# Boeing Special Attention Service Bulletin 747-52-2286: Revision 1

- Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2012-0804; AD 2013-01-02 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Boeing Special Attention Service Bulletin 747-52-2286](https://openairdocs.org/service-documents/boeing/sb-747-52-2286.md)
- Title as filed: U.S. DOT/FAA - Service Information
- Pages: 36
- PDF: https://openairdocs.org/files/sha256/93/64/9364c8678b3e043b756eb62c2c9621cb59af6513ceddfa0c737be032f26df212
- Page: https://openairdocs.org/service-documents/boeing/sb-747-52-2286/file/9364c8678b3e

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Commercial 
Airplanes
747
Service Bulletin
SPECIAL ATTENTION
Number: 747-52-2286
Original Issue: September 28, 2007
Revision 1: October 28, 2010
ATA System: 5200
SUBJECT: DOORS - Forward, Aft and Nose Cargo Doors - Cargo Door Control Switch -
Replacement
Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15
CFR 730-774). An export license may be required before it is used for development, production or use by foreign
persons from specific countries. The controller of this data has the individual responsibility to abide by all export
laws.
9E991ECCN:
BOEING PROPRIETARY, CONFIDENTIAL, AND/OR TRADE SECRET
Copyright © 2007 The Boeing Company
Unpublished Work - All Rights Reserved
Boeing claims copyright in each page of this document only to the extent that the page contains copyrightable
subject matter. Boeing also claims copyright in this document as a compilation and/or collective work.
This document includes proprietary information owned by The Boeing Company and/or one or more third parties.
Treatment of the document and the information it contains is governed by contract with Boeing. For more
information, contact The Boeing Company, P.O. Box 3707, Seattle, Washington 98124.
Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner,
BBJ, DC-8, DC-9, DC-10, KC-10, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8A, Poseidon and the
Boeing livery are all trademarks owned by The Boeing Company; and no trademark license is granted in
connection with this document unless provided in writing by Boeing.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 28, 2007
747-52-2286Revision 1: October 28, 2010
1 of 36
2.0

### Page 2

BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 28, 2007
747-52-2286Revision 1: October 28, 2010
2 of 36
BOEING SERVICE BULLETIN 747-52-2286
BLANK PAGE

### Page 3

Table of Contents
Revision Transmittal Sheet ............................................ 5
Summary ...................................................... 7
1. PLANNING INFORMATION ........................................ 1 1
A. Effectivity ............................................... 1 1
1. Airplanes ............................................ 1 1
2. Spares Affected ........................................ 2 0
B. Concurrent Requirements ...................................... 2 0
C. Reason ................................................ 2 0
D. Description .............................................. 2 1
E. Compliance .............................................. 2 1
F. Approval ............................................... 2 2
G. Manpower .............................................. 2 3
H. Weight and Balance Changes .................................... 2 4
I. Electrical Load Data ......................................... 2 4
J. References .............................................. 2 4
1. Existing Data: ......................................... 2 4
2. Data supplied with this Service Bulletin: ........................... 2 4
3. Installation Drawings Used in the Preparation of this Service Bulletin: ........... 2 4
K. Publications Affected ........................................ 2 4
L. Interchangeability and Intermixability of Parts ........................... 2 5
2. MATERIAL INFORMATION ........................................ 2 7
A. Material - Price and Availability ................................... 2 7
B. Industry Support Information .................................... 2 7
C. Parts Necessary For Each Airplane ................................. 2 7
1. Kits/Parts: ........................................... 2 7
2. Parts and Materials Supplied by the Operator: ........................ 2 7
3. Parts Modified and Reidentified: ............................... 2 7
4. Parts Removed and Not Replaced: .............................. 2 7
D. Parts Necessary to Change Spares ................................. 2 7
E. Special Tooling - Price and Availability ............................... 2 7
F. Special Tooling Necessary to do this Service Bulletin ....................... 2 7
3. ACCOMPLISHMENT INSTRUCTIONS .................................. 2 9
A. GENERAL INFORMATION ..................................... 2 9
B. WORK INSTRUCTIONS ....................................... 2 9
FIGURE 1: REPLACE CARGO DOOR CONTROL SWITCH - FORWARD CARGO DOOR ...... 3 1
FIGURE 2: REPLACE CARGO DOOR CONTROL SWITCH - AFT CARGO DOOR .......... 3 3
FIGURE 3: REPLACE CARGO DOOR CONTROL SWITCH - NOSE CARGO DOOR [Group 2-3] . . 35
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 28, 2007
747-52-2286Revision 1: October 28, 2010
3 of 36
BOEING SERVICE BULLETIN 747-52-2286

### Page 4

BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 28, 2007
747-52-2286Revision 1: October 28, 2010
4 of 36
BOEING SERVICE BULLETIN 747-52-2286
BLANK PAGE

### Page 5

Commercial 
Airplanes
747
Service Bulletin
SPECIAL ATTENTION
Revision Transmittal SheetNumber: 747-52-2286Original Issue: September 28, 2007
Revision 1: October 28, 2010
ATA System: 5200
SUBJECT: DOORS - Forward, Aft and Nose Cargo Doors - Cargo Door Control Switch -
Replacement
This revision includes all pages of the service bulletin.
COMPLIANCE INFORMATION RELATED TO THIS REVISION
No more work is necessary on airplanes changed in accordance with the original issue of this service bulletin.
747-400F Airplanes line number 1382 through 1419 were added to the service bulletin effectivity as new Group
3.
Federal Aviation Administration (FAA) Airworthiness Directive AD 2009-22-08 is related to this service bulletin.
REASON FOR REVISION
This revision is sent to add 747-400F airplanes line number 1382 through 1419 as new Group 3. It had previously
been planned that scheduled cargo door control switch replacement on these airplanes would be addressed by
a revision to the 747-400 Maintenance Planning Document (MPD), Boeing Document D621U400. However, it
was later determined that those airplanes would be added to this service bulletin rather than revising the 747-400
MPD.
In addition, in Paragraph 1.E., Compliance, the table was changed to add Group 3, and to clarify the compliance
time for Group 1 and Group 2. "Within 6 years from the date of issuance of the original certificate of airworthiness
or the original export certificate of airworthiness" has been included as an option to "within 24 months after the
original issue date on this service bulletin".
References to FAA AD 2009-22-08 were added as part of this revision.
Vertical lines are put on the left edge of each page, except in Paragraph 1.A., Effectivity, to show the location
of important changes.
Pages with no vertical lines have no important changes.
REVISION HISTORY
September 28, 2007Original Issue:
October 28, 2010Revision 1:
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 28, 2007
747-52-2286Revision 1: October 28, 2010
5 of 36

### Page 6

BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 28, 2007
747-52-2286Revision 1: October 28, 2010
6 of 36
BOEING SERVICE BULLETIN 747-52-2286
BLANK PAGE

### Page 7

Commercial 
Airplanes
747
Service Bulletin
SPECIAL ATTENTION
SummaryNumber: 747-52-2286Original Issue: September 28, 2007
Revision 1: October 28, 2010
ATA System: 5200
SUBJECT: DOORS - Forward, Aft and Nose Cargo Doors - Cargo Door Control Switch -
Replacement
BOEING RECOMMENDS THAT EACH OPERATOR EXAMINE THIS SERVICE BULLETIN IMMEDIATELY.
CONCURRENT REQUIREMENTS
None.
BACKGROUND
Boeing has received 12 reports from 8 operators of problems associated with uncommanded operation of the
Forward and Aft Cargo Doors. 10 of these reports came from 757 airplanes. Further testing of the Cargo Door
Control Switch found that the switch remained in the CLOSE position after it was released, causing the door to
continue moving. The cause of the switch failure (Part Number MS25307-272) is related to the rated switch
operation cycle life. The switch is located in the external control panel forward of each lower lobe cargo door
and aft of the nose cargo door. The number of flight cycles for these airplanes were between 9,390 and 22,529.
On one occasion an employee was killed, trapped between the cargo door and door frame. Failure to replace
the Cargo Door Control Switch can result in injuries to persons and damage to the airplane and equipment.
The MS25307-272 Cargo Door Control Switch is not installed at the nose cargo door on 747-200C and 747-200F
airplanes.
This bulletin establishes the replacement interval and gives replacement details for the Forward, Aft and Nose
Cargo Door Control Switches.
Boeing Service Related Problem (SRP) 747-SRP-52-0084 is related to this service bulletin.
ACTION
Replace the Forward, Aft and Nose Cargo Door Control Switches at the times given in Paragraph 1.E.,
Compliance.
EFFECTIVITY
All 747-100, 747-100B, 747-100B SUD, 747-200B, 747-200C, 747-200F, 747-300, 747-400, 747-400D, 747-400F,
747SP, 747SR Airplanes. Refer to Paragraph 1.A.1 Airplanes, for the list of affected airplanes.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 28, 2007
747-52-2286Revision 1: October 28, 2010
7 of 36

### Page 8

COMPLIANCE
Federal Aviation Administration (FAA) Airworthiness Directive AD 2009-22-08 is related to this service bulletin.
See Service Bulletin Paragraph 1.E. for compliance information.
INDUSTRY SUPPORT INFORMATION
Boeing warranty remedies are not available for the repair procedures given in this service bulletin.
MANPOWER
Elapsed HoursTotal Task HoursAirplanes
3.253.25Group 1
4.254.25Group 2 and
Group 3
MATERIAL INFORMATION
Operator Supplied Parts/Materials.
Refer to Paragraph 2.A., Material - Price and Availability.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 28, 2007
747-52-2286Revision 1: October 28, 2010
8 of 36
BOEING SERVICE BULLETIN 747-52-2286

### Page 9 (OCR)

BOEING SERVICE BULLETIN 747-52-2286
FORWARD CARGO DOOR
CONTROL SWITCH ACCESS
NOSE CARGO DOOR
FORWARD
AFT CARGO DOOR  CARGO DOOR
AFT CARGO DOOR
CONTROL SWITCH
ACCESS
REPLACE FORWARD, AFT AND NOSE
CARGO DOOR CONTROL SWITCHES
CARGO DOOR EXTERIOR CONTROL  SWITCH ACCESS PANEL  1364273
(TYPICAL)
Original Issue: September 28, 2007
Revision 1: October 28, 2010  BOEING PROPRIETARY -  747-52-2286
Copyright © Unpublished Work - See page 1 for details.  9 of 36

### Page 10

BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 28, 2007
747-52-2286Revision 1: October 28, 2010
10 of 36
BOEING SERVICE BULLETIN 747-52-2286
BLANK PAGE

### Page 11

Commercial 
Airplanes
747
Service Bulletin
SPECIAL ATTENTION
Number: 747-52-2286
Original Issue: September 28, 2007
Revision 1: October 28, 2010
ATA System: 5200
SUBJECT: DOORS - Forward, Aft and Nose Cargo Doors - Cargo Door Control Switch -
Replacement
BOEING RECOMMENDS THAT EACH OPERATOR EXAMINE THIS SERVICE BULLETIN IMMEDIATELY.
1.    PLANNING INFORMATION
A. Effectivity
1. Airplanes
Refer to Service Bulletin Index Document D6-30300 Part 3 for Airplane Variable Number, Line
Number, and Serial Number data.
This service bulletin is for the airplanes shown below.
DESCRIPTIONCONFIGURATIONGROUP
747-100, 747-100B, 747-100B SUD, 747-200B, 747-200C, 747-200F,
747-300, 747-400, 747-400D, 747SP, 747SR Airplanes, Line number
1 through 1381
-1
747-400F Airplanes, Line number 968 through 1381-2
747-400F Airplanes, Line number 1382 through 1419-3
Airplane Models:
747-100, 747-100B, 747-100B SUD, 747-200B, 747-200C, 747-200F, 747-300, 747-400,
747-400D, 747-400F, 747SP, 747SR
GroupVariable Number
1RA001 - RA034
1RA101 - RA115
1RA161 - RA164
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 28, 2007
747-52-2286Revision 1: October 28, 2010
11 of 36

### Page 12

GroupVariable Number
1RA201 - RA203
1RA216 - RA217
1RA245 - RA246
1RA251 - RA266
1RA301 - RA318
1RA351 - RA360
1RA369 - RA373
1RA401 - RA418
1RA501 - RA502
1RA521 - RA528
1RA532 - RA548
1RA551 - RA552
1RA559 - RA561
1RA581 - RA582
1RA585
1RA601 - RA602
1RA631 - RA635
1RA651 - RA652
1RA671 - RA677
1RA701 - RA702
1RA721 - RA731
1RA741 - RA745
1RA749 - RA750
1RA761 - RA762
1RA781 - RA784
1RA901 - RA916
1RB001 - RB016
1RB041 - RB044
1RB071 - RB075
1RB101 - RB102
1RB411 - RB413
1RB421
1RB601 - RB607
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 28, 2007
747-52-2286Revision 1: October 28, 2010
12 of 36
BOEING SERVICE BULLETIN 747-52-2286

### Page 13

GroupVariable Number
1RB681 - RB697
1RB711
1RB721 - RB723
1RB741 - RB748
1RD001 - RD004
1RD021 - RD022
1RD041 - RD059
1RD071 - RD072
1RD081 - RD083
1RD091 - RD092
1RD101 - RD104
1RD121 - RD127
1RD131 - RD144
1RD166 - RD167
1RD171 - RD172
1RD181 - RD183
1RD201 - RD204
1RD221 - RD227
1RD231 - RD235
1RD241 - RD243
1RD251 - RD262
1RD271 - RD272
1RD291 - RD292
1RD301 - RD302
1RD311
1RD351 - RD358
1RD361 - RD366
1RD381 - RD383
1RD411 - RD414
1RD421 - RD426
1RD431 - RD435
1RD441 - RD442
1RD451 - RD456
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 28, 2007
747-52-2286Revision 1: October 28, 2010
13 of 36
BOEING SERVICE BULLETIN 747-52-2286

### Page 14

GroupVariable Number
1RD461
1RD471 - RD475
1RD513 - RD519
1RD531 - RD533
1RD551
1RD561
1RD571
1RD581 - RD583
1RD591 - RD593
1RD601 - RD607
1RD621 - RD623
1RD641 - RD649
1RD651 - RD659
1RD661
1RD671
1RD681 - RD682
1RD691 - RD692
1RD701 - RD702
1RD721 - RD722
1RD741 - RD742
1RD751 - RD755
1RD761
1RD771 - RD775
1RD781 - RD783
1RD791 - RD792
1RE001
1RF001 - RF006
1RG001 - RG009
1RG091
1RG095
1RG101 - RG104
1RG121 - RG126
1RG141 - RG142
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 28, 2007
747-52-2286Revision 1: October 28, 2010
14 of 36
BOEING SERVICE BULLETIN 747-52-2286

### Page 15

GroupVariable Number
1RG161 - RG164
1RG171 - RG174
1RG191 - RG193
1RG211 - RG213
1RG221 - RG222
1RH101 - RH102
1RH111 - RH112
1RH121 - RH122
1RJ131 - RJ133
1RJ151 - RJ152
1RJ301 - RJ303
1RJ321 - RJ322
1RJ331 - RJ333
2RL401 - RL403
2RL411 - RL436
2RL451 - RL456
2RL461 - RL462
2RL471 - RL473
3RL474 - RL481
2RL491 - RL492
2RL501 - RL502
2RL511 - RL512
3RL513 - RL516
2RL521
3RL522
2RL531
3RL532 - RL534
3RL551
3RL561 - RL568
3RL571 - RL572
3RL576 - RL577
3RL579
3RL581 - RL586
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 28, 2007
747-52-2286Revision 1: October 28, 2010
15 of 36
BOEING SERVICE BULLETIN 747-52-2286

### Page 16

GroupVariable Number
2RL651 - RL655
2RL671 - RL675
2RL681 - RL683
3RL684
2RL751 - RL752
1RM001 - RM007
1RM010 - RM013
1RM021 - RM024
1RM026 - RM030
1RM036 - RM045
1RM051 - RM053
1RM071
1RM081 - RM084
1RM091
1RM096 - RM097
1RM116 - RM117
1RM126 - RM132
1RM136 - RM147
1RM156 - RM158
1RM166 - RM177
1RM191 - RM192
1RM231 - RM233
1RM241 - RM246
1RM261 - RM264
1RM316 - RM318
1RM331 - RM333
1RM341
1RM351 - RM355
1RM366 - RM367
1RM401 - RM403
1RM426
1RM431
1RM441 - RM443
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 28, 2007
747-52-2286Revision 1: October 28, 2010
16 of 36
BOEING SERVICE BULLETIN 747-52-2286

### Page 17

GroupVariable Number
1RM445
1RM801 - RM803
1RM811 - RM813
2RM851 - RM859
2RM861 - RM863
2RM871 - RM889
3RM890
2RM891 - RM899
2RM901 - RM906
2RM911
1RR001 - RR005
1RR021 - RR025
1RR031
1RR201 - RR206
1RR221 - RR226
1RR261 - RR267
1RR301 - RR310
1RR331 - RR332
1RR336
1RR341 - RR345
1RR361 - RR362
1RR421 - RR422
1RR431 - RR432
1RR441 - RR442
1RR451
1RR501 - RR504
1RR521 - RR522
1RR526
1RR531
1RR551 - RR556
1RR561
1RR566
2RR701
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 28, 2007
747-52-2286Revision 1: October 28, 2010
17 of 36
BOEING SERVICE BULLETIN 747-52-2286

### Page 18

GroupVariable Number
2RR721 - RR724
2RR746 - RR748
2RR851 - RR856
2RR861 - RR862
2RR951 - RR952
1RS001 - RS002
1RS201
1RS211 - RS212
1RS221 - RS222
1RS231 - RS241
1RS251 - RS259
1RS263
1RS265 - RS268
1RS271 - RS276
1RS291 - RS292
1RS301 - RS306
1RS311 - RS320
1RS331 - RS333
1RS341 - RS342
1RS699
1RS701 - RS703
1RS711 - RS713
1RS721 - RS722
1RS731 - RS732
1RS741 - RS743
1RS751 - RS752
1RS761 - RS762
1RS771
1RS781 - RS782
1RS786
1RT001 - RT014
1RT021 - RT022
1RT031 - RT035
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 28, 2007
747-52-2286Revision 1: October 28, 2010
18 of 36
BOEING SERVICE BULLETIN 747-52-2286

### Page 19

GroupVariable Number
1RT041 - RT047
1RT061
1RT071 - RT075
1RT101 - RT103
1RT121
1RT131 - RT137
1RT151 - RT152
1RT161 - RT168
1RT401 - RT412
1RT431 - RT447
1RT451 - RT469
1RT471 - RT499
1RT501 - RT535
1RT551 - RT568
1RT571 - RT591
1RT601 - RT657
1RT671 - RT673
1RT681 - RT682
1RT691 - RT699
1RT701 - RT704
1RT711 - RT717
1RT741 - RT757
1RT776 - RT777
1RT781 - RT784
1RT801 - RT803
1RT811 - RT814
1RT831 - RT837
1RT861 - RT864
1RT876 - RT880
1RT931 - RT932
1RT945 - RT949
1RT951 - RT955
1RT966 - RT967
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 28, 2007
747-52-2286Revision 1: October 28, 2010
19 of 36
BOEING SERVICE BULLETIN 747-52-2286

### Page 20

GroupVariable Number
1RU001 - RU006
1RU016 - RU017
1RU031 - RU032
1RU051 - RU052
1RU059 - RU062
1RU081 - RU083
1RU101 - RU102
1RU121 - RU132
1RU801 - RU809
1RU831 - RU841
2. Spares Affected
None.
B. Concurrent Requirements
None.
C. Reason
Boeing has received 12 reports from 8 operators of problems associated with uncommanded operation
of the Forward and Aft Cargo Doors. 10 of these reports came from 757 airplanes. Further testing of
the Cargo Door Control Switch found that the switch remained in the CLOSE position after it was
released, causing the door to continue moving. The cause of the switch failure (Part Number
MS25307-272) is related to the rated switch operation cycle life. The switch is located in the external
control panel forward of each lower lobe cargo door and aft of the nose cargo door. The number of
flight cycles for these airplanes were between 9,390 and 22,529. On one occasion an employee was
killed, trapped between the cargo door and door frame. Failure to replace the Cargo Door Control
Switch can result in injuries to persons and damage to the airplane and equipment.
The MS25307-272 Cargo Door Control Switch is not installed at the nose cargo door on 747-200C and
747-200F airplanes.
This bulletin establishes the replacement interval and gives replacement details for the Forward, Aft
and Nose Cargo Door Control Switches.
Revision 1 is sent to add 747-400F airplanes line number 1382 through 1419 as new Group 3. It had
previously been planned that scheduled cargo door control switch replacement on these airplanes
would be addressed by a revision to the 747-400 Maintenance Planning Document (MPD), Boeing
Document D621U400. However, it was later determined that those airplanes would be added to this
service bulletin rather than revising the 747-400 MPD. In addition, in Paragraph 1.E., Compliance, the
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 28, 2007
747-52-2286Revision 1: October 28, 2010
20 of 36
BOEING SERVICE BULLETIN 747-52-2286

### Page 21

table was changed to add Group 3, and to clarify the compliance time for Group 1 and Group 2. "Within
6 years from the date of issuance of the original certificate of airworthiness or the original export
certificate of airworthiness" has been included as an option to "within 24 months after the original issue
date on this service bulletin". References to FAA AD 2009-22-08 were also added as part of Revision
1.
Boeing Service Related Problem (SRP) 747-SRP-52-0084 is related to this service bulletin.
D. Description
Replace the Forward, Aft and Nose Cargo Door Control Switches at the times given in Paragraph 1.E.,
Compliance.
No more work is necessary on airplanes changed in accordance with the original issue of this service
bulletin.
The work in this service bulletin is done in the maintenance zone(s) given below.
Group 1:
Affected Maintenance Zones
ZoneModel
122, 142747-100, 747-100B, 747-100B
SUD, 747-200B, 747-200C,
747-200F, 747-300, 747-400,
747-400D, 747SP, 747SR
Group 2-3:
Affected Maintenance Zones
ZoneModel
122, 142, 211747-400F
E. Compliance
Federal Aviation Administration (FAA) Airworthiness Directive AD 2009-22-08 is related to this service
bulletin.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 28, 2007
747-52-2286Revision 1: October 28, 2010
21 of 36
BOEING SERVICE BULLETIN 747-52-2286

### Page 22

Table 1: Cargo Door Control Switch Replacement
Repeat Interval
(Not to Exceed)
Compliance Time (Whichever
Occurs Later)
ActionCondition
6 yearsWithin 6 years
from the date of
issuance of the
original certifi-
cate of airworthi-
ness or the origi-
nal export certifi-
cate of airworthi-
ness.
Within 24
months after the
original issue
date on this ser-
vice bulletin.
Replace the Control
Switch in the external
control panels for the
Forward and Aft Cargo
Doors in accordance with
Paragraph 3.B., Work In-
structions, Part 1.
Group 1 Airplanes
6 yearsWithin 6 years
from the date of
issuance of the
original certifi-
cate of airworthi-
ness or the origi-
nal export certifi-
cate of airworthi-
ness.
Within 24
months after the
original issue
date on this ser-
vice bulletin.
Replace the Control
Switch in the external
control panels for the
Forward and Aft Cargo
Doors and for the Nose
Cargo Door in accor-
dance with Paragraph
3.B., Work Instructions,
Part 2.
Group 2 Airplanes
6 yearsWithin 6 years from the date of is-
suance of the original certificate
of airworthiness or the original ex-
port certificate of airworthiness.
Replace the Control
Switch in the external
control panels for the
Forward and Aft Cargo
Doors and for the Nose
Cargo Door in accor-
dance with Paragraph
3.B., Work Instructions,
Part 2.
Group 3 Airplanes
F. Approval
This service bulletin was examined by the Federal Aviation Administration (FAA). The changes specified
in this service bulletin comply with the applicable regulations and are FAA approved, as well as European
Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/JAA approved
airplanes listed in the service bulletin effectivity. This service bulletin and its approval were based on
the airplane in its original Boeing delivery configuration or as modified by other approved Boeing
changes.
If an airplane has a non-Boeing modification or repair that affects a component or system also affected
by this service bulletin, the operator is responsible for obtaining appropriate regulatory agency approval
before incorporating this service bulletin.
The Manager of the FAA Seattle Aircraft Certification Office (ACO) approves the modification defined
in this service bulletin with the corresponding compliance times specified in Table 1 under Paragraph
1.E., Compliance of Service Bulletin 747-52-2286 Revision 1 as an AMOC to the corresponding
requirements of paragraphs (c), (f) and (h) of AD 2009-22-08. All provisions of AD 2009-22-08 that are
not specifically referenced in this paragraph remain fully applicable and must be complied with.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 28, 2007
747-52-2286Revision 1: October 28, 2010
22 of 36
BOEING SERVICE BULLETIN 747-52-2286

### Page 23

G. Manpower
The table below shows an estimate of the task hours necessary to do this replacement for each airplane.
This estimate is for direct labor only, done by an experienced crew. Adjust the estimate with operator
task hour data if necessary. The estimate does not include lost time. These are some examples of lost
time:
— Time to adjust to the workplace
— Time to schedule the work
— Time to inspect the work
— Time to cure the materials
— Time to make the parts
— Time to find the tools.
Group 1:
Table 1 - Replacement of the Forward and Aft Cargo Door Control Switches
Elapsed HoursTask HoursNumber of Per-
sons
Task
0.500.501Open Access
Replace Cargo Door Control Switch
1.001.001Figure 1
1.001.001Figure 2
0.500.501Close Access
0.250.251Test Cargo Doors
3.253.25TOTAL FOR EACH AIRPLANE
Group 2-3:
Table 2 - Replacement of the Forward, Aft and Nose Cargo Door Control Switches
Elapsed HoursTask HoursNumber of Per-
sons
Task
0.500.501Open Access
Replace Cargo Door Control Switch
1.001.001Figure 1
1.001.001Figure 2
1.001.001Figure 3
0.500.501Close Access
0.250.251Test Cargo Doors
4.254.25TOTAL FOR EACH AIRPLANE
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 28, 2007
747-52-2286Revision 1: October 28, 2010
23 of 36
BOEING SERVICE BULLETIN 747-52-2286

### Page 24

H. Weight and Balance Changes
None.
I. Electrical Load Data
Not changed.
J. References
1. Existing Data:
a. Service Related Problem (SRP) 747-SRP-52-0084
b. 747-400 Aircraft Maintenance Manual (AMM) 52-31-00, 52-31-17, 52-34, 52-34-00, 52-34-10
c. 747-100/200/300 Aircraft Maintenance Manual (AMM) 52-34, 52-34-00, 52-34-10
d. 747-100/200/300 Baggage and Cargo Loading Manual (BCLM) 25-53, 25-57
e. 747-400 Baggage and Cargo Loading Manual (BCLM) 25-53, 25-57
f. Standard Wiring Practices Manual (SWPM) 20-10-11, 20-10-12, 20-30-00
g. Federal Aviation Administration (FAA) Airworthiness Directive 2009-22-08
2. Data supplied with this Service Bulletin:
None.
3. Installation Drawings Used in the Preparation of this Service Bulletin:
TitleDrawing Number
Switch Instl- Cargo Door Control & Lights65B41786
Electrical Installation - Forward Cargo Door, Wire and Equipment65B07320
Electrical Installation - Aft Cargo Door, Wire and Equipment65B07323
Nose Door and Light Control Assembly284U1590
These drawings were used to prepare this service bulletin. These drawings are not necessary to
make the specified changes, and are not supplied with this service bulletin. These drawings may
not be applicable to all airplane configurations or operators.
K. Publications Affected
1. Publications:
Chapter-SectionPublication
747-100/200/300 AMM 52-34, 747-400 AMM
52-34, 747-400 AMM 52-31-00
747 Maintenance Manual
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 28, 2007
747-52-2286Revision 1: October 28, 2010
24 of 36
BOEING SERVICE BULLETIN 747-52-2286

### Page 25

Chapter-SectionPublication
747-100/200/300 BCLM 25-53, 747-
100/200/300 BCLM 25-57, 747-400 BCLM
25-53, 747-400 BCLM 25-57
747 Baggage/Cargo Loading Manual
2. Damage Tolerance Based Structural Inspections:
Boeing has evaluated the repairs and/or changes in this service bulletin for effects on Fatigue
Critical Structure (FCS) and for changes to Damage Tolerance Inspections (DTI) required in the
Maintenance Program. This service bulletin does not affect FCS, therefore DTIs are not necessary.
L. Interchangeability and Intermixability of Parts
Accomplishment of this service bulletin does not affect interchangeability or intermixability of parts.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 28, 2007
747-52-2286Revision 1: October 28, 2010
25 of 36
BOEING SERVICE BULLETIN 747-52-2286

### Page 26

BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 28, 2007
747-52-2286Revision 1: October 28, 2010
26 of 36
BOEING SERVICE BULLETIN 747-52-2286
BLANK PAGE

### Page 27

2.    MATERIAL INFORMATION
A. Material - Price and Availability
The operator can supply the parts and materials shown in Paragraph 2.C., Parts Necessary for Each
Airplane. As an alternative, operators can purchase the parts from Boeing Spares. This service bulletin
does not show the Boeing price and supply data.
B. Industry Support Information
Boeing warranty remedies are not available for the repair procedures given in this service bulletin.
C. Parts Necessary For Each Airplane
1. Kits/Parts:
None.
2. Parts and Materials Supplied by the Operator:
NotesNameQTYPart Number /
Specification
Cargo door control switch.
Group 1 airplanes only require
2 Toggle Switches.
Toggle Switch3MS25307-272
BMS5-45 Class A is an accept-
able alternate sealant.
Sealant-BMS5-37
3. Parts Modified and Reidentified:
None.
4. Parts Removed and Not Replaced:
None.
D. Parts Necessary to Change Spares
None.
E. Special Tooling - Price and Availability
None.
F. Special Tooling Necessary to do this Service Bulletin
No special tools or equipment are necessary to do the change in this service bulletin. But, maintenance
and overhaul tools in the manuals given in Paragraph 1.J., References, can be necessary. Examine
operator tool supply to make sure all necessary tools are available.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 28, 2007
747-52-2286Revision 1: October 28, 2010
27 of 36
BOEING SERVICE BULLETIN 747-52-2286

### Page 28

BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 28, 2007
747-52-2286Revision 1: October 28, 2010
28 of 36
BOEING SERVICE BULLETIN 747-52-2286
BLANK PAGE

### Page 29

3.    ACCOMPLISHMENT INSTRUCTIONS
A. GENERAL INFORMATION
CAUTION: KEEP THE WORK AREA, WIRES AND ELECTRICAL BUNDLES CLEAN OF METAL
PARTICLES OR CONTAMINATION WHEN YOU USE TOOLS. UNWANTED MATERIAL,
METAL PARTICLES OR CONTAMINATION CAUGHT IN WIRE BUNDLES CAN CAUSE
DAMAGE TO THE BUNDLES. DAMAGED WIRE BUNDLES CAN CAUSE SPARKS OR
OTHER ELECTRICAL DAMAGE.
NOTE: 1. Manual titles are referred to by acronyms. Refer to Paragraph 1.J., References, for
definition of the acronyms.
2. Obey all of the warnings and cautions given in the specified manual sections.
3. These work instructions refer to procedures included on other Boeing documents.
When the words "refer to" are used and the operator has an accepted alternative
procedure, the accepted alternative procedure can be used. When the words "in
accordance with" are included in the instruction, the procedure in the Boeing document
must be used.
4. Refer to the Boeing Standard Wiring Practices Manuals SWPM 20-10-11and SWPM
20-10-12 for the wire installation procedures.
B. WORK INSTRUCTIONS
Group 1:
PART 1 - FORWARD AND AFT CARGO DOOR CONTROL SWITCH REPLACEMENT
1. Get access to the applicable access panel, 122AR for the forward cargo door control switch and
142AR for the aft cargo door control switch.
2. Replace Cargo Door Control Switch for the forward cargo door in accordance with FIGURE 1.
3. Replace Cargo Door Control Switch for the aft cargo door in accordance with FIGURE 2.
4. Test the forward and aft cargo doors. Position cargo door control switch to OPEN then to CLOSE
and check that door operates. Refer to 747-100/200/300 AMM 52-34-00 and 747-400 AMM 52-34-00
as accepted procedures.
5. Put the airplane back to a serviceable condition.
Group 2-3:
PART 2 - FORWARD, AFT AND NOSE CARGO DOOR CONTROL SWITCH REPLACEMENT
1. Get access to the applicable access panel, 122AR for the forward cargo door control switch, 142AR
for the aft cargo door control switch and H121 for the nose cargo door control switch.
2. Replace Cargo Door Control Switch for the forward cargo door in accordance with FIGURE 1.
3. Replace Cargo Door Control Switch for the aft cargo door in accordance with FIGURE 2.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 28, 2007
747-52-2286Revision 1: October 28, 2010
29 of 36
BOEING SERVICE BULLETIN 747-52-2286

### Page 30

4. Replace Cargo Door Control Switch for the nose cargo door in accordance with FIGURE 3.
5. Test the forward, aft and nose cargo doors. Position cargo door control switch to OPEN then to
CLOSE and check that door operates. Refer to 747-100/200/300 AMM 52-34-00, 747-400 AMM
52-34-00 and 747-400 AMM 52-31-00 as accepted procedures.
6. Put the airplane back to a serviceable condition.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 28, 2007
747-52-2286Revision 1: October 28, 2010
30 of 36
BOEING SERVICE BULLETIN 747-52-2286

### Page 31 (OCR)

BOEING SERVICE BULLETIN 747-52-2286
FORWARD CARGO DOOR
CONTROL SWITCH ACCESS
FORWARD CARGO DOOR
2) FORWARD CARGO DOOR
CONTROL SWITCH
CARGO DOOR EXTERIOR CONTROL SWITCH  1364303
122AR ACCESS PANEL
The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for this figure.
FIGURE 1: REPLACE CARGO DOOR CONTROL SWITCH - FORWARD CARGO DOOR
(SHEET 1 OF 2)
Original Issue: September 28, 2007
Revision 1 October 28, 2010  BOEING PROPRIETARY -  747-52-2286
Copyright © Unpublished Work - See page 1 for details.  31 0f 36

### Page 32

MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
Refer to 747-100/200/300 AMM
52-34-10 or 747-400 AMM 52-
34-107 as an accepted proce-
dure.
1MS25307-272Cargo Door Control
Switch
Remove1
Refer to 747-100/200/300 AMM
52-34-10 or 747-400 AMM 52-
34-10 as an accepted proce-
dure. (a)
1MS25307-272Cargo Door Control
Switch
Install (New)2
(a) Remove old sealant from wire connectors. Brush coat the switch terminals with BMS5-37 or BMS5-45
Class A sealant after all wires are connected. Refer to SWPM 20-30-00 as an accepted procedure.
FIGURE 1: REPLACE CARGO DOOR CONTROL SWITCH - FORWARD CARGO DOOR
(SHEET 2 OF 2)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 28, 2007
747-52-2286Revision 1 October 28, 2010
32 of 36
BOEING SERVICE BULLETIN 747-52-2286

### Page 33 (OCR)

BOEING SERVICE BULLETIN 747-52-2286
AFT CARGO DOOR
CONTROL SWITCH ACCESS
AFT CARGO DOOR
2) AFT CARGO DOOR
CONTROL SWITCH
CARGO DOOR EXTERIOR CONTROL SWITCH  1364304
142AR ACCESS PANEL
The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for this figure.
FIGURE 2: REPLACE CARGO DOOR CONTROL SWITCH - AFT CARGO DOOR
(SHEET 1 OF 2)
Original Issue: September 28, 2007
Revision 1 October 28, 2010  BOEING PROPRIETARY -  747-52-2286
Copyright © Unpublished Work - See page 1 for details.  33 0f 36

### Page 34

MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
Refer to 747-100/200/300 AMM
52-34-10 or 747-400 AMM 52-
34-10 as an accepted proce-
dure.
1MS25307-272Cargo Door Control
Switch
Remove1
Refer to 747-100/200/300 AMM
52-34-10 or 747-400 AMM 52-
34-10 as an accepted proce-
dure. (a)
1MS25307-272Cargo Door Control
Switch
Install (New)2
(a) Remove old sealant from wire connectors. Brush coat the switch terminals with BMS5-37 or BMS5-45
Class A sealant after all wires are connected. Refer to SWPM 20-30-00 as an accepted procedure.
FIGURE 2: REPLACE CARGO DOOR CONTROL SWITCH - AFT CARGO DOOR
(SHEET 2 OF 2)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 28, 2007
747-52-2286Revision 1 October 28, 2010
34 of 36
BOEING SERVICE BULLETIN 747-52-2286

### Page 35 (OCR)

BOEING SERVICE BULLETIN 747-52-2286
This Figure applies only to: Group 2-3.
NOSE DOOR AND
LIGHT MODULE,
H121
SEE A
NOSE CARGO DOOR
NOSE CARGO DOOR CONTROLS
O  O
POWER  LOCK-OUT  LATCHES  DOOR
ON  ENGAGED  CLOSED
CLOSED  OPEN
OFF/LOCK TEST  LAMP
SYSTEM POWER  TEST  CONTROL
OFF  ON
THRESHOLD  SIDEWALL  CEILING  NOSE SPOT LIGHT
LIGHT CONTROLS
NOSE DOOR CONTROL AND  LIGHTS MODULE, H121
1372147
FIGURE 3: REPLACE CARGO DOOR CONTROL SWITCH - NOSE CARGO DOOR
(SHEET 1 OF 2)
Original Issue: September 28, 2007
Revision 1 October 28, 2010  BOEING PROPRIETARY -  747-52-2286
Copyright © Unpublished Work - See page 1 for details.  35 of 36

### Page 36

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for this figure.
MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
Refer to 747-400 AMM 52-31-
17 as an accepted procedure.
1MS25307-272Cargo Door Control
Switch
Remove1
Refer to 747-400 AMM 52-31-
17 as an accepted procedure.
(a)
1MS25307-272Cargo Door Control
Switch
Install (New)2
(a) Remove old sealant from wire connectors. Brush coat the switch terminals with BMS5-37 or BMS5-45
Class A sealant after all wires are connected. Refer to SWPM 20-30-00 as an accepted procedure.
FIGURE 3: REPLACE CARGO DOOR CONTROL SWITCH - NOSE CARGO DOOR
(SHEET 2 OF 2)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 28, 2007
747-52-2286Revision 1 October 28, 2010
36 of 36
BOEING SERVICE BULLETIN 747-52-2286

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
