# Boeing Special Attention Service Bulletin 737-32-1486: Revision 1

- Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2016-5468; AD 2017-04-11 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Boeing Special Attention Service Bulletin 737-32-1486](https://openairdocs.org/service-documents/boeing/sb-737-32-1486.md)
- Title as filed: U.S. DOT/FAA - SB-737-32-1486-00
- Pages: 90
- PDF: https://openairdocs.org/files/sha256/67/9e/679ea138e05bcfaa1da8aa74c760b2a04b7fc4048e2ad5fa71065bd301908af0
- Page: https://openairdocs.org/service-documents/boeing/sb-737-32-1486/file/679ea138e05b

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Commercial 
Airplanes
737
Service Bulletin
SPECIAL ATTENTION
Number: 737-32-1486
Original Issue: November 06, 2014
ATA System: 3211 3221
SUBJECT: LANDING GEAR - Main and Nose Landing Gear - Landing Gear External Surface
Inspection and Outer Cylinder Assembly Trunnion Bore Inspection
Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15
CFR 300-774). An export license may be required before it is used for development, production or use by foreign
persons from specific countries. The controller of this data has the individual responsibility to abide by all export
laws.
9E991ECCN:
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET
Copyright © 2014 Boeing.
Unpublished Work. All Rights Reserved.
Treatment of this document and its content is governed by contract with Boeing. Rights to use this document
are licensed on a per aircraft basis and such rights may not be transferable. For more information, contact The
Boeing Company.
Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner,
BBJ, DC-8, DC-9, DC-10, KC-10, KC-46, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8, Poseidon and
Boeing liveries are all trademarks owned by The Boeing Company; and no trademark license is granted in
connection with this document unless provided in writing by Boeing.
Original Issue: November 06, 2014
737-32-1486
1 of 90
6.0

### Page 2

Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 06, 2014
737-32-1486
2 of 90
BOEING SERVICE BULLETIN 737-32-1486
BLANK PAGE

### Page 3

Table of Contents
Summary ...................................................... 5
1. PLANNING INFORMATION ........................................ 9
A. Effectivity ................................................ 9
1. Airplanes ............................................. 9
2. Spares Affected ........................................ 2 6
B. Concurrent Requirements ...................................... 2 6
C. Reason ................................................ 2 6
D. Description .............................................. 2 7
E. Compliance .............................................. 2 8
F. Approval ............................................... 3 2
G. Manpower .............................................. 3 2
H. Weight and Balance Changes .................................... 3 4
I. Electrical Load Data ......................................... 3 5
J. References .............................................. 3 5
1. Existing Data: ......................................... 3 5
2. Data Supplied with this Service Bulletin: ........................... 3 5
3. Installation Drawings Used in the Preparation of this Service Bulletin: ........... 3 5
K. Publications Affected ........................................ 3 5
L. Interchangeability and Intermixability of Parts ........................... 3 6
M. Software Accomplishment Summary ................................ 3 6
2. MATERIAL INFORMATION ........................................ 3 7
A. Material - Price and Availability ................................... 3 7
B. Industry Support Information .................................... 3 7
C. Parts Necessary for Each Airplane ................................. 3 7
1. Kits/Parts ............................................ 3 7
2. Parts and Materials Supplied by the Operator ........................ 3 7
3. Parts Modified and Reidentified ................................ 3 8
4. Parts Removed and Not Replaced .............................. 3 8
D. Parts Necessary to Change Spares ................................. 3 8
E. Special Tooling - Price and Availability ............................... 3 8
F. Special Tooling Necessary to do this Service Bulletin ....................... 3 8
3. ACCOMPLISHMENT INSTRUCTIONS .................................. 3 9
A. GENERAL INFORMATION ..................................... 3 9
B. WORK INSTRUCTIONS ....................................... 4 1
FIGURE 1: LEFT MAIN LANDING GEAR EXTERNAL SURFACE DETAILED INSPECTION ..... 5 1
FIGURE 2: LEFT MAIN LANDING GEAR (MLG) OUTER CYLINDER ASSEMBLY TRUNNION BORE
DETAILED INSPECTION [Group 1-2, Configuration 1] ................... 5 3
FIGURE 3: LEFT MAIN LANDING GEAR (MLG) OUTER CYLINDER ASSEMBLY TRUNNION BUSHING
INSTALLATION [Group 1-2, Configuration 1] ......................... 5 7
FIGURE 4: RIGHT MAIN LANDING GEAR (MLG) EXTERNAL SURFACE DETAILED INSPECTION . 63
FIGURE 5: RIGHT MAIN LANDING GEAR (MLG) OUTER CYLINDER ASSEMBLY TRUNNION BORE
DETAILED INSPECTION [Group 1-2, Configuration 1] ................... 6 5
FIGURE 6: RIGHT MAIN LANDING GEAR (MLG) OUTER CYLINDER ASSEMBLY TRUNNION BUSHING
INSTALLATION [Group 1-2, Configuration 1] ......................... 6 9
FIGURE 7: NOSE LANDING GEAR (NLG) EXTERNAL SURFACE DETAILED INSPECTION ..... 7 5
APPENDIX A: .................................................. 7 7
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 06, 2014
737-32-1486
3 of 90
BOEING SERVICE BULLETIN 737-32-1486

### Page 4

APPENDIX B: FORWARD OUTER CYLINDER TRUNNION BUSHING - MAKE .............. 8 2
APPENDIX C: AFT OUTER CYLINDER TRUNNION BUSHING - MAKE .................. 8 5
APPENDIX D: .................................................. 8 8
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 06, 2014
737-32-1486
4 of 90
BOEING SERVICE BULLETIN 737-32-1486

### Page 5

Commercial 
Airplanes
737
Service Bulletin
SPECIAL ATTENTION
SummaryNumber: 737-32-1486Original Issue: November 06, 2014
ATA System: 3211 3221
SUBJECT: LANDING GEAR - Main and Nose Landing Gear - Landing Gear External Surface
Inspection and Outer Cylinder Assembly Trunnion Bore Inspection
BOEING RECOMMENDS THAT EACH OPERATOR EXAMINE THIS SERVICE BULLETIN IMMEDIATELY.
CONCURRENT REQUIREMENTS
None.
BACKGROUND
This service bulletin gives instructions to inspect the external surfaces of the Left and Right Main Landing Gear
(MLG) and Nose Landing Gear (NLG) for areas of cracked, loose, peeling, or missing paint, primer or sealant,
or any corrosion. Second, inspect the MLG outer cylinder assembly trunnion bores for corrosion, pitting, missing
primer, or missing Corrosion Inhibiting Compound (CIC). If this service bulletin is not done, stress corrosion
cracking could occur and may cause a fracture and gear collapse.
Several operators have reported paint deterioration on the surface of the MLG and NLG and early onset of
corrosion in the trunnion bore of the MLG outer cylinder. An MRO first observed forward trunnion bore corrosion
on a right MLG while installing new bushings with service bulletin 737-32-1448. Another MRO disclosed that
between 2007 and 2010 the primer used on the landing gear components did not comply with BMS10-79. Paint
chip and trunnion bore analysis showed that unqualified primer was used, primer application was up to 5 times
too thick while enamel was too thin, there was early deterioration of the fillet seal at the trunnion bore, and the
trunnion bushing installation process did not follow the SOPM which may have scraped the finish on the bore.
This service bulletin requires operators to inspect the surfaces of the MLG and NLG for surface finish damage.
Any damage requires repair, component replacement, or landing gear replacement. This inspection must be
repeated in accordance with the compliance time. This service bulletin also inspects the MLG outer cylinder
assembly trunnion bores for inner surface damage and corrosion. Any damage requires repair, component
replacement, or landing gear replacement. After inspection, instructions are provided to install new forward and
aft trunnion bushings, based on service bulletin 737-32-1448.
Aircraft that have already completed the inspection of the MLG and NLG surfaces and the outer cylinder trunnion
bore by Boeing's request and completed the terminating action for this service bulletin do not need to do the
actions in this service bulletin. Aircraft that have already completed the inspection of the MLG trunnion bores
do not need to repeat the inspection as required by Table 2 of Paragraph 1.E., Compliance. A table of the part
numbers and serial numbers of the affected MLG, side struts, NLG, and drag struts has been included in
APPENDIX D.
Boeing Service Related Problem (SRP) 737NG-SRP-32-0186 is related to this service bulletin.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 06, 2014
737-32-1486
5 of 90

### Page 6

Boeing Fleet Team Digest (FTD) 737NG FTD 32-13005 is related to this service bulletin.
This table is provided to operators for planning purposes only. Refer to the applicable sections for more
information.
ReferenceAffectedPlanning Data
Paragraph 1.A.2., Spares AffectedYesSpares Affected
Paragraph 1.E., Compliance and Paragraph
1.F., Approval
YesAD Related
Paragraph 1.H., Weight and Balance ChangesNoWeight and Balance Change
Paragraph 1.I., Electrical Load DataNoElectrical Load Changed
Paragraph 1.K., Publications AffectedYesPublications Affected
Paragraph 1.K., Publications AffectedNoAirplane Flight Operations Affected (Flight Crew
Operations Manual and/or FAA Approved Air-
plane Flight Manual)
Paragraph 2.C.1., Kits/PartsNoKits/Parts Required
Paragraph 2.C.2., Parts and Materials Supplied
by the Operator
YesOperator Supplied Parts/Material
Paragraph 2.F., Special Tooling Necessary to
do this Service Bulletin
NoSpecial Tooling Required
ACTION
Inspect for the affected part numbers and serial numbers of the MLG and NLG listed in APPENDIX D. If affected
parts are installed on the airplane, then the applicable actions must be taken in accordance with this service
bulletin.
WORK PACKAGE 1: MAIN LANDING GEAR - EXTERNAL SURFACE AND TRUNNION BORE DETAILED
INSPECTIONS (SAFETY):
Do a detailed inspection of the external surfaces of the MLG for areas of cracked, loose, peeling, or missing
paint, primer or sealant, or any corrosion. (Group 1-2, Configuration 1) Remove the MLG to do a detailed
inspection the outer cylinder trunnion bore for corrosion, pitting, missing primer, or missing CIC. Corrective action
for the inspections is the choice of repair, replace individual component(s), or replace the MLG. The external
surface detailed inspection must be repeated, and terminating action is replacement of the MLG.
WORK PACKAGE 2: NOSE LANDING GEAR - EXTERNAL SURFACE DETAILED INSPECTION (ECONOMIC):
Do a detailed inspection of the external surfaces of the NLG. Corrective action for the inspection is the choice
of repair, replace individual component(s), or replace the NLG. The external surface detailed inspection must
be repeated, and terminating action is replacement of the NLG.
EFFECTIVITY
737-600/700/700C/800/900 Airplane(s). Refer to Paragraph 1.A.1., Airplanes, for the list of affected airplane(s).
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 06, 2014
737-32-1486
6 of 90
BOEING SERVICE BULLETIN 737-32-1486

### Page 7

COMPLIANCE
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to this service
bulletin. The Airworthiness Directive will make the compliance tasks and times given in this service bulletin
mandatory.
Refer to Paragraph 1.E., Compliance.
INDUSTRY SUPPORT INFORMATION
Boeing warranty remedies are available for airplanes in warranty as of February 21, 2013. Please refer to
Paragraph 2.B., Industry Support Information. The warranty remedies will expire eight years from the original
issue date of this service bulletin.
MANPOWER
Refer to Paragraph 1.G., Manpower.
MATERIAL INFORMATION
Operator Supplied Parts/Materials.
Refer to Paragraph 2.A., Material - Price and Availability.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 06, 2014
737-32-1486
7 of 90
BOEING SERVICE BULLETIN 737-32-1486

### Page 8 (OCR)

BOEING SERVICE BULLETIN 737-32-1486
INSPECT THE EXTERNAL
SURFACES OF THE LEFT
HAND AND RIGHT HAND
MAIN LANDING GEAR
(MLG) FOR AREAS OF
CRACKED, LOOSE,
PEELING. OR MISSING
PAINT, PRIMER OR
SEALANT, OR ANY
CORROSION.
INSPECT THE MLG
OUTER CYLINDER
ASSEMBLY TRUNNION
BORES FOR CORROSION,
PITTING, MISSING
PRIMER, AND MISSING
CORROSION INHIBITING
COMPOUND (CIC).
INSPECT THE EXTERNAL SURFACES OF
THE NOSE LANDING GEAR (NG) FOR
AREAS OF CRACKED, LOOSE, PEELING,
OR MISSING PAINT, PRIMER, OF
SEALANT, OR ANY CORROSION
2289606
Original Issue: November 06, 2014
PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  Work - See page 1 for details.  737-32-1486  8 of 90

### Page 9

Commercial 
Airplanes
737
Service Bulletin
SPECIAL ATTENTION
Number: 737-32-1486
Original Issue: November 06, 2014
ATA System: 3211 3221
SUBJECT: LANDING GEAR - Main and Nose Landing Gear - Landing Gear External Surface
Inspection and Outer Cylinder Assembly Trunnion Bore Inspection
BOEING RECOMMENDS THAT EACH OPERATOR EXAMINE THIS SERVICE BULLETIN IMMEDIATELY.
1.    PLANNING INFORMATION
A. Effectivity
1. Airplanes
Refer to Service Bulletin Index D6-19567 Part 3 for Airplane Variable Number, Line Number, and
Serial Number data.
This service bulletin is for the airplane(s) shown below.
The airplane effectivity in Group 1 below is based on the aircraft that received affected parts from
the Boeing Exchange Program. Removal of affected parts after this installation may allow installation
of affected parts or components on airplanes in Group 2. Make sure the inspections described in
this service bulletin are accomplished on all airplanes for which affected parts or components have
been installed.
NOTE: The Variable Number table below includes all affected airplanes up to Line Number 5170.
Affected airplanes after Line Number 5170 will be added to the service bulletin's
MyBoeingFleet.com (MBF) "get effectivity" result when they are added to the MBF Fleet
Profile Page.
DESCRIPTIONCONFIGURATIONGROUP
737-700/800 Airplanes that received and installed affected parts from
the Boeing Exchange Program. If the affected part numbers with
serial numbers listed in APPENDIX D are not installed, then no action
is required.
-1
Airplanes that did not incorporate 737-32-1448 or inspect the outer
cylinder assembly trunnion bore after the last landing gear overhaul.
1
Airplanes that incorporated 737-32-1448 or inspected the outer
cylinder assembly trunnion bore after the last landing gear overhaul.
2
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 06, 2014
737-32-1486
9 of 90

### Page 10

DESCRIPTIONCONFIGURATIONGROUP
737-600/700/700C/800/900 Airplanes that may have received affected
parts because the parts are rotable. If the affected part numbers with
serial numbers listed in APPENDIX D are not installed, then no action
is required.
-2
Airplanes that did not incorporate 737-32-1448 or inspect the outer
cylinder assembly trunnion bore after the last landing gear overhaul.
1
Airplanes that incorporated 737-32-1448 or inspected the outer
cylinder assembly trunnion bore after the last landing gear overhaul.
2
Airplane Models:
737-600, 737-700, 737-700C, 737-800, 737-900
GroupVariable Number
2YA001 - YA099
2YA101 - YA199
2YA201 - YA211
2YA221
2YA231 - YA242
2YA251 - YA256
2YA271 - YA272
2YA291
2YA301
1YA302
2YA311 - YA314
2YA321 - YA323
2YA336 - YA345
2YA351
2YA356 - YA357
2YA366 - YA367
2YA371 - YA377
2YA501 - YA536
2YA541 - YA552
2YA571 - YA577
1YA578
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 06, 2014
737-32-1486
10 of 90
BOEING SERVICE BULLETIN 737-32-1486

### Page 11

GroupVariable Number
2YA601 - YA615
2YA621 - YA622
2YA626 - YA631
2YA635 - YA636
2YA641 - YA642
2YA645 - YA650
2YA656 - YA659
2YA666 - YA667
2YA671 - YA672
2YA681 - YA691
2YA701 - YA704
1YA705
2YA706 - YA710
2YA721 - YA722
2YA731 - YA734
2YA751 - YA756
2YA801 - YA803
2YA809
2YA811 - YA814
2YA831
1YA832 - YA833
2YA834 - YA835
1YA841 - YA842
2YA843 - YA862
2YA881 - YA882
2YA891 - YA892
2YA961 - YA978
2YB001 - YB006
2YB101 - YB126
1YB127
2YB128 - YB132
2YB151 - YB152
1YB153
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 06, 2014
737-32-1486
11 of 90
BOEING SERVICE BULLETIN 737-32-1486

### Page 12

GroupVariable Number
2YB156 - YB158
2YB161 - YB164
2YB171 - YB172
2YB181 - YB184
2YB201 - YB208
2YB271
2YB276
2YB301 - YB310
2YB371 - YB392
2YB501 - YB502
2YB521 - YB526
2YB541 - YB544
2YB551
2YB561 - YB598
2YB601 - YB636
2YB651
2YB656
2YB671 - YB672
2YB851 - YB863
2YB871 - YB874
2YB881 - YB893
2YB901 - YB903
2YB911
2YB961 - YB975
2YB981
2YB986 - YB998
2YC001 - YC030
2YC051 - YC084
2YC091 - YC095
2YC101 - YC103
1YC104
2YC111 - YC113
2YC121
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 06, 2014
737-32-1486
12 of 90
BOEING SERVICE BULLETIN 737-32-1486

### Page 13

GroupVariable Number
2YC126 - YC127
1YC136 - YC137
2YC138
1YC139 - YC140
2YC141
2YC146 - YC147
2YC151 - YC155
1YC156
2YC166 - YC171
2YC176 - YC179
2YC186 - YC190
2YC201 - YC203
2YC206 - YC207
2YC301 - YC305
2YC321 - YC387
2YC391 - YC394
2YC396
2YC401 - YC405
1YC406 - YC408
2YC409 - YC417
2YC421
1YC422
2YC426 - YC428
2YC436 - YC439
2YC441 - YC448
1YC451
2YC452 - YC455
2YC459
2YC461 - YC465
1YC466
2YC467
2YC471 - YC499
2YC501 - YC526
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 06, 2014
737-32-1486
13 of 90
BOEING SERVICE BULLETIN 737-32-1486

### Page 14

GroupVariable Number
1YC571
2YC572 - YC574
1YC575
2YC576
1YC577 - YC580
2YC581 - YC583
2YC587 - YC589
2YC591 - YC593
2YC601 - YC655
2YC681 - YC696
2YC701 - YC715
2YC720 - YC725
2YC727 - YC752
2YC761 - YC770
2YC781 - YC784
1YC785
2YC786 - YC789
1YC790
2YC791
1YC792
2YC793
2YC801 - YC892
2YC901 - YC907
2YC921 - YC922
1YC931
2YC932
2YC941 - YC951
2YC971 - YC978
2YC981 - YC983
2YD001 - YD007
2YD021 - YD025
2YD041 - YD057
2YD081 - YD084
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 06, 2014
737-32-1486
14 of 90
BOEING SERVICE BULLETIN 737-32-1486

### Page 15

GroupVariable Number
2YD101 - YD117
2YD121 - YD126
2YD151 - YD159
2YD171 - YD172
2YD201 - YD203
2YD206 - YD209
2YD216 - YD219
2YD251 - YD254
2YD256 - YD257
2YD261
1YD301
2YD302 - YD330
1YD331
2YD332 - YD334
2YD391
2YD401 - YD410
2YD412 - YD422
2YD481 - YD485
2YD491 - YD499
2YD501 - YD512
2YD531 - YD535
2YD541 - YD547
2YD561 - YD564
2YD571 - YD572
2YD591 - YD595
2YD601 - YD612
2YD651 - YD655
2YE001 - YE020
2YE051
2YE101 - YE109
2YE151 - YE157
2YE171 - YE172
2YE201 - YE206
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 06, 2014
737-32-1486
15 of 90
BOEING SERVICE BULLETIN 737-32-1486

### Page 16

GroupVariable Number
2YE301 - YE305
2YE321 - YE326
2YE371 - YE383
2YF001 - YF011
2YF021 - YF049
2YF051 - YF079
2YF086 - YF087
2YF106 - YF107
2YF111 - YF114
2YF116 - YF119
2YF121 - YF132
2YF176 - YF178
2YF191 - YF192
2YF201 - YF276
2YF401 - YF402
2YF431 - YF432
2YF436 - YF437
2YF441 - YF442
2YF451 - YF460
2YF501 - YF599
2YF601 - YF666
2YF701 - YF707
2YF801 - YF805
2YF831 - YF832
2YF836 - YF838
2YF871 - YF872
2YF901 - YF905
2YF921 - YF928
2YF951 - YF954
2YG001 - YG002
1YG003
2YG004 - YG044
2YG061 - YG064
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 06, 2014
737-32-1486
16 of 90
BOEING SERVICE BULLETIN 737-32-1486

### Page 17

GroupVariable Number
2YG066 - YG074
1YG075
2YG076 - YG089
2YG091 - YG099
2YG101 - YG104
2YG111 - YG114
2YG116 - YG142
1YG201
2YG202 - YG205
2YG211 - YG214
2YG221 - YG224
2YG251 - YG252
2YG501 - YG514
2YG601 - YG602
2YG701
2YG711
2YJ001 - YJ013
2YJ021
2YJ471 - YJ480
2YJ501 - YJ517
2YJ531 - YJ579
2YJ591 - YJ599
2YJ631 - YJ632
2YJ671 - YJ694
2YJ801 - YJ867
2YJ871 - YJ880
2YJ901 - YJ904
2YJ908 - YJ929
2YJ931 - YJ937
2YJ941 - YJ956
2YJ961
2YJ976 - YJ977
2YK001 - YK007
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 06, 2014
737-32-1486
17 of 90
BOEING SERVICE BULLETIN 737-32-1486

### Page 18

GroupVariable Number
2YK101 - YK104
2YK111 - YK112
2YK121 - YK122
2YK131 - YK133
2YK136 - YK139
2YK141 - YK142
2YK146 - YK148
2YK151 - YK154
2YK161 - YK167
2YK171
2YK176 - YK177
2YK186
2YK191
2YK196
2YK201 - YK202
2YK301 - YK314
2YK321 - YK340
2YK361 - YK378
2YK401 - YK406
2YK426 - YK427
2YK431 - YK450
2YK456 - YK467
2YK471 - YK473
2YK476
2YK480 - YK487
2YK491 - YK493
2YK495 - YK499
2YK511 - YK516
2YK521 - YK530
2YK551 - YK571
2YK576 - YK577
2YK580 - YK585
2YK601 - YK602
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 06, 2014
737-32-1486
18 of 90
BOEING SERVICE BULLETIN 737-32-1486

### Page 19

GroupVariable Number
2YK606 - YK607
1YK611
2YK612 - YK616
2YK621 - YK634
2YK641 - YK644
2YK651 - YK665
2YK671 - YK672
2YK676 - YK677
2YK681 - YK686
2YK691
2YK695 - YK699
2YK701 - YK713
2YK716 - YK719
2YK721 - YK741
2YK751 - YK770
2YK776 - YK778
2YK781 - YK785
2YK791 - YK792
2YK796 - YK797
2YK801 - YK899
2YK901 - YK912
2YK918 - YK919
2YK921 - YK929
2YK941 - YK999
2YL001 - YL005
2YL011 - YL016
2YL021 - YL024
2YL051 - YL052
2YL056 - YL057
2YL061
2YL066 - YL069
2YL076 - YL077
2YL101 - YL137
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 06, 2014
737-32-1486
19 of 90
BOEING SERVICE BULLETIN 737-32-1486

### Page 20

GroupVariable Number
2YL201 - YL237
2YL241 - YL242
2YL271 - YL272
2YL281 - YL284
2YL301 - YL303
2YL311 - YL314
2YL316 - YL321
2YL351 - YL353
2YL371 - YL374
2YL401
2YL421 - YL429
2YL431 - YL444
2YL461 - YL478
2YL501 - YL509
2YL531 - YL534
2YL541 - YL551
2YL561 - YL579
2YL591 - YL598
2YL601 - YL606
2YL611 - YL612
2YL616 - YL617
2YL621
2YL626
2YL631 - YL634
2YL636 - YL637
2YL661 - YL664
2YL676 - YL691
2YL696 - YL697
2YL701 - YL707
2YL731
2YL751 - YL752
2YL756 - YL757
2YL761 - YL780
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 06, 2014
737-32-1486
20 of 90
BOEING SERVICE BULLETIN 737-32-1486

### Page 21

GroupVariable Number
2YL796 - YL797
2YL801 - YL815
2YL901 - YL910
2YL921 - YL940
2YL951 - YL968
2YM101 - YM103
2YM201 - YM244
2YM251 - YM299
2YM301 - YM399
2YM401 - YM415
2YM471
2YM481 - YM484
2YM501 - YM515
2YM521 - YM522
2YM541
2YM551 - YM553
2YM571 - YM572
2YM581 - YM582
2YM591 - YM599
2YM631 - YM634
2YM641 - YM652
2YM671 - YM674
2YM691 - YM699
2YM701 - YM710
2YM761 - YM765
2YM771 - YM779
2YN001 - YN016
2YN021 - YN024
2YN061
2YN071 - YN082
2YN091 - YN092
2YN101 - YN112
2YN121
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 06, 2014
737-32-1486
21 of 90
BOEING SERVICE BULLETIN 737-32-1486

### Page 22

GroupVariable Number
2YN126
2YN201 - YN202
2YN211 - YN219
2YN231 - YN236
2YN261
2YN501
2YN531 - YN534
2YN551 - YN562
2YN581 - YN583
2YN601 - YN606
2YN651 - YN653
2YN701 - YN702
2YN741 - YN746
2YN756
2YQ001 - YQ003
2YQ011 - YQ021
2YQ026 - YQ029
2YQ036 - YQ045
2YQ201 - YQ207
2YQ231
2YQ241 - YQ251
2YQ281 - YQ284
2YQ291 - YQ296
2YQ301 - YQ302
2YQ321 - YQ324
2YQ331 - YQ334
2YQ346 - YQ347
2YQ401 - YQ403
2YQ451 - YQ454
2YQ456
2YQ461
2YQ471
2YQ501 - YQ513
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 06, 2014
737-32-1486
22 of 90
BOEING SERVICE BULLETIN 737-32-1486

### Page 23

GroupVariable Number
2YR001 - YR035
2YR051 - YR086
2YR091 - YR098
2YR101 - YR105
2YR111 - YR119
2YR126 - YR144
2YR166 - YR182
2YR186 - YR198
2YR201 - YR204
2YR231 - YR294
2YR296 - YR297
2YR301 - YR334
2YR338 - YR339
2YR361 - YR366
2YR371 - YR373
2YR376
2YR381 - YR382
2YR386 - YR387
2YR391
2YR396 - YR398
2YR401 - YR405
2YR411 - YR413
2YR416 - YR418
2YR421 - YR424
2YR426 - YR438
2YR441 - YR449
2YR451 - YR455
2YR457 - YR499
2YR501 - YR506
2YR511 - YR520
2YR526 - YR544
2YR546 - YR551
2YR556 - YR562
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 06, 2014
737-32-1486
23 of 90
BOEING SERVICE BULLETIN 737-32-1486

### Page 24

GroupVariable Number
2YR571 - YR580
2YR591 - YR592
2YR601 - YR605
2YR616 - YR648
2YR651 - YR658
2YR661 - YR663
2YR671 - YR672
2YR676 - YR677
2YR701 - YR769
2YR771 - YR792
2YR801 - YR816
2YR831 - YR838
2YR841 - YR849
2YR851 - YR881
2YR901 - YR903
2YR931 - YR934
2YR938 - YR944
2YR951 - YR970
2YR981 - YR994
2YS001 - YS002
2YS006 - YS009
2YS031 - YS032
2YS051 - YS073
2YS101 - YS120
2YS126 - YS130
2YS151 - YS160
2YS166 - YS188
2YS191 - YS194
2YS196 - YS197
2YS201 - YS209
2YS221 - YS225
2YS231 - YS236
2YS271 - YS281
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 06, 2014
737-32-1486
24 of 90
BOEING SERVICE BULLETIN 737-32-1486

### Page 25

GroupVariable Number
2YS301 - YS333
2YS351 - YS362
2YS371 - YS374
2YS381 - YS383
2YS401
2YS451
2YS456
2YS462
2YS501 - YS502
2YS506
2YS511
2YS551 - YS553
2YS561 - YS575
2YS581 - YS586
2YS591 - YS595
2YS601 - YS676
2YS686 - YS690
2YS701 - YS708
2YS721 - YS747
2YS761 - YS762
2YS771 - YS780
2YS806 - YS810
2YS816 - YS817
2YS823 - YS825
2YS851 - YS856
2YS876
2YS881 - YS882
2YS901 - YS908
2YS911 - YS915
2YS961 - YS964
2YS991 - YS993
2YT001 - YT004
2YT006
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 06, 2014
737-32-1486
25 of 90
BOEING SERVICE BULLETIN 737-32-1486

### Page 26

GroupVariable Number
2YT031 - YT032
2YT036
2YT061 - YT067
2YT101 - YT106
2YT126
2YT136 - YT138
2YT176 - YT178
2YT201
2YT251 - YT265
2YT301
2YT306 - YT307
2YT311 - YT312
2YT401 - YT403
2YT411 - YT414
2YT461 - YT468
2YT601 - YT604
2YT761 - YT766
2. Spares Affected
Examine your spares supply for the part numbers and serial numbers listed in APPENDIX D. If
any affected parts are found, do not install these parts on an airplane until overhaul is completed.
If you are no longer in possession of the affected parts or the airplane that the affected parts were
installed on, forward this information to the new owner.
B. Concurrent Requirements
None.
C. Reason
This service bulletin gives instructions to inspect the external surfaces of the Left and Right Main
Landing Gear (MLG) and Nose Landing Gear (NLG) for areas of cracked, loose, peeling, or missing
paint, primer or sealant, or any corrosion. Second, inspect the MLG outer cylinder assembly trunnion
bores for corrosion, pitting, missing primer, or missing Corrosion Inhibiting Compound (CIC). If this
service bulletin is not done, stress corrosion cracking may cause a fracture and gear collapse.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 06, 2014
737-32-1486
26 of 90
BOEING SERVICE BULLETIN 737-32-1486

### Page 27

Several operators have reported paint deterioration on the surface of the MLG and NLG and early
onset of corrosion in the trunnion bore of the MLG outer cylinder. An MRO first observed forward
trunnion bore corrosion on a right MLG while installing new bushings with service bulletin 737-32-1448.
Another MRO disclosed that between 2007 and 2010 the primer used on the landing gear components
did not comply with BMS10-79. Paint chip and trunnion bore analysis showed that unqualified primer
was used, primer application was up to 5 times too thick while enamel was too thin, there was early
deterioration of the fillet seal at the trunnion bore, and the trunnion bushing installation process did not
follow the SOPM which may have scraped the finish on the bore.
This service bulletin requires operators to inspect the surfaces of the MLG and NLG for surface finish
damage. Any damage requires repair, component replacement, or landing gear replacement. This
inspection must be repeated in accordance with the compliance time. This service bulletin also inspects
the MLG outer cylinder assembly trunnion bores for inner surface damage and corrosion. Any damage
requires repair, component replacement, or landing gear replacement. After inspection, instructions
are provided to install new forward and aft trunnion bushings, based on service bulletin 737-32-1448.
Aircraft that have already completed the inspection of the MLG and NLG surfaces and the outer cylinder
trunnion bore by Boeing's request and completed the terminating action for this service bulletin do not
need to do the actions in this service bulletin. Aircraft that have already completed the inspection of
the MLG trunnion bores do not need to repeat the inspection as required by Table 2 of Paragraph 1.E.,
Compliance. A table of the part numbers and serial numbers of the affected MLG, side struts, NLG,
and drag struts has been included in APPENDIX D.
Boeing Service Related Problem (SRP) 737NG-SRP-32-0186 is related to this service bulletin.
Boeing Fleet Team Digest (FTD) 737NG FTD 32-13005 is related to this service bulletin.
This service bulletin is related to 737-32-1448, 737-32-1402, and 737-32-1376 which require access
to the forward and aft trunnion pins of the MLG outer cylinder assemblies. Boeing recommends doing
these service bulletins at the same time because of the common access.
D. Description
Inspect for the affected part numbers and serial numbers of the MLG and NLG listed in APPENDIX D.
If affected parts are installed on the airplane, then the applicable actions must be taken in accordance
with this service bulletin.
WORK PACKAGE 1: MAIN LANDING GEAR - EXTERNAL SURFACE AND TRUNNION BORE
DETAILED INSPECTIONS (SAFETY):
Do a detailed inspection of the external surfaces of the MLG for areas of cracked, loose, peeling, or
missing paint, primer or sealant, or any corrosion. (Group 1-2, Configuration 1) Remove the MLG to
do a detailed inspection the outer cylinder trunnion bore for corrosion, pitting, missing primer, or missing
CIC. Corrective action for the inspections is the choice of repair, replace individual component(s), or
replace the MLG. The external surface detailed inspection must be repeated, and terminating action
is replacement of the MLG.
WORK PACKAGE 2: NOSE LANDING GEAR - EXTERNAL SURFACE DETAILED INSPECTION
(ECONOMIC):
Do a detailed inspection of the external surfaces of the NLG. Corrective action for the inspection is the
choice of repair, replace individual component(s), or replace the NLG. The external surface detailed
inspection must be repeated, and terminating action is replacement of the NLG.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 06, 2014
737-32-1486
27 of 90
BOEING SERVICE BULLETIN 737-32-1486

### Page 28

The work in this service bulletin is done in the maintenance zone(s) given below.
Group 1:
Affected Maintenance Zones
ZoneModel
713, 734, 744737-700, 737-800
Group 2:
Affected Maintenance Zones
ZoneModel
713, 734, 744737-600, 737-700, 737-700C,
737-800, 737-900
E. Compliance
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to
this service bulletin. The Airworthiness Directive will make the compliance tasks and times given in this
service bulletin mandatory.
The Conditions, Actions and Compliance times shown apply to each MLG independently.
When more than one OPTION is given for a CONDITION, do only one of the OPTION numbers. When
more than one ACTION is given for a CONDITION number or an OPTION number, do all of the ACTION
numbers for that CONDITION number or OPTION number.
Do the required actions in accordance with Paragraph 3. Accomplishment Instructions.
Table 1: MAIN LANDING GEAR - PART NUMBER AND SERIAL NUMBER INSPECTION (SAFETY)
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
-Within 24 months
after the original is-
sue date of this
service bulletin.
Do MAIN LANDING
GEAR - PART NUMBER
AND SERIAL NUMBER
INSPECTION
All Airplanes
--No action required.CONDITION 1: AFFECT-
ED PART NUMBER AND
SERIAL NUMBER NOT
FOUND.
--See Table 3 and Table 4
for required actions and
compliance times.
CONDITION 2: AFFECT-
ED PART NUMBER AND
SERIAL NUMBER
FOUND.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 06, 2014
737-32-1486
28 of 90
BOEING SERVICE BULLETIN 737-32-1486

### Page 29

Table 2: NOSE LANDING GEAR - PART NUMBER AND SERIAL NUMBER INSPECTION (ECONOMIC)
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
-Within 24 months
after the original is-
sue date of this
service bulletin.
Do NOSE LANDING
GEAR - PART NUMBER
AND SERIAL NUMBER
INSPECTION
All Airplanes
--No action required.CONDITION 3: AFFECT-
ED PART NUMBER AND
SERIAL NUMBER NOT
FOUND
--See Table 5 for required
actions and compliance
times.
CONDITION 4: AFFECT-
ED PART NUMBER AND
SERIAL NUMBER FOUND
Table 3: MAIN LANDING GEAR - EXTERNAL SURFACE DETAILED INSPECTION (SAFETY)
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
-Within 10 years
from the most re-
cent overhaul of
the landing gear.
Do PART 8: MAIN
LANDING GEAR RE-
PLACEMENT (a) (c)
Airplanes with affected
MLG part number and seri-
al number installed
12 months (b) (c)
(d)
Within 24 months
after the original is-
sue date of this
service bulletin.
Do PART 1: MAIN
LANDING GEAR - EX-
TERNAL SURFACE DE-
TAILED INSPECTION
Airplanes with affected
MLG part number and seri-
al number installed
--No action required.CONDITION 5: NO
CRACKED, LOOSE,
PEELING OR MISSING
PAINT, PRIMER OR
SEALANT, AND NO COR-
ROSION FOUND ON EX-
TERNAL SURFACES
-Before further
flight.
OPTION 1: Do PART 8:
MAIN LANDING GEAR
REPLACEMENT (a) (c)
CONDITION 6: ANY
CRACKED, LOOSE,
PEELING, OR MISSING
PAINT, PRIMER OR
SEALANT, OR ANY COR-
ROSION FOUND ON EX-
TERNAL SURFACES
OPTION 2: Do PART 3:
MAIN LANDING GEAR -
EXTERNAL SURFACE
REPAIR
OPTION 3: Do PART 4:
MAIN LANDING GEAR -
COMPONENT REPLACE-
MENT (a) (b)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 06, 2014
737-32-1486
29 of 90
BOEING SERVICE BULLETIN 737-32-1486

### Page 30

Table 3: MAIN LANDING GEAR - EXTERNAL SURFACE DETAILED INSPECTION (SAFETY)
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
(a) Do not reinstall a removed component and/or MLG on another airplane until overhaul is
completed. Refer to 737-600/700/800/900 TASK Card 32-040-01-01 or 737-
600/700/800/900 TASK Card 32-040-02-01.
(b) Accomplishing PART 4: MAIN LANDING GEAR - COMPONENT REPLACEMENT termi-
nates all required airplane actions given in this service bulletin for that component only.
(c) Accomplishing PART 8: MAIN LANDING GEAR REPLACEMENT terminates all required
airplane actions given in this service bulletin for that main landing gear only.
(d) Repeat PART 1: MAIN LANDING GEAR - EXTERNAL SURFACE DETAILED INSPECTION
for components and MLG that were not replaced.
Group 1-2, Configuration 1:
Table 4: MAIN LANDING GEAR - OUTER CYLINDER ASSEMBLY TRUNNION BORE DETAILED
INSPECTION AND BUSHING REPLACEMENT (SAFETY)
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
-Within 24 months
after the original is-
sue date of this
service bulletin.
OPTION 1: Do PART 8:
MAIN LANDING GEAR
REPLACEMENT (a) (c)
Airplanes with affected
MLG part number and seri-
al number installed
OPTION 4: Do PART 2:
MAIN LANDING GEAR -
TRUNNION BORE DE-
TAILED INSPECTION
AND BUSHING RE-
PLACEMENT
OPTION 6: Do PART 7:
MAIN LANDING GEAR -
OUTER CYLINDER RE-
PLACEMENT (a) (b)
-Before further
flight.
Do PART 5: OUTER
CYLINDER ASSEMBLY
TRUNNION BUSHING
INSTALLATION.
CONDITION 7: NO COR-
ROSION, PITTING, MISS-
ING PRIMER, OR MISS-
ING CORROSION INHIBIT-
ING COMPOUND IN THE
TRUNNION BORE FOUND
(from PART 2)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 06, 2014
737-32-1486
30 of 90
BOEING SERVICE BULLETIN 737-32-1486

### Page 31

Group 1-2, Configuration 1:
Table 4: MAIN LANDING GEAR - OUTER CYLINDER ASSEMBLY TRUNNION BORE DETAILED
INSPECTION AND BUSHING REPLACEMENT (SAFETY)
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
-Before further
flight.
OPTION 1: Do PART 8:
MAIN LANDING GEAR
REPLACEMENT (a) (c)
CONDITION 8: ANY COR-
ROSION, PITTING, MISS-
ING PRIMER, OR MISS-
ING CORROSION INHIBIT-
ING COMPOUND IN THE
TRUNNION BORE FOUND
OPTION 5: Do PART 6:
MAIN LANDING GEAR -
OUTER CYLINDER RE-
PAIR AND BUSHING IN-
STALLATION
(from PART 2)
OPTION 6: Do PART 7:
MAIN LANDING GEAR -
OUTER CYLINDER RE-
PLACEMENT (a) (b)
(a) Do not reinstall a removed component and/or MLG on another airplane until overhaul is
completed. Refer to 737-600/700/800/900 TASK Card 32-040-01-01 or 737-
600/700/800/900 TASK Card 32-040-02-01.
(b) Accomplishing PART 7: MAIN LANDING GEAR - OUTER CYLINDER REPLACEMENT
terminates all required airplane actions given in this service bulletin for that component
only.
(c) Accomplishing PART 8: MAIN LANDING GEAR REPLACEMENT terminates all required
airplane actions given in this service bulletin for that main landing gear only.
Table 5: NOSE LANDING GEAR - EXTERNAL SURFACE DETAILED INSPECTION (ECONOMIC)
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
-Within 10 years
from the most re-
cent overhaul of
the landing gear.
Do PART 12: NOSE
LANDING GEAR RE-
PLACEMENT (a) (c)
Airplanes with affected
NLG part number and seri-
al number installed
12 months (b) (c)
(d)
Within 24 months
after the original is-
sue date of this
service bulletin.
Do PART 9: NOSE
LANDING GEAR - EX-
TERNAL SURFACE DE-
TAILED INSPECTION
Airplanes with affected
NLG part number and seri-
al number installed
--No action required.CONDITION 9: NO
CRACKED, LOOSE,
PEELING OR MISSING
PAINT, PRIMER OR
SEALANT, AND NO COR-
ROSION FOUND ON EX-
TERNAL SURFACES
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 06, 2014
737-32-1486
31 of 90
BOEING SERVICE BULLETIN 737-32-1486

### Page 32

Table 5: NOSE LANDING GEAR - EXTERNAL SURFACE DETAILED INSPECTION (ECONOMIC)
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
-Before further
flight.
OPTION 7: Do PART 10:
NOSE LANDING GEAR
- EXTERNAL SURFACE
REPAIR
CONDITION 10: ANY
CRACKED, LOOSE,
PEELING, OR MISSING
PAINT, PRIMER OR
SEALANT, OR ANY COR-
ROSION FOUND ON EX-
TERNAL SURFACES
OPTION 8: Do PART 11:
NOSE LANDING GEAR
- COMPONENT RE-
PLACEMENT (a) (b)
OPTION 9: Do PART 12:
NOSE LANDING GEAR
REPLACEMENT (a) (c)
(a) Do not reinstall a removed component and/or NLG on another airplane until overhaul is
completed. Refer to 737-600/700/800/900 TASK Card 32-090-00-01.
(b) Accomplishing PART 11: NOSE LANDING GEAR - COMPONENT REPLACEMENT ter-
minates all required airplane actions given in this service bulletin for that component only.
(c) Accomplishing PART 12: NOSE LANDING GEAR REPLACEMENT terminates all required
airplane actions given in this service bulletin for the NLG.
(d) Repeat PART 9: NOSE LANDING GEAR - EXTERNAL SURFACE DETAILED INSPEC-
TION for components that were not replaced.
F. Approval
This service bulletin was examined by the Federal Aviation Administration (FAA). The changes specified
in this service bulletin comply with the applicable regulations and are FAA approved, as well as European
Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/JAA approved
airplanes listed in the service bulletin effectivity. This service bulletin and its approval were based on
the airplane in its original Boeing delivery configuration or as modified by other approved Boeing
changes.
If an airplane has a non-Boeing modification or repair that affects a component or system also affected
by this service bulletin, the operator is responsible for obtaining appropriate regulatory agency approval
before incorporating this service bulletin.
G. Manpower
The table below shows an estimate of the task hours necessary to do this inspection for each airplane.
This estimate is for direct labor only, done by an experienced crew. Adjust the estimate with operator
task hour data if necessary. The estimate does not include lost time. These are some examples of lost
time:
 Time to adjust to the workplace
 Time to schedule the work
 Time to inspect the work
 Time to cure the materials
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 06, 2014
737-32-1486
32 of 90
BOEING SERVICE BULLETIN 737-32-1486

### Page 33

 Time to make the parts
 Time to find the tools.
TABLE 1: PART 1 - MAIN LANDING GEAR - EXTERNAL SURFACE DETAILED INSPECTION
Elapsed HoursTask HoursNumber of PersonsTask
0.500.501Open Access
2.7511.004Remove LH & RH
Wheels and Brakes
LEFT MLG INSPECTION
2.002.001Figure 1
(a)(a)-Repair Left MLG (b)
RIGHT MLG INSPECTION
2.002.001Figure 4
(a)(a)-Repair Right MLG (b)
0.500.501Close Access
7.7516.00TOTAL FOR EACH AIRPLANE
(a) The repair time necessary will be dependant upon the extent of the damage
found during inspection.
(b) The task hours for this task are not included in the total number of hours.
Operators will have to add these task hours to the total number of hours if the
MLG needs repair.
Group 1-2, Configuration 1:
TABLE 2: PART 2 - MAIN LANDING GEAR - TRUNNION BORE DETAILED INSPECTION AND
BUSHING REPLACEMENT
Elapsed HoursTask HoursNumber of PersonsTask
LEFT MLG TRUNNION BORE INSPECTION
5.0015.003Remove Left MLG
2.002.001Figure 2
(a)(a)-Repair Trunnion
Bore
14.0028.002Replace Outer Cylin-
der Assembly (b)
2.502.501Figure 3 (c)
5.0015.003Install Left MLG
RIGHT MLG TRUNNION BORE INSPECTION
5.0015.003Remove Right MLG
2.002.001Figure 5
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 06, 2014
737-32-1486
33 of 90
BOEING SERVICE BULLETIN 737-32-1486

### Page 34

Group 1-2, Configuration 1:
TABLE 2: PART 2 - MAIN LANDING GEAR - TRUNNION BORE DETAILED INSPECTION AND
BUSHING REPLACEMENT
Elapsed HoursTask HoursNumber of PersonsTask
(a)(a)-Repair Trunnion
Bore
14.0028.002Replace Outer Cylin-
der Assembly (b)
2.502.501Figure 6 (c)
5.0015.003Install Right MLG
0.300.301Close Access
29.3069.30TOTAL FOR EACH AIRPLANE
(a) The repair time necessary will be dependant upon the extent of the damage
found during inspection.
(b) The task hours for this task are not included in the total number of hours.
Operators will have to add these task hours to the total number of hours if the
Outer Cylinder Assembly needs to be replaced.
(c) The task hours required to apply cadmium plate and make new outer cylinder
assembly trunnion bushings are not included in the estimate given. More time
will be required to accomplish these task.
TABLE 3: PART 9 - NOSE LANDING GEAR - EXTERNAL SURFACE DETAILED INSPECTION
Elapsed HoursTask HoursNumber of PersonsTask
0.500.501Open Access
2.755.502Remove Wheels
NLG INSPECTION
2.002.001Figure 7
(a)(a)-Repair NLG (a)
2.755.502Install Wheels
0.500.501Close Access
8.5014.00TOTAL FOR EACH AIRPLANE
(a) The repair time necessary will be dependant upon the extent of the damage
found during inspection.
H. Weight and Balance Changes
None.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 06, 2014
737-32-1486
34 of 90
BOEING SERVICE BULLETIN 737-32-1486

### Page 35

I. Electrical Load Data
Not changed.
J. References
1. Existing Data:
a. Boeing Service Bulletin 737-32-1376, 737-32-1402, 737-32-1448
b. Boeing Service Related Problem (SRP) 737NG-SRP-32-0186
c. Component Maintenance Manual (CMM) 32-00-05, 32-11-12, 32-21-12
d. Service Bulletin Index D6-19567
e. Standard Overhaul Practices Manual (SOPM) 20-10-02, 20-10-03, 20-20-01, 20-20-02,
20-30-02, 20-30-03, 20-41-02, 20-42-05, 20-42-10, 20-44-04, 20-50-01, 20-50-03, 20-50-10,
20-50-19
f. 737-600/700/800/900 Aircraft Maintenance Manual (AMM) 32-00-01, 32-11-00, 32-21-00,
32-41-41, 32-45-11, 32-45-21, 51-00-51
g. 737-600/700/800/900 TASK Card 32-040-01-01, 32-040-02-01, 32-090-00-01
h. 737NG Fleet Team Digest (FTD) 32-13005
2. Data Supplied with this Service Bulletin:
None.
3. Installation Drawings Used in the Preparation of this Service Bulletin:
TitleDrawing Number
INSTALLATION - MAIN LANDING GEAR161A0001
OUTER CYLINDER ASSY - SHOCK STRUT, MAIN
LANDING GEAR
161A1110
BUSHING - OUTER CYLINDER, MAIN LANDING
GEAR
161A1112
OUTER CYLINDER ASSY - SHOCK STRUT MAIN
LANDING GEAR
161A1118
INSTALLATION - NOSE LANDING GEAR162A0001
K. Publications Affected
1. Publications:
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 06, 2014
737-32-1486
35 of 90
BOEING SERVICE BULLETIN 737-32-1486

### Page 36

Chapter-SectionPublication
32-11Component Maintenance Manual
2. Damage Tolerance Based Structural Inspections:
Boeing has evaluated the repairs and/or changes in this service bulletin for effects on Fatigue
Critical Structure (FCS) and for changes to Damage Tolerance Inspections (DTI) required in the
Maintenance Program. This service bulletin does not affect FCS, therefore DTIs are not necessary.
L. Interchangeability and Intermixability of Parts
Accomplishment of this service bulletin does not affect interchangeability or intermixability of parts.
M. Software Accomplishment Summary
Not affected.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 06, 2014
737-32-1486
36 of 90
BOEING SERVICE BULLETIN 737-32-1486

### Page 37

2.    MATERIAL INFORMATION
A. Material - Price and Availability
The operator can supply the parts and materials shown in Paragraph 2.C., Parts Necessary for Each
Airplane. As an alternative, operators can purchase the parts from Boeing Spares. This service bulletin
does not show the Boeing price and supply data.
B. Industry Support Information
Boeing warranty remedies are available for 737 airplanes/parts in warranty as of February 21, 2013.
For inspection labor task hour reimbursement for airplanes/parts in warranty as of that date, send a
warranty claim to Boeing Fleet Support Contracts - Warranty. If the condition described in this service
bulletin is found during the inspection for airplanes/parts in warranty as of that date and additional task
hours and/or materials are required, send a warranty claim to Boeing Fleet Support Contracts - Warranty.
The warranty remedies will expire eight years from the original release date of this service bulletin.
C. Parts Necessary for Each Airplane
1. Kits/Parts
None.
2. Parts and Materials Supplied by the Operator
The following parts or materials are necessary to do the change in this service bulletin. Parts and
materials in the manuals given in Paragraph 1.J., References, can also be necessary. Examine
operator part and material supply to make sure all necessary parts and materials are available.
Group 1-2, Configuration 1:
NotesNameQtyPart Number/ Specification
(a) (b)OUTER CYLINDER ASSEM-
BLY FORWARD TRUNNION
BUSHING
2161A1112-5
(a) (c)OUTER CYLINDER ASSEM-
BLY AFT TRUNNION BUSHING
2161A1112-6
(d)PRIMER6 OzBMS 10-79, TYPE III
(d)SEALANT6 OzBMS 5-95
(a) Make the change in accordance with in this service bulletin.
(b) Airplanes that have not incorporated 737-32-1448 will be replacing part 161A1112-1 with
this part.
(c) Airplanes that have not incorporated 737-32-1448 will be replacing part 161A1112-2 with
this part.
(d) Refer to the Qualified Products List at the end of the Boeing Material Specification (BMS)
for supplier data.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 06, 2014
737-32-1486
37 of 90
BOEING SERVICE BULLETIN 737-32-1486

### Page 38

3. Parts Modified and Reidentified
None.
4. Parts Removed and Not Replaced
None.
D. Parts Necessary to Change Spares
None.
E. Special Tooling - Price and Availability
None.
F. Special Tooling Necessary to do this Service Bulletin
No special tools or equipment are necessary to do the change in this service bulletin. But, maintenance
and overhaul tools in the manuals given in Paragraph 1.J., References, can be necessary. Examine
operator tool supply to make sure all necessary tools are available.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 06, 2014
737-32-1486
38 of 90
BOEING SERVICE BULLETIN 737-32-1486

### Page 39

3.    ACCOMPLISHMENT INSTRUCTIONS
A. GENERAL INFORMATION
NOTE: 1. Manual titles are referred to by acronyms. Refer to Paragraph 1.J., References, for
definition of the acronyms.
2. Obey all of the warnings and cautions given in the specified manual sections.
3. Unless shown differently, these dimensions and tolerances are used:
– Linear dimensions are in inches
– Tolerance on linear dimensions, other than rivet and bolt edge margins, is plus
or minus 0.03 inch
– Tolerance on rivet and bolt edge margin is plus or minus 0.05 inch
– Angular tolerance is plus or minus 2 degrees
– Hole dimensions for standard solid rivets and fasteners are in Structural Repair
Manual (SRM) Chapter 51
– Torque Values:
— Values for structural fasteners are given in 737NG Structural Repair Manual,
Chapter 51.
— Values for airframe maintenance tasks are included in Chapter 20 of 737NG
Airplane Maintenance Manual (AMM).
— Values for electrical maintenance tasks are included in Chapter 20 of
Standard Wiring Practices Manual (SWPM).
— Values for engine maintenance tasks are included in Chapter 70 of 737NG
Airplane Maintenance Manual (AMM).
— Non-standard torque values for maintenance tasks are included in the
applicable installation step.
4. Use the approved fastener, process and material substitutions in accordance with
SRM Chapter 51.
5. If the length of any fastener specified in this service bulletin does not meet installation
standards given in SRM Chapter 51, then a fastener of the same specification, or
an approved substitute, with a length which meets the installation standards given
in SRM Chapter 51 may be used. In addition, washers may be installed for fastener
grip length in accordance with SRM Chapter 51. Refer to SOPM 20-50-01 for alternate
full threaded fasteners (screws) needed for installation in this service bulletin.
6. A Detailed Inspection is defined as: An intensive examination of a specific item,
installation, or assembly to detect damage, failure, or irregularity. Available lighting
is normally supplemented with a direct source of good lighting at an intensity deemed
appropriate. Inspection aids such as mirrors, magnifying lenses, etc. may be
necessary. Surface cleaning and elaborate procedures may be required.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 06, 2014
737-32-1486
39 of 90
BOEING SERVICE BULLETIN 737-32-1486

### Page 40

7. A General Visual Inspection is defined as: A visual examination of an interior or
exterior area, installation or assembly to detect obvious damage, failure or irregularity.
This level of inspection is made from within touching distance unless otherwise
specified. A mirror may be necessary to enhance visual access to all exposed surfaces
in the inspection area. This level of inspection is made under normally available
lighting conditions such as daylight, hangar lighting, flashlight or drop-light and may
require removal or opening of access panels or doors. Stands, ladders or platforms
may be required to gain proximity to the area being checked.
8. These work instructions refer to procedures included in other Boeing documents.
When the words "refer to" are used and the operator has an accepted alternative
procedure, the accepted alternative procedure can be used. When the words "in
accordance with" are included in the instruction, the procedure in the Boeing document
must be used.
9. The instructions in Paragraph 3.B., Work Instructions and the figures can include
operation of tools or test equipment. Boeing Engineering Tool Drawings, the Illustrated
Tool and Equipment Manual, and the Special Tool and Ground Handling Drawing
Index contain data on versions of the tools or test equipment that you can use. It is
permitted to use replaced tools. It is not permitted to use superseded tools.
10. If it is necessary to remove more parts for access, you can remove those parts. If
you can get access without removing identified parts, it is not necessary to remove
all of the identified parts. Jacking and shoring limitations must be observed.
11. Where the work instructions include installation of a kept part, a new or serviceable
part with the same part number can be installed as an alternative to the kept part.
12. This service bulletin includes functional test procedures for the systems changed by
this service bulletin. More functional tests can possibly be necessary in accordance
with standard maintenance practices because of interruption to other airplane systems.
13. If shading is used, shaded areas in Figures are to separate the non-critical and
non-authoritative information from the critical and authoritative information.
14. When more than one OPTION is given for a CONDITION, do only one of the OPTION
numbers. When more than one ACTION is given for a CONDITION number or an
OPTION number, do all of the ACTION numbers for that CONDITION number or
OPTION number.
15. The compliance times for the actions in Paragraph 3.B., WORK INSTRUCTIONS
are in Paragraph 1.E., Compliance.
16. The CONDITIONS, ACTIONS and OPTIONS shown apply to each Main Landing
Gear independently.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 06, 2014
737-32-1486
40 of 90
BOEING SERVICE BULLETIN 737-32-1486

### Page 41

17. Some steps in the Work Instructions are identified as Required for Compliance (RC).
If this service bulletin is mandated by an Airworthiness Directive (AD), then the steps
identified as RC must be done to comply with the AD. RC steps that are part of an
OPTION are only required if that OPTION is selected. Alternative procedures for
steps not identified with RC can be used if the RC steps can still be done as specified,
and the airplane can be put back in a serviceable condition. RC steps that "refer to"
a procedure as acceptable may still use an accepted alternate procedure as long as
the intent of the step is accomplished. An Alternative Method of Compliance (AMOC)
is not necessary for deviations to steps that are not identified as RC.
B. WORK INSTRUCTIONS
MAIN LANDING GEAR - PART NUMBER AND SERIAL NUMBER INSPECTION
1. RC - Do an inspection of the Left and Right MLG Component Installation and the Left and Right
MLG Side Strut Assembly, to determine if any part numbers with the serial numbers listed in
APPENDIX D are installed. As an alternative, a review of the maintenance or delivery records can
be used if the part numbers and serial numbers can be positively determined.
NOTE: APPENDIX D lists the airplane variable number that most recently had the part numbers
and serial numbers installed before the release of the service bulletin. The airplane with
affected parts may have changed because the parts are rotable.
a. CONDITION 1: AFFECTED PART NUMBER AND SERIAL NUMBER NOT FOUND
(1) No action required.
b. CONDITION 2: AFFECTED PART NUMBER AND SERIAL NUMBER FOUND
(1) Do WORK PACKAGE 1: MAIN LANDING GEAR - EXTERNAL SURFACE AND
TRUNNION BORE DETAILED INSPECTIONS (SAFETY).
NOSE LANDING GEAR - PART NUMBER AND SERIAL NUMBER INSPECTION
1. Do an inspection of the NLG Component Installation and the NLG Drag Strut Assembly to determine
the part numbers and serial numbers. As an alternative, a review of the maintenance or delivery
records can be used if the part numbers and serial numbers can be positively determined.
NOTE: APPENDIX D lists the airplane variable number that most recently had the part numbers
and serial numbers installed before the release of the service bulletin. The airplane with
affected parts may have changed because the parts are rotable.
a. CONDITION 3: AFFECTED PART NUMBER AND SERIAL NUMBER NOT FOUND
(1) No action required.
b. CONDITION 4: AFFECTED PART NUMBER AND SERIAL NUMBER FOUND
(1) Do WORK PACKAGE 2: NOSE LANDING GEAR - EXTERNAL SURFACE DETAILED
INSPECTION (ECONOMIC).
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 06, 2014
737-32-1486
41 of 90
BOEING SERVICE BULLETIN 737-32-1486

### Page 42

WORK PACKAGE 1: MAIN LANDING GEAR - EXTERNAL SURFACE AND TRUNNION BORE
DETAILED INSPECTIONS (SAFETY)
1. Do PART 1: MAIN LANDING GEAR - EXTERNAL SURFACE DETAILED INSPECTION.
a. CONDITION 5: NO CRACKED, LOOSE, PEELING OR MISSING PAINT, PRIMER OR
SEALANT, AND NO CORROSION FOUND ON EXTERNAL SURFACES
(1) No action required.
b. CONDITION 6: ANY CRACKED, LOOSE, PEELING, OR MISSING PAINT, PRIMER OR
SEALANT, OR ANY CORROSION FOUND ON EXTERNAL SURFACES
(1) OPTION 1: Do PART 8: MAIN LANDING GEAR REPLACEMENT.
NOTE: If OPTION 1 (Do PART 8: MAIN LANDING GEAR REPLACEMENT) is not done,
it still must be done at the time specified in Table 3 in Paragraph 1.E.,
Compliance.
(2) OPTION 2: Do PART 3: MAIN LANDING GEAR - EXTERNAL SURFACE REPAIR.
(3) OPTION 3: Do PART 4: MAIN LANDING GEAR - COMPONENT REPLACEMENT.
2. Group 1-2, Configuration 1:
Do one of these steps:
a. OPTION 1: Do PART 8: MAIN LANDING GEAR REPLACEMENT.
NOTE: If OPTION 1 (Do PART 8: MAIN LANDING GEAR REPLACEMENT) is not done, it
still must be done at the time specified in Table 3 in Paragraph 1.E., Compliance.
b. OPTION 4: Do PART 2: MAIN LANDING GEAR - TRUNNION BORE DETAILED INSPECTION
AND BUSHING REPLACEMENT.
(1) CONDITION 7: NO CORROSION, PITTING, MISSING PRIMER, OR MISSING
CORROSION INHIBITING COMPOUND IN THE TRUNNION BORE FOUND.
(a) Do PART 5: OUTER CYLINDER ASSEMBLY TRUNNION BUSHING INSTALLATION
(2) CONDITION 8: ANY CORROSION, PITTING, MISSING PRIMER, OR MISSING
CORROSION INHIBITING COMPOUND IN THE TRUNNION BORE FOUND.
(a) OPTION 1: Do PART 8: MAIN LANDING GEAR REPLACEMENT
NOTE: If OPTION 1 (Do PART 8: MAIN LANDING GEAR REPLACEMENT) is not
done, it still must be done at the time specified in Table 3 in Paragraph 1.E.,
Compliance.
(b) OPTION 5: Do PART 6: MAIN LANDING GEAR - OUTER CYLINDER REPAIR AND
BUSHING INSTALLATION
(c) OPTION 6: Do PART 7: MAIN LANDING GEAR - OUTER CYLINDER
REPLACEMENT
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 06, 2014
737-32-1486
42 of 90
BOEING SERVICE BULLETIN 737-32-1486

### Page 43

c. OPTION 6: Do PART 7: MAIN LANDING GEAR - OUTER CYLINDER REPLACEMENT.
3. Put the airplane back to a serviceable condition.
PART 1: MAIN LANDING GEAR - EXTERNAL SURFACE DETAILED INSPECTION
1. Do these steps for the applicable Main Landing Gear:
NOTE: The applicable MLG are defined by part number and serial number in APPENDIX D.
a. Install downlock pins. Refer to 737-600/700/800/900 AMM 32-00-01 as an accepted procedure.
b. RC - Remove the MLG Wheel and Tire Assembly. Refer to 737-600/700/800/900 AMM
32-45-11 as an accepted procedure.
c. RC - Remove the MLG Brakes. Refer to 737-600/700/800/900 AMM 32-41-41 as an accepted
procedure.
d. RC - Do a Detailed Inspection of the external surfaces of the applicable main landing gear for
areas of cracked, loose, peeling, or missing paint, primer or sealant, or any corrosion.
(1) For the left MLG, do in accordance with FIGURE 1.
(2) For the right MLG, do in accordance with FIGURE 4.
Group 1-2, Configuration 1:
PART 2: MAIN LANDING GEAR - TRUNNION BORE DETAILED INSPECTION AND BUSHING
REPLACEMENT
1. Do these steps for the applicable Main Landing Gear:
NOTE: The applicable MLG are defined by part number and serial number in APPENDIX D.
a. Remove the MLG. Refer to 737-600/700/800/900 AMM 32-11-00 as an accepted procedure.
b. RC - Remove the Forward and Aft Trunnion Bushings from the applicable outer cylinder
assembly, and do a Detailed Inspection of the surfaces of the trunnion bore.
(1) For the left MLG, do in accordance with FIGURE 2.
(2) For the right MLG, do in accordance with FIGURE 5.
c. RC - Install the applicable Forward and Aft Trunnion Bushings.
(1) For the left MLG, do in accordance with FIGURE 3.
(2) For the right MLG, do in accordance with FIGURE 6.
PART 3: MAIN LANDING GEAR - EXTERNAL SURFACE REPAIR
1. RC - For areas of cracked, loose, peeling, or missing paint or primer, or areas of corrosion, do
these steps to repair the damaged areas:
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 06, 2014
737-32-1486
43 of 90
BOEING SERVICE BULLETIN 737-32-1486

### Page 44

a. Remove partially adhered paint and primer from paint areas that appear cracked, loose, or
peeled. Use a plastic scraper that will not damage the cadmium plating or base metal. Refer
to APPENDIX A, "External Finish Degradation" as an example of cracked, loose, or peeled
paint.
b. Do a Detailed Inspection of the areas of missing paint and do these steps:
(1) If one area of missing paint is larger than 12 square inches or there is a total of more
than 72 square inches of missing paint on one component, then replace the component.
Do PART 4: MAIN LANDING GEAR - COMPONENT REPLACEMENT.
NOTE: Use a tape measure or other measuring device to calculate the area of missing
paint.
(2) If corrosion is found, do one of these steps:
(a) Do PART 8: MAIN LANDING GEAR REPLACEMENT.
NOTE: If PART 8: MAIN LANDING GEAR REPLACEMENT is not done, it still must
be done at the time specified in Table 3 in Paragraph 1.E., Compliance.
(b) Do PART 4: MAIN LANDING GEAR - COMPONENT REPLACEMENT.
(c) Contact Boeing for repair instructions and do the repair.
c. If the fillet seals are intact, total area of missing paint is less than 72 square inches, each area
of missing paint is less than 12 square inches, and there is no corrosion, then do these steps
to repair the external finish:
(1) Clean each area of missing paint with solvent in accordance with SOPM 20-30-03, revision
046, dated July 1, 2014, or later Boeing approved revisions that are published on
myboeingfleet.
(2) Abrasive clean areas that have primer. Use light hand pressure to lightly abrade the
surface of the primer. Do not abrade the areas where the primer is missing and the
cadmium plating is exposed. Use aluminum oxide abrasive pad 320 grit or finer, or light
grade Scotch-Brite type A, very fine in accordance with SOPM 20-41-02 Paragraph 4.A.,
Method 1 (Painted Surface Reactivation), revision 016, dated November 1, 2011, or later
Boeing approved revisions that are published on myboeingfleet.
(3) Apply 2 coats of BMS 10-79, Type III primer in accordance with SOPM 20-44-04, revision
012, dated March 1, 2012, or later Boeing approved revisions that are published on
myboeingfleet.
(a) Make sure the primer thickness is between 0.0011 to 0.0021 inch.
(4) Apply BMS 10-60 enamel.
(a) Make sure that the enamel dry film thickness is between 0.010 - 0.012 inch.
2. RC - For areas of cracked, loose, peeling or missing sealant, do these steps:
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 06, 2014
737-32-1486
44 of 90
BOEING SERVICE BULLETIN 737-32-1486

### Page 45

a. Remove partially adhered paint and primer from paint areas that appear cracked, loose, or
peeled. Use a plastic scraper that will not damage the cadmium plating or base metal. Refer
to APPENDIX A, "External Finish Degradation" as an example of cracked, loose, or peeled
paint.
b. Remove the remaining fillet seal from the bushing flange in accordance with SOPM 20-30-02,
revision 035, dated March 1, 2013, or later Boeing approved revisions that are published on
myboeingfleet. Use acceptable tools in accordance with SOPM 20-50-19, revision 035, dated
July 1, 2014, or later Boeing approved revisions that are published on myboeingfleet.
c. Do a Detailed Inspection of the areas of missing paint and the area around the bushing flange
for corrosion.
(1) If corrosion is found, do one of these steps:
(a) Do PART 8: MAIN LANDING GEAR REPLACEMENT.
NOTE: If PART 8: MAIN LANDING GEAR REPLACEMENT is not done, it still must
be done at the time specified in Table 3 in Paragraph 1.E., Compliance.
(b) Do PART 4: MAIN LANDING GEAR - COMPONENT REPLACEMENT.
(c) Contact Boeing for repair instructions and do the repair.
d. If no corrosion is found, continue with the repair:
(1) Apply stylus cadmium plating to the repair areas. Apply chromate treatment to areas
where stylus cadmium plating was performed. Control the application of the solution to
prevent contamination of the surrounding areas and interfaces in accordance with SOPM
20-42-10, revision 017, dated July 1, 2009, or later Boeing approved revisions that are
published on myboeingfleet.
NOTE: Parts must not be stylus plated while under load. The maximum area to be stylus
plated at one time is 12 square inches.
(a) Make sure that the plate thickness is at least 0.0005 inch.
(2) Apply 2 coats of BMS 10-79, Type III primer in accordance with SOPM 20-44-04, revision
012, dated March 1, 2012 or later Boeing approved revisions that are published on
myboeingfleet.
(a) Make sure the primer thickness is between 0.0011 to 0.0021 inch.
(3) If the bushing was removed, install a new bushing in accordance with SOPM 20-50-03,
revision 103, dated July 1, 2014, or later Boeing approved revisions that are published
on myboeingfleet.
(4) Apply fillet sealant around the bushing flange. For bushings without a flange, apply fillet
sealant around the ends of the bushing. No sealant is allowed on the bushing face and
inner bore. Apply fillet sealant in accordance with SOPM 20-50-19, revision 018, dated
July 1, 2014, or later Boeing approved revisions that are published on myboeingfleet and
in accordance with CMM 32-11-12 "Fillet Seal Instructions" revision 039, dated July 1,
2014 or later Boeing approved revisions that are published on myboeingfleet.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 06, 2014
737-32-1486
45 of 90
BOEING SERVICE BULLETIN 737-32-1486

### Page 46

(5) Apply BMS 10-60 enamel.
(a) Make sure that the enamel dry film thickness is between 0.010 - 0.012 inch.
3. Install the Landing Gear Wheel and Tire Assembly. Refer to 737-600/700/800/900 AMM 32-45-11
as an accepted procedure.
PART 4: MAIN LANDING GEAR - COMPONENT REPLACEMENT
1. If necessary, remove the MLG. Refer to 737-600/700/800/900 AMM 32-11-00 as an accepted
procedure.
2. RC - Replace the component or components with a serviceable component or components. Refer
to CMM 32-11-12 as an accepted procedure.
3. Install the MLG Wheel and Tire Assembly. Refer to 737-600/700/800/900 AMM 32-45-11 as an
accepted procedure.
Group 1-2, Configuration 1:
PART 5: OUTER CYLINDER ASSEMBLY TRUNNION BUSHING INSTALLATION
1. RC - Install the applicable Forward and Aft Trunnion Bushings.
a. For the left MLG, do in accordance with FIGURE 3.
b. For the right MLG, do in accordance with FIGURE 6.
2. Install the MLG. Refer to 737-600/700/800/900 AMM 32-11-00 as an accepted procedure.
Group 1-2, Configuration 1:
PART 6: MAIN LANDING GEAR - OUTER CYLINDER REPAIR AND BUSHING INSTALLATION
1. RC - If there is corrosion or pitting, do these steps to repair the outer cylinder assembly trunnion
bore. Refer to CMM 32-11-12 and CMM 32-00-05 as an accepted procedure.
a. For areas where corrosion is visible, remove all corrosion by machining and inspecting in
accordance with SOPM 20-10-02, revision 042, dated July 1, 2011, or later Boeing approved
revisions that are published on myboeingfleet.
b. Do a fluorescent penetrant inspection of the repair area to make sure the corrosion was
completely removed in accordance with SOPM 20-20-02, revision 024, dated July 1, 2009,
or later Boeing approved revisions that are published on myboeingfleet. Repair if any corrosion
is found.
c. Do a magnetic particle inspection or fluorescent penetrant inspection of the repair area for
cracks in accordance with SOPM 20-20-01, revision 028, dated July 1, 2009, or later Boeing
approved revisions that are published on myboeingfleet or in accordance with SOPM 20-20-02,
revision 024, dated July 1, 2009, or later Boeing approved revisions that are published on
myboeingfleet. Repair if any crack is found.
d. Flap peen, shot peen, or rotary peen the repair area in accordance with SOPM 20-10-03,
revision 040, dated November 1, 2013, or later Boeing approved revisions that are published
on myboeingfleet.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 06, 2014
737-32-1486
46 of 90
BOEING SERVICE BULLETIN 737-32-1486

### Page 47

2. RC - Repair missing primer and missing corrosion inhibiting compound (CIC) and install the
applicable Forward and Aft Trunnion Bushings.
a. For the left MLG, do in accordance with FIGURE 3.
b. For the right MLG, do in accordance with FIGURE 6.
3. Install the MLG. Refer to 737-600/700/800/900 AMM 32-11-00 as an accepted procedure.
Group 1-2, Configuration 1:
PART 7: MAIN LANDING GEAR - OUTER CYLINDER REPLACEMENT
1. RC - Replace the outer cylinder assembly. Refer to CMM 32-11-12 as an accepted procedure.
2. Install the MLG. Refer to 737-600/700/800/900 AMM 32-11-00 as an accepted procedure.
PART 8: MAIN LANDING GEAR REPLACEMENT
1. RC - Replace the MLG with a serviceable MLG. Refer to 737-600/700/800/900 AMM 32-11-00 as
an accepted procedure.
WORK PACKAGE 2: NOSE LANDING GEAR - EXTERNAL SURFACE DETAILED INSPECTION
(ECONOMIC)
1. Do PART 9: NOSE LANDING GEAR - EXTERNAL SURFACE DETAILED INSPECTION.
a. CONDITION 9: NO CRACKED, LOOSE, PEELING OR MISSING PAINT, PRIMER OR
SEALANT, AND NO CORROSION FOUND ON EXTERNAL SURFACES
(1) No action required.
b. CONDITION 10: ANY CRACKED, LOOSE, PEELING, OR MISSING PAINT, PRIMER OR
SEALANT, OR ANY CORROSION FOUND ON EXTERNAL SURFACES
(1) OPTION 7: Do PART 10: NOSE LANDING GEAR - EXTERNAL SURFACE REPAIR.
(2) OPTION 8: Do PART 11: NOSE LANDING GEAR - COMPONENT REPLACEMENT.
(3) OPTION 9: Do PART 12: NOSE LANDING GEAR REPLACEMENT.
NOTE: If OPTION 9 (Do PART 12: NOSE LANDING GEAR REPLACEMENT) is not
done, it still must be done at the time specified in Table 5 in Paragraph 1.E.,
Compliance.
2. Put the airplane back to a serviceable condition.
PART 9: NOSE LANDING GEAR - EXTERNAL SURFACE DETAILED INSPECTION
1. Install downlock pins. Refer to 737-600/700/800/900 AMM 32-00-01 as an accepted procedure.
2. Remove the NLG Wheel and Tire Assembly. Refer to 737-600/700/800/900 AMM 32-45-21 as an
accepted procedure.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 06, 2014
737-32-1486
47 of 90
BOEING SERVICE BULLETIN 737-32-1486

### Page 48

3. Do a Detailed Inspection of the external surface of the nose landing gear for areas of cracked,
loose, peeling, or missing paint, primer or sealant, or any corrosion in accordance with FIGURE
7.
PART 10: NOSE LANDING GEAR - EXTERNAL SURFACE REPAIR
1. For areas of cracked, loose, peeling, or missing paint or primer, or areas of corrosion, do these
steps to repair the damaged areas:
a. Remove partially adhered paint and primer from paint areas that appear cracked, loose, or
peeled. Use a plastic scraper that will not damage the cadmium plating or base metal. Refer
to APPENDIX A, "External Finish Degradation" as an example of cracked, loose, or peeled
paint.
b. Do a Detailed Inspection of the areas of missing paint and do these steps:
(1) If one area of missing paint is larger than 12 square inches or there is a total of more
than 72 square inches of missing paint on one component, then replace the component.
Do PART 11: NOSE LANDING GEAR - COMPONENT REPLACEMENT.
NOTE: Use a tape measure or other measuring device to calculate the area of missing
paint.
(2) If corrosion is found, do one of these steps:
(a) Do PART 12: NOSE LANDING GEAR REPLACEMENT.
NOTE: If PART 12: NOSE LANDING GEAR REPLACEMENT is not done, it still
must be done at the time specified in Table 5 in Paragraph 1.E., Compliance.
(b) Do PART 11: NOSE LANDING GEAR - COMPONENT REPLACEMENT.
(c) Contact Boeing for repair instructions and do the repair.
c. If the fillet seals are intact, total area of missing paint is less than 72 square inches, each area
of missing paint is less than 12 square inches, and there is no corrosion, then do these steps
to repair the external finish:
(1) Clean each area of missing paint with solvent in accordance with SOPM 20-30-03, revision
046, dated July 1, 2014, or later Boeing approved revisions that are published on
myboeingfleet.
(2) Abrasive clean areas that have primer. Use light hand pressure to lightly abrade the
surface of the primer. Do not abrade the areas where the primer is missing and the
cadmium plating is exposed. Use aluminum oxide abrasive pad 320 grit or finer, or light
grade Scotch-Brite type A, very fine in accordance with SOPM 20-41-02 Paragraph 4.A.,
Method 1 (Painted Surface Reactivation), revision 016, dated November 1, 2013, or later
Boeing approved revisions that are published on myboeingfleet.
(3) Apply 2 coats of BMS 10-79, Type III primer in accordance with SOPM 20-44-04, revision
012, dated March 1, 2012, or later Boeing approved revisions that are published on
myboeingfleet.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 06, 2014
737-32-1486
48 of 90
BOEING SERVICE BULLETIN 737-32-1486

### Page 49

(a) Make sure the primer thickness is between 0.0011 to 0.0021 inch.
(4) Apply BMS 10-60 enamel.
(a) Make sure that the enamel dry film thickness is between 0.010 - 0.012 inch.
2. For areas of cracked, loose, peeling or missing sealant, do these steps:
a. Remove partially adhered paint and primer from paint areas that appear cracked, loose, or
peeled. Use a plastic scraper that will not damage the cadmium plating or base metal. Refer
to APPENDIX A, "External Finish Degradation" as an example of cracked, loose, or peeled
paint.
b. Remove the remaining fillet seal from the bushing flange in accordance with SOPM 20-30-02,
revision 035, dated March 1, 2013, or later Boeing approved revisions that are published on
myboeingfleet. Use acceptable tools in accordance with SOPM 20-50-19, revision 035, dated
July 1, 2014, or later Boeing approved revisions that are published on myboeingfleet.
c. Do a Detailed Inspection of the areas of missing paint and the area around the bushing flange
for corrosion.
(1) If corrosion is found, do one of these steps:
(a) Do PART 12: NOSE LANDING GEAR REPLACEMENT.
NOTE: If PART 12: NOSE LANDING GEAR REPLACEMENT is not done, it still
must be done at the time specified in Table 5 in Paragraph 1.E., Compliance.
(b) Do PART 11: NOSE LANDING GEAR - COMPONENT REPLACEMENT.
(c) Contact Boeing for repair instructions and do the repair.
d. If no corrosion is found, continue with the repair:
(1) Apply stylus cadmium plating to the repair areas. Apply chromate treatment to areas
where stylus cadmium plating was performed. Control the application of the solution to
prevent contamination of the surrounding areas and interfaces in accordance with SOPM
20-42-10, revision 017, dated July 1, 2009, or later Boeing approved revisions that are
published on myboeingfleet.
NOTE: Parts must not be stylus plated while under load. The maximum area to be stylus
plated at one time is 12 square inches.
(a) Make sure that the plate thickness is at least 0.0005 inch.
(2) Apply 2 coats of BMS 10-79, Type III primer in accordance with SOPM 20-44-04, revision
012, dated March 1, 2012 or later Boeing approved revisions that are published on
myboeingfleet.
(a) Make sure the primer thickness is between 0.0011 to 0.0021 inch.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 06, 2014
737-32-1486
49 of 90
BOEING SERVICE BULLETIN 737-32-1486

### Page 50

(3) If the bushing was removed, install a new bushing in accordance with SOPM 20-50-03,
revision 103, dated July 1, 2014, or later Boeing approved revisions that are published
on myboeingfleet.
(4) Apply fillet sealant around the bushing flange. For bushings without a flange, apply fillet
sealant around the ends of the bushing. No sealant is allowed on the bushing face and
inner bore. Apply fillet sealant in accordance with SOPM 20-50-19, revision 018, dated
July 1, 2014, or later Boeing approved revisions that are published on myboeingfleet and
in accordance with CMM 32-11-12 "Fillet Seal Instructions" revision 039, dated July 1,
2014 or later Boeing approved revisions that are published on myboeingfleet.
(5) Apply BMS 10-60 enamel.
(a) Make sure that the enamel dry film thickness is between 0.010 - 0.012 inch.
3. Install the Landing Gear Wheel and Tire Assembly. Refer to 737-600/700/800/900 AMM 32-45-21
as an accepted procedure.
PART 11: NOSE LANDING GEAR - COMPONENT REPLACEMENT
1. If necessary, remove the NLG. Refer to 737-600/700/800/900 AMM 32-21-00 as an accepted
procedure.
2. Replace the component or components with a serviceable component or components. Refer to
CMM 32-21-12 as an accepted procedure.
3. Install the NLG. Refer to 737-600/700/800/900 AMM 32-21-00 as an accepted procedure.
4. Install the NLG Wheel and Tire Assembly. Refer to 737-600/700/800/900 AMM 32-45-21 as an
accepted procedure.
PART 12: NOSE LANDING GEAR REPLACEMENT
1. Replace the NLG with a serviceable NLG. Refer to 737-600/700/800/900 AMM 32-21-00 as an
accepted procedure.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 06, 2014
737-32-1486
50 of 90
BOEING SERVICE BULLETIN 737-32-1486

### Page 51 (OCR)

BOEING SERVICE BULLETIN 737-32-1486
}
®
LEFT MAIN  2287660
LANDING GEAR
FIGURE 1: LEFT MAIN LANDING GEAR EXTERNAL SURFACE DETAILED INSPECTION
(SHEET 1 OF 2)
Original Issue: November 06, 2014
PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  737-32-1486
Work - See page 1 for details.  51 of 90

### Page 52

More DataQtyIdentificationNameTaskStep
as required to per-
form the inspection
in accordance with
SOPM 20-30-03, re-
vision 046, dated
July 1, 2014, or later
Boeing approved re-
visions that are pub-
lished on myboe-
ingfleet.
-161A0001-( )MAIN LANDING GEARClean1
Detailed Inspection
of exterior surfaces
for areas of cracked,
loose, peeling, miss-
ing paint or primer,
and corrosion. (a)
1161A0001-( )MAIN LANDING GEARInspect2
Detailed Inspection
of bushing fillet seal
locations for evi-
dence of cracked,
loose, peeling, or
missing sealant, and
corrosion. (a)
1161A0001-( )MAIN LANDING GEARInspect3
(a) Refer to APPENDIX A for picture examples.
FIGURE 1: LEFT MAIN LANDING GEAR EXTERNAL SURFACE DETAILED INSPECTION
(SHEET 2 OF 2)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 06, 2014
737-32-1486
52 of 90
BOEING SERVICE BULLETIN 737-32-1486

### Page 53 (OCR)

BOEING SERVICE BULLETIN 737-32-1486
This Figure applies only to: Group 1-2, Configuration 1.
OUTER CYLINDER
ASSEMBLY
LEFT MAIN  2287670
LANDING GEAR
FIGURE 2: LEFT MAIN LANDING GEAR (MLG) OUTER CYLINDER ASSEMBLY TRUNNION BORE DETAILED
INSPECTION
(SHEET 1 OF 4)
Original Issue: November 06, 2014
Export Controlled ECCN: 9E991 - BOEING  737-32-1486
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.  53 of 90

### Page 54 (OCR)

BOEING SERVICE BULLETIN 737-32-1486
OUTER CYLINDEF
4 6 8) ASSEMBLY AFT
TRUNNION BORE
OUTER CYLINDER
3OO ASSEMBLY  FORWARD
TRUNNION BORE
2287681
The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for the right MLG.
FIGURE 2: LEFT MAIN LANDING GEAR (MLG) OUTER CYLINDER ASSEMBLY TRUNNION BORE DETAILED
INSPECTION
(SHEET 2 OF 4)
Original Issue: November 06, 2014
PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  737-32-1486
Work - See page 1 for details.  54 of 90

### Page 55

More DataQtyIdentificationNameTaskStep
from the outer cylin-
der assembly bore
in accordance with
SOPM 20-50-03, re-
vision 103, dated
July 1, 2014, or later
Boeing approved re-
visions that are pub-
lished on myboe-
ingfleet.
1161A1112-1;
161A1112-5
OUTER CYLINDER
ASSEMBLY FOR-
WARD TRUNNION
BUSHING
Remove1
from the outer cylin-
der assembly bore
in accordance with
SOPM 20-50-03, re-
vision 103, dated
July 1, 2014, or later
Boeing approved re-
visions that are pub-
lished on myboe-
ingfleet.
1161A1112-2;
161A1112-6
OUTER CYLINDER
ASSEMBLY AFT
TRUNNION BUSHING
Remove2
Detailed Inspection
for corrosion, pitting,
missing primer, or
missing CIC at the
surface of the trun-
nion bore. (a) (b)
1-OUTER CYLINDER
ASSEMBLY FOR-
WARD TRUNNION
BORE
Inspect3
Detailed Inspection
for corrosion, pitting,
missing primer, or
missing CIC at the
surface of the trun-
nion bore. (a) (b)
1-OUTER CYLINDER
ASSEMBLY AFT
TRUNNION BORE
Inspect4
as required to per-
form the inspection
in accordance with
SOPM 20-30-03, re-
vision 046, dated
July 1, 2014, or later
Boeing approved re-
visions that are pub-
lished on myboe-
ingfleet.
1-OUTER CYLINDER
ASSEMBLY FOR-
WARD TRUNNION
BORE
Clean5
FIGURE 2: LEFT MAIN LANDING GEAR (MLG) OUTER CYLINDER ASSEMBLY TRUNNION BORE DETAILED
INSPECTION
(SHEET 3 OF 4)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 06, 2014
737-32-1486
55 of 90
BOEING SERVICE BULLETIN 737-32-1486

### Page 56

More DataQtyIdentificationNameTaskStep
as required to per-
form the inspection
in accordance with
SOPM 20-30-03, re-
vision 046, dated
July 1, 2014, or later
Boeing approved re-
visions that are pub-
lished on myboe-
ingfleet.
1-OUTER CYLINDER
ASSEMBLY AFT
TRUNNION BORE
Clean6
Detailed Inspection
for corrosion, pitting,
or missing primer at
the surface of the
trunnion bore. Refer
to 737-
600/700/800/900
AMM 51-00-51 as
an accepted proce-
dure. (a)
1-OUTER CYLINDER
ASSEMBLY FOR-
WARD TRUNNION
BORE
Inspect7
Detailed Inspection
for corrosion, pitting,
or missing primer at
the surface of the
trunnion bore. Refer
to 737-
600/700/800/900
AMM 51-00-51 as
an accepted proce-
dure. (a)
1-OUTER CYLINDER
ASSEMBLY AFT
TRUNNION BORE
Inspect8
(a) Refer to APPENDIX A for picture examples.
(b) Do not clean the trunnion bore prior to performing the inspection.
FIGURE 2: LEFT MAIN LANDING GEAR (MLG) OUTER CYLINDER ASSEMBLY TRUNNION BORE DETAILED
INSPECTION
(SHEET 4 OF 4)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 06, 2014
737-32-1486
56 of 90
BOEING SERVICE BULLETIN 737-32-1486

### Page 57 (OCR)

BOEING SERVICE BULLETIN 737-32-1486
This Figure applies only to: Group 1-2, Configuration 1.
OUTER CYLINDER
ASSEMBLY
LEFT MAIN  2287996
LANDING GEAR
FIGURE 3: LEFT MAIN LANDING GEAR (MLG) OUTER CYLINDER ASSEMBLY TRUNNION BUSHING
INSTALLATION
(SHEET 1 OF 6)
Original Issue: November 06, 2014
Export Controlled ECCN: 9E991 - BOEING  737-32-1486
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.  57 of 90

### Page 58 (OCR)

BOEING SERVICE BULLETIN 737-32-1486
OUTER CYLINDER
245  ASSEMBLY AFT
TRUNNION BORE
DOO AGENCY PORTARO  _ OUTER CYLINDEF
TRUNNION BORE
OUTER CYLINDER
2287995
FIGURE 3: LEFT MAIN LANDING GEAR (MLG) OUTER CYLINDER ASSEMBLY TRUNNION BUSHING
INSTALLATION
(SHEET 2 OF 6)
Original Issue: November 06, 2014
PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  737-32-1486
Work - See page 1 for details.  58 of 90

### Page 59

More DataQtyIdentificationNameTaskStep
abrasive clean to re-
move primer from
the bore surface
where the bushing
will be installed in
accordance with
SOPM 20-30-03, re-
vision 046, dated
July 1, 2014, or later
Boeing approved re-
visions that are pub-
lished on myboe-
ingfleet.
--OUTER CYLINDER
ASSEMBLY FOR-
WARD TRUNNION
BORE
Clean1
abrasive clean to re-
move primer from
the bore surface
where the bushing
will be installed in
accordance with
SOPM 20-30-03, re-
vision 046, dated
July 1, 2014, or later
Boeing approved re-
visions that are pub-
lished on myboe-
ingfleet.
--OUTER CYLINDER
ASSEMBLY AFT
TRUNNION BORE
Clean2
inner diameter. This
dimension is used to
make the new bush-
ing.
1-OUTER CYLINDER
ASSEMBLY FOR-
WARD TRUNNION
BORE
Measure3
inner diameter. This
dimension is used to
make the new bush-
ing.
1-OUTER CYLINDER
ASSEMBLY AFT
TRUNNION BORE
Measure4
FIGURE 3: LEFT MAIN LANDING GEAR (MLG) OUTER CYLINDER ASSEMBLY TRUNNION BUSHING
INSTALLATION
(SHEET 3 OF 6)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 06, 2014
737-32-1486
59 of 90
BOEING SERVICE BULLETIN 737-32-1486

### Page 60

More DataQtyIdentificationNameTaskStep
and also apply chro-
mate treatment to
any area where pro-
tective finish is dam-
aged in the outer
cylinder assembly
trunnion bore as
necessary in accor-
dance with SOPM
20-42-10, revision
017, dated July 1,
2009, or later Boeing
approved revisions
that are published
on myboeingfleet.
(a)
--STYLUS CADMIUM
PLATE
Apply5
one coat to the outer
cylinder assembly
trunnion bore where
new protective finish
has been applied as
necessary in accor-
dance with SOPM
20-44-04, revision
012, dated March 1,
2012, or later Boeing
approved revisions
that are published
on myboeingfleet.
-BMS 10-79, TYPE IIIPRIMERApply
in accordance with
APPENDIX B.
1161A1112-5OUTER CYLINDER
ASSEMBLY FOR-
WARD TRUNNION
BUSHING
Make6
in accordance with
APPENDIX C.
1161A1112-6OUTER CYLINDER
ASSEMBLY AFT
TRUNNION BUSHING
Make
FIGURE 3: LEFT MAIN LANDING GEAR (MLG) OUTER CYLINDER ASSEMBLY TRUNNION BUSHING
INSTALLATION
(SHEET 4 OF 6)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 06, 2014
737-32-1486
60 of 90
BOEING SERVICE BULLETIN 737-32-1486

The text continues at https://openairdocs.org/service-documents/boeing/sb-737-32-1486/file/679ea138e05b.md?from=61

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
