# Boeing Special Attention Service Bulletin 737-00-1028: No revision named

- Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2020-0686; AD 2020-24-02 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Boeing Special Attention Service Bulletin 737-00-1028](https://openairdocs.org/service-documents/boeing/sb-737-00-1028.md)
- Title as filed: 737-00-1028
- Pages: 18
- PDF: https://openairdocs.org/files/sha256/d9/c8/d9c8bba9788dc7d598d2d96d1e696856247c23c8100af4be71f35384ccab905f
- Page: https://openairdocs.org/service-documents/boeing/sb-737-00-1028/file/d9c8bba9788d

## Text

Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Commercial 
Airplanes
737
Service Bulletin
SPECIAL ATTENTION
Number: 737-00-1028
Original Issue: July 20, 2020
ATA System: 0000
SUBJECT: ADMINISTRATIVE GENERAL - Aircraft General - Angle of Attack Sensor System Test
and Operational Readiness Flight
Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15
CFR 300-774). An export license may be required before it is used for development, production or use by foreign
persons from specific countries. The controller of this data has the individual responsibility to abide by all export
laws.
9E991ECCN:
Copyright © 2020 Boeing.
Unpublished Work. All Rights Reserved.
Treatment of this document and its content is governed by contract with Boeing. Rights to use this document
are licensed on a per aircraft basis and such rights may not be transferable. For more information, contact The
Boeing Company.
Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner,
BBJ, DC-8, DC-9, DC-10, KC-10, KC-46, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8, Poseidon and
Boeing liveries are all trademarks owned by The Boeing Company; and no trademark license is granted in
connection with this document unless provided in writing by Boeing.
Original Issue: July 20, 2020
737-00-1028
1 of 18
3.0

### Page 2

Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 20, 2020
737-00-1028
2 of 18
BOEING SERVICE BULLETIN 737-00-1028
BLANK PAGE

### Page 3

Table of Contents
Summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
1. PLANNING INFORMATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
A. Effectivity . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
1. Airplanes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
2. Spares Affected . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
B. Concurrent Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
C. Reason . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
D. Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
E. Compliance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
F. Approval . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
G. Manpower . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
H. Weight and Balance Changes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
I. Electrical Load Data . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
J. References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
1. Existing Data: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
2. Data Supplied with this Service Bulletin: . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
3. Installation Drawings Used in the Preparation of this Service Bulletin: . . . . . . . . . . . 11
K. Publications Affected . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
L. Interchangeability and Intermixability of Parts . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
M. Software Accomplishment Summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
2. MATERIAL INFORMATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
A. Material - Price and Availability . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
B. Industry Support Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
C. Parts Necessary for Each Airplane . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
1. Kits/Parts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
2. Parts and Materials Supplied by the Operator . . . . . . . . . . . . . . . . . . . . . . . . 13
3. Parts Modified and Reidentified . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
4. Parts Removed and Not Replaced . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
D. Parts Necessary to Change Spares . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
E. Special Tooling - Price and Availability . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
F. Special Tooling Necessary to do this Service Bulletin . . . . . . . . . . . . . . . . . . . . . . . 13
3. ACCOMPLISHMENT INSTRUCTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
A. GENERAL INFORMATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
B. WORK INSTRUCTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
APPENDIX A: OPERATIONAL READINESS FLIGHT . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 20, 2020
737-00-1028
3 of 18
BOEING SERVICE BULLETIN 737-00-1028

### Page 4

Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 20, 2020
737-00-1028
4 of 18
BOEING SERVICE BULLETIN 737-00-1028
BLANK PAGE

### Page 5

Commercial 
Airplanes
737
Service Bulletin
SPECIAL ATTENTION
SummaryNumber: 737-00-1028Original Issue: July 20, 2020
ATA System: 0000
SUBJECT: ADMINISTRATIVE GENERAL - Aircraft General - Angle of Attack Sensor System Test
and Operational Readiness Flight
BOEING RECOMMENDS THAT EACH OPERATOR EXAMINE THIS DOCUMENT IMMEDIATELY.
CONCURRENT REQUIREMENTS
None.
BACKGROUND
In March 2019, aviation authorities around the world grounded the 737-8 and 737-9 airplanes after two airplane
crashes occurred within a period of five months. As a result of the groundings, affected operators canceled their
flights and Boeing halted 737-8 and 737-9 deliveries and reduced production. All affected airplanes were put
into Active Storage or Prolonged Parking.
This service bulletin gives mandated instructions to do an Angle of Attack (AOA) Sensor System Test and an
Operational Readiness Flight.
This table is provided to operators for planning purposes only. Refer to the applicable sections for more
information.
ReferenceAffectedPlanning Data
Paragraph 1.A.2., Spares AffectedNoSpares Affected
Paragraph 1.E., Compliance and Paragraph
1.F., Approval
YesAD Related
Paragraph 1.H., Weight and Balance ChangesNoWeight and Balance Change
Paragraph 1.I., Electrical Load DataNoElectrical Load Changed
Paragraph 1.K., Publications AffectedNoPublications Affected
Paragraph 1.K., Publications AffectedNoAirplane Flight Operations Affected (Flight Crew
Operations Manual and/or FAA Approved Air-
plane Flight Manual)
Paragraph 2.C.1., Kits/PartsNoKits/Parts Required
Paragraph 2.C.2., Parts and Materials Supplied
by the Operator
NoOperator Supplied Parts/Material
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 20, 2020
737-00-1028
5 of 18

### Page 6

ReferenceAffectedPlanning Data
Paragraph 2.F., Special Tooling Necessary to
do this Service Bulletin
NoSpecial Tooling Required
ACTION (PRR 3M9900-054R)
1. Do an Angle of Attack (AOA) Sensor System Test.
2. Do an Operational Readiness Flight.
EFFECTIVITY
737-8 and 737-9 Airplane(s). Refer to Paragraph 1.A.1., Airplanes, for the list of affected airplane(s).
COMPLIANCE
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to this service
bulletin. The Airworthiness Directive will make the compliance tasks and times given in this service bulletin
mandatory.
Refer to Paragraph 1.E., Compliance.
INDUSTRY SUPPORT INFORMATION
Boeing warranty remedies are not available for the procedures given in this service bulletin.
MANPOWER
Refer to Paragraph 1.G., Manpower.
MATERIAL INFORMATION
None.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 20, 2020
737-00-1028
6 of 18
BOEING SERVICE BULLETIN 737-00-1028

### Page 7

Commercial 
Airplanes
737
Service Bulletin
SPECIAL ATTENTION
Number: 737-00-1028
Original Issue: July 20, 2020
ATA System: 0000
SUBJECT: ADMINISTRATIVE GENERAL - Aircraft General - Angle of Attack Sensor System Test
and Operational Readiness Flight
BOEING RECOMMENDS THAT EACH OPERATOR EXAMINE THIS DOCUMENT IMMEDIATELY.
1.    PLANNING INFORMATION
A. Effectivity
1. Airplanes
This bulletin is applicable to 737-8, 737-9 Airplane(s), line number(s) 5602, 5668, 5788, 5852,
5902, 5948, 5992, 6034, 6074, 6114, 6154, 6188, 6222, 6272, 6290, 6308, 6326, 6344, 6360,
6372, 6384, 6396, 6408, 6420, 6430, 6441, 6448, 6456, 6464, 6472, 6481, 6490, 6499, 6508,
6515, 6521, 6528, 6535, 6542, 6548, 6555, 6562, 6569, 6575, 6582, 6589, 6594, 6598, 6603,
6607, 6612, 6616, 6621, 6625, 6630, 6634, 6639, 6643, 6648, 6652, 6657, 6661, 6666, 6672,
6677, 6681, 6686, 6690, 6695, 6699, 6704, 6708, 6713, 6717, 6722, 6726, 6731, 6735, 6740,
6749, 6753, 6758, 6762, 6767, 6771, 6776, 6780, 6783, 6785, 6789, 6792, 6794, 6796, 6803,
6805, 6807, 6810, 6814, 6816, 6819, 6821, 6825, 6828, 6830, 6834, 6837, 6839, 6841, 6843,
6848, 6850, 6852, 6855, 6859, 6861, 6864, 6866, 6868, 6872, 6875, 6877, 6881, 6884, 6886,
6890, 6893, 6895, 6897, 6899, 6904, 6906, 6908, 6911, 6915, 6917, 6920, 6922, 6926, 6929,
6931, 6935, 6938, 6940, 6942, 6944, 6949, 6951, 6953, 6956, 6960, 6963, 6965, 6968, 6970,
6973, 6975-6976, 6978, 6980, 6983, 6985, 6988, 6990-6991, 6993, 6995, 6998, 7000, 7003,
7005-7006, 7008, 7010, 7013, 7015, 7018, 7020, 7023, 7025, 7027-7028, 7030, 7033, 7035, 7038,
7040, 7042-7043, 7045, 7048, 7050, 7053, 7055, 7060, 7062, 7064-7065, 7068, 7070, 7073, 7075,
7077, 7079-7080, 7083, 7085, 7088, 7090, 7093, 7095-7096, 7098, 7100, 7103, 7105, 7108,
7110-7111, 7113, 7115, 7118, 7120, 7123, 7125, 7128, 7130, 7132-7133, 7135, 7138, 7140, 7143,
7145, 7147-7148, 7150, 7153, 7155, 7158, 7160, 7163, 7165-7166, 7168, 7170, 7173, 7175, 7178,
7180-7181, 7183, 7185-7186, 7188, 7190, 7192-7193, 7195-7196, 7198, 7200-7201, 7203, 7205,
7207-7208, 7210-7211, 7213, 7215-7216, 7218, 7220, 7222-7223, 7225-7226, 7228, 7230-7231,
7233, 7236-7238, 7240-7241, 7245-7246, 7248, 7250, 7252-7253, 7255-7256, 7258, 7261, 7265,
7267-7268, 7270-7271, 7275-7276, 7278, 7281-7283, 7286, 7288, 7290-7291, 7293, 7295-7296,
7298, 7300-7301, 7303, 7305-7306, 7308, 7310-7311, 7313, 7315-7316, 7320-7321, 7323, 7325,
7328, 7330-7331, 7333, 7335-7336, 7338, 7340-7341, 7343, 7345, 7348, 7350, 7353, 7355-7356,
7358, 7360-7361, 7363, 7365-7366, 7368, 7370, 7373, 7375, 7378, 7380-7381, 7383-7385,
7388-7390, 7393-7395, 7398-7401, 7403-7406, 7409-7411, 7413-7414, 7416, 7419, 7421, 7423,
7428, 7430, 7433, 7435, 7446 in 1 Group(s). Where the effectivity is presented with hyphens
between line numbers, the airplane applicability means "through" and "inclusive", e.g. line numbers
1-9 means line numbers 1 through 9 inclusive.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 20, 2020
737-00-1028
7 of 18

### Page 8

Refer to Service Bulletin Index D6-19567 Part 3 for Airplane Variable Number, Line Number, and
Serial Number data.
The Variable Numbers and Group Information for the applicable airplanes is given below. An
equivalent change is on subsequent production airplanes. Refer to PRR 3M9900-054R for data
about this change.
DESCRIPTIONCONFIGURATIONGROUP
737-8 and 737-9 airplanes.- 1
Airplane Models:
737-8, 737-9
GroupVariable Number
11A001 - 1A002
11A004 - 1A035
11A201 - 1A209
11A211
11A301 - 1A318
11A401 - 1A413
11A451 - 1A467
11A476 - 1A482
11A501 - 1A502
11A521 - 1A523
11A531
11A541 - 1A545
11A601 - 1A614
11A676 - 1A691
11A726 - 1A730
11A741 - 1A743
11A751 - 1A757
11A801
11A851 - 1A866
11A916 - 1A919
11A926 - 1A929
11A943
11A951 - 1A956
GroupVariable Number
11B001 - 1B011
11B101 - 1B124
11B201 - 1B206
11B251 - 1B266
11B376 - 1B380
11B386 - 1B389
11B396
11B401
11B491 - 1B494
11B511 - 1B512
11B521 - 1B522
11B531
11B540 - 1B541
11B566 - 1B569
11B576 - 1B578
11B601
11B635 - 1B636
11B651 - 1B657
11B701
11B801 - 1B806
11B930 - 1B934
11C001 - 1C002
11C201 - 1C202
GroupVariable Number
11C221 - 1C222
11C301 - 1C305
11C326 - 1C335
11C401 - 1C404
11C451
11C453
11C501 - 1C510
11C690
11C701 - 1C712
11C826 - 1C827
11C946 - 1C947
11D002 - 1D004
11D051 - 1D056
11D101 - 1D114
11D201
11D251 - 1D253
11D401
11D466 - 1D467
11J021
11J041 - 1J042
11J066 - 1J067
11J101 - 1J102
11J301
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 20, 2020
737-00-1028
8 of 18
BOEING SERVICE BULLETIN 737-00-1028

### Page 9

GroupVariable Number
11J401 - 1J402
GroupVariable Number
11J601
GroupVariable Number
--
2. Spares Affected
None.
B. Concurrent Requirements
None.
C. Reason
In March 2019, aviation authorities around the world grounded the 737-8 and 737-9 airplanes after two
airplane crashes occurred within a period of five months. As a result of the groundings, affected operators
canceled their flights and Boeing halted 737-8 and 737-9 deliveries and reduced production. All affected
airplanes were put into Active Storage or Prolonged Parking.
This service bulletin gives mandated instructions to do an Angle of Attack (AOA) Sensor System Test
and an Operational Readiness Flight.
D. Description
1. Do an Angle of Attack (AOA) Sensor System Test.
2. Do an Operational Readiness Flight.
The work in this service bulletin is done in the maintenance zone(s) given below.
Affected Maintenance Zones
ZoneModel
211, 212737-8, 737-9
E. Compliance
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to
this service bulletin. The Airworthiness Directive will make the compliance tasks and times given in this
service bulletin mandatory.
Accomplish the required action(s), based on the applicable condition(s) in Tables 1 and 2 in accordance
with Accomplishment Instructions.
Table 1: Angle of Attack (AOA) Sensor System Test
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
-Before Operational
Readiness Flight.
Do Angle of Attack (AOA)
Sensor System Test.
All Airplanes
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 20, 2020
737-00-1028
9 of 18
BOEING SERVICE BULLETIN 737-00-1028

### Page 10

Table 2: Operational Readiness Flight
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
-Before Revenue
Flight.
Do an Operational
Readiness Flight.
All Airplanes
F. Approval
This service bulletin was examined by the Federal Aviation Administration (FAA). The actions specified
in this service bulletin comply with the applicable regulations and are FAA approved, as well as European
Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/JAA approved
airplanes listed in the service bulletin effectivity. This service bulletin and its approval were based on
the airplane in its original Boeing delivery configuration or as modified by other approved Boeing
changes.
If an airplane has a non-Boeing modification or repair that affects a component or system also affected
by this service bulletin, the operator is responsible for obtaining appropriate regulatory agency approval
before incorporating this service bulletin.
G. Manpower
Elapsed HoursTask HoursNumber of PersonsTask
8405Angle of Attack
(AOA) Sensor Sys-
tem Test. (a)
10505Operational Readi-
ness Flight. (a)
1890TOTAL FOR EACH AIRPLANE
(a) Maximum number of people, task hours, and elapsed hours are given to do
the work. Hours for any corrective action is not included in this estimate.
H. Weight and Balance Changes
None.
I. Electrical Load Data
Not changed.
J. References
1. Existing Data:
a. Engineering Change Memo PRR 3M9900-054R
b. Service Bulletin Index D6-19567
c. 737-8/-9 Aircraft Maintenance Manual (AMM) 34-21-05
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 20, 2020
737-00-1028
10 of 18
BOEING SERVICE BULLETIN 737-00-1028

### Page 11

2. Data Supplied with this Service Bulletin:
None.
3. Installation Drawings Used in the Preparation of this Service Bulletin:
None.
K. Publications Affected
1. Publications:
None.
2. Damage Tolerance Based Structural Inspections:
Boeing has evaluated the actions in this service bulletin for effects on Fatigue Critical Structure
(FCS) and for changes to Damage Tolerance Inspections (DTI) required in the Maintenance
Program. This service bulletin does not affect FCS, therefore DTIs are not necessary.
L. Interchangeability and Intermixability of Parts
Accomplishment of this service bulletin does not affect interchangeability or intermixability of parts.
M. Software Accomplishment Summary
Not affected.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 20, 2020
737-00-1028
11 of 18
BOEING SERVICE BULLETIN 737-00-1028

### Page 12

Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 20, 2020
737-00-1028
12 of 18
BOEING SERVICE BULLETIN 737-00-1028
BLANK PAGE

### Page 13

2.    MATERIAL INFORMATION
A. Material - Price and Availability
None.
B. Industry Support Information
Boeing warranty remedies are not available for the procedures given in this service bulletin.
C. Parts Necessary for Each Airplane
1. Kits/Parts
None.
2. Parts and Materials Supplied by the Operator
None.
3. Parts Modified and Reidentified
None.
4. Parts Removed and Not Replaced
None.
D. Parts Necessary to Change Spares
None.
E. Special Tooling - Price and Availability
None.
F. Special Tooling Necessary to do this Service Bulletin
No special tools or equipment are necessary to do the actions in this service bulletin. But, maintenance
and overhaul tools in the manuals given in Paragraph 1.J., References, can be necessary. Examine
operator tool supply to make sure all necessary tools are available.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 20, 2020
737-00-1028
13 of 18
BOEING SERVICE BULLETIN 737-00-1028

### Page 14

Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 20, 2020
737-00-1028
14 of 18
BOEING SERVICE BULLETIN 737-00-1028
BLANK PAGE

### Page 15

3.    ACCOMPLISHMENT INSTRUCTIONS
A. GENERAL INFORMATION
KEEP THE WORK AREA, WIRES AND ELECTRICAL BUNDLES CLEAN OF
METAL PARTICLES OR CONTAMINATION WHEN YOU USE TOOLS. UNWANTED
MATERIAL, METAL PARTICLES OR CONTAMINATION CAUGHT IN WIRE
BUNDLES CAN CAUSE DAMAGE TO THE BUNDLES. DAMAGED WIRE BUNDLES
CAN CAUSE SPARKS OR OTHER ELECTRICAL DAMAGE.
CAUTION
NOTE: 1. Manual titles are referred to by acronyms. Refer to Paragraph 1.J., References, for
definition of the acronyms.
2. Obey all of the warnings and cautions given in the specified manual sections.
3. These work instructions refer to procedures included in other Boeing documents.
When the words "refer to" are used and the operator has an accepted alternative
procedure, the accepted alternative procedure can be used. When the words "in
accordance with" are included in the instruction, the procedure in the Boeing document
must be used.
4. The compliance times for the actions in Paragraph 3.B., WORK INSTRUCTIONS
are in Paragraph 1.E., Compliance.
5. Some steps in the Work Instructions are labeled as Required for Compliance (RC).If
this service bulletin is mandated by an Airworthiness Directive (AD), then the steps
labeled as RC, including sub-steps under an RC step and any figures identified in
an RC step, must be done to comply with the AD. If a step or sub-step is labeled
"RC Exempt," then the RC requirement is removed from that step or sub-step. An
Alternative Method of Compliance (AMOC) is required for any deviations to RC steps,
including sub-steps and identified figures. Steps not labeled as RC may be deviated
from using accepted methods in accordance with the operator's maintenance or
inspection program without obtaining approval of an AMOC. This is provided that
the RC steps, including sub-steps and identified figures, can still be done as specified,
and the airplane can be put back in an airworthy condition.
B. WORK INSTRUCTIONS
1. RC - Do Angle of Attack (AOA) Sensor System Test of the left side and right side AOA sensors in
accordance with 737-8/-9 AMM 34-21-05-730-801 dated Jul 15/2020 or later Boeing approved
revisions. Where the AMM includes "Preferred" and "Alternate" test options, do the "Preferred"
test using the angle of attack probe test fixture. If the AOA Sensor System Test fails, do applicable
on-condition corrective action(s) and repeat the test until the test passes.
2. RC - Do an Operational Readiness Flight to include flaps retracted flight at or above 20,000 ft.
above Mean Sea Level (MSL). Refer to APPENDIX A as an accepted procedure.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 20, 2020
737-00-1028
15 of 18
BOEING SERVICE BULLETIN 737-00-1028

### Page 16

1. Operational Readiness Flight Recommendations
Boeing considers an operationally representative flight profile sufficiently rigorous for exposing anomalies
not uncovered during a thorough and disciplined maintenance depreservation activity. Such a flight
could be done on a re-positioning flight from its storage location. During the operational readiness flight,
flight crews can exercise airplane systems in accordance with normal Flight Crew Operations Manual
(FCOM) procedures, with emphasis on expected system functionality. Supplementary Procedures may
also be used as needed, conditions permitting.
An operational readiness flight of an airplane that has been depreserved needs to abide by all certified
Airplane Flight Manual (AFM) and FCOM limitations.
2. Operational Readiness Flight Profile
An Operational Readiness Flight includes the following phases of flight utilizing Normal Procedures
and appropriate Supplementary Procedures as needed, conditions permitting:
– Preflight - verification of proper switch positions, circuit breaker status, fluid quantities, discrepancies
and overall configuration.
– Taxi - normal brakes and steering.
– Takeoff - normal flight instrument and engine indications, normal landing gear and flap retraction.
– Climb - normal flight instrument and engine indications, automatic air conditioning and pressurization
systems (air conditioning temperature range control & response), and anti-ice systems (conditions
permitting).
– Cruise - at a cruise altitude at or above 20,000 ft. MSL, normal flight instrument and engine
indications, automatic air conditioning and pressurization systems.
– Descent - normal automatic air conditioning and pressurization systems performance, normal
speedbrake extension and retraction.
– Approach - normal flight instrument indications, normal flap extension, normal landing gear
extension.
– Landing - normal speedbrake extension, normal automatic and manual braking, reverse thrust
operation, automatic pressurization system.
– Taxi In and Shutdown - verification of normal depressurization, fluid quantities and any abnormalities.
a. Preflight
Accomplish the following Boeing 737 MAX FCOM NP.21 Amplified Normal Procedures or approved
operator equivalent including any checklists referenced in these procedures:
– Preliminary Preflight Procedure - Captain or First Officer
– CDU Preflight Procedure - Captain and First Officer
– Exterior Inspection - Captain and/or First Officer
– Preflight Procedure - First Officer
– Preflight Procedure - Captain
– Before Start Procedure
– Pushback or Towing Procedure
b. Engine Start and Taxi
APPENDIX A:  OPERATIONAL READINESS FLIGHT
(SHEET 1 OF 3)
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 20, 2020
737-00-1028
16 of 18
BOEING SERVICE BULLETIN 737-00-1028

### Page 17

Accomplish the following Boeing 737 MAX FCOM NP.21 Amplified Normal Procedures or approved
operator equivalent including any checklists referenced in these procedures:
– Engine Start Procedure
– Before Taxi Procedure
– Before Takeoff Procedure
c. Takeoff
Accomplish the following Boeing 737 MAX FCOM NP.21 Amplified Normal Procedures or approved
operator equivalent including any checklists referenced in these procedures:
– Takeoff Procedure
d. Climb and Cruise
Accomplish the following Boeing 737 MAX FCOM NP.21 Amplified Normal Procedures or approved
operator equivalent including any checklists referenced in these procedures:
– Climb and Cruise Procedure
e. Descent
Accomplish the following Boeing 737 MAX FCOM NP.21 Amplified Normal Procedures or approved
operator equivalent including any checklists referenced in these procedures:
– Descent Procedure
f. Approach
Accomplish the following Boeing 737 MAX FCOM NP.21 Amplified Normal Procedures or approved
operator equivalent including any checklists referenced in these procedures:
– Approach Procedure
g. Landing
Accomplish the following Boeing 737 MAX FCOM NP.21 Amplified Normal Procedures or approved
operator equivalent including any checklists referenced in these procedures:
– Landing Procedure
– Landing Roll Procedure
h. Taxi In and Shutdown
Accomplish the following Boeing 737 MAX FCOM NP.21 Amplified Normal Procedures or approved
operator equivalent including any checklists referenced in these procedures:
– After Landing Procedure
APPENDIX A:  OPERATIONAL READINESS FLIGHT
(SHEET 2 OF 3)
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 20, 2020
737-00-1028
17 of 18
BOEING SERVICE BULLETIN 737-00-1028

### Page 18

– Shutdown Procedures
– Secure Procedure
APPENDIX A:  OPERATIONAL READINESS FLIGHT
(SHEET 3 OF 3)
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 20, 2020
737-00-1028
18 of 18
BOEING SERVICE BULLETIN 737-00-1028

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
