# Boeing Special Attention Service Bulletin 737-28-1303: No revision named

- Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2012-0860; AD 2013-04-11 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Boeing Special Attention Service Bulletin 737-28-1303](https://openairdocs.org/service-documents/boeing/sb-737-28-1303.md)
- Title as filed: U.S. DOT/FAA - Service Information
- Pages: 33
- PDF: https://openairdocs.org/files/sha256/4b/b0/4bb0287e8845d4360d480c02eea1e45cd316f338815b0417f15b9ba72913a6d9
- Page: https://openairdocs.org/service-documents/boeing/sb-737-28-1303/file/4bb0287e8845

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Commercial 
Airplanes
737
Service Bulletin
SPECIAL ATTENTION
Number: 737-28-1303
Original Issue: April 26, 2012
ATA System: 2800
SUBJECT: FUEL - General - Left Environmental Control Systems Bay Wire Clamp - Inspection
and Replacement
Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15
CFR 300-774). An export license may be required before it is used for development, production or use by foreign
persons from specific countries. The controller of this data has the individual responsibility to abide by all export
laws.
9E991ECCN:
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET
Copyright © 2012 Boeing.
Unpublished Work. All Rights Reserved.
Treatment of this document and its content is governed by contract with Boeing. Rights to use this document
are licensed on a per aircraft basis and such rights may not be transferable. For more information, contact The
Boeing Company.
Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner™,
BBJ, DC-8, DC-9, DC-10, KC-10, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8A, Poseidon and Boeing
liveries are all trademarks owned by The Boeing Company; and no trademark license is granted in connection
with this document unless provided in writing by Boeing. BOEING is a trademark of Boeing Management
Company.
Original Issue: April 26, 2012
737-28-1303
1 of 33
9.0

### Page 2

Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 26, 2012
737-28-1303
2 of 33
BOEING SERVICE BULLETIN 737-28-1303
BLANK PAGE

### Page 3

Table of Contents
Summary ...................................................... 5
1. PLANNING INFORMATION ........................................ 9
A. Effectivity ................................................ 9
1. Airplanes ............................................. 9
2. Spares Affected ........................................ 1 4
B. Concurrent Requirements ...................................... 1 4
C. Reason ................................................ 1 4
D. Description .............................................. 1 5
E. Compliance .............................................. 1 5
F. Approval ............................................... 1 5
G. Manpower .............................................. 1 6
H. Weight and Balance Changes .................................... 1 7
I. Electrical Load Data ......................................... 1 7
J. References .............................................. 1 7
1. Existing Data: ......................................... 1 7
2. Data Supplied with this Service Bulletin: ........................... 1 7
3. Installation Drawings Used in the Preparation of this Service Bulletin: ........... 1 7
K. Publications Affected ........................................ 1 7
L. Interchangeability and Intermixability of Parts ........................... 1 7
M. Software Accomplishment Summary ................................ 1 8
2. MATERIAL INFORMATION ........................................ 1 9
A. Material - Price and Availability ................................... 1 9
B. Industry Support Information .................................... 1 9
C. Parts Necessary for Each Airplane ................................. 1 9
1. Kits/Parts ............................................ 1 9
2. Parts and Materials Supplied by the Operator ........................ 1 9
3. Parts Modified and Reidentified ................................ 2 0
4. Parts Removed and Not Replaced .............................. 2 0
D. Parts Necessary to Change Spares ................................. 2 0
E. Special Tooling - Price and Availability ............................... 2 0
F. Special Tooling Necessary to do this Service Bulletin ....................... 2 0
3. ACCOMPLISHMENT INSTRUCTIONS .................................. 2 1
A. GENERAL INFORMATION ..................................... 2 1
B. WORK INSTRUCTIONS ....................................... 2 2
FIGURE 1: LEFT SIDE - ENVIRONMENTAL CONTROL SYSTEMS (ECS) BAY - WIRE CLAMP -
INSPECTION [Group 1] .................................... 2 3
FIGURE 2: LEFT SIDE - ENVIRONMENTAL CONTROL SYSTEMS (ECS) BAY - WIRE CLAMP -
INSPECTION [Group 2] .................................... 2 6
FIGURE 3: LEFT SIDE - ENVIRONMENTAL CONTROL SYSTEMS (ECS) BAY - WIRE CLAMP -
REPLACEMENT [Group 1] .................................. 2 9
FIGURE 4: LEFT SIDE - ENVIRONMENTAL CONTROL SYSTEMS (ECS) BAY - WIRE CLAMP -
REPLACEMENT [Group 2] .................................. 3 2
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 26, 2012
737-28-1303
3 of 33
BOEING SERVICE BULLETIN 737-28-1303

### Page 4

Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 26, 2012
737-28-1303
4 of 33
BOEING SERVICE BULLETIN 737-28-1303
BLANK PAGE

### Page 5

Commercial 
Airplanes
737
Service Bulletin
SPECIAL ATTENTION
SummaryNumber: 737-28-1303Original Issue: April 26, 2012
ATA System: 2800
SUBJECT: FUEL - General - Left Environmental Control Systems Bay Wire Clamp - Inspection
and Replacement
BOEING RECOMMENDS THAT EACH OPERATOR EXAMINE THIS SERVICE BULLETIN IMMEDIATELY.
CONCURRENT REQUIREMENTS
None.
BACKGROUND
This service bulletin gives instructions to inspect and replace incorrect wire bundle clamp(s) installed on a wire
bundle in the left Environmental Control Systems (ECS) bay. A fully cushioned clamp should be installed to
prevent potential conductor to clamp short circuits. If this service bulletin is not done, conductor to clamp short
circuits could produce arcing from a hot short and introduce a potential ignition source in the center wing tank
and a subsequent fire or explosion.
During a drawing review, Boeing found that some callouts for the fully cushioned wire bundle clamp were
accidentally left out from the production drawings in the left ECS bay. This could lead to the installation of an
incorrect clamp. It was found that the incorrect clamp could be installed at two locations on 737-600 and -700
airplanes and one location on 737-800 and 900ER airplanes. The clamp(s) that should have been installed are
fully cushioned and part of the Special Federal Aviation Regulation (SFAR) 88 requirement. The production
drawings have now been corrected and airplane line number 3488 and subsequent have the correct clamp(s)
installed. Boeing initiated this service bulletin to address this condition.
Accomplishment of this service bulletin replaces incorrect wire bundle clamp(s) installed in the left ECS bay with
fully cushioned clamp(s). Installation of fully cushioned clamp(s) will prevent an electrical fault current paths to
the center wing tank caused by wiring hot shorts.
Boeing Service Related Problem (SRP) 737-SRP-28-0136 is related to this service bulletin.
Boeing Fleet Team Digest (FTD) 737NG-FTD-28-11001 is related to this service bulletin.
This table is provided to operators for planning purposes only. Refer to the applicable sections for more
information.
ReferenceAffectedPlanning Data
Paragraph 1.A.2., Spares AffectedNoSpares Affected
Paragraph 1.E., ComplianceNoAD Related
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 26, 2012
737-28-1303
5 of 33

### Page 6

ReferenceAffectedPlanning Data
Paragraph 1.H., Weight and Balance ChangesNoWeight and Balance Change
Paragraph 1.I., Electrical Load DataNoElectrical Load Changed
Paragraph 1.K., Publications AffectedNoPublications Affected
Paragraph 1.K., Publications AffectedNoAirplane Flight Operations Affected (Flight Crew
Operations Manual and/or FAA Approved Air-
plane Flight Manual)
Paragraph 2.C.1., Kits/PartsNoKits/Parts Required
Paragraph 2.C.2., Parts and Materials Supplied
by the Operator
YesOperator Supplied Material
Paragraph 2.F., Special Tooling Necessary to
do this Service Bulletin
NoSpecial Tooling Required
ACTION
Get access to the left side ECS bay by opening the ECS bay access door 192CL. Do a Detailed Inspection of
the wire clamp installed at specified location(s). If TA0930034-10 clamp has not been installed, remove the
clamp and install a TA0930034-10 fully cushioned wire clamp. Close left side ECS bay access door 192CL.
EFFECTIVITY
737-600/-700/-800/-900ER Airplane(s). Refer to Paragraph 1.A.1., Airplanes, for the list of affected airplane(s).
COMPLIANCE
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to this service
bulletin. The Airworthiness Directive will make the compliance tasks and times given in this service bulletin
mandatory.
Boeing recommends that the inspection and change given in this service bulletin be done within 60 months after
the original issue date of this service bulletin.
INDUSTRY SUPPORT INFORMATION
Boeing warranty remedies are available for airplanes in warranty as of June 02, 2011. Please refer to Paragraph
2.B., Industry Support Information.
MANPOWER
Refer to Paragraph 1.G., Manpower.
MATERIAL INFORMATION
Operator Supplied Parts/Materials.
Refer to Paragraph 2.A., Material - Price and Availability.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 26, 2012
737-28-1303
6 of 33
BOEING SERVICE BULLETIN 737-28-1303

### Page 7 (OCR)

BOEING SERVICE BULLETIN 737-28-1303
STA
588.0
STA
654.0
A ECS BAY
LEFT SIDE
STA 654.0
LBL 4.0
WIRE BUNDLES  STRINGER 1
STRINGER 3
LBL 42.0
STRINGER 5
STRINGER 7
GROUP 2 AIRPLANES:
DO A DETAILED INSPECTION  STRINGER 9
OF THE WIRE BUNDLE IN THE
LEFT ECS BAY FOR
INCORRECT CLAMP
INSTALLATION AT THE
LOCATION SHOWN. REPLACE
INCORRECT CLAMP.
GROUP 1 AIRPLANES:
DO A DETAILED INSPECTION OF
THE WIRE BUNDLE IN THE LEFT
ECS BAY FOR INCORRECT
CLAMP INSTALLATION AT THE
TWO LOCATIONS SHOWN.
REPLACE INCORRECT CLAMPS.
2110627
Original Issue: April 26, 2012
Export Controlled ECCN: 9E991 - BOEING  737-28-1303
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.  7 of 33

### Page 8

Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 26, 2012
737-28-1303
8 of 33
BOEING SERVICE BULLETIN 737-28-1303
BLANK PAGE

### Page 9

Commercial 
Airplanes
737
Service Bulletin
SPECIAL ATTENTION
Number: 737-28-1303
Original Issue: April 26, 2012
ATA System: 2800
SUBJECT: FUEL - General - Left Environmental Control Systems Bay Wire Clamp - Inspection
and Replacement
BOEING RECOMMENDS THAT EACH OPERATOR EXAMINE THIS SERVICE BULLETIN IMMEDIATELY.
1.    PLANNING INFORMATION
A. Effectivity
1. Airplanes
This service bulletin is for the airplane(s) shown below.
Refer to Service Bulletin Index D6-19567 Part 3 for Airplane Variable Number, Line Number, and
Serial Number data.
DESCRIPTIONCONFIGURATIONGROUP
737-600/-700 airplanes, line numbers 1820 thru 3487 that could have
two incorrect wire bundle clamps installed.
-1
737-800/-900ER airplanes, line numbers 2007 thru 2040 and 2621
thru 3222 that could have one incorrect wire bundle clamp installed.
-2
Airplane Models:
737-600, 737-700, 737-800, 737-900ER
GroupVariable Number
1YA977 - YA978
1YB384 - YB392
1YB575
1YB578 - YB580
1YB592 - YB598
1YB633 - YB635
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 26, 2012
737-28-1303
9 of 33

### Page 10

GroupVariable Number
1YB671 - YB672
1YB889 - YB893
1YB964 - YB974
1YB986 - YB996
2YC095
2YC743
2YD415 - YD416
1YE374 - YE383
2YF001 - YF006
2YF023 - YF039
2YF046
2YF052 - YF060
2YF086
2YF112 - YF114
2YF116 - YF117
2YF121 - YF122
2YF191 - YF192
2YF201 - YF241
2YF401 - YF402
2YF451 - YF454
2YF501 - YF570
2YF701 - YF705
2YF801
2YF831 - YF832
2YF901 - YF902
1YG094 - YG099
1YG101 - YG103
1YG111 - YG114
1YG116 - YG128
1YG203 - YG205
1YG212 - YG214
1YG221 - YG224
1YG251 - YG252
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 26, 2012
737-28-1303
10 of 33
BOEING SERVICE BULLETIN 737-28-1303

### Page 11

GroupVariable Number
2YH011 - YH012
2YH031 - YH047
2YH054 - YH055
2YH111 - YH130
2YH207
2YH301 - YH305
2YH321 - YH322
2YJ006
2YJ010
2YJ554 - YJ556
2YJ565 - YJ575
2YJ597 - YJ599
2YJ874 - YJ880
2YJ909 - YJ910
2YK133
2YK176 - YK177
2YK186
2YK191
2YK196
2YK201 - YK202
2YK310 - YK312
2YK333
2YK338 - YK340
2YK375 - YK378
2YK437 - YK439
2YK461 - YK465
2YK471
2YK486 - YK487
2YK496 - YK497
2YK521 - YK529
2YK563 - YK565
2YK567 - YK570
2YK576
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 26, 2012
737-28-1303
11 of 33
BOEING SERVICE BULLETIN 737-28-1303

### Page 12

GroupVariable Number
2YK580
2YK615 - YK616
2YK626 - YK630
2YK632
2YK661 - YK664
2YK671 - YK672
2YK676 - YK677
2YK681 - YK686
2YK691
2YK713
2YK722 - YK723
2YK759 - YK770
2YK776 - YK778
2YK885 - YK899
2YK911 - YK912
2YK919
2YK952 - YK956
2YK961
2YK972 - YK980
2YK985 - YK992
2YL005
2YL115 - YL130
2YL208 - YL218
2YL283 - YL284
2YL320 - YL321
2YL351 - YL353
2YL374
2YL401
2YL427 - YL429
2YL438 - YL444
2YL473 - YL478
2YL506 - YL509
2YL534
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 26, 2012
737-28-1303
12 of 33
BOEING SERVICE BULLETIN 737-28-1303

### Page 13

GroupVariable Number
2YL541 - YL544
2YL562 - YL568
2YL592
2YL611 - YL612
2YL616 - YL617
2YL621
2YL626
2YL631 - YL633
2YL662 - YL664
2YL676 - YL681
2YL691
2YL701 - YL702
2YL731
2YL751 - YL752
2YL761 - YL769
2YL801 - YL809
2YL905 - YL910
2YL921 - YL930
2YL933 - YL936
2YL951 - YL960
1YM206 - YM242
1YM273 - YM299
1YM301 - YM397
1YM506 - YM515
1YM553
1YM581 - YM582
1YM591 - YM599
1YM631 - YM634
1YM641 - YM652
1YM671 - YM674
1YM691 - YM698
1YM701 - YM710
1YM761 - YM765
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 26, 2012
737-28-1303
13 of 33
BOEING SERVICE BULLETIN 737-28-1303

### Page 14

GroupVariable Number
1YN002 - YN016
1YN021 - YN024
1YN061
1YN071 - YN082
1YN091 - YN092
1YN101 - YN112
1YN121
1YN201 - YN202
1YN211 - YN219
1YN231 - YN235
1YN261
2YQ001 - YQ003
2YQ011
2. Spares Affected
None.
B. Concurrent Requirements
None.
C. Reason
This service bulletin gives instructions to inspect and replace incorrect wire bundle clamp(s) installed
on a wire bundle in the left Environmental Control Systems (ECS) bay. A fully cushioned clamp should
be installed to prevent potential conductor to clamp short circuits. If this service bulletin is not done,
conductor to clamp short circuits could produce arcing from a hot short and introduce a potential ignition
source in the center wing tank and a subsequent fire or explosion.
During a drawing review, Boeing found that some callouts for the fully cushioned wire bundle clamp
were accidentally left out from the production drawings in the left ECS bay. This could lead to the
installation of an incorrect clamp. It was found that the incorrect clamp could be installed at two locations
on 737-600 and -700 airplanes and one location on 737-800 and 900ER airplanes. The clamp(s) that
should have been installed are fully cushioned and part of the Special Federal Aviation Regulation
(SFAR) 88 requirement. The production drawings have now been corrected and airplane line number
3488 and subsequent have the correct clamp(s) installed. Boeing initiated this service bulletin to address
this condition.
Accomplishment of this service bulletin replaces incorrect wire bundle clamp(s) installed in the left ECS
bay with fully cushioned clamp(s). Installation of fully cushioned clamp(s) will prevent an electrical fault
current paths to the center wing tank caused by wiring hot shorts.
Boeing Service Related Problem (SRP) 737-SRP-28-0136 is related to this service bulletin.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 26, 2012
737-28-1303
14 of 33
BOEING SERVICE BULLETIN 737-28-1303

### Page 15

Boeing Fleet Team Digest (FTD) 737NG-FTD-28-11001 is related to this service bulletin.
D. Description
Get access to the left side ECS bay by opening the ECS bay access door 192CL. Do a Detailed
Inspection of the wire clamp installed at specified location(s). If TA0930034-10 clamp has not been
installed, remove the clamp and install a TA0930034-10 fully cushioned wire clamp. Close left side
ECS bay access door 192CL.
The work in this service bulletin is done in the maintenance zone(s) given below.
Group 1:
Affected Maintenance Zones
ZoneModel
192737-600, 737-700
Group 2:
Affected Maintenance Zones
ZoneModel
192737-800, 737-900ER
E. Compliance
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to
this service bulletin. The Airworthiness Directive will make the compliance tasks and times given in this
service bulletin mandatory.
Boeing recommends that the inspection and change given in this service bulletin be done within 60
months after the original issue date of this service bulletin.
F. Approval
This service bulletin was examined by the Federal Aviation Administration (FAA). The changes specified
in this service bulletin comply with the applicable regulations and are FAA approved, as well as European
Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/JAA approved
airplanes listed in the service bulletin effectivity. This service bulletin and its approval were based on
the airplane in its original Boeing delivery configuration or as modified by other approved Boeing
changes.
If an airplane has a non-Boeing modification or repair that affects a component or system also affected
by this service bulletin, the operator is responsible for obtaining appropriate regulatory agency approval
before incorporating this service bulletin.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 26, 2012
737-28-1303
15 of 33
BOEING SERVICE BULLETIN 737-28-1303

### Page 16

G. Manpower
The table below shows an estimate of the task hours necessary to do this inspection for each airplane.
This estimate is for direct labor only, done by an experienced crew. Adjust the estimate with operator
task hour data if necessary. The estimate does not include lost time. These are some examples of lost
time:
 Time to adjust to the workplace
 Time to schedule the work
 Time to inspect the work
 Time to cure the materials
 Time to make the parts
 Time to find the tools.
Group 1:
Elapsed HoursTask HoursNumber of PersonsTask
0.500.501Open Access
0.300.301FIGURE 1
2.004.002Left Side Primary
Heat Exchanger Re-
moval
0.400.401FIGURE 3 (a)
2.004.002Left Side Primary
Heat Exchanger In-
stallation
0.500.501Close Access
5.309.30TOTAL FOR EACH AIRPLANE (b)
(a) Estimate does not include time for repair if damage to the wire bundle is found.
(b) Estimate is based on correct installation of all wire clamps.
Group 2:
Elapsed HoursTask HoursNumber of PersonsTask
0.500.501Open Access
0.150.151FIGURE 2
0.400.401FIGURE 4 (a)
0.500.501Close Access
1.151.15TOTAL FOR EACH AIRPLANE (b)
(a) Estimate does not include time for repair if damage to the wire bundle is found.
(b) Estimate is based on correct installation of all wire clamps.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 26, 2012
737-28-1303
16 of 33
BOEING SERVICE BULLETIN 737-28-1303

### Page 17

H. Weight and Balance Changes
None.
I. Electrical Load Data
Not changed.
J. References
1. Existing Data:
a. Service Bulletin Index D6-19567
b. Standard Wiring Practices Manual (SWPM) 20-10-11, 20-10-12, 20-10-13, 20-10-19
c. 737-600/700/800/900 Aircraft Maintenance Manual (AMM) 06-41-00, 21-51-03
d. Service Related Problem (SRP) 737-SRP-28-0136
e. Fleet Team Digest (FTD) 737-FTD-28-11001
2. Data Supplied with this Service Bulletin:
None.
3. Installation Drawings Used in the Preparation of this Service Bulletin:
TitleDrawing Number
Wire Bundle Instl - Left, A/C Pack Bay and Wing to Body Fairing288A1139
The table above lists applicable drawings used to prepare this service bulletin. The drawings are
not necessary to make the specified changes, and are not supplied with this service bulletin. The
drawings may not be applicable to all airplane configurations or operators.
K. Publications Affected
1. Publications:
None.
2. Damage Tolerance Based Structural Inspections:
Boeing has evaluated the repairs and/or changes in this service bulletin for effects on Fatigue
Critical Structure (FCS) and for changes to Damage Tolerance Inspections (DTI) required in the
Maintenance Program. This service bulletin does not affect FCS, therefore DTIs are not necessary.
L. Interchangeability and Intermixability of Parts
Accomplishment of this service bulletin does not affect interchangeability or intermixability of parts.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 26, 2012
737-28-1303
17 of 33
BOEING SERVICE BULLETIN 737-28-1303

### Page 18

M. Software Accomplishment Summary
Not affected.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 26, 2012
737-28-1303
18 of 33
BOEING SERVICE BULLETIN 737-28-1303

### Page 19

2.    MATERIAL INFORMATION
A. Material - Price and Availability
The operator can supply the parts and materials shown in Paragraph 2.C., Parts Necessary for Each
Airplane,. As an alternative, operators can purchase the parts from Boeing Spares. This service bulletin
does not show the Boeing price and supply data.
B. Industry Support Information
Boeing warranty remedies are available for 737-600/700/800/900ER airplanes in warranty as of June
02, 2011. For inspection man hour reimbursement for airplanes in warranty as of that date, send a
warranty claim to Boeing Commercial Airplanes Group - Warranties. If the condition described in this
service bulletin is found during the inspection for airplanes in warranty as of that date and additional
man hours and kits, parts, and/or special tools are required, send a warranty claim to Boeing Commercial
Airplanes Group - Warranties. Please refer to this service bulletin number and reference the airplane
variable number(s) in your purchase order.
C. Parts Necessary for Each Airplane
1. Kits/Parts
None
2. Parts and Materials Supplied by the Operator
Group 1:
NotesNameQTYPart Number /
Specification
(a) (b)Saddle Clamp2TA0930034-10
(a) The Quantity shown is the maximum amount that may be necessary if the inspection
shows incorrect clamp installation.
(b) Can be procured from TA Aerospace, Kirkhill-TA Division of Esterline Technologies
Corporation, (84971), 28065 Franklin Parkway, Valencia, California, 91380-9031.
Group 2:
NotesNameQTYPart Number /
Specification
(a) (b)Saddle Clamp1TA0930034-10
(a) The Quantity shown is the maximum amount that may be necessary if the inspection
shows incorrect clamp installation.
(b) Can be procured from TA Aerospace, Kirkhill-TA Division of Esterline Technologies
Corporation, (84971), 28065 Franklin Parkway, Valencia, California, 91380-9031.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 26, 2012
737-28-1303
19 of 33
BOEING SERVICE BULLETIN 737-28-1303

### Page 20

3. Parts Modified and Reidentified
None
4. Parts Removed and Not Replaced
None
D. Parts Necessary to Change Spares
None.
E. Special Tooling - Price and Availability
None.
F. Special Tooling Necessary to do this Service Bulletin
No special tools or equipment are necessary to do the change in this service bulletin. But, maintenance
and overhaul tools in the manuals given in Paragraph 1.J., References, can be necessary. Examine
operator tool supply to make sure all necessary tools are available.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 26, 2012
737-28-1303
20 of 33
BOEING SERVICE BULLETIN 737-28-1303

### Page 21

3.    ACCOMPLISHMENT INSTRUCTIONS
A. GENERAL INFORMATION
CAUTION: KEEP THE WORK AREA, WIRES AND ELECTRICAL BUNDLES CLEAN OF METAL
PARTICLES OR CONTAMINATION WHEN YOU USE TOOLS. UNWANTED MATERIAL,
METAL PARTICLES OR CONTAMINATION CAUGHT IN WIRE BUNDLES CAN CAUSE
DAMAGE TO THE BUNDLES. DAMAGED WIRE BUNDLES CAN CAUSE SPARKS OR
OTHER ELECTRICAL DAMAGE.
NOTE: 1. Manual titles are referred to by acronyms. Refer to Paragraph 1.J., References, for
definition of the acronyms.
2. Obey all of the warnings and cautions given in the specified manual sections.
3. Use the approved fastener and process material substitutions in accordance with
SRM Chapter 51.
4. Refer to the SWPM 20-10-11 and SWPM 20-10-12 for the wire installation procedures,
and SWPM 20-10-19 for the wire separation requirements, as accepted procedures.
5. If the length of any fastener specified in this service bulletin does not meet installation
standards given in SRM Chapter 51, then a fastener of the same specification, or
an approved substitute, with a length which meets the installation standards given
in SRM Chapter 51 may be used. In addition, washers may be installed for fastener
grip length in accordance with SRM Chapter 51.
6. A Detailed Inspection is defined as: An intensive examination of a specific item,
installation, or assembly to detect damage, failure, or irregularity. Available lighting
is normally supplemented with a direct source of good lighting at an intensity deemed
appropriate. Inspection aids such as mirrors, magnifying lenses, etc. may be
necessary. Surface cleaning and elaborate procedures may be required.
7. These work instructions refer to procedures included in other Boeing documents.
When the words "refer to" are used and the operator has an accepted alternative
procedure, the accepted alternative procedure can be used. When the words "in
accordance with" are included in the instruction, the procedure in the Boeing document
must be used.
8. The instructions in Paragraph 3.B., Work Instructions and the figures can include
operation of tools or test equipment. Boeing Engineering Tool Drawings, the Illustrated
Tool and Equipment Manual, and the Special Tool and Ground Handling Drawing
Index contain data on versions of the tools or test equipment that you can use. It is
permitted to use replaced tools. It is not permitted to use superseded tools.
9. If it is necessary to remove more parts for access, you can remove those parts. If
you can get access without removing identified parts, it is not necessary to remove
all of the identified parts. Jacking and shoring limitations must be observed.
10. Where the work instructions include installation of a kept part, a new or serviceable
part with the same part number can be installed as an alternative to the kept part.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 26, 2012
737-28-1303
21 of 33
BOEING SERVICE BULLETIN 737-28-1303

### Page 22

B. WORK INSTRUCTIONS
1. Get access to the left side ECS bay by opening ECS bay access door 192CL. Refer to
737-600/700/800/900 AMM 06-41-00 as an accepted procedure.
2. Group 1:
Remove the primary heat exchanger to get access to the wire clamps. Refer to 737-600/700/800/900
AMM 21-51-03 as an accepted procedure.
3. Do a Detailed Inspection of the wire bundle to make sure that TA0930034-10 wire clamps are
installed in accordance with FIGURE 1 or FIGURE 2:
a. Group 1:
In accordance with FIGURE 1.
(1) If the installed wire clamps are not TA0930034-10, replace wire clamp installation in
accordance with FIGURE 3.
(2) If the installed wire clamps are TA0930034-10, no more work is necessary.
b. Group 2:
In accordance with FIGURE 2.
(1) If the installed wire clamp is not TA0930034-10, replace wire clamp installation in
accordance with FIGURE 4.
(2) If the installed wire clamp is TA0930034-10, no more work is necessary.
4. Group 1:
Install the primary heat exchanger. Refer to 737-600/700/800/900 AMM 21-51-03 as an accepted
procedure.
5. Close the left side ECS bay access door 192CL. Refer to 737-600/700/800/900 AMM 06-41-00
as an accepted procedure.
6. Put the airplane back in a serviceable condition.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 26, 2012
737-28-1303
22 of 33
BOEING SERVICE BULLETIN 737-28-1303

### Page 23 (OCR)

BOEING SERVICE BULLETIN 737-28-1303
This Figure applies only to: Group 1.
STA
654  STA
588
STA
654
STRINGER 1  A ECS BAY  LEFT SIDE
LBL 4
WIRE
BUNDLES  STRINGER 3
STRINGER 5
STRINGER 7
STRINGER 9
/ STRINGER  10
CLAMP 1L  C
CLAMP 2L
AC PACK NOT SHOWN FOR CLARITY  2110631
FIGURE 1: LEFT SIDE - ENVIRONMENTAL CONTROL SYSTEMS (ECS) BAY - WIRE CLAMP - INSPECTION
(SHEET 1 OF 3)
Original Issue: April 26, 2012
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.  23 of 33

### Page 24 (OCR)

BOEING SERVICE BULLETIN 737-28-1303
HYDRAULIC  HYDRAULIC
TUBES  TUBES
SADDLE
SADDLE  CLAMP
CLAMP
CLAMP 1L  CLAMP 2L
TYPICAL INSTALLATION  TYPICAL INSTALLATION
FLANGED CUSHION
2 LOCATIONS
TYPICAL CORRECT  D-D  2110634
CLAMP INSTALLATION
FIGURE 1: LEFT SIDE - ENVIRONMENTAL CONTROL SYSTEMS (ECS) BAY - WIRE CLAMP - INSPECTION
(SHEET 2 OF 3)
Original Issue: April 26, 2012
Export Controlled ECCN: 9E991 - BOEING  PROPRIETARY - Copyright © Unpublished  737-28-1303
Work - See page 1 for details.  24 of 33

### Page 25

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for this figure.
More DataQtyIdentificationNameTaskStep
(a)2-ClampInspect1
(a) Do a Detailed Inspection of the clamp to make sure that the flanged cushions completely surrounds the
two metal strap sections of the clamp. Inspect to make sure that the P/N of the clamp installed is a
TA0930034-10 clamp.
FIGURE 1: LEFT SIDE - ENVIRONMENTAL CONTROL SYSTEMS (ECS) BAY - WIRE CLAMP - INSPECTION
(SHEET 3 OF 3)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 26, 2012
737-28-1303
25 of 33
BOEING SERVICE BULLETIN 737-28-1303

### Page 26 (OCR)

BOEING SERVICE BULLETIN 737-28-1303
This Figure applies only to: Group 2.
STA
654  STA
588
STA
654
ECS BAY
STRINGER 1  LEFT SIDE
LBL 4
WIRE  BUNDLES  STRINGER 3
STRINGER 5
STRINGER 7
STRINGER 9
BL  42  / STRINGER
10
CLAMP 1L
АС PACK NOT SHOWN FOR CLARITY  2110636
FIGURE 2: LEFT SIDE - ENVIRONMENTAL CONTROL SYSTEMS (ECS) BAY - WIRE CLAMP - INSPECTION
(SHEET 1 OF 3)
Original Issue: April 26, 2012
Export Controlled ECCN: 9E991 - BOEING  PROPRIETARY - Copyright @ Unpublished  C1-82-LL
Work - See page 1 for details.  26 of 33

### Page 27 (OCR)

BOEING SERVICE BULLETIN 737-28-1303
HYDRAULIC
TUBES
ADDLI
CLAMI
CLAMP 1L
TYPICAL INSTALLATION
FLANGED CUSHION
1 LOCATION
TYPICAL CORRECT  C-C  2110639
CLAMP INSTALLATION
FIGURE 2: LEFT SIDE - ENVIRONMENTAL CONTROL SYSTEMS (ECS) BAY - WIRE CLAMP - INSPECTION
(SHEET 2 OF 3)
Original Issue: April 26, 2012
PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  737-28-1303
Work - See page 1 for details.  27 of 33

### Page 28

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for this figure.
More DataQtyIdentificationNameTaskStep
(a)1-ClampInspect1
(a) Do a Detailed Inspection of the clamp to make sure that the flanged cushions completely surrounds the
two metal strap sections of the clamp. Inspect to make sure that the P/N of the clamp installed is a
TA0930034-10 clamp.
FIGURE 2: LEFT SIDE - ENVIRONMENTAL CONTROL SYSTEMS (ECS) BAY - WIRE CLAMP - INSPECTION
(SHEET 3 OF 3)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 26, 2012
737-28-1303
28 of 33
BOEING SERVICE BULLETIN 737-28-1303

### Page 29 (OCR)

BOEING SERVICE BULLETIN 737-28-1303
This Figure applies only to: Group 1.
STA
654  STA
588
STA
654
STRINGER 1  A ECS BAY  LEFT SIDE
LBL 4
WIRE
BUNDLES  STRINGER 3
STRINGER 5
STRINGER 7
STRINGER 9
LBL  / STRINGER
42
CLAMP 1L
CLAMP 2L
AC PACK NOT SHOWN FOR CLARITY  2110640
FIGURE 3: LEFT SIDE - ENVIRONMENTAL CONTROL SYSTEMS (ECS) BAY - WIRE CLAMP -
REPLACEMENT
(SHEET 1 OF 3)
Original Issue: April 26, 2012
Export Controlled ECCN: 9E991 - BOEING  737-28-1303
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.  29 of 33

### Page 30 (OCR)

BOEING SERVICE BULLETIN 737-28-1303
CLAMP 1L
TYPICAL INSTALLATION
LEWD
CLAMP 2L
TYPICAL INSTALLATION
2110645
FIGURE 3: LEFT SIDE - ENVIRONMENTAL CONTROL SYSTEMS (ECS) BAY - WIRE CLAMP -
REPLACEMENT
(SHEET 2 OF 3)
Original Issue: April 26, 2012
Export Controlled ECCN: 9E991 - BOEING  PROPRIETARY - Copyright © Unpublished  737-28-1303
Work - See page 1 for details.  30 of 33

### Page 31

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for this figure.
More DataQtyIdentificationNameTaskStep
(a)4-FastenersRemove / Keep1
--ClampRemove2
(b)1-Wire BundleInspect3
(c) (a)2TA0930034-10ClampInstall (New)4
(c) (a)4-FastenerInstall (Kept)5
(a) The Quantity shown is the maximum amount that is necessary if both clamps must be replaced.
(b) Do a Detailed Inspection of the wire bundle for chaffing at the specified clamp locations. If damaged wires
are found, repair damaged wires. Refer to SWPM 20-10-13 as an accepted procedure for damage condi-
tions and repair instructions.
(c) Refer to SWPM 20-10-12 as an accepted procedure.
FIGURE 3: LEFT SIDE - ENVIRONMENTAL CONTROL SYSTEMS (ECS) BAY - WIRE CLAMP -
REPLACEMENT
(SHEET 3 OF 3)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 26, 2012
737-28-1303
31 of 33
BOEING SERVICE BULLETIN 737-28-1303

### Page 32 (OCR)

BOEING SERVICE BULLETIN 737-28-1303
This Figure applies only to: Group 2.
STA
654  STA
588
STA
654
STRINGER 1  A ECS BAY  LEFT SIDE
LBL 4
WIRE  BUNDLES  STRINGER 3
STRINGER 5
STRINGER 7
STRINGER 9
LBL  / STRINGER
42
CLAMP 1L
AC PACK NOT SHOWN FOR CLARITY  2110643
FIGURE 4: LEFT SIDE - ENVIRONMENTAL CONTROL SYSTEMS (ECS) BAY - WIRE CLAMP -
REPLACEMENT
(SHEET 1 OF 2)
Original Issue: April 26, 2012
Export Controlled ECCN: 9E991 - BOEING  PROPRIETARY - Copyright © Unpublished  737-28-1303
Work - See page 1 for details.  32 of 33

### Page 33

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for this figure.
More DataQtyIdentificationNameTaskStep
2-FastenerRemove / Keep1
1-ClampRemove2
(a)--Wire BundleInspect3
(b)1TA0930034-10ClampInstall (New)4
(b)2-FastenerInstall (Kept)5
(a) Do a Detailed Inspection of the wire bundle for chaffing at the specified clamp location. If damaged wires
are found, repair damaged wires. Refer to SWPM 20-10-13 as an accepted procedure for damage condi-
tions and repair instructions.
(b) Refer to SWPM 20-10-12 as an accepted procedure.
FIGURE 4: LEFT SIDE - ENVIRONMENTAL CONTROL SYSTEMS (ECS) BAY - WIRE CLAMP -
REPLACEMENT
(SHEET 2 OF 2)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 26, 2012
737-28-1303
33 of 33
BOEING SERVICE BULLETIN 737-28-1303

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.