# Boeing Special Attention Service Bulletin 747-25-3381: Revision 3, part 1 of 2

- Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2021-0794; AD 2021-26-10 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Boeing Special Attention Service Bulletin 747-25-3381](https://openairdocs.org/service-documents/boeing/sb-747-25-3381.md)
- Title as filed: SB-747-25-3381-03-- BOEING_Part1
- Pages: 107
- PDF: https://openairdocs.org/files/sha256/53/a3/53a3139e1ea25a7b547f19c25b48fcf4b7fc49f2a7e85123cd084deb4eb6b0d9
- Page: https://openairdocs.org/service-documents/boeing/sb-747-25-3381/file/53a3139e1ea2

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Commercial 
Airplanes
747
Service Bulletin
SPECIAL ATTENTION
Number: 747-25-3381
Original Issue: August 19, 2010
Revision 3: February 19, 2021
ATA System: 2500 2030 2050 2453 2514 2552
2553 2559
SUBJECT: EQUIPMENT/FURNISHINGS - Flight Compartment and Cargo Compartment - BMS
8-39 Urethane Foam Replacement
Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15
CFR 300-774). An export license may be required before it is used for development, production or use by foreign
persons from specific countries. The controller of this data has the individual responsibility to abide by all export
laws.
9E991ECCN:
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET
Copyright © 2010 Boeing.
Unpublished Work. All Rights Reserved.
Treatment of this document and its content is governed by contract with Boeing. Rights to use this document
are licensed on a per aircraft basis and such rights may not be transferable. For more information, contact The
Boeing Company.
Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner,
BBJ, DC-8, DC-9, DC-10, KC-10, KC-46, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8, Poseidon and
Boeing liveries are all trademarks owned by The Boeing Company; and no trademark license is granted in
connection with this document unless provided in writing by Boeing.
Original Issue: August 19, 2010
747-25-3381Revision 3: February 19, 2021
1 of 213
7.0

### Page 2

Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 19, 2010
747-25-3381Revision 3: February 19, 2021
2 of 213
BOEING SERVICE BULLETIN 747-25-3381
BLANK PAGE

### Page 3

Table of Contents
Revision Transmittal Sheet . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
Summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
1. PLANNING INFORMATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21
A. Effectivity . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21
1. Airplanes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21
2. Spares Affected . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32
B. Concurrent Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32
C. Reason . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32
D. Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 34
E. Compliance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 42
F. Approval . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 42
G. Manpower . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 43
H. Weight and Balance Changes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 51
I. Electrical Load Data . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 52
J. References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 52
1. Existing Data: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 52
2. Data Supplied with this Service Bulletin: . . . . . . . . . . . . . . . . . . . . . . . . . . . 53
3. Installation Drawings Used in the Preparation of this Service Bulletin: . . . . . . . . . . . 53
K. Publications Affected . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 53
L. Interchangeability and Intermixability of Parts . . . . . . . . . . . . . . . . . . . . . . . . . . . 53
M. Software Accomplishment Summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 54
2. MATERIAL INFORMATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 55
A. Material - Price and Availability . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 55
B. Industry Support Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 57
C. Parts Necessary for Each Airplane . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 57
1. Kits/Parts: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 57
2. Parts and Materials Supplied by the Operator: . . . . . . . . . . . . . . . . . . . . . . . . 65
3. Parts Modified and Reidentified: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 66
4. Parts Removed and Not Replaced: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 66
D. Parts Necessary to Change Spares . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 66
E. Special Tooling - Price and Availability . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 66
F. Special Tooling Necessary to do this Service Bulletin . . . . . . . . . . . . . . . . . . . . . . . 66
3. ACCOMPLISHMENT INSTRUCTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 67
A. GENERAL INFORMATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 67
B. WORK INSTRUCTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 68
FIGURE 1: MAIN DECK FOAM AIR SEAL REPLACEMENT, LEFT SIDE WALL [Group 1, 6-7, 10,
Configuration 1; Group 10, Configuration 2; Group 12, 15, Configuration 1] . . . . . . . . 78
FIGURE 2: MAIN DECK SYSTEM TUBE/WIRE FOAM SEAL REPLACEMENT, LEFT SIDEWALL [Group
1, 6, Configuration 1] . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 87
FIGURE 3: MAIN DECK FOAM AIR SEAL REPLACEMENT RIGHT SIDE WALL [Group 1, 6-7, 10,
Configuration 1; Group 10, Configuration 2; Group 12, 15, Configuration 1] . . . . . . . . 94
FIGURE 4: MAIN DECK CEILING PANEL FOAM STRIP REPLACEMENT [Group 1, 6, Configuration 1]
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 102
FIGURE 5: THIS FIGURE IS DELETED . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 105
FIGURE 6: MAIN DECK SYSTEM TUBE/WIRE FOAM SEAL REPLACEMENT, RIGHT SIDEWALL [Group
1, 6, Configuration 1] . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 106
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 19, 2010
747-25-3381Revision 3: February 19, 2021
3 of 213
BOEING SERVICE BULLETIN 747-25-3381

### Page 4

FIGURE 7: FORWARD CARGO COMPARTMENT SYSTEM TUBE/WIRE FOAM SEAL REPLACEMENT
[Group 1-3, 6-10, Configuration 1; Group 10, Configuration 2; Group 12-13, Configuration 1;
Group 13, Configuration 4; Group 14, Configuration 1, 4; Group 15-16, Configuration 1; Group
16, Configuration 2, 5; Group 17, Configuration 1-2, 5; Group 18-19, Configuration 1; Group 19,
Configuration 2, 5] . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 113
FIGURE 8: AFT CARGO COMPARTMENT SYSTEM TUBE/WIRE FOAM SEAL REPLACEMENT [Group
1-3, 6-10, Configuration 1; Group 10, Configuration 2; Group 12-16, Configuration 1; Group 16,
Configuration 2; Group 17, Configuration 1-2; Group 18-19, Configuration 1; Group 19,
Configuration 2] . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 121
FIGURE 9: FLIGHT COMPARTMENT OVERHEAD ELECTRICAL EQUIPMENT PANEL FOAM
REPLACEMENT [Group 1-3, 7-10, Configuration 1; Group 10, Configuration 2; Group 12-16,
Configuration 1; Group 16, Configuration 2; Group 17, Configuration 1-2; Group 18-19,
Configuration 1; Group 19, Configuration 2] . . . . . . . . . . . . . . . . . . . . . . . . . 129
FIGURE 10: FLIGHT COMPARTMENT OVERHEAD PANEL SUPPORT STRUCTURE FOAM REPLACEMENT
[Group 1-3, 7-9, Configuration 1; Group 10, Configuration 2; Group 11-12, 15, Configuration 1;
Group 16-17, Configuration 2; Group 18, Configuration 1; Group 19, Configuration 2] . . 133
FIGURE 11: FLIGHT COMPARTMENT OVERHEAD DRIPSHIELD FOAM REPLACEMENT [Group 1-3, 7-10,
Configuration 1; Group 10, Configuration 2; Group 12-16, Configuration 1; Group 16, Configuration
2; Group 17, Configuration 1-2; Group 18-19, Configuration 1; Group 19, Configuration 2] . 137
FIGURE 12: MAIN DECK AIR BAFFLE FOAM INSPECTION AND REMOVAL, LEFT/RIGHT SIDEWALLS
[Group 2-3, 9, 13-14, 16, Configuration 1; Group 16, Configuration 2; Group 17, Configuration
1-2; Group 19, Configuration 1-2] . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 140
FIGURE 13: MAIN DECK AIR BAFFLE FOAM INSTALLATION, LEFT/RIGHT SIDEWALLS [Group 2-3, 9,
13-14, 16, Configuration 1; Group 16, Configuration 2; Group 17, Configuration 1-2; Group 19,
Configuration 1-2] . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 146
FIGURE 14: MAIN DECK AIR BAFFLE FOAM INSPECTION AND REMOVAL, LEFT/RIGHT SIDEWALLS
[Group 4-5, Configuration 1] . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 153
FIGURE 15: MAIN DECK AIR BAFFLE FOAM INSTALLATION, LEFT/RIGHT SIDEWALLS [Group 4-5,
Configuration 1] . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 159
FIGURE 16: CROWN AREA - FOAM PAD REMOVAL [Group 1-3, 6-10, Configuration 1; Group 10,
Configuration 2; Group 11-16, Configuration 1; Group 16, Configuration 2; Group 17, Configuration
1-2; Group 18-19, Configuration 1; Group 19, Configuration 2] . . . . . . . . . . . . . . . 165
FIGURE 17: E1/E2 EQUIPMENT RACK WIU COVER ASSEMBLIES FOAM REPLACEMENT [Group 1,
Configuration 1-2; Group 2, Configuration 1-2; Group 3, Configuration 1-2; Group 6, Configuration
1-2; Group 7, Configuration 1-2; Group 8, Configuration 1-2; Group 9, Configuration 1-2; Group
11, Configuration 1-2; Group 18, Configuration 1-2] . . . . . . . . . . . . . . . . . . . . . 170
FIGURE 18: FLIGHT COMPARTMENT MOISTURE SEAL REPLACEMENT [Group 1, Configuration 1-2;
Group 2, Configuration 1-2; Group 3, Configuration 1-2; Group 6, Configuration 1-2; Group 7,
Configuration 1-2; Group 8, Configuration 1-2; Group 9, Configuration 1-2; Group 10,
Configuration 1-3; Group 11, Configuration 1-2; Group 12, Configuration 1-2; Group 13,
Configuration 1-2; Group 14, Configuration 1-2; Group 15, Configuration 1-2; Group 16,
Configuration 1-3; Group 17, Configuration 1-3; Group 18, Configuration 1-2; Group 19,
Configuration 1-3] . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 172
FIGURE 19: FORWARD CARGO COMPARTMENT SYSTEM TUBE/WIRE FOAM SEAL REPLACEMENT
[Group 1, Configuration 2-3; Group 2, Configuration 2-3; Group 3, Configuration 2-3; Group 6,
Configuration 2-3; Group 7, Configuration 2-3; Group 8, Configuration 2-3; Group 9, Configuration
2-3; Group 10, Configuration 3-4; Group 11; Group 12, Configuration 2-3; Group 13, Configuration
2-3; Group 14, Configuration 2-3; Group 15, Configuration 2-3; Group 16, Configuration 3-4;
Group 17, Configuration 3-4; Group 18, Configuration 2-3; Group 19, Configuration 3-4] . 175
FIGURE 20: AFT CARGO COMPARTMENT SYSTEM TUBE/WIRE FOAM SEAL REPLACEMENT [Group
1, Configuration 2-3; Group 2, Configuration 2-3; Group 3, Configuration 2-3; Group 6,
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 19, 2010
747-25-3381Revision 3: February 19, 2021
4 of 213
BOEING SERVICE BULLETIN 747-25-3381

### Page 5

Configuration 2-3; Group 7, Configuration 2-3; Group 8, Configuration 2-3; Group 9, Configuration
2-3; Group 10, Configuration 3-4; Group 12, Configuration 2-3; Group 13, Configuration 2-3;
Group 14, Configuration 2-3; Group 15, Configuration 2-3; Group 16, Configuration 3-4; Group
17, Configuration 3-4; Group 18, Configuration 2-3; Group 19, Configuration 3-4] . . . . 182
Appendix A: SANDING AND SCOURING (BAC 5748, TYPE II, CLASS 5) . . . . . . . . . . . . . . . 186
Appendix B: BMS8-39 URETHANE FOAM REPLACEMENT EXCLUDED AREAS/APPLICATIONS . 188
Appendix C: EXAMPLE PHOTOS OF BMS 8-39 FOAM INSTALLATIONS . . . . . . . . . . . . . . . 190
APPENDIX D: EXISTING BMS 8-39 PART NUMBERS . . . . . . . . . . . . . . . . . . . . . . . . . . . 206
APPENDIX E: FIGURE APPLICABILITY IN A TABULAR FORMAT . . . . . . . . . . . . . . . . . . . . 211
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 19, 2010
747-25-3381Revision 3: February 19, 2021
5 of 213
BOEING SERVICE BULLETIN 747-25-3381

### Page 6

Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 19, 2010
747-25-3381Revision 3: February 19, 2021
6 of 213
BOEING SERVICE BULLETIN 747-25-3381
BLANK PAGE

### Page 7

Commercial 
Airplanes
747
Service Bulletin
SPECIAL ATTENTION
Revision Transmittal SheetNumber: 747-25-3381Original Issue: August 19, 2010
Revision 3: February 19, 2021
ATA System: 2500 2030 2050 2453 2514 2552
2553 2559
SUBJECT: EQUIPMENT/FURNISHINGS - Flight Compartment and Cargo Compartment - BMS
8-39 Urethane Foam Replacement
This revision includes all pages of the service bulletin.
COMPLIANCE INFORMATION RELATED TO THIS REVISION
Federal Aviation Administration (FAA) Airworthiness Directive AD 2013-11-04 is related to this service bulletin.
The FAA will possibly release an additional Airworthiness Directive related to this service bulletin. The
Airworthiness Directive will make the compliance tasks and times given in this service bulletin mandatory.
Airplane variable number RT951 was moved from Group 10 to Group 16.
Airplane variable numbers RT161, RT164, RT166, RT519, RT520, RT528, RT657 and RT967 were moved from
Group 7 to new Group 18.
Airplane variable numbers RT461, RT631, RT632, RT642, RT743, RT752, RT654, RT691, RT692, and RT876
were moved from Group 16 to new Group 19.
Airplane variable number RT524 was moved from Group 2 to Group 7.
Effects of Revision 3 on airplanes on which the Original Issue, Revision 1 and Revision 2 of this service bulletin
was previously done:
See Paragraph 1.D., Description for more information.
REASON FOR REVISION
This revision is sent to add an instruction for airplanes of Groups 13, 14, 16, 17 and 19. An instruction is also
added for Group 11 airplanes as a result of an occurrence of BMS 8-39 foam in the forward cargo compartment.
This revision is also sent to incorporate what was found from the completed validation and to move airplanes
between groups to agree with their configurations of equipment/furnishings related to the instructions of this
service bulletin. Additionally, this revision gives separation of the work in the forward cargo compartment of this
service bulletin from the work in the forward cargo compartment of Boeing service bulletin 747-25-3725.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 19, 2010
747-25-3381Revision 3: February 19, 2021
7 of 213

### Page 8

As a part of a service bulletin validation program, this change was completed on airplane RT161 by Service
Bulletin 747-25-3381 Revision 2 before the release of Revision 3 of this service bulletin. The change completed
on airplane RT161 by Service Bulletin 747-25-3381 Revision 2 is equivalent to the release of Revision 3 of this
service bulletin. Airplane RT161 had the configuration of a Group 7 airplane at Revision 2 of this service bulletin.
These sections were changed:
1. Summary Background, added Boeing Service Bulletin reference, Service Related Problem (SRP)
reference, Boeing Fleet Team Digest (FTD) references and validation information.
2. Summary Action, changed and added applicability, added instructions, changed format to have one
list with all actions for each set of applicabilities.
3. Summary Compliance, added information.
4. Summary Material Information, added information.
5. Summary Illustration, changed applicability and added instructions.
6. Paragraph 1.A.1, Airplanes, changed information and descriptions. Added two new groups.
7. Paragraph 1.C., Reason, added Boeing Service Bulletin reference, SRP reference, Boeing FTD
references, validation information and Revision 3 information.
8. Paragraph 1.D., Description, changed and added applicability, added instructions, changed format to
have one list with all actions for each set of applicabilities, added Revision 3 information, and changed
maintenance zones.
9. Paragraph 1.E., Compliance, added information.
10. Paragraph 1.F., Approval, changed information.
11. Paragraph 1.G., Manpower, changed manpower information.
12. Paragraph 1.H., Weight and Balance Changes, added information.
13. Paragraph 1.J.1., Existing Data, added Engineering Change Memo, Aircraft Maintenance Manual
(AMM), Boeing Service Bulletin and Boeing FTD references. Removed Standard Wiring Practices
Manual (SWPM) references.
14. Paragraph 1.K.1., Publications, added AMM and Illustrated Parts Catalog (IPC) references.
15. Paragraph 2.A., Material - Price and Availability, changed kit applicability.
16. Paragraph 2.C.1., Kits/Parts, changed table.
17. Paragraph 2.C.2., Parts and Materials Supplied by the Operator, added information, notes, and parts.
18. Paragraph 2.C.3., Parts Modified and Reidentified, changed and added information.
19. Paragraph 3.A., General Information, changed and added notes.
20. Paragraph 3.B., Work Instructions, changed applicability, and added and removed work instructions.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 19, 2010
747-25-3381Revision 3: February 19, 2021
8 of 213
BOEING SERVICE BULLETIN 747-25-3381

### Page 9

21. Figures 1 thru 20, changed applicability.
22. Figure 1, added information to step table.
23. Figure 2, changed illustrations, added note above step table and changed step table, added footnote.
24. Figure 3, changed illustration and added information to step table.
25. Figure 6, changed illustrations, added note above step table and changed step table, added footnotes.
26. Figure 7, changed illustrations, added notes above step table and changed step table, added footnote.
27. Figure 8, changed illustrations, added notes above step table and changed step table, added footnote.
28. Figure 9, changed illustrations and note above step table, added footnote. Changed step table and
figure title.
29. Figure 10, changed figure title, corrected applicability.
30. Figure 11, changed note above step table and changed step table.
31. Figures 13 and 15, changed step table.
32. Figure 16, changed figure title, changed Sheet 1 illustration, added note above step table and changed
step table.
33. Figure 17, changed illustration, changed step table and added footnote.
34. Figure 19, changed illustrations, added notes above step table, added footnote and changed step table.
35. Figure 20, changed illustration, changed notes above step table, changed step table and added footnote.
36. APPENDIX A, added footnote (b), added photograph, removed information.
37. APPENDIX C, changed sheet 8 illustration, added sheet 15 and 16 illustrations.
38. APPENDIX D, changed Table 6 and added applicability.
39. APPENDIX E, added.
The data given in Alternative Method of Compliance Notices 747-25-3381 AMOC 01, 747-25-3381 AMOC 02,
747-25-3381 AMOC 03 and 747-25-3381 AMOC 04 are included in this revision.
The data given in Information Notice 747-25-3381 IN 02 is included in this revision.
Vertical lines are put on the left edge of each page, except in Paragraph 1.A., Effectivity and format changes,
to show the location of all content changes.
Pages with no vertical lines have no changes.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 19, 2010
747-25-3381Revision 3: February 19, 2021
9 of 213
BOEING SERVICE BULLETIN 747-25-3381

### Page 10

REVISION HISTORY
August 19, 2010Original Issue:
May 17, 2012Revision 1:
July 24, 2014Revision 2:
February 19, 2021Revision 3:
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 19, 2010
747-25-3381Revision 3: February 19, 2021
10 of 213
BOEING SERVICE BULLETIN 747-25-3381

### Page 11

Commercial 
Airplanes
747
Service Bulletin
SPECIAL ATTENTION
SummaryNumber: 747-25-3381Original Issue: August 19, 2010
Revision 3: February 19, 2021
ATA System: 2500 2030 2050 2453 2514 2552
2553 2559
SUBJECT: EQUIPMENT/FURNISHINGS - Flight Compartment and Cargo Compartment - BMS
8-39 Urethane Foam Replacement
BOEING RECOMMENDS THAT EACH OPERATOR EXAMINE THIS DOCUMENT IMMEDIATELY.
CONCURRENT REQUIREMENTS
None.
BACKGROUND
This change replaces seals in the cargo compartments and insulation on the pilots overhead panel that degrade
over time and no longer satisfy the requirements for flammability, smoke and halon retention and fire blocking.
If you do not make the change as given in this service bulletin, the degraded material can be an unacceptable
fuel source for a fire if exposed to an ignition source. The degraded material will also compromise halon and
smoke retention and fire blocking, which could result in the inability to keep sufficient halon concentrations within
the cargo compartment.
The seals are made of BMS 8-39 urethane foam. BMS 8-39 foam fire retardants are mixed into, but are not
chemically connected with, the remaining components of the foam. This condition will cause the fire retardants
to have decreased effectiveness of fire resistance over time.
Some operators reported the BMS 8-39 urethane foam burned at some areas in service. Boeing found that the
self-extinguishing and physical properties of the BMS 8-39 Urethane foam can degrade after five to ten years.
The degraded material can be an unacceptable fire fuel source for a fire if exposed to an ignition source. The
degraded material will also compromise halon and smoke retention and fire blocking, which could result in the
inability to keep sufficient halon concentrations within the cargo compartment.
This change replaces BMS 8-39 urethane foam in areas of the airplane where it is not easy to access for fire
and smoke detection or suppression. It is also replaced in areas where it is used to prevent fire or smoke
penetration. It is not replaced in areas where it is encapsulated by a protective fire resistant barrier or where it
is physically isolated from an ignition source. The BMS 8-39 foam is replaced with either BMS 8-371 insulation
foam or BMS 1-68 silicone foam rubber. The selection of either BMS 8-371 or BMS 1-68 material will be based
on requirements for use and its location in the airplane.
Boeing Service Related Problem 747-SRP-25-0234 and 747-SRP-25-0403 are related to this service bulletin.
Boeing Service Bulletin 747-53-2877 and 747-25-3725 are related to this service bulletin.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 19, 2010
747-25-3381Revision 3: February 19, 2021
11 of 213

### Page 12

Boeing Fleet Team Digest (FTD) 747 FTD 53-13010, 747 FTD 25-03005 and 747-400 FTD 25-03009 are related
to this service bulletin.
As a part of a service bulletin validation program, this change was completed on airplane RM084 by Service
Bulletin 747-25-3381 Original Issue before the release of Revision 1 of this service bulletin. The change completed
on airplane RM084 by Service Bulletin 747-25-3381 Original Issue is equivalent to the release of Revision 1 of
this service bulletin. Airplane RM084 has the configuration of a Group 2 airplane.
As a part of a service bulletin validation program, this change was completed on airplane RT161 by Service
Bulletin 747-25-3381 Revision 2 before the release of Revision 3 of this service bulletin. The change completed
on airplane RT161 by Service Bulletin 747-25-3381 Revision 2 is equivalent to the release of Revision 3 of this
service bulletin. Airplane RT161 had the configuration of a Group 7 airplane at Revision 2 of this service bulletin.
This table is provided to operators for planning purposes only. Refer to the applicable sections for more
information.
ReferenceAffectedPlanning Data
Paragraph 1.A.2., Spares AffectedNoSpares Affected
Paragraph 1.E., Compliance and Paragraph
1.F., Approval
YesAD Related
Paragraph 1.H., Weight and Balance ChangesNoWeight and Balance Change
Paragraph 1.I., Electrical Load DataNoElectrical Load Changed
Paragraph 1.K., Publications AffectedYesPublications Affected
Paragraph 1.K., Publications AffectedNoAirplane Flight Operations Affected
(Flight Crew Operations Manual and/or
FAA Approved Airplane Flight Manual)
Paragraph 2.C.1., Kits/PartsYesKits/Parts Required
Paragraph 2.C.2., Parts and Materials Supplied
by the Operator
YesOperator Supplied Parts/Material
Paragraph 2.F., Special Tooling Necessary to
do this Service Bulletin
NoSpecial Tooling Required
ACTION (PRR 85901-98RS, PRR 85901-58S)
Group 1, Configuration 1:
1. Replace BMS 8-39 foam seals in the main deck system tube/wire on the left and right sidewalls.
2. Replace BMS 8-39 foam air seals in the main deck on the left and right sidewalls.
3. Replace BMS 8-39 foam strip on the main deck ceiling panel.
4. Replace BMS 8-39 foam seals in the forward and aft cargo compartment system tube/wire.
5. Replace BMS 8-39 foam in the flight compartment overhead electrical equipment panel.
6. Replace BMS 8-39 foam in the flight compartment overhead electrical equipment panel structure.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 19, 2010
747-25-3381Revision 3: February 19, 2021
12 of 213
BOEING SERVICE BULLETIN 747-25-3381

### Page 13

7. Replace BMS 8-39 foam in the flight compartment overhead dripshield.
8. Remove foam pads from the crown area of the airplane.
9. Replace the flight compartment moisture seal.
10. Replace BMS 8-39 foam seals in the E1/E2 rack Wire Integration Unit (WIU) cover assemblies.
Group 1-3, Configuration 2:
1. Replace BMS 8-39 foam seals in the E1/E2 rack Wire Integration Unit (WIU) cover assemblies.
2. Replace the flight compartment moisture seal.
3. Replace BMS 8-39 foam seals in the forward and aft cargo compartment system tube/wire.
Group 1-3, 6-8, Configuration 3; Group 9, Configuration 2-3; Group 10, Configuration 4; Group 12-15,
Configuration 3; Group 16-17, Configuration 4; Group 18, Configuration 3; Group 19, Configuration
4:
1. Replace BMS 8-39 foam seals in the forward and aft cargo compartment system tube/wire.
Group 2-3, 9, Configuration 1:
1. Replace BMS 8-39 foam seals in the forward and aft cargo compartment system tube/wire.
2. Replace BMS 8-39 foam in the flight compartment overhead electrical equipment panel.
3. Replace BMS 8-39 foam in the flight compartment overhead electrical equipment panel structure.
4. Replace BMS 8-39 foam in the flight compartment overhead dripshield.
5. Replace the flight compartment moisture seal.
6. Replace BMS 8-39 foam seals in the E1/E2 rack WIU cover assemblies.
7. Replace BMS 8-39 foam in the main deck air baffle on left and right sidewalls.
8. Remove foam pads from the crown area of the airplane.
Group 4-5, Configuration 1:
1. Replace BMS 8-39 foam in the main deck air baffle on left and right sidewalls.
Group 6, Configuration 1:
1. Replace BMS 8-39 foam in the main deck air baffle on left and right sidewalls.
2. Replace BMS 8-39 foam seals in the main deck system tube/wire on the left and right sidewalls.
3. Replace BMS 8-39 foam strip in main deck ceiling panel.
4. Replace BMS 8-39 foam seals in the forward and aft cargo compartment system tube/wire.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 19, 2010
747-25-3381Revision 3: February 19, 2021
13 of 213
BOEING SERVICE BULLETIN 747-25-3381

### Page 14

5. Remove foam pads from the crown area of the airplane.
6. Replace the flight compartment moisture seal.
7. Replace foam seals in the E1/E2 rack WIU cover assemblies.
Group 6-9, 18, Configuration 2:
1. Replace foam seals in the E1/E2 rack WIU cover assemblies.
2. Replace the flight compartment moisture seal.
3. Replace BMS 8-39 foam seals in the forward and aft cargo compartment system tube/wire.
Group 7, Configuration 1:
1. Replace BMS 8-39 foam air seals in main deck on the left and right sidewalls.
2. Replace BMS 8-39 foam seals in the forward and aft cargo compartment system tube/wire.
3. Replace BMS 8-39 foam in the flight compartment overhead electrical equipment panel.
4. Replace BMS 8-39 foam in the flight compartment overhead electrical equipment panel structure.
5. Replace BMS 8-39 foam in the flight compartment overhead dripshield.
6. Replace the flight compartment moisture seal.
7. Replace foam seals in the E1/E2 rack WIU cover assemblies.
Group 8, 18, Configuration 1:
1. Replace BMS 8-39 foam seals in the forward and aft cargo compartment system tube/wire.
2. Replace BMS 8-39 foam in the flight compartment overhead electrical equipment panel.
3. Replace BMS 8-39 foam in the flight compartment overhead electrical equipment panel structure.
4. Replace BMS 8-39 foam in the flight compartment overhead dripshield.
5. Remove foam pads from the crown area of the airplane.
6. Replace the flight compartment moisture seal.
7. Replace foam seals in the E1/E2 rack WIU cover assemblies.
Group 10, Configuration 1:
1. Replace BMS 8-39 foam in the main deck air baffle on left and right sidewalls.
2. Replace BMS 8-39 foam seals in the forward and aft cargo compartment system tube/wire.
3. Replace BMS 8-39 foam in the flight compartment overhead electrical equipment panel.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 19, 2010
747-25-3381Revision 3: February 19, 2021
14 of 213
BOEING SERVICE BULLETIN 747-25-3381

### Page 15

4. Replace BMS 8-39 foam in the flight compartment overhead dripshield.
5. Remove foam pads from the crown area of the airplane.
6. Replace the flight compartment moisture seals.
Group 10, Configuration 2:
1. Replace BMS 8-39 foam air seals in main deck on the left and right sidewalls.
2. Replace BMS 8-39 foam seals in the forward and aft cargo compartment system tube/wire.
3. Replace BMS 8-39 foam in the flight compartment overhead electrical equipment panel.
4. Replace BMS 8-39 foam in the flight compartment overhead electrical equipment panel structure.
5. Replace BMS 8-39 foam in the flight compartment overhead dripshield.
6. Remove foam pads from the crown area of the airplane.
7. Replace the flight compartment moisture seal.
Group 10, Configuration 3; Group 12-15, Configuration 2; Group 16-17, 19, Configuration 3:
1. Replace the flight compartment moisture seal.
2. Replace BMS 8-39 foam seals in the forward and aft cargo compartment system tube/wire.
Group 11, Configuration 1:
1. Replace BMS 8-39 foam in the flight compartment overhead electrical equipment panel structure.
2. Remove foam pads from the crown area of the airplane.
3. Replace the flight compartment moisture seal.
4. Replace foam seals in the E1/E2 rack WIU cover assemblies.
5. Replace forward cargo compartment system tube/wire foam seal.
Group 12, 15, Configuration 1:
1. Replace BMS 8-39 foam air seals in main deck on the left and right sidewalls.
2. Replace BMS 8-39 foam seals in the forward and aft cargo compartment system tube/wire.
3. Replace BMS 8-39 foam in the flight compartment overhead electrical equipment panel.
4. Replace BMS 8-39 foam in the flight compartment overhead electrical equipment panel structure.
5. Replace BMS 8-39 foam in the flight compartment overhead dripshield.
6. Remove foam pads from the crown area of the airplane.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 19, 2010
747-25-3381Revision 3: February 19, 2021
15 of 213
BOEING SERVICE BULLETIN 747-25-3381

### Page 16

7. Replace the flight compartment moisture seal.
Group 16-17, 19, Configuration 2:
1. Replace BMS 8-39 foam seals in the forward and aft cargo compartment system tube/wire.
2. Replace BMS 8-39 foam in the flight compartment overhead electrical equipment panel.
3. Replace BMS 8-39 foam in the flight compartment overhead electrical equipment panel structure.
4. Replace BMS 8-39 foam in the flight compartment overhead dripshield.
5. Replace the flight compartment moisture seal.
6. Replace BMS 8-39 foam in the main deck air baffle on left and right sidewalls.
7. Remove foam pads from the crown area of the airplane.
Group 11, Configuration 2; Group 13-14, Configuration 4; Group 16-17, 19, Configuration 5:
1. Replace forward cargo compartment system tube/wire foam seal.
Group 13-14, 16-17, 19, Configuration 1:
1. Replace BMS 8-39 foam seals in the forward and aft cargo compartment system tube/wire.
2. Replace BMS 8-39 foam in the flight compartment overhead electrical equipment panel.
3. Replace BMS 8-39 foam in the flight compartment overhead dripshield.
4. Replace the flight compartment moisture seal.
5. Replace BMS 8-39 foam in the main deck air baffle on left and right sidewalls.
6. Remove foam pads from the crown area of the airplane.
Group 1-3, Configuration 4; Group 4-5, Configuration 2; Group 6-9, Configuration 4; Group 10,
Configuration 5; Group 12, Configuration 4; Group 13-14, Configuration 5; Group 15, Configuration
4; Group 16-17, Configuration 6; Group 18, Configuration 4:
1. No more work is required.
EFFECTIVITY
747-100/100B/100B SUD/200B/200F/300/400/400D/400F, 747SP, 747SR Airplane(s). Refer to Paragraph
1.A.1., Airplanes for the list of affected airplanes.
COMPLIANCE
Federal Aviation Administration (FAA) Airworthiness Directive AD 2013-11-04 is related to this service bulletin.
The FAA will possibly release an additional Airworthiness Directive related to this service bulletin. The
Airworthiness Directive will make the compliance tasks and times given in this service bulletin mandatory.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 19, 2010
747-25-3381Revision 3: February 19, 2021
16 of 213
BOEING SERVICE BULLETIN 747-25-3381

### Page 17

Refer to Paragraph 1.E., Compliance.
INDUSTRY SUPPORT INFORMATION
Boeing warranty remedies are not available for the inspections and configuration changes given in this service
bulletin.
MANPOWER
Refer to Paragraph 1.G., Manpower.
MATERIAL INFORMATION
Boeing Supplied Kits/Parts.
Operator Supplied Materials/Parts.
Refer to Paragraph 2.A., Material - Price and Availability.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 19, 2010
747-25-3381Revision 3: February 19, 2021
17 of 213
BOEING SERVICE BULLETIN 747-25-3381

### Page 18 (OCR)

BOEING SERVICE BULLETIN 747-25-3381
GROUP 11, CONFIGURATION 1-2;
GROUP 13-14, CONFIGURATION 4;
GROUP 16-17, CONFIGURATION 5:
REPLACE THE FORWARD CARGO COMPARTMENT SYSTEM
TUBE/WIRE FOAM SEAL.
GROUP 1-3, 6-10, 12-19, CONFIGURATION 1-3;
GROUP 10, 16-17, 19, CONFIGURATION 4: REPLACE
THE FORWARD AND AFT CARGO COMPARTMENT SYSTEM
TUBE/WIRE FOAM SEAL.
GROUP 1, 6-7, 10, CONFIGURATION 1;
GROUP 10, CONFIGURATION 2;
GROUP 12, 15 CONFIGURATION 1:
REPLACE THE MAIN DECK SYSTEM
TUBE/WIRE FOAM SEAL.
STA
2341
GROUP 1-3, 6-10, CONFIGURATION 1;
GROUP 10, CONFIGURATION 2;
GROUP 11, CONFIGURATION 1;
GROUP 12-16, CONFIGURATION 1;
GROUP 16, CONFIGURATION 2;
GROUP 17, CONFIGURATION 1-2;
GROUP 18-19, CONFIGURATION 1;
GROUP 19, CONFIGURATION 2:
REMOVE FOAM PADS FROM THE CROWN
STA  AREA OF THE AIRPLANE.
342
GROUP
GROUP 9, 13-14, 16 CONFIGURATION 1;
GROUP 16, CONFIGURATION 2;
GROUP 17, CONFIGURATION 1-2;
GROUP 19, CONFIGURATION 1-2:
REMOVE AND INSTALL MAIN DECK AIR BAFFLE FOAM.  D73949
Original Issue: August 19, 2010
Revision 3: February 19, 2021  PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  747-25-3381
Work - See page 1 for details.  18 of 213

### Page 19 (OCR)

BOEING SERVICE BULLETIN 747-25-3381
GROUP 1-3, 7-9, 12, 18, CONFIGURATION 1;
GROUP 10, 16-17, 19, CONFIGURATION 1-2:
REPLACE FOAM IN THE FLIGHT COMPARTMENT OVERHEAD
PANEL SUPPORT STRUCTURE AND IN THE FLIGHT
COMPARTMENT OVERHEAD DRIPSHIELD.
GROUP 1-3, 7-9, 11, CONFIGURATION 1; GROUP 10,
CONFIGURATION 2:
REPLACE FOAM IN THE FLIGHT COMPARTMENT PANEL
SUPPORT STRUCTURE.
CONFIGURATION 1-2; GROUP 10,  GROUP 1-5, 6-9, 12-13, 10,
16-17, 19, CONFIGURATION 1-3;
GROUP 11, CONFIGURATION 1:
REPLACE THE FLIGHT COMPARTMENT
MOISTURE SEAL.
GROUP 1-3, 6-9, 18,
CONFIGURATION 1-2; GROUP 11,
CONFIGURATION 1:
REPLACE FOAM SEAL ON THE E1/E2
RACKS WIU COVER ASSEMBLIES.
2255989
Original Issue: August 19, 2010
Revision 3: February 19, 2021  PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  747-25-3381
Work - See page 1 for details.  19 of 213

### Page 20

Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 19, 2010
747-25-3381Revision 3: February 19, 2021
20 of 213
BOEING SERVICE BULLETIN 747-25-3381
BLANK PAGE

### Page 21

Commercial 
Airplanes
747
Service Bulletin
SPECIAL ATTENTION
Number: 747-25-3381
Original Issue: August 19, 2010
Revision 3: February 19, 2021
ATA System: 2500 2030 2050 2453 2514 2552
2553 2559
SUBJECT: EQUIPMENT/FURNISHINGS - Flight Compartment and Cargo Compartment - BMS
8-39 Urethane Foam Replacement
BOEING RECOMMENDS THAT EACH OPERATOR EXAMINE THIS DOCUMENT IMMEDIATELY.
1.    PLANNING INFORMATION
A. Effectivity
1. Airplanes
Refer to Service Bulletin Index Document D6-30300 Part 3 for Airplane Variable Number, Line
Number, and Serial Number data.
This bulletin is applicable to 747-100, 747-100B, 747-100B SUD, 747-200B, 747-200F, 747-300,
747-400, 747-400D, 747-400F, 747SP, 747SR Airplane(s), line number(s) 5, 8-9, 23-25, 28, 41-42,
46, 48, 52, 57, 59-61, 64, 66-67, 70, 72-73, 77-80, 82, 85-86, 90, 94-96, 106-107, 109-112, 115-119,
121-122, 125, 128, 130-131, 133-138, 141, 143-144, 147, 150-152, 155-156, 159, 161, 163,
165-166, 169-171, 178-179, 181, 183, 185-189, 192, 195-197, 199, 202, 204, 210, 214-215,
217-222, 225-226, 231-236, 238-240, 242, 244-248, 250, 253-257, 259-260, 262-264, 267, 271,
274-276, 278-279, 282-284, 288, 290-292, 294, 296, 298-300, 302-304, 306-307, 309-310, 312-314,
317, 320-324, 326, 328-329, 332-333, 335-336, 338, 341, 344-346, 348-349, 351, 353, 355-357,
359-361, 364-365, 367-371, 373-381, 383, 389-390, 393, 395, 397, 402-405, 407, 411-415,
417-418, 421-425, 427-429, 431, 434-437, 440-443, 445-447, 450-452, 457, 459, 461, 463,
465-471, 473-474, 479, 481, 484, 487, 489, 491, 493, 495-498, 501-504, 506-507, 509, 511-519,
521-523, 525-534, 536, 539, 541-542, 544, 546-548, 550-554, 556-557, 559-560, 563-564, 566-568,
570, 572, 575-579, 581-589, 592-603, 606-607, 609-612, 615-616, 618-622, 624, 626-627, 629-632,
634-646, 648-653, 655, 657-659, 661-668, 671-679, 681, 683, 685-686, 688, 690-696, 698,
700-705, 707-709, 711, 713, 715-717, 719, 721-723, 725-751, 753-771, 773-775, 777-813, 815-817,
819-821, 823-877, 879-885, 887-888, 890-976, 978-1082, 1084-1098, 1100-1419 in 19 Group(s).
Where the effectivity is presented with hyphens between line numbers, the airplane applicability
means "through" and "inclusive", e.g. line numbers 1-9 means line numbers 1 through 9 inclusive.
The Variable Numbers and Group Information for the applicable airplanes is given below. Refer
to PRR 85901-58S and PRR 85901-98RS for data about this change.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 19, 2010
747-25-3381Revision 3: February 19, 2021
21 of 213

### Page 22

DESCRIPTIONCONFIGURATIONGROUP
747-400F Airplanes.-1
Airplanes that have not accomplished the Original Issue, Revision 1
or Revision 2 of this service bulletin.
1
Airplanes that have accomplished the Original Issue but not Revision
1 or Revision 2 of this service bulletin.
2
Airplanes that have accomplished Revision 1 but not Revision 2 of
this service bulletin.
3
Airplanes that have accomplished Revision 2 of this service bulletin.4
747-400, -400D Passenger airplanes.-2
Airplanes that have not accomplished the Original Issue, Revision 1
or Revision 2 of this service bulletin.
1
Airplanes that have accomplished the Original Issue but not Revision
1 or Revision 2 of this service bulletin.
2
Airplanes that have accomplished Revision 1 but not Revision 2 of
this service bulletin.
3
Airplanes that have accomplished Revision 2 of this service bulletin.4
747-400 Combi Airplanes.-3
Airplanes that have not accomplished the Original Issue, Revision 1
or Revision 2 of this service bulletin.
1
Airplanes that have accomplished the Original Issue but not Revision
1 or Revision 2 of this service bulletin.
2
Airplanes that have accomplished Revision 1 but not Revision 2 of
this service bulletin.
3
Airplanes that have accomplished Revision 2 of this service bulletin.4
747-100, -100B, -100B SUD, -200B, -300, 747SP, 747SR Passenger
Airplanes.
-4
Airplanes that have not accomplished the Original Issue, Revision 1
or Revision 2 of this service bulletin.
1
Airplanes that have accomplished the Original Issue, Revision 1 or
Revision 2 of this service bulletin.
2
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 19, 2010
747-25-3381Revision 3: February 19, 2021
22 of 213
BOEING SERVICE BULLETIN 747-25-3381

### Page 23

DESCRIPTIONCONFIGURATIONGROUP
747-100, -200B, -300, 747SR Passenger Airplanes that have been
converted to freighters and 747-200F Airplanes.
-5
Airplanes that have not accomplished the Original Issue, Revision 1
or Revision 2 of this service bulletin.
1
Airplanes that have accomplished the Original Issue, Revision 1 or
Revision 2 of this service bulletin.
2
747-400F Airplanes with acceptable foam insulation on the flight
deck.
-6
Airplanes that have not accomplished the Original Issue, Revision 1
or Revision 2 of this service bulletin.
1
Airplanes that have accomplished the Original Issue but not Revision
1 or Revision 2 of this service bulletin.
2
Airplanes that have accomplished Revision 1 but not Revision 2 of
this service bulletin.
3
Airplanes that have accomplished Revision 2 of this service bulletin.4
747-400 Passenger Airplanes that have been converted into
freighters.
-7
Airplanes that have not accomplished the Original Issue, Revision 1
or Revision 2 of this service bulletin.
1
Airplanes that have accomplished the Original Issue but not Revision
1 or Revision 2 of this service bulletin.
2
Airplanes that have accomplished Revision 1 but not Revision 2 of
this service bulletin.
3
Airplanes that have accomplished Revision 2 of this service bulletin.4
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 19, 2010
747-25-3381Revision 3: February 19, 2021
23 of 213
BOEING SERVICE BULLETIN 747-25-3381

### Page 24

DESCRIPTIONCONFIGURATIONGROUP
747-400 Airplane line number 1101 that is a Boeing Converted
Freighter (BCF).
-8
Airplane that has not accomplished the Original Issue, Revision 1 or
Revision 2 of this service bulletin.
1
Airplane that has accomplished the Original Issue but not Revision
1 or Revision 2 of this service bulletin.
2
Airplane that has accomplished Revision 1 but not Revision 2 of this
service bulletin.
3
Airplane that has accomplished Revision 2 of this service bulletin.4
747-400 Combi Airplanes.-9
Airplanes that have not accomplished the Original Issue, Revision 1
or Revision 2 of this service bulletin.
1
Airplanes that have accomplished the Original Issue but not Revision
1 or Revision 2 of this service bulletin.
2
Airplanes that have accomplished Revision 1 but not Revision 2 of
this service bulletin.
3
Airplanes that have accomplished Revision 2 of this service bulletin.4
747-400 Airplanes that are Boeing Converted Freighter (BCF), are
included in service bulletin 747-21-2347 and have E1/E2 Wire
Integration Unit (WIU) covers which had no foam installed in
production.
-10
Airplanes that have not accomplished the Original Issue of this service
bulletin and have not accomplished service bulletin 747-21-2347.
1
Airplanes that have not accomplished the Original Issue of this service
bulletin but have accomplished service bulletin 747-21-2347.
2
Airplanes that have accomplished the Original Issue but not Revision
1 or Revision 2 of this service bulletin.
3
Airplanes that have accomplished Revision 1 but not Revision 2 of
this service bulletin.
4
Airplanes that have accomplished Revision 2 of this service bulletin.5
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 19, 2010
747-25-3381Revision 3: February 19, 2021
24 of 213
BOEING SERVICE BULLETIN 747-25-3381

### Page 25

DESCRIPTIONCONFIGURATIONGROUP
747-400F Airplanes after line number 1374.-11
Airplanes that have not accomplished Revision 1 or Revision 2 of
this service bulletin.
1
Airplanes that have accomplished Revision 1 or Revision 2 of this
service bulletin.
2
747-400F Airplane, line number 968, that was previously in Group 1
at Revision 1 of this service bulletin and has E1/E2 WIU covers which
had no foam installed in production.
-12
Airplane that has not accomplished the Original Issue, Revision 1 or
Revision 2 of this service bulletin.
1
Airplane that has accomplished the Original Issue but not Revision
1 or Revision 2 of this service bulletin.
2
Airplane that has accomplished Revision 1 but not Revision 2 of this
service bulletin.
3
Airplane that has accomplished Revision 2 of this service bulletin.4
747-400, -400D Passenger Airplanes that were previously in Group
2 at Revision 1 of this service bulletin and have E1/E2 WIU covers
which had no foam installed in production.
-13
Airplanes that have not accomplished the Original Issue, Revision 1
or Revision 2 of this service bulletin.
1
Airplanes that have accomplished the Original Issue but not Revision
1 or Revision 2 of this service bulletin.
2
Airplanes that have accomplished Revision 1 but not Revision 2 of
this service bulletin.
3
Airplanes that have accomplished Revision 2 but not the Original
Issue or Revision 1 of this service bulletin.
4
Airplanes that have accomplished Revision 2 and have accomplished
the Original Issue or Revision 1 of this service bulletin.
5
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 19, 2010
747-25-3381Revision 3: February 19, 2021
25 of 213
BOEING SERVICE BULLETIN 747-25-3381

### Page 26

DESCRIPTIONCONFIGURATIONGROUP
747-400 Combi Airplanes that were previously in Group 3 at Revision
1 of this service bulletin, and have E1/E2 WIU covers without foam
installed in production.
-14
Airplanes that have not accomplished the Original Issue, Revision 1
or Revision 2 of this service bulletin.
1
Airplanes that have accomplished the Original Issue but not Revision
1 or Revision 2 of this service bulletin.
2
Airplanes that have accomplished Revision 1 but not Revision 2 of
this service bulletin.
3
Airplanes that have accomplished Revision 2 but not the Original
Issue or Revision 1 of this service bulletin.
4
Airplanes that have accomplished the Original Issue, Revision 1 and
Revision 2 of this service bulletin.
5
747-400 Airplanes that were previously in Group 2 or Group 7 at
Revision 1 of this service bulletin, are Boeing Converted Freighters
(BCFs) and have E1/E2 WIU covers without foam installed in
production.
-15
Airplanes that have not accomplished the Original Issue, Revision 1
or Revision 2 of this service bulletin.
1
Airplanes that have accomplished the Original Issue but not Revision
1 or Revision 2 of this service bulletin.
2
Airplanes that have accomplished Revision 1 but not Revision 2 of
this service bulletin.
3
Airplanes that have accomplished Revision 2 of this service bulletin.4
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 19, 2010
747-25-3381Revision 3: February 19, 2021
26 of 213
BOEING SERVICE BULLETIN 747-25-3381

### Page 27

DESCRIPTIONCONFIGURATIONGROUP
747-400, -400D Passenger Airplanes that were previously in Group
8 at the Original Issue or Revision 1 of this service bulletin, are
included in service bulletin 747-21-2347 and have E1/E2 WIU covers
without foam installed in production.
-16
Airplanes that have not accomplished the Original Issue, Revision 1
or Revision 2 of this service bulletin and have not accomplished
service bulletin 747-21-2347.
1
Airplanes that have not accomplished the Original Issue, Revision 1
or Revision 2 of this service bulletin but have accomplished service
bulletin 747-21-2347.
2
Airplanes that have accomplished the Original Issue but not Revision
1 or Revision 2 of this service bulletin.
3
Airplanes that have accomplished Revision 1 but not Revision 2 of
this service bulletin.
4
Airplanes that have accomplished Revision 2 but have not
accomplished the Original Issue or Revision 1 of this service bulletin.
5
Airplanes that have accomplished Revision 2 and have accomplished
the Original Issue or Revision 1 of this service bulletin.
6
747-400 Combi Airplanes that were previously in Group 9 at Revision
1 of this service bulletin, are included in service bulletin 747-21-2347
and have E1/E2 WIU covers without foam installed in production.
-17
Airplanes that have not accomplished the Original Issue, Revision 1
or Revision 2 of this service bulletin and have not accomplished
service bulletin 747-21-2347.
1
Airplanes that have not accomplished the Original Issue, Revision 1
or Revision 2 of this service bulletin but have accomplished service
bulletin 747-21-2347.
2
Airplanes that have accomplished the Original Issue but not Revision
1 or Revision 2 of this service bulletin.
3
Airplanes that have accomplished Revision 1 but not Revision 2 of
this service bulletin.
4
Airplanes that have accomplished Revision 2 but have not
accomplished the Original Issue or Revision 1 of this service bulletin.
5
Airplanes that have accomplished Revision 2 and have accomplished
the Original Issue or Revision 1 of this service bulletin.
6
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 19, 2010
747-25-3381Revision 3: February 19, 2021
27 of 213
BOEING SERVICE BULLETIN 747-25-3381

### Page 28

DESCRIPTIONCONFIGURATIONGROUP
747-400 Airplanes that are Boeing Converted Freighters, and were
previously in Group 7 at Revision 2 of this service bulletin.
-18
Airplanes that have not accomplished the Original Issue, Revision 1
or Revision 2 of this service bulletin.
1
Airplanes that have accomplished the Original Issue but not Revision
1 or Revision 2 of this service bulletin.
2
Airplanes that have accomplished Revision 1 but not Revision 2 of
this service bulletin.
3
Airplanes that have accomplished Revision 2 of this service bulletin.4
747-400, -400D Airplanes that were previously in Group 16 at
Revision 2 of this service bulletin, are included in service bulletin
747-21-2347, are Boeing Converted Freighters (BCFs) and have
E1/E2 WIU covers without installed in production.
-19
Airplanes that have not accomplished the Original Issue of this service
bulletin and have not accomplished service bulletin 747-21-2347.
1
Airplanes that have not accomplished the Original Issue of this service
bulletin but have accomplished service bulletin 747-21-2347.
2
Airplanes that have accomplished the Original Issue but not Revision
1 or Revision 2 of this service bulletin.
3
Airplanes that have accomplished Revision 1 but not Revision 2 of
this service bulletin.
4
Airplanes that have accomplished Revision 2 of this service bulletin.5
Airplane Models:
747-100, 747-100B, 747-100B SUD, 747-200B, 747-200F, 747-300, 747-400, 747-400D, 747-400F,
747SP, 747SR
GroupVariable Number
5RA015
4RA016
5RA026
5RA028 - RA030
5RA033
5RA101 - RA103
GroupVariable Number
4RA106
5RA111 - RA112
5RA161 - RA163
4RA217
4RA245 - RA246
4RA266
GroupVariable Number
4RA301 - RA308
4RA310
4RA312 - RA317
4RA370 - RA373
5RA401 - RA405
5RA524
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 19, 2010
747-25-3381Revision 3: February 19, 2021
28 of 213
BOEING SERVICE BULLETIN 747-25-3381

### Page 29

GroupVariable Number
4RA526 - RA528
4RA532 - RA535
4RA537
4RA539 - RA541
4RA543 - RA548
4RA560
5RA631 - RA635
4RA651
4RA671 - RA675
4RA677
4RA722 - RA724
4RA728 - RA731
4RA742 - RA745
4RA749 - RA750
5RA784
5RA901 - RA902
4RA903
4RA906 - RA908
5RA910 - RA916
4RB001
4RB004 - RB008
4RB010 - RB011
4RB013 - RB016
5RB041
5RB043
4RB102
4RB411
5RB412
4RB601
5RB604 - RB605
5RB607
4RB681 - RB685
4RB687
GroupVariable Number
4RB691 - RB695
5RB696
4RB697
4RB711
4RB722 - RB723
4RB741 - RB746
4RB748
4RD001 - RD004
5RD041 - RD044
4RD045 - RD047
4RD053
5RD055
4RD056 - RD057
4RD072
5RD082 - RD083
4RD101 - RD104
4RD121 - RD127
4RD131 - RD132
4RD134 - RD138
4RD140 - RD141
5RD142
4RD143
5RD144
4RD166 - RD167
4RD171 - RD172
4RD181 - RD182
4RD201 - RD204
4RD221 - RD224
5RD225
4RD226
5RD227
4RD231 - RD232
5RD233 - RD235
GroupVariable Number
4RD241 - RD243
4RD251 - RD262
4RD271 - RD272
4RD291 - RD292
5RD301 - RD302
4RD311
4RD352 - RD357
5RD358
5RD361 - RD366
5RD381 - RD383
5RD411 - RD412
4RD413
5RD414
4RD421 - RD424
4RD431 - RD432
5RD433 - RD434
4RD435
5RD441 - RD442
4RD451 - RD456
5RD461
4RD471 - RD475
4RD513
4RD516
4RD531
5RD551
4RD561
5RD581 - RD583
5RD601 - RD607
4RD621
5RD622 - RD623
5RD641 - RD643
5RD646
4RD649
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 19, 2010
747-25-3381Revision 3: February 19, 2021
29 of 213
BOEING SERVICE BULLETIN 747-25-3381

### Page 30

GroupVariable Number
4RD651 - RD655
4RD657
4RD661
4RD671
4RD681 - RD682
5RD691
4RD701 - RD702
5RD721 - RD722
5RD752
4RD775
4RD791 - RD792
2RF001 - RF006
4RG008 - RG009
4RG091
4RG095
4RG101 - RG104
4RG122 - RG123
4RG125
4RG141 - RG142
4RG161 - RG164
4RG171 - RG174
4RG191
4RG193
4RG213
4RG221 - RG222
4RH101 - RH102
4RH121 - RH122
1RL401 - RL403
1RL411 - RL428
6RL429
11RL430
1RL431 - RL434
6RL435 - RL436
GroupVariable Number
1RL451 - RL453
6RL454 - RL455
11RL456
1RL461 - RL462
1RL471 - RL472
11RL473 - RL481
6RL491 - RL492
6RL501 - RL502
11RL511 - RL516
11RL521 - RL522
11RL531 - RL534
11RL551
11RL561 - RL568
11RL571 - RL572
11RL576 - RL577
11RL579
11RL581 - RL586
1RL651 - RL655
1RL671 - RL675
1RL681 - RL683
11RL684
1RL751 - RL752
2RM001 - RM007
2RM010 - RM013
2RM021 - RM024
2RM026 - RM030
2RM036 - RM045
2RM051 - RM053
2RM071
2RM081 - RM084
2RM091
2RM096 - RM097
2RM116 - RM117
GroupVariable Number
2RM126 - RM132
2RM136 - RM147
2RM156 - RM158
2RM166 - RM177
2RM191 - RM192
2RM231 - RM233
2RM241 - RM246
2RM261 - RM264
2RM316 - RM318
2RM331 - RM333
2RM341
2RM351 - RM355
2RM366 - RM367
2RM401 - RM403
2RM426
2RM431
2RM441 - RM443
2RM445
2RM801 - RM803
2RM811 - RM813
1RM851 - RM859
1RM861 - RM862
6RM863
1RM871 - RM888
6RM889
11RM890
1RM891 - RM899
1RM901 - RM906
1RM911
5RR221
5RR301
12RR701
1RR721 - RR724
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 19, 2010
747-25-3381Revision 3: February 19, 2021
30 of 213
BOEING SERVICE BULLETIN 747-25-3381

### Page 31

GroupVariable Number
1RR746 - RR748
1RR851 - RR856
1RR861 - RR862
1RR951 - RR952
4RS001 - RS002
4RS211 - RS212
4RS221 - RS222
4RS232 - RS233
4RS235 - RS241
4RS251 - RS259
4RS263
4RS265 - RS268
4RS271 - RS276
4RS292
4RS301 - RS306
4RS311 - RS320
4RS331 - RS333
4RS341 - RS342
4RS699
4RS701 - RS703
4RS711 - RS713
5RS721 - RS722
4RS731 - RS732
5RS741
4RS742
5RS743
4RS751 - RS752
4RS761
5RS762
5RS771
4RS781 - RS782
5RS786
17RT001 - RT009
GroupVariable Number
9RT010 - RT014
17RT021 - RT022
10RT031 - RT033
3RT034 - RT035
17RT041 - RT047
17RT061
10RT071 - RT072
17RT073 - RT074
14RT075
17RT101 - RT103
17RT121
17RT131 - RT133
3RT134 - RT137
3RT151 - RT152
18RT161
7RT162 - RT163
18RT164
7RT165
18RT166
3RT167 - RT168
16RT401 - RT410
2RT411 - RT412
16RT431 - RT441
2RT442 - RT447
16RT451 - RT455
10RT456
16RT457 - RT460
19RT461
16RT462 - RT464
13RT465
2RT466 - RT469
16RT471 - RT490
13RT491 - RT492
GroupVariable Number
16RT493
13RT494 - RT496
2RT497 - RT499
15RT501
13RT502 - RT505
15RT506 - RT510
13RT511 - RT512
15RT513
13RT514 - RT515
15RT516
13RT517
15RT518
18RT519 - RT520
2RT521 - RT523
7RT524
2RT525 - RT527
18RT528
2RT529 - RT530
16RT531 - RT534
13RT535
16RT551 - RT568
16RT571
10RT572 - RT579
16RT580
2RT581 - RT588
2RT590
16RT591
16RT601 - RT618
13RT619 - RT620
2RT621 - RT630
19RT631 - RT632
16RT633
10RT634
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 19, 2010
747-25-3381Revision 3: February 19, 2021
31 of 213
BOEING SERVICE BULLETIN 747-25-3381

### Page 32

GroupVariable Number
2RT636 - RT640
16RT641
19RT642
16RT643 - RT653
19RT654
10RT655
15RT656
18RT657
16RT671 - RT673
16RT681 - RT682
19RT691 - RT692
16RT693 - RT696
2RT697 - RT699
16RT701 - RT704
16RT711 - RT712
16RT714 - RT717
16RT741 - RT742
19RT743
13RT744 - RT745
2RT746 - RT750
10RT751
GroupVariable Number
19RT752
16RT753 - RT754
13RT755
7RT756 - RT757
16RT776 - RT777
10RT781 - RT782
16RT783
2RT784
2RT801 - RT803
2RT811 - RT814
7RT831 - RT832
2RT833 - RT835
8RT837
16RT861 - RT864
19RT876
16RT877 - RT878
2RT879 - RT880
13RT931 - RT932
2RT945 - RT949
16RT951
10RT952
GroupVariable Number
14RT953
3RT954
2RT955
2RT966
18RT967
2RU001 - RU006
2RU016 - RU017
2RU031 - RU032
2RU051 - RU052
2RU059 - RU062
2RU081 - RU083
2RU101 - RU102
2RU121 - RU132
16RU801 - RU806
13RU807 - RU808
2RU809
16RU831 - RU835
13RU836 - RU837
2RU838 - RU841
--
--
2. Spares Affected
None.
B. Concurrent Requirements
None.
C. Reason
This change replaces seals in the cargo compartments and insulation on the pilots overhead panel
that degrade over time and no longer satisfy the requirements for flammability, smoke and halon
retention and fire blocking. If you do not make the change as given in this service bulletin, the degraded
material can be an unacceptable fuel source for a fire if exposed to an ignition source. The degraded
material will also compromise halon and smoke retention and fire blocking, which could result in the
inability to keep sufficient halon concentrations within the cargo compartment.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 19, 2010
747-25-3381Revision 3: February 19, 2021
32 of 213
BOEING SERVICE BULLETIN 747-25-3381

### Page 33

The seals are made of BMS 8-39 urethane foam. BMS 8-39 foam fire retardants are mixed into, but
are not chemically connected with, the remaining components of the foam. This condition will cause
the fire retardants to have decreased effectiveness of fire resistance over time.
Some operators reported the BMS 8-39 urethane foam burned at some areas in service. Boeing found
that the self-extinguishing and physical properties of the BMS 8-39 Urethane foam can degrade after
five to ten years. The degraded material can be an unacceptable fire fuel source for a fire if exposed
to an ignition source. The degraded material will also compromise halon and smoke retention and fire
blocking, which could result in the inability to keep sufficient halon concentrations within the cargo
compartment.
This change replaces BMS 8-39 urethane foam in areas of the airplane where it is not easy to access
for fire and smoke detection or suppression. It is also replaced in areas where it is used to prevent fire
or smoke penetration. It is not replaced in areas where it is encapsulated by a protective fire resistant
barrier or where it is physically isolated from an ignition source. The BMS 8-39 foam is replaced with
either BMS 8-371 insulation foam or BMS 1-68 silicone foam rubber. The selection of either BMS 8-371
or BMS 1-68 material will be based on requirements for use and its location in the airplane.
Boeing Service Related Problem 747-SRP-25-0234 and 747-SRP-25-0403 are related to this service
bulletin.
Boeing Service Bulletin 747-53-2877 and 747-25-3725 are related to this service bulletin.
Boeing Fleet Team Digest (FTD) 747 FTD 53-13010, 747 FTD 25-03005 and 747-400 FTD 25-03009
are related to this service bulletin.
As a part of a service bulletin validation program, this change was completed on airplane RM084 by
Service Bulletin 747-25-3381 Original Issue before the release of Revision 1 of this service bulletin.
The change completed on airplane RM084 by Service Bulletin 747-25-3381 Original Issue is equivalent
to the release of Revision 1 of this service bulletin. Airplane RM084 has the configuration of a Group
2 airplane.
As a part of a service bulletin validation program, this change was completed on airplane RT161 by
Service Bulletin 747-25-3381 Revision 2 before the release of Revision 3 of this service bulletin. The
change completed on airplane RT161 by Service Bulletin 747-25-3381 Revision 2 is equivalent to the
release of Revision 3 of this service bulletin. Airplane RT161 had the configuration of a Group 7 airplane
at Revision 2 of this service bulletin.
Revision 1 was sent to add airplanes RL430, RL456, RL473-RL481, RL511-RL516, RL521-RL522,
RL531-RL534, RL551, RL561-RL568, RL571-RL572, RL576-RL577, RL579, RL581-RL586, RL684
and RM890 to a new Group 11 of this service bulletin effectivity. In addition, Figure 5 was deleted and
the applicability was changed for Figures 7-11. Figures 17 and 18 were added to replace addition foam
on the E1/E2 rack WIU cover assemblies on the E1 / E2 equipment racks and in the flight compartment
for Group 2, Configuration 2 airplanes.
Revision 2 was sent to add airplane RL456 to Group 11 of this service bulletin effectivity and to provide
a new top kit for Group 11 airplanes. Airplane RL456 was accidently missed out of the effectivity in
previous releases of the service bulletin. In addition, Boeing was told by some operators, that some
airplanes had no foam installed in the E1/E2 WIU covers. As a result, Group 10 was updated to not
include installation of foam in the E1/E2 WIU covers and new groups 12-17 were created and airplanes
with this configuration were moved as applicable. For operators that had already installed foam on the
E1/E2 WIU covers in accordance with the original issue or Revision 1 of this service bulletin, it was not
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 19, 2010
747-25-3381Revision 3: February 19, 2021
33 of 213
BOEING SERVICE BULLETIN 747-25-3381

### Page 34

necessary to remove the foam from the covers. Revision 2 also added more work configurations for
airplanes in Groups 1-3 and 6-9 that had accomplished the original issue, but not Revision 1 of the
service bulletin. It was necessary for these airplanes to replace foam on the E1/E2 equipment rack
WIU cover assemblies and the flight compartment moisture seals. This information was not given in
revision 1 of the service bulletin.
Also, Revision 2 added two missing parts, for operators that had received top kit 015U1780-11 at
Revision level A. In Revision 1 of this service bulletin, top kit 015U1780-11 was revised to revision level
B with foam tape part number 015U1780-18, (quantity12) and foam part number 232U1497-85, (quantity
2) being added. For operators that had received top kit 015U1780-11 at Revision level A, but had not
incorporated the service bulletin, it was necessary to order the foam tape and the foam to be able to
accomplish Revision 2 of this service bulletin. These parts were added to the Material Information
section of the service bulletin. There were also reports of foam tape 015U1780-18 received without
adhesive. For operators that had foam tape 015U1780-18 without adhesive, but had not incorporated
this service bulletin, it was necessary to order new foam tape 015U1780-18 that has adhesive to
accomplish this service bulletin.
Revision 3 is sent to add an instruction for airplanes of Groups 13, 14, 16, 17 and 19. An instruction is
also added for Group 11 airplanes as a result of an occurrence of BMS 8-39 foam in the forward cargo
compartment. Revision 3 is also sent to incorporate what was found from the completed validation and
to move airplanes between groups to agree with their configurations of equipment/furnishings related
to the instructions of this service bulletin. Additionally, Revision 3 gives separation of the work in the
forward cargo compartment of this service bulletin from the work in the forward cargo compartment of
Boeing service bulletin 747-25-3725.
D. Description
Group 1, Configuration 1:
1. Replace BMS 8-39 foam seals in the main deck system tube/wire on the left and right sidewalls.
2. Replace BMS 8-39 foam air seals in the main deck on the left and right sidewalls.
3. Replace BMS 8-39 foam strip on the main deck ceiling panel.
4. Replace BMS 8-39 foam seals in the forward and aft cargo compartment system tube/wire.
5. Replace BMS 8-39 foam in the flight compartment overhead electrical equipment panel.
6. Replace BMS 8-39 foam in the flight compartment overhead electrical equipment panel structure.
7. Replace BMS 8-39 foam in the flight compartment overhead dripshield.
8. Remove foam pads from the crown area of the airplane.
9. Replace the flight compartment moisture seal.
10. Replace BMS 8-39 foam seals in the E1/E2 rack Wire Integration Unit (WIU) cover assemblies.
Group 1-3, Configuration 2:
1. Replace BMS 8-39 foam seals in the E1/E2 rack Wire Integration Unit (WIU) cover assemblies.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 19, 2010
747-25-3381Revision 3: February 19, 2021
34 of 213
BOEING SERVICE BULLETIN 747-25-3381

### Page 35

2. Replace the flight compartment moisture seal.
3. Replace BMS 8-39 foam seals in the forward and aft cargo compartment system tube/wire.
Group 1-3, 6-8, Configuration 3; Group 9, Configuration 2-3; Group 10, Configuration 4; Group
12-15, Configuration 3; Group 16-17, Configuration 4; Group 18, Configuration 3; Group 19,
Configuration 4:
1. Replace BMS 8-39 foam seals in the forward and aft cargo compartment system tube/wire.
Group 2-3, 9, Configuration 1:
1. Replace BMS 8-39 foam seals in the forward and aft cargo compartment system tube/wire.
2. Replace BMS 8-39 foam in the flight compartment overhead electrical equipment panel.
3. Replace BMS 8-39 foam in the flight compartment overhead electrical equipment panel structure.
4. Replace BMS 8-39 foam in the flight compartment overhead dripshield.
5. Replace the flight compartment moisture seal.
6. Replace BMS 8-39 foam seals in the E1/E2 rack WIU cover assemblies.
7. Replace BMS 8-39 foam in the main deck air baffle on left and right sidewalls.
8. Remove foam pads from the crown area of the airplane.
Group 4-5, Configuration 1:
1. Replace BMS 8-39 foam in the main deck air baffle on left and right sidewalls.
Group 6, Configuration 1:
1. Replace BMS 8-39 foam in the main deck air baffle on left and right sidewalls.
2. Replace BMS 8-39 foam seals in the main deck system tube/wire on the left and right sidewalls.
3. Replace BMS 8-39 foam strip in main deck ceiling panel.
4. Replace BMS 8-39 foam seals in the forward and aft cargo compartment system tube/wire.
5. Remove foam pads from the crown area of the airplane.
6. Replace the flight compartment moisture seal.
7. Replace foam seals in the E1/E2 rack WIU cover assemblies.
Group 6-9, 18, Configuration 2:
1. Replace foam seals in the E1/E2 rack WIU cover assemblies.
2. Replace the flight compartment moisture seal.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 19, 2010
747-25-3381Revision 3: February 19, 2021
35 of 213
BOEING SERVICE BULLETIN 747-25-3381

### Page 36

3. Replace BMS 8-39 foam seals in the forward and aft cargo compartment system tube/wire.
Group 7, Configuration 1:
1. Replace BMS 8-39 foam air seals in main deck on the left and right sidewalls.
2. Replace BMS 8-39 foam seals in the forward and aft cargo compartment system tube/wire.
3. Replace BMS 8-39 foam in the flight compartment overhead electrical equipment panel.
4. Replace BMS 8-39 foam in the flight compartment overhead electrical equipment panel structure.
5. Replace BMS 8-39 foam in the flight compartment overhead dripshield.
6. Replace the flight compartment moisture seal.
7. Replace foam seals in the E1/E2 rack WIU cover assemblies.
Group 8, 18, Configuration 1:
1. Replace BMS 8-39 foam seals in the forward and aft cargo compartment system tube/wire.
2. Replace BMS 8-39 foam in the flight compartment overhead electrical equipment panel.
3. Replace BMS 8-39 foam in the flight compartment overhead electrical equipment panel structure.
4. Replace BMS 8-39 foam in the flight compartment overhead dripshield.
5. Remove foam pads from the crown area of the airplane.
6. Replace the flight compartment moisture seal.
7. Replace foam seals in the E1/E2 rack WIU cover assemblies.
Group 10, Configuration 1:
1. Replace BMS 8-39 foam in the main deck air baffle on left and right sidewalls.
2. Replace BMS 8-39 foam seals in the forward and aft cargo compartment system tube/wire.
3. Replace BMS 8-39 foam in the flight compartment overhead electrical equipment panel.
4. Replace BMS 8-39 foam in the flight compartment overhead dripshield.
5. Remove foam pads from the crown area of the airplane.
6. Replace the flight compartment moisture seals.
Group 10, Configuration 2:
1. Replace BMS 8-39 foam air seals in main deck on the left and right sidewalls.
2. Replace BMS 8-39 foam seals in the forward and aft cargo compartment system tube/wire.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 19, 2010
747-25-3381Revision 3: February 19, 2021
36 of 213
BOEING SERVICE BULLETIN 747-25-3381

### Page 37

3. Replace BMS 8-39 foam in the flight compartment overhead electrical equipment panel.
4. Replace BMS 8-39 foam in the flight compartment overhead electrical equipment panel structure.
5. Replace BMS 8-39 foam in the flight compartment overhead dripshield.
6. Remove foam pads from the crown area of the airplane.
7. Replace the flight compartment moisture seal.
Group 10, Configuration 3; Group 12-15, Configuration 2; Group 16-17, 19, Configuration 3:
1. Replace the flight compartment moisture seal.
2. Replace BMS 8-39 foam seals in the forward and aft cargo compartment system tube/wire.
Group 11, Configuration 1:
1. Replace BMS 8-39 foam in the flight compartment overhead electrical equipment panel structure.
2. Remove foam pads from the crown area of the airplane.
3. Replace the flight compartment moisture seal.
4. Replace foam seals in the E1/E2 rack WIU cover assemblies.
5. Replace forward cargo compartment system tube/wire foam seal.
Group 12, 15, Configuration 1:
1. Replace BMS 8-39 foam air seals in main deck on the left and right sidewalls.
2. Replace BMS 8-39 foam seals in the forward and aft cargo compartment system tube/wire.
3. Replace BMS 8-39 foam in the flight compartment overhead electrical equipment panel.
4. Replace BMS 8-39 foam in the flight compartment overhead electrical equipment panel structure.
5. Replace BMS 8-39 foam in the flight compartment overhead dripshield.
6. Remove foam pads from the crown area of the airplane.
7. Replace the flight compartment moisture seal.
Group 16-17, 19, Configuration 2:
1. Replace BMS 8-39 foam seals in the forward and aft cargo compartment system tube/wire.
2. Replace BMS 8-39 foam in the flight compartment overhead electrical equipment panel.
3. Replace BMS 8-39 foam in the flight compartment overhead electrical equipment panel structure.
4. Replace BMS 8-39 foam in the flight compartment overhead dripshield.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 19, 2010
747-25-3381Revision 3: February 19, 2021
37 of 213
BOEING SERVICE BULLETIN 747-25-3381

### Page 38

5. Replace the flight compartment moisture seal.
6. Replace BMS 8-39 foam in the main deck air baffle on left and right sidewalls.
7. Remove foam pads from the crown area of the airplane.
Group 11, Configuration 2; Group 13-14, Configuration 4; Group 16-17, 19, Configuration 5:
1. Replace forward cargo compartment system tube/wire foam seal.
Group 13-14, 16-17, 19, Configuration 1:
1. Replace BMS 8-39 foam seals in the forward and aft cargo compartment system tube/wire.
2. Replace BMS 8-39 foam in the flight compartment overhead electrical equipment panel.
3. Replace BMS 8-39 foam in the flight compartment overhead dripshield.
4. Replace the flight compartment moisture seal.
5. Replace BMS 8-39 foam in the main deck air baffle on left and right sidewalls.
6. Remove foam pads from the crown area of the airplane.
Group 1-3, Configuration 4; Group 4-5, Configuration 2; Group 6-9, Configuration 4; Group 10,
Configuration 5; Group 12, Configuration 4; Group 13-14, Configuration 5; Group 15,
Configuration 4; Group 16-17, Configuration 6; Group 18, Configuration 4:
1. No more work is required.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 19, 2010
747-25-3381Revision 3: February 19, 2021
38 of 213
BOEING SERVICE BULLETIN 747-25-3381

### Page 39

Effects of Revision 3 on airplanes on which the Original Issue, Revision 1 and Revision 2 of this service
bulletin was previously done:
ActionConditionGroup
None.Airplanes that have re-
placed and removed BMS
8-39 foam.
Group 1-3, 6-9, 12, 15, 18,
Configuration 4; Group 10, 13-
14, Configuration 5; Group 16-
17, Configuration 6
None.Airplanes that have re-
placed BMS 8-39 foam.
Group 4-5, Configuration 2
Replace forward cargo compartment system
tube/wire foam seals in accordance with FIGURE
19.
Airplanes that have re-
placed and removed BMS
8-39 foam.
Group 11, Configuration 2
Replace the forward cargo compartment system
tube/wire foam seals in accordance with FIGURE
7.
Airplanes that have re-
placed and removed BMS
8-39 foam in accordance
with the instructions of Re-
vision 2 of this service bul-
letin only, which did not in-
clude the replacement of
system tube/wire foam
seals in the forward cargo
compartment.
Group 13-14, Configuration 4;
Group 16-17, 19, Configura-
tion 5
The work in this service bulletin is done in the maintenance zone(s) given below.
Group 1:
Affected Maintenance Zones
ZoneModel
117, 118, 121, 122, 123, 124, 125, 126, 127,
128, 141, 142, 143, 144, 145, 146, 147, 148,
211, 212, 221, 222, 223, 224, 231, 232, 233,
234, 241, 242, 243, 244, 251, 252, 253, 254,
261, 262, 263, 264, 271, 272, 273, 274
747-400F
Group 2:
Affected Maintenance Zones
ZoneModel
117, 118, 121, 122, 123, 124, 125, 126, 127,
128, 141, 142, 143, 144, 145, 146, 147, 148,
211, 212, 221, 222, 223, 224, 225, 226, 231,
232, 233, 234, 241, 242, 243, 244, 251, 252,
253, 254, 261, 262, 263, 264, 271, 272, 273, 274
747-400, 747-400D
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 19, 2010
747-25-3381Revision 3: February 19, 2021
39 of 213
BOEING SERVICE BULLETIN 747-25-3381

### Page 40

Group 3:
Affected Maintenance Zones
ZoneModel
117, 118, 121, 122, 123, 124, 125, 126, 127,
128, 141, 142, 143, 144, 145, 146, 147, 148,
211, 212, 221, 222, 223, 224, 225, 226, 231,
232, 233, 234, 241, 242, 243, 244, 251, 252,
253, 254, 261, 262, 263, 264, 271, 272, 273, 274
747-400
Group 4:
Affected Maintenance Zones
ZoneModel
211, 212, 231, 232, 241, 242, 251, 252, 261,
262, 271, 272
747-100, 747-100B, 747-100B
SUD, 747-200B, 747-300,
747SP, 747SR
Group 5:
Affected Maintenance Zones
ZoneModel
211, 212, 231, 232, 241, 242, 251, 252, 261,
262, 271, 272
747-100, 747-200B, 747-200F,
747-300, 747SR
Group 6:
Affected Maintenance Zones
ZoneModel
117, 118, 211, 212, 223, 224, 231, 232, 233,
234, 241, 242, 243, 244, 251, 252, 253, 254,
261, 262, 263, 264, 271, 272, 273, 274
747-400F
Group 7-9:
Affected Maintenance Zones
ZoneModel
117, 118, 121, 122, 123, 124, 125, 126, 127,
128, 141, 142, 143, 144, 145, 146, 147, 148,
211, 212, 221, 222, 223, 224, 225, 226, 231,
232, 241, 242, 243, 244, 251, 252, 253, 254,
261, 262, 263, 264, 272, 273, 274
747-400
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 19, 2010
747-25-3381Revision 3: February 19, 2021
40 of 213
BOEING SERVICE BULLETIN 747-25-3381

### Page 41

Group 10, 14-15, 17, 19:
Affected Maintenance Zones
ZoneModel
121, 122, 123, 124, 125, 126, 127, 128, 141,
142, 143, 144, 145, 146, 147, 148, 211, 212,
221, 222, 223, 224, 225, 226, 231, 232, 241,
242, 243, 244, 251, 252, 253, 254, 261, 262,
263, 264, 272, 273, 274
747-400
Group 11:
Affected Maintenance Zones
ZoneModel
117, 118, 121, 122, 141, 142, 221, 222, 223,
224, 233, 234, 243, 244, 253, 254, 263, 264,
273, 274
747-400F
Group 12:
Affected Maintenance Zones
ZoneModel
121, 122, 123, 124, 125, 126, 127, 128, 141,
142, 143, 144, 145, 146, 147, 148, 211, 212,
221, 222, 223, 224, 231, 232, 233, 234, 241,
242, 243, 244, 251, 252, 253, 254, 261, 262,
263, 264, 271, 272, 273, 274
747-400F
Group 13, 16:
Affected Maintenance Zones
ZoneModel
121, 122, 123, 124, 125, 126, 127, 128, 141,
142, 143, 144, 145, 146, 147, 148, 211, 212,
221, 222, 223, 224, 225, 226, 231, 232, 241,
242, 243, 244, 251, 252, 253, 254, 261, 262,
263, 264, 271, 272, 273, 274
747-400, 747-400D
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 19, 2010
747-25-3381Revision 3: February 19, 2021
41 of 213
BOEING SERVICE BULLETIN 747-25-3381

### Page 42

Group 18:
Affected Maintenance Zones
ZoneModel
117, 118, 121, 122, 123, 124, 125, 126, 127,
128, 221, 222, 223, 224, 225, 226, 231, 232,
241, 242, 243, 244, 251, 252, 253, 254, 261,
262, 263, 264, 271, 272, 273, 274
747-400
E. Compliance
Federal Aviation Administration (FAA) Airworthiness Directive AD 2013-11-04 is related to this service
bulletin. The effective date of AD 2013-11-04 is July 09, 2013.
The FAA will possibly release an additional Airworthiness Directive related to this service bulletin. The
Airworthiness Directive will make the compliance tasks and times given in this service bulletin mandatory.
Group 1, Configuration 1-3; Group 2, Configuration 1-3; Group 3, Configuration 1-3; Group 4-6,
Configuration 1; Group 6, Configuration 2-3; Group 7, Configuration 1-3; Group 8, Configuration
1-3; Group 9, Configuration 1-3; Group 10, Configuration 1-4; Group 11-12, Configuration 1;
Group 12, Configuration 2-3; Group 13, Configuration 1-3; Group 14, Configuration 1-3; Group
15, Configuration 1-3; Group 16, Configuration 1-4; Group 17, Configuration 1-4; Group 18,
Configuration 1-3; Group 19, Configuration 1-4:
Boeing recommends that the change given in this service bulletin be done within 72 months after the
Original Issue date of this service bulletin.
Group 11, Configuration 2; Group 13-14, Configuration 4; Group 16-17, 19, Configuration 5:
Boeing recommends that the work for the forward cargo compartment given in this service bulletin be
done within 72 months after the Revision 3 date of this service bulletin.
F. Approval
This service bulletin was examined by the Federal Aviation Administration (FAA). The changes specified
in this service bulletin comply with the applicable regulations and are FAA approved, as well as European
Union Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/JAA
approved airplanes listed in the service bulletin effectivity. This service bulletin and its approval were
based on the airplane in its original Boeing delivery configuration or as modified by other approved
Boeing changes.
The Manager of the FAA Seattle ACO Branch approves the accomplishment of the changes defined
in Compliance, Accomplishment Instructions and APPENDIX A of this service bulletin revision as an
Alternative Method of Compliance (AMOC) to accomplishing the requirements of paragraph (g)(1) of
AD 2013-11-04. All provisions of AD 2013-11-04 that are not specifically referenced in the above
statement remain fully applicable and must be complied with accordingly.
If an airplane has a non-Boeing modification or repair that affects a component or system also affected
by this service bulletin, the operator is responsible for obtaining appropriate regulatory agency approval
before incorporating this service bulletin.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 19, 2010
747-25-3381Revision 3: February 19, 2021
42 of 213
BOEING SERVICE BULLETIN 747-25-3381

### Page 43

G. Manpower
The table(s) below show(s) an estimate of the task-hours necessary to do this change for each airplane.
This estimate is for direct labor only, done by an experienced crew. Adjust the estimate with operator
task-hour data if necessary. The estimate does not include lost time. These are some examples of lost
time:
— Time to adjust to the workplace
— Time to schedule the work
— Time to examine the work
— Time to cure the materials
— Time to make the parts
— Time to find the tools.
Group 1, Configuration 1:
Elapsed HoursTask-HoursNumber of
Persons
Task
4.2517.004FIGURE 1
4.25 (a)34.00 (a)8FIGURE 2
3.7515.004FIGURE 3
1.001.001FIGURE 4
4.25 (a)34.00 (a)8FIGURE 6
4.00 (b)32.00 (b)8FIGURE 7
4.00 (b)32.00 (b)8FIGURE 8
6.0012.002FIGURE 9
1.753.502FIGURE 10
3.253.251FIGURE 11
0.25 (c)(d)0.25 (c)1FIGURE 16
3.256.502FIGURE 18
4.2534.008FIGURE 17
44.25224.50TOTAL FOR EACH AIRPLANE
(a) This manpower is for an average number of 44 locations on an airplane. Add or reduce
the manpower when a different number are found by the inspection given in the figure.
(b) This manpower is for an average number of 42 locations on an airplane. Add or reduce
the manpower when a different number are found by the inspection given in the figure.
(c) The estimate given is for an average to remove and repair blanket at one location and
does not include time to access or inspect. Operators should multiply the number of lo-
cations found during the inspection by the estimate and add that to the total estimate
given to arrive at a revised total for each airplane.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 19, 2010
747-25-3381Revision 3: February 19, 2021
43 of 213
BOEING SERVICE BULLETIN 747-25-3381

### Page 44

Group 1, Configuration 1:
Elapsed HoursTask-HoursNumber of
Persons
Task
(d) As an example, for access to the crown area of the airplane, the time to remove and
install ceiling panels or linings from Body Station (STA) 140 to STA 2360 is estimated
to take up to 65 hours. Adjust the total elapsed time by the number of crew applied to
the task, and the number of ceiling panels or linings necessary for removal.
Group 7, Configuration 1:
Elapsed HoursTask-HoursNumber of
Persons
Task
4.2517.004FIGURE 1
3.7515.004FIGURE 3
4.00 (a)32.00(a)8FIGURE 7
4.00 (a)32.00(a)8FIGURE 8
6.0012.002FIGURE 9
1.753.502FIGURE 10
3.253.251FIGURE 11
0.25 (b)(c)0.25 (b)1FIGURE 16
3.256.502FIGURE 18
4.2534.008FIGURE 17
34.75155.50TOTAL FOR EACH AIRPLANE
(a) This manpower is for an average number of 42 locations on an airplane. Add or reduce
the manpower when a different number are found by the inspection given in the figure.
(b) The estimate given is for an average to remove and repair blanket at one location and
does not include time to access or inspect. Operators should multiply the number of lo-
cations found during the inspection by the estimate and add that to the total estimate
given to arrive at a revised total for each airplane.
(c) As an example, for access to the crown area of the airplane, the time to remove and
install ceiling panels or linings from Body Station (STA) 140 to STA 2360 is estimated
to take up to 65 hours. Adjust the total elapsed time by the number of crew applied to
the task, and the number of ceiling panels or linings necessary for removal.
Group 8, 18, Configuration 1:
Elapsed HoursTask-HoursNumber of
Persons
Task
4.00 (a)32.00(a)8FIGURE 7
4.00 (a)32.00(a)8FIGURE 8
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 19, 2010
747-25-3381Revision 3: February 19, 2021
44 of 213
BOEING SERVICE BULLETIN 747-25-3381

### Page 45

Group 8, 18, Configuration 1:
Elapsed HoursTask-HoursNumber of
Persons
Task
6.0012.002FIGURE 9
1.753.502FIGURE 10
3.253.251FIGURE 11
0.25 (b)(c)0.25 (b)1FIGURE 16
3.256.502FIGURE 18
4.2534.008FIGURE 17
26.75123.50TOTAL FOR EACH AIRPLANE
(a) This manpower is for an average number of 42 locations on an airplane. Add or reduce
the manpower when a different number are found by the inspection given in the figure.
(b) The estimate given is for an average to remove and repair blanket at one location and
does not include time to access or inspect. Operators should multiply the number of lo-
cations found during the inspection by the estimate and add that to the total estimate
given to arrive at a revised total for each airplane.
(c) As an example, for access to the crown area of the airplane, the time to remove and
install ceiling panels or linings from Body Station (STA) 140 to STA 2360 is estimated
to take up to 65 hours. Adjust the total elapsed time by the number of crew applied to
the task, and the number of ceiling panels or linings necessary for removal.
Group 1-3, 6-9, 18, Configuration 2:
Elapsed HoursTask-HoursNumber of PersonsTask
3.256.502FIGURE 18
4.2534.008FIGURE 17
7.5040.50TOTAL FOR EACH AIRPLANE
Group 2-3, 9, Configuration 1:
Elapsed HoursTask-HoursNumber of
Persons
Task
4.00 (a)32.00 (a)8FIGURE 7
4.00 (a)32.00 (a)8FIGURE 8
6.0012.002FIGURE 9
1.753.502FIGURE 10
3.253.252FIGURE 11
3.256.502FIGURE 18
4.2534.008FIGURE 17
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 19, 2010
747-25-3381Revision 3: February 19, 2021
45 of 213
BOEING SERVICE BULLETIN 747-25-3381

### Page 46

Group 2-3, 9, Configuration 1:
Elapsed HoursTask-HoursNumber of
Persons
Task
11.00 (b)88.00 (b)8FIGURE 12
27.50 (b)220.00 (b)8FIGURE 13
0.25 (c)(d)0.25 (c)1FIGURE 16
65.25431.50TOTAL FOR EACH AIRPLANE
(a) This manpower is for an average number of 42 locations on an airplane. Add or reduce
the manpower when a different number are found by the inspection given in the figure.
(b) This manpower is for an average number of 176 locations on an airplane. Add or reduce
the manpower when a different number are found by the inspection given in the figure.
(c) The estimate given is for an average to remove and repair blanket at one location and
does not include time to access or inspect. Operators should multiply the number of lo-
cations found during the inspection by the estimate and add that to the total estimate
given to arrive at a revised total for each airplane.
(d) As an example, for access to the crown area of the airplane, the time to remove and
install ceiling panels or linings from Body Station (STA) 140 to STA 2360 is estimated
to take up to 65 hours. Adjust the total elapsed time by the number of crew applied to
the task, and the number of ceiling panels or linings necessary for removal.
Group 16-17, 19, Configuration 2:
Elapsed HoursTask-HoursNumber of
Persons
Task
4.00 (a)32.00 (a)8FIGURE 7
4.00 (a)32.00 (a)8FIGURE 8
6.0012.002FIGURE 9
1.753.502FIGURE 10
3.253.252FIGURE 11
3.256.502FIGURE 18
11.00 (b)88.00 (b)8FIGURE 12
27.50 (b)220.00 (b)8FIGURE 13
0.25 (c)(d)0.25 (c)1FIGURE 16
61.00397.50TOTAL FOR EACH AIRPLANE
(a) This manpower is for an average number of 42 locations on an airplane. Add or reduce
the manpower when a different number are found by the inspection given in the figure.
(b) This manpower is for an average number of 176 locations on an airplane. Add or reduce
the manpower when a different number are found by the inspection given in the figure.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 19, 2010
747-25-3381Revision 3: February 19, 2021
46 of 213
BOEING SERVICE BULLETIN 747-25-3381

### Page 47

Group 16-17, 19, Configuration 2:
Elapsed HoursTask-HoursNumber of
Persons
Task
(c) The estimate given is for an average to remove and repair blanket at one location and
does not include time to access or inspect. Operators should multiply the number of lo-
cations found during the inspection by the estimate and add that to the total estimate
given to arrive at a revised total for each airplane.
(d) As an example, for access to the crown area of the airplane, the time to remove and
install ceiling panels or linings from Body Station (STA) 140 to STA 2360 is estimated
to take up to 65 hours. Adjust the total elapsed time by the number of crew applied to
the task, and the number of ceiling panels or linings necessary for removal.
Group 4-5, Configuration 1:
Elapsed HoursTask-HoursNumber of PersonsTask
---Open Access
11.088.08FIGURE 14
27.5 (a)220.0 (a)8FIGURE 15
---Close Access
38.5308.0TOTAL FOR EACH AIRPLANE
(a) This manpower is for an average number of 176 locations on an airplane. Add or reduce
the manpower when a different number are found by the inspection given in the figure.
Group 6, Configuration 1:
Elapsed HoursTask-HoursNumber of
Persons
Task
4.2517.004FIGURE 1
4.25 (a)34.00 (a)8FIGURE 2
3.7515.004FIGURE 3
1.001.001FIGURE 4
4.25 (a)34.00 (a)8FIGURE 6
4.00 (b)32.00 (b)8FIGURE 7
4.00 (b)32.00 (b)8FIGURE 8
0.25 (c)(d)0.25 (c)1FIGURE 16
3.256.502FIGURE 18
4.2534.008FIGURE 17
33.25205.75TOTAL FOR EACH AIRPLANE
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 19, 2010
747-25-3381Revision 3: February 19, 2021
47 of 213
BOEING SERVICE BULLETIN 747-25-3381

### Page 48

Group 6, Configuration 1:
Elapsed HoursTask-HoursNumber of
Persons
Task
(a) This manpower is for an average number of 44 locations on an airplane. Add or reduce
the manpower when a different number are found by the inspection given in the figure.
(b) This manpower is for an average number of 42 locations on an airplane. Add or reduce
the manpower when a different number are found by the inspection given in the figure.
(c) The estimate given is for an average to remove and repair blanket at one location and
does not include time to access or inspect. Operators should multiply the number of lo-
cations found during the inspection by the estimate and add that to the total estimate
given to arrive at a revised total for each airplane.
(d) As an example, for access to the crown area of the airplane, the time to remove and
install ceiling panels or linings from Body Station (STA) 140 to STA 2360 is estimated
to take up to 65 hours. Adjust the total elapsed time by the number of crew applied to
the task, and the number of ceiling panels or linings necessary for removal.
Group 13-14, 16-17, 19, Configuration 1:
Elapsed HoursTask-HoursNumber of
Persons
Task
4.00 (a)32.00 (a)8FIGURE 7
4.00 (a)32.00 (a)8FIGURE 8
6.0012.002FIGURE 9
3.253.251FIGURE 11
3.256.502FIGURE 18
11.00 (b)88.00 (b)8FIGURE 12
27.50 (b)220.00 (b)8FIGURE 13
0.25 (c)(d)0.25 (c)1FIGURE 16
59.25394.00TOTAL FOR EACH AIRPLANE
(a) This manpower is for an average number of 42 locations on an airplane. Add or reduce
the manpower when a different number are found by the inspection given in the figure.
(b) This manpower is for an average number of 176 locations on an airplane. Add or reduce
the manpower when a different number are found by the inspection given in the figure.
(c) The estimate given is for an average to remove and repair blanket at one location and
does not include time to access or inspect. Operators should multiply the number of lo-
cations found during the inspection by the estimate and add that to the total estimate
given to arrive at a revised total for each airplane.
(d) As an example, for access to the crown area of the airplane, the time to remove and
install ceiling panels or linings from Body Station (STA) 140 to STA 2360 is estimated
to take up to 65 hours. Adjust the total elapsed time by the number of crew applied to
the task, and the number of ceiling panels or linings necessary for removal.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 19, 2010
747-25-3381Revision 3: February 19, 2021
48 of 213
BOEING SERVICE BULLETIN 747-25-3381

### Page 49

Group 10, Configuration 1:
Elapsed HoursTask-HoursNumber of PersonsTask
4.2517.004FIGURE 1
3.7515.004FIGURE 3
4.00 (a)32.00 (a)8FIGURE 7
4.00 (a)32.00 (a)8FIGURE 8
6.0012.002FIGURE 9
3.253.251FIGURE 11
0.25 (b)(c)0.25 (b)1FIGURE 16
3.256.502FIGURE 18
28.75118.00TOTAL FOR EACH AIRPLANE
(a) This manpower is for an average number of 42 locations on an airplane. Add or reduce
the manpower when a different number are found by the inspection given in the figure.
(b) The estimate given is for an average to remove and repair blanket at one location and
does not include time to access or inspect. Operators should multiply the number of lo-
cations found during the inspection by the estimate and add that to the total estimate
given to arrive at a revised total for each airplane.
(c) As an example, for access to the crown area of the airplane, the time to remove and
install ceiling panels or linings from Body Station (STA) 140 to STA 2360 is estimated
to take up to 65 hours. Adjust the total elapsed time by the number of crew applied to
the task, and the number of ceiling panels or linings necessary for removal.
Group 10, Configuration 2; Group 12, 15, Configuration 1:
Elapsed HoursTask-HoursNumber of
Persons
Task
4.2517.004FIGURE 1
3.7515.004FIGURE 3
4.00 (a)32.00(a)8FIGURE 7
4.00 (a)32.00(a)8FIGURE 8
6.0012.002FIGURE 9
1.753.502FIGURE 10
3.253.251FIGURE 11
0.25 (b)(c)0.25(b)1FIGURE 16
3.256.502FIGURE 18
30.50121.50TOTAL FOR EACH AIRPLANE
(a) This manpower is for an average number of 42 locations on an airplane. Add or reduce
the manpower when a different number are found by the inspection given in the figure.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 19, 2010
747-25-3381Revision 3: February 19, 2021
49 of 213
BOEING SERVICE BULLETIN 747-25-3381

### Page 50

Group 10, Configuration 2; Group 12, 15, Configuration 1:
Elapsed HoursTask-HoursNumber of
Persons
Task
(b) The estimate given is for an average to remove and repair blanket at one location and
does not include time to access or inspect. Operators should multiply the number of lo-
cations found during the inspection by the estimate and add that to the total estimate
given to arrive at a revised total for each airplane.
(c) As an example, for access to the crown area of the airplane, the time to remove and
install ceiling panels or linings from Body Station (STA) 140 to STA 2360 is estimated
to take up to 65 hours. Adjust the total elapsed time by the number of crew applied to
the task, and the number of ceiling panels or linings necessary for removal.
Group 10, Configuration 3; Group 12-15, Configuration 2; Group 16-17, 19, Configuration 3:
Elapsed HoursTask-HoursNumber of PersonsTask
3.256.502FIGURE 18
3.256.50TOTAL FOR EACH AIRPLANE
Group 11, Configuration 1:
Elapsed HoursTask-HoursNumber of
Persons
Task
1.753.502FIGURE 10
0.25 (a)(b)0.25 (a)1FIGURE 16
3.256.502FIGURE 18
4.2534.008FIGURE 17
4.00 (c)32.00 (c)8FIGURE 19
13.5076.25TOTAL FOR EACH AIRPLANE
(a) The estimate given is for an average to remove and repair blanket at one location and
does not include time to access or inspect. Operators should multiply the number of lo-
cations found during the inspection by the estimate and add that to the total estimate
given to arrive at a revised total for each airplane.
(b) As an example, for access to the crown area of the airplane, the time to remove and
install ceiling panels or linings from Body Station (STA) 140 to STA 2360 is estimated
to take up to 65 hours. Adjust the total elapsed time by the number of crew applied to
the task, and the number of ceiling panels or linings necessary for removal.
(c) This manpower is for an average number of 42 locations on an airplane. Add or reduce
the manpower when a different number are found by the inspection given in the figure.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 19, 2010
747-25-3381Revision 3: February 19, 2021
50 of 213
BOEING SERVICE BULLETIN 747-25-3381

### Page 51

Group 11, Configuration 2:
Elapsed HoursTask-HoursNumber of
Persons
Task
4.00 (a)32.00 (a)8FIGURE 19
4.0032.00TOTAL FOR EACH AIRPLANE
(a) This manpower is for an average number of 42 locations on an airplane. Add or reduce
the manpower when a different number are found by the inspection given in the figure.
Group 1, Configuration 2-3; Group 2, Configuration 2-3; Group 3, Configuration 2-3; Group 6,
Configuration 2-3; Group 7, Configuration 2-3; Group 8, Configuration 2-3; Group 9, Configuration
2-3; Group 10, Configuration 3-4; Group 12, Configuration 2-3; Group 13, Configuration 2-3;
Group 14, Configuration 2-3; Group 15, Configuration 2-3; Group 16, Configuration 3-4; Group
17, Configuration 3-4; Group 18, Configuration 2-3; Group 19, Configuration 3-4:
Elapsed HoursTask-HoursNumber of
Persons
Task
4.00 (a)32.00 (a)8FIGURE 19
4.00 (a)32.00 (a)8FIGURE 20
8.0064.00TOTAL FOR EACH AIRPLANE
(a) This manpower is for an average number of 42 locations on an airplane. Add or reduce
the manpower when a different number are found by the inspection given in the figure.
Group 13-14, Configuration 4; Group 16-17, 19, Configuration 5:
Elapsed HoursTask-HoursNumber of PersonsTask
4.00 (a)32.00 (a)8FIGURE 7
4.0032.00TOTAL FOR EACH AIRPLANE
(a) This manpower is for an average number of 42 locations on an airplane. Add or reduce
the manpower when a different number are found by the inspection given in the figure.
H. Weight and Balance Changes
Group 1-3, 7-9, Configuration 1; Group 10, Configuration 2; Group 12, 15, Configu-
ration 1; Group 16-17, Configuration 2; Group 18, Configuration 1; Group 19, Con-
figuration 2:
Change in Moment
(Pound-Inches)
Change in Weight
(Pounds)Airplane
-269.7-0.5747-400, 747-400D,
747-400F
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 19, 2010
747-25-3381Revision 3: February 19, 2021
51 of 213
BOEING SERVICE BULLETIN 747-25-3381

### Page 52

Group 6, Configuration 1:
Change in Moment
(Pound-Inches)
Change in Weight
(Pounds)Airplane
-134.2-0.1747-400F
Group 10, 13-14, 16-17, 19, Configuration 1:
Change in Moment
(Pound-Inches)
Change in Weight
(Pounds)Airplane
-213.7-0.3747-400, 747-400D
Group 11, Configuration 1:
Change in Moment
(Pound-Inches)
Change in Weight
(Pounds)Airplane
-190.2-0.3747-400F
Group 1, Configuration 2-4; Group 2, Configuration 2-4; Group 3, Configuration 2-4; Group 4-5;
Group 6, Configuration 2-4; Group 7, Configuration 2-4; Group 8, Configuration 2-4; Group 9,
Configuration 2-4; Group 10, Configuration 3-5; Group 11-12, Configuration 2; Group 12,
Configuration 3-4; Group 13, Configuration 2-5; Group 14, Configuration 2-5; Group 15,
Configuration 2-4; Group 16, Configuration 3-6; Group 17, Configuration 3-6; Group 18,
Configuration 2-4; Group 19, Configuration 3-5:
None.
I. Electrical Load Data
Not applicable.
J. References
1. Existing Data:
a. Engineering Change Memo PRR 85901-98RS, PRR 85901-58S
b. Boeing Service Bulletin 747-25-3725, 747-53-2877
c. Boeing Service Related Problem (SRP) 747-SRP-25-0234, 747-SRP-25-0403
d. Federal Aviation Administration (FAA) Airworthiness Directive (AD) 2013-11-04
e. Standard Overhaul Practices Manual (SOPM) 20-30-03, 20-50-10, 20-50-12
f. Standard Wiring Practices Manual (SWPM) 20-10-11, 20-10-12, 20-10-19
g. 747 Fleet Team Digest (FTD) 25-03005, 53-13010
h. 747-100/200/300 Aircraft Maintenance Manual (AMM) 20-30-80, 25-59-00
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 19, 2010
747-25-3381Revision 3: February 19, 2021
52 of 213
BOEING SERVICE BULLETIN 747-25-3381

### Page 53

i. 747-400 Aircraft Maintenance Manual (AMM) 20-30-80, 20-41-03, 25-00-00, 25-14-01,
25-22-01, 25-22-03, 25-22-04, 25-32-01, 25-40-03, 25-52-01, 25-53-15, 25-59-01, 31-12-11,
31-12-16
j. 747-400 Fleet Team Digest (FTD) 25-03009
2. Data Supplied with this Service Bulletin:
None.
3. Installation Drawings Used in the Preparation of this Service Bulletin:
These drawings were used to prepare this service bulletin. These drawings are not necessary to
make the specified changes, and are not supplied with this service bulletin. These drawings may
not be applicable to all airplane configurations or operators.
TitleDrawing Number
SEAL INSTL - MOISTURE, FLIGHT DECK232U1497
OVERHEAD PANEL INSTL - PILOTS233U3100
CIRCUIT BREAKER AND LIGHTPLATE INSTL OVERHEAD
PANEL (P7)
233U5100
K. Publications Affected
1. Publications:
Chapter-SectionPublication
11-12, 11-17, 23-31, 24-51, 24-54, 25-14, 25-17,
25-20, 25-21, 25-51, 25-52, 25-55, 25-59, 33-11,
53-42
747-400 Illustrated Parts Catalog
25-21, 53-17747 Aircraft Maintenance Manual
- Practices and Procedures
25-21747-100/200/300 Illustrated Parts
Catalog
2. Damage Tolerance Based Structural Inspections:
Boeing has evaluated the repairs or changes in this service bulletin for effects on Fatigue Critical
Structure (FCS) and for changes to Damage Tolerance Inspections (DTI) required in the
Maintenance Program. This service bulletin does not affect FCS, therefore DTIs are not necessary.
L. Interchangeability and Intermixability of Parts
Refer to Paragraph 2.C., Parts Necessary for Each Airplane, for interchangeability and intermixability
information.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 19, 2010
747-25-3381Revision 3: February 19, 2021
53 of 213
BOEING SERVICE BULLETIN 747-25-3381

### Page 54

M. Software Accomplishment Summary
Not affected.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 19, 2010
747-25-3381Revision 3: February 19, 2021
54 of 213
BOEING SERVICE BULLETIN 747-25-3381

### Page 55

2.    MATERIAL INFORMATION
A. Material - Price and Availability
Boeing can supply the kits shown in Paragraph 2.C., Parts Necessary for Each Airplane. Operators
are encouraged to share schedule requirements with Boeing for incorporation of the service bulletin.
The kits are subject to the terms and conditions of the Boeing standard purchase order acknowledgment.
Prices are in United States Dollars. Terms: Net 30 days.
Reference this service bulletin and submit your purchase order by one of these methods:
1. Order on-line via ATA Spec 2000 or The Boeing PART Page
2. Fax to (206) 662-7145
NOTE: The top kits, 015U1780-1, -2, -11, -15 and -19 contain a maximum requirement because the
quantity, length and thickness of foam used in the airplane can vary significantly between
airplanes.
Group 10, Configuration 1:
REFER TO THE BOEING PART PAGE ON MYBOEINGFLEET.COM OR CONTACT FIRST RESPONDER
AT FR@BOEING.COM FOR THE LATEST REORDER LEAD TIME (ROLT) AND PRICE INFORMATION
Unit Price as of the
Revision 2 date of this
Service Bulletin (US
Dollars)
ROLT as of the Revi-
sion 2 date of this
Service Bulletin (Cal-
endar Days)
QTYDateNameKit Number
$4,734.00140--TOP KIT015U1780-1
Group 9, 13-14, 16-17, 19, Configuration 1:
REFER TO THE BOEING PART PAGE ON MYBOEINGFLEET.COM OR CONTACT FIRST RESPONDER
AT FR@BOEING.COM FOR THE LATEST REORDER LEAD TIME (ROLT) AND PRICE INFORMATION
Unit Price as of the
Revision 2 date of this
Service Bulletin (US
Dollars)
ROLT as of the Revi-
sion 2 date of this
Service Bulletin (Cal-
endar Days)
QTYDateNameKit Number
$6,523.00140--TOP KIT015U1780-2
Group 1, 6-8, Configuration 1; Group 10, Configuration 2; Group 12, 15, 18, Configuration 1:
REFER TO THE BOEING PART PAGE ON MYBOEINGFLEET.COM OR CONTACT FIRST RESPONDER
AT FR@BOEING.COM FOR THE LATEST REORDER LEAD TIME (ROLT) AND PRICE INFORMATION
Unit Price as of the
Revision 2 date of this
Service Bulletin (US
Dollars)
ROLT as of the Revi-
sion 2 date of this
Service Bulletin (Cal-
endar Days)
QTYDateNameKit Number
$6,262.00140--TOP KIT015U1780-11 (a)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 19, 2010
747-25-3381Revision 3: February 19, 2021
55 of 213
BOEING SERVICE BULLETIN 747-25-3381

### Page 56

Group 1, 6-8, Configuration 1; Group 10, Configuration 2; Group 12, 15, 18, Configuration 1:
REFER TO THE BOEING PART PAGE ON MYBOEINGFLEET.COM OR CONTACT FIRST RESPONDER
AT FR@BOEING.COM FOR THE LATEST REORDER LEAD TIME (ROLT) AND PRICE INFORMATION
Unit Price as of the
Revision 2 date of this
Service Bulletin (US
Dollars)
ROLT as of the Revi-
sion 2 date of this
Service Bulletin (Cal-
endar Days)
QTYDateNameKit Number
$96.00140--FOAM TAPE,
0.25 T X 0.75
W
015U1780-18
(b)(a)
$114.00140--FOAM232U1497-85
(c)(a)
(a) For operators that have Top Kit 015U1780-11, some early shipments of the Top Kit 015U1780-11
were missing foam tape part number 015U1780-18 (QTY 12) and foam part number 232U1497-85
(QTY 2). Operators should verify that these parts are included in their Top Kit 015U1780-11. If these
parts are missing, operators should order foam tape part number 015U1780-18 (QTY 12) and foam
part number 232U1497-85 (QTY 2) to complete the Top Kit to accomplish Revision 2 of this service
bulletin.
(b) QTY 12 of this part is necessary to accomplish Revision 2 of this service bulletin if the operator has
Top Kit 015U1780-11 Revision A.
(c) QTY 2 of this part is necessary to accomplish Revision 2 of this service bulletin if the operator has
Top Kit 015U1780-11 Revision A.
Group 2-3, 9, Configuration 1; Group 16-17, 19, Configuration 2:
REFER TO THE BOEING PART PAGE ON MYBOEINGFLEET.COM OR CONTACT FIRST RESPONDER
AT FR@BOEING.COM FOR THE LATEST REORDER LEAD TIME (ROLT) AND PRICE INFORMATION
Unit Price as of the
Revision 2 date of this
Service Bulletin (US
Dollars)
ROLT as of the Revi-
sion 2 date of this
Service Bulletin (Cal-
endar Days)
QTYDateNameKit Number
SUPERSEDEDTOP KIT015U1780-12 (a)
$8,852.00139--TOP KIT015U1780-19 (b)
$2,072.00139--SUPPLEMEN-
TAL KIT
015U1780-20 (a)
(a) 015U1780-20 is a supplemental kit for 015U1780-12 top kit. 015U1780-20 plus 015U1780-12 is
equivalent to 015U1780-19 replacement kit.
(b) 015U1780-19 is a replacement kit for 015U1780-12 top kit. 015U1780-20 plus 015U1780-12 is
equivalent to 015U1780-19 replacement kit.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 19, 2010
747-25-3381Revision 3: February 19, 2021
56 of 213
BOEING SERVICE BULLETIN 747-25-3381

### Page 57

Group 4-5, Configuration 1:
REFER TO THE BOEING PART PAGE ON MYBOEINGFLEET.COM OR CONTACT FIRST RESPONDER
AT FR@BOEING.COM FOR THE LATEST REORDER LEAD TIME (ROLT) AND PRICE INFORMATION
Unit Price as of the
Revision 2 date of this
Service Bulletin (US
Dollars)
ROLT as of the Revi-
sion 2 date of this
Service Bulletin (Cal-
endar Days)
QTYDateNameKit Number
$1,971.00139--TOP KIT015U1780-15
Group 11, Configuration 1:
REFER TO THE BOEING PART PAGE ON MYBOEINGFLEET.COM OR CONTACT FIRST RESPONDER
AT FR@BOEING.COM FOR THE LATEST REORDER LEAD TIME (ROLT) AND PRICE INFORMATION
Unit Price as of the
Revision 2 date of this
Service Bulletin (US
Dollars)
ROLT as of the Revi-
sion 2 date of this
Service Bulletin (Cal-
endar Days)
NameKit Number
$2,665.00139TOP KIT015U1780-21
B. Industry Support Information
Boeing warranty remedies are not available for the inspections and configuration changes given in this
service bulletin.
C. Parts Necessary for Each Airplane
1. Kits/Parts:
To get the kits/parts shown below, refer to Paragraph 2.A., Material - Price and Availability.
NOTE: One top kit and/or item(s)/supplemental kit and the items shown in Paragraph 2.C.2.,
Parts and Materials Supplied by the Operator, are necessary for each airplane.
Group 10, Configuration 1:
Kit 015U1780
NotesExisting Part
Number
NameQTYNew Part Number
-1
--TOP KIT - FLAT
BOM, 747-400
FREIGHTER AIR-
PLANE BMS 8-39
FOAM REPLACE-
MENT
-015U1780-1
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 19, 2010
747-25-3381Revision 3: February 19, 2021
57 of 213
BOEING SERVICE BULLETIN 747-25-3381

### Page 58

Group 10, Configuration 1:
Kit 015U1780
NotesExisting Part
Number
NameQTYNew Part Number
-1
-453U7013-11,
453U7013-12,
453U7013-13,
453U7013-14
FOAM AIR SEAL,
0.5 T X 0.5 W
6015U1780-3
-453U7013-11,
453U7013-12,
453U7013-13,
453U7013-14
FOAM AIR SEAL,
0.75 T X 0.75 W
2015U1780-4
--FOAM AIR SEAL,
0.5 T X 1.0 W
1015U1780-5
-453U7013-11,
453U7013-12,
453U7013-13,
453U7013-14
FOAM AIR SEAL,
1.0 T X 1.0 W
1015U1780-6
-453U7120-43FOAM TAPE, 0.25
T X 1.0 W
1015U1780-7
-61B60002-327FOAM TAPE, 0.5 T
X 2.0 W
2015U1780-8
-284U1808-7FOAM TAPE, 0.25
T X 0.75 W
12015U1780-18
-232U1497-54FOAM3232U1497-73
-232U1497-41FOAM2232U1497-85
-233U3311-5INSULATION2233U3311-51
-233U3311-7INSULATION1233U3311-52
-233U3311-9INSULATION1233U3311-53
-233U3311-14INSULATION1233U3311-54
-233U3311-18INSULATION1233U3311-55
-233U3311-25INSULATION1233U3311-56
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 19, 2010
747-25-3381Revision 3: February 19, 2021
58 of 213
BOEING SERVICE BULLETIN 747-25-3381

### Page 59

Group 9, 13-14, 16-17, 19, Configuration 1:
Kit 015U1780
NotesExisting Part
Number
NameQTYNew Part Number
-2
--TOP KIT - FLAT
BOM, 747-400
PASSENGER AIR-
PLANE BMS 8-39
FOAM REPLACE-
MENT
-015U1780-2
-61B60002-327FOAM TAPE, 0.5 T
X 2.0 W
2015U1780-8
-411U1362-1,
411U1362-2,
411U1362-3,
411U1362-4,
411U1362-5,
411U1362-6,
411U1362-7,
411U1362-9,
411U1362-10;
69B53040-1
through 69B53040-
20
FOAM 1.0 T X 1.0
W
14015U1780-9
-411U1362-1,
411U1362-2,
411U1362-3,
411U1362-4,
411U1362-5,
411U1362-6,
411U1362-7,
411U1362-9,
411U1362-10;
69B53040-1
through 69B53040-
20
FOAM 0.75 T X 1.0
W
8015U1780-10
-284U1808-7FOAM TAPE, 0.25
T X 0.75 W
12015U1780-18
-232U1497-54FOAM3232U1497-73
-232U1497-41FOAM2232U1497-85
-233U3311-5INSULATION2233U3311-51
-233U3311-7INSULATION1233U3311-52
-233U3311-9INSULATION1233U3311-53
-233U3311-14INSULATION1233U3311-54
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 19, 2010
747-25-3381Revision 3: February 19, 2021
59 of 213
BOEING SERVICE BULLETIN 747-25-3381

### Page 60

Group 9, 13-14, 16-17, 19, Configuration 1:
Kit 015U1780
NotesExisting Part
Number
NameQTYNew Part Number
-2
-233U3311-18INSULATION1233U3311-55
-233U3311-25INSULATION1233U3311-56
Group 1, 6-8, Configuration 1; Group 10, 12, 15, 18, Configuration 2:
Kit 015U1780
NotesExisting Part
Number
NameQTYNew Part Number
-11
(a)
--TOP KIT - 747-400
FREIGHTER AIR-
PLANE BMS8-39
FOAM REPLACE-
MENT
-015U1780-11
-453U7013-11,
453U7013-12,
453U7013-13,
453U7013-14
FOAM AIR SEAL,
0.5 T X 0.5 W
6015U1780-3
-453U7013-11,
453U7013-12,
453U7013-13,
453U7013-14
FOAM AIR SEAL,
0.75 T X 0.75 W
2015U1780-4
--FOAM AIR SEAL,
0.5 T X 1.0 W
1015U1780-5
-453U7013-11,
453U7013-12,
453U7013-13,
453U7013-14
FOAM AIR SEAL,
1.0 T X 1.0 W
1015U1780-6
-453U7120-43FOAM TAPE, 0.25
T X 1.0 W
1015U1780-7
-61B60002-327FOAM TAPE, 0.5 T
X 2.0 W
2015U1780-8
-284U1808-7FOAM TAPE, 0.25
T X 0.75 W
12015U1780-18
-232U1497-54FOAM3232U1497-73
-232U1497-52FOAM2232U1497-74
-232U1497-53FOAM2232U1497-75
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 19, 2010
747-25-3381Revision 3: February 19, 2021
60 of 213
BOEING SERVICE BULLETIN 747-25-3381

The text continues at https://openairdocs.org/service-documents/boeing/sb-747-25-3381/file/53a3139e1ea2.md?from=61

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
