# Boeing Service Bulletin 737-32-1376: Revision 2

- Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2007-29087; AD 2009-26-04 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Boeing Service Bulletin 737-32-1376](https://openairdocs.org/service-documents/boeing/sb-737-32-1376.md)
- Title as filed: U.S. DOT/FAA - Boeing's Service Bulletin
- Pages: 71
- PDF: https://openairdocs.org/files/sha256/b7/d8/b7d8c8d8b4183d11e12edb11769a1772eadf807dafd5f1a721c57ffdf5c620a0
- Page: https://openairdocs.org/service-documents/boeing/sb-737-32-1376/file/b7d8c8d8b418

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Commercial        
Airplane
Group 
 737
Service Bulletin
Number: 737-32-1376
Date: May 12, 2005
Revision 2: August 06, 2008
ATA System: 3211
SUBJECT: LANDING GEAR - Main Landing Gear - Forward Trunnion Pin Inspection and
Replacement.
Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15
CFR 730-774). An export license may be required before it is used for development, production or use by foreign
persons from specific countries. The controller of this data has the individual responsibility to abide by all export
laws.
9E991ECCN:
BOEING PROPRIETARY, CONFIDENTIAL, AND/OR TRADE SECRET
Copyright © 2005 The Boeing Company
Unpublished Work - All Rights Reserved
Boeing claims copyright in each page of this document only to the extent that the page contains copyrightable
subject matter. Boeing also claims copyright in this document as a compilation and/or collective work.
This document includes proprietary information owned by The Boeing Company and/or one or more third parties.
Treatment of the document and the information it contains is governed by contract with Boeing. For more
information, contact The Boeing Company, P .O. Box 3707, Seattle, Washington 98124.
Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner,
BBJ, DC-8, DC-9, DC-10, MD-10, MD-11, MD-80, MD-88, MD-90, and the Boeing livery are all trademarks
owned by The Boeing Company; and no trademark license is granted in connection with this document unless
provided in writing by Boeing.
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
May 12, 2005
737-32-1376Revision 2: August 06, 2008
1 of 71
6.0

### Page 2

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
May 12, 2005
737-32-1376Revision 2: August 06, 2008
2 of 71
BOEING SERVICE BULLETIN 737-32-1376
BLANK PAGE

### Page 3

Table of Contents
Revision Transmittal Sheet ............................................ 5
Summary ..................................................... 7
1. PLANNING INFORMATION ........................................ 1 1
A. Effectivity ............................................... 1 1
1. Airplanes ............................................ 1 1
2. Spares Affected ........................................ 1 6
B. Concurrent Requirements ...................................... 1 6
C. Reason ................................................ 1 6
D. Description .............................................. 1 8
E. Compliance .............................................. 1 9
F . Approval ............................................... 2 2
G. Manpower .............................................. 2 2
H. Weight and Balance Changes .................................... 2 5
I. Electrical Load Data ......................................... 2 5
J. References .............................................. 2 5
1. Existing Data: .......................................... 2 5
2. Data supplied with this Service Bulletin: ........................... 2 5
3. Installation Drawings Used in the Preparation of this Service Bulletin: ........... 2 5
K. Publications Affected ......................................... 2 5
L. Interchangeability and Intermixability of Parts ........................... 2 5
2. MATERIAL INFORMATION ........................................ 2 7
A. Material - Price and Availability ................................... 2 7
B. Industry Support Information .................................... 2 8
C. Parts Necessary For Each Airplane ................................. 2 8
1. Kits/Parts: ............................................ 2 8
2. Parts and Materials Supplied by the Operator: ........................ 2 9
3. Parts Modified and Reidentified: ................................ 2 9
4. Parts Removed and Not Replaced: .............................. 2 9
D. Parts Necessary to Change Spares ................................. 2 9
E. Special Tooling - Price and Availability ............................... 2 9
F . Special Tooling Necessary to do this Service Bulletin ....................... 3 0
3. ACCOMPLISHMENT INSTRUCTIONS .................................. 3 1
A. GENERAL INFORMATION ..................................... 3 1
B. WORK INSTRUCTIONS ....................................... 3 2
FIGURE 1: LEFT MLG FORWARD TRUNNION PIN TRANSITION RADIUS - IN-SITU INSPECTION . 40
FIGURE 2: RIGHT MLG FORWARD TRUNNION PIN TRANSITION RADIUS - IN-SITU INSPECTION . 42
FIGURE 3: LEFT MLG FORWARD TRUNNION PIN TRANSITION RADIUS, LEAD-IN CHAMFER, AND
CROSS BOLT BORE - INSPECTION WITH MAIN LANDING GEAR REMOVED...... 4 4
FIGURE 4: RIGHT MLG FORWARD TRUNNION PIN TRANSITION RADIUS, LEAD-IN CHAMFER, AND
CROSS BOLT BORE - INSPECTION WITH MAIN LANDING GEAR REMOVED...... 4 6
FIGURE 5: LEFT MLG FORWARD TRUNNION PIN - BLENDING AND REPAIR OF THE PROTECTIVE
FINISH WITH MAIN LANDING GEAR REMOVED ...................... 4 8
FIGURE 6: RIGHT MLG FORWARD TRUNNION PIN - BLENDING AND REPAIR OF THE PROTECTIVE
FINISH WITH MAIN LANDING GEAR REMOVED ...................... 5 1
FIGURE 7: THIS FIGURE HAS BEEN DELETED ............................. 5 4
FIGURE 8: THIS FIGURE HAS BEEN DELETED ............................. 5 5
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
May 12, 2005
737-32-1376Revision 2: August 06, 2008
3 of 71
BOEING SERVICE BULLETIN 737-32-1376

### Page 4

FIGURE 9: THIS FIGURE HAS BEEN DELETED ............................. 5 6
FIGURE 10: THIS FIGURE HAS BEEN DELETED ............................. 5 7
FIGURE 11: THIS FIGURE HAS BEEN DELETED ............................. 5 8
FIGURE 12: THIS FIGURE HAS BEEN DELETED ............................. 5 9
FIGURE 13: THIS FIGURE HAS BEEN DELETED ............................. 6 0
FIGURE 14: THIS FIGURE HAS BEEN DELETED ............................. 6 1
FIGURE 15: LEFT MLG FORWARD TRUNNION PIN - LUBRICATION .................. 6 2
FIGURE 16: RIGHT MLG FORWARD TRUNNION PIN - LUBRICATION ................. 6 4
FIGURE 17: LEFT MLG FORWARD TRUNNION PIN TRANSITION RADIUS - REPAIR OF THE PROTECTIVE
FINISH IN-SITU ........................................ 6 6
FIGURE 18: RIGHT MLG FORWARD TRUNNION PIN TRANSITION RADIUS - REPAIR OF THE
PROTECTIVE FINISH IN-SITU ................................ 6 8
Appendix A: INSPECTION REPORT FORM - LEFT SIDE MAIN LANDING GEAR FORWARD TRUNNION
P I N............................................... 7 0
Appendix B: INSPECTION REPORT FORM - RIGHT SIDE MAIN LANDING GEAR FORWARD TRUNNION
P I N............................................... 7 1
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
May 12, 2005
737-32-1376Revision 2: August 06, 2008
4 of 71
BOEING SERVICE BULLETIN 737-32-1376

### Page 5

Commercial        
Airplane
Group 
 737
Service Bulletin
Revision Transmittal SheetNumber: 737-32-1376Date: May 12, 2005
Revision 2: August 06, 2008
ATA System: 3211
SUBJECT: LANDING GEAR - Main Landing Gear - Forward Trunnion Pin Inspection and
Replacement.
This Revision includes all pages of the service bulletin.
COMPLIANCE INFORMATION RELATED TO THIS REVISION
No more work is necessary on airplanes changed as shown in the original issue of SB 737-32-1376 dated May
12, 2005, or in SB 737-32-1376 Revision 1 dated March 19, 2007, or on airplanes which have had the original
Trunnion Pins overhauled or replaced.
REASON FOR REVISION
This revision is sent to advise the operators that the compliance requirements given in Table I and Table II have
been changed. Also, the format of paragraph 3.B, Work Instructions has been changed.The new PART I provides
instructions to inspect the Forward Trunnion Pin cylinder to spherical Transition Radius with the Main Landing
Gear not removed (in-situ). The new PART II provides instructions to inspect the Lead-In Chamfer, and the
Cross Bolt Bore of the Forward Trunnion PIN with the Main Landing Gear removed. The new PART IV provides
instructions to repair the Forward Trunnion Pin Transition Radius protective finish with Main Landing Gear not
removed (in-situ).
Also, this revision is sent to inform the operators that the format of the compliance tables has been changed to
agree with the new Work Instructions format. Compliance Table 1 provides information for lubrication and
inspection of the Forward Trunnion Pin with the Main Landing Gear not removed (in-situ). Compliance Table 2
provides information for the complete detail inspection of the Forward Trunnion Pin with the Main Landing Gear
removed.
The compliance time for the Forward Trunnion Pin detailed inspection and lubrication must now be calculated
from the release date of Revision 2 of this service bulletin.
Changes to this service bulletin include:
— Summary - Background: Changed the order of the critical areas that have to be inspected.
— Summary - Action: Added "in-situ" detailed inspection action of the MLG Forward Trunnion Pin (Main Landing
Gear not removed) and changed the detailed inspection action of the MLG Forward Trunnion Pin with the
Landing Gear removed.
— Summary - Summary Illustration: Added new data to Summary illustration.
— Paragraph 1.C., Reason: Added the list with all changes included in Revision 2 of this service bulletin.
— Paragraph 1.D., Description: Summary Illustration: Added "in-situ" detailed inspection action of the MLG
Forward Trunnion Pin and changed the detailed inspection action of the MLG Forward Trunnion Pin with
the Landing Gear removed.
— Paragraph 1.E., Compliance: Changed the Format of the Compliance tables, Table 1 an Table 2.
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
May 12, 2005
737-32-1376Revision 2: August 06, 2008
5 of 71

### Page 6

— Paragraph 1.G., Manpower: Added a manpower table for each "Part" given in Accomplishment Instructions.
— Paragraph 2.A., Material - Price and Availability: Has been revised to include new Trunnion Pin part numbers,
a new unit price, and availability date.
— Paragraph 2.C.1., Parts Necessary For Each Airplane, Kits/Parts - Added new Trunnion Pin part numbers.
— Paragraph 2.C.2., Parts and Materials Supplied by the Operator: Ultrachromate 300 Concentrate has been
added to the table, and the lockwire part number has been corrected.
— Paragraph 3.B., General information - Added the general note related to the terms "refer to" and "in
accordance with".
— Paragraph 3.B., Work Instructions:
— Deleted the separate access work instructions and added access work instructions to PART I and
PART II.
— Changed existing Part I and PART II.
— Added a new Part, Part IV - MLG Forward Trunnion Pin - Repair Of The Protective Finish In-Situ" to
provide instructions to repair the protective finish with the Main Landing Gear not removed.
— Changed existing Part IV to "Part V - MLG Forward Trunnion Pin - Blending and Repair of The Protective
Finish with Main Landing Gear Removed". Added additional work instructions to repair the protective
finish.
— Figure 1 and Figure 2: Removed the cross bolt bore and the lead-in chamfer inspection, changed Detail A,
and changed the figure title.
— Figure 3 and Figure 4: Changed the inspection requirements and figure title.
— Figure 5 and Figure 6: Added new data to repair the protective finish with the Main Landing Gear removed.
— Deleted Figure 7, Figure 8, Figure 9, Figure 10, Figure 11, Figure 12, Figure 13, and Figure 14. The work
instructions given in these figures was replaced with the Airplane Maintenance Manual tasks that were
referenced in paragraph 3.B., Work Instructions.
— Added Figure 17 and Figure 18 to provide instructions to repair the Trunnion Pin Transition Radius protective
finish In-Situ.
REVISION HISTORY
May 12, 2005Original Issue:
March 19, 2007Revision 1:
August 06, 2008Revision 2:
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
May 12, 2005
737-32-1376Revision 2: August 06, 2008
6 of 71
BOEING SERVICE BULLETIN 737-32-1376

### Page 7

Commercial        
Airplane
Group 
 737
Service Bulletin
SummaryNumber: 737-32-1376Date: May 12, 2005
Revision 2: August 06, 2008
ATA System: 3211
SUBJECT: LANDING GEAR - Main Landing Gear - Forward Trunnion Pin Inspection and
Replacement.
CONCURRENT REQUIREMENTS
None.
BACKGROUND
This Service Bulletin gives instructions to inspect the Left Hand and Right Hand Main Landing Gear (MLG)
Forward Trunnion Pins for finish damage or corrosion pitting, and if necessary, to replace them. If this Service
Bulletin is not done, the corrosion pitting could cause stress cracking of the forward trunnion pin which could
result in a MLG collapse due to fracture of the pin.
MLG forward trunnion pin protective finishes may have been damaged during final assembly. The protective
finish could be damaged at two locations using an unauthorized process and damaged at one location because
the pin was not handled correctly. The damage of the protective finish puts the base metal at risk from corrosion
pitting. MLG forward trunnion pins may have been delivered to operators with compromised corrosion protection
in three critical areas:
1. The transition radius between the chrome plated outer diameter and the spherical ball bearing surface.
2. The lead-in chamfer and outer diameter surface.
3. The cross bolt bore and outer diameter surface.
Boeing Service Related Problem (SRP) 737NG-SRP-32-0129 is related to this service bulletin.
ACTION
Do the lubrication of the Left Hand and Right Hand MLG Forward Trunnion Pins at the thresholds and repeat
intervals given in Paragraph 1.E., Compliance, Table 1.
Do (in-situ) a detailed inspection of the Left Hand and Right Hand Forward Trunnion Pins Transition Radius
area (with the Main Landing Gear not removed) at the thresholds and repeat intervals given in Paragraph 1.E.,
Compliance, Table 1.
NOTE: Make sure that you have serviceable Trunnion Pins on hand in case the Trunnion Pins inspected are
found with damage and need to be replaced.
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
May 12, 2005
737-32-1376Revision 2: August 06, 2008
7 of 71

### Page 8

NOTE: The Left and Right MLG Trunnion Pins Transition Radius area must be re-inspected at the intervals
given in Paragraph E, Compliance, Table 1, if damage was found during In-Situ Inspection as given in
PART I.
Remove Main Landing Gear and do a detailed inspection of the Left Hand and Right Hand Transition Radius if
not already inspected in-situ, the Lead-In Chamfer, and the Cross Bolt Hole at the thresholds given in Paragraph
1.E., Compliance, Table 2.
Repair/Overhaul or replace the MLG Forward Trunnion Pins if damaged finishes or corrosion is found.
Record the results of all inspections on the forms in Appendix A and Appendix B of this service bulletin.
EFFECTIVITY
737-600, -700, -700C, -800 and -900 airplanes with line numbers 533 through 1422. Refer to Service Bulletin
Paragraph 1.A.1 for effectivity.
COMPLIANCE
Refer to Paragraph 1.E., for Compliance Information.
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to this service
bulletin. The Airworthiness Directive will make the compliance tasks and times given in this service bulletin
mandatory.
INDUSTRY SUPPORT INFORMATION
Boeing warranty remedies are available for airplanes in warranty as of February 2, 2004. Please refer to Paragraph
2.B., Industry Support Information.
MANPOWER
Refer to Paragraph 1.G., Manpower.
MATERIAL INFORMATION
Boeing Supplied Kits/Parts.
Refer to Paragraph 2.A., Material - Price and Availability.
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
May 12, 2005
737-32-1376Revision 2: August 06, 2008
8 of 71
BOEING SERVICE BULLETIN 737-32-1376

### Page 9 (OCR)

BOEING SERVICE BULLETIN 737-32-1376
FORWARD
TRUNNION PIN
INBD
_ INBD
FWD  > FWD
DO IN SITU A DETAILED INSPECTION OF THE TRANSITION RADIUS AREA OF
THE TRUNNION PIN AT THE THRESHOLD AND REPEAT INTERVALS GIVEN IN
COMPLIANCE TIME.
REMOVE THE MAIN LANDING GEAR AND DO A DETAILED INSPECTION OF THE
FORWARD TRUNNION PIN TRANSITION RADIUS, LEAD-IN CHAMFER, AND CROSS
BOLT BORE AT THE THRESHOLD GIVEN IN COMPLIANCE TIME.
REPAIR OR REPLACE THE FORWARD TRUNNION PIN IF CORROSION, AND/OR
FINISH DAMAGE, AND/OR SCRAPES, AND/OR SCRATCHES ARE PRESENT.
FORWARD TRUNNION  BEARING ASSEMBLY
(MLG NOT SHOWN FOR CLARITY)  434212
May 12, 2005
Revision 2: August 06, 2008  737-32-1376
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.  9 of 71

### Page 10

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
May 12, 2005
737-32-1376Revision 2: August 06, 2008
10 of 71
BOEING SERVICE BULLETIN 737-32-1376
BLANK PAGE

### Page 11

Commercial        
Airplane
Group 
 737
Service Bulletin
Number: 737-32-1376
Date: May 12, 2005
Revision 2: August 06, 2008
ATA System: 3211
SUBJECT: LANDING GEAR - Main Landing Gear - Forward Trunnion Pin Inspection and
Replacement.
1.    PLANNING INFORMATION
A. Effectivity
1. Airplanes
Refer to Service Bulletin Index Document D6-19567 Part 3 for Airplane Variable Number, Line
Number, and Serial Number data.
This service bulletin is for the airplanes shown below.
DESCRIPTIONCONFIGURATIONGROUP
737-600, -700, -700C, -800 and -900 airplanes, line numbers 533
thru 1422.
-1
737-700 BBJ, 737-800 BBJ, C40A, C40B, C40C airplanes, line
numbers 533 thru 1422.
-2
Airplane Models:
737-600, 737-700, 737-700C, 737-800, 737-900
GroupVariable Number
1YA064 - YA099
1YA101 - YA145
1YA208 - YA211
1YA221
1YA255 - YA256
1YA323
1YA336 - YA345
1YA351
1YA356 - YA357
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
May 12, 2005
737-32-1376Revision 2: August 06, 2008
11 of 71

### Page 12

GroupVariable Number
1YA366 - YA367
1YA371 - YA372
1YA549 - YA552
1YA613 - YA615
1YA621 - YA622
1YA626 - YA630
1YA635 - YA636
1YA641 - YA642
1YA645 - YA650
1YA656 - YA659
1YA671 - YA672
1YA681 - YA691
1YA705 - YA710
1YA734
1YA801 - YA803
1YA809
1YA835
1YA849 - YA862
1YA891 - YA892
1YA965 - YA972
1YB101 - YB126
1YB151 - YB153
1YB156
1YB161 - YB164
1YB171 - YB172
1YB181 - YB184
1YB201 - YB208
1YB271
1YB276
1YB301 - YB310
1YB501 - YB502
1YB521 - YB525
1YB541 - YB543
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
May 12, 2005
737-32-1376Revision 2: August 06, 2008
12 of 71
BOEING SERVICE BULLETIN 737-32-1376

### Page 13

GroupVariable Number
1YB551
1YB561 - YB570
1YB581 - YB583
1YB601 - YB615
1YB631 - YB632
1YB851 - YB856
1YC019 - YC030
1YC062 - YC070
1YC079 - YC082
1YC091 - YC094
1YC104
1YC113
1YC138 - YC141
1YC146 - YC147
1YC151 - YC156
1YC166 - YC169
1YC171
1YC176 - YC178
1YC186 - YC189
1YC201
1YC304 - YC305
1YC363 - YC380
1YC383 - YC384
1YC392 - YC393
1YC410 - YC417
1YC421 - YC422
1YC426 - YC428
1YC436 - YC437
1YC443 - YC448
1YC455
1YC459
1YC464 - YC467
1YC476 - YC499
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
May 12, 2005
737-32-1376Revision 2: August 06, 2008
13 of 71
BOEING SERVICE BULLETIN 737-32-1376

### Page 14

GroupVariable Number
1YC520 - YC526
1YC581 - YC583
1YC587 - YC589
1YC621 - YC655
1YC681 - YC696
1YC708 - YC715
1YC720 - YC725
1YC727 - YC730
1YC737 - YC741
1YC769 - YC770
1YC785 - YC793
1YC833 - YC892
1YC904 - YC907
1YC921 - YC922
1YC946 - YC951
1YC972 - YC978
1YD005 - YD007
1YD023 - YD025
1YD042 - YD055
1YD081 - YD084
1YD101 - YD107
1YD121 - YD126
1YD151 - YD157
1YD171 - YD172
1YD201 - YD203
1YD206 - YD209
1YD216 - YD219
1YD251 - YD254
1YD256 - YD257
1YD261
1YD301 - YD332
1YD391
2YD401 - YD410
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
May 12, 2005
737-32-1376Revision 2: August 06, 2008
14 of 71
BOEING SERVICE BULLETIN 737-32-1376

### Page 15

GroupVariable Number
1YD481 - YD485
1YD501 - YD511
1YD531 - YD534
1YD541 - YD547
1YD561 - YD564
1YD571 - YD572
1YD601 - YD612
1YE051
1YE155 - YE157
1YE172
1YE201 - YE206
1YE301 - YE305
1YE321 - YE323
2YG036 - YG044
2YG069 - YG089
1YG201
1YG502 - YG506
1YG601 - YG602
1YJ001 - YJ002
1YJ471 - YJ480
1YJ501 - YJ517
1YJ531 - YJ532
1YJ591 - YJ592
1YJ631 - YJ632
1YJ671 - YJ682
1YJ801 - YJ813
1YJ861 - YJ867
1YJ871
1YJ901
1YJ911 - YJ916
1YJ931
1YK001 - YK002
1YK101 - YK104
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
May 12, 2005
737-32-1376Revision 2: August 06, 2008
15 of 71
BOEING SERVICE BULLETIN 737-32-1376

### Page 16

GroupVariable Number
1YM101
2. Spares Affected
None.
B. Concurrent Requirements
None.
C. Reason
This Service Bulletin gives instructions to inspect the Left Hand and Right Hand Main Landing Gear
(MLG) Forward Trunnion Pins for finish damage or corrosion pitting, and if necessary, to replace them.
If this Service Bulletin is not done, the corrosion pitting could cause stress cracking of the forward
trunnion pin which could result in a MLG collapse due to fracture of the pin.
MLG forward trunnion pin protective finishes may have been damaged during final assembly. The
protective finish could be damaged at two locations using an unauthorized process and damaged at
one location because the pin was not handled correctly. The damage of the protective finish puts the
base metal at risk from corrosion pitting. MLG forward trunnion pins may have been delivered to
operators with compromised corrosion protection in three critical areas:
1. The transition radius between the chrome plated outer diameter and the spherical ball bearing
surface.
2. The lead-in chamfer and outer diameter surface.
3. The cross bolt bore and outer diameter surface.
The original issue of this service bulletin was delayed during the Boeing and Federal Aviation
Administration (FAA) service bulletin approval process. The service bulletin was released immediately
after approval without a change to the original release date of May 12, 2005. It is not possible for
operators to meet the required compliance times as given in Paragraph 1.E., Compliance with this
release date.The compliance times for both the Forward Trunnion Pin detailed inspection and lubrication
must now be calculated from the release date of Revision 1 of this service bulletin.
Also changed is the compliance threshold for the detailed inspection for the 737-700 and 737-800
Boeing Business Jet and C40B and C40C airplanes. These airplanes have been put into a new Group
2 with separate compliance requirements. In addition, BMS 3-38 is included as an optional material,
161A1188-9 is included as an optional part, a new Appendix B has been added for the Right Main
Landing Gear, a Special Tool has been included, and the work instructions have been updated to clarify
the inspections, correct a Component Maintenance Manual (CMM) reference and add a new Aircraft
Maintenance Manual (AMM) reference. There is also a possibility that the FAA will release an
Airworthiness Directive for this service bulletin.
Revision 1 is sent to include the following changes:
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
May 12, 2005
737-32-1376Revision 2: August 06, 2008
16 of 71
BOEING SERVICE BULLETIN 737-32-1376

### Page 17

— Summary - Action: Includes a reference to the new Appendix B.
— Summary - Compliance: Information has been included on the possibility of a related FAA
Airworthiness Directive.
— Summary - Manpower: Estimates now included for Group 1 and Group 2 airplanes.
— Paragraph 1.D., Description: Includes a reference to the new Appendix B.
— Paragraph 1.E., Compliance: Has been changed into two separate tables for Group 1 and new
Group 2 airplanes. Additional information has been included to make the compliance requirements
more clear and on the possible FAA Airworthiness Directive.
— Paragraph 1.G., Manpower: Applies to both Group 1 and Group 2 airplanes.
— Paragraph 2.A., Material - Price and Availability:
— Has been revised to include ROLT details and a new unit price availability date.
— Pin assembly 161A1188-9 has been added as an optional replacement for the 161A1188-3
pin assembly.
— Paragraph 2.C.2, Parts and Materials Supplied by the Operator: BMS 3-38 (corrosion inhibiting
material) has been added to the table as an alternative to BMS 3-27.
— Paragraph 3.B., Work Instructions:
— Part I, Step 1.d.: Has changed to Step 2 and a note added to tell operators the Part II inspection
is not required if the trunnion pin is replaced in Part I, Step 1.a.
— Part I, Step 1.e.: Has changed to Step 3.
— Part I and Part II now include references to the new Appendix B.
— Part III. Step 2: The CMM reference given in the Note is corrected from CMM 32-11-09 to
737-600/700/800/900 AMM 57-15-01 .
— Figures 9 and 10: The lockwire part number has been changed and a new AMM reference has
been included for the retainer nut removal procedure. Added note to list the tool that is needed to
remove the Retainer Nut.
— Figures 11 and 12:
— The torque value for the Retainer Nut has been corrected and the AMM reference for the
Retainer Nut installation has been included.
— Pin assembly 161A1188-9 has been added as an optional replacement for the 161A1188-3
pin assembly.
— Appendix A: This inspection report form has been changed to make it applicable to the Left side
Main Landing Gear Forward Trunnion Pin only.
— New Appendix B: A separate inspection report form has been added for the Right side Main Landing
Gear Forward Trunnion Pin.
Revision 2 is sent to include the following changes:
— Summary - Background: Changed the order of the critical areas that have to be inspected.
— Summary - Action: Added "in-situ" detailed inspection action of the MLG Forward Trunnion Pin
(Main Landing Gear not removed) and changed the detailed inspection action of the MLG Forward
Trunnion Pin with the Landing Gear removed.
— Summary - Summary Illustration: Added new data to Summary illustration.
— Paragraph 1.C., Reason: Added the list with all changes included in Revision 2 of this service
bulletin.
— Paragraph 1.D., Description: Summary Illustration: Added "in-situ" detailed inspection action of
the MLG Forward Trunnion Pin and changed the detailed inspection action of the MLG Forward
Trunnion Pin with the Landing Gear removed.
— Paragraph 1.E., Compliance: Changed the Format of the Compliance tables, Table 1 an Table 2.
— Paragraph 1.G., Manpower: Added a manpower table for each "Part" given in Accomplishment
Instructions.
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
May 12, 2005
737-32-1376Revision 2: August 06, 2008
17 of 71
BOEING SERVICE BULLETIN 737-32-1376

### Page 18

— Paragraph 2.A., Material - Price and Availability: Has been revised to include new Trunnion Pin
part numbers, a new unit price, and availability date.
— Paragraph 2.C.1., Parts Necessary For Each Airplane, Kits/Parts - Added new Trunnion Pin part
numbers.
— Paragraph 2.C.2., Parts and Materials Supplied by the Operator: Ultrachromate 300 Concentrate
has been added to the table, and the lockwire part number has been corrected.
— Paragraph 3.B., General information - Added the general note related to the terms "refer to" and
"in accordance with".
— Paragraph 3.B., Work Instructions:
— Deleted the separate access work instructions and added access instructions to PART I and
PART II.
— Changed existing Part I and PART II.
— Added a new Part, Part IV - MLG Forward Trunnion Pin - Repair Of The Protective Finish
In-Situ" to provide instructions to repair the protective finish with the Main Landing Gear not
removed.
— Changed existing Part IV to "Part V - MLG Forward Trunnion Pin - Blending and Repair of
The Protective Finish with Main Landing Gear Removed". Added additional work instructions
to repair the protective finish.
— Figure 1 and Figure 2: Removed the cross bolt bore and the lead-in chamfer inspection, changed
Detail A, and changed the figure title.
— Figure 3 and Figure 4: Changed the inspection requirements and figure title.
— Figure 5 and Figure 6: Added new data to repair the protective finish with the Main Landing Gear
removed.
— Deleted Figure 7, Figure 8, Figure 9, Figure 10, Figure 11, Figure 12, Figure 13, and Figure 14.
The work instructions given in these figures was replaced with the Airplane Maintenance Manual
tasks that were referenced in paragraph 3.B., Work Instructions.
— Added Figure 17 and Figure 18 to provide instructions to repair the Trunnion Pin Transition Radius
protective finish In-Situ.
Boeing Service Related Problem (SRP) 737NG-SRP-32-0129 is related to this service bulletin.
D. Description
Do the lubrication of the Left Hand and Right Hand MLG Forward Trunnion Pins at the thresholds and
repeat intervals given in paragraph 1.E., Compliance, Table 1.
Do (in-situ) a detailed inspection of the Left Hand and Right Hand MLG Forward Trunnion Pins Transition
Radius area (with the Main Landing Gear not removed) at the thresholds and repeat intervals given in
paragraph 1.E., Compliance, Table 1.
NOTE: Make sure that you have serviceable Trunnion Pins on hand in case the Trunnion Pins
inspected are found with damage and need to be replaced.
NOTE: The Left and Right MLG Trunnion Pins Transition Radius area must be re-inspected at the
intervals given in Paragraph E, Compliance, Table 1, if damage was found during In-Situ
Inspection as given in PART I.
Remove Main Landing Gear and do a detailed inspection of the Left Hand and Right Hand Forward
Trunnion Pins Transition Radius (if not already inspected in-situ), the Lead-In Chamfer, and the Cross
Bolt Bore at the thresholds given in paragraph 1.E., Table 2.
Repair/Overhaul or replace the MLG Forward Trunnion Pins if damaged finishes or corrosion is found.
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
May 12, 2005
737-32-1376Revision 2: August 06, 2008
18 of 71
BOEING SERVICE BULLETIN 737-32-1376

### Page 19

Record the results of all inspections on the forms in Appendix A and Appendix B of this service bulletin.
Revision 1 - No more work is necessary on airplanes changed as shown in the original issue of this
service bulletin.
Revision 2 - No more work is necessary on airplanes changed as shown in the original issue of SB
737-32-1376 dated May 12, 2005, or in SB 737-32-1376 Revision 1 dated March 19, 2007, or on
airplanes which have had the original Trunnion Pins overhauled or replaced.
The work in this service bulletin is done in the maintenance zone(s) given below.
Group 1:
Affected Maintenance Zones
ZoneModel
551, 661, 734, 744737-600, 737-700, 737-700C,
737-800, 737-900
Group 2:
Affected Maintenance Zones
ZoneModel
551, 661, 734, 744737-700, 737-800
E. Compliance
Table 1 - MLG Forward Trunnion Pin - Inspection and Lubrication of the Transition Radius with Main
Landing Gear not removed (In-Situ)
Repeat Interval
(Not to
Exceed)
Compliance Time (Whichever
Occurs Later)
ActionCondition
30 days (a) (b)Within 30 days
from the date of
Revision 2 of
this service
bulletin.
-Lubricate the MLG Forward
Trunnion Pin in accordance
with Accomplishment
Instruction 3.B., Part VI,
"MLG Forward Trunnion Pin
- Lubrication"
All airplanes.
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
May 12, 2005
737-32-1376Revision 2: August 06, 2008
19 of 71
BOEING SERVICE BULLETIN 737-32-1376

### Page 20

Table 1 - MLG Forward Trunnion Pin - Inspection and Lubrication of the Transition Radius with Main
Landing Gear not removed (In-Situ)
Repeat Interval
(Not to
Exceed)
Compliance Time (Whichever
Occurs Later)
ActionCondition
-Within 6 months
from the date of
Revision 2 of
this service
bulletin.
Within 60
months since
the date of
issuance of the
original
standard
airworthiness
certificate or
date of
issuance of the
original export
certificate of
airworthiness.
Detailed Inspection of the
Transition Radius location
(In-Situ) in accordance with
Accomplishment Instruction,
paragraph 3.B., Part I, "MLG
Forward Trunnion Pin -
Inspection of the Transition
Radius with the MLG Not
Removed (in-situ)".
All airplanes.
-Before further
flight
-Repair the finish in
accordance with
Accomplishment Instruction,
paragraph 3.B., Part IV,
"MLG Forward Trunnion Pin
- Repair of the Protective
Finish In-Situ"
Airplanes with finish damage
(scrapes or scratches
through the full thickness of
the primer or areas of
missing primer) found in the
Transition Radius location,
and no corrosion, no pitting,
and no base metal
scratches. And
24 Months (c)Within 24
Months after the
finish damage is
repaired.
-Detailed Inspection of the
Transition Radius location
(In-Situ) in accordance with
Accomplishment Instruction,
paragraph 3.B., Part I, "MLG
Forward Trunnion Pin -
Inspection of the Transition
Radius with the MLG Not
Removed (in-situ).
-Before further
flight (d)
-Do Accomplishment
Instruction, paragraph 3.B.,
Part III, "MLG Forward
Trunnion Pin -
Replacement".
Airplanes with corrosion, or
pitting, or base metal
scratches in the base
material at the Transition
Radius location.
-Before further
flight.
-Do Accomplishment
Instruction paragraph 3.B.,
Part VI, "MLG Forward
Trunnion Pin - Lubrication".
Airplanes with no corrosion,
no pitting, no base metal
scratches, and no finish
damage at the Transition
Radius location.
(a) This differs from the times stated in the 737-600/700/800/900 Maintenance Planning Document.
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
May 12, 2005
737-32-1376Revision 2: August 06, 2008
20 of 71
BOEING SERVICE BULLETIN 737-32-1376

### Page 21

Table 1 - MLG Forward Trunnion Pin - Inspection and Lubrication of the Transition Radius with Main
Landing Gear not removed (In-Situ)
Repeat Interval
(Not to
Exceed)
Compliance Time (Whichever
Occurs Later)
ActionCondition
(b) Until the inspections of PART II, "MLG Forward Trunnion Pin - Transition Radius, Lead-in Chamfer, And
Cross Bolt Bore Inspection with Landing Gear Removed" are completed, or the Forward Trunnion Pin is
Replaced or Overhauled in accordance with CMM 57-15-01.
(c) The Overhaul of the Trunnion Pin in accordance with CMM 57-15-01 or Replacement of the Trunnion Pin
terminates the repeat inspection for that pin only.
(d) Trunnion pins that are removed from the airplane can be repaired at the operator's approved maintenance
facility in accordance with CMM 57-15-01. Repair of the trunnion pin in accordance with CMM 57-15-01
will meet all compliance requirements of this service bulletin for that pin only.
Table 2 - MLG Forward Trunnion Pin - Inspection of the Lead-in Chamfer, and Cross Bolt Bore with Main
Landing Gear removed
Repeat Interval
(Not to
Exceed)
Compliance Time (Whichever
Occurs Later)
ActionCondition
-Within 6 Months
from the date of
Revision 2 of
this service
bulletin.
Within 120
months since
the date of
issuance of the
original
standard
airworthiness
certificate or
date of
issuance of the
original export
certificate of
airworthiness.
Detailed inspection of the
Lead-in Chamfer, and Cross
Bolt Bore in accordance with
Accomplishment Instruction
3.B., Part II, "MLG Forward
Trunnion Pin - Transition
Radius, Lead-in Chamfer,
And Cross Bolt Bore
Inspection with Landing
Gear Removed".
All Airplanes that have not
inspected the MLG Trunnion
Pin as given in
Accomplishment
Instructions, paragraph 3.B.,
PART II.
--Before further
flight. (a)
Do Accomplishment
Instruction 3.B., Part III,
"MLG Forward Trunnion Pin
- Replacement".
Airplanes with corrosion,
pitting, or base metal
scratches in the base
material, found in the
Lead-In Chamfer, or Cross
Bolt Bore location.
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
May 12, 2005
737-32-1376Revision 2: August 06, 2008
21 of 71
BOEING SERVICE BULLETIN 737-32-1376

### Page 22

Table 2 - MLG Forward Trunnion Pin - Inspection of the Lead-in Chamfer, and Cross Bolt Bore with Main
Landing Gear removed
Repeat Interval
(Not to
Exceed)
Compliance Time (Whichever
Occurs Later)
ActionCondition
--Before further
flight.
Do Accomplishment
Instruction 3.B., Part V, Step
1.a., "MLG Forward Trunnion
Pin - Blending and Repair of
the Protective Finish With
Main Landing Gear
Removed".
Airplanes with finish damage
(scrapes or scratches
through the full thickness of
the primer or areas of
missing primer) found in the
Lead-In Chamfer, or Cross
Bolt Bore location, and no
corrosion, no pitting, and no
base metal scratches in the
base material.
--Before further
flight.
Do Accomplishment
Instruction, paragraph 3.B.,
Part VI, "MLG Forward
Trunnion Pin - Lubrication.
Airplanes with no corrosion,
no pitting, no base metal
scratches, and no finish
damage in Cross Bolt Bore
and Lead-in Chamfer
location.
(a) Trunnion pins that are removed from the airplane can be repaired at the operator's approved maintenance
facility in accordance with CMM 57-15-01. Repair of the trunnion pin in accordance with CMM 57-15-01
will meet all compliance requirements of this service bulletin for that pin only.
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to
this service bulletin.The Airworthiness Directive will make the compliance tasks and times given in this
service bulletin mandatory.
F. Approval
This service bulletin was examined by the Federal Aviation Administration (FAA).The changes specified
in this service bulletin comply with the applicable regulations and are FAA approved, as well as European
Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/JAA approved
airplanes listed in the service bulletin effectivity. This service bulletin and its approval were based on
the airplane in its original Boeing delivery configuration or as modified by other approved Boeing
changes.
If an airplane has a non-Boeing modification or repair that affects a component or system also affected
by this service bulletin, the operator is responsible for obtaining appropriate regulatory agency approval
before incorporating this service bulletin.
G. Manpower
The table below shows an estimate of the task-hours necessary to do this service bulletin for each
airplane. This estimate is for direct labor only, done by an experienced crew. Adjust the estimate with
operator task-hour data if necessary.The estimate does not include lost time.These are some examples
of lost time:
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
May 12, 2005
737-32-1376Revision 2: August 06, 2008
22 of 71
BOEING SERVICE BULLETIN 737-32-1376

### Page 23

— Time to adjust to the workplace
— Time to schedule the work
— Time to examine the work
— Time to cure the materials
— Time to make the parts
— Time to find the tools.
PART I - MLG FORWARD TRUNNION PIN - TRANSITION RADIUS INSPECTION WITH MAIN
LANDING GEAR NOT REMOVED (IN-SITU)
Elapsed HoursTask-HoursNumber of
Persons
Task
1.002.002Open Access
2.002.001Figure 1
2.002.001Figure 2
1.002.002Close Access
6.00 (a)8.00 (a)TOTAL FOR EACH AIRPLANE
(a) Total assumes no corrosion or finish damage is found in inspections covered
in Figure 1 and Figure 2. if corrosion or finish damage is found more work
may be necessary in Part 1.
PART II - MLG FORWARD TRUNNION PIN - TRANSITION RADIUS, LEAD-IN CHAMFER,
AND CROSS BOLT BORE INSPECTION WITH MAIN LANDING GEAR REMOVED
Elapsed HoursTask-HoursNumber of
Persons
Task
1.255.004Open Access
5.0030.006Remove Main
Landing Gear
5.0030.006Install Main Landing
Gear
1.001.001Figure 3
1.001.001Figure 4
5.005.004Close Access
18.2572.00TOTAL FOR EACH AIRPLANE
PART III - MLG FORWARD TRUNNION PIN - REPLACEMENT
Elapsed HoursTask-HoursNumber of
Persons
Task
9.0036.004Remove Trunnion
Bearing Assemblies
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
May 12, 2005
737-32-1376Revision 2: August 06, 2008
23 of 71
BOEING SERVICE BULLETIN 737-32-1376

### Page 24

PART III - MLG FORWARD TRUNNION PIN - REPLACEMENT
Elapsed HoursTask-HoursNumber of
Persons
Task
1.002.002Remove Fwd
Trunnion Pins
1.002.002Install Forward
Trunnion Pins
9.0036.004Install Trunnion
Bearing Assemblies
20.0076.00TOTAL FOR EACH AIRPLANE
PART IV - MLG FORWARD TRUNNION PIN - REPAIR OF THE PROTECTIVE FINISH IN-SITU
Elapsed HoursTask-HoursNumber of
Persons
Task
(a)(a)(a)Figure 17
(a)(a)(a)Figure 18
(a)(a)TOTAL FOR EACH AIRPLANE
(a) Manpower estimates are not available for Figure 5 and Figure 6: Left and
Right MLG Forward Trunnion Pin - Repair Of The Protective Finish In-Situ.
The Tasks involved in both Figures are covered by Lost Time.
PART V - MLG FORWARD TRUNNION PIN - BLENDING AND REPAIR OF THE PROTECTIVE
FINISH WITH MAIN LANDING GEAR REMOVED
Elapsed HoursTask-HoursNumber of
Persons
Task
(a)(a)(a)Figure 5
(a)(a)(a)Figure 6
(a)(a)TOTAL FOR EACH AIRPLANE
(a) Manpower estimates are not available for Figure 5 and Figure 6: Left and
Right MLG Forward Trunnion Pin - Protective Finish Application.The Tasks
involved in both Figures are covered by Lost Time.
PART VI - MLG FORWARD TRUNNION PIN - LUBRICATION
Elapsed HoursTask-HoursNumber of
Persons
Task
0.250.251Figure 15
0.250.251Figure 16
0.500.50TOTAL FOR EACH AIRPLANE
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
May 12, 2005
737-32-1376Revision 2: August 06, 2008
24 of 71
BOEING SERVICE BULLETIN 737-32-1376

### Page 25

H. Weight and Balance Changes
None.
I. Electrical Load Data
Not changed.
J. References
1. Existing Data:
a. Service Related Problem (SRP) 737NG-32-0129.
b. Boeing Drawing 65-88700 and 161A1188.
c. Component Maintenance Manual (CMM) 32-11-09, 57-15-01
d. Standard Overhaul Practices Manual (SOPM) 20-30-03, 20-41-02, 20-41-05, 20-42-02,
20-42-10, 20-44-04, 20-60-03
e. 737-600/700/800/900 Aircraft Maintenance Manual (AMM) 07-11-01., 07-11-01, 12-21-11,
32-00-01., 32-11-00., 32-11-83, 57-15-01, 57-16-01
f. 737-600/700/800/900 Maintenance Planning Data (MPD) Appendix A
g. 737-700/800 Maintenance Planning Data (MPD) Appendix A
2. Data supplied with this Service Bulletin:
None.
3. Installation Drawings Used in the Preparation of this Service Bulletin:
TitleDrawing Number
PIN ASSY - FORWARD TRUNNION BEARING, MLG.161A1188
These drawings were used to prepare this service bulletin. These drawings are not necessary to
make the specified changes, and are not supplied with this service bulletin. These drawings may
not be applicable to all airplane configurations or operators.
K. Publications Affected
None.
L. Interchangeability and Intermixability of Parts
Refer to Paragraph 2.C., Parts Necessary For Each Airplane, for interchangeability and intermixability
information.
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
May 12, 2005
737-32-1376Revision 2: August 06, 2008
25 of 71
BOEING SERVICE BULLETIN 737-32-1376

### Page 26

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
May 12, 2005
737-32-1376Revision 2: August 06, 2008
26 of 71
BOEING SERVICE BULLETIN 737-32-1376
BLANK PAGE

### Page 27

2.    MATERIAL INFORMATION
A. Material - Price and Availability
Boeing can supply the parts shown in Paragraph 2.C., Parts Necessary For Each Airplane as shown
below. If there is a limit to the quantity (QTY) of available parts, a supply sequence is given by Spares.
More parts become available as shown in the Reorder Lead Time (ROLT). ROLT is calculated from
the date Boeing gets the purchase order.
Unit Price thru
Dec 31, 2008
ROLT
(Weeks)
QTYDateNamePart Number
$3,556.00-1-Forward Trunnion Pin161A1188-1 (a) (g)
$3,556.00-1-Forward Trunnion Pin161A1188-3 (b) (g)
$3,556.00-1-Forward Trunnion Pin161A1188-5 (c) (g)
$3,556.00-1-Forward Trunnion Pin161A1188-9 (d) (g)
$3,556.00-1-Forward Trunnion Pin161A1188-13 (e) (g)
$3,556.00-1-Forward Trunnion Pin161A1188-15 (f) (g)
(a) 161A1188-1 Trunnion Pin may replace 161A1188-1 and 161A1188-5 Trunnion Pins.
(b) 161A1188-3 Trunnion Pin may replace 161A1188-3 and 161A1188-9 Trunnion Pins.
(c) 161A1188-5 Trunnion Pin replaces only 161A1188-5 Trunnion Pins.
(d) 161A1188-9 Trunnion Pin may replace 161A1188-3 and 161A1188-9 Trunnion Pins.
(e) 161A1188-13 may replace 161A1188-1 and 161A1188-5 Trunnion Pins.
(f) 161A1188-15 may replace 161A1188-1 and 161A1188-5 Trunnion Pins.
(g) The quantity shown is for a single main landing gear strut.
NOTE: Operators will need to identify which trunnion pin was initially fitted to each main landing gear
strut. This will ensure the correct replacement part is ordered.
The parts are subject to the terms and conditions of the Boeing standard purchase order
acknowledgement. After the Price date, new price data is applicable. Prices are in United States dollars.
Terms: Net 30 days.
REFERENCE THIS SERVICE BULLETIN NUMBER AND SUBMIT PURCHASE ORDER BY ONE
OF THE METHODS THAT FOLLOW:
1. Order on-line via ATA Spec 2000 or Boeing Part Page
2. Fax to (206) 662-7145
3. Spares Customer Support - MC 36-65 Boeing Spares Department P .O. Box 3707 Seattle,
Washington 98124-2207 USA (Service Bulletin 737-32-1376)
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
May 12, 2005
737-32-1376Revision 2: August 06, 2008
27 of 71
BOEING SERVICE BULLETIN 737-32-1376

### Page 28

B. Industry Support Information
Boeing warranty remedies are available for 737-600/700/800/900 airplanes in warranty as of February
2, 2004. For inspection man-hour reimbursement for airplanes in warranty as of that date, send a
warranty claim to Boeing Commercial Airplanes Group - Warranties. If the condition described in this
service bulletin is found during the inspection for airplanes in warranty as of that date and additional
man-hours and kits, parts, and/or special tools are required, send a warranty claim to Boeing Commercial
Airplanes Group - Warranties. Please refer to this service bulletin number and reference the airplane
variable number(s) in your purchase order.
C. Parts Necessary For Each Airplane
1. Kits/Parts:
To get the parts shown below, refer to Paragraph 2.A., Material - Price and Availability.
NOTE: The items shown in Paragraph 2.C.2., Parts and Materials Supplied by the Operator, are
necessary for each airplane.
NotesExisting Part NumberNameQTYNew Part Number
(a) (f) (g) (h)161A1188-1Forward Trunnion Pin1161A1188-1
(b) (f) (g) (h)161A1188-3Forward Trunnion Pin1161A1188-3 or
161A1188-9 (optional)
(c) (f) (g) (h)161A1188-5Forward Trunnion Pin1161A1188-5
(d) (f)161A1188-1Forward Trunnion Pin1161A1188-13
(e) (f)161A1188-1Forward Trunnion Pin1161A1188-15
(a) 161A1188-1 Trunnion Pin may replace 161A1188-1 and 161A1188-5 Trunnion Pins.
(b) 161A1188-3 may replace or may be replaced by 161A1188-9 Trunnion Pin.
(c) 161A1188-5 Trunnion Pin replaces only 161A1188-5 Trunnion Pins.
(d) 161A1188-13 Trunnion Pin may replace 161A1188-1 and 161A1188-5 Trunnion Pins.
(e) 161A1188-15 Trunnion Pin may replace 161A1188-1 and 161A1188-5 Trunnion Pins.
(f) Quantity shown is for one main landing gear strut.
(g) Rework the existing part at an authorized repair center or send the parts that are removed to Boeing
at the address given below: Spares Distribution Center Repair Overhaul and Exchange Services
The Boeing Company 2201 South 142nd Street Building 2201, Door W-10, SSA 111 SeaTac,
Washington 98168 Make sure the parts have tags, with the data that follows: - Identification of
airplane from which the parts were removed; - Total flight cycles and flight hours on the parts; - Make
a note that the parts were removed in SB 737-32-1376.
(h) This part is used in production.
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
May 12, 2005
737-32-1376Revision 2: August 06, 2008
28 of 71
BOEING SERVICE BULLETIN 737-32-1376

### Page 29

2. Parts and Materials Supplied by the Operator:
NotesNameQTYPart Number /
Specification
(a)Nondrying Resin Mix Corrosion
Inhibiting Material
4 oz.BMS 3-27
(a) (b)Corrosion Inhibiting Material,
Nondrying Paste
4 oz.BMS 3-38
(a)Grease - Aircraft General Purpose32 oz.BMS 3-33
(a)Urethane Compatible Corrosion
Resistant Primer
4 oz.BMS 10-79 Type III
Grade A
Lockwire10 feetMS20995NC32
(a)Cleaning Solvent1 pintBMS 11-7
(c)Aluminum Oxide Fabric (240 grit or
finer)
3 feetScotch-Brite, Type A or
Bear-Tex
(d) (e)Ultrachromate 300 or equivalent
material
As
Required
Chromate Treatment
Solution
(a) See the Qualified Products List at the end of the Boeing Material Specification
(BMS) for supplier data.
(b) This can be used as an alternative material to BMS 3-27.
(c) Vendor Contact Information:3M Company3M Center, Federal Systems Department
Building 225-3S-20 Saint Paul MN 55144-1000U. S.A. or Norton Co. Advanced
Ceramics 1 New Bond Street P .O. Box 15008 Worcester MA 01615-0008 U.S.A.
(d) Vendor Contact Information: V64709, Delta Pollution Control, Inc., 30540 S.E. 8th,
Preston, Washington, 98050.
(e) Refer to SOPM 20-42-02 , paragraph 7.C., Table 5 for other equivalent chromate
treatment solutions.
3. Parts Modified and Reidentified:
None.
4. Parts Removed and Not Replaced:
None.
D. Parts Necessary to Change Spares
None.
E. Special Tooling - Price and Availability
None.
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
May 12, 2005
737-32-1376Revision 2: August 06, 2008
29 of 71
BOEING SERVICE BULLETIN 737-32-1376

### Page 30

F. Special Tooling Necessary to do this Service Bulletin
No special tools or equipment are necessary to do the change in this service bulletin. But, maintenance
and overhaul tools in the manuals given in Paragraph 1.J., References, can be necessary. Examine
operator tool supply to make sure all necessary tools are available.
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
May 12, 2005
737-32-1376Revision 2: August 06, 2008
30 of 71
BOEING SERVICE BULLETIN 737-32-1376

### Page 31

3.    ACCOMPLISHMENT INSTRUCTIONS
A. GENERAL INFORMATION
CAUTION: KEEP THE WORK AREA, WIRES AND ELECTRICAL BUNDLES CLEAN OF METAL
PARTICLES OR CONTAMINATION WHEN YOU USE TOOLS. UNWANTED MATERIAL,
METAL PARTICLES OR CONTAMINATION CAUGHT IN WIRE BUNDLES CAN CAUSE
DAMAGE TO THE BUNDLES. DAMAGED WIRE BUNDLES CAN CAUSE SPARKS OR
OTHER ELECTRICAL DAMAGE.
NOTE: 1. Manual titles are referred to by acronyms. Refer to Paragraph 1.J., References, for
definition of the acronyms.
2. Obey all of the warnings and cautions given in the specified manual sections.
3. The work instructions are divided into work packages.Task-Hours and Elapsed-Hours
for each package are given in Paragraph 1.G., Manpower.Y ou can do each work
package independently.
4. Unless shown differently, these dimensions and tolerances are used:
— Linear dimensions are in inches
— Tolerance on linear dimensions, other than rivet and bolt edge margins, is plus
or minus 0.03 inch.
— Tolerance on rivet and bolt edge margin is plus or minus 0.05 inch
— Angular tolerance is plus or minus 2 degrees
— Hole dimensions for standard solid rivets are given in 737 Structural Repair
Manual, Chapter 51
— Torque limits to tighten nuts and bolts are given in 737 Structural Repair Manual,
Chapter 51.
5. A Detailed Inspection is defined as: An intensive examination of a specific item,
installation, or assembly to detect damage, failure, or irregularity. Available lighting
is normally supplemented with a direct source of good lighting at an intensity deemed
appropriate. Inspection aids such as mirrors magnifying lenses, etc. may be
necessary. Surface cleaning and elaborate procedures may be required.
6. These work instructions refer to procedures included in other Boeing documents.
When the words "refer to" are used and the operator has an accepted alternative
procedure, the accepted alternative procedure can be used. When the words "in
accordance with" are included in the instruction, the procedure in the Boeing document
must be used.
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
May 12, 2005
737-32-1376Revision 2: August 06, 2008
31 of 71
BOEING SERVICE BULLETIN 737-32-1376

### Page 32

B. WORK INSTRUCTIONS
PART I - MLG FORWARD TRUNNION PIN - TRANSITION RADIUS INSPECTION WITH MAIN
LANDING GEAR NOT REMOVED (IN-SITU)
WARNING: MAKE SURE THE DOWNLOCK PINS ARE INSTALLED ON ALL THE LANDING GEAR.
WITHOUT THE DOWNLOCK PINS, THE LANDING GEAR COULD RETRACT AND
CAUSE INJURIES TO PERSONS AND DAMAGE TO EQUIPMENT
1. Install the downlock pins in the nose and main landing gear. Refer to 737-600/700/800/900 AMM
32-00-01 as an accepted procedure.
2. Remove the following access panels for a better accessibility to the inspection area:
a. 551BB, Lower Inboard Fixed Trailing Edge, Gear Adjustment Door, for the Left Landing gear.
b. 551CB, Lower Inboard Fixed Trailing Edge, Gear Access Panel, for the Left Landing Gear.
c. 651BB, Lower Inboard Fixed Trailing Edge, Gear Adjustment Door, for the Right Landing
Gear.
d. 651CB, Lower Inboard Fixed Trailing Edge, Gear Access Panel, for the Right Landing Gear.
Refer to to 737-600/700/800/900 MPD Appendix A or 737-700/800 MPD Appendix A for the
panels location.
3. Open the following access panels:
a. 551DB, Lower Inboard Fixed Trailing Edge, Lube Actuator & MLG Beam Outboard Attach Pin
Access Panel.
b. 651DB, Lower Inboard Fixed Trailing Edge, Lube Actuator & MLG Beam Outboard Attach Pin
Access Panel.
Refer to 737-600/700/800/900 MPD Appendix A or 737-700/800 MPD Appendix A for the
panels location.
4. Clean the grease and debris from the transition radius area using a clean cloth and solvent. Refer
to SOPM 20-30-03 as an accepted procedure.
5. Do a detailed inspection of the Transition Radius area with the aid of up to 10X magnification or
a boroscope on both the left and right MLG Forward Trunnion Pins. Use good light in order to have
a good exposure of the Transition Radius area. Look for finish damage (scrapes or scratches
through the full thickness of the primer or areas of missing primer), and for signs of corrosion, and
pitting, and base metal scratches in the base material. Refer to Figure 1 and Figure 2. Minor
scrapes and scratches that do not fully penetrate the primer layer shall not be considered as finish
damage.
NOTE: It is difficult to inspect the outboard Transition Radius area using a mirror. There is better
visibility of this area if you look from the bottom up. It is recommended that Operators
use a boroscope to inspect the outboard area of the Forward Trunnion Pin.
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
May 12, 2005
737-32-1376Revision 2: August 06, 2008
32 of 71
BOEING SERVICE BULLETIN 737-32-1376

### Page 33

a. If no corrosion, no pitting, no base metal scratches, and no finish damage are found at the
Transition Radius location on the left and/or right Forward Trunnion Pin(s), continue with Step
6.
b. If corrosion, pitting, or base metal scratches is found in the base material at the Transition
Radius area, on the left and/or right Forward Trunnion Pin(s), remove and replace the Forward
Trunnion Pin(s) as given in PART III - MLG Forward Trunnion Pin - Replacement, and then
continue with Step 6.
c. If finish damage (scrapes or scratches through the full thickness of the primer, or areas of
missing primer) is found at the Transition Radius area on the left and/or right Forward Trunnion
Pin(s), and there is no corrosion, no pitting, and no base metal scratches in the base material,
continue with step 5.c.(3), If there is damage on the outboard side of the Trunnion Pin you
may need to remove the Main Landing Gear in order to perform the inspection and the repair
of the protective finish. If it is necessary to remove the Main Landing Gear continue with step
5.c.(1).
(1) Lift the airplane on Jacks if/as necessary. Refer to 737-600/700/800/900 AMM 07-11-01
as an accepted procedure.
WARNING: DO NOT REMOVE THE VALVE BODY UNTIL THE SHOCK STRUT IS FULL Y
DEFLATED. IF YOU REMOVE THE VALVE BODY WHEN THERE IS
PRESSURE, THE PRESSURE CAN BLOW THE VALVE BODY OUT AND
CAUSE INJURY TO PERSONS
WARNING: MAKE SURE THE HYDRAULIC PRESSURE IS BELOW 5000 PSIG WHEN
YOU OPERATE THE DOLL Y ASSEMBL Y AND THE MAIN LANDING GEAR
PIVOTS ABOUT THE FORWARD TRUNNION BEARING PIN. IF THE
HYDRAULIC PRESSURE IS 5000 PSIG OR HIGHER, A BINDING CONDITION
OCCURS. THIS CAN CAUSE INJURY TO PERSONS AND DAMAGE TO
EQUIPMENT.
WARNING: MAKE SURE THE HYDRAULIC PRESSURE IS BELOW 5000 PSIG WHEN
YOU DISCONNECT THE AFT TRUNNION FROM THE AFT TRUNNION
BEARING PIN. IF THE HYDRAULIC PRESSURE IS 5000 PSIG OR HIGHER,
A BINDING CONDITION OCCURS.THIS CAN CAUSE INJURY TO PERSONS
AND DAMAGE TO EQUIPMENT.
WARNING: MAKE SURE THE HYDRAULIC PRESSURE IS BELOW 5000 PSIG WHEN
YOU DISCONNECT THE FORWARD TRUNNION FROM THE FORWARD
TRUNNION BEARING PIN. IF THE HYDRAULIC PRESSURE IS 5000 PSIG
OR HIGHER, A BINDING CONDITION OCCURS. THIS CAN CAUSE INJURY
TO PERSONS AND DAMAGE TO EQUIPMENT.
(2) Remove the Main Landing Gear (MLG). Refer to 737-600/700/800/900 AMM 32-11-00
as an accepted procedure.
(3) Do "PART IV - MLG Forward Trunnion Pin - Repair of the Protective Finish In-Situ".
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
May 12, 2005
737-32-1376Revision 2: August 06, 2008
33 of 71
BOEING SERVICE BULLETIN 737-32-1376

### Page 34

6. Do "PART VI - MLG Forward Trunnion Pin - Lubrication".
7. Put the airplane back to a serviceable condition.
8. Report all inspection data (condition of grease, corrosion, finish damage, surface deformation,
and/or scratches) to Boeing on the inspection forms in Appendix A and Appendix B of this service
bulletin. Information should state whether any damage was found or not, a description of the
damage where found, trunnion pin part number and serial number, airplane identifier, and airplane
cycles/hours.
PART II - MLG FORWARD TRUNNION PIN - TRANSITION RADIUS, LEAD-IN CHAMFER, AND
CROSS BOLT BORE INSPECTION WITH LANDING GEAR REMOVED
1. Install the downlock pins in the nose and main landing gear. Refer to 737-600/700/800/900 AMM
32-00-01 as an accepted procedure.
2. Lift the airplane on jacks. Refer to 737-600/700/800/900 AMM 07-11-01 as an accepted procedure
WARNING: DO NOT REMOVE THE VALVE BODY UNTIL THE SHOCK STRUT IS FULL Y
DEFLATED. IF YOU REMOVE THE VALVE BODY WHEN THERE IS PRESSURE, THE
PRESSURE CAN BLOW THE VALVE BODY OUT AND CAUSE INJURY TO PERSONS
WARNING: MAKE SURE THE HYDRAULIC PRESSURE IS BELOW 5000 PSIG WHEN YOU
OPERATE THE DOLL Y ASSEMBL Y AND THE MAIN LANDING GEAR PIVOTS ABOUT
THE FORWARD TRUNNION BEARING PIN. IF THE HYDRAULIC PRESSURE IS 5000
PSIG OR HIGHER, A BINDING CONDITION OCCURS. THIS CAN CAUSE INJURY TO
PERSONS AND DAMAGE TO EQUIPMENT.
WARNING: MAKE SURE THE HYDRAULIC PRESSURE IS BELOW 5000 PSIG WHEN YOU
DISCONNECT THE AFT TRUNNION FROM THE AFT TRUNNION BEARING PIN. IF
THE HYDRAULIC PRESSURE IS 5000 PSIG OR HIGHER, A BINDING CONDITION
OCCURS. THIS CAN CAUSE INJURY TO PERSONS AND DAMAGE TO EQUIPMENT.
WARNING: MAKE SURE THE HYDRAULIC PRESSURE IS BELOW 5000 PSIG WHEN YOU
DISCONNECT THE FORWARD TRUNNION FROM THE FORWARD TRUNNION
BEARING PIN. IF THE HYDRAULIC PRESSURE IS 5000 PSIG OR HIGHER, A BINDING
CONDITION OCCURS. THIS CAN CAUSE INJURY TO PERSONS AND DAMAGE TO
EQUIPMENT.
3. Remove the main landing gear (MLG). Refer to 737-600/700/800/900 AMM 32-11-00 as an accepted
procedure.
NOTE: Use this procedure for the transition radius location if the inspection of that location is
being performed with the landing gear removed. It is not necessary to use this procedure
for the transition radius location if inspections are performed as given in PART I.
4. Do a detailed inspection using a 10x magnification and good light, on both the left and right MLG
forward trunnion pins at the Transition radius, Lead-In Chamfer, and Cross Bolt Bore. Look for
finish damage (scrapes and scratches through the full thickness of the primer or areas of missing
primer), and for signs of corrosion, and pitting, and base metal scratches in the base material.
Refer to Figure 3 and Figure 4. Minor scrapes and scratches that do not fully penetrate the primer
layer shall not be considered as finish damage.
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
May 12, 2005
737-32-1376Revision 2: August 06, 2008
34 of 71
BOEING SERVICE BULLETIN 737-32-1376

### Page 35

a. If no corrosion, no pitting, no base metal scratches, and no finish damage are found at the
Transition Radius, and at the Lead-In Chamfer, and at the Cross Bolt Bore location, on the
left and/or right Forward Trunnion Pin(s), continue with Step 5.
b. If corrosion, pitting, or base metal scratches is found on the Transition Radius area, or Lead-In
Chamfer, or Cross Bolt Bore remove and replace the Trunnion Pin with a serviceable Trunnion
Pin as given in PART III - MLG Forward Trunnion Pin - Replacement, and then continue with
Step 5.
c. If finish damage (scrapes or scratches through the full thickness of the primer, or areas of
missing primer) is found on the Transition Radius area, or Lead-In Chamfer, or Cross Bolt
Bore and there is no corrosion, no pitting, and no base metal scratches repair protective
finishes as given in "PART V - MLG Forward Trunnion Pin - Blending and Repair of the
Protective Finish With Main Landing Gear Removed", or replace the Trunnion Pin with a
serviceable part as given in PART III - MLG Forward Trunnion Pin - Replacement, then continue
with Step 5.
CAUTION: MAKE SURE THE FORWARD TRUNNION BEARING PIN DOES NOT MOVE ON THE
PROTECTOR ASSEMBL Y (C32034-4) DURING THE REMOVAL OR INSTALLATION
OF THE MAIN LANDING GEAR. IF THIS CONDITION OCCURS, IT CAN CAUSE
DAMAGE TO THE PIN.THE TOOLS AND EQUIPMENT NECESSARY FOR REMOVING
AND INSTALLING THE MAIN LANDIG GEAR ARE GIVEN IN 737-600/700/800/900
AMM 32-11-00.
5. Install the MLG on the airplane. Refer to 737-600/700/800/900 AMM 32-11-00 as an accepted
procedure.
6. Do "PART VI - MLG Forward Trunnion Pin - Lubrication".
7. Put the airplane back to a serviceable condition.
8. Report all inspection data (condition of grease, corrosion, finish damage, surface deformation,
and/or scratches) to Boeing on the inspection forms in Appendix A and Appendix B of this service
bulletin. Information should state whether any damage was found or not, a description of the
damage where found, trunnion pin part number and serial number, airplane identifier, and airplane
cycles/hours.
PART III - MLG FORWARD TRUNNION PIN - REPLACEMENT
WARNING: USE NITRILE GLOVES FOR SKIN PROTECTION AGAINST COMPOUND C00913
(MASTINOX 6856K). IF MASTINOX GETS ON YOUR SKIN, IMMEDIATEL Y REMOVE
IT WITH WATER. IF THIS MATERIAL GETS IN YOUR EYES, IMMEDIATEL Y FLUSH
YOUR EYES WITH WATER AND GET MEDICAL AID. THIS MATERIAL CONTAINS
VERY POISONOUS AND FLAMMABLE AGENTS WHICH CAN CAUSE INJURIES TO
PERSONS.
1. Remove the left (MLG) and/or right (MLG) Forward Trunnion Bearing Assembly(ies) in accordance
with 737-600/700/800/900 AMM 32-11-83.
2. Remove the left (MLG) and/or right (MLG) Forward Trunnion Pin(s) in accordance with
737-600/700/800/900 AMM 57-16-01.
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
May 12, 2005
737-32-1376Revision 2: August 06, 2008
35 of 71
BOEING SERVICE BULLETIN 737-32-1376

### Page 36

NOTE: The race assembly (161A1187-1) is made of half races (161A1187-2 and 161A1187-3).
The half races are matched set and must not be mixed with other race details. Care
should be taken during the removal of the race assembly. the half races can easily fall
and become damaged. Identify the race details as a a matched set using paper tags.
NOTE: Trunnion Pins that are removed from the airplane can be repaired at the operator's
approved maintenance facility in accordance with CMM 57-15-01.
3. Install the replacement left (MLG) and/or right (MLG) Forward Trunnion Pin(s) in accordance with
737-600/700/800/900 AMM 57-16-01.
CAUTION: PROTECT THE TRANSITION RADIUS FINISHES FROM POSSIBLE DAMAGE
RESULTING FROM CONTACT WITH THE SEAL RETAINER RING.
a. 161A1188-1 Trunnion Pin may replace 161A1188-1 and 161A1188-5 Forward Trunnion Pins.
b. 161A1188-3 may replace or may be replaced by 161A1188-9 Trunnion Pin.
c. 161A1188-5 Trunnion Pin replaces only 161A1188-5 Pins.
d. 161A1188-13 Trunnion Pin may replace 161A1188-1 and 161A1188-5 Forward Trunnion
Pins.
e. 161A1188-15 Trunnion Pin may replace 161A1188-1 and 161A1188-5 Forward Trunnion
Pins.
4. Install the left (MLG) and/or right (MLG) Forward Trunnion Bearing Assembly(ies) in accordance
with 737-600/700/800/900 AMM 32-11-83.
NOTE: Do not force the fuse pin installation if binding occurs. Remove the Forward Trunnion
Pins and inspect the bushing inner diameter surfaces for contamination or damage.
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
May 12, 2005
737-32-1376Revision 2: August 06, 2008
36 of 71
BOEING SERVICE BULLETIN 737-32-1376

### Page 37

PART IV - MLG FORWARD TRUNNION PIN - REPAIR OF THE PROTECTIVE FINISH IN-SITU (THE
MAIN LANDING GEAR NOT REMOVED)
WARNING: MAKE SURE THAT PERSONS AND EQUIPMENT ARE CLEAR OF ALL CONTROL
SURFACES BEFORE YOU SUPPL Y HYDRAULIC POWER. AILERONS, RUDDERS,
ELEVATORS, FLAPS, SLATS, SPOILERS, LANDING GEAR AND THRUST REVERSERS
CAN MOVE QUICKL Y WHEN YOU SUPPL Y HYDRAULIC POWER. THIS CAN CAUSE
INJURY TO PERSONS AND DAMAGE TO EQUIPMENT.
WARNING: MAKE SURE THE HYDRAULIC PRESSURE IS BELOW 5000 PSIG WHEN YOU
CONNECT THE FORWARD TRUNNION TO THE FORWARD TRUNNION BEARING
PIN. IF THE HYDRAULIC PRESSURE IS 5000 PSIG OR HIGHER, A BINDING
CONDITION OCCURS. THIS CAN CAUSE INJURY TO PERSONS AND DAMAGE TO
EQUIPMENT.
WARNING: MAKE SURE THE HYDRAULIC PRESSURE IS BELOW 5000 PSIG WHEN YOU
OPERATE THE DOLL Y ASSEMBL Y AND TO LIFT THE AFT TRUNNION INTO ITS
POSITION. IF THE HYDRAULIC PRESSURE IS 5000 PSIG OR HIGHER WHEN YOU
DO THIS, A BINDING CONDITION OCCURS.THIS CAN CAUSE INJURY TO PERSONS
AND DAMAGE TO EQUIPMENT
CAUTION: PROTECT THE TRANSITION RADIUS FINISHES FROM DAMAGE BY CONTACT WITH
THE SEAL RETAINER RING.
1. Operators need to repair damaged finishes as given below:
a. Clean the damaged finishes and surrounding areas with solvent in accordance with FIGURE
17 and FIGURE 18.
NOTE: Operators need to solvent clean again the damaged finishes after the inspection has
been performed to make sure that all possible contaminants are removed before
abrasive cleaning.
b. Abrasive clean the primer in accordance with FIGURE 17 and FIGURE 18.
c. Solvent Clean the repair area in accordance with FIGURE 17 and FIGURE 18.
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
May 12, 2005
737-32-1376Revision 2: August 06, 2008
37 of 71
BOEING SERVICE BULLETIN 737-32-1376

### Page 38

d. Apply chromate conversion in accordance with FIGURE 17 and FIGURE 18.
e. Apply primer to the affected area on the Transition Radius in accordance with FIGURE 17
and FIGURE 18.
f. Apply Corrosion inhibiting Compound (CIC) to the Transition Radius in accordance with
FIGURE 17 and FIGURE 18.
PART V- MLG FORWARD TRUNNION PIN - BLENDING AND REPAIR OF THE PROTECTIVE
FINISH WITH MAIN LANDING GEAR REMOVED
WARNING: MAKE SURE THAT PERSONS AND EQUIPMENT ARE CLEAR OF ALL CONTROL
SURFACES BEFORE YOU SUPPL Y HYDRAULIC POWER. AILERONS, RUDDERS,
ELEVATORS, FLAPS, SLATS, SPOILERS, LANDING GEAR AND THRUST REVERSERS
CAN MOVE QUICKL Y WHEN YOU SUPPL Y HYDRAULIC POWER. THIS CAN CAUSE
INJURY TO PERSONS AND DAMAGE TO EQUIPMENT.
WARNING: MAKE SURE THE HYDRAULIC PRESSURE IS BELOW 5000 PSIG WHEN YOU
CONNECT THE FORWARD TRUNNION TO THE FORWARD TRUNNION BEARING
PIN. IF THE HYDRAULIC PRESSURE IS 5000 PSIG OR HIGHER, A BINDING
CONDITION OCCURS. THIS CAN CAUSE INJURY TO PERSONS AND DAMAGE TO
EQUIPMENT.
WARNING: MAKE SURE THE HYDRAULIC PRESSURE IS BELOW 5000 PSIG WHEN YOU
OPERATE THE DOLL Y ASSEMBL Y AND TO LIFT THE AFT TRUNNION INTO ITS
POSITION. IF THE HYDRAULIC PRESSURE IS 5000 PSIG OR HIGHER WHEN YOU
DO THIS, A BINDING CONDITION OCCURS.THIS CAN CAUSE INJURY TO PERSONS
AND DAMAGE TO EQUIPMENT.
CAUTION: PROTECT THE TRANSITION RADIUS FINISHES FROM DAMAGE BY CONTACT WITH
THE SEAL RETAINER RING.
1. Clean areas of damaged finishes and immediate surrounding surfaces with solvent in accordance
with FIGURE 5 and FIGURE 6.
NOTE: Operators may need to solvent clean again the damaged finishes after the inspection
has been performed to make sure that all possible contaminants are removed before
abrasive cleaning.
a. If the finish damage does penetrate the full thickness of the primer but does not penetrate the
full thickness of the Ti-Cad plating, operators need to restore the finish as given below:
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
May 12, 2005
737-32-1376Revision 2: August 06, 2008
38 of 71
BOEING SERVICE BULLETIN 737-32-1376

### Page 39

(1) Abrasive clean the primer in area of damage in accordance with FIGURE 5 and FIGURE
6.
(2) Solvent clean repair area in accordance with FIGURE 5 and FIGURE 6.
(3) Apply chromate conversion coating in accordance with FIGURE 5 and FIGURE 6.
(4) Apply primer to affected areas of the Trunnion Pin in accordance with FIGURE 5 and
FIGURE 6.
b. If the finish damage, surface deformations, and/or scratches do penetrate the full thickness
of the primer and/or Ti-Cad plating, operators need to restore both the cadmium plate and
primer finish as given below.
CAUTION: PART V STEP 1.b.3. IS APPLICABLE TO THE LEAD-IN CHAMFER AND
TRANSITION RADIUS ONL Y . DO NOT APPL Y STYLUS CADMIUM PLATE
AT THE CROSS BOLT LOCATION.
(1) Abrasive clean the repair area of damage in accordance with FIGURE 5 and FIGURE 6.
(2) Solvent clean of the repair area in accordance with FIGURE 5 and FIGURE 6.
(3) Apply stylus cadmium plate to the bare metal areas on the Lead-in Chamfer and/or
Transition Radius only in accordance with FIGURE 5 and FIGURE 6.
(4) Apply primer to the affected areas on the cross bolt bore, lead-in chamfer, and the
transition radius in accordance with FIGURE 5 and FIGURE 6.
2. Apply a thick layer BMS3-33 grease or equivalent to the Trunnion Pin exterior surfaces and cross
bolt bushing inner diameter. Refer to SOPM 20-60-03 as an accepted procedure.
PART VI - MLG FORWARD TRUNNION PIN - LUBRICATION
WARNING: MAKE SURE THE DOWNLOCK PINS ARE INSTALLED ON ALL THE LANDING GEAR.
WITHOUT THE DOWNLOCK PINS, THE LANDING GEAR COULD RETRACT AND
CAUSE INJURIES TO PERSONS AND DAMAGE TO EQUIPMENT.
WARNING: USE GLOVES AND EYE PROTECTION WHEN YOU LUBRICATE WITH THE USE OF
A GREASE GUN. LUBRICANT AT HIGH PRESSURE CAN CAUSE INJURY TO
PERSONS.
1. Lubricate the Left and Right MLG Forward Trunnion Pins as given in Figure 15.
2. Put the airplane back to a serviceable condition.
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
May 12, 2005
737-32-1376Revision 2: August 06, 2008
39 of 71
BOEING SERVICE BULLETIN 737-32-1376

### Page 40 (OCR)

BOEING SERVICE BULLETIN 737-32-1376
SEE
FWD
TRANSITION RADIUS AREA WHERE  INBD<
CORROSION,AND/OR FINISH
DAMAGE, AND/OR SCRAPES, AND OR  SCRATCHES MAY EXIST  LEFT MAIN LANDING GEAR
FORWARD TRUNNION
HOUSING ASSEMBLY
• FORWARD TRUNNION PIN
12
LEFT MAIN
LANDING GEAR
STRUT
→FWD  434518
FIGURE 1: LEFT MLG FORWARD TRUNNION PIN TRANSITION RADIUS - IN-SITU INSPECTION
(SHEET 1 OF 2)
May 12, 2005
Revision 2 August 06, 2008  737-32-1376
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.  40 of 71

### Page 41

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for the left side of the airplane.
MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
Surface of excess grease and dirt. Refer
to SOPM 20-30-03 as an accepted
procedure.
1161A1188-( )Forward
Trunnion
Pin
Clean1
The Transition Radius (cylindrical to
spherical transition area) for evidence of
corrosion, and/or finish damage, and/or
scrapes, and/or scratches as given in
PART I. (a)
1161A1188-( )Forward
Trunnion
Pin
Inspect2
(a) Fill out the inspection form in Appendix A and send to Boeing.
FIGURE 1: LEFT MLG FORWARD TRUNNION PIN TRANSITION RADIUS - IN-SITU INSPECTION
(SHEET 2 OF 2)
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
May 12, 2005
737-32-1376Revision 2 August 06, 2008
41 of 71
BOEING SERVICE BULLETIN 737-32-1376

### Page 42 (OCR)

BOEING SERVICE BULLETIN 737-32-1376
SEE Q
A FWD
TRANSITION RADIUS AREA WHERE
CORROSION,AND/OR FINISH
RIGHT MAIN LANDING GEAR  DAMAGE, AND/OR SCRAPES, AND OR
SCRATCHES MAY EXIST
FORWARD TRUNNION
HOUSING ASSEMBLY
FORWARD TRUNNION PIN
RIGHT MAIN
LANDING GEAR
STRUT
GENT
OMI  434526
FIGURE 2: RIGHT MLG FORWARD TRUNNION PIN TRANSITION RADIUS - IN-SITU INSPECTION
(SHEET 1 OF 2)
May 12, 2005
Revision 2 August 06, 2008
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.  42 of 71

### Page 43

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for the right side of the airplane.
MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
Surface of excess grease and dirt. Refer to
SOPM 20-30-03 as an accepted procedure.
1161A1188-( )Forward
Trunnion
Pin
Clean1
The cylindrical to spherical transition area
(Transition Radius) for evidence of
corrosion, and/or finish damage, and/or
scrapes, and/or scratches as given in PART
I.(a)
1161A1188-( )Forward
Trunnion
Pin
Inspect2
(a) Fill out the inspection form in Appendix A and send to Boeing.
FIGURE 2: RIGHT MLG FORWARD TRUNNION PIN TRANSITION RADIUS - IN-SITU INSPECTION
(SHEET 2 OF 2)
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
May 12, 2005
737-32-1376Revision 2 August 06, 2008
43 of 71
BOEING SERVICE BULLETIN 737-32-1376

### Page 44 (OCR)

BOEING SERVICE BULLETIN 737-32-1376
SEE
FWD
INBD<
AREA WHERE CORROSION, AND/OR
FINISH DAMAGE, AND/OR SCRAPES,
LEFT MAIN LANDING GEAR  AND/OR SCRATCHES MAY EXIST
. INBD
> FWD
FORWARD TRUNNION BEARING ASSEMBLY
434560
FIGURE 3: LEFT MLG FORWARDTRUNNION PINTRANSITION RADIUS, LEAD-IN CHAMFER, AND CROSS
BOLT BORE - INSPECTION WITH MAIN LANDING GEAR REMOVED
(SHEET 1 OF 2)
May 12, 2005
Revision 2 August 06, 2008  737-32-1376
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.  44 of 71

### Page 45

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for the left side of the airplane.
MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
surfaces of excess grease and dirt. Refer
to SOPM 20-30-03 as an accepted
procedure.
1161A1188-( )Forward
Trunnion Pin
Clean1
The Transition Radius (cylindrical to
spherical transition area), the Lead-in
chamfer to cylindrical surface, and the
Cross Bolt Bore surface adjacent to
outer surface for evidence of corrosion,
and/or finish damage, and/or scrapes,
and/or scratches as given in Part II. (a)
(b)
1161A1188-( )Forward
Trunnion Pin
Inspect2
(a) Use this procedure for the Transition Radius Location if the inspection of that location is being performed
with the landing gear removed. It is not necessary to use this procedure for the Transition Radius
location if inspections are performed as given in PART I.
(b) It is not necessary to inspect the Transition Radius area if it was already inspected as given in Part I.
FIGURE 3: LEFT MLG FORWARD TRUNNION PIN TRANSITION RADIUS, LEAD-IN CHAMFER, AND CROSS
BOLT BORE - INSPECTION WITH MAIN LANDING GEAR REMOVED
(SHEET 2 OF 2)
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
May 12, 2005
737-32-1376Revision 2 August 06, 2008
45 of 71
BOEING SERVICE BULLETIN 737-32-1376

### Page 46 (OCR)

BOEING SERVICE BULLETIN 737-32-1376
SEE A
A FWD
→INBD
RIGHT MAIN LANDING GEAR  AREA WHERE CORROSION, AND/OR
FINISH DAMAGE, AND/OR SCRAPES,
AND/OR SCRATCHES MAY EXIST
INBD
FWD
.. a
FORWARD TRUNNION BEARING ASSEMBLY
434561
FIGURE 4: RIGHT MLG FORWARD TRUNNION PIN TRANSITION RADIUS, LEAD-IN CHAMFER, AND
CROSS BOLT BORE - INSPECTION WITH MAIN LANDING GEAR REMOVED
(SHEET 1 OF 2)
May 12, 2005
Revision 2 August 06, 2008
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.  46 of 71

### Page 47

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for the right side of the airplane.
MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
surfaces of excess grease and dirt.
Refer to SOPM 20-30-03 as an
accepted procedure.
1161A1188-( )Forward
Trunnion
Pin
Clean1
The Transition Radius (cylindrical to
spherical transition area), the Lead-in
chamfer to cylindrical surface, and
the Cross Bolt Bore surface adjacent
to outer surface for evidence of
corrosion, and/or finish damage,
and/or scrapes, and/or scratches as
given in Part II. (a) (b)
1161A1188-( )Forward
Trunnion
Pin
Inspect2
(a) Use this procedure for the Transition Radius Location if the inspection of that location is being performed
with the landing gear removed. It is not necessary to use this procedure for the Transition Radius
location if inspections are performed as given in PART I.
(b) It is not necessary to inspect the Transition Radius area if it was already inspected as given in Part I.
FIGURE 4: RIGHT MLG FORWARD TRUNNION PIN TRANSITION RADIUS, LEAD-IN CHAMFER, AND
CROSS BOLT BORE - INSPECTION WITH MAIN LANDING GEAR REMOVED
(SHEET 2 OF 2)
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
May 12, 2005
737-32-1376Revision 2 August 06, 2008
47 of 71
BOEING SERVICE BULLETIN 737-32-1376

### Page 48 (OCR)

BOEING SERVICE BULLETIN 737-32-1376
FORWARD TRUNNION
SEE  BEARING ASSEMBLY
FWD
LEFT MAIN LANDING GEAR
→ INBO
> FWD
FORWARD TRUNNION BEARING ASSEMBLY
FORWARD
TRUNNION PIN
REAR
SPAR
CROSS BOLT
BORE
→FWD
LEAD-IN
CHAMFER  TRANSITION
RADIUS
FORWARD TRUNNION PIN  A-A  437903
FIGURE 5: LEFT MLG FORWARDTRUNNION PIN - BLENDING AND REPAIR OFTHE PROTECTIVE FINISH
WITH MAIN LANDING GEAR REMOVED
(SHEET 1 OF 3)
May 12, 2005
Revision 2 August 06, 2008  737-32-1376
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.  48 of 71

### Page 49

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for the left side of the airplane.
MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
With solvent. Refer to SOPM 20-30-03 as
an accepted procedure. (a)
--Cross bolt bore and
outer diameter
surface.
Clean1
--Lead-in chamfer
and outer diameter
surface
--Transition radius
If the finish damage, surface deformation, and/or scratches do penetrate the full thickness of the primer and/or
Ti-Cad plating, Operators need to restore both the cadmium plate and primer finish as given below. Do steps
2, 3, 4, 6, and 7.
If the finish damage penetrate the full thickness of the primer Operators need to restore the primer finish as
given below. Continue with step 5.
CAUTION: STEPS 2, 3, 4, AND 5 ONL Y APPL Y TO THE LEAD-IN CHAMFER AND TRANSITION RADIUS.
Use light hand pressure to lightly abrade
the surface of the primer. Do not abrade
the areas where the primer is missing and
the cadmium plating is exposed. (b)
--Lead-in chamfer
and outer diameter
surface
Abrasive
Clean
2
Transition radius
again with solvent where areas of bare
metal exist, including immediate
surrounding areas. Refer to SOPM
20-30-03 as an accepted procedure.
--Lead-in chamfer
and outer diameter
surface
Clean3
Transition radius
where the surface protective coating was
damaged or disturbed. Refer to SOPM
20-42-10. (c) (d) (e)
--Low Hydrogen
Embrittlement
Stylus Cadmium
Plating
Apply4
with cotton swabs or gauze. Apply as little
solution as possible to prevent
contamination of the surrounding areas.
Refer to SOPM 20-42-10 as an accepted
procedure.
As
Req.
Ultrachromate 300
or equivalent (f)
Chromate
Conversion Coating
Apply5
where the surface protective coating was
damaged or disturbed, using a brush.
Refer to SOPM 20-44-04 as an accepted
procedure. (g) (h)
1 oz.BMS 10-79, Type
III Grade A or
Grade D
PrimerApply6
FIGURE 5: LEFT MLG FORWARD TRUNNION PIN - BLENDING AND REPAIR OF THE PROTECTIVE FINISH
WITH MAIN LANDING GEAR REMOVED
(SHEET 2 OF 3)
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
May 12, 2005
737-32-1376Revision 2 August 06, 2008
49 of 71
BOEING SERVICE BULLETIN 737-32-1376

### Page 50

MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
in a thick layer to the trunnion pin exterior
surfaces and cross bolt bushing inner
diameter. Refer to SOPM 20-60-03 as an
accepted procedure.
8 oz.BMS 3-33GreaseApply7
(a) Replace or overhaul the Trunnion Pin if damage penetrates the Ti-Cad plating at the cross bolt bore
location.
(b) Use aluminum oxide abrasive pad 320 grit or finer, or light grade Scotch-Brite type A, very fine. Refer to
SOPM 20-41-02 Paragraph 4.A., Method 1 (Painted Surface Reactivation) as an accepted procedure.
(c) Mask the perimeter between the transition radius and spherical area to prevent debris and chemical
solution from going in the spherical area of the Trunnion Pin.
(d) The materials required for this task are given in SOPM 20-42-10.
(e) The Stylus Cadmium plating must be done with the Trunnion Pin unloaded.
(f) Refer to SOPM 20-42-02 , paragraph 7.C., Table 5 for other equivalent chromate treatment solutions.
(g) The primer application must be flush with or below the level of the chrome plated cylindrical surface. This
will make sure that installation of the pin is not prevented. Check for excess primer height using a straight
edge placed on the chrome plated pin outer diameter surface.
(h) Refer to SOPM 20-44-04 as an accepted procedure for curing time and temperature. Allow enough time
for drying before handling and grease application.
FIGURE 5: LEFT MLG FORWARD TRUNNION PIN - BLENDING AND REPAIR OF THE PROTECTIVE FINISH
WITH MAIN LANDING GEAR REMOVED
(SHEET 3 OF 3)
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
May 12, 2005
737-32-1376Revision 2 August 06, 2008
50 of 71
BOEING SERVICE BULLETIN 737-32-1376

### Page 51 (OCR)

BOEING SERVICE BULLETIN 737-32-1376
FORWARD TRUNNION
BEARING ASSEMBLY  SEE
• FWD
RIGHT MAIN LANDING GEAR
INBD
FWD
FORWARD TRUNNION BEARING ASSEMBLY
FORWARD
TRUNNION PIN
REAR
SPAR
CROSS BOLT
BORE
FWDC
LEAD-IN
RADIUS  TRANSITION  167  CHAMFER
A-A
FORWARD TRUNNION PIN  437904
FIGURE 6: RIGHT MLG FORWARD TRUNNION PIN - BLENDING AND REPAIR OFTHE PROTECTIVE
FINISH WITH MAIN LANDING GEAR REMOVED
(SHEET 1 OF 3)
May 12, 2005
Revision 2 August 06, 2008  737-32-1376
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.  51 of 71

### Page 52

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for the right side of the airplane.
MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
with solvent. Refer to SOPM 20-30-03 as
an accepted procedure. (a)
--Cross bolt bore and
outer diameter
surface.
Clean1
--Lead-in chamfer
and outer diameter
surface
--Transition radius
If the finish damage, surface deformation, and/or scratches do penetrate the full thickness of the primer and/or
Ti-Cad plating, Operators need to restore both the cadmium plate and primer finish as given below. Do steps
2, 3, 4, 6 and 7.
If the finish damage penetrates the full thickness of the primer only Operators need to restore the primer finish
only as given below. Continue with step 5.
CAUTION: STEPS 2, 3, 4, AND 5 ONL Y APPL Y TO THE LEAD-IN CHAMFER AND TRANSITION RADIUS.
Use light hand pressure to lightly abrade
the surface of the primer. Do not abrade
the areas where the primer is missing and
the cadmium plating is exposed. (b)
--Lead-in chamfer
and outer diameter
surface
Abrasive
Clean
2
Transition radius
again with solvent where areas of bare
metal exist, including immediate
surrounding areas. Refer to SOPM
20-30-03 as an accepted procedure.
--Lead-in chamfer
and outer diameter
surface
Clean3
Transition radius
where the surface protective coating was
damaged or disturbed. Refer to SOPM
20-42-10. (c) (d) (e)
--Low Hydrogen
Embrittlement
Stylus Cadmium
Plating
Apply4
with cotton swabs or gauze. Apply as little
solution as possible to prevent
contamination of the surrounding areas.
Refer to SOPM 20-42-10 as an accepted
procedure.
As
Req.
Ultrachromate 300
or equivalent (f)
Chromate
Conversion Coating
Apply5
where the surface protective coating was
damaged or disturbed, using a brush.
Refer to SOPM 20-44-04 as an accepted
procedure. (g) (h)
1 oz.BMS 10-79, Type
III Grade A or
Grade D
PrimerApply6
FIGURE 6: RIGHT MLG FORWARD TRUNNION PIN - BLENDING AND REPAIR OF THE PROTECTIVE
FINISH WITH MAIN LANDING GEAR REMOVED
(SHEET 2 OF 3)
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
May 12, 2005
737-32-1376Revision 2 August 06, 2008
52 of 71
BOEING SERVICE BULLETIN 737-32-1376

### Page 53

MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
in a thick layer to the trunnion pin exterior
surfaces and cross bolt bushing inner
diameter. Refer to SOPM 20-60-03 as an
accepted procedure.
8 oz.BMS 3-33GreaseApply7
(a) Replace or overhaul the Trunnion Pin if damage penetrates the Ti-Cad plating at the cross bolt bore
location.
(b) Use aluminum oxide abrasive pad 320 grit or finer, or light grade Scotch-Brite type A, very fine. Refer to
SOPM 20-41-02 Paragraph 4.A., Method 1 (Painted Surface Reactivation) as an accepted procedure.
(c) Mask the perimeter between the transition radius and spherical area to prevent debris and chemical
solution from going in the spherical area of the Trunnion Pin.
(d) The materials required for this task are given in SOPM 20-42-10.
(e) The Stylus Cadmium plating must be done with the Trunnion Pin unloaded.
(f) Refer to SOPM 20-42-02 , paragraph 7.C., Table 5 for other equivalent chromate treatment solutions.
(g) The primer application must be flush with or below the level of the chrome plated cylindrical surface. This
will make sure that installation of the pin is not prevented. Check for excess primer height using a straight
edge placed on the chrome plated pin outer diameter surface.
(h) Refer toSOPM 20-44-04as an accepted procedure for curing time and temperature. Allow enough time
for drying before handling and grease application.
FIGURE 6: RIGHT MLG FORWARD TRUNNION PIN - BLENDING AND REPAIR OF THE PROTECTIVE
FINISH WITH MAIN LANDING GEAR REMOVED
(SHEET 3 OF 3)
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
May 12, 2005
737-32-1376Revision 2 August 06, 2008
53 of 71
BOEING SERVICE BULLETIN 737-32-1376

### Page 54 (OCR)

BOEING SERVICE BULLETIN 737-32-1376
THIS FIGURE IS DELETED.
FIGURE 7: THE SET OSEEN DELETED
Revision 2 August 06  ›. 200‹  737-32-1376
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.  54 of 71

### Page 55 (OCR)

BOEING SERVICE BULLETIN 737-32-1376
THIS FIGURE IS DELETED.
D38438
FIGURES: THIS SHEET 1 OF BEEN DELETED
Revision 2 August 06, 2008  737-32-1376
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.  55 of 71

### Page 56 (OCR)

BOEING SERVICE BULLETIN 737-32-1376
THIS FIGURE IS DELETED.
FIGURES: THE SET OSEEN DELETED
Revision 2 August 06  ›. 2008  737-32-1376
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.  56 of 71

### Page 57 (OCR)

BOEING SERVICE BULLETIN 737-32-1376
THIS FIGURE IS DELETED.
D38438
FIGURE 10: TH SHEET TOAS BEEN DELETED
Revision 2 August 06, 2008  737-32-1376
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.  57 0f 71

### Page 58 (OCR)

BOEING SERVICE BULLETIN 737-32-1376
THIS FIGURE IS DELETED.
FIGURE 1: T SECTION BEEN DELETED
Revision 2 August 06  ›. 200‹  737-32-1376
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.  58 of 71

### Page 59 (OCR)

BOEING SERVICE BULLETIN 737-32-1376
THIS FIGURE IS DELETED.
D38438
FIGURE 12: TH SHEET 1 AS BEEN DELETED
May 12, 2005
Revision 2 August 06, 2008  737-32-1376
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.  59 of 71

### Page 60 (OCR)

BOEING SERVICE BULLETIN 737-32-1376
THIS FIGURE IS DELETED.
FIGURE 13: TH SECTION BEEN DELETED
Revision 2 August 06  ›. 2008  737-32-1376
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.  60 of 71

The text continues at https://openairdocs.org/service-documents/boeing/sb-737-32-1376/file/b7d8c8d8b418.md?from=61

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.