# Boeing Special Attention Service Bulletin 727-55-0093: No revision named

- Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2008-1117; AD 2009-20-03 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Boeing Special Attention Service Bulletin 727-55-0093](https://openairdocs.org/service-documents/boeing/sb-727-55-0093.md)
- Title as filed: U.S. DOT/FAA - Boeing Special Attention Service Bulletin
- Pages: 39
- PDF: https://openairdocs.org/files/sha256/06/21/062166da1e2ba5277830607961c8df1ee894182a3fcc6fd524e02755ed957370
- Page: https://openairdocs.org/service-documents/boeing/sb-727-55-0093/file/062166da1e2b

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Commercial        
Airplane
Group 
 727
Service Bulletin
SPECIAL ATTENTION
Number: 727-55-0093
Date: March 12, 2008
ATA System: 5530
SUBJECT: STABILIZERS - Vertical Stabilizer - Kickload Beam Shear Tie and Web Post, Stringer
10, Stringer 11 and Rear Spar Chord - Inspection and Repair.
Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15
CFR 730-774). An export license may be required before it is used for development, production or use by foreign
persons from specific countries. The controller of this data has the individual responsibility to abide by all export
laws.
9E991ECCN:
BOEING PROPRIETARY, CONFIDENTIAL, AND/OR TRADE SECRET
Copyright © 2008 The Boeing Company
Unpublished Work - All Rights Reserved
Boeing claims copyright in each page of this document only to the extent that the page contains copyrightable
subject matter. Boeing also claims copyright in this document as a compilation and/or collective work.
This document includes proprietary information owned by The Boeing Company and/or one or more third parties.
Treatment of the document and the information it contains is governed by contract with Boeing. For more
information, contact The Boeing Company, P .O. Box 3707, Seattle, Washington 98124.
Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner,
BBJ, DC-8, DC-9, DC-10, MD-10, MD-11, MD-80, MD-88, MD-90, and the Boeing livery are all trademarks
owned by The Boeing Company; and no trademark license is granted in connection with this document unless
provided in writing by Boeing.
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
March 12, 2008
727-55-0093
1 of 39
2.0

### Page 2

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
March 12, 2008
727-55-0093
2 of 39
BOEING SERVICE BULLETIN 727-55-0093
BLANK PAGE

### Page 3

Table of Contents
Summary ..................................................... 5
1. PLANNING INFORMATION ......................................... 9
A. Effectivity ................................................ 9
1. Airplanes ............................................. 9
2. Spares Affected ........................................ 1 3
B. Concurrent Requirements ...................................... 1 3
C. Reason ................................................ 1 4
D. Description .............................................. 1 4
E. Compliance .............................................. 1 4
F . Approval ............................................... 1 5
G. Manpower .............................................. 1 5
H. Weight and Balance Changes .................................... 1 6
I. Electrical Load Data ......................................... 1 6
J. References .............................................. 1 7
1. Existing Data: .......................................... 1 7
2. Data supplied with this Service Bulletin: ........................... 1 7
3. Installation Drawings Used in the Preparation of this Service Bulletin: ........... 1 7
K. Publications Affected ......................................... 1 7
L. Interchangeability and Intermixability of Parts ........................... 1 7
2. MATERIAL INFORMATION ........................................ 1 9
A. Material - Price and Availability ................................... 1 9
B. Industry Support Information .................................... 1 9
C. Parts Necessary For Each Airplane ................................. 1 9
1. Kits/Parts: ............................................ 1 9
2. Parts and Materials Supplied by the Operator: ........................ 1 9
3. Parts Modified and Reidentified: ................................ 2 0
4. Parts Removed and Not Replaced: .............................. 2 0
D. Parts Necessary to Change Spares ................................. 2 0
E. Special Tooling - Price and Availability ............................... 2 0
F . Special Tooling Necessary to do this Service Bulletin ....................... 2 0
3. ACCOMPLISHMENT INSTRUCTIONS .................................. 2 1
A. GENERAL INFORMATION ..................................... 2 1
B. WORK INSTRUCTIONS ....................................... 2 1
FIGURE 1: VERTICAL STABILIZER - KICKLOAD BEAM - ACCESS OPTION 1 ............ 2 5
FIGURE 2: VERTICAL STABILIZER - KICKLOAD BEAM - ACCESS OPTION 2 ............ 2 7
FIGURE 3: VERTICAL STABILIZER - KICKLOAD BEAM AND ADJACENT STRUCTURE - INSPECTION
.................................................. 3 0
FIGURE 4: CLOSE ACCESS TO THE KICKLOAD BEAM IN THE VERTICAL STABILIZER - OPTION 1
.................................................. 3 5
FIGURE 5: CLOSE ACCESS TO THE KICKLOAD BEAM IN THE VERTICAL STABILIZER - OPTION 2
.................................................. 3 7
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
March 12, 2008
727-55-0093
3 of 39
BOEING SERVICE BULLETIN 727-55-0093

### Page 4

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
March 12, 2008
727-55-0093
4 of 39
BOEING SERVICE BULLETIN 727-55-0093
BLANK PAGE

### Page 5

Commercial        
Airplane
Group 
 727
Service Bulletin
SPECIAL ATTENTION
SummaryNumber: 727-55-0093Date: March 12, 2008
ATA System: 5530
SUBJECT: STABILIZERS - Vertical Stabilizer - Kickload Beam Shear Tie and Web Post, Stringer
10, Stringer 11 and Rear Spar Chord - Inspection and Repair.
BOEING RECOMMENDS THAT EACH OPERATOR EXAMINE THIS SERVICE BULLETIN IMMEDIATEL Y .
CONCURRENT REQUIREMENTS
None.
BACKGROUND
This service bulletin is sent to inspect for cracking in the left and right side shear ties and the left and right side
web posts of the kickload beam and adjacent structure in the vertical stabilizer. Undetected fatigue cracks in
the kickload beam, when coupled with failures in adjacent structure, could result in structural failure of the vertical
stabilizer which would lead to loss of control of the airplane.
Cracking of the shear ties and web posts can diminish the effectiveness of both left side and right side stringer
11. When coupled with failures in the rear spar chord or stringer 10, the critical crack length at which limit load
can be sustained is reduced, rendering the existing inspection intervals for stringer 10 and the rear spar chord
insufficient.
The cracking was reported by one operator during a scheduled maintenance visit. The subject airplane had
65,000 flight hours and 42,000 flight cycles. The reported cracking of the left and right side web posts, which
attach to the kickload beam and the left and right side stringer 11 in the vertical stabilizer, were due to stress
corrosion caused by elevated fit up stress. Cracking of the left side and right side shear ties, which attach to the
kickload beam, were a result of fatigue caused by compensation for cracking in the web posts.
Boeing Service Related Problem (SRP) 727-SRP-55-0041 is related to this service bulletin.
ACTION
Do a High Frequency Eddy Current (HFEC) and Low Frequency Eddy Current (LFEC) inspection for cracking
of the left and right side shear ties and the left and right side web posts. Do HFEC and LFEC inspections for
cracking in the left and right side stringer 10, left and right side stringer 11, rear spar chord, associated critical
fasteners and adjacent surfaces in the vertical stabilizer. If any cracking is found in the left or right side shear
ties or the left or right side web posts, then replace the cracked parts. If damage is found in the left or right side
stringer 10, left or right side stringer 11, rear spar chord, associated critical fasteners or adjacent surfaces in
the vertical stabilizer, then contact Boeing for repair instructions.
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
March 12, 2008
727-55-0093
5 of 39

### Page 6

EFFECTIVITY
All 727/727-100/727-100C/727-200/727-200F/727C Airplanes. Refer to Paragraph 1.A., Effectivity for the list of
affected airplanes.
COMPLIANCE
See Service Bulletin Paragraph 1.E., Compliance.
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to this service
bulletin. The Airworthiness Directive will make the compliance tasks and times given in this service bulletin
mandatory.
INDUSTRY SUPPORT INFORMATION
Boeing warranty remedies are not available for the configuration changes, inspection and repair procedures
given in this service bulletin.
MANPOWER
Elapsed HoursTotal Task HoursAirplanes
8.3514.85Access Option 1 - All Airplanes
18.5049.00Access Option 2 - All Airplanes
MATERIAL INFORMATION
Operator Supplied Parts/Materials.
Refer to Paragraph 2.A., Material - Price and Availability.
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
March 12, 2008
727-55-0093
6 of 39
BOEING SERVICE BULLETIN 727-55-0093

### Page 7 (OCR)

BOEING SERVICE BULLETIN 727-55-0093
STA
STA  1342
1183
STA
1110
ACCESS
OPTION 1
ACCESS
OPTION 2
SEE
DO HFEC AND LFEC INSPECTIONS FOR
CRACKING OF THE REAR SPAR CHORD,
STRINGER NUMBER 10, STRINGER
NUMBER 11 AND VERTICAL STABILIZER
SKIN
DO HFEC INSPECTIONS FOR
CRACKING OF THE KICKLOAD
BEAM SHEAR TIE AND WEB
POST. REPAIR BY
REPLACEMENT IF NECESSARY
REAR SPAR  STRINGER 11
CHORD
dott  STA 1342
KICKLOAD  BULKHEAD
BEAM CHORD
VIEW LOOKING AFT  1450702
March 12, 2008
727-55-0093
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.  7 of 39

### Page 8

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
March 12, 2008
727-55-0093
8 of 39
BOEING SERVICE BULLETIN 727-55-0093
BLANK PAGE

### Page 9

Commercial        
Airplane
Group 
 727
Service Bulletin
SPECIAL ATTENTION
Number: 727-55-0093
Date: March 12, 2008
ATA System: 5530
SUBJECT: STABILIZERS - Vertical Stabilizer - Kickload Beam Shear Tie and Web Post, Stringer
10, Stringer 11 and Rear Spar Chord - Inspection and Repair.
BOEING RECOMMENDS THAT EACH OPERATOR EXAMINE THIS SERVICE BULLETIN IMMEDIATEL Y .
1.    PLANNING INFORMATION
A. Effectivity
1. Airplanes
Refer to Service Bulletin Index Document D6-9825 Part 3 for Airplane Variable Number, Line
Number, and Serial Number data.
DESCRIPTIONCONFIGURATIONGROUP
All 727, 727C, 727-100, -100C, -200, -200F Airplanes-1
Airplane Models:
727, 727-100, 727-100C, 727-200, 727-200F , 727C
GroupVariable Number
1E0001 - E0042
1E0101 - E0140
1E0201 - E0216
1E0301 - E0351
1E0401 - E0423
1E3001 - E3006
1E3011 - E3014
1E3021 - E3040
1E3059
1E3061 - E3077
1E3101 - E3103
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
March 12, 2008
727-55-0093
9 of 39

### Page 10

GroupVariable Number
1E3111 - E3118
1E3141 - E3152
1E3171 - E3177
1E3201 - E3206
1E3221 - E3224
1E3241 - E3290
1E3341 - E3350
1E3401 - E3421
1E3451 - E3452
1E3471 - E3474
1E3501 - E3513
1E3516 - E3523
1E3551 - E3553
1E3571 - E3578
1E3601 - E3604
1E3621 - E3622
1E3651 - E3655
1E3677
1E3681 - E3684
1E3701 - E3704
1E3751 - E3755
1E3781 - E3784
1E5001 - E5011
1E5031 - E5068
1E5101 - E5116
1E5141 - E5143
1E5161 - E5164
1E5201 - E5203
1E5221 - E5245
1E5251 - E5252
1E5271 - E5281
1E5301 - E5306
1E5351 - E5353
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
March 12, 2008
727-55-0093
10 of 39
BOEING SERVICE BULLETIN 727-55-0093

### Page 11

GroupVariable Number
1E5381 - E5382
1E5401 - E5424
1E5426 - E5429
1E5433
1E5435
1E5451 - E5455
1E5481 - E5483
1E5501 - E5502
1QA001 - QA046
1QA051 - QA099
1QA101 - QA199
1QA201 - QA225
1QA301 - QA349
1QA351 - QA376
1QA378
1QA401 - QA499
1QA501 - QA537
1QA551 - QA579
1QA581 - QA585
1QA601 - QA688
1QA701 - QA753
1QA801 - QA805
1QA851 - QA899
1QA901 - QA946
1QA949
1QB001 - QB002
1QB031 - QB049
1QB051 - QB068
1QB101 - QB110
1QB114 - QB119
1QB121 - QB149
1QB151 - QB158
1QB201 - QB220
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
March 12, 2008
727-55-0093
11 of 39
BOEING SERVICE BULLETIN 727-55-0093

### Page 12

GroupVariable Number
1QB301 - QB316
1QB351 - QB352
1QB401 - QB407
1QB451 - QB458
1QB501 - QB575
1QB601 - QB629
1QB651
1QB701 - QB705
1QB801 - QB810
1QB901 - QB904
1QD001 - QD012
1QD031 - QD046
1QD085 - QD088
1QD101 - QD105
1QD121 - QD127
1QD141 - QD149
1QD161 - QD164
1QD191 - QD192
1QD201 - QD239
1QD281 - QD284
1QD301 - QD305
1QD321 - QD330
1QD351
1QD401 - QD403
1QD407
1QD410
1QD421 - QD427
1QD441 - QD453
1QD471 - QD475
1QD501 - QD518
1QD551 - QD558
1QD571 - QD572
1QD581 - QD583
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
March 12, 2008
727-55-0093
12 of 39
BOEING SERVICE BULLETIN 727-55-0093

### Page 13

GroupVariable Number
1QD601 - QD607
1QD621 - QD624
1QD641
1QD661 - QD663
1QD681 - QD685
1QD691 - QD692
1QD701 - QD702
1QD711 - QD717
1QD741
1QD761 - QD769
1QD781 - QD782
1QD791
1QD801 - QD804
1QD821 - QD828
1QD901 - QD910
1QD931 - QD932
1QD951 - QD954
1QD971 - QD973
1QD991 - QD992
1QE001 - QE002
1QL001 - QL008
1QL031 - QL032
1QL081
1QL501 - QL515
2. Spares Affected
Examine your spares supply for the parts or components identified in Paragraph 2.C., Parts
Necessary for Each Airplane. If any parts or components are found, refer to Paragraph 2.C. for
the recommended use.
B. Concurrent Requirements
None.
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
March 12, 2008
727-55-0093
13 of 39
BOEING SERVICE BULLETIN 727-55-0093

### Page 14

C. Reason
This service bulletin is sent to inspect for cracking in the left and right side shear ties and the left and
right side web posts of the kickload beam and adjacent structure in the vertical stabilizer. Undetected
fatigue cracks in the kickload beam, when coupled with failures in adjacent structure, could result in
structural failure of the vertical stabilizer which would lead to loss of control of the airplane.
Cracking of the shear ties and web posts can diminish the effectiveness of both left side and right side
stringer 11. When coupled with failures in the rear spar chord or stringer 10, the critical crack length
at which limit load can be sustained is reduced, rendering the existing inspection intervals for stringer
10 and the rear spar chord insufficient.
The cracking was reported by one operator during a scheduled maintenance visit.The subject airplane
had 65,000 flight hours and 42,000 flight cycles. The reported cracking of the left and right side web
posts, which attach to the kickload beam and the left and right side stringer 11 in the vertical stabilizer,
were due to stress corrosion caused by elevated fit up stress. Cracking of the left side and right side
shear ties, which attach to the kickload beam, were a result of fatigue caused by compensation for
cracking in the web posts.
Boeing Service Related Problem (SRP) 727-SRP-55-0041 is related to this service bulletin.
D. Description
Do a High Frequency Eddy Current (HFEC) and Low Frequency Eddy Current (LFEC) inspection for
cracking of the left and right side shear ties and the left and right side web posts. Do HFEC and LFEC
inspections for cracking in the left and right side stringer 10, left and right side stringer 11, rear spar
chord, associated critical fasteners and adjacent surfaces in the vertical stabilizer. If any cracking is
found in the left or right side shear ties or the left or right side web posts, then replace the cracked
parts. If damage is found in the left or right side stringer 10, left or right side stringer 11, rear spar chord,
associated critical fasteners or adjacent surfaces in the vertical stabilizer, then contact Boeing for repair
instructions.
Affected Maintenance Zones
ZoneModel
2-37, 3-95, 4-52727, 727-100, 727-100C,
727-200, 727-200F , 727C
E. Compliance
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to
this service bulletin.The Airworthiness Directive will make the compliance tasks and times given in this
service bulletin mandatory.
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
March 12, 2008
727-55-0093
14 of 39
BOEING SERVICE BULLETIN 727-55-0093

### Page 15

Table1: Inspection and Repair of the Web Posts and Shear Ties attached to the Kickload Beam in the
Vertical Stabilizer. Inspection of Stringer 10, Stringer 11, Rear Spar Chord and the associated critical
fasteners and adjacent surfaces in the Vertical Stabilizer.
Repeat Interval
(Not to Exceed)
Compliance Time (Whichever
Occurs First)
ActionCondition
10,000 flight hours
or 7,500 flight
cycles, whichever
occurs first.
Before 42,000
total flight
cycles.
Before 56,000
total flight hours.
Do High Frequency Eddy
Current (HFEC) and Low
Frequency Eddy Current
(LFEC) inspections as
given in Paragraph 3.B.,
Work Instructions, Part 2.
All airplanes with less than
52,000 total flight hours or
39,000 total flight cycles at
the date on this service
bulletin.
10,000 flight hours
or 7,500 flight
cycles, whichever
occurs first.
Within 3,000
flight cycles
after the date on
this service
bulletin.
Within 4,000
flight hours after
the date on this
service bulletin.
Do High Frequency Eddy
Current (HFEC) and Low
Frequency Eddy Current
(LFEC) inspections as
given in Paragraph 3.B.,
Work Instructions, Part 2.
All airplanes with more
than 52,000 total flight
hours or 39,000 total flight
cycles at the date on this
service bulletin.
-Before further flight.Replace cracked parts as
given in Paragraph 3.B.,
Work Instructions Part 3.
Any crack is found in a
shear tie or web post.
-Before further flight.Contact Boeing for repair
instructions and repair.
Any crack found in stringer
10, stringer 11, the rear
spar chord or the vertical
stabilizer adjacent
surfaces.
F. Approval
This service bulletin was examined by the Federal Aviation Administration (FAA).The changes specified
in this service bulletin comply with the applicable regulations and are FAA approved, as well as European
Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/JAA approved
airplanes listed in the service bulletin effectivity. This service bulletin and its approval were based on
the airplane in its original Boeing delivery configuration or as modified by other approved Boeing
changes.
If an airplane has a non-Boeing modification or repair that affects a component or system also affected
by this service bulletin, the operator is responsible for obtaining appropriate regulatory agency approval
before incorporating this service bulletin.
G. Manpower
The table below shows an estimate of the task hours necessary to do this service bulletin for each
airplane. This estimate is for direct labor only, done by an experienced crew. Adjust the estimate with
operator task hour data if necessary.The estimate does not include lost time.These are some examples
of lost time:
— Time to adjust to the workplace
— Time to schedule the work
— Time to inspect the work
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
March 12, 2008
727-55-0093
15 of 39
BOEING SERVICE BULLETIN 727-55-0093

### Page 16

— Time to cure the materials
— Time to make the parts
— Time to find the tools.
Table 1: Access Option 1
Elapsed HoursTask HoursNumber of
Persons
Task
0.751.502Open Access
0.750.751Figure 1
5.0010.002Figure 3
1.001.001Figure 4
0.100.101Access Panel
Continuity Test.
0.751.502Close Access
8.3514.85TOTAL FOR EACH AIRPLANE
Table 2: Access Option 2
Elapsed HoursTask HoursNumber of
Persons
Task
0.751.502Open Access
5.0015.003Figure 2
5.0010.002Figure 3
7.0021.003Figure 5
0.751.502Close Access
18.5049.00TOTAL FOR EACH AIRPLANE
H. Weight and Balance Changes
None.
I. Electrical Load Data
Not applicable.
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
March 12, 2008
727-55-0093
16 of 39
BOEING SERVICE BULLETIN 727-55-0093

### Page 17

J. References
1. Existing Data:
a. Service Related Problem (SRP) 727-SRP-55-0041
b. 727 Aircraft Maintenance Manual (AMM) 12-30-05, 25-54-00, 27-20-00, 27-30-00, 27-40-31,
54-14-11, 71-00-00, 74-00-00, 78-30-00, 80-11-00
c. 727 Non-Destructive Testing (NDT) Manual Part 6, 51-00-00, Part 6, 55-30-27,
d. 727 Structural Repair Manual (SRM) Chapter 51
2. Data supplied with this Service Bulletin:
None.
3. Installation Drawings Used in the Preparation of this Service Bulletin:
TitleDrawing Number
SKIN AND STRINGER INSTALLATION - INTERSPAR, FIN STRINGER 7
TO REAR SPAR
65-17463
DOOR INSTALLATION - VERTICAL STABILIZER ACCESS65-19696
BEAM INSTALLATION - STRINGER 11 TO REAR SPAR FIN, STA1374.665-25662
CENTERLINE DIAGRAM - VERTICAL TAIL65-72791
These drawings were used to prepare this service bulletin. These drawings are not necessary to
make the specified changes, and are not supplied with this service bulletin. These drawings may
not be applicable to all airplane configurations or operators.
K. Publications Affected
None.
L. Interchangeability and Intermixability of Parts
Accomplishment of this service bulletin does not affect interchangeability or intermixability of parts.
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
March 12, 2008
727-55-0093
17 of 39
BOEING SERVICE BULLETIN 727-55-0093

### Page 18

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
March 12, 2008
727-55-0093
18 of 39
BOEING SERVICE BULLETIN 727-55-0093
BLANK PAGE

### Page 19

2.    MATERIAL INFORMATION
A. Material - Price and Availability
Boeing can supply the parts shown in Paragraph 2.C., Parts Necessary for Each Airplane and Paragraph
2.D., Parts Necessary to Change Spares, as shown below. Parts availability is shown in the Reorder
Lead Time (ROLT). ROLT data is not available at the time of writing this service bulletin.
Unit Price thru
06/30/2008
ROLT
(Weeks)
NamePart Number
$768.00-Web Post-Kickload Beam65-25662U23
$768.00-Web Post-Kickload Beam65-25662U24
$390.00-Shear Tie-Kickload Beam65-25662U25
$390.00-Shear Tie-Kickload Beam65-25662U26
The parts are subject to the terms and conditions of the Boeing standard purchase order
acknowledgment. After the Unit Price date, new price and ROLT data is applicable. Prices are in United
States dollars. Terms: Net 30 days.
Reference this service bulletin and submit your purchase order by one of the methods that
follow:
1. Order on-line via ATA Spec 2000 or Boeing Part Page
2. Fax to (206) 662-7145
3. Spares Customer Support - MC 36-65
Boeing Spares Department
P .O. Box 3707
Seattle, Washington 98124-2207 USA
B. Industry Support Information
Boeing warranty remedies are not available for the configuration changes, inspection and repair
procedures given in this service bulletin.
C. Parts Necessary For Each Airplane
1. Kits/Parts:
None.
2. Parts and Materials Supplied by the Operator:
QTYNamePart Number
1Web Post-Kickload Beam65-25662U23
1Web Post-Kickload Beam65-25662U24
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
March 12, 2008
727-55-0093
19 of 39
BOEING SERVICE BULLETIN 727-55-0093

### Page 20

QTYNamePart Number
1Shear Tie-Kickload Beam65-25662U25
1Shear Tie-Kickload Beam65-25662U26
3. Parts Modified and Reidentified:
None.
4. Parts Removed and Not Replaced:
None.
D. Parts Necessary to Change Spares
None.
E. Special Tooling - Price and Availability
None.
F. Special Tooling Necessary to do this Service Bulletin
No special tools or equipment are necessary to do the change in this service bulletin. But, maintenance
and overhaul tools in the manuals given in Paragraph 1.J., References, can be necessary. Examine
operator tool supply to make sure all necessary tools are available.
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
March 12, 2008
727-55-0093
20 of 39
BOEING SERVICE BULLETIN 727-55-0093

### Page 21

3.    ACCOMPLISHMENT INSTRUCTIONS
A. GENERAL INFORMATION
CAUTION: KEEP THE WORK AREA, WIRES AND ELECTRICAL BUNDLES CLEAN OF METAL
PARTICLES OR CONTAMINATION WHEN YOU USE TOOLS. UNWANTED MATERIAL,
METAL PARTICLES OR CONTAMINATION CAUGHT IN WIRE BUNDLES CAN CAUSE
DAMAGE TO THE BUNDLES. DAMAGED WIRE BUNDLES CAN CAUSE SPARKS OR
OTHER ELECTRICAL DAMAGE.
NOTE: 1. Manual titles are referred to by acronyms. Refer to Paragraph 1.J., References, for
definition of the acronyms.
2. Obey all of the warnings and cautions given in the specified manual sections.
3. Unless shown differently, these dimensions and tolerances are used:
– Linear dimensions are in inches
– Tolerance on linear dimensions, other than rivet and bolt edge margins, is plus
or minus 0.03 inch
– Tolerance on rivet and bolt edge margin is plus or minus 0.05 inch
– Hole dimensions for standard solid rivets are given in 727 SRM Chapter 51.
– Torque limits to tighten nuts and bolts are given in 727 SRM Chapter 51.
4. Hole requirements are given in 727 SRM Chapter 51.
5. For approved fastener and process material substitutions, refer to 727 SRM Chapter
51. Alternate fasteners are given in 727 SRM Chapter 51 and Boeing Drawing
65-88700.
6. If the length of any fastener specified in this service bulletin does not meet the
installation standards given in 727 SRM Chapter 51, then a fastener of the same
specification, or an approved substitute, with a length which meets the installation
standards given in 727 SRM Chapter 51 may be used.
7. These work instructions refer to procedures included in other Boeing documents.
When the words "refer to" are used and the operator has an accepted alternative
procedure, the accepted alternative procedure can be used. When the words "as
given in" are included in the instruction, the procedure in the Boeing document must
be used.
B. WORK INSTRUCTIONS
1. PART 1 - PREPARATION AND ACCESS
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
March 12, 2008
727-55-0093
21 of 39
BOEING SERVICE BULLETIN 727-55-0093

### Page 22

a. Remove power from the horizontal stabilizer trim. Refer to 727 AMM 27-40-31 as an accepted
procedure.
b. Make sure the elevator and tab systems are in the neutral power off position. Remove pressure
from the elevator hydraulic system 'A' and hydraulic system 'B'. Refer to 727 AMM 27-30-00
as an accepted procedure.
c. Make sure the rudder and rudder trim systems are in the neutral power off position. Remove
pressure from the rudder and rudder trim hydraulic system 'A' and hydraulic system 'B'. Refer
to 727 AMM 27-20-00 as an accepted procedure.
d. Remove power from the number 1, number 2 and number 3 engine ignition and start systems.
Refer to 727 AMM 74-00-00 and 727 AMM 80-11-00 as accepted procedures.
e. Remove power from the number 1, number 2 and number 3 engine thrust reverse systems.
Refer to 727 AMM 78-30-00 as an accepted procedure.
f. Operators have 2 Options to get access to the kickload beam in the vertical stabilizer as
follows:
(1) Option 1 - Get access through the access panel 9504 in the vertical stabilizer and then
through the manholes in the inspar ribs numbers 4, 3A, 3 and 2 inside the vertical stabilizer.
Refer to FIGURE 1as an accepted procedure.
(2) Option 2 - Get access through the number 2 engine intake duct cavity by removing the
ventral stairwell ceiling panels, the number 2 engine and the number 2 engine intake
duct. Refer to FIGURE 2 as an accepted procedure.
2. PART 2 - INSPECTION
a. Do a High Frequency Eddy Current (HFEC) and Low Frequency Eddy Current (LFEC)
inspection for cracking in the shear ties, web posts, stringer 10, stringer 11, rear spar chord
and skin, as given in FIGURE 3.
(1) If any crack is found in the shear ties or the web posts, then replace the cracked parts
as given in Part 3 - Shear Tie and Web Post Replacement.
(2) If any crack is found in structure other than the shear ties or web posts, then contact
Boeing for repair instructions.
NOTE: When contacting Boeing, give a complete description of damage, drawings and
photographs.
3. PART 3 - SHEAR TIE AND WEB POST REPLACEMENT
a. If either the web post or the shear tie is cracked, then:
(1) Remove both the web post and the shear tie.
(2) Discard the web post if it is cracked. Discard the shear tie if it is cracked.
(3) Do a High Frequency Eddy Current (HFEC) inspection of the entire surface of a salvaged
web post or shear tie for cracking as given in 727 NDT Part 6, 51-00-00, Figure 23.
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
March 12, 2008
727-55-0093
22 of 39
BOEING SERVICE BULLETIN 727-55-0093

### Page 23

(a) If any crack is found in the web post or shear tie, discard it.
(4) Replace a cracked shear tie or web post. The new shear tie and web post part numbers
are:
— 65-25662U25 Shear Tie - Left side.
— 65-25662U26 Shear Tie - Right side.
— 65-25662U23 Web Post - Left side.
— 65-25662U24 Web Post - Right side.
(5) Do a HFEC inspection of all open fastener holes in the kickload beam web and chords
as given in 727 NDT Part 6, 51-00-00, Figure 1, Figure 11 or Figure 16.
(a) If any crack is found or other damage is found, contact Boeing for a repair plan.
NOTE: Give Boeing a complete description of the damage.
(6) Install the serviceable shear tie and web post using the production drawings for fastener,
finish, and sealing requirements except as noted:
— Substitute fasteners, as given in the 727 SRM Chapter 51, can be used.
— Oversize holes as required to maintain a proper fit. Contact Boeing if oversizing
beyond 0.03125 inch is required to maintain proper fit.
— Apply chemical conversion coating and BMS 10-11 type 1 primer to bare surfaces,
except omit primer in riveted fastener holes.
— Shim gaps greater than .003 inch. Contact Boeing if gaps exceed .032 inch.
NOTE: Note the following:
— The production drawing for the attachment of the web post is 65-25662.
— The production drawings for the attachment of the shear tie is 65-25662
and 65-17463.
— Match drill a new shear tie or web post to existing holes
— Install all bolts in transition fit holes, wet with BMS 5-95 sealant
4. PART 4 - RESTORATION
a. Close up access as follows:
(1) If Option 1 access was used then refer to FIGURE 4 as an accepted procedure.
(2) If Option 2 access was used then refer to FIGURE 5 as an accepted procedure.
b. Restore power to the number 1, number 2 and number 3 engine thrust reverse systems. Refer
to 727 AMM 78-30-00 as an accepted procedure.
c. Restore power to the number 1, number 2 and number 3 engine ignition and start systems.
Refer to 727 AMM 74-00-00 and 727 AMM 80-11-00 as accepted procedures.
d. Pressurize the rudder and rudder trim hydraulic system 'A' and hydraulic system 'B'. Refer to
727 AMM 27-20-00 as an accepted procedure.
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
March 12, 2008
727-55-0093
23 of 39
BOEING SERVICE BULLETIN 727-55-0093

### Page 24

e. Pressurize the elevator hydraulic system 'A' and hydraulic system 'B'. Refer to 727 AMM
27-30-00 as an accepted procedure.
f. Restore power to the horizontal stabilizer trim. Refer to 727 AMM 27-40-31 as an accepted
procedure.
g. Put the airplane back to a serviceable condition.
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
March 12, 2008
727-55-0093
24 of 39
BOEING SERVICE BULLETIN 727-55-0093

### Page 25 (OCR)

BOEING SERVICE BULLETIN 727-55-0093
STA
STA  1342
1183
STA
1110
REAR SPAR
CHORD
REAR SPAR WEB
STRINGER 11
SEE
FRONT SPAR
STA 1342
88
88
KICKLOAD BEAM  0000000  0000000
CHORD
STA 1342
BULKHEAD
VEIW LOOKING AFT.  1450705
FIGURE 1: VERTICAL STABILIZER - KICKLOAD BEAM - ACCESS OPTION 1
(SHEET 1 OF 2)
March 12, 2008
727-55-0093
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.  25 of 39

### Page 26

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for this figure.
MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
(a)19504access panelRemove / Keep1
(b)--accessGet2
165-25662kickload beamLocate3
(c)--debris shieldPut4
(a) Refer to 727 AMM 12-30-05 as an accepted procedure.
(b) Proceed down through the manholes in the inspar ribs to the kickload beam in the vertical stabilizer.
(c) in the cavity above number 2 engine intake duct and under the kickload beam in the vertical stabilizer
to prevent entry of foreign objects during inspection and any subsequent repairs.
FIGURE 1: VERTICAL STABILIZER - KICKLOAD BEAM - ACCESS OPTION 1
(SHEET 2 OF 2)
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
March 12, 2008
727-55-0093
26 of 39
BOEING SERVICE BULLETIN 727-55-0093

### Page 27 (OCR)

BOEING SERVICE BULLETIN 727-55-0093
-SEE A
(2 NUMBER 2 ENGINE
STA 1342
BULKHEAD
VENTRAL
AIRSTAIR
1500557
FIGURE 2: VERTICAL STABILIZER - KICKLOAD BEAM - ACCESS OPTION 2
(SHEET 1 OF 3)
March 12, 2008
727-55-0093
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.  27 of 39

### Page 28 (OCR)

BOEING SERVICE BULLETIN 727-55-0093
KICKLOAD BEAM CHORD  REAR SPAR CHORD  STRINGER 11
STA 1342 BULKHEAD  REAR SPAR WEB
VIEW LOOKING AFT.
1500559
FIGURE 2: VERTICAL STABILIZER - KICKLOAD BEAM - ACCESS OPTION 2
(SHEET 2 OF 3)
March 12, 2008
727-55-0093
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.  28 of 39

### Page 29

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for this figure.
MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
(a)74750, 4751, 4752,
4753, 4754, 4755,
4756
ventral stairwell ceiling panelsRemove / Keep1
(b)--number 2 engineRemove / Keep2
(c)--number 2 engine intake duct, aft
section
Remove / Keep3
165-25662kickload beamLocate4
(d)--debris shieldPut5
(a) Refer to 727 AMM 25-54-00 as an accepted procedure.
(b) Refer to 727 AMM 71-00-00 as an accepted procedure.
(c) Refer to 727 AMM 54-14-11 as an accepted procedure.
(d) in the cavity above number 2 engine intake duct and under the kickload beam in the vertical stabilizer
to prevent entry of foreign objects during inspection and any subsequent repairs.
FIGURE 2: VERTICAL STABILIZER - KICKLOAD BEAM - ACCESS OPTION 2
(SHEET 3 OF 3)
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
March 12, 2008
727-55-0093
29 of 39
BOEING SERVICE BULLETIN 727-55-0093

### Page 30 (OCR)

BOEING SERVICE BULLETIN 727-55-0093
VERTICAL  - KICKLOAD BEAM
STABILIZER
STA 1342
BULKHEAD
KICKLOAD BEAM
STRINGER 11
REAR
SPAR
CHORD
• SEE A
A-A  BL 0
LEFT SIDE SHOWN - RIGHT SIDE OPPOSITE
VIEW LOOKING FORWARD
1499995
FIGURE 3: VERTICAL STABILIZER - KICKLOAD BEAM AND ADJACENT STRUCTURE - INSPECTION
(SHEET 1 OF 5)
March 12, 2008
727-55-0093
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.  30 of 39

### Page 31 (OCR)

BOEING SERVICE BULLETIN 727-55-0093
VERTICAL
STRINGER 10
STABILIZER
RIB
STRINGER 11  (TYPICAL
60 LOCATIONS)
REAR SPAR  TYPICAL
CHORD  2 LOCATIONS)
0>10
(TYPICAL
7 LOCATIONS)
KICKLOAD
BEAM
SHEAR TIE
UP
→FWD
B-B  STA 1342
LEFT SIDE SHOWN - RIGHT SIDE OPPOSITE
O FASTENER LOCATIONS TO BE INSPECTED USING LFEC BETWEEN FASTENERS AND HFEC AROUND
PERIMETER
)LFEC INSPECTION BETWEEN FASTENERS
1U HFEC INSPECTION AROUND PERIMETER
• FASTENER LOCATIONS TO BE INSPECTED USING HFEC
• FASTENER LOCATIONS TO BE INSPECTED USING HFEC AROUND RADIUS FILLER PERIMETER  1500002
FIGURE 3: VERTICAL STABILIZER - KICKLOAD BEAM AND ADJACENT STRUCTURE - INSPECTION
(SHEET 2 OF 5)
March 12, 2008
727-55-0093
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.  31 0f 39

### Page 32 (OCR)

BOEING SERVICE BULLETIN 727-55-0093
SEE
4 LOCATIONS
- UPPER CHORD
STRINGER 11
—INBD
SEE
FOR LOWER  - WEB POST
SURFACE
- KICKLOAD
BEAM (WEB)
SHEAR TIE
REAR
SPAR
CHORD  INSPECTION AREA - WEB POST
LEFT SIDE SHOWN - RIGHT SIDE OPPOSITE
VIEW IS OF UPPER SURFACE LOOKING FORWARD
UP
- STRINGER 11
4 LOCATIONS
→ FWD
INBD
WEB POST
SEE
SHEAR TIE
KICKLOAD
REAR  BEAM (WEB)
SPAR  C-C
CHORD  VIEW LOOKING OUTBOARD
VIEW ROTATED 90 DEGREES CLOCKWISE
INSPECTION AREA - SHEAR TIE
LEFT SIDE SHOWN - RIGHT SIDE OPPOSITE
VIEW IS OF LOWER SURFACE LOOKING AFT
FASTENERS LOCATIONS TO BE INSPECTED AROUND USING HFEC
xxx AREA TO BE INSPECTED USING HFEC
FIGURE 3: VERTICAL STABILIZER - KICKLOAD BEAM AND ADJACENT STRUCTURE - INSPECTION
(SHEET 3 OF 5)
March 12, 2008
727-55-0093
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.  32 of 39

### Page 33 (OCR)

BOEING SERVICE BULLETIN 727-55-0093
STRINGER 11
WEB POST REMOVED
SHOWING CRACKING
WEB POST
TYPICAL
CRACKING
VIEW LOOKING AFT
LEFT SIDE SHOWN - RIGHT SIDE OPPOSITE
TYPICAL
SHEAR TIE  CRACKING
KICKLOAD
BEAM WEB
LEFT SIDE LOWER SURFACE SHOWN -  1503098
RIGHT SIDE OPPOSITE
FIGURE 3: VERTICAL STABILIZER - KICKLOAD BEAM AND ADJACENT STRUCTURE - INSPECTION
(SHEET 4 OF 5)
March 12, 2008
727-55-0093
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.  33 of 39

### Page 34

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for this figure.
MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
(a)--stringer 10, stringer
11, rear spar
chord, skin
Inspect1
(b)--stringer 11, rear
spar chord
Inspect2
(c)--stringer 10Inspect3
(d)--web postInspect4
(e)--shear tieInspect5
(a) Do an HFEC inspection around the fastener head as given in 727 NDT Part 6, 55-30-27 Figure 3.
(b) Do an LFEC inspection between the fastener heads and do a HFEC inspection around the perimeter
of the shear tie as given in 727 NDT Part 6, 55-30-27 Figure 3.
(c) Do an HFEC inspection around the radius filler perimeter as given in 727 NDT Part 6, 55-30-27 Figure
3.
(d) Do an HFEC inspection around the fastener heads and a HFEC inspection of the fillet radius as given
in 727 NDT Part 6, 55-30-27 Figure 3.
(e) Do an HFEC inspection as given in 727 NDT Part 6, 55-30-27 Figure 3.
FIGURE 3: VERTICAL STABILIZER - KICKLOAD BEAM AND ADJACENT STRUCTURE - INSPECTION
(SHEET 5 OF 5)
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
March 12, 2008
727-55-0093
34 of 39
BOEING SERVICE BULLETIN 727-55-0093

### Page 35 (OCR)

BOEING SERVICE BULLETIN 727-55-0093
STA
STA  1342
1183
STA
1110
(4
REAR SPAR
CHORD
REAR SPAR WEB
STRINGER 11
SEE
STA 1342
KICKLOAD  200000000  0000000
BEAM CHORD  0009
STA 1342
BULKHEAD
VIEW LOOKING AFT  1450738
FIGURE 4: CLOSE ACCESS TO THE KICKLOAD BEAM IN THE VERTICAL STABILIZER - OPTION 1
(SHEET 1 OF 2)
March 12, 2008
727-55-0093
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.  35 of 39

### Page 36

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for this figure.
MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
(a)--debrisRemove1
(b)--debrisRemove2
(c)--debris shieldRemove3
(d)19504access panelInstall (kept)4
(a) and any foreign objects from the cavity above number 2 engine intake duct forward of the bulkhead
at STA1342.
(b) and any foreign objects from the vicinity of the inspar ribs number 2, 3, 3A and 4 and around the inspar
manhole apertures in the vertical stabilizer.
(c) from the cavity above number 2 engine intake duct and under the kickload beam in the vertical stabilizer.
(d) Make sure installation bonding is done. Refer to 727 AMM 12-30-05 as an accepted procedure.
FIGURE 4: CLOSE ACCESS TO THE KICKLOAD BEAM IN THE VERTICAL STABILIZER - OPTION 1
(SHEET 2 OF 2)
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
March 12, 2008
727-55-0093
36 of 39
BOEING SERVICE BULLETIN 727-55-0093

### Page 37 (OCR)

BOEING SERVICE BULLETIN 727-55-0093
-SEE A
(4) NUMBER 2 ENGINE
STA 1342 BULKHEAD
VENTRAL
AIRSTAIR
1500562
FIGURE 5: CLOSE ACCESS TO THE KICKLOAD BEAM INTHE VERTICAL STABILIZER - OPTION 2
(SHEET 1 OF 3)
March 12, 2008
727-55-0093
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.  37 of 39

### Page 38 (OCR)

BOEING SERVICE BULLETIN 727-55-0093
KICKLOAD BEAM CHORD  REAR SPAR CHORD  STRINGER 11
STA 1342 BULKHEAD  REAR SPAR WEB
VIEW LOOKING AFT
1500560
FIGURE 5: CLOSE ACCESS TO THE KICKLOAD BEAM INTHE VERTICAL STABILIZER - OPTION 2
(SHEET 2 OF 3)
March 12, 2008
727-55-0093
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.  38 of 39

### Page 39

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for this figure.
MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
(a)--debrisRemove1
(b)--debris shieldRemove2
(c)--number 2 engine
intake duct, aft
section
Install (kept)3
(d)--number 2 engineInstall (kept)4
(e)74750, 4751,
4752, 4753,
4754, 4755, 4756
ventral stairwell
ceiling panels
Install (kept)5
(a) and any foreign objects from the cavity above the number 2 engine intake duct forward of the bulkhead
at STA1342.
(b) from the cavity above the number 2 engine intake duct and under the kickload beam in the vertical stabilizer.
(c) Refer to 727 AMM 54-14-11 as an accepted procedure.
(d) Refer to 727 AMM 71-00-00 as an accepted procedure.
(e) Refer to 727 AMM 25-54-00 as an accepted procedure.
FIGURE 5: CLOSE ACCESS TO THE KICKLOAD BEAM IN THE VERTICAL STABILIZER - OPTION 2
(SHEET 3 OF 3)
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
March 12, 2008
727-55-0093
39 of 39
BOEING SERVICE BULLETIN 727-55-0093

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
