# Boeing Special Attention Service Bulletin 727-53-0234: No revision named

- Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2013-0362; AD 2013-15-15 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Boeing Special Attention Service Bulletin 727-53-0234](https://openairdocs.org/service-documents/boeing/sb-727-53-0234.md)
- Title as filed: Boeing - Service Bulletin
- Pages: 85
- PDF: https://openairdocs.org/files/sha256/a5/bb/a5bb060ed50b3cbd0a2fad4af8e8c2635a38fd371a7428f1db5812b793136876
- Page: https://openairdocs.org/service-documents/boeing/sb-727-53-0234/file/a5bb060ed50b

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Commercial 
Airplanes
727
Service Bulletin
SPECIAL ATTENTION
Number: 727-53-0234
Original Issue: January 17, 2013
ATA System: 5311
SUBJECT: FUSELAGE - Frames and Bulkheads - Body Station (STA) 188 through STA 344 -
Frame Inspection in the Area of the Floor Beam Attachment
Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15
CFR 300-774). An export license may be required before it is used for development, production or use by foreign
persons from specific countries. The controller of this data has the individual responsibility to abide by all export
laws.
9E991ECCN:
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET
Copyright © 2013 Boeing.
Unpublished Work. All Rights Reserved.
Treatment of this document and its content is governed by contract with Boeing. Rights to use this document
are licensed on a per aircraft basis and such rights may not be transferable. For more information, contact The
Boeing Company.
Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner™,
BBJ, DC-8, DC-9, DC-10, KC-10, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8A, Poseidon and Boeing
liveries are all trademarks owned by The Boeing Company; and no trademark license is granted in connection
with this document unless provided in writing by Boeing. BOEING is a trademark of Boeing Management
Company.
Original Issue: January 17, 2013
727-53-0234
1 of 85
2.0

### Page 2

Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 17, 2013
727-53-0234
2 of 85
BOEING SERVICE BULLETIN 727-53-0234
BLANK PAGE

### Page 3

Table of Contents
Summary ...................................................... 5
1. PLANNING INFORMATION ........................................ 9
A. Effectivity ................................................ 9
1. Airplanes ............................................. 9
2. Spares Affected ........................................ 1 5
B. Concurrent Requirements ...................................... 1 5
C. Reason ................................................ 1 5
D. Description .............................................. 1 6
E. Compliance .............................................. 1 6
F. Approval ............................................... 1 7
G. Manpower .............................................. 1 7
H. Weight and Balance Changes .................................... 2 2
I. Electrical Load Data ......................................... 2 2
J. References .............................................. 2 2
1. Existing Data: ......................................... 2 2
2. Data Supplied with this Service Bulletin: ........................... 2 2
3. Installation Drawings Used in the Preparation of this Service Bulletin: ........... 2 2
K. Publications Affected ........................................ 2 3
L. Interchangeability and Intermixability of Parts ........................... 2 3
M. Software Accomplishment Summary ................................ 2 3
2. MATERIAL INFORMATION ........................................ 2 5
A. Material - Price and Availability ................................... 2 5
B. Industry Support Information .................................... 2 5
C. Parts Necessary for Each Airplane ................................. 2 5
1. Kits/Parts ............................................ 2 5
2. Parts and Materials Supplied by the Operator ........................ 2 5
3. Parts Modified and Reidentified ................................ 2 5
4. Parts Removed and Not Replaced .............................. 2 5
D. Parts Necessary to Change Spares ................................. 2 5
E. Special Tooling - Price and Availability ............................... 2 5
F. Special Tooling Necessary to do this Service Bulletin ....................... 2 5
3. ACCOMPLISHMENT INSTRUCTIONS .................................. 2 7
A. GENERAL INFORMATION ..................................... 2 7
B. WORK INSTRUCTIONS ....................................... 2 8
FIGURE 1: FUSELAGE - STA 188 LEFT SIDE - FRAME INSPECTION IN THE AREA OF THE FLOOR
BEAM ATTACHMENT ..................................... 3 0
FIGURE 2: FUSELAGE - STA 188 RIGHT SIDE - FRAME INSPECTION IN THE AREA OF THE FLOOR
BEAM ATTACHMENT ..................................... 3 2
FIGURE 3: FUSELAGE - STA 196.5 LEFT SIDE - FRAME INSPECTION IN THE AREA OF THE FLOOR
BEAM ATTACHMENT ..................................... 3 4
FIGURE 4: FUSELAGE - STA 196.5 RIGHT SIDE - FRAME INSPECTION IN THE AREA OF THE FLOOR
BEAM ATTACHMENT ..................................... 3 6
FIGURE 5: FUSELAGE - STA 203.8 LEFT SIDE - FRAME INSPECTION IN THE AREA OF THE FLOOR
BEAM ATTACHMENT ..................................... 3 8
FIGURE 6: FUSELAGE - STA 203.8 RIGHT SIDE - FRAME INSPECTION IN THE AREA OF THE FLOOR
BEAM ATTACHMENT ..................................... 4 0
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 17, 2013
727-53-0234
3 of 85
BOEING SERVICE BULLETIN 727-53-0234

### Page 4

FIGURE 7: FUSELAGE - STA 211.8 LEFT SIDE - FRAME INSPECTION IN THE AREA OF THE FLOOR
BEAM ATTACHMENT ..................................... 4 2
FIGURE 8: FUSELAGE - STA 211.8 RIGHT SIDE - FRAME INSPECTION IN THE AREA OF THE FLOOR
BEAM ATTACHMENT ..................................... 4 4
FIGURE 9: FUSELAGE - STA 219.8 LEFT SIDE - FRAME INSPECTION IN THE AREA OF THE FLOOR
BEAM ATTACHMENT ..................................... 4 6
FIGURE 10: FUSELAGE - STA 219.8 RIGHT SIDE - FRAME INSPECTION IN THE AREA OF THE FLOOR
BEAM ATTACHMENT ..................................... 4 8
FIGURE 11: FUSELAGE - STA 227.8 LEFT SIDE - FRAME INSPECTION IN THE AREA OF THE FLOOR
BEAM ATTACHMENT [Group 3-4, 6] ............................. 5 0
FIGURE 12: FUSELAGE - STA 227.8 RIGHT SIDE - FRAME INSPECTION IN THE AREA OF THE FLOOR
BEAM ATTACHMENT [Group 3-4, 6] ............................. 5 2
FIGURE 13: FUSELAGE - STA 227.8 LEFT SIDE - FRAME INSPECTION IN THE AREA OF THE FLOOR
BEAM ATTACHMENT [Group 1-2, 5] ............................. 5 4
FIGURE 14: FUSELAGE - STA 227.8 RIGHT SIDE - FRAME INSPECTION IN THE AREA OF THE FLOOR
BEAM ATTACHMENT [Group 1-2, 5] ............................. 5 6
FIGURE 15: FUSELAGE - STA 235.8 LEFT SIDE - FRAME INSPECTION IN THE AREA OF THE FLOOR
BEAM ATTACHMENT ..................................... 5 8
FIGURE 16: FUSELAGE - STA 235.8 RIGHT SIDE - FRAME INSPECTION IN THE AREA OF THE FLOOR
BEAM ATTACHMENT ..................................... 6 0
FIGURE 17: FUSELAGE - STA 243.7 LEFT SIDE - FRAME INSPECTION IN THE AREA OF THE FLOOR
BEAM ATTACHMENT ..................................... 6 2
FIGURE 18: FUSELAGE - STA 243.7 RIGHT SIDE - FRAME INSPECTION IN THE AREA OF THE FLOOR
BEAM ATTACHMENT ..................................... 6 4
FIGURE 19: FUSELAGE - STA 251.6 LEFT SIDE - FRAME INSPECTION IN THE AREA OF THE FLOOR
BEAM ATTACHMENT ..................................... 6 6
FIGURE 20: FUSELAGE - STA 251.6 RIGHT SIDE - FRAME INSPECTION IN THE AREA OF THE FLOOR
BEAM ATTACHMENT ..................................... 6 8
FIGURE 21: FUSELAGE - STA 277 LEFT SIDE - FRAME INSPECTION IN THE AREA OF THE FLOOR
BEAM ATTACHMENT ..................................... 7 0
FIGURE 22: FUSELAGE - STA 277 RIGHT SIDE - FRAME INSPECTION IN THE AREA OF THE FLOOR
BEAM ATTACHMENT ..................................... 7 2
FIGURE 23: FUSELAGE - STA 294.5 LEFT SIDE - FRAME INSPECTION IN THE AREA OF THE FLOOR
BEAM ATTACHMENT [Group 1-4] .............................. 7 4
FIGURE 24: FUSELAGE - STA 294.5 LEFT SIDE - FRAME INSPECTION IN THE AREA OF THE FLOOR
BEAM ATTACHMENT [Group 5-6] .............................. 7 6
FIGURE 25: FUSELAGE - STA 294.5 RIGHT SIDE - FRAME INSPECTION IN THE AREA OF THE FLOOR
BEAM ATTACHMENT ..................................... 7 8
FIGURE 26: FUSELAGE - STA 312 RIGHT SIDE - FRAME INSPECTION IN THE AREA OF THE FLOOR
BEAM ATTACHMENT ..................................... 8 0
FIGURE 27: FUSELAGE - STA 328 RIGHT SIDE - FRAME INSPECTION IN THE AREA OF THE FLOOR
BEAM ATTACHMENT ..................................... 8 2
FIGURE 28: FUSELAGE - STA 344 RIGHT SIDE - FRAME INSPECTION IN THE AREA OF THE FLOOR
BEAM ATTACHMENT ..................................... 8 4
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 17, 2013
727-53-0234
4 of 85
BOEING SERVICE BULLETIN 727-53-0234

### Page 5

Commercial 
Airplanes
727
Service Bulletin
SPECIAL ATTENTION
SummaryNumber: 727-53-0234Original Issue: January 17, 2013
ATA System: 5311
SUBJECT: FUSELAGE - Frames and Bulkheads - Body Station (STA) 188 through STA 344 -
Frame Inspection in the Area of the Floor Beam Attachment
BOEING RECOMMENDS THAT EACH OPERATOR EXAMINE THIS SERVICE BULLETIN IMMEDIATELY.
CONCURRENT REQUIREMENTS
None.
BACKGROUND
This service bulletin gives instructions to inspect the frames for any crack in the area of the floor beam attachments
at Body Station (STA) 188 through STA 344. Frame cracking could adversely affect the integrity of the airplane
structure. If the work in this service bulletin is not done, extended frame cracking could lead to complete fracture
of the frame which may result in damage to the skin and cause a possible decompression and unscheduled
down time.
The section 41 frames in the area of the floor beam attachments have been determined to be structure that is
susceptible to Widespread Fatigue Damage (WFD).
During a 727 Extended Pressure Test, cracks were discovered in the frame web common to the floor beam
attachment. Using these test results a WFD assessment was performed for fuselage frames common to the
floor beam attachments. The result of the assessment is a recommendation for an inspection program for the
section 41 frame fastener holes in the area of the floor beam attachments. As of the original issue of this bulletin,
there are no in-service reports of this type of cracking.
Accomplishment of the work in this service bulletin will make sure that any crack in the frames in the area of the
floor beam attachment at STA 188 through STA 344 is detected and repaired early. Early crack detection and
repair helps to maintain the structural integrity of the frames.
Boeing Service Related Problem (SRP) 727-SRP-53-0412 is related to this service bulletin.
This table is provided to operators for planning purposes only. Refer to the applicable sections for more
information.
ReferenceAffectedPlanning Data
Paragraph 1.A.2., Spares AffectedNoSpares Affected
Paragraph 1.E., Compliance and Paragraph
1.F., Approval
NoAD Related
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 17, 2013
727-53-0234
5 of 85

### Page 6

ReferenceAffectedPlanning Data
Paragraph 1.H., Weight and Balance ChangesNoWeight and Balance Change
Paragraph 1.I., Electrical Load DataNoElectrical Load Changed
Paragraph 1.K., Publications AffectedNoPublications Affected
Paragraph 1.K., Publications AffectedNoAirplane Flight Operations Affected (Flight Crew
Operations Manual and/or FAA Approved Air-
plane Flight Manual)
Paragraph 2.C.1., Kits/PartsNoKits/Parts Required
Paragraph 2.C.2., Parts and Materials Supplied
by the Operator
NoOperator Supplied Parts/Material
Paragraph 2.F., Special Tooling Necessary to
do this Service Bulletin
NoSpecial Tooling Required
ACTION
Get access to the frames in the area of the floor beam attachments on the left side at STA 188 through STA
251.6 and STA 277 through STA 294.5, and on the right side at STA 188 through 251.6 and STA 277 through
STA 344.
Do High Frequency Eddy Current (HFEC) inspections of the frames for any crack in the area of the floor beam
attachments on the left side at STA 188 through STA 251.6 and STA 277 through STA 294.5, and on the right
side at STA 188 through STA 251.6 and STA 277 through STA 344. If any crack is found, contact Boeing for
repair instructions and do the work instructed by Boeing before further flight. Do the repeat inspections at the
times given in Paragraph 1.E., Compliance.
EFFECTIVITY
All 727, 727-100, 727-100C, 727-200, 727-200F, 727C airplanes. Refer to Paragraph 1.A.1., Airplanes, for the
list of affected airplanes.
COMPLIANCE
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to this service
bulletin. The Airworthiness Directive will make the compliance tasks and times given in this service bulletin
mandatory.
Refer to Paragraph 1.E., Compliance.
INDUSTRY SUPPORT INFORMATION
Boeing warranty remedies are not available for the inspection given in this service bulletin.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 17, 2013
727-53-0234
6 of 85
BOEING SERVICE BULLETIN 727-53-0234

### Page 7

MANPOWER
Refer to Paragraph 1.G., Manpower.
Elapsed HoursTotal Task HoursAirplanes
Right Side OnlyLeft Side OnlyRight Side OnlyLeft Side Only
39.95 (a)32.35 (a)62.4554.85Group 1-2, 5
39.45 (a)31.85 (a)61.9554.35Group 3-4, 6
(a) The left side inspections and the right side inspections can be accomplished at the same time.
MATERIAL INFORMATION
None.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 17, 2013
727-53-0234
7 of 85
BOEING SERVICE BULLETIN 727-53-0234

### Page 8 (OCR)

BOEING SERVICE BULLETIN 727-53-0234
STA
178
FRAME LOWER CHORD
FRAME LOWER WEB
FRAME INBOARD LOWER
CHORD
SKIN  FLOOR BEAM UPPER  CHORD
CRACK  • DO HFEC INSPECTIONS OF THE FRAME
(TYPICAL)  FOR ANY CRACK IN THE AREA OF THE
FLOOR BEAM ATTACHMENTS AT 25
LOCATIONS. IF ANY CRACK IS FOUND,
CONTACT BOEING FOR REPAIR
INSTRUCTIONS AND DO THE WORK
INSTRUCTED BY BOEING.
S-18L
FLOOR BEAM WEB
FLOOR BEAM
LOWER CHORD
S-19L
INBD
+ HFEC INSPECTION AROUND FASTENER
OTHER LOCATIONS SIMILAR  STA 277 LEFT SIDE SHOWN,  -*- REFERENCE FASTENER  2201499
A-A  , HFEC INSPECTION
Original Issue: January 17, 2013
PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  727-53-0234
Work - See page 1 for details.  8 of 85

### Page 9

Commercial 
Airplanes
727
Service Bulletin
SPECIAL ATTENTION
Number: 727-53-0234
Original Issue: January 17, 2013
ATA System: 5311
SUBJECT: FUSELAGE - Frames and Bulkheads - Body Station (STA) 188 through STA 344 -
Frame Inspection in the Area of the Floor Beam Attachment
BOEING RECOMMENDS THAT EACH OPERATOR EXAMINE THIS SERVICE BULLETIN IMMEDIATELY.
1.    PLANNING INFORMATION
A. Effectivity
1. Airplanes
Refer to Service Bulletin Index D6-9825 Part 3 for Airplane Variable Number, Line Number, and
Serial Number data.
This service bulletin is for the airplanes shown below.
DESCRIPTIONCONFIGURATIONGROUP
727, 727-100, 727C airplanes without a forward airstair door and
without airstair provision.
-1
727, 727-100, 727C airplanes with a forward airstair door or with
airstair provision.
-2
727, 727-100, 100C, 200, 200F, 727C airplanes without a forward
airstair door and without airstair provision that have a different frame
configuration at STA 227.8.
-3
727-100, 200, 727C airplanes with a forward airstair door or with
airstair provision that have a different frame configuration at STA
227.8.
-4
727 airplanes without a forward airstair door and without airstair
provision that have a different frame configuration at STA 294.5 left
side and at STA 227.8.
-5
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 17, 2013
727-53-0234
9 of 85

### Page 10

DESCRIPTIONCONFIGURATIONGROUP
727 airplanes without a forward airstair door and without airstair
provision that have a different frame configuration at STA 294.5 left
side.
-6
Airplane Models:
727, 727-100, 727-100C, 727-200, 727-200F, 727C
GroupVariable Number
5E0001 - E0042
2E0101 - E0140
2E0201 - E0216
5E0301 - E0348
6E0349 - E0351
5E0401 - E0423
2E3001 - E3003
1E3004
3E3005 - E3006
2E3011 - E3013
1E3014
2E3021 - E3028
1E3029 - E3040
1E3059
2E3061 - E3067
1E3068 - E3070
2E3071
1E3072 - E3074
3E3075 - E3077
2E3101 - E3103
2E3111 - E3115
1E3116 - E3117
3E3118
2E3141
1E3142 - E3149
3E3150 - E3152
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 17, 2013
727-53-0234
10 of 85
BOEING SERVICE BULLETIN 727-53-0234

### Page 11

GroupVariable Number
2E3171 - E3175
1E3176 - E3177
2E3201 - E3204
1E3205 - E3206
1E3221 - E3222
3E3223 - E3224
1E3241 - E3277
3E3278 - E3290
2E3341 - E3350
1E3401 - E3417
3E3418 - E3421
1E3451 - E3452
1E3471 - E3472
3E3473 - E3474
1E3501
2E3502 - E3508
4E3509 - E3513
4E3516 - E3522
3E3523
1E3551 - E3553
1E3571 - E3574
3E3575 - E3578
1E3601 - E3602
3E3603 - E3604
1E3621
3E3622
3E3651 - E3655
3E3677
3E3681 - E3684
3E3701 - E3704
3E3751 - E3755
3E3781 - E3784
1E5001 - E5010
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 17, 2013
727-53-0234
11 of 85
BOEING SERVICE BULLETIN 727-53-0234

### Page 12

GroupVariable Number
3E5011
1E5031 - E5049
3E5050 - E5068
1E5101 - E5112
3E5113 - E5116
1E5141 - E5142
3E5143
1E5161 - E5164
1E5201 - E5203
2E5221 - E5230
4E5231 - E5245
1E5251 - E5252
1E5271 - E5277
3E5278 - E5281
1E5301 - E5302
3E5303 - E5306
3E5351 - E5353
3E5381 - E5382
3E5401 - E5424
3E5426 - E5429
3E5433
3E5435
3E5451 - E5455
3E5481 - E5483
3E5501 - E5502
4QA001 - QA031
3QA032 - QA046
3QA051 - QA099
3QA101 - QA199
3QA201 - QA225
3QA301 - QA322
4QA323 - QA324
3QA325 - QA349
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 17, 2013
727-53-0234
12 of 85
BOEING SERVICE BULLETIN 727-53-0234

### Page 13

GroupVariable Number
3QA351 - QA376
3QA378
3QA401 - QA499
3QA501 - QA537
3QA551 - QA579
3QA581 - QA585
4QA601 - QA666
3QA667 - QA688
3QA701 - QA753
3QA801 - QA805
3QA851 - QA899
3QA901 - QA946
3QA949
3QB001 - QB002
3QB031 - QB049
3QB051 - QB068
3QB101 - QB110
3QB114 - QB119
3QB121 - QB149
3QB151 - QB158
3QB201 - QB220
3QB301 - QB316
3QB351 - QB352
3QB401 - QB407
3QB451 - QB458
3QB501 - QB575
3QB601 - QB629
3QB651
3QB701 - QB705
3QB801 - QB810
3QB901 - QB904
3QD001 - QD012
3QD031 - QD046
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 17, 2013
727-53-0234
13 of 85
BOEING SERVICE BULLETIN 727-53-0234

### Page 14

GroupVariable Number
3QD085 - QD088
3QD101 - QD105
3QD121 - QD127
3QD141 - QD149
3QD161 - QD164
3QD191 - QD192
3QD201 - QD239
3QD281 - QD284
3QD301 - QD305
3QD321 - QD330
3QD351
4QD401 - QD403
4QD407
4QD410
3QD421 - QD426
4QD427
3QD441 - QD453
3QD471 - QD475
3QD501 - QD518
3QD551 - QD558
3QD571 - QD572
3QD581 - QD583
3QD601 - QD607
3QD621 - QD624
3QD641
3QD661 - QD663
3QD681 - QD685
3QD691 - QD692
3QD701 - QD702
3QD711 - QD717
3QD741
3QD761 - QD769
3QD781 - QD782
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 17, 2013
727-53-0234
14 of 85
BOEING SERVICE BULLETIN 727-53-0234

### Page 15

GroupVariable Number
3QD791
3QD801 - QD804
3QD821 - QD828
3QD901 - QD910
3QD931 - QD932
3QD951 - QD954
3QD971 - QD973
3QD991 - QD992
4QE001 - QE002
3QL001 - QL008
3QL031 - QL032
4QL081
3QL501 - QL515
2. Spares Affected
None.
B. Concurrent Requirements
None.
C. Reason
This service bulletin gives instructions to inspect the frames for any crack in the area of the floor beam
attachments at Body Station (STA) 188 through STA 344. Frame cracking could adversely affect the
integrity of the airplane structure. If the work in this service bulletin is not done, extended frame cracking
could lead to complete fracture of the frame which may result in damage to the skin and cause a
possible decompression and unscheduled down time.
The section 41 frames in the area of the floor beam attachments have been determined to be structure
that is susceptible to Widespread Fatigue Damage (WFD).
During a 727 Extended Pressure Test, cracks were discovered in the frame web common to the floor
beam attachment. Using these test results a WFD assessment was performed for fuselage frames
common to the floor beam attachments. The result of the assessment is a recommendation for an
inspection program for the section 41 frame fastener holes in the area of the floor beam attachments.
As of the original issue of this bulletin, there are no in-service reports of this type of cracking.
Accomplishment of the work in this service bulletin will make sure that any crack in the frames in the
area of the floor beam attachment at STA 188 through STA 344 is detected and repaired early. Early
crack detection and repair helps to maintain the structural integrity of the frames.
Boeing Service Related Problem (SRP) 727-SRP-53-0412 is related to this service bulletin.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 17, 2013
727-53-0234
15 of 85
BOEING SERVICE BULLETIN 727-53-0234

### Page 16

D. Description
Get access to the frames in the area of the floor beam attachments on the left side at STA 188 through
STA 251.6 and STA 277 through STA 294.5, and on the right side at STA 188 through 251.6 and STA
277 through STA 344.
Do High Frequency Eddy Current (HFEC) inspections of the frames for any crack in the area of the
floor beam attachments on the left side at STA 188 through STA 251.6 and STA 277 through STA
294.5, and on the right side at STA 188 through STA 251.6 and STA 277 through STA 344. If any crack
is found, contact Boeing for repair instructions and do the work instructed by Boeing before further
flight. Do the repeat inspections at the times given in Paragraph 1.E., Compliance.
The work in this service bulletin is done in the maintenance zone(s) given below.
Group 1-2:
Affected Maintenance Zones
ZoneModel
2-21, 2-22, 2-23, 2-24727, 727-100, 727C
Group 3:
Affected Maintenance Zones
ZoneModel
2-21, 2-22, 2-23, 2-24727, 727-100, 727-100C, 727-
200, 727-200F, 727C
Group 4:
Affected Maintenance Zones
ZoneModel
2-21, 2-22, 2-23, 2-24727-100, 727-200, 727C
Group 5-6:
Affected Maintenance Zones
ZoneModel
2-21, 2-22, 2-23, 2-24727
E. Compliance
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to
this service bulletin. The Airworthiness Directive will make the compliance tasks and times given in this
service bulletin mandatory.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 17, 2013
727-53-0234
16 of 85
BOEING SERVICE BULLETIN 727-53-0234

### Page 17

Table 1: Frame Inspection in the Area of the Floor Beam Attachments - STA 188 through STA 344
Repeat Interval
(Not to Exceed)
Compliance Time (Whichever
Occurs Later)
ActionCondition
20,000 flight cy-
cles.
Within 24
months after
the original is-
sue date of this
service bul-
letin.
Before 61,000
total flight cy-
cles.
Do High Frequency Eddy Current (HFEC)
inspections of the frames for any crack in the
area of the floor beam attachments on the
left side at STA 188 through STA 251.6 and
STA 277 through STA 294.5, and on the right
side at STA 188 through STA 251.6 and STA
277 through STA 344 in accordance with
Paragraph 3.B., Work Instructions Part 2.
All airplanes.
-Before further flight.Contact Boeing for repair instructions and
do the work instructed by Boeing.
If any crack is
found.
F. Approval
This service bulletin was examined by the Federal Aviation Administration (FAA). The changes specified
in this service bulletin comply with the applicable regulations and are FAA approved, as well as European
Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/JAA approved
airplanes listed in the service bulletin effectivity. This service bulletin and its approval were based on
the airplane in its original Boeing delivery configuration or as modified by other approved Boeing
changes.
If an airplane has a non-Boeing modification or repair that affects a component or system also affected
by this service bulletin, the operator is responsible for obtaining appropriate regulatory agency approval
before incorporating this service bulletin.
G. Manpower
The table below shows an estimate of the task hours necessary to do this service for each airplane.
This estimate is for direct labor only, done by an experienced crew. Adjust the estimate with operator
task hour data if necessary. The estimate does not include lost time. These are some examples of lost
time:
 Time to adjust to the workplace
 Time to schedule the work
 Time to inspect the work
 Time to cure the materials
 Time to make the parts
 Time to find the tools.
Group 1-2:
Elapsed HoursTask HoursNumber of PersonsTask
7.5030.004Open Access
2.002.001FIGURE 1
2.002.001FIGURE 2
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 17, 2013
727-53-0234
17 of 85
BOEING SERVICE BULLETIN 727-53-0234

### Page 18

Group 1-2:
Elapsed HoursTask HoursNumber of PersonsTask
2.152.151FIGURE 3
2.152.151FIGURE 4
2.152.151FIGURE 5
2.152.151FIGURE 6
2.152.151FIGURE 7
2.152.151FIGURE 8
2.152.151FIGURE 9
2.152.151FIGURE 10
2.502.501FIGURE 13
2.502.501FIGURE 14
2.302.301FIGURE 15
2.202.201FIGURE 16
2.302.301FIGURE 17
2.202.201FIGURE 18
2.152.151FIGURE 19
2.152.151FIGURE 20
2.502.501FIGURE 21
2.502.501FIGURE 22
2.502.501FIGURE 23
2.502.501FIGURE 25
2.602.601FIGURE 26
2.602.601FIGURE 27
2.602.601FIGURE 28
7.5030.004Close Access
32.35 (a)54.85TOTAL FOR EACH AIRPLANE - LEFT SIDE ONLY
39.95 (a)62.45TOTAL FOR EACH AIRPLANE - RIGHT SIDE ONLY
(a) The left side inspections and the right side inspections can be accomplished at the same
time.
Group 3-4:
Elapsed HoursTask HoursNumber of PersonsTask
7.5030.004Open Access
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 17, 2013
727-53-0234
18 of 85
BOEING SERVICE BULLETIN 727-53-0234

### Page 19

Group 3-4:
Elapsed HoursTask HoursNumber of PersonsTask
2.002.001FIGURE 1
2.002.001FIGURE 2
2.152.151FIGURE 3
2.152.151FIGURE 4
2.152.151FIGURE 5
2.152.151FIGURE 6
2.152.151FIGURE 7
2.152.151FIGURE 8
2.152.151FIGURE 9
2.152.151FIGURE 10
2.002.001FIGURE 11
2.002.001FIGURE 12
2.302.301FIGURE 15
2.202.201FIGURE 16
2.302.301FIGURE 17
2.202.201FIGURE 18
2.152.151FIGURE 19
2.152.151FIGURE 20
2.502.501FIGURE 21
2.502.501FIGURE 22
2.502.501FIGURE 23
2.502.501FIGURE 25
2.602.601FIGURE 26
2.602.601FIGURE 27
2.602.601FIGURE 28
7.5030.004Close Access
31.85 (a)54.35TOTAL FOR EACH AIRPLANE - LEFT SIDE ONLY
39.45 (a)61.95TOTAL FOR EACH AIRPLANE - RIGHT SIDE ONLY
(a) The left side inspections and the right side inspections can be accomplished at the same
time.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 17, 2013
727-53-0234
19 of 85
BOEING SERVICE BULLETIN 727-53-0234

### Page 20

Group 5:
Elapsed HoursTask HoursNumber of PersonsTask
7.5030.004Open Access
2.002.001FIGURE 1
2.002.001FIGURE 2
2.152.151FIGURE 3
2.152.151FIGURE 4
2.152.151FIGURE 5
2.152.151FIGURE 6
2.152.151FIGURE 7
2.152.151FIGURE 8
2.152.151FIGURE 9
2.152.151FIGURE 10
2.502.501FIGURE 13
2.502.501FIGURE 14
2.302.301FIGURE 15
2.202.201FIGURE 16
2.302.301FIGURE 17
2.202.201FIGURE 18
2.152.151FIGURE 19
2.152.151FIGURE 20
2.502.501FIGURE 21
2.502.501FIGURE 22
2.502.501FIGURE 24
2.502.501FIGURE 25
2.602.601FIGURE 26
2.602.601FIGURE 27
2.602.601FIGURE 28
7.5030.004Close Access
32.35 (a)54.85TOTAL FOR EACH AIRPLANE - LEFT SIDE ONLY
39.95 (a)62.45TOTAL FOR EACH AIRPLANE - RIGHT SIDE ONLY
(a) The left side inspections and the right side inspections can be accomplished at the same
time.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 17, 2013
727-53-0234
20 of 85
BOEING SERVICE BULLETIN 727-53-0234

### Page 21

Group 6:
Elapsed HoursTask HoursNumber of PersonsTask
7.5030.004Open Access
2.002.001FIGURE 1
2.002.001FIGURE 2
2.152.151FIGURE 3
2.152.151FIGURE 4
2.152.151FIGURE 5
2.152.151FIGURE 6
2.152.151FIGURE 7
2.152.151FIGURE 8
2.152.151FIGURE 9
2.152.151FIGURE 10
2.002.001FIGURE 11
2.002.001FIGURE 12
2.302.301FIGURE 15
2.202.201FIGURE 16
2.302.301FIGURE 17
2.202.201FIGURE 18
2.152.151FIGURE 19
2.152.151FIGURE 20
2.502.501FIGURE 21
2.502.501FIGURE 22
2.502.501FIGURE 24
2.502.501FIGURE 25
2.602.601FIGURE 26
2.602.601FIGURE 27
2.602.601FIGURE 28
7.5030.004Close Access
31.85 (a)54.35TOTAL FOR EACH AIRPLANE - LEFT SIDE ONLY
39.45 (a)61.95TOTAL FOR EACH AIRPLANE - RIGHT SIDE ONLY
(a) The left side inspections and the right side inspections can be accomplished at the same
time.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 17, 2013
727-53-0234
21 of 85
BOEING SERVICE BULLETIN 727-53-0234

### Page 22

H. Weight and Balance Changes
None.
I. Electrical Load Data
Not applicable.
J. References
1. Existing Data:
a. Boeing Service Letter 727-SL-51-041
b. Boeing Service Related Problem (SRP) 727-SRP-53-0412
c. Service Bulletin Index D6-9825
d. 727 Aircraft Maintenance Manual (AMM) 12-30-01, 12-30-1, 25-10-0, 25-10-01, 25-10-21,
25-21-01, 25-21-1, 25-21-321, 25-21-46, 25-40-0, 25-40-00
e. 727 Non-Destructive Testing (NDT) Manual Part 6, 51-00-00
2. Data Supplied with this Service Bulletin:
None.
3. Installation Drawings Used in the Preparation of this Service Bulletin:
TitleDrawing Number
FRAME INSTL - BODY STA 18865-16301
FRAME INSTL - BODY STA 196.565-16302
FRAME INSTL - BODY STA 203.865-16303
FRAME INSTL - BODY STA 211.865-16304
FRAME INSTL - BODY STA 219.865-16305
BULKHEAD INSTALLATION - STATION 227.865-16306
FRAME INSTL - BODY STA 235.865-16307
FRAME INSTL - BODY STA 243.765-16308
FRAME INSTL - BODY STA 251.665-16309
FRAME AND BEAM INSTALLATION - STA 27765-16311
BULKHEAD INSTALLATION - STATION 294.565-16312
FRAME INSTALLATION - BODY STATION 31265-16314
FRAME INSTALLATION - BODY STATION 32865-16315
FRAME INSTALLATION - BODY STA 34465-16316
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 17, 2013
727-53-0234
22 of 85
BOEING SERVICE BULLETIN 727-53-0234

### Page 23

TitleDrawing Number
FLOOR INSTALLATION - STA 178 - 259.565-17592
CABIN FLOOR INSTALLATION - STA 259.5 - 31265-17593
The table above lists applicable drawings used to prepare this service bulletin. The drawings are
not necessary to make the specified changes, and are not supplied with this service bulletin. The
drawings may not be applicable to all airplane configurations or operators.
K. Publications Affected
1. Publications:
None.
2. Damage Tolerance Based Structural Inspections:
Boeing has evaluated this service bulletin for effects on Fatigue Critical Structure (FCS) and for
changes to Damage Tolerance Inspections (DTI) required in the Maintenance Program. This
service bulletin does not affect FCS because it contains no repair and/or changes therefore DTIs
are not necessary. If a repair is required as a result of the inspection within this service bulletin, a
Damage Tolerance Evaluation (DTE) of the repair will be conducted to determine if DTI is needed.
L. Interchangeability and Intermixability of Parts
Accomplishment of this service bulletin does not affect interchangeability or intermixability of parts.
M. Software Accomplishment Summary
Not affected.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 17, 2013
727-53-0234
23 of 85
BOEING SERVICE BULLETIN 727-53-0234

### Page 24

Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 17, 2013
727-53-0234
24 of 85
BOEING SERVICE BULLETIN 727-53-0234
BLANK PAGE

### Page 25

2.    MATERIAL INFORMATION
A. Material - Price and Availability
None.
B. Industry Support Information
Boeing warranty remedies are not available for the inspection given in this service bulletin.
C. Parts Necessary for Each Airplane
1. Kits/Parts
None.
2. Parts and Materials Supplied by the Operator
None.
3. Parts Modified and Reidentified
None.
4. Parts Removed and Not Replaced
None.
D. Parts Necessary to Change Spares
None.
E. Special Tooling - Price and Availability
None.
F. Special Tooling Necessary to do this Service Bulletin
No special tools or equipment are necessary to do the change in this service bulletin. But, maintenance
and overhaul tools in the manuals given in Paragraph 1.J., References, can be necessary. Examine
operator tool supply to make sure all necessary tools are available.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 17, 2013
727-53-0234
25 of 85
BOEING SERVICE BULLETIN 727-53-0234

### Page 26

Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 17, 2013
727-53-0234
26 of 85
BOEING SERVICE BULLETIN 727-53-0234
BLANK PAGE

### Page 27

3.    ACCOMPLISHMENT INSTRUCTIONS
A. GENERAL INFORMATION
CAUTION: KEEP THE WORK AREA, WIRES AND ELECTRICAL BUNDLES CLEAN OF METAL
PARTICLES OR CONTAMINATION WHEN YOU USE TOOLS. UNWANTED MATERIAL,
METAL PARTICLES OR CONTAMINATION CAUGHT IN WIRE BUNDLES CAN CAUSE
DAMAGE TO THE BUNDLES. DAMAGED WIRE BUNDLES CAN CAUSE SPARKS OR
OTHER ELECTRICAL DAMAGE.
NOTE: 1. Manual titles are referred to by acronyms. Refer to Paragraph 1.J., References, for
definition of the acronyms.
2. Obey all of the warnings and cautions given in the specified manual sections.
3. Unless shown differently, these dimensions and tolerances are used:
– Linear dimensions are in inches
– Tolerance on linear dimensions, other than rivet and bolt edge margins, is plus
or minus 0.03 inch
– Tolerance on rivet and bolt edge margin is plus or minus 0.05 inch
– Angular tolerance is plus or minus 2 degrees
– Hole dimensions for standard solid rivets and fasteners are in Structural Repair
Manual (SRM) Chapter 51
4. Use the approved fastener and process material substitutions in accordance with
SRM Chapter 51.
5. If the length of any fastener specified in this service bulletin does not meet installation
standards given in SRM Chapter 51, then a fastener of the same specification, or
an approved substitute, with a length which meets the installation standards given
in SRM Chapter 51 may be used. In addition, washers may be installed for fastener
grip length in accordance with SRM Chapter 51.
6. These work instructions refer to procedures included in other Boeing documents.
When the words "refer to" are used and the operator has an accepted alternative
procedure, the accepted alternative procedure can be used. When the words "in
accordance with" are included in the instruction, the procedure in the Boeing document
must be used.
7. Boeing Service Letter 727-SL-51-041, Damage Reporting and Repair Plan/Design
Guidelines, is an acceptable procedure to request information from Boeing for
additional structural repair instructions. The Service Letter describes what information
must be provided to Boeing before a structural repair can be provided.
8. The instructions in Paragraph 3.B., Work Instructions and the figures can include
operation of tools or test equipment. Boeing Engineering Tool Drawings, the Illustrated
Tool and Equipment Manual, and the Special Tool and Ground Handling Drawing
Index contain data on versions of the tools or test equipment that you can use. It is
permitted to use replaced tools. It is not permitted to use superseded tools.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 17, 2013
727-53-0234
27 of 85
BOEING SERVICE BULLETIN 727-53-0234

### Page 28

9. If it is necessary to remove more parts for access, you can remove those parts. If
you can get access without removing identified parts, it is not necessary to remove
all of the identified parts. Jacking and shoring limitations must be observed.
B. WORK INSTRUCTIONS
Part 1 - Access
1. Remove the carpet riser from forward and immediately aft of the forward entry doorway. Refer to
727 AMM 25-21-46 and 727 AMM 25-21-321 as accepted procedures.
2. Remove the forward lavatory as necessary. Refer to 727 AMM 25-40-00 and 727 AMM 25-40-0
as accepted procedures.
3. Remove the lower lining from the left and right side of the control cabin. Refer to 727 AMM 25-10-01
and 727 AMM 25-10-0 as accepted procedures.
4. Open access door 1103 to get access to the lower nose compartment. Refer to 727 AMM 12-30-01
and 727 AMM 12-30-1 as accepted procedures.
5. Remove the insulation blankets to expose the frames at least 10 inches on both sides of the floor
on the left side at Body Station (STA) 188 through 251.6 and STA 277 through STA 294.5, and
on the right side at STA 188 through 251.6 and STA 277 through STA 344. Refer to 727 AMM
25-10-21, 727 AMM 25-21-01 and 727 AMM 25-21-1 as accepted procedures.
Part 2 - Inspection
1. Do High Frequency Eddy Current (HFEC) inspections of the frames for any crack in the area of
the floor beam attachments on the left side at STA 188 through STA 251.6 and STA 277 through
STA 294.5 in accordance with the table below.
a. If any crack is found, contact Boeing for repair instructions and do the work instructed by
Boeing.
b. If no cracking is found, do the repeat inspections at the interval given in Paragraph 1.E.,
Compliance.
Frame Inspection - Left Side
STA Number and Applicable FigureGroup
344328312294.5277251.6243.7235.8227.8219.8211.8203.8196.5188
---232129171513975311 and 2
---232129171511975313 and 4
---242129171513975315
---242129171511975316
2. Do HFEC inspections of the frames for any crack in the area of the floor beam attachments on the
right side at STA 188 through STA 251.6 and STA 277 through STA 344 in accordance with the
table below.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 17, 2013
727-53-0234
28 of 85
BOEING SERVICE BULLETIN 727-53-0234

### Page 29

a. If any crack is found, contact Boeing for repair instructions and do the work instructed by
Boeing.
b. If no cracking is found, do the repeat inspections at the interval given in Paragraph 1.E.,
Compliance.
Frame Inspection - Right Side
STA Number and Applicable FigureGroup
344328312294.5277251.6243.7235.8227.8219.8211.8203.8196.5188
2827262522201816141086421, 2
and 5
2827262522201816121086423, 4
and 6
Part 3 - Close Access
1. Install insulation blankets to the inspected areas. Refer to 727 AMM 25-10-21, 727 AMM 25-21-01
and 727 AMM 25-21-1 as accepted procedures.
2. Close the lower nose compartment access door 1103. Refer to 727 AMM 12-30-01 and 727 AMM
12-30-1 as accepted procedures.
3. Install the lower lining to the left and right side of the control cabin. Refer to 727 AMM 25-10-01
and 727 AMM 25-10-0 as accepted procedures.
4. Install the forward lavatory as necessary. Refer to 727 AMM 25-40-00 and 727 AMM 25-40-0 as
accepted procedures.
5. Install the carpet riser forward and immediately aft of the forward entry doorway. Refer to 727 AMM
25-21-46 and 727 AMM 25-21-321 as accepted procedures.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 17, 2013
727-53-0234
29 of 85
BOEING SERVICE BULLETIN 727-53-0234

### Page 30 (OCR)

BOEING SERVICE BULLETIN 727-53-0234
STA STA  STA
178  188  360
FRAME INBOARD
UPPER CHORD
SKIN
FLOOR BEAM
UPPER CHORD
FRAME
OUTBOARD
LOWER
CHORD
FRAME INBOARD
LOWER CHORD
• FRAME OUTBOARD
WEB CHORD
INBD
+ HFEC INSPECTION AROUND FASTENER
1- REFERENCE FASTENER
, HFEC INSPECTION
STA 188 LEFT SIDE, VIEW LOOKING FORWARD  A-A  2201615
FIGURE 1: FUSELAGE - STA 188 LEFT SIDE - FRAME INSPECTION IN THE AREA OF THE FLOOR BEAM
ATTACHMENT
(SHEET 1 OF 2)
Original Issue: January 17, 2013
Export Controlled ECCN: 9E991 - BOEING  PROPRIETARY - Copyright © Unpublished  727-53-0234
Work - See page 1 for details.  30 of 85

### Page 31

The step numbers shown below agree with the numbers shown in the circle symbols in the figure.
More DataQtyIdentificationNameTaskStep
(a)1-Frame WebInspect1
(b)1-Frame WebInspect2
(c)1-Frame WebInspect3
(a) Do a High Frequency Eddy Current (HFEC) inspection of the frame web around the indicated fasteners
for any crack in accordance with 727 NDT Manual Part 6, 51-00-00 Procedure 4 or Procedure 23. Do the
inspection from the aft side of the frame.
(b) Do a HFEC inspection of the frame web around the indicated fasteners for any crack in accordance with
727 NDT Manual Part 6, 51-00-00 Procedure 4 or Procedure 23. Do the inspection from the forward side
of the frame.
(c) Do a HFEC inspection of the frame web along the edge of the chord as shown in accordance with 727
NDT Manual Part 6, 51-00-00 Procedure 4 or Procedure 23. Do the inspection from the forward side of
the frame.
FIGURE 1: FUSELAGE - STA 188 LEFT SIDE - FRAME INSPECTION IN THE AREA OF THE FLOOR BEAM
ATTACHMENT
(SHEET 2 OF 2)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 17, 2013
727-53-0234
31 of 85
BOEING SERVICE BULLETIN 727-53-0234

### Page 32 (OCR)

BOEING SERVICE BULLETIN 727-53-0234
STA STA  STA
178  188  360
FRAME INBOARD
UPPER CHORD
SKIN
FLOOR BEAM
UPPER CHORD
FRAME
OUTBOARD
LOWER
CHORD
FRAME INBOARD -
LOWER CHORD
FRAME OUTBOARD
WEB CHORD
INBD
+ HFEC INSPECTION AROUND FASTENER
*- REFERENCE FASTENER  _ STA 188 RIGHT SIDE, VIEW LOOKING FORWARD
, HFEC INSPECTION  A-A
FIGURE 2: FUSELAGE - STA 188 RIGHT SIDE - FRAME INSPECTION IN THE AREA OF THE FLOOR BEAM
ATTACHMENT
(SHEET 1 OF 2)
Original Issue: January 17, 2013
Export Controlled ECCN: 9E991 - BOEING  PROPRIETARY - Copyright © Unpublished  727-53-0234
Work - See page 1 for details.  32 of 85

### Page 33

The step numbers shown below agree with the numbers shown in the circle symbols in the figure.
More DataQtyIdentificationNameTaskStep
(a)1-Frame WebInspect1
(b)1-Frame WebInspect2
(c)1-Frame WebInspect3
(a) Do a High Frequency Eddy Current (HFEC) inspection of the frame web around the indicated fasteners
for any crack in accordance with 727 NDT Manual Part 6, 51-00-00 Procedure 4 or Procedure 23. Do the
inspection from the aft side of the frame.
(b) Do a HFEC inspection of the frame web around the indicated fasteners for any crack in accordance with
727 NDT Manual Part 6, 51-00-00 Procedure 4 or Procedure 23. Do the inspection from the forward side
of the frame.
(c) Do a HFEC inspection of the frame web along the edge of the chord as shown in accordance with 727
NDT Manual Part 6, 51-00-00 Procedure 4 or Procedure 23. Do the inspection from the forward side of
the frame.
FIGURE 2: FUSELAGE - STA 188 RIGHT SIDE - FRAME INSPECTION IN THE AREA OF THE FLOOR BEAM
ATTACHMENT
(SHEET 2 OF 2)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 17, 2013
727-53-0234
33 of 85
BOEING SERVICE BULLETIN 727-53-0234

### Page 34 (OCR)

BOEING SERVICE BULLETIN 727-53-0234
STA  STA  STA
178 196.5  360
FRAME OUTBOARD
UPPER CHORD
FRAME INBOARD
UPPER CHORD
FRAME
UPPER
WEB
SKIN
SHEAR
TIE
FLOOR BEAM
CHANNEL
4 LOCATIONS
- FRAME LOWER WEB
INBD
+ HFEC INSPECTION AROUND FASTENER
+ REFERENCE FASTENER
STA 196.5 LEFT SIDE, VIEW LOOKING FORWARD  %, HFEC INSPECTION  2201813
A-A
FIGURE 3: FUSELAGE - STA 196.5 LEFT SIDE - FRAME INSPECTION IN THE AREA OF THE FLOOR
BEAM ATTACHMENT
(SHEET 1 OF 2)
Original Issue: January 17, 2013
PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  727-53-0234
Work - See page 1 for details.  34 of 85

### Page 35

The step numbers shown below agree with the numbers shown in the circle symbols in the figure.
More DataQtyIdentificationNameTaskStep
(a)1-Frame WebInspect1
(b)1-Frame WebInspect2
(c)1-Frame WebInspect3
(a) Do a High Frequency Eddy Current (HFEC) inspection of the frame web around the indicated fasteners
for any crack in accordance with 727 NDT Manual Part 6, 51-00-00 Procedure 4 or Procedure 23. Do the
inspection from the aft side of the frame.
(b) Do a HFEC inspection of the frame web around the indicated fasteners for any crack in accordance with
727 NDT Manual Part 6, 51-00-00 Procedure 4 or Procedure 23. Do the inspection from the forward side
of the frame.
(c) Do a HFEC inspection of the frame web along the edge of the chord as shown in accordance with 727
NDT Manual Part 6, 51-00-00 Procedure 4 or Procedure 23. Do the inspection from the forward side of
the frame.
FIGURE 3: FUSELAGE - STA 196.5 LEFT SIDE - FRAME INSPECTION IN THE AREA OF THE FLOOR
BEAM ATTACHMENT
(SHEET 2 OF 2)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 17, 2013
727-53-0234
35 of 85
BOEING SERVICE BULLETIN 727-53-0234

### Page 36 (OCR)

BOEING SERVICE BULLETIN 727-53-0234
STA STA  STA
178 196.5  360
FRAME OUTBOARD
UPPER CHORD
FRAME  UPPER  UPPER CHORD  FRAME INBOARD
WEB
_SKIN
• SHEAR
TIE
FLOOR BEAM
CHANNEL
4 LOCATIONS
FRAME LOWER WEB
INBD
+ HFEC INSPECTION AROUND FASTENER
*- REFERENCE FASTENER
, HFEC INSPECTION  STA 196.5 RIGHT SIDE, VIEW LOOKING FORWARD  A-A  2201818
FIGURE 4: FUSELAGE - STA 196.5 RIGHT SIDE - FRAME INSPECTION IN THE AREA OF THE FLOOR
BEAM ATTACHMENT
(SHEET 1 OF 2)
Original Issue: January 17, 2013
Export Controlled ECCN: 9E991 - BOEING  PROPRIETARY - Copyright © Unpublished  727-53-0234
Work - See page 1 for details.  36 of 85

### Page 37

The step numbers shown below agree with the numbers shown in the circle symbols in the figure.
More DataQtyIdentificationNameTaskStep
(a)1-Frame WebInspect1
(b)1-Frame WebInspect2
(c)1-Frame WebInspect3
(a) Do a High Frequency Eddy Current (HFEC) inspection of the frame web around the indicated fasteners
for any crack in accordance with 727 NDT Manual Part 6, 51-00-00 Procedure 4 or Procedure 23. Do the
inspection from the aft side of the frame.
(b) Do a HFEC inspection of the frame web around the indicated fasteners for any crack in accordance with
727 NDT Manual Part 6, 51-00-00 Procedure 4 or Procedure 23. Do the inspection from the forward side
of the frame.
(c) Do a HFEC inspection of the frame web along the edge of the chord as shown in accordance with 727
NDT Manual Part 6, 51-00-00 Procedure 4 or Procedure 23. Do the inspection from the forward side of
the frame.
FIGURE 4: FUSELAGE - STA 196.5 RIGHT SIDE - FRAME INSPECTION IN THE AREA OF THE FLOOR
BEAM ATTACHMENT
(SHEET 2 OF 2)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 17, 2013
727-53-0234
37 of 85
BOEING SERVICE BULLETIN 727-53-0234

### Page 38 (OCR)

BOEING SERVICE BULLETIN 727-53-0234
STA STA  STA
178 203.8  360
FRAME OUTBOARD
UPPER CHORD
FRAME UPPER
WEB
FRAME INBOARD
UPPER CHORD
SKIN
SHEAR
TIE
FLOOR BEAM
CHANNEL
•
4 LOCATIONS
INBD
+ HFEC INSPECTION AROUND FASTENER
STA 203.8 LEFT SIDE, VIEW LOOKING FORWARD  -*- REFERENCE FASTENER  2201822
A-A  , HFEC INSPECTION
FIGURE 5: FUSELAGE - STA 203.8 LEFT SIDE - FRAME INSPECTION IN THE AREA OF THE FLOOR
BEAM ATTACHMENT
(SHEET 1 OF 2)
Original Issue: January 17, 2013
PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  727-53-0234
Work - See page 1 for details.  38 of 85

### Page 39

The step numbers shown below agree with the numbers shown in the circle symbols in the figure.
More DataQtyIdentificationNameTaskStep
(a)1-Frame WebInspect1
(b)1-Frame WebInspect2
(c)1-Frame WebInspect3
(a) Do a High Frequency Eddy Current (HFEC) inspection of the frame web around the indicated fasteners
for any crack in accordance with 727 NDT Manual Part 6, 51-00-00 Procedure 4 or Procedure 23. Do the
inspection from the aft side of the frame.
(b) Do a HFEC inspection of the frame web around the indicated fasteners for any crack in accordance with
727 NDT Manual Part 6, 51-00-00 Procedure 4 or Procedure 23. Do the inspection from the forward side
of the frame.
(c) Do a HFEC inspection of the frame web along the edge of the chord as shown in accordance with 727
NDT Manual Part 6, 51-00-00 Procedure 4 or Procedure 23. Do the inspection from the forward side of
the frame.
FIGURE 5: FUSELAGE - STA 203.8 LEFT SIDE - FRAME INSPECTION IN THE AREA OF THE FLOOR
BEAM ATTACHMENT
(SHEET 2 OF 2)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 17, 2013
727-53-0234
39 of 85
BOEING SERVICE BULLETIN 727-53-0234

### Page 40 (OCR)

BOEING SERVICE BULLETIN 727-53-0234
STA STA  STA
178 203.8  360
FRAME  FRAME OUTBOARD
INBOARD  UPPER CHORD
UPPER  FRAME UPPER
CHORD  WEB
SHEAR
TIE
SKIN
FLOOR BEAM
CHANNEL
4 LOCATIONS
INBD
+ HFEC INSPECTION AROUND FASTENER
*- REFERENCE FASTENER  HFEC INSPECTION  STA 203.8 RIGHT SIDE, VIEW LOOKING FORWARD  A-A  2201863
FIGURE 6: FUSELAGE - STA 203.8 RIGHT SIDE - FRAME INSPECTION IN THE AREA OF THE FLOOR
BEAM ATTACHMENT
(SHEET 1 OF 2)
Original Issue: January 17, 2013
PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  727-53-0234
Work - See page 1 for details.  40 of 85

### Page 41

The step numbers shown below agree with the numbers shown in the circle symbols in the figure.
More DataQtyIdentificationNameTaskStep
(a)1-Frame WebInspect1
(b)1-Frame WebInspect2
(c)1-Frame WebInspect3
(a) Do a High Frequency Eddy Current (HFEC) inspection of the frame web around the indicated fasteners
for any crack in accordance with 727 NDT Manual Part 6, 51-00-00 Procedure 4 or Procedure 23. Do the
inspection from the aft side of the frame.
(b) Do a HFEC inspection of the frame web around the indicated fasteners for any crack in accordance with
727 NDT Manual Part 6, 51-00-00 Procedure 4 or Procedure 23. Do the inspection from the forward side
of the frame.
(c) Do a HFEC inspection of the frame web along the edge of the chord as shown in accordance with 727
NDT Manual Part 6, 51-00-00 Procedure 4 or Procedure 23. Do the inspection from the forward side of
the frame.
FIGURE 6: FUSELAGE - STA 203.8 RIGHT SIDE - FRAME INSPECTION IN THE AREA OF THE FLOOR
BEAM ATTACHMENT
(SHEET 2 OF 2)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 17, 2013
727-53-0234
41 of 85
BOEING SERVICE BULLETIN 727-53-0234

### Page 42 (OCR)

BOEING SERVICE BULLETIN 727-53-0234
ST 21.  STA
360
FRAME OUTBOARD
UPPER CHORD
FRAME INBOARD
UPPER CHORD
SHEAR
TIE
FLOOR BEAM
CHANNEL
SKIN
4 LOCATIONS
- FRAME WEB
INBD
+ HFEC INSPECTION AROUND FASTENER
STA 211.8 LEFT SIDE, VIEW LOOKING FORWARD  A-A  *- REFERENCE FASTENER  %, HFEC INSPECTION  2202051
FIGURE 7: FUSELAGE - STA 211.8 LEFT SIDE - FRAME INSPECTION IN THE AREA OF THE FLOOR
BEAM ATTACHMENT
(SHEET 1 OF 2)
Original Issue: January 17, 2013
PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  727-53-0234
Work - See page 1 for details.  42 of 85

### Page 43

The step numbers shown below agree with the numbers shown in the circle symbols in the figure.
More DataQtyIdentificationNameTaskStep
(a)1-Frame WebInspect1
(b)1-Frame WebInspect2
(c)1-Frame WebInspect3
(a) Do a High Frequency Eddy Current (HFEC) inspection of the frame web around the indicated fasteners
for any crack in accordance with 727 NDT Manual Part 6, 51-00-00 Procedure 4 or Procedure 23. Do the
inspection from the aft side of the frame.
(b) Do a HFEC inspection of the frame web around the indicated fasteners for any crack in accordance with
727 NDT Manual Part 6, 51-00-00 Procedure 4 or Procedure 23. Do the inspection from the forward side
of the frame.
(c) Do a HFEC inspection of the frame web along the edge of the chord as shown in accordance with 727
NDT Manual Part 6, 51-00-00 Procedure 4 or Procedure 23. Do the inspection from the forward side of
the frame.
FIGURE 7: FUSELAGE - STA 211.8 LEFT SIDE - FRAME INSPECTION IN THE AREA OF THE FLOOR
BEAM ATTACHMENT
(SHEET 2 OF 2)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 17, 2013
727-53-0234
43 of 85
BOEING SERVICE BULLETIN 727-53-0234

### Page 44 (OCR)

BOEING SERVICE BULLETIN 727-53-0234
STA  STA
211.8  360
FRAME OUTBOARD
UPPER CHORD
FRAME INBOARD
UPPER CHORD
SKIN
SHEAR
TIE
FLOOR BEAM
CHANNEL
4 LOCATIONS
FRAME WEB
INBD
+ HFEC INSPECTION AROUND FASTENER
* REFERENCE FASTENER
*, HFEC INSPECTION  STA 211.8 RIGHT SIDE, VIEW LOOKING FORWARD  2202052
A-A
FIGURE 8: FUSELAGE - STA 211.8 RIGHT SIDE - FRAME INSPECTION IN THE AREA OF THE FLOOR
BEAM ATTACHMENT
(SHEET 1 OF 2)
Original Issue: January 17, 2013
PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  727-53-0234
Work - See page 1 for details.  44 of 85

### Page 45

The step numbers shown below agree with the numbers shown in the circle symbols in the figure.
More DataQtyIdentificationNameTaskStep
(a)1-Frame WebInspect1
(b)1-Frame WebInspect2
(c)1-Frame WebInspect3
(a) Do a High Frequency Eddy Current (HFEC) inspection of the frame web around the indicated fasteners
for any crack in accordance with 727 NDT Manual Part 6, 51-00-00 Procedure 4 or Procedure 23. Do the
inspection from the aft side of the frame.
(b) Do a HFEC inspection of the frame web around the indicated fasteners for any crack in accordance with
727 NDT Manual Part 6, 51-00-00 Procedure 4 or Procedure 23. Do the inspection from the forward side
of the frame.
(c) Do a HFEC inspection of the frame web along the edge of the chord as shown in accordance with 727
NDT Manual Part 6, 51-00-00 Procedure 4 or Procedure 23. Do the inspection from the forward side of
the frame.
FIGURE 8: FUSELAGE - STA 211.8 RIGHT SIDE - FRAME INSPECTION IN THE AREA OF THE FLOOR
BEAM ATTACHMENT
(SHEET 2 OF 2)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 17, 2013
727-53-0234
45 of 85
BOEING SERVICE BULLETIN 727-53-0234

### Page 46 (OCR)

BOEING SERVICE BULLETIN 727-53-0234
ST 257.8
FRAME OUTBOARD
FRAME  UPPER CHORD
OPPER
WEB
FRAME INBOARD
UPPER CHORD
SKIN
SHEAR
TIE
FLOOR BEAM
CHANNEL
4 LOCATIONS
INBD
+ HFEC INSPECTION AROUND FASTENER
STA 219.8 LEFT SIDE, VIEW LOOKING FORWARD  A-A  -*- REFERENCE FASTENER  , HFEC INSPECTION  2202081
FIGURE 9: FUSELAGE - STA 219.8 LEFT SIDE - FRAME INSPECTION IN THE AREA OF THE FLOOR
BEAM ATTACHMENT
(SHEET 1 OF 2)
Original Issue: January 17, 2013
PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  727-53-0234
Work - See page 1 for details.  46 of 85

### Page 47

The step numbers shown below agree with the numbers shown in the circle symbols in the figure.
More DataQtyIdentificationNameTaskStep
(a)1-Frame WebInspect1
(b)1-Frame WebInspect2
(c)1-Frame WebInspect3
(a) Do a High Frequency Eddy Current (HFEC) inspection of the frame web around the indicated fasteners
for any crack in accordance with 727 NDT Manual Part 6, 51-00-00 Procedure 4 or Procedure 23. Do the
inspection from the aft side of the frame.
(b) Do a HFEC inspection of the frame web around the indicated fasteners for any crack in accordance with
727 NDT Manual Part 6, 51-00-00 Procedure 4 or Procedure 23. Do the inspection from the forward side
of the frame.
(c) Do a HFEC inspection of the frame web along the edge of the chord as shown in accordance with 727
NDT Manual Part 6, 51-00-00 Procedure 4 or Procedure 23. Do the inspection from the forward side of
the frame.
FIGURE 9: FUSELAGE - STA 219.8 LEFT SIDE - FRAME INSPECTION IN THE AREA OF THE FLOOR
BEAM ATTACHMENT
(SHEET 2 OF 2)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 17, 2013
727-53-0234
47 of 85
BOEING SERVICE BULLETIN 727-53-0234

### Page 48 (OCR)

BOEING SERVICE BULLETIN 727-53-0234
STA  STA  STA
178  219.8  360  FRAME OUTBOARD
UPPER CHORD  FRAME
UPPER
FRAME INBOARD  WEB
UPPER CHORD
SKIN
SHEAR
TIE
CHANNEL,  FLOOR BEAM
4 LOCATIONS
INBD
† HFEC INSPECTION AROUND FASTENER
-*- REFERENCE FASTENER  VIEW LOOKING FORWARD  STA 219.8 RIGHT SIDE,
, HFEC INSPECTION  A-A  2202493
FIGURE 10: FUSELAGE - STA 219.8 RIGHT SIDE - FRAME INSPECTION IN THE AREA OF THE FLOOR
BEAM ATTACHMENT
(SHEET 1 OF 2)
Original Issue: January 17, 2013
PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  727-53-0234
Work - See page 1 for details.  48 of 85

### Page 49

The step numbers shown below agree with the numbers shown in the circle symbols in the figure.
More DataQtyIdentificationNameTaskStep
(a)1-Frame WebInspect1
(b)1-Frame WebInspect2
(c)1-Frame WebInspect3
(a) Do a High Frequency Eddy Current (HFEC) inspection of the frame web around the indicated fasteners
for any crack in accordance with 727 NDT Manual Part 6, 51-00-00 Procedure 4 or Procedure 23. Do the
inspection from the aft side of the frame.
(b) Do a HFEC inspection of the frame web around the indicated fasteners for any crack in accordance with
727 NDT Manual Part 6, 51-00-00 Procedure 4 or Procedure 23. Do the inspection from the forward side
of the frame.
(c) Do a HFEC inspection of the frame web along the edge of the chord as shown in accordance with 727
NDT Manual Part 6, 51-00-00 Procedure 4 or Procedure 23. Do the inspection from the forward side of
the frame.
FIGURE 10: FUSELAGE - STA 219.8 RIGHT SIDE - FRAME INSPECTION IN THE AREA OF THE FLOOR
BEAM ATTACHMENT
(SHEET 2 OF 2)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 17, 2013
727-53-0234
49 of 85
BOEING SERVICE BULLETIN 727-53-0234

### Page 50 (OCR)

BOEING SERVICE BULLETIN 727-53-0234
This Figure applies only to: Group 3-4, 6.
STA  STA  STA
178  227.8  360
FRAME OUTBOARD  FRAME UPPER
UPPER CHORD  WEB
FRAME INBOARL
UPPER CHORE
SKIN
• SHEAR TIE  FLOOR BEAM
CHANNEL
INBD
+ HFEC INSPECTION AROUND FASTENER
STA 227.8 LEFT SIDE, VIEW LOOKING FORWARD  A-A  - REFERENCE FASTENER  , HFEC INSPECTION  2202494
FIGURE 11: FUSELAGE - STA 227.8 LEFT SIDE - FRAME INSPECTION IN THE AREA OF THE FLOOR
BEAM ATTACHMENT
(SHEET 1 OF 2)
Original Issue: January 17, 2013
PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  727-53-0234
Work - See page 1 for details.  50 of 85

### Page 51

The step numbers shown below agree with the numbers shown in the circle symbols in the figure.
More DataQtyIdentificationNameTaskStep
(a)1-Frame WebInspect1
(b)1-Frame WebInspect2
(c)1-Frame WebInspect3
(a) Do a High Frequency Eddy Current (HFEC) inspection of the frame web around the indicated fasteners
for any crack in accordance with 727 NDT Manual Part 6, 51-00-00 Procedure 4 or Procedure 23. Do the
inspection from the aft side of the frame.
(b) Do a HFEC inspection of the frame web around the indicated fasteners for any crack in accordance with
727 NDT Manual Part 6, 51-00-00 Procedure 4 or Procedure 23. Do the inspection from the forward side
of the frame.
(c) Do a HFEC inspection of the frame web along the edge of the chord as shown in accordance with 727
NDT Manual Part 6, 51-00-00 Procedure 4 or Procedure 23. Do the inspection from the forward side of
the frame.
FIGURE 11: FUSELAGE - STA 227.8 LEFT SIDE - FRAME INSPECTION IN THE AREA OF THE FLOOR
BEAM ATTACHMENT
(SHEET 2 OF 2)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 17, 2013
727-53-0234
51 of 85
BOEING SERVICE BULLETIN 727-53-0234

### Page 52 (OCR)

BOEING SERVICE BULLETIN 727-53-0234
This Figure applies only to: Group 3-4, 6.
STA  STA  STA
178  227.8  360
FRAME UPPER  FRAME OUTBOARD
WEB  UPPER CHORD
FRAME INBOARD
UPPER CHORD
+
SKIN
SHEAR TIE
FLOOR BEAM
CHANNEL
(3)
2 LOCATIONS
INBD
+ HFEC INSPECTION AROUND FASTENER
* REFERENCE FASTENER  , HFEC INSPECTION  VIEW LOOKING FORWARD  STA 227.8 RIGHT SIDE,  A-A  2202496
FIGURE 12: FUSELAGE - STA 227.8 RIGHT SIDE - FRAME INSPECTION IN THE AREA OF THE FLOOR
BEAM ATTACHMENT
(SHEET 1 OF 2)
Original Issue: January 17, 2013
PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  727-53-0234
Work - See page 1 for details.  52 of 85

### Page 53

The step numbers shown below agree with the numbers shown in the circle symbols in the figure.
More DataQtyIdentificationNameTaskStep
(a)1-Frame WebInspect1
(b)1-Frame WebInspect2
(c)1-Frame WebInspect3
(a) Do a High Frequency Eddy Current (HFEC) inspection of the frame web around the indicated fasteners
for any crack in accordance with 727 NDT Manual Part 6, 51-00-00 Procedure 4 or Procedure 23. Do the
inspection from the aft side of the frame.
(b) Do a HFEC inspection of the frame web around the indicated fasteners for any crack in accordance with
727 NDT Manual Part 6, 51-00-00 Procedure 4 or Procedure 23. Do the inspection from the forward side
of the frame.
(c) Do a HFEC inspection of the frame web along the edge of the chord as shown in accordance with 727
NDT Manual Part 6, 51-00-00 Procedure 4 or Procedure 23. Do the inspection from the forward side of
the frame.
FIGURE 12: FUSELAGE - STA 227.8 RIGHT SIDE - FRAME INSPECTION IN THE AREA OF THE FLOOR
BEAM ATTACHMENT
(SHEET 2 OF 2)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 17, 2013
727-53-0234
53 of 85
BOEING SERVICE BULLETIN 727-53-0234

### Page 54 (OCR)

BOEING SERVICE BULLETIN 727-53-0234
This Figure applies only to: Group 1-2, 5.
STA  STA  STA
178  227.8  360
FRAME OUTBOARD
UPPER CHORD
FRAME MID-UPPER
WEB
FRAME INBOARD
UPPER CHORD
SKIN
SHEAR
TIE
FLOOR BEAM
CHANNEL
10 LOCATIONS
FRAME  MID-UPPER  + HFEC INSPECTION AROUND FASTENER
AND LOWER  *- REFERENCE FASTENER
WEB  STA 227.8 LEFT SIDE, VIEW LOOKING FORWARD  A-A  HFEC INSPECTION  2202497
FIGURE 13: FUSELAGE - STA 227.8 LEFT SIDE - FRAME INSPECTION IN THE AREA OF THE FLOOR
BEAM ATTACHMENT
(SHEET 1 OF 2)
Original Issue: January 17, 2013
Export Controlled ECCN: 9E991 - BOEING  PROPRIETARY - Copyright © Unpublished  727-53-0234
Work - See page 1 for details.  54 of 85

### Page 55

The step numbers shown below agree with the numbers shown in the circle symbols in the figure.
More DataQtyIdentificationNameTaskStep
(a)1-Frame WebInspect1
(b)1-Frame WebInspect2
(c)1-Frame WebInspect3
(a) Do a High Frequency Eddy Current (HFEC) inspection of the frame web around the indicated fasteners
for any crack in accordance with 727 NDT Manual Part 6, 51-00-00 Procedure 4 or Procedure 23. Do the
inspection from the aft side of the frame.
(b) Do a HFEC inspection of the frame web around the indicated fasteners for any crack in accordance with
727 NDT Manual Part 6, 51-00-00 Procedure 4 or Procedure 23. Do the inspection from the forward side
of the frame.
(c) Do a HFEC inspection of the frame web along the edge of the chord as shown in accordance with 727
NDT Manual Part 6, 51-00-00 Procedure 4 or Procedure 23. Do the inspection from the forward side of
the frame.
FIGURE 13: FUSELAGE - STA 227.8 LEFT SIDE - FRAME INSPECTION IN THE AREA OF THE FLOOR
BEAM ATTACHMENT
(SHEET 2 OF 2)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 17, 2013
727-53-0234
55 of 85
BOEING SERVICE BULLETIN 727-53-0234

### Page 56 (OCR)

BOEING SERVICE BULLETIN 727-53-0234
This Figure applies only to: Group 1-2, 5.
STA  STA  STA
178  227.8  360
FRAME OUTBOARD
UPPER CHORD
FRAME
MID-UPPER WEB
SKIN
FRAME INBOARD  SHEAR  TIE
UPPER CHORD
FLOOR BEAM
CHANNEL
10 LOCATIONS
FRAME
MID-UPPER
† HFEC INSPECTION AROUND FASTENER  AND LOWER
*- REFERENCE FASTENER  STA 227.8 RIGHT SIDE, VIEW LOOKING FORWARD  WEB
, HFEC INSPECTION  A-A  2202507
FIGURE 14: FUSELAGE - STA 227.8 RIGHT SIDE - FRAME INSPECTION IN THE AREA OF THE FLOOR
BEAM ATTACHMENT
(SHEET 1 OF 2)
Original Issue: January 17, 2013
PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  727-53-0234
Work - See page 1 for details.  56 of 85

### Page 57

The step numbers shown below agree with the numbers shown in the circle symbols in the figure.
More DataQtyIdentificationNameTaskStep
(a)1-Frame WebInspect1
(b)1-Frame WebInspect2
(c)1-Frame WebInspect3
(a) Do a High Frequency Eddy Current (HFEC) inspection of the frame web around the indicated fasteners
for any crack in accordance with 727 NDT Manual Part 6, 51-00-00 Procedure 4 or Procedure 23. Do the
inspection from the aft side of the frame.
(b) Do a HFEC inspection of the frame web around the indicated fasteners for any crack in accordance with
727 NDT Manual Part 6, 51-00-00 Procedure 4 or Procedure 23. Do the inspection from the forward side
of the frame.
(c) Do a HFEC inspection of the frame web along the edge of the chord as shown in accordance with 727
NDT Manual Part 6, 51-00-00 Procedure 4 or Procedure 23. Do the inspection from the forward side of
the frame.
FIGURE 14: FUSELAGE - STA 227.8 RIGHT SIDE - FRAME INSPECTION IN THE AREA OF THE FLOOR
BEAM ATTACHMENT
(SHEET 2 OF 2)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 17, 2013
727-53-0234
57 of 85
BOEING SERVICE BULLETIN 727-53-0234

### Page 58 (OCR)

BOEING SERVICE BULLETIN 727-53-0234
FRAME OUTBOARD  STA  STA
UPPER CHORD  FRAME INBOARD  178  235.8
UPPER CHORD
STIFFENER
FRAME WEB AND
DOUBLER
SKIN
SHEAR  1
TIE
CRACK
(TYPICAL
FLOOR BEAM
CHANNEL
6 LOCATIONS
INBD
+ HFEC INSPECTION AROUND FASTENER
STA 235.8 LEFT SIDE, VIEW LOOKING FORWARD  A-A  -*- REFERENCE FASTENER  , HFEC INSPECTION  2202590
FIGURE 15: FUSELAGE - STA 235.8 LEFT SIDE - FRAME INSPECTION IN THE AREA OF THE FLOOR
BEAM ATTACHMENT
(SHEET 1 OF 2)
Original Issue: January 17, 2013
PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  727-53-0234
Work - See page 1 for details.  58 of 85

### Page 59

The step numbers shown below agree with the numbers shown in the circle symbols in the figure.
More DataQtyIdentificationNameTaskStep
(a)1-Frame WebInspect1
(b)1-Frame WebInspect2
(c)1-Frame WebInspect3
(a) Do a High Frequency Eddy Current (HFEC) inspection of the frame web around the indicated fasteners
for any crack in accordance with 727 NDT Manual Part 6, 51-00-00 Procedure 4 or Procedure 23. Do the
inspection from the aft side of the frame.
(b) Do a HFEC inspection of the frame web around the indicated fasteners for any crack in accordance with
727 NDT Manual Part 6, 51-00-00 Procedure 4 or Procedure 23. Do the inspection from the forward side
of the frame.
(c) Do a HFEC inspection of the frame web along the edge of the chord as shown in accordance with 727
NDT Manual Part 6, 51-00-00 Procedure 4 or Procedure 23. Do the inspection from the forward side of
the frame.
FIGURE 15: FUSELAGE - STA 235.8 LEFT SIDE - FRAME INSPECTION IN THE AREA OF THE FLOOR
BEAM ATTACHMENT
(SHEET 2 OF 2)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 17, 2013
727-53-0234
59 of 85
BOEING SERVICE BULLETIN 727-53-0234

### Page 60 (OCR)

BOEING SERVICE BULLETIN 727-53-0234
STA  STA
235.8  360  FRAME OUTBOARD
FRAME INBOARL  UPPER CHORD
UPPER CHORD
FRAME
WEB
AND
DOUBLER
SKIN
CRACK
(TYPICAL)  SHEAR
TIE
FLOOR BEAM
CHANNEL
6 LOCATIONS
INBD
+ HFEC INSPECTION AROUND FASTENER
-*- REFERENCE FASTENER  STA 235.8 RIGHT SIDE,
, HFEC INSPECTION  VIEW LOOKING FORWARD  2202593
A-A
FIGURE 16: FUSELAGE - STA 235.8 RIGHT SIDE - FRAME INSPECTION IN THE AREA OF THE FLOOR
BEAM ATTACHMENT
(SHEET 1 OF 2)
Original Issue: January 17, 2013
PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  727-53-0234
Work - See page 1 for details.  60 of 85

The text continues at https://openairdocs.org/service-documents/boeing/sb-727-53-0234/file/a5bb060ed50b.md?from=61

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
