# Boeing Service Bulletin 737-27-1300: No revision named

- Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2012-0994; AD 2013-06-05 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Boeing Service Bulletin 737-27-1300](https://openairdocs.org/service-documents/boeing/sb-737-27-1300.md)
- Title as filed: U.S. DOT/FAA - Service Information
- Pages: 59
- PDF: https://openairdocs.org/files/sha256/e6/3d/e63dbeead5743806aa78b2df402198930ae88d8f97b176c95eaf56bad30ae48c
- Page: https://openairdocs.org/service-documents/boeing/sb-737-27-1300/file/e63dbeead574

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Commercial 
Airplanes
737
Service Bulletin
Number: 737-27-1300
Original Issue: April 16, 2012
ATA System: 2731
SUBJECT: FLIGHT CONTROLS - Elevator and Tab - Elevator Tab Control Mechanism - Aft Attach
Lug Modification
Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15
CFR 300-774). An export license may be required before it is used for development, production or use by foreign
persons from specific countries. The controller of this data has the individual responsibility to abide by all export
laws.
9E991ECCN:
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET
Copyright © 2012 Boeing.
Unpublished Work. All Rights Reserved.
Treatment of this document and its content is governed by contract with Boeing. Rights to use this document
are licensed on a per aircraft basis and such rights may not be transferable. For more information, contact The
Boeing Company.
Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner™,
BBJ, DC-8, DC-9, DC-10, KC-10, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8A, Poseidon and Boeing
liveries are all trademarks owned by The Boeing Company; and no trademark license is granted in connection
with this document unless provided in writing by Boeing. BOEING is a trademark of Boeing Management
Company.
Original Issue: April 16, 2012
737-27-1300
1 of 59
4.0

### Page 2

Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 16, 2012
737-27-1300
2 of 59
BOEING SERVICE BULLETIN 737-27-1300
BLANK PAGE

### Page 3

Table of Contents
Summary ...................................................... 5
1. PLANNING INFORMATION ........................................ 9
A. Effectivity ................................................ 9
1. Airplanes ............................................. 9
2. Spares Affected ........................................ 2 2
B. Concurrent Requirements ...................................... 2 2
C. Reason ................................................ 2 2
D. Description .............................................. 2 3
E. Compliance .............................................. 2 3
F. Approval ............................................... 2 4
G. Manpower .............................................. 2 4
H. Weight and Balance Changes .................................... 2 5
I. Electrical Load Data ......................................... 2 5
J. References .............................................. 2 5
1. Existing Data: ......................................... 2 5
2. Data Supplied with this Service Bulletin: ........................... 2 6
3. Installation Drawings Used in the Preparation of this Service Bulletin: ........... 2 6
K. Publications Affected ........................................ 2 6
L. Interchangeability and Intermixability of Parts ........................... 2 7
M. Software Accomplishment Summary ................................ 2 7
2. MATERIAL INFORMATION ........................................ 2 9
A. Material - Price and Availability ................................... 2 9
B. Industry Support Information .................................... 2 9
C. Parts Necessary for Each Airplane ................................. 2 9
1. Kits/Parts ............................................ 2 9
2. Parts and Materials Supplied by the Operator ........................ 3 2
3. Parts Modified and Reidentified ................................ 3 3
4. Parts Removed and Not Replaced .............................. 3 3
D. Parts Necessary to Change Spares ................................. 3 3
E. Special Tooling - Price and Availability ............................... 3 3
F. Special Tooling Necessary to do this Service Bulletin ....................... 3 4
3. ACCOMPLISHMENT INSTRUCTIONS .................................. 3 5
A. GENERAL INFORMATION ..................................... 3 5
B. WORK INSTRUCTIONS ....................................... 3 6
FIGURE 1: RIGHT SIDE, ELEVATOR TAB CONTROL MECHANISM MODIFICATION ........ 4 2
FIGURE 2: LEFT SIDE, ELEVATOR TAB CONTROL MECHANISM MODIFICATION ......... 4 9
FIGURE 3: RIGHT SIDE, ELEVATOR TAB CONTROL MECHANISM INSTALLATION ........ 5 6
FIGURE 4: LEFT SIDE, ELEVATOR TAB CONTROL MECHANISM INSTALLATION ......... 5 8
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 16, 2012
737-27-1300
3 of 59
BOEING SERVICE BULLETIN 737-27-1300

### Page 4

Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 16, 2012
737-27-1300
4 of 59
BOEING SERVICE BULLETIN 737-27-1300
BLANK PAGE

### Page 5

Commercial 
Airplanes
737
Service Bulletin
SummaryNumber: 737-27-1300Original Issue: April 16, 2012
ATA System: 2731
SUBJECT: FLIGHT CONTROLS - Elevator and Tab - Elevator Tab Control Mechanism - Aft Attach
Lug Modification
CONCURRENT REQUIREMENTS
None.
BACKGROUND
Boeing has received 2 reports from operators where the failure of the aft attach lugs on the left elevator tab
control mechanism resulted in unwanted elevator freeplay vibration during flight. Investigation revealed that the
bearings installed in the elevator tab control mechanism aft attach lugs were likely installed such that they may
become loose and migrate. This service bulletin installs a new or modified elevator tab control mechanism with
a new improved machined lug with a new bearing that has an improved retention swage. A secondary retention
feature was also added to the lug assemblies to ensure the bearings remain in the load path in the event of a
swage failure. This new improved machined lug is more robust than the original and will increase the service
life of the lugs and bearings of the elevator tab control mechanism. A loose bearing in the aft attach lug of the
elevator tab control mechanism that is allowed to migrate out of the load path could lead to unwanted elevator
freeplay and then tab vibration which could lead to structural failure of the elevator or the horizontal stabilizer,
which can result in unsafe flight conditions.
The related Elevator Tab service bulletins are 737-27A1299 and 737-27A1297.
Boeing Service Related Problem (SRP) 737NG-SRP-27-0211 is related to this service bulletin.
This table is provided to operators for planning purposes only. Refer to the applicable sections for more
information.
ReferenceAffectedPlanning Data
Paragraph 1.A.2., Spares AffectedYesSpares Affected
Paragraph 1.F., ApprovalYesAD Related
Paragraph 1.H., Weight and Balance ChangesYesWeight and Balance Change
Paragraph 1.I., Electrical Load DataNoElectrical Load Changed
Paragraph 1.K., Publications AffectedYesPublications Affected
Paragraph 1.K., Publications AffectedNoAirplane Flight Operations Affected
Paragraph 2.C.1., Kits/PartsYesKits/Parts Required
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 16, 2012
737-27-1300
5 of 59

### Page 6

ReferenceAffectedPlanning Data
Paragraph 2.C.2., Parts and Materials Supplied by the
Operator
YesOperator Supplied Material
Paragraph 2.F., Special Tooling Necessary to do this
Service Bulletin
YesSpecial Tooling Required
ACTION (PRR 38964)
Airplane Work
1. Gain access to the elevator tab control mechanism. Remove and replace with a new or previously
modified elevator tab control mechanism or remove and modify the elevator tab control mechanism by
installing the new machined lug assemblies to the existing frames and applying the part mark, as
indicated under Component Work. Perform functional tests, a power-off (manual reversion) flight test
and return the airplane to a serviceable condition.
Component Work
1. Disassemble the elevator tab control mechanism and remove the lugs (bracket) from the frame.
2. Replace the sheet metal lug assemblies with the new machined lug assemblies.
3. Reassemble the elevator tab control mechanism and part mark with the new dash number.
EFFECTIVITY
737-600, -700, -700C, -800, -900 and -900ER Airplane(s). Refer to Paragraph 1.A., Effectivity, Airplanes, for
the list of affected airplanes.
COMPLIANCE
Federal Aviation Administration (FAA) Airworthiness Directive AD 2010-17-19 is related to this service bulletin.
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to this service
bulletin. The Airworthiness Directive will make the compliance tasks and times given in this service bulletin
mandatory.
Refer to Paragraph 1.E., Compliance.
INDUSTRY SUPPORT INFORMATION
Boeing warranty remedies are available for airplanes in warranty as of March 11, 2010. Please refer to Paragraph
2.B., Industry Support Information.
MANPOWER
Refer to Paragraph 1.G., Manpower.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 16, 2012
737-27-1300
6 of 59
BOEING SERVICE BULLETIN 737-27-1300

### Page 7

Elapsed HoursTotal Task HoursAirplanes
11.0012.00TOTAL FOR
EACH IN-
STALLED ELE-
VATOR TAB
CONTROL
MECHANISM
6.006.00TOTAL FOR
SPARE COMPO-
NENT - ELEVA-
TOR TAB CON-
TROL MECHA-
NISM
MATERIAL INFORMATION
Boeing Supplied Kits/Parts.
Refer to Paragraph 2.A., Material - Price and Availability.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 16, 2012
737-27-1300
7 of 59
BOEING SERVICE BULLETIN 737-27-1300

### Page 8 (OCR)

BOEING SERVICE BULLETIN 737-27-1300
REMOVE AND REPLACE EACH
ELEVATOR TAB CONTROL MECHANISM
OR MODIFY THEM BY REMOVING EACH
OLD SHEET METAL LUG ASSEMBLY AND
NSTALLING A NEW MACHINED LUG
ASSEMBLY FOR THE LEFT AND RIGHT
LUG ASSEMBLIES ON EACH MECHANISM.
LEFT SIDE SHOWN, RIGHT SIDE SIMILAR  2107054
Original Issue: April 16, 2012
PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  737-27-1300
Work - See page 1 for details.  8 of 59

### Page 9

Commercial 
Airplanes
737
Service Bulletin
Number: 737-27-1300
Original Issue: April 16, 2012
ATA System: 2731
SUBJECT: FLIGHT CONTROLS - Elevator and Tab - Elevator Tab Control Mechanism - Aft Attach
Lug Modification
1.    PLANNING INFORMATION
A. Effectivity
1. Airplanes
DESCRIPTIONCONFIGURATIONGROUP
Line numbers 1 through 3909-1
Airplane Models:
737-600, 737-700, 737-700C, 737-800, 737-900, 737-900ER
GroupVariable Number
1YA001 - YA099
1YA101 - YA199
1YA201 - YA211
1YA221
1YA231 - YA242
1YA251 - YA256
1YA271 - YA272
1YA291
1YA301 - YA302
1YA311 - YA314
1YA321 - YA323
1YA336 - YA345
1YA351
1YA356 - YA357
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 16, 2012
737-27-1300
9 of 59

### Page 10

GroupVariable Number
1YA366 - YA367
1YA371 - YA377
1YA501 - YA536
1YA541 - YA552
1YA571 - YA578
1YA601 - YA615
1YA621 - YA622
1YA626 - YA631
1YA635 - YA636
1YA641 - YA642
1YA645 - YA650
1YA656 - YA659
1YA666 - YA667
1YA671 - YA672
1YA681 - YA691
1YA701 - YA710
1YA721 - YA722
1YA731 - YA734
1YA751 - YA756
1YA801 - YA803
1YA809
1YA811 - YA814
1YA831 - YA835
1YA841 - YA862
1YA881 - YA882
1YA891 - YA892
1YA961 - YA978
1YB001 - YB006
1YB101 - YB132
1YB151 - YB153
1YB156 - YB158
1YB161 - YB164
1YB171 - YB172
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 16, 2012
737-27-1300
10 of 59
BOEING SERVICE BULLETIN 737-27-1300

### Page 11

GroupVariable Number
1YB181 - YB184
1YB201 - YB208
1YB271
1YB276
1YB301 - YB310
1YB371 - YB392
1YB501 - YB502
1YB521 - YB526
1YB541 - YB544
1YB551
1YB561 - YB598
1YB601 - YB635
1YB651
1YB656
1YB671 - YB672
1YB851 - YB863
1YB871 - YB874
1YB881 - YB893
1YB901 - YB903
1YB911
1YB961 - YB975
1YB981
1YB986 - YB998
1YC001 - YC030
1YC051 - YC084
1YC091 - YC095
1YC101 - YC104
1YC111 - YC113
1YC121
1YC126 - YC127
1YC136 - YC141
1YC146 - YC147
1YC151 - YC156
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 16, 2012
737-27-1300
11 of 59
BOEING SERVICE BULLETIN 737-27-1300

### Page 12

GroupVariable Number
1YC166 - YC171
1YC176 - YC179
1YC186 - YC190
1YC201 - YC203
1YC206 - YC207
1YC301 - YC305
1YC321 - YC387
1YC391 - YC394
1YC396
1YC401 - YC417
1YC421 - YC422
1YC426 - YC428
1YC436 - YC439
1YC441 - YC448
1YC451 - YC455
1YC459
1YC461 - YC467
1YC471 - YC499
1YC501 - YC526
1YC571 - YC583
1YC587 - YC589
1YC591 - YC593
1YC601 - YC655
1YC681 - YC696
1YC701 - YC715
1YC720 - YC725
1YC727 - YC752
1YC761 - YC770
1YC781 - YC793
1YC801 - YC892
1YC901 - YC907
1YC921 - YC922
1YC931 - YC932
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 16, 2012
737-27-1300
12 of 59
BOEING SERVICE BULLETIN 737-27-1300

### Page 13

GroupVariable Number
1YC941 - YC951
1YC971 - YC978
1YC981 - YC983
1YD001 - YD007
1YD021 - YD025
1YD041 - YD057
1YD081 - YD084
1YD101 - YD117
1YD121 - YD126
1YD151 - YD159
1YD171 - YD172
1YD201 - YD203
1YD206 - YD209
1YD216 - YD219
1YD251 - YD254
1YD256 - YD257
1YD261
1YD301 - YD334
1YD391
1YD401 - YD410
1YD412 - YD418
1YD481 - YD485
1YD491 - YD499
1YD501 - YD512
1YD531 - YD535
1YD541 - YD547
1YD561 - YD564
1YD571 - YD572
1YD591 - YD595
1YD601 - YD612
1YD651 - YD655
1YE001 - YE020
1YE051
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 16, 2012
737-27-1300
13 of 59
BOEING SERVICE BULLETIN 737-27-1300

### Page 14

GroupVariable Number
1YE101 - YE109
1YE151 - YE157
1YE171 - YE172
1YE201 - YE206
1YE301 - YE305
1YE321 - YE326
1YE371 - YE383
1YF001 - YF011
1YF021 - YF049
1YF051 - YF067
1YF086 - YF087
1YF106 - YF107
1YF111 - YF114
1YF116 - YF119
1YF121 - YF132
1YF176 - YF178
1YF191 - YF192
1YF201 - YF276
1YF401 - YF402
1YF431 - YF432
1YF436 - YF437
1YF441 - YF442
1YF451 - YF460
1YF501 - YF599
1YF601 - YF638
1YF701 - YF707
1YF801 - YF805
1YF831 - YF832
1YF836 - YF838
1YF901 - YF905
1YF921 - YF928
1YF951 - YF954
1YG001 - YG044
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 16, 2012
737-27-1300
14 of 59
BOEING SERVICE BULLETIN 737-27-1300

### Page 15

GroupVariable Number
1YG061 - YG064
1YG066 - YG089
1YG091 - YG099
1YG101 - YG104
1YG111 - YG114
1YG116 - YG134
1YG201 - YG205
1YG211 - YG214
1YG221 - YG224
1YG251 - YG252
1YG501 - YG512
1YG601 - YG602
1YG701
1YG711
1YH001 - YH012
1YH031 - YH055
1YH071 - YH080
1YH101 - YH132
1YH201 - YH202
1YH206 - YH207
1YH301 - YH306
1YH321 - YH322
1YH501 - YH515
1YH551 - YH552
1YH601 - YH602
1YH611 - YH612
1YH631 - YH632
1YH641
1YJ001 - YJ013
1YJ021
1YJ471 - YJ480
1YJ501 - YJ517
1YJ531 - YJ579
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 16, 2012
737-27-1300
15 of 59
BOEING SERVICE BULLETIN 737-27-1300

### Page 16

GroupVariable Number
1YJ591 - YJ599
1YJ631 - YJ632
1YJ671 - YJ694
1YJ801 - YJ867
1YJ871 - YJ880
1YJ901 - YJ904
1YJ908 - YJ929
1YJ931 - YJ937
1YJ941 - YJ956
1YJ961
1YJ976 - YJ977
1YK001 - YK007
1YK101 - YK104
1YK111 - YK112
1YK121 - YK122
1YK131 - YK133
1YK136 - YK139
1YK141 - YK142
1YK146 - YK148
1YK151 - YK154
1YK161 - YK167
1YK171
1YK176 - YK177
1YK186
1YK191
1YK196
1YK201 - YK202
1YK301 - YK314
1YK321 - YK340
1YK361 - YK378
1YK401 - YK406
1YK426 - YK427
1YK431 - YK450
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 16, 2012
737-27-1300
16 of 59
BOEING SERVICE BULLETIN 737-27-1300

### Page 17

GroupVariable Number
1YK456 - YK467
1YK471 - YK473
1YK476
1YK480 - YK487
1YK491 - YK492
1YK495 - YK499
1YK511 - YK516
1YK521 - YK530
1YK551 - YK571
1YK576 - YK577
1YK580 - YK585
1YK601 - YK602
1YK606 - YK607
1YK611 - YK616
1YK621 - YK634
1YK641 - YK644
1YK651 - YK665
1YK671 - YK672
1YK676 - YK677
1YK681 - YK686
1YK691
1YK701 - YK713
1YK716 - YK719
1YK721 - YK741
1YK751 - YK770
1YK776 - YK778
1YK781 - YK785
1YK791 - YK792
1YK796 - YK797
1YK801 - YK899
1YK901 - YK912
1YK918 - YK919
1YK921 - YK929
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 16, 2012
737-27-1300
17 of 59
BOEING SERVICE BULLETIN 737-27-1300

### Page 18

GroupVariable Number
1YK941 - YK998
1YL001 - YL005
1YL011 - YL016
1YL021 - YL024
1YL051 - YL052
1YL056 - YL057
1YL061
1YL066 - YL069
1YL076 - YL077
1YL101 - YL137
1YL201 - YL232
1YL241 - YL242
1YL271 - YL272
1YL281 - YL284
1YL301 - YL303
1YL311 - YL314
1YL316 - YL321
1YL351 - YL353
1YL371 - YL374
1YL401
1YL421 - YL429
1YL431 - YL444
1YL461 - YL478
1YL501 - YL509
1YL531 - YL534
1YL541 - YL551
1YL561 - YL579
1YL591 - YL598
1YL601 - YL606
1YL611 - YL612
1YL616 - YL617
1YL621
1YL626
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 16, 2012
737-27-1300
18 of 59
BOEING SERVICE BULLETIN 737-27-1300

### Page 19

GroupVariable Number
1YL631 - YL634
1YL636 - YL637
1YL661 - YL664
1YL676 - YL691
1YL696 - YL697
1YL701 - YL707
1YL731
1YL751 - YL752
1YL756 - YL757
1YL761 - YL780
1YL796 - YL797
1YL801 - YL815
1YL901 - YL910
1YL921 - YL940
1YL951 - YL968
1YM101 - YM103
1YM201 - YM244
1YM251 - YM299
1YM301 - YM399
1YM401 - YM415
1YM471
1YM481 - YM484
1YM501 - YM515
1YM521 - YM522
1YM541
1YM551 - YM553
1YM571 - YM572
1YM581 - YM582
1YM591 - YM599
1YM631 - YM634
1YM641 - YM652
1YM671 - YM674
1YM691 - YM699
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 16, 2012
737-27-1300
19 of 59
BOEING SERVICE BULLETIN 737-27-1300

### Page 20

GroupVariable Number
1YM701 - YM710
1YM761 - YM765
1YM771 - YM779
1YN001 - YN016
1YN021 - YN024
1YN061
1YN071 - YN082
1YN091 - YN092
1YN101 - YN112
1YN121
1YN201 - YN202
1YN211 - YN219
1YN231 - YN236
1YN261
1YN501
1YN531 - YN534
1YN551 - YN552
1YN601 - YN602
1YN701 - YN702
1YQ001 - YQ003
1YQ011 - YQ019
1YQ026 - YQ029
1YQ036 - YQ045
1YQ201 - YQ202
1YQ231
1YQ241 - YQ251
1YQ281 - YQ282
1YQ291 - YQ296
1YQ301 - YQ302
1YQ401 - YQ403
1YQ451 - YQ454
1YQ461
1YQ471
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 16, 2012
737-27-1300
20 of 59
BOEING SERVICE BULLETIN 737-27-1300

### Page 21

GroupVariable Number
1YR001 - YR015
1YR051 - YR057
1YR091
1YR101 - YR102
1YR111 - YR116
1YR126 - YR132
1YR141 - YR142
1YR166 - YR174
1YR201 - YR204
1YR231 - YR248
1YR271 - YR278
1YR286 - YR287
1YR291 - YR294
1YR296 - YR297
1YR301 - YR314
1YR361 - YR363
1YR381 - YR382
1YR401 - YR405
1YR421 - YR422
1YR431
1YR441
1YR451 - YR455
1YR501 - YR504
1YR511 - YR514
1YR516 - YR520
1YR526 - YR527
1YR601 - YR605
1YR616 - YR617
1YR651 - YR653
1YR656
1YR701 - YR717
1YR801 - YR808
1YR831 - YR833
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 16, 2012
737-27-1300
21 of 59
BOEING SERVICE BULLETIN 737-27-1300

### Page 22

GroupVariable Number
1YR851 - YR855
1YR901
1YR951 - YR952
1YR981 - YR984
1YS001 - YS002
1YS051 - YS054
1YS101
1YS151
2. Spares Affected
Examine your spares supply for the parts or components identified in Paragraph 2.C., Parts
Necessary for Each Airplane. If any parts or components are found, refer to Paragraph 2.C. for
the recommended use.
B. Concurrent Requirements
None.
C. Reason
Boeing has received 2 reports from operators where the failure of the aft attach lugs on the left elevator
tab control mechanism resulted in unwanted elevator freeplay vibration during flight. Investigation
revealed that the bearings installed in the elevator tab control mechanism aft attach lugs were likely
installed such that they may become loose and migrate. This service bulletin installs a new or modified
elevator tab control mechanism with a new improved machined lug with a new bearing that has an
improved retention swage. A secondary retention feature was also added to the lug assemblies to
ensure the bearings remain in the load path in the event of a swage failure. This new improved machined
lug is more robust than the original and will increase the service life of the lugs and bearings of the
elevator tab control mechanism. A loose bearing in the aft attach lug of the elevator tab control
mechanism that is allowed to migrate out of the load path could lead to unwanted elevator freeplay
and then tab vibration which could lead to structural failure of the elevator or the horizontal stabilizer,
which can result in unsafe flight conditions.
Boeing Service Related Problem (SRP) 737NG-SRP-27-0211 is related to this service bulletin.
Fleet Team Digest 737NG FTD 27-10005 is related to this service bulletin.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 16, 2012
737-27-1300
22 of 59
BOEING SERVICE BULLETIN 737-27-1300

### Page 23

D. Description
Airplane Work
1. Gain access to the elevator tab control mechanism. Remove and replace with a new or previously
modified elevator tab control mechanism or remove and modify the elevator tab control mechanism
by installing the new machined lug assemblies to the existing frames and applying the part mark,
as indicated under Component Work. Perform functional tests, a power-off (manual reversion)
flight test and return the airplane to a serviceable condition..
Component Work
1. Disassemble the elevator tab control mechanism and remove the lugs (bracket) from the frame.
2. Replace the sheet metal lug assemblies with the new machined lug assemblies.
3. Reassemble the elevator tab control mechanism and part mark with the new dash number.
The work in this service bulletin is done in the maintenance zone(s) given below.
Affected Maintenance Zones
ZoneModel
333, 334, 343, 344737-600, 737-700, 737-700C,
737-800, 737-900, 737-900ER
E. Compliance
Federal Aviation Administration (FAA) Airworthiness Directive AD 2010-17-19 is related to this service
bulletin.
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to
this service bulletin. The Airworthiness Directive will make the compliance tasks and times given in this
service bulletin mandatory.
Table 1: Elevator Tab Control Mechanism Aft Attach Lug Replacement
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
-Within five years
after the date of
the original issue of
this service bulletin
Replace the elevator tab
control mechanisms that
have sheet metal aft at-
tach lugs with elevator
tab control mechanisms
that have the new ma-
chined aft attach lugs in
accordance with work in-
struction 3.B.
All Airplanes
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 16, 2012
737-27-1300
23 of 59
BOEING SERVICE BULLETIN 737-27-1300

### Page 24

F. Approval
This service bulletin was examined by the Federal Aviation Administration (FAA). The changes specified
in this service bulletin comply with the applicable regulations and are FAA approved, as well as European
Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/JAA approved
airplanes listed in the service bulletin effectivity. This service bulletin and its approval were based on
the airplane in its original Boeing delivery configuration or as modified by other approved Boeing
changes.
If an airplane has a non-Boeing modification or repair that affects a component or system also affected
by this service bulletin, the operator is responsible for obtaining appropriate regulatory agency approval
before incorporating this service bulletin.
In addition, the Manager of the FAA Seattle Aircraft Certification Office approves the action (i.e. inspection
or modification) defined in this service bulletin as an alternative method of compliance to the requirements
of paragraph (g), (h), (i), (j), (k), (l), (m), (n), (o), (p), (q), (r), (s), (t) of AD 2010-17-19. All provisions of
AD 2010-17-19 that are not specifically referenced in the above statement remain fully applicable and
must be complied with.
G. Manpower
The table below shows an estimate of the task hours necessary to do tasks required in this service
bulletin for one elevator tab control mechanism, there are two on the airplane. This estimate is for direct
labor only, done by an experienced crew. Adjust the estimate with operator task hour data if necessary.
The estimate does not include lost time. These are some examples of lost time:
 Time to adjust to the workplace
 Time to schedule the work
 Time to inspect the work
 Time to cure the materials
 Time to make the parts
 Time to find the tools.
Airplane Work
Elapsed HoursTask HoursNumber of PersonsTask
0.500.501Open Access
1.501.501Remove the elevator
tab control mecha-
nism
1.501.501Install the elevator
tab control mecha-
nism
0.500.501Close Access
1.002.002Test
(a)(a)2Flight Test
(a) Flight test hours are not included in estimate.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 16, 2012
737-27-1300
24 of 59
BOEING SERVICE BULLETIN 737-27-1300

### Page 25

Airplane Work
Elapsed HoursTask HoursNumber of PersonsTask
5.006.00TOTAL FOR EACH INSTALLED ELEVATOR
TAB CONTROL MECHANISM
Component Work
Elapsed HoursTask HoursNumber of PersonsTask
1.601.601Disassemble the ele-
vator tab control
mechanism
2.802.801Modify the elevator
tab control mecha-
nism
1.601.601Reassemble the ele-
vator tab control
mechanism
6.006.00TOTAL FOR EACH COMPONENT
H. Weight and Balance Changes
Change in Moment
(Inches-Pound)
Change in Weight
(Pounds)Airplane
+ 1,812.0 Inches-
Pounds
+ 1.5 Pounds737-600
+ 1,872.0 Inches-
Pounds
+ 1.5 Pounds737-700, -700C
+ 2,040.0 Inches-
Pounds
+ 1.5 Pounds737-800
+ 2,103.0 Inches-
Pounds
+ 1.5 Pounds737-900, -900ER
I. Electrical Load Data
Not applicable.
J. References
1. Existing Data:
a. Engineering Change Memo PRR 38964
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 16, 2012
737-27-1300
25 of 59
BOEING SERVICE BULLETIN 737-27-1300

### Page 26

b. Service Related Problem (SRP) 737NG-SRP-27-0211
c. Fleet Team Digest 737NG FTD 27-10005
d. Boeing Program Letter BPL 6-1151-737-PGM-196, dated July 15, 2011
e. 737 Maintenance Manual (AMM) Subject737-600/700/800/900 AMM 27-31-00 ,
737-600/700/800/900 AMM 27-31-34,
f. Component Maintenance Manual (CMM) CMM 27-34-03
g. Boeing Standard Wiring Practices Manual (SWPM) SWPM 20-10-11, SWPM 20-10-12, SWPM
20-10-19
h. Boeing Standard Overhaul Practices Manual (SOPM) SOPM 20-43-03, SOPM 20-50-07,
SOPM 20-50-10, SOPM 20-50-19
i. Boeing Service Bulletin 737-27A1297, 737-27A1299
j. FAA Airworthiness Directive AD 2010-17-19
k. Boeing Parts Standards Document D-590
2. Data Supplied with this Service Bulletin:
None.
3. Installation Drawings Used in the Preparation of this Service Bulletin:
TitleDrawing Number
Tab Mechanism Assy - Elevator Control251A2430
Frame Assy - Tab Mechanism, Elevator Control251A2431
Tab Mechanism instl - Elevator Control251A2401
The table above lists applicable drawings used to prepare this service bulletin. The drawings are
not necessary to make the specified changes, and are not supplied with this service bulletin. The
drawings may not be applicable to all airplane configurations or operators.
K. Publications Affected
1. Publications:
Chapter-SectionPublication
27-31737 Aircraft Maintenance Manual
-737 Structural Repair Manual
27-31737 Illustrated Parts Catalog
-737 Weight and Balance Manual
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 16, 2012
737-27-1300
26 of 59
BOEING SERVICE BULLETIN 737-27-1300

### Page 27

Chapter-SectionPublication
27-34Component Maintenance Manual
2. Damage Tolerance Based Structural Inspections:
Boeing has evaluated the repairs and/or changes in this service bulletin for effects on Fatigue
Critical Structure (FCS) and for changes to Damage Tolerance Inspections (DTI) required in the
Maintenance Program. This service bulletin does not affect FCS, therefore DTIs are not necessary.
L. Interchangeability and Intermixability of Parts
Refer to Paragraph 2.C., Parts Necessary for Each Airplane, for interchangeability and intermixability
information.
M. Software Accomplishment Summary
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 16, 2012
737-27-1300
27 of 59
BOEING SERVICE BULLETIN 737-27-1300

### Page 28

Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 16, 2012
737-27-1300
28 of 59
BOEING SERVICE BULLETIN 737-27-1300
BLANK PAGE

### Page 29

2.    MATERIAL INFORMATION
A. Material - Price and Availability
Boeing can supply the kits/parts shown in Paragraph 2.C., Parts Necessary for Each Airplane, and
Paragraph 2.D., Parts Necessary to Change Spares. Operators are encouraged to share schedule
requirements with Boeing for incorporation of the service bulletin. The kits/parts are subject to the terms
and conditions of the Boeing standard purchase order acknowledgment. Prices are in United States
Dollars. Terms: Net 30 days.
Reference this service bulletin and submit your purchase order by one of these methods:
1. Order on-line via ATA Spec 2000 or The Boeing PART Page
2. Fax to (206) 662-7145
REFER TO THE BOEING PART PAGE ON MYBOEINGFLEET.COM OR CONTACT FIRST RESPONDER
AT FR@BOEING.COM FOR THE LATEST REORDER LEAD TIME (ROLT) AND PRICE INFORMATION
Unit Price as of
the original issue
date of this Ser-
vice Bulletin (US
Dollars)
ROLT as of the
original issue
date of this Ser-
vice Bulletin (Cal-
endar Days)
QTYDateNameKit/Part Number
$2,359.00222 days--Top Kit002A0001-107
$570.00242 days--Top Kit002A0001-109
B. Industry Support Information
Boeing warranty remedies are available for 737 NG airplanes in warranty as of March 11, 2010. For
man-hour reimbursement for airplanes in warranty as of that date, send a warranty claim to Boeing
Warranty & Product Assurance Contracts. The parts for airplanes in warranty as of that date will be
supplied at no charge. Send a purchase order for the parts to Boeing Spares. Please refer to this
service bulletin number and reference the airplane variable number(s) in your purchase order. Also
see Program Letter BPL 6-1151-737-PGM-196, dated July 15,2011 for out of warranty parts support.
Additional copies of program letters are available from Boeing Commercial Airplanes Group - Warranties.
QTY (1) MIT002A0001-107 will be supplied for each operator with 737NG airplanes in warranty as of
March 11, 2010, and are not planning to accomplish modifications at Boeing or a MRO. Please see
Program Letter BPL 6-1151-737-PGM-196-R1, for out of warranty tool support.
C. Parts Necessary for Each Airplane
1. Kits/Parts
To get the kits/parts shown below, refer to Paragraph 2.A., Material - Price and Availability.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 16, 2012
737-27-1300
29 of 59
BOEING SERVICE BULLETIN 737-27-1300

### Page 30

NOTE: Two of each top kit and the items shown in Paragraph 2.C.2., Parts and Materials Supplied
by the Operator, are necessary for each airplane. One of the 002A0001-107 kits is
necessary to modify each spare. As an option operators may exchange their elevator tab
control mechanism for one previously modified or send their elevator tab control
mechanism to be modified by a designated MRO. (c) (d)
Kit 002A0001
NotesExisting Part
Number
NameQTYNew Part Number
-109-107
(c)Kit - Retrofit - Elev
Tab Control Mech
Aft Attach Lug
.-002A0001-107
(d)Kit - Retrofit - Elev
Tab Instl
-.002A0001-109
PIN ASSY - DUAL
LOAD PATH, TAB
MECHANISM, ELE-
VATOR CONTROL
1.251A2445-4
PIN ASSY - DUAL
LOAD PATH, TAB
MECHANISM, ELE-
VATOR CONTROL
1.251A2445-5
(a)LUG ASSY - TAB
MECHANISM, ELE-
VATOR CON-
TROLS
.1251A2455-1
DOUBLER - TAB
MECHANISM, ELE-
VATOR CON-
TROLS
.2251A2455-10
RADIUS FILLER,
UPPER - TAB
MECHANISM, ELE-
VATOR CON-
TROLS
.2251A2455-11
(a)LUG ASSY - TAB
MECHANISM, ELE-
VATOR CON-
TROLS
.1251A2455-2
MACHINED SPAC-
ER - TAB MECHA-
NISM, ELEVATOR
CONTROLS
.2251A2455-7
RETAINER - TAB
MECHANISM, ELE-
VATOR CONTROL
.2251A2455-8
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 16, 2012
737-27-1300
30 of 59
BOEING SERVICE BULLETIN 737-27-1300

### Page 31

Kit 002A0001
NotesExisting Part
Number
NameQTYNew Part Number
-109-107
RADIUS FILLER,
LOWER - TAB
MECHANISM, ELE-
VATOR CON-
TROLS
.2251A2455-9
(a) (b)BOLT, HEX DRIVE.4BACB30FM5AK7
(a) (b)BOLT, PROTRUD-
ING HD
.4BACB30MB8A10
(a)COLLAR.4BACC30BH8
(a)COLLAR.4BACC30M5
(a)NUT1.BACN10HR5CD
(a)SELF-LOCKING
NUT
.1BACN10JC12CD
(a)NUT,SELF-LOCK-
ING
1.BACN10JC4CD
(a)SELF-LOCKING
NUT
22BACN10JC5CD
(a)SELF-LOCKING
NUT
.3BACN10JC7CD
(a)NUT42BACN10YR3CD
(a)NUT4.BACN10YR4CD
(a) (b)PIN, COTTER2.BACP18BC02A12P
(a) (b)RIVET, BLIND.4BACR15FP5F3R
(a) (b)RIVET, 100 DEG.2BACR15GF5D11
(a) (b)RIVET, 100 DEG.2BACR15GF5D12
(a) (b)RIVET, 100 DEG.2BACR15GF5D9
(a) (b)SCREW, CAP2.BACS12GU3K7
(a)SHIM, LAMINAT-
ED
.4BACS40R007Y020P
(a)CSK WASHER1.BACW10BP5CD
(a)WASHER, FLAT4.BACW10P475CG
(a)WASHER2.NAS1149D0332J
(a)WASHER, FLAT42NAS1149D0363J
(a)WASHER1.NAS1149D0463J
(a)WASHER32NAS1149D0563J
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 16, 2012
737-27-1300
31 of 59
BOEING SERVICE BULLETIN 737-27-1300

### Page 32

Kit 002A0001
NotesExisting Part
Number
NameQTYNew Part Number
-109-107
(a)WASHER.3NAS1149D0763J
(a)WASHER, PLAIN.1NAS1149D1290J
(a)BUSHING2.NAS75-5-021
(a)WASHER.2BACW10P220S
(a) Discard the existing part{Keep the existing part if there are other uses for it}
(b) If grip length shown is not available at Boeing, fasteners supplied in kits may
be one grip length longer than indicated. Also, if any fasteners part numbers
listed are not available or have been superseded, substitute fasteners may be
supplied in kits. Boeing Document D-590 and Boeing Drawing 65-88700 are
used to determine the part numbers used as substitutes.
(c) One kit is required for each elevator tab control mechanism that the operator
plans to modify.
(d) One kit is required for each elevator tab control mechanism that is installed on
the airplane.
2. Parts and Materials Supplied by the Operator
NotesNameQTYPart Number /
Specification
As an option to modifying
your elevator tab control
mechanism, you may install
a new or previously modi-
fied elevator tab control
mechanism.
Elevator Tab Control Mechanism,
Left hand side
1251A2430-25
As an option to modifying
your elevator tab control
mechanism, you may install
a new or previously modi-
fied elevator tab control
mechanism.
Elevator Tab Control Mechanism,
Right hand side
1251A2430-26
(a)Anti-seize Compound1 ozBMS 3-28
Clear Skydrol-resistance Topcoating1 ozType 41
Chemical conversion coating1 ozAlodine
(a) Refer to the Qualified Products List at the end of the Boeing Material Specification (BMS)
for supplier data.
– Part Interchangeability
– Left hand side:
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 16, 2012
737-27-1300
32 of 59
BOEING SERVICE BULLETIN 737-27-1300

### Page 33

251A2430-23 is a replacement for a 251A2430-17 and -13 or -101 and -103
251A2430-25 is a replacement for a 251A2430-15
– Right hand side:
251A2430-24 is a replacement for a 251A2430-18 and -14 or -102 and -104
251A2430-26 is a replacement for a 251A2430-16
3. Parts Modified and Reidentified
NotesNew Part NumberNameQTYExisting Part
Number
(a) (c)251A2455-1, -2Lug assembly4-
(a) (b) (c)251A2431-15, -17
& -16, -18
Frame assembly4251A2431-11, -12
(a) (b) (c)251A2430-23, -24Elevator tab control
mechanism
2251A2430-13, -14,
-17, -18, -101, -
102, -103, -104
(a) Make the change in accordance with this service bulletin.
(b) This is the part number after the change is done in accordance with this service bulletin.
(c) This part is used in production.
4. Parts Removed and Not Replaced
None.
D. Parts Necessary to Change Spares
To get the kits shown below, refer to Paragraph 2.A., Material - Price and Availability.
QTYNamePart Number
1Top Kit002A0001-107
E. Special Tooling - Price and Availability
Boeing can supply the tool(s) shown in Paragraph 2.F., Special Tooling Necessary to do this Service
Bulletin. Operators are encouraged to share schedule requirements with Boeing for incorporation of
the service bulletin. The tool(s) are subject to the terms and conditions of the Boeing standard purchase
order acknowledgement. Prices are in United States Dollars. Terms: Net 30 days.
Reference this service bulletin number and submit your purchase order by one of these methods:
1. Order on-line via ATA Spec 2000 or Boeing Part Page
2. Fax to (206) 662-7145
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 16, 2012
737-27-1300
33 of 59
BOEING SERVICE BULLETIN 737-27-1300

### Page 34

REFER TO THE BOEING PART PAGE ON MYBOEINGFLEET.COM OR CONTACT FIRST
RESPONDER AT FR@BOEING.COM FOR THE LATEST REORDER LEAD TIME (ROLT)
AND PRICE INFORMATION
Purchase Data:
Unit Price as of
the Original Issue
date of this Ser-
vice Bulletin (US
Dollars)
NameTool Kit Number
$2,145.00 (b)Miscellaneous Tool Tab Mecha-
nism Lug Locating Tool
MIT002A0001-107
-Removal / Installation EQPT - -
TAB Mechanism ASSY, Eleva-
tor Control. (a)
C27085
(a) This tool is not required to accomplish this service bulletin, but it is
listed as an option and recommended to help prevent damage to the el-
evator tab mechanism bearings when the aft pin assemblies are removed.
This tool is GSE (Ground Support Equipment), operators will have access
to the drawing, and they will be able to procure it from wherever they
want.
(b) The daily rate is $90.00
F. Special Tooling Necessary to do this Service Bulletin
To get the tools shown below, refer to Paragraph 2.E., Special Tooling - Price and Availability.
Maintenance and overhaul tools in the manuals shown in Paragraph 1.J., References, can also be
necessary. Examine operator tool supply to make sure all necessary tools are available.
NameTool Kit Number
Miscellaneous Tool Tab Mecha-
nism Lug Locating Tool
MIT002A0001-107
Removal / Installation EQPT - -
TAB Mechanism ASSY, Elevator
Control (a)
C27085
(a) This tool is not required to accomplish this service
bulletin, but it is listed as an option and recommended
to help prevent damage to the elevator tab mechanism
bearings when the aft pin assemblies are removed. This
tool is GSE (Ground Support Equipment), operators will
have access to the drawing, and they will be able to
procure it from wherever they want.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 16, 2012
737-27-1300
34 of 59
BOEING SERVICE BULLETIN 737-27-1300

### Page 35

3.    ACCOMPLISHMENT INSTRUCTIONS
A. GENERAL INFORMATION
CAUTION: KEEP THE WORK AREA, WIRES AND ELECTRICAL BUNDLES CLEAN OF METAL
PARTICLES OR CONTAMINATION WHEN YOU USE TOOLS. UNWANTED MATERIAL,
METAL PARTICLES OR CONTAMINATION CAUGHT IN WIRE BUNDLES CAN CAUSE
DAMAGE TO THE BUNDLES. DAMAGED WIRE BUNDLES CAN CAUSE SPARKS OR
OTHER ELECTRICAL DAMAGE.
NOTE: 1. Manual titles are referred to by acronyms. Refer to Paragraph 1.J., References, for
definition of the acronyms.
2. Obey all of the warnings and cautions given in the specified manual sections.
3. The work instructions are divided into Airplane Work and Component Work. Task
Hours and Elapsed Hours for each section are given in Paragraph 1.G., Manpower.
4. Unless shown differently, these dimensions and tolerances are used:
– Linear dimensions are in inches
– Tolerance on linear dimensions, other than rivet and bolt edge margins, is plus
or minus 0.03 inch
– Tolerance on rivet and bolt edge margin is plus or minus 0.05 inch
– Angular tolerance is plus or minus 2 degrees
– Hole dimensions for standard solid rivets and fasteners are in Structural Repair
Manual (SRM) Chapter 51
– Torque limits to tighten nuts and bolts are in SRM Chapter 51
5. Use the approved fastener and process material substitutions in accordance with
SRM Chapter 51.
6. Refer to the SWPM 20-10-11 and SWPM 20-10-12 for the wire installation procedures,
and SWPM 20-10-19 for the wire separation requirements, as accepted procedures.
7. The necessary conditions for selection of clamp type and size are included in SWPM
20-10-12. If any wire bundle support clamp specified in this service bulletin does not
make a correct fit on the wire bundle, refer to SWPM 20-10-12 as an accepted
procedure to select a clamp that fits correctly.
8. If the length of any fastener specified in this service bulletin does not meet installation
standards given in SRM Chapter 51, then a fastener of the same specification, or
an approved substitute, with a length which meets the installation standards given
in SRM Chapter 51 may be used. In addition, washers may be installed for fastener
grip length in accordance with SRM Chapter 51.
9. A Detailed Inspection is defined as: An intensive examination of a specific item,
installation, or assembly to detect damage, failure, or irregularity. Available lighting
is normally supplemented with a direct source of good lighting at an intensity deemed
appropriate. Inspection aids such as mirrors, magnifying lenses, etc. may be
necessary. Surface cleaning and elaborate procedures may be required.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 16, 2012
737-27-1300
35 of 59
BOEING SERVICE BULLETIN 737-27-1300

### Page 36

10. A General Visual Inspection is defined as: A visual examination of an interior or
exterior area, installation or assembly to detect obvious damage, failure or irregularity.
This level of inspection is made from within touching distance unless otherwise
specified. A mirror may be necessary to enhance visual access to all exposed surfaces
in the inspection area. This level of inspection is made under normally available
lighting conditions such as daylight, hangar lighting, flashlight or drop-light and may
require removal or opening of access panels or doors. Stands, ladders or platforms
may be required to gain proximity to the area being checked.
11. These work instructions refer to procedures included in other Boeing documents.
When the words "refer to" are used and the operator has an accepted alternative
procedure, the accepted alternative procedure can be used. When the words "in
accordance with" are included in the instruction, the procedure in the Boeing document
must be used.
12. Boeing Service Letter 737-SL-51-042, Damage Reporting and Repair Plan/Design
Guidelines, is an acceptable procedure to request information from Boeing for
additional structural repair instructions. The Service Letter describes what information
must be provided to Boeing before a structural repair can be provided.
13. The instructions in Paragraph 3.B., Work Instructions and the figures can include
operation of tools or test equipment. Boeing Engineering Tool Drawings, the Illustrated
Tool and Equipment Manual, and the Special Tool and Ground Handling Drawing
Index contain data on versions of the tools or test equipment that you can use. It is
permitted to use replaced tools. It is not permitted to use superseded tools.
14. If it is necessary to remove more parts for access, you can remove those parts. If
you can get access without removing identified parts, it is not necessary to remove
all of the identified parts. Jacking and shoring limitations must be observed.
15. Where the work instructions include installation of a kept part, a new or serviceable
part with the same part number can be installed as an alternative to the kept part.
16. This service bulletin includes functional test procedures for the systems changed by
this service bulletin. More functional tests can possibly be necessary in accordance
with standard maintenance practices because of interruption to other airplane systems.
17. Some Boeing parts are supplied in a temporary configuration. Those parts are
identified with a 'U', 'W', or 'Y' in place of the '-' (dash) in the part number. It is
permitted to install parts identified with a 'U', 'W', or 'Y' as an alternative to the '-'
(dash) part number. Boeing Drawing 005W0900 contains more data.
B. WORK INSTRUCTIONS
Airplane work, right elevator tab control mechanism
1. Gain access to the Horizontal Stabilizer and the Elevator as required. Refer to 737-600/700/800/900
AMM 27-31-34 as an accepted procedure.
2. Remove the elevator tab control mechanism. Refer to 737-600/700/800/900 AMM 27-31-34 as an
accepted procedure.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 16, 2012
737-27-1300
36 of 59
BOEING SERVICE BULLETIN 737-27-1300

### Page 37

NOTE: As an option the actuator can be removed from the elevator tab control mechanism and
left on the airplane, prior to removing the elevator tab control mechanism.
3. Remove the actuator from the elevator tab control mechanism. Refer to CMM 27-34-03 or
737-600/700/800/900 AMM 27-31-34 as an accepted procedure.
NOTE: It is not required to remove the actuator from the airplane.
4. Modify your elevator tab control mechanism in accordance with the Component Work section.
NOTE: As an option to modifying your elevator tab control mechanism in accordance with the
Component Work section, you may install a new elevator tab control mechanism with the
machined lugs or elevator tab control mechanism previously modified in accordance to
the requirements of this service bulletin.
5. Install the 251A2430-24 elevator tab control mechanism onto the airplane. If the actuator was left
on the airplane install the 251A2430-26 elevator tab control mechanism onto the airplane. Refer
to 737-600/700/800/900 AMM 27-31-34 as an accepted procedure. Use the fastener codes in
accordance with Figure 3 for the replacement fasteners, otherwise re-use the fasteners removed
from the airplane. Installation fasteners, that are to be replaced are provided in kit #002A0001-109.
6. This step is only required if the actuator has not been previously installed in the elevator tab control
mechanism.
Install the actuator onto the new 251A2430-26 elevator tab control mechanism. Refer to CMM
27-34-03 or 737-600/700/800/900 AMM 27-31-34 as an accepted procedure. Use the fastener
codes in accordance with Figure 3 for the replacement fasteners, otherwise reuse the existing
fasteners. Installation fasteners that are to be replaced are provided in kit #002A0001-109
7. Part mark the assembly with the actuator to 251A2430 -24 in accordance with Figure 1, if the
assembly has not been previously part marked.
8. Close access and restore airplane as required, refer to 737-600/700/800/900 AMM 27-31-34 as
an accepted procedure.
9. Perform functional tests and a power-off (manual reversion) flight test. Ref to 737-600/700/800/900
AMM 27-31-34, 737-600/700/800/900 AMM 27-31-00 as an accepted procedure.
10. Put the airplane back into a serviceable condition.
11. Report all tab mechanism retrofit completions to Boeing using the Service Requests application
on MyBoeingFleet. Include airplane identification and date the retrofit was completed.
Airplane work, left elevator tab control mechanism
1. Gain access to the Horizontal Stabilizer and the Elevator as required. Refer to 737-600/700/800/900
AMM 27-31-34 as an accepted procedure.
2. Remove the elevator tab control mechanism. Refer to 737-600/700/800/900 AMM 27-31-34 as an
accepted procedure.
NOTE: As an option the actuator can be removed from the elevator tab control mechanism and
left on the airplane, prior to removing the elevator tab control mechanism.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 16, 2012
737-27-1300
37 of 59
BOEING SERVICE BULLETIN 737-27-1300

### Page 38

3. Remove the actuator from the elevator tab control mechanism. Refer to CMM 27-34-03 or
737-600/700/800/900 AMM 27-31-34 as an accepted procedure.
NOTE: It is not required to remove the actuator from the airplane.
4. Modify your elevator tab control mechanism in accordance with the Component Work section.
NOTE: As an option to modifying your elevator tab control mechanism in accordance with the
Component Work section, you may install a new elevator tab control mechanism with the
machined lugs or elevator tab control mechanism previously modified in accordance to
the requirements of this service bulletin.
5. Install the 251A2430-23 elevator tab control mechanism onto the airplane. If the actuator was left
on the airplane install the 251A2430-25 elevator tab control mechanism onto the airplane. Refer
to 737-600/700/800/900 AMM 27-31-34 as an accepted procedure. Use the fastener codes in
accordance with Figure 3 for the replacement fasteners, otherwise re-use the fasteners removed
from the airplane. Installation fasteners, that are to be replaced are provided in kit #002A0001-109.
6. This step is only required if the actuator has not been previously installed in the elevator tab control
mechanism.
Install the actuator onto the new 251A2430-25 elevator tab control mechanism. Refer to CMM
27-34-03 or 737-600/700/800/900 AMM 27-31-34 as an accepted procedure. Use the fastener
codes in accordance with Figure 4 for the replacement fasteners, otherwise reuse the existing
fasteners. Installation fasteners and hardware that are to be replaced are provided in kit
#002A0001-109.
7. Part mark the assembly with the actuator to 251A2430-23 in accordance with Figure 2, if the
assembly has not been previously part marked.
8. Close access and restore airplane as required, refer to 737-600/700/800/900 AMM 27-31-34 as
an accepted procedure.
9. Perform functional tests and a power-off (manual reversion) flight test. Ref to 737-600/700/800/900
AMM 27-31-34, 737-600/700/800/900 AMM 27-31-00 as an accepted procedure.
10. Put the airplane back into a serviceable condition.
11. Report all tab mechanism retrofit completions to Boeing using the Service Requests application
on MyBoeingFleet. Include airplane identification and date the retrofit was completed.
Component work, right elevator tab control mechanism
1. Disassemble the elevator tab control mechanism as required to get access to the left and right
frame assemblies. Refer to CMM 27-34-03 as an accepted procedure.
2. Remove the sheet metal lug (bracket) assemblies from the left and right frame assemblies. Refer
to CMM 27-34-03 as an accepted procedure.
3. For each frame assembly: Locate the frame assembly on the tool, using the 2 indicated holes in
the frame and make the cutout. Refer to the MIT002A0001-107 tool use instructions as an accepted
procedure.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 16, 2012
737-27-1300
38 of 59
BOEING SERVICE BULLETIN 737-27-1300

### Page 39

4. For each frame assembly: Locate the new lug assembly onto the close tolerance pin. Refer to the
MIT002A0001-107 tool use instructions as an accepted procedure.
5. For each frame assembly: Locate the doubler at the lower flange and the shims at the upper and
lower flanges, between the lug assembly and the frame in accordance with Figure 1. Use the shims
to center the lug assemble in the frame.
6. For each frame assembly: Clamp the lug assembly against the web of the frame subassembly.
Refer to the MIT002A0001-107 tool use instructions as an accepted procedure.
7. For each frame assembly: Locate the upper and lower radius fillers flush with the end of the lug
assembly and clamp in place in accordance with Figure 1.
8. For each frame assembly: Match drill fastener holes in lower flange, upper flange and lower part
of the frame web through the stack-up using existing hole locations in the frame assemblies in
accordance with Figure 1.
NOTE: Take care not to oversize the existing hole.
9. For each frame assembly: Install 2 fasteners in lower flange and 1 in upper flange and 2 in the
lower part of the frame web in accordance with Figure 1. Note, there are two more existing holes
in the upper frame flange that will be used when the elevator tab control mechanism is reassembled.
10. For each frame assembly: Locate the spacers/retainers with the MIT002A0001-107 tool.
a. For the left frame assembly: Locate the retainers and clamp in place. Refer to the
MIT002A0001-107 tool use instructions as an accepted procedure.
b. For the right frame assembly: Locate the machined spacers and clamp in place. Refer to the
MIT002A0001-107 tool use instructions as an accepted procedure.
11. For each frame assembly: Drill holes through the spacer/retainer stack-up.
a. For the left frame assembly: Drill holes through the retainer stack-up. Refer to the
MIT002A0001-107 tool use instructions as an accepted procedure. Install double flush fasteners
in accordance with Figure 1.
b. For the right frame assembly: Drill holes through the machined spacer stack-up. Refer to the
MIT002A0001-107 tool use instructions as an accepted procedure. Install double flush fasteners
in accordance with Figure 1
12. Reassemble the elevator tab control mechanism. Refer to CMM 27-34-03 as an accepted procedure.
Use the fastener codes in accordance with Figure 1 for the replacement fasteners, otherwise reuse
the existing fasteners. Installation fasteners that are to be replaced are provided in kit
#002A0001-107.
13. Part mark the frame assemblies in accordance with Figure 1. On the right mechanism the
251A2431-11 frame becomes a 251A2431-18 frame and the 251A2431-12 becomes a
251A2431-16.
14. Part mark 251A2430-26 on the elevator tab control mechanism in accordance with Figure 1.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 16, 2012
737-27-1300
39 of 59
BOEING SERVICE BULLETIN 737-27-1300

### Page 40

NOTE: After installation of the actuator, part mark 251A2430-24 on the elevator tab control
mechanism in accordance with Figure 1
Component work, left elevator tab control mechanism
1. Disassemble the elevator tab control mechanism as required to get access to the left and right
frame assemblies. Refer to CMM 27-34-03 as an accepted procedure.
2. Remove the sheet metal lug (bracket) assemblies from the left and right frame assemblies. Refer
to CMM 27-34-03 as an accepted procedure.
3. For each frame assembly: Locate the frame assembly on the tool, using the 2 indicated holes in
the frame and make the cutout. Refer to the MIT002A0001-107 tool use instructions as an accepted
procedure.
4. For each frame assembly: Locate the new lug assembly onto the close tolerance pin. Refer to the
MIT002A0001-107 tool use instructions as an accepted procedure.
5. For each frame assembly: Locate the doubler at the lower flange and the shims at the upper and
lower flanges, between the lug assembly and the frame in accordance with Figure 2. Use the shims
to center the lug assemble in the frame.
6. For each frame assembly: Clamp the lug assembly against the web of the frame subassembly.
Refer to the MIT002A0001-107 tool use instructions as an accepted procedure.
7. For each frame assembly: Locate the upper and lower radius fillers flush with the end of the lug
assembly and clamp in place in accordance with Figure 2.
8. For each frame assembly: Match drill fastener holes in lower flange, upper flange and the lower
part of the frame web through the stack-up using existing hole locations in the frame assemblies
in accordance with Figure 2.
NOTE: Take care not to oversize the existing hole.
9. For each frame assembly: Install 2 fasteners in lower flange, 1 in upper flange and 2 in the lower
part of the frame web in accordance with Figure 2. Note, there are two more existing holes in the
upper frame flange that will be used when the elevator tab control mechanism is reassembled.
10. For each frame assembly: Locate the spacers/retainers with the MIT002A0001-107 tool.
a. For the left frame assembly: Locate the machined spacers and clamp in place. Refer to the
MIT002A0001-107 tool use instructions as an accepted procedure.
b. For the right frame assembly: Locate the retainers and clamp in place. Refer to the
MIT002A0001-107 tool use instructions as an accepted procedure.
11. For each frame assembly: Drill holes through the bearing retainer stack-up.
a. For the left frame assembly: Drill holes through the machined spacer stack-up. Refer to the
MIT002A0001-107 tool use instructions as an accepted procedure. Install double flush fasteners
in accordance with Figure 2.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 16, 2012
737-27-1300
40 of 59
BOEING SERVICE BULLETIN 737-27-1300

### Page 41

b. For the right frame assembly: Drill holes through the retainer stack-up. Refer to the
MIT002A0001-107 tool use instructions as an accepted procedure. Install double flush fasteners
in accordance with Figure 2.
12. Reassemble the elevator tab control mechanism. Refer to CMM 27-34-03 as an accepted procedure.
Use the fastener codes in accordance with Figure 2 for the replacement fasteners, otherwise reuse
the existing fasteners. Installation fasteners that are to be replaced are provided in kit
#002A0001-107.
13. Part mark the frame assemblies in accordance with Figure 2. On the left mechanism the
251A2431-11 frame becomes a 251A2431-15 frame and the 251A2431-12 becomes a
251A2431-17.
14. Part mark 251A2430-25 on the elevator tab control mechanism in accordance with Figure 2.
NOTE: After installation of the actuator, part mark 251A2430-23 on the elevator tab control
mechanism in accordance with Figure 2.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 16, 2012
737-27-1300
41 of 59
BOEING SERVICE BULLETIN 737-27-1300

### Page 42 (OCR)

BOEING SERVICE BULLETIN 737-27-1300
¡D, E
AA, K, Z, J  • D, E
J, X, L, AD
(2 LOCATIONS)
AB, H, AA, K
A-A  2106230
FIGURE 1: RIGHT SIDE, ELEVATOR TAB CONTROL MECHANISM MODIFICATION
(SHEET 1 OF 7)
Original Issue: April 16, 2012
Export Controlled ECCN: 9E991 - BOEING  PROPRIETARY - Copyright © Unpublished  737-27-1300
Work - See page 1 for details.  42 of 59

### Page 43 (OCR)

BOEING SERVICE BULLETIN 737-27-1300
O (2 LOCATIONS)
R (2 LOCATIONS)
(6) RETAINER
RETAINER 6
2106270
FIGURE 1: RIGHT SIDE, ELEVATOR TAB CONTROL MECHANISM MODIFICATION
(SHEET 2 OF 7)
Original Issue: April 16, 2012
PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  737-27-1300
Work - See page 1 for details.  43 of 59

### Page 44 (OCR)

BOEING SERVICE BULLETIN 737-27-1300
) SPACER
O (2 LOCATIONS)
Q (2 LOCATIONS)
SPACER 6
2113347
FIGURE 1: RIGHT SIDE, ELEVATOR TAB CONTROL MECHANISM MODIFICATION
(SHEET 3 OF 7)
Original Issue: April 16, 2012
Export Controlled ECCN: 9E991 - BOEING  PROPRIETARY - Copyright © Unpublished  737-27-1300
Work - See page 1 for details.  44 of 59

### Page 45 (OCR)

BOEING SERVICE BULLETIN 737-27-1300
C,F
C,
B-B
2106405
FIGURE 1: RIGHT SIDE, ELEVATOR TAB CONTROL MECHANISM MODIFICATION
(SHEET 4 OF 7)
Original Issue: April 16, 2012
PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  Work - See page 1 for details.  737-27-1300  45 of 59

### Page 46

More DataQtyIdentificationNameTaskStep
Install flush with
edge of lug as-
sembly. Shim
if/as required.
4BACS40R007Y020PSHIM, LAMINAT-
ED
Install (New)1
Install flush with
edge of lug as-
sembly.
2251A2455-10DOUBLER - TAB
MECHANISM,
ELEVATOR
CONTROLS
Install (New)2
Install flush with
edge of lug as-
sembly.
2251A2455-11RADIUS FILLER,
UPPER - TAB
MECHANISM,
ELEVATOR
CONTROLS
Install (New)3
Install flush with
edge of lug as-
sembly.
2251A2455-9RADIUS FILLER,
LOWER - TAB
MECHANISM,
ELEVATOR
CONTROLS
Install (New)
Match drill 5
holes each side.
(a)
10-Fastener HoleDrill4
(b)1251A2455-1LUG ASSY -
TAB MECHA-
NISM, ELEVA-
TOR CON-
TROLS
Install (New)5
Left frame assem-
bly
(b)1251A2455-2LUG ASSY -
TAB MECHA-
NISM, ELEVA-
TOR CON-
TROLS
Install (New)
Right frame as-
sembly
(a)2251A2455-7MACHINED
SPACER - TAB
MECHANISM,
ELEVATOR
CONTROLS
Install (New)6
Right frame as-
sembly
(a)2251A2455-8RETAINER -
TAB MECHA-
NISM, ELEVA-
TOR CONTROL
Install (New)
Left frame assem-
bly
FIGURE 1: RIGHT SIDE, ELEVATOR TAB CONTROL MECHANISM MODIFICATION
(SHEET 5 OF 7)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 16, 2012
737-27-1300
46 of 59
BOEING SERVICE BULLETIN 737-27-1300

### Page 47

More DataQtyIdentificationNameTaskStep
On the top of the
frame assem-
blies Part mark
251A2431-16
(right frame assy)
& 251A2431-18
(left frame assy)
on the
251A2430-26 ele-
vator tab control
mechanism. (c)
2-Part MarkIdentify7
On the bottom of
the elevator tab
control mecha-
nism part mark
251A2430-26. (c)
(d)
1-Part MarkIdentify
On the bottom of
the elevator tab
control mecha-
nism with actua-
tor installed part
mark 251A2430-
24. (c) (d)
1-Part MarkIdentify
(a) Touch-up fastener holes with Chemical Conversion Coating. Refer to SOPM 20-43-03 as an accepted
procedure.
(b) Wet install bolts with BMS 5-95. Refer to SOPM 20-50-19 as an accepted procedure.
(c) Rubber stamp part mark. Refer to SOPM 20-50-10 as an accepted procedure.
(d) Apply abrasive overcoat.
More DataHole DiaQtyIdentificationNameCode
Head far side-4BACB30FM5AK7BOLT, HEX DRIVEC
-4BACB30MB8A10BOLT, PROTRUDING
HD
D
-4BACC30BH8COLLARE
-4BACC30M5COLLARF
-1BACN10JC12CDSELF-LOCKING NUTH
-2BACN10JC5CDSELF-LOCKING NUTJ
-3BACN10JC7CDSELF-LOCKING NUTK
-2BACN10YR3CDNUTL
FIGURE 1: RIGHT SIDE, ELEVATOR TAB CONTROL MECHANISM MODIFICATION
(SHEET 6 OF 7)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 16, 2012
737-27-1300
47 of 59
BOEING SERVICE BULLETIN 737-27-1300

### Page 48

More DataHole DiaQtyIdentificationNameCode
Head near side-4BACR15FP5F3RRIVET, BLINDO
Head near side. Grip
length may need to be
adjusted depending on the
amount of shimming, if
any.
-2BACR15GF5D11RIVET, 100 DEGP
Head near side, double
flush
-2BACR15GF5D12RIVET, 100 DEGQ
Head near side, double
flush
-2BACR15GF5D9RIVET, 100 DEGR
-2NAS1149D0363JWASHER, FLATX
-2NAS1149D0563JWASHERZ
-3NAS1149D0763JWASHERAA
-1NAS1149D1290JWASHER, PLAINAB
-2BACW10P220SWASHERAD
FIGURE 1: RIGHT SIDE, ELEVATOR TAB CONTROL MECHANISM MODIFICATION
(SHEET 7 OF 7)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 16, 2012
737-27-1300
48 of 59
BOEING SERVICE BULLETIN 737-27-1300

### Page 49 (OCR)

BOEING SERVICE BULLETIN 737-27-1300
D,E\
D, E
AA, K, Z, J
J, X, L, AD
(2 LOCATIONS)
AB, H, AA, K
5 25
A-A  2106161
FIGURE 2: LEFT SIDE, ELEVATOR TAB CONTROL MECHANISM MODIFICATION
(SHEET 1 OF 7)
Original Issue: April 16, 2012
Export Controlled ECCN: 9E991 - BOEING  737-27-1300
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.  49 of 59

### Page 50 (OCR)

BOEING SERVICE BULLETIN 737-27-1300
O (2 LOCATIONS)
• Q (2 LOCATIONS)
6 SPACER
SPACER (6)
2113380
FIGURE 2: LEFT SIDE, ELEVATOR TAB CONTROL MECHANISM MODIFICATION
(SHEET 2 OF 7)
Original Issue: April 16, 2012
Export Controlled ECCN: 9E991 - BOEING  PROPRIETARY - Copyright © Unpublished  737-27-1300
Work - See page 1 for details.  50 of 59

### Page 51 (OCR)

BOEING SERVICE BULLETIN 737-27-1300
O (2 LOCATIONS)
R (2 LOCATIONS)
RETAINER
(6) RETAINER
2106385
FIGURE 2: LEFT SIDE, ELEVATOR TAB CONTROL MECHANISM MODIFICATION
(SHEET 3 OF 7)
Original Issue: April 16, 2012
PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  737-27-1300
Work - See page 1 for details.  51 of 59

### Page 52 (OCR)

BOEING SERVICE BULLETIN 737-27-1300
C,F
B-B
2107039
FIGURE 2: LEFT SIDE, ELEVATOR TAB CONTROL MECHANISM MODIFICATION
(SHEET 4 OF 7)
Original Issue: April 16, 2012
Export Controlled ECCN: 9E991 - BOEING  PROPRIETARY - Copyright © Unpublished  737-27-1300
Work - See page 1 for details.  52 of 59

### Page 53

More DataQtyIdentificationNameTaskStep
Install flush with
edge of lug as-
sembly. Shim
if/as required.
4BACS40R007Y020PSHIM, LAMINAT-
ED
Install (New)1
Install flush with
edge of lug as-
sembly.
2251A2455-10DOUBLER - TAB
MECHANISM,
ELEVATOR
CONTROLS
Install (New)2
Install flush with
edge of lug as-
sembly.
2251A2455-11RADIUS FILLER,
UPPER - TAB
MECHANISM,
ELEVATOR
CONTROLS
Install (New)3
Install flush with
edge of lug as-
sembly.
2251A2455-9RADIUS FILLER,
LOWER - TAB
MECHANISM,
ELEVATOR
CONTROLS
Install (New)
Match drill 5
holes each side.
(a)
10-Fastener HoleDrill4
(b)1251A2455-1LUG ASSY -
TAB MECHA-
NISM, ELEVA-
TOR CON-
TROLS
Install (New)5
Left frame assem-
bly
(b)1251A2455-2LUG ASSY -
TAB MECHA-
NISM, ELEVA-
TOR CON-
TROLS
Install (New)
Right frame as-
sembly
(a)2251A2455-7MACHINED
SPACER - TAB
MECHANISM,
ELEVATOR
CONTROLS
Install (New)6
Left frame assem-
bly
(a)2251A2455-8RETAINER -
TAB MECHA-
NISM, ELEVA-
TOR CONTROL
Install (New)
Right frame as-
sembly
FIGURE 2: LEFT SIDE, ELEVATOR TAB CONTROL MECHANISM MODIFICATION
(SHEET 5 OF 7)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 16, 2012
737-27-1300
53 of 59
BOEING SERVICE BULLETIN 737-27-1300

### Page 54

More DataQtyIdentificationNameTaskStep
On the top of the
frame assem-
blies Part mark
251A2431-15
(left frame assy)
& 251A2431-17
(right frame assy)
on the
251A2430-25 ele-
vator tab control
mechanism. (c)
2-Part MarkIdentify7
On the bottom of
the elevator tab
control mecha-
nism part mark
251A2430-25. (c)
(d)
1-Part MarkIdentify
On the bottom of
the elevator tab
control mecha-
nism with actua-
tor installed part
mark 251A2430-
23. (c) (d)
1-Part MarkIdentify
(a) Touch-up fastener holes with Chemical Conversion Coating. Refer to SOPM 20-43-03 as an accepted
procedure.
(b) Wet install bolts with BMS 5-95. Refer to SOPM 20-50-19 as an accepted procedure.
(c) Rubber stamp part mark. Refer to SOPM 20-50-10 as an accepted procedure.
(d) apply abrasive overcoat.
More DataHole DiaQtyIdentificationNameCode
Head far side-4BACB30FM5AK7BOLT, HEX DRIVEC
-4BACB30MB8A10BOLT, PROTRUDING
HD
D
-4BACC30BH8COLLARE
-4BACC30M5COLLARF
-1BACN10JC12CDSELF-LOCKING NUTH
-2BACN10JC5CDSELF-LOCKING NUTJ
-3BACN10JC7CDSELF-LOCKING NUTK
-2BACN10YR3CDNUTL
FIGURE 2: LEFT SIDE, ELEVATOR TAB CONTROL MECHANISM MODIFICATION
(SHEET 6 OF 7)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 16, 2012
737-27-1300
54 of 59
BOEING SERVICE BULLETIN 737-27-1300

### Page 55

More DataHole DiaQtyIdentificationNameCode
Head near side-4BACR15FP5F3RRIVET, BLINDO
Head near side. Grip
length may need to be
adjusted depending on the
amount of shimming, if
any.
-2BACR15GF5D11RIVET, 100 DEGP
Head near side, double
flush
-2BACR15GF5D12RIVET, 100 DEGQ
Head near side, double
flush
-2BACR15GF5D9RIVET, 100 DEGR
-2NAS1149D0363JWASHER, FLATX
-2NAS1149D0563JWASHERZ
-3NAS1149D0763JWASHERAA
-1NAS1149D1290JWASHER, PLAINAB
-2BACW10P220SWASHERAD
FIGURE 2: LEFT SIDE, ELEVATOR TAB CONTROL MECHANISM MODIFICATION
(SHEET 7 OF 7)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 16, 2012
737-27-1300
55 of 59
BOEING SERVICE BULLETIN 737-27-1300

### Page 56 (OCR)

BOEING SERVICE BULLETIN 737-27-1300
AC, L, X
J. Z
U, Z, G
S, W
• M, v
A, L, X
- B, L, X
- -
M, V, N  2113175
FIGURE 3: RIGHT SIDE, ELEVATOR TAB CONTROL MECHANISM INSTALLATION
(SHEET 1 OF 2)
Original Issue: April 16, 2012
Export Controlled ECCN: 9E991 - BOEING  PROPRIETARY - Copyright © Unpublished  737-27-1300
Work - See page 1 for details.  56 of 59

### Page 57

More DataQtyIdentificationNameTaskStep
Use the parts/fasten-
ers at the locations
shown to replace the
existing parts/fasten-
ers. All other
parts/fasteners are
to be reused for in-
stallation. (a)
1-Elevator Tab Control
Mechanism
Install (Changed)1
(a) Refer to 737-600/700/800/900 AMM 27-31-34 as an accepted procedure.
More DataHole DiaQtyIdentificationNameCode
(a)-1251A2445-4PIN ASSY - DUAL
LOAD PATH, TAB
MECHANISM, ELEVA-
TOR CONTROL
A
(a)-1251A2445-5PIN ASSY - DUAL
LOAD PATH, TAB
MECHANISM, ELEVA-
TOR CONTROL
B
-1BACN10HR5CDNUTG
-1BACN10JC4CDNUT,SELF-LOCKINGI
-2BACN10JC5CDSELF-LOCKING NUTJ
-4BACN10YR3CDNUTL
-4BACN10YR4CDNUTM
-2BACP18BC02A12PPIN, COTTERN
-2BACS12GU3K7SCREW, CAPS
-1BACW10BP5CDCSK WASHERU
-4BACW10P475CGWASHER, FLATV
-2NAS1149D0332JWASHERW
-4NAS1149D0363JWASHER, FLATX
-1NAS1149D0463JWASHERY
-3NAS1149D0563JWASHERZ
(a)-2NAS75-5-021BUSHINGAC
(a) Apply BMS3-28 anti-seize compound to the OD of the fastener or bushing prior to installation. Refer to
SOPM 20-50-07 as an acceptable procedure.
FIGURE 3: RIGHT SIDE, ELEVATOR TAB CONTROL MECHANISM INSTALLATION
(SHEET 2 OF 2)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 16, 2012
737-27-1300
57 of 59
BOEING SERVICE BULLETIN 737-27-1300

### Page 58 (OCR)

BOEING SERVICE BULLETIN 737-27-1300
AC, L, X
J, Z
• U,Z, G
S, W
B, L, X
M, V, N  2113170
FIGURE 4: LEFT SIDE, ELEVATOR TAB CONTROL MECHANISM INSTALLATION
(SHEET 1 OF 2)
Original Issue: April 16, 2012
Export Controlled ECCN: 9E991 - BOEING  PROPRIETARY - Copyright © Unpublished  737-27-1300
Work - See page 1 for details.  58 of 59

### Page 59

More DataQtyIdentificationNameTaskStep
Use the parts/fasten-
ers at the locations
shown to replace the
existing parts/fasten-
ers. All other
parts/fasteners are
to be reused for in-
stallation. (a)
1-Elevator Tab Control
Mechanism
Install (Changed)1
(a) Refer to 737-600/700/800/900 AMM 27-31-34 as an accepted procedure.
More DataHole DiaQtyIdentificationNameCode
(a)-1251A2445-4PIN ASSY - DUAL
LOAD PATH, TAB
MECHANISM, ELEVA-
TOR CONTROL
A
(a)-1251A2445-5PIN ASSY - DUAL
LOAD PATH, TAB
MECHANISM, ELEVA-
TOR CONTROL
B
-1BACN10HR5CDNUTG
-1BACN10JC4CDNUT,SELF-LOCKINGI
-2BACN10JC5CDSELF-LOCKING NUTJ
-4BACN10YR3CDNUTL
-4BACN10YR4CDNUTM
-2BACP18BC02A12PPIN, COTTERN
-2BACS12GU3K7SCREW, CAPS
-1BACW10BP5CDCSK WASHERU
-4BACW10P475CGWASHER, FLATV
-2NAS1149D0332JWASHERW
-4NAS1149D0363JWASHER, FLATX
-1NAS1149D0463JWASHERY
-3NAS1149D0563JWASHERZ
(a)-2NAS75-5-021BUSHINGAC
(a) Apply BMS3-28 anti-seize compound to the OD of the fastener or bushing prior to installation. Refer to
SOPM 20-50-07 as an acceptable procedure.
FIGURE 4: LEFT SIDE, ELEVATOR TAB CONTROL MECHANISM INSTALLATION
(SHEET 2 OF 2)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 16, 2012
737-27-1300
59 of 59
BOEING SERVICE BULLETIN 737-27-1300

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
