# Boeing Special Attention Service Bulletin 737-32-1402: Revision 1

- Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2013-0690; AD 2014-08-11 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Boeing Special Attention Service Bulletin 737-32-1402](https://openairdocs.org/service-documents/boeing/sb-737-32-1402.md)
- Title as filed: U.S. DOT/FAA - SB-737-32-1402-01
- Pages: 55
- PDF: https://openairdocs.org/files/sha256/3e/6f/3e6f81b6ddbb015721498724c7dd69bcd69c9b1763a73d1696e4ecf3ea5ec7e5
- Page: https://openairdocs.org/service-documents/boeing/sb-737-32-1402/file/3e6f81b6ddbb

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Commercial 
Airplanes
737
Service Bulletin
SPECIAL ATTENTION
Number: 737-32-1402
Original Issue: August 06, 2008
Revision 1: February 07, 2013
ATA System: 3211
SUBJECT: LANDING GEAR - Main Landing Gear - Forward Trunnion Pin Inspection and
Replacement.
Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15
CFR 300-774). An export license may be required before it is used for development, production or use by foreign
persons from specific countries. The controller of this data has the individual responsibility to abide by all export
laws.
9E991ECCN:
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET
Copyright © 2008 Boeing.
Unpublished Work. All Rights Reserved.
Treatment of this document and its content is governed by contract with Boeing. Rights to use this document
are licensed on a per aircraft basis and such rights may not be transferable. For more information, contact The
Boeing Company.
Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner,
BBJ, DC-8, DC-9, DC-10, KC-10, KC-46, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8, Poseidon and
Boeing liveries are all trademarks owned by The Boeing Company; and no trademark license is granted in
connection with this document unless provided in writing by Boeing.
Original Issue: August 06, 2008
737-32-1402Revision 1: February 07, 2013
1 of 55
7.0

### Page 2

Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 06, 2008
737-32-1402Revision 1: February 07, 2013
2 of 55
BOEING SERVICE BULLETIN 737-32-1402
BLANK PAGE

### Page 3

Table of Contents
Revision Transmittal Sheet ............................................ 5
Summary ...................................................... 9
1. PLANNING INFORMATION ........................................ 1 3
A. Effectivity ............................................... 1 3
1. Airplanes ............................................ 1 3
2. Spares Affected ........................................ 2 1
B. Concurrent Requirements ...................................... 2 1
C. Reason ................................................ 2 1
D. Description .............................................. 2 2
E. Compliance .............................................. 2 3
F. Approval ............................................... 2 7
G. Manpower .............................................. 2 7
H. Weight and Balance Changes .................................... 2 9
I. Electrical Load Data ......................................... 2 9
J. References .............................................. 2 9
1. Existing Data: ......................................... 2 9
2. Data Supplied with this Service Bulletin: ........................... 3 0
3. Installation Drawings Used in the Preparation of this Service Bulletin: ........... 3 0
K. Publications Affected ........................................ 3 0
L. Interchangeability and Intermixability of Parts ........................... 3 0
M. Software Accomplishment Summary ................................ 3 0
2. MATERIAL INFORMATION ........................................ 3 1
A. Material - Price and Availability ................................... 3 1
B. Industry Support Information .................................... 3 2
C. Parts Necessary for Each Airplane ................................. 3 2
1. Kits/Parts: ........................................... 3 2
2. Parts and Materials Supplied by the Operator: ........................ 3 3
3. Parts Modified and Reidentified: ............................... 3 4
4. Parts Removed and Not Replaced: .............................. 3 4
D. Parts Necessary to Change Spares ................................. 3 4
E. Special Tooling - Price and Availability ............................... 3 4
F. Special Tooling Necessary to do this Service Bulletin ....................... 3 4
3. ACCOMPLISHMENT INSTRUCTIONS .................................. 3 5
A. GENERAL INFORMATION ..................................... 3 5
B. WORK INSTRUCTIONS ....................................... 3 6
FIGURE 1: LEFT MLG FORWARD TRUNNION PIN TRANSITION RADIUS - INSPECTION ..... 4 2
FIGURE 2: RIGHT MLG FORWARD TRUNNION PIN TRANSITION RADIUS - INSPECTION ..... 4 4
FIGURE 3: LEFT MLG FORWARD TRUNNION PIN - PROTECTIVE FINISH APPLICATION ..... 4 6
FIGURE 4: RIGHT MLG FORWARD TRUNNION PIN - PROTECTIVE FINISH APPLICATION .... 4 9
FIGURE 5: FORWARD TRUNNION PIN LUBRICATION - LEFT MLG .................. 5 2
FIGURE 6: FORWARD TRUNNION PIN LUBRICATION - RIGHT MLG ................. 5 4
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 06, 2008
737-32-1402Revision 1: February 07, 2013
3 of 55
BOEING SERVICE BULLETIN 737-32-1402

### Page 4

Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 06, 2008
737-32-1402Revision 1: February 07, 2013
4 of 55
BOEING SERVICE BULLETIN 737-32-1402
BLANK PAGE

### Page 5

Commercial 
Airplanes
737
Service Bulletin
SPECIAL ATTENTION
Revision Transmittal SheetNumber: 737-32-1402Original Issue: August 06, 2008
Revision 1: February 07, 2013
ATA System: 3211
SUBJECT: LANDING GEAR - Main Landing Gear - Forward Trunnion Pin Inspection and
Replacement.
This revision includes all pages of the service bulletin.
COMPLIANCE INFORMATION RELATED TO THIS REVISION
Federal Aviation Administration (FAA) Airworthiness Directive AD 2009-24-07 is related to this service bulletin.
No more work is necessary on the airplane(s) changed in accordance with the Original Issue of this service
bulletin.
737-600/700/800/900 airplanes, but not 737-700/700C/800 airplanes with a Boeing Business Jet (BBJ)
configuration, from Line Number 1423 to 1787 and from Line Number 2091 to 3526, are added to Group 1 of
this service bulletin effectivity. These airplanes must start and continue repeat lubrication applications for the
forward trunnion pin and do a detailed inspection of the trunnion pin transition radius, of the left and right Main
Landing Gear (MLG).
737-700/700C/800 airplanes with a Boeing Business Jet configuration (BBJ) variable numbers YD412, YD415
thru YD417, YG091 thru YG093, YG103, YG104, YG111 thru YG114, YG116 thru YG128 and YG701 are added
to Group 2. These airplanes must start and continue repeat lubrication applications for the forward trunnion pin
and do a detailed inspection of the trunnion pin transition radius, of the left and right Main Landing Gear (MLG).
Airplanes variable numbers YG101 and YG102 are moved from Group 1 to Group 2 of this service bulletin
effectivity.
REASON FOR REVISION
This revision is sent to increase the service bulletin effectivity to a larger range of airplanes because of reports
of corrosion protection damage to the forward trunnion pin on 737 airplanes outside the original service bulletin
effectivity. Airplanes line numbers 1423 thru 1787 and 2091 thru 3526 have therefore been added to Group 1
and Group 2 of the service bulletin effectivity where applicable. From line number 3527 and above a new trunnion
pin seal and seal retainer were installed that are less likely to allow damage in this area. Also, a requirement
was added to production drawings to do a visual inspection of the protective coating of the forward trunnion pin
transition radius, after the MLG is installed. Airplane variable numbers YG101 and YG102 are moved to Group
2, because they were not correctly identified as BBJ before. Material Information and Accomplishment Instructions
are changed to show trunnion pin, P/N 161A1188-3, as fully interchangeable with P/N 161A1188-9, also trunnion
pins, P/N 161A1188-17, -19, -21 and -23 are added with their related part substitutions. Appendix A and B and
related operator inspection report instructions are removed.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 06, 2008
737-32-1402Revision 1: February 07, 2013
5 of 55

### Page 6

Terminology has been changed in the Work Instructions to agree with the terminology defined in Paragraph
3.A., General Information - Notes.
These sections are changed:
1. In Summary, Background: Added Boeing Service Related Problem, Boeing Fleet Team Digest, Boeing
Service Letter and related Boeing Service Bulletin references. Updated second paragraph.
2. In Summary, Action: Removed inspection report.
3. In Summary, Effectivity: Updated airplane models and statement.
4. In Summary, Compliance: Added FAA AD 2009-24-07.
5. In Paragraph 1.A., Effectivity: Updated airplane models and Group Configuration Table. Added airplanes
line numbers 1423 thru 1787 and 2091 thru 3526, as applicable, to effectivity list. Moved airplanes
variable numbers YG101 and YG102 from Group 1 to Group 2.
6. In Paragraph 1.C., Reason: Added Boeing Service Related Problem, Boeing Fleet Team Digest and
Boeing Service Letter references. Updated second paragraph.
7. In Paragraph 1.D., Description: Removed inspection report. Updated airplane models in maintenance
zone table.
8. In Paragraph 1.E., Compliance: Added FAA AD 2009-24-07 and note. Updated compliance times for
to refer to this AD and added new rows to Table 1 and 2 to cover airplanes not included in the effectivity
of the Original Issue of this service bulletin.
9. In Paragraph 1.F., Approval: Added Alternative Method of Compliance (AMOC) statement.
10. In Paragraph 1.G., Manpower: Added footnote (b) and references to the Manpower table for PART I.
Corrected PART IV total.
11. In Paragraph 1.J., References: updated.
12. In Paragraph 1.K., Publications Affected: Added Publications Affected table, with new IPC reference,
and note on Damage Tolerance Based Structural Inspections.
13. Added Paragraph 1.M., Software Accomplishment Summary: New service bulletin section - not affected.
14. In Paragraph 2.A., Material - Price and Availability: Changed footnote (b) to show correct part
interchangeability. Added P/N's 161A1188-17, -19, -21 and -23 and Footnotes (h) thru (l). Updated
prices.
15. In Paragraph 2.B., Industry Support Information: Updated warranty statement.
16. In Paragraph 2.C.1., Kits/Parts: Changed footnote (b) and added optional P/N 161A1188-9 to show
correct part interchangeability. Added P/N's 161A1188-17, -19, -21 and -23 and Footnotes (i) thru (n).
17. In Paragraph 2.C.2., Parts and Materials Supplied by the Operator: Corrected Grease Specification
and Chromate name. Added equivalent material specifications for Ultrachromate 300. Combined BMS
3-38 and BMS 3-26.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 06, 2008
737-32-1402Revision 1: February 07, 2013
6 of 55
BOEING SERVICE BULLETIN 737-32-1402

### Page 7

18. In Paragraph 3.A., General Information: General Notes updated.
19. In Paragraph 3.B., Work Instructions, PART I: Corrected Step 2. Added notes to Step 5.c.2. Removed
Step 6 for inspection report.
20. In Paragraph 3.B., Work Instructions, PART II: Changed Step 3.b. and added Steps 3.f. thru 3.i. and
note to show part interchangeability. Added Steps 5 thru 9.
21. In Paragraph 3.B., Work Instructions, PART III: Updated paragraph structure. Changed part name in
Step 4 to agree with Figures 3 and 4. Added Step 7.
22. In Paragraph 3.B., Work Instructions, PART IV: Added Steps 2 thru 4.
23. In Figure 1 Step Table: Added Inspection Description to Step 2. Removed Footnote (a) and reference.
24. In Figure 2 Step Table: Added Inspection Description to Step 2. Removed Footnote (a) and reference.
25. In Figure 3 Step Table: Added equivalent material specifications. Updated quantity definitions.
26. In Figure 4 Step Table: Added equivalent material specifications. Updated quantity definitions.
27. Removed Appendix A and B.
The data given in Information Notices 737-32-1402 IN 01, 737-32-1402 IN 02 is included in this revision.
Vertical lines are put on the left edge of each page, except in Paragraph 1.A., Effectivity, to show the location
of important changes.
Pages with no vertical lines have no important changes.
REVISION HISTORY
August 06, 2008Original Issue:
February 07, 2013Revision 1:
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 06, 2008
737-32-1402Revision 1: February 07, 2013
7 of 55
BOEING SERVICE BULLETIN 737-32-1402

### Page 8

Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 06, 2008
737-32-1402Revision 1: February 07, 2013
8 of 55
BOEING SERVICE BULLETIN 737-32-1402
BLANK PAGE

### Page 9

Commercial 
Airplanes
737
Service Bulletin
SPECIAL ATTENTION
SummaryNumber: 737-32-1402Original Issue: August 06, 2008
Revision 1: February 07, 2013
ATA System: 3211
SUBJECT: LANDING GEAR - Main Landing Gear - Forward Trunnion Pin Inspection and
Replacement.
BOEING RECOMMENDS THAT EACH OPERATOR EXAMINE THIS SERVICE BULLETIN IMMEDIATELY.
CONCURRENT REQUIREMENTS
None.
BACKGROUND
This Service Bulletin gives instructions to inspect the Main Landing Gear (MLG) forward trunnion pins for finish
damage or corrosion pitting, and if necessary, to replace them. If this Service Bulletin is not done, the corrosion
pitting could cause stress cracking of the forward trunnion pin which could result in a MLG collapse due to
fracture of the pin.
MLG forward trunnion pin protective finishes may have been damaged during final assembly. The protective
finish could be damaged at the transition radius between the chrome plated outer diameter and the spherical
ball bearing surface, because the pin was not handled correctly. The damage of the protective finish puts the
base metal at risk from corrosion pitting. After the release of the Original Issue of this service bulletin, Boeing
has received a total of four reports of MLG trunnion pin transition radius finish damage on pins installed on
airplanes that are before and after the effectivity of the Original Issue of this service bulletin. In each case, the
MLG had not been removed since aircraft delivery and the damage is similar to that described in this service
bulletin. Thus, at this revision, the effectivity is being increased to include those airplanes omitted previously,
between line numbers 1423 and 3526. From line number 3527 and above a new trunnion pin seal and seal
retainer were installed that are less likely to allow damage in this area. Also, a requirement was added to
production drawings to do a visual inspection of the protective coating of the forward trunnion pin transition
radius, after the MLG is installed.
Boeing Service Bulletin 737-32-1376 and 737-32-1448, are related to this service bulletin.
Boeing recommends to do this service bulletin at the same time as Boeing Service Bulletin 737-32-1448, if
applicable.
Boeing Service Related Problem (SRP) 737NG-SRP-32-0175 and 737NG-SRP-32-0157 are related to this
service bulletin.
Boeing Service Letter 737-SL-32-166 is related to this service bulletin.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 06, 2008
737-32-1402Revision 1: February 07, 2013
9 of 55

### Page 10

Boeing Fleet Team Digest 737NG FTD 32-11005, 737NG FTD 32-07010 and 737NG FTD 32-09004 are related
to this service bulletin.
ACTION
Do the lubrication of the MLG Forward Trunnion Pins at the thresholds given in Paragraph 1.E., Compliance,
Table 1 or Table 2 as applicable.
Do (in-situ) a detailed inspection of the Forward Trunnion Pin Transition Radius area (with the Main Landing
Gear not removed) at the thresholds and repeat intervals given in Paragraph 1.E., Compliance, Table 1 or Table
2 as applicable.
Repair/Overhaul or replace the MLG Forward Trunnion Pin if finish damage or corrosion is found.
EFFECTIVITY
737-600, 737-700, 737-700C, 737-800, 737-900 Airplanes. Refer to Paragraph 1.A.1., Airplanes, for the list of
affected airplane(s).
COMPLIANCE
Federal Aviation Administration (FAA) Airworthiness Directive AD 2009-24-07 is related to this service bulletin.
Refer to Paragraph 1.E., Compliance.
INDUSTRY SUPPORT INFORMATION
Boeing warranty remedies are available for airplanes in warranty as of February 22, 2007. Please refer to
Paragraph 2.B., Industry Support Information.
MANPOWER
Refer to Paragraph 1.G., Manpower.
MATERIAL INFORMATION
Boeing Supplied Kits/Parts.
Refer to Paragraph 2.A., Material - Price and Availability.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 06, 2008
737-32-1402Revision 1: February 07, 2013
10 of 55
BOEING SERVICE BULLETIN 737-32-1402

### Page 11 (OCR)

BOEING SERVICE BULLETIN 737-32-1402
FORWARD
TRUNNION PIN
INBD  • INBD
FWD  > FWD
LANDING GEAR REMOVED  LANDING GEAR REMOVED
DO IN SITU A DETAILED INSPECTION OF THE MLG FORWARD TRUNNION PIN
TRANSITION RADIUS AT THE THRESHOLD AND REPEAT INTERVALS GIVEN IN
COMPLIANCE TIME. LOOK FOR EVIDENCE OF CORROSION, AND/OR FINISH
DAMAGE, AND/OR SCRAPES, AND/OR SCRATCHES. IF DAMAGE IS FOUND, REPAIR
OR REPLACE THE TRUNNION PIN AS APPLICABLE.
1423601
Original Issue: August 06, 2008
Revision 1: February 07, 2013  Export Controlled ECCN: 9E991 - BOEING  737-32-1402
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.  11 of 55

### Page 12

Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 06, 2008
737-32-1402Revision 1: February 07, 2013
12 of 55
BOEING SERVICE BULLETIN 737-32-1402
BLANK PAGE

### Page 13

Commercial 
Airplanes
737
Service Bulletin
SPECIAL ATTENTION
Number: 737-32-1402
Original Issue: August 06, 2008
Revision 1: February 07, 2013
ATA System: 3211
SUBJECT: LANDING GEAR - Main Landing Gear - Forward Trunnion Pin Inspection and
Replacement.
BOEING RECOMMENDS THAT EACH OPERATOR EXAMINE THIS SERVICE BULLETIN IMMEDIATELY.
1.    PLANNING INFORMATION
A. Effectivity
1. Airplanes
Refer to Service Bulletin Index D6-19567 Part 3 for Airplane Variable Number, Line Number, and
Serial Number data.
This service bulletin is for the airplane(s) shown below.
DESCRIPTIONCONFIGURATIONGROUP
737-600, -700, -700C, -800 and -900 airplanes, from Line Number
1423 to 3526, but not 737-700/700C/800 airplanes with a Boeing
Business Jet configuration.
-1
737-700, -700C and -800 airplanes, with a Boeing Business Jet (BBJ)
configuration, between line number 1423 and 3526.
-2
Airplane Models:
737-600, 737-700, 737-700C, 737-800, 737-900
GroupVariable Number
1YA146 - YA199
1YA373 - YA377
1YA631
1YA666 - YA667
1YA973 - YA978
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 06, 2008
737-32-1402Revision 1: February 07, 2013
13 of 55

### Page 14

GroupVariable Number
1YB127 - YB132
1YB157 - YB158
1YB371 - YB392
1YB526
1YB544
1YB571 - YB580
1YB584 - YB598
1YB616 - YB630
1YB633 - YB635
1YB651
1YB656
1YB671 - YB672
1YB857 - YB863
1YB871 - YB874
1YB881 - YB893
1YB901 - YB903
1YB911
1YB961 - YB974
1YB981
1YB986 - YB996
1YC083 - YC084
1YC095
1YC170
1YC179
1YC190
1YC202 - YC203
1YC206 - YC207
1YC385 - YC387
1YC394
1YC438 - YC439
1YC742 - YC750
1YD056 - YD057
1YD108 - YD113
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 06, 2008
737-32-1402Revision 1: February 07, 2013
14 of 55
BOEING SERVICE BULLETIN 737-32-1402

### Page 15

GroupVariable Number
1YD158 - YD159
1YD333 - YD334
2YD412 - YD417
1YD491 - YD499
1YD512
1YD535
1YD591 - YD595
1YD651 - YD655
1YE324 - YE326
1YE371 - YE383
1YF001 - YF011
1YF021 - YF049
1YF051 - YF065
1YF086 - YF087
1YF106 - YF107
1YF111 - YF114
1YF116 - YF119
1YF121 - YF128
1YF176 - YF178
1YF191 - YF192
1YF201 - YF276
1YF401 - YF402
1YF431 - YF432
1YF441 - YF442
1YF451 - YF460
1YF501 - YF599
1YF701 - YF707
1YF801 - YF803
1YF831 - YF832
1YF836 - YF838
1YF901 - YF905
1YF921 - YF927
1YF951
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 06, 2008
737-32-1402Revision 1: February 07, 2013
15 of 55
BOEING SERVICE BULLETIN 737-32-1402

### Page 16

GroupVariable Number
2YG091 - YG099
2YG101 - YG104
2YG111 - YG114
2YG116 - YG128
1YG202 - YG205
1YG211 - YG214
1YG221 - YG224
1YG251 - YG252
1YG507 - YG511
2YG701
1YG711
1YJ003 - YJ013
1YJ021
1YJ533 - YJ579
1YJ593 - YJ599
1YJ683 - YJ694
1YJ814 - YJ860
1YJ872 - YJ880
1YJ902 - YJ904
1YJ908 - YJ910
1YJ917 - YJ929
1YJ932 - YJ937
1YJ941 - YJ956
1YJ961
1YJ976 - YJ977
1YK003 - YK007
1YK111 - YK112
1YK121 - YK122
1YK131 - YK133
1YK136 - YK139
1YK141 - YK142
1YK146 - YK148
1YK151 - YK154
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 06, 2008
737-32-1402Revision 1: February 07, 2013
16 of 55
BOEING SERVICE BULLETIN 737-32-1402

### Page 17

GroupVariable Number
1YK161 - YK167
1YK171
1YK176 - YK177
1YK186
1YK191
1YK196
1YK201 - YK202
1YK301 - YK314
1YK321 - YK340
1YK361 - YK378
1YK401 - YK406
1YK426 - YK427
1YK431 - YK450
1YK456 - YK467
1YK471 - YK473
1YK476
1YK480 - YK487
1YK491
1YK495 - YK498
1YK511 - YK516
1YK521 - YK530
1YK551 - YK571
1YK576 - YK577
1YK580 - YK585
1YK601 - YK602
1YK606 - YK607
1YK611 - YK616
1YK621 - YK634
1YK641 - YK644
1YK651 - YK665
1YK671 - YK672
1YK676 - YK677
1YK681 - YK686
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 06, 2008
737-32-1402Revision 1: February 07, 2013
17 of 55
BOEING SERVICE BULLETIN 737-32-1402

### Page 18

GroupVariable Number
1YK691
1YK701 - YK713
1YK716 - YK719
1YK721 - YK741
1YK751 - YK770
1YK776 - YK778
1YK781 - YK785
1YK792
1YK796 - YK797
1YK801 - YK899
1YK901 - YK912
1YK918 - YK919
1YK921 - YK928
1YK941 - YK959
1YK961 - YK996
1YL001 - YL005
1YL011 - YL016
1YL021 - YL024
1YL051 - YL052
1YL056 - YL057
1YL061
1YL066 - YL069
1YL076 - YL077
1YL101 - YL136
1YL201 - YL226
1YL271 - YL272
1YL281 - YL284
1YL302 - YL303
1YL311 - YL314
1YL316 - YL321
1YL351 - YL353
1YL371 - YL374
1YL401
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 06, 2008
737-32-1402Revision 1: February 07, 2013
18 of 55
BOEING SERVICE BULLETIN 737-32-1402

### Page 19

GroupVariable Number
1YL421 - YL429
1YL431 - YL444
1YL461 - YL478
1YL501 - YL509
1YL531 - YL534
1YL541 - YL544
1YL561 - YL569
1YL591 - YL598
1YL601 - YL606
1YL611 - YL612
1YL616 - YL617
1YL621
1YL626
1YL631 - YL634
1YL636 - YL637
1YL661 - YL664
1YL676 - YL681
1YL691
1YL696 - YL697
1YL701 - YL706
1YL731
1YL751 - YL752
1YL756 - YL757
1YL761 - YL779
1YL796 - YL797
1YL801 - YL815
1YL901 - YL910
1YL921 - YL940
1YL951 - YL968
1YM102 - YM103
1YM201 - YM242
1YM251 - YM299
1YM301 - YM398
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 06, 2008
737-32-1402Revision 1: February 07, 2013
19 of 55
BOEING SERVICE BULLETIN 737-32-1402

### Page 20

GroupVariable Number
1YM471
1YM481 - YM484
1YM501 - YM515
1YM521 - YM522
1YM541
1YM551 - YM553
1YM571 - YM572
1YM581 - YM582
1YM591 - YM599
1YM631 - YM634
1YM641 - YM652
1YM671 - YM674
1YM691 - YM698
1YM701 - YM710
1YM761 - YM765
1YN001 - YN016
1YN021 - YN024
1YN061
1YN071 - YN082
1YN091 - YN092
1YN101 - YN112
1YN121
1YN201 - YN202
1YN211 - YN219
1YN231 - YN236
1YN261
1YN501
1YQ001 - YQ003
1YQ011 - YQ017
1YQ026 - YQ027
1YQ036 - YQ042
1YQ201
1YQ231
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 06, 2008
737-32-1402Revision 1: February 07, 2013
20 of 55
BOEING SERVICE BULLETIN 737-32-1402

### Page 21

GroupVariable Number
1YQ241 - YQ242
1YQ291 - YQ295
1YQ401 - YQ403
1YR001 - YR005
1YR051 - YR053
1YR101
1YR111 - YR112
1YR166
1YR201 - YR203
1YR231 - YR232
2. Spares Affected
None.
B. Concurrent Requirements
None.
C. Reason
This Service Bulletin gives instructions to inspect the Main Landing Gear (MLG) forward trunnion pins
for finish damage or corrosion pitting, and if necessary, to replace them. If this Service Bulletin is not
done, the corrosion pitting could cause stress cracking of the forward trunnion pin which could result
in a MLG collapse due to fracture of the pin.
MLG forward trunnion pin protective finishes may have been damaged during final assembly. The
protective finish could be damaged at the transition radius between the chrome plated outer diameter
and the spherical ball bearing surface, because the pin was not handled correctly. The damage of the
protective finish puts the base metal at risk from corrosion pitting. After the release of the Original Issue
of this service bulletin, Boeing has received a total of four reports of MLG trunnion pin transition radius
finish damage on pins installed on airplanes that are before and after the effectivity of the Original Issue
of this service bulletin. In each case, the MLG had not been removed since aircraft delivery and the
damage is similar to that described in this service bulletin. Thus, at this revision, the effectivity is being
increased to include those airplanes omitted previously, between line numbers 1423 and 3526. From
line number 3527 and above a new trunnion pin seal and seal retainer were installed that are less likely
to allow damage in this area. Also, a requirement was added to production drawings to do a visual
inspection of the protective coating of the forward trunnion pin transition radius, after the MLG is installed.
Boeing Service Bulletin 737-32-1376 and 737-32-1448, are related to this service bulletin.
Boeing recommends to do this service bulletin at the same time as Boeing Service Bulletin 737-32-1448,
if applicable.
Boeing Service Related Problem (SRP) 737NG-SRP-32-0175 and 737NG-SRP-32-0157 are related
to this service bulletin.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 06, 2008
737-32-1402Revision 1: February 07, 2013
21 of 55
BOEING SERVICE BULLETIN 737-32-1402

### Page 22

Boeing Service Letter 737-SL-32-166 is related to this service bulletin.
Boeing Fleet Team Digest 737NG FTD 32-11005, 737NG FTD 32-07010 and 737NG FTD 32-09004
are related to this service bulletin.
Revision 1 is sent to increase the service bulletin effectivity to a larger range of airplanes because of
reports of corrosion protection damage to the forward trunnion pin on 737 airplanes outside the original
service bulletin effectivity. Airplanes line numbers 1423 thru 1787 and 2091 thru 3526 have therefore
been added to Group 1 and Group 2 of the service bulletin effectivity where applicable. From line
number 3527 and above a new trunnion pin seal and seal retainer were installed that are less likely to
allow damage in this area. Also, a requirement was added to production drawings to do a visual
inspection of the protective coating of the forward trunnion pin transition radius, after the MLG is installed.
Airplane variable numbers YG101 and YG102 are moved to Group 2, because they were not correctly
identified as BBJ before. Material Information and Accomplishment Instructions are changed to show
trunnion pin, P/N 161A1188-3, as fully interchangeable with P/N 161A1188-9, also trunnion pins, P/N
161A1188-17, -19, -21 and -23 are added with their related part substitutions. Appendix A and B and
related operator inspection report instructions are removed..
D. Description
Do the lubrication of the MLG Forward Trunnion Pins at the thresholds in accordance with Paragraph
1.E., Compliance, Table 1 or Table 2 as applicable.
Do (in-situ) a detailed inspection of the Forward Trunnion Pin Transition Radius area at the thresholds
and repeat intervals in accordance with Paragraph 1.E., Compliance, Table 1 or Table 2 as applicable.
NOTE: Make sure that you have serviceable Trunnion Pins on hand in case the Trunnion Pins
inspected are found with damage and need to be replaced.
Repair/Overhaul or replace the MLG Forward Trunnion Pin if damaged finishes or corrosion is found.
Revision 1 - No more work is necessary on the airplane(s) changed in accordance with the original
issue of this service bulletin.
The work in this service bulletin is done in the maintenance zone(s) given below.
Group 1:
Affected Maintenance Zones
ZoneModel
551, 661, 734, 744737-600, 737-700, 737-700C,
737-800, 737-900
Group 2:
Affected Maintenance Zones
ZoneModel
551, 661, 734, 744737-700, 737-700C, 737-800
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 06, 2008
737-32-1402Revision 1: February 07, 2013
22 of 55
BOEING SERVICE BULLETIN 737-32-1402

### Page 23

E. Compliance
Accomplish the required action(s), based on the applicable condition(s), in Table(s) 1 and 2, in
accordance with Paragraph 3. Accomplishment Instructions.
Federal Aviation Administration (FAA) Airworthiness Directive AD 2009-24-07 is related to this service
bulletin.
Group 1:
Table 1 - MLG Forward Trunnion Pin - Inspection and Lubrication of the Transition Radius with Main
Landing Gear not removed (In-Situ)
Repeat Interval
(Not to Exceed)
Compliance Time (Whichever
Occurs Later)
ActionCondition
30 days (a)Within 30 days
from January 4,
2010, the effec-
tive date of AD
2009-24-07 .
-Lubricate the MLG For-
ward Trunnion Pin in ac-
cordance with Accom-
plishment Instruction 3.B.,
PART IV, "MLG Forward
Trunnion Pin - Lubrica-
tion"
All airplanes that were in-
cluded in the effectivity of
the Original Issue of this
service bulletin.
30 days (a)Within 30 days
from the date of
Revision 1 of
this service bul-
letin
-Lubricate the MLG For-
ward Trunnion Pin in ac-
cordance with Accom-
plishment Instruction 3.B.,
PART IV, "MLG Forward
Trunnion Pin - Lubrica-
tion"
All airplanes that were NOT
included in the effectivity of
the original issue of this
service bulletin.
-Within 6 months
from January 4,
2010, the effec-
tive date of AD
2009-24-07 .
Within 60
months since
the date of is-
suance of the
original stan-
dard airworthi-
ness certificate
or date of is-
suance of the
original export
certificate of air-
worthiness.
Detailed Inspection of the
Transition Radius location
(In-Situ) in accordance
with Accomplishment In-
struction, paragraph 3.B.,
PART I, "MLG Forward
Trunnion Pin - Inspection
of the Transition Radius
with the MLG Not Re-
moved (in-situ)".
All airplanes that were in-
cluded in the effectivity of
the Original Issue of this
service bulletin.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 06, 2008
737-32-1402Revision 1: February 07, 2013
23 of 55
BOEING SERVICE BULLETIN 737-32-1402

### Page 24

Group 1:
Table 1 - MLG Forward Trunnion Pin - Inspection and Lubrication of the Transition Radius with Main
Landing Gear not removed (In-Situ)
Repeat Interval
(Not to Exceed)
Compliance Time (Whichever
Occurs Later)
ActionCondition
-Within 6 months
from the date of
Revision 1 of
this service bul-
letin
Within 60
months since
the date of is-
suance of the
original stan-
dard airworthi-
ness certificate
or date of is-
suance of the
original export
certificate of air-
worthiness
Detailed Inspection of the
Transition Radius location
(In-Situ) in accordance
with Accomplishment In-
struction, paragraph 3.B.,
PART I, "MLG Forward
Trunnion Pin - Inspection
of the Transition Radius
with the MLG Not Re-
moved (in-situ)"
All airplanes that were NOT
included in the effectivity of
the original issue of this
service bulletin.
-Before further
flight
-Repair the finish in accor-
dance with Accomplish-
ment Instruction, para-
graph 3.B., PART III,
"MLG Forward Trunnion
Pin - Blending and Repair
of the Protective Finish"
(in situ).
Airplanes with finish dam-
age (scrapes or scratches
through the full thickness
of the primer or areas of
missing primer) found in
the Transition Radius loca-
tion, and no corrosion, no
pitting, and no base metal
scratches. And
24 Months (b)Within 24
Months after the
finish damage is
repaired
-Detailed Inspection of the
Transition Radius location
(In-Situ) in accordance
with Accomplishment In-
struction, paragraph 3.B.,
PART I, "MLG Forward
Trunnion Pin - Inspection
of the Transition Radius
with the MLG Not Re-
moved (in-situ)".
-Before further
flight (c)
-Do Accomplishment In-
struction, paragraph 3.B.,
PART II, "MLG Forward
Trunnion Pin - Replace-
ment".
Airplanes with corrosion, or
pitting, or base metal
scratches in the base mate-
rial, found at the Transition
Radius location.
-Before further
flight.
-Do Accomplishment In-
struction paragraph 3.B.,
PART IV, "MLG Forward
Trunnion Pin - Lubrica-
tion".
Airplanes with no corro-
sion, no pitting , no base
metal scratches, and no
finish damage at the Tran-
sition Radius location.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 06, 2008
737-32-1402Revision 1: February 07, 2013
24 of 55
BOEING SERVICE BULLETIN 737-32-1402

### Page 25

Group 1:
Table 1 - MLG Forward Trunnion Pin - Inspection and Lubrication of the Transition Radius with Main
Landing Gear not removed (In-Situ)
Repeat Interval
(Not to Exceed)
Compliance Time (Whichever
Occurs Later)
ActionCondition
(a) Until the inspections of PART I, "MLG Forward Trunnion Pin - Inspection of the Transition Radius with
the MLG Not Removed" are completed.
(b) Until the Forward Trunnion Pin is Replaced or Overhauled - for that pin only. Refer to CMM 57-15-01 as
an accepted procedure.
(c) Trunnion pins that are removed from the airplane can be repaired at the operator's approved maintenance
facility. Refer to CMM 57-15-01 as an accepted procedure. The repair of the Trunnion Pin, with reference
to CMM 57-15-01, will meet all compliance requirements of this service bulletin, for that pin only.
Group 2:
Table 2 - MLG Forward Trunnion Pin - Inspection and Lubrication of the Transition Radius with Main
Landing Gear not removed (In-Situ)
Repeat Interval
(Not to Exceed)
Compliance Time (Whichever
Occurs Later)
ActionCondition
30 days (a)Within 30 days
from January 4,
2010, the effec-
tive date of AD
2009-24-07 .
-Lubricate the MLG For-
ward Trunnion Pin in ac-
cordance with Accom-
plishment Instruction 3.B.,
PART IV, "MLG Forward
Trunnion Pin - Lubrica-
tion"
All airplanes that were in-
cluded in the effectivity of
the Original Issue of this
service bulletin.
30 days (a)Within 30 days
from the date of
Revision 1 of
this service bul-
letin
-Lubricate the MLG For-
ward Trunnion Pin in ac-
cordance with Accom-
plishment Instruction 3.B.,
PART IV, "MLG Forward
Trunnion Pin - Lubrica-
tion"
All airplanes that were NOT
included in the effectivity of
the original issue of this
service bulletin.
-Within 6 months
from January 4,
2010, the effec-
tive date of AD
2009-24-07 .
Within 60
months since
the date of is-
suance of the
original stan-
dard airworthi-
ness certificate
or date of is-
suance of the
original export
certificate of air-
worthiness.
Detailed Inspection of the
Transition Radius location
(In-Situ) in accordance
with Accomplishment In-
struction, paragraph 3.B.,
PART I, "MLG Forward
Trunnion Pin - Inspection
of the Transition Radius
with the MLG Not Re-
moved (in-situ)".
All airplanes that were in-
cluded in the effectivity of
the Original Issue of this
service bulletin.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 06, 2008
737-32-1402Revision 1: February 07, 2013
25 of 55
BOEING SERVICE BULLETIN 737-32-1402

### Page 26

Group 2:
Table 2 - MLG Forward Trunnion Pin - Inspection and Lubrication of the Transition Radius with Main
Landing Gear not removed (In-Situ)
Repeat Interval
(Not to Exceed)
Compliance Time (Whichever
Occurs Later)
ActionCondition
-Within 6 months
from the date of
Revision 1 of
this service bul-
letin
Within 60
months since
the date of is-
suance of the
original stan-
dard airworthi-
ness certificate
or date of is-
suance of the
original export
certificate of air-
worthiness
Detailed Inspection of the
Transition Radius location
(In-Situ) in accordance
with Accomplishment In-
struction, paragraph 3.B.,
PART I, "MLG Forward
Trunnion Pin - Inspection
of the Transition Radius
with the MLG Not Re-
moved (in-situ)"
All airplanes that were NOT
included in the effectivity of
the original issue of this
service bulletin.
-Before further
flight
-Repair the finish in accor-
dance with Accomplish-
ment Instruction, para-
graph 3.B., PART III,
"MLG Forward Trunnion
Pin - Blending and Repair
of the Protective Finish"
(In-Situ).
Airplanes with finish dam-
age (scrapes or scratches
through the full thickness
of the primer or areas of
missing primer) found in
the Transition Radius loca-
tion and no corrosion, no
pitting, and no base metal
scratches And
24 Months (b)Within 24
Months after the
finish damage is
repaired.
Detailed Inspection of the
Transition Radius location
(In-Situ) in accordance
with Accomplishment In-
struction, paragraph 3.B.,
PART I, "MLG Forward
Trunnion Pin - Inspection
of the Transition Radius
with the MLG Not Re-
moved (in-situ)".
-Before further
flight (c)
-Do Accomplishment In-
struction, paragraph 3.B.,
PART II, "MLG Forward
Trunnion Pin - Replace-
ment".
Airplanes with corrosion, or
pitting, or base metal
scratches in the base mate-
rial, found at the Transition
Radius location.
-Before further
flight.
-Do Accomplishment In-
struction paragraph 3.B.,
PART IV, "MLG Forward
Trunnion Pin - Lubrica-
tion".
Airplanes with no corro-
sion, no pitting , no base
metal scratches, and no
finish damage at the Tran-
sition Radius location.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 06, 2008
737-32-1402Revision 1: February 07, 2013
26 of 55
BOEING SERVICE BULLETIN 737-32-1402

### Page 27

Group 2:
Table 2 - MLG Forward Trunnion Pin - Inspection and Lubrication of the Transition Radius with Main
Landing Gear not removed (In-Situ)
Repeat Interval
(Not to Exceed)
Compliance Time (Whichever
Occurs Later)
ActionCondition
(a) Until the inspections of PART I, "MLG Forward Trunnion Pin - Inspection of the Transition Radius with
the MLG Not Removed" are completed.
(b) Until the Forward Trunnion Pin is Replaced or Overhauled - for that pin only. Refer to CMM 57-15-01 as
an accepted procedure.
(c) Trunnion pins that are removed from the airplane can be repaired at the operator's approved maintenance
facility. Refer to CMM 57-15-01 as an accepted procedure. The repair of the Trunnion Pin, with reference
to CMM 57-15-01, will meet all compliance requirements of this service bulletin, for that pin only.
F. Approval
This service bulletin was examined by the Federal Aviation Administration (FAA). The changes specified
in this service bulletin comply with the applicable regulations and are FAA approved, as well as European
Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/JAA approved
airplanes listed in the service bulletin effectivity. This service bulletin and its approval were based on
the airplane in its original Boeing delivery configuration or as modified by other approved Boeing
changes.
If an airplane has a non-Boeing modification or repair that affects a component or system also affected
by this service bulletin, the operator is responsible for obtaining appropriate regulatory agency approval
before incorporating this service bulletin.
In addition, the Manager of the FAA Seattle Aircraft Certification Office approves the accomplishment
of the inspection, investigative and corrective actions, and lubrication specified in Section 1.E.,
Compliance, of Service Bulletin 737-32-1402, Revision 1, as an alternative method of compliance to
the inspection, investigative and corrective actions, and lubrication specified in Section 1.E., Compliance,
of Service Bulletin 737-32-1402, Original Issue, dated August 6, 2008, and required by paragraphs (g),
(h), and (j) of AD 2009-24-07. All provisions of AD 2009-24-07 that are not specifically referenced in
this paragraph remain fully applicable and must be complied with accordingly.
G. Manpower
The table below shows an estimate of the task-hours necessary to do this service bulletin for each
airplane. This estimate is for direct labor only, done by an experienced crew. Adjust the estimate with
operator task-hour data if necessary. The estimate does not include lost time. These are some examples
of lost time:
— Time to adjust to the workplace
— Time to schedule the work
— Time to examine the work
— Time to cure the materials
— Time to make the parts
— Time to find the tools.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 06, 2008
737-32-1402Revision 1: February 07, 2013
27 of 55
BOEING SERVICE BULLETIN 737-32-1402

### Page 28

TABLE 1: PART I - MLG FORWARD TRUNNION PIN - TRANSITION RADIUS INSPECTION
WITH MAIN LANDING GEAR NOT REMOVED (IN-SITU)
Elapsed HoursTask-HoursNumber of Per-
sons
Task
1.00 (b)2.00 (b)2Open Access
2.002.001FIGURE 1
2.002.001FIGURE 2
1.00 (b)2.00 (b)2Close Access
6.00 (a) (b)8.00 (a) (b)TOTAL FOR EACH AIRPLANE FOR
PART I
(a) Total assumes no corrosion or finish damages found during the inspections
covered in FIGURE 1 and FIGURE 2. If corrosion or finish damage is found
more work may be necessary in PART I.
(b) Estimates shown do not include time to remove and put back the left and
right Main Landing Gear (MLG), if necessary. If it is necessary to remove
and put back a MLG, an additional 34.00 hours will be added to the total
for each airplane. Add 17.00 hours to the Open Access estimate and 17.00
hours to the Close Access estimate, for each MLG that must be removed
and put back.
TABLE 2: PART II - MLG FORWARD TRUNNION PIN - REPLACEMENT
Elapsed HoursTask-HoursNumber of Per-
sons
Task
9.0036.004Remove Trunnion
Bearing Assy
1.002.002Remove FWD
Trunnion Pins
1.002.002Install FWD Trun-
nion Pins
9.0036.004Install Trunnion
Bearing Assy
20.0076.00TOTAL FOR EACH AIRPLANE FOR
PART II
TABLE 3: PART III - MLG FORWARD TRUNNION PIN - BLENDING AND REPAIR OF THE
PROTECTIVE FINISH
Elapsed HoursTask-HoursNumber of Per-
sons
Task
(a)(a)(a)FIGURE 3
(a)(a)(a)FIGURE 4
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 06, 2008
737-32-1402Revision 1: February 07, 2013
28 of 55
BOEING SERVICE BULLETIN 737-32-1402

### Page 29

TABLE 3: PART III - MLG FORWARD TRUNNION PIN - BLENDING AND REPAIR OF THE
PROTECTIVE FINISH
Elapsed HoursTask-HoursNumber of Per-
sons
Task
(a)(a)TOTAL FOR EACH AIRPLANE FOR
PART III
(a) Manpower estimates are not available for FIGURE 3 and FIGURE 4: Left
and right MLG Forward Trunnion Pin Protective Finish Restoration. The
tasks covered by both figures are covered by Lost Time.
TABLE 4: PART IV - MLG FORWARD TRUNNION PIN - LUBRICATION
Elapsed HoursTask-HoursNumber of Per-
sons
Task
0.250.251FIGURE 5
0.250.251FIGURE 6
0.500.50TOTAL FOR EACH AIRPLANE FOR
PART IV
H. Weight and Balance Changes
None.
I. Electrical Load Data
Not changed.
J. References
1. Existing Data:
a. Boeing Service Bulletin 737-32-1376, 737-32-1448.
b. Boeing Service Letter 737-SL-32-166.
c. Boeing Service Related Problem (SRP) 737NG-SRP-32-0157, 737NG-SRP-32-0175.
d. Component Maintenance Manual (CMM) 57-15-01.
e. Federal Aviation Administration (FAA) Airworthiness Directive (AD) 2009-24-07.
f. Service Bulletin Index D6-19567.
g. Standard Overhaul Practices Manual (SOPM) 20-00-00, 20-30-03, 20-41-05, 20-42-10,
20-44-04.
h. 737-600/700/800/900 Aircraft Maintenance Manual (AMM) 07-11-01, 12-21-11, 32-00-01,
32-11-00, 32-11-83, 57-16-01.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 06, 2008
737-32-1402Revision 1: February 07, 2013
29 of 55
BOEING SERVICE BULLETIN 737-32-1402

### Page 30

i. 737-600/700/800/900 Maintenance Planning Data (MPD) Appendix A.
j. 737-700/800 Maintenance Planning Data (MPD) Appendix A.
k. 737NG Fleet Team Digest (FTD) 32-07010, 32-09004, 32-11005.
2. Data Supplied with this Service Bulletin:
None.
3. Installation Drawings Used in the Preparation of this Service Bulletin:
None.
K. Publications Affected
1. Publications:
Chapter-SectionPublication
32-11737 Illustrated Parts Catalog
2. Damage Tolerance Based Structural Inspections:
Boeing has evaluated the repairs and/or changes in this service bulletin for effects on Fatigue
Critical Structure (FCS) and for changes to Damage Tolerance Inspections (DTI) required in the
Maintenance Program. This service bulletin does not affect FCS, therefore DTIs are not necessary.
L. Interchangeability and Intermixability of Parts
Refer to Paragraph 2.C., Parts Necessary for Each Airplane, for interchangeability and intermixability
information.
M. Software Accomplishment Summary
Not affected.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 06, 2008
737-32-1402Revision 1: February 07, 2013
30 of 55
BOEING SERVICE BULLETIN 737-32-1402

### Page 31

2.    MATERIAL INFORMATION
A. Material - Price and Availability
Boeing can supply the parts shown in Paragraph 2.C., Parts Necessary for Each Airplane. Operators
are encouraged to share schedule requirements with Boeing for incorporation of the service bulletin.
The parts are subject to the terms and conditions of the Boeing standard purchase order
acknowledgment. Prices are in United States Dollars. Terms: Net 30 days.
Reference this service bulletin and submit your purchase order by one of these methods:
1. Order on-line via ATA Spec 2000 or The Boeing PART Page
2. Fax to (206) 662-7145
REFER TO THE BOEING PART PAGE ON MYBOEINGFLEET.COM OR CONTACT FIRST RESPONDER
AT FR@BOEING.COM FOR THE LATEST REORDER LEAD TIME (ROLT) AND PRICE INFORMATION
Unit Price as of
the Revision 01
date of this Ser-
vice Bulletin
(US Dollars)
ROLT as
of the Re-
vision 01
date of
this Ser-
vice Bul-
letin (Cal-
endar
Days)
QTYDateNamePart Number
$4,271.00-1-Forward Trunnion Pin161A1188-1 (a) (g)
$4,271.00-1-Forward Trunnion Pin161A1188-3 (b) (g)
$4,271.00-1-Forward Trunnion Pin161A1188-5 (c) (g)
$4,271.00-1-Forward Trunnion Pin161A1188-9 (d) (g)
$12,084.00-1-Forward Trunnion Pin161A1188-13 (e) (g)
$12,084.00-1-Forward Trunnion Pin161A1188-15 (f) (g)
$12,084.00-1-Forward Trunnion Pin161A1188-17 (g) (h) (l)
$12,084.00-1-Forward Trunnion Pin161A1188-19 (g) (i) (l)
$12,084.00-1-Forward Trunnion Pin161A1188-21 (g) (j) (l)
$12,084.00-1-Forward Trunnion Pin161A1188-23 (g) (k) (l)
(a) 161A1188-1 Trunnion Pin may replace 161A1188-1 and 161A1188-5 Trunnion Pins.
(b) 161A1188-3 Trunnion Pin may replace 161A1188-3 or 161A1188-9 Trunnion Pins.
(c) 161A1188-5 Trunnion Pin replaces only 161A1188-5 Trunnion Pins.
(d) 161A1188-9 Trunnion Pin may replace 161A1188-3 and 161A1188-9 Trunnion Pins.
(e) 161A1188-13 Trunnion Pin may replace 161A1188-1 and 161A1188-5 Trunnion Pins.
(f) 161A1188-15 Trunnion Pin may replace 161A1188-1 and 161A1188-5 Trunnion Pins.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 06, 2008
737-32-1402Revision 1: February 07, 2013
31 of 55
BOEING SERVICE BULLETIN 737-32-1402

### Page 32

REFER TO THE BOEING PART PAGE ON MYBOEINGFLEET.COM OR CONTACT FIRST RESPONDER
AT FR@BOEING.COM FOR THE LATEST REORDER LEAD TIME (ROLT) AND PRICE INFORMATION
Unit Price as of
the Revision 01
date of this Ser-
vice Bulletin
(US Dollars)
ROLT as
of the Re-
vision 01
date of
this Ser-
vice Bul-
letin (Cal-
endar
Days)
QTYDateNamePart Number
(g) The quantity shown is for a single main landing gear strut.
(h) 161A1188-17 Trunnion Pin may replace 161A1188-1 Trunnion Pins.
(i) 161A1188-19 Trunnion Pin may replace 161A1188-13 Trunnion Pins.
(j) 161A1188-21 Trunnion Pin may replace 161A1188-15 Trunnion Pins
(k) 161A1188-23 Trunnion Pin may replace 161A1188-5 Trunnion Pins.
(l) This part is required for the terminating action given in Boeing Service Bulletin 737-32-1448.
NOTE: Operators will need to identify which trunnion pin was initially fitted to each main landing gear
strut. This will ensure the correct replacement part is ordered.
B. Industry Support Information
Boeing warranty remedies are available for 737-600/700/800/900 airplanes in warranty as of February
22, 2007. For inspection man-hour reimbursement for airplanes in warranty as of that date, send a
warranty claim to Boeing Commercial Airplanes Group - Warranties. If the condition described in this
service bulletin is found during the inspection for airplanes in warranty as of that date and additional
man-hours and kits, parts, and/or special tools are required, send a warranty claim to Boeing Commercial
Airplanes Group - Warranties. Please refer to this service bulletin number and reference the airplane
variable number(s) in your purchase order.
C. Parts Necessary for Each Airplane
1. Kits/Parts:
To get the kits/parts shown below, refer to Paragraph 2.A., Material - Price and Availability.
NOTE: The items shown in Paragraph 2.C.2., Parts and Materials Supplied by the Operator, are
necessary for each airplane.
NotesExisting Part NumberNameQTYNew Part Number
(a) (f) (g) (h)161A1188-1 or
161A1188-5 (optional)
Forward Trunnion Pin1161A1188-1
(b) (f) (g) (h)161A1188-3 or
161A1188-9 (optional)
Forward Trunnion Pin1161A1188-3 or
161A1188-9 (optional)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 06, 2008
737-32-1402Revision 1: February 07, 2013
32 of 55
BOEING SERVICE BULLETIN 737-32-1402

### Page 33

NotesExisting Part NumberNameQTYNew Part Number
(c) (f) (g)161A1188-5 or
161A1188-23 (optional)
Forward Trunnion Pin1161A1188-5
(d) (f)161A1188-1 or
161A1188-5 (optional)
Forward Trunnion Pin1161A1188-13
(e) (f)161A1188-1 or
161A1188-5 (optional)
Forward Trunnion Pin1161A1188-15
(f) (h) (j) (n)161A1188-1Forward Trunnion Pin1161A1188-17
(f) (i) (k) (n)161A1188-13Forward Trunnion Pin1161A1188-19
(f) (i) (l) (n)161A1188-15Forward Trunnion Pin1161A1188-21
(f) (i) (m) (n)161A1188-5Forward Trunnion Pin1161A1188-23
(a) 161A1188-1 Trunnion Pin may replace 161A1188-1 and 161A1188-5 Trunnion Pins.
(b) 161A1188-3 or 161A1188-9 Trunnion Pins may replace 161A1188-3 or 161A1188-9 Trunnion Pins.
(c) 161A1188-5 Trunnion Pin replaces only 161A1188-5 Trunnion Pins.
(d) 161A1188-13 Trunnion Pin may replace 161A1188-1 and 161A1188-5 Trunnion Pins.
(e) 161A1188-15 Trunnion Pin may replace 161A1188-1 and 161A1188-5 Trunnion Pins.
(f) Quantity shown is for one main landing gear strut.
(g) Rework the existing part at an authorized repair center or send the parts that are removed to Boeing
at the address given below: Spares Distribution Center Repair Overhaul and Exchange Services
The Boeing Company 2201 South 142nd Street Building 2201, Door W-10, SSA 111 SeaTac,
Washington 98168 Make sure the parts have tags, with the data that follows:
(h) This part is used in production.
(i) This part is not used in production.
(j) 161A1188-17 Trunnion Pin replaces only 161A1188-1 Trunnion Pins.
(k) 161A1188-19 Trunnion Pin replaces only 161A1188-13 Trunnion Pins.
(l) 161A1188-21 Trunnion Pin replaces only 161A1188-15 Trunnion Pins.
(m) 161A1188-23 Trunnion Pin replaces only 161A1188-5 Trunnion Pins.
(n) This part is required for the terminating action given in Boeing Service Bulletin 737-32-1448.
2. Parts and Materials Supplied by the Operator:
NotesNameQTYPart Number / Specifi-
cation
(a)Corrosion Inhibiting Compound16 oz.BMS 3-38 or BMS 3-26,
Type II
(a)Grease - Aircraft General Purpose32oz.BMS 3-33
(a)Urethane Compatible Corrosion Re-
sistant Primer
4 oz.BMS 10-79 Type III
Grade A or Grade D
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 06, 2008
737-32-1402Revision 1: February 07, 2013
33 of 55
BOEING SERVICE BULLETIN 737-32-1402

### Page 34

NotesNameQTYPart Number / Specifi-
cation
Lockwire10 feetMS20995NC32
(a)Cleaning Solvent1 pintBMS 11-7
(b)Scotch-Brite, Type A, very fine or
equivalent material
3 feetAbrasive
(c)Aluminum Oxide Abrasive Pad, 320
grit or finer or equivalent material
As Nec-
essary
Abrasive
(d)Chromate Conversion Coating4 oz.Ultrachromate 300, or
equivalent chromate
solution per QQ-P-416
or AMS-QQ-P-416,
Type II.
(a) See the Qualified Products List at the end of the Boeing Material Specification
(BMS) for supplier data.
(b) Vendor Contact Information: V76381, 3M CO., 3M Center Bldg. 225-3S-20, St.
Paul, Minnesota 55144-1000. Refer to SOPM 20-00-00 for vendors.
(c) Vendor Contact Information: V06565, Norton Company, Coated Abrasive Div., 10th
Ave. and 25th St., Watervliet, New York 12189. Refer to SOPM 20-00-00 for ven-
dors.
(d) Vendor Contact Information: V64709, Delta Pollution Control, Inc., 30540 S.E. 8th,
Preston, Washington, 98050. Refer to SOPM 20-00-00 for vendors.
3. Parts Modified and Reidentified:
None.
4. Parts Removed and Not Replaced:
None.
D. Parts Necessary to Change Spares
None.
E. Special Tooling - Price and Availability
None.
F. Special Tooling Necessary to do this Service Bulletin
No special tools or equipment are necessary to do the change in this service bulletin. But, maintenance
and overhaul tools in the manuals given in Paragraph 1.J., References, can be necessary. Examine
operator tool supply to make sure all necessary tools are available.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 06, 2008
737-32-1402Revision 1: February 07, 2013
34 of 55
BOEING SERVICE BULLETIN 737-32-1402

### Page 35

3.    ACCOMPLISHMENT INSTRUCTIONS
A. GENERAL INFORMATION
CAUTION: KEEP THE WORK AREA, WIRES AND ELECTRICAL BUNDLES CLEAN OF METAL
PARTICLES OR CONTAMINATION WHEN YOU USE TOOLS. UNWANTED MATERIAL,
METAL PARTICLES OR CONTAMINATION CAUGHT IN WIRE BUNDLES CAN CAUSE
DAMAGE TO THE BUNDLES. DAMAGED WIRE BUNDLES CAN CAUSE SPARKS OR
OTHER ELECTRICAL DAMAGE.
NOTE: 1. Manual titles are referred to by acronyms. Refer to Paragraph 1.J., References, for
definition of the acronyms.
2. Obey all of the warnings and cautions given in the specified manual sections.
3. The work instructions are divided into work packages. Task-Hours and Elapsed-Hours
for each package are given in Paragraph 1.G., Manpower.
4. Unless shown differently, these dimensions and tolerances are used:
— Torque limits to tighten nuts and bolts are given in 737 Structural Repair Manual,
Chapter 51.
5. A Detailed Inspection is defined as: An intensive examination of a specific item,
installation, or assembly to detect damage, failure, or irregularity. Available lighting
is normally supplemented with a direct source of good lighting at an intensity deemed
appropriate. Inspection aids such as mirrors magnifying lenses, etc. may be
necessary. Surface cleaning and elaborate procedures may be required.
6. A General Visual Inspection is defined as: A visual examination of an interior or
exterior area, installation or assembly to detect obvious damage, failure or irregularity.
This level of inspection is made from within touching distance unless otherwise
specified. A mirror may be necessary to enhance visual access to all exposed surfaces
in the inspection area. This level of inspection is made under normally available
lighting conditions such as daylight, hangar lighting, flashlight or drop-light and may
require removal or opening of access panels or doors. Stands, ladders or platforms
may be required to gain proximity to the area being checked.
7. These work instructions refer to procedures included in other Boeing documents.
When the words "refer to" are used and the operator has an accepted alternative
procedure, the accepted alternative procedure can be used. When the words "in
accordance with" are included in the instruction, the procedure in the Boeing document
must be used.
8. The instructions in Paragraph 3.B., Work Instructions and the figures can include
operation of tools or test equipment. Boeing Engineering Tool Drawings, the Illustrated
Tool and Equipment Manual, and the Special Tool and Ground Handling Drawing
Index contain data on versions of the tools or test equipment that you can use. It is
permitted to use replaced tools. It is not permitted to use superseded tools.
9. If it is necessary to remove more parts for access, you can remove those parts. If
you can get access without removing identified parts, it is not necessary to remove
all of the identified parts. Jacking and shoring limitations must be observed.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 06, 2008
737-32-1402Revision 1: February 07, 2013
35 of 55
BOEING SERVICE BULLETIN 737-32-1402

### Page 36

10. Where the work instructions include installation of a kept part, a new or serviceable
part with the same part number can be installed as an alternative to the kept part.
B. WORK INSTRUCTIONS
PART I - MLG FORWARD TRUNNION PIN - TRANSITION RADIUS INSPECTION WITH MAIN
LANDING GEAR NOT REMOVED (IN-SITU)
WARNING: MAKE SURE THE DOWNLOCK PINS ARE INSTALLED ON ALL THE LANDING GEAR.
WITHOUT THE DOWNLOCK PINS, THE LANDING GEAR COULD RETRACT AND
CAUSE INJURIES TO PERSONS AND DAMAGE TO EQUIPMENT
1. Install the downlock pins in the nose and main landing gear. Refer to 737-600/700/800/900 AMM
32-00-01 as an accepted procedure.
2. Remove the following access panels, if necessary, for a better accessibility to the inspection area:
a. 551BB, Lower Inboard Fixed Trailing Edge, Gear Adjustment Door, for the Left Landing Gear.
b. 551CB, Lower Inboard Fixed Trailing Edge, Gear Access Panel, for the Left Landing Gear.
c. 651BB, Lower Inboard Fixed Trailing Edge, Gear Adjustment Door, for the Right Landing
Gear.
d. 651CB, Lower Inboard Fixed Trailing Edge, Gear Access Panel, for the Right Landing Gear.
Refer to 737-600/700/800/900 MPD Appendix A or 737-700/800 MPD Appendix A for the
panel locations.
3. Open the following access panels:
a. 551DB, Lower Inboard Fixed Trailing Edge, Lube Actuator & MLG Beam Outboard Attach Pin
Access Panel.
b. 651DB, Lower Inboard Fixed Trailing Edge, Lube Actuator & MLG Beam Outboard Attach Pin
Access Panel.
Refer to 737-600/700/800/900 MPD Appendix A or 737-700/800 MPD Appendix A for the
panel locations.
4. Clean the grease and debris from the transition radius area using a clean cloth and solvent. Refer
to SOPM 20-30-03 as an accepted procedure.
5. Do a detailed inspection of the transition radius area of the Forward Trunnion Pin, on both the left
and right MLG, in accordance with FIGURE 1 and FIGURE 2. Look for finish damage (scrapes
and scratches through the full thickness of primer or areas of missing primer), signs of corrosion,
and pitting, and base metal scratches in the base material. Minor scrapes and/or scratches that
do not fully penetrate the primer layer shall not be considered as finish damage.
NOTE: It is difficult to inspect the outboard transition radius area using a mirror. There is better
visibility of this area if you look from the bottom up. It is recommended that Operators
use a 10X magnification boroscope to inspect the outboard area of the Trunnion Pin. Use
good light in order to have a good exposure of the transition radius area.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 06, 2008
737-32-1402Revision 1: February 07, 2013
36 of 55
BOEING SERVICE BULLETIN 737-32-1402

### Page 37

a. If no corrosion, no pitting, no base metal scratches, and no finish damage are found at the
Transition Radius location on the left and/or right forward trunnion pin(s), do PART IV - MLG
Forward Trunnion Pin - Lubrication.
b. If corrosion, pitting, or base metal scratches is found at the Transition Radius area on the left
and/or right forward trunnion pin(s) remove and replace the Trunnion pin in accordance with
PART II - MLG Forward Trunnion Pin Replacement.
c. If finish damage (scrapes or scratches through the full thickness of the primer, or areas of
missing primer) is found at the Transition Radius location on the left and/or right Forward
Trunnion Pin(s), and there is no corrosion, no pitting, and no base metal scratches in the base
material, continue with step 5.c.(3). If there is damage on the outboard side of the Trunnion
Pin you may need to remove the Main Landing Gear in order to perform the inspection and
the repair of the protective finish. If it is necessary to remove the Main Landing Gear continue
with step 5.c.(1).
(1) Lift the airplane on Jacks if/as necessary. Refer to 737-600/700/800/900 AMM 07-11-01
as an accepted procedure.
WARNING: DO NOT REMOVE THE VALVE BODY UNTIL THE SHOCK STRUT IS FULLY
DEFLATED. IF YOU REMOVE THE VALVE BODY WHEN THERE IS
PRESSURE, THE PRESSURE CAN BLOW THE VALVE BODY OUT AND
CAUSE INJURY TO PERSONS
WARNING: MAKE SURE THE HYDRAULIC PRESSURE IS BELOW 5000 PSIG WHEN
YOU OPERATE THE DOLLY ASSEMBLY AND THE MAIN LANDING GEAR
PIVOTS ABOUT THE FORWARD TRUNNION BEARING PIN. IF THE
HYDRAULIC PRESSURE IS 5000 PSIG OR HIGHER, A BINDING CONDITION
OCCURS. THIS CAN CAUSE INJURY TO PERSONS AND DAMAGE TO
EQUIPMENT.
WARNING: MAKE SURE THE HYDRAULIC PRESSURE IS BELOW 5000 PSIG WHEN
YOU DISCONNECT THE AFT TRUNNION FROM THE AFT TRUNNION
BEARING PIN. IF THE HYDRAULIC PRESSURE IS 5000 PSIG OR HIGHER,
A BINDING CONDITION OCCURS. THIS CAN CAUSE INJURY TO PERSONS
AND DAMAGE TO EQUIPMENT.
WARNING: MAKE SURE THE HYDRAULIC PRESSURE IS BELOW 5000 PSIG WHEN
YOU DISCONNECT THE FORWARD TRUNNION FROM THE FORWARD
TRUNNION BEARING PIN. IF THE HYDRAULIC PRESSURE IS 5000 PSIG
OR HIGHER, A BINDING CONDITION OCCURS. THIS CAN CAUSE INJURY
TO PERSONS AND DAMAGE TO EQUIPMENT.
CAUTION: MAKE SURE THE FORWARD TRUNNION PIN DOES NOT MOVE ON THE
PROTECTOR ASSEMBLY (C32034-4) DURING THE REMOVAL OR
INSTALLATION OF THE MAIN LANDING GEAR. IF THIS CONDITION
OCCURS, IT CAN CAUSE DAMAGE TO THE PIN. THE TOOLS AND
EQUIPMENT NECESSARY FOR REMOVING AND INSTALLING THE MAIN
LANDING GEAR ARE GIVEN IN 737-600/700/800/900 AMM 32-11-00.
(2) Remove the Main Landing Gear (MLG). Refer to 737-600/700/800/900 AMM 32-11-00
as an accepted procedure.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 06, 2008
737-32-1402Revision 1: February 07, 2013
37 of 55
BOEING SERVICE BULLETIN 737-32-1402

### Page 38

NOTE: Removal of the wheels, tires and brakes, with reference to 737-600/700/800/900
AMM 32-11-00, is recommended, because it will make the MLG easier to handle,
but these removals are not necessary to remove or install the MLG.
NOTE: Operators may use new improved protector tools, P/N C32034-228, which are
part of landing gear installation kit, P/N C32034-227, when the MLG is removed.
The landing gear installation kit can hold the MLG with the wheels, tires and
brakes installed, refer to Boeing Service Letter 737-SL-32-166 for more data.
(3) Do PART III - MLG Forward Trunnion Pin - Blending and Repair of the Protective Finish.
PART II - MLG FORWARD TRUNNION PIN - REPLACEMENT
WARNING: USE NITRILE GLOVES FOR SKIN PROTECTION AGAINST COMPOUND C00913
(MASTINOX 6856K). IF MASTINOX GETS ON YOUR SKIN, IMMEDIATELY REMOVE
IT WITH WATER. IF THIS MATERIAL GETS IN YOUR EYES, IMMEDIATELY FLUSH
YOUR EYES WITH WATER AND GET MEDICAL AID. THIS MATERIAL CONTAINS
VERY POISONOUS AND FLAMMABLE AGENTS WHICH CAN CAUSE INJURIES TO
PERSONS.
1. Remove the left (MLG) and/or right (MLG) Forward Trunnion Bearing Assembly(ies). Refer to
737-600/700/800/900 AMM 32-11-83 as an accepted procedure.
2. Remove the left (MLG) and/or right (MLG) Forward Trunnion Pin(s). Refer to 737-600/700/800/900
AMM 57-16-01 as an accepted procedure.
NOTE: The race assembly (161A1187-1) is made of half races (161A1187-2 and 161A1187-3).
The half races are matched set and must not be mixed with other race details. Care
should be taken during the removal of the race assembly. the half races can easily fall
and become damaged. Identify the race details as a matched set using paper tags.
NOTE: Trunnion Pins that are removed from the airplane can be repaired at the operator's
approved maintenance facility. Refer to CMM 57-15-01 as an accepted procedure.
3. Install the replacement left (MLG) and/or right (MLG) Forward Trunnion Pin(s). Refer to
737-600/700/800/900 AMM 57-16-01 as an accepted procedure.
CAUTION: PROTECT THE TRANSITION RADIUS FINISHES FROM POSSIBLE DAMAGE
RESULTING FROM CONTACT WITH THE SEAL RETAINER RING.
a. 161A1188-1 Trunnion Pin may replace 161A1188-1 and 161A1188-5 Forward Trunnion Pins.
b. 161A1188-3 or 161A1188-9 Trunnion Pins may replace 161A1188-3 or 161A1188-9 Trunnion
Pins.
c. 161A1188-5 Trunnion Pin replaces only 161A1188-5 Trunnion Pins.
d. 161A1188-13 Trunnion Pin may replace 161A1188-1 and 161A1188-5 Trunnion Pins.
e. 161A1188-15 Trunnion Pin may replace 161A1188-1 and 161A1188-5 Trunnion Pins.
f. 161A1188-17 Trunnion Pin may replace 161A1188-1 Trunnion Pins.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 06, 2008
737-32-1402Revision 1: February 07, 2013
38 of 55
BOEING SERVICE BULLETIN 737-32-1402

### Page 39

g. 161A1188-19 Trunnion Pin may replace 161A1188-13 Trunnion Pins.
h. 161A1188-21 Trunnion Pin may replace 161A1188-15 Trunnion Pins.
i. 161A1188-23 Trunnion Pin may replace 161A1188-5 Trunnion Pins.
NOTE: Trunnion Pin P/N 161A1188 -17, -19, -21 or -23 is required for the terminating action
given in Boeing Service Bulletin 737-32-1448. Refer to Paragraph 2.C.1., Kits/Parts
for more data.
4. Install the left (MLG) and/or right (MLG) Forward Trunnion Bearing Assembly(ies). Refer to
737-600/700/800/900 AMM 32-11-83 as an accepted procedure.
NOTE: Do not force the fuse pin installation if binding occurs. Remove the pins and inspect the
bushing inner diameter surfaces for contamination or damage.
5. Do a General Visual Inspection of the transition radius area of the left (MLG) and/or right (MLG)
forward trunnion pin. Look for finish damage (scrapes and scratches) in the protective coatings,
and repair all damage found. Refer to 737-600/700/800/900 AMM 32-11-00 as an accepted
procedure.
6. If not done, close the access panels that follow:
a. 551DB, Lower Inboard Fixed Trailing Edge, Lube Actuator & MLG Beam Outboard Attach Pin
Access Panel.
b. 651DB, Lower Inboard Fixed Trailing Edge, Lube Actuator & MLG Beam Outboard Attach Pin
Access Panel.
Refer to 737-600/700/800/900 MPD Appendix A or 737-700/800 MPD Appendix A for the
panel locations.
7. If not done, install the access panels that follow:
a. 551BB, Lower Inboard Fixed Trailing Edge, Gear Adjustment Door, for the Left Landing Gear.
b. 551CB, Lower Inboard Fixed Trailing Edge, Gear Access Panel, for the Left Landing Gear.
c. 651BB, Lower Inboard Fixed Trailing Edge, Gear Adjustment Door, for the Right Landing
Gear.
d. 651CB, Lower Inboard Fixed Trailing Edge, Gear Access Panel, for the Right Landing Gear.
Refer to 737-600/700/800/900 MPD Appendix A or 737-700/800 MPD Appendix A for the
panel locations.
8. If not done, remove the downlock pins in the nose and main landing gear. Refer to
737-600/700/800/900 AMM 32-00-01 as an accepted procedure.
9. Put the airplane back to a serviceable condition.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 06, 2008
737-32-1402Revision 1: February 07, 2013
39 of 55
BOEING SERVICE BULLETIN 737-32-1402

### Page 40

PART III - MLG FORWARD TRUNNION PIN - BLENDING AND REPAIR OF THE PROTECTIVE
FINISH
WARNING: MAKE SURE THAT PERSONS AND EQUIPMENT ARE CLEAR OF ALL CONTROL
SURFACES BEFORE YOU SUPPLY HYDRAULIC POWER. AILERONS, RUDDERS,
ELEVATORS, FLAPS, SLATS, SPOILERS, LANDING GEAR AND THRUST REVERSERS
CAN MOVE QUICKLY WHEN YOU SUPPLY HYDRAULIC POWER. THIS CAN CAUSE
INJURY TO PERSONS AND DAMAGE TO EQUIPMENT.
WARNING: MAKE SURE THE HYDRAULIC PRESSURE IS BELOW 5000 PSIG WHEN YOU
CONNECT THE FORWARD TRUNNION TO THE FORWARD TRUNNION BEARING
PIN. IF THE HYDRAULIC PRESSURE IS 5000 PSIG OR HIGHER, A BINDING
CONDITION OCCURS. THIS CAN CAUSE INJURY TO PERSONS AND DAMAGE TO
EQUIPMENT.
WARNING: MAKE SURE THE HYDRAULIC PRESSURE IS BELOW 5000 PSIG WHEN YOU
OPERATE THE DOLLY ASSEMBLY AND TO LIFT THE AFT TRUNNION INTO ITS
POSITION. IF THE HYDRAULIC PRESSURE IS 5000 PSIG OR HIGHER WHEN YOU
DO THIS, A BINDING CONDITION OCCURS. THIS CAN CAUSE INJURY TO PERSONS
AND DAMAGE TO EQUIPMENT
CAUTION: PROTECT THE TRANSITION RADIUS FINISHES FROM DAMAGE BY CONTACT WITH
THE SEAL RETAINER RING.
1. Clean areas of damaged finishes and immediate surrounding surfaces with solvent in accordance
with FIGURE 3 and FIGURE 4.
2. Abrasive clean the primer in accordance with FIGURE 3 and FIGURE 4.
3. Solvent clean the repair area in accordance with FIGURE 3 and FIGURE 4.
4. Apply Chromate Conversion Coating in accordance with FIGURE 3 and FIGURE 4.
5. Apply primer to the affected area on the Transition Radius in accordance with FIGURE 3 and
FIGURE 4.
6. Apply Corrosion Inhibiting Compound (CIC) to the Transition Radius in accordance with FIGURE
3 and FIGURE 4.
7. If the MLG was removed (in PART I):
a. Install the MLG. Refer to 737-600/700/800/900 AMM 32-11-00 as an accepted procedure.
b. Do a General Visual Inspection of the transition radius area of the left (MLG) and/or right
(MLG) forward trunnion pin. Look for finish damage (scrapes and scratches) in the protective
coatings, and repair all damage found. Refer to 737-600/700/800/900 AMM 32-11-00 as an
accepted procedure.
8. Do PART IV - MLG Trunnion Pin - Lubrication.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 06, 2008
737-32-1402Revision 1: February 07, 2013
40 of 55
BOEING SERVICE BULLETIN 737-32-1402

### Page 41

PART IV - MLG FORWARD TRUNNION PIN - LUBRICATION
WARNING: MAKE SURE THE DOWNLOCK PINS ARE INSTALLED ON ALL THE LANDING GEAR.
WITHOUT THE DOWNLOCK PINS, THE LANDING GEAR COULD RETRACT AND
CAUSE INJURIES TO PERSONS AND DAMAGE TO EQUIPMENT.
WARNING: USE GLOVES AND EYE PROTECTION WHEN YOU LUBRICATE WITH THE USE OF
A GREASE GUN. LUBRICANT AT HIGH PRESSURE CAN CAUSE INJURY TO
PERSONS.
1. Lubricate the Left and Right MLG Forward Trunnion Pins in accordance with FIGURE 5 and
FIGURE 6.
2. If not done, close the access panels that follow:
a. 551DB, Lower Inboard Fixed Trailing Edge, Lube Actuator & MLG Beam Outboard Attach Pin
Access Panel.
b. 651DB, Lower Inboard Fixed Trailing Edge, Lube Actuator & MLG Beam Outboard Attach Pin
Access Panel.
Refer to 737-600/700/800/900 MPD Appendix A or 737-700/800 MPD Appendix A for the
panel locations.
3. If not done, install the access panels that follow:
a. 551BB, Lower Inboard Fixed Trailing Edge, Gear Adjustment Door, for the Left Landing Gear.
b. 551CB, Lower Inboard Fixed Trailing Edge, Gear Access Panel, for the Left Landing Gear.
c. 651BB, Lower Inboard Fixed Trailing Edge, Gear Adjustment Door, for the Right Landing
Gear.
d. 651CB, Lower Inboard Fixed Trailing Edge, Gear Access Panel, for the Right Landing Gear.
Refer to 737-600/700/800/900 MPD Appendix A or 737-700/800 MPD Appendix A for the
panel locations.
4. If not done, remove the downlock pins in the nose and main landing gear. Refer to
737-600/700/800/900 AMM 32-00-01 as an accepted procedure.
5. Put the airplane back to a serviceable condition.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 06, 2008
737-32-1402Revision 1: February 07, 2013
41 of 55
BOEING SERVICE BULLETIN 737-32-1402

### Page 42 (OCR)

BOEING SERVICE BULLETIN 737-32-1402
SEE A
FWD
TRANSITION RADIUS AREA WHERE  INBD <
CORROSION,AND/OR FINISH
DAMAGE, AND/OR SCRAPES, AND OR  SCRATCHES CAN EXIST  LEFT MAIN LANDING GEAR
FORWARD TRUNNION
HOUSING ASSEMBLY
LEFT MAIN
LANDING GEAR
STRUT
AINBD
OFWD  1423630
FIGURE 1: LEFT MLG FORWARD TRUNNION PIN TRANSITION RADIUS - INSPECTION
(SHEET 1 OF 2)
Original Issue: August 06, 2008
Revision 1 February 07, 2013  Export Controlled ECCN: 9E991 - BOEING  PROPRIETARY - Copyright © Unpublished  737-32-1402
Work - See page 1 for details.  42 of 55

### Page 43

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for one side of the airplane.
MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
Surface of excess grease and dirt. Refer
to SOPM 20-30-03 as an accepted proce-
dure.
1161A1188-( )Forward
Trunnion
Pin
Clean1
Do a detailed inspection of the Transition
Radius (cylindrical to spherical transition
area) for evidence of corrosion, and/or fin-
ish damage, and/or scratches in accor-
dance with PART I.
1161A1188-( )Forward
Trunnion
Pin
Inspect2
FIGURE 1: LEFT MLG FORWARD TRUNNION PIN TRANSITION RADIUS - INSPECTION
(SHEET 2 OF 2)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 06, 2008
737-32-1402Revision 1 February 07, 2013
43 of 55
BOEING SERVICE BULLETIN 737-32-1402

### Page 44 (OCR)

BOEING SERVICE BULLETIN 737-32-1402
SEE A
A FWD
> INBD  TRANSITION RADIUS AREA WHERE
CORROSION,AND/OR FINISH
RIGHT MAIN LANDING GEAR  DAMAGE, AND/OR SCRAPES, AND OR
SCRATCHES CAN EXIST
FORWARD TRUNNION
HOUSING ASSEMBLY
RIGHT MAIN
LANDING GEAR
STRUT
INDO
FWD C  1424123
FIGURE 2: RIGHT MLG FORWARD TRUNNION PIN TRANSITION RADIUS - INSPECTION
(SHEET 1 OF 2)
Original Issue: August 06, 2008
Revision 1 February 07, 2013  Export Controlled ECCN: 9E991 - BOEING  PROPRIETARY - Copyright © Unpublished  737-32-1402
Work - See page 1 for details.  44 of 55

### Page 45

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for one side of the airplane.
MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
Surface of excess grease and dirt. Refer to
SOPM 20-30-03 as an accepted procedure.
1161A1188-( )Forward
Trunnion
Pin
Clean1
Do a detailed inspection of the Transition
Radius (cylindrical to spherical transition
area) for evidence of corrosion, and/or finish
damage, and/or scratches in accordance
with PART I.
1161A1188-( )Forward
Trunnion
Pin
Inspect2
FIGURE 2: RIGHT MLG FORWARD TRUNNION PIN TRANSITION RADIUS - INSPECTION
(SHEET 2 OF 2)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 06, 2008
737-32-1402Revision 1 February 07, 2013
45 of 55
BOEING SERVICE BULLETIN 737-32-1402

### Page 46 (OCR)

BOEING SERVICE BULLETIN 737-32-1402
SEE A
FWD,
TRANSITION RADIUS AREA WHERE  INBD
CORROSION,AND/OR FINISH
DAMAGE, AND/OR SCRAPES, AND OR  SCRATCHES CAN EXIST  LEFT MAIN LANDING GEAR
FORWARD TRUNNION
HOUSING ASSEMBLY
LEFT MAIN
LANDING GEAR
STRUT  1
AINBD
→FWD  1424138
FIGURE 3: LEFT MLG FORWARD TRUNNION PIN - PROTECTIVE FINISH APPLICATION
(SHEET 1 OF 3)
Original Issue: August 06, 2008
Revision 1 February 07, 2013  Export Controlled ECCN: 9E991 - BOEING  PROPRIETARY - Copyright © Unpublished  737-32-1402
Work - See page 1 for details.  46 of 55

### Page 47

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for one side of the airplane.
MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
With solvent where areas of finish damage
or bare metal exist. Refer to SOPM 20-30-
03 as an accepted procedure.
--Transition RadiusClean1
Use light hand pressure to lightly abrade
the surface of the primer. Do not abrade
the areas where the primer is missing and
the cadmium plating is exposed. (a)
Transition RadiusAbrasive
Clean
2
Again with solvent the area that has been
abraded in step 2 including the immediate
surrounding areas. Refer to SOPM 20-30-
03 as an accepted procedure.
--Transition RadiusClean3
With cotton swabs or gauze. Apply as little
solution as possible to prevent contamina-
tion of the surrounding areas. Refer to
SOPM 20-42-10 as an accepted proce-
dure. (b)
up to
1 oz.
Ultrachromate
300, or equivalent
chromate solution
per QQ-P-416 or
AMS-QQ-P-416,
Type II.
Chromate Conver-
sion Coating
Apply4
FIGURE 3: LEFT MLG FORWARD TRUNNION PIN - PROTECTIVE FINISH APPLICATION
(SHEET 2 OF 3)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 06, 2008
737-32-1402Revision 1 February 07, 2013
47 of 55
BOEING SERVICE BULLETIN 737-32-1402

### Page 48

MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
Where the surface protective coating was
damaged or disturbed, using a brush.
Apply two coats of primer. Refer to SOPM
20-44-04 as an accepted procedure. (c)
up to
1 oz.
BMS 10-79, Type
III Grade A or
Grade D
PrimerApply
(Manual-
ly)
5
In a thick layer to the trunnion pin exterior
surfaces using a brush. Refer to SOPM
20-41-05 as an accepted procedure.
up to
8 oz.
BMS 3-26, Type II
or BMS 3-38
Corrosion Inhibiting
Compound (CIC)
Apply
(Manual-
ly)
6
(a) Use aluminum oxide abrasive pad 320 grit or finer, or a light grade Scotch-Brite type A, very fine.
(b) Mask the area with aluminum tape on both sides of the Transition Radius Area, around the perimeter of
the Trunnion Pin to prevent debris from going in the spherical or cylindrical area of the Trunnion Pin.
(c) Refer to SOPM 20-44-04 as an accepted procedure for curing time and temperature. Allow enough time
for drying before handling and grease application.
FIGURE 3: LEFT MLG FORWARD TRUNNION PIN - PROTECTIVE FINISH APPLICATION
(SHEET 3 OF 3)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 06, 2008
737-32-1402Revision 1 February 07, 2013
48 of 55
BOEING SERVICE BULLETIN 737-32-1402

### Page 49 (OCR)

BOEING SERVICE BULLETIN 737-32-1402
SEE 1
FWD
› INBD  TRANSITION RADIUS AREA WHERE
CORROSION,AND/OR FINISH
RIGHT MAIN LANDING GEAR  DAMAGE, AND/OR SCRAPES, AND OR  SCRATCHES CAN EXIST
FORWARD TRUNNION
HOUSING ASSEMBLY ~
RIGHT MAIN
LANDING GEAR
STRUT
INBD f
FWD  1424139
FIGURE 4: RIGHT MLG FORWARD TRUNNION PIN - PROTECTIVE FINISH APPLICATION
(SHEET 1 OF 3)
Original Issue: August 06, 2008
Revision 1 February 07, 2013  Export Controlled ECCN: 9E991 - BOEING  737-32-1402
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.  49 of 55

### Page 50

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for one side of the airplane.
MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
With solvent where areas of finish damage
or bare metal exist. Refer to SOPM 20-30-
03 as an accepted procedure.
--Transition RadiusClean1
Use light hand pressure to lightly abrade
the surface of the primer. Do not abrade
the areas where the primer is missing and
the cadmium plating is exposed. (a)
Transition RadiusAbrasive
Clean
2
Again with solvent the area that has been
abraded in step 2 including the immediate
surrounding areas. Refer to SOPM 20-30-
03 as an accepted procedure.
--Transition RadiusClean3
With cotton swabs or gauze. Apply as little
solution as possible to prevent contamina-
tion of the surrounding areas. Refer to
SOPM 20-42-10 as an accepted proce-
dure. (b)
up to
1 oz.
Ultrachromate
300, or equivalent
chromate solution
per QQ-P-416 or
AMS-QQ-P-416,
Type II.
Chromate Conver-
sion Coating
Apply4
FIGURE 4: RIGHT MLG FORWARD TRUNNION PIN - PROTECTIVE FINISH APPLICATION
(SHEET 2 OF 3)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 06, 2008
737-32-1402Revision 1 February 07, 2013
50 of 55
BOEING SERVICE BULLETIN 737-32-1402

### Page 51

MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
Where the surface protective coating was
damaged or disturbed, using a brush.
Apply two coats of primer. Refer to SOPM
20-44-04 as an accepted procedure. (c)
up to
1 oz.
BMS 10-79, Type
III Grade A or
Grade D
PrimerApply
(Manual-
ly)
5
In a thick layer to the trunnion pin exterior
surfaces using a brush. Refer to SOPM
20-41-05 as an accepted procedure.
up to
8 oz.
BMS 3-26, Type II,
or BMS 3-38
Corrosion Inhibiting
Compound (CIC)
Apply
(Manual-
ly)
6
(a) Use aluminum oxide abrasive pad 320 grit or finer, or a light grade Scotch-Brite type A, very fine.
(b) Mask the area with aluminum tape on both sides of the Transition Radius Area, around the perimeter of
the Trunnion Pin to prevent debris from going in the spherical or cylindrical area of the Trunnion Pin.
(c) Refer to SOPM 20-44-04 as an accepted procedure for curing time and temperature. Allow enough time
for drying before handling and grease application.
FIGURE 4: RIGHT MLG FORWARD TRUNNION PIN - PROTECTIVE FINISH APPLICATION
(SHEET 3 OF 3)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 06, 2008
737-32-1402Revision 1 February 07, 2013
51 of 55
BOEING SERVICE BULLETIN 737-32-1402

### Page 52 (OCR)

BOEING SERVICE BULLETIN 737-32-1402
FWD
INBD
LEFT MAIN LANDING GEAR
INBD
> FWD
INBD  1424142
FIGURE 5: FORWARD TRUNNION PIN LUBRICATION - LEFT MLG
(SHEET 1 OF 2)
Original Issue: August 06, 2008
Revision 1 February 07, 2013  Export Controlled ECCN: 9E991 - BOEING  PROPRIETARY - Copyright © Unpublished  737-32-1402
Work - See page 1 for details.  52 of 55

### Page 53

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for one side of the airplane.
MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
With BMS 3-33 at the
times in accordance with
Paragraph 1.E., Compli-
ance. (a) (b)
1161A1188-( )Left Forward Trun-
nion Pin
Lubricate1
With BMS 3-33 at the
times in accordance with
Paragraph 1.E., Compli-
ance. (a)
1115A5240-( )Left Forward Trun-
nion Bearing
Housing
Lubricate2
(a) Refer to 737-600/700/800/900 AMM 12-21-11 as an accepted procedure.
(b) Lubricate the trunnion pin through the lube fitting on the outer cylinder.
FIGURE 5: FORWARD TRUNNION PIN LUBRICATION - LEFT MLG
(SHEET 2 OF 2)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 06, 2008
737-32-1402Revision 1 February 07, 2013
53 of 55
BOEING SERVICE BULLETIN 737-32-1402

### Page 54 (OCR)

BOEING SERVICE BULLETIN 737-32-1402
SEE
SEE B  FWD
> INBD
RIGHT MAIN LANDING GEAR
INBD
FWD
FWD <
INBD
1424146
FIGURE 6: FORWARD TRUNNION PIN LUBRICATION - RIGHT MLG
(SHEET 1 OF 2)
Original Issue: August 06, 2008
Revision 1 February 07, 2013  Export Controlled ECCN: 9E991 - BOEING  737-32-1402
PROPRIETARY - Copyright @ Unpublished
Work - See page 1 for details.  54 of 55

### Page 55

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for one side of the airplane.
MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
With BMS 3-33 at the
times in accordance with
Paragraph 1.E., Compli-
ance. (a) (b)
1161A1188-( )Right Forward
Trunnion Pin
Lubricate1
With BMS 3-33 at the
times in accordance with
Paragraph 1.E., Compli-
ance. (a)
1115A5240-( )Right Forward
Trunnion Bearing
Housing
Lubricate2
(a) Refer to 737-600/700/800/900 AMM 12-21-11 as an accepted procedure.
(b) Lubricate the trunnion pin through the lube fitting on the outer cylinder.
FIGURE 6: FORWARD TRUNNION PIN LUBRICATION - RIGHT MLG
(SHEET 2 OF 2)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 06, 2008
737-32-1402Revision 1 February 07, 2013
55 of 55
BOEING SERVICE BULLETIN 737-32-1402

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.