# Boeing Service Bulletin 747-53-2721: U.S. DOT/FAA - Boeing Service Bulletin

- Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2013-0540; AD 2013-26-12 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Boeing Service Bulletin 747-53-2721](https://openairdocs.org/service-documents/boeing/sb-747-53-2721.md)
- Title as filed: U.S. DOT/FAA - Boeing Service Bulletin
- Pages: 140
- PDF: https://openairdocs.org/files/sha256/fe/c7/fec78260e69d1977ed63fd2300a37e2a0f0ad3f4c0ae06ac2fd05c85089be3de
- Page: https://openairdocs.org/service-documents/boeing/sb-747-53-2721/file/fec78260e69d

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Commercial 
Airplanes
747
Service Bulletin
Number: 747-53-2721
Original Issue: May 28, 2009
Revision 3: June 25, 2013
ATA System: 5331
SUBJECT: FUSELAGE - Skin - Install Rub Strips at Vertical Fin Seal to Fuselage Interface
Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15
CFR 300-774). An export license may be required before it is used for development, production or use by foreign
persons from specific countries. The controller of this data has the individual responsibility to abide by all export
laws.
9E991ECCN:
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET
Copyright © 2009 Boeing.
Unpublished Work. All Rights Reserved.
Treatment of this document and its content is governed by contract with Boeing. Rights to use this document
are licensed on a per aircraft basis and such rights may not be transferable. For more information, contact The
Boeing Company.
Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner,
BBJ, DC-8, DC-9, DC-10, KC-10, KC-46, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8, Poseidon and
Boeing liveries are all trademarks owned by The Boeing Company; and no trademark license is granted in
connection with this document unless provided in writing by Boeing.
Original Issue: May 28, 2009
747-53-2721Revision 3: June 25, 2013
1 of 140
4.0

### Page 2

Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 28, 2009
747-53-2721Revision 3: June 25, 2013
2 of 140
BOEING SERVICE BULLETIN 747-53-2721
BLANK PAGE

### Page 3

Table of Contents
Revision Transmittal Sheet ............................................ 5
Summary ...................................................... 7
1. PLANNING INFORMATION ........................................ 1 1
A. Effectivity ............................................... 1 1
1. Airplanes ............................................ 1 1
2. Spares Affected ........................................ 2 0
B. Concurrent Requirements ...................................... 2 0
C. Reason ................................................ 2 0
D. Description .............................................. 2 2
E. Compliance .............................................. 2 3
F. Approval ............................................... 2 9
G. Manpower .............................................. 2 9
H. Weight and Balance Changes .................................... 3 1
I. Electrical Load Data ......................................... 3 1
J. References .............................................. 3 1
1. Existing Data: ......................................... 3 1
2. Data Supplied with this Service Bulletin: ........................... 3 2
3. Installation Drawings Used in the Preparation of this Service Bulletin: ........... 3 3
K. Publications Affected ........................................ 3 3
L. Interchangeability and Intermixability of Parts ........................... 3 3
M. Software Accomplishment Summary ................................ 3 3
2. MATERIAL INFORMATION ........................................ 3 5
A. Material - Price and Availability ................................... 3 5
B. Industry Support Information .................................... 3 6
C. Parts Necessary for Each Airplane ................................. 3 6
1. Kits/Parts ............................................ 3 6
2. Parts and Materials Supplied by the Operator ........................ 4 8
3. Parts Modified and Reidentified ................................ 4 8
4. Parts Removed and Not Replaced .............................. 4 8
D. Parts Necessary to Change Spares ................................. 4 9
E. Special Tooling - Price and Availability ............................... 4 9
F. Special Tooling Necessary to do this Service Bulletin ....................... 4 9
3. ACCOMPLISHMENT INSTRUCTIONS .................................. 5 1
A. GENERAL INFORMATION ..................................... 5 1
B. WORK INSTRUCTIONS ....................................... 5 3
FIGURE 1: PREPARE FOR THE FORWARD RUB STRIP INSTALLATION [Group 1] ......... 6 5
FIGURE 2: PREPARE FOR THE AFT RUB STRIP INSTALLATION ................... 6 8
FIGURE 3: FORWARD RUB STRIP INSTALLATION [Group 1] ..................... 7 1
FIGURE 4: AFT RUB STRIP INSTALLATION ............................... 7 9
FIGURE 5: DELETED ............................................ 8 6
FIGURE 6: DELETED ............................................ 8 7
FIGURE 7: PREPARE FOR THE FORWARD RUB STRIP INSTALLATION [Group 2] ......... 8 8
FIGURE 8: FORWARD RUB STRIP INSTALLATION [Group 2] ..................... 9 2
FIGURE 9: PREPARE FOR THE FORWARD RUB STRIP INSTALLATION [Group 3] ........ 1 0 1
FIGURE 10: FORWARD RUB STRIP INSTALLATION [Group 3] .................... 1 0 6
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 28, 2009
747-53-2721Revision 3: June 25, 2013
3 of 140
BOEING SERVICE BULLETIN 747-53-2721

### Page 4

FIGURE 11: ZONE 1 - FULL-LENGTH REPAIR - LEFT SIDE - POST REPAIR INSPECTION  [Group 1] . 117
FIGURE 12: ZONE 1 - FULL-LENGTH REPAIR - RIGHT SIDE - POST REPAIR INSPECTION  [Group 1]
................................................. 1 2 3
FIGURE 13: ZONE 1 - FULL-LENGTH REPAIR - LEFT SIDE - POST REPAIR INSPECTION  [Group 2] . 129
FIGURE 14: ZONE 1 - FULL-LENGTH REPAIR - RIGHT SIDE - POST REPAIR INSPECTION  [Group 2]
................................................. 1 3 5
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 28, 2009
747-53-2721Revision 3: June 25, 2013
4 of 140
BOEING SERVICE BULLETIN 747-53-2721

### Page 5

Commercial 
Airplanes
747
Service Bulletin
Revision Transmittal SheetNumber: 747-53-2721Original Issue: May 28, 2009
Revision 3: June 25, 2013
ATA System: 5331
SUBJECT: FUSELAGE - Skin - Install Rub Strips at Vertical Fin Seal to Fuselage Interface
This revision includes all pages of the service bulletin.
COMPLIANCE INFORMATION RELATED TO THIS REVISION
No more work is necessary on the airplane(s) changed or inspected in accordance with the original issue,
Revision 1 or Revision 2 of this service bulletin.
Federal Aviation Administration (FAA) Airworthiness Directive AD 2009-14-02, is related to this service bulletin.
REASON FOR REVISION
This revision is sent to clarify the post modification and post repair inspections requirements and to transfer post
repair inspection instructions from the Structural Repair Manual (SRM) and Repair Assessment Guidelines
(RAG) to this service bulletin for airplanes that have the zone 1 full length repair installed.
These sections were changed:
1. Summary, Background: A fleet team digest reference and a planning table is added.
2. Summary, Action: A post repair inspection is added.
3. Paragraph 1.C., Reason: Clarify post modification and post repair inspections requirements and
transferred post repair inspection instructions from the Structural Repair Manual (SRM) and Repair
Assessment Guidelines (RAG) for airplanes that have the zone 1 full length repair installed.
4. Paragraph 1.D., Description: A post repair inspection is added.
5. Paragraph 1.E., Compliance: Repair Assessment Guidelines (RAG) and a Structural Repair Manual
(SRM) reference is added. Table 2 title is changed. Table 2 is updated to include new Zone 1 post
repair inspections and the compliance for RAG and SRM inspections has been removed from Table 2
and Table 3.
6. Paragraph 1.G., Manpower: Manpower times for Zone 1 post repair inspections is added.
7. Paragraph 1.K., Publications Affected, Damage Tolerance Based Structural Inspections: New statements
added.
8. Paragraph 1.M., Software Accomplishment Summary: Software accomplishment summary section is
added.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 28, 2009
747-53-2721Revision 3: June 25, 2013
5 of 140

### Page 6

9. Paragraph 2.A., Material - Price and Availability: Repair Kit zone names have been changed.
10. Paragraph 2.C., Parts Necessary For Each Airplane: Corrected the zone names for kit numbers.
11. Paragraph 3.A., General Information: The notes section is updated.
12. Paragraph 3.B., Work Instructions: Are updated to include new Zone 1 post repair inspections.
13. FIGURE 11, FIGURE 12, FIGURE 13 and FIGURE 14: Zone 1 post repair inspections are added.
The data given in Information Notice 747-53-2721 IN 02 is included in this revision.
The data given in Information Notice 747-53-2721 IN 03 is included in this revision.
Vertical lines are put on the left edge of each page, except in Paragraph 1.A., Effectivity and format changes,
to show the location of all content changes.
Pages with no vertical lines have no important changes.
REVISION HISTORY
May 28, 2009Original Issue:
June 24, 2010Revision 1:
March 17, 2011Revision 2:
June 25, 2013Revision 3:
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 28, 2009
747-53-2721Revision 3: June 25, 2013
6 of 140
BOEING SERVICE BULLETIN 747-53-2721

### Page 7

Commercial 
Airplanes
747
Service Bulletin
SummaryNumber: 747-53-2721Original Issue: May 28, 2009
Revision 3: June 25, 2013
ATA System: 5331
SUBJECT: FUSELAGE - Skin - Install Rub Strips at Vertical Fin Seal to Fuselage Interface
CONCURRENT REQUIREMENTS
The service bulletin listed below must be done before or at the same time as this service bulletin:
DescriptionService BulletinCompany
Inspects and repairs skin damage to the fuselage at the
vertical stabilizer seal interface.
747-53A2478 Revision
1, Revision 2 or Revi-
sion 3
Boeing
BACKGROUND
This service bulletin gives instructions to install corrosion resistant steel (CRES) rub strips on the skin on the
aft fuselage at the vertical fin blade seal to fuselage interface. Installation of these rub strips will prevent skin
wear damage which results in thinning of the skin and could lead to cracking. Undetected cracking in the
pressurized Section 46 could reach sufficient length to cause in-flight depressurization of the airplane.
Operators have reported skin wear damage beyond allowable limits at the vertical stabilizer blade seal to fuselage
interface in Section 46 and Section 48. Service Bulletin 747-53A2478 was issued to provide repeat inspection
and repair instructions for this skin wear.
Accomplishment of the rub strip installation will protect the skin in the affected area from wear damage at the
vertical fin blade seal interface, and terminate the repeat inspection requirements of Service Bulletin 747-53A2478.
Repeat inspection requirements for installed rub strips is given in this service bulletin. If the rub strip installation
given in this service bulletin is not accomplished, operators will be required to continue to do inspections in
accordance with Service Bulletin 747-53A2478 and AD 2009-14-02.
As a part of a service bulletin validation program, this change was completed on airplane RM803 by Service
Bulletin 747-53-2721 Original Issue before the release of Revision 1 of this service bulletin. The change completed
on airplane RM803 by Service Bulletin 747-53-2721 Original Issue is equivalent to Revision 1 of this service
bulletin. Airplane RM803 has the configuration of a Group 1 airplane.
Boeing Service Related Problem (SRP) 747-SRP-53-0296 is related to this service bulletin.
Boeing Fleet Team Digest (FTD) 747 FTD 53-06007 is related to this service bulletin.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 28, 2009
747-53-2721Revision 3: June 25, 2013
7 of 140

### Page 8

This table is provided to operators for planning purposes only. Refer to the applicable sections for more
information.
ReferenceAffectedPlanning Data
Paragraph 1.A.2., Spares AffectedNoSpares Affected
Paragraph 1.E., Compliance and Paragraph
1.F., Approval
YesAD Related
Paragraph 1.H., Weight and Balance ChangesYesWeight and Balance Change
Paragraph 1.I., Electrical Load DataNoElectrical Load Changed
Paragraph 1.K., Publications AffectedNoPublications Affected
Paragraph 1.K., Publications AffectedNoAirplane Flight Operations Affected (Flight Crew
Operations Manual and/or FAA Approved Air-
plane Flight Manual)
Paragraph 2.C.1., Kits/PartsYesKits/Parts Required
Paragraph 2.C.2., Parts and Materials Supplied
by the Operator
YesOperator Supplied Parts/Material
Paragraph 2.F., Special Tooling Necessary to
do this Service Bulletin
NoSpecial Tooling Required
ACTION (PRR 85901-83S)
This service bulletin installs new CRES rub strips to the skin at the vertical stabilizer fin blade seal and fuselage
interface.
For the actions in this service bulletin, the areas where rub strips are installed are divided into the following
zones:
– Zone 1: STA 2280 to STA 2360 (Section 46) (STA 2072 to STA 2360 on Group 2 airplanes)
– Zone 2: STA 2360 to STA 2397 (Section 48)
– Zone 3: STA 2397 to STA 2417 (Section 48)
– Zone 4: STA 2517 to STA 2557 (Section 48)
– Zone 5: STA 2557 to STA 2598 (Section 48)
– Zone 6: STA 2598 to STA 2638 (Section 48)
Do post repair and post modification inspections in accordance with Paragraph 1.E., Compliance or if local
repairs were installed, do additional post modification and post repair inspections of the repaired areas in
accordance with the applicable Repair Assessment Guidelines (RAG) and/or Structural Repair Manual (SRM).
EFFECTIVITY
747-100, 747-100B, 747-100B SUD, 747-200B, 747-200C, 747-200F, 747-300, 747-400, 747-400D, 747-400F,
747SP and 747SR series airplanes. Refer to Paragraph 1.A.1., Airplanes for the list of affected airplanes.
COMPLIANCE
Federal Aviation Administration (FAA) Airworthiness Directive AD 2009-14-02 is related to this service bulletin.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 28, 2009
747-53-2721Revision 3: June 25, 2013
8 of 140
BOEING SERVICE BULLETIN 747-53-2721

### Page 9

Refer to Paragraph 1.E., Compliance.
INDUSTRY SUPPORT INFORMATION
Boeing warranty remedies are not available for the configuration changes, inspection, and/or repair procedures
given in this service bulletin.
MANPOWER
Work Package 1 - Forward Rub Strip Installation:
Elapsed HoursTotal Task HoursAirplanes
18.7538.00747
Work Package 2 - Aft Rub Strip Installation:
Elapsed HoursTotal Task HoursAirplanes
12.7533.25747
Zone 1 Post Repair Inspection
Elapsed HoursTotal Task HoursAirplanes
18.0036.00Group 1
20.0053.00Group 2
Refer to Paragraph 1.G., Manpower.
MATERIAL INFORMATION
Operator Supplied Parts/Materials.
Refer to Paragraph 2.A., Material - Price and Availability
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 28, 2009
747-53-2721Revision 3: June 25, 2013
9 of 140
BOEING SERVICE BULLETIN 747-53-2721

### Page 10 (OCR)

BOEING SERVICE BULLETIN 747-53-2721
INSTALL RUB STRIPS AT
VERTICAL FIN SEAL TO
FUSELAGE INTERFACE
STA
2628
STA
2521
STA
2360  STA 12413
STA I
2280
BULKHEAD  AFT PRESSURE  GROUP 1 AIRPLANE SHOWN  GROUP 2 - 3 SIMILAR  1662857
Original Issue: May 28, 2009
Revision 3: June 25, 2013  PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  747-53-2721
Work - See page 1 for details.  10 of 140

### Page 11

Commercial 
Airplanes
747
Service Bulletin
Number: 747-53-2721
Original Issue: May 28, 2009
Revision 3: June 25, 2013
ATA System: 5331
SUBJECT: FUSELAGE - Skin - Install Rub Strips at Vertical Fin Seal to Fuselage Interface
1.    PLANNING INFORMATION
A. Effectivity
1. Airplanes
Refer to Service Bulletin Index Document D6-30300, Part 3 for Airplane Variable Number, Line
Number, and Serial Number data.
On airplane line number 1385, rub strips were installed in production by Rapid Revision
RR47040-92.
This service bulletin is for the airplanes shown below. Refer to PRR 85901-83S for data about this
change.
DESCRIPTIONCONFIGURATIONGROUP
747 series airplanes line number 1-1384 and 1386-1419, except
747SP and 747 LCF airplanes.
-1
All 747SP airplanes.-2
747 LCF airplanes.-3
Airplane Models:
747-100, 747-100B, 747-100B SUD, 747-200B, 747-200C, 747-200F, 747-300, 747-400,
747-400D, 747-400F, 747SP, 747SR
GroupVariable Number
1RA001 - RA034
1RA101 - RA115
1RA161 - RA164
1RA201 - RA203
1RA216 - RA217
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 28, 2009
747-53-2721Revision 3: June 25, 2013
11 of 140

### Page 12

GroupVariable Number
1RA245 - RA246
1RA251 - RA266
1RA301 - RA318
1RA351 - RA360
1RA369 - RA373
1RA401 - RA418
1RA501 - RA502
1RA521 - RA528
1RA532 - RA548
1RA551 - RA552
1RA559 - RA561
1RA581 - RA582
1RA585
1RA601 - RA602
1RA631 - RA635
1RA651 - RA652
1RA671 - RA677
1RA701 - RA702
1RA721 - RA731
1RA741 - RA745
1RA749 - RA750
1RA761 - RA762
1RA781 - RA784
1RA901 - RA916
1RB001 - RB016
1RB041 - RB044
1RB071 - RB075
1RB101 - RB102
1RB411 - RB413
1RB421
1RB601 - RB607
1RB681 - RB697
1RB711
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 28, 2009
747-53-2721Revision 3: June 25, 2013
12 of 140
BOEING SERVICE BULLETIN 747-53-2721

### Page 13

GroupVariable Number
1RB721 - RB723
1RB741 - RB748
1RD001 - RD004
1RD021 - RD022
1RD041 - RD059
1RD071 - RD072
1RD081 - RD083
1RD091 - RD092
1RD101 - RD104
1RD121 - RD127
1RD131 - RD144
1RD166 - RD167
1RD171 - RD172
1RD181 - RD183
1RD201 - RD204
1RD221 - RD227
1RD231 - RD235
1RD241 - RD243
1RD251 - RD262
1RD271 - RD272
1RD291 - RD292
1RD301 - RD302
1RD311
1RD351 - RD358
1RD361 - RD366
1RD381 - RD383
1RD411 - RD414
1RD421 - RD426
1RD431 - RD435
1RD441 - RD442
1RD451 - RD456
1RD461
1RD471 - RD475
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 28, 2009
747-53-2721Revision 3: June 25, 2013
13 of 140
BOEING SERVICE BULLETIN 747-53-2721

### Page 14

GroupVariable Number
1RD513 - RD519
1RD531 - RD533
1RD551
1RD561
1RD571
1RD581 - RD583
1RD591 - RD593
1RD601 - RD607
1RD621 - RD623
1RD641 - RD649
1RD651 - RD659
1RD661
1RD671
1RD681 - RD682
1RD691 - RD692
1RD701 - RD702
1RD721 - RD722
1RD741 - RD742
1RD751 - RD755
1RD761
1RD771 - RD775
1RD781 - RD783
1RD791 - RD792
1RE001
1RF001 - RF006
2RG001 - RG009
2RG091
2RG095
2RG101 - RG104
2RG121 - RG126
2RG141 - RG142
2RG161 - RG164
2RG171 - RG174
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 28, 2009
747-53-2721Revision 3: June 25, 2013
14 of 140
BOEING SERVICE BULLETIN 747-53-2721

### Page 15

GroupVariable Number
2RG191 - RG193
2RG211 - RG213
2RG221 - RG222
2RH101 - RH102
2RH111 - RH112
2RH121 - RH122
1RJ131 - RJ133
1RJ151 - RJ152
1RJ301 - RJ303
1RJ321 - RJ322
1RJ331 - RJ333
1RL401 - RL403
1RL411 - RL436
1RL451 - RL456
1RL461 - RL462
1RL471 - RL480
1RL491 - RL492
1RL501 - RL502
1RL511 - RL516
1RL521 - RL522
1RL531 - RL534
1RL551
1RL561 - RL568
1RL571 - RL572
1RL576 - RL577
1RL579
1RL581 - RL586
1RL651 - RL655
1RL671 - RL675
1RL681 - RL684
1RL751 - RL752
1RM001 - RM007
1RM010 - RM013
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 28, 2009
747-53-2721Revision 3: June 25, 2013
15 of 140
BOEING SERVICE BULLETIN 747-53-2721

### Page 16

GroupVariable Number
1RM021 - RM024
1RM026 - RM030
1RM036 - RM045
1RM051 - RM053
1RM071
1RM081 - RM084
1RM091
1RM096 - RM097
1RM116 - RM117
1RM126 - RM132
1RM136 - RM147
1RM156 - RM158
1RM166 - RM177
1RM191 - RM192
1RM231 - RM233
1RM241 - RM246
1RM261 - RM264
1RM316 - RM318
1RM331 - RM333
1RM341
1RM351 - RM355
1RM366 - RM367
1RM401 - RM403
1RM426
1RM431
1RM441 - RM443
1RM445
1RM801 - RM803
1RM811 - RM813
1RM851 - RM859
1RM861 - RM863
1RM871 - RM899
1RM901 - RM906
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 28, 2009
747-53-2721Revision 3: June 25, 2013
16 of 140
BOEING SERVICE BULLETIN 747-53-2721

### Page 17

GroupVariable Number
1RM911
1RR001 - RR005
1RR021 - RR025
1RR031
1RR201 - RR206
1RR221 - RR226
1RR261 - RR267
1RR301 - RR310
1RR331 - RR332
1RR336
1RR341 - RR345
1RR361 - RR362
1RR421 - RR422
1RR431 - RR432
1RR441 - RR442
1RR451
1RR501 - RR504
1RR521 - RR522
1RR526
1RR531
1RR551 - RR556
1RR561
1RR566
1RR701
1RR721 - RR724
1RR746 - RR748
1RR851 - RR856
1RR861 - RR862
1RR951 - RR952
1RS001 - RS002
1RS201
1RS211 - RS212
1RS221 - RS222
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 28, 2009
747-53-2721Revision 3: June 25, 2013
17 of 140
BOEING SERVICE BULLETIN 747-53-2721

### Page 18

GroupVariable Number
1RS231 - RS241
1RS251 - RS259
1RS263
1RS265 - RS268
1RS271 - RS276
1RS291 - RS292
1RS301 - RS306
1RS311 - RS320
1RS331 - RS333
1RS341 - RS342
1RS699
1RS701 - RS703
1RS711 - RS713
1RS721 - RS722
1RS731 - RS732
1RS741 - RS743
1RS751 - RS752
1RS761 - RS762
1RS771
1RS781 - RS782
1RS786
1RT001 - RT014
1RT021 - RT022
1RT031 - RT035
1RT041 - RT047
1RT061
1RT071 - RT075
1RT101 - RT103
1RT121
1RT131 - RT137
1RT151 - RT152
1RT161 - RT168
1RT401 - RT412
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 28, 2009
747-53-2721Revision 3: June 25, 2013
18 of 140
BOEING SERVICE BULLETIN 747-53-2721

### Page 19

GroupVariable Number
1RT431 - RT447
1RT451 - RT469
1RT471 - RT499
1RT501 - RT535
1RT551 - RT568
1RT571 - RT591
1RT601 - RT630
3RT631 - RT632
1RT633 - RT657
1RT671 - RT673
1RT681 - RT682
1RT691 - RT699
1RT701 - RT704
1RT711 - RT717
1RT741 - RT742
3RT743
1RT744 - RT757
1RT776 - RT777
1RT781 - RT784
1RT801 - RT803
1RT811 - RT814
1RT831 - RT837
1RT861 - RT864
3RT876
1RT877 - RT880
1RT931 - RT932
1RT945 - RT949
1RT951 - RT955
1RT966 - RT967
1RU001 - RU006
1RU016 - RU017
1RU031 - RU032
1RU051 - RU052
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 28, 2009
747-53-2721Revision 3: June 25, 2013
19 of 140
BOEING SERVICE BULLETIN 747-53-2721

### Page 20

GroupVariable Number
1RU059 - RU062
1RU081 - RU083
1RU101 - RU102
1RU121 - RU132
1RU801 - RU809
1RU831 - RU841
2. Spares Affected
None.
B. Concurrent Requirements
The service bulletin listed below must be done before or at the same time as this service bulletin:
DescriptionService BulletinCompany
Inspects and repairs skin damage to the fuselage at the
vertical stabilizer seal interface.
747-53A2478 Revision
1, Revision 2 or Revi-
sion 3
Boeing
C. Reason
This service bulletin gives instructions to install corrosion resistant steel (CRES) rub strips on the skin
on the aft fuselage at the vertical fin blade seal to fuselage interface. Installation of these rub strips will
prevent skin wear damage which results in thinning of the skin and could lead to cracking. Undetected
cracking in the pressurized Section 46 could reach sufficient length to cause in-flight depressurization
of the airplane.
Operators have reported skin wear damage beyond allowable limits at the vertical stabilizer blade seal
to fuselage interface in Section 46 and Section 48. Service Bulletin 747-53A2478 was issued to provide
repeat inspection and repair instructions for this skin wear.
Accomplishment of the rub strip installation will protect the skin in the affected area from wear damage
at the vertical fin blade seal interface, and terminate the repeat inspection requirements of Service
Bulletin 747-53A2478. Repeat inspection requirements for installed rub strips is given in this service
bulletin. If the rub strip installation given in this service bulletin is not accomplished, operators will be
required to continue to do inspections in accordance with Service Bulletin 747-53A2478 and AD
2009-14-02.
As a part of a service bulletin validation program, this change was completed on airplane RM803 by
Service Bulletin 747-53-2721 Original Issue before the release of Revision 1 of this service bulletin.
The change completed on airplane RM803 by Service Bulletin 747-53-2721 Original Issue is equivalent
to Revision 1 of this service bulletin. Airplane RM803 has the configuration of a Group 1 airplane.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 28, 2009
747-53-2721Revision 3: June 25, 2013
20 of 140
BOEING SERVICE BULLETIN 747-53-2721

### Page 21

Revision 1 is sent to update the tables in Paragraph 1.E., Compliance. Compliance Tables 2 and 3
have been combined into new Table 2 in this revision. As shown in new Table 2, post modification
inspections of the skin under installed rub strips in Section 46 where a repair is installed should be
done in accordance with the 747 Repair Assessment Guidelines. If no repair is installed but the skin
has been blended within the limits given in the applicable Structural Repair manual, inspections of the
skin under the rub strip is only necessary in Zone 1 (STA 2280 to STA 2360).
A new Table 3 has been added to Paragraph 1.E., Compliance. Table 3 gives post modification
instructions for rub strips that were installed prior to the release of this service bulletin which were
approved by Boeing in accordance with an FAA 8110-3 form or an FAA 8100-9 form.
Kits for repairs that cover the full-length of the affected skin panels have been added. As part of the
repair definitions, the affected skin areas have been divided into six Zones. Zones 1, 2, and 3 are
applicable to the three skin panels affected by the forward rub strip installation area. Zones 4, 5, and
6 are applicable to the three skin panels affected by the aft rub strip installation area. Repair kits for
Zones 1 through 5 are listed in Paragraph 2.A., Material - Price and Availability and Paragraph 2.C.1.,
Kits/Parts. Drawings 146U0001 and 148U0027, which give details of the Zone 1 through Zone 5 repairs
and are sent with this revision, are listed in Paragraph 1.J.2., Data supplied with this Service Bulletin.
The steps in Paragraph 3.B., Work Instructions have been changed to show that the skin wear and
blend out limits are in accordance with the applicable Structural Repair Manual, rather than the 0.007
inch limit included in the initial release of this service bulletin.
Paragraph 3.B., Work Instructions, PART 4 has been added to give instructions for repairs that may
be necessary in the affected rub strip areas.
Preparation Figures 1 and 2 have been changed to recommend that an open-hole High Frequency
Eddy Current (HFEC) inspection be done at the affected fastener locations prior to rub strip installation.
The Summary illustration and the locators in Figures 2 and 4 have been changed to more clearly show
the applicable Body Station locations in the aft rub strip installation area.
The steps in Paragraph 3.B., Work Instructions, Work Package 2 for removal and reinstallation of the
vertical fin for access to the rub strip installation area have been removed. In addition, the data in
Figures 5 and 6, for removal and reinstallation of stringer splices for access to the aft rub strip installation
area, has been removed. Boeing has determined that removal of the vertical fin for access to the rub
strip installation area is not necessary.
References to the service bulletin validation that was completed in accordance with the initial release
of this service bulletin have been added.
The data given in Information Notice 747-53-2721 IN 01 is included in this revision. IN 01 was issued
to advise that, it was not necessary to remove the vertical fin for access to the aft rub strip installation
area. IN 01 also advised that in View A of Figure 4, the location identified as "STA 2517.25" should
instead be "STA 2537.25".
Revision 2 is sent to include rub strip installation instructions for 747SP and 747 Large Cargo Freighter
(LCF) airplanes.
Revision 3 is sent to clarify the post modification and post repair inspections requirements and to
transfer post repair inspection instructions from the Structural Repair Manual (SRM) and Repair
Assessment Guidelines (RAG) to this service bulletin for airplanes that have the zone 1 full length
repair installed.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 28, 2009
747-53-2721Revision 3: June 25, 2013
21 of 140
BOEING SERVICE BULLETIN 747-53-2721

### Page 22

Boeing Service Related Problem (SRP) 747-SRP-53-0296 is related to this service bulletin.
D. Description
This service bulletin installs new CRES rub strips to the skin at the vertical stabilizer fin blade seal and
fuselage interface.
For the actions in this service bulletin, the areas where rub strips are installed are divided into the
following zones:
– Zone 1: STA 2280 to STA 2360 (Section 46) (STA 2072 to STA 2360 on Group 2 airplanes)
– Zone 2: STA 2360 to STA 2397 (Section 48)
– Zone 3: STA 2397 to STA 2417 (Section 48)
– Zone 4: STA 2517 to STA 2557 (Section 48)
– Zone 5: STA 2557 to STA 2598 (Section 48)
– Zone 6: STA 2598 to STA 2638 (Section 48)
Do post repair and post modification inspections in accordance with Paragraph 1.E., Compliance or if
local repairs were installed, do additional post modification and post repair inspections of the repaired
areas in accordance with the applicable Repair Assessment Guidelines (RAG) and/or Structural Repair
Manual (SRM).
Revision 1 - No more work is necessary on airplanes changed in accordance with the original issue of
this service bulletin. However, post repair and post modification inspections have been added.
Revision 2 - No more work is necessary on the airplanes changed in accordance with the original issue
or Revision 1 of this service bulletin. Do post repair or post modification inspections in accordance with
Paragraph 1.E., Compliance.
Revision 3 - No more work is necessary on the airplane(s) changed or inspected in accordance with
the original issue, Revision 1 or Revision 2 of this service bulletin.
The work in this service bulletin is done in the maintenance zone(s) given below.
Group 1:
Affected Maintenance Zones
ZoneModel
273, 274, 311, 312, 313, 314, 315, 316747-100, 747-100B, 747-100B
SUD, 747-200B, 747-200C,
747-200F, 747-300, 747-400,
747-400D, 747-400F, 747SR
Group 2:
Affected Maintenance Zones
ZoneModel
273, 274, 311, 312, 313, 314, 315, 316747SP
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 28, 2009
747-53-2721Revision 3: June 25, 2013
22 of 140
BOEING SERVICE BULLETIN 747-53-2721

### Page 23

Group 3:
Affected Maintenance Zones
ZoneModel
273, 274, 311, 312, 313, 314, 315, 316747-400
E. Compliance
Federal Aviation Administration (FAA) Airworthiness Directive AD 2009-14-02 is related to this service
bulletin.
Rub Strip Installation
1. No compliance time is given for the rub strip installations given in Paragraph 3.B., Work Instructions,
Part 1.
Airplanes that have Rub Strips Installed in accordance with this Service Bulletin, or Approved
by Boeing in Accordance With an FAA 8110-3 Form or an FAA 8100-9 Form Prior to the Original
Issue of this Service Bulletin
1. When all rub strips have been installed, inspections in accordance with Service Bulletin
747-53A2478 are no longer necessary.
2. For airplanes which have had rub strips installed, Boeing recommends the following:
a. On any airplane with rub strips installed in accordance with this service bulletin, or as approved
by Boeing in accordance with an FAA 8110-3 Form or an FAA 8100-9 Form prior to the original
issue of this service bulletin, do inspections of the rub strips and blade seals in accordance
with Table 1.
b. On any airplane with rub strips or repairs installed in accordance with this service bulletin, do
inspections of the fuselage skin in accordance with Table 2.
c. On any airplane with rub strips installed as approved by Boeing in accordance with an FAA
8110-3 Form or an FAA 8100-9 Form prior to the original issue of this service bulletin, do
inspections of the fuselage skin in accordance with Table 3.
3. If local repairs were installed, additional post modification and post repair inspections of the repaired
areas are provided in the applicable Repair Assessment Guidelines (RAG) and/or Structural Repair
Manual (SRM).
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 28, 2009
747-53-2721Revision 3: June 25, 2013
23 of 140
BOEING SERVICE BULLETIN 747-53-2721

### Page 24

Table 1: Post Modification or Post Repair Inspection of Installed Rub Strips and Blade Seals
Repeat Interval
(Not to Exceed)
Compliance Time (Whichever
Occurs Earlier )
ActionCondition
10,000 flight-cycles
or 36,000 flight-
hours, whichever
occurs earlier.
Within 36,000
flight-hours after
rub strip installa-
tion.
Within 10,000
flight-cycles af-
ter rub strip in-
stallation.
Do an external detailed in-
spection of the rub strips
and blade seals for dam-
age or wear in accordance
with Paragraph 3.B., Work
Instructions, Part 2, Work
Package 3.
Rub Strips installed for-
ward of STA 2417 in accor-
dance with this service
bulletin, or as approved by
Boeing in accordance with
an FAA 8110-3 Form or an
FAA 8100-9 Form prior to
the original issue of this
service bulletin.
10,000 flight-cycles
or 36,000 flight-
hours, whichever
occurs earlier.
Within 36,000
flight-hours after
rub strip installa-
tion.
Within 10,000
flight-cycles af-
ter rub strip in-
stallation.
Do an external detailed in-
spection of the rub strips
and blade seals for dam-
age or wear in accordance
with Paragraph 3.B., Work
Instructions, Part 2, Work
Package 4.
Rub Strips installed aft of
STA 2517 in accordance
with this service bulletin, or
as approved by Boeing in
accordance with an FAA
8110-3 Form or an FAA
8100-9 Form prior to the
original issue of this ser-
vice bulletin.
-Before further flight.Install new rub strip(s) in
accordance with Paragraph
3.B., Work Instructions,
Part 1.
Rub strips that have wear
greater than 0.008 inch
deep, or that have loss of
adhesion to the fuselage
skin, or that are found to
be buckled.
-Before further flight.Replace any torn or
gouged blade seals or any
loose or missing fasteners.
Blade seals that are torn or
gouged, or loose or miss-
ing fasteners.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 28, 2009
747-53-2721Revision 3: June 25, 2013
24 of 140
BOEING SERVICE BULLETIN 747-53-2721

### Page 25

Table 2 : Post Modification or Post Repair Inspection of the Fuselage Skin in Areas With Rub Strips In-
stalled in Accordance With this Service Bulletin
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
3,000 flight cycles.Within 15,000 total
flight cycles after the
installation of the repair.
Do a post repair internal de-
tailed inspection of the Zone 1
Full-Length Repair for any crack
in accordance with Paragraph
3.B., Work Instructions, Part 5.
(Zone 1 work only). And
Zone 1 with a rub strip and a
Full-Length Repair installed in
accordance with Paragraph
3.B., Work Instructions, Part 4.
1,500 flight cycles.Do a post repair external de-
tailed inspection of the Zone 1
Full-Length Repair for any crack
in accordance with Paragraph
3.B., Work Instructions, Part 5.
(Zone 1 work only). And
1,500 flight cycles.Do a post repair external Low
Frequency Eddy Current (LFEC)
inspection of the Zone 1 Full-
Length Repair for any crack in
accordance with Paragraph
3.B., Work Instructions, Part 5.
(Zone 1 work only).
Or
6,000 flight cycles.Do a post repair internal surface
High Frequency Eddy Current
(HFEC) inspection of the Zone
1 Full-Length Repair for any
crack in accordance with Para-
graph 3.B., Work Instructions,
Part 5. (Zone 1 work only).
6,000 flight cycles.Before 20,000 total
flight cycles, or within
6,000 flight-cycles after
rub strip installation,
whichever is later.
Remove the rub strips. Do exter-
nal detailed and surface HFEC
inspections of the fuselage skin
that was under the rub strips or
tapered fillers, but not under the
Local Repair, for cracks in accor-
dance with Paragraph 3.B.,
Work Instructions, Part 3, Work
Package 5 (Zone 1 work only).
Zone 1 with a rub strip and any
Local Repair installed in accor-
dance with Paragraph 3.B.,
Work Instructions, Part 4.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 28, 2009
747-53-2721Revision 3: June 25, 2013
25 of 140
BOEING SERVICE BULLETIN 747-53-2721

### Page 26

Table 2 : Post Modification or Post Repair Inspection of the Fuselage Skin in Areas With Rub Strips In-
stalled in Accordance With this Service Bulletin
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
6,000 flight cycles.Before 20,000 total
flight cycles, or within
6,000 flight-cycles after
rub strip installation,
whichever is later.
Remove the rub strips and do
external detailed and surface
HFEC inspections of the fuse-
lage skin that was under the rub
strips for cracks in accordance
with Paragraph 3.B., Work In-
structions, Part 3, Work Pack-
age 5 (Zone 1 work only).
Zone 1 with rub strips installed
with no Full-Length or Local
Repairs, but with skin blends
that do not exceed the limits
given in the Structural Repair
Manual.
-At or before 35,000 to-
tal flight-cycles. (a)
Contact The Boeing Company
for additional modification
and/or inspection instructions
and do the modification and/or
inspection as applicable.
Zone 1 with rub strips installed
with no Full-Length or Local
Repairs, and no skin blends.
-Before further flight.Install a repair in accordance
with Paragraph 3.B., Work In-
structions, Part 4. If a Local Re-
pair is installed, install new rub
strips in accordance with Para-
graph 3.B., Work Instructions,
Part 1.
Any crack found in Zone 1 after
rub strip removal.
-Before further flight.Install new rub strips in accor-
dance with Paragraph 3.B.,
Work Instructions, Part 1.
No crack found in Zone 1 after
rub strip removal.
-Before further flight.Contact The Boeing Company
for repair instructions and do the
repair.
Any crack found in a Zone 1
Full-Length Repair inspection in
accordance with Paragraph
3.B., Work Instructions, Part 5.
-At or before 35,000 to-
tal flight-cycles. (a)
Contact The Boeing Company
for additional modification
and/or inspection instructions
and do the modification and/or
inspection as applicable.
Any affected Zone 2 through
Zone 6 with rub strips installed,
with or without repairs, and with
no skin blends or with skin
blends that do not exceed the
limits given in the Structural
Repair Manual.
(a) Limit of Validity. Refer to Boeing Service Letter 747-SL-53-088 or Fleet Team Digest 747-FTD-51-07001.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 28, 2009
747-53-2721Revision 3: June 25, 2013
26 of 140
BOEING SERVICE BULLETIN 747-53-2721

### Page 27

Table 3: Post Modification or Post Repair Inspections of the Fuselage Skin in Areas With Rub Strips In-
stalled Prior to the Original Issue of This Service Bulletin
Repeat Interval
(Not to Exceed)
(b)
Compliance Time (Whichever
Occurs Later ) (b)
Action (b)Condition
6,000 flight cycles.Within 6,000
flight-cycles af-
ter rub strip in-
stallation.
Before 20,000
total flight cy-
cles.
Remove the rub strips. Do
external detailed and sur-
face HFEC inspections of
the fuselage skin that was
under the rub strips, but
not under the repair, for
cracks in accordance with
Paragraph 3.B., Work In-
structions, Part 3, Work
Package 5 (Zone 1 work
only).
Zone 1 with CRES rub
strips installed prior to the
original issue of this ser-
vice bulletin, approved by
Boeing in accordance with
an FAA 8110-3 form or an
FAA 8100-9 form, with any
internal or external reinforc-
ing structural repair in-
stalled.
-1,200 flight-cy-
cles after the
date on Revi-
sion 1 of this
service bulletin.
At or before
35,000 total
flight-cycles. (a)
Contact The Boeing Com-
pany for additional modifi-
cation and/or inspection
instructions and do the
modification and/or inspec-
tion as applicable.
Zone 2 through Zone 6
with CRES rub strips in-
stalled prior to the original
issue of this service bul-
letin, approved by Boeing
in accordance with an FAA
8110-3 form or an FAA
8100-9 form, with any inter-
nal or external reinforcing
structural repair installed.
And
6,000 flight cycles.Within 6,000
flight-cycles af-
ter rub strip in-
stallation, or
1,200 flight-cy-
cles after the
date on Revi-
sion 1 of this
service bulletin,
whichever oc-
curs later.
Before 20,000
total flight cy-
cles.
Remove the rub strips. Do
external detailed and sur-
face HFEC inspections of
the fuselage skin that was
under the rub strips, but
not under the repair, for
cracks in accordance with
Paragraph 3.B., Work In-
structions, Part 3, Work
Package 5 and Work
Package 6 (Zone 2 through
6 work only).
-1,200 flight-cy-
cles after the
date on Revi-
sion 1 of this
service bulletin.
At or before
35,000 total
flight-cycles. (a)
A modification and/or in-
spections are required.
Airplanes with CRES rub
strips installed prior to the
original issue of this ser-
vice bulletin, approved by
Boeing in accordance with
an FAA 8110-3 form or an
FAA 8100-9 form, with no
repairs installed and no
skin blends.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 28, 2009
747-53-2721Revision 3: June 25, 2013
27 of 140
BOEING SERVICE BULLETIN 747-53-2721

### Page 28

Table 3: Post Modification or Post Repair Inspections of the Fuselage Skin in Areas With Rub Strips In-
stalled Prior to the Original Issue of This Service Bulletin
Repeat Interval
(Not to Exceed)
(b)
Compliance Time (Whichever
Occurs Later ) (b)
Action (b)Condition
-Within 1,200
flight-cycles af-
ter rub strip in-
stallation, or
within 1,200
flight cycles af-
ter the Revision
1 date of this
service bulletin,
whichever is lat-
er.
At or before
20,000 total
flight-cycles.
Remove the rub strips and
do external detailed and
surface HFEC inspections
of the fuselage skin that
was under the rub strips for
cracks in accordance with
Paragraph 3.B., Work In-
structions, Part 3, Work
Package 5 and 6.
Airplanes with CRES rub
strips installed prior to the
original issue of this ser-
vice bulletin, approved by
Boeing in accordance with
an FAA 8110-3 form or an
FAA 8100-9 form, with no
repairs installed but with
blended skin, and surface
HFEC inspection of the
skin WAS NOT done prior
to rub strip installation.
-Within 6,000
flight-cycles af-
ter rub strip in-
stallation, or
within 1,200
flight cycles af-
ter the Revision
1 date of this
service bulletin,
whichever is lat-
er.
At or before
20,000 total
flight-cycles.
Remove the rub strips and
do external detailed and
surface HFEC inspections
of the fuselage skin that
was under the rub strips for
cracks in accordance with
Paragraph 3.B., Work In-
structions, Part 3, Work
Package 5 and 6.
Airplanes with CRES rub
strips installed prior to the
original issue of this ser-
vice bulletin, approved by
Boeing in accordance with
an FAA 8110-3 form or an
FAA 8100-9 form, with no
repairs installed but with
blended skin, and surface
HFEC inspection of the
skin WAS done prior to rub
strip installation.
-Before further flight.Install a repair in accor-
dance with Paragraph 3.B.,
Work Instructions, Part 4.
If a Local Repair is in-
stalled, install new rub
strips in accordance with
Paragraph 3.B., Work In-
structions, Part 1.
Any crack found.
-Before further flight.Install new rub strips in ac-
cordance with Paragraph
3.B., Work Instructions,
Part 3.
No crack found after rub
strip removal.
(a) Limit of Validity. Refer to Boeing Service Letter 747-SL-53-088 or Fleet Team Digest 747-FTD-51-07001.
(b) If the 8100-9 or 8110-3 that approved installation of the rub strips specifies a more restrictive inspection
requirement, then the inspections must be done in accordance with the 8100-9 or 8110-3.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 28, 2009
747-53-2721Revision 3: June 25, 2013
28 of 140
BOEING SERVICE BULLETIN 747-53-2721

### Page 29

F. Approval
This service bulletin was examined by the Federal Aviation Administration (FAA). The changes specified
in this service bulletin comply with the applicable regulations and are FAA approved, as well as European
Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/JAA approved
airplanes listed in the service bulletin effectivity. This service bulletin and its approval were based on
the airplane in its original Boeing delivery configuration or as modified by other approved Boeing
changes.
If an airplane has a non-Boeing modification or repair that affects a component or system also affected
by this service bulletin, the operator is responsible for obtaining appropriate regulatory agency approval
before incorporating this service bulletin.
This service bulletin has been approved by the Federal Aviation Administration (FAA). In addition, the
Manager of the FAA Seattle Aircraft Certification Office (ACO) approves the accomplishment of the
inspection, repair, and modification procedures with the corresponding compliance times specified in
Tables 1 through 3 under paragraph 1.E., "Compliance" of Service Bulletin 747-53-2721, Revision 3,
as an Alternative Method of Compliance (AMOC) to the inspections, corrective actions, and terminating
actions required by paragraphs (f), (i), (j), (k), and (l) of AD 2009-14-02. This AMOC only applies to the
areas inspected, repaired, or modified in accordance with this service bulletin. When this service bulletin
specifies contacting Boeing for repair instructions, the repair instructions must be approved by the FAA
in accordance with paragraph (m) of the AD. All provisions of AD 2009-14-02 that are not specifically
referenced in this paragraph remain fully applicable and must be complied with accordingly.
G. Manpower
The table below shows an estimate of the task hours necessary to do this change for each airplane.
This estimate is for direct labor only, done by an experienced crew. Adjust the estimate with operator
task hour data if necessary. The estimate does not include lost time. These are some examples of lost
time:
 Time to adjust to the workplace
 Time to schedule the work
 Time to inspect the work
 Time to cure the materials
 Time to make the parts
 Time to find the tools.
Work Package 1 - Forward Rub Strip Installation:
Elapsed HoursTask HoursNumber of PersonsTask
4.754.751Open Access
5.0020.004Clean
4.258.502Install Rub Strips
4.754.751Close Access
18.7538.00TOTAL FOR EACH AIRPLANE
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 28, 2009
747-53-2721Revision 3: June 25, 2013
29 of 140
BOEING SERVICE BULLETIN 747-53-2721

### Page 30

Work Package 2 - Aft Rub Strip Installation:
Elapsed HoursTask HoursNumber of PersonsTask
0.250.251Open Access
4.7519.004Clean
6.2512.502Install Rub Strips
1.501.501Close Access
12.7533.25TOTAL FOR EACH AIRPLANE
Work Package 3 - Inspection of the Forward Rub Strip Installation:
Elapsed HoursTask HoursNumber of PersonsTask
3.003.001Inspect Rub Strips
3.003.00TOTAL FOR EACH AIRPLANE
Work Package 4 - Inspection of the Aft Rub Strip Installation:
Elapsed HoursTask HoursNumber of PersonsTask
2.502.501Inspect Rub Strips
2.502.50TOTAL FOR EACH AIRPLANE
Work Package 5 - Inspection of the Skin Under the Zone 1 Rub Strip Installation:
Elapsed HoursTask HoursNumber of PersonsTask
4.754.751Open Access
2.004.002Remove Existing Rub Strips
5.0020.004Clean
4.258.502Install Rub Strips
4.754.751Close Access
20.7542.00TOTAL FOR EACH AIRPLANE
NOTE: More time will be required for additional inspections and repairs if damage is found.
Group 1:
Zone 1 Full-Length Repair - Post Repair Inspection.
Elapsed HoursTask HoursNumber of PersonsTask
4.504.501Open Access
4.5013.503FIGURE 11
4.5013.503FIGURE 12
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 28, 2009
747-53-2721Revision 3: June 25, 2013
30 of 140
BOEING SERVICE BULLETIN 747-53-2721

### Page 31

Group 1:
Zone 1 Full-Length Repair - Post Repair Inspection.
Elapsed HoursTask HoursNumber of PersonsTask
4.504.501Close Access
18.0036.00TOTAL FOR EACH AIRPLANE
Group 2:
Zone 1 Full-Length Repair - Post Repair Inspection.
Elapsed HoursTask HoursNumber of PersonsTask
4.504.501Open Access
5.5022.004FIGURE 13
5.5022.004FIGURE 14
4.504.501Close Access
20.0053.00TOTAL FOR EACH AIRPLANE
H. Weight and Balance Changes
Change in Moment
(Pound-Inches)
Change in Weight
(Pounds)Airplane
+ 23801.9+ 9.7Group 1 Rub Strip
Installation
+20412.6+9.3Group 2 Rub Strip
Installation
+33531.2+10.7Group 3 Rub Strip
Installation
I. Electrical Load Data
Not changed.
J. References
1. Existing Data:
a. Engineering Change Memo PRR 85901-83S
b. Boeing Service Related Problem (SRP) 747-SRP-53-0296
c. Federal Aviation Administration (FAA) Airworthiness Directive (AD) 2009-14-02, 2010-10-05
d. Standard Overhaul Practices Manual (SOPM) 20-00-00, 20-30-02, 20-42-05, 20-43-03,
20-44-01, 20-44-04, 20-50-12, 20-50-19
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 28, 2009
747-53-2721Revision 3: June 25, 2013
31 of 140
BOEING SERVICE BULLETIN 747-53-2721

### Page 32

e. 747-100/200/300 Aircraft Maintenance Manual (AMM) 12-09-05, 12-09-07, 25-22-00, 25-22-07,
55-30-10
f. 747-400 Aircraft Maintenance Manual (AMM) 06-09-05, 06-09-07, 25-22-00, 25-22-04, 55-30-10
g. Boeing Service Bulletin 747-53-2721, 747-53A2367, 747-53A2478
h. Boeing Service Letter 747-SL-53-088
i. 747-100/200/300 Structural Repair Manual (SRM) 51-30-08, 53-30-01
j. 747-400 Structural Repair Manual (SRM) 51-40-08, 53-00-01
k. 747-400F Structural Repair Manual (SRM) 51-40-08, 53-00-01
l. 747-400SF Structural Repair Manual (SRM) 51-40-08, 53-00-01
m. 747 Non-Destructive Testing (NDT) Manual Part 4, 51-00-00, Part 6, 51-00-00, Part 6, 53-30-00
n. 747 Repair Assessment Guidelines (RAG) D6-36181
o. 747-SP Structural Repair Manual (SRM) 51-30-08, 53-31-00
p. 747-400LCF Structural Repair Manual (SRM) 51-40-08, 53-00-01
2. Data Supplied with this Service Bulletin:
a. Drawings:
ADCNDCN/REVSheetTitleDrawing No
--1Kit - Fuselage Skin Repair For Blade Seal
Damage, Sect. 46
146U0001
-A3
-A4
-APSDL
-B1Kit - Fuselage Skin Repair For Blade Seal
Damage, Sect. 48
148U0027
-A16
-B2
-B3
-A4
-A5
-DPSDL
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 28, 2009
747-53-2721Revision 3: June 25, 2013
32 of 140
BOEING SERVICE BULLETIN 747-53-2721

### Page 33

3. Installation Drawings Used in the Preparation of this Service Bulletin:
TitleDrawing Number
PANEL INSTL - STR 3L - STR 3R, STA 2397 - 251765B02703
PANEL INSTL - STR 1 to STR 11, STA 2360 - 259865B02706
This drawing was used to prepare this service bulletin. This drawing is not necessary to make the
specified changes, and is not supplied with this service bulletin. This drawing may not be applicable
to all airplane configurations or operators.
K. Publications Affected
1. Publications:
Chapter-SectionPublication
53-30-03747-100/-200/-300 Structural Repair Manual
53-39-01747-SP Structural Repair Manual
53-80-01747-400, -400F, -400SF, and -400 LCF
Structural Repair Manual
2. Damage Tolerance Based Structural Inspections:
Boeing has evaluated the repairs and/or changes in this service bulletin for effects on Fatigue
Critical Structure (FCS) and for changes to Damage Tolerance Inspections (DTI) required in the
Maintenance Program. This service bulletin affects FCS and new DTI requirements for the structure
affected are contained in Paragraph 1.E., Compliance of this service bulletin or in existing
documents.
L. Interchangeability and Intermixability of Parts
Accomplishment of this service bulletin does not affect interchangeability or intermixability of parts.
M. Software Accomplishment Summary
Not affected.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 28, 2009
747-53-2721Revision 3: June 25, 2013
33 of 140
BOEING SERVICE BULLETIN 747-53-2721

### Page 34

Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 28, 2009
747-53-2721Revision 3: June 25, 2013
34 of 140
BOEING SERVICE BULLETIN 747-53-2721
BLANK PAGE

### Page 35

2.    MATERIAL INFORMATION
A. Material - Price and Availability
Boeing can supply the kits shown in Paragraph 2.C., Parts Necessary for Each Airplane. Operators
are encouraged to share schedule requirements with Boeing for incorporation of the service bulletin.
The kits are subject to the terms and conditions of the Boeing standard purchase order acknowledgment.
Prices are in United States Dollars. Terms: Net 30 days.
Reference this service bulletin and submit your purchase order by one of these methods:
1. Order on-line via ATA Spec 2000 or The Boeing PART Page
2. Fax to (206) 662-7145
REFER TO THE BOEING PART PAGE ON MYBOEINGFLEET.COM OR CONTACT FIRST RESPONDER
AT FR@BOEING.COM FOR THE LATEST REORDER LEAD TIME (ROLT) AND PRICE INFORMATION
Unit Price as of
the Revision 1
date of this Ser-
vice Bulletin (US
Dollars)
ROLT as of the
Revision 1 date of
this Service Bul-
letin (Calendar
Days)
NameKit Number
$6,035280Top Kit - Forward Rub Strip Instl015U1832-1
$6,075280Top Kit - Aft Rub Strip Instl015U1832-2
$2,881510Repair Kit - Zone 1 Left146U0001-23
$2,881510Repair Kit - Zone 1 Right146U0001-24
$6,253550Repair Kit - Zone 5 Left148U0027-11
$6,253550Repair Kit - Zone 5 Right148U0027-12
Inactive for procurement. Superseded
by 148U0027-57.
Repair Kit - Zone 4 Left148U0027-21
Inactive for procurement. Superseded
by 148U0027-58.
Repair Kit - Zone 4 Right148U0027-22
$3,008510Repair Kit - Zone 2 Left148U0027-31
$3,011510Repair Kit - Zone 2 Right148U0027-32
$5,545510Repair Kit - Zone 3 Left148U0027-41
$5,545510Repair Kit - Zone 3 Right148U0027-42
$5,942550Repair Kit - Zone 4 Left148U0027-57
$6,081550Repair Kit - Zone 4 Right148U0027-58
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 28, 2009
747-53-2721Revision 3: June 25, 2013
35 of 140
BOEING SERVICE BULLETIN 747-53-2721

### Page 36

Unit Price as of
the Revision 2
date of this Ser-
vice Bulletin (US
Dollars)
ROLT as of the
Revision 2 date of
this Service Bul-
letin (Calendar
Days)
NameKit Number
$6,818280Top Kit - Forward Rub Strip Instl - Group 2015U1832-3
$8,772280Top Kit - Forward Rub Strip Instl - Group 3015U1832-4
B. Industry Support Information
Boeing warranty remedies are not available for the configuration changes, inspection, and/or repair
procedures given in this service bulletin.
C. Parts Necessary for Each Airplane
1. Kits/Parts
Top Kit 015U1832-1 is used for Work Package 1 - Forward Rub Strip Installation on Group 1
airplanes.
Top Kit 015U1832-2 is used for Work Package 2 - Aft Rub Strip Installation on all airplanes.
Top Kit 015U1832-3 is used for Work Package 1 - Forward Rub Strip Installation on Group 2
airplanes.
Top Kit 015U1832-4 is used for Work Package 1 - Forward Rub Strip Installation on Group 3
airplanes.
Kit 015U1832
NotesNameQTYNew Part Number
-4-3-2-1
-Top Kit - Forward Rub Strip Instl - Group 1...-015U1832-1
-Top Kit - Aft Rub Strip Instl..-.015U1832-2
-Top Kit - Forward Rub Strip Instl - Group 2.-..015U1832-3
-Top Kit - Forward Rub Strip Instl - Group 3-...015U1832-4
-RUB STRIP.1..146U0043-3
-RUB STRIP.1..146U0043-4
-RUB STRIP.1..146U0043-5
-RUB STRIP.1..146U0043-6
-FILLER.2..146U0043-7
-RUB STRIP...1146U3911-1
-RUB STRIP...1146U3911-2
-RUB STRIP...1146U3911-3
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 28, 2009
747-53-2721Revision 3: June 25, 2013
36 of 140
BOEING SERVICE BULLETIN 747-53-2721

### Page 37

Kit 015U1832
NotesNameQTYNew Part Number
-4-3-2-1
-RUB STRIP...1146U3911-4
-RUB STRIP11.1148U1202-1
-RUB STRIP..1.148U1202-10
-RUB STRIP11.1148U1202-2
-RUB STRIP..1.148U1202-3
-RUB STRIP..1.148U1202-4
-RUB STRIP..1.148U1202-5
-RUB STRIP..1.148U1202-6
-RUB STRIP..1.148U1202-7
-RUB STRIP..1.148U1202-8
-RUB STRIP..1.148U1202-9
-WASHER624142066-2955-10
-WASHER..8.66-2955-12
-WASHER.22..66-2955-50
-WASHER101041466-2955-75
-WASHER..10.66-2955-9
-RUB STRIP1...814U7317-1
-RUB STRIP1...814U7317-2
-RUB STRIP1...814U7317-3
-RUB STRIP1...814U7317-4
-RUB STRIP1...814U7317-5
-RUB STRIP1...814U7317-6
-RUB STRIP1...814U7317-7
(a)BOLT, HEX HEAD22.2BACB30NM4K10
(a)BOLT, HEX HEAD22.2BACB30NM5K13
(a)BOLT, HEX HEAD22.2BACB30NM5K21
(a)BOLT..2.BACB30NM6K28
(BACB30LM6-28,
BACB30LM6K28
optional)
(a)BOLT, 100 DEG HEX DR74...BACB30NW6K3X
(a)BOLT, 100 DEG HEX DR64...BACB30NW6K4X
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 28, 2009
747-53-2721Revision 3: June 25, 2013
37 of 140
BOEING SERVICE BULLETIN 747-53-2721

### Page 38

Kit 015U1832
NotesNameQTYNew Part Number
-4-3-2-1
(a)BOLT, 100 DEG HEX DR12...BACB30NW6K5X
(a)BOLT, 100 DEG HEX DR2611..BACB30NW6K6X
(a)BOLT, 100 DEG HEX DR306..BACB30NW6K7X
(a)BOLT, PROTRUDING HD1415..BACB30NX6K2
(a)BOLT, PROTRUDING HD4...BACB30NX6K3
(a)BOLT, PROTRUDING HD.8.8BACB30NX6K3X
(a)BOLT, PROTRUDING HD.2..BACB30NX6K4
(a)BOLT, PROTRUDING HD8646BACB30NX6K4X
(a)BOLT, PROTRUDING HD4...BACB30NX6K5X
(a)BOLT, PROTRUDING HD1610812BACB30NX6K6X
(a)BOLT, PROTRUDING HD46648BACB30NX6K7X
(a)BOLT, PROTRUDING HD.62.BACB30NX6K8X
(a)BOLT, PROTRUDING HD.22.BACB30NX8K4X
(a)BOLT, PROTRUDING HD..4.BACB30NX8K6X
(a)BOLT, PROTRUDING HD..2.BACB30NX8K7X
(a)BOLT, PROTRUDING HD..1414BACB30VT6K2
(a)BOLT, PROTRUDING HEAD..68BACB30VT6K3
(a)BOLT22102BACB30VT6K6
-COLLAR20620..BACC30AG6
-COLLAR1818..BACC30BH6
-COLLAR223025BACC30BL6
-COLLAR74531835BACC30M6
-COLLAR.28.BACC30M8
-NUT22.2BACN11Z4CD
-NUT44.4BACN11Z5CD
-NUT..2.BACN11Z6CD
-RIVET, 100 DEG.55..BACR15GF6D6
-WASHER22.2BACW10BP4CD
-WASHER22.2BACW10BP4DP
-CSK WASHER44.4BACW10BP5CD
-WASHER-PLAIN44.4BACW10BP5DP
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 28, 2009
747-53-2721Revision 3: June 25, 2013
38 of 140
BOEING SERVICE BULLETIN 747-53-2721

### Page 39

Kit 015U1832
NotesNameQTYNew Part Number
-4-3-2-1
-WASHER, PLAIN..2.BACW10BP6CD
-WASHER, SELF-ALIGN..2.BACW10CA6CC
-WASHER, SELF-ALIGN..2.BACW10CA6PV
(a) If grip length shown is not available at Boeing, fasteners supplied in kits may be one grip length longer
than indicated. Also, if any fasteners part numbers listed are not available or have been superseded,
substitute fasteners may be supplied in kits. Boeing Document D-590 and Boeing Drawing 65B88700 are
used to determine the part numbers used as substitutes.
Kit 146U0001
NotesNameQTYNew Part Number
-24-23
-REPAIR KIT - ZONE 1 LEFT.-146U0001-23
-REPAIR KIT - ZONE 1 RIGHT-.146U0001-24
-RUB STRIP1.146U3911-10
-RUB STRIP.1146U3911-11
-RUB STRIP1.146U3911-12
-RUB STRIP.1146U3911-9
-WASHER7766-2955-10
-WASHER121266-2955-50
-WASHER2266-2955-52
-RAW MATERIAL - FIELD REPAIR11691U1041-20
(a)BOLT55BACB30MY8K21X
(a)BOLT22BACB30MY8K23X
(a)BOLT22BACB30NW6K7X
(a)BOLT33BACB30NW6K8X
(a)BOLT11BACB30NW8K7X
(a)BOLT77BACB30NX6K3X
(a)BOLT1010BACB30NX6K4X
(a)BOLT33BACB30NX6K5X
(a)BOLT11BACB30NX6K6X
(a)BOLT33BACB30NX6K7X
(a)BOLT22BACB30NX6K8X
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 28, 2009
747-53-2721Revision 3: June 25, 2013
39 of 140
BOEING SERVICE BULLETIN 747-53-2721

### Page 40

Kit 146U0001
NotesNameQTYNew Part Number
-24-23
(a)BOLT11BACB30NX6K9X
(a)BOLT33BACB30NX8K6X
-COLLAR2727BACC30BH6
-COLLAR33BACC30BH8
-COLLAR55BACC30M6
-COLLAR88BACC30M8
-FILLER11BACF3F009K035NN
(a)RIVET132132BACR15BB6D5C
(a)RIVET22BACR15BB6D6C
(a)RIVET1414BACR15BB6D7C
(a)RIVET11BACR15BB6D8C
(a)RIVET11BACR15BB7D7C
(a)RIVET11BACR15BB7D8C
(a)RIVET33BACR15BB9D8C
(a)RIVET222222BACR15GF6D5
(a)RIVET88BACR15GF6D6
(a)RIVET1111BACR15GF6D7
(a)RIVET44BACR15GF6D8
(a)RIVET4646BACR15GF7D7
(a)RIVET1111BACR15GF7D8
(a)RIVET22BACR15GF7D9
-SHIM66BACS40R005B005F
-SHIM22BACS40R008B073F
-SPACER, SLEEVE22NAS42DD10A-26FC
-SPACER, SLEEVE33NAS42DD10A-38FC
-SPACER, SLEEVE11NAS42DD10A-50FC
(a) If grip length shown is not available at Boeing, fasteners supplied in kits may be one grip length longer
than indicated. Also, if any fasteners part numbers listed are not available or have been superseded,
substitute fasteners may be supplied in kits. Boeing Document D-590 and Boeing Drawing 65B88700
are used to determine the part numbers used as substitutes.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 28, 2009
747-53-2721Revision 3: June 25, 2013
40 of 140
BOEING SERVICE BULLETIN 747-53-2721

### Page 41

Kit 148U0027
NotesNameQTYNew Part Number
-58-57-22-21
(a)REPAIR KIT - ZONE 4 LEFT...-148U0027-21
(b)REPAIR KIT - ZONE 4 RIGHT..-.148U0027-22
-REPAIR KIT - ZONE 4 LEFT.-..148U0027-57
-REPAIR KIT - ZONE 4 RIGHT-...148U0027-58
-PLATE.1.1148U0027-25
-PLATE1.1.148U0027-26
-RUB STRIP.1.1148U0027-27
-RUB STRIP1.1.148U0027-28
-RUB STRIP.1.1148U0027-29
-RUB STRIP1.1.148U0027-30
-REPAIR DOUBLER.1.1148U0027-53
(148U0027-23 op-
tional)
-REPAIR DOUBLER1.1.148U0027-54
(148U0027-24 op-
tional)
-SPLICE.1..65B02810U11
-SPLICE1...65B02810U18
-WASHER19219213613666-2955-10
-WASHER779966-2955-12
-WASHER17317318118166-2955-50
(c)BOLT4444BACB30MY8K10Y
(c)BOLT5555BACB30MY8K5Y
(c)BOLT6666BACB30MY8K6Y
(c)BOLT6666BACB30MY8K7Y
(c)BOLT8888BACB30MY8K8Y
(c)BOLT7777BACB30NM6K12
(c)BOLT1111BACB30NM6K26
(c)BOLT1111BACB30NM6K28
(c)BOLT..66BACB30NW6K13X
(c)BOLT73739090BACB30NW6K14X
(c)BOLT3333BACB30NW6K5X
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 28, 2009
747-53-2721Revision 3: June 25, 2013
41 of 140
BOEING SERVICE BULLETIN 747-53-2721

### Page 42

Kit 148U0027
NotesNameQTYNew Part Number
-58-57-22-21
(c)BOLT5555BACB30NW6K6X
(c)BOLT331212BACB30NW6K7X
(c)BOLT10101212BACB30NW6K8X
(c)BOLT4444BACB30NW6K9X
(c)BOLT6666BACB30NX6K11X
(c)BOLT5555BACB30NX6K12X
(c)BOLT2222BACB30NX6K13X
(c)BOLT2222BACB30NX6K14X
(c)BOLT66..BACB30NX6K19X
(c)BOLT1111BACB30NX6K5X
(c)BOLT2244BACB30NX6K7X
(c)BOLT1111BACB30NX6K8X
(c)BOLT3333BACB30NX8K6
(c)BOLT20202222BACB30NX8K7
(c)BOLT47475050BACB30NX8K8
(c)BOLT1111BACB30VT6K5
(c)BOLT2222BACB30VT6K7
-COLLAR28283030BACC30BH6
-COLLAR72727575BACC30BH8
-COLLAR3333BACC30BL6
-COLLAR101101134134BACC30M6
-COLLAR32323131BACC30R8
-FILLER1111BACF3F010K020NN
-NUT9999BACN11Z6CD
(c)RIVET146146145145BACR15BB6D6C
(c)RIVET6666BACR15BB7D10C
(c)RIVET30303030BACR15BB7D7C
(c)RIVET8888BACR15BB7D8C
(c)RIVET6666BACR15BB7D9C
(c)RIVET7777BACR15BB8D10C
(c)RIVET16161818BACR15BB8D8C
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 28, 2009
747-53-2721Revision 3: June 25, 2013
42 of 140
BOEING SERVICE BULLETIN 747-53-2721

### Page 43

Kit 148U0027
NotesNameQTYNew Part Number
-58-57-22-21
(c)RIVET36363636BACR15BB8D9C
(c)RIVET7799BACR15BB9D11C
(c)RIVET75757575BACR15GF7D10
(c)RIVET14141414BACR15GF7D7
(c)RIVET31312929BACR15GF7D8
(c)RIVET36363333BACR15GF7D9
-SHIM-LAMINATED11..BACS40R010B035F
-WASHER, PLAIN9999BACW10BP6CD
-WASHER, SELF-ALIGN9999BACW10CA6CC
-WASHER, SELF-ALIGN9999BACW10CA6PV
-SPACER22..NAS43DD4-38FC
-SPACER22..NAS43DD4-46FC
-SPACER22..NAS43DD4-51FC
(a) Superseded by 148U0027-57.
(b) Superseded by 148U0027-58.
(c) If grip length shown is not available at Boeing, fasteners supplied in kits may be one grip length longer
than indicated. Also, if any fasteners part numbers listed are not available or have been superseded,
substitute fasteners may be supplied in kits. Boeing Document D-590 and Boeing Drawing 65B88700 are
used to determine the part numbers used as substitutes.
Kit 148U0027
NotesNameQTYNew Part Number
-42-41-32-31-12-11
-REPAIR KIT - ZONE 5 LEFT.....-148U0027-11
-REPAIR KIT - ZONE 5 RIGHT....-.148U0027-12
-REPAIR KIT - ZONE 2 LEFT...-..148U0027-31
-REPAIR KIT - ZONE 2 RIGHT..-...148U0027-32
-REPAIR KIT - ZONE 3 LEFT.-....148U0027-41
-REPAIR KIT - ZONE 3 RIGHT-.....148U0027-42
-REPAIR DOUBLER.....1148U0027-13
-REPAIR DOUBLER....1.148U0027-14
-REPAIR TRIPLER.....1148U0027-15
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 28, 2009
747-53-2721Revision 3: June 25, 2013
43 of 140
BOEING SERVICE BULLETIN 747-53-2721

### Page 44

Kit 148U0027
NotesNameQTYNew Part Number
-42-41-32-31-12-11
-REPAIR TRIPLER....1.148U0027-16
-RUB STRIP...1..148U0027-35
-RUB STRIP..1...148U0027-36
-REPAIR DOUBLER.1....148U0027-43
-REPAIR DOUBLER1.....148U0027-44
-RUB STRIP.1....148U0027-45
-RUB STRIP1.....148U0027-46
-REPAIR FILLER.1....148U0027-49
-REPAIR FILLER1.....148U0027-50
-RUB STRIP.....1148U0027-51
-RUB STRIP....1.148U0027-52
-REPAIR DOUBLER...1..148U0027-55
(148U0027-33 op-
tional)
-REPAIR DOUBLER..1...148U0027-56
(148U0027-34 op-
tional)
-SKIN PANEL.1....65B02706U323
-SKIN PANEL1.....65B02706U324
-WASHER....303066-2955-10
-WASHER....12012066-2955-12
-WASHER2277..66-2955-50
(a)BOLT..15151515BACB30MY8K19X
(a)BOLT....4141BACB30MY8K5X
(a)BOLT....4848BACB30MY8K5Y
(a)BOLT....1212BACB30MY8K6X
(a)BOLT....1313BACB30MY8K6Y
(a)BOLT....1818BACB30MY8K7X
(a)BOLT..11..BACB30MY8K8X
(a)BOLT..99..BACB30NM4K12
(a)BOLT11....BACB30NM5K12
(a)BOLT1133..BACB30NM5K13
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 28, 2009
747-53-2721Revision 3: June 25, 2013
44 of 140
BOEING SERVICE BULLETIN 747-53-2721

### Page 45

Kit 148U0027
NotesNameQTYNew Part Number
-42-41-32-31-12-11
(a)BOLT44....BACB30NM5K14
(a)BOLT22....BACB30NM5K22
(a)BOLT1818....BACB30NW6K11X
(a)BOLT1818....BACB30NW6K12X
(a)BOLT9393....BACB30NW6K13X
(a)BOLT66....BACB30NW6K4X
(a)BOLT..202077BACB30NW6K5X
(a)BOLT..2424..BACB30NW6K6X
(a)BOLT7775751717BACB30NW6K7X
(a)BOLT..4343..BACB30NW6K8X
(a)BOLT....2525BACB30NW8K5X
(a)BOLT....55BACB30NW8K6X
(a)BOLT....22BACB30NW8K7X
(a)BOLT....22BACB30NX6K3Y
(a)BOLT....55BACB30NX6K4Y
(a)BOLT..44..BACB30NX6K5X
(a)BOLT..334444BACB30NX6K5Y
(a)BOLT..55..BACB30NX6K6X
(a)BOLT,..6677BACB30NX6K6Y
(a)BOLT111122BACB30NX6K7X
(a)BOLT..6622BACB30NX6K7Y
(a)BOLT..33..BACB30NX6K8X
(a)BOLT..3030..BACB30NX6K8Y
(a)BOLT..55..BACB30NX8K5
(a)BOLT..44..BACB30NX8K6
(a)BOLT..66..BACB30NX8K7
(a)BOLT1111..BACB30NX8K7X
(a)BOLT14143333..BACB30NX8K8
(a)BOLT..33..BACB30NX8K9
(a)BOLT....3737BACB30VT6K2
(a)BOLT....6565BACB30VT6K3
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 28, 2009
747-53-2721Revision 3: June 25, 2013
45 of 140
BOEING SERVICE BULLETIN 747-53-2721

### Page 46

Kit 148U0027
NotesNameQTYNew Part Number
-42-41-32-31-12-11
(a)BOLT....8080BACB30VT6K4
(a)BOLT...1..BACB30VT6K5
(a)BOLT..1717..BACB30VT6K7
(a)BOLT....2020BACB30YP6K2
(a)BOLT....245245BACB30YP6K4
(a)BOLT..1717..BACB30YP6K7
-COLLAR..50506262BACC30AC6
-COLLAR..7722BACC30BH6
-COLLAR14145353..BACC30BH8
-COLLAR..3918447447BACC30BL6
-COLLAR1481481731732424BACC30M6
-COLLAR111717126126BACC30M8
-COLLAR....6262BACC30R8
-FILLER, FLAT11....BACF3F030J067AN
-NUT..99..BACN11Z4CD
-NUT8833..BACN11Z5CD
(a)RIVET..11..BACR15BB6D10C
(a)RIVET..9696..BACR15BB6D6C
(a)RIVET..55..BACR15BB6D7C
(a)RIVET..44..BACR15BB6D8C
(a)RIVET..33..BACR15BB6D9C
(a)RIVET..44..BACR15BB7D7C
(a)RIVET..22..BACR15BB7D8C
(a)RIVET..22..BACR15BB8D10C
(a)RIVET33331919..BACR15BB8D11C
(a)RIVET..55..BACR15BB8D9C
(a)RIVET..1919..BACR15GF6D10
(a)RIVET..1313..BACR15GF6D7
(a)RIVET..1313..BACR15GF6D8
(a)RIVET..1212..BACR15GF6D9
(a)RIVET58583636..BACR15GF7D10
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 28, 2009
747-53-2721Revision 3: June 25, 2013
46 of 140
BOEING SERVICE BULLETIN 747-53-2721

### Page 47

Kit 148U0027
NotesNameQTYNew Part Number
-42-41-32-31-12-11
(a)RIVET..1414..BACR15GF7D7
(a)RIVET..1717..BACR15GF7D8
(a)RIVET14142020..BACR15GF7D9
-WASHER..99..BACW10BP4CD
-WASHER..99..BACW10BP4DP
-CSK WASHER8833..BACW10BP5CD
-WASHER-PLAIN8833..BACW10BP5DP
-SPACER..11..NAS42DD10A-
14FC
-SPACER..22..NAS42DD10A-
16FC
-SPACER..22..NAS42DD10A-
25FC
-SPACER..22..NAS42DD10A-
28FC
-SPACER..11..NAS42DD10A-
29FC
-SPACER..11..NAS42DD10A-
33FC
-SPACER..22..NAS42DD10A-
34FC
-SPACER..11..NAS42DD10A-
35FC
-SPACER....33NAS42DD10A-
38FC
-SPACER..44..NAS42DD10A-
39FC
-SPACER..3333NAS42DD10A-
42FC
-SPACER..11..NAS42DD10A-
44FC
-SPACER..1166NAS42DD10A-
46FC
-SPACER....33NAS42DD10A-
47FC
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 28, 2009
747-53-2721Revision 3: June 25, 2013
47 of 140
BOEING SERVICE BULLETIN 747-53-2721

### Page 48

Kit 148U0027
NotesNameQTYNew Part Number
-42-41-32-31-12-11
-SPACER..22..NAS42DD10A-
48FC
-SPACER..11..NAS42DD10A-
49FC
-SPACER..11..NAS42DD10A-
50FC
(a) If grip length shown is not available at Boeing, fasteners supplied in kits may be one grip length longer
than indicated. Also, if any fasteners part numbers listed are not available or have been superseded,
substitute fasteners may be supplied in kits. Boeing Document D-590 and Boeing Drawing 65B88700 are
used to determine the part numbers used as substitutes.
2. Parts and Materials Supplied by the Operator
NotesNameQTYPart Number / Specifica-
tion
(a)SEALANT1 PintBMS 5-95
(a)PRIMER1 PintBMS 10-79, Type III
(b)CHEMICAL CONVERSION
COATING
1 PintALODINE
(a)ADHESIVE1 PintBMS 5-92 or BMS 5-123
(c)CHEMICAL STRIPPER1 PintSTRIPPER
May be procured from:COLLAR24BACC30BL6
Hi-Shear Corporation
2600 Skypark Drive
Torrance, CA 90505
Cage Code 73197
-Bolt2BACB30NX6K14X
(a) See the Qualified Products List at the end of the Boeing Material Specification (BMS) for supplier data.
(b) Refer to SOPM 20-43-03, Type 2, Class A or B for material alternatives and SOPM 20-00-00 for
supplier data.
(c) Refer to SOPM 20-30-02 for material alternatives and SOPM 20-00-00 for supplier data..
3. Parts Modified and Reidentified
None.
4. Parts Removed and Not Replaced
None.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 28, 2009
747-53-2721Revision 3: June 25, 2013
48 of 140
BOEING SERVICE BULLETIN 747-53-2721

### Page 49

D. Parts Necessary to Change Spares
None.
E. Special Tooling - Price and Availability
None.
F. Special Tooling Necessary to do this Service Bulletin
No special tools or equipment are necessary to do the change in this service bulletin. But, maintenance
and overhaul tools in the manuals given in Paragraph 1.J., References, can be necessary. Examine
operator tool supply to make sure all necessary tools are available.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 28, 2009
747-53-2721Revision 3: June 25, 2013
49 of 140
BOEING SERVICE BULLETIN 747-53-2721

### Page 50

Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 28, 2009
747-53-2721Revision 3: June 25, 2013
50 of 140
BOEING SERVICE BULLETIN 747-53-2721
BLANK PAGE

### Page 51

3.    ACCOMPLISHMENT INSTRUCTIONS
A. GENERAL INFORMATION
CAUTION: KEEP THE WORK AREA, WIRES AND ELECTRICAL BUNDLES CLEAN OF METAL
PARTICLES OR CONTAMINATION WHEN YOU USE TOOLS. UNWANTED MATERIAL,
METAL PARTICLES OR CONTAMINATION CAUGHT IN WIRE BUNDLES CAN CAUSE
DAMAGE TO THE BUNDLES. DAMAGED WIRE BUNDLES CAN CAUSE SPARKS OR
OTHER ELECTRICAL DAMAGE.
NOTE: 1. Manual titles are referred to by acronyms. Refer to Paragraph 1.J., References, for
definition of the acronyms.
2. Obey all of the warnings and cautions given in the specified manual sections.
3. Unless shown differently, these dimensions and tolerances are used:
– Linear dimensions are in inches
– Tolerance on linear dimensions, other than rivet and bolt edge margins, is plus
or minus 0.03 inch
– Tolerance on rivet and bolt edge margin is plus or minus 0.05 inch
– Angular tolerance is plus or minus 2 degrees
– Hole dimensions for standard solid rivets are in 747 SRM, Chapter 51
– Torque limits to tighten nuts and bolts are in 747 SRM, Chapter 51
4. Use the approved fastener and process material substitutions in accordance with
747 SRM, Chapter 51.
5. If the length of any fastener specified in this service bulletin does not meet the
installation standards in SRM Chapter 51, then a fastener of the same specification,
or an approved substitute, with a length which meets the installation standards given
in SRM Chapter 51 may be used. In addition, washers may be installed for fastener
grip length in accordance with SRM Chapter 51. Refer to SOPM 20-50-01 for alternate
full threaded fasteners (screws) needed for installation in this service bulletin.
6. A Detailed Inspection is defined as: An intensive examination of a specific item,
installation, or assembly to detect damage, failure, or irregularity. Available lighting
is normally supplemented with a direct source of good lighting at an intensity deemed
appropriate. Inspection aids such as mirrors, magnifying lenses, etc. may be
necessary. Surface cleaning and elaborate procedures may be required.
7. These work instructions refer to procedures included in other Boeing documents.
When the words "refer to" are used and the operator has an accepted alternative
procedure, the accepted alternative procedure can be used. When the words "in
accordance with" are included in the instruction, the procedure in the Boeing document
must be used.
8. The work instructions are divided into work packages. Task Hours and Elapsed Hours
for each package are given in Paragraph 1.G., Manpower. You can do each work
package as required.
9. A “Local Repair" is defined as a skin doubler installation that does not extend over
the entire length of an affected skin panel.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 28, 2009
747-53-2721Revision 3: June 25, 2013
51 of 140
BOEING SERVICE BULLETIN 747-53-2721

### Page 52

10. If necessary to ensure adequate edge margin at all affected fastener locations, it is
acceptable for the operator to make new, larger rub strips from 1/2 hard CRES 301
sheet per AMS 5518, 0.016 inch or 0.020 inch thick. Finish any new rub strip with
zinc-nickel alloy plate in accordance with BAC 5637, Type II, Class 2 or AMS 2417
Type 2, or cadmium plate in accordance with SOPM 20-42-05 Type 2, Class 2 or
QQ-P-416, Type 2, Class 2. After plating, apply one coat of BMS 10-79, Type III
primer, then apply BMS 10-86, Type I or Type II abrasion resistant teflon coating in
accordance with SOPM 20-44-01 Type 27 (except applied to a thickness of
0.002-0.004 inch) on the exterior surface only.
11. This service bulletin contains instructions to remove and keep parts for installation.
However, before installation of any removed and kept part, the part must be in a
serviceable condition. Replacement of the removed and kept part with a new or
serviceable part of the same part number/specification is an acceptable alternative
unless otherwise stated in the service bulletin instructions.
12. Boeing Service Letter 747-SL-51-048, Damage Reporting and Repair Plan/Design
Guidelines, is an acceptable procedure to request information from Boeing for
additional structural repair instructions. The Service Letter describes what information
must be provided to Boeing before a structural repair can be provided.
13. The instructions in Paragraph 3.B., Work Instructions and the figures can include
operation of tools or test equipment. Boeing Engineering Tool Drawings, the Illustrated
Tool and Equipment Manual, and the Special Tool and Ground Handling Drawing
Index contain data on versions of the tools or test equipment that you can use. It is
permitted to use replaced tools. It is not permitted to use superseded tools.
14. If it is necessary to remove more parts for access, you can remove those parts. If
you can get access without removing identified parts, it is not necessary to remove
all of the identified parts. Jacking and shoring limitations must be observed.
15. Where the work instructions include installation of a kept part, a new or serviceable
part with the same part number can be installed as an alternative to the kept part.
16. This service bulletin includes functional test procedures for the systems changed by
this service bulletin. More functional tests can possibly be necessary in accordance
with standard maintenance practices because of interruption to other airplane systems.
17. Some Boeing parts are supplied in a temporary configuration. Those parts are
identified with a 'U', 'W', or 'Y' in place of the '-' (dash) in the part number. It is
permitted to install parts identified with a 'U', 'W', or 'Y' as an alternative to the '-'
(dash) part number. Boeing Drawing 005W0900 contains more data.
18. Additional post modifications inspections of the repaired areas are provided in the
applicable Repair Assessment Guidelines (RAG) and/or Structural Repair Manual
(SRM).
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 28, 2009
747-53-2721Revision 3: June 25, 2013
52 of 140
BOEING SERVICE BULLETIN 747-53-2721

### Page 53

B. WORK INSTRUCTIONS
PART 1 - Rub Strip Installation
1. Do inspections of the fuselage skin for wear and cracks at the vertical stabilizer seal interface in
accordance with Service Bulletin 747-53A2478. Repair any cracks found in accordance with PART
4.
Based on results of the inspections done in accordance with Service Bulletin 747-53A2478, do as
follows:
a. If the depth of any blend out repair in the skin and fasteners in areas where rub strips will be
installed exceeds the limits given in 747-100/200/300 SRM 53-30-01, 747-400 SRM 53-00-01,
747-400F SRM 53-00-01, 747-400SF SRM 53-00-01, 747-SP SRM 53-31-00 or 747-400LCF
SRM 53-00-01 a repair must be installed in accordance with PART 4.
NOTE: The Full-Length Repairs (repairs that extend over the entire length of an affected
skin panel) in PART 4 are for the situation where the skin in the affected zone has
been trimmed for the entire length of the affected skin panel. However, it is only
necessary to trim out damage in areas where skin wear exceeds the limits given on
Drawings 146U0001 and 148U0027. In areas with limited skin trims, it may still be
possible to install the Full-Length Repair with fillers where the skin was removed or
blended. As an option, Local Repairs can be installed in accordance with the
applicable Structural Repair Manual, with tapered fillers adjacent to the Local Repair
in accordance with PART 4, and then do the rub strip installation in that area in
accordance with Work Package 1 or Work Package 2.
b. If no crack or existing Local Repair is in the area and the depth of any blend out repair in the
skin in areas where rub strips will be installed does not exceed the limits given in
747-100/200/300 SRM 53-30-01, 747-400 SRM 53-00-01, 747-400F SRM 53-00-01, 747-400SF
SRM 53-00-01, 747-SP SRM 53-31-00 or 747-400LCF SRM 53-00-01 do the rub strip
installation in accordance with Work Package 1 and Work Package 2.
c. If an existing Local Repair is in the area and the depth of any blend out repair in the skin in
areas where rub strips will be installed does not exceed the limits given in 747-100/200/300
SRM 53-30-01, 747-400 SRM 53-00-01, 747-400F SRM 53-00-01, 747-400SF SRM 53-00-01,
747-SP SRM 53-31-00 or 747-400LCF SRM 53-00-01 do one of the steps that follow:
(1) Remove the Local Repair and install a Full-Length Repair in accordance with PART 4.
(2) Install a tapered filler adjacent to the Local Repair in accordance with PART 4 and do
the rub strip installation in that area in accordance with Work Package 1 or Work Package
2.
Work Package 1 - Forward Rub Strip Installation (Zone 1, Zone 2, and Zone 3):
a. Get access to skin on aft side of pressure bulkhead at Station 2360 by removing access door
312A. Refer to 747-400 AMM 06-09-05 or 747-100/200/300 AMM 12-09-05 for access door
location.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 28, 2009
747-53-2721Revision 3: June 25, 2013
53 of 140
BOEING SERVICE BULLETIN 747-53-2721

### Page 54

b. Group 1-2:
Get access to skin on forward side of pressure bulkhead at Station 2360 by removing lowered
ceiling panels as necessary between Stations 2280 and 2360. Refer to 747-400 AMM 25-22-04
or 747-100/200/300 AMM 25-22-07 as an accepted procedure.
c. Remove ceiling insulation blankets as necessary. Refer to 747-400 AMM 25-22-00 or
747-100/200/300 AMM 25-22-00 as an accepted procedure.
d. Group 1:
Do the following steps:
(1) Remove fasteners and clean the area where rub strips will be installed in accordance
with FIGURE 1.
NOTE: Rub strips can be used as a template to identify fasteners to be removed and
area to be cleaned and inspected.
(2) Do High Frequency Eddy Current (HFEC) inspection of the outer skin and around fasteners
in area that will be covered by the rub strips in accordance with FIGURE 1. Based on
inspection results do as follows:
(a) If a crack is in the area, or the depth of any blend out repair in the skin exceeds the
limits given in 747-100/200/300 SRM 53-30-01, 747-400 SRM 53-00-01, 747-400F
SRM 53-00-01, or 747-400SF SRM 53-00-01, install a repair in accordance with
PART 4. The Full-Length Repairs in PART 4 include rub strips.
(b) If no crack is in the area, and the depth of any blend out repair in the skin does not
exceed the limits given in 747-100/200/300 SRM 53-30-01, 747-400 SRM 53-00-01,
747-400F SRM 53-00-01, or 747-400SF SRM 53-00-01, go to the next step.
(3) Do open hole HFEC inspections of the skin at the open fastener holes that will be used
to attach the new rub strips in accordance with FIGURE 1.
(4) If a fastener hole crack is found, contact The Boeing Company for repair instructions and
do the repair or install a repair in accordance with PART 4. The Full-Length Repairs in
PART 4 include rub strips.
(5) If no fastener hole crack is found, install repair washers and rub strips in accordance with
FIGURE 3.
e. Group 2:
Do the following steps:
(1) Remove fasteners and clean area where rub strips will be installed in accordance with
FIGURE 7.
NOTE: Rub strips can be used as a template to identify fasteners to be removed and
area to be cleaned and inspected.
(2) Do High Frequency Eddy Current (HFEC) inspection of the outer skin and around fasteners
in area that will be covered by the rub strips in accordance with FIGURE 7. Based on
inspection results do as follows:
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 28, 2009
747-53-2721Revision 3: June 25, 2013
54 of 140
BOEING SERVICE BULLETIN 747-53-2721

### Page 55

(a) If a crack is in the area, or the depth of any blend out repair in the skin exceeds the
limits given in 747-SP SRM 53-31-00, install a repair in accordance with Service
Bulletin 747-53A2478 or PART 4. The full length repairs include rub strips.
(b) If no crack is in the area, and the depth of any blend out repair in the skin does not
exceed the limits given in 747-SP SRM 53-31-00, go to next step.
(3) Do open hole HFEC inspections of the skin at the open fastener holes that will be used
to attach the new rub strips in accordance with FIGURE 7.
(4) If a fastener hole crack is found, make the fastener hole up to 1/32 inch oversize in
diameter to remove the crack indication. If making the fastener hole oversize does not
remove the crack indication, contact The Boeing Company for repair instructions and do
the repair or install a repair in accordance with Service Bulletin 747-53A2478 or PART
4. The full length repairs in PART 4 include rub strips. If making the fastener hole oversize
does remove the crack indication, install repair washers and rub strips in accordance with
FIGURE 8, except install a larger fastener of the same type specified in FIGURE 8 at the
repaired fastener hole location.
(5) Install repair washers and rub strips in accordance with FIGURE 8.
NOTE: 1. On Group 2 airplanes, the rub strip installation in Zone 1 covers the
Stringer 4 lap joint. Inspections of the Stringer 4 lap joint are described
in Boeing Service Bulletin 747-53A2367, "Fuselage - Skin - Body Skin
Lap Joint Inspections Based On Fatigue Test Results" and mandated
by AD 2010-10-05. Other inspections of the Stringer 4 lap joint are
required by Boeing Document D6-35022, the 747 Supplemental
Structural Inspection Document. Accomplishment of these inspections
will require periodic removal and replacement of the Zone 1 rub strips.
2. On Group 2 airplanes, if the skin in Zone 1 along the upper row of
fasteners in the Stringer 4 lap joint has been previously repaired by
blending, Contact The Boeing Company for additional inspection and
do the inspection.
f. Group 3:
Do the following steps:
(1) Remove fasteners and clean area where rub strips will be installed in accordance with
FIGURE 9.
NOTE: Rub strips can be used as a template to identify fasteners to be removed and
area to be cleaned and inspected.
(2) Do High Frequency Eddy Current (HFEC) inspection of the outer skin and around fasteners
in area that will be covered by the rub strips in accordance with FIGURE 9. Based on
inspection results do as follows:
(a) If a crack is in the area, or the depth of any blend out repair in the skin exceeds the
limits given in 747-400LCF SRM 53-00-01, install a repair in accordance with Service
Bulletin 747-53A2478 or PART 4. The full length repairs include rub strips.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 28, 2009
747-53-2721Revision 3: June 25, 2013
55 of 140
BOEING SERVICE BULLETIN 747-53-2721

### Page 56

(b) If no crack in the area, and the depth of any blend out repair in the skin does not
exceed the limits given in 747-400LCF SRM 53-00-01, go to next step.
(3) Do open hole HFEC inspections of the skin at the open fastener holes that will be used
to attach the new rub strips in accordance with FIGURE 9.
(4) If a fastener hole crack is found, make the fastener hole up to 1/32 inch oversize in
diameter to remove the crack indication. If making the fastener hole oversize does not
remove the crack indication, contact The Boeing Company for repair instructions and do
the repair or install a repair in accordance with Service Bulletin 747-53A2478 or PART
4. The full length repairs in PART 4 include rub strips. If making the fastener hole oversize
does remove the crack indication, install repair washers and rub strips in accordance with
FIGURE 10, except install a larger fastener of the same type specified in FIGURE 10 at
the repaired fastener hole location.
(5) Install repair washers, fasteners and rub strips in accordance with FIGURE 10.
g. Install ceiling insulation blankets previously removed. Refer to 747-400 AMM 25-22-00 or
747-100/200/300 AMM 25-22-00 as an accepted procedure.
h. Group 1-2:
Install previously removed ceiling panels. Refer to 747-400 AMM 25-22-04 or 747-100/200/300
AMM 25-22-07 as an accepted procedure.
i. Install previously removed access door 312A. Refer to 747-400 AMM 06-09-05 or
747-100/200/300 AMM 12-09-05 for access door location.
Work Package 2 - Aft Rub Strip Installation (Zone 4, Zone 5, and Zone 6):
a. Get internal access to fuselage skin by removing access door 315A. Refer to 747-400 AMM
06-09-05 or 747-100/200/300 AMM 12-09-05 for access door location.
b. This step has been deleted.
c. This step has been deleted.
d. Remove fasteners and clean area where rub strips will be installed in accordance with FIGURE
2.
NOTE: Rub strips can be used as a template to identify fasteners to be removed and area
to be cleaned and inspected.
e. Do a High Frequency Eddy Current (HFEC) inspection of the outer skin and around fasteners
in area that will be covered by the rub strips in accordance with FIGURE 2. Based on inspection
results do as follows:
(1) If a crack is in the area, or the depth of any blend out repair in the skin exceeds the limits
given in 747-100/200/300 SRM 53-30-01, 747-400 SRM 53-00-01, 747-400F SRM
53-00-01, 747-400SF SRM 53-00-01, 747-SP SRM 53-31-00 or 747-400LCF SRM
53-00-01, install a repair in accordance with PART 4. The Full-Length Repairs in PART
4 include rub strips.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 28, 2009
747-53-2721Revision 3: June 25, 2013
56 of 140
BOEING SERVICE BULLETIN 747-53-2721

### Page 57

(2) If no crack is in the area, and the depth of any blend out repair in the skin does not exceed
the limits given in 747-100/200/300 SRM 53-30-01, 747-400 SRM 53-00-01, 747-400F
SRM 53-00-01, 747-400SF SRM 53-00-01, 747-SP SRM 53-31-00 or 747-400LCF SRM
53-00-01 go to next step.
f. Do open hole HFEC inspections of the skin at the open fastener holes that will be used to
attach the new rub strips in accordance with FIGURE 2.
g. If a fastener hole crack is found, contact The Boeing Company for repair instructions and do
the repair or install a repair in accordance with PART 4. The Full-Length Repairs in PART 4
include rub strips.
h. Install repair washers and rub strips in accordance with FIGURE 4.
i. This step has been deleted.
j. This step has been deleted.
k. Install previously removed access door 315A. Refer to 747-400 AMM 06-09-05 or
747-100/200/300 AMM 12-09-05 for access door location.
2. Install previously removed panels 322AL, 322AR, 322BL, 322CL and 324AL. Refer to
747-100/200/300 AMM 55-30-10 or 747-400 AMM 55-30-10 as an accepted procedure. Refer to
747-100/200/300 AMM 12-09-07 or 747-400 AMM 06-09-07 for location of seal panels.
3. Put the airplane back to a serviceable condition. Do inspections in modified areas in accordance
with PART 2 and PART 3 at the times given in Paragraph 1.E., Compliance, Tables 1, 2, and 3.
PART 2 - Rub Strip and Blade Seal Inspections
1. Do an inspection of installed rub strips as follows:
Work Package 3 - Inspection of the Forward Rub Strip Installation (Zone 1, Zone 2, and Zone
3):
a. Do a Detailed Inspection of the blade-seal rub-strip contact area. Visually inspect for blade-seal
tears, gouges and to ensure uniform contact between blade-seal and rub-strip.
b. Get access to blade-seal rub-strip contact surface by gently prying on blade seal with a suitable
stiff thin wide blade such-as a 2-3 inch wide putty knife or equivalent and inspect as follows:
(1) Do a Detailed Inspection of rub-strips for general wear, loss of adhesion to body skin,
buckling, loose/missing fasteners and significant surface wear.
NOTE: Significant surface wear here is defined as wear visually discernible as excessive
when compared to a surrounding undamaged wear surface.
(2) Select all locations of significant surface wear and measure material loss or remaining
thickness in accordance with 747 NDT Part 4, 51-00-00, Procedure 2 or Procedure 3.
c. If material loss in any rub-strip is greater than 0.008 inch replace with new rub-strip in
accordance with Work Package 1.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 28, 2009
747-53-2721Revision 3: June 25, 2013
57 of 140
BOEING SERVICE BULLETIN 747-53-2721

### Page 58

d. Replace any torn or gouged blade seals or any loose or missing fasteners.
e. Replace any rub strips that are found to have a loss of adhesion to the fuselage skin, or that
are found to be buckled in accordance with Work Package 1.
Work Package 4 - Inspection of the Aft Rub Strip Installation (Zone 4, Zone 5, and Zone 6):
a. Do a Detailed Inspection of the blade-seal rub-strip contact area. Visually inspect for blade-seal
tears, gouges and to ensure uniform contact between blade-seal and rub-strip.
b. Get access to blade-seal rub-strip contact surface by gently prying on blade seal with a suitable
stiff thin wide blade such-as a 2-3 inch wide putty knife or equivalent and inspect as follows:
(1) Do a Detailed Inspection of rub-strips for general wear, loss of adhesion to body skin,
buckling, loose/missing fasteners and significant surface wear.
NOTE: Significant surface wear here is defined as wear visually discernible as excessive
when compared to a surrounding undamaged wear surface.
(2) Select all locations of significant surface wear and measure material loss or remaining
thickness in accordance with 747 NDT Part 4, 51-00-00, Procedure 2 or Procedure 3.
c. If material loss in any rub-strip is greater than 0.008 inch replace with new rub-strip in
accordance with Work Package 2.
d. Replace any torn or gouged blade seals or any loose or missing fasteners.
e. Replace any rub strips that are found to have a loss of adhesion to the fuselage skin, or that
are found to be buckled in accordance with Work Package 2.
PART 3 - Fuselage Skin Inspections - Airplanes that have Rub Strips Installed
1. Remove existing rub strips, inspect the fuselage skin, and install rub strips as follows:
NOTE: Work Package 5 below is only necessary for Zone 1 on airplanes with rub strips that were
installed in accordance with this service bulletin.
Work Package 5 - Inspection of the Skin Under the Forward Rub Strip Installation (Zone 1,
Zone 2, and Zone 3):
a. Get access to skin on aft side of pressure bulkhead at Station 2360 by removing access door
312A. Refer to 747-400 AMM 06-09-05 or 747-100/200/300 AMM 12-09-05 for access door
location.
b. Remove panels 322AL, 322AR, 322BL, and 322CL. Refer to 747-100/200/300 AMM 55-30-10
or 747-400 AMM 55-30-10 as an accepted procedure. Refer to 747-100/200/300 AMM 12-09-07
or 747-400 AMM 06-09-07 for location of seal panels.
c. Group 1-2:
Get access to skin on forward side of pressure bulkhead at Station 2360 by removing lowered
ceiling panels as necessary between stations 2280 and 2360. Refer to 747-400 AMM 25-22-04
or 747-100/200/300 AMM 25-22-07 as an accepted procedure.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 28, 2009
747-53-2721Revision 3: June 25, 2013
58 of 140
BOEING SERVICE BULLETIN 747-53-2721

### Page 59

d. Remove ceiling insulation blankets as necessary. Refer to 747-400 AMM 25-22-00 or
747-100/200/300 AMM 25-22-00 as an accepted procedure.
e. Remove previously installed rub strips and clean fuselage skin in area where rub strips were
installed. To clean area refer to FIGURE 1 as an accepted procedure.
f. Do High Frequency Eddy Current (HFEC) inspection of the outer skin and around fastener
locations in the area that was covered by the rub strips in accordance with FIGURE 1. Based
on inspection results do as follows:
(1) If a crack is in the area, or the depth of any blend out repair in the skin exceeds the limits
given in 747-100/200/300 SRM 53-30-01, 747-400 SRM 53-00-01, 747-400F SRM
53-00-01, 747-400SF SRM 53-00-01, 747-SP SRM 53-31-00 or 747-400LCF SRM
53-00-01 install a repair in accordance with PART 4. The Full-Length Repairs in PART
4 include rub strips.
(2) If no crack is in the area, and the depth of any blend out repair in the skin does not exceed
the limits given in 747-100/200/300 SRM 53-30-01, 747-400 SRM 53-00-01, 747-400F
SRM 53-00-01, 747-400SF SRM 53-00-01, 747-SP SRM 53-31-00 or 747-400LCF SRM
53-00-01 go to the next step.
g. Do open hole HFEC inspections of the skin at the open fastener holes that will be used to
attach the new rub strips in accordance with FIGURE 1.
h. If a fastener hole crack is found, contact The Boeing Company for repair instructions and do
the repair or install a repair in accordance with PART 4. The Full-Length Repairs in PART 4
include rub strips.
i. Install repair washers and rub strips in accordance with FIGURE 3.
j. Install ceiling insulation blankets previously removed. Refer to 747-400 AMM 25-22-00 or
747-100/200/300 AMM 25-22-00 as an accepted procedure.
k. Group 1-2:
Install previously removed ceiling panels. Refer to 747-400 AMM 25-22-04 or 747-100/200/300
AMM 25-22-07 as an accepted procedure.
l. Install previously removed access door 312A. Refer to 747-400 AMM 06-09-05 or
747-100/200/300 AMM 12-09-05 for access door location.
m. Install previously removed panels 322AL, 322AR, 322BL, and 322CL. Refer to 747-100/200/300
AMM 55-30-10 or 747-400 AMM 55-30-10 as an accepted procedure. Refer to 747-100/200/300
AMM 12-09-07 or 747-400 AMM 06-09-07 for location of seal panels.
n. Put the airplane back to a serviceable condition.
Work Package 6 - Inspection of the Skin Under any Aft Rub Strips that were installed prior
to the Original Issue of this Service Bulletin (Zone 4, Zone 5, and Zone 6):
a. Get access to fuselage skin by removing access door 315A. Refer to 747-400 AMM 06-09-05
or 747-100/200/300 AMM 12-09-05 for access door location.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 28, 2009
747-53-2721Revision 3: June 25, 2013
59 of 140
BOEING SERVICE BULLETIN 747-53-2721

### Page 60

b. Remove panel 324AL. Refer to 747-100/200/300 AMM 55-30-10 or 747-400 AMM 55-30-10
as an accepted procedure. Refer to 747-100/200/300 AMM 12-09-07 or 747-400 AMM 06-09-07
for location of seal panels.
c. This step has been deleted.
d. This step has been deleted.
e. Remove previously installed rub strips and clean fuselage skin in area where rub strips were
installed. To clean area refer to FIGURE 2 as an accepted procedure.
f. Do High Frequency Eddy Current (HFEC) inspection of the outer skin and around fasteners
in the area that was covered by the rub strips in accordance with FIGURE 2. Based on
inspection results do as follows:
(1) If a crack is in the area, or the depth of any blend out repair in the skin exceeds the limits
given in 747-100/200/300 SRM 53-30-01, 747-400 SRM 53-00-01, 747-400F SRM
53-00-01, 747-400SF SRM 53-00-01, 747-SP SRM 53-31-00 or 747-400LCF SRM
53-00-01 install a repair in accordance with PART 4. The Full-Length Repairs in PART
4 include rub strips.
(2) If no crack is in the area, and the depth of any blend out repair in the skin does not exceed
the limits given in 747-100/200/300 SRM 53-30-01, 747-400 SRM 53-00-01, 747-400F
SRM 53-00-01, 747-400SF SRM 53-00-01, 747-SP SRM 53-31-00 or 747-400LCF SRM
53-00-01 go to the next step.
g. Do open hole HFEC inspections of the skin at the open fastener holes that will be used to
attach the new rub strips in accordance with FIGURE 2.
h. If a fastener hole crack is found, contact The Boeing Company for repair instructions and do
the repair or install a repair in accordance with PART 4. The Full-Length Repairs in PART 4
include rub strips.
i. Install repair washers and rub strips in accordance with FIGURE 4.
j. This step has been deleted.
k. This step has been deleted.
l. Install previously removed access door 315A. Refer to 747-400 AMM 06-09-05 or
747-100/200/300 AMM 12-09-05 for access door location.
m. Install previously removed panel 324AL. Refer to 747-100/200/300 AMM 55-30-10 or 747-400
AMM 55-30-10 as an accepted procedure. Refer to 747-100/200/300 AMM 12-09-07 or 747-400
AMM 06-09-07 for location of seal panels.
n. Put the airplane back to a serviceable condition.
PART 4 - Repairs
1. Full-Length Repairs:
If necessary, install Full-Length Repairs in affected areas as follows:
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 28, 2009
747-53-2721Revision 3: June 25, 2013
60 of 140
BOEING SERVICE BULLETIN 747-53-2721

The text continues at https://openairdocs.org/service-documents/boeing/sb-747-53-2721/file/fec78260e69d.md?from=61

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
