# Boeing Special Attention Service Bulletin 747-25-3693: No revision named

- Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2017-0499; AD 2017-22-10 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Boeing Special Attention Service Bulletin 747-25-3693](https://openairdocs.org/service-documents/boeing/sb-747-25-3693.md)
- Title as filed: SB-747-25-3693-00--
- Pages: 39
- PDF: https://openairdocs.org/files/sha256/bd/f5/bdf50d09437353969ac1ba0b1a3d8e047eaa169d2ee9875e3e7f85198746fdc3
- Page: https://openairdocs.org/service-documents/boeing/sb-747-25-3693/file/bdf50d094373

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Commercial 
Airplanes
747
Service Bulletin
SPECIAL ATTENTION
Number: 747-25-3693
Original Issue: November 10, 2016
ATA System: 2550
SUBJECT: EQUIPMENT/FURNISHINGS - Crew Ladder Handrail, Joint Fastener Assembly,
Replacement
Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15
CFR 300-774). An export license may be required before it is used for development, production or use by foreign
persons from specific countries. The controller of this data has the individual responsibility to abide by all export
laws.
9E991ECCN:
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET
Copyright © 2016 Boeing.
Unpublished Work. All Rights Reserved.
Treatment of this document and its content is governed by contract with Boeing. Rights to use this document
are licensed on a per aircraft basis and such rights may not be transferable. For more information, contact The
Boeing Company.
Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner,
BBJ, DC-8, DC-9, DC-10, KC-10, KC-46, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8, Poseidon and
Boeing liveries are all trademarks owned by The Boeing Company; and no trademark license is granted in
connection with this document unless provided in writing by Boeing.
Original Issue: November 10, 2016
747-25-3693
1 of 39
3.0

### Page 2

Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 10, 2016
747-25-3693
2 of 39
BOEING SERVICE BULLETIN 747-25-3693
BLANK PAGE

### Page 3

Table of Contents
Summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
1. PLANNING INFORMATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
A. Effectivity . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
1. Airplanes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
2. Spares Affected . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
B. Concurrent Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
C. Reason . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
D. Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
E. Compliance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
F. Approval . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
G. Manpower . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
H. Weight and Balance Changes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
I. Electrical Load Data . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
J. References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
1. Existing Data: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
2. Data Supplied with this Service Bulletin: . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
3. Installation Drawings Used in the Preparation of this Service Bulletin: . . . . . . . . . . . 14
K. Publications Affected . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
L. Interchangeability and Intermixability of Parts . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
M. Software Accomplishment Summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
2. MATERIAL INFORMATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
A. Material - Price and Availability . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
B. Industry Support Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
C. Parts Necessary for Each Airplane . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
1. Kits/Parts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
2. Parts and Materials Supplied by the Operator . . . . . . . . . . . . . . . . . . . . . . . . 19
3. Parts Modified and Reidentified . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
4. Parts Removed and Not Replaced . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
D. Parts Necessary to Change Spares . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
E. Special Tooling - Price and Availability . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
F. Special Tooling Necessary to do this Service Bulletin . . . . . . . . . . . . . . . . . . . . . . . 19
3. ACCOMPLISHMENT INSTRUCTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21
A. GENERAL INFORMATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21
B. WORK INSTRUCTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22
FIGURE 1: CREW LADDER - UPPER, MID-LOWER, AND LOWER JOINTS - FASTENER ASSEMBLY
REPLACEMENT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23
FIGURE 2: CREW LADDER - MID-UPPER JOINTS - FASTENER ASSEMBLY REPLACEMENT [Group 1]
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31
FIGURE 3: CREW LADDER - MID-UPPER JOINTS - FASTENER ASSEMBLY REPLACEMENT [Group 2]
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35
APPENDIX A: BOEING PART DEMAND INTENT SURVEY . . . . . . . . . . . . . . . . . . . . . . . . . 39
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 10, 2016
747-25-3693
3 of 39
BOEING SERVICE BULLETIN 747-25-3693

### Page 4

Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 10, 2016
747-25-3693
4 of 39
BOEING SERVICE BULLETIN 747-25-3693
BLANK PAGE

### Page 5

Commercial 
Airplanes
747
Service Bulletin
SPECIAL ATTENTION
SummaryNumber: 747-25-3693Original Issue: November 10, 2016
ATA System: 2550
SUBJECT: EQUIPMENT/FURNISHINGS - Crew Ladder Handrail, Joint Fastener Assembly,
Replacement
BOEING RECOMMENDS THAT EACH OPERATOR EXAMINE THIS DOCUMENT IMMEDIATELY.
CONCURRENT REQUIREMENTS
None.
BACKGROUND
This service bulletin will make sure that the fastener assemblies that secure the handrail to the crew ladder do
not come loose. If this service bulletin is not done, the fastener assemblies could come loose and cause the
joint to disengage, which can cause damage to equipment or injury to personnel.
Bolts on existing fastener assemblies for the crew ladder handrail are too short to ensure self-locking nut elements
are fully engaged. There has been one report of a nut that became loose on a crew ladder handrail, causing
the handrail to dislodge during use.
This service bulletin removes existing bolts and nuts from the fastener assemblies on the crew ladder handrail
and replaces them with longer bolts to ensure that self-locking nut elements are fully engaged.
Boeing Service Related Problem (SRP) 747-8-SRP-25-0365 is related to this service bulletin.
This table is provided to operators for planning purposes only. Refer to the applicable sections for more
information.
ReferenceAffectedPlanning Data
Paragraph 1.A.2., Spares AffectedNoSpares Affected
Paragraph 1.E., Compliance and Paragraph
1.F., Approval
YesAD Related
Paragraph 1.H., Weight and Balance ChangesYesWeight and Balance Change
Paragraph 1.I., Electrical Load DataNoElectrical Load Changed
Paragraph 1.K., Publications AffectedYesPublications Affected
Paragraph 1.K., Publications AffectedNoAirplane Flight Operations Affected (Flight Crew
Operations Manual and/or FAA Approved Air-
plane Flight Manual)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 10, 2016
747-25-3693
5 of 39

### Page 6

ReferenceAffectedPlanning Data
Paragraph 2.C.1., Kits/PartsYesKits/Parts Required
Paragraph 2.C.2., Parts and Materials Supplied
by the Operator
YesOperator Supplied Parts/Material
Paragraph 2.F., Special Tooling Necessary to
do this Service Bulletin
NoSpecial Tooling Required
ACTION (PRR 85901-155S)
Replace existing fastener assemblies on crew access ladder handrail assembly.
EFFECTIVITY
747-400 with a Boeing Converted Freighter (BCF) configuration, 747-400F, 747-8F Airplanes. Refer to Paragraph
1.A., Effectivity, Airplanes for the list of affected airplanes.
COMPLIANCE
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to this service
bulletin. The Airworthiness Directive will make the compliance tasks and times given in this service bulletin
mandatory.
Boeing recommends that the change given in this service bulletin be done within 36 months after the original
issue date of this service bulletin.
INDUSTRY SUPPORT INFORMATION
Boeing warranty remedies are available for airplanes in warranty as of March 4, 2009. Please refer to Paragraph
2.B., Industry Support Information. The warranty remedies will expire eight years from the original issue date of
this service bulletin.
MANPOWER
Refer to Paragraph 1.G., Manpower.
MATERIAL INFORMATION
Boeing Supplied Kits/Parts.
Refer to Paragraph 2.A., Material - Price and Availability.
Operators are encouraged to complete the survey provided in APPENDIX A of this service bulletin to help Boeing
predict the quantity and timing of the Boeing Supplied Kits/Parts.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 10, 2016
747-25-3693
6 of 39
BOEING SERVICE BULLETIN 747-25-3693

### Page 7 (OCR)

BOEING SERVICE BULLETIN 747-25-3693
REPLACE
000  FASTENER  ASSEMBLIES
REPLACE
FASTENER
ASSEMBLIES
REPLACE
FASTENER
ASSEMBLIES
CREW LADDER  2524518
Original Issue: November 10, 2016
Export Controlled ECCN: 9E991 - BOEING  747-25-3693
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.  7 of 39

### Page 8

Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 10, 2016
747-25-3693
8 of 39
BOEING SERVICE BULLETIN 747-25-3693
BLANK PAGE

### Page 9

Commercial 
Airplanes
747
Service Bulletin
SPECIAL ATTENTION
Number: 747-25-3693
Original Issue: November 10, 2016
ATA System: 2550
SUBJECT: EQUIPMENT/FURNISHINGS - Crew Ladder Handrail, Joint Fastener Assembly,
Replacement
BOEING RECOMMENDS THAT EACH OPERATOR EXAMINE THIS DOCUMENT IMMEDIATELY.
1.    PLANNING INFORMATION
A. Effectivity
1. Airplanes
This service bulletin is applicable to 747-400 airplanes with a Boeing Converted Freighter (BCF)
configuration, and 747-400F, 747-8F airplanes, line numbers 717-1534, and 1536 in 2 Groups.
The Variable Numbers and Group Information for the applicable airplanes is given below. An
equivalent change is on subsequent production airplanes Line Numbers 1535, 1540 and on. Refer
to PRR 85901-155S for data about this change.
Refer to Service Bulletin Index D6-30300 Part 3 for Airplane Variable Number, Line Number, and
Serial Number data.
DESCRIPTIONCONFIGURATIONGROUP
747-400 airplanes with a BCF configuration, 747-400F, 747-8F
airplanes with a Group 1 fastener assembly for the mid-upper joint
on the left and right sides.
-1
747-8F airplanes with a Group 2 fastener assembly for the mid-upper
joint on the left and right sides.
-2
Airplane Models:
747-400, 747-400F, 747-8F
GroupVariable Number
1RC501 - RC505
2RC506 - RC514
1RC521 - RC523
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 10, 2016
747-25-3693
9 of 39

### Page 10

GroupVariable Number
2RC524 - RC528
1RC541
1RC546
2RC547 - RC550
1RC551 - RC558
2RC559 - RC566
1RC571 - RC577
2RC578 - RC582
1RC601 - RC603
2RC604 - RC605
2RC641 - RC644
2RC652
2RC661
2RC671 - RC674
1RL401 - RL403
1RL411 - RL436
1RL451 - RL456
1RL461 - RL462
1RL471 - RL481
1RL491 - RL492
1RL501 - RL502
1RL511 - RL516
1RL521 - RL522
1RL531 - RL534
1RL551
1RL561
1RL563 - RL568
1RL571 - RL572
1RL576 - RL577
1RL579
1RL581 - RL586
1RL651 - RL655
1RL671 - RL675
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 10, 2016
747-25-3693
10 of 39
BOEING SERVICE BULLETIN 747-25-3693

### Page 11

GroupVariable Number
1RL681 - RL684
1RL751 - RL752
1RM082
1RM128
1RM192
1RM851 - RM859
1RM861 - RM862
1RM871 - RM899
1RM901 - RM906
1RM911
1RR701
1RR721 - RR724
1RR746 - RR748
1RR851 - RR856
1RR861 - RR862
1RR951 - RR952
1RT021 - RT022
1RT031 - RT033
1RT061
1RT071 - RT072
1RT101
1RT103
1RT131 - RT134
1RT161 - RT166
1RT456
1RT501
1RT506 - RT510
1RT513
1RT515 - RT516
1RT518 - RT521
1RT524
1RT528
1RT530
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 10, 2016
747-25-3693
11 of 39
BOEING SERVICE BULLETIN 747-25-3693

### Page 12

GroupVariable Number
1RT572 - RT576
1RT578 - RT579
1RT633 - RT634
1RT642
1RT654 - RT657
1RT691 - RT692
1RT745
1RT747
1RT750 - RT754
1RT756 - RT757
1RT781 - RT782
1RT831 - RT832
1RT837
1RT864
1RT952
1RT967
2. Spares Affected
None.
B. Concurrent Requirements
None.
C. Reason
This service bulletin will make sure that the fastener assemblies that secure the handrail to the crew
ladder do not come loose. If this service bulletin is not done, the fastener assemblies could come loose
and cause the joint to disengage, which can cause damage to equipment or injury to personnel.
Bolts on existing fastener assemblies for the crew ladder handrail are too short to ensure self-locking
nut elements are fully engaged. There has been one report of a nut that became loose on a crew ladder
handrail, causing the handrail to dislodge during use.
This service bulletin removes existing bolts and nuts from the fastener assemblies on the crew ladder
handrail and replaces them with longer bolts to ensure that self-locking nut elements are fully engaged.
Boeing Service Related Problem 747-8-SRP-25-0365 is related to this service bulletin.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 10, 2016
747-25-3693
12 of 39
BOEING SERVICE BULLETIN 747-25-3693

### Page 13

D. Description
Replace existing fastener assemblies on crew access ladder handrail assembly.
The work in this service bulletin is done in the maintenance zone(s) given below.
Group 1:
Affected Maintenance Zones
ZoneModel
121747-400, 747-400F, 747-8F
Group 2:
Affected Maintenance Zones
ZoneModel
121747-8F
E. Compliance
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to
this service bulletin. The Airworthiness Directive will make the compliance tasks and times given in this
service bulletin mandatory.
Boeing recommends that the change given in this service bulletin be done within 36 months after the
original issue date of this service bulletin.
F. Approval
This service bulletin was examined by the Federal Aviation Administration (FAA). The changes specified
in this service bulletin comply with the applicable regulations and are FAA approved, as well as European
Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/JAA approved
airplanes listed in the service bulletin effectivity. This service bulletin and its approval were based on
the airplane in its original Boeing delivery configuration or as modified by other approved Boeing
changes.
If an airplane has a non-Boeing modification or repair that affects a component or system also affected
by this service bulletin, the operator is responsible for obtaining appropriate regulatory agency approval
before incorporating this service bulletin.
G. Manpower
The table below shows an estimate of the task hours necessary to do this service bulletin for each
airplane. This estimate is for direct labor only, done by an experienced crew. Adjust the estimate with
operator task hour data if necessary. The estimate does not include lost time. These are some examples
of lost time:
• Time to adjust to the workplace
• Time to schedule the work
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 10, 2016
747-25-3693
13 of 39
BOEING SERVICE BULLETIN 747-25-3693

### Page 14

• Time to inspect the work
• Time to cure the materials
• Time to make the parts
• Time to find the tools
Group 1:
Elapsed HoursTask HoursNumber of PersonsTask
2.252.251Figure 1
0.500.501Figure 2
2.752.75TOTAL FOR EACH AIRPLANE
Group 2:
Elapsed HoursTask HoursNumber of PersonsTask
2.252.251Figure 1
0.500.501Figure 3
2.752.75TOTAL FOR EACH AIRPLANE
H. Weight and Balance Changes
None.
I. Electrical Load Data
Not changed.
J. References
1. Existing Data:
a. Engineering Change Memo PRR 85901-155S
b. Boeing Service Related Problem (SRP) 747-8-SRP-25-0365
c. Service Bulletin Index D6-30300
d. Standard Overhaul Practices Manual (SOPM) 20-50-01, 20-50-02, 20-50-12
2. Data Supplied with this Service Bulletin:
None.
3. Installation Drawings Used in the Preparation of this Service Bulletin:
TitleDrawing Number
LADDER INSTL - CREW ACCESS232U4701
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 10, 2016
747-25-3693
14 of 39
BOEING SERVICE BULLETIN 747-25-3693

### Page 15

K. Publications Affected
1. Publications:
Chapter-SectionPublication
25-13747 Illustrated Parts Catalog
2. Damage Tolerance Based Structural Inspections:
Boeing has evaluated the repairs and/or changes in this service bulletin for effects on Fatigue
Critical Structure (FCS) and for changes to Damage Tolerance Inspections (DTI) required in the
Maintenance Program. This service bulletin does not affect FCS, therefore DTIs are not necessary.
L. Interchangeability and Intermixability of Parts
Accomplishment of this service bulletin does not affect interchangeability or intermixability of parts.
M. Software Accomplishment Summary
Not affected.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 10, 2016
747-25-3693
15 of 39
BOEING SERVICE BULLETIN 747-25-3693

### Page 16

Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 10, 2016
747-25-3693
16 of 39
BOEING SERVICE BULLETIN 747-25-3693
BLANK PAGE

### Page 17

2.    MATERIAL INFORMATION
A. Material - Price and Availability
Boeing can supply the kits shown in Paragraph 2.C., Parts Necessary for Each Airplane. Operators
are encouraged to share schedule requirements with Boeing for incorporation of the service bulletin.
The kits are subject to the terms and conditions of the Boeing standard purchase order acknowledgment.
Prices are in United States Dollars. Terms: Net 30 days.
Spec releases service bulletin and submit your purchase order by one of these methods:
1. Order on-line via ATA Spec 2000 or The Boeing PART Page
2. Fax to (206) 662-7145
REFER TO THE BOEING PART PAGE ON MYBOEINGFLEET.COM OR CONTACT FIRST RESPONDER
AT FR@BOEING.COM FOR THE LATEST REORDER LEAD TIME (ROLT) AND PRICE INFORMATION
Unit Price as of
the original issue
date of this Ser-
vice Bulletin (US
Dollars)
ROLT as of the
original issue
date of this Ser-
vice Bulletin (Cal-
endar Days)
QTYDateNameKit Number
2,418.00298112/05/2017Retrofit Kit015U2179-2
Operators are encouraged to complete the survey provided in APPENDIX A of this service bulletin to
help Boeing predict the quantity and timing of the Boeing Supplied Kits.
B. Industry Support Information
Boeing warranty remedies are available for 747 airplanes in warranty as of March 4, 2009. For task
hour reimbursement for airplanes in warranty as of that date, send a warranty claim to BCA Contracts
- Warranty. The kits for airplanes in warranty as of that date will be supplied at no charge. Send a
purchase order for the kits to Boeing Material Management. Please refer to this service bulletin number
and reference the airplane variable numbers in your purchase order. The warranty remedies will expire
eight years from the original issue date of this service bulletin.
C. Parts Necessary for Each Airplane
1. Kits/Parts
To get the kits/parts shown below, refer to Paragraph 2.A., Material - Price and Availability.
NOTE: One top kit and the items shown in Paragraph 2.C.2., Parts and Materials Supplied by
the Operator, are necessary for each airplane.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 10, 2016
747-25-3693
17 of 39
BOEING SERVICE BULLETIN 747-25-3693

### Page 18

ALL
Kit 015U2179
NotesExisting Part
Number
NameQtyNew Part Number
-2
Retrofit Kit - Crew Lad-
der Hardware
-015U2179-2
COVER2232U4764-2
COVER4232U4764-3
COVER2232U4764-4
BUSHING2BACB28AK05-020
BUSHING2BACB28AK05-021
BUSHING, PLAIN2BACB28AK05-038
BUSHING, PLAIN2BACB28BG03A072B1
(232U4780-24 op-
tional)
BUSHING, PLAIN2BACB28BG03A093B1
(232U4780-25 op-
tional)
BUSHING, PLAIN2BACB28BG03A140B1
(232U4780-23 op-
tional)
BOLT, HEX HEAD2BACB30NM3DK16
BOLT2BACB30US3K16D
BOLT2BACB30US3K17D
BOLT2BACB30US3K25D
NUT, CASTELLATED8BACN11N3CD
PIN8BACP18BC02A04P
WASHER6BACW10BP3CD
WASHER2BACW10BP3CK
WASHER4BACW10BP3DP
WASHER6BACW10BP3PK
(a)WASHER, PLAIN8BACW10BP5PK
SPACERS FOR
BOLTS
4NAS43DD3-16FC
(a) There are more parts than are necessary for Group 2 airplanes.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 10, 2016
747-25-3693
18 of 39
BOEING SERVICE BULLETIN 747-25-3693

### Page 19

2. Parts and Materials Supplied by the Operator
The following parts or materials are necessary to do the change in this service bulletin. Parts and
materials in the manuals given in Paragraph 1.J., References, can also be necessary. Examine
operator part and material supply to make sure all necessary parts and materials are available.
NotesNameQTYPart Number /
Specification
(a)Adhesive1 OZBMS 5-92 Type 5
(a) Refer to the Qualified Products List at the end of the Boeing Material Specification (BMS)
for supplier data.
3. Parts Modified and Reidentified
None.
4. Parts Removed and Not Replaced
None.
D. Parts Necessary to Change Spares
None.
E. Special Tooling - Price and Availability
None.
F. Special Tooling Necessary to do this Service Bulletin
No special tools or equipment are necessary to do the change in this service bulletin. But, maintenance
and overhaul tools in the manuals given in Paragraph 1.J., References, can be necessary. Examine
operator tool supply to make sure all necessary tools are available.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 10, 2016
747-25-3693
19 of 39
BOEING SERVICE BULLETIN 747-25-3693

### Page 20

Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 10, 2016
747-25-3693
20 of 39
BOEING SERVICE BULLETIN 747-25-3693
BLANK PAGE

### Page 21

3.    ACCOMPLISHMENT INSTRUCTIONS
A. GENERAL INFORMATION
WARNING: DO NOT WORK ON MORE THAN ONE JOINT AT A TIME. REMOVING FASTENERS
FROM MORE THAN ONE JOINT AT A TIME MAY CAUSE PERSONAL INJURY AND/OR
DAMAGE TO THE ASSEMBLY AND SURROUNDING AREA OF THE AIRPLANE.
CAUTION: KEEP THE WORK AREA, WIRES AND ELECTRICAL BUNDLES CLEAN OF METAL
PARTICLES OR CONTAMINATION WHEN YOU USE TOOLS. UNWANTED MATERIAL,
METAL PARTICLES OR CONTAMINATION CAUGHT IN WIRE BUNDLES CAN CAUSE
DAMAGE TO THE BUNDLES. DAMAGED WIRE BUNDLES CAN CAUSE SPARKS OR
OTHER ELECTRICAL DAMAGE.
NOTE: 1. Manual titles are referred to by acronyms. Refer to Paragraph 1.J., References, for
definition of the acronyms.
2. Obey all of the warnings and cautions given in the specified manual sections.
3. Unless shown differently, these dimensions and tolerances are used:
– Linear dimensions are in inches
– Tolerance on linear dimensions, other than rivet and bolt edge margins, is plus
or minus 0.03 inch
– Tolerance on rivet and bolt edge margin is plus or minus 0.05 inch
– Angular tolerance is plus or minus 2 degrees
– Hole dimensions for standard solid rivets and fasteners are in Structural Repair
Manual (SRM) Chapter 51
– Torque Values:
— Values for structural fasteners are given in 747 Structural Repair Manual,
Chapter 51.
— Values for airframe maintenance tasks are included in Chapter 20 of 747
Aircraft Maintenance Manual (AMM).
— Values for electrical maintenance tasks are included in Chapter 20 of
Standard Wiring Practices Manual (SWPM).
— Values for engine maintenance tasks are included in Chapter 70 of 747
Aircraft Maintenance Manual (AMM).
— Non-standard torque values for maintenance tasks are included in the
applicable installation step.
4. Use the approved fastener, process and material substitutions in accordance with
SRM Chapter 51.
5. These work instructions refer to procedures included in other Boeing documents.
When the words "refer to" are used and the operator has an accepted alternative
procedure, the accepted alternative procedure can be used. When the words "in
accordance with" are included in the instruction, the procedure in the Boeing document
must be used.
6. If it is necessary to remove more parts for access, you can remove those parts. If
you can get access without removing identified parts, it is not necessary to remove
all of the identified parts. Jacking and shoring limitations must be observed.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 10, 2016
747-25-3693
21 of 39
BOEING SERVICE BULLETIN 747-25-3693

### Page 22

7. Where the work instructions include installation of a kept part, a new or serviceable
part with the same part number can be installed as an alternative to the kept part.
8. Use of colors in Figures is based on guidance from the ATA e-Business Program
(ATA) iSpec 2200.
9. The compliance times for the actions in Paragraph 3.B., WORK INSTRUCTIONS
are in Paragraph 1.E., Compliance.
10. Some steps in the Work Instructions are labeled as Required for Compliance (RC).If
this service bulletin is mandated by an Airworthiness Directive (AD), then the steps
labeled as RC, including sub-steps under an RC step and any figures identified in
an RC step, must be done to comply with the AD. If a step or sub-step is labeled
"RC Exempt," then the RC requirement is removed from that step or substep. An
Alternative Method of Compliance (AMOC) is required for any deviations to RC steps,
including sub-steps and identified figures. Steps not labeled as RC may be deviated
from using accepted methods in accordance with the operator's maintenance or
inspection program without obtaining approval of an AMOC. This is provided that
the RC steps, including sub-steps and identified figures, can still be done as specified,
and the airplane can be put back in an airworthy condition.
B. WORK INSTRUCTIONS
1. Extend the crew ladder on the main deck.
2. Group 1:
RC - Replace fastener assemblies in the crew access ladder handrail in accordance with FIGURE
1 and FIGURE 2.
3. Group 2:
RC - Replace fastener assemblies in the crew access ladder handrail in accordance with FIGURE
1 and FIGURE 3.
4. Retract the crew ladder on the main deck.
5. Put the airplane back to a serviceable condition.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 10, 2016
747-25-3693
22 of 39
BOEING SERVICE BULLETIN 747-25-3693

### Page 23 (OCR)

BOEING SERVICE BULLETIN 747-25-3693
000
CREW LADDER  2528792
FIGURE 1: CREW LADDER - UPPER, MID-LOWER, AND LOWER JOINTS - FASTENER ASSEMBLY
REPLACEMENT
(SHEET 1 OF 8)
Original Issue: November 10, 2016
Export Controlled ECCN: 9E991 - BOEING  747-25-3693
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.  23 of 39

### Page 24 (OCR)

BOEING SERVICE BULLETIN 747-25-3693
HOOO
BEFORE  AFTER
4000000
BEFORE  AFTER
2528798
FIGURE 1: CREW LADDER - UPPER, MID-LOWER, AND LOWER JOINTS - FASTENER ASSEMBLY
REPLACEMENT
(SHEET 2 OF 8)
Original Issue: November 10, 2016
PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  747-25-3693
Work - See page 1 for details.  24 of 39

### Page 25 (OCR)

BOEING SERVICE BULLETIN 747-25-3693
100000
BEFORE  AFTER
00000  000000.
BEFORE  AFTER
FIGURE 1: CREW LADDER - UPPER, MID-LOWER, AND LOWER JOINTS - FASTENER ASSEMBLY
REPLACEMENT
(SHEET 3 OF 8)
Original Issue: November 10, 2016
Export Controlled ECCN: 9E991 - BOEING  747-25-3693
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.  25 of 39

### Page 26 (OCR)

BOEING SERVICE BULLETIN 747-25-3693
5000  0000
BEFORE  AFTER
BEFORE  AFTER  2524516
FIGURE 1: CREW LADDER - UPPER, MID-LOWER, AND LOWER JOINTS - FASTENER ASSEMBLY
REPLACEMENT
(SHEET 4 OF 8)
Original Issue: November 10, 2016
PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  747-25-3693
Work - See page 1 for details.  26 of 39

### Page 27

WARNING: DO NOT WORK ON MORE THAN ONE JOINT AT A TIME. REMOVING FASTENERS FROM
MORE THAN ONE JOINT AT A TIME MAY CAUSE PERSONAL INJURY AND/OR DAMAGE TO
THE ASSEMBLY AND SURROUNDING AREA OF THE AIRPLANE.
The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for this figure.
More DataQtyIdentificationNameTaskStep
1-BOLTRemove1
2-WASHERRemove
1-NUTRemove
1-SPACERRemove
(a)1BACB30NM3DK16BOLT, HEX HEADInstall (New)2
1BACW10BP3CDWASHERInstall (New)
2BACW10BP3DPWASHERInstall (New)
2NAS43DD3-16FCSPACERS FOR
BOLTS
Install (New)
(b)1BACN11N3CDNUT, CASTELLATEDInstall (New)
(b)1BACP18BC02A04PPINInstall (New)
(e), (c)-BMS 5-92 TYPE 5ADHESIVEApply
(e)1232U4764-4COVERInstall (New)
1-BOLTRemove3
2-WASHERRemove
1-NUTRemove
1-SPACERRemove
(a)1BACB30NM3DK16BOLT, HEX HEADInstall (New)4
1BACW10BP3CDWASHERInstall (New)
2BACW10BP3DPWASHERInstall (New)
2NAS43DD3-16FCSPACERS FOR
BOLTS
Install (New)
(b)1BACN11N3CDNUT, CASTELLATEDInstall (New)
(b)1BACP18BC02A04PPINInstall (New)
(e), (c)-BMS 5-92 TYPE 5ADHESIVEApply
(e)1232U4764-4COVERInstall (New)
FIGURE 1: CREW LADDER - UPPER, MID-LOWER, AND LOWER JOINTS - FASTENER ASSEMBLY
REPLACEMENT
(SHEET 5 OF 8)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 10, 2016
747-25-3693
27 of 39
BOEING SERVICE BULLETIN 747-25-3693

### Page 28

More DataQtyIdentificationNameTaskStep
(d)1-BOLTRemove5
2-WASHERRemove
1-NUTRemove
1-BUSHINGRemove
1232U4775-1SPACERRemove / Keep
1232U4775-1SPACERInstall (Kept)6
1BACB28BG03A140B1
(232U4780-23 optional)
BUSHING, PLAINInstall (New)
(a)1BACB30US3K25DBOLTInstall (New)
1BACW10BP3CDWASHERInstall (New)
1BACW10BP5PKWASHER, PLAINInstall (New)
1BACB28AK05-021BUSHINGInstall (New)
1BACW10BP3PKWASHERInstall (New)
(b)1BACN11N3CDNUT, CASTELLATEDInstall (New)
(b)1BACP18BC02A04PPINInstall (New)
(e), (c)-BMS 5-92 TYPE 5ADHESIVEApply
(e)1232U4764-3COVERInstall (New)
(d)1-BOLTRemove7
2-WASHERRemove
1-NUTRemove
1-BUSHINGRemove
1232U4775-1SPACERRemove / Keep
FIGURE 1: CREW LADDER - UPPER, MID-LOWER, AND LOWER JOINTS - FASTENER ASSEMBLY
REPLACEMENT
(SHEET 6 OF 8)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 10, 2016
747-25-3693
28 of 39
BOEING SERVICE BULLETIN 747-25-3693

### Page 29

More DataQtyIdentificationNameTaskStep
1232U4775-1SPACERInstall (Kept)8
1BACB28BG03A140B1
(232U4780-23 optional)
BUSHING, PLAINInstall (New)
(a)1BACB30US3K25DBOLTInstall (New)
1BACW10BP3CDWASHERInstall (New)
1BACW10BP5PKWASHER, PLAINInstall (New)
1BACB28AK05-021BUSHINGInstall (New)
1BACW10BP3PKWASHERInstall (New)
(b)1BACN11N3CDNUT, CASTELLATEDInstall (New)
(b)1BACP18BC02A04PPINInstall (New)
(e), (c)-BMS 5-92 TYPE 5ADHESIVEApply
(e)1232U4764-3COVERInstall (New)
1-BOLTRemove9
2-WASHERRemove
1-NUTRemove
1-BUSHINGRemove
1BACB28BG03A093B1
(232U4780-25 optional)
BUSHING, PLAINInstall (New)10
2BACW10BP5PKWASHER, PLAINInstall (New)
1BACW10BP3CKWASHERInstall (New)
(a)1BACB30US3K16DBOLTInstall (New)
1BACB28AK05-020BUSHINGInstall (New)
1BACW10BP3PKWASHERInstall (New)
(b)1BACN11N3CDNUT, CASTELLATEDInstall (New)
(b)1BACP18BC02A04PPINInstall (New)
(e), (c)-BMS 5-92 TYPE 5ADHESIVEApply
(e)1232U4764-3COVERInstall (New)
1-BOLTRemove11
2-WASHERRemove
1-NUTRemove
1-BUSHINGRemove
FIGURE 1: CREW LADDER - UPPER, MID-LOWER, AND LOWER JOINTS - FASTENER ASSEMBLY
REPLACEMENT
(SHEET 7 OF 8)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 10, 2016
747-25-3693
29 of 39
BOEING SERVICE BULLETIN 747-25-3693

### Page 30

More DataQtyIdentificationNameTaskStep
1BACB28BG03A093B1
(232U4780-25 optional)
BUSHING, PLAINInstall (New)12
2BACW10BP5PKWASHER, PLAINInstall (New)
1BACW10BP3CKWASHERInstall (New)
(a)1BACB30US3K16DBOLTInstall (New)
1BACB28AK05-020BUSHINGInstall (New)
1BACW10BP3PKWASHERInstall (New)
(b)1BACN11N3CDNUT, CASTELLATEDInstall (New)
(b)1BACP18BC02A04PPINInstall (New)
(e), (c)-BMS 5-92 TYPE 5ADHESIVEApply
(e)1232U4764-3COVERInstall (New)
(a) Insert washer onto bolt before inserting bolt into joint assembly.
(b) Refer to SOPM 20-50-01 and SOPM 20-50-02 as an accepted procedure.
(c) Refer to SOPM 20-50-12 as an accepted procedure.
(d) Be aware that swing arm will fall after removing the bolt.
(e) Bond to mate surface of hand rail using adhesive.
FIGURE 1: CREW LADDER - UPPER, MID-LOWER, AND LOWER JOINTS - FASTENER ASSEMBLY
REPLACEMENT
(SHEET 8 OF 8)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 10, 2016
747-25-3693
30 of 39
BOEING SERVICE BULLETIN 747-25-3693

### Page 31 (OCR)

BOEING SERVICE BULLETIN 747-25-3693
This Figure applies only to: Group 1.
STA
520
CREW LADDER  2528912
FIGURE 2: CREW LADDER - MID-UPPER JOINTS - FASTENER ASSEMBLY REPLACEMENT
(SHEET 1 OF 4)
Original Issue: November 10, 2016
Export Controlled ECCN: 9E991 - BOEING  747-25-3693
PROPRIETARY - Copyright © Unpublished  Work - See page 1 for details.  31 of 39

### Page 32 (OCR)

BOEING SERVICE BULLETIN 747-25-3693
BEFORE  AFTER
000  0001
BEFORE  AFTER
2529327
FIGURE 2: CREW LADDER - MID-UPPER JOINTS - FASTENER ASSEMBLY REPLACEMENT
(SHEET 2 OF 4)
Original Issue: November 10, 2016
Export Controlled ECCN: 9E991 - BOEING  PROPRIETARY - Copyright © Unpublished  747-25-3693
Work - See page 1 for details.  32 of 39

### Page 33

WARNING: DO NOT WORK ON MORE THAN ONE JOINT AT A TIME. REMOVING FASTENERS FROM
MORE THAN ONE JOINT AT A TIME MAY CAUSE PERSONAL INJURY AND/OR DAMAGE TO
THE ASSEMBLY AND SURROUNDING AREA OF THE AIRPLANE.
The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for this figure.
More DataQtyIdentificationNameTaskStep
1-BOLTRemove1
2-WASHERRemove
1-NUTRemove
1-BUSHINGRemove
(a)1BACB30US3K17DBOLTInstall (New)2
1BACW10BP3CDWASHERInstall (New)
1BACB28BG03A072B1
(232U4780-24 optional)
BUSHING, PLAINInstall (New)
(d)1BACW10BP5PKWASHER, PLAINInstall (New)
1BACB28AK05-038BUSHING, PLAINInstall (New)
1BACW10BP3PKWASHERInstall (New)
(b)1BACN11N3CDNUT, CASTELLATEDInstall (New)
(b)1BACP18BC02A04PPINInstall (New)
(e), (c)-BMS 5-92 TYPE 5ADHESIVEApply
(e)1232U4764-2COVERInstall (New)
1-BOLTRemove3
2-WASHERRemove
1-NUTRemove
1-BUSHINGRemove
FIGURE 2: CREW LADDER - MID-UPPER JOINTS - FASTENER ASSEMBLY REPLACEMENT
(SHEET 3 OF 4)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 10, 2016
747-25-3693
33 of 39
BOEING SERVICE BULLETIN 747-25-3693

### Page 34

More DataQtyIdentificationNameTaskStep
(a)1BACB30US3K17DBOLTInstall (New)4
1BACW10BP3CDWASHERInstall (New)
1BACB28BG03A072B1
(232U4780-24 optional)
BUSHING, PLAINInstall (New)
(d)1BACW10BP5PKWASHER, PLAINInstall (New)
1BACB28AK05-038BUSHING, PLAINInstall (New)
1BACW10BP3PKWASHERInstall (New)
(b)1BACN11N3CDNUT, CASTELLATEDInstall (New)
(b)1BACP18BC02A04PPINInstall (New)
(e), (c)-BMS 5-92 TYPE 5ADHESIVEApply
(e)1232U4764-2COVERInstall (New)
(a) Insert washer onto bolt before inserting bolt into joint assembly.
(b) Refer to SOPM 20-50-01 and SOPM 20-50-02 as an accepted procedure.
(c) Refer to SOPM 20-50-12 as an accepted procedure.
(d) This part must be placed at bottom of the bore, between two bushings.
(e) Bond to mate surface of hand rail using adhesive.
FIGURE 2: CREW LADDER - MID-UPPER JOINTS - FASTENER ASSEMBLY REPLACEMENT
(SHEET 4 OF 4)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 10, 2016
747-25-3693
34 of 39
BOEING SERVICE BULLETIN 747-25-3693

### Page 35 (OCR)

BOEING SERVICE BULLETIN 747-25-3693
This Figure applies only to: Group 2.
STA
520
CREW LADDER  2528911
FIGURE 3: CREW LADDER - MID-UPPER JOINTS - FASTENER ASSEMBLY REPLACEMENT
(SHEET 1 OF 4)
Original Issue: November 10, 2016
Export Controlled ECCN: 9E991 - BOEING  747-25-3693
PROPRIETARY - Copyright © Unpublished  Work - See page 1 for details.  35 of 39

### Page 36 (OCR)

BOEING SERVICE BULLETIN 747-25-3693
BEFORE  AFTER
000
BEFORE  AFTER
2528807
FIGURE 3: CREW LADDER - MID-UPPER JOINTS - FASTENER ASSEMBLY REPLACEMENT
(SHEET 2 OF 4)
Original Issue: November 10, 2016
Export Controlled ECCN: 9E991 - BOEING  PROPRIETARY - Copyright © Unpublished  747-25-3693
Work - See page 1 for details.  36 of 39

### Page 37

WARNING: DO NOT WORK ON MORE THAN ONE JOINT AT A TIME. REMOVING FASTENERS FROM
MORE THAN ONE JOINT AT A TIME MAY CAUSE PERSONAL INJURY AND/OR DAMAGE TO
THE ASSEMBLY AND SURROUNDING AREA OF THE AIRPLANE.
The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for this figure.
More DataQtyIdentificationNameTaskStep
1-BOLTRemove1
2-WASHERRemove
1-NUTRemove
1-BUSHINGRemove
(a)1BACB30US3K17DBOLTInstall (New)2
1BACW10BP3CDWASHERInstall (New)
1BACB28BG03A072B1
(232U4780-24 optional)
BUSHING, PLAINInstall (New)
1BACB28AK05-038BUSHING, PLAINInstall (New)
1BACW10BP3PKWASHERInstall (New)
(b)1BACN11N3CDNUT, CASTELLATEDInstall (New)
(b)1BACP18BC02A04PPINInstall (New)
(d), (c)-BMS 5-92 TYPE 5ADHESIVEApply
(d)1232U4764-2COVERInstall (New)
1-BOLTRemove3
2-WASHERRemove
1-NUTRemove
1-BUSHINGRemove
FIGURE 3: CREW LADDER - MID-UPPER JOINTS - FASTENER ASSEMBLY REPLACEMENT
(SHEET 3 OF 4)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 10, 2016
747-25-3693
37 of 39
BOEING SERVICE BULLETIN 747-25-3693

### Page 38

More DataQtyIdentificationNameTaskStep
(a)1BACB30US3K17DBOLTInstall (New)4
1BACW10BP3CDWASHERInstall (New)
1BACB28BG03A072B1
(232U4780-24 optional)
BUSHING, PLAINInstall (New)
1BACB28AK05-038BUSHING, PLAINInstall (New)
1BACW10BP3PKWASHERInstall (New)
(b)1BACN11N3CDNUT, CASTELLATEDInstall (New)
(b)1BACP18BC02A04PPINInstall (New)
(d), (c)-BMS 5-92 TYPE 5ADHESIVEApply
(d)1232U4764-2COVERInstall (New)
(a) Insert washer onto bolt before inserting bolt into joint assembly.
(b) Refer to SOPM 20-50-01 and SOPM 20-50-02 as an accepted procedure.
(c) Refer to SOPM 20-50-12 as an accepted procedure.
(d) Bond to mate surface of hand rail using adhesive.
The parts shown in the table below are provided as extra parts for this figure.
More DataQtyIdentificationName
2BACW10BP5PKWASHER, PLAIN
FIGURE 3: CREW LADDER - MID-UPPER JOINTS - FASTENER ASSEMBLY REPLACEMENT
(SHEET 4 OF 4)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 10, 2016
747-25-3693
38 of 39
BOEING SERVICE BULLETIN 747-25-3693

### Page 39 (OCR)

BOEING SERVICE BULLETIN 747-25-3693
Boeing Part Demand Intent
After review of this service bulletin, Boeing asks that the primary engineer fill out this survey to help Boeing
predict the quantity and timing of the Boeing supplied kits.
Airline:
Contact Name:
Date:
Contact E-mail:
• Yes  • No Have/will you recommend to your airline to accomplish this service bulletin?
• Yes  - No Would issuance of an AD change this decision?
When would you likely be starting this SB incorporation? Month/ Year_
How many airplanes per month do you plan to accomplish? Airplane/Month
How many total airplanes do you plan to complete? Total Airplanes
For inspection Service Bulletins, are you planning to replace on condition, or a fleet campaign to replace on
all airplanes regardless of condition?
- On Condition  Campaign
If you are not incorporating this Service Bulletin at this time will you please help us understand the reason(s)
why? Your input will help us provide better customer support.
- Cost Prohibitive  Continue Inspections  • Other
Operator Comments:
Within 45 days of the SB issue, or as soon after as possible, please scan this form and send to:
sbsolutions@boeing.com
Disclaimer: The data provided in this survey will be used for planning purposes only and does not
constitute a commitment on any part of the airlines to purchase the parts in question, nor does it constitute  2326214
a commitment on the part of Boeing to deliver the parts in question. This survey is a projection to help
Boeing forecast demand levels and timing to better support the customers schedule.
APPENDIX A: BOEING PART DEMAND INTENT SURVEY
(SHEET 1 OF 1)
Original Issue: November 10, 2016
PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  747-25-3693
Work - See page 1 for details.  39 of 39

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
