# Boeing Service Bulletin 747-28-2228: Revision 1

- Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2019-0859; AD 2020-07-14 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Boeing Service Bulletin 747-28-2228](https://openairdocs.org/service-documents/boeing/sb-747-28-2228.md)
- Title as filed: SB-747-28-2228-01--
- Pages: 43
- PDF: https://openairdocs.org/files/sha256/07/0a/070ab0667fbba1bfabb404a3e309ca51439bef7daaee49de55d20b692d0b66e1
- Page: https://openairdocs.org/service-documents/boeing/sb-747-28-2228/file/070ab0667fbb

## Text

Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Commercial
Airplane
Group
747
Service Bulletin
Number: 747-28-2228 Revision Transmittal SheetDate: November 4, 1999
Revision 1: September 27, 2001
ATA System: 2815 2817 2825 2831
SUBJECT: FUEL - Distribution - Override/Jettison, APU and Electrical Scavenge Pump Bonding Jumper
Modification
This revision includes all pages of the service bulletin.
COMPLIANCE INFORMATION RELATED TO THIS REVISION
More work is necessary on airplanes to rebond the bonding jumper if BMS 10-20 was applied on the mating
surfaces between the bonding jumper and rear spar as previously specified in the Figures 2 and 3 of the
initial release of this service bulletin.
REASON FOR REVISION
This revision is sent to make these changes:
1. Correct bolt length for installation of bonding jumpers on the transfer/jettison pumps on the horizontal
stabilizer fuel tank. Bolt BACB30NM4HK16 callout in Figure 3 is too long for the installation and is
changed to BACB30NM4HK7.
2. Correct sequence for installation of bonding jumper and application of surface finishes in Figures 2 and 3.
3. In Figure 4 and 5, change the bonding jumper length and revise instructions to include installation of
additional washer and longer bolt for pumps that has a recess at bonding jumper mounting hole.
4. Change to make Views C-C and D-D in Figure 2 and View D-D in Figure 3 applicable to 747-400
airplanes only.
Vertical lines are put on the left edge of each page, except in Paragraph 1.A., Effectivity, to show the location
of important changes.
Pages with no vertical lines have no important changes.
REVISION HISTORY
Original Release: November 4, 1999
Revision 1: September 27, 2001
747-28-2228
Revision Transmittal Page 1 of 1

### Page 2

(No text on this page.)

### Page 3

Commercial
Airplane
Group
747
Service Bulletin
Number: 747-28-2228 SummaryDate: November 4, 1999
Revision 1: September 27, 2001
ATA System: 2815 2817 2825 2831
SUBJECT: FUEL - Distribution - Override/Jettison, APU and Electrical Scavenge Pump Bonding Jumper
Modification
CONCURRENT REQUIREMENTS
For airplanes in Group 1, you cannot make the
changes given in this service bulletin unless the
changes given in Part I of Service Bulletin
747-28-2033 are made. The changes given in
Service Bulletin 747-28-2033 were made on Groups
2, 3, and 4 airplanes before delivery.
BACKGROUND
The change in this service bulletin will make sure
that the override/jettison, APU and electrical
scavenge pumps meet the fault current bonding
requirements.
Data from the fuel tank inspection program indicates
that the existing bond path design provides
insufficient bond resistance margin between the
pump motor/impeller and structure. This service
bulletin provides instructions to replace the existing
bonding jumper with a double braid bonding jumper
and installs a second bonding jumper to lower the
resistance bond path to meet the current bonding
requirements. Incorporation of this service bulletin
provides sufficient margin to allow for deterioration
of the bond path and reduces the need for regular
maintenance and frequent bond rework.
ACTION
For Groups 1, 2 and 3 airplanes, do these steps on
the six override/jettison fuel pumps and on the two
transfer/jettison pumps for airplanes with horizontal
stabilizer tanks.
- Examine the existing bonding jumper and if
necessary replace the bonding jumper.
- Install a second bonding jumper.
For all airplanes, replace the bonding jumper on the
APU fuel pump.
For Groups 1 and 2 airplanes, replace the bonding
jumper on the electrical scavenge pump.
EFFECTIVITY
Group 1 : All 747 airplanes line numbers 1 to 167
Group 2 : All 747 airplanes line numbers 168 to 971
Group 3: All 747 airplanes line numbers 972 to 1161
Group 4: All 747 airplanes line numbers 1162 to
1229
COMPLIANCE
No compliance time is given.
INDUSTRY SUPPORT INFORMATION
Boeing warranty remedies are not available for the
configuration changes given in this service bulletin.
MANPOWER
Total Elapsed Time
Airplanes Man-Hours (Hours)
Groups 1 and 2 14.5 7.25
Group 3 13.75 6.75
Group 4 6 6
MATERIAL INFORMATION
Boeing Supplied Kits
Refer to Paragraph 2.A., Material - Price and
Availability.
747-28-2228
Summary Page 1 of 2

### Page 4

BOEING SERVICE BULLETIN 747-28-2228
THE BONDING JUMPER ON
FOR ALL AIRPLANES, REPLACEFOR GROUPS 1 AND 2 AIRPLANES,
FOR GROUPS 1, 2 AND 3 AIRPLANES
FOR GROUPS 1, 2 AND 3 AIRPLANES
TANK, EXAMINE AND IF NECESSARY,
WITH HORIZONTAL STABILIZER
TRANSFER/JETTISON FUEL PUMP
BONDING JUMPER ON THE
JUMPER AND INSTALL A SECOND
REPLACE THE EXISTING BONDING
A SECOND BONDING JUMPER ON THE
EXAMINE AND IF NECESSARY, REPLACE
OVERRIDE/JETTISON FUEL PUMPS
EXISTING BONDING JUMPER AND INSTALL
THE APU FUEL PUMP
SCAVENGE FUEL PUMP
JUMPER ON THE ELECTRICAL
REPLACE THE BONDING
S94946
November 4, 1999 747-28-2228
Revision 1: September 27, 2001 Summary Page 2 of 2

### Page 5

Commercial
Airplane
Group
747
Service Bulletin
Number: 747-28-2228
Date: November 4, 1999
Revision 1: September 27, 2001
ATA System: 2815 2817 2825 2831
SUBJECT: FUEL - Distribution - Override/Jettison, APU and Electrical Scavenge Pump Bonding Jumper
Modification
1. PLANNING INFORMATION
A. Effectivity
1. Airplanes
Refer to Service Bulletin Index Document D6-30300, Part 3 for Airplane Variable Number, Line
Number, and Serial Number data.
This service bulletin is for the airplanes shown below.
Airplane Models:
747-SP 747-SR 747-100 747-100B
747-200B 747-200C 747-200F 747-300
747-400 747-400D 747-400F
IDENTIFICATION BY CUSTOMER, CUSTOMER CODE, GROUP AND VARIABLE NUMBER
AAR AIRCRAFT SALES AND LEASING (AFD)
2 RB681-RB682
AEROLINEAS ARGENTINAS (ARG)
1 RA651 RB001
2 RD053 RD122-RD127
AGES AIRCRAFT SALES & LEASING (AGJ)
2 RB004
AIR ATLANTA ICELANDIC (AID)
1 RA533 RA742 RA762
2 RA217 RA539 RA541-RA542
AIR CANADA (ACN)
2 RA749-RA750 RD531 RT101-RT103
AIR CHINA (BEJ)
2 RD781-RD783 RG164 RG211-RG213 RR451 RT031-RT033 RT876-RT878
3 RT034-RT035 RT879-RT880
4 RM811-RM813
AIR DABIA (DBI)
1 RA406
November 4, 1999 747-28-2228
Revision 1: September 27, 2001 Page 1 of 38

### Page 6

BOEING SERVICE BULLETIN 747-28-2228
AIR FRANCE (AFA)
2 RA259 RA262-RA263 RA265 RD271-RD272 RD651-RD655 RD657-RD659
RD721-RD722 RD791-RD792 RR302 RR304-RR309 RR331-RR332 RS751-RS752
RT071-RT075 RT121 RT591 RT711-RT716
AIR GABON (GBN)
2 RD661
AIR HONG KONG (AHK)
2 RD581-RD583
AIR INDIA (AIN)
1 RA722
2 RA723 RA725 RA728-RA731 RS781-RS782
3 RU001-RU006
AIR MADAGASCAR (MAD)
2 RD561
AIR NAMIBIA (NAM)
3 RT137
AIR NEW ZEALAND (ANZ)
2 RD473-RD475 RT671-RT673 RT703 RT932
3 RM082
4 RM191-RM192
AIR PACIFIC (APC)
2 RD518
AIRFREIGHT EXPRESS LIMITED (AIF)
2 RR221-RR222
ALBARAKA (AAB)
1 RA115 RB102
ALITALIA (ALI)
2 RD181 RD451-RD456 RD751 RD753 RR561
ALL NIPPON AIRWAYS (ANA)
2 RB683 RB686-RB697 RD231-RD235 RR551-RR556 RT751-RT754 RT776-RT777
RU831-RU835
3 RT755-RT757 RU836-RU841
4 RM231-RM232
AMERICAN EXPRESS BANK (AXP)
2 RD171-RD172
AMIRI FLIGHT (ABD)
2 RH102
ASIANA AIRLINES (AAR)
2 RT131-RT133
3 RM071 RR746-RR748 RT134-RT136 RU032
4 RM861
November 4, 1999 747-28-2228
Revision 1: September 27, 2001 2

### Page 7

BOEING SERVICE BULLETIN 747-28-2228
ATLAS AIR (TLS)
2 RB684-RB685 RD044 RD361-RD366 RD411-RD412 RD641-RD643 RD646
RD691-RD692 RD752 RD754-RD755 RJ331-RJ333 RR301 RR303
4 RM891-RM899
BAHRAIN AMIRI FLIGHT (BHR)
2 RG009
BALTIA AIR LINES (BLT)
1 RA303
BOEING (TBC)
1 RA001 RA904
2 RR223-RR224 RR421
BRITISH AIRWAYS (BAB)
1 RA301 RA305-RA307
2 RA308 RA310 RA312-RA318 RB411-RB413 RD131-RD141 RD143
RD311 RT471-RT496
3 RM096-RM097 RM136-RM139 RT497-RT499 RU121-RU132
4 RM140-RM145 RM261-RM264
CAMEROON AIRLINES (CAM)
2 RD761
CANADIAN AIRLINES (CDI)
2 RT701-RT702 RT704
3 RU059
CARGOLUX AIRLINES (CLX)
2 RR701
3 RR721-RR724
4 RM881-RM883
CARLINE AIRLINES (TIC)
2 RB722
CATHAY PACIFIC AIRWAYS (CAT)
2 RD352-RD355 RD358 RR441-RR442 RR531 RS301-RS306 RT451-RT465
3 RR951-RR952 RT466-RT469
CHINA AIRLINES (CHI)
2 RD081-RD083 RD551 RG171-RG172 RG174 RR521-RR522 RT631-RT634
3 RM021 RT636-RT640
4 RM022-RM024
CONTINENTAL AIRLINES (CAL)
2 RA561 RB005-RB006
CORSAIR (COR)
1 RA023 RA025 RA675
2 RA257 RA677 RG124 RS235 RS237
DUBAI AIR WING (DAW)
2 RG191 RG193
EGYPTAIR (EGP)
2 RS731-RS732
November 4, 1999 747-28-2228
Revision 1: September 27, 2001 3

### Page 8

BOEING SERVICE BULLETIN 747-28-2228
EL AL ISRAEL AIRLINES (ELA)
1 RA781-RA782
2 RA783-RA784 RB007 RJ151-RJ152 RR225-RR226
3 RU081-RU083
4 RM091
EVA AIR (EVA)
2 RT951-RT952
3 RM116-RM117 RT161-RT168 RT953-RT955
EVERGREEN INTERNATIONAL A/L (EVR)
1 RA004 RA028 RA113 RA253 RA631 RA633
2 RB604 RB607 RD041-RD042 RJ131 RJ133
FLIGHTPLAN INTERNATIONAL (FLP)
1 RA003
GARUDA INDONESIA (GIA)
2 RD421-RD424 RT931
3 RU061-RU062
GATX CAPITAL CORPORATION (GAX)
1 RA002 RA030
GE CAPITAL CORPORATION (GEF)
1 RA005
GENERAL ELECTRIC COMPANY (GEC)
1 RA016
GOVERNMENT OF JAPAN (JAG)
2 RT681-RT682
H.M.S.F. AND AMEDEO CORP. (BWN)
2 RT440
IBERIA AIRLINES (IBE)
2 RA585 RB421 RD431-RD435
IRAN AIR (IRN)
1 RA101-RA103 RA112 RA161-RA163
2 RB711 RD681-RD682 RG101-RG104 RR001-RR004
IRAQI AIRWAYS (IRQ)
2 RG095 RJ301-RJ303
JAPAN AIRLINES (JAL)
1 RA532 RA534-RA535
2 RA526-RA528 RA537-RA538 RA540 RA543-RA548 RB721 RB723
RD055 RD221-RD227 RR261-RR262 RR264-RR267 RR361-RR362 RS001-RS002
RS251-RS259 RS263 RS265-RS268 RT641-RT656 RT861-RT864 RU801-RU807
3 RM126 RT657 RT966-RT967 RU808-RU809
4 RM127-RM129 RM316
KABO AIR (KAB)
1 RA501-RA502
November 4, 1999 747-28-2228
Revision 1: September 27, 2001 4

### Page 9

BOEING SERVICE BULLETIN 747-28-2228
KITTY HAWK INTERNATIONAL (CKF)
1 RA521 RA523-RA524 RA635 RB002
2 RA525 RD201 RD203 RD621-RD623
KLM - ROYAL DUTCH AIRLINES (KLM)
2 RD381-RD383 RD601-RD607 RS711-RS713 RT001-RT009 RT531-RT535
3 RT010-RT014
4 RM801
KOREAN AIR (KAL)
2 RD071-RD072 RD091 RD441-RD442 RG221-RG222 RJ132 RR021-RR025
RR201 RR336 RS292 RS786 RT061 RT571-RT580
3 RM011 RR861-RR862 RT581-RT588 RT590 RT811-RT814
4 RM012 RM871
KUWAIT AIRWAYS (KUW)
2 RD202 RD204
3 RT151
LUFTHANSA GERMAN AIRLINES (DLH)
2 RD182-RD183 RD291-RD292 RD644-RD645 RD647 RD649 RD771-RD775
RR202-RR206 RT041-RT047 RT431-RT439 RT441
3 RT442-RT447
4 RM001-RM002
MALAYSIA AIRLINES (MAS)
2 RD142 RD144 RS771 RT021-RT022 RT743-RT744
3 RM036-RM038 RT745-RT750 RU016-RU017
MARTINAIR HOLLAND (MTH)
2 RJ321-RJ322 RR310
MK AIRLINES (MKA)
2 RR263
NASA (NAS)
1 RA908
2 RB601
NIPPON CARGO AIRLINES (NCA)
2 RD461
NORTHWEST AIRLINES (NWA)
1 RA351 RA353 RA358 RA369-RA373
2 RD056-RD057 RD241-RD243 RD251-RD262 RR005 RR341-RR345 RR431-RR432
RR503 RT401-RT410
4 RM241-RM243
OKADA AIR (OKD)
1 RA522
OLYMPIC AIRWAYS (OLY)
2 RD022 RD048-RD050
OMAN ROYAL FLIGHT (RFO)
2 RG161 RG163
November 4, 1999 747-28-2228
Revision 1: September 27, 2001 5

### Page 10

BOEING SERVICE BULLETIN 747-28-2228
PACIFICORP AIRFINANCE (PHC)
2 RD043
PAKISTAN INT'L AIRLINES (PIA)
2 RD003-RD004 RD101-RD104 RD701-RD702
PANAIR (PNR)
2 RG122
PEGASUS AVIATION GROUP (PSS)
1 RA674
PHILIPPINE AIRLINES (PAL)
2 RD413
3 RT152 RU051-RU052 RU060
4 RM084
POLAR AIR CARGO (PAO)
1 RA007 RA013 RA027 RA401-RA405 RA632 RA634
RA910 RA914 RB041
2 RD592 RR501 RR504
QANTAS (QAN)
2 RD517 RD519 RD532-RD533 RH111-RH112 RS271-RS276 RT551-RT568
RT741-RT742
3 RU031
QATAR AIRWAYS (QTA)
2 RG162
ROYAL AIR MAROC (RAM)
2 RD671 RT717
SABENA (SAB)
2 RS761-RS762
SAUDI ARABIAN AIRLINES (SVA)
2 RB741-RB746 RB748 RH121 RR526 RS311-RS320
3 RU101-RU102
4 RM156-RM157
SAUDI ROYAL FLIGHT (SRF)
2 RH101 RH122 RS699
SINGAPORE AIRLINES (SIA)
2 RS231 RS233-RS234 RS238-RS241 RS741 RS743 RT501-RT518
3 RR851-RR856 RT519-RT530 RT831-RT837
4 RM851-RM852
SOUTH AFRICAN AIRWAYS (SAA)
1 RB071-RB073
2 RB074-RB075 RD741 RG121 RG123 RG125-RG126 RR566
RS211-RS212 RS232 RS236 RT781-RT783
3 RM081 RT784
4 RM083 RM146-RM147
SOUTHERN AIR INC (SOF)
2 RD648
November 4, 1999 747-28-2228
Revision 1: September 27, 2001 6

### Page 11

BOEING SERVICE BULLETIN 747-28-2228
STAR AIR TOURS (SRT)
2 RG192
SWISSAIR (SWS)
2 RS221-RS222 RS701-RS703
SYRIANAIR (SYR)
2 RG141-RG142
S583 (583)
2 RD166-RD167
TAAG (ANGOLA AIRLINES) (ANG)
2 RS742
TAG AVIATION (TAG)
2 RG173
THAI (TII)
2 RS341-RS342 RT691-RT696
3 RT697-RT699 RT801-RT803
4 RM026-RM027
TOWER AIR (TOW)
1 RA015 RA024 RA106 RA201 RB003 RB042
2 RA311 RA726 RD001-RD002 RD045-RD047 RD052 RD054
RD414 RD571 RE001
TRITON AVIATION SERVICES (TIA)
2 RD425-RD426
TWA (TWA)
1 RA551
2 RA266
UNITED AIRLINES (UAL)
1 RA903 RA906-RA907
2 RB010-RB012 RD301-RD302 RD513-RD516 RG006-RG007 RG091 RT601-RT619
3 RT411-RT412 RT620-RT630
4 RM166-RM176
UNITED STATES AIR FORCE (UO1)
2 RB013-RB016
UPS (UPS)
1 RA006 RA026 RA029 RA033 RA901-RA902 RA911-RA913
RA915-RA916
2 RB605 RD051 RD058-RD059 RD593
VARIG AIRLINES (VAR)
2 RS331-RS333 RS721-RS722
VIRGIN ATLANTIC AIRWAYS (VAA)
1 RA560 RA909
2 RB008-RB009 RD121 RD356-RD357 RD471-RD472
3 RT945-RT949
4 RM051
November 4, 1999 747-28-2228
Revision 1: September 27, 2001 7

### Page 12

BOEING SERVICE BULLETIN 747-28-2228
WORLDWIDE AIRCRAFT HOLDING CO. (WAH)
2 RG008
IDENTIFICATION BY VARIABLE NUMBER
GROUP 1
RA001-RA034 RA101-RA115 RA161-RA164 RA201-RA203 RA216 RA245
RA251-RA255 RA301-RA307 RA351-RA360 RA369-RA373 RA401-RA412 RA501-RA502
RA521-RA524 RA532-RA535 RA551-RA552 RA559-RA560 RA581-RA582 RA601-RA602
RA631-RA635 RA651-RA652 RA671-RA676 RA701-RA702 RA721-RA722 RA741-RA743
RA761-RA762 RA781-RA782 RA901-RA916 RB001-RB003 RB041-RB044 RB071-RB073
RB101-RB102
GROUP 2
RA217 RA246 RA256-RA266 RA308-RA318 RA413-RA418 RA525-RA528
RA536-RA548 RA561 RA585 RA677 RA723-RA731 RA744-RA745
RA749-RA750 RA783-RA784 RB004-RB016 RB074-RB075 RB411-RB413 RB421
RB601-RB607 RB681-RB697 RB711 RB721-RB723 RB741-RB748 RD001-RD004
RD021-RD022 RD041-RD059 RD071-RD072 RD081-RD083 RD091-RD092 RD101-RD104
RD121-RD127 RD131-RD144 RD166-RD167 RD171-RD172 RD181-RD183 RD201-RD204
RD221-RD227 RD231-RD235 RD241-RD243 RD251-RD262 RD271-RD272 RD291-RD292
RD301-RD302 RD311 RD351-RD358 RD361-RD366 RD381-RD383 RD411-RD414
RD421-RD426 RD431-RD435 RD441-RD442 RD451-RD456 RD461 RD471-RD475
RD513-RD519 RD531-RD533 RD551 RD561 RD571 RD581-RD583
RD591-RD593 RD601-RD607 RD621-RD623 RD641-RD649 RD651-RD659 RD661
RD671 RD681-RD682 RD691-RD692 RD701-RD702 RD721-RD722 RD741-RD742
RD751-RD755 RD761 RD771-RD775 RD781-RD783 RD791-RD792 RE001
RG001-RG009 RG091 RG095 RG101-RG104 RG121-RG126 RG141-RG142
RG161-RG164 RG171-RG174 RG191-RG193 RG211-RG213 RG221-RG222 RH101-RH102
RH111-RH112 RH121-RH122 RJ131-RJ133 RJ151-RJ152 RJ301-RJ303 RJ321-RJ322
RJ331-RJ333 RR001-RR005 RR021-RR025 RR031 RR201-RR206 RR221-RR226
RR261-RR267 RR301-RR310 RR331-RR332 RR336 RR341-RR345 RR361-RR362
RR421-RR422 RR431-RR432 RR441-RR442 RR451 RR501-RR504 RR521-RR522
RR526 RR531 RR551-RR556 RR561 RR566 RR701
RS001-RS002 RS201 RS211-RS212 RS221-RS222 RS231-RS241 RS251-RS259
RS263 RS265-RS268 RS271-RS276 RS291-RS292 RS301-RS306 RS311-RS320
RS331-RS333 RS341-RS342 RS699 RS701-RS703 RS711-RS713 RS721-RS722
RS731-RS732 RS741-RS743 RS751-RS752 RS761-RS762 RS771 RS781-RS782
RS786 RT001-RT009 RT021-RT022 RT031-RT033 RT041-RT047 RT061
RT071-RT075 RT101-RT103 RT121 RT131-RT133 RT401-RT410 RT431-RT441
RT451-RT465 RT471-RT496 RT501-RT518 RT531-RT535 RT551-RT568 RT571-RT580
RT591 RT601-RT619 RT631-RT634 RT641-RT656 RT671-RT673 RT681-RT682
RT691-RT696 RT701-RT704 RT711-RT717 RT741-RT744 RT751-RT754 RT776-RT777
RT781-RT783 RT861-RT864 RT876-RT878 RT931-RT932 RT951-RT952 RU801-RU807
RU831-RU835
GROUP 3
RM011 RM021 RM036-RM038 RM071 RM081-RM082 RM096-RM097
RM116-RM117 RM126 RM136-RM139 RR721-RR724 RR746-RR748 RR851-RR856
RR861-RR862 RR951-RR952 RT010-RT014 RT034-RT035 RT134-RT137 RT151-RT152
RT161-RT168 RT411-RT412 RT442-RT447 RT466-RT469 RT497-RT499 RT519-RT530
RT581-RT590 RT620-RT630 RT635-RT640 RT657 RT697-RT699 RT745-RT750
RT755-RT757 RT784 RT801-RT803 RT811-RT814 RT831-RT837 RT879-RT880
RT945-RT949 RT953-RT955 RT966-RT967 RU001-RU006 RU016-RU017 RU031-RU032
RU051-RU052 RU059-RU062 RU081-RU083 RU101-RU102 RU121-RU132 RU808-RU809
RU836-RU841
November 4, 1999 747-28-2228
Revision 1: September 27, 2001 8

### Page 13

BOEING SERVICE BULLETIN 747-28-2228
GROUP 4
RM001-RM002 RM012 RM022-RM024 RM026-RM027 RM051 RM083-RM084
RM091 RM127-RM129 RM140-RM147 RM156-RM157 RM166-RM176 RM191-RM192
RM231-RM232 RM241-RM243 RM261-RM264 RM316 RM801 RM811-RM813
RM851-RM852 RM861 RM871 RM881-RM883 RM891-RM899
2. Spares Affected
None
November 4, 1999 747-28-2228
Revision 1: September 27, 2001 9

### Page 14

BOEING SERVICE BULLETIN 747-28-2228
B. Concurrent Requirements
For airplanes in Group 1, you cannot make the changes given in this service bulletin unless the
changes given in Part I of Service Bulletin 747-28-2033 are made. The changes given in Service
Bulletin 747-28-2033 were made on Groups 2, 3, and 4 airplanes before delivery.
C. Reason
The change in this service bulletin will make sure that the override/jettison, APU and electrical
scavenge pumps meet the fault current bonding requirements.
Data from the fuel tank inspection program indicates that the existing bond path design provides
insufficient bond resistance margin between the pump motor/impeller and structure. This service
bulletin provides instructions to replace the existing bonding jumper with a double braid bonding
jumper and installs a second bonding jumper to lower the resistance bond path to meet the current
bonding requirements. Incorporation of this service bulletin provides sufficient margin to allow for
deterioration of the bond path and reduces the need for regular maintenance and frequent bond
rework.
Revision 1 is sent to make these changes:
1. Correct bolt length for installation of bonding jumpers on the transfer/jettison pumps on the
horizontal stabilizer fuel tank. Bolt BACB30NM4HK16 callout in Figure 3 is too long for the
installation and is changed to BACB30NM4HK7.
2. Correct sequence for installation of bonding jumper and application of surface finishes in Figures 2
and 3.
3. In Figure 4 and 5, change the bonding jumper length and revise instructions to include installation
of additional washer and longer bolt for pumps that has a recess at bonding jumper mounting hole.
4. Change to make Views C-C and D-D in Figure 2 and View D-D in Figure 3 applicable to 747-400
airplanes only.
D. Description
For Groups 1, 2 and 3 airplanes, do these steps on the six override/jettison fuel pumps and on the
two transfer/jettison pumps for airplanes with horizontal stabilizer tanks.
- Examine the existing bonding jumper and if necessary replace the bonding jumper.
- Install a second bonding jumper.
For all airplanes, replace the bonding jumper on the APU fuel pump.
For Groups 1 and 2 airplanes, replace the bonding jumper on the electrical scavenge pump.
Revision 1 - more work is necessary on airplanes to rebond the bonding jumper if BMS 10-20 was
applied on the mating surfaces between the bonding jumper and rear spar as previously specified in
the Figures 2 and 3 of the initial release of this service bulletin..
The airplane effectivity is divided into four groups because of configuration differences.
NOTE: This service bulletin is applicable to Group 1 airplanes if the changes given in Part I of
Service Bulletin 747-28-2033 were made. The changes given in Service Bulletin
747-28-2033 were made on Groups 2, 3, and 4 airplanes.
November 4, 1999 747-28-2228
Revision 1: September 27, 2001 10

### Page 15

BOEING SERVICE BULLETIN 747-28-2228
E. Compliance
No compliance time is given.
F. Approval
This service bulletin was examined by the Federal Aviation Administration (FAA). The changes
specified in this service bulletin comply with the applicable Federal Aviation Regulations (FAR) and
are FAA approved. This service bulletin and the FAA approval were based on the airplane in its
original Boeing delivery configuration or as modified by other FAA approved Boeing changes.
If an airplane has a non-Boeing modification or repair that affects a component or system also
affected by this service bulletin, the operator is responsible for obtaining appropriate regulatory
agency approval before incorporating this service bulletin.
G. Manpower
The table below shows an estimate of the man-hours necessary to do this change for each airplane.
This estimate is for direct labor only, done by an experienced crew. Adjust the estimate with operator
man-hour data if necessary. The estimate does not include lost time. These are some examples of
lost time:
- Time to adjust to the workplace
- Time to schedule the work
- Time to examine the work
- Time to cure the materials
- Time to make the parts
- Time to find the tools.
Airplane Task Number of Persons Man-Hours Elapsed Time (Hours)
Groups 1, 2
Open Access 2 2 1
Change 2 8 4
Close Access 2 2 1
Test 2 2.5 1.25
TOTAL FOR EACH AIRPLANE 14.5 7.25
Group 3
Open Access 2 2 1
Change 2 7.5 3.75
Close Access 2 2 1
Test 2 2.25 1
TOTAL FOR EACH AIRPLANE 13.75 6.75
Group 4
Open Access 1 1.5 1.5
Change 1 2.25 2.25
Close Access 1 1.5 1.5
Test 1 0.75 0.75
TOTAL FOR EACH AIRPLANE 6 6
November 4, 1999 747-28-2228
Revision 1: September 27, 2001 11

### Page 16

BOEING SERVICE BULLETIN 747-28-2228
H. Weight and Balance Changes
Change in Weight Change in Moment
Airplane (Pounds) (Pound-Inches)
Groups 1 and 2 + 1.8 + 2482
Group 3 + 1.6 + 2206
Group 4 + 0.2 + 250
I. Electrical Load Data
Not applicable
J. References
1. Existing Data:
a. 747/747-400 Maintenance Manual (AMM) Subjects 09-11-00, 32-00-30, 51-31-01
b. Boeing Standard Wiring Practices Manual (BSWPM) 20-20-00
c. Boeing Standard Overhaul Practices Manual (BSOPM) 20-11-03, 20-43-03
d. Boeing Service Bulletin 747-28-2033, "Fuel Pump - Motor Housing External Bonding Jumper
Installation"
2. Data supplied with this service bulletin:
None
3. Installation Drawings Used in the Preparation of This Service Bulletin:
Drawing Number Title
65B92603 Equipment Instl - Pressure Fuel, Defuel
and Jettison System
344U1014 Equipment Instl - Fuel Transfer
Horizontal Stab
65B92403 Equipment Instl - APU Fuel, Section 12
65B92406 Scavenge System Instl - Center Wing
Tank
These drawings were used to prepare this service bulletin. These drawings are not necessary to
make the specified changes, and are not supplied with this service bulletin. These drawings may
not be applicable to all airplane configurations or operators.
November 4, 1999 747-28-2228
Revision 1: September 27, 2001 12

### Page 17

BOEING SERVICE BULLETIN 747-28-2228
K. Publications Changed
Publication Chapter-Section
747 Maintenance Manual 28-31
747 Illustrated Parts Catalog 28-31
L. Interchangeability and Intermixability of Parts
Refer to Paragraph 2.E., Existing Parts Accountability, for interchangeability and intermixability
information.
November 4, 1999 747-28-2228
Revision 1: September 27, 2001 13

### Page 18

BOEING SERVICE BULLETIN 747-28-2228
BLANK PAGE
November 4, 1999 747-28-2228
Revision 1: September 27, 2001 14

### Page 19

BOEING SERVICE BULLETIN 747-28-2228
2. MATERIAL INFORMATION
A. Material - Price and Availability
Boeing can supply the kits shown in Paragraph 2.C., Parts Necessary For Each Airplane, as shown
below. Kit availability is shown in the Reorder Lead Time (ROLT). ROLT is calculated from the date
Boeing gets the purchase order.
ROLT Unit Price thru
Kit Number Name (weeks) Dec 31/00
015U1634-1 Top Kit 26 $ 959.00
015U1634-2 Kit 25 $ 82.00
015U1634-3 Kit 25 $ 227.00
015U1634-4 Kit 18 $ 3.60
015U1634-5 Kit 25 $ 84.70
The kits are subject to the terms and conditions of the Boeing standard purchase order
acknowledgment. After the Unit Price date, new price {and ROLT} data is applicable. Prices are in
United States dollars. Terms: Net 30 days.
Send purchase orders and letters about the supply data to the Director of Spares and refer to this
service bulletin number.
B. Industry Support Information
Boeing warranty remedies are not available for the configuration changes given in this service
bulletin.
C. Parts Necessary For Each Airplane
1. Kits:
To get the kits shown below, refer to Paragraph 2.A., Material - Price and Availability.
NOTE: One top kit and the items shown in Paragraph 2.C.2., Parts and Materials Supplied by the
Operator, are necessary for each airplane. Top kit 015U1634-1 contains enough parts to
make a modification on all pumps for each airplane; however, operators can order kits
015U1634-2, -3, -4 or -5 to make a modification on one or more pumps as necessary.
015U1634 - TOP KIT, FUEL PUMP BONDING JUMPER MODIFICATION
-1 -2 -3 -4 -5
QTY Part Number Name
- . . . . 015U1634-1 Top Kit
4 - . . . 015U1634-2 (a) Kit, Bonding Jumper Modification for Main
Tank outboard or Center Wing
Override/Jettison Pump
2 . - . . 015U1634-3 (a) Kit, Bonding Jumper Modification for Main
Tank Inboard Override/Jettison Pump
2 . . - . 015U1634-4 (a) Kit, Bonding Jumper Replacement for APU
or Electrical Scavenge Pump
November 4, 1999 747-28-2228
Revision 1: September 27, 2001 15

### Page 20

BOEING SERVICE BULLETIN 747-28-2228
(Continued)
015U1634 - TOP KIT, FUEL PUMP BONDING JUMPER MODIFICATION
-1 -2 -3 -4 -5
QTY Part Number Name
2 . . . - 015U1634-5 (a) Kit, Bonding Jumper Modification for
Horizontal Stabilizer Transfer/Jettison Pump
. 2 2 . 2 BACJ40E20-24 Bonding Jumper
. . 2 . . 303U0013-2 Bonding Jumper
. . . 1 . BACJ40D10-32 Bonding Jumper
. 1 1 . 1 69B92489-14 Bonding Clip
. 1 1 . 1 BACB30NM4K4 Bolt
. . 1 . 1 BACB30NM4HK7 Bolt
. 1 1 . . BACB30NM4HK13 Bolt
. 1 1 . . BACB30NM4HK16 Bolt
. . . 6 . NAS1149D0316J Washer
. 8 8 . 8 NAS1149D0416J Washer
. 3 3 . 3 NAS1149DN832J Washer
. 1 1 . 1 MS21042L4 Nut
. . . 1 . NAS1149D0363H Washer
. . . 1 . BACB30NM3K16 Bolt
(a) The kit has more parts than are necessary for installation. Discard parts that are not used or
keep the parts for spares.
2. Parts and Materials Supplied by the Operator:
QTY Part Number {Specification} Name
5 ounces BMS 10-20 (a) Primer
8 ounces BMS 5-142 (a) Sealant
5 ounces Alodine 600 (b) Chemical Conversion Coating
10 feet MS20995NC32 Lockwire
(a) See the Qualified Products List at the end of the Boeing Material
Specification (BMS) for supplier data.
(b) Parker - Amchem (V84063)
32100 Stephens Hwy
Madison Heights, Michigan 48071
D. Parts Necessary to Change Spares
None
November 4, 1999 747-28-2228
Revision 1: September 27, 2001 16

### Page 21

BOEING SERVICE BULLETIN 747-28-2228
E. Existing Parts Accountability
The parts shown below are changed as shown in this service bulletin. Quantity (QTY) is the number
of parts changed on each airplane.
Existing Part Number RUC Name QTY New Part Number PNC RC
BACJ40D20-24 DIS Bonding Jumper 6 (a) BACJ40E20-24 S C
BACJ40A20-6 DIS Bonding Jumper 2 BACJ40D10-32 S C
303U0013-1 DIS Bonding Jumper 2 303U0013-2 S C
(a) Quantity is 8 for airplanes with horizontal stabilizer fuel tank.
RUC Recommended Use Code
DIS - Discard the part.
- Keep the part if there are other uses for it.
PNC Part Number Code
S - This is the part number for the new equivalent or replacement part.
- To get a new part, use this part number in your order.
RC Replacement Code
C - You can use the existing part to replace the new or changed part. If you use the
existing part, you cancel the effect of the change given in this service bulletin.
F. Special Tooling - Price and Availability
None
G. Special Tooling Necessary to do this Service Bulletin
No special tools or equipment are necessary to do the change in this service bulletin. But,
maintenance and overhaul tools in the manuals given in Paragraph 1.J., References, can be
necessary. Examine operator tool supply to make sure all necessary tools are available.
November 4, 1999 747-28-2228
Revision 1: September 27, 2001 17

### Page 22

BOEING SERVICE BULLETIN 747-28-2228
BLANK PAGE
November 4, 1999 747-28-2228
Revision 1: September 27, 2001 18

### Page 23

BOEING SERVICE BULLETIN 747-28-2228
3. ACCOMPLISHMENT INSTRUCTIONS
GENERAL NOTES
1. The paragraphs identified with a letter give the general work instructions and the necessary tests.
The instructions identified with numbers on the figures give the recommended sequence of steps.
2. Unless shown differently, these dimensions and tolerances are used:
- Linear dimensions are in inches
- Tolerance on linear dimensions, other than rivet and bolt edge margins, is plus or minus 0.03
inch
- Tolerance on rivet and bolt edge margin is plus or minus 0.05 inch
- Angular tolerance is plus or minus 2 degrees
- Hole dimensions for standard solid rivets are given in 747 Structural Repair Manual, Chapter 51
- Torque limits to tighten nuts and bolts are given in 747 Structural Repair Manual, Chapter 51.
3. Alternative fasteners are given in 747 Structural Repair Manual, Chapter 51.
4. Obey all of the warnings and cautions given in the specified manual sections.
WORK INSTRUCTIONS
A. Install the wing body landing gear ground lockpins as specified in the 747/747-400 AMM 09-11-00.
B. Install the wing body landing gear door locks as specified in the 747/747-400 AMM 32-00-30.
C. For Groups 1, 2 and 3 airplanes, do these steps:
1. For airplanes with horizontal stabilizer fuel tank, open the horizontal jackscrew access door
312A.
2. Examine the bonding jumper as shown in Figure 1 and do the applicable step:
a. If the bonding jumper has only one piece braid, replace existing bonding jumper as shown
in Figure 2 and install a second bonding jumper as shown in Figure 3.
b. If the bonding jumper has two piece braid, install a second bonding jumper as shown in
Figure 3.
D. For all airplanes, replace the bonding jumpers on the APU pump as shown in Figure 4.
E. For Groups 1 and 2 airplanes, replace the bonding jumper on the electrical scavenge pump as
shown in Figure 5.
F. Put the airplane back to a serviceable condition.
November 4, 1999 747-28-2228
Revision 1: September 27, 2001 19

### Page 24

BOEING SERVICE BULLETIN 747-28-2228
FIGURE TABLE OF CONTENTS
Title Page
FIGURE 1. OVERRIDE/JETTISON PUMP BONDING JUMPER EXAMINATION -
GROUPS 1, 2 AND 3 AIRPLANES . . . ............................. 2 1
FIGURE 2. OVERRIDE/JETTISON PUMP BONDING JUMPER REPLACEMENT -
GROUPS 1, 2 AND 3 AIRPLANES . . . ............................. 2 4
FIGURE 3. OVERRIDE/JETTISON PUMP SECOND BONDING JUMPER
INSTALLATION - GROUPS 1, 2 AND 3 AIRPLANES . ................. 2 8
FIGURE 4. APU PUMP BONDING JUMPER REPLACEMENT - ALL AIRPLANES .... 3 3
FIGURE 5. ELECTRICAL SCAVENGE PUMP BONDING JUMPER
REPLACEMENT - GROUPS 1 AND 2 AIRPLANES . . ................. 3 6
November 4, 1999 747-28-2228
Revision 1: September 27, 2001 20

### Page 25

BOEING SERVICE BULLETIN 747-28-2228
SEE A
OVERRIDE/JETTISON PUMP
SEE A
STABILIZER FUEL
WITH HORIZONTAL
PUMP FOR AIRPLANES
TRANSFER/JETTISON
TANK
S94960
FIGURE 1. OVERRIDE/JETTISON PUMP BONDING JUMPER EXAMINATION - GROUPS 1, 2 AND 3
AIRPLANES
November 4, 1999 SHEET 1 OF 3 747-28-2228
Revision 1: September 27, 2001 21

### Page 26

BOEING SERVICE BULLETIN 747-28-2228
2
2
1 1
ONE PIECE BRAID
BONDING JUMPER
TWO PIECE BRAID
A
ELECTRICAL CONNECTOR
PUMPS WITH A FACE MOUNTED
ELECTRICAL CONNECTOR
PUMPS WITH A BRACKET MOUNTED
BONDING JUMPER
S95000
FIGURE 1. OVERRIDE/JETTISON PUMP BONDING JUMPER EXAMINATION - GROUPS 1, 2 AND 3
AIRPLANES
November 4, 1999 SHEET 2 OF 3 747-28-2228
Revision 1: September 27, 2001 22

### Page 27

BOEING SERVICE BULLETIN 747-28-2228
The step numbers shown below agree with the numbers shown in the circle symbols in the figure.
STEP TASK NAME PART NUMBER QTY NOTES
1 Examine Bonding Jumper - - For number of braid piece. See
illustration.
If the bonding jumper has two piece braid, do step 2 as shown below.
2 Measure
and
Record
Bonding Resistance - - Between the pump motor case
and structure. Maximum 0.0002
ohms.
Rework Bonding Jumper
Connections
- - If the bonding resistance is
more than 0.0002 ohm.
FIGURE 1. OVERRIDE/JETTISON PUMP BONDING JUMPER EXAMINATION - GROUPS 1, 2 AND 3
AIRPLANES
November 4, 1999 SHEET 3 OF 3 747-28-2228
Revision 1: September 27, 2001 23

### Page 28

BOEING SERVICE BULLETIN 747-28-2228
EXCEPT 747−400SEE A BSEE
SEE A
SEE A
STABILIZER FUEL TANK
WITH HORIZONTAL
PUMP FOR AIRPLANES
TRANSFER/JETTISON
OVERRIDE/JETTISON PUMP
MAIN TANK INBOARD
OVERRIDE/JETTISON PUMP
S95034
FIGURE 2. OVERRIDE/JETTISON PUMP BONDING JUMPER REPLACEMENT - GROUPS 1, 2 AND 3
AIRPLANES
November 4, 1999 SHEET 1 OF 4 747-28-2228
Revision 1: September 27, 2001 24

### Page 29

BOEING SERVICE BULLETIN 747-28-2228
B
ELECTRICAL CONNECTOR
PUMPS WITH A FACE MOUNTED
ELECTRICAL CONNECTOR
PUMPS WITH A BRACKET MOUNTED
A
ELECTRICAL CONNECTOR
PUMPS WITH A FACE MOUNTED
ELECTRICAL CONNECTOR
PUMPS WITH A BRACKET MOUNTED
D
DC
C
B
BA
A
S95165
FIGURE 2. OVERRIDE/JETTISON PUMP BONDING JUMPER REPLACEMENT - GROUPS 1, 2 AND 3
AIRPLANES
November 4, 1999 SHEET 2 OF 4 747-28-2228
Revision 1: September 27, 2001 25

### Page 30

BOEING SERVICE BULLETIN 747-28-2228
9
9
114
114 12
114 12
114
8
10
3 6
2
71
114 12 114114 12
9
9
53
114
8
10
71
2
3 6
10
3 5
82
71
10
82
71
C−C
A−A
D−D
B−B
S95162
FIGURE 2. OVERRIDE/JETTISON PUMP BONDING JUMPER REPLACEMENT - GROUPS 1, 2 AND 3
AIRPLANES
November 4, 1999 SHEET 3 OF 4 747-28-2228
Revision 1: September 27, 2001 26

### Page 31

BOEING SERVICE BULLETIN 747-28-2228
The step numbers shown below agree with the numbers shown in the circle symbols in the figure.
STEP TASK NAME PART NUMBER QTY NOTES
1 Remove Bolt - - Keep
Washer - - Discard
2 Remove Bolt - - Keep
Washer - - Discard
Nut - - Keep
3 Remove /
Discard
Bonding Jumper - - -
4 Clean Mating Surfaces - - Refer to the BSOPM 20-11-03.
5 Install Bonding Jumper BACJ40E20-24 8 Only quantity of 6 is required for
747-400 airplanes.
6 Install Bonding Jumper 303U0013-2 2 -
7 Install Bolt (kept) - - -
Washer NAS1149D0416J 8 -
8 Install Bolt (kept) - - -
Washer NAS1149D0416J 16 -
Nut (kept) - - -
9 Measure
and
Record
Bonding Resistance - - Between the pump motor case
and structure. Maximum 0.0002
ohms. Refer to the BSWPM
20-20-00.
10 Install Sealant BMS 5-142 - Refer to the 747/747-400 AMM
51-31-01. Make sure the
mating surface between
bonding jumper terminal and
rear spar is completely sealed.
11 Apply Chemical
Conversion Coating
Alodine 600 To bared surface if any. Refer
to the BSOPM 20-43-03.
12 Apply Primer BMS 10-20 - To bared surface if any.
FIGURE 2. OVERRIDE/JETTISON PUMP BONDING JUMPER REPLACEMENT - GROUPS 1, 2 AND 3
AIRPLANES
November 4, 1999 SHEET 4 OF 4 747-28-2228
Revision 1: September 27, 2001 27

### Page 32

BOEING SERVICE BULLETIN 747-28-2228
EXCEPT 747−400
A B
(TYPICAL) (TYPICAL)
SEE A
SEE A
OVERRIDE/JETTISON PUMP
SEE A BSEE
MAIN TANK INBOARD
OVERRIDE/JETTISON PUMP
A
A B
B
TRANSFER/JETTISON
AIRPLANES WITH
PUMP FOR
HORIZONTAL
STABILIZER FUEL
TANK
S95230
FIGURE 3. OVERRIDE/JETTISON PUMP SECOND BONDING JUMPER INSTALLATION - GROUPS 1, 2
AND 3 AIRPLANES
November 4, 1999 SHEET 1 OF 5 747-28-2228
Revision 1: September 27, 2001 28

### Page 33

BOEING SERVICE BULLETIN 747-28-2228
4
31
2 2
4
4
31
SEE C
C
JUMPER INSTALLATION
FOR OPTIONAL BONDING
JUMPER INSTALLATION
OPTIONAL BONDING
A−A B−B
E
E
UP
D
D
UP
C
C
UP
S95229
FIGURE 3. OVERRIDE/JETTISON PUMP SECOND BONDING JUMPER INSTALLATION - GROUPS 1, 2
AND 3 AIRPLANES
November 4, 1999 SHEET 2 OF 5 747-28-2228
Revision 1: September 27, 2001 29

### Page 34

BOEING SERVICE BULLETIN 747-28-2228
84
10
5 13
10
5 13
12
7
4 9
13 145
11
14135
12
6
11
10
5 13
12
7
4 9
13 145
11
D−DC−C
E−E
V60825
FIGURE 3. OVERRIDE/JETTISON PUMP SECOND BONDING JUMPER INSTALLATION - GROUPS 1, 2
AND 3 AIRPLANES
November 4, 1999 SHEET 3 OF 5 747-28-2228
Revision 1: September 27, 2001 30

### Page 35

BOEING SERVICE BULLETIN 747-28-2228
The step numbers shown below agree with the numbers shown in the circle symbols in the figure.
STEP TASK NAME PART NUMBER QTY NOTES
1 Remove Lockwire - - If the bolt has lockwire
Nut - - Keep
Washer - - Discard
2 Clean Mating Surfaces - - -
Apply Alodine 600 - - On the pump housing surface.
Install Bonding Clip 69B92489-14 8 -
3 Install Nut (kept) - - -
Washer NAS1149DN832J 16 -
Lockwire MS20995NC32 - -
4 Remove /
Discard
Lockwire - - If the bolt has lockwire.
Bolt - - -
Washer - - -
5 Clean Mating Surfaces - - Refer to the BSOPM 20-11-03.
6 Install Bonding Jumper BACJ40E20-24 8 Only quantity of 6 is required for
747-400 airplanes.
7 Install Bonding Jumper 303U0013-2 2 -
8 Install Bolt BACB30NM4HK13
or
BACB30NM4HK16
6 For override/jettision pumps on
the wing fuel tank. Use the
required fastener. Only quantity
of 4 is required for 747-400
airplanes.
BACB30NM4HK7 2 For transfer/jettison pumps on
the horizontal stabilizer fuel tank
Washer NAS1149D0416J 6 -
Lockwire MS20995NC32 - Necessary only if the adjacent
bolt has hole for lockwire.
9 Install Bolt BACB30NM4HK7 2
Washer NAS1149D0416J 2 -
Lockwire MS20995NC32 - Necessary only if the adjacent
bolt has hole for lockwire.
10 Install Bolt BACB30NM4K4 8 -
Washer NAS1149D0416J 16 -
Nut MS21042L4 8 -
11 Measure Bonding Resistance - - Between pump motor case and
structure. The resistance value
should be less than the record
value in Figure 1 or Figure 2.
Maximum 0.0002 ohms. Refer
to the BSWPM 20-20-00.
FIGURE 3. OVERRIDE/JETTISON PUMP SECOND BONDING JUMPER INSTALLATION - GROUPS 1, 2
AND 3 AIRPLANES
November 4, 1999 SHEET 4 OF 5 747-28-2228
Revision 1: September 27, 2001 31

### Page 36

BOEING SERVICE BULLETIN 747-28-2228
(Continued)
STEP TASK NAME PART NUMBER QTY NOTES
12 Apply Sealant BMS 5-142 - Refer to the 747/747-400 AMM
51-31-01. Make sure the
mating surface between
bonding jumper terminal and
rear spar is completely sealed.
13 Apply Chemical
Conversion Coating
Alodine 600 - To bared surface if any. Refer
to the BSOPM 20-43-03.
14 Apply Primer BMS 10-20 - To bared surface if any.
FIGURE 3. OVERRIDE/JETTISON PUMP SECOND BONDING JUMPER INSTALLATION - GROUPS 1, 2
AND 3 AIRPLANES
November 4, 1999 SHEET 5 OF 5 747-28-2228
Revision 1: September 27, 2001 32

### Page 37

BOEING SERVICE BULLETIN 747-28-2228
INBDFWD
7
62
15
43
A
A
APU FUEL BOOST PUMP
S95837
FIGURE 4. APU PUMP BONDING JUMPER REPLACEMENT - ALL AIRPLANES
November 4, 1999 SHEET 1 OF 3 747-28-2228
Revision 1: September 27, 2001 33

### Page 38

BOEING SERVICE BULLETIN 747-28-2228
WITHOUT RECESS
WITH RECESS
HOUSING
A−A
BONDING JUMPER
WASHER
BOLT
WASHER
HOUSING
ACTUATOR
PUMP
BONDING JUMPER
BOLT
WASHER
WASHER
ACTUATOR
PUMP
TO FILL RECESS
V52076
FIGURE 4. APU PUMP BONDING JUMPER REPLACEMENT - ALL AIRPLANES
November 4, 1999 SHEET 2 OF 3 747-28-2228
Revision 1: September 27, 2001 34

### Page 39

BOEING SERVICE BULLETIN 747-28-2228
The step numbers shown below agree with the numbers shown in the circle symbols in the figure.
STEP TASK NAME PART NUMBER QTY NOTES
1 Remove Bolt - - Keep
Washer - - Discard
Nut - - Keep
2 Remove Lockwire - - -
Bolt - - Keep
Washer - - Discard
3 Remove /
Discard
Bonding Jumper - - -
4 Clean Mating Surfaces - - Refer to the BSOPM 20-11-03.
Remove Red Band - - On the bonding jumper if
installed.
Install Bonding Jumper BACJ40D10-32 1 -
5 Install Bolt (kept) - - -
Washer NAS1149D0316J 3 -
Nut (kept) - - -
6 Install Bolt (kept) - - If the bonding jumper mounting
hole at the pump does not have
a recess.Washer NAS1149D0316J 2
Lockwire MS20995NC32 -
Or
Install Bolt BACB30NM3K16 1 If the bonding jumper mounting
hole at the pump has a recess.
Install thick washer
NAS1149D0363H between
bonding jumper and pump
actuator housing to fill the
recess and washer
NAS1149D0316J under the bolt
head.
Washer NAS1149D0316J 1
Washer NAS1149D0363H 1
Lockwire MS20995NC32 -
7 Measure Bonding Resistance - - Between the pump housing and
rear spar structure. Maximum
0.001 ohms. Refer to the
BSWPM 20-20-00.
FIGURE 4. APU PUMP BONDING JUMPER REPLACEMENT - ALL AIRPLANES
November 4, 1999 SHEET 3 OF 3 747-28-2228
Revision 1: September 27, 2001 35

### Page 40

BOEING SERVICE BULLETIN 747-28-2228
INBDFWD
3 4
51
26
7
A
A
ELECTRICAL SCAVENGE PUMP
S95838
FIGURE 5. ELECTRICAL SCAVENGE PUMP BONDING JUMPER REPLACEMENT - GROUPS 1 AND 2
AIRPLANES
November 4, 1999 SHEET 1 OF 3 747-28-2228
Revision 1: September 27, 2001 36

### Page 41

BOEING SERVICE BULLETIN 747-28-2228
WITHOUT RECESS
WITH RECESS
HOUSING
A−A
BONDING JUMPER
WASHER
BOLT
WASHER
HOUSING
ACTUATOR
PUMP
BONDING JUMPER
BOLT
WASHER
WASHER
ACTUATOR
PUMP
TO FILL RECESS
V52085
FIGURE 5. ELECTRICAL SCAVENGE PUMP BONDING JUMPER REPLACEMENT - GROUPS 1 AND 2
AIRPLANES
November 4, 1999 SHEET 2 OF 3 747-28-2228
Revision 1: September 27, 2001 37

### Page 42

BOEING SERVICE BULLETIN 747-28-2228
The step numbers shown below agree with the numbers shown in the circle symbols in the figure.
STEP TASK NAME PART NUMBER QTY NOTES
1 Remove Bolt - - Keep
Washer - - Discard
Nut - - Keep
2 Remove Lockwire - - -
Bolt - - Keep
Washer - - Discard
3 Remove /
Discard
Bonding Jumper - - -
4 Clean Mating Surfaces - - Refer to the BSOPM 20-11-03.
Remove Red Band - - On the bonding jumper if
installed.
Install Bonding Jumper BACJ40D10-32 1 -
5 Install Bolt (kept) - - -
Washer NAS1149D0316J 3 -
Nut (kept) - - -
6 Install Bolt (kept) - - If the bonding jumper mounting
hole at the pump does not have
a recess.Washer NAS1149D0316J 2
Lockwire MS20995NC32 -
Or
Install Bolt BACB30NM3K16 - If the bonding jumper mounting
hole at the pump has a recess.
Install thick washer
NAS1149D0363H between
bonding jumper and pump
actuator housing to fill the
recess and washer
NAS1149D0316J under the bolt
head.
Washer NAS1149D0316J 1
Washer NAS1149D0363H 1
Lockwire MS20995NC32 -
7 Measure Bonding Resistance - - Between the pump housing and
rear spar structure. Maximum
0.001 ohms. Refer to the
BSWPM 20-20-00.
FIGURE 5. ELECTRICAL SCAVENGE PUMP BONDING JUMPER REPLACEMENT - GROUPS 1 AND 2
AIRPLANES
November 4, 1999 SHEET 3 OF 3 747-28-2228
Revision 1: September 27, 2001 38

### Page 43

Commercial
Airplane
Group
747
Service Bulletin
Number: 747-28-2228 Evaluation FormDate: November 4, 1999
Revision 1: September 27, 2001
ATA System: 2815 2817 2825 2831
Prepared By: Tuan Lam
SUBJECT: FUEL - Distribution - Override/Jettison, APU and Electrical Scavenge Pump Bonding Jumper
Modification
Use this evaluation form to tell us what you think of the quality of this service bulletin. We will use the data
that you give us to improve the quality of our service bulletins.
NOTE: Please do not use this evaluation form to tell us to make changes to your manuals. To make these
changes, please use a Publication Change Request (PCR) form.
Please give us this data:
(If necessary, please use the other side. Thank you for the time you used to give us your comments.)
OPERATOR: TODAY'S DATE:
PREPARED BY: TITLE:
ORGANIZATION: TELEX CODE:
TELEPHONE NUMBER: BASE:
Please rate the quality of this service bulletin: (good) 4321 (poor)
Please rate the quality of the illustrations: (good) 4321 (poor)
Will you do the change given by this service bulletin? Yes No If not, please explain:
Is this service bulletin easy to understand? Yes No If not, please explain:
Is this service bulletin easy to use? Yes No If not, please explain:
Are the Planning Information, Material Information, and
Accomplishment Instructions accurate? Yes No If not, please explain:
Is the Manpower estimate accurate? Yes No If not, please explain:
Give the completed evaluation form to your Boeing Field Service Representative or send the evaluation form
directly to this address:
Manager
Service Bulletin Engineering
Boeing Commercial Airplane Group
P.O. Box 3707, Mail Stop 2H-37
Seattle, WA 98124-2207

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
