# Boeing Service Bulletin 727-53-0149: Revision 4

- Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2013-0545; AD 2014-05-14 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Boeing Service Bulletin 727-53-0149](https://openairdocs.org/service-documents/boeing/sb-727-53-0149.md)
- Title as filed: Boeing Service Bulletin
- Pages: 57
- PDF: https://openairdocs.org/files/sha256/c9/a5/c9a5720dc8948f00e1858b14369b882641a6fc6b830b49f755c947cea7610903
- Page: https://openairdocs.org/service-documents/boeing/sb-727-53-0149/file/c9a5720dc894

## Text

This text is OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1 (OCR)

Group  Airplane  Commercial  SERVICE BULLET ENGMEERING Service Bulletin  .III1 0 2 1991  MASTER COPY  727
ATA System: 5314  Revision Transmittal Sheet
Number:  727-53-0149
Date:  May 4, 1979
Revision 4:  June 27, 1991
SUBJECT: FUSELAGE - MAIN WHEEL WELL PRESSURE FLOOR INSPECTION, MODIFICATION
AND REPAIR
NOTE: This revision includes all pages of the service bulletin.
SUMMARY
This revision is sent to provide information about a new top kit and new supplemental kits. The
inspection area is expanded to examine the beads at Body Station 950. Also an inspection
threshold and a repeat inspection interval are added for all areas not repaired or preventively
modified as described in Part III of the Accomplishment Instructions.  The intent of
727-53-0149NSC1 and 727-53-0149NSC2 are also added.
Airplane Effectivity shows changes of airplane operators.
No more work is necessary on airplanes changed by Revision 3 of this service bulletin.
More work is necessary on airplanes changed by the original issue, Revision 1 or Revision 2 of this
service bulletin. The work necessary is to add the additional doublers at right and left buttock line
50 to the side of the body, between body station 920 and 950.
Vertical lines on the left edge of each page show the location of data changes. If no vertical lines
are shown on a page, no important changes were made on that page.
REVISION HISTORY
Original Issue:  May 4, 1979
Revision 1:  September 19, 1980
Revision 2:  March 20, 1981
Revision 3:  November 2, 1989
Revision 4:  June 27, 1991
BOEING COMMERCIAL AIRPLANE GROUP PO BOX 3707 SEATTLE, WASHINGTON 98124-2207

### Page 2 (OCR)

PEEING  Airplane  Commercial  727
Group  Service Bulletin
ATA System: 5314  Summary
Number:  727-53-0149
Date:  May 4, 1979
Revision 4:  June 27, 1991
SUBJECT: FUSELAGE - MAIN WHEEL WELL PRESSURE FLOOR INSPECTION, MODIFICATION
AND REPAIR
BACKGROUND
Based on a structural review of the 727 airplane,
incorporation of the modification per this service
bulletin is recommended on aging airplanes.
Eight operators have reported 34 cracks on 20
airplanes, each along the ends of the pressure
floor reinforcing beads at Stations 930 and 940.
The cracks ranged from 0.38 to 15.25 inches in
length. Propagation of undetected cracks could
result in cabin pressurization difficulties.
Since Revision 3 of this service bulletin, similar
cracks have been reported at Body Station 950.
The airplanes had accumulated between 24,000
and 42,200 flight cycles and 24,000 and 49,500
flight hours.
Although there have been no reports of cracking
at Stations 880 and 890, the possibility exists
that cracks may develop at these stations also.
This service bulletin is the subject of FAA
Airworthiness Directive 90-17-06 Amendment
39-6691 which supersedes existing Federal
Aviation Administration (FAA) Airworthiness
Directive 88-26-02, Amendment 39-6089.
ACTION (PRR 24311)
As recommended by the 727 Aging Fleet
Structures Working  Group,  accomplish
modification  per  Accomplishment
Instructions at or before the accumulation of
60,000 flight cycles.
When the airplane has 20,000 flight cycles, or
within the next 2500 cycles, whichever is later,
inspect the ends of the pressure floor beads
adjacent to Stations 880, 890, 930, 940 and
If the previous  inspection is High
Frequance Eddy Current, examine at 5000 flight
cycle intervals. If the previous inspection is
visual or dye penetrant, examine at 4000 flight
intervals.  Repeat inspection until
preventive modification or permanent repair is
accomplished. Cracks in specified areas may be
repaired with doublers. An interim repair may be
accomplished providing a permanent repair is
made within 600 flights thereafter.
Airplanes previously modified per the original
release, or Revision 1 or 2 of this bulletin, or
Group 2 airplanes require repeat inspection for
cracks in the pressure floor web at BS 930, 940
and 950 between Buttock Lines 50 and 63 until
doublers are installed per this
Airplanes previously repaired using blind
fasteners require replacing fasteners upon
accumulating 10,000 flight cycles.
EFFECTIVITY
All 727 airplanes
Group 1 - Line Position 1-1432
Group 2 - Line Position 1433-1832
MANPOWER
Total Manhours - 274 per airplane
Elapsed Time - 42 Hours
MATERIAL INFORMATION
Kit  Price*
69-70864-3  $3282.00
69-70864-4  $5565.00
69-70864-5  $ 3624.00
* See Paragraph I. F. for terms and conditions
applicable  price and  delivery
information
BOEING COMMERCIAL AIRPLANE GROUP PO BOX 3707 SEATTLE, WASHINGTON 98124-2207  Summary Page 1 of 2

### Page 3 (OCR)

BOEING SERVICE BULLETIN 727-53-0149
STA 950 \
STA 940\
SEE DETAIL I
STA 930
STA 890
STA 880  & AIRPLANE
STA 870
FWDE
LEFT MAIN WHEEL WELL
+ +  + + + + + + +
+  + + +
TYPICAL
CRACKS
782880  DETAIL I
(PLAN VIEW)
May 4/79
Rev. 4: Jun 27/91  Summary Page 2 of 2

### Page 4 (OCR)

BOEING  Airplane  Commercial  727
Group  Service Bulletin
ATA System:  5314
Number:  727-53-0149
Date:  May 4, 1979
Revision 4:  June 27,1991
SUBJECT: FUSELAGE - MAIN WHEEL WELL PRESSURE FLOOR INSPECTION, MODIFICATION
AND REPAIR
I. PLANNING INFORMATION
A. Effectivity
1. Airplanes
Refer to Service Bulletin Index Document D6-9825, Part 3 for Airplane Variable Number, Line
Number, and Serial Number data.
An equivalent change was incorporated in production in accordance with PRR 24311 on
applicable airplanes other than those listed below.
LISTING BY CUSTOMER, CUSTOMER CODE, GROUP AND VARIABLE NUMBER
CUSTOMER
GROUP VARIABLE NUMBER
A. L. I. (IBA)
1 E3026  E3116
ACES (ACE)
1 E0130  E3148  E3651
AERO CHASQUI (CHQ)
1 E3501  E3653
AERO PERU (PER)
1 E3503  E3621  E5278
AEROEJECUTIVO (AEJ)
1 E0101  E0404
AEROLINEAS ARGENTINAS (ARG)
1 QD601-QD602
2 QD450  QD603-QD607
AERONICA (ANC)
1 E0133
AIR ALGERIE (ALG)
1 QA574-QA576 QB451-QB453
2 QB454-QB458
AIR CANADA (ACN)
1 QD205  QD209-QD210
2 QD215-QD223 QD225  QD231-QD239
May 4/79  727-53-0149
Rev. 4: Jun 27/91  Page 1of 53

### Page 5 (OCR)

BOEING SERVICE BULLETIN 727-53-0149
LISTING BY CUSTOMER, CUSTOMER CODE, GROUP AND VARIABLE NUMBER, (continued)
CUSTOMER
GROUP VARIABLE NUMBER
AVIANCA (AVI)
1 E3036  E3064  E3068-E3069  E3141-E3143 E3204  E3221-E3224
E3402  E3406  E5451  E5453  QA572  QB031-QB033
QD553-QD554
2 QD581-QD583 QD991-QD992
AVIATION CONSULTANTS (ACT)
1 E3076
AVIATION SALES CO., INC. (ASC)
1 QA038  QA908  QA918
AVIOGENEX AIR TRANSPORT (AVG)
1 QD006  QD191-QD192
2 QD518
BAHRAIN, GOVT OF (BHR)
2 QD451
BELGIAN AIR FORCE (BLG)
1 E5351-E5352
BRADLEY AIR SERVICES (BRS)
1 E3065  E5112  E5141  E5481-E5483
BRANIFF AIRLINES (BNF)
1 QA002  QA359
BRITHEN LTD. (BTN)
1 E0211
BURLINGTON NORTHERN (BR)
1 E3509
CARNIVAL AIR (CVL)
1 E3030  QA636  QA641
CHINESE AIR FORCE (CAF)
1 E3506  E3512  E5409  E5435
CITICORP INDUSTRIAL CREDIT (CIC)
1 QD206
CLAY LACY AVIATION, INC. (CYA)
1 E3077
CONNIE KALITTA FLYING SERVICES (CKF)
1 E0304  E5050
CONTINENTAL AIRLINES, INC. (CAL)
1 E0038-E0042  E0202  E0205  E3001  E3241  E3245
E3247  E3253  E5201  E5455  QA019-QA021 QA059-QA072
QA301-QA304 QA306  QA308-QA314 QA325-QA344 QA870-QA893 QA896
QD501-QD509
QA345-QA349  QB901-QB904 QD510  QD512-QD517
May 4/79  727-53-0149
Rev. 4: Jun 27/91

### Page 6 (OCR)

BOEING SERVICE BULLETIN 727-53-0149
LISTING BY CUSTOMER, CUSTOMER CODE, GROUP AND VARIABLE NUMBER, (continued)
CUSTOMER
GROUP VARIABLE NUMBER
AIR COLUMBUS (COB)
1 QL001-QL002
AIR FRANCE (AFA)
1 QA351-QA352 QA551  QA554  QA561-QA562 QA565-QA570
2 QD761-QD769 QD781-QD782
AIR JAMAICA (JAM)
1 QD281-QD284
AIR PANAMA INTERNATIONAL (PAN)
1 E3115
AIR TRANSAT (AI)
1 QD206-QD207 QD212
AIRCRAFT SUPPORT GROUP (ASG)
1 E3202
AIRLINE CREDIT CONSULTANTS (ACJ)
1 E0340  E3070  E3076
ALASKA AIRLINES (ASA)
1 E3401  E3521  E5058  E5142  QA378  QA894-QA895
QD902  QD904-QD905 QD931-QD932 QD951
2 QB619  QB622  QB624-QB628 QD555  QD558  QD791
QD909  QD952-QD954
ALLRED INTERNATIONAL, INC. (RED)
1 E0206
AMERICAN AIRLINES, INC. (AAL)
1 E0301-E0303  E0305-E0309  E0311-E0326  E0328-E0330  E0332  E0334
E0336-E0339  E0345  E0348-E0349  E3075  E3519-E3520  QA014
QA101-QA178 QA854  QA856-QA869
2 QA179-QA199 QB801-QB810
AMERICAN TRANS AIR (AAT)
1 E3029  E3032-E3033 E3286-E3289
AMERIJET INTERNATIONAL, INC. (AMJ)
1 E0104  E3028  E3073-E3074 E3145  E3341  E5161
E5403
AMWAY PRODUCTS (AMA)
1 E3681
ANSETT AIRLINES OF AUSTRALIA (ANS)
1 E0119  QD034
2 QD040  QD043-QD046
ARIANA AFGAN AIRLINES CO., LTD (AFG)
1 E5410  E5424
мау 4/79  727-53-0149
Rev. 4: Jun 27/91

### Page 7 (OCR)

BOEING SERVICE BULLETIN 727-53-0149
LISTING BY CUSTOMER, CUSTOMER CODE, GROUP AND VARIABLE NUMBER, (continued)
CUSTOMER
GROUP VARIABLE NUMBER
AUSTRALIAN AIRLINES LIMITED (AUS)
1 QD001-QD004 QD007-QD008
2 QD009-QD012
AVENSA (AVN)
1 E0034-E0036  E3072  E3244  E3246  E3248  E3511
QA036  QA039  QA041-QA043 QA853  QD121
AVIANCA (AVI)
1 E3036  E3064  E3069  E3141-E3143  E3146  E3149
E3204  E3221-E3224  E3402  E3406  E5451  E5453
QA572  QB031-QB033 QD553-QD554
2 QD581-QD583 QD991-QD992
AVIATION SALES CO., INC. (ASC)
1 QA038  QA908  QA918
AVIOGENEX AIR TRANSPORT (AVG)
1 QD006  QD191-QD192
2 QD518
BAHRAIN, GOVT OF (BHR)
2 QD451
BELGIAN AIR FORCE (BLG)
1 E5351-E5352
BRADLEY AIR SERVICES (BRS)
1 E3065  E5112  E5141  E5481-E5483
BRANIFF AIRLINES (BNF)
1 QA002  QA359
BRITHEN LTD. (BTN)
1 E0211
BURLINGTON NORTHERN (BR)
1 E3509
CARNIVAL AIR (CVL)
1 E3030  QA636  QA641
CHINESE AIR FORCE (CAF)
1 E3506  E3512  E5409  E5435
CITICORP INDUSTRIAL CREDIT (CIC)
1 QD211
CLAY LACY AVIATION, INC. (CYA)
1 E3077
CONNIE KALITTA FLYING SERVICES (CKF)
1 E0304  E5050
May 4/79  727-53-0149
Rev. 4: Jun 27/91

### Page 8 (OCR)

BOEING SERVICE BULLETIN 727-53-0149
LISTING BY CUSTOMER, CUSTOMER CODE, GROUP AND VARIABLE NUMBER, (continued)
CUSTOMER
GROUP VARIABLE NUMBER
CONTINENTAL AIRLINES, INC. (CAL)
1 E0038-E0042  E0202  E0205  E3001  E3241  E3245
E3247  E3253  E5201  E5455  QA019-QA021 QA059-QA072
QA301-QA304 QA306  QA308-QA314  QA325-QA344 QA870-QA893  QA896
QD501-QD509
2 QA345-QA349 QB901-QB904 QD510  QD512-QD517
CORSAIR (CRA)
1 E3002  E3011-E3012
CRUZEIRO DO SUL (CRU)
1 E3071  E3345  E3781-E3783
DALLAH AVCO (AVO)
1 E3038
DAN AIR (DAN)
1 QB035  QB114  QD033  QD123  QD903  QL004-QL005
QL031-QL032
DAVIS OIL CO. (DOC)
1 E3206
DELTA AIR LINES, INC. (DAL)
1 QA073-QA079 QA081-QA092 QA096-QA099 QA907  QA909-QA917 QA919-QA926
QA929-QA933 QB501-QB552
2 QA939-QA946 QA949  QB553-QB558 QB560-QB575
DHL CORPORATION/WORLDWIDE COURIER EXP. (DHL)
1 E0030  E3622  E5046-E5047  E5273-E5274
QA552-QA553 QA555-QA556  QA563-QA564
DIRECTORATE OF POLICE AVIATION (OMAN) (OMA)
1 E0210
DOMINICANA AIRLINES (DOM)
1 E3755  E5404  QD351
DONREY, INC. (DON)
1 E3014
DONVAN ENTERPRISES, INC. (DNV)
1 E0351
E-SYSTEMS (ESM)
2 QD908
EASTERN AIR LINES, INC. (EAL)
1 QA601-QA605 QA607-QA620 QA622  QA624  QA628  QA630-QA634
QA642-QA653
2 QA659-QA671 QA673-QA684 QA686-QA688
ECHO BAY MINES (EKO)
1 E5418
мау 4/79  727-53-0140
Rev. 4: Jun 27/91

### Page 9 (OCR)

BOEING SERVICE BULLETIN 727-53-0149
LISTING BY CUSTOMER, CUSTOMER CODE, GROUP AND VARIABLE NUMBER, (continued)
CUSTOMER
GROUP VARIABLE NUMBER
EMERY WORLDWIDE (EAF)
1 E5003  E5005  E5007-E5011 E5413  E5415
EMIRATES AIRLINES (EAD)
2 QB065  QD452  QD972
ETHIOPIAN AIRLINES, CORP. (ETH)
2 QD661-QD663 QD971
EUROPE AERO SERVICE (EUR)
1 QA573  QA855
EUROPEAN AIR TRANSPORT (EPT)
1 E3701-E3703
EVERGREEN INTERNATIONAL AIRLINES (EVR)
1 E3101  E3151-E3152  E3275-E3276  E3652  E5104-E5105  E5108
E5277  E5426
F.A.M.C.O. (AVIATION) (FAM)
1 E5353
FAHAD AL-TAMEEMI (TMI)
1 E3410
FAUCETT (COMPANIA DE AVIATION S.A. (FCT)
1 QA901  QA904
FEDERAL AVIATION ADMINISTRATION (FAA)
1 E0201  E5241
FEDERAL EXPRESS (FED)
1 E0023-E0028  E0122-E0123  E0125-E0129  E0131-E0132  E0134-E0138
E0341-E0344  E0346-E0347
E3254-E3274  E3277-E3283  E5048-E5049  E5052-E5054
E5056-E5057  E5059-E5063  E5101-E5102  E5163-E5164  E5221-E5224
E5226-E5240  QA093-QA095
QA897-QA899  QB601-QB609  QD035-QD038 QD201-QD204 QD208  QD213-QD214
2 QB610-QB617 QD039  QD041-QD042 QD224  QD226-QD230 QL501-QL515
FORBES, INC. (FRB)
1 E3655
FREEPORT-MCMORAN (FMR)
1 E3346
FUNAIR (FUN)
1 E3419
GEORGETOWN AIRCRAFT SERVICES (GEO)
1 E0216
GLENHOLME ENTERPRISES INC. (GLE)
1 E3144
GOVERNMENT OF MEXICO (MXG)
1 E3037
May 4/79  727-53-0149
Rev. 4: Jun 27/91

### Page 10 (OCR)

BOEING SERVICE BULLETIN 727-53-0149
LISTING BY CUSTOMER, CUSTOMER CODE, GROUP AND VARIABLE NUMBER, (continued)
CUSTOMER
GROUP VARIABLE NUMBER
GOVERNMENT OF SENEGAL (SEN)
1 QD402
GOVT. OF BURKINA FASO (HTV)
1 E3176
GUESS?, INC. (GES)
1 E3420
HAPAG LLOYD (HAP)
1 E3114  E3452
HCL AVIATION, INC. (HCL)
1 E3242
2 QA658
IBERIA (LINEAS AEREAS DE ESPANA S.A.) (IBE)
1 QB121-QB145 QB147-QB149 QB151-QB153
2 QB155-QB158
IMPERIAL PALACE AIR LTD. (IPA)
1 E0213
INTERNATIONAL AIR LEASES (IAL)
1 E3068  QA004  QA902  QA905-QA906
IRAN ISLAMIC REPUBLIC AIRLINE (IRN)
1 E0204  E3118  E3472-E3473 QD101-QD105
IRAQI AIRWAYS (IRQ)
1 QD421-QD423
2 QD424-QD426
ISTANBUL AIRLINES (IST)
1 QA557-QA558
ITAPEMIRIM TRANSPORTES AEREOS S.A. (ITP)
1 E3344
JET AVIATION (JTA)
1 E3407
JET EAST, INC. (JTE)
1 E0418  E0420-E0422 E3117  E3201  E3205  E3347-E3348
E3350  QD032
JUGOSLOVENSKI AEROTRANSPORT (JAT)
1 QD142-QD145
2 QD146-QD149
KABO AIR LIMITED (KAB)
1 E0103  E0107
KALAIR USA CORPORATION (KLA)
1 E3604
KELOWNA FLIGHTCRAFT AIR CHARTER LTD. (KEL)
1 E5001  E5428
Rev. 4: Jun 27/91  May 4/79  727-53-0149

### Page 11 (OCR)

BOEING SERVICE BULLETIN 727-53-0149
LISTING BY CUSTOMER, CUSTOMER CODE, GROUP AND VARIABLE NUMBER, (continued)
CUSTOMER
GROUP VARIABLE NUMBER
KEY AIRLINES (KEY)
1 E0029  E0033  E3027  E3243  E3250-E3252 E3571
QA559-QA560
KOREAN AIR LINES, INC. (KAL)
1 QA015  QA022  QA024-QA025 QA033-QA035 QA037  QA040
QA044-QA046
KUWAIT AIRWAYS CORPORATION (KUW)
2 QD801-QD804
LACSA (LAC)
1 E3654  QD031
2 QD701-QD702 QD907
LADECO (LDE)
1 E0032  E3103  E3517  E3573
LIBYAN ARAB (LAA)
1 QA316-QA324 QB651
LILTIJARA CO., LTD. (LIL)
2 QD973
LINA CONGO (LNA)
2 QD446
LLOYD AERO BOLIVIANO (LAB)
1 E3102  E3522  E5421  QD161-QD163
LUFTHANSA GERMAN AIRLINES (DLH)
1 QB105-QB106 QB108-QB109 QB116  QB305  QB307-QB308 QB310-QB315
2 QB316
MCNALL AVIATION (MCN)
1 E3035
MEXICAN AIR FORCE (MXA)
1 E3171-E3172 E3175
MEXICANA (CMA)
1 QA654-QA656 QB034  QB036-QB045 QD085-QD088 QD444
2 QA657 '  QB046-QB049 QB051-QB058 QB060-QB064 QD556-QD557 QD571-QD572
MEZEL AIR LTD. (MEZ)
1 QD906
MGM GRAND AIR (MGM)
1 E3504-E3505 E3510
MIAMI AIR INTERNATIONAL INC. (MIB)
2 QA672
IMME AVIATION (CAYMAN ISLANDS) LTD. (MME)
1 E0209
MRH AVIATION LTD. (BLA)
1 E3005
May 4/79  727-53-0149
Rev. 4: Jun 27/91

### Page 12 (OCR)

BOEING SERVICE BULLETIN 727-53-0149
LISTING BY CUSTOMER, CUSTOMER CODE, GROUP AND VARIABLE NUMBER, (continued)
CUSTOMER
GROUP VARIABLE NUMBER
NIGERIA, GOV OF (NGA)
2 QL081
NOBLE AIR (NOB)
1 QB351-QB352
2 QB219
NOMADS, INC. (NOM)
1 E5279
NORTHWEST AIRLINES, INC. (NWA)
1 E3021-E3023 E3025  E3031  E3034  E3039-E3040 E3173
QA701-QA703 QA705-QA706 QA708-QA720 QA722-QA723 QA725-QA745 QD441-QD443
QD445
2 QA746-QA753 QD447-QD449 QD453  QD711-QD717
OCCIDENTAL PETROLEUM CORP (OCP)
1 E3004
OLYMPIC AIRWAYS (OLY)
1 QA001  QA801-QA805 QB117-QB118  QB309
PAN AMERICAN WORLD AIRWAYS, INC. (PAA)
1 QA003  QA057-QA058 QA201-QA207  QA209-QA214 QA216-QA225 QA366
QA369-QA371 QA627  QA637-QA640 QA704
QA707  QA851-QA852  QB001-QB002 QB101-QB104 QB107
QB110  QB115  QB301-QB304
2 QD691-QD692 QD821-QD828
PANAMANIAN AIR FORCE (PAF)
1 E3203
PINECROFT, LIMITED (PCT)
1 E3507  QD401
PRIVATE JET EXPEDITIONS, INC. (PJE)
1 E0413
QATAR (QAT)
1 QD403
R. B. HARIRI (RBH)
2 QE002
REEVE ALEUTIAN AIRWAYS, INC. (RVV)
1 E5035  E5040
RELIANCE GROUP, INC. (RGI)
1 E3285
REPUBLIC OF CAMEROON (CMR)
1 QD410
REPUBLIC OF ZAIRE (ZAR)
1 E0214
May 4/79  727-53-0149
Rev. 4: Jun 27/91  9

### Page 13 (OCR)

BOEING SERVICE BULLETIN 727-53-0149
LISTING BY CUSTOMER, CUSTOMER CODE, GROUP AND VARIABLE NUMBER, (continued)
CUSTOMER
GROUP VARIABLE NUMBER
RESBERY CORPORATION (INI)
1 E3150
RICH INTERNATIONAL AIRWAYS (RIH)
1 E3013
ROYAL AIR MAROC (RAM)
1 QA577-QA579 QA581-QA584
2. QA585
ROYAL BRUNEI (RBA)
1 E0212
2. QD407
ROYAL JORDANIAN AIRLINE (RJA)
2. QD124-QD126
ROYAL NEPAL AIRLINES (RNA)
1 E3784  E5419
ROYAL NEW ZEALAND AIR FORCE (RNZ)
1 E5065  E5068
RYAN INTERNATIONAL AIRLINES (RYN)
1 E3003  E3409  E3411  E3415-E3418 E5002  E5004
E5006  E5031-E5032  E5037  E5039  E5041-E5042 E5280
E5381  E5411  E5433  E5502
SAETA OF ECUADOR (SAE)
1 E0414  E3576
SCIBE-AIRLIFT KINSHASA (SAK)
1 E0208  E3451
SERVICIOS AEREOS NACIONALES, S.A. (SAN)
1 E3684
SHERRARD AVIATION PTY LTD. (SHD)
1 E5501
SIGAIR (SIG)
1 E0207
SKYWAYS INTERNATIONAL, INC (SKL)
1 E3421
STERLING AIRWAYS (STR)
1 QLO03
2 QD164  QD427  QD684-QD685 QL006-QL008
SUN COUNTRY AIRLINES (SCA)
1 QD005
2. QB629
SYRIAN ARAB AIRLINES (SYR)
1 QD471-QD473
May 4/79  127-53-0110
Rev. 4: Jun 27/91

### Page 14 (OCR)

BOEING SERVICE BULLETIN 727-53-0149
LISTING BY CUSTOMER, CUSTOMER CODE, GROUP AND VARIABLE NUMBER, (continued)
CUSTOMER
GROUP VARIABLE NUMBER
T A PORTUGUESES (TAP)
1 QD302
2 QD303-QD305
TAESA (TES)
1 E3024  E3174  E3553
TAN SAHSA HONDURAS AIRLINES (SAH)
1 E3113
THE K. B. A. FOUNDATION (KBA)
1 E3574
THE LIMITED, INC. (LII)
1 E3704
TNT-SAVA (TNN)
1 E3508  E5114
TOROSAIR (TOS)
1 QA903
TRACINDA CORPORATION (TRD)
1 E3284
TRANS WORLD AIRLINES, INC. (TWA)
1 E0401  E0405-E0408 E0412  E0416-E0417  E0419  E0423
QA501-QA527 QA529-QA537 QB201-QB203
2 QB204-QB218 QB220
TRANSPORTES AEREOS MILITAR EQUATORIANOS (TAM)
1 E3513  E3516  E3682
2 QD741
TRIANGLE AIRCRAFT SERVICES CORP. (TRI)
2 QD910
TRUMP SHUTTLE, INC. (TSI)
1 E0106  E0116  E0121  E0140  E3342-E3343  E3349
QA010-QA012 QA017-QA018 QA353-QA355 QA357  QA606  QA623
QA625-QA626
2 QD474-QD475
TUNIS AIR (TUN)
1 QA571  QB401-QB407
TUR EUROPEAN AIRWAYS (TOU)
1 QB119  QB306
TURKISH AIRLINES (THY)
1 QD321-QD322 QD324-QD325
2 QD327-QD330 QD511
UNITED AIR LINES, INC. (UAL)
2 QA469-QA499 Q8701-QB705 QA401-QA468  1 E0003  E0005-E0022
May 4/79  Rev. 4: Jun 27/91  727-53-0149

### Page 15 (OCR)

BOEING SERVICE BULLETIN 727-53-0149
LISTING BY CUSTOMER, CUSTOMER CODE, GROUP AND VARIABLE NUMBER, (continued)
CUSTOMER
GROUP VARIABLE NUMBER
UNITED PARCEL SERVICE (UPS)
1 E5033-E5034  E5036  E5038  E5043-E5045  E5051  E5106-E5107
E5109-E5111  E5113  E5115-E5116  E5162  E5225  E5243-E5245
E5251-E5252  E5271  E5275-E5276  E5301-E5306  E5401  E5405
E5417  E5422-E5423  E5427  E5429  QA927  QD551-QD552
2 QA934-QA938
UNITED STATES MARSHAL'S SERVICE (USV)
1 E0215  E3059
USAF - 727 C-22A PROGRAM (UO5)
1 E0203
USAF - 727 C-22B PROGRAM (UO6)
1 E3061  E3063  E3066-E3067
USAIR, INC. (USA)
1 QA005-QA009 QA023  QA026-QA032  QA051-QA056 QA358  QA360-QA365
QA367-QA368 QA372-QA373 QA928
2. QA374-QA376  QB066-QB068 QB618  QB620-QB621 QB623  QD681-QD683
USAL, LTD. (ULL)
1 E3523
VALLEJO CORPORATION (VAC)
1 E3683
VARIG AIRLINES (VAR)
1 E3572  E3575  E3751-E3754  E5272  E5406-E5407 E5412
VIEW TOP CORPORATION (VTC)
1 E3006
WEDGE AVIATION, INC (WST)
2. QE001
WESTFIELD AVIATION LTD. (WEF)
1 E0350
WORLDWAYS CANADA LTD (WWC)
1 E3601-E3603
YEMEN AIRWAYS (YEM)
2. QD621-QD624 QD641
May 4/79  727-53-0112
Rev. 4: Jun 27/91

### Page 16 (OCR)

BOEING SERVICE BULLETIN 727-53-0149
LISTING BY VARIABLE NUMBER
GROUP 1
E0001-E0042  E0101-E0140  E0201-E0216  E0301-E0351  E0401-E0423  E3001-E3006
E3011-E3014  E3021-E3040  E3059  E3061-E3077  E3101-E3103  E3111-E3118
E3141-E3152  E3171-E3177  E3201-E3206  E3221-E3224  E3241-E3290  E3341-E3350
E3401-E3421  E3451-E3452  E3471-E3474  E3501-E3513  E3516-E3523  E3551-E3553
E3571-E3578  E3601-E3604  E3621-E3622  E3651-E3655  E3677  E3681-E3684
E3701-E3704  E3751-E3755  E3781-E3784  E5001-E5011  E5031-E5068  E5101-E5116
E5141-E5143  E5161-E5164  E5201-E5203  E5221-E5245  E5251-E5252  E5271-E5281
E5301-E5306  E5351-E5353  E5381-E5382  E5401-E5424  E5426-E5429
E5435  E5451-E5455  E5481-E5483  E5501-E5502  QA001-QA046 QA051-QA099
QA101-QA178 QA201-QA225  QA301-QA344  QA351-QA373  QA401-QA468
QA501-QA537  QA551-QA579  QA581-QA584  QA601-QA656  QA701-QA745 QA801-QA805
QA851-QA899  QA901-QA933  QB001-QB002  QB031-QB045  QB101-QB110 QB114-QB119
QB121-QB149  QB151-QB153  QB201-QB203  QB301-QB315  QB351-QB352  QB401-QB407
QB451-QB453  QB501-QB552  QB601-QB609  QD001-QD008  QD031-QD038
QD085-QD088  QD101-QD105  QD121-QD123  QD141-QD145 QD161-QD163 QD191-QD192
QD201-QD214  QD281-QD284  QD301-QD302  QD321-QD326  QD401-QD403
QD410  QD421-QD423  QD441-QD445  QD471-QD473  QD501-QD509  QD551-QD554
QD601-QD602 QD901-QD906  QD931-QD932 QD951  QL001-QL005  QL031-QL032
GROUP 2
QA179-QA199  QA345-QA349  QA374-QA376  QA469-QA499  QA657-QA688
QA746-QA753  QA934-QA946  QB046-QB049  QB051-QB068  QB154-QB158
QB204-QB220  QB454-QB458 QB553-QB575  QB610-QB629  QB701-QB705
QB801-QB810  QB901-QB904  QD009-QD012  QD039-QD046  QD124-QD127 QD146-QD149
QD215-QD239  QD303-QD305  QD327-QD330  QD424-QD427
QD446-QD453  QD474-QD475  QD510-QD518  QD555-QD558  QD571-QD572 QD581-QD583
QD603-QD607  QD621-QD624  QD661-QD663  QD681-QD685  QD691-QD692
QD701-QD702  QD711-QD717  QD761-QD769  QD781-QD782
QD801-QD804  QD821-QD828  QD907-QD910 QD952-QD954  QD971-QD973 QD991-QD992
QE001-QE002  QL006-QL008  QL501-QL515
2. Spares
None
мау 4/79  727-53-0149
Rev. 4: Jun 27/91  13

### Page 17 (OCR)

BOEING SERVICE BULLETIN 727-53-0149
B. Reason
As a result of the FAA-sponsored Aging Fleet Conference, a 727 Structures Working Group with
Airline and Boeing members and FAA observers was formed to review structural service bulletin
modifications and recommend selected bulletins for incorporation on aging airplanes. This service
bulletin modification has been recommended for incorporation on aging 727 airplanes.
Incorporation of the modification described in this bulletin will reduce the possibility of cracks in the
main wheel well pressure floor adjacent to the floor beams at Body Stations 880, 890, 930, 940 and
950. Propagation of undetected cracks could result in pressurization difficulties.
Eight operators have reported 34 cracks on 20 airplanes along the ends of the pressure floor
reinforcing beads at Stations 930 and 940. The cracks ranged from 0.38 to 15.25 inches in length.
The airplanes had accumulated between 24,000 and 42,200 flight cycles and 24,000 and 49,500
flight hours.
Since Revision 3 of this service bulletin, similar cracks have been reported at Body Station 950.
Although there have been no reports of cracking at Stations 880 and 890, the possibility exists that
cracks may develop at these stations also. A preventive modification and repair for cracking at
wheel well pressure web Stations 900 through 920 is described in Service Bulletin 727-53-124.
Revision 1 was issued to provide detailed instructions for cutting and splicing fiberglass air
conditioning ducts to allow access to rework area without removing aft body fuel tanks. Some of the
ducts are made of polycarbonate and may not be cut and spliced.  The splicing procedure is
required only when aft body tanks are installed and it is not feasible to remove them.  In all other
instances, to minimize airplane downtime, entire duct should be removed during rework.
Subsequent to the issue of Revision 1 of this service bulletin operators requested an interim crack
repair similar to that contained in Service Bulletin 727-53-124. In addition, one operator reported
cracks beyond repairable limits contained in repair drawings included with this bulletin. Therefore,
Revision 2 was issued to allow an optional interim repair for cracks within limits and to transmit
revised drawings providing for expanded repairs in certain areas. Several previous kits have been
replaced to account for expanded repairs.
Revision 3 of this bulletin is issued to provide the recommendations of the Aging Fleet 727
Structures Working Group. Also provided is an additional modification kit to install a 0.100 inch
thick doubler between Body Station 920 and Body Station 950 and between Buttock Line 50 and
side of body on both left and right sides of airplane.
Revision 4 of this bulletin is issued to provide information about a new top kit and new supplemental
kits.  The new top kit provides two doublers to cover the same area as the doubler provided in
Revision 3 of this bulletin. The doublers 65-89360-129 and -130, provided by Revision 3 require
rework to make two doublers 65-89360-137 and two doublers 65-89360-138. The new revision to
the drawing added information for installation of the doubler if existing repairs are at the same
location. The inspection area is expanded to examine the beads at Body Station 950. Also an
inspection threshold and a repeat inspection interval are added for all areas not repaired or
preventively modified as described in Part III of the Accomplishment Instructions. The intent of
727-53-0149NSC1 and 727-53-0149NSC2 are also added.
May 4/79  727-53-0149
Rev. 4: Jun 27/91  14

### Page 18 (OCR)

BOEING SERVICE BULLETIN 727-53-0149
C. Description
Based on a structural review of the 727 airplane, it is recommended that the modification per
Accomplishment Instructions of this service bulletin be accomplished prior to, or upon accumulation
of 60,000 flight cycles.
When the airplane has 20,000 flight cycles, or within the next 2500 cycles, whichever is later,
inspect the ends of the pressure floor beads adjacent to Stations 880, 890, 930, 940 and 950. If the
previous inspection is High Frequance Eddy Current, examine at 5000 flight cycle intervals. If the
previous inspection is visual or dye penetrant, examine at 4000 flight cycle intervals. Repeat
inspection until preventive modification or permanent repair is accomplished. Eddy-current or
penetrant inspection is the preferred method of crack detection.
Preventive modification consists of addition of reinforcing strips along each inspected floor beam
and replacement of one stiffener between Stations 870 and 880. In addition, doublers are installed
between Body Station 920 and 950 and between right Buttock Line (BL) 50 and side of body and
left BL 50 and side of body. Cracks may be repaired in specified areas by adding doublers and
reinforcing strips. An interim repair consisting of stop drilling and sealing of cracks within limits may
be accomplished providing the permanent repair is made within 600 flights thereafter. The
preventive modification should be accomplished in unrepaired areas.
On airplanes that have Permanent Repair (shown in Figure 2) or Preventive Modification (shown in
Figure 3) installed in one or part of the specified areas, inspect all remaining specitied areas. It the
previous inspection is High Frequance Eddy Current, examine at 5000 flight cycle intervals. It the
previous inspection is visual or dye penetrant, examine at 4000 flight cycle intervals. Repeat
inspection until Permanent Repair or Preventive Modification is installed.
Airplanes previously modified per the original issue, or Revisions 1 or 2 of this bulletin, or Group 2
airplanes require repeat inspection for cracks in the pressure floor web at Body Stations 930, 940
and 950 between Buttock Lines (BL) 50 and side of airplane body until additional doublers are
installed per Revision 3 or this revision.
Airplanes previously repaired per the original issue, or Revisions 1, 2 or 3 of this bulletin using blind
fasteners require additional work to replace fasteners after 10,000 flight cycles.
This service bulletin is the subject of Federal Aviation Administration (FAA) Airworthiness Directive
90-17-06 Amendment 39-6691 which supersedes existing FAA Airworthiness Directive 88-26-02,
Amendment 39-6089.
NOTE: 1. If not already accomplished, concurrent incorporation of Service Bulletin 727-53-124,
"Main Wheel Well Pressure Floor Inspection, Modification and Repair", is suggested on
commonly affected airplanes.
2. This service bulletin is listed in Boeing Document D6- 54860.
D. Approval
This service bulletin has been reviewed by the Federal Aviation Administration (FAA) and the
repairs and modifications herein comply with the applicable Federal Aviation Regulations (FAR's)
and are FAA approved.
The FAA has determined that repair and modification in accordance with Revision 4 to service
bulletin 727-53-0149 "FUSELAGE - MAIN WHEEL WELL PRESSURE FLOOR INSPECTION,
MODIFICATION AND REPAIR" provides an acceptable alternate means of compliance for FAA
Airworthiness Directive 90-17-06,  Amendment  39-6691 which supersedes existing FAA
Airworthiness Directive 88-26-02, Amendment 39-6089.
May 4/79  727-53-0149
Rev. 4: Jun 27/91  15

### Page 19 (OCR)

BOEING SERVICE BULLETIN 727-53-0149
E. Manpower
Approximately 274 man-hours are necessary to do this modification for each airplane.
The data below shows an estimate of the man-hours necessary to do this modification for each
airplane. This estimate is for direct labor only, done only by an experienced crew. Adjust these
estimates with operator man-hour data if necessary. It does not include lost time such as: time to
adjust to the work place; schedule the work; examine the work; cure materials; make parts; find
tools or other lost time.
Elapsed
Number of  Time
Task  Persons  Man-Hours  (Hours)
Examine  2  2  1
Open Access for Change  8  40  5
Change  162  27
Close Access  72  9
NOTE: Additional time may be necessary to do repair during modification. Repair time will vary
depending on extent of repair.
May 4/79  727-53-0149
Rev. 4: Jun 27/91  16

### Page 20 (OCR)

BOEING SERVICE BULLETIN 727-53-0149
F. Material - Price and Availability
1. 1. The modification kit identified in Paragraph II.A. may be obtained from Boeing within the
terms and conditions defined below. After expiration of the quotation, price and delivery data
will be provided upon request.
The delivery quotation below is computed from date of receipt of customer purchase order.
Improved flow times may be possible if necessary to support customers' planned modification
schedules. It is therefore requested that customer purchase orders requiring earlier kit delivery
include planned dates of kit incorporation.
Delivery
Kit Number  Description  Weeks  Unit Price
69-70864-1  Modification  Inactive for
Kit  procurement
69-70864-2  Modification  Inactive for
Kit  procurement
69-70864-4  Modification  25  $5565.00
Kit (Group 1)
65-89360-127  Doubler Kit  Inactive for
procurement
69-70864-5  Modification Kit  21  $3624.00
(Group 2)
69-70864-3  Kit - Supplements  20  $3282.00
69-70864-2
Date: June 27, 1991
мау 4/79  727-53-0149
Rev. 4: Jun 27/91  17

### Page 21 (OCR)

BOEING SERVICE BULLETIN 727-53-0149
2. It is recommended that the repair kits identified in Paragraph II.A. be furnished or fabricated
from operator's existing stock or purchased directly from industry sources. The following
Boeing price data is provided for planning purposes or in the event operators desire to purchase
kits from Boeing. Delivery data will be provided upon request.
Kit Number  Description  Unit Price
65-89360-71  Repair Kit  Inactive for Procurement
65-89360-72  Repair Kit  Inactive for Procurement
65-89360-73  Repair Kit  Inactive for Procurement_..
65-89360-74  Repair Kit  Inactive for Procurement
65-89360-75  Repair Kit  $304.00
65-89360-76  Repair Kit  $304.00
65-89360-77  Repair Kit  $179.00
65-89360-78  Repair Kit  $179.00
65-89360-79  Repair Kit  $196.00
65-89360-81  Repair Kit  $213.00
65-89360-82  Repair Kit  $180.00
65-89360-85  Repair Kit  $191.00
65-89360-86  Repair Kit  $188.00
65-89360-103  Repair Kit  $860.00
65-89360-104  Repair Kit  $860.00
65-89360-105  Repair Kit  $901.00
65-89360-106  Repair Kit  $901.00
Date: June 27, 1991
The prices quoted are subject to the terms and conditions of Boeing's standard purchase order
acknowledgment. Quotations are subject to acceptance within 180 days from date hereon.
Prices quoted in United States Dollars. Terms: Net 30 days.
Address purchase orders and correspondence pertaining to this quotation to Director of Spares,
and refer to this service bulletin number.
May 4/79  727-53-0149
Rev. 4: Jun 27/91  18

### Page 22 (OCR)

BOEING SERVICE BULLETIN 727-53-0149
G. Tooling - Price and Availability
None
H. Weight and Balance (Modification Only)
Applicability  Change in Basic Weight  Change in Basic Moment
Pounds  Pound-Inches
69-70864-2  +24.5  +22,662
69-70864-3  +3.3  +3069
69-70864-4  +23.2  +21460
69-70864-5  +11.3  +10509
65-89360-127  +10.2  +9,486
мау 4/79  727-53-0149
Rev. 4: Jun 27/91  19

### Page 23 (OCR)

BOEING SERVICE BULLETIN 727-53-0149
1. References
1. Existing Data
a. Engineering Change Memo PRR 24311
b. Structural Repair Manual Subject 51-30-2 and 51-30-5
c. 727 Overhaul Manual Subject 20-50-12
d. Boeing Service Bulletin 727-53-124, 'Main Wheel Well Pressure Floor Inspection,
Modification and Repair"
e. FAA Airworthiness Directive 90-17-06, Amendment 39-6691
1. Boeing Document D6-54860 Aging Airplane Service Bulletin Structural Modification
Program - Model 727"
2. New or revised data supplied with this service bulletin:
Drawing No.  Sht.  DCN ADCN  Title
65-89360  PL  Doubler Installation -
Pressure Floor Main
5  8  Gear Wheel well
6  2
7
8
9
3. Process Data:
Boeing Process Specifications that are listed on drawings supplied in support of this bulletin are
not detailed in this bulletin since they are common practices which can be accomplished in
accordance with operator's normal procedures.
J. Publications Changed
Publication  Chapter-Section
727 Structural Repair Manual  53-10-02
May 4/79  727-53-0149
Rev. 4: Jun 27/91  20

### Page 24 (OCR)

BOEING SERVICE BULLETIN 727-53-0149
II. MATERIAL INFORMATION
A. Parts Required Per Airplane
1. The following modification kit may be obtained from Boeing as noted in Paragraph I.F.:
NOTES:
1. Only one top kit is required to modify each airplane.
2. On Group 2 airplanes or group 1 airplanes previously modified per the original
issue, Revision 1 or 2 of this bulletin only require the Modification Kit 69-70864-5.
3. For operators that have ordered 65-89360-127 kit per Revision 3 of this bulletin
only require the supplemental Kit 69-70864-3.
4. For contents of kits refer to drawings supplied with this service bulletin.
69-70864 -  REINFORCEMENT INSTALLATION, PRESSURE FLOOR, MAIN GEAR WHEEL  WELL
-5  -3  -2  -1
Anueno  Part Number  Nomenclature
69-70864-1 (a)(b)  Top Kit (Inactive)
69-70864-2 (a)(c)  Top Kit (Inactive)
69-70864-3 (c)(d)  Supplemental Kit
69-70864-4 (a)(b)(c)  Top Kit (Group 1)
69-70864-5 (b)(a)  Top Kit (Group 2)
1  1  65-89360-83  Reinforcement
Installation
1  65-89360-127 (b)  Doubler Installation
65-89360-135  Doubler Installation
1  65-89360-136  Doubler Installation
1  1  1  65-89619-1  Support Bracket
Installation
(a) Top Kit 69-70864-4 supersedes 69-70864-2 and 69-70864-1.
(b) Kit 69-70864-1 plus Kit 65-89360-127 plus Kit 69-70864-3 is equivalent to 69-70864-4; also
Kit 69-70864-1 plus kit 69-70864-5 is equivalent to 69-70864-4
(c) Kit 69-70864-2 plus Kit 69-70864-3 is equivalent to 69-70864-4
(d) Kit 65-89360-127 plus Kit 69-70864-3 is equivalent to 69-70864-5, after rework of doublers
65-89360-129 and 65-89360-130 to two 65-89360-137 doublers and two 65-89360-138
May 4/79  727-53-0149
Rev. 4: Jun 27/91  21

### Page 25 (OCR)

BOEING SERVICE BULLETIN 727-53-0149
doublers.
2. The following repair kits may be furnished by the operator or obtained from Boeing as noted in
Paragraph I.F.:
NOTE: For contents of kits refer to drawings supplied with this service bulletin.
65-89360 - DOUBLER INSTALLATION, PRESSURE FLOOR MAZN GEAR WHEEL WELL
-73  -72  -71
Quantity  Part Number  Nomenclature
65-89360-71(a)  Repair Kit - Left,
Sta 920-930, BL32-58
65-89360-72(b)  Repair Kit - Right,
Sta 920-930, BL32-58
65-89360-73(c)  Repair Kit - Left,
Sta 930-940, BL32-55
(a) Superseded by 65-89360-105
(b) Superseded by 65-89360-106
(c) Superseded by 65-89360-103
65-89360-  DOUBLER INSTALLATION, PRESSURE FLOUR MAIN GEAR
WHEEL WELL
-76  -75  -74
Quantity  Part Number  Nomenclature
65-89360-74(d)  Repair Kit - Right,
Sta 930-940, BL32-55
65-89360-75  Repair Kit - Left,
Sta 930-940, BL20-32
65-89360-76  Repair Kit-Right,
Sta 930-940, BL20-32
(d) Superseded by 65-89360-104
May 4/79  727-53-0149
Rev. 4: Jun 27/91  22

### Page 26 (OCR)

BOEING SERVICE BULLETIN 727-53-0149
65-89360 -  DOUBLER INSTALLATION, PRESSURE FLOOR MAIN GEAR WHEEL
WELL
-79  -78  -77
Quantity  Part Number  Nomenclature
65-89360-77  Repair Kit -Left,
Sta 930-940, BL2-12
65-89360-78  Repair Kit-Right
Sta 930-940, BL2-12
65-89360-79  Repair Kit-Left,
Sta 920-930, BL2-16
65-89360 -  DOUBLER INSTALLATION, PRESSURE FLOOR MAIN GEAR
WHEEL WELL
-86  -85  -82  -81
Quantity  Part Number  Nomenclature
65-89360-81  Repair Kit -Left,
Sta 880-890, BL 0-22
65-89360-82  Repair Kit -Right,
Sta 880-890, BL 0-12
65-89360-85  Repair Kit -Left,
Sta 890-900, BL 0-22
65-89360-86  Repair Kit -Right,
Sta 890-900, BL 0-15
May 4/79  727-53-0149
Rev. 4: Jun 27/91  23

### Page 27 (OCR)

BOEING SERVICE BULLETIN 727-53-0149
65-89360 -  DOUBLER INSTALLATION, PRESSURE FLOOR MAIN GEAR
WHEEL WELL
-106  -105  -104  -103
Quantity  Part Number  Nomenclature
65-89360 -103(e)  Repair Kit - Left
Sta 930 - 940, BL 32-61
65-89360 -104(f)  Repair Kit - Right
Sta 930 - 940, BL 32-61
65-89360-105(9)  Repair Kit - Left
Sta 920 - 930, BL 32-61
65-89360 -106(h)  Repair Kit - Right
Sta 920 - 930, BL 32-61
(e) Supersedes 65-89360-73
(1) Supersedes 65-89360-74
(g) Supersedes 65-89360-71
(h) Supersedes 65-89360-72
May 4/79  727-53-0149
Rev. 4: Jun 27/91  24

### Page 28 (OCR)

BOEING SERVICE BULLETIN 727-53-0149
3. The following materials are to be supplied by the operator for airplanes with aft body fuel tanks
installed (See Figure 5 for requirements):
Quantity  Part Number  Nomenclature
As Required  R110 (a)  Resin Mix
As Required  R110 (a)  Resin Mix
As Required  BMS 9-3 (b)  181 Fabric
(C)  Polyvinylchloride (PVC)
(c)  Polyvinylalcohol (PVA)
As Required  BMS 8-39, Type I (d)  Insulation
Composition A
As Required  BMS 8-39, Type IV (d)  Insulation
Composition A
As Required  Type 12 (e)  Adhesive
As Required  Type 48 (e)  Adhesive
As Required  Schnee Moorhead  Sealing Compound
No. 5144 (1)
As Required  Foster 9B2 (g)  Sealing Compound
As Required  BMS 8-201, Type I (h)  Resin
As Required  BMS 8-201, Type II (h)(i)  Resin
(a) See Bac 5419 for sources of components of resin mix R110 or R111.
(b) BFG Industries, Inc.
P.O. Box 21207
3330 West Friendly Ave.
Greensboro, NC 27420
Clark-Schwebel Fiber Glass Corp.
P.O. Box 2627
2200 South Murray Avenue
Anderson, SC 29622
6M825
Clark-Schwebel
International S.A.
Battice, Belgium V
B1353
Hexcel Corporation
11711 Dublin Blvd.
Dublin, CA 94566
04621
(c) Reynolds Metals Company
2819 First Avenue
Seattle, WA 98121
May 4/79  727-53-0149
Rev. 4: Jun 27/91  25

### Page 29 (OCR)

BOEING SERVICE BULLETIN 727-53-0149
(d) General Plastics Manufacturing Company
P.O. Box 9097
Tacoma, WA 98409
28014
Scotfoam Corporation
1500 East 2nd. Street
Chester, PA 19013
(e) See 727 Overhaul Manual Subject 20-50-12.
(1) Schnee Moorehead
Chemicals, Inc.
Irving, TX 75060-3153
53309
(g) Atacs Products Inc.
1120 SW 16th
Renton, WA 98055
61426
(h) Furane Products Company
5121 San Fernando Road West
Los Angles, CA 90039
(1) Ren Plastics
A Ciba-Geigy Company
4917 Dawn Avenue
East Lansing, MI 48823-2821
02684
B. Paris Required to Modify Spares
None
C. Special Tools and Equipment Required
None
May 4/79  727-53-0149
Rev. 4: Jun 27/91  26

### Page 30 (OCR)

BOEING SERVICE BULLETIN 727-53-0149
D. Existing Parts Accountability
The parts shown below are changed by this service bulletin. Quantity (Qty) is the number of parts
changed on the airplane.
Existing  Part  New Part
Part Number  Name  Quantity  RUC  Number  PNC  RC
69-14165-1  Bracket Assembly  1  DIS  69-66838-1  S
69-14165-2  Bracket Assembly  1  DIS  69-66838-2  S  A
69-14165-3  Bracket Assembly  1  DIS  69-66838-3  S
69-14172-1  Bracket Assembly  1  DIS  69-66838-4  S  A
65-26122-1  Bracket Quadrant  1  RWK  65-89360-149  N  A
65-26122-2  Bracket Quadrant  1  RWK  65-89360-150  N
65-28410-1  Bracket Assembly  1  RWK  65-89360-151  N
65-28410-2  Bracket Assembly  1  RWK  65-89360-152  N
65-28410-7  Bracket Assembly  RWK  65-89360-151  N
65-28410-8  Bracket Assembly  RWK  65-89360-152  N
RUC Recommend Use Code
DIS - Discard the part.
RWK - Make the change as specified in this service bulletin.
PNC  Part Number Code
N  - There is no equivalent Boeing part number for the changed
part. Show on the part that this service bulletin has been
done.
S - New equivalent or replacement part number.
Replacement Code
A - Not Interchangeable: Do not replace one part with the
other.
May 4/79  727-53-0149
Rev. 4: Jun 27/91  27

### Page 31 (OCR)

BOEING SERVICE BULLETIN 727-53-0149
BLANK PAGE
May 4/79  727-53-0149
Rev. 4: Jun 27/91  28 (Blank)

### Page 32 (OCR)

BOEING SERVICE BULLETIN 727-53-0149
III. ACCOMPLISHMENT INSTRUCTIONS
NOTES: 1. The paragraphs identified with letters give the general work instructions and the necessary
tests. The instructions identified with numbers on the figures give the recommended
sequence of operations.
2. As stated in Paragraph I.D. interim crack repairs specified in Part Il below are FAA
approved contingent upon accomplishment of permanent repair per Part III or inspection
as noted.
3. As recommended by the 727 Aging Fleet Structures Working Group, accomplish the
modification per this service bulletin, Part IV of the Accomplishment instructions prior to or
upon the accumulation of 60,000 flights.
Part I - Inspection
A. Inspect lower surface of pressure floor adjacent to Body Stations 880, 890, 930,940 and 950 for
cracks in the left and right main wheel wells per Figure 1.
B. If no cracks are found, accomplish preventive modification per Part IV or repeat inspection per
Paragraph A above at maintenance intervals as shown in Paragraph I.C. Description, until
Accomplishment Instructions Part IV Preventive Modification or Part III Permanent Repair is
accomplished.
C. On airplanes previously modified per the original issue, or Revisions 1or 2 of this bulletin or all
Group 2 airplanes, inspect for cracks in main wheel well pressure floor at Body Stations 930,940 and
950 between left and right Buttock Line (BL) 50 and side of body per Figure 1.
D. If no cracks are found per Paragraph C above, accomplish doubler installation per Figure 3 Circle
Note 5 and Drawing 65-89360 Sheet 8 and 9, or repeat inspection per Paragraph C above at
maintenance intervals as shown in Paragraph I.C. Description, until Accomplishment Instructions
Part IV Preventive Modification or Part III Permanent Repair is accomplished.
E. If cracks are found per Paragraphs A. or C. above, do Interim Repair per Part Il or Permanent Repair
per Part III.
F. On airplanes that have Permanent Repair (shown in Figure 2) or Preventive Modification (shown in
Figure 3) installed in one or part of the specified areas, inspect all remaining specified areas at
maintenance intervals as shown in Paragraph I.C. Description, until Permanent Repair or Preventive
Modification is installed in all areas.
May 4/79  727-53-0149
Rev. 4: Jun 27/91  29

### Page 33 (OCR)

BOEING SERVICE BULLETIN 727-53-0149
Part II - Interim Repair (optional):
If cracks are found which do not exceed limits specified in Table I, stop drill cracks with 0.190 inch
diameter drill, apply pressure and environmental sealant per operator's standard procedures and
accomplish permanent repair per Part ill within 600 flights.
TABLE I
Crack Limits
CONDITION  CRACK LIMIT
One bead cracked and no cracks in adjacent  1.00 inch
beads.
Two adjacent beads cracked and no cracks in  1.00 inch, combined
beads on both sides of cracked pair.  length
Three or more adjacent beads cracked.  0.35 inch per bead
May 4/79  727-53-0149
Rev. 4: Jun 27/91  30

### Page 34 (OCR)

BOEING SERVICE BULLETIN 727-53-0149
Part III - Permanent Repair:
If cracks are found, accomplish the following:
A. Gain access to upper surface of pressure floor by removing equipment and floor panels per
operator's standard procedure.
B. On affected airplanes prior to Line Position 1358, gain access to lower surface (if required along
inboard edge) by removing wheel well ducts per operator's standard procedure (Ref. 727
Maintenance Manual Subject 21-20-4). Affected airplanes Line Position 1358 and on do not have
ducts in this area.
NOTE: If airplane is equipped with aft body fuel tanks, the tanks must be removed per operator's
standard procedure (Ref. 727 Maintenance Manual Subject 53-20-31) to allow duct
removal. The inner ducts are made from either a polycarbonate or a fiberglass material.
Instead of tank removal, the fiberglass ducts may be cut (to provide access) and spliced
(after rework) per Figure 5. Polycarbonate ducts may not be cut and spliced. Inner duct
material may be checked from above by removing floor panel over duct at Station 960.
Identity type of duct installed as follows:
1. Polycarbonate material has the look of extruded plastic. It is usually black or gray with a
smooth finish. PVC Pipe is a typical example of extruded smooth plastic.
2. Fiberglass is generally light green with a rougher texture due to a cloth lay-up with resin.
The ram air inlet ducts are a typical example of fiberglass ducts.
C. Stop drill each end of cracks with No. 11(0.191 inch diameter) hole. Eddy current inspect to confirm
crack containment. If so, increase hole size with 1/4-inch drill to 0.250 inch diameter.
May 4/79  727-53-0149
Rev. 4: Jun 27/91  31

### Page 35 (OCR)

BOEING SERVICE BULLETIN 727-53-0149
D. Remove required fasteners, clips and brackets and install repair parts per Figure 2.
NOTES: 1.Shorter or longer doublers than those included in the kits and shown on Drawing
65-89360 may be installed as a repair.
2. If existing repair doubler interferes with new repair, it will be necessary to remove the
existing repair doubler and install a new repair that covers both areas.
3. If expedited repair is required, the repair parts may be installed, without gaining access
to the upper surface of the pressure floor, with blind bolts, BACBOLB)-(), or Visu-Lok
PLT210 blind bolts, at all fastener locations. If blind fasteners are installed, however, they
must be inspected when the airplane has 3000 cycles atter installation and at intervals
of approximately 2,500 flight cycles until replaced with fasteners specified on Drawing
65-89360, at or prior to 10,000 flight cycles since installation of the blind bolts. Install
blind bolts per 727 Structural Repair Manual Subject 51-30-2 and 51-30-5. Hole sizes for
installation of blind bolts are specified in Table Il.
4. Airplanes previously repaired using blind fasteners that have accumulated 10,000 flight
cycles, should replace the blind fasteners with solid fasteners per drawing 65-89360,
within 3,000 flights after receipt of this Revision 3.
TABLE I|
Hole Size (in inches) for Installation of Blind Bolts
Hole Size
Nominal  Standard
Fastener  PLT210
Size  BACB3OLB()-()
3/16  0.199 to 0.202
1/4  0.260 to 0.263
E. Install preventive modification straps and doublers per Figure 3 in all remaining specified areas not
repaired, or inspect all remaining specified areas not repaired at maintenance intervals as shown in
Paragraph I.C. Description, until Permanent Repair or Preventive Modification is installed in all
specified areas.
F. Replace tubing brackets specified in Figure 4 and reinstall remaining clips and brackets.
G. Finish reworked areas to match surrounding areas per operator's standard procedure.
H. Return airplane to operating configuration
May 4/79  727-53-0149
Rev. 4: Jun 27/91  32

### Page 36 (OCR)

BOEING SERVICE BULLETIN 727-53-0149
Part IV - Preventive Modification
Accomplish preventive modification as follows:
A. Gain access to upper surface of pressure floor by removing equipment and floor panels per
operator's standard procedure.
B. On affected airplanes prior to Line Position 1358, gain access to lower surface by removing wheel
well ducts per operator's standard procedure (Ref. 727 Maintenance Manual Subject 21-20-4).
Affected airplanes Line Position 1358 and on do not have ducts in this area.
NOTE: If airplane is equipped with aft body fuel tanks, the tanks must be removed per operator's
standard procedure (Ref. 727 Maintenance Manual Subject 53-20-31) to allow duct
removal. The inner ducts are made from either a polycarbonate or a fiberglass material.
Instead of tank removal, the fiberglass ducts may be cut (to provide access) and spliced
(after rework) per Figure 5. Polycarbonate ducts may not be cut and spliced. Inner duct
material may be checked from above by removing floor panel over duct at Station 960.
Identify type of duct installed as follows:
1. Polycarbonate material has the look of extruded plastic. It is usually black or gray with a
smooth finish. PVC pipe is a typical example of extruded smooth plastic.
2. Fiberglass is generally light green with a rougher texture due to a cloth lay-up with resin.
The ram air inlet ducts are a typical example of fiberglass ducts.
C. Remove required fasteners, clips and brackets and modify per Figure 3.
NOTE: On airplanes previously modified by instructions in the original issue or Revisions 1 or 2 and
group 2 airplanes not modified by instructions in Revision 3 require installation of doublers
65-89360-137 and 65-89360-138 per Figure 3 circle note 5 or 6.
D. Replace tubing brackets specified in Figure 4 and reinstall remaining clips and brackets.
E. Finish reworked area to match surrounding area per operator's standard procedure.
F. Return airplane to operating configuration.
May 4/79  727-53-0149
Rev. 4: Jun 27/91  33

### Page 37 (OCR)

BOEING SERVICE BULLETIN 727-53-0149
Illustration Table of Contents
Title  Page
Figure 1. Inspection  33
Figure 2. Crack Repair  35
Figure 3. Preventive Modification  37
Figure 4. Tubing Bracket Replacement  47
Figure 5. Air Conditioning Duct Cutting and Splicing  49
May 4/79  727-53-0149
Rev. 4: Jun 27/91  34

### Page 38 (OCR)

BOEING SERVICE BULLETIN 727-53-0149
STA 950.
STA 940  SEE DETAIL I
STA 930
STA 890
STA 880  € AIRPLANE
STA 870
SEE DETAIL I
FWDE
LEFT MAIN WHEEL WELL
• STA
880
890
930
940
950
+ +  +  + +
+ + + +  +  + + + + +  + +++++++
871642  DETAIL I
(PLAN VIEW)
FIGURE 1. INSPECTION
May 4/79  727-53-0149
Rev. 4: Jun 27/91  35

### Page 39 (OCR)

BOEING SERVICE BULLETIN 727-53-0149
The instructions given below agree with the numbers shown inside the circle symbols in the figure:
NOTE: Strip paint prior to penetrant inspection to ensure accurate results.
(Preferred) Perform eddy-current or penetrant inspection, per operator's standard procedure, of ends of  beads in pressure floor just forward and aft of Station 880, 890, 930, 940 and 950 floor beams across
entire width of wheel well.
(Optionally) Perform a close visual inspection of the area. If any indication of distress such as cracking
or flaked paint is tound, pentorm eddy-current or penetrant inspection to contirm and determine true
extent of cracking.
FIGURE 1. INSPECTION
May 4/79  727-53-0149
Rev. 4: Jun 27/91  36

### Page 40 (OCR)

BOEING SERVICE BULLETIN 727-53-0149
STA 940  BL60
STA 930-  ,BL50
STA 920  ,BL40
, BL30
_BL20
BL10
STA 890
STA 880  AIRPLANE
FWDE
LEFT MAIN WHEEL WELL
LEFT SIDE SHOWN, RIGHT SIDE OPPOSITE (EXCEPT AS NOTED:
VIEW LOOKING UP, FORWARD AND INBOARL
871644
FIGURE 2. CRACK REPAIR
May 4/79  727-53-0149
Rev. 4: Jun 27/91  37

### Page 41 (OCR)

BOEING SERVICE BULLETIN 727-53-0149
The instructions given below agree with the numbers shown inside the circle symbols in the figure:
NOTES: 1. Install all repairs in accordance with Drawing 65-89360 Sheets PL, 5,6, 8 and 9.
2. If cracks exist in areas not covered by repairs contact Boeing for appropriate action.
3. One or more of the following repairs may be used depending upon crack locations.
1 Accomplish doubler installation 65-89360-81 (left side) or -82 (right side).
2 Accomplish doubler installation 65-89360-85 (left side) or -86 (right side).
3 Accomplish doubler installation 65-89360-105 (left side) or -106 (right side).
4 Accomplish doubler installation 65-89360-79 (left side only).
5 Accomplish doubler installation 65-89360-103 (left side) or -104 (right side).
6 Accomplish doubler installation 65-89360-75 (left side) or -76 (right side).
7 Accomplish doubler installation 65-89360-77 (left side) or -78 (right side).
8 Accomplish doubler installation 65-89360-135 (lett side) or -136 (right side).
FIGURE 2. _ CRACK REPAIR
May 4/79  727-53-0149
Rev. 4: Jun 27/91  38

### Page 42 (OCR)

BOEING SERVICE BULLETIN 727-53-0149
SEE DETAIL III
SEE DETAIL IV
SEE DETAIL I
BL 10  STA 940
BL 20  STA 930
BL 30  STA 920
BL 50
BL 60  STA 890
STA 880
SEE DETAIL II
SEE DETAIL VII
→ FWD  SEE DETAIL V (LEFT SIDE)
SEE DETAIL VI (RIGHT SIDE)
MAIN WHEEL WELL
VIEW LOOKING UP, FORWARD AND OUTBOARD
LEFT SIDE SHOWN, RIGHT SIDE OPPOSITE (EXCEPT AS NOTED)
782919
FIGURE 3. PREVENTIVE MODIFICATION
May 4/79  727-53-0149
Rev. 4: Jun 27/91  39

### Page 43 (OCR)

BOEING SERVICE BULLETIN 727-53-0149
LEFT SIDE
65-18745-451  RIGHT SIDE B  BL  20
(LEFT SIDE)
65-18745-452
(RIGHT SIDE)  STA
- 940
BL
30
33 PLACES LEFT
65-18745-449
(LEFT SIDE)
65-18745-450
(RIGHT SIDE)
BL
40
BL  LEFT SIDE
33 PLACES LEFT
32 PLACES RIGHT  50  RIGHT SIDE 4|
STA
940
FILLER  3 (RIGHT SIDE ONLY)  FILLER
(LEFT SIDE ONLY)  → FWD
DETAIL I
FIGURE 3. PREVENTIVE MODIFICATION
May 4/79  727-53-0149
Rev. 4: Jun 27/91  40

### Page 44 (OCR)

BOEING SERVICE BULLETIN 727-53-0149
BL
LEFT SIDE -  30
RIGHT SIDE A  STA
930
- CUTOUT
BL
40
DOUBLER
65-18745-457 (LEFT)
65-18745-458(RIGHT)
25 PLACES
SEWD
LEFT SIDE
RIGHT SIDE
BL
50
STA
930
2) 65-18745-460CRIGHT.  65-18145-4590LEF1.
784074  25 PLACES
DETAIL II
FIGURE 3. PREVENTIVE MODIFICATION
May 4/79  727-53-0149
Rev. 4: Jun 27/91

### Page 45 (OCR)

BOEING SERVICE BULLETIN 727-53-0149
65-18745-453 (LEFT SIDE)  RIGHT SIDE
65-18745-454 (RIGHT SIDE)  LEFT SIDE
STA
930
INTERCOSTAL-PRESSURE FLOOR
STATION 930-940
BL
10
65-18745-455 (LEFT SIDE)
65-18745-456 (RIGHT SIDE)
DOUBLER
A 21 PLACES  → FWD
DETAIL III
784179
FIGURE 3. PREVENTIVE MODIFICATION
May 4/79  727-53-0149
Rev. 4: Jun 27/91  42

### Page 46 (OCR)

BOEING SERVICE BULLETIN 727-53-0149
39 PLACES
65-18745-463(LEFT SIDE)
65-18745-464(RIGHT SIDE)
STA
890
65-18745-465(LEFT SIDE)
65-18745-466(RIGHT SIDE)
BL
10
RIGHT SIDE
BL
20  LEFT SIDE
BRAKE CONTROL
SUPPORT ANGLE
→ FWD
DETAIL IV
784243
FIGURE 3. PREVENTIVE MODIFICATION
May 4/79  727-53-0149
Rev. 4: Jun 27/91  43

### Page 47 (OCR)

BOEING SERVICE BULLETIN 727-53-0149
65-18745-4732
STA
/ 880
BL
10
65-18745-471 2)
BL
16.5
BL
20
45 2 PLACES
36 PLACES  "ĩz
"то
5 PLACES
(THRU VERTICAL FLANGE)
→ FWD
DETAIL V
784404
FIGURE 3. PREVENTIVE MODIFICATION
May 4/79  Rev. 4: Jun 27/91  727-53-0149  44

### Page 48 (OCR)

BOEING SERVICE BULLETIN 727-53-0149
(2) 65-18745-472
RBL  - 16 PLACES
10
2) 65-18745-474  STA
880
BL  →EWD
784444  DETAIL VI
(RIGHT SIDE)
FIGURE 3. PREVENTIVE MODIFICATION
May 4/79  727-53-0149
Rev. 4: Jun 27/91  45

### Page 49 (OCR)

BOEING SERVICE BULLETIN 727-53-0149
65-18745-469 (LEFT SIDE)
BL
65-18745-470 (RIGHT SIDE)
30
2
STA
890
BL
40  → FWD
65-18745-467 (LEFT SIDE)
65-18745-468 (RIGHT SIDE)
4 PLACES
7 LEFT SIDE
BiZ RIGHT SIDE
13 PLACES
9 PLACES
DETAIL VII
784478
FIGURE 3. PREVENTIVE MODIFICATION
May 4/79  727-53-0149
Rev. 4: Jun 27/91  46

### Page 50 (OCR)

BOEING SERVICE BULLETIN 727-53-0149
The instructions given below agree with the numbers shown inside the circle symbols in the figure:
NOTES:
1. Install reinforcing strips or fillers using extensive pressure faying surface seal BMS 5-95 on
all mating surfaces.
2. Install all rivets with head down.
1 Remove and discard existing stiffener.
2 Remove fasteners as required and install reinforcing strips. Position approximately as shown with 0.45
inch minimum edge margin on existing fasteners. Trim reinforcing strips if required to clear any repairs
accomplished per Figure 2.
3 Remove fasteners as required and install filler 65-18745-478 (left side) or 65-18745-479 (right side).
4 Install stiffener 65-18745-475 with tapered filler BACF3T01J9-7 in joggled area.
5 If installing Kit 69-70864-4, install doubler 65-89360-137 and doubler 65-89360-138 per Installation
-135 on drawing 65-89360 sheet 8. Trim straps which may exist at Body Station 920, 930 and 940 to
accommodate the -135 installation. If the existing repair doublers interfer with the -135 installation,
remove or trim the existing repair doublers as shown on drawing 65-89360. If doublers are removed
fabricate a new doubler similar to the doubler in the -135 installation so that it covers the whole area of
the -135 installation and the removed repair doublers per instructions shown on drawing 65-89360.
6 If installing Kit 65-89360-127 with Supplemental Kit 69-70864-3, rework the doublers 65-89360-129 and
65-89360-130 to doubler 65-89360-137 and doubler 65-89360-138 per Installation -135 on drawing
65-89360 sheet 8 and install per Installation -135. Trim straps which may exist at Body Station 920,
930 and 940 to accommodate the -135 installation. If the existing repair doublers interfer with the -135
installation, remove or trim the existing repair doublers as shown on drawing 65-89360. If doublers are
removed fabricate a new doubler similar to the doubler in the -135 installation so that it covers the
whole area of the -135 installation and the removed repair doublers per instructions shown on drawing
65-89360.
FIGURE 3. PREVENTIVE MODIFICATION
May 4/79  Rev. 4: Jun 27/91  727-53-0147

### Page 51 (OCR)

BOEING SERVICE BULLETIN 727-53-0149
The instructions given below agree with the letter shown in the upper-left of the fastener symbols in the
figure:
A. Drill No. 11 (0.191 inch diameter) hole to match existing hole and install rivet BACR15BB6D10.
B. Drill size F (0.257 inch diameter) hole to match existing hole and install rivet BACR15BB8D(*). Use
grip length 14 unless otherwise noted.
C. Drill 0.263 (+0.003 or -0.000) inch diameter hole to match existing hole and install bolt BACB30FP8-(*)
and collar BACC30M8; put head of bolt on inboard side, next to angle.
D. Drill 0.200 (+0.003 or -0.000) inch diameter hole to match existing hole and install bolt BACB30FP6-(*)
and collar BACC30M6.
E. Drill 0.200 (+0.003 or -0.000) inch diameter hole to match existing hole and install bolt BACB30MC6-6
and collar BACC30X6 when tubing bracket is reinstalled
F. See Figure 4 for fastener installation.
G. Drill No. 21 (0.159 inch diameter) hole to match existing hole and install rivet BACR15BB5D6.
H. Countersink existing hole lower side 100 degrees and plug with rivet BACR15CE5D5 through web only.
Drill No. 21 (0.159 inch diameter) hole through web and stiffener located 0.35 inch aft of plugged hole
and install rivet BACR15BB4D(*).
FIGURE 3. PREVENTIVE MODIFICATION
May 4/79  Rev. 4: Jun 27/91  727-53-0149  48

### Page 52 (OCR)

BOEING SERVICE BULLETIN 727-53-0149
STA 940
BL
BL
40
STA 890  .10
MAIN WHEEL WELL
LEFT SIDE ONLY
FWDE
FWDE
784938
FIGURE 4. TUBING BRACKET REPLACEMENT
May 4/79  Rev. 4: Jun 27/91  727-53-0149

### Page 53 (OCR)

BOEING SERVICE BULLETIN 727-53-0149
The instructions given below agree with the numbers shown inside the circle symbols in the figure:
1 Remove and discard bracket assembly 69-14165-1 and install bracket assembly 69-66838-1.
2 Remove and discard bracket assembly 69-14165-2 and install bracket assembly 69-66838-2.
3 Remove and discard bracket assembly 69-14165-3 and install bracket assembly 69-66838-3.
4 Remove and discard bracket assembly 69-14172-1 and install bracket assembly 69-66838-4.
The instructions given below agree with the letter shown in the upper-left of the fastener symbols in the
figure:
A. Drill 0.200 (+0.003 or -0.000) inch diameter hole to match existing hole and install bolt BACB30MC6-*  and collar BACC30X6 (Head bottom side).
B. Drill 0.263 (+0.003 or -0.000) inch diameter hole to match existing hole and install bolt BACB30MC8-9
and collar BACC30X8 (Head bottom side).
FIGURE 4. TUBING BRACKET REPLACEMENT
May 4/79  727-53-0149
Rev. 4: Jun 27/91  50

### Page 54 (OCR)

BOEING SERVICE BULLETIN 727-53-0149
APPLICABLE TO AIRPLANES
WITH BODY FUEL TANKS
STA
740
STA
870
STA
970
olajo aja
00000  FWD<
785021
FIGURE 5. AIR CONDITIONING DUCT CUTTING AND SPLICING
May 4/79  Rev. 4: Jun 27/91  727-53-0151

### Page 55 (OCR)

BOEING SERVICE BULLETIN 727-53-0149
The instructions given below agree with the numbers shown inside the circle symbols in the figure:
Cut ducts as follows:
1 Disconnect outer duct at each end to allow rotation during cutting.
2 Cut perimeter of outer duct at two convenient locations. Cut horizontally between the perimeter cuts.
3 Slide cut section of outer duct over itself to provide access to inner duct.
4 Cut and remove section of inner duct. Offset inner duct cut approximately ten inches from outer duct
cut. Salvage duct section for reinstallation. Apply resin mix R110 or R111 (prepared according to
BAC5419) to edges of cut to prevent unraveling during rework.
Splice inner duct as follows:
5 Remove insulation from splice areas and sand surface of duct to remove gloss.
6 Apply a brush coat of resin mix R110 or R111 (prepared according to BAC5419) to each splice area
and wrap one ply of four inch wide 181 fabric BMS 9-3 around duct centered on joint.
WARNING: Epoxy resins and hardeners are skin irritants and sensitizers. Avoid breathing vapors. Do
not get in eyes, on skin, or on clothing. Wash hands before eating or smoking. Use only
with adequate ventilation.
Overlap ends a minimum of one inch and remove air pockets with a squeegee. Repeat procedure using
resin and a five inch wide strip of fabric followed by resin and a six inch wide strip of fabric, staggering
overlaps. Upon completion apply a coat of resin mix.
7 Tape end of eight to ten inch wide strip of polyvinylchloride (PVC) or polyvinylalcohol (PVA) film to
unwetted area of duct. Wrap film over splice for two or three revolutions under tension and tape end
securely.
8 Cure for two hours minimum at 120 to 160 degrees F. to gel the resin and remove PVC or PVA film.
Cut and fit insulation BMS 8-39, Type I or IV, Composition A and bond with Type 12 or 48 adhesive per
727 Overhaul Manual Subject 20-50-12. Complete curing for 20 hours minimum at 60 to 95 degrees F.
Splice outer duct as follows:
9 Sand surface of duct in splice areas to remove gloss.
10 Prepare Resin Mix 1 as follows:
BMS 8-201, Type | or Type II.
98 to 102 parts by weight of resin and 12 to 15 parts by weight of catalyst.
11 Apply a brush coat of resin mix 1 to entire area and spiral wrap one ply of four inch wide 181 fabric
BMS 9-3 along horizontal cut to overlap vertical end cuts by one inch. Wrapped edges to overlap by
one half to one inch. Remove air pockets with squeegee. Apply two more layers of resin and fabric,
overlapping the ends of previous layer by one inch.
12 Place perforated parting film and three plies bleeder cloth (181 fabric BMS 9-3) over splice.
FIGURE 5. AIR CONDITIONING DUCT CUTTING AND SPLICING
мау 4/79  727-53-0149
Rev. 4: Jun 27/91  52

### Page 56 (OCR)

BOEING SERVICE BULLETIN 727-53-0149
13 Position vacuum hose to contact bleeder cloth outside splice area. Stretch a piece of vacuum bag
material (Mylar, Tedlar or PVA film) over entire splice area and seal around hose with sealing
compound (Schnee Moorehead No. 5144, Foster 9B2 or General Seal 100). Evacuate to 20 inches of
mercury and force excess resin from wraps with squeegee.
14 Cure the splice under a vacuum of 20 inches of mercury. At 70 degrees F., Type I resin should be
cured 12 hours and Type Il resin 5 hours. Do not exceed 160 degrees F. during cure. Cure time may be
accelerated by use of heat as follows:
Cure  Temperature (F)
Time
Hours  Type I Resin  Type I Resin
2 1/2  160  160
155  140
2 1/2  150  120
4  145  105
4 1/2  140  85
5  135  70
6  125
7  120
8  110
9  100
10  90
11  80
12  70
15 Remove vacuum bag material.
FIGURE 5. AIR CONDITIONING DUCT CUTTING AND SPLICING
May 4/79  Rev. 4: Jun 27/91  727-53-0149

### Page 57 (OCR)

SOEING  Airplane  Commercial  727
Group  Service Bulletin
ATA System: 5314  Evaluation Form
Number:  727-53-0149 Rev 4
Date:  June 27, 1991
Prepared By: Patrick E McGee
SUBJECT: FUSELAGE - MAIN WHEEL WELL PRESSURE FLOOR INSPECTION, MODIFICATION
AND REPAIR
Use this evaluation form to tell us what you think of the quality of this service bulletin. We will use the
data that you give us to correct any errors in this bulletin and to improve the quality of new service
bulletins.
NOTE: Please do not use this evaluation form to tell us to make changes to your maintenance or
repair manuals. To make these changes, please use a Publication Change Request (PCR)
Give the completed evaluation form to your Boeing Field Service Representative or send the evaluation
form directly to this address:
R.G. Kelsey
Manager
Service Bulletin Engineering
Boeing Commercial Airplane Group
P.O. Box 3707, Mail Stop 2L-02
Seattle, WA 98124-2207
Please give us the following data:
OPERATOR:  TODAY'S DATE:
PREPARED BY:  TITLE:
ORGANIZATION:  TELEX CODE:
TELEPHONE NUMBER:
Please tell us about the quality of this service bulletin in the areas shown below:
Good  Poor
How easy is the service bulletin to use?  1
How easy is the service bulletin to understand?
Is the data accurate?  3
Is the Manpower Estimate accurate?  3  1
How is the quality of the Figures?  4  3  1
How is the quality of the printing?  4  1
How is the general quality of the service bulletin?  4  3  2  1
COMMENTS:
If you have additional comments please use the other side. Thank you for taking the time to complete
this form.
BOEING COMMERCIAL AIRPLANE GROUP PO BOX 3707 SEATTLE, WASHINGTON 98124-2207

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
