# Boeing Special Attention Service Bulletin 747-35-2134: No revision named

- Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2018-0362; AD 2018-09-12 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Boeing Special Attention Service Bulletin 747-35-2134](https://openairdocs.org/service-documents/boeing/sb-747-35-2134.md)
- Title as filed: SB-747-35-2134-00--
- Pages: 90
- PDF: https://openairdocs.org/files/sha256/be/c0/bec0b4eb279a558e2dc23683aa77e8e53529bacdd79b7c40bc3342b7e45a9307
- Page: https://openairdocs.org/service-documents/boeing/sb-747-35-2134/file/bec0b4eb279a

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Commercial 
Airplanes
747
Service Bulletin
SPECIAL ATTENTION
Number: 747-35-2134
Original Issue: November 22, 2017
ATA System: 3521
SUBJECT: OXYGEN - Passenger Oxygen System - Low Pressure Oxygen System Hose Assembly
Replacement and Hose Assembly Inspection
Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15
CFR 300-774). An export license may be required before it is used for development, production or use by foreign
persons from specific countries. The controller of this data has the individual responsibility to abide by all export
laws.
9E991ECCN:
Copyright © 2017 Boeing.
Unpublished Work. All Rights Reserved.
Treatment of this document and its content is governed by contract with Boeing. Rights to use this document
are licensed on a per aircraft basis and such rights may not be transferable. For more information, contact The
Boeing Company.
Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner,
BBJ, DC-8, DC-9, DC-10, KC-10, KC-46, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8, Poseidon and
Boeing liveries are all trademarks owned by The Boeing Company; and no trademark license is granted in
connection with this document unless provided in writing by Boeing.
Original Issue: November 22, 2017
747-35-2134
1 of 90
4.0

### Page 2

Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 22, 2017
747-35-2134
2 of 90
BOEING SERVICE BULLETIN 747-35-2134
BLANK PAGE

### Page 3

Table of Contents
Summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
1. PLANNING INFORMATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
A. Effectivity . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
1. Airplanes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
2. Spares Affected . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
B. Concurrent Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
C. Reason . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
D. Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
E. Compliance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
F. Approval . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
G. Manpower . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
H. Weight and Balance Changes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
I. Electrical Load Data . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
J. References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
1. Existing Data: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
2. Data Supplied with this Service Bulletin: . . . . . . . . . . . . . . . . . . . . . . . . . . . 20
3. Installation Drawings Used in the Preparation of this Service Bulletin: . . . . . . . . . . . 20
K. Publications Affected . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20
L. Interchangeability and Intermixability of Parts . . . . . . . . . . . . . . . . . . . . . . . . . . . 20
M. Software Accomplishment Summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21
2. MATERIAL INFORMATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23
A. Material - Price and Availability . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23
B. Industry Support Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25
C. Parts Necessary for Each Airplane . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25
1. Kits/Parts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25
2. Parts and Materials Supplied by the Operator . . . . . . . . . . . . . . . . . . . . . . . . 27
3. Parts Modified and Reidentified . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27
4. Parts Removed and Not Replaced . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27
D. Parts Necessary to Change Spares . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27
E. Special Tooling - Price and Availability . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27
F. Special Tooling Necessary to do this Service Bulletin . . . . . . . . . . . . . . . . . . . . . . . 27
3. ACCOMPLISHMENT INSTRUCTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29
A. GENERAL INFORMATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29
B. WORK INSTRUCTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31
FIGURE 1: MAIN DECK PASSENGER COMPARTMENT, ABOVE CEILING - LOW PRESSURE OXYGEN
SYSTEM FLEXIBLE HOSE ASSEMBLIES - REPLACEMENT  [Group 1] . . . . . . . . . . 36
FIGURE 2: MAIN DECK PASSENGER COMPARTMENT, ABOVE CEILING - LOW PRESSURE OXYGEN
SYSTEM FLEXIBLE HOSE ASSEMBLIES - REPLACEMENT  [Group 2] . . . . . . . . . . 39
FIGURE 3: MAIN DECK PASSENGER COMPARTMENT, ABOVE CEILING - LOW PRESSURE OXYGEN
SYSTEM FLEXIBLE HOSE ASSEMBLIES - REPLACEMENT  [Group 3] . . . . . . . . . . 42
FIGURE 4: MAIN DECK PASSENGER COMPARTMENT, ABOVE CEILING - LOW PRESSURE OXYGEN
SYSTEM FLEXIBLE HOSE ASSEMBLIES - REPLACEMENT  [Group 4] . . . . . . . . . . 45
FIGURE 5: MAIN DECK PASSENGER COMPARTMENT, ABOVE CEILING - LOW PRESSURE OXYGEN
SYSTEM FLEXIBLE HOSE ASSEMBLIES - REPLACEMENT  [Group 5] . . . . . . . . . . 48
FIGURE 6: MAIN DECK PASSENGER COMPARTMENT, ABOVE CEILING - LOW PRESSURE OXYGEN
SYSTEM FLEXIBLE HOSE ASSEMBLIES - REPLACEMENT  [Group 6] . . . . . . . . . . 51
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 22, 2017
747-35-2134
3 of 90
BOEING SERVICE BULLETIN 747-35-2134

### Page 4

FIGURE 7: MAIN DECK PASSENGER COMPARTMENT, ABOVE CEILING - LOW PRESSURE OXYGEN
SYSTEM FLEXIBLE HOSE ASSEMBLIES - REPLACEMENT  [Group 7] . . . . . . . . . . 55
FIGURE 8: MAIN DECK PASSENGER COMPARTMENT, ABOVE CEILING - LOW PRESSURE OXYGEN
SYSTEM FLEXIBLE HOSE ASSEMBLIES - REPLACEMENT  [Group 8] . . . . . . . . . . 59
FIGURE 9: MAIN DECK PASSENGER COMPARTMENT, ABOVE CEILING - LOW PRESSURE OXYGEN
SYSTEM FLEXIBLE HOSE ASSEMBLIES - REPLACEMENT  [Group 9] . . . . . . . . . . 62
FIGURE 10: MAIN DECK PASSENGER COMPARTMENT, ABOVE CEILING - LOW PRESSURE OXYGEN
SYSTEM FLEXIBLE HOSE ASSEMBLIES - REPLACEMENT  [Group 10] . . . . . . . . . 65
FIGURE 11: MAIN DECK PASSENGER COMPARTMENT, ABOVE CEILING - LOW PRESSURE OXYGEN
SYSTEM FLEXIBLE HOSE ASSEMBLIES - REPLACEMENT  [Group 11] . . . . . . . . . 69
FIGURE 12: MAIN DECK PASSENGER COMPARTMENT, ABOVE CEILING - LOW PRESSURE OXYGEN
SYSTEM FLEXIBLE HOSE ASSEMBLIES - REPLACEMENT  [Group 12] . . . . . . . . . 73
FIGURE 13: MAIN DECK PASSENGER COMPARTMENT, ABOVE CEILING - LOW PRESSURE OXYGEN
SYSTEM FLEXIBLE HOSE ASSEMBLIES - REPLACEMENT  [Group 13] . . . . . . . . . 77
FIGURE 14: MAIN DECK PASSENGER COMPARTMENT, ABOVE CEILING - LOW PRESSURE OXYGEN
SYSTEM FLEXIBLE HOSE ASSEMBLIES - REPLACEMENT  [Group 15] . . . . . . . . . 81
FIGURE 15: UPPER DECK AND MAIN DECK PASSENGER COMPARTMENTS, ABOVE CEILING - LOW
PRESSURE OXYGEN HOSE ASSEMBLY - GENERAL VISUAL INSPECTION . . . . . . 84
APPENDIX A: LOGIC DIAGRAM FOR PARAGRAPH 1.E., COMPLIANCE: TABLE 1: LOW PRESSURE
OXYGEN SYSTEM INSPECTION AND FLEXIBLE HOSE ASSEMBLIES REPLACEMENT
[Group 1-13, 15] . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 85
APPENDIX B: LOGIC DIAGRAM FOR PARAGRAPH 1.E., COMPLIANCE: TABLE 2: LOW PRESSURE
OXYGEN HOSE ASSEMBLY INSPECTION [Group 14] . . . . . . . . . . . . . . . . . . . 86
APPENDIX C: LOW PRESSURE OXYGEN HOSE ASSEMBLY CLEARANCES . . . . . . . . . . . . . . 87
APPENDIX D: PART DEMAND INTENT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 90
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 22, 2017
747-35-2134
4 of 90
BOEING SERVICE BULLETIN 747-35-2134

### Page 5

Commercial 
Airplanes
747
Service Bulletin
SPECIAL ATTENTION
SummaryNumber: 747-35-2134Original Issue: November 22, 2017
ATA System: 3521
SUBJECT: OXYGEN - Passenger Oxygen System - Low Pressure Oxygen System Hose Assembly
Replacement and Hose Assembly Inspection
BOEING RECOMMENDS THAT EACH OPERATOR EXAMINE THIS DOCUMENT IMMEDIATELY.
CONCURRENT REQUIREMENTS
None.
BACKGROUND
Accomplishment of this service bulletin will remove the possibility that the low pressure oxygen system is
electrically conductive. Oxygen hose assemblies that have the possibility of being electrically conductive supply
a path to ground when minimum clearances are not kept during the occurrence of an electrical fault. If this
service bulletin is not done the low-pressure oxygen flex hoses can potentially be conductive, become heated
from electrical faults and cause or contribute to an oxygen-fed fire event in the passenger cabin.
As a result of a fire in the flight deck of a 777 airplane which was suspected to be caused by the crew oxygen
system, the crew and gaseous passenger oxygen systems on the 777 airplane were updated to remove any
flexible hose assemblies that were not explicitly non-conductive. While no fire caused by a gaseous oxygen
system has been reported on a 747 airplane, as an extra precaution flexible conductive hose assemblies in
select locations are being replaced with non-conductive hose assemblies to make sure that in the event of an
electrical fault, such as an unintended short circuit, it will not be possible for oxygen system to give a path to
ground.
The service bulletin provides instructions to replace specified flexible hose assemblies with non-conductive
flexible hose assemblies at multiple locations to make sure that if there is an electrical fault there will not be a
direct path to ground through the passenger oxygen system. This service bulletin also gives instructions to make
sure that the oxygen system low pressure hose assemblies have minimum clearance from adjacent structure
and systems.
Boeing Service Related Problem (SRP) 747-SRP-35-0063 is related to this service bulletin.
Boeing Fleet Team Digest (FTD) 747 FTD 35-14003 is related to this service bulletin.
This table is provided to operators for planning purposes only. Refer to the applicable sections for more
information.
ReferenceAffectedPlanning Data
Paragraph 1.A.2., Spares AffectedNoSpares Affected
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 22, 2017
747-35-2134
5 of 90

### Page 6

ReferenceAffectedPlanning Data
Paragraph 1.E., ComplianceYesAD Related
Paragraph 1.H., Weight and Balance ChangesNoWeight and Balance Change
Paragraph 1.I., Electrical Load DataNoElectrical Load Changed
Paragraph 1.K., Publications AffectedYesPublications Affected
Paragraph 1.K., Publications AffectedNoAirplane Flight Operations Affected (Flight Crew
Operations Manual and/or FAA Approved Air-
plane Flight Manual)
Paragraph 2.C.1., Kits/PartsYesKits/Parts Required
Paragraph 2.C.2., Parts and Materials Supplied
by the Operator
NoOperator Supplied Parts/Material
Paragraph 2.F., Special Tooling Necessary to
do this Service Bulletin
NoSpecial Tooling Required
ACTION (PRR 85901-147RS)
Group 1-13, 15:
Get access to the low pressure oxygen system above the ceiling of the main deck and upper deck passenger
compartments. Replace specified conductive hose assemblies with non-conductive ones. Do a general visual
inspection of low pressure oxygen system to make sure that the oxygen system low pressure hose assemblies
have minimum clearance from adjacent structure and systems. Test the low pressure oxygen system.
Group 14:
Get access to the low pressure oxygen system above the ceiling of the main deck and upper deck passenger
compartments. Do a general visual inspection of low pressure oxygen system to make sure that the oxygen
system low pressure hose assemblies have minimum clearance from adjacent structure and systems. If equipment
was disconnected, test the low pressure oxygen system.
EFFECTIVITY
747-200B/300/400 Airplane(s) with a therapeutic oxygen option installed. Refer to Paragraph 1.A.1., Airplanes,
for the list of affected airplane(s).
COMPLIANCE
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to this service
bulletin. The Airworthiness Directive will make the compliance tasks and times given in this service bulletin
mandatory.
Refer to Paragraph 1.E., Compliance.
INDUSTRY SUPPORT INFORMATION
Boeing warranty remedies are not available for the configuration changes and inspection procedures given in
this service bulletin.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 22, 2017
747-35-2134
6 of 90
BOEING SERVICE BULLETIN 747-35-2134

### Page 7 (OCR)

BOEING SERVICE BULLETIN 747-35-2134
MANPOWER
Refer to Paragraph 1.G., Manpower.
MATERIAL INFORMATION
Boeing Supplied Kits/Parts.
Refer to Paragraph 2.A., Material - Price and Availability.
Operators are encouraged to complete the survey provided in APPENDIX D of this service bulletin to help Boeing
predict the quantity and timing of the Boeing Supplied Kits/Parts.
GROUP 1 THRU 13:
REPLACE SPECIFIED CONDUCTIVE HOSE
ASSEMBLIES WITH NON-CONDUCTIVE
HOSE ASSEMBLIES
GROUP 15
REPLACE SPECIFIED CONDUCTIVE HOSE
ASSEMBLIES WITH NON-CONDUCTIVE
HOSE ASSEMBLIES
DO A GENERAL VISUAL INSPECTION OF THE LOW
PRESSURE OXYGEN SYSTEM EQUIPMENT TO
MAKE SURE HOSE ASSEMBLIES HAVE THE
MINIMUM CLEARANCE FROM ADJACENT
STRUCTURE AND SYSTEM.
2574542
Original Issue: November 22, 2017
Export Controlled ECCN: 9E991  747-35-2134
Copyright © Unpublished
Work - See page 1 for details.  7 of 90

### Page 8

Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 22, 2017
747-35-2134
8 of 90
BOEING SERVICE BULLETIN 747-35-2134
BLANK PAGE

### Page 9

Commercial 
Airplanes
747
Service Bulletin
SPECIAL ATTENTION
Number: 747-35-2134
Original Issue: November 22, 2017
ATA System: 3521
SUBJECT: OXYGEN - Passenger Oxygen System - Low Pressure Oxygen System Hose Assembly
Replacement and Hose Assembly Inspection
BOEING RECOMMENDS THAT EACH OPERATOR EXAMINE THIS DOCUMENT IMMEDIATELY.
1.    PLANNING INFORMATION
A. Effectivity
1. Airplanes
Refer to Service Bulletin Index D6-30300 Part 3 for Airplane Variable Number, Line Number, and
Serial Number data.
This service bulletin is applicable to 747-200B/300/400 Airplanes with a therapeutic oxygen option
installed, line numbers 292-1331, in 15 Groups. The Variable Numbers and Group Information for
the applicable airplanes is given below. Refer to PRR 85901-147RS for data about this change.
DESCRIPTIONCONFIGURATIONGROUP
747-400 Airplanes delivered with a unique configuration of flexible
oxygen hoses for the low pressure oxygen system.
-1
747-400 Airplanes delivered with a unique configuration of flexible
oxygen hoses for the low pressure oxygen system.
-2
747-400 Airplanes delivered with a unique configuration of flexible
oxygen hoses for the low pressure oxygen system.
-3
747-400 Airplanes delivered with a unique configuration of flexible
oxygen hoses for the low pressure oxygen system.
-4
747-400 Airplanes delivered with a unique configuration of flexible
oxygen hoses for the low pressure oxygen system.
-5
747-400 Airplanes delivered with a unique configuration of flexible
oxygen hoses for the low pressure oxygen system.
-6
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 22, 2017
747-35-2134
9 of 90

### Page 10

DESCRIPTIONCONFIGURATIONGROUP
747-400 Airplanes delivered with a unique configuration of flexible
oxygen hoses for the low pressure oxygen system.
-7
747-400 Airplanes delivered with a unique configuration of flexible
oxygen hoses for the low pressure oxygen system.
-8
747-400 Airplanes delivered with a unique configuration of flexible
oxygen hoses for the low pressure oxygen system.
-9
747-400 Airplanes delivered with a unique configuration of flexible
oxygen hoses for the low pressure oxygen system.
-10
747-400 Airplanes delivered with a unique configuration of flexible
oxygen hoses for the low pressure oxygen system.
-11
747-400 Airplanes delivered with a unique configuration of flexible
oxygen hoses for the low pressure oxygen system.
-12
747-400 Airplanes delivered with a unique configuration of flexible
oxygen hoses for the low pressure oxygen system.
-13
747-400 Airplanes delivered with a unique configuration of flexible
oxygen hoses for the low pressure oxygen system.
-14
747-200B/300 Airplanes delivered with a unique configuration of
flexible oxygen hoses for the low pressure oxygen system.
-15
Airplane Models:
747-200B, 747-300, 747-400
GroupVariable Number
15RD131 - RD132
15RD143
14RF001 - RF006
5RM010
10RM036
10RM038 - RM040
2RM096 - RM097
2RM136 - RM145
8RM158
2RM261 - RM264
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 22, 2017
747-35-2134
10 of 90
BOEING SERVICE BULLETIN 747-35-2134

### Page 11

GroupVariable Number
9RM331 - RM333
4RM351 - RM355
10RM366 - RM367
3RM426
15RS316 - RS320
1RT102
7RT151
2RT471
2RT474 - RT475
2RT477 - RT479
2RT481
2RT483 - RT487
2RT489 - RT490
2RT494
2RT496 - RT499
11RT552 - RT554
12RT555 - RT556
13RT561 - RT564
13RT566 - RT567
10RT744
10RT748 - RT749
10RU016 - RU017
6RU061 - RU062
2RU121 - RU132
2. Spares Affected
None.
B. Concurrent Requirements
None.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 22, 2017
747-35-2134
11 of 90
BOEING SERVICE BULLETIN 747-35-2134

### Page 12

C. Reason
Accomplishment of this service bulletin will remove the possibility that the low pressure oxygen system
is electrically conductive. Oxygen hose assemblies that have the possibility of being electrically
conductive supply a path to ground when minimum clearances are not kept during the occurrence of
an electrical fault. If this service bulletin is not done the low-pressure oxygen flex hoses can potentially
be conductive, become heated from electrical faults and cause or contribute to an oxygen-fed fire event
in the passenger cabin.
As a result of a fire in the flight deck of a 777 airplane which was suspected to be caused by the crew
oxygen system, the crew and gaseous passenger oxygen systems on the 777 airplane were updated
to remove any flexible hose assemblies that were not explicitly non-conductive. While no fire caused
by a gaseous oxygen system has been reported on a 747 airplane, as an extra precaution flexible
conductive hose assemblies in select locations are being replaced with non-conductive hose assemblies
to make sure that in the unusual occurrence of an electrical fault, such as an unintended short circuit,
it will not be possible for oxygen system to give a path to ground.
The service bulletin provides instructions to replace specified flexible hose assemblies with
non-conductive flexible hose assemblies at multiple locations to make sure that if there is an electrical
fault there will not be a direct path to ground through the passenger oxygen system. This service bulletin
also gives instructions to make sure that the oxygen system low pressure hose assemblies have
minimum clearance from adjacent structure and systems.
Boeing Service Related Problem (SRP) 747-SRP-35-0063 is related to this service bulletin.
Boeing Fleet Team Digest (FTD) 747 FTD 35-14003 is related to this service bulletin.
D. Description
Group 1-13, 15:
Get access to the low pressure oxygen system above the ceiling of the main deck and upper deck
passenger compartments. Replace specified conductive hose assemblies with non-conductive ones.
Do a general visual inspection of low pressure oxygen system to make sure that the oxygen system
low pressure hose assemblies have minimum clearance from adjacent structure and systems. Test
the low pressure oxygen system.
Group 14:
Get access to the low pressure oxygen system above the ceiling of the main deck and upper deck
passenger compartments. Do a general visual inspection of low pressure oxygen system to make sure
that the oxygen system low pressure hose assemblies have minimum clearance from adjacent structure
and systems. If equipment was disconnected, test the low pressure oxygen system.
The work in this service bulletin is done in the maintenance zone(s) given below.
Group 1-14:
Affected Maintenance Zones
ZoneModel
211, 212, 223, 224, 225, 226, 231, 232, 243,
244, 253, 254, 263, 264, 273, 274
747-400
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 22, 2017
747-35-2134
12 of 90
BOEING SERVICE BULLETIN 747-35-2134

### Page 13

Group 15:
Affected Maintenance Zones
ZoneModel
211, 212, 223, 224, 225, 226, 231, 232, 233,
234, 243, 244, 253, 254, 263, 264, 273, 274
747-200B, 747-300
E. Compliance
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to
this service bulletin. The Airworthiness Directive will make the compliance tasks and times given in this
service bulletin mandatory.
Group 1-13, 15:
Accomplish the required actions, based on the applicable conditions in Table 1, in accordance with
Paragraph 3. Accomplishment Instructions.
Group 14:
Accomplish the required actions, based on the applicable conditions in Table 2, in accordance with
Paragraph 3. Accomplishment Instructions.
Group 1-13, 15:
A logic diagram showing compliance tasks and compliance times is included as an aid in APPENDIX
A.
Group 14:
A logic diagram showing compliance tasks and compliance times is included as an aid in APPENDIX
B.
Group 1-13, 15:
Table 1: LOW PRESSURE OXYGEN SYSTEM INSPECTION AND FLEXIBLE HOSE ASSEMBLIES
REPLACEMENT
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
-Within 72 months
after the Original
Issue date of this
service bulletin.
Do PART 1: LOW PRES-
SURE OXYGEN HOSE -
REPLACEMENT (a)
All Airplanes.
Do PART 2: LOW PRES-
SURE OXYGEN SYS-
TEM HOSE ASSEMBLY
- GENERAL VISUAL IN-
SPECTION
--No further action re-
quired.
CONDITION 1: ALL HOSE
ASSEMBLIES HAVE
MORE THAN OR EQUAL
TO THE MINIMUM
CLEARANCE
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 22, 2017
747-35-2134
13 of 90
BOEING SERVICE BULLETIN 747-35-2134

### Page 14

Group 1-13, 15:
Table 1: LOW PRESSURE OXYGEN SYSTEM INSPECTION AND FLEXIBLE HOSE ASSEMBLIES
REPLACEMENT
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
-Before further
flight.
Adjust to make the mini-
mum clearances agree
with the dimension(s)
specified in APPENDIX
C. (a)
CONDITION 2: ONE OR
MORE HOSE ASSEM-
BLIES HAVE LESS THAN
THE MINIMUM CLEAR-
ANCE
(a) Refer to Table 3 for Oxygen System Low Pressure Test.
Group 14:
Table 2: LOW PRESSURE OXYGEN SYSTEM INSPECTION
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
-Within 72 months
after the Original
Issue date of this
service bulletin.
Do PART 2: LOW PRES-
SURE OXYGEN SYS-
TEM HOSE ASSEMBLY
- GENERAL VISUAL IN-
SPECTION
All Airplanes.
--No further action re-
quired.
CONDITION 1: ALL HOSE
ASSEMBLIES HAVE
MORE THAN OR EQUAL
TO THE MINIMUM
CLEARANCE
-Before further
flight.
Adjust to make the mini-
mum clearances agree
with the dimension(s)
specified in APPENDIX
C. (a)
CONDITION 2: ONE OR
MORE HOSE ASSEM-
BLIES HAVE LESS THAN
THE MINIMUM CLEAR-
ANCE
(a) Refer to Table 3 for Oxygen System Low Pressure Test.
Table 3: OXYGEN SYSTEM LOW PRESSURE LEAK TEST
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
-Before further
flight.
Do an Oxygen System
Low Pressure Leak Test
and applicable corrective
actions.
All Airplanes
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 22, 2017
747-35-2134
14 of 90
BOEING SERVICE BULLETIN 747-35-2134

### Page 15

F. Approval
This service bulletin was examined by the Federal Aviation Administration (FAA). The changes specified
in this service bulletin comply with the applicable regulations and are FAA approved, as well as European
Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/JAA approved
airplanes listed in the service bulletin effectivity. This service bulletin and its approval were based on
the airplane in its original Boeing delivery configuration or as modified by other approved Boeing
changes.
If an airplane has a non-Boeing modification or repair that affects a component or system also affected
by this service bulletin, the operator is responsible for obtaining appropriate regulatory agency approval
before incorporating this service bulletin.
G. Manpower
The table below shows an estimate of the task hours necessary to do this service bulletin for each
airplane. This estimate is for direct labor only, done by an experienced crew. Adjust the estimate with
operator task hour data if necessary. The estimate does not include lost time. These are some examples
of lost time:
• Time to adjust to the workplace
• Time to schedule the work
• Time to inspect the work
• Time to cure the materials
• Time to make the parts
• Time to find the tools
Group 1:
Elapsed HoursTask HoursNumber of PersonsTask
4.008.002Open Access
2.004.002FIGURE 1
0.501.002FIGURE 15
0.250.502Leak Detection Test
4.008.002Close Access
10.7521.50TOTAL FOR EACH AIRPLANE
Group 2:
Elapsed HoursTask HoursNumber of PersonsTask
4.008.002Open Access
2.004.002FIGURE 2
0.501.002FIGURE 15
0.250.502Leak Detection Test
4.008.002Close Access
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 22, 2017
747-35-2134
15 of 90
BOEING SERVICE BULLETIN 747-35-2134

### Page 16

Group 2:
Elapsed HoursTask HoursNumber of PersonsTask
10.7521.50TOTAL FOR EACH AIRPLANE
Group 3:
Elapsed HoursTask HoursNumber of PersonsTask
4.008.002Open Access
2.004.002FIGURE 3
0.501.002FIGURE 15
0.250.502Leak Detection Test
4.008.002Close Access
10.7521.50TOTAL FOR EACH AIRPLANE
Group 4:
Elapsed HoursTask HoursNumber of PersonsTask
4.008.002Open Access
2.004.002FIGURE 4
0.501.002FIGURE 15
0.250.502Leak Detection Test
4.008.002Close Access
10.7521.50TOTAL FOR EACH AIRPLANE
Group 5:
Elapsed HoursTask HoursNumber of PersonsTask
2.004.002Open Access
1.503.002FIGURE 5
0.501.002FIGURE 15
0.250.502Leak Detection Test
2.004.002Close Access
6.2512.50TOTAL FOR EACH AIRPLANE
Group 6:
Elapsed HoursTask HoursNumber of PersonsTask
3.006.002Open Access
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 22, 2017
747-35-2134
16 of 90
BOEING SERVICE BULLETIN 747-35-2134

### Page 17

Group 6:
Elapsed HoursTask HoursNumber of PersonsTask
2.254.502FIGURE 6
0.501.002FIGURE 15
0.250.502Leak Detection Test
3.006.002Close Access
9.0018.00TOTAL FOR EACH AIRPLANE
Group 7:
Elapsed HoursTask HoursNumber of PersonsTask
3.006.002Open Access
2.004.002FIGURE 7
0.501.002FIGURE 15
0.250.502Leak Detection Test
3.006.002Close Access
8.7517.50TOTAL FOR EACH AIRPLANE
Group 8:
Elapsed HoursTask HoursNumber of PersonsTask
3.006.002Open Access
2.004.002FIGURE 8
0.501.002FIGURE 15
0.250.502Leak Detection Test
3.006.002Close Access
8.7517.50TOTAL FOR EACH AIRPLANE
Group 9:
Elapsed HoursTask HoursNumber of PersonsTask
3.006.002Open Access
1.753.502FIGURE 9
0.501.002FIGURE 15
.250.502Leak Detection Test
3.006.002Close Access
8.5017.00TOTAL FOR EACH AIRPLANE
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 22, 2017
747-35-2134
17 of 90
BOEING SERVICE BULLETIN 747-35-2134

### Page 18

Group 10:
Elapsed HoursTask HoursNumber of PersonsTask
3.006.002Open Access
1.753.502FIGURE 10
0.501.002FIGURE 15
0.250.502Leak Detection Test
3.006.002Close Access
8.5017.00TOTAL FOR EACH AIRPLANE
Group 11:
Elapsed HoursTask HoursNumber of PersonsTask
3.006.002Open Access
2.004.002FIGURE 11
0.501.002FIGURE 15
0.250.502Leak Detection Test
3.006.002Close Access
8.7517.50TOTAL FOR EACH AIRPLANE
Group 12:
Elapsed HoursTask HoursNumber of PersonsTask
3.006.002Open Access
2.254.502FIGURE 12
0.501.002FIGURE 15
0.250.502Leak Detection Test
3.006.002Close Access
9.0018.00TOTAL FOR EACH AIRPLANE
Group 13:
Elapsed HoursTask HoursNumber of PersonsTask
3.006.002Open Access
2.254.502FIGURE 13
0.501.002FIGURE 15
0.250.502Leak Detection Test
3.006.002Close Access
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 22, 2017
747-35-2134
18 of 90
BOEING SERVICE BULLETIN 747-35-2134

### Page 19

Group 13:
Elapsed HoursTask HoursNumber of PersonsTask
9.0018.00TOTAL FOR EACH AIRPLANE
Group 14:
Elapsed HoursTask HoursNumber of PersonsTask
1.002.002Open Access
0.501.002FIGURE 15
0.250.502Leak Detection
Test(a)
1.002.002Close Access
2.505.00TOTAL FOR EACH AIRPLANE
(a) This is only necessary if a hose had to be disconnected as a result of the in-
spection.
Group 15:
Elapsed HoursTask HoursNumber of PersonsTask
3.006.002Open Access
1.753.502FIGURE 14
0.501.002FIGURE 15
0.250.502Leak Detection Test
3.006.002Close Access
8.5017.00TOTAL FOR EACH AIRPLANE
H. Weight and Balance Changes
None.
I. Electrical Load Data
Not changed.
J. References
1. Existing Data:
a. Engineering Change Memo PRR 85901-147RS
b. Boeing Service Related Problem (SRP) 747-SRP-35-0063
c. Service Bulletin Index D6-30300
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 22, 2017
747-35-2134
19 of 90
BOEING SERVICE BULLETIN 747-35-2134

### Page 20

d. Standard Overhaul Practices Manual (SOPM) 20-50-01
e. 747 Fleet Team Digest (FTD) 35-14003
f. 747-100/200/300 Aircraft Maintenance Manual (AMM) 20-51-01, 25-22-01, 25-22-03, 25-22-04,
25-23-01, 25-23-04, 25-28-01, 35-00-00, 35-21-00
g. 747-400 Aircraft Maintenance Manual (AMM) 20-51-01, 25-22-01, 25-22-04, 25-23-01,
25-23-04, 25-28-01, 25-28-02, 25-28-23, 35-00-00, 35-21-00
2. Data Supplied with this Service Bulletin:
None.
3. Installation Drawings Used in the Preparation of this Service Bulletin:
TitleDrawing Number
OXYGEN TUBING & SPRT INSTL- MAIN DISTRIBUTION LOOP417U4371
OXY SYS & CONNECTION INSTL417U4403
OXYGEN SYSTEM CONNECTION INSTALLATION - MAIN DECK417U4405
OXYGEN SYSTEM CONNECTION INSTALLATION - MAIN DECK417U4428
OXYGEN TUBING INSTLS - PASSENGER OXY SYS65B68276
The table above lists applicable drawings used to prepare this service bulletin. The drawings are
not necessary to make the specified changes, and are not supplied with this service bulletin. The
drawings may not be applicable to all airplane configurations or operators.
K. Publications Affected
1. Publications:
Chapter-SectionPublication
35-21747-100/200/300 Illustrated Parts Catalog
35-21747-400 Illustrated Parts Catalog
2. Damage Tolerance Based Structural Inspections:
Boeing has evaluated the repairs and/or changes in this service bulletin for effects on Fatigue
Critical Structure (FCS) and for changes to Damage Tolerance Inspections (DTI) required in the
Maintenance Program. This service bulletin does not affect FCS, therefore DTIs are not necessary.
L. Interchangeability and Intermixability of Parts
Refer to Paragraph 2.C., Parts Necessary for Each Airplane, for interchangeability and intermixability
information.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 22, 2017
747-35-2134
20 of 90
BOEING SERVICE BULLETIN 747-35-2134

### Page 21

M. Software Accomplishment Summary
Not affected.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 22, 2017
747-35-2134
21 of 90
BOEING SERVICE BULLETIN 747-35-2134

### Page 22

Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 22, 2017
747-35-2134
22 of 90
BOEING SERVICE BULLETIN 747-35-2134
BLANK PAGE

### Page 23

2.    MATERIAL INFORMATION
A. Material - Price and Availability
Boeing can supply the parts shown in Paragraph 2.C., Parts Necessary for Each Airplane. Operators
are encouraged to share schedule requirements with Boeing for incorporation of the service bulletin.
The parts are subject to the terms and conditions of the Boeing standard purchase order
acknowledgment. Prices are in United States Dollars. Terms: Net 30 days.
Reference this service bulletin and submit your purchase order by one of these methods:
1. Order on-line via ATA Spec 2000 or The Boeing PART Page
2. Fax to (206) 662-7145
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 22, 2017
747-35-2134
23 of 90
BOEING SERVICE BULLETIN 747-35-2134

### Page 24

Group 1-13, 15:
REFER TO THE BOEING PART PAGE ON MYBOEINGFLEET.COM OR CONTACT FIRST RESPONDER
AT FR@BOEING.COM FOR THE LATEST REORDER LEAD TIME (ROLT) AND PRICE INFORMATION
Unit Price as of
the Original Issue
date of this Ser-
vice Bulletin (US
Dollars)
ROLT as of the
Original Issue
date of this Ser-
vice Bulletin (Cal-
endar Days)
QTYDateNamePart Number
$179.00(a)1October 23,
2017
HOSE ASSY38001-657
$143.001HOSE ASSY38001-658
$121.001HOSE ASSY38001-659
$114.001October 16,
2017
HOSE ASSY38001-660
$104.002HOSE ASSY38001-666
$229.001HOSE ASSY38001-667
$270.002HOSE ASSY38001-668
$86.001HOSE ASSY57034-16N120090
$92.002HOSE ASSY57034-16N120188
$219.001October 19,
2017
HOSE ASSY57034-16N120350
$310.001October 16,
2017
HOSE ASSY57034-24N120195
$467.001October 19,
2017
HOSE ASSY57034-24N120410
$159.001October 23,
2017
HOSE ASSY57034N13240
$115.002October 19,
2017
HOSE ASSY57034N25107
$139.001HOSE ASSY57034N25200
$149.002HOSE ASSY57034N25240
$157.002HOSE ASSY57034N35280
$85.001HOSE ASSY57034N53120
$83.002HOSE ASSY57034N55159
$115.001October 23,
2017
HOSE ASSY57034N65147
$229.001HOSE ASSY57034N73200
(a) Contact Boeing Spares.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 22, 2017
747-35-2134
24 of 90
BOEING SERVICE BULLETIN 747-35-2134

### Page 25

Group 1-13:
REFER TO THE BOEING PART PAGE ON MYBOEINGFLEET.COM OR CONTACT FIRST RESPONDER
AT FR@BOEING.COM FOR THE LATEST REORDER LEAD TIME (ROLT) AND PRICE INFORMATION
Unit Price as of
the Original Issue
date of this Ser-
vice Bulletin (US
Dollars)
ROLT as of the
Original Issue
date of this Ser-
vice Bulletin (Cal-
endar Days)
QTYDateNamePart Number
(a)(a)(b)O-RING417U4205-1
(b)O-RING417U4205-2
(a) Contact Boeing Spares.
(b) Readily available from Boeing Spares.
Operators are encouraged to complete the survey provided in APPENDIX D of this service bulletin to
help Boeing predict the quantity and timing of the Boeing Supplied Kits/Parts.
B. Industry Support Information
Boeing warranty remedies are not available for the configuration changes and inspection procedures
given in this service bulletin.
C. Parts Necessary for Each Airplane
1. Kits/Parts
To get the kits/parts shown below, refer to Paragraph 2.A., Material - Price and Availability.
NOTE: Parts and the items shown in Paragraph 2.C.2., Parts and Materials Supplied by the
Operator, are necessary for each airplane.
Group 1-13, 15:
NotesExisting Boeing Part
Number (Supplier Part
Number)
NameQTYPart Number
(a)(b)(c)60B50059-58 (38001-58)HOSE ASSY-38001-659
(a)(b)(c)60B50059-61 (38001-61)HOSE ASSY-38001-660
(a)(b)(c)60B50059-65 (38001-65)HOSE ASSY-38001-666
(a)(b)(c)60B50059-98 (38001-98)HOSE ASSY-38001-657
(a)(b)(c)60B50059-103 (38001-103)HOSE ASSY-38001-667
(a)(b)(c)60B50059-104 (38001-104)HOSE ASSY-38001-668
(a)(b)(c)60B50059-115 (38001-115)HOSE ASSY-57034-16N120090
(a)(b)(c)60B50059-116 (38001-116)HOSE ASSY-57034-24N120195
(a)(b)(c)60B50059-118 (38001-118)HOSE ASSY-57034-16N120188
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 22, 2017
747-35-2134
25 of 90
BOEING SERVICE BULLETIN 747-35-2134

### Page 26

Group 1-13, 15:
NotesExisting Boeing Part
Number (Supplier Part
Number)
NameQTYPart Number
(a)(b)(c)60B50059-119 (38001-119)HOSE ASSY-38001-658
(a)(b)(c)60B50059-126 (38001-126)HOSE ASSY-57034-24N120410
(a)(b)(c)60B50059-127 (38001-127)HOSE ASSY-57034-16N120350
(a)(b)(c)S417U406-13240 (57034-
13240)
HOSE ASSY-57034N13240
(a)(b)(c)S417U406-25107 (57034-
25107)
HOSE ASSY-57034N25107
(a)(c)(c)S417U406-25200 (57034-
25200)
HOSE ASSY-57034N25200
(a)(b)(c)S417U406-25240 (57034-
25240)
HOSE ASSY-57034N25240
(a)(b)(c)S417U406-35280 (57034-
35280)
HOSE ASSY-57034N35280
(a)(b)(c)S417U406-53120 (57034-
53120)
HOSE ASSY-57034N53120
(a)(b)(c)S417U406-55159 (57034-
55159)
HOSE ASSY-57034N55159
(a)(b)(c)S417U406-65147 (57034-
65147)
HOSE ASSY-57034N65147
(a)(b)(c)S417U406-73200 (57034-
73200)
HOSE ASSY-57034N73200
(a) Discard the existing part.
(b) You cannot use the existing part to replace the new or changed part.
(c) Refer to FIGURE 1 thru FIGURE 14, as applicable, for quantities.
Group 1-13:
NotesExisting Boeing Part
Number
NameQTYBoeing Part Num-
ber
(a)(b)(c)417U4205-1O-RING-417U4205-1
(a)(b)(c)417U4205-2O-RING-417U4205-2
(a) Discard the existing part.
(b) You cannot use the existing part to replace the new or changed part.
(c) Refer to FIGURE 1 thru FIGURE 13, as applicable, for quantities. A maximum of two O-rings are nec-
essary for each applicable hose assembly.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 22, 2017
747-35-2134
26 of 90
BOEING SERVICE BULLETIN 747-35-2134

### Page 27

2. Parts and Materials Supplied by the Operator
None.
3. Parts Modified and Reidentified
None.
4. Parts Removed and Not Replaced
None.
D. Parts Necessary to Change Spares
None.
E. Special Tooling - Price and Availability
None.
F. Special Tooling Necessary to do this Service Bulletin
No special tools or equipment are necessary to do the change in this service bulletin. But, maintenance
and overhaul tools in the manuals given in Paragraph 1.J., References, can be necessary. Examine
operator tool supply to make sure all necessary tools are available.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 22, 2017
747-35-2134
27 of 90
BOEING SERVICE BULLETIN 747-35-2134

### Page 28

Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 22, 2017
747-35-2134
28 of 90
BOEING SERVICE BULLETIN 747-35-2134
BLANK PAGE

### Page 29

3.    ACCOMPLISHMENT INSTRUCTIONS
A. GENERAL INFORMATION
OPEN EXPOSURE OF THE OXYGEN SYSTEM MUST BE KEPT TO A MINIMUM
TO PROTECT THE INTEGRITY OF THE OXYGEN SYSTEM. OPEN EXPOSURE
TIME IS NOT TO BE MORE THAN 5 MINUTES. COVER AND SEAL OPEN LINES
WITH A SUFFICIENT PLASTIC BAG, CAP OR PLUG TO PREVENT
CONTAMINATION. CONTAMINATION CAN CAUSE A FIRE OR EXPLOSION IN
AN OXYGEN SYSTEM WHICH MAY CAUSE INJURIES TO PERSONNEL AND
DAMAGE EQUIPMENT. RETURN ANY CONTAMINATED EQUIPMENT TO
VENDOR
WARNING
USE ONLY OXYGEN-CLEAN COMPONENTS IN THE OXYGEN SYSTEM. IF YOU
DO NOT USE OXYGEN-CLEAN COMPONENTS, A FIRE OR AN EXPLOSION
CAN OCCUR. THIS CAN CAUSE DAMAGE TO EQUIPMENT OR INJURIES TO
PERSONS.
WARNING
MAKE SURE THAT THE OXYGEN SYSTEM IS DEACTIVATED AND ALL OXYGEN
CYLINDERS ARE FULLY CLOSED. IF THE OXYGEN SYSTEM IS NOT
DEACTIVATED AND ALL THE OXYGEN CYLINDERS ARE NOT FULLY CLOSED,
THE OXYGEN SYSTEM COULD BE PRESSURIZED. IF WORK IS DONE ON A
PRESSURIZED OXYGEN SYSTEM, INJURY TO PERSONNEL AND/OR DAMAGE
TO EQUIPMENT CAN OCCUR.
WARNING
LOOSEN THE OXYGEN CONNECTIONS CAREFULLY. THE REMAINING OXYGEN
CAN RELEASE WITH A LARGE FORCE AND CAN CAUSE INJURY TO PERSONS
AND DAMAGE TO THE AIRPLANE AND EQUIPMENT.
WARNING
OXYGEN SYSTEM COMPONENTS REQUIRE SPECIAL CARE AND HANDLING
PROCEDURES. BEFORE WORK IS DONE ON THE OXYGEN SYSTEM, REVIEW
THE SAFETY AND MAINTENANCE PROCEDURES GIVEN IN
747-100/200/300 AMM 35-00-00 OR 747-400 AMM 35-00-00 PRIOR TO
MODIFYING THE OXYGEN SYSTEM.
CAUTION
KEEP THE WORK AREA, WIRES AND ELECTRICAL BUNDLES CLEAN OF
METAL PARTICLES OR CONTAMINATION WHEN YOU USE TOOLS. UNWANTED
MATERIAL, METAL PARTICLES OR CONTAMINATION CAUGHT IN WIRE
BUNDLES CAN CAUSE DAMAGE TO THE BUNDLES. DAMAGED WIRE BUNDLES
CAN CAUSE SPARKS OR OTHER ELECTRICAL DAMAGE.
CAUTION
FAILURE TO OBSERVE THESE SAFETY PRECAUTIONS AND MAINTENANCE
INSTRUCTIONS COULD RESULT IN A FIRE OR EXPLOSION WHICH CAN
CAUSE SERIOUS INJURY TO PERSONNEL AND SEVERE DAMAGE TO THE
AIRPLANE AND EQUIPMENT.
CAUTION
NOTE: 1. Manual titles are referred to by acronyms. Refer to Paragraph 1.J., References, for
definition of the acronyms.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 22, 2017
747-35-2134
29 of 90
BOEING SERVICE BULLETIN 747-35-2134

### Page 30

2. Obey all of the warnings and cautions given in the specified manual sections.
3. Unless shown differently, these dimensions and tolerances are used:
– Linear dimensions are in inches
– Tolerance on linear dimensions, other than rivet and bolt edge margins, is plus
or minus 0.03 inch
– Tolerance on rivet and bolt edge margin is plus or minus 0.05 inch
– Angular tolerance is plus or minus 2 degrees
– Hole dimensions for standard solid rivets and fasteners are in Structural Repair
Manual (SRM) Chapter 51
– Torque Values:
— Values for airframe maintenance tasks are included in Chapter 20 of 747
Aircraft Maintenance Manual (AMM).
— Non-standard torque values for maintenance tasks are included in the
applicable installation step.
4. Use the approved fastener, process and material substitutions in accordance with
SRM Chapter 51.
5. If the length of any fastener specified in this service bulletin does not meet installation
standards given in SRM Chapter 51, then a fastener of the same specification, or
an approved substitute, with a length which meets the installation standards given
in SRM Chapter 51 may be used. In addition, washers may be installed for fastener
grip length in accordance with SRM Chapter 51. Refer to SOPM 20-50-01 for alternate
full threaded fasteners (screws) needed for installation in this service bulletin.
6. A General Visual Inspection is defined as: A visual examination of an interior or
exterior area, installation or assembly to detect obvious damage, failure or irregularity.
This level of inspection is made from within touching distance unless otherwise
specified. A mirror may be necessary to enhance visual access to all exposed surfaces
in the inspection area. This level of inspection is made under normally available
lighting conditions such as daylight, hangar lighting, flashlight or drop-light and may
require removal or opening of access panels or doors. Stands, ladders or platforms
may be required to gain proximity to the area being checked.
7. These work instructions refer to procedures included in other Boeing documents.
When the words "refer to" are used and the operator has an accepted alternative
procedure, the accepted alternative procedure can be used. When the words "in
accordance with" are included in the instruction, the procedure in the Boeing document
must be used.
8. If it is necessary to remove more parts for access, you can remove those parts. If
you can get access without removing identified parts, it is not necessary to remove
all of the identified parts. Jacking and shoring limitations must be observed.
9. Where the work instructions include installation of a kept part, a new or serviceable
part with the same part number can be installed as an alternative to the kept part.
10. Use of colors in Figures is based on guidance from the ATA e-Business Program
(ATA) iSpec 2200.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 22, 2017
747-35-2134
30 of 90
BOEING SERVICE BULLETIN 747-35-2134

### Page 31

11. The compliance times for the actions in Paragraph 3.B., WORK INSTRUCTIONS
are in Paragraph 1.E., Compliance.
12. Some steps in the Work Instructions are labeled as Required for Compliance (RC).
If this service bulletin is mandated by an Airworthiness Directive (AD), then the steps
labeled as RC, including sub-steps under an RC step and any figures identified in
an RC step, must be done to comply with the AD. If a step or sub-step is labeled
"RC Exempt," then the RC requirement is removed from that step or sub-step. An
Alternative Method of Compliance (AMOC) is required for any deviations to RC steps,
including sub-steps and identified figures. Steps not labeled as RC may be deviated
from using accepted methods in accordance with the operator's maintenance or
inspection program without obtaining approval of an AMOC. This is provided that
the RC steps, including sub-steps and identified figures, can still be done as specified,
and the airplane can be put back in an airworthy condition.
B. WORK INSTRUCTIONS
DO NOT TIGHTEN THE SHUTOFF VALVE ON EACH OXYGEN CYLINDER MORE
THAN 25 IN-LB. TOO MUCH TORQUE CAN CAUSE DAMAGE TO THE SHUTOFF
VALVE.
CAUTION
1. Prepare the passenger gaseous oxygen system to do maintenance. Refer to 747-100/200/300
AMM 35-00-00 or 747-400 AMM 35-00-00, 'Safety Precautions', as an accepted procedure.
2. Remove and keep the main deck passenger compartment ceiling panels. Refer to 747-100/200/300
AMM 25-22-01 or 747-400 AMM 25-22-01 as an accepted procedure.
3. Remove and keep the upper deck passenger compartment ceiling panels. Refer to 747-100/200/300
AMM 25-22-03 or 747-400 AMM 25-22-03 as an accepted procedure.
4. Remove and keep the lowered ceiling panels main deck passenger compartment. Refer to
747-100/200/300 AMM 25-22-04 or 747-400 AMM 25-22-04 as an accepted procedure.
5. Group 15:
Remove and keep the overhead stowage bins in the main deck and upper deck passenger
compartments. Refer to 747-100/200/300 AMM 25-28-01 as an accepted procedure.
6. Group 1-14:
Remove and keep the outboard and center overhead stowage bins in the main deck passenger
compartment. Refer to 747-400 AMM 25-28-01 and 747-400 AMM 25-28-02 as accepted
procedures.
7. Group 1-14:
Remove and keep the outboard overhead stowage bins in the upper deck passenger compartment.
Refer to 747-400 AMM 25-28-23 as an accepted procedure.
8. Open or remove and keep the main deck Passenger Service Units (PSU) and Attendant's Service
Units (ASU) or overdoor service panels, to get access to the low pressure oxygen hose assemblies.
Refer to 747-100/200/300 AMM 25-23-01 and 747-100/200/300 AMM 25-23-04, or 747-400 AMM
25-23-01 and 747-400 AMM 25-23-04, as accepted procedures.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 22, 2017
747-35-2134
31 of 90
BOEING SERVICE BULLETIN 747-35-2134

### Page 32

MAKE SURE THAT THE AREA IN AND AROUND THE OXYGEN SYSTEM ARE
CLEAN.
CAUTION
9. Group 1-13, 15:
RC - Do PART 1: LOW PRESSURE OXYGEN HOSE ASSEMBLY - REPLACEMENT
10. RC - Do PART 2: LOW PRESSURE OXYGEN SYSTEM HOSE ASSEMBLY - GENERAL VISUAL
INSPECTION.
a. CONDITION 1: ALL HOSES HAVE MORE THAN OR EQUAL TO THE MINIMUM CLEARANCE
(1) No further action required
b. CONDITION 2: ONE OR MORE HOSE ASSEMBLIES HAVE LESS THAN THE MINIMUM
CLEARANCE
(1) Adjust to make the minimum clearance agree with the dimension(s) specified in APPENDIX
C. Refer to 747-100/200/300 AMM 35-00-00 or 747-400 AMM 35-00-00 as an accepted
procedure.
11. Open oxygen system shutoff valve. Refer to 747-100/200/300 AMM 35-00-00 or 747-400 AMM
35-00-00, 'Safety Precautions', as an accepted procedure.
12. RC - If one or more hose assemblies were replaced or disconnected, do an Oxygen System Low
Pressure Leak Test of the passenger oxygen system. If the oxygen system fails the test, do
corrective actions, repeat the test, and do applicable corrective actions until the test is passed.
Refer to 747-100/200/300 AMM 35-21-00 or 747-400 AMM 35-21-00 as an accepted procedure.
13. Close or install the main deck Passenger Service Units (PSU) and Attendant's Service Units (ASU)
or overdoor service panels, to close access to the low pressure oxygen hose assemblies. Refer
to 747-100/200/300 AMM 25-23-01 and 747-100/200/300 AMM 25-23-04, or 747-400 AMM 25-23-01
and 747-400 AMM 25-23-04, as accepted procedures.
14. Group 1-14:
Install the outboard overhead stowage bins in the upper deck passenger compartment. Refer to
747-400 AMM 25-28-23 as an accepted procedure.
15. Group 1-14:
Install the outboard and center overhead stowage bins in the main deck passenger compartment.
Refer to 747-400 AMM 25-28-01 and 747-400 AMM 25-28-02 as accepted procedures.
16. Group 15:
Install the overhead stowage bins in the main deck and upper deck passenger compartments.
Refer to 747-100/200/300 AMM 25-28-01 as an accepted procedure.
17. Install the lowered ceiling panels main deck passenger compartment. Refer to 747-100/200/300
AMM 25-22-04 or 747-400 AMM 25-22-04 as an accepted procedure.
18. Install the upper deck passenger compartment ceiling panels. Refer to 747-100/200/300 AMM
25-22-03 or 747-400 AMM 25-22-03 as an accepted procedure.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 22, 2017
747-35-2134
32 of 90
BOEING SERVICE BULLETIN 747-35-2134

### Page 33

19. Install main deck passenger compartment ceiling panels. Refer to 747-100/200/300 AMM 25-22-01
or 747-400 AMM 25-22-01 as an accepted procedure.
20. Put the airplane back to a serviceable condition.
Group 1-13, 15:
PART 1: LOW PRESSURE OXYGEN HOSE - REPLACEMENT
1. Replace each conductive low pressure oxygen system flexible hose assembly with a non-conductive
one in accordance with Table 3 and:
Group 1:
FIGURE 1
Group 2:
FIGURE 2
Group 3:
FIGURE 3
Group 4:
FIGURE 4
Group 5:
FIGURE 5
Group 6:
FIGURE 6
Group 7:
FIGURE 7
Group 8:
FIGURE 8
Group 9:
FIGURE 9
Group 10:
FIGURE 10
Group 11:
FIGURE 11
Group 12:
FIGURE 12
Group 13:
FIGURE 13
Group 15:
FIGURE 14
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 22, 2017
747-35-2134
33 of 90
BOEING SERVICE BULLETIN 747-35-2134

### Page 34

Table 3: HOSE ASSEMBLY REPLACEMENT
More DataNew O-Ring To InstallNew Hose Assembly Part
Number To Install
Removed Hose Assem-
bly Part Number (Suppli-
er Part Number)
(a)-38001-66760B50059-103 (38001-
103)
(a)-38001-66860B50059-104 (38001-
104)
(a)-57034-16N12009060B50059-115 (38001-
115)
(a)-57034-24N12019560B50059-116 (38001-
116)
(a)-57034-16N12018860B50059-118 (38001-
118)
(a)-38001-65860B50059-119 (38001-
119)
(a)-57034-24N12041060B50059-126 (38001-
126)
(a)-57034-16N12035060B50059-127 (38001-
127)
(a)-38001-65960B50059-58 (38001-58)
(a)-38001-66060B50059-61 (38001-61)
(a)-38001-66660B50059-65 (38001-65)
(a)-38001-65760B50059-98 (38001-98)
(a)417U4205-257034N13240S417U406-13240 (57034-
13240)
(a)417U4205-157034N25107S417U406-25107 (57034-
25107)
(a)417U4205-157034N25200S417U406-25200 (57034-
25200)
(a)417U4205-157034N25240S417U406-25240 (57034-
25240)
(a)417U4205-157034N35280S417U406-35280 (57034-
35280)
(a)417U4205-257034N53120S417U406-53120 (57034-
53120)
(a)417U4205-157034N55159S417U406-55159 (57034-
55159)
(a)417U4205-157034N65147S417U406-65147 (57034-
65147)
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 22, 2017
747-35-2134
34 of 90
BOEING SERVICE BULLETIN 747-35-2134

### Page 35

Table 3: HOSE ASSEMBLY REPLACEMENT
More DataNew O-Ring To InstallNew Hose Assembly Part
Number To Install
Removed Hose Assem-
bly Part Number (Suppli-
er Part Number)
(a)417U4205-257034N73200S417U406-73200 (57034-
73200)
(a) If the part number of the removed hose assembly is not known, contact The Boeing Company for instructions
and do the instructions.
PART 2: LOW PRESSURE OXYGEN SYSTEM HOSE ASSEMBLY - GENERAL VISUAL INSPECTION
1. Do a General Visual Inspection of the low pressure oxygen system in the main deck and upper
deck passenger compartments to make sure there is minimum clearance of the oxygen system
hose assemblies from adjacent structure and systems, in accordance with FIGURE 15.
NOTE: This work does not include the flexible oxygen hose assemblies replaced in accordance
with PART 1.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 22, 2017
747-35-2134
35 of 90
BOEING SERVICE BULLETIN 747-35-2134

### Page 36 (OCR)

BOEING SERVICE BULLETIN 747-35-2134
This Figure applies only to: Group 1.
STA
2360
STA
1480
STA
STA  1000
520
MAIN  STA
DISTRIBUTION  1085
LOOP
STA  STA
STA  605  861
420
_ RBL
100
- 0.0  BL
- LBL
100
STA  STA  STA
534  797  842  14
11) 12  STA  861
A-A  2574547
FIGURE 1: MAIN DECK PASSENGER COMPARTMENT, ABOVE CEILING - LOW PRESSURE OXYGEN
SYSTEM FLEXIBLE HOSE ASSEMBLIES - REPLACEMENT
(SHEET 1 OF 3)
Original Issue: November 22, 2017
Export Controlled ECCN: 9E991  747-35-2134
Copyright © Unpublished
Work - See page 1 for details.  36 of 90

### Page 37

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for each airplane.
More DataQtyIdentificationNameTaskStep
Hose assembly con-
nection to center bin.
(a)
2S417U406-( )RETAINERRemove / Keep1
(a)1S417U406-( )HOSE ASSYRemove
(a)2417U4205-( )O-RINGRemove
Hose assembly con-
nection to center bin.
(a)
2417U4205-( )O-RINGInstall (New)2
(a)157034N( )HOSE ASSYInstall (New)
(a)2S417U406-( )RETAINERInstall (Kept)
Hose assembly con-
nection to stowage
bin endcap. (a)
1S417U406-( )RETAINERRemove / Keep3
(a)1S417U406-( )HOSE ASSYRemove
(a)1417U4205-( )O-RINGRemove
Hose assembly con-
nection to stowage
bin endcap. (a)
1417U4205-( )O-RINGInstall (New)4
(a)(b)157034N( )HOSE ASSYInstall (New)
(a)1S417U406-( )RETAINERInstall (Kept)
Hose assembly con-
nection to stowage
bin endcap. (a)
160B50059-( )HOSE ASSYRemove5
Hose assembly con-
nection to stowage
bin endcap. (a)(b)
157034-( )HOSE ASSYInstall (New)6
Upper deck hose
assembly hook up to
main distribution
loop. (a)
160B50059-( )HOSE ASSYRemove7
Upper deck hose
assembly hook up to
main distribution
loop. (a)(b)
157034-( )HOSE ASSYInstall (New)8
FIGURE 1: MAIN DECK PASSENGER COMPARTMENT, ABOVE CEILING - LOW PRESSURE OXYGEN
SYSTEM FLEXIBLE HOSE ASSEMBLIES - REPLACEMENT
(SHEET 2 OF 3)
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 22, 2017
747-35-2134
37 of 90
BOEING SERVICE BULLETIN 747-35-2134

### Page 38

More DataQtyIdentificationNameTaskStep
Hose assembly con-
nection to stowage
bin endcap. (a)
1S417U406-( )RETAINERRemove / Keep9
(a)1S417U406-( )HOSE ASSYRemove
(a)1417U4205-( )O-RINGRemove
Hose assembly con-
nection to stowage
bin endcap. (a)
1417U4205-( )O-RINGInstall (New)10
(a)(b)157034N( )HOSE ASSYInstall (New)
(a)1S417U406-( )RETAINERInstall (Kept)
Upper deck hose
assembly hook up to
main distribution
loop. (a)
160B50059-( )HOSE ASSYRemove11
Upper deck hose
assembly hook up to
main distribution
loop. (a)(b)
157034-( )HOSE ASSYInstall (New)12
Hose assembly con-
nection to stowage
bin endcap. (a)
160B50059-( )HOSE ASSYRemove13
Hose assembly con-
nection to stowage
bin end cap. (a)(b)
157034-( )HOSE ASSYInstall (New)14
Hose assembly con-
nection to center bin.
(a)
1S417U406-( )RETAINERRemove / Keep15
(a)1S417U406-( )HOSE ASSYRemove
(a)1417U4205-( )O-RINGRemove
Hose assembly con-
nection to center bin.
(a)
1417U4205-( )O-RINGInstall (New)16
(a)(b)157034N( )HOSE ASSYInstall (New)
(a)1S417U406-( )RETAINERInstall (Kept)
(a) Refer to 747-400 AMM 35-00-00 as an accepted procedure.
(b) Refer to 747-400 AMM 20-51-01 as an accepted procedure.
FIGURE 1: MAIN DECK PASSENGER COMPARTMENT, ABOVE CEILING - LOW PRESSURE OXYGEN
SYSTEM FLEXIBLE HOSE ASSEMBLIES - REPLACEMENT
(SHEET 3 OF 3)
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 22, 2017
747-35-2134
38 of 90
BOEING SERVICE BULLETIN 747-35-2134

### Page 39 (OCR)

BOEING SERVICE BULLETIN 747-35-2134
This Figure applies only to: Group 2.
STA
2360
STA
1480
STA \
STA  1000
520
STA
1085
STA  STA
STA  861  1100
420
_ RBL
100
+ - LBL  100
STA  MAIN  STA
534  DISTRIBUTION  797
LOOP  STA
861
A-A
FIGURE 2: MAIN DECK PASSENGER COMPARTMENT, ABOVE CEILING - LOW PRESSURE OXYGEN
SYSTEM FLEXIBLE HOSE ASSEMBLIES - REPLACEMENT
(SHEET 1 OF 3)
Original Issue: November 22, 2017
Export Controlled ECCN: 9E991  747-35-2134
Copyright © Unpublished
Work - See page 1 for details.  39 of 90

### Page 40

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for each airplane.
More DataQtyIdentificationNameTaskStep
Hose assembly con-
nection to center bin.
(a)
2S417U406-( )RETAINERRemove / Keep1
(a)1S417U406-( )HOSE ASSYRemove
(a)2417U4205-( )O-RINGRemove
Hose assembly con-
nection to center bin.
(a)
2417U4205-( )O-RINGInstall (New)2
(a)157034N( )HOSE ASSYInstall (New)
(a)1S417U406-( )RETAINERInstall (Kept)
Hose assembly con-
nection to stowage
bin endcap. (a)
1S417U406-( )RETAINERRemove / Keep3
(a)1S417U406-( )HOSE ASSYRemove
(a)1417U4205-( )O-RINGRemove
Hose assembly con-
nection to stowage
bin endcap. (a)
1417U4205-( )O-RINGInstall (New)4
(a)157034N( )HOSE ASSYInstall (New)
(a)1S417U406-( )RETAINERInstall (Kept)
Hose assembly con-
nection to stowage
bin endcap. (a)
160B50059-( )HOSE ASSYRemove5
Hose assembly con-
nection to stowage
bin endcap. (a)(b)
157034-( )HOSE ASSYInstall (New)6
Main distribution
loop connection to
upper deck. (a)
160B50059-( )HOSE ASSYRemove7
Main distribution
loop connection to
upper deck. (a)(b)
157034-( )HOSE ASSYInstall (New)8
FIGURE 2: MAIN DECK PASSENGER COMPARTMENT, ABOVE CEILING - LOW PRESSURE OXYGEN
SYSTEM FLEXIBLE HOSE ASSEMBLIES - REPLACEMENT
(SHEET 2 OF 3)
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 22, 2017
747-35-2134
40 of 90
BOEING SERVICE BULLETIN 747-35-2134

### Page 41

More DataQtyIdentificationNameTaskStep
Hose assembly con-
nection to stowage
bin endcap. (a)
1S417U406-( )RETAINERRemove / Keep9
(a)1S417U406-( )HOSE ASSYRemove
(a)1417U4205-( )O-RINGRemove
Hose assembly con-
nection to stowage
bin endcap. (a)
1417U4205-( )O-RINGInstall (New)10
(a)(b)157034N( )HOSE ASSYInstall (New)
(a)1S417U406-( )RETAINERInstall (Kept)
Upper deck hose
assembly hook up to
main distribution
loop. (a)
160B50059-( )HOSE ASSYRemove11
Upper deck hose
assembly hook up to
main distribution
loop. (a)(b)
157034-( )HOSE ASSYInstall (New)12
Hose assembly con-
nection to stowage
bin endcap. (a)
160B50059-( )HOSE ASSYRemove13
Hose assembly con-
nection to stowage
bin endcap. (a)(b)
157034-( )HOSE ASSYInstall (New)14
Hose assembly con-
nection to center
stowage bin. (a)
1S417U406-( )RETAINERRemove / Keep15
(a)1S417U406-( )HOSE ASSYRemove
(a)1417U4205-( )O-RINGRemove
Hose assembly con-
nection to center
stowage bin. (a)
1417U4205-( )O-RINGInstall (New)16
(a)(b)157034N( )HOSE ASSYInstall (New)
(a)1S417U406-( )RETAINERInstall (Kept)
(a) Refer to 747-400 AMM 35-00-00 as an accepted procedure.
(b) Refer to 747-400 AMM 20-51-01 as an accepted procedure.
FIGURE 2: MAIN DECK PASSENGER COMPARTMENT, ABOVE CEILING - LOW PRESSURE OXYGEN
SYSTEM FLEXIBLE HOSE ASSEMBLIES - REPLACEMENT
(SHEET 3 OF 3)
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 22, 2017
747-35-2134
41 of 90
BOEING SERVICE BULLETIN 747-35-2134

### Page 42 (OCR)

BOEING SERVICE BULLETIN 747-35-2134
This Figure applies only to: Group 3.
STA
2360
STA
1480
STA
STA  1000
520
STA  STA
725  1085
STA  STA
STA  797  861  1100
420
- RBL  100
- 480
534  STA  MAIN  DISTRIBUTION  SIA  797  STA  842  13 14  (15) 16
LOOP  STA
861
A-A  2574826
FIGURE 3: MAIN DECK PASSENGER COMPARTMENT, ABOVE CEILING - LOW PRESSURE OXYGEN
SYSTEM FLEXIBLE HOSE ASSEMBLIES - REPLACEMENT
(SHEET 1 OF 3)
Original Issue: November 22, 2017
Export Controlled ECCN: 9E991  747-35-2134
Copyright © Unpublished
Work - See page 1 for details.  42 of 90

### Page 43

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for each airplane.
More DataQtyIdentificationNameTaskStep
Hose assembly con-
nection to center
stowage bin. (a)
2S417U406-( )RETAINERRemove / Keep1
(a)1S417U406-( )HOSE ASSYRemove
(a)2417U4205-( )O-RINGRemove
Hose assembly con-
nection to center
stowage bin. (a)
2417U4205-( )O-RINGInstall (New)2
(a)157034N( )HOSE ASSYInstall (New)
(a)2S417U406-( )RETAINERInstall (Kept)
Hose assembly con-
nection to stowage
bin endcap. (a)
1S417U406-( )RETAINERRemove / Keep3
(a)1S417U406-( )HOSE ASSYRemove
(a)1417U4205-( )O-RINGRemove
Hose assembly con-
nection to stowage
bin endcap. (a)
1417U4205-( )O-RINGInstall (New)4
(a)(b)157034N( )HOSE ASSYInstall (New)
(a)1S417U406-( )RETAINERInstall (Kept)
Hose assembly con-
nection to stowage
bin endcap. (a)
160B50059-( )HOSE ASSYRemove5
Hose assembly con-
nection to stowage
bin endcap. (a)(b)
157034-( )HOSE ASSYInstall (New)6
Main distribution
loop connection to
upper deck.(a)
160B50059-( )HOSE ASSYRemove7
Main distribution
loop connection to
upper deck. (a)(b)
157034-( )HOSE ASSYInstall (New)8
FIGURE 3: MAIN DECK PASSENGER COMPARTMENT, ABOVE CEILING - LOW PRESSURE OXYGEN
SYSTEM FLEXIBLE HOSE ASSEMBLIES - REPLACEMENT
(SHEET 2 OF 3)
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 22, 2017
747-35-2134
43 of 90
BOEING SERVICE BULLETIN 747-35-2134

### Page 44

More DataQtyIdentificationNameTaskStep
Hose assembly con-
nection to stowage
bin endcap. (a)
1S417U406-( )RETAINERRemove / Keep9
(a)1S417U406-( )HOSE ASSYRemove
(a)1417U4205-( )O-RINGRemove
Hose assembly con-
nection to stowage
bin endcap. (a)
1417U4205-( )O-RINGInstall (New)10
(a)(b)157034N( )HOSE ASSYInstall (New)
(a)1S417U406-( )RETAINERInstall (Kept)
Upper deck hose
assembly hook up to
main distribution
loop. (a)
160B50059-( )HOSE ASSYRemove11
Upper deck hose
assembly hook up to
main distribution
loop. (a)(b)
157034-( )HOSE ASSYInstall (New)12
Hose assembly con-
nection to stowage
bin endcap. (a)
160B50059-( )HOSE ASSYRemove13
Hose assembly con-
nection to stowage
bin endcap. (a)(b)
157034-( )HOSE ASSYInstall (New)14
Hose assembly con-
nection to center
stowage bin. (a)
1S417U406-( )RETAINERRemove / Keep15
(a)1S417U406-( )HOSE ASSYRemove
(a)1417U4205-( )O-RINGRemove
Hose assembly con-
nection to center
stowage bin. (a)
1417U4205-( )O-RINGInstall (New)16
(a)(b)157034N( )HOSE ASSYInstall (New)
(a)1S417U406-( )RETAINERInstall (Kept)
(a) Refer to 747-400 AMM 35-00-00 as an accepted procedure.
(b) Refer to 747-400 AMM 20-51-01 as an accepted procedure.
FIGURE 3: MAIN DECK PASSENGER COMPARTMENT, ABOVE CEILING - LOW PRESSURE OXYGEN
SYSTEM FLEXIBLE HOSE ASSEMBLIES - REPLACEMENT
(SHEET 3 OF 3)
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 22, 2017
747-35-2134
44 of 90
BOEING SERVICE BULLETIN 747-35-2134

### Page 45 (OCR)

BOEING SERVICE BULLETIN 747-35-2134
This Figure applies only to: Group 4.
STA
2360
STA
1480
STA \
STA  1000
520
STA  STA
725  1085
STA  STA  STA
STA  740  861  1100
420
_ RBL
100
- B0
1 - 100  ALBL
MAIN
STA  DISTRIBUTION  STA  STA
534  LOOP  797  842 |
STA
861
A-A  2575019
FIGURE 4: MAIN DECK PASSENGER COMPARTMENT, ABOVE CEILING - LOW PRESSURE OXYGEN
SYSTEM FLEXIBLE HOSE ASSEMBLIES - REPLACEMENT
(SHEET 1 OF 3)
Original Issue: November 22, 2017
Export Controlled ECCN: 9E991  747-35-2134
Copyright © Unpublished
Work - See page 1 for details.  45 of 90

### Page 46

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for each airplane.
More DataQtyIdentificationNameTaskStep
Hose assembly con-
nection to center
stowage bin. (a)
2S417U406-( )RETAINERRemove / Keep1
(a)1S417U406-( )HOSE ASSYRemove
(a)2417U4205-( )O-RINGRemove
Hose assembly con-
nection to center
stowage bin. (a)
2417U4205-( )O-RINGInstall (New)2
(a)157034N( )HOSE ASSYInstall (New)
(a)2S417U406-( )RETAINERInstall (Kept)
Hose assembly con-
nection to stowage
bin endcap. (a)
1S417U406-( )RETAINERRemove / Keep3
(a)1S417U406-( )HOSE ASSYRemove
(a)1417U4205-( )O-RINGRemove
Hose assembly con-
nection to stowage
bin endcap. (a)
1417U4205-( )O-RINGInstall (New)4
(a)(b)157034N( )HOSE ASSYInstall (New)
(a)1S417U406-( )RETAINERInstall (Kept)
Hose assembly con-
nection to stowage
bin endcap. (a)
160B50059-( )HOSE ASSYRemove5
Hose assembly con-
nection to stowage
bin endcap. (a)(b)
157034-( )HOSE ASSYInstall (New)6
Main distribution
loop connection to
upper deck. (a)
160B50059-( )HOSE ASSYRemove7
Main distribution
loop connection to
upper deck. (a)(b)
157034-( )HOSE ASSYInstall (New)8
FIGURE 4: MAIN DECK PASSENGER COMPARTMENT, ABOVE CEILING - LOW PRESSURE OXYGEN
SYSTEM FLEXIBLE HOSE ASSEMBLIES - REPLACEMENT
(SHEET 2 OF 3)
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 22, 2017
747-35-2134
46 of 90
BOEING SERVICE BULLETIN 747-35-2134

### Page 47

More DataQtyIdentificationNameTaskStep
Hose assembly con-
nection to stowage
bin endcap.(a)
1S417U406-( )RETAINERRemove / Keep9
(a)1S417U406-( )HOSE ASSYRemove
(a)1417U4205-( )O-RINGRemove
Hose assembly con-
nection to stowage
bin endcap. (a)
1417U4205-( )O-RINGInstall (New)10
(a)(b)157034N( )HOSE ASSYInstall (New)
(a)1S417U406-( )RETAINERInstall (Kept)
Upper deck hose
assembly hook up to
main distribution
loop. (a)
160B50059-( )HOSE ASSYRemove11
Upper deck hose
assembly hook up to
main distribution
loop. (a)(b)
157034-( )HOSE ASSYInstall (New)12
Hose assembly con-
nection to stowage
bin endcap. (a)
160B50059-( )HOSE ASSYRemove13
Hose assembly con-
nection to stowage
bin endcap. (a)(b)
157034-( )HOSE ASSYInstall (New)14
Hose assembly con-
nection to center
stowage bin. (a)
1S417U406-( )RETAINERRemove / Keep15
(a)1S417U406-( )HOSE ASSYRemove
(a)1417U4205-( )O-RINGRemove
Hose assembly con-
nection to center
stowage bin. (a)
1417U4205-( )O-RINGInstall (New)16
(a)(b)157034N( )HOSE ASSYInstall (New)
(a)1S417U406-( )RETAINERInstall (Kept)
(a) Refer to 747-400 AMM 35-00-00 as an accepted procedure.
(b) Refer to 747-400 AMM 20-51-01 as an accepted procedure.
FIGURE 4: MAIN DECK PASSENGER COMPARTMENT, ABOVE CEILING - LOW PRESSURE OXYGEN
SYSTEM FLEXIBLE HOSE ASSEMBLIES - REPLACEMENT
(SHEET 3 OF 3)
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 22, 2017
747-35-2134
47 of 90
BOEING SERVICE BULLETIN 747-35-2134

### Page 48 (OCR)

BOEING SERVICE BULLETIN 747-35-2134
This Figure applies only to: Group 5.
STA
2360
STA
1480
STA
STA  1000
520
00000000
MAIN
DISTRIBUTION  STA
LOOP  1341
STA  STA
208  1360
STA
200
_ RBL
100
BL
0.0
LBL
100
STA  STA  STA
534  842  1320
A-A  2575022
FIGURE 5: MAIN DECK PASSENGER COMPARTMENT, ABOVE CEILING - LOW PRESSURE OXYGEN
SYSTEM FLEXIBLE HOSE ASSEMBLIES - REPLACEMENT
(SHEET 1 OF 3)
Original Issue: November 22, 2017
Export Controlled ECCN: 9E991  747-35-2134
Copyright © Unpublished
Work - See page 1 for details.  48 of 90

### Page 49

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for each airplane.
More DataQtyIdentificationNameTaskStep
Hose assembly con-
nection to center
stowage bin. (a)
160B50059-( )HOSE ASSYRemove1
Hose assembly con-
nection to center
stowage bin. (a)(b)
138001-( )HOSE ASSYInstall (New)2
Main distribution
loop connection to
upper deck. (a)
160B50059-( )HOSE ASSYRemove3
Main distribution
loop connection to
upper deck. (a)(b)
157034-( )HOSE ASSYInstall (New)4
Main distribution
loop connection to
upper deck. (a)
160B50059-( )HOSE ASSYRemove5
Main distribution
loop connection to
upper deck. (a)(b)
157034-( )HOSE ASSYInstall (New)6
Hose assembly con-
nection to stowage
bin endcap. (a)
2S417U406-( )RETAINERRemove / Keep7
(a)1S417U406-( )HOSE ASSYRemove
(a)2417U4205-( )O-RINGRemove
Hose assembly con-
nection to stowage
bin endcap. (a)
2417U4205-( )O-RINGInstall (New)8
(a)157034N( )HOSE ASSYInstall (New)
(a)2S417U406-( )RETAINERInstall (Kept)
Hose assembly con-
nection to center
stowage bin. (a)
2S417U406-( )RETAINERRemove / Keep9
(a)1S417U406-( )HOSE ASSYRemove
(a)2417U4205-( )O-RINGRemove
FIGURE 5: MAIN DECK PASSENGER COMPARTMENT, ABOVE CEILING - LOW PRESSURE OXYGEN
SYSTEM FLEXIBLE HOSE ASSEMBLIES - REPLACEMENT
(SHEET 2 OF 3)
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 22, 2017
747-35-2134
49 of 90
BOEING SERVICE BULLETIN 747-35-2134

### Page 50

More DataQtyIdentificationNameTaskStep
Hose assembly con-
nection to center
stowage bin. (a)
2417U4205-( )O-RINGInstall (New)10
(a)157034N( )HOSE ASSYInstall (New)
(a)2S417U406-( )RETAINERInstall (Kept)
Hose assembly con-
nection to stowage
bin endcap. (a)
2S417U406-( )RETAINERRemove / Keep11
(a)1S417U406-( )HOSE ASSYRemove
(a)2417U4205-( )O-RINGRemove
Hose assembly con-
nection to stowage
bin endcap. (a)
2417U4205-( )O-RINGInstall (New)12
(a)157034N( )HOSE ASSYInstall (New)
(a)2S417U406-( )RETAINERInstall (Kept)
(a) Refer to 747-400 AMM 35-00-00 as an accepted procedure.
(b) Refer to 747-400 AMM 20-51-01 as an accepted procedure.
FIGURE 5: MAIN DECK PASSENGER COMPARTMENT, ABOVE CEILING - LOW PRESSURE OXYGEN
SYSTEM FLEXIBLE HOSE ASSEMBLIES - REPLACEMENT
(SHEET 3 OF 3)
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 22, 2017
747-35-2134
50 of 90
BOEING SERVICE BULLETIN 747-35-2134

### Page 51 (OCR)

BOEING SERVICE BULLETIN 747-35-2134
This Figure applies only to: Group 6.
STA
2360
STA
1480
STA  1000 A  STA
520
STA  STA
725  1085
STA
180  STA  STA
861  1100
ISTA
200  RBL
100
_ LBL
100
STA
208
STA  STA  STA
534  797  842  У16)
MAIN
DISTRIBUTION
LOOP
А-A  2575035
FIGURE 6: MAIN DECK PASSENGER COMPARTMENT, ABOVE CEILING - LOW PRESSURE OXYGEN
SYSTEM FLEXIBLE HOSE ASSEMBLIES - REPLACEMENT
(SHEET 1 OF 4)
Original Issue: November 22, 2017
Export Controlled ECCN: 9E991  Copyright © Unpublished  747-35-2134
Work - See page 1 for details.  51 of 90

### Page 52

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for each airplane.
More DataQtyIdentificationNameTaskStep
Hose assembly con-
nection to outboard
stowage bin. (a)
1S417U406-( )RETAINERRemove / Keep1
(a)1S417U406-( )HOSE ASSYRemove
(a)1417U4205-( )O-RINGRemove
Hose assembly con-
nection to outboard
stowage bin. (a)
1417U4205-( )O-RINGInstall (New)2
(a)(b)157034N( )HOSE ASSYInstall (New)
(a)1S417U406-( )RETAINERInstall (Kept)
Hose assembly con-
nection to center
stowage bin. (a)
160B50059-( )HOSE ASSYRemove3
Hose assembly con-
nection to center
stowage bin. (a)(b)
138001-( )HOSE ASSYInstall (New)4
Hose assembly con-
nection to center
stowage bin. (a)
2S417U406-( )RETAINERRemove / Keep5
(a)1S417U406-( )HOSE ASSYRemove
(a)2417U4205-( )O-RINGRemove
Hose assembly con-
nection to center
stowage bin. (a)
2417U4205-( )O-RINGInstall (New)6
(a)157034N( )HOSE ASSYInstall (New)
(a)2S417U406-( )RETAINERInstall (Kept)
Hose assembly con-
nection to stowage
bin endcap. (a)
160B50059-( )HOSE ASSYRemove7
Hose assembly con-
nection to stowage
bin endcap. (a)(b)
157034-( )HOSE ASSYInstall (New)8
Main distribution
loop connection to
upper deck. (a)
160B50059-( )HOSE ASSYRemove9
FIGURE 6: MAIN DECK PASSENGER COMPARTMENT, ABOVE CEILING - LOW PRESSURE OXYGEN
SYSTEM FLEXIBLE HOSE ASSEMBLIES - REPLACEMENT
(SHEET 2 OF 4)
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 22, 2017
747-35-2134
52 of 90
BOEING SERVICE BULLETIN 747-35-2134

### Page 53

More DataQtyIdentificationNameTaskStep
Main distribution
loop connection to
upper deck. (a)(b)
157034-( )HOSE ASSYInstall (New)10
Hose assembly con-
nection to stowage
bin endcap. (a)
1S417U406-( )RETAINERRemove / Keep11
(a)1S417U406-( )HOSE ASSYRemove
(a)1417U4205-( )O-RINGRemove
Hose assembly con-
nection to stowage
bin endcap. (a)
1417U4205-( )O-RINGInstall (New)12
(a)(b)157034N( )HOSE ASSYInstall (New)
(a)1S417U406-( )RETAINERInstall (Kept)
Upper deck hose
assembly hook up to
main distribution
loop. (a)
160B50059-( )HOSE ASSYRemove13
Upper deck hose
assembly hook up to
main distribution
loop. (a)(b)
157034-( )HOSE ASSYInstall (New)14
Hose assembly con-
nection to stowage
bin endcap. (a)
1S417U406-( )RETAINERRemove / Keep15
(a)1S417U406-( )HOSE ASSYRemove
(a)1417U4205-( )O-RINGRemove
Hose assembly con-
nection to stowage
bin endcap. (a)
1417U4205-( )O-RINGInstall (New)16
(a)(b)157034N( )HOSE ASSYInstall (New)
(a)1S417U406-( )RETAINERInstall (Kept)
Hose assembly con-
nection to center
stowage bin. (a)
1S417U406-( )RETAINERRemove / Keep17
(a)1S417U406-( )HOSE ASSYRemove
(a)1417U4205-( )O-RINGRemove
FIGURE 6: MAIN DECK PASSENGER COMPARTMENT, ABOVE CEILING - LOW PRESSURE OXYGEN
SYSTEM FLEXIBLE HOSE ASSEMBLIES - REPLACEMENT
(SHEET 3 OF 4)
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 22, 2017
747-35-2134
53 of 90
BOEING SERVICE BULLETIN 747-35-2134

### Page 54

More DataQtyIdentificationNameTaskStep
Hose assembly con-
nection to center
stowage bin. (a)
1417U4205-( )O-RINGInstall (New)18
(a)(b)157034N( )HOSE ASSYInstall (New)
(a)1S417U406-( )RETAINERInstall (Kept)
(a) Refer to 747-400 AMM 35-00-00 as an accepted procedure.
(b) Refer to 747-400 AMM 20-51-01 as an accepted procedure.
FIGURE 6: MAIN DECK PASSENGER COMPARTMENT, ABOVE CEILING - LOW PRESSURE OXYGEN
SYSTEM FLEXIBLE HOSE ASSEMBLIES - REPLACEMENT
(SHEET 4 OF 4)
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 22, 2017
747-35-2134
54 of 90
BOEING SERVICE BULLETIN 747-35-2134

### Page 55 (OCR)

BOEING SERVICE BULLETIN 747-35-2134
This Figure applies only to: Group 7.
STA
2360
STA
1480
STA
STA  1000 A
520
STA
1085
STA
208  MAIN  STA
DISTRIBUTION  1100
STA  LOOP
200
‚RBL
100
~ BL  0.0
100
STA  STA  STA
534  797  861
A-A  2575194
FIGURE 7: MAIN DECK PASSENGER COMPARTMENT, ABOVE CEILING - LOW PRESSURE OXYGEN
SYSTEM FLEXIBLE HOSE ASSEMBLIES - REPLACEMENT
(SHEET 1 OF 4)
Original Issue: November 22, 2017
Export Controlled ECCN: 9E991  747-35-2134
Copyright © Unpublished
Work - See page 1 for details.  55 of 90

### Page 56

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for each airplane.
More DataQtyIdentificationNameTaskStep
Hose assembly con-
nection to center
stowage bin. (a)
160B50059-( )HOSE ASSYRemove1
Hose assembly con-
nection to center
stowage bin. (a)(b)
138001-( )HOSE ASSYInstall (New)2
Hose assembly con-
nection to stowage
bin endcap. (a)
1S417U406-( )RETAINERRemove / Keep3
(a)1S417U406-( )HOSE ASSYRemove
(a)1417U4205-( )O-RINGRemove
Hose assembly con-
nection to stowage
bin endcap. (a)
1417U4205-( )O-RINGInstall (New)4
(a)(b)157034N( )HOSE ASSYInstall (New)
(a)1S417U406-( )RETAINERInstall (Kept)
Hose assembly con-
nection to stowage
bin endcap. (a)
1S417U406-( )RETAINERRemove / Keep5
(a)1S417U406-( )HOSE ASSYRemove
(a)1417U4205-( )O-RINGRemove
Hose assembly con-
nection to stowage
bin endcap. (a)
1417U4205-( )O-RINGInstall (New)6
(a)(b)157034N( )HOSE ASSYInstall (New)
(a)1S417U406-( )RETAINERInstall (Kept)
Main distribution
loop connection to
upper deck. (a)
160B50059-( )HOSE ASSYRemove7
Main distribution
loop connection to
upper deck. (a)(b)
157034-( )HOSE ASSYInstall (New)8
FIGURE 7: MAIN DECK PASSENGER COMPARTMENT, ABOVE CEILING - LOW PRESSURE OXYGEN
SYSTEM FLEXIBLE HOSE ASSEMBLIES - REPLACEMENT
(SHEET 2 OF 4)
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 22, 2017
747-35-2134
56 of 90
BOEING SERVICE BULLETIN 747-35-2134

### Page 57

More DataQtyIdentificationNameTaskStep
Hose assembly con-
nection to stowage
bin endcap. (a)
1S417U406-( )RETAINERRemove / Keep9
(a)1S417U406-( )HOSE ASSYRemove
(a)1417U4205-( )O-RINGRemove
Hose assembly con-
nection to stowage
bin endcap. (a)
1417U4205-( )O-RINGInstall (New)10
(a)(b)157034N( )HOSE ASSYInstall (New)
(a)1S417U406-( )RETAINERInstall (Kept)
Main distribution
loop connection to
upper deck. (a)
160B50059-( )HOSE ASSYRemove11
Main distribution
loop connection to
upper deck. (a)(b)
157034-( )HOSE ASSYInstall (New)12
Hose assembly con-
nection to stowage
bin endcap. (a)
1S417U406-( )RETAINERRemove / Keep13
(a)1S417U406-( )HOSE ASSYRemove
(a)1417U4205-( )O-RINGRemove
Hose assembly con-
nection to stowage
bin endcap. (a)
1417U4205-( )O-RINGInstall (New)14
(a)(b)157034N( )HOSE ASSYInstall (New)
(a)1S417U406-( )RETAINERInstall (Kept)
Hose assembly con-
nection to center
stowage bin. (a)
1S417U406-( )RETAINERRemove / Keep15
(a)1S417U406-( )HOSE ASSYRemove
(a)1417U4205-( )O-RINGRemove
Hose assembly con-
nection to center
stowage bin. (a)
1417U4205-( )O-RINGInstall (New)16
(a)(b)157034N( )HOSE ASSYInstall (New)
(a)1S417U406-( )RETAINERInstall (Kept)
(a) Refer to 747-400 AMM 35-00-00 as an accepted procedure.
FIGURE 7: MAIN DECK PASSENGER COMPARTMENT, ABOVE CEILING - LOW PRESSURE OXYGEN
SYSTEM FLEXIBLE HOSE ASSEMBLIES - REPLACEMENT
(SHEET 3 OF 4)
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 22, 2017
747-35-2134
57 of 90
BOEING SERVICE BULLETIN 747-35-2134

### Page 58

More DataQtyIdentificationNameTaskStep
(b) Refer to 747-400 AMM 20-51-01 as an accepted procedure.
FIGURE 7: MAIN DECK PASSENGER COMPARTMENT, ABOVE CEILING - LOW PRESSURE OXYGEN
SYSTEM FLEXIBLE HOSE ASSEMBLIES - REPLACEMENT
(SHEET 4 OF 4)
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 22, 2017
747-35-2134
58 of 90
BOEING SERVICE BULLETIN 747-35-2134

### Page 59 (OCR)

BOEING SERVICE BULLETIN 747-35-2134
This Figure applies only to: Group 8.
STA
2360
STA
1480
STA
STA  1000 A
520
STA
1085
STA  208  MAIN  SIA  861  STA
DISTRIBUTION  1100
STA  LOOP
200  RBL
100
BL
O.0
LBL
100
STA  STA  STA
534  797  842
A-A  2577299
FIGURE 8: MAIN DECK PASSENGER COMPARTMENT, ABOVE CEILING - LOW PRESSURE OXYGEN
SYSTEM FLEXIBLE HOSE ASSEMBLIES - REPLACEMENT
(SHEET 1 OF 3)
Original Issue: November 22, 2017
Export Controlled ECCN: 9E991  747-35-2134
Copyright © Unpublished
Work - See page 1 for details.  59 of 90

### Page 60

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for each airplane.
More DataQtyIdentificationNameTaskStep
Hose assembly con-
nection to center
stowage bin. (a)
160B50059-( )HOSE ASSYRemove1
Hose assembly con-
nection to center
stowage bin. (a)(b)
138001-( )HOSE ASSYInstall (New)2
Hose assembly con-
nection to stowage
bin endcap .(a)
1S417U406-( )RETAINERRemove / Keep3
(a)1S417U406-( )HOSE ASSYRemove
(a)1417U4205-( )O-RINGRemove
Hose assembly con-
nection to stowage
bin endcap. (a)
1417U4205-( )O-RINGInstall (New)4
(a)(b)157034N( )HOSE ASSYInstall (New)
(a)1S417U406-( )RETAINERInstall (Kept)
Hose assembly con-
nection to stowage
bin endcap. (a)
160B50059-( )HOSE ASSYRemove5
Hose assembly con-
nection to stowage
bin endcap. (a)(b)
157034-( )HOSE ASSYInstall (New)6
Main distribution
loop connection to
upper deck. (a)
160B50059-( )HOSE ASSYRemove7
Main distribution
loop connection to
upper deck. (a)(b)
157034-( )HOSE ASSYInstall (New)8
Hose assembly con-
nection to stowage
bin endcap. (a)
1S417U406-( )RETAINERRemove / Keep9
(a)1S417U406-( )HOSE ASSYRemove
(a)1417U4205-( )O-RINGRemove
FIGURE 8: MAIN DECK PASSENGER COMPARTMENT, ABOVE CEILING - LOW PRESSURE OXYGEN
SYSTEM FLEXIBLE HOSE ASSEMBLIES - REPLACEMENT
(SHEET 2 OF 3)
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 22, 2017
747-35-2134
60 of 90
BOEING SERVICE BULLETIN 747-35-2134

The text continues at https://openairdocs.org/service-documents/boeing/sb-747-35-2134/file/bec0b4eb279a.md?from=61

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
