253W20  150 IN.  / 0253S24 +1  D2 7/ / / 0263C24 +  (RAF)(RAB)  *Q606D18  + *Q11R18A +/  (RAF)  *011218  B1 / 010R18B +
S30-236  STA 160 L  B2 +7+  02 71/1  AUTO CENTER AFT BOOST PUMP
+ Q608B18C +  - O9N18C +  - Q607B18B +  010N18B  Q2J18B +  • Q1J18C +  S1-37  CENTER AFT BOOST PUMP  OVERHEAD SWITCH PANEL  R2-579 R5-607
FIGURE 5: CENTER TANK FUEL BOOST WIRE CHANGES
(SHEET 2 OF 7)
Original Issue: September 27, 2013
Revision 1 August 27, 2015  Export Controlled ECCN: 9E991 - BOEING  PROPRIETARY - Copyright © Unpublished  MD90-28-013
Work - See page 1 for details.  56 of 140

### Page 57 (OCR)

BOEING SERVICE BULLETIN MD90-28-013
CENTER  *O8B20N •
R5-1307 P1-1307  STA 248 L  R5-1306 P1-1306  STA 246 L
O C1  011 01B1SC +110-  Tof7 09A18C +  B2 | 0 B1  +0144 02B18B +140-  A2 | O A1  АЗ  | 0770110184+/  S1-37  CENTER AFT BOOST PUMP  C2 0 C1  0+ 04B18C++10-  0F3+ Q12A18C++4  0 B1  041 Q5B18B +  A2 | 0 A1  o  TOAS + 014A18A+  S1-36  CENTER FWD BOOST PUMP  Q258C24+  " Da  1 021+ 0254A24 +  S1-36  CENTER FWD BOOST PUMP  D2  "D3  i O//+ Q253A24 +  S1-37  CENTER AFT BOOST PUMP  OVERHEAD SWITCH PANEL
B1-923  CENTER AFT FUEL BOOST PUMP  B1-922  CENTER FWD FUEL BOOST PUMP  LOWER ELECTRICAL POWER CENTER
T20
5VAC OC  15VAC-0B-R  115VAC PC-L  (115VAC 0B-L
FIGURE 5: CENTER TANK FUEL BOOST WIRE CHANGES
(SHEET 3 OF 7)
Original Issue: September 27, 2013
Revision 1 August 27, 2015  Export Controlled ECCN: 9E991 - BOEING  MD90-28-013
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.  57 of 140

### Page 58 (OCR)

BOEING SERVICE BULLETIN MD90-28-013
890
Q642A18N  3556)
175 IN
(1268  1131  (1131
Q14X18
175 IN.
R2-1494 R5-1494  S30-236
CENTER FWD BOOST PUMP GFI RELAY  STA 160 L
AFT LEFT EQUIPMENT BAY
A2 | 0 A1
O 888
A3 O  Q14Y18
330 IN
S1-36
CENTER FWD BOOST PUMP
OVERHEAD SWITCH PANEL
2B18N  3556)-
(1131
Q11X18  9LX
175
R2-1495 R5-1495  S30-236
CENTER AFT BOOST PUMP GFI RELAY  STA 160 L
AFT LEFT EQUIPMENT BAY
A2  O A1
888
A3O  Q11Y18
S1-37  330 IN.
CENTER AFT BOOST PUMP
OVERHEAD SWITCH PANEL
FIGURE 5: CENTER TANK FUEL BOOST WIRE CHANGES
(SHEET 4 OF 7)
Original Issue: September 27, 2013
Revision 1 August 27, 2015  Export Controlled ECCN: 9E991 - BOEING  PROPRIETARY - Copyright © Unpublished  MD90-28-013
Work - See page 1 for details.  58 of 140

### Page 59 (OCR)

BOEING SERVICE BULLETIN MD90-28-013
(3 PLACES)  (12 PLACES) (12 PLACES)  (3 PLACES)  (3 PLACES
5A  ( 889)  (1131)  (1131)  12668
115VAC-OC-R  Q1P18C•  14LA  Q1M16C  C2  C  Q9U16C
310 IN  175 IN  175 IN.
(115VAC-OB-R  Q2R18B •  - 3LX  •Q2N16B  B2  B1  • Q10U16B
310 IN.  175 IN  175 IN.
(115VAC-OA-R  Q3S18A  1 3LA  Q3P16A  A2  A1  Q11U16A
310 IN.  175 IN.  175 IN.
B1-923
R5-1495 R2-1495 R5-1495
CENTER AFT FUEL BOOST PUMP  CENTER AFT BOOST PUMP
GFI RELAY
(3 PLACES)  1(3 PLACES)  (3 PLACES
889  12668  (12668
(115VAC-OC-L  Q4P18C - 2LA  - Q4M16C  C2  C  • Q12U16C
310 IN  175 IN  1175 IN
(115VAC-OB-L  Q5P18B - 1LX  — Q5M16B-  - B2  B1  • Q13U16B
310 IN  175 IN  175 IN.
115VAC-OA-L  06S18A - 1LA  - Q6P16A-  1A2  A1  - Q14U16A
310 IN  175 IN  175 IN
B1-922
R5-1494 R2-1494 R5-1494
CENTER FWD FUEL BOOST PUMP  | CENTER FWD BOOST PUMP |  GFI RELAY
UPPER EPC CIRCUIT BREAKER PANEL
AFT LEFT EQUIPMENT BAY
(6 PLACES)
P  Q14V18A  5LA
200 IN.
N  Q13V18B•  5LX
200 IN.
M  Q12V18C-  6LA
200 IN.
Q11V18A -  7LA
200 IN.
K  Q10V18B  7LX
200 IN.
Q9V18C  8LA
200 IN.
P1-1307 R5-1307  S30-236
STA 246 L  STA 160 L
FIGURE 5: CENTER TANK FUEL BOOST WIRE CHANGES
(SHEET 5 OF 7)
Original Issue: September 27, 2013
Revision 1 August 27, 2015  PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  Work - See page 1 for details.  MD90-28-013  59 of 140

### Page 60 (OCR)

BOEING SERVICE BULLETIN MD90-28-013
S
53V24  240 IN
R5-1494 R2-1494 R5-1494  CENTER FWD BOOST PUMP GFI RELAY  1268  R5-1495 R2-1495 R5-1495  CENTER AFT BOOST PUMP GFI RELAY
Q258F20  175 IN.
(2 PLACES)  (1126
S30-236  STA 160 L
0258D24  200 N
R2-593 R5-619  CENTER PUMP  PRESS INHIBIT
1889445
FIGURE 5: CENTER TANK FUEL BOOST WIRE CHANGES
(SHEET 6 OF 7)
Original Issue: September 27, 2013
Revision 1 August 27, 2015  PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  MD90-28-013
Work - See page 1 for details.  60 of 140

The text continues at https://openairdocs.org/service-documents/boeing/md90-28-013/file/bab8798abb39.md?from=61

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
