# Boeing Service Bulletin 727-28-0134: No revision named

- Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2013-0666; AD 2013-22-03 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Boeing Service Bulletin 727-28-0134](https://openairdocs.org/service-documents/boeing/sb-727-28-0134.md)
- Title as filed: U.S. DOT/FAA - Boeing Commercial Airplanes Service Bulletin
- Pages: 26
- PDF: https://openairdocs.org/files/sha256/f6/7d/f67d4faf422999f4bfa62d5c2363da37d40efc4cd91ab0b6d826b8c02d72cb87
- Page: https://openairdocs.org/service-documents/boeing/sb-727-28-0134/file/f67d4faf4229

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Commercial 
Airplanes
727
Service Bulletin
Number: 727-28-0134
Original Issue: January 12, 2012
ATA System: 2811
SUBJECT: FUEL - Integral Fuel Tanks - Access Door Inspection/Replacement
Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15
CFR 730-774). An export license may be required before it is used for development, production or use by foreign
persons from specific countries. The controller of this data has the individual responsibility to abide by all export
laws.
9E991ECCN:
BOEING PROPRIETARY, CONFIDENTIAL, AND/OR TRADE SECRET
Copyright © 2012 The Boeing Company
Unpublished Work - All Rights Reserved
Boeing claims copyright in each page of this document only to the extent that the page contains copyrightable
subject matter. Boeing also claims copyright in this document as a compilation and/or collective work.
This document includes proprietary information owned by The Boeing Company and/or one or more third parties.
Treatment of the document and the information it contains is governed by contract with Boeing. For more
information, contact The Boeing Company, P.O. Box 3707, Seattle, Washington 98124.
Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner,
BBJ, DC-8, DC-9, DC-10, KC-10, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8A, Poseidon and the
Boeing livery are all trademarks owned by The Boeing Company; and no trademark license is granted in
connection with this document unless provided in writing by Boeing.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: January 12, 2012
727-28-0134
1 of 26
10.0

### Page 2

BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: January 12, 2012
727-28-0134
2 of 26
BOEING SERVICE BULLETIN 727-28-0134
BLANK PAGE

### Page 3

Table of Contents
Summary ...................................................... 5
1. PLANNING INFORMATION ........................................ 7
A. Effectivity ................................................ 7
1. Airplanes ............................................. 7
2. Spares Affected ........................................ 1 1
B. Concurrent Requirements ...................................... 1 1
C. Reason ................................................ 1 2
D. Description .............................................. 1 2
E. Compliance .............................................. 1 2
F. Approval ............................................... 1 2
G. Manpower .............................................. 1 3
H. Weight and Balance Changes .................................... 1 3
I. Electrical Load Data ......................................... 1 3
J. References .............................................. 1 3
1. Existing Data: ......................................... 1 3
2. Data supplied with this Service Bulletin: ........................... 1 4
3. Installation Drawings Used in the Preparation of this Service Bulletin: ........... 1 4
K. Publications Affected ........................................ 1 4
L. Interchangeability and Intermixability of Parts ........................... 1 4
2. MATERIAL INFORMATION ........................................ 1 5
A. Material - Price and Availability ................................... 1 5
B. Industry Support Information .................................... 1 5
C. Parts Necessary For Each Airplane ................................. 1 5
1. Kits/Parts: ........................................... 1 5
2. Parts and Materials Supplied by the Operator: ........................ 1 5
3. Parts Modified and Reidentified: ............................... 1 5
4. Parts Removed and Not Replaced: .............................. 1 5
D. Parts Necessary to Change Spares ................................. 1 5
E. Special Tooling - Price and Availability ............................... 1 5
F. Special Tooling Necessary to do this Service Bulletin ....................... 1 5
3. ACCOMPLISHMENT INSTRUCTIONS .................................. 1 7
A. GENERAL INFORMATION ..................................... 1 7
B. WORK INSTRUCTIONS ....................................... 1 7
FIGURE 1: ACCESS DOOR INSPECTION - LEFT WING ........................ 1 9
FIGURE 2: ACCESS DOOR INSPECTION - RIGHT WING ....................... 2 1
APPENDIX A: PROCEDURE FOR ACCESS DOOR INSPECTION ..................... 2 3
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: January 12, 2012
727-28-0134
3 of 26
BOEING SERVICE BULLETIN 727-28-0134

### Page 4

BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: January 12, 2012
727-28-0134
4 of 26
BOEING SERVICE BULLETIN 727-28-0134
BLANK PAGE

### Page 5

Commercial 
Airplanes
727
Service Bulletin
SummaryNumber: 727-28-0134Original Issue: January 12, 2012
ATA System: 2811
SUBJECT: FUEL - Integral Fuel Tanks - Access Door Inspection/Replacement
CONCURRENT REQUIREMENTS
Refer to Paragraph 1.B., Concurrent Requirements.
BACKGROUND
This service bulletin provides instructions to inspect the Wing Fuel Tank Access Doors to make sure that Impact
Resistant Access Doors are installed in the correct locations and stencils and index markers are applied. Fire
can result from damage to a standard access door if it is located where an Impact Resistant Access Door is
required.
An operator identified a standard access door located where an Impact Resistant Access Door is required. In
addition, the operator examined its spares stock and found that some Impact Resistant Access Doors were
without stencils. These findings have raised a concern about the possibility of more standard access doors being
installed at locations where Impact Resistant Access Doors are required. Impact Resistant Access Doors minimize
risk of penetration from engine debris or objects thrown by airplane tires. By accomplishing the inspection in
this service bulletin, operators can make sure that stencils and index markers are applied and Impact Resistant
Access Doors are installed at the correct locations, providing increased resistance to Wing Fuel Tank penetration.
Boeing Service Related Problem (SRP) 727-SRP-57-0225 is related to this service bulletin.
ACTION
Identify the Wing Fuel Tank Access Doors. Do a General Visual Inspection or an ultrasonic Non-Destructive
Test (NDT) to make sure that Impact Resistant Access Doors are installed in the correct locations. If a standard
access door is identified in a location where an Impact Resistant Access Door is required, replace the door with
an Impact Resistant Access Door. Do a General Visual Inspection to make sure that stencils and index markers
are applied. If a stencil and/or index marker is missing, apply new stencil and/or index marker.
EFFECTIVITY
All 727, 727-100/100C/200/200F and 727C Airplanes.
Refer to Paragraph 1.A.1, Effectivity.
COMPLIANCE
Refer to Paragraph 1.E., Compliance.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: January 12, 2012
727-28-0134
5 of 26

### Page 6 (OCR)

BOEING SERVICE BULLETIN 727-28-0134
INDUSTRY SUPPORT INFORMATION
Refer to Paragraph 2.B., Industry Support Information.
MANPOWER
Refer to Paragraph 1.G., Manpower.
MATERIAL INFORMATION
Refer to Paragraph 2.A., Material - Price and Availability.
0000000000
000
IDENTIFY THE WING FUEL TANK  CESS DOORS. DO THE INSPECTION OF
THE WING FUEL TANK ACCESS DO  ORS TO MAKE SURE THAT IMPACT
RESISTANT ACCESS DOORS  STALLED IN THE CORRECT LOCATIONS
AND THAT STENCIL  RKERS ARE APPLIED. IF A STANDARD
ACCESS DOOR IS IDI  OCATION WHERE AN IMPACT
RESISTANT ACCESS  REQUIRED, REPLACE THE DOOR WITH AN
IMPACT RESISTANT  MARKER IS MISSING, APPLY NEW STENCIL AND/OR INDEX MARKER.  OOR. IF ANY STENCIL AND/OR INDEX  1839597
Original Issue: January 12, 2012
727-28-0134
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.  6 of 26

### Page 7

Commercial 
Airplanes
727
Service Bulletin
Number: 727-28-0134
Original Issue: January 12, 2012
ATA System: 2811
SUBJECT: FUEL - Integral Fuel Tanks - Access Door Inspection/Replacement
1.    PLANNING INFORMATION
A. Effectivity
1. Airplanes
Refer to Service Bulletin Index Document D6-30300 Part 3 for Airplane Variable Number, Line
Number, and Serial Number data.
This service bulletin is for the airplanes shown below.
DESCRIPTIONCONFIGURATIONGROUP
All 727, 727-100/100C/200/200F and 727C Airplanes-1
Airplane Models:
727, 727-100, 727-100C, 727-200, 727-200F, 727C
GroupVariable Number
1E0001 - E0042
1E0101 - E0140
1E0201 - E0216
1E0301 - E0351
1E0401 - E0423
1E3001 - E3006
1E3011 - E3014
1E3021 - E3040
1E3059
1E3061 - E3077
1E3101 - E3103
1E3111 - E3118
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: January 12, 2012
727-28-0134
7 of 26

### Page 8

GroupVariable Number
1E3141 - E3152
1E3171 - E3177
1E3201 - E3206
1E3221 - E3224
1E3241 - E3290
1E3341 - E3350
1E3401 - E3421
1E3451 - E3452
1E3471 - E3474
1E3501 - E3513
1E3516 - E3523
1E3551 - E3553
1E3571 - E3578
1E3601 - E3604
1E3621 - E3622
1E3651 - E3655
1E3677
1E3681 - E3684
1E3701 - E3704
1E3751 - E3755
1E3781 - E3784
1E5001 - E5011
1E5031 - E5068
1E5101 - E5116
1E5141 - E5143
1E5161 - E5164
1E5201 - E5203
1E5221 - E5245
1E5251 - E5252
1E5271 - E5281
1E5301 - E5306
1E5351 - E5353
1E5381 - E5382
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: January 12, 2012
727-28-0134
8 of 26
BOEING SERVICE BULLETIN 727-28-0134

### Page 9

GroupVariable Number
1E5401 - E5424
1E5426 - E5429
1E5433
1E5435
1E5451 - E5455
1E5481 - E5483
1E5501 - E5502
1QA001 - QA046
1QA051 - QA099
1QA101 - QA199
1QA201 - QA225
1QA301 - QA349
1QA351 - QA376
1QA378
1QA401 - QA499
1QA501 - QA537
1QA551 - QA579
1QA581 - QA585
1QA601 - QA688
1QA701 - QA753
1QA801 - QA805
1QA851 - QA899
1QA901 - QA946
1QA949
1QB001 - QB002
1QB031 - QB049
1QB051 - QB068
1QB101 - QB110
1QB114 - QB119
1QB121 - QB149
1QB151 - QB158
1QB201 - QB220
1QB301 - QB316
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: January 12, 2012
727-28-0134
9 of 26
BOEING SERVICE BULLETIN 727-28-0134

### Page 10

GroupVariable Number
1QB351 - QB352
1QB401 - QB407
1QB451 - QB458
1QB501 - QB575
1QB601 - QB629
1QB651
1QB701 - QB705
1QB801 - QB810
1QB901 - QB904
1QD001 - QD012
1QD031 - QD046
1QD085 - QD088
1QD101 - QD105
1QD121 - QD127
1QD141 - QD149
1QD161 - QD164
1QD191 - QD192
1QD201 - QD239
1QD281 - QD284
1QD301 - QD305
1QD321 - QD330
1QD351
1QD401 - QD403
1QD407
1QD410
1QD421 - QD427
1QD441 - QD453
1QD471 - QD475
1QD501 - QD518
1QD551 - QD558
1QD571 - QD572
1QD581 - QD583
1QD601 - QD607
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: January 12, 2012
727-28-0134
10 of 26
BOEING SERVICE BULLETIN 727-28-0134

### Page 11

GroupVariable Number
1QD621 - QD624
1QD641
1QD661 - QD663
1QD681 - QD685
1QD691 - QD692
1QD701 - QD702
1QD711 - QD717
1QD741
1QD761 - QD769
1QD781 - QD782
1QD791
1QD801 - QD804
1QD821 - QD828
1QD901 - QD910
1QD931 - QD932
1QD951 - QD954
1QD971 - QD973
1QD991 - QD992
1QE001 - QE002
1QL001 - QL008
1QL031 - QL032
1QL081
1QL501 - QL515
2. Spares Affected
None.
B. Concurrent Requirements
The service bulletin listed below must be done before or at the same time as this service bulletin:
DescriptionService BulletinCompany
Fuel tank access door replacement727-28-0101 Revision 1Boeing
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: January 12, 2012
727-28-0134
11 of 26
BOEING SERVICE BULLETIN 727-28-0134

### Page 12

C. Reason
This service bulletin provides instructions to inspect the Wing Fuel Tank Access Doors to make sure
that Impact Resistant Access Doors are installed in the correct locations and stencils and index markers
are applied. Fire can result from damage to a standard access door if it is located where an Impact
Resistant Access Door is required.
An operator identified a standard access door located where an Impact Resistant Access Door is
required. In addition, the operator examined its spares stock and found that some Impact Resistant
Access Doors were without stencils. These findings have raised a concern about the possibility of more
standard access doors being installed at locations where Impact Resistant Access Doors are required.
Impact Resistant Access Doors minimize risk of penetration from engine debris or objects thrown by
airplane tires. By accomplishing the inspection in this service bulletin, operators can make sure that
stencils and index markers are applied and Impact Resistant Access Doors are installed at the correct
locations, providing increased resistance to Wing Fuel Tank penetration.
Boeing Service Related Problem (SRP) 727-SRP-57-0225 is related to this service bulletin.
D. Description
Identify the Wing Fuel Tank Access Doors. Do a General Visual Inspection or an ultrasonic
Non-Destructive Test (NDT) to make sure that Impact Resistant Access Doors are installed in the
correct locations. If a standard access door is identified in a location where an Impact Resistant Access
Door is required, replace the door with an Impact Resistant Access Door. Do a General Visual Inspection
to make sure that stencils and index markers are applied. If a stencil and/or index marker is missing,
apply new stencil and/or index marker.
The work in this service bulletin is done in the maintenance zone(s) given below.
Affected Maintenance Zones
ZoneModel
5-72, 5-73, 6-75, 6-76727, 727-100, 727-100C, 727-
200, 727-200F, 727C
E. Compliance
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to
this service bulletin. The Airworthiness Directive will make the compliance tasks and times given in this
service bulletin mandatory.
Boeing recommends that the inspection given in this service bulletin be done within 72 months after
the original issue date of this service bulletin.
F. Approval
This service bulletin was examined by the Federal Aviation Administration (FAA). The changes specified
in this service bulletin comply with the applicable regulations and are FAA approved, as well as European
Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/JAA approved
airplanes listed in the service bulletin effectivity. This service bulletin and its approval were based on
the airplane in its original Boeing delivery configuration or as modified by other approved Boeing
changes.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: January 12, 2012
727-28-0134
12 of 26
BOEING SERVICE BULLETIN 727-28-0134

### Page 13

If an airplane has a non-Boeing modification or repair that affects a component or system also affected
by this service bulletin, the operator is responsible for obtaining appropriate regulatory agency approval
before incorporating this service bulletin.
G. Manpower
The table below shows an estimate of the man-hours necessary to do this change for each airplane.
This estimate is for direct labor only, done by experienced crews. Adjust the estimate with operator
man-hour data if necessary. The estimate does not include lost time. These are examples of lost time:
— Time to adjust to the workplace
— Time to schedule the work
— Time to examine the work
— Time to cure the materials
— Time to make the parts
— Time to find the tools.
OPTION 1: MAN-HOURS FOR GENERAL VISUAL INSPECTION PROCEDURE
More DataElapsed HoursTask HoursNumber of PersonsTask
(a)1.501.501Figure 1
(a)1.501.501Figure 2
(a)3.003.00TOTAL FOR EACH AIRPLANE
(a) Does not include time to defuel/refuel.
OPTION 2: MAN-HOURS FOR ULTRASONIC NON-DESTRUCTIVE TEST (NDT) INSPECTION PROCEDURE
More DataElapsed HoursTask HoursNumber of PersonsTask
(a)1.001.001Figure 1
(a)1.001.001Figure 2
(a)2.002.00TOTAL FOR EACH AIRPLANE
(a) Does not include time to defuel/refuel.
H. Weight and Balance Changes
None
I. Electrical Load Data
Not applicable
J. References
1. Existing Data:
a. Boeing Service Related Problem (SRP) 727-SRP-57-0225
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: January 12, 2012
727-28-0134
13 of 26
BOEING SERVICE BULLETIN 727-28-0134

### Page 14

b. Boeing Service Bulletin 727-28-0101
c. Standard Overhaul Practices Manual (SOPM) 20-50-10
d. 727 Aircraft Maintenance Manual (AMM) 28-11-21, 28-23-00
e. 727 Illustrated Parts Catalog (IPC) 57-30-00
f. 727 Non-Destructive Testing (NDT) Manual 727 NDT Part 4, 51-00-00
2. Data supplied with this Service Bulletin:
None.
3. Installation Drawings Used in the Preparation of this Service Bulletin:
None.
K. Publications Affected
1. Publications:
None.
2. Damage Tolerance Based Structural Inspections:
Boeing has evaluated this service bulletin for effects on Fatigue Critical Structure (FCS) and for
changes to Damage Tolerance Inspections (DTI) required in the Maintenance Program. This
service bulletin does not affect FCS, therefore DTIs are not necessary.
L. Interchangeability and Intermixability of Parts
Refer to Paragraph 2.C., Parts Necessary For Each Airplane, for interchangeability and intermixability
information.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: January 12, 2012
727-28-0134
14 of 26
BOEING SERVICE BULLETIN 727-28-0134

### Page 15

2.    MATERIAL INFORMATION
A. Material - Price and Availability
Refer to Paragraph 2.C., Parts Necessary For Each Airplane.
B. Industry Support Information
Boeing warranty remedies are available for 727 airplanes in warranty as of June 19, 2008. For inspection
man-hour reimbursement for airplanes in warranty as of that date, send a warranty claim to Boeing
Warranty & Product Assurance Contracts. If the condition described in this service bulletin is found
during the initial inspection for airplanes in warranty as of that date and additional man-hours or parts
are required, send a warranty claim to Boeing Warranty & Product Assurance Contracts. Warranty
remedies are not available for continued inspections as described in this Service Bulletin as these
actions are considered routine maintenance.
C. Parts Necessary For Each Airplane
1. Kits/Parts:
None
2. Parts and Materials Supplied by the Operator:
Refer to Illustrated Parts Catalog (IPC) 727 IPC 57-30-00.
3. Parts Modified and Reidentified:
None.
4. Parts Removed and Not Replaced:
None
D. Parts Necessary to Change Spares
None
E. Special Tooling - Price and Availability
None
F. Special Tooling Necessary to do this Service Bulletin
No special tools or equipment are necessary to do the change in this service bulletin. But, maintenance
and overhaul tools in the manuals given in Paragraph 1.J., References, can be necessary. Examine
operator tool supply to make sure all necessary tools are available.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: January 12, 2012
727-28-0134
15 of 26
BOEING SERVICE BULLETIN 727-28-0134

### Page 16

BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: January 12, 2012
727-28-0134
16 of 26
BOEING SERVICE BULLETIN 727-28-0134
BLANK PAGE

### Page 17

3.    ACCOMPLISHMENT INSTRUCTIONS
A. GENERAL INFORMATION
CAUTION: KEEP THE WORK AREA, WIRES AND ELECTRICAL BUNDLES CLEAN OF METAL
PARTICLES OR CONTAMINATION WHEN YOU USE TOOLS. UNWANTED MATERIAL,
METAL PARTICLES OR CONTAMINATION CAUGHT IN WIRE BUNDLES CAN CAUSE
DAMAGE TO THE BUNDLES. DAMAGED WIRE BUNDLES CAN CAUSE SPARKS OR
OTHER ELECTRICAL DAMAGE.
NOTE: 1. Manual titles are referred to by acronyms. Refer to Paragraph 1.J., References, for
definition of the acronyms.
2. Obey all of the warnings and cautions given in the specified manual sections.
3. Unless shown differently, these dimensions and tolerances are used:
– Linear dimensions are in inches
– Tolerance on linear dimensions, other than rivet and bolt edge margins, is plus
or minus 0.03 inch
– Tolerance on rivet and bolt edge margin is plus or minus 0.05 inch
– Angular tolerance is plus or minus 2 degrees
4. If the length of any fastener specified in this service bulletin does not meet the
installation standards in SRM Chapter 51, then a fastener of the same specification,
or an approved substitute, with a length which meets the installation standards in
SRM Chapter 51 may be used.
5. A General Visual Inspection is defined as: A visual examination of an interior or
exterior area, installation or assembly to detect obvious damage, failure or irregularity.
This level of inspection is made from within touching distance unless otherwise
specified. A mirror may be necessary to enhance visual access to all exposed surfaces
in the inspection area. This level of inspection is made under normally available
lighting conditions such as daylight, hangar lighting, flashlight or drop-light and may
require removal or opening of access doors or doors. Stands, ladders or platforms
may be required to gain proximity to the area being checked.
6. A Non-Destructive Test (NDT) is an inspection/testing procedure used to determine
the condition of a material in such a manner as to not damage or destroy the material
under investigation. The material is examined for flaws or conditions that could be
detrimental to the integrity of the structure.
7. These work instructions refer to procedures included in other Boeing documents.
When the words "refer to" are used and the operator has an accepted alternative
procedure, the accepted alternative procedure can be used. When the words "in
accordance with" are included in the instruction, the procedure in the Boeing document
must be used.
B. WORK INSTRUCTIONS
1. Do a General Visual Inspection or an ultrasonic Non-Destructive Test (NDT) of the left wing fuel
tank access door to make sure that an Impact Resistant Access Door is installed in the correct
location, in accordance with FIGURE 1.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: January 12, 2012
727-28-0134
17 of 26
BOEING SERVICE BULLETIN 727-28-0134

### Page 18

2. If a standard access door is found, replace the standard access door with an Impact Resistant
access door. Refer to 727 AMM 28-11-21 as an accepted procedure.
3. Do a General Visual Inspection of the left wing fuel tank access door to verify stencils and index
markers are applied in accordance with FIGURE 1.
4. If a stencil and/or index marker is missing, apply stencil and/or index marker in accordance with
FIGURE 1.
5. Do a General Visual Inspection or an ultrasonic NDT of the right wing fuel tank access door to
make sure that an Impact Resistant Access Door is installed in the correct location, in accordance
with FIGURE 2.
6. If a standard access door is found, replace the standard access door with an Impact Resistant
access door. Refer to 727 AMM 28-11-21 as an accepted procedure.
7. Do a General Visual Inspection of the right wing fuel tank access door to verify stencils and index
markers are applied in accordance with FIGURE 2.
8. If a stencil and/or index marker is missing, apply stencil and/or index marker in accordance with
FIGURE 2.
9. If one or more access doors were replaced and a leak check has not been done, refuel the
applicable fuel tank and check for leaks. Repair if necessary. Refer to 727 AMM 28-11-21 as an
accepted procedure.
10. Put the airplane back to a serviceable condition.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: January 12, 2012
727-28-0134
18 of 26
BOEING SERVICE BULLETIN 727-28-0134

### Page 19 (OCR)

BOEING SERVICE BULLETIN 727-28-0134
BOOST PUMP ACCESS
PANEL No. 1
BOOST PUMP ACCESS
PANEL No. 2
BOOST PUMP ACCESS
PANEL No. 3
BOOST PUMP ACCESS
PANEL No. 4
001o
ACCESS DOOR No. 2 LA  IMPACT RESISTANT
BOTTOM VIEW, LEFT WING
DOOR 1
0.60
ANT DOOR  0.40
1.15  1.05  INSTALL ONLY IMPACT RESISTANT  DOOR AT THIS LOCATION  CAUTION  2.25  1.75
.55
.45
0.50
(TYPICAL)
DIMENSION FOR  IMPACT RESISTANT ACCESS DOOR
INDEX MARKERS
1839605
The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for each wing.
FIGURE 1: ACCESS DOOR INSPECTION - LEFT WING
(SHEET 1 OF 2)
Original Issue: January 12, 2012
BOEING PROPRIETARY -  727-28-0134
Copyright © Unpublished Work - See page 1 for details.  19 of 26

### Page 20

NOTEQTYPART NUMBERNAMETASKSTEP
(a)1-Access DoorInspect1
(b)--Stencil and Index MarkerInspect2
(b)--StencilInspect3
(b)--Index MarkerInspect4
(a) In accordance with APPENDIX A.
(b) If a stencil and/or index marker is missing, apply stencil and/or index marker with BMS
10-60, Polyurethane Gloss Enamel, matching color to existing stencil and/or index marker.
Refer to SOPM 20-50-10.
FIGURE 1: ACCESS DOOR INSPECTION - LEFT WING
(SHEET 2 OF 2)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: January 12, 2012
727-28-0134
20 of 26
BOEING SERVICE BULLETIN 727-28-0134

### Page 21 (OCR)

BOEING SERVICE BULLETIN 727-28-0134
BOOST PUMP ACCESS
PANEL No. 1
BOOST PUMP ACCESS
PANEL No. 2
BOOST PUMP ACCESS
PANEL No. 3
BOOST PUMP ACCESS
PANEL No. 4
00000010  A ACCESS DOOR NO. 4  IMPACT RESISTAN
BOTTOM VIEW, RIGHT WING
DOOR (1)
0.60  IMPACT RESISTANT D
0.40
2?25  • TALENT THE CAPSTANT
1.15
1.05  10.55  0.45
1.55
0.50  1.45
(TYPICAL
IMPACT RESISTANT ACCESS DOOR  DIMENSION FOR
INDEX MARKERS  1839608
The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for each wing.
FIGURE 2: ACCESS DOOR INSPECTION - RIGHT WING
(SHEET 1 OF 2)
Original Issue: January 12, 2012
BOEING PROPRIETARY -  727-28-0134
Copyright © Unpublished Work - See page 1 for details.  21 of 26

### Page 22

NOTEQTYPART NUMBERNAMETASKSTEP
(a)1-Access DoorInspect1
(b)--Stencil and Index MarkerInspect2
(b)--StencilInspect3
(b)--Index MarkerInspect4
(a) In accordance with APPENDIX A.
(b) If a stencil and/or index marker is missing, apply stencil and/or index marker with BMS
10-60, Polyurethane Gloss Enamel, matching color to existing stencil and/or index marker.
Refer to SOPM 20-50-10.
FIGURE 2: ACCESS DOOR INSPECTION - RIGHT WING
(SHEET 2 OF 2)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: January 12, 2012
727-28-0134
22 of 26
BOEING SERVICE BULLETIN 727-28-0134

### Page 23

Use one of these two procedures to inspect each of the specified access doors.
OPTION 1: GENERAL VISUAL INSPECTION PROCEDURE
1. General Visual Inspection Procedure:
a. Defuel the applicable fuel tank. Refer to 727 AMM 28-23-00 as an accepted procedure.
b. Remove the access door. Refer to 727 AMM 28-11-21 as an accepted procedure.
c. Do a General Visual Inspection of the internal surface of the access door. If the internal surface of the
access door has protruding cast aluminum integral ribs, then the door is a standard access door (Figure
A1). If the internal surface is smooth (no ribs showing), then the door is an impact resistant access
door (Figure A1).
APPENDIX A: PROCEDURE FOR ACCESS DOOR INSPECTION
(SHEET 1 OF 4)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: January 12, 2012
727-28-0134
23 of 26
BOEING SERVICE BULLETIN 727-28-0134

### Page 24 (OCR)

BOEING SERVICE BULLETIN 727-28-0134
STANDARD ACCESS DOOR
(TYPICAL)
ALUMINUM
HONEYCOMB
FILLER
IMPACT RESISTANT ACCESS DOOR  (TYPICAL)  1856885
Figure Al
APPENDIX A: PROCEDURE FOR ACCESS DOOR INSPECTION
(SHEET 2 OF 4)
Original Issue: January 12, 2012
727-28-0134
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.  24 of 26

### Page 25

OPTION 2: ULTRASONIC NON-DESTRUCTIVE TEST (NDT) INSPECTION PROCEDURE
1. General:
a. This procedure is permitted with or without fuel in the tanks.
b. Refer to Non-Destructive Test (NDT) Standard Practices Manual 727 NDT Part 4, 51-00-00 as an
accepted procedure.
2. Equipment:
a. Digital thickness gage: Kramer Branson CL300, or equivalent.
b. Aluminum step wedge standard with a range that includes 0.08 to 0.50 inch.
c. A 0.25 inch, 15mhz delay tip or equivalent transducer.
d. Couplant: A low viscosity oil or UT couplant which will not damage the airplane structure.
3. Preparation: Clean fuel tank access door external skin.
4. Calibration: Calibrate the gage between 0.08 and 0.50 inch.
5. Inspection:
a. Along the center line of the long axis, slowly scan the fuel tank access door from one end to the other
end (Figure A2).
b. If a rib is detected and the rib thickness is greater than 0.50 inch, then the door is a standard access
door.
c. If the access door has a thickness between 0.08 and 0.10 inch and no ribs are detected, then the
access door is an impact resistant access door.
APPENDIX A: PROCEDURE FOR ACCESS DOOR INSPECTION
(SHEET 3 OF 4)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: January 12, 2012
727-28-0134
25 of 26
BOEING SERVICE BULLETIN 727-28-0134

### Page 26

Figure A2
APPENDIX A: PROCEDURE FOR ACCESS DOOR INSPECTION
(SHEET 4 OF 4)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: January 12, 2012
727-28-0134
26 of 26
BOEING SERVICE BULLETIN 727-28-0134

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.