# Boeing Special Attention Service Bulletin 737-32-1448: Revision 1

- Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2015-8133; AD 2016-18-01 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Boeing Special Attention Service Bulletin 737-32-1448](https://openairdocs.org/service-documents/boeing/sb-737-32-1448.md)
- Title as filed: U.S. DOT/FAA - SB-737-32-1448-01
- Pages: 187
- PDF: https://openairdocs.org/files/sha256/c2/a4/c2a41d87c3811d431dbd546ec20fe6be9117575b82fb3397ff7634842935778c
- Page: https://openairdocs.org/service-documents/boeing/sb-737-32-1448/file/c2a41d87c381

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Commercial 
Airplanes
737
Service Bulletin
SPECIAL ATTENTION
Number: 737-32-1448
Original Issue: May 19, 2011
Revision 1: May 29, 2015
ATA System: 3211
SUBJECT: LANDING GEAR - Main Landing Gear - Forward and Aft Trunnion Pin Assemblies
Inspection and Change
Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15
CFR 300-774). An export license may be required before it is used for development, production or use by foreign
persons from specific countries. The controller of this data has the individual responsibility to abide by all export
laws.
9E991ECCN:
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET
Copyright © 2011 Boeing.
Unpublished Work. All Rights Reserved.
Treatment of this document and its content is governed by contract with Boeing. Rights to use this document
are licensed on a per aircraft basis and such rights may not be transferable. For more information, contact The
Boeing Company.
Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner,
BBJ, DC-8, DC-9, DC-10, KC-10, KC-46, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8, Poseidon and
Boeing liveries are all trademarks owned by The Boeing Company; and no trademark license is granted in
connection with this document unless provided in writing by Boeing.
Original Issue: May 19, 2011
737-32-1448Revision 1: May 29, 2015
1 of 187
5.0

### Page 2

Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 19, 2011
737-32-1448Revision 1: May 29, 2015
2 of 187
BOEING SERVICE BULLETIN 737-32-1448
BLANK PAGE

### Page 3

Table of Contents
Revision Transmittal Sheet . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
Summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
1. PLANNING INFORMATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
A. Effectivity . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
1. Airplanes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
2. Spares Affected . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29
B. Concurrent Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29
C. Reason . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29
D. Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30
E. Compliance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33
F. Approval . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 42
G. Manpower . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 42
H. Weight and Balance Changes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 48
I. Electrical Load Data . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 48
J. References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 49
1. Existing Data: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 49
2. Data Supplied with this Service Bulletin: . . . . . . . . . . . . . . . . . . . . . . . . . . . 49
3. Installation Drawings Used in the Preparation of this Service Bulletin: . . . . . . . . . . . 49
K. Publications Affected . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 49
L. Interchangeability and Intermixability of Parts . . . . . . . . . . . . . . . . . . . . . . . . . . . 50
M. Software Accomplishment Summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 50
2. MATERIAL INFORMATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 51
A. Material - Price and Availability . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 51
B. Industry Support Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 52
C. Parts Necessary for Each Airplane . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 52
1. Kits/Parts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 52
2. Parts and Materials Supplied by the Operator . . . . . . . . . . . . . . . . . . . . . . . . 54
3. Parts Modified and Reidentified . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56
4. Parts Removed and Not Replaced . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 58
D. Parts Necessary to Change Spares . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 58
E. Special Tooling - Price and Availability . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 58
F. Special Tooling Necessary to do this Service Bulletin . . . . . . . . . . . . . . . . . . . . . . . 58
3. ACCOMPLISHMENT INSTRUCTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59
A. GENERAL INFORMATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59
B. WORK INSTRUCTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 60
FIGURE 1: LEFT MAIN LANDING GEAR (MLG) OUTER CYLINDER ASSEMBLY AND TRUNNION PIN
ASSEMBLIES INSPECTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 75
FIGURE 2: MAIN LANDING GEAR (MLG) FORWARD TRUNNION PIN ASSEMBLY INSPECTION . 77
FIGURE 3: MAIN LANDING GEAR (MLG) AFT TRUNNION PIN ASSEMBLY INSPECTION . . . . . 78
FIGURE 4: RIGHT MAIN LANDING GEAR (MLG) OUTER CYLINDER ASSEMBLY AND TRUNNION PIN
ASSEMBLIES INSPECTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 79
FIGURE 5: LEFT MAIN LANDING GEAR (MLG) FORWARD OUTER CYLINDER TRUNNION BUSHING
REPLACEMENT [Group 1-2] . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 81
FIGURE 6: LEFT MAIN LANDING GEAR (MLG) FORWARD OUTER CYLINDER TRUNNION BUSHING
REPLACEMENT [Group 3] . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 85
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 19, 2011
737-32-1448Revision 1: May 29, 2015
3 of 187
BOEING SERVICE BULLETIN 737-32-1448

### Page 4

FIGURE 7: LEFT MAIN LANDING GEAR (MLG) AFT OUTER CYLINDER TRUNNION BUSHING
REPLACEMENT [Group 1-2] . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 89
FIGURE 8: LEFT MAIN LANDING GEAR (MLG) AFT OUTER CYLINDER TRUNNION BUSHING
REPLACEMENT [Group 3] . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 94
FIGURE 9: MAIN LANDING GEAR (MLG) FORWARD TRUNNION PIN CROSS BOLT BUSHING
REPLACEMENT [Group 1] . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 99
FIGURE 10: LEFT MAIN LANDING GEAR (MLG) AFT TRUNNION PIN ASSEMBLY, AFT TRUNNION
BEARING BALL AND AFT TRUNNION BEARING RACE REMOVAL . . . . . . . . . . . 101
FIGURE 11: MAIN LANDING GEAR (MLG) AFT TRUNNION PIN CROSS BOLT BUSHING REPLACEMENT
[Group 1-2] . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 104
FIGURE 12: MAIN LANDING GEAR (MLG) AFT TRUNNION PIN CROSS BOLT BUSHING REPLACEMENT
[Group 3] . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 106
FIGURE 13: MAIN LANDING GEAR (MLG) AFT TRUNNION BEARING RACE INSPECTION . . . . 108
FIGURE 14: LEFT MAIN LANDING GEAR (MLG) AFT TRUNNION PIN ASSEMBLY, AFT TRUNNION
BEARING BALL AND AFT TRUNNION BEARING RACE INSTALLATION  [Group 1-2] . 109
FIGURE 15: LEFT MAIN LANDING GEAR (MLG) AFT TRUNNION PIN ASSEMBLY, AFT TRUNNION
BEARING BALL AND AFT TRUNNION BEARING RACE INSTALLATION  [Group 3] . . 113
FIGURE 16: LEFT MAIN LANDING GEAR INSTALLATION . . . . . . . . . . . . . . . . . . . . . . . 117
FIGURE 17: RIGHT MAIN LANDING GEAR (MLG) FORWARD OUTER CYLINDER TRUNNION BUSHING
REPLACEMENT [Group 1-2] . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 120
FIGURE 18: RIGHT MAIN LANDING GEAR (MLG) FORWARD OUTER CYLINDER TRUNNION BUSHING
REPLACEMENT [Group 3] . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 124
FIGURE 19: RIGHT MAIN LANDING GEAR (MLG) AFT OUTER CYLINDER TRUNNION BUSHING
REPLACEMENT [Group 1-2] . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 128
FIGURE 20: RIGHT MAIN LANDING GEAR (MLG) AFT OUTER CYLINDER TRUNNION BUSHING
REPLACEMENT [Group 3] . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 133
FIGURE 21: RIGHT MAIN LANDING GEAR (MLG) AFT TRUNNION PIN ASSEMBLY, AFT TRUNNION
BEARING BALL AND AFT TRUNNION BEARING RACE REMOVAL . . . . . . . . . . . 138
FIGURE 22: RIGHT MAIN LANDING GEAR (MLG) AFT TRUNNION PIN ASSEMBLY, AFT TRUNNION
BEARING BALL AND AFT TRUNNION BEARING RACE INSTALLATION  [Group 1-2] . 141
FIGURE 23: RIGHT MAIN LANDING GEAR (MLG) AFT TRUNNION PIN ASSEMBLY, AFT TRUNNION
BEARING BALL AND AFT TRUNNION BEARING RACE INSTALLATION  [Group 3] . . 145
FIGURE 24: RIGHT MAIN LANDING GEAR INSTALLATION . . . . . . . . . . . . . . . . . . . . . . 149
FIGURE 25: MAIN LANDING GEAR TRUNNION HOUSING ASSEMBLY RETAINER AND SEAL INSPECTION
[Group 1-2, Configuration 1] . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 152
FIGURE 26: MAIN LANDING GEAR TRUNNION HOUSING ASSEMBLY RETAINER AND SEAL
REPLACEMENT [Group 1-2] . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 154
APPENDIX A: FORWARD OUTER CYLINDER TRUNNION BUSHING - MAKE [Group 1-2] . . . . . . . 156
APPENDIX B: FORWARD OUTER CYLINDER TRUNNION BUSHING - MAKE [Group 3] . . . . . . . . 159
APPENDIX C: AFT OUTER CYLINDER TRUNNION BUSHING - MAKE [Group 1-2] . . . . . . . . . . . 162
APPENDIX D: AFT OUTER CYLINDER TRUNNION BUSHING - MAKE [Group 3] . . . . . . . . . . . . 165
APPENDIX E: FORWARD TRUNNION PIN CROSS BOLT BUSHING - MAKE  [Group 1] . . . . . . . . 168
APPENDIX F: AFT TRUNNION PIN CROSS BOLT BUSHING - MAKE  [Group 1-2] . . . . . . . . . . . 170
APPENDIX G: AFT TRUNNION PIN CROSS BOLT BUSHING - MAKE  [Group 3] . . . . . . . . . . . . 172
APPENDIX H: AFT TRUNNION BEARING BALL - CHANGE  [Group 1-2] . . . . . . . . . . . . . . . . . 174
APPENDIX I: AFT TRUNNION BEARING BALL - CHANGE  [Group 3] . . . . . . . . . . . . . . . . . . 177
APPENDIX J: AFT TRUNNION BEARING RACE - CHANGE  [Group 1-2] . . . . . . . . . . . . . . . . 180
APPENDIX K: AFT TRUNNION BEARING RACE - CHANGE [Group 3] . . . . . . . . . . . . . . . . . . 183
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 19, 2011
737-32-1448Revision 1: May 29, 2015
4 of 187
BOEING SERVICE BULLETIN 737-32-1448

### Page 5

APPENDIX L: DIMENSIONING SYMBOLS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 186
APPENDIX M: PART DEMAND INTENT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 187
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 19, 2011
737-32-1448Revision 1: May 29, 2015
5 of 187
BOEING SERVICE BULLETIN 737-32-1448

### Page 6

Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 19, 2011
737-32-1448Revision 1: May 29, 2015
6 of 187
BOEING SERVICE BULLETIN 737-32-1448
BLANK PAGE

### Page 7

Commercial 
Airplanes
737
Service Bulletin
SPECIAL ATTENTION
Revision Transmittal SheetNumber: 737-32-1448Original Issue: May 19, 2011
Revision 1: May 29, 2015
ATA System: 3211
SUBJECT: LANDING GEAR - Main Landing Gear - Forward and Aft Trunnion Pin Assemblies
Inspection and Change
This revision includes all pages of the service bulletin.
COMPLIANCE INFORMATION RELATED TO THIS REVISION
Effects of this Revision on airplanes on which the original issue was previously done:
See Paragraph 1.D., Description for more information.
REASON FOR REVISION
This revision is sent to add Work Package 4 for Group 1 and Group 2 airplanes that have previously changed
the Main Landing Gear (MLG) trunnion pin assemblies in accordance with Work Package 3. It provides new
figures to replace the seal and retainer configuration for the trunnion housing assembly. This information has
also been added to Work Package 3 for operators that have not previously changed the MLG trunnion pin
assemblies. In addition, 737-700 Increased Gross Weight (IGW) airplanes, which includes any 737-700 airplanes
with a Boeing Business Jet (BBJ) configuration, an Extended Range (ER) configuration, and an Air Early Warning
And Control (AEW&C) configuration are moved from Group 1 to Group 2 as they have a MLG configuration that
is similar to 737-800 airplanes. The use of Component Maintenance Manual (CMM) and Standard Overhaul
Practices Manual (SOPM) procedures that have been identified as critical in this service bulletin are mandated.
Instructions to accomplish these critical procedures now use the terminology "in accordance with". This revision
also clarifies the lubrication procedure to show only the applicable lubrication locations and changes the MLG
support beam part marking information.
Airplanes YG001-YG044, YG061-YG064, YG066-YG089, YG091-YG099, YG101-YG104, YG111-YG114,
YG116-YG128, YG201-YG205, YG211-YG214, YG221-YG224, and YG251-YG252 are moved from Group 1
to Group 2 to agree with their Main Landing Gear (MLG) configuration.
These sections are changed:
1. Summary Background: Background information is updated. The summary evaluation table and a Fleet
Team Digest (FTD) statement are added.
2. Summary Action: New Work Package 4 is added and Work Packages 1 thru 3 are updated.
3. Summary Material Information: Survey statement added.
4. Summary Illustration: New Work Package 4 is added and Work Packages 1 thru 3 are updated.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 19, 2011
737-32-1448Revision 1: May 29, 2015
7 of 187

### Page 8

5. Paragraph 1.A., Effectivity: The group configuration table is updated.
6. Paragraph 1.C., Reason: Reason information is updated. The summary evaluation table and a Fleet
Team Digest (FTD) statement are added.
7. Paragraph 1.D., Description: New Work Package 4 is added and Work Packages 1 thru 3 are updated.
8. Paragraph 1.E., Compliance: New compliance tables are added and the existing table is updated.
9. Paragraph 1.G., Manpower: The existing manpower tables are updated and a new table is added for
Work Package 4.
10. Paragraph 1.J., References: The reference list is updated.
11. Paragraph 1.K., Publications Affected: IPC references added.
12. Paragraph 1.M., Software Accomplishment Summary: A software section is added.
13. Paragraph 2.A., Material - Price and Availability: A new Top Kit is added and ROLT is updated.
14. Paragraph 2.C.1., Kits/Parts: A new Top Kit is added and the applicability is updated.
15. Paragraph 2.C.2., Parts and Materials Supplied by the Operator: The materials table is updated and
a new table is added.
16. Paragraph 2.C.3., Parts Modified and Re-identified: A footnote reference is updated and the MLG
support beam assembly part numbers are removed.
17. Paragraph 3.B., Work instructions: Work Packages 1 thru 3 are updated and Work Package 4 is added.
18. Figures 1, 4 and 10 Footnote (a) is updated.
19. Figures 5, 6, 7, 8, 9, 11, 12, 13, 16, 17, 18, 19, 20 and 24: Step table is updated.
20. Figures 5, 6, 7, 8, 17, 18, 19 and 20: Step illustration is updated.
21. Figures 14, 15, 22, 23, and 24: Part marking information is updated.
22. Figures 25 and 26: Added for this revision.
23. Appendix A, B, C and D: Cadmium plating step updated.
24. Appendix E, F and G: Step table updated.
25. Appendix H, I, J and K: Illustrations and step table are updated.
26. Appendix : Part Demand intent form added.
The data given in Information Notice 737-32-1448 IN 01 is included in this revision.
Vertical lines are put on the left edge of each page, except in Paragraph 1.A., Effectivity, to show the location
of important changes.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 19, 2011
737-32-1448Revision 1: May 29, 2015
8 of 187
BOEING SERVICE BULLETIN 737-32-1448

### Page 9

Pages with no vertical lines have no important changes.
REVISION HISTORY
May 19, 2011Original Issue:
May 29, 2015Revision 1:
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 19, 2011
737-32-1448Revision 1: May 29, 2015
9 of 187
BOEING SERVICE BULLETIN 737-32-1448

### Page 10

Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 19, 2011
737-32-1448Revision 1: May 29, 2015
10 of 187
BOEING SERVICE BULLETIN 737-32-1448
BLANK PAGE

### Page 11

Commercial 
Airplanes
737
Service Bulletin
SPECIAL ATTENTION
SummaryNumber: 737-32-1448Original Issue: May 19, 2011
Revision 1: May 29, 2015
ATA System: 3211
SUBJECT: LANDING GEAR - Main Landing Gear - Forward and Aft Trunnion Pin Assemblies
Inspection and Change
BOEING RECOMMENDS THAT EACH OPERATOR EXAMINE THIS SERVICE BULLETIN IMMEDIATELY.
CONCURRENT REQUIREMENTS
None.
BACKGROUND
This service bulletin is sent to make sure the left and right Main Landing Gear (MLG) forward and aft trunnion
pin assemblies and the components related to the MLG forward and aft trunnion pin assemblies remain
serviceable. Corrosion and chrome damage has been found on some of these components. If this service bulletin
is not done, corrosion and chrome plate damage on these components could cause the MLG forward and aft
trunnion pin assemblies to crack which could result in a MLG collapse.
Several operators have reported heavy corrosion and pitting of the MLG forward and aft trunnion pin assemblies.
Boeing found a number of causes for this damage which include insufficient lubrication, joint contamination and
mixed greases. It was found that the lubrication between the forward and aft trunnion pin assemblies and the
outer cylinder assembly bushings and the lubrication of the aft trunnion bearing ball was not sufficient to prevent
wear and corrosion. It was also found that the clearances between the forward and aft trunnion pin cross bolt
bushings and the cross bolts could affect the rate of wear and corrosion of MLG trunnion pin assemblies. To
correct these problems, Boeing has changed the design of the outer cylinder forward and aft trunnion bushings
to improve lubrication around the outer diameter of the forward and aft trunnion pin assemblies and changed
the design of aft trunnion bearing split ball to add a circumferential lube groove and larger diameter through
holes which improves lubrication around the aft pin at the interface with the aft trunnion bearing. In addition
Boeing has changed the design of the forward and aft trunnion pin cross bolt bushings for the trunnion pins to
reduce relative motion of each pin within the outer cylinder assembly bushings and reduce wear.
Accomplishment of this service bulletin lubricates and inspects existing MLG forward and aft trunnion pin
assemblies at regular intervals to prevent damage and corrosion. Instructions are given to overhaul or replace
damaged or corroded forward and aft trunnion pin assemblies. In addition, instructions are provided to install
new forward and aft trunnion bushings in the MLG outer cylinder assembly, install new trunnion pin cross bolt
bushings in the forward and aft trunnion pins, install a new/changed aft trunnion bearing ball, install a new/changed
aft trunnion bearing race, and install a new forward trunnion pin housing assembly seal and retainer configuration
on applicable airplanes. Installation of the new trunnion bushings in the MLG outer cylinder assembly,
new/changed aft trunnion bearing ball and aft trunnion bearing race are the terminating actions to the repeat
lubrication and repeat inspections given in this service bulletin and will improve grease distribution which will
reduce wear in the joint and prevent corrosion.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 19, 2011
737-32-1448Revision 1: May 29, 2015
11 of 187

### Page 12

Boeing recommends to do this service bulletin at the same time as 737-32-1376 or 737-32-1402 if applicable.
Boeing Service Related Problem (SRP) 737-SRP-32-0165 is related to this service bulletin.
Boeing Fleet Team Digest (FTD) 737NG FTD 32-09001 is related to this service bulletin.
This table is provided to operators for planning purposes only. Refer to the applicable sections for more
information.
ReferenceAffectedPlanning Data
Paragraph 1.A.2., Spares AffectedNoSpares Affected
Paragraph 1.E., Compliance and Paragraph
1.F., Approval
YesAD Related
Paragraph 1.H., Weight and Balance ChangesNoWeight and Balance Change
Paragraph 1.I., Electrical Load DataNoElectrical Load Changed
Paragraph 1.K., Publications AffectedYesPublications Affected
Paragraph 1.K., Publications AffectedNoAirplane Flight Operations Affected (Flight Crew
Operations Manual and/or FAA Approved Air-
plane Flight Manual)
Paragraph 2.C.1., Kits/PartsYesKits/Parts Required
Paragraph 2.C.2., Parts and Materials Supplied
by the Operator
YesOperator Supplied Parts/Material
Paragraph 2.F., Special Tooling Necessary to
do this Service Bulletin
NoSpecial Tooling Required
ACTION (PRR 38275-165S)
Group 1-2, Configuration 1; Group 3:
WORK PACKAGE 1:
1. Lubricate the forward and aft trunnion pin assemblies on the left and right MLG.
Group 1-2, Configuration 1; Group 3:
WORK PACKAGE 2:
1. Do a general visual inspection and a detailed inspection if necessary of the forward and aft trunnion
pin assemblies on the left and right MLG.
NOTE: Make sure that you have serviceable trunnion pins available in case the trunnion pins inspected
are found with corrosion or damage and need to be replaced.
a. If corrosion or damage is found on the forward trunnion pin assembly:
(1) Group 1-2, Configuration 1:
Overhaul or replace the forward trunnion pin assembly and install a new forward trunnion pin
housing assembly seal and retainer configuration.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 19, 2011
737-32-1448Revision 1: May 29, 2015
12 of 187
BOEING SERVICE BULLETIN 737-32-1448

### Page 13

(2) Group 3:
Overhaul or replace the forward trunnion pin assembly.
b. If corrosion or damage is found on the aft trunnion pin assemblies, overhaul or replace the aft
trunnion pin assemblies.
c. If no corrosion or damage is found on the fwd and aft trunnion pin assemblies, no overhaul or
replacement of the forward and aft trunnion pin assemblies is necessary.
2. Lubricate the forward and aft trunnion pin assemblies on the left and right MLG.
Group 1-2, Configuration 1; Group 3:
WORK PACKAGE 3:
1. Group 1-2, Configuration 1:
As terminating action to repeat lubrications and repeat inspections given in compliance, replace the
forward and aft outer cylinder trunnion bushings, the forward and aft trunnion pin cross bolt bushings,
the aft bearing ball and aft bearing race with new or changed parts and install a new forward trunnion
pin housing assembly seal and retainer configuration.
2. Group 3:
As terminating action to repeat lubrications and repeat inspections given in compliance, replace the
forward and aft outer cylinder trunnion bushings, the forward and aft trunnion pin cross bolt bushings,
the aft bearing ball and aft bearing race with new or changed parts.
Group 1-2, Configuration 2:
WORK PACKAGE 4:
1. Install a new forward trunnion pin housing assembly seal and retainer configuration.
EFFECTIVITY
737-600/700/700C/800/900/900ER Airplanes. Refer to Paragraph 1.A.1., Airplanes, for the list of affected
airplanes.
COMPLIANCE
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to this service
bulletin. The Airworthiness Directive will make the compliance tasks and times given in this service bulletin
mandatory.
Refer to Paragraph 1.E., Compliance.
INDUSTRY SUPPORT INFORMATION
Boeing warranty remedies are not available for the configuration changes, inspection, and/or overhaul procedures
given in this service bulletin.
MANPOWER
Refer to Paragraph 1.G., Manpower.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 19, 2011
737-32-1448Revision 1: May 29, 2015
13 of 187
BOEING SERVICE BULLETIN 737-32-1448

### Page 14

MATERIAL INFORMATION
Boeing Supplied Kits/Parts.
Refer to Paragraph 2.A., Material - Price and Availability.
Operators are encouraged to complete the survey provided in APPENDIX M of this service bulletin to help
Boeing predict the quantity and timing of the Boeing Supplied Kits/Parts.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 19, 2011
737-32-1448Revision 1: May 29, 2015
14 of 187
BOEING SERVICE BULLETIN 737-32-1448

### Page 15 (OCR)

BOEING SERVICE BULLETIN 737-32-1448
AFT TRUNNION
PIN ASSEMBLY
INBD
LEFT MAIN LANDING GEAR SHOWN  INBD
RIGHT MAIN LANDING GEAR SIMILAR
(LOOKING AFT)
MAIN LANDING
GEAR SUPPORT  MAIN LANDING GEAR NOT SHOWN
BEAM  FOR CLARITY
GROUP 1-2, CONFIGURATION 1, GROUP 3:
WORK PACKAGE 1:
FORWARD  LUBRICATE THE FORWARD AND AFT TRUNNION PIN
TRUNNION PIN  ASSEMBLIES ON THE LEFT AND RIGHT MLG.
• ASSEMBLY  GROUP 1-2, CONFIGURATION 1, GROUP 3:
WORK PACKAGE 2:
DO A GENERAL VISUAL INSPECTION AND A DETAILED
INSPECTION IF NECESSARY OF THE FWD AND AFT
TRUNNION PIN ASSEMBLIES ON THE LEFT AND RIGHT MLG.
-IF CORROSION OR DAMAGE IS FOUND ON THE FWD AND/OR
AFT TRUNNION PIN ASSEMBLIES, REPAIR OR REPLACE THE
FWD AND/OR AFT TRUNNION PIN ASSEMBLIES AS APPLICABLE.
GROUP 1-2, CONFIGURATION 1 ONLY:
INSTALL A NEW FORWARD TRUNNION PIN HOUSING ASSEMBLY
-SEAL AND RETAINER CONFIGURATION AS APPLICABLE.
GROUP 1-2, CONFIGURATION 1, GROUP 3:
WORK PACKAGE 3:
- REPLACE THE FWD AND AFT OUTER CYLINDER TRUNNION
BUSHINGS, THE FORWARD TRUNNION PIN CROSS BOLT
BUSHINGS (GROUP 1 ONLY) AND AFT TRUNNION PIN CROSS
BOLT BUSHINGS, AFT BEARING BALL AND AFT BEARING RACE
MAIN LANDING GEAR NOT SHOWN  WITH NEW OR CHANGED PARTS.
FOR CLARITY  GROUP 1-2, CONFIGURATION 1 ONLY:
- INSTALL A NEW FORWARD TRUNNION PIN HOUSING ASSEMBLY
SEAL AND RETAINER.
GROUP 1-2, CONFIGURATION 2:
WORK PACKAGE 4:  1984864
- INSTALL A NEW MLG FORWARD TRUNNION PIN HOUSING
ASSEMBLY, SEAL AND RETAINER.
Original Issue: May 19, 2011
Revision 1: May 29, 2015  Export Controlled ECCN: 9E991 - BOEING  737-32-1448
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.  15 of 187

### Page 16

Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 19, 2011
737-32-1448Revision 1: May 29, 2015
16 of 187
BOEING SERVICE BULLETIN 737-32-1448
BLANK PAGE

### Page 17

Commercial 
Airplanes
737
Service Bulletin
SPECIAL ATTENTION
Number: 737-32-1448
Original Issue: May 19, 2011
Revision 1: May 29, 2015
ATA System: 3211
SUBJECT: LANDING GEAR - Main Landing Gear - Forward and Aft Trunnion Pin Assemblies
Inspection and Change
BOEING RECOMMENDS THAT EACH OPERATOR EXAMINE THIS SERVICE BULLETIN IMMEDIATELY.
1.    PLANNING INFORMATION
A. Effectivity
1. Airplanes
Refer to Service Bulletin Index Document D6-19567 Part 3 for Airplane Variable Number, Line
Number, and Serial Number data.
This service bulletin is for the airplanes shown below. An equivalent change is on subsequent
production airplanes. Refer to PRR 38275-165S for data about this change.
DESCRIPTIONCONFIGURATIONGROUP
737-600/700 airplanes line number 1 thru 3526, except 737-700
airplanes with a Boeing Business Jet configuration, an Extended
Range configuration, and an Air Early Warning And Control
configuration.
-1
Airplanes that have not accomplished Work Package 3 of the original
issue of this service bulletin.
1
Airplanes that have accomplished Work Package 3 of the original
issue of this service bulletin.
2
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 19, 2011
737-32-1448Revision 1: May 29, 2015
17 of 187

### Page 18

DESCRIPTIONCONFIGURATIONGROUP
737-700C/800/900 airplanes line number 1 thru 3526 and 737-700
Increased Gross Weight (IGW) airplanes line number 1 thru 3526,
which includes any 737-700 airplanes with a Boeing Business Jet
configuration, an Extended Range configuration, and an Air Early
Warning And Control configuration.
-2
Airplanes that have not accomplished Work Package 3 of the original
issue of this service bulletin.
1
Airplanes that have accomplished Work Package 3 of the original
issue of this service bulletin.
2
737-900ER airplanes line number 1 thru 3526.-3
Airplane Models:
737-600, 737-700, 737-700C, 737-800, 737-900, 737-900ER
GroupVariable Number
1YA001 - YA099
1YA101 - YA199
1YA201 - YA211
1YA221
1YA231 - YA242
1YA251 - YA256
1YA271 - YA272
1YA291
1YA301 - YA302
1YA311 - YA314
1YA321 - YA323
1YA336 - YA345
1YA351
1YA356 - YA357
1YA366 - YA367
1YA371 - YA377
1YA501 - YA536
1YA541 - YA552
1YA571 - YA578
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 19, 2011
737-32-1448Revision 1: May 29, 2015
18 of 187
BOEING SERVICE BULLETIN 737-32-1448

### Page 19

GroupVariable Number
1YA601 - YA615
1YA621 - YA622
1YA626 - YA631
1YA635 - YA636
1YA641 - YA642
1YA645 - YA650
1YA656 - YA659
1YA666 - YA667
1YA671 - YA672
1YA681 - YA691
1YA701 - YA710
1YA721 - YA722
1YA731 - YA734
1YA751 - YA756
1YA801 - YA803
1YA809
1YA811 - YA814
1YA831 - YA835
1YA841 - YA862
1YA881 - YA882
1YA891 - YA892
1YA961 - YA978
1YB001 - YB006
1YB101 - YB132
1YB151 - YB153
1YB156 - YB158
1YB161 - YB164
1YB171 - YB172
1YB181 - YB184
1YB201 - YB208
1YB271
1YB276
1YB301 - YB310
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 19, 2011
737-32-1448Revision 1: May 29, 2015
19 of 187
BOEING SERVICE BULLETIN 737-32-1448

### Page 20

GroupVariable Number
1YB371 - YB392
1YB501 - YB502
1YB521 - YB526
1YB541 - YB544
1YB551
1YB561 - YB598
1YB601 - YB635
1YB651
1YB656
1YB671 - YB672
1YB851 - YB863
1YB871 - YB874
1YB881 - YB893
1YB901 - YB903
1YB911
1YB961 - YB974
1YB981
1YB986 - YB996
2YC001 - YC030
2YC051 - YC084
2YC091 - YC095
2YC101 - YC104
2YC111 - YC113
2YC121
2YC126 - YC127
2YC136 - YC141
2YC146 - YC147
2YC151 - YC156
2YC166 - YC171
2YC176 - YC179
2YC186 - YC190
2YC201 - YC203
2YC206 - YC207
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 19, 2011
737-32-1448Revision 1: May 29, 2015
20 of 187
BOEING SERVICE BULLETIN 737-32-1448

### Page 21

GroupVariable Number
2YC301 - YC305
2YC321 - YC387
2YC391 - YC394
2YC396
2YC401 - YC417
2YC421 - YC422
2YC426 - YC428
2YC436 - YC439
2YC441 - YC448
2YC451 - YC455
2YC459
2YC461 - YC467
2YC471 - YC499
2YC501 - YC526
2YC571 - YC583
2YC587 - YC589
2YC591 - YC593
2YC601 - YC655
2YC681 - YC696
2YC701 - YC715
2YC720 - YC725
2YC727 - YC752
2YC761 - YC770
2YC781 - YC793
2YC801 - YC892
2YC901 - YC907
2YC921 - YC922
2YC931 - YC932
2YC941 - YC951
2YC971 - YC978
2YC981 - YC983
2YD001 - YD007
2YD021 - YD025
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 19, 2011
737-32-1448Revision 1: May 29, 2015
21 of 187
BOEING SERVICE BULLETIN 737-32-1448

### Page 22

GroupVariable Number
2YD041 - YD057
2YD081 - YD084
2YD101 - YD113
2YD121 - YD126
2YD151 - YD159
2YD171 - YD172
2YD201 - YD203
2YD206 - YD209
2YD216 - YD219
2YD251 - YD254
2YD256 - YD257
2YD261
2YD301 - YD334
2YD391
2YD401 - YD410
2YD412 - YD417
2YD481 - YD485
2YD491 - YD499
2YD501 - YD512
2YD531 - YD535
2YD541 - YD547
2YD561 - YD564
2YD571 - YD572
2YD591 - YD595
2YD601 - YD612
2YD651 - YD655
1YE001 - YE020
1YE051
1YE101 - YE109
1YE151 - YE157
1YE171 - YE172
1YE201 - YE206
1YE301 - YE305
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 19, 2011
737-32-1448Revision 1: May 29, 2015
22 of 187
BOEING SERVICE BULLETIN 737-32-1448

### Page 23

GroupVariable Number
1YE321 - YE326
1YE371 - YE383
2YF001 - YF011
2YF021 - YF049
2YF051 - YF065
2YF086 - YF087
2YF106 - YF107
2YF111 - YF114
2YF116 - YF119
2YF121 - YF128
2YF176 - YF178
2YF191 - YF192
2YF201 - YF276
2YF401 - YF402
2YF431 - YF432
2YF441 - YF442
2YF451 - YF460
2YF501 - YF599
2YF701 - YF707
2YF801 - YF803
2YF831 - YF832
2YF836 - YF838
2YF901 - YF905
2YF921 - YF927
2YF951
2YG001 - YG044
2YG061 - YG064
2YG066 - YG089
2YG091 - YG099
2YG101 - YG104
2YG111 - YG114
2YG116 - YG128
2YG201 - YG205
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 19, 2011
737-32-1448Revision 1: May 29, 2015
23 of 187
BOEING SERVICE BULLETIN 737-32-1448

### Page 24

GroupVariable Number
2YG211 - YG214
2YG221 - YG224
2YG251 - YG252
2YG501 - YG511
2YG601 - YG602
2YG701
2YG711
3YH001 - YH012
3YH031 - YH055
3YH071 - YH078
3YH101 - YH132
3YH201 - YH202
3YH206 - YH207
3YH301 - YH306
3YH321 - YH322
2YJ001 - YJ013
2YJ021
2YJ471 - YJ480
2YJ501 - YJ517
2YJ531 - YJ579
2YJ591 - YJ599
2YJ631 - YJ632
2YJ671 - YJ694
2YJ801 - YJ867
2YJ871 - YJ880
2YJ901 - YJ904
2YJ908 - YJ929
2YJ931 - YJ937
2YJ941 - YJ956
2YJ961
2YJ976 - YJ977
2YK001 - YK007
2YK101 - YK104
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 19, 2011
737-32-1448Revision 1: May 29, 2015
24 of 187
BOEING SERVICE BULLETIN 737-32-1448

### Page 25

GroupVariable Number
2YK111 - YK112
2YK121 - YK122
2YK131 - YK133
2YK136 - YK139
2YK141 - YK142
2YK146 - YK148
2YK151 - YK154
2YK161 - YK167
2YK171
2YK176 - YK177
2YK186
2YK191
2YK196
2YK201 - YK202
2YK301 - YK314
2YK321 - YK340
2YK361 - YK378
2YK401 - YK406
2YK426 - YK427
2YK431 - YK450
2YK456 - YK467
2YK471 - YK473
2YK476
2YK480 - YK487
2YK491
2YK495 - YK498
2YK511 - YK516
2YK521 - YK530
2YK551 - YK571
2YK576 - YK577
2YK580 - YK585
2YK601 - YK602
2YK606 - YK607
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 19, 2011
737-32-1448Revision 1: May 29, 2015
25 of 187
BOEING SERVICE BULLETIN 737-32-1448

### Page 26

GroupVariable Number
2YK611 - YK616
2YK621 - YK634
2YK641 - YK644
2YK651 - YK665
2YK671 - YK672
2YK676 - YK677
2YK681 - YK686
2YK691
2YK701 - YK713
2YK716 - YK719
2YK721 - YK741
2YK751 - YK770
2YK776 - YK778
2YK781 - YK785
2YK791 - YK792
2YK796 - YK797
2YK801 - YK899
2YK901 - YK912
2YK918 - YK919
2YK921 - YK928
2YK941 - YK959
2YK961 - YK996
2YL001 - YL005
2YL011 - YL016
2YL021 - YL024
2YL051 - YL052
2YL056 - YL057
2YL061
2YL066 - YL069
2YL076 - YL077
2YL101 - YL136
2YL201 - YL226
2YL271 - YL272
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 19, 2011
737-32-1448Revision 1: May 29, 2015
26 of 187
BOEING SERVICE BULLETIN 737-32-1448

### Page 27

GroupVariable Number
2YL281 - YL284
2YL301 - YL303
2YL311 - YL314
2YL316 - YL321
2YL351 - YL353
2YL371 - YL374
2YL401
2YL421 - YL429
2YL431 - YL444
2YL461 - YL478
2YL501 - YL509
2YL531 - YL534
2YL541 - YL544
2YL561 - YL569
2YL591 - YL598
2YL601 - YL606
2YL611 - YL612
2YL616 - YL617
2YL621
2YL626
2YL631 - YL634
2YL636 - YL637
2YL661 - YL664
2YL676 - YL681
2YL691
2YL696 - YL697
2YL701 - YL706
2YL731
2YL751 - YL752
2YL756 - YL757
2YL761 - YL779
2YL796 - YL797
2YL801 - YL815
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 19, 2011
737-32-1448Revision 1: May 29, 2015
27 of 187
BOEING SERVICE BULLETIN 737-32-1448

### Page 28

GroupVariable Number
2YL901 - YL910
2YL921 - YL940
2YL951 - YL968
1YM101 - YM103
1YM201 - YM242
1YM251 - YM299
1YM301 - YM398
1YM471
1YM481 - YM484
1YM501 - YM515
1YM521 - YM522
1YM541
1YM551 - YM553
1YM571 - YM572
1YM581 - YM582
1YM591 - YM599
1YM631 - YM634
1YM641 - YM652
1YM671 - YM674
1YM691 - YM698
1YM701 - YM710
1YM761 - YM765
1YN001 - YN016
1YN021 - YN024
1YN061
1YN071 - YN082
1YN091 - YN092
1YN101 - YN112
1YN121
1YN201 - YN202
1YN211 - YN219
1YN231 - YN236
1YN261
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 19, 2011
737-32-1448Revision 1: May 29, 2015
28 of 187
BOEING SERVICE BULLETIN 737-32-1448

### Page 29

GroupVariable Number
1YN501
2YQ001 - YQ003
2YQ011 - YQ017
2YQ026 - YQ027
2YQ036 - YQ042
2YQ201
2YQ231
2YQ241 - YQ242
2YQ291 - YQ295
2YQ401 - YQ403
2YR001 - YR005
2YR051 - YR053
2YR101
2YR111 - YR112
2YR166
2YR201 - YR203
2YR231 - YR232
2. Spares Affected
None.
B. Concurrent Requirements
None.
C. Reason
This service bulletin is sent to make sure the left and right Main Landing Gear (MLG) forward and aft
trunnion pin assemblies and the components related to the MLG forward and aft trunnion pin assemblies
remain serviceable. Corrosion and chrome damage has been found on some of these components. If
this service bulletin is not done, corrosion and chrome plate damage on these components could cause
the MLG forward and aft trunnion pin assemblies to crack which could result in a MLG collapse.
Several operators have reported heavy corrosion and pitting of the MLG forward and aft trunnion pin
assemblies. Boeing found a number of causes for this damage which include insufficient lubrication,
joint contamination and mixed greases. It was found that the lubrication between the forward and aft
trunnion pin assemblies and the outer cylinder assembly bushings and the lubrication of the aft trunnion
bearing ball was not sufficient to prevent wear and corrosion. It was also found that the clearances
between the forward and aft trunnion pin cross bolt bushings and the cross bolts could affect the rate
of wear and corrosion of MLG trunnion pin assemblies. To correct these problems, Boeing has changed
the design of the outer cylinder forward and aft trunnion bushings to improve lubrication around the
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 19, 2011
737-32-1448Revision 1: May 29, 2015
29 of 187
BOEING SERVICE BULLETIN 737-32-1448

### Page 30

outer diameter of the forward and aft trunnion pin assemblies and changed the design of aft trunnion
bearing split ball to add a circumferential lube groove and larger diameter through holes which improves
lubrication around the aft pin at the interface with the aft trunnion bearing. In addition Boeing has
changed the design of the forward and aft trunnion pin cross bolt bushings for the trunnion pins to
reduce relative motion of each pin within the outer cylinder assembly bushings and reduce wear.
Accomplishment of this service bulletin lubricates and inspects existing MLG forward and aft trunnion
pin assemblies at regular intervals to prevent damage and corrosion. Instructions are given to overhaul
or replace damaged or corroded forward and aft trunnion pin assemblies. In addition, instructions are
provided to install new forward and aft trunnion bushings in the MLG outer cylinder assembly, install
new trunnion pin cross bolt bushings in the forward and aft trunnion pins, install a new/changed aft
trunnion bearing ball, install a new/changed aft trunnion bearing race, and install a new forward trunnion
pin housing assembly seal and retainer configuration on applicable airplanes. Installation of the new
trunnion bushings in the MLG outer cylinder assembly, new/changed aft trunnion bearing ball and aft
trunnion bearing race are the terminating actions to the repeat lubrication and repeat inspections given
in this service bulletin and will improve grease distribution which will reduce wear in the joint and prevent
corrosion.
Boeing recommends to do this service bulletin at the same time as 737-32-1376 or 737-32-1402 if
applicable.
Boeing Service Related Problem (SRP) 737-SRP-32-0165 is related to this service bulletin.
Boeing Fleet Team Digest (FTD) 737NG FTD 32-09001 is related to this service bulletin.
Revision 1 is sent to add Work Package 4 for Group 1 and Group 2 airplanes that have previously
changed the Main Landing gear (MLG) trunnion pin assemblies in accordance with Work Package 3.
It provides new figures to replace the seal and retainer configuration for the trunnion housing assembly.
This information has also been added to Work Package 3 for operators that have not previously changed
the MLG trunnion pin assemblies. In addition, 737-700 Increased Gross Weight (IGW) airplanes, which
includes any 737-700 airplanes with a Boeing Business Jet (BBJ) configuration, an Extended Range
(ER) configuration, and an Air Early Warning And Control (AEW&C) configuration are moved from
Group 1 to Group 2 as they have a MLG configuration that is similar to 737-800 airplanes. The use of
Component Maintenance Manual (CMM) and Standard Overhaul Practices Manual (SOPM) procedures
that have been identified as critical in this service bulletin are mandated. Instructions to accomplish
these critical procedures now use the terminology "in accordance with". Revision 1 also clarifies the
lubrication procedure to show only the applicable lubrication locations and changes the MLG support
beam part marking information.
The data given in Information Notice 737-32-1448 IN 01 is included in this revision.
D. Description
Group 1-2, Configuration 1; Group 3:
WORK PACKAGE 1:
1. Lubricate the forward and aft trunnion pin assemblies on the left and right MLG.
Group 1-2, Configuration 1; Group 3:
WORK PACKAGE 2:
1. Do a general visual inspection and a detailed inspection if necessary of the forward and aft trunnion
pin assemblies on the left and right MLG.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 19, 2011
737-32-1448Revision 1: May 29, 2015
30 of 187
BOEING SERVICE BULLETIN 737-32-1448

### Page 31

NOTE: Make sure that you have serviceable trunnion pins available in case the trunnion pins
inspected are found with corrosion or damage and need to be replaced.
a. If corrosion or damage is found on the forward trunnion pin assembly:
(1) Group 1-2, Configuration 1:
Overhaul or replace the forward trunnion pin assembly and install a new forward trunnion
pin housing assembly seal and retainer configuration.
(2) Group 3:
Overhaul or replace the forward trunnion pin assembly.
b. If corrosion or damage is found on the aft trunnion pin assemblies, overhaul or replace the
aft trunnion pin assemblies.
c. If no corrosion or damage is found on the fwd and aft trunnion pin assemblies, no overhaul
or replacement of the forward and aft trunnion pin assemblies is necessary.
2. Lubricate the forward and aft trunnion pin assemblies on the left and right MLG.
Group 1-2, Configuration 1; Group 3:
WORK PACKAGE 3:
1. Group 1-2, Configuration 1:
As terminating action to repeat lubrications and repeat inspections given in compliance, replace
the forward and aft outer cylinder trunnion bushings, the forward and aft trunnion pin cross bolt
bushings, the aft bearing ball and aft bearing race with new or changed parts and install a new
forward trunnion pin housing assembly seal and retainer configuration.
2. Group 3:
As terminating action to repeat lubrications and repeat inspections given in compliance, replace
the forward and aft outer cylinder trunnion bushings, the forward and aft trunnion pin cross bolt
bushings, the aft bearing ball and aft bearing race with new or changed parts.
Group 1-2, Configuration 2:
WORK PACKAGE 4:
1. Install a new forward trunnion pin housing assembly seal and retainer configuration.
Effects of this Revision on airplanes on which the original issue was previously done:
ActionConditionGroup
Operators must continue to do the
repeat lubrication and MLG forward
and aft trunnion inspections in accor-
dance with Paragraph 1.E., Compli-
ance until new and improved parts
are installed.
Previously accomplished the lubrica-
tion and MLG forward and aft trun-
nion inspections in accordance with
Paragraph 3.B., Work Instructions,
Work Package 1 and 2 of the origi-
nal issue of this service bulletin.
Group 1, Configuration 1
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 19, 2011
737-32-1448Revision 1: May 29, 2015
31 of 187
BOEING SERVICE BULLETIN 737-32-1448

### Page 32

ActionConditionGroup
Install a new forward trunnion pin
housing assembly seal and retainer
configuration in accordance with
Paragraph 3.B., Work Instructions,
Work Package 4.
Previously accomplished the MLG
trunnion pin assemblies change in
accordance with Paragraph 3.B.,
Work Instructions, Work Package 3
and 2 of the original issue of this
service bulletin.
Group 1, Configuration 2
Operators must continue to do the
repeat lubrication and MLG forward
and aft trunnion inspections in accor-
dance with Paragraph 1.E., Compli-
ance until new and improved parts
are installed.
Previously accomplished the lubrica-
tion and MLG forward and aft trun-
nion inspections in accordance with
Paragraph 3.B., Work Instructions,
Work Package 1 and 2 of the origi-
nal issue of this service bulletin.
Group 2, Configuration 1
Install a new forward trunnion pin
housing assembly seal and retainer
configuration in accordance with
Paragraph 3.B., Work Instructions,
Work Package 4.
Previously accomplished the MLG
trunnion pin assemblies change in
accordance with Paragraph 3.B.,
Work Instructions, Work Package 3
and 2 of the original issue of this
service bulletin.
Group 2, Configuration 2
Operators must continue to do the
repeat lubrication and MLG forward
and aft trunnion inspections in accor-
dance with Paragraph 1.E., Compli-
ance until new and improved parts
are installed. (a)
Previously accomplished the lubrica-
tion and MLG forward and aft trun-
nion inspections in accordance with
Paragraph 3.B., Work Instructions,
Work Package 1 and 2 of the origi-
nal issue of this service bulletin.
Group 3
(a) MLG forward trunnion pin housing assembly seal and retainer replacement is not necessary.
The work in this service bulletin is done in the maintenance zone(s) given below.
Group 1:
Affected Maintenance Zones
ZoneModel
133, 134, 551, 651, 734, 744737-600, 737-700
Group 2:
Affected Maintenance Zones
ZoneModel
133, 134, 551, 651, 734, 744737-700, 737-700C, 737-800,
737-900
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 19, 2011
737-32-1448Revision 1: May 29, 2015
32 of 187
BOEING SERVICE BULLETIN 737-32-1448

### Page 33

Group 3:
Affected Maintenance Zones
ZoneModel
133, 134, 551, 651, 734, 744737-900ER
E. Compliance
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to
this service bulletin. The Airworthiness Directive will make the compliance tasks and times given in this
service bulletin mandatory.
Boeing recommends that the inspection, change and/or overhaul given in this service bulletin be done
within the time limits given in the table below.
Group 1-2, Configuration 1:
TABLE 1: MAIN LANDING GEAR (MLG) TRUNNION PIN ASSEMBLIES CORROSION
Repeat Interval
(Not to Exceed)
Compliance Time (Whichever
Occurs Later)
ActionCondition
30 days. See foot-
note (a)
Within 30 days
since the date of
issuance of the
original stan-
dard airworthi-
ness certificate
or date of is-
suance of the
original export
certificate of air-
worthiness.
Within 30 days
from the original
issue date on
this service bul-
letin.
Lubricate the MLG for-
ward and aft trunnion pin
assemblies in accordance
with Paragraph 3.B.,
Work Instructions, Work
Package 1.
All Airplanes
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 19, 2011
737-32-1448Revision 1: May 29, 2015
33 of 187
BOEING SERVICE BULLETIN 737-32-1448

### Page 34

Group 1-2, Configuration 1:
TABLE 1: MAIN LANDING GEAR (MLG) TRUNNION PIN ASSEMBLIES CORROSION
Repeat Interval
(Not to Exceed)
Compliance Time (Whichever
Occurs Later)
ActionCondition
18 months. See
footnote (a)
Within 60
months since
the date of is-
suance of the
original stan-
dard airworthi-
ness certificate
or date of is-
suance of the
original export
certificate of air-
worthiness, or
within 60
months from the
date of MLG in-
stallation after
overhaul
whichever oc-
curs later.
Within 6 months
from the original
issue date on
this service bul-
letin
Do a general visual in-
spection of the MLG for-
ward and aft trunnion pin
assemblies with the MLG
not removed for signs of
corrosion and chrome
plating damage in accor-
dance with Paragraph
3.B., Work Instructions,
Work Package 2.
All Airplanes
--Before further
flight.
Lubricate the MLG for-
ward and aft trunnion pin
assemblies in accordance
with Paragraph 3.B.,
Work Instructions, Work
Package 2.
No sign of corrosion or
chrome plating damage
found during general visual
inspection of the MLG for-
ward and aft trunnion pin
assemblies in accordance
with Paragraph 3.B., Work
Instructions, Work Package
2.
--Before further
flight.
Do a detailed inspection
of the applicable MLG
forward trunnion pin as-
sembly and do a part
number inspection of the
MLG forward trunnion pin
housing assembly seal
and retainer in accor-
dance with Paragraph
3.B., Work Instructions,
Work Package 2.
Any sign of corrosion or
chrome plating damage
found on a MLG forward
trunnion pin assembly dur-
ing general visual inspec-
tion in accordance with
Paragraph 3.B., Work In-
structions, Work Package
2.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 19, 2011
737-32-1448Revision 1: May 29, 2015
34 of 187
BOEING SERVICE BULLETIN 737-32-1448

### Page 35

Group 1-2, Configuration 1:
TABLE 1: MAIN LANDING GEAR (MLG) TRUNNION PIN ASSEMBLIES CORROSION
Repeat Interval
(Not to Exceed)
Compliance Time (Whichever
Occurs Later)
ActionCondition
--Before further
flight.
Replace the MLG forward
trunnion pin housing as-
sembly seal, retainer, and
support ring assembly in
accordance with Para-
graph 3.B., Work Instruc-
tions, Work Package 2
with a new seal and re-
tainer configuration.
No areas of loose or miss-
ing chrome plating or corro-
sion found during detailed
inspection of applicable
MLG forward trunnion pin
assembly in accordance
with Paragraph 3.B., Work
Instructions, Work Package
2.
AndAnd
Lubricate the applicable
MLG forward trunnion pin
assembly in accordance
with Paragraph 3.B.,
Work Instructions, Work
Package 2.
MLG forward trunnion pin
housing assembly seal P/N
S38624 and retainer P/N
161A1194-1 found during
inspection in accordance
with Paragraph 3.B., Work
Instructions, Work Package
2.
--Before further
flight.
No overhaul or replace-
ment of the MLG forward
trunnion pin assembly is
necessary. Lubricate the
applicable MLG forward
trunnion pin assembly in
accordance with Para-
graph 3.B., Work Instruc-
tions, Work Package 2.
No areas of loose or miss-
ing chrome plating or corro-
sion found during detailed
inspection of applicable
MLG forward trunnion pin
assembly in accordance
with Paragraph 3.B., Work
Instructions, Work Package
2.
And
MLG forward trunnion pin
housing assembly seal P/N
5649-0615-369 and retain-
er P/N 161A1194-3 found
during inspection in accor-
dance with Paragraph 3.B.,
Work Instructions, Work
Package 2.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 19, 2011
737-32-1448Revision 1: May 29, 2015
35 of 187
BOEING SERVICE BULLETIN 737-32-1448

### Page 36

Group 1-2, Configuration 1:
TABLE 1: MAIN LANDING GEAR (MLG) TRUNNION PIN ASSEMBLIES CORROSION
Repeat Interval
(Not to Exceed)
Compliance Time (Whichever
Occurs Later)
ActionCondition
--Before further
flight.
Overhaul or replace the
applicable MLG forward
trunnion pin assembly in
accordance with Para-
graph 3.B., Work Instruc-
tions, Work Package 2.
Any area of loose or miss-
ing chrome plating or corro-
sion found during detailed
inspection of applicable
MLG forward trunnion pin
assembly in accordance
with Paragraph 3.B., Work
Instructions, Work Package
2.
And
Replace the MLG forward
trunnion pin housing as-
sembly seal, retainer, and
support ring assembly in
accordance with Para-
graph 3.B., Work Instruc-
tions, Work Package 2
with a new seal and re-
tainer configuration. See
footnote (b)
And
MLG forward trunnion pin
housing assembly seal P/N
S38624 and retainer P/N
161A1194-1 found during
inspection in accordance
with Paragraph 3.B., Work
Instructions, Work Package
2.
--Before further
flight.
Overhaul or replace the
applicable MLG forward
trunnion pin assembly in
accordance with Para-
graph 3.B., Work Instruc-
tions, Work Package 2.
See footnote (b)
Any area of loose or miss-
ing chrome plating or corro-
sion found during detailed
inspection of applicable
MLG forward trunnion pin
assembly in accordance
with Paragraph 3.B., Work
Instructions, Work Package
2.
And
MLG forward trunnion pin
housing assembly seal P/N
5649-0615-369 and retain-
er P/N 161A1194-3 found
during inspection in accor-
dance with Paragraph 3.B.,
Work Instructions, Work
Package 2.
--Before further
flight.
Do a detailed inspection
of the applicable MLG aft
trunnion pin assembly in
accordance with Para-
graph 3.B., Work Instruc-
tions, Work Package 2.
Any sign of corrosion or
chrome plating damage
found on a MLG aft trun-
nion pin assemblies during
general visual inspection in
accordance with Paragraph
3.B., Work Instructions
Work Package 2.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 19, 2011
737-32-1448Revision 1: May 29, 2015
36 of 187
BOEING SERVICE BULLETIN 737-32-1448

### Page 37

Group 1-2, Configuration 1:
TABLE 1: MAIN LANDING GEAR (MLG) TRUNNION PIN ASSEMBLIES CORROSION
Repeat Interval
(Not to Exceed)
Compliance Time (Whichever
Occurs Later)
ActionCondition
--Before further
flight.
No overhaul or replace-
ment of the MLG aft trun-
nion pin assembly is nec-
essary. Lubricate the ap-
plicable MLG aft trunnion
pin assembly in accor-
dance with Paragraph
3.B., Work Instructions,
Work Package 2.
No areas of loose or miss-
ing chrome plating or corro-
sion found during detailed
inspection of applicable
MLG aft trunnion pin as-
sembly in accordance with
Paragraph 3.B., Work In-
structions, Work Package
2.
--Before further
flight.
Overhaul or replace the
applicable MLG aft trun-
nion pin assembly in ac-
cordance with Paragraph
3.B., Work Instructions,
Work Package 2. See
footnote (c)
Any area of loose or miss-
ing chrome plating or corro-
sion found during detailed
inspection of applicable
MLG aft trunnion pin as-
sembly in accordance with
Paragraph 3.B., Work In-
structions, Work Package
2.
-The next MLG
overhaul, not to
exceed 10 years
from the date of
MLG installation
after the most
recent overhaul
or not to exceed
10 years since
the date of is-
suance of the
original stan-
dard airworthi-
ness certificate
or date of is-
suance of the
original export
certificate of air-
worthiness
whichever oc-
curs later.
The next MLG
overhaul, not to
exceed 10 years
from the original
issue date on
this service bul-
letin.
Do the MLG trunnion pin
assembly changes in ac-
cordance with Paragraph
3.B., Work Instructions,
Work Package 3. See
footnote (a)
And
Inspect the left and right
MLG forward trunnion pin
housing assembly seal
and retainer for part
numbers in accordance
with Paragraph 3.B.,
Work Instructions, Work
Package 3.
All airplanes
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 19, 2011
737-32-1448Revision 1: May 29, 2015
37 of 187
BOEING SERVICE BULLETIN 737-32-1448

### Page 38

Group 1-2, Configuration 1:
TABLE 1: MAIN LANDING GEAR (MLG) TRUNNION PIN ASSEMBLIES CORROSION
Repeat Interval
(Not to Exceed)
Compliance Time (Whichever
Occurs Later)
ActionCondition
--Before further
flight.
Replace the MLG forward
trunnion pin housing as-
sembly seal, retainer, and
support ring assembly in
accordance with Para-
graph 3.B., Work Instruc-
tions, Work Package 3
with a new seal and re-
tainer configuration.
MLG forward trunnion pin
housing assembly seal P/N
S38624 and retainer P/N
161A1194-1 found during
inspection in accordance
with Paragraph 3.B., Work
Instructions, Work Package
3.
---No replacement of the
MLG forward trunnion pin
housing assembly seal
and retainer is necessary.
MLG forward trunnion pin
housing assembly seal P/N
5649-0615-369 and retain-
er P/N 161A1194-3 found
during inspection in accor-
dance with Paragraph 3.B.,
Work Instructions, Work
Package 3.
(a) Installation of the new and improved parts in accordance with Work Package 3 is the terminating action
for the repeat lubrication and repeat inspection tasks given in this service bulletin.
(b) Forward trunnion pins can be overhauled at the operators approved maintenance facility in accordance
with CMM 57-15-01 "Repair 12-3 and Repair 12-4" revision 30, dated July 01, 2014 or later Boeing ap-
proved revisions that are published on myboeingfleet.
(c) Aft trunnion pins can be overhauled at the operators approved maintenance facility in accordance with
CMM 32-11-09 "Repair 3-1" revision 23, dated March 01, 2014 or later Boeing approved revisions that
are published on myboeingfleet.
Group 3:
TABLE 2: MAIN LANDING GEAR (MLG) TRUNNION PIN ASSEMBLIES CORROSION
Repeat Interval
(Not to Exceed)
Compliance Time (Whichever
Occurs Later)
ActionCondition
30 days. See foot-
note (a)
Within 30 days
since the date of
issuance of the
original stan-
dard airworthi-
ness certificate
or date of is-
suance of the
original export
certificate of air-
worthiness.
Within 30 days
from the original
issue date on
this service bul-
letin.
Lubricate the MLG for-
ward and aft trunnion pin
assemblies in accordance
with Paragraph 3.B.,
Work Instructions, Work
Package 1.
All Airplanes
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 19, 2011
737-32-1448Revision 1: May 29, 2015
38 of 187
BOEING SERVICE BULLETIN 737-32-1448

### Page 39

Group 3:
TABLE 2: MAIN LANDING GEAR (MLG) TRUNNION PIN ASSEMBLIES CORROSION
Repeat Interval
(Not to Exceed)
Compliance Time (Whichever
Occurs Later)
ActionCondition
18 months. See
footnote (a)
Within 60
months since
the date of is-
suance of the
original stan-
dard airworthi-
ness certificate
or date of is-
suance of the
original export
certificate of air-
worthiness, or
within 60
months from the
date of MLG in-
stallation after
overhaul
whichever oc-
curs later.
Within 6 months
from the original
issue date on
this service bul-
letin
Do a general visual in-
spection of the MLG for-
ward and aft trunnion pin
assemblies with the MLG
not removed for signs of
corrosion and chrome
plating damage in accor-
dance with Paragraph
3.B., Work Instructions,
Work Package 2.
All Airplanes
--Before further
flight.
Lubricate the MLG for-
ward and aft trunnion pin
assemblies in accordance
with Paragraph 3.B.,
Work Instructions, Work
Package 2.
No sign of corrosion or
chrome plating damage
found during general visual
inspection of the MLG for-
ward and aft trunnion pin
assemblies in accordance
with Paragraph 3.B., Work
Instructions, Work Package
2.
--Before further
flight.
Do a detailed inspection
of the applicable MLG
forward trunnion pin as-
sembly in accordance
with Paragraph 3.B.,
Work Instructions, Work
Package 2.
Any sign of corrosion or
chrome plating damage
found on a MLG forward
trunnion pin assembly dur-
ing general visual inspec-
tion in accordance with
Paragraph 3.B., Work In-
structions, Work Package
2.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 19, 2011
737-32-1448Revision 1: May 29, 2015
39 of 187
BOEING SERVICE BULLETIN 737-32-1448

### Page 40

Group 3:
TABLE 2: MAIN LANDING GEAR (MLG) TRUNNION PIN ASSEMBLIES CORROSION
Repeat Interval
(Not to Exceed)
Compliance Time (Whichever
Occurs Later)
ActionCondition
--Before further
flight.
No overhaul or replace-
ment of the MLG forward
trunnion pin assembly is
necessary. Lubricate the
applicable MLG forward
trunnion pin assembly in
accordance with Para-
graph 3.B., Work Instruc-
tions, Work Package 2.
No areas of loose or miss-
ing chrome plating or corro-
sion found during detailed
inspection of applicable
MLG forward trunnion pin
assembly in accordance
with Paragraph 3.B., Work
Instructions, Work Package
2.
--Before further
flight.
Overhaul or replace the
applicable MLG forward
trunnion pin assembly in
accordance with Para-
graph 3.B., Work Instruc-
tions, Work Package 2.
See footnote (b)
Any area of loose or miss-
ing chrome plating or corro-
sion found during detailed
inspection of applicable
MLG forward trunnion pin
assembly in accordance
with Paragraph 3.B., Work
Instructions, Work Package
2.
--Before further
flight.
Do a detailed inspection
of the applicable MLG aft
trunnion pin assembly in
accordance with Para-
graph 3.B., Work Instruc-
tions, Work Package 2.
Any sign of corrosion or
chrome plating damage
found on a MLG aft trun-
nion pin assemblies during
general visual inspection in
accordance with Paragraph
3.B., Work Instructions
Work Package 2.
--Before further
flight.
No overhaul or replace-
ment of the MLG aft trun-
nion pin assembly is nec-
essary. Lubricate the ap-
plicable MLG aft trunnion
pin assembly in accor-
dance with Paragraph
3.B., Work Instructions,
Work Package 2.
No areas of loose or miss-
ing chrome plating or corro-
sion found during detailed
inspection of applicable
MLG aft trunnion pin as-
sembly in accordance with
Paragraph 3.B., Work In-
structions, Work Package
2.
--Before further
flight.
Overhaul or replace the
applicable MLG aft trun-
nion pin assembly in ac-
cordance with Paragraph
3.B., Work Instructions,
Work Package 2. See
footnote (c)
Any area of loose or miss-
ing chrome plating or corro-
sion found during detailed
inspection of applicable
MLG aft trunnion pin as-
sembly in accordance with
Paragraph 3.B., Work In-
structions, Work Package
2.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 19, 2011
737-32-1448Revision 1: May 29, 2015
40 of 187
BOEING SERVICE BULLETIN 737-32-1448

### Page 41

Group 3:
TABLE 2: MAIN LANDING GEAR (MLG) TRUNNION PIN ASSEMBLIES CORROSION
Repeat Interval
(Not to Exceed)
Compliance Time (Whichever
Occurs Later)
ActionCondition
-The next MLG
overhaul, not to
exceed 10 years
from the date of
MLG installation
after the most
recent overhaul
or not to exceed
10 years since
the date of is-
suance of the
original stan-
dard airworthi-
ness certificate
or date of is-
suance of the
original export
certificate of air-
worthiness
whichever oc-
curs later.
The next MLG
overhaul, not to
exceed 10 years
from the original
issue date on
this service bul-
letin.
Do the MLG trunnion pin
assembly changes in ac-
cordance with Paragraph
3.B., Work Instructions,
Work Package 3. See
footnote (a)
All airplanes
(a) Installation of the new and improved parts in accordance with Work Package 3 is the terminating action
for the repeat lubrication and repeat inspection tasks given in this service bulletin.
(b) Forward trunnion pins can be overhauled at the operators approved maintenance facility in accordance
with CMM 57-15-01 "Repair 12-3 and Repair 12-4" revision 30, dated July 01, 2014 or later Boeing ap-
proved revisions that are published on myboeingfleet.
(c) Aft trunnion pins can be overhauled at the operators approved maintenance facility in accordance with
CMM 32-11-09 "Repair 3-1" revision 23, dated March 01, 2014 or later Boeing approved revisions that
are published on myboeingfleet.
Group 1-2, Configuration 2:
Table 3: MAIN LANDING GEAR (MLG) TRUNNION PIN HOUSING ASSEMBLY SEAL AND RETAINER
CHANGE
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
-The next MLG
overhaul, not to
exceed 10 years
from the date of
MLG installation
after the most re-
cent overhaul.
Replace the MLG forward
trunnion pin housing as-
sembly seal, support ring
assembly, and retainer in
accordance with Para-
graph 3.B., Work Instruc-
tions, Work Package 4.
Airplanes that have accom-
plished Work Package 3 of
the original issue of this
service bulletin.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 19, 2011
737-32-1448Revision 1: May 29, 2015
41 of 187
BOEING SERVICE BULLETIN 737-32-1448

### Page 42

F. Approval
This service bulletin was examined by the Federal Aviation Administration (FAA). The changes specified
in this service bulletin comply with the applicable regulations and are FAA approved, as well as European
Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/JAA approved
airplanes listed in the service bulletin effectivity. This service bulletin and its approval were based on
the airplane in its original Boeing delivery configuration or as modified by other approved Boeing
changes.
If an airplane has a non-Boeing modification or repair that affects a component or system also affected
by this service bulletin, the operator is responsible for obtaining appropriate regulatory agency approval
before incorporating this service bulletin.
G. Manpower
The table below shows an estimate of the task hours necessary to do this inspection/change for each
airplane. This estimate is for direct labor only, done by an experienced crew. Adjust the estimate with
operator task hour data if necessary. The estimate does not include lost time. These are some examples
of lost time:
• Time to adjust to the workplace
• Time to schedule the work
• Time to inspect the work
• Time to cure the materials
• Time to make the parts
• Time to find the tools.
Group 1-2, Configuration 1; Group 3:
TABLE 1: WORK PACKAGE 1 - LUBRICATION
Elapsed HoursTask HoursNumber of PersonsTask
0.500.501Open Access
1.001.001Lubricate
0.500.501Close Access
2.002.00TOTAL FOR EACH AIRPLANE
Group 1-2, Configuration 1:
TABLE 2: WORK PACKAGE 2 - INSPECTION
Elapsed HoursTask HoursNumber of PersonsTask
0.500.501Access
LEFT MLG INSPECTION
2.002.001FIGURE 1
(b)(b)3Part 1
3.00 (b)6.00 (b)2Part 2
5.0015.003MLG Installation
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 19, 2011
737-32-1448Revision 1: May 29, 2015
42 of 187
BOEING SERVICE BULLETIN 737-32-1448

### Page 43

Group 1-2, Configuration 1:
TABLE 2: WORK PACKAGE 2 - INSPECTION
Elapsed HoursTask HoursNumber of PersonsTask
2.002.001MLG Lubrication
RIGHT MLG INSPECTION
2.002.001FIGURE 4
(b)(b)3Part 3
3.00 (b)6.00 (b)2Part 4
5.0015.003MLG Installation
2.002.001MLG Lubrication
0.500.501Close Access
(a)(a)TOTAL FOR EACH AIRPLANE
(a) The total task hours and elapsed hours are not given as the work necessary
is variable.
(b) The task hours and elapsed hours shown do not include overhaul of the trun-
nion pin assembly.
Group 3:
TABLE 2: WORK PACKAGE 2 - INSPECTION
Elapsed HoursTask HoursNumber of PersonsTask
0.500.501Access
LEFT MLG INSPECTION
2.002.001FIGURE 1
7.00 (b)21.00 (b)3Part 1
3.00 (b)6.00 (b)2Part 2
5.0015.003MLG Installation
2.002.001MLG Lubrication
RIGHT MLG INSPECTION
2.002.001FIGURE 4
7.00 (b)21.00 (b)3Part 3
3.00 (b)6.00 (b)2Part 4
5.0015.003MLG Installation
2.002.001MLG Lubrication
0.500.501Close Access
(a)(a)TOTAL FOR EACH AIRPLANE
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 19, 2011
737-32-1448Revision 1: May 29, 2015
43 of 187
BOEING SERVICE BULLETIN 737-32-1448

### Page 44

Group 3:
TABLE 2: WORK PACKAGE 2 - INSPECTION
Elapsed HoursTask HoursNumber of PersonsTask
(a) The total task hours and elapsed hours are not given as the work necessary
is variable.
(b) The task hours and elapsed hours shown do not include overhaul of the trun-
nion pin assembly.
Group 1-2, Configuration 1:
TABLE 3: WORK PACKAGE 3 - MLG TRUNNION PIN ASSEMBLIES - CHANGE
Elapsed HoursTask HoursNumber of PersonsTask
2.002.001Access
LEFT MLG
5.0015.003Left MLG Removal
3.00 (a)6.00 (a)2FIGURE 5
3.00 (a)6.00 (a)2FIGURE 7
1.002.002Forward trunnion
bearing assembly
and pin assembly re-
moval
1.00 (a)2.002FIGURE 9 (e)
0.250.251FIGURE 25
1.002.002Forward trunnion
bearing assembly
and pin assembly in-
stallation
1.001.001FIGURE 10
2.00 (a)2.00 (a)2FIGURE 11
(b)(b)(b)Aft Trunnion Bearing
Ball - Change (AP-
PENDIX H)
1.001.001FIGURE 13
(c)(c)(c)Aft Trunnion Bearing
Race - Change (AP-
PENDIX J)
1.001.001FIGURE 14
5.0015.003FIGURE 16
Contained in FIGURE 16 work instructions.Left MLG Installation
2.002.001Left MLG Lubrication
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 19, 2011
737-32-1448Revision 1: May 29, 2015
44 of 187
BOEING SERVICE BULLETIN 737-32-1448

### Page 45

Group 1-2, Configuration 1:
TABLE 3: WORK PACKAGE 3 - MLG TRUNNION PIN ASSEMBLIES - CHANGE
Elapsed HoursTask HoursNumber of PersonsTask
RIGHT MLG
5.0015.003Right MLG Removal
3.00 (a)6.00 (a)2FIGURE 17
3.00 (a)6.00 (a)2FIGURE 19
1.002.002Forward trunnion
bearing assembly
and pin assembly re-
moval
1.00 (a)2.002FIGURE 9 (e)
0.250.251FIGURE 25
1.002.002Forward trunnion
bearing assembly
and pin assembly in-
stallation
1.001.001FIGURE 21
2.00 (a)2.00 (a)2FIGURE 11
(b)(b)(b)Aft Trunnion Bearing
Ball - Change (AP-
PENDIX H)
1.001.001FIGURE 13
(c)(c)(c)Aft Trunnion Bearing
Race - Change (AP-
PENDIX J)
1.001.001FIGURE 22
5.0015.003FIGURE 24
Contained in FIGURE 24 work instructions.Right MLG Installa-
tion
2.002.001Right MLG Lubrica-
tion
(d)(d)TOTAL FOR EACH AIRPLANE
(a) The work in this figure includes instructions to make new bushings. The step
to make the bushings will not be necessary for operators that order a top kit.
The estimate does not include time to make new bushings in this Figure.
(b) The Boeing estimated task-hours does not include time to change the Aft
trunnion Bearing Ball.
(c) The Boeing estimated task-hours does not include time to change the Aft
trunnion Bearing Race.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 19, 2011
737-32-1448Revision 1: May 29, 2015
45 of 187
BOEING SERVICE BULLETIN 737-32-1448

### Page 46

Group 1-2, Configuration 1:
TABLE 3: WORK PACKAGE 3 - MLG TRUNNION PIN ASSEMBLIES - CHANGE
Elapsed HoursTask HoursNumber of PersonsTask
(d) The total task hours and elapsed hours are not given as the work necessary
is variable.
(e) Group 1 airplanes only.
Group 3:
TABLE 3: WORK PACKAGE 3 - MLG TRUNNION PIN ASSEMBLIES - CHANGE
Elapsed HoursTask HoursNumber of PersonsTask
2.002.001Access
LEFT MLG
5.0015.003Left MLG Removal
3.00 (a)6.00 (a)2FIGURE 6
3.00 (a)6.00 (a)2FIGURE 8
1.001.001FIGURE 10
1.00 (a)2.00 (a)2FIGURE 12
(b)Aft Trunnion Bearing
Ball - Change (AP-
PENDIX I)
1.001.001FIGURE 13
(c)Aft Trunnion Bearing
Race - Change (AP-
PENDIX K)
1.001.001FIGURE 15
5.0015.003FIGURE 16
Contained in FIGURE 16 work instructions.Left MLG Installation
2.002.001Left MLG Lubrication
RIGHT MLG
5.0015.003Right MLG Removal
(a)FIGURE 18
(a)FIGURE 20
1.001.001FIGURE 21
(a)FIGURE 12
(b)Aft Trunnion Bearing
Ball - Change (AP-
PENDIX I)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 19, 2011
737-32-1448Revision 1: May 29, 2015
46 of 187
BOEING SERVICE BULLETIN 737-32-1448

### Page 47

Group 3:
TABLE 3: WORK PACKAGE 3 - MLG TRUNNION PIN ASSEMBLIES - CHANGE
Elapsed HoursTask HoursNumber of PersonsTask
1.001.001FIGURE 13
(c)Aft Trunnion Bearing
Race - Change (AP-
PENDIX K)
1.001.001FIGURE 23
5.0015.003FIGURE 24
Contained in FIGURE 24 work instructions.Right MLG Installa-
tion
2.002.001Right MLG Lubrica-
tion
(d)(d)TOTAL FOR EACH AIRPLANE
(a) The work in this figure includes instructions to make new bushings. The step
to make the bushings will not be necessary for operators that order a top kit.
The estimate does not include time to make new bushings in this Figure.
(b) The Boeing estimated task-hours does not include time to change the Aft
trunnion Bearing Ball.
(c) The Boeing estimated task-hours does not include time to change the Aft
trunnion Bearing Race.
(d) The total task hours and elapsed hours are not given as the work necessary
is variable.
Group 1-2, Configuration 2:
TABLE 4 - WORK PACKAGE 4 - MLG FORWARD TRUNNION PIN HOUSING ASSEMBLY
SEAL AND RETAINER - REPLACEMENT
Elapsed HoursTask HoursNumber of PersonsTask
2.002.001Access
LEFT MLG
5.0015.003Left MLG Removal
1.002.002Left MLG Forward
Trunnion Bearing
Assembly Removal
2.002.002Left MLG Forward
Trunnion Pin Assem-
bly Removal
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 19, 2011
737-32-1448Revision 1: May 29, 2015
47 of 187
BOEING SERVICE BULLETIN 737-32-1448

### Page 48

Group 1-2, Configuration 2:
TABLE 4 - WORK PACKAGE 4 - MLG FORWARD TRUNNION PIN HOUSING ASSEMBLY
SEAL AND RETAINER - REPLACEMENT
Elapsed HoursTask HoursNumber of PersonsTask
1.002.002FIGURE 26 and Left
MLG Forward Trun-
nion Pin Assembly
Installation
1.002.002Left MLG Forward
Trunnion Bearing
Assembly Installation
5.0015.003Left MLG Installation
2.002.001Lubrication
RIGHT MLG
5.0015.003Right MLG Removal
1.002.002Right MLG Forward
Trunnion Bearing
Assembly Removal
2.002.002Right MLG Forward
Trunnion Pin Assem-
bly Removal
2.002.002FIGURE 26 and
Right MLG Forward
Trunnion Pin Assem-
bly Installation
1.002.002Right MLG Forward
Trunnion Bearing
Assembly Installation
5.0015.003Right MLG Installa-
tion
2.002.001Lubrication
2.002.001Close Access (Left
and Right)
40.0084.00TOTAL FOR EACH AIRPLANE
H. Weight and Balance Changes
None.
I. Electrical Load Data
Not changed.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 19, 2011
737-32-1448Revision 1: May 29, 2015
48 of 187
BOEING SERVICE BULLETIN 737-32-1448

### Page 49

J. References
1. Existing Data:
a. Engineering Change Memo PRR 38275-165S
b. Boeing Service Bulletin 737-32-1376, 737-32-1402
c. Boeing Service Related Problem (SRP) 737-SRP-32-0165
d. Component Maintenance Manual (CMM) 32-11-09, 32-11-12, 57-15-01
e. Standard Overhaul Practices Manual (SOPM) 20-10-05, 20-10-07, 20-10-09, 20-20-02,
20-30-02, 20-30-03, 20-42-05, 20-42-10, 20-44-04, 20-50-03, 20-50-10, 20-50-19
f. 737-600/700/800/900 Aircraft Maintenance Manual (AMM) 12-21-11, 32-00-01, 32-11-00,
32-11-83, 57-16-01, 57-16-02
g. 737NG Fleet Team Digest (FTD) 32-09001
2. Data Supplied with this Service Bulletin:
None.
3. Installation Drawings Used in the Preparation of this Service Bulletin:
TitleDrawing Number
OUTER CYLINDER ASSEMBLY - SHOCK STRUT MAIN LANDING
GEAR
161A1110
BUSHINGS - OUTER CYLINDER, MAIN LANDING GEAR161A1112
OUTER CYLINDER - SHOCK STRUT MAIN LANDING GEAR161A1116
OUTER CYLINDER ASSY - SHOCK STRUT MAIN LANDING GEAR161A1118
PIN ASSY - FORWARD TRUNNION BEARING MLG161A1188
BUSHING - CROSS BOLT, FWD TRUNNION BEARING, MLG161A1189
PIN ASSEMBLY - AFT TRUNNION BEARING MAIN LANDING
GEAR
161A1192
BUSHING - CROSS BOLT, AFT TRUNNION BEARING, MLG161A1193
RACE ASSY - OUTER, AFT TRUNNION BRG, MLG161A1501
BALL ASSY - SPLIT, AFT TRUNNION BRG, MLG161A1502
These drawings were used to prepare this service bulletin. These drawings are not necessary to
make the specified changes, and are not supplied with this service bulletin. These drawings may
not be applicable to all airplane configurations or operators.
K. Publications Affected
1. Publications:
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 19, 2011
737-32-1448Revision 1: May 29, 2015
49 of 187
BOEING SERVICE BULLETIN 737-32-1448

### Page 50

Chapter-SectionPublication
11-22, 32-11, 57-15, 57-42737 Illustrated Parts Catalog
32-11, 57-15Component Maintenance Manual
2. Damage Tolerance Based Structural Inspections:
Boeing has evaluated the repairs and/or changes in this service bulletin for effects on Fatigue
Critical Structure (FCS) and for changes to Damage Tolerance Inspections (DTI) required in the
Maintenance Program. This service bulletin does not affect FCS, therefore DTIs are not necessary.
L. Interchangeability and Intermixability of Parts
Accomplishment of this service bulletin does not affect interchangeability or intermixability of parts.
M. Software Accomplishment Summary
Not affected.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 19, 2011
737-32-1448Revision 1: May 29, 2015
50 of 187
BOEING SERVICE BULLETIN 737-32-1448

### Page 51

2.    MATERIAL INFORMATION
A. Material - Price and Availability
Boeing can supply the kits shown in Paragraph 2.C., Parts Necessary for Each Airplane. Operators
are encouraged to share schedule requirements with Boeing for incorporation of the service bulletin.
The kits are subject to the terms and conditions of the Boeing standard purchase order acknowledgment.
Prices are in United States Dollars. Terms: Net 30 days.
Reference this service bulletin and submit your purchase order by one of these methods:
1. Order on-line via ATA Spec 2000 or The Boeing PART Page
2. Fax to (206) 662-7145
Group 1-2:
REFER TO THE BOEING PART PAGE ON MYBOEINGFLEET.COM OR CONTACT FIRST RESPONDER
AT FR@BOEING.COM FOR THE LATEST REORDER LEAD TIME (ROLT) AND PRICE INFORMATION
Unit Price as of
the Revision 01
date of this Ser-
vice Bulletin (US
Dollars)
ROLT as of the
Revision 01 date
of this Service
Bulletin (Calendar
Days)
NameKit Number
$22,995.00200TOP KIT - MAIN LANDING GEAR FWD AND
AFT TRUNNION PIN CORROSION
002A0014-39 (a)
$696.00145TOP KIT - MLG FWD TRUNNION PIN
HOUSING ASSEMBLY SEAL AND RETAIN-
ER REPLACEMENT
002A0014-82
(a) This Top Kit is only necessary for operators of Group 1-2, Configuration 1 airplanes. Operators that order
Top Kit 002A0014-39, will also need to order Top Kit 002A0014-82. As an alternative to purchasing Top
Kit 002A0014-39, operators can make the parts listed in the Top Kit.
Group 3:
REFER TO THE BOEING PART PAGE ON MYBOEINGFLEET.COM OR CONTACT FIRST RESPONDER
AT FR@BOEING.COM FOR THE LATEST REORDER LEAD TIME (ROLT) AND PRICE INFORMATION
Unit Price as of
the Revision 01
date of this Ser-
vice Bulletin (US
Dollars)
ROLT as of the
Revision 01 date
of this Service
Bulletin (Calendar
Days)
NameKit Number
$22,995.00200TOP KIT - MAIN LANDING GEAR FWD AND
AFT TRUNNION PIN CORROSION
002A0014-40
Operators are encouraged to complete the survey provided in APPENDIX M of this service bulletin to
help Boeing predict the quantity and timing of the Boeing Supplied Kits/Parts.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 19, 2011
737-32-1448Revision 1: May 29, 2015
51 of 187
BOEING SERVICE BULLETIN 737-32-1448

### Page 52

B. Industry Support Information
Boeing warranty remedies are not available for the configuration changes, inspection, and/or overhaul
procedures given in this service bulletin.
C. Parts Necessary for Each Airplane
1. Kits/Parts
To get the kits/parts shown below, refer to Paragraph 2.A., Material - Price and Availability.
Group 1-2, Configuration 1:
NOTE: Top kit 002A0014-39, Top kit 002A0014-82, and the items shown in Paragraph 2.C.2.,
Parts and Materials Supplied by the Operator, are necessary for each airplane.
Group 1-2, Configuration 2:
NOTE: Top kit 002A0014-82 and the items shown in Paragraph 2.C.2., Parts and Materials
Supplied by the Operator, are necessary for each airplane.
Group 1-2, Configuration 1:
NOTE: As an alternative to purchasing Top Kit 002A0014-39, the operators can make the parts
listed in this Top Kit.
Group 1-2, Configuration 1:
Kit 002A0014
NotesExisting Part
Number
NameQTYNew Part Number
-39
TOP KIT - MAIN
LANDING GEAR
FWD AND AFT
TRUNNION PIN
CORROSION
-002A0014-39
(a)BUSHING - OUT-
ER CYLINDER,
MAIN LANDING
GEAR
2161A1112-5
(a)BUSHING - OUT-
ER CYLINDER,
MAIN LANDING
GEAR
2161A1112-6
(a) (b)BUSHING -
CROSS BOLT,
FWD TRUNNION
BEARING, MLG
2161A1189-4
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 19, 2011
737-32-1448Revision 1: May 29, 2015
52 of 187
BOEING SERVICE BULLETIN 737-32-1448

### Page 53

Group 1-2, Configuration 1:
Kit 002A0014
NotesExisting Part
Number
NameQTYNew Part Number
-39
(a)BUSHING -
CROSS BOLT,
AFT TRUNNION
BEARING, MLG
2161A1193-3
(a)RACE ASSY -
OUTER, AFT
TRUNNION BRG,
MLG
2161A1501-9
(a)BALL ASSY -
SPLIT, AFT TRUN-
NION BRG, MAIN
LANDING GEAR
2161A1502-9
(a) This part is used for Production.
(b) Not used for Group 2 airplanes.
Group 3:
NOTE: As an alternative to purchasing Top Kit 002A0014-40, the operators can make the parts
listed in this Top Kit.
Group 3:
NOTE: One top kit and the items shown in Paragraph 2.C.2., Parts and Materials Supplied by
the Operator, are necessary for each airplane.
Group 3:
Kit 002A0014
NotesExisting Part
Number
NameQTYNew Part Number
-40
TOP KIT - MAIN
LANDING GEAR
FWD AND AFT
TRUNNION PIN
CORROSION
-002A0014-40
(a)BUSHING - OUT-
ER CYLINDER,
MAIN LANDING
GEAR
2161A1112-7
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 19, 2011
737-32-1448Revision 1: May 29, 2015
53 of 187
BOEING SERVICE BULLETIN 737-32-1448

### Page 54

Group 3:
Kit 002A0014
NotesExisting Part
Number
NameQTYNew Part Number
-40
(a)BUSHING - OUT-
ER CYLINDER,
MAIN LANDING
GEAR
2161A1112-8
(a)BUSHING -
CROSS BOLT,
AFT TRUNNION
BEARING, MLG
2161A1193-4
(a)RACE ASSY -
OUTER, AFT
TRUNNION BRG,
MLG
2161A1501-11
(a)BALL ASSY -
SPLIT, AFT TRUN-
NION BRG, MAIN
LANDING GEAR
2161A1502-13
(a) This part is used for Production
Group 1-2:
Kit 002A0014
NotesExisting Part
Number
NameQTYNew Part Number
-82
TOP KIT - MLG
FWD TRUNNION
PIN HOUSING AS-
SEMBLY SEAL
AND RETAINER
REPLACEMENT
-002A0014-82
(a) (b)S38624SEAL25649-0615-369
(a) (b)161A1194-1RETAINER2161A1194-3
(a) This part is used in production.
(b) You cannot use the existing part to replace the new or changed part.
2. Parts and Materials Supplied by the Operator
The following parts or materials are necessary to do the change in this service bulletin. Parts and
materials in the manuals given in Paragraph 1.J., References, can also be necessary. Examine
operator part and material supply to make sure all necessary parts and materials are available.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 19, 2011
737-32-1448Revision 1: May 29, 2015
54 of 187
BOEING SERVICE BULLETIN 737-32-1448

### Page 55

Group 1-2, Configuration 1; Group 3:
NotesNameQTYPart Number /
Specification
(a) (b)GREASE6 ozBMS 3-33
(a) (b)CORROSION INHIBITING MATERI-
AL, NON-DRYING PASTE
6 ozBMS 3-38
(a) (b)SEALANT6 ozBMS 5-95
(a) (b)ENAMEL6 ozBMS 10-60, TYPE
II
(a) (b)TUNGSTEN CARBIDE-COBALT-
CHROME
6 ozBMS 10-67, TYPE
XVII, CLASS 2
(BMS 10-67, TYPE
XVII, CLASS 2,
GRADE B Option-
al)
(a) (b)PRIMER6 ozBMS 10-79, TYPE
III
(c) (b)AL-NI-BRONZE ANNEALED
ROUND BAR (Outer Diameter: 3.9
inches, Length: 6.8 inches)
4AMS 4640
applicable to Group 1 air-
planes only. (d) (b)
COPPER BERYLLIUM (UNS
C17200) solution treated and aged
(TFOO) tubing (Outer Diameter:
1.375 inches, Inner Diameter: 0.99
inch, Length: 3.4 inches)
2AMS 4535
(b)CADMIUM PLATE6 ozTYPE II, CLASS 2
(a) (e)PROTECTIVE ENAMEL6 ozBMS10-60, TYPE
II CLEAR
(a) See the Qualified Products List at the end of the Boeing Material Specification (BMS) for
supplier data.
(b) Refer to Paragraph 3.B., Work Instructions.
(c) Optional Material AMS 4880 AL-NI-BRONZE (UNS C95510) ANNEALED CASTING or
AMS 4640 AL-NI BRONZE (UNS C63000) ANNEALED TUBING.
(d) Optional Material AMS 4533 COPPER BERYLLIUM (UNS C17200) solution treated and
aged (TFOO)bar or AMS 4533 COPPER BERYLLIUM (UNS C17200) solution treated
and aged (TFOO) round bar.
(e) Refer to SOPM 20-50-10 for alternative equivalent materials.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 19, 2011
737-32-1448Revision 1: May 29, 2015
55 of 187
BOEING SERVICE BULLETIN 737-32-1448

### Page 56

Group 1-2, Configuration 2:
NotesNameQTYPart Number /
Specification
(a) (b)GREASE6 ozBMS 3-33
(a) See the Qualified Products List at the end of the Boeing Material Specification (BMS) for
supplier data.
(b) Refer to Paragraph 3.B., Work Instructions.
3. Parts Modified and Reidentified
The parts shown below are changed as shown in this service bulletin. The quantity (QTY) is the
number of parts changed on each airplane.
NotesNew Part NumberNameQTYExisting Part Number
(a) (b) (d)161A1110-1-PRR38275-165S
(e)
OUTER CYLINDER ASSEM-
BLY
1161A1110-1
(a) (b) (c)161A1110-171161A1110-5/-9/-13
(a) (b) (d)161A1110-2-PRR38275-165S
(f)
1161A1110-2
(a) (b) (c)161A1110-181161A1110-6/-10/-14
(a) (b) (d)161A1116-1-PRR38275-165S
(g)
1161A1116-1
(a) (b) (c)161A1116-171161A1116-5/-9/-13
(a) (b) (d)161A1116-2-PRR38275-165S
(h)
1161A1116-2
(a) (b) (c)161A1116-181161A1116-6/-10/14
(a) (b) (d)161A1118-1-PRR38275-165S
(i)
1161A1118-1
(a) (b) (c)161A1118-251161A1118-5/-9/-17
(a) (b) (c)161A1118-271161A1118-13
(a) (b) (c)161A1118-281161A1118-14
(a) (b) (d)161A1118-2-PRR38275-165S
(j)
1161A1118-2
(a) (b) (c)161A1118-261161A1118-6/-10/-18
(a) (b) (c)161A1118-291161A1118-21
(a) (b) (c)161A1118-301161A1118-22
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 19, 2011
737-32-1448Revision 1: May 29, 2015
56 of 187
BOEING SERVICE BULLETIN 737-32-1448

### Page 57

NotesNew Part NumberNameQTYExisting Part Number
(a) (b) (d)161A1188-17FORWARD TRUNNION PIN
ASSEMBLY
2161A1188-1
161A1188-232161A1188-5
161A1188-192161A1188-13
161A1188-212161A1188-15
(a) (b) (c)161A1192-11AFT TRUNNION PIN AS-
SEMBLY
2161A1192-1
161A1192-132161A1192-3
161A1192-192161A1192-5
161A1192-152161A1192-7
(a) (b) (c)161A1501-9RACE ASSY - OUTER, AFT
TRUNNION BRG, MLG
1161A1501-1
161A1501-111161A1501-3
161A1501-91161A1501-5
161A1501-111161A1501-7
(a) (b) (c)161A1502-9BALL ASSY - SPLIT, AFT
TRUNNION BRG, MAIN
LANDING GEAR
1161A1502-1
161A1502-131161A1502-5
(a) Make the change in accordance with in this service bulletin.
(b) This is the part number after the change is done in accordance with this service bulletin.
(c) This part is used in production.
(d) This part is not used in production.
(e) Outer cylinder assemblies installed with 161A1110-3 outer cylinder (different fluid port fill configuration)
should part mark the outer cylinder assembly with the part number 161A1110-1-PRR38275-165S. There
is no equivalent production part number for these outer cylinder assemblies.
(f) Outer cylinder assemblies installed with 161A1110-4 outer cylinder (different fluid port fill configuration)
should part mark the outer cylinder assembly with the part number 161A1110-2-PRR38275-165S. There
is no equivalent production part number for these outer cylinder assemblies.
(g) Outer cylinder assemblies installed with 161A1116-3 outer cylinder (different fluid port fill configuration)
should part mark the outer cylinder assembly with the part number 161A1116-1-PRR38275-165S. There
is no equivalent production part number for these outer cylinder assemblies.
(h) Outer cylinder assemblies installed with 161A1116-4 outer cylinder (different fluid port fill configuration)
should part mark the outer cylinder assembly with the part number 161A1116-2-PRR38275-165S. There
is no equivalent production part number for these outer cylinder assemblies.
(i) Outer cylinder assemblies installed with 161A1118-3 outer cylinder (different fluid port fill configuration)
should part mark the outer cylinder assembly with the part number 161A1118-1-PRR38275-165S. There
is no equivalent production part number for these outer cylinder assemblies.
(j) Outer cylinder assemblies installed with 161A1118-4 outer cylinder (different fluid port fill configuration)
should part mark the outer cylinder assembly with the part number 161A1118-2-PRR38275-165S. There
is no equivalent production part number for these outer cylinder assemblies.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 19, 2011
737-32-1448Revision 1: May 29, 2015
57 of 187
BOEING SERVICE BULLETIN 737-32-1448

### Page 58

4. Parts Removed and Not Replaced
None.
D. Parts Necessary to Change Spares
None.
E. Special Tooling - Price and Availability
None.
F. Special Tooling Necessary to do this Service Bulletin
No special tools or equipment are necessary to do the change in this service bulletin. But, maintenance
and overhaul tools in the manuals given in Paragraph 1.J., References, can be necessary. Examine
operator tool supply to make sure all necessary tools are available.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 19, 2011
737-32-1448Revision 1: May 29, 2015
58 of 187
BOEING SERVICE BULLETIN 737-32-1448

### Page 59

3.    ACCOMPLISHMENT INSTRUCTIONS
A. GENERAL INFORMATION
CAUTION: KEEP THE WORK AREA, WIRES AND ELECTRICAL BUNDLES CLEAN OF METAL
PARTICLES OR CONTAMINATION WHEN YOU USE TOOLS. UNWANTED MATERIAL,
METAL PARTICLES OR CONTAMINATION CAUGHT IN WIRE BUNDLES CAN CAUSE
DAMAGE TO THE BUNDLES. DAMAGED WIRE BUNDLES CAN CAUSE SPARKS OR
OTHER ELECTRICAL DAMAGE.
NOTE: 1. Manual titles are referred to by acronyms. Refer to Paragraph 1.J., References, for
definition of the acronyms.
2. Obey all of the warnings and cautions given in the specified manual sections.
3. The work instructions are divided into work packages. Task Hours and Elapsed Hours
for each package are given in Paragraph 1.G., Manpower. You can do each work
package independently.
4. Unless shown differently, these dimensions and tolerances are used:
– Linear dimensions are in inches
– Tolerance on linear dimensions, other than rivet and bolt edge margins, is plus
or minus 0.03 inch
– Tolerance on rivet and bolt edge margin is plus or minus 0.05 inch
– Angular tolerance is plus or minus 2 degrees
– Hole dimensions for standard solid rivets are in Structural Repair Manual (SRM)
Chapter 51
– Torque limits to tighten nuts and bolts are in SRM Chapter 51
5. Use the approved fastener and process material substitutions in accordance with
SRM Chapter 51. Alternate fasteners are listed in SRM Chapter 51.
6. A Detailed Inspection is defined as: An intensive examination of a specific item,
installation, or assembly to detect damage, failure, or irregularity. Available lighting
is normally supplemented with a direct source of good lighting at an intensity deemed
appropriate. Inspection aids such as mirrors, magnifying lenses, etc. may be
necessary. Surface cleaning and elaborate procedures may be required.
7. A General Visual Inspection is defined as: A visual examination of an interior or
exterior area, installation or assembly to detect obvious damage, failure or irregularity.
This level of inspection is made from within touching distance unless otherwise
specified. A mirror may be necessary to enhance visual access to all exposed surfaces
in the inspection area. This level of inspection is made under normally available
lighting conditions such as daylight, hangar lighting, flashlight or drop-light and may
require removal or opening of access panels or doors. Stands, ladders or platforms
may be required to gain proximity to the area being checked.
8. These work instructions refer to procedures included in other Boeing documents.
When the words "refer to" are used and the operator has an accepted alternative
procedure, the accepted alternative procedure can be used. When the words "in
accordance with" are included in the instruction, the procedure in the Boeing document
must be used.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 19, 2011
737-32-1448Revision 1: May 29, 2015
59 of 187
BOEING SERVICE BULLETIN 737-32-1448

### Page 60

9. Refer to APPENDIX A thru APPENDIX L for instructions to make the forward and
aft outer cylinder trunnion bushings, aft trunnion bearing ball and aft trunnion bearing
race.
10. The instructions in Paragraph 3.B., Work Instructions and the figures can include
operation of tools or test equipment. Boeing Engineering Tool Drawings, the Illustrated
Tool and Equipment Manual, and the Special Tool and Ground Handling Drawing
Index contain data on versions of the tools or test equipment that you can use. It is
permitted to use replaced tools. It is not permitted to use superseded tools.
11. If it is necessary to remove more parts for access, you can remove those parts. If
you can get access without removing identified parts, it is not necessary to remove
all of the identified parts. Jacking and shoring limitations must be observed.
12. If the length of any fastener specified in this service bulletin does not meet installation
standards given in SRM Chapter 51, then a fastener of the same specification, or
an approved substitute, with a length which meets the installation standards given
in SRM Chapter 51 may be used. In addition, washers may be installed for fastener
grip length in accordance with SRM Chapter 51.
13. Where the work instructions include installation of a kept part, a new or serviceable
part with the same part number can be installed as an alternative to the kept part.
The removed part can be discarded if a new or serviceable part is installed.
14. This service bulletin includes functional test procedures for the systems changed by
this service bulletin. More functional tests can possibly be necessary in accordance
with standard maintenance practices because of interruption to other airplane systems.
B. WORK INSTRUCTIONS
Group 1-2, Configuration 1; Group 3:
WORK PACKAGE 1: LUBRICATION
1. Install downlock pins. Refer to 737-600/700/800/900 AMM 32-00-01 as an accepted procedure.
2. Lubricate the forward and aft trunnion pin assemblies on the left and right Main Landing Gear
(MLG) using the lubrication fittings located on the forward and aft trunnions of the outer cylinder
(2 locations), the aft trunnion bearing (1 location), and the forward trunnion bearing housing (1
location). Refer to 737-600/700/800/900 AMM 12-21-11 as an accepted procedure.
3. Put the airplane back to a serviceable condition.
Group 1-2, Configuration 1; Group 3:
WORK PACKAGE 2: INSPECTION
1. Install downlock pins. Refer to 737-600/700/800/900 AMM 32-00-01 as an accepted procedure.
2. Do a general visual inspection of the left MLG at the forward and aft trunnion pin locations and the
visible surfaces of the forward and aft trunnion pin assemblies for signs of corrosion and chrome
plating damage in accordance with FIGURE 1.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 19, 2011
737-32-1448Revision 1: May 29, 2015
60 of 187
BOEING SERVICE BULLETIN 737-32-1448

The text continues at https://openairdocs.org/service-documents/boeing/sb-737-32-1448/file/c2a41d87c381.md?from=61

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
