# Boeing Special Attention Service Bulletin 747-71-2332: Revision 1

- Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2016-3702; AD 2016-18-04 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Boeing Special Attention Service Bulletin 747-71-2332](https://openairdocs.org/service-documents/boeing/sb-747-71-2332.md)
- Title as filed: U.S. DOT/FAA - SB-747-71-2332-R1
- Pages: 67
- PDF: https://openairdocs.org/files/sha256/cd/3e/cd3e3ba0d0c6b7e7d8715aedf962ed4438b9dcb76368d3de5f51417ef6e57119
- Page: https://openairdocs.org/service-documents/boeing/sb-747-71-2332/file/cd3e3ba0d0c6

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Commercial 
Airplanes
747
Service Bulletin
SPECIAL ATTENTION
Number: 747-71-2332
Original Issue: May 30, 2014
Revision 1: May 28, 2015
ATA System: 7121
SUBJECT: POWER PLANT - Engine Mounts - Forward Engine Mount Barrel Nut Installation
Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15
CFR 300-774). An export license may be required before it is used for development, production or use by foreign
persons from specific countries. The controller of this data has the individual responsibility to abide by all export
laws.
9E991ECCN:
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET
Copyright © 2014 Boeing.
Unpublished Work. All Rights Reserved.
Treatment of this document and its content is governed by contract with Boeing. Rights to use this document
are licensed on a per aircraft basis and such rights may not be transferable. For more information, contact The
Boeing Company.
Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner,
BBJ, DC-8, DC-9, DC-10, KC-10, KC-46, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8, Poseidon and
Boeing liveries are all trademarks owned by The Boeing Company; and no trademark license is granted in
connection with this document unless provided in writing by Boeing.
Original Issue: May 30, 2014
747-71-2332Revision 1: May 28, 2015
1 of 67
4.0

### Page 2

Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 30, 2014
747-71-2332Revision 1: May 28, 2015
2 of 67
BOEING SERVICE BULLETIN 747-71-2332
BLANK PAGE

### Page 3

Table of Contents
Revision Transmittal Sheet . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
Summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
1. PLANNING INFORMATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
A. Effectivity . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
1. Airplanes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
2. Spares Affected . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
B. Concurrent Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
C. Reason . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
D. Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16
E. Compliance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
F. Approval . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
G. Manpower . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
H. Weight and Balance Changes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21
I. Electrical Load Data . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21
J. References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21
1. Existing Data: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21
2. Data Supplied with this Service Bulletin: . . . . . . . . . . . . . . . . . . . . . . . . . . . 22
3. Installation Drawings Used in the Preparation of this Service Bulletin: . . . . . . . . . . . 22
K. Publications Affected . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22
L. Interchangeability and Intermixability of Parts . . . . . . . . . . . . . . . . . . . . . . . . . . . 22
M. Software Accomplishment Summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22
2. MATERIAL INFORMATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23
A. Material - Price and Availability . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23
B. Industry Support Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23
C. Parts Necessary for Each Airplane . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23
1. Kits/Parts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23
2. Parts and Materials Supplied by the Operator . . . . . . . . . . . . . . . . . . . . . . . . 24
3. Parts Modified and Reidentified . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24
4. Parts Removed and Not Replaced . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24
D. Parts Necessary to Change Spares . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24
E. Special Tooling - Price and Availability . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24
F. Special Tooling Necessary to do this Service Bulletin . . . . . . . . . . . . . . . . . . . . . . . 25
3. ACCOMPLISHMENT INSTRUCTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27
A. GENERAL INFORMATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27
B. WORK INSTRUCTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29
FIGURE 1: FORWARD ENGINE MOUNT BARREL NUT INSTALLATION . . . . . . . . . . . . . . . 34
FIGURE 2: STRUT BULKHEAD AND FORWARD ENGINE MOUNT GENERAL VISUAL INSPECTION. 39
FIGURE 3: FORWARD ENGINE MOUNT BARREL NUT ULTRASONIC INSPECTION . . . . . . . . 41
FIGURE 4: ENGINE 1 AND 2 FORWARD ENGINE MOUNT BARREL NUT NUT-BY-NUT REPLACEMENT
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 44
FIGURE 5: ENGINE 3 AND 4 FORWARD ENGINE MOUNT BARREL NUT NUT-BY-NUT REPLACEMENT
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 50
FIGURE 6: FORWARD ENGINE MOUNT BARREL NUT TORQUE AND TORQUE STRIPE APPLICATION
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56
APPENDIX A: ULTRASONIC (UT) INSPECTION PROCEDURE . . . . . . . . . . . . . . . . . . . . . . 59
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 30, 2014
747-71-2332Revision 1: May 28, 2015
3 of 67
BOEING SERVICE BULLETIN 747-71-2332

### Page 4

APPENDIX B: LOGIC DIAGRAM . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 66
APPENDIX C: PART DEMAND INTENT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 67
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 30, 2014
747-71-2332Revision 1: May 28, 2015
4 of 67
BOEING SERVICE BULLETIN 747-71-2332

### Page 5

Commercial 
Airplanes
747
Service Bulletin
SPECIAL ATTENTION
Revision Transmittal SheetNumber: 747-71-2332Original Issue: May 30, 2014
Revision 1: May 28, 2015
ATA System: 7121
SUBJECT: POWER PLANT - Engine Mounts - Forward Engine Mount Barrel Nut Installation
This revision includes all pages of the service bulletin.
COMPLIANCE INFORMATION RELATED TO THIS REVISION
Effects of this Revision on airplanes on which Original Issue was previously done:
See Paragraph 1.D., Description for more information.
No airplanes were added to this service bulletin effectivity.
REASON FOR REVISION
This revision is sent to add notes to state that removed forward engine mount barrel nuts cannot be reinstalled
in the forward engine mount assemblies after incorporation of this service bulletin.
These sections were changed:
1. Airplanes RC573, RC526, RC510, RC511, RC009, RC642 were moved from Group 1 to the new Group
2.
NOTE: These airplanes were moved from Group 1 to the new Group 2 because these airplanes were
delivered with the original release of this service bulletin incorporated.
2. In Summary, Summary Evaluation Table was changed.
3. In Paragraph 1.A.2, Spares Affected, paragraph and table were added.
4. In Paragraph 1.D., WORK PACKAGE 2, Added Group 1 and Group 2 Condition table
5. In Paragraph 1.E., Compliance, Note (b) was added to the Table 3.
6. In Paragraph 3.B., Work Instructions, a Note was added to the Work Package 2.
7. In Figure 1, Note (h) was added to the table.
8. In Figure 4, Note (g) was added to the table.
9. In Figure 5, Note (g) was added to the table.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 30, 2014
747-71-2332Revision 1: May 28, 2015
5 of 67

### Page 6

Vertical lines are put on the left edge of each page, except in Paragraph 1.A., Effectivity and format changes,
to show the location of all content changes.
Pages with no vertical lines have no changes.
REVISION HISTORY
May 30, 2014Original Issue:
May 28, 2015Revision 1:
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 30, 2014
747-71-2332Revision 1: May 28, 2015
6 of 67
BOEING SERVICE BULLETIN 747-71-2332

### Page 7

Commercial 
Airplanes
747
Service Bulletin
SPECIAL ATTENTION
SummaryNumber: 747-71-2332Original Issue: May 30, 2014
Revision 1: May 28, 2015
ATA System: 7121
SUBJECT: POWER PLANT - Engine Mounts - Forward Engine Mount Barrel Nut Installation
BOEING RECOMMENDS THAT EACH OPERATOR EXAMINE THIS SERVICE BULLETIN IMMEDIATELY.
CONCURRENT REQUIREMENTS
None.
BACKGROUND
Accomplishment of this service bulletin will install newly designed barrel nuts on the forward engine mount to
eliminate the complete failure of barrel nuts. Some existing barrel nuts on the forward engine mount have been
found to be cracked. A crack on both sides of the barrel nut will cause complete failure of the barrel nut. If the
existing barrel nuts on the forward engine mount are not replaced, the existing barrel nuts could become cracked.
A complete failure of two or more barrel nuts on the same engine reduces the load capacity of the forward engine
mount and could result in separation of an engine from the airplane. Separation of an inboard engine under
power could result in loss of control of the airplane.
An operator reported that while replacing the No.2 engine, the Non Destructive Test (NDT) inspection of the
barrel nuts on the forward engine mount revealed cracks on 2 out of 4 barrel nuts. The operator also discovered
1 cracked barrel nut on the No. 1 engine. This was the first reported occurrence on the 747-8. Also, The Boeing
Company did a NDT inspection of barrel nuts on a flight test airplane. There were 2 barrel nuts where a crack
had initiated on the No. 2 engine. Since that time, Boeing service bulletin 747-71A2329 was issued to inspect
the barrel nuts on the forward engine mounts. A total of 8 barrel nuts have been found with cracks. These barrel
nuts are located at the forward end of the strut box and are used to fasten the forward engine mount to the strut.
A barrel nut with a crack on one side will still be able to carry ultimate load. A crack on both sides of the barrel
nut will cause complete failure of the barrel nut. Boeing has not received any reports of a barrel nut with a crack
on both sides.
The newly designed barrel nut has increased strength due to its improved features. There is a deeper counterbore
to help prevent high stress concentrations around the saddle of the barrel nut. As well, the barrel nut has more
material added to it than the previous barrel nut to increase strength. As well, the reduced torque will prevent
the newly designed barrel nuts from cracking.
This service bulletin gives instructions to install newly designed barrel nuts on the forward engine mount. This
will prevent the complete failure of barrel nuts that could result in the separation of an engine from the airplane.
This service bulletin also gives instructions to update the airplane scheduled maintenance program to incorporate
the 747-8/-8F Airworthiness Limitation (AWL), Document Number D011U721-02-01, SSI 54-50-003c, applicable
to 747-8/-8F airplanes with barrel nut SL4750NA at the forward engine mount.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 30, 2014
747-71-2332Revision 1: May 28, 2015
7 of 67

### Page 8

This service bulletin is terminating action for all actions in Boeing service bulletin 747-71A2329 original release
and AD 2013-24-12.
Boeing Fleet Team Digest (FTD) 747 FTD 71-13001 is related to this service bulletin.
Boeing Service Related Problem (SRP) 747-8-SRP-71-0060 is related to this service bulletin.
This table is provided to operators for planning purposes only. Refer to the applicable sections for more
information.
ReferenceAffectedPlanning Data
Paragraph 1.A.2., Spares AffectedYesSpares Affected
Paragraph 1.E., Compliance and Paragraph
1.F., Approval
YesAD Related
Paragraph 1.H., Weight and Balance ChangesNoWeight and Balance Change
Paragraph 1.I., Electrical Load DataNoElectrical Load Changed
Paragraph 1.K., Publications AffectedYesPublications Affected
Paragraph 1.K., Publications AffectedNoAirplane Flight Operations Affected (Flight Crew
Operations Manual and/or FAA Approved Air-
plane Flight Manual)
Paragraph 2.C.1., Kits/PartsYesKits/Parts Required
Paragraph 2.C.2., Parts and Materials Supplied
by the Operator
YesOperator Supplied Parts/Material
Paragraph 2.F., Special Tooling Necessary to
do this Service Bulletin
NoSpecial Tooling Required
ACTION (PRR 85901-134S)
WORK PACKAGE 1 - FORWARD ENGINE MOUNT BARREL NUT REPLACEMENT
1. Do one of the following:
a. Do PART 1: BOOTSTRAP INSTALLATION AND FORWARD ENGINE MOUNT BARREL NUT
REPLACEMENT.
(1) Gain access. Install forward bootstrap. Replace barrel nuts on forward engine mount. Remove
forward bootstrap. Close access.
or
b. Do PART 2: GENERAL VISUAL INSPECTION OF STRUT BULKHEAD AND FORWARD ENGINE
MOUNT and PART 3: ULTRASONIC INSPECTION OF FORWARD ENGINE MOUNT BARREL
NUTS and PART 4: NUT-BY-NUT METHOD OF FORWARD ENGINE MOUNT BARREL NUT
REPLACEMENT.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 30, 2014
747-71-2332Revision 1: May 28, 2015
8 of 67
BOEING SERVICE BULLETIN 747-71-2332

### Page 9

(1) Gain access. Do general visual inspection of strut bulkhead and forward engine mount. Do
ultrasonic inspection of forward engine mount barrel nuts. Replace forward engine mount
barrel nuts. Close access.
WORK PACKAGE 2: FORWARD ENGINE MOUNT BARREL NUT - AIRPLANE SCHEDULED
MAINTENANCE PROGRAM CHANGE
1. Update the airplane scheduled maintenance program to incorporate the 747-8/-8F Airworthiness
Limitation (AWL), Document Number D011U721-02-01, SSI 54-50-003c, applicable to 747-8/-8F
airplanes with barrel nut SL4750NA at the forward engine mount.
EFFECTIVITY
747-8/-8F Airplane(s). Refer to Paragraph 1.A.1., Airplanes, for the list of affected airplane(s).
COMPLIANCE
Federal Aviation Administration (FAA) Airworthiness Directive AD 2013-24-12 is related to this service bulletin.
The effective date of AD 2013-24-12 is December 17, 2013.
This service bulletin is terminating action for all actions in Boeing service bulletin 747-71A2329 original release
and AD 2013-24-12.
Refer to Paragraph 1.E., Compliance.
INDUSTRY SUPPORT INFORMATION
Please refer to Paragraph 2.B., Industry Support Information.
MANPOWER
Elapsed HoursTotal Task HoursEngines
7.0017.00PART 1: BOOTSTRAP INSTALLATION AND FORWARD
ENGINE MOUNT BARREL NUT REPLACEMENT (a)
3.953.95PART 2: GENERAL VISUAL INSPECTION OF STRUT
BULKHEAD AND FORWARD ENGINE MOUNT (a)
4.254.25PART 3: ULTRASONIC INSPECTION OF FORWARD EN-
GINE MOUNT BARREL NUTS (a)
6.0010.00PART 4: NUT-BY-NUT METHOD OF FORWARD ENGINE
MOUNT BARREL NUT REPLACEMENT (a)
3.009.00PART 5: BOOTSTRAP INSTALLATION AND CONTACT
BOEING. (a) (b)
(a) Estimated hours are for 1 engine.
(b) The hours required to contact Boeing for the repair and to do the repair could not be estimated and are
not included.
Refer to Paragraph 1.G., Manpower.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 30, 2014
747-71-2332Revision 1: May 28, 2015
9 of 67
BOEING SERVICE BULLETIN 747-71-2332

### Page 10

MATERIAL INFORMATION
Boeing Supplied Kits/Parts.
Refer to Paragraph 2.A., Material - Price and Availability.
Operators are encouraged to complete the survey provided in APPENDIX C of this service bulletin to help Boeing
predict the quantity and timing of the Boeing Supplied Kits/Parts.
Operator Supplied Parts/Materials.
Refer to Paragraph 2.A., Material - Price and Availability.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 30, 2014
747-71-2332Revision 1: May 28, 2015
10 of 67
BOEING SERVICE BULLETIN 747-71-2332

### Page 11 (OCR)

BOEING SERVICE BULLETIN 747-71-2332
WORK PACKAGE 1 - FORWARD ENGINE MOUNT BARREL NUT REPLACEMENT
1. DO ONE OF THE FOLLOWING:
A. DO PART 1: BOOTSTRAP INSTALLATION AND FORWARD ENGINE MOUNT BARREL NUT
REPLACEMENT.
1. GAIN ACCESS. INSTALL FORWARD BOOTSTRAP. REPLACE BARREL NUTS ON
FORWARD ENGINE MOUNT. REMOVE FORWARD BOOTSTRAP. CLOSE ACCESS
2. DO PART 2: GENERAL VISUAL INSPECTION OF STRUT BULKHEAD AND FORWARD
ENGINE MOUNT AND PART 3: ULTRASONIC INSPECTION OF FORWARD ENGINE MOUNT BARREL
NUTS AND PART 4: NUT-BY-NUT METHOD OF FORWARD ENGINE MOUNT BARREL NUT
REPLACEMENT.
A. GAIN ACCESS. DO GENERAL VISUAL INSPECTION OF STRUT BULKHEAD AND
FORWARD ENGINE MOUNT. DO ULTRASONIC INSPECTION OF FORWARD ENGINE
MOUNT BARREL NUTS. REPLACE FORWARD ENGINE MOUNT BARREL NUTS.
CLOSE ACCESS.
WORK PACKAGE 2: FORWARD ENGINE MOUNT BARREL NUT - AIRPLANE SCHEDULED
MAINTENANCE PROGRAM CHANGE
1. UPDATE THE AIRPLANE SCHEDULED MAINTENANCE PROGRAM TO INCORPORATE THE
747-8/-8F AIRWORTHINESS LIMITATION (AWL), DOCUMENT NUMBER D011U721-02-01,
SSI 54-50-003, APPLICABLE TO 747-8/-8F AIRPLANES WITH BARREL NUT SL4750NA AT
THE FORWARD ENGINE MOUNT.
Original Issue: May 30, 2014
Revision 1: May 28, 2015  Export Controlled ECCN: 9E991 - BOEING  747-71-2332
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.  11 of 67

### Page 12

Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 30, 2014
747-71-2332Revision 1: May 28, 2015
12 of 67
BOEING SERVICE BULLETIN 747-71-2332
BLANK PAGE

### Page 13

Commercial 
Airplanes
747
Service Bulletin
SPECIAL ATTENTION
Number: 747-71-2332
Original Issue: May 30, 2014
Revision 1: May 28, 2015
ATA System: 7121
SUBJECT: POWER PLANT - Engine Mounts - Forward Engine Mount Barrel Nut Installation
BOEING RECOMMENDS THAT EACH OPERATOR EXAMINE THIS SERVICE BULLETIN IMMEDIATELY.
1.    PLANNING INFORMATION
A. Effectivity
1. Airplanes
Refer to Service Bulletin Index D6-30300 Part 3 for Airplane Variable Number, Line Number, and
Serial Number data.
This service bulletin is applicable to 747-8 Airplanes with GE engines installed, line numbers
1420-1434, 1436-1486, 1488, 1490-1492, 1494-1498 in 2 Groups. The Variable Numbers and
Group Information for the applicable airplanes is given below. Refer to PRR 85901-134S for data
about this change.
DESCRIPTIONCONFIGURATIONGROUP
747-8/-8F airplanes delivered with SL4081C14SP1 barrel nuts
installed on the forward engine mount.
-1
Airplanes which were delivered with the original release of this service
bulletin incorporated.
-2
Airplane Models:
747-8, 747-8F
GroupVariable Number
1RC001 - RC008
2RC009
1RC022 - RC034
1RC501 - RC509
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 30, 2014
747-71-2332Revision 1: May 28, 2015
13 of 67

### Page 14

GroupVariable Number
2RC510 - RC511
1RC521 - RC525
2RC526
1RC541
1RC546 - RC549
1RC551 - RC563
1RC571 - RC572
2RC573
1RC574 - RC582
1RC601 - RC605
2RC642
2. Spares Affected
Examine your spares supply for the parts or components identified below . If any parts or
components are found, refer to Paragraph 3.B., Work Instructions for the recommended action.
Part Number
SL4081C14SP1
B. Concurrent Requirements
None.
C. Reason
Accomplishment of this service bulletin will install newly designed barrel nuts on the forward engine
mount to eliminate the complete failure of barrel nuts. Some existing barrel nuts on the forward engine
mount have been found to be cracked. A crack on both sides of the barrel nut will cause complete
failure of the barrel nut. If the existing barrel nuts on the forward engine mount are not replaced, the
existing barrel nuts could become cracked. A complete failure of two or more barrel nuts on the same
engine reduces the load capacity of the forward engine mount and could result in separation of an
engine from the airplane. Separation of an inboard engine under power could result in loss of control
of the airplane.
An operator reported that while replacing the No.2 engine, the Non Destructive Test (NDT) inspection
of the barrel nuts on the forward engine mount revealed cracks on 2 out of 4 barrel nuts. The operator
also discovered 1 cracked barrel nut on the No. 1 engine. This was the first reported occurrence on
the 747-8. Also, The Boeing Company did a NDT inspection of barrel nuts on a flight test airplane.
There were 2 barrel nuts where a crack had initiated on the No. 2 engine. Since that time, Boeing
service bulletin 747-71A2329 was issued to inspect the barrel nuts on the forward engine mounts. A
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 30, 2014
747-71-2332Revision 1: May 28, 2015
14 of 67
BOEING SERVICE BULLETIN 747-71-2332

### Page 15

total of 8 barrel nuts have been found with cracks. These barrel nuts are located at the forward end of
the strut box and are used to fasten the forward engine mount to the strut. A barrel nut with a crack on
one side will still be able to carry ultimate load. A crack on both sides of the barrel nut will cause
complete failure of the barrel nut. Boeing has not received any reports of a barrel nut with a crack on
both sides.
The newly designed barrel nut has increased strength due to its improved features. There is a deeper
counterbore to help prevent high stress concentrations around the saddle of the barrel nut. As well,
the barrel nut has more material added to it than the previous barrel nut to increase strength. As well,
the reduced torque will prevent the newly designed barrel nuts from cracking.
This service bulletin gives instructions to install newly designed barrel nuts on the forward engine
mount. This will prevent the complete failure of barrel nuts that could result in the separation of an
engine from the airplane.
This service bulletin also gives instructions to update the airplane scheduled maintenance program to
incorporate the 747-8/-8F Airworthiness Limitation (AWL), Document Number D011U721-02-01, SSI
54-50-003c, applicable to 747-8/-8F airplanes with barrel nut SL4750NA at the forward engine mount.
This service bulletin is terminating action for all actions in Boeing service bulletin 747-71A2329 original
release and AD 2013-24-12.
Boeing Fleet Team Digest (FTD) 747 FTD 71-13001 is related to this service bulletin.
Boeing Service Related Problem (SRP) 747-8-SRP-71-0060 is related to this service bulletin.
Revision 1 is sent to add notes to state that removed forward engine mount barrel nuts cannot be
reinstalled in the forward engine mount assemblies after incorporation of this service bulletin.
These sections were changed:
1. Airplanes RC573, RC526, RC510, RC511, RC009, RC642 were moved from Group 1 to the new
Group 2.
NOTE: These airplanes were moved from Group 1 to the new Group 2 because these airplanes
were delivered with the original release of this service bulletin incorporated.
2. In Summary, Summary Evaluation Table was changed.
3. In Paragraph 1.A.2, Spares Affected, paragraph and table were added.
4. In Paragraph 1.D., WORK PACKAGE 2, Added Group 1 and Group 2 Condition table
5. In Paragraph 1.E., Compliance, Note (b) was added to the Table 3.
6. In Paragraph 3.B., Work Instructions, a Note was added to the Work Package 2.
7. In Figure 1, Note (h) was added to the table.
8. In Figure 4, Note (g) was added to the table.
9. In Figure 5, Note (g) was added to the table.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 30, 2014
747-71-2332Revision 1: May 28, 2015
15 of 67
BOEING SERVICE BULLETIN 747-71-2332

### Page 16

D. Description
WORK PACKAGE 1 - FORWARD ENGINE MOUNT BARREL NUT REPLACEMENT
1. Do one of the following:
a. Do PART 1: BOOTSTRAP INSTALLATION AND FORWARD ENGINE MOUNT BARREL
NUT REPLACEMENT.
(1) Gain access. Install forward bootstrap. Replace barrel nuts on forward engine mount.
Remove forward bootstrap. Close access.
or
b. Do PART 2: GENERAL VISUAL INSPECTION OF STRUT BULKHEAD AND FORWARD
ENGINE MOUNT and PART 3: ULTRASONIC INSPECTION OF FORWARD ENGINE MOUNT
BARREL NUTS and PART 4: NUT-BY-NUT METHOD OF FORWARD ENGINE MOUNT
BARREL NUT REPLACEMENT.
(1) Gain access. Do general visual inspection of strut bulkhead and forward engine mount.
Do ultrasonic inspection of forward engine mount barrel nuts. Replace forward engine
mount barrel nuts. Close access.
WORK PACKAGE 2: FORWARD ENGINE MOUNT BARREL NUT - AIRPLANE SCHEDULED
MAINTENANCE PROGRAM CHANGE
1. Update the airplane scheduled maintenance program to incorporate the 747-8/-8F Airworthiness
Limitation (AWL), Document Number D011U721-02-01, SSI 54-50-003c, applicable to 747-8/-8F
airplanes with barrel nut SL4750NA at the forward engine mount.
Revision 1 - Effects of this Revision on airplanes on which Original Issue was previously done:
ActionConditionGroup
Replace reinstalled Barrel Nut P/N
SL4081C14SP1 with the new Barrel
Nut SL4750NA in the forward engine
mount assemblies.
Barrel Nut P/N SL4081C14SP1 is
reinstalled in the forward engine
mount assemblies after incorpora-
tion of original Issue of this service
bulletin.
Group 1
No further action is required.Barrel Nut P/N SL4081C14SP1 is
NOT reinstalled in the forward en-
gine mount assemblies after incorpo-
ration of original Issue of this service
bulletin.
Group 1
Replace installed Barrel Nut P/N
SL4081C14SP1 with the new Barrel
Nut SL4750NA in the forward engine
mount assemblies.
Barrel Nut P/N SL4081C14SP1 is
installed in the forward engine
mount assemblies after airplane de-
livery.
Group 2
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 30, 2014
747-71-2332Revision 1: May 28, 2015
16 of 67
BOEING SERVICE BULLETIN 747-71-2332

### Page 17

ActionConditionGroup
No further action is required.Barrel Nut P/N SL4081C14SP1 is
NOT installed in the forward engine
mount assemblies after airplane de-
livery.
Group 2
The work in this service bulletin is done in the maintenance zone(s) given below.
Affected Maintenance Zones
ZoneModel
412, 422, 432, 442747-8, 747-8F
E. Compliance
Federal Aviation Administration (FAA) Airworthiness Directive AD 2013-24-12 is related to this service
bulletin. The effective date of AD 2013-24-12 is December 17, 2013.
When more than one OPTION is given for a CONDITION, do only one of the OPTION numbers. When
more than one ACTION is given for a CONDITION number or an OPTION number, do all of the ACTION
numbers for that CONDITION number or OPTION number.
The Conditions, Actions and Compliance times shown apply to each engine independently.
Do the required actions in accordance with Paragraph 3. Accomplishment Instructions.
Table 1: FORWARD ENGINE MOUNT BARREL NUT REPLACEMENT
Repeat Interval
(Not to Exceed)
Compliance Time (Whichever
Occurs First)
ActionCondition
-Within 7,200
flight cycles af-
ter the original
issue date of
this service bul-
letin.
Within 72
months after the
original issue
date of this ser-
vice bulletin.
Do PART 1: BOOT-
STRAP INSTALLATION
AND FORWARD EN-
GINE MOUNT BARREL
NUT REPLACEMENT (a)
or
All airplanes
Do PART 2: GENERAL
VISUAL INSPECTION
OF STRUT BULKHEAD
AND FORWARD EN-
GINE MOUNT. (a) (b)
(a) Accomplishment of WORK PACKAGE 1 - FORWARD ENGINE MOUNT BARREL NUT REPLACEMENT
and WORK PACKAGE 2: FORWARD ENGINE MOUNT BARREL NUT - AIRPLANE SCHEDULED
MAINTENANCE PROGRAM CHANGE is terminating action for all actions in Boeing service bulletin 747-
71A2329 original release and AD 2013-24-12.
(b) See Table 2: INSPECTIONS AND NUT-BY-NUT FORWARD ENGINE MOUNT BARREL NUT REPLACE-
MENT for disposition of findings.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 30, 2014
747-71-2332Revision 1: May 28, 2015
17 of 67
BOEING SERVICE BULLETIN 747-71-2332

### Page 18

Table 2: ACTIONS AFTER ACCOMPLISHING PART 2: GENERAL VISUAL INSPECTION OF STRUT
BULKHEAD AND FORWARD ENGINE MOUNT
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
-Before further
flight.
Do PART 5: BOOT-
STRAP INSTALLATION
AND CONTACT BOE-
ING.
CONDITION 1.0.0: ANY
GAP FOUND BETWEEN
THE FORWARD ENGINE
MOUNT AND STRUT
BULKHEAD.
-Before further
flight.
Do PART 3: ULTRASON-
IC INSPECTION OF
FORWARD ENGINE
MOUNT BARREL NUTS.
CONDITION 2.0.0: NO
GAP FOUND BETWEEN
THE FORWARD ENGINE
MOUNT AND STRUT
BULKHEAD.
-Before further
flight.
Do PART 1: BOOT-
STRAP INSTALLATION
AND FORWARD EN-
GINE MOUNT BARREL
NUT REPLACEMENT.
CONDITION 2.1.0: ANY
CRACK FOUND DURING
ULTRASONIC INSPEC-
TION.
-Before further
flight.
Do PART 4: NUT-BY-
NUT METHOD OF FOR-
WARD ENGINE MOUNT
BARREL NUT REPLACE-
MENT.
CONDITION 2.2.0: NO
CRACK FOUND DURING
ULTRASONIC INSPEC-
TION.
-Before further
flight.
Do PART 5: BOOT-
STRAP INSTALLATION
AND CONTACT BOE-
ING.
CONDITION 2.2.1: ANY
BREAK FOUND ON ANY
TORQUE STRIPE BE-
TWEEN FORWARD EN-
GINE MOUNT AND
STRUT BULKHEAD.
-Before further
flight.
Complete PART 4: NUT-
BY-NUT METHOD OF
FORWARD ENGINE
MOUNT BARREL NUT
REPLACEMENT.
CONDITION 2.2.2: NO
BREAK FOUND ON ANY
TORQUE STRIPE BE-
TWEEN FORWARD EN-
GINE MOUNT AND
STRUT BULKHEAD.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 30, 2014
747-71-2332Revision 1: May 28, 2015
18 of 67
BOEING SERVICE BULLETIN 747-71-2332

### Page 19

Table 3: FORWARD ENGINE MOUNT BARREL NUT - AIRPLANE SCHEDULED MAINTENANCE
PROGRAM CHANGE
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
-Within 30 days af-
ter the date of ac-
complishment of
3.B. WORK PACK-
AGE 1 - FOR-
WARD ENGINE
MOUNT BARREL
NUT REPLACE-
MENT.
Do the forward engine
mount barrel nut airplane
scheduled maintenance
program change in accor-
dance with the accom-
plishment instructions of
3.B. WORK PACKAGE 2:
AIRPLANE SCHEDULED
MAINTENANCE PRO-
GRAM CHANGE. (a) (b)
All Airplanes
(a) Accomplishment of WORK PACKAGE 1 - FORWARD ENGINE MOUNT BARREL NUT
REPLACEMENT and WORK PACKAGE 2: FORWARD ENGINE MOUNT BARREL NUT
- AIRPLANE SCHEDULED MAINTENANCE PROGRAM CHANGE is terminating action
for all actions in Boeing service bulletin 747-71A2329 original release and AD 2013-24-
12.
(b) Reinstallation of barrel nut P/N SL4081C14SP1 at the forward engine mount assemblies
is prohibited. Only barrel nut P/N SL4750NA is allowed for reinstallation.
F. Approval
This service bulletin was examined by the Federal Aviation Administration (FAA). The changes specified
in this service bulletin comply with the applicable regulations and are FAA approved, as well as European
Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/JAA approved
airplanes listed in the service bulletin effectivity. This service bulletin and its approval were based on
the airplane in its original Boeing delivery configuration or as modified by other approved Boeing
changes.
If an airplane has a non-Boeing modification or repair that affects a component or system also affected
by this service bulletin, the operator is responsible for obtaining appropriate regulatory agency approval
before incorporating this service bulletin.
In addition, the Manager of the FAA Seattle Aircraft Certification Office approves the accomplishment
of the replacement and scheduled maintenance program change defined in tables 1, 2 and 3 of this
service bulletin as an alternative method of compliance (AMOC) to the accomplishment of the repetitive
inspections defined by SB 747-71A2329, dated September 27, 2013 required by paragraph (g) of AD
2013-24-12. All provisions of AD 2013-24-12 that are not specifically referenced in the above statement
remain fully applicable and must be complied with accordingly.
G. Manpower
The table below shows an estimate of the task hours necessary to do this inspection and installation
for each engine. This estimate is for direct labor only, done by an experienced crew. Adjust the estimate
with operator task hour data if necessary. The estimate does not include lost time. These are some
examples of lost time:
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 30, 2014
747-71-2332Revision 1: May 28, 2015
19 of 67
BOEING SERVICE BULLETIN 747-71-2332

### Page 20

• Time to adjust to the workplace
• Time to schedule the work
• Time to inspect the work
• Time to cure the materials
• Time to make the parts
• Time to find the tools.
Manpower estimates are not applicable to Work Package 2.
PART 1: BOOTSTRAP INSTALLATION AND FORWARD ENGINE MOUNT BARREL NUT
REPLACEMENT
Elapsed HoursTask HoursNumber of PersonsTask
1.504.503Open Access
4.008.002FIGURE 1
1.504.503Close Access
7.0017.00TOTAL FOR EACH ENGINE
PART 2: GENERAL VISUAL INSPECTION OF STRUT BULKHEAD AND FORWARD ENGINE
MOUNT
Elapsed HoursTask HoursNumber of PersonsTask
1.101.101Open Access
1.751.751FIGURE 2
1.101.101Close Access
3.953.95TOTAL FOR EACH ENGINE
PART 3: ULTRASONIC INSPECTION OF FORWARD ENGINE MOUNT BARREL NUTS
Elapsed HoursTask HoursNumber of PersonsTask
1.001.001Open Access
2.252.251FIGURE 3
1.001.001Close Access
4.254.25TOTAL FOR EACH ENGINE
PART 4: NUT-BY-NUT METHOD OF FORWARD ENGINE MOUNT BARREL NUT REPLACE-
MENT
Elapsed HoursTask HoursNumber of PersonsTask
1.001.001Open Access
4.008.002FIGURE 4 or FIG-
URE 5
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 30, 2014
747-71-2332Revision 1: May 28, 2015
20 of 67
BOEING SERVICE BULLETIN 747-71-2332

### Page 21

PART 4: NUT-BY-NUT METHOD OF FORWARD ENGINE MOUNT BARREL NUT REPLACE-
MENT
Elapsed HoursTask HoursNumber of PersonsTask
1.001.001Close Access
6.0010.00TOTAL FOR EACH ENGINE
PART 5: BOOTSTRAP INSTALLATION AND CONTACT BOEING
Elapsed HoursTask HoursNumber of PersonsTask
0.852.553Open Access
0.651.953Install Bootstrap
(a)(a)-Contact Boeing for
the repair and do the
repair.
1.504.503Close Access
3.009.00TOTAL FOR EACH ENGINE
(a) The hours required to contact Boeing for the repair and to do the repair could
not be estimated and are not included.
H. Weight and Balance Changes
None.
I. Electrical Load Data
Not changed.
J. References
1. Existing Data:
a. Engineering Change Memo PRR 85901-134S
b. Boeing Service Bulletin 747-71A2329
c. Boeing Service Related Problem (SRP) 747-8-SRP-71-0060
d. Federal Aviation Administration (FAA) Airworthiness Directive (AD) 2013-24-12
e. Service Bulletin Index D6-30300
f. Standard Overhaul Practices Manual (SOPM) 20-50-01, 20-50-07
g. Standard Wiring Practices Manual (SWPM) 20-10-11, 20-10-12, 20-10-19
h. 747 Fleet Team Digest (FTD) 71-13001
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 30, 2014
747-71-2332Revision 1: May 28, 2015
21 of 67
BOEING SERVICE BULLETIN 747-71-2332

### Page 22

i. 747-8 Aircraft Maintenance Manual (AMM) 54-62-04, 71-00-00, 71-11-04, 71-21-03
j. 747-8/8F Airworthiness Limitations (AWLs), D011U721-02-01 Section 54-50-003c
2. Data Supplied with this Service Bulletin:
None.
3. Installation Drawings Used in the Preparation of this Service Bulletin:
TitleDrawing Number
ENGINE MOUNT TO STRUT MODULE - GENX-2B310U8010
The table above lists applicable drawings used to prepare this service bulletin. The drawings are
not necessary to make the specified changes, and are not supplied with this service bulletin. The
drawings may not be applicable to all airplane configurations or operators.
K. Publications Affected
1. Publications:
Chapter-SectionPublication
71-00747 Aircraft Maintenance Manual
54-51747 Illustrated Parts Catalog
Section 54-50-003c747-8/8F Airworthiness Limitations (AWLs),
D011U721-02-01, Revision Dated April 2014
or Newer
2. Damage Tolerance Based Structural Inspections:
Boeing has evaluated the repairs and/or changes in this service bulletin for effects on Fatigue
Critical Structure (FCS) and for changes to Damage Tolerance Inspections (DTI) required in the
Maintenance Program. This service bulletin does not affect FCS, therefore DTIs are not necessary.
L. Interchangeability and Intermixability of Parts
Refer to Paragraph 2.C., Parts Necessary for Each Airplane, for interchangeability and intermixability
information.
M. Software Accomplishment Summary
Not affected.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 30, 2014
747-71-2332Revision 1: May 28, 2015
22 of 67
BOEING SERVICE BULLETIN 747-71-2332

### Page 23

2.    MATERIAL INFORMATION
A. Material - Price and Availability
The operator can supply the parts and materials shown in Paragraph 2.C., Parts Necessary for Each
Airplane. As an alternative, operators can purchase the parts from Boeing Spares. The Boeing price
data shown below is given for planning purposes. Supply data can be given if requested. The parts
are subject to the terms and conditions of the Boeing standard purchase order acknowledgment. Prices
are in United States Dollars. Terms: Net 30 days
Reference this service bulletin and submit your purchase order by one of these methods:
1. Order on-line via ATA Spec 2000 or The Boeing PART Page
2. Fax to (206) 662-7145
REFER TO THE BOEING PART PAGE ON MYBOEINGFLEET.COM OR CONTACT FIRST RESPONDER
AT FR@BOEING.COM FOR THE LATEST REORDER LEAD TIME (ROLT) AND PRICE INFORMATION
Unit Price as of
the original issue
date of this Ser-
vice Bulletin (US
Dollars)
ROLT as of the
original issue
date of this Ser-
vice Bulletin (Cal-
endar Days)
QTYDateNamePart Number
$199.00N/A118404/23/2014BARREL NUTSL4750NA
B. Industry Support Information
At the time of the release of this service bulletin, warranty remedies have not been determined. However,
Boeing is making service bulletin materials available to all affected aircraft at no charge. Further, Boeing
will provide man-hour reimbursement for all airplanes. Send a warranty claim to Boeing Warranty &
Product Assurance Contracts. Send a purchase order for the materials to Boeing Spares. Please refer
to this service bulletin number and reference the airplane variable number(s) in your purchase order.
The warranty remedies will expire eight years from the original release date of this service letter/service
bulletin.
C. Parts Necessary for Each Airplane
1. Kits/Parts
To get the kits/parts shown below, refer to Paragraph 2.A., Material - Price and Availability.
NOTE: The end items and the items shown in Paragraph 2.C.2., Parts and Materials Supplied
by the Operator, are necessary for each airplane.
NotesExisting Part
Number
NameQTYNew Part Number
(a) (b)
(c)
SL4081C14SP1BARREL NUT16SL4750NA
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 30, 2014
747-71-2332Revision 1: May 28, 2015
23 of 67
BOEING SERVICE BULLETIN 747-71-2332

### Page 24

NotesExisting Part
Number
NameQTYNew Part Number
(a) This part is used in production.
(b) You cannot use the existing part to replace the new or changed part.
(c) Quantity of 4 required for each engine.
2. Parts and Materials Supplied by the Operator
The following parts or materials are necessary to do the change in this service bulletin. Parts and
materials in the manuals given in Paragraph 1.J., References, can also be necessary. Examine
operator part and material supply to make sure all necessary parts and materials are available.
NotesNameQTYPart Number /
Specification
Quantity may vary based on
inspection results. (b)
BOLT16 (a)BACB30US14-31M
(c)MARKING LACQUER2
ounces
-
(d)NEVER-SEEZ PURE NICKEL SPE-
CIAL ANTI-SEIZE
--
(a) Quantity of 4 required for each engine.
(b) LISI Aerospace North America (727622), 2600 Skypark Drive Torrance, CA 90505
(c) F-925, Skydrol Resistant Torque Seal, Organic Products Company, PO Box 560625,
Dallas, TX 75356-0625 (MSDS41617)
(d) USM Corp. Sub of Emhart Industries Inc Bostik Div (V70707), 211 Boston St, Middleton
01949, Essex, MA.
3. Parts Modified and Reidentified
None.
4. Parts Removed and Not Replaced
None.
D. Parts Necessary to Change Spares
None.
E. Special Tooling - Price and Availability
None.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 30, 2014
747-71-2332Revision 1: May 28, 2015
24 of 67
BOEING SERVICE BULLETIN 747-71-2332

### Page 25

F. Special Tooling Necessary to do this Service Bulletin
No special tools or equipment are necessary to do the change in this service bulletin. But, maintenance
and overhaul tools in the manuals given in Paragraph 1.J., References, can be necessary. Examine
operator tool supply to make sure all necessary tools are available.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 30, 2014
747-71-2332Revision 1: May 28, 2015
25 of 67
BOEING SERVICE BULLETIN 747-71-2332

### Page 26

Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 30, 2014
747-71-2332Revision 1: May 28, 2015
26 of 67
BOEING SERVICE BULLETIN 747-71-2332
BLANK PAGE

### Page 27

3.    ACCOMPLISHMENT INSTRUCTIONS
A. GENERAL INFORMATION
CAUTION: KEEP THE WORK AREA, WIRES AND ELECTRICAL BUNDLES CLEAN OF METAL
PARTICLES OR CONTAMINATION WHEN YOU USE TOOLS. UNWANTED MATERIAL,
METAL PARTICLES OR CONTAMINATION CAUGHT IN WIRE BUNDLES CAN CAUSE
DAMAGE TO THE BUNDLES. DAMAGED WIRE BUNDLES CAN CAUSE SPARKS OR
OTHER ELECTRICAL DAMAGE.
NOTE: 1. Manual titles are referred to by acronyms. Refer to Paragraph 1.J., References, for
definition of the acronyms.
2. Obey all of the warnings and cautions given in the specified manual sections.
3. The work instructions are divided into work packages. Task Hours and Elapsed Hours
for each package are given in Paragraph 1.G., Manpower. Work package 1 must be
done before work package 2.
4. Unless shown differently, these dimensions and tolerances are used:
– Linear dimensions are in inches
– Tolerance on linear dimensions, other than rivet and bolt edge margins, is plus
or minus 0.03 inch
– Tolerance on rivet and bolt edge margin is plus or minus 0.05 inch
– Angular tolerance is plus or minus 2 degrees
– Hole dimensions for standard solid rivets and fasteners are in Structural Repair
Manual (SRM) Chapter 51
– Torque Values:
— Values for structural fasteners are given in 747 Structural Repair Manual,
Chapter 51.
— Values for airframe maintenance tasks are included in Chapter 20 of 747
Airplane Maintenance Manual (AMM).
— Values for electrical maintenance tasks are included in Chapter 20 of
Standard Wiring Practices Manual (SWPM).
— Values for engine maintenance tasks are included in Chapter 70 of 747
Airplane Maintenance Manual (AMM).
— Non-standard torque values for maintenance tasks are included in the
applicable installation step.
5. Use the approved fastener, process and material substitutions in accordance with
SRM Chapter 51.
6. Refer to the SWPM 20-10-11 and SWPM 20-10-12 for the wire installation procedures,
and SWPM 20-10-19 for the wire separation requirements, as accepted procedures.
7. The necessary conditions for selection of clamp type and size are included in SWPM
20-10-12. If any wire bundle support clamp specified in this service bulletin does not
make a correct fit on the wire bundle, refer to SWPM 20-10-12 as an accepted
procedure to select a clamp that fits correctly.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 30, 2014
747-71-2332Revision 1: May 28, 2015
27 of 67
BOEING SERVICE BULLETIN 747-71-2332

### Page 28

8. If the length of any fastener specified in this service bulletin does not meet installation
standards given in SRM Chapter 51, then a fastener of the same specification, or
an approved substitute, with a length which meets the installation standards given
in SRM Chapter 51 may be used. In addition, washers may be installed for fastener
grip length in accordance with SRM Chapter 51. Refer to SOPM 20-50-01 for alternate
full threaded fasteners (screws) needed for installation in this service bulletin.
9. A Detailed Inspection is defined as: An intensive examination of a specific item,
installation, or assembly to detect damage, failure, or irregularity. Available lighting
is normally supplemented with a direct source of good lighting at an intensity deemed
appropriate. Inspection aids such as mirrors, magnifying lenses, etc. may be
necessary. Surface cleaning and elaborate procedures may be required.
10. A General Visual Inspection is defined as: A visual examination of an interior or
exterior area, installation or assembly to detect obvious damage, failure or irregularity.
This level of inspection is made from within touching distance unless otherwise
specified. A mirror may be necessary to enhance visual access to all exposed surfaces
in the inspection area. This level of inspection is made under normally available
lighting conditions such as daylight, hangar lighting, flashlight or drop-light and may
require removal or opening of access panels or doors. Stands, ladders or platforms
may be required to gain proximity to the area being checked.
11. These work instructions refer to procedures included in other Boeing documents.
When the words "refer to" are used and the operator has an accepted alternative
procedure, the accepted alternative procedure can be used. When the words "in
accordance with" are included in the instruction, the procedure in the Boeing document
must be used.
12. Refer to APPENDIX B for logic diagram. Logic diagrams are provided as an aid only.
Information contained in Paragraph 1.E., Compliance is the primary source for
compliance times. Information in Paragraph 3.B., Work Instructions is the primary
source for tasks required for compliance.
13. If it is necessary to remove more parts for access, you can remove those parts. If
you can get access without removing identified parts, it is not necessary to remove
all of the identified parts. Jacking and shoring limitations must be observed.
14. Where the work instructions include installation of a kept part, a new or serviceable
part with the same part number can be installed as an alternative to the kept part.
15. Use of colors in Figures is based on guidance from the ATA e-Business Program
(ATA) iSpec 2200.
16. When more than one OPTION is given for a CONDITION, do only one of the OPTION
numbers. When more than one ACTION is given for a CONDITION number or an
OPTION number, do all of the ACTION numbers for that CONDITION number or
OPTION number.
17. The compliance times for the actions in Paragraph 3.B., WORK INSTRUCTIONS
are in Paragraph 1.E., Compliance.
18. The CONDITIONS, ACTIONS and OPTIONS shown apply to each engine
independently.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 30, 2014
747-71-2332Revision 1: May 28, 2015
28 of 67
BOEING SERVICE BULLETIN 747-71-2332

### Page 29

19. Some steps in the Work Instructions are labeled as Required for Compliance (RC).
If this service bulletin is mandated by an Airworthiness Directive (AD), then the steps
labeled as RC, including sub-steps under an RC step and any figures identified in
an RC step, must be done to comply with the AD. An Alternative Method of
Compliance (AMOC) is required for any deviations to RC steps, including sub-steps
and identified figures. Steps not labeled as RC may be deviated from using accepted
methods in accordance with the operator's maintenance or inspection program without
obtaining approval of an AMOC. This is provided that the RC steps, including
sub-steps and identified figures, can still be done as specified, and the airplane can
be put back in an airworthy condition.
B. WORK INSTRUCTIONS
WORK PACKAGE 1 - FORWARD ENGINE MOUNT BARREL NUT REPLACEMENT
1. Do one of the following for each engine:
a. Do PART 1: BOOTSTRAP INSTALLATION AND FORWARD ENGINE MOUNT BARREL
NUT REPLACEMENT.
or
b. Do PART 2: GENERAL VISUAL INSPECTION OF STRUT BULKHEAD AND FORWARD
ENGINE MOUNT.
(1) CONDITION 1.0.0: ANY GAP FOUND BETWEEN THE FORWARD ENGINE MOUNT
AND STRUT BULKHEAD DURING GENERAL VISUAL INSPECTION.
(a) ACTION 1: Do PART 5: BOOTSTRAP INSTALLATION AND CONTACT BOEING.
NOTE: PART 4: NUT-BY-NUT METHOD OF FORWARD ENGINE MOUNT BARREL
NUT REPLACEMENT is not allowable.
(2) CONDITION 2.0.0: NO GAP FOUND BETWEEN THE FORWARD ENGINE MOUNT
AND STRUT BULKHEAD DURING GENERAL VISUAL INSPECTION.
(a) ACTION 1: Do PART 3: ULTRASONIC INSPECTION OF FORWARD ENGINE
MOUNT BARREL NUTS to determine if PART 4: NUT-BY-NUT METHOD OF
FORWARD ENGINE MOUNT BARREL NUT REPLACEMENT is allowable.
1) CONDITION 2.1.0: ANY CRACK FOUND ON ANY BARREL NUT DURING
ULTRASONIC INSPECTION.
a) ACTION 1: Do PART 1: BOOTSTRAP INSTALLATION AND FORWARD
ENGINE MOUNT BARREL NUT REPLACEMENT.
NOTE: PART 4: NUT-BY-NUT METHOD OF FORWARD ENGINE MOUNT
BARREL NUT REPLACEMENT is not allowable.
2) CONDITION 2.2.0: NO CRACK FOUND ON ANY BARREL NUT DURING
ULTRASONIC INSPECTION.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 30, 2014
747-71-2332Revision 1: May 28, 2015
29 of 67
BOEING SERVICE BULLETIN 747-71-2332

### Page 30

a) ACTION 1: Do PART 4: NUT-BY-NUT METHOD OF FORWARD ENGINE
MOUNT BARREL NUT REPLACEMENT.
{1} CONDITION 2.2.1: During any barrel nut replacement - ANY BREAK
FOUND ON ANY TORQUE STRIPE BETWEEN FORWARD ENGINE
MOUNT AND STRUT BULKHEAD.
– ACTION 1: Do PART 5: BOOTSTRAP INSTALLATION AND
CONTACT BOEING.
{2} CONDITION 2.2.2: During any barrel nut replacement - NO BREAK
FOUND ON ANY TORQUE STRIPE BETWEEN FORWARD ENGINE
MOUNT AND STRUT BULKHEAD.
– ACTION 1: Complete PART 4: NUT-BY-NUT METHOD OF
FORWARD ENGINE MOUNT BARREL NUT REPLACEMENT.
2. Put the airplane back to a serviceable condition.
WORK PACKAGE 2: FORWARD ENGINE MOUNT BARREL NUT - AIRPLANE SCHEDULED
MAINTENANCE PROGRAM CHANGE
1. RC - Update the airplane scheduled maintenance program to incorporate the 747-8/-8F
Airworthiness Limitation (AWL), Document Number D011U721-02-01, SSI 54-50-003c, applicable
to 747-8/-8F airplanes with barrel nut SL4750NA at the forward engine mount.
NOTE: Reinstallation of barrel nut P/N SL4081C14SP1 at the forward engine mount assemblies
is prohibited. Only barrel nut P/N SL4750NA is allowed for reinstallation.
PART 1: BOOTSTRAP INSTALLATION AND BARREL NUT REPLACEMENT
1. Remove fan cowl. Refer to 747-8 AMM 71-11-04 as an accepted procedure.
2. Remove the No. 2 Forward Fairing. Refer to 747-8 AMM 54-62-04 as an accepted procedure.
3. Install the forward bootstrap tool assembly. Refer to 747-8 AMM 71-00-00 as an accepted procedure.
4. RC - Apply the load to the forward engine mount. Refer to 747-8 AMM 71-00-00 as an accepted
procedure.
NOTE: Apply the load to the forward engine mount to remove the tension load from the forward
engine mount bolts.
5. RC - Install new barrel nuts in accordance with FIGURE 1.
6. Remove the load to the forward engine mount. Refer to 747-8 AMM 71-00-00 as an accepted
procedure.
7. Remove the forward bootstrap tool assembly. Refer to 747-8 AMM 71-00-00 as an accepted
procedure.
8. Install the No. 2 Forward Fairing. Refer to 747-8 AMM 54-62-04 as an accepted procedure.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 30, 2014
747-71-2332Revision 1: May 28, 2015
30 of 67
BOEING SERVICE BULLETIN 747-71-2332

### Page 31

9. Install fan cowl. Refer to 747-8 AMM 71-11-04 as an accepted procedure.
PART 2: GENERAL VISUAL INSPECTION OF STRUT BULKHEAD AND FORWARD ENGINE
MOUNT
1. RC - Do a general visual inspection of the barrel nuts at the forward engine mount to determine if
any barrel nut P/N SL4081C14SP1 is installed. A review of airplane maintenance records is
acceptable in lieu of this inspection if the part number of the barrel nut can be conclusively
determined from that review. If no barrel nut P/N SL4081C14SP1 is installed, no further action is
necessary for PART 2: GENERAL VISUAL INSPECTION OF STRUT BULKHEAD AND FORWARD
ENGINE MOUNT.
2. Make sure the engine is hanging on the wing with no additional ground service equipment or other
non-flight items of mass attached.
3. Make sure no jacking loads are applied to the engine.
4. Open fan cowl. Refer to 747-8 AMM 71-11-04 as an accepted procedure.
5. Remove the No. 2 Forward Fairing. Refer to 747-8 AMM 54-62-04 as an accepted procedure.
6. RC - Do general visual inspection of strut bulkhead and forward engine mount in accordance with
FIGURE 2.
7. Install the No. 2 Forward Fairing. Refer to 747-8 AMM 54-62-04 as an accepted procedure.
8. Close fan cowl. Refer to 747-8 AMM 71-11-04 as an accepted procedure.
PART 3: ULTRASONIC INSPECTION OF FORWARD ENGINE MOUNT BARREL NUTS
1. Make sure the engine is hanging on the wing with no additional ground service equipment or other
non-flight items of mass attached.
2. Make sure no jacking loads are applied to the engine.
3. Open fan cowl. Refer to 747-8 AMM 71-11-04 as an accepted procedure.
4. RC - Do ultrasonic inspection of forward engine mount barrel nuts in accordance with FIGURE 3.
5. Close fan cowl. Refer to 747-8 AMM 71-11-04 as an accepted procedure.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 30, 2014
747-71-2332Revision 1: May 28, 2015
31 of 67
BOEING SERVICE BULLETIN 747-71-2332

### Page 32

PART 4: NUT-BY-NUT METHOD OF FORWARD ENGINE MOUNT BARREL NUT REPLACEMENT
WARNING: NO PERSONNEL ALLOWED UNDER THE ENGINE DURING THIS PROCESS.
WARNING: PROCESS OF REMOVING THE EXISTING BARREL NUT AND INSTALLING THE NEW
BARREL NUT MUST BE ACCOMPLISHED WITH ONLY ONE OF FOUR BOLTS/BARREL
NUTS AT A TIME IN THE SEQUENCE DEFINED BELOW. THE REMAINING 3 BOLTS
MUST REMAIN FULLY TORQUED.
WARNING: FOR EACH ENGINE, ONCE THE PROCESS OF REMOVING/REPLACING THE BARREL
NUTS HAS STARTED, THE PROCESS MUST BE COMPLETED WITHOUT DISRUPTION
OR DELAY.
1. Make sure the engine is hanging on the wing with no additional ground service equipment or other
non-flight items of mass attached.
2. Make sure no jacking loads are applied to the engine.
3. Open fan cowl. Refer to 747-8 AMM 71-11-04 as an accepted procedure.
4. Remove the No. 2 Forward Fairing. Refer to 747-8 AMM 54-62-04 as an accepted procedure.
5. RC - Replace barrel nuts in accordance with the following figures:
ENGINE 4ENGINE 3ENGINE 2ENGINE 1
FIGURE 5FIGURE 5FIGURE 4FIGURE 4
6. RC - Torque and torque stripe barrel nuts in accordance with FIGURE 6.
7. Install the No. 2 Forward Fairing. Refer to 747-8 AMM 54-62-04 as an accepted procedure.
8. Close fan cowl. Refer to 747-8 AMM 71-11-04 as an accepted procedure.
PART 5: BOOTSTRAP INSTALLATION AND CONTACT BOEING
1. Remove fan cowl. Refer to 747-8 AMM 71-11-04 as an accepted procedure.
2. Remove the No. 2 Forward Fairing. Refer to 747-8 AMM 54-62-04 as an accepted procedure.
3. Install the forward bootstrap tool assembly. Refer to 747-8 AMM 71-00-00 as an accepted procedure.
4. RC - Apply the load to the forward engine mount. Refer to 747-8 AMM 71-00-00 as an accepted
procedure.
NOTE: Apply the load to the forward engine mount to remove the tension load from the forward
engine mount bolts.
5. RC - Contact Boeing for the repair and do the repair.
6. Remove the load to the forward engine mount. Refer to 747-8 AMM 71-00-00 as an accepted
procedure.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 30, 2014
747-71-2332Revision 1: May 28, 2015
32 of 67
BOEING SERVICE BULLETIN 747-71-2332

### Page 33

7. Remove the forward bootstrap tool assembly. Refer to 747-8 AMM 71-00-00 as an accepted
procedure.
8. Install the No. 2 Forward Fairing. Refer to 747-8 AMM 54-62-04 as an accepted procedure.
9. Install fan cowl. Refer to 747-8 AMM 71-11-04 as an accepted procedure.
10. Put the airplane back to a serviceable condition.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 30, 2014
747-71-2332Revision 1: May 28, 2015
33 of 67
BOEING SERVICE BULLETIN 747-71-2332

### Page 34 (OCR)

BOEING SERVICE BULLETIN 747-71-2332
ORIENTATION SAME FOR ALL ENGINE LOCATIONS
ORIENTATION SAME FOR
ALL ENGINE LOCATIONS
FWD
FIGURE 1: FORWARD ENGINE MOUNT BARREL NUT INSTALLATION
(SHEET 1 OF 5)
Original Issue: May 30, 2014
Revision 1 May 28, 2015  Export Controlled ECCN: 9E991 - BOEING  PROPRIETARY - Copyright © Unpublished  747-71-2332
Work - See page 1 for details.  34 of 67

### Page 35 (OCR)

BOEING SERVICE BULLETIN 747-71-2332
WD
ORIENTATION SAME FOR ALL ENGINE LOCATIONS
ID  AND  E
ORIENTATION SAME FOR
ALL ENGINE LOCATIONS
2322586
FIGURE 1: FORWARD ENGINE MOUNT BARREL NUT INSTALLATION
(SHEET 2 OF 5)
Original Issue: May 30, 2014
Revision 1 May 28, 2015  PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  747-71-2332
Work - See page 1 for details.  35 of 67

### Page 36 (OCR)

BOEING SERVICE BULLETIN 747-71-2332
BOLT.
2
WASHER 1
BARREL
NUT
BOLT_
RETAINER  WASHER (4
BARREL
NUT
BEFORE
(TYPICAL 4 LOCATIONS)
RETAINER
AFTER
(TYPICAL 4 LOCATIONS)
2336764
FIGURE 1: FORWARD ENGINE MOUNT BARREL NUT INSTALLATION
(SHEET 3 OF 5)
Original Issue: May 30, 2014
Revision 1 May 28, 2015  Export Controlled ECCN: 9E991 - BOEING  PROPRIETARY - Copyright © Unpublished  747-71-2332
Work - See page 1 for details.  36 of 67

### Page 37

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for each engine.
More DataQtyIdentificationNameTaskStep
Refer to 747-8 AMM
71-00-00 as an ac-
cepted procedure.
4BACB30US14-31MBOLTRemove1
Refer to 747-8 AMM
71-00-00 as an ac-
cepted procedure.
4BACW10BP14ACUWASHERRemove / Keep
Refer to 747-8 AMM
71-00-00 as an ac-
cepted procedure.
4SL4081C14SP1BARREL NUTRemove
(h)
Refer to 747-8 AMM
71-00-00 as an ac-
cepted procedure.
4SLR4124C14RETAINERRemove / Keep
(a)4BACB30US14-31MBOLTClean2
(a)4-BOLT HOLEClean
(a)4-BARREL NUT BORESClean
(b)--NEVER-SEEZ PURE
NICKEL SPECIAL AN-
TI-SEIZE
Apply3
FIGURE 1: FORWARD ENGINE MOUNT BARREL NUT INSTALLATION
(SHEET 4 OF 5)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 30, 2014
747-71-2332Revision 1 May 28, 2015
37 of 67
BOEING SERVICE BULLETIN 747-71-2332

### Page 38

More DataQtyIdentificationNameTaskStep
CAUTION: DO NOT APPLY MORE THAN THE MAXIMUM SPECIFIED TORQUE WHEN YOU TIGHTEN
THE FASTENERS. DAMAGE TO THE PARTS MAY OCCUR IF TOO MUCH TORQUE IS AP-
PLIED.
(c) Refer to 747-8
AMM 71-00-00 as
an accepted proce-
dure. No grip length
substitution allowed.
4BACB30US14-31MBOLTInstall (New)4
(d) Refer to 747-8
AMM 71-00-00 as
an accepted proce-
dure.
4BACW10BP14ACUWASHERInstall (Kept)
Refer to 747-8 AMM
71-00-00 as an ac-
cepted procedure.
4SL4750NABARREL NUTInstall (New)
Refer to 747-8 AMM
71-00-00 as an ac-
cepted procedure.
4SLR4124C14RETAINERInstall (Kept)
(e)4BACB30US14-31MBOLTTorque
(f)4BACB30US14-31MBOLTTorque
(g)4-MARKING LACQUERApply
(a) Remove any existing grease from the bolt, bolt hole and from the barrel nut bores.
(b) Apply anti-seize compound to only the threads of the bolt and the threads of the barrel nut. Do not apply
compound to exterior cylindrical portion of barrel nut. Refer to SOPM 20-50-07 as an acceptable procedure.
(c) A serviceable part may be installed in place of a new part if the part has been dye penetrant inspected
since it was last removed from service and no crack was found. Refer to 747-8 AMM 71-21-03 as an ac-
cepted procedure.
(d) Install countersunk side of washer adjacent to bolt head.
(e) Make sure forward engine mount barrel nuts run-on torque to be a within a minimum of 70 inch-pounds
and a maximum of 600 inch-pounds with bolt lubricated with Bostic Never-Seez Pure Nickel Special anti-
seize. Nuts not meeting this requirement shall be replaced.
(f) Tighten forward engine mount bolts to a torque of 3300-3500 inch-pounds.
(g) Apply torque stripe common to bolt head, washer, and forward engine mount.
(h) Discard. Reuse of barrel nuts P/N SL4081C14SP1 removed per this service bulletin is prohibited.
FIGURE 1: FORWARD ENGINE MOUNT BARREL NUT INSTALLATION
(SHEET 5 OF 5)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 30, 2014
747-71-2332Revision 1 May 28, 2015
38 of 67
BOEING SERVICE BULLETIN 747-71-2332

### Page 39 (OCR)

BOEING SERVICE BULLETIN 747-71-2332
FWD
FIGURE 2: STRUT BULKHEAD AND FORWARD ENGINE MOUNT GENERAL VISUAL INSPECTION
(SHEET 1 OF 2)
Original Issue: May 30, 2014
Revision 1 May 28, 2015  PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING
Work - See page 1 for details.  19 10 68

### Page 40

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for each engine.
More DataQtyIdentificationNameTaskStep
(a)--FORWARD ENGINE
MOUNT
Inspect1
(b)2-MARKING LACQUERApply2
(a) Perform a general visual inspection for gaps between the forward engine mount and the strut bulkhead.
(b) Apply torque stripe between the forward engine mount and the strut bulkhead at 2 locations. One location
near the outboard end and one location near the inboard end.
FIGURE 2: STRUT BULKHEAD AND FORWARD ENGINE MOUNT GENERAL VISUAL INSPECTION
(SHEET 2 OF 2)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 30, 2014
747-71-2332Revision 1 May 28, 2015
40 of 67
BOEING SERVICE BULLETIN 747-71-2332

### Page 41 (OCR)

BOEING SERVICE BULLETIN 747-71-2332
FWD  2337184
FIGURE 3: FORWARD ENGINE MOUNT BARREL NUT ULTRASONIC INSPECTION
(SHEET 1 OF 3)
Original Issue: May 30, 2014
Revision 1 May 28, 2015  PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING
Work - See page 1 for details.  1910 -7

### Page 42 (OCR)

BOEING SERVICE BULLETIN 747-71-2332
00•
STRUT
•BULKHEAD
BOLT  WD  FORWARD
ENGINE MOUNT
4 LOCATIONS
WASHER  FORWARD
BARREL  ENGINE MOUNT
NUT
RETAINER
3) 4 LOCATIONS  2337187
FIGURE 3: FORWARD ENGINE MOUNT BARREL NUT ULTRASONIC INSPECTION
(SHEET 2 OF 3)
Original Issue: May 30, 2014
Revision 1 May 28, 2015  Export Controlled ECCN: 9E991 - BOEING  PROPRIETARY - Copyright © Unpublished  747-71-2332
Work - See page 1 for details.  42 of 67

### Page 43

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for each engine.
More DataQtyIdentificationNameTaskStep
CAUTION: DO NOT APPLY MORE THAN THE MAXIMUM SPECIFIED TORQUE WHEN YOU TIGHTEN
THE FASTENERS. DAMAGE TO THE PARTS MAY OCCUR IF TOO MUCH TORQUE IS AP-
PLIED.
(a)4BACB30US14-31MBOLTTorque1
(b)4-MARKING LACQUERApply2
(c)4SL4081C14SP1BARREL NUTInspect3
(a) Torque to 3300-3500 inch-pounds and hold for a minimum of 3 seconds. Torque may be applied to the
bolts in any sequence.
(b) Apply torque stripe to bolt head, washer, and strut bulkhead at all 4 locations.
(c) Do an Ultrasonic Inspection to each barrel nut in accordance with APPENDIX A.
FIGURE 3: FORWARD ENGINE MOUNT BARREL NUT ULTRASONIC INSPECTION
(SHEET 3 OF 3)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 30, 2014
747-71-2332Revision 1 May 28, 2015
43 of 67
BOEING SERVICE BULLETIN 747-71-2332

### Page 44 (OCR)

BOEING SERVICE BULLETIN 747-71-2332
FWD  2335045
FIGURE 4: ENGINE 1 AND 2 FORWARD ENGINE MOUNT BARREL NUT NUT-BY-NUT REPLACEMENT
(SHEET 1 OF 6)
Original Issue: May 30, 2014
Revision 1 May 28, 2015  Export Controlled ECCN: 9E991 - BOEING  PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.

### Page 45 (OCR)

BOEING SERVICE BULLETIN 747-71-2332
STRUT
•BULKHEAD
VD
FORWARD
ENGINE MOUNT
LOCATION A
D AND E  LOCATION C
LOCATION D
LOCATION B
AND
AND E
FORWARD
ENGINE MOUNT
AND  2335058
FIGURE 4: ENGINE 1 AND 2 FORWARD ENGINE MOUNT BARREL NUT NUT-BY-NUT REPLACEMENT
(SHEET 2 OF 6)
Original Issue: May 30, 2014
Revision 1 May 28, 2015  PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  747-71-2332
Work - See page 1 for details.  45 of 67

### Page 46 (OCR)

BOEING SERVICE BULLETIN 747-71-2332
BOLT.
13 4
WASHER 4)
BARREL
NUT
BOLT_
•1800
RETAINER  WASHER 7
BARREL
NUT
BEFORE
(TYPICAL)
RETAINER
AFTER
(TYPICAL)
2335086
FIGURE 4: ENGINE 1 AND 2 FORWARD ENGINE MOUNT BARREL NUT NUT-BY-NUT REPLACEMENT
(SHEET 3 OF 6)
Original Issue: May 30, 2014
Revision 1 May 28, 2015  Export Controlled ECCN: 9E991 - BOEING  PROPRIETARY - Copyright © Unpublished  747-71-2332
Work - See page 1 for details.  46 of 67

### Page 47

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for each bolt location.
More DataQtyIdentificationNameTaskStep
CAUTION: ALL THE STEPS BELOW MUST BE DONE AT EACH BOLT LOCATION. ALL STEPS MUST
BE REPEATED AT EACH BOLT LOCATION. ALL STEPS MUST BE ACCOMPLISHED FIRST
AT BOLT LOCATION A, THEN ALL STEPS AT BOLT LOCATION B, THEN ALL STEPS AT
BOLT LOCATION C AND THEN ALL STEPS AT BOLT LOCATION D. THIS ORDER MUST BE
FOLLOWED.
Loosen bolt approxi-
mately 3-4 turns.
1BACB30US14-31MBOLTLoosen1
(a)2-MARKING LACQUERInspect2
CAUTION: DO NOT APPLY MORE THAN THE MAXIMUM SPECIFIED TORQUE WHEN YOU TIGHTEN
THE FASTENERS. DAMAGE TO THE PARTS MAY OCCUR IF TOO MUCH TORQUE IS AP-
PLIED.
(b) Inspect bolt loca-
tions that have not
been loosened or
had a new barrel nut
installed.
-BACB30US14-31MBOLTInspect3
(c) Clean off broken
torque stripe.
-BACB30US14-31MBOLTClean
(c) Torque to 3300-
3500 inch-pounds.
-BACB30US14-31MBOLTTorque
(c) Apply torque
stripe to bolt head,
washer, and strut
bulkhead.
--MARKING LACQUERApply
1BACB30US14-31MBOLTRemove / Keep4
1BACW10BP14ACUWASHERRemove / Keep
(g)1SL4081C14SP1BARREL NUTRemove
1SLR4124C14RETAINERRemove / Keep
FIGURE 4: ENGINE 1 AND 2 FORWARD ENGINE MOUNT BARREL NUT NUT-BY-NUT REPLACEMENT
(SHEET 4 OF 6)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 30, 2014
747-71-2332Revision 1 May 28, 2015
47 of 67
BOEING SERVICE BULLETIN 747-71-2332

### Page 48

More DataQtyIdentificationNameTaskStep
Remove any grease
from the forward en-
gine mount. Remove
broken marking lac-
quer on the strut
bulkhead from the
torque stripe across
the bolt head, wash-
er and strut bulk-
head.
1-FORWARD ENGINE
MOUNT
Clean5
Remove any grease.1-BARREL NUT BORESClean
Remove any grease.1-BOLT HOLEClean
(d)--NEVER-SEEZ PURE
NICKEL SPECIAL AN-
TI-SEIZE
Apply6
(e) No grip length
substitution allowed.
1BACB30US14-31MBOLTInstall (New)7
1BACW10BP14ACUWASHERInstall (Kept)
1SL4750NABARREL NUTInstall (New)
1SLR4124C14RETAINERInstall (Kept)
Do run-on torque
check of 70-600
inch-pounds. (f)
1BACB30US14-31MBOLTTorque8
CAUTION: DO NOT APPLY MORE THAN THE MAXIMUM SPECIFIED TORQUE WHEN YOU TIGHTEN
THE FASTENERS. DAMAGE TO THE PARTS MAY OCCUR IF TOO MUCH TORQUE IS AP-
PLIED.
Torque to 3300-
3500 inch-pounds.
1BACB30US14-31MBOLTTorque9
Update maintenance
records to show that
the barrel nut has
been replaced at this
location.
1BACB30US14-31MBOLTIdentify10
(a)2-MARKING LACQUERInspect11
(a) Perform a general visual inspection for a break in the torque stripes between the forward engine mount
and the strut bulkhead. Refer to CONDITION 2.2.1 and CONDITION 2.2.2 for disposition of findings.
(b) Perform a general visual inspection for a break in the torque stripes on the bolt head, washer, and strut
bulkhead. Refer to Footnote (c) for disposition of findings.
FIGURE 4: ENGINE 1 AND 2 FORWARD ENGINE MOUNT BARREL NUT NUT-BY-NUT REPLACEMENT
(SHEET 5 OF 6)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 30, 2014
747-71-2332Revision 1 May 28, 2015
48 of 67
BOEING SERVICE BULLETIN 747-71-2332

### Page 49

More DataQtyIdentificationNameTaskStep
(c) These steps are only required if a broken torque stripe on the bolt head, washer, and strut bulkhead is
found. These steps are only required at the location of the broken torque stripe.
(d) Apply anti-seize compound to only the threads of the bolt and the threads of the barrel nut. Do not apply
compound to exterior cylindrical portion of barrel nut. Refer to SOPM 20-50-07 as an acceptable procedure.
(e) A serviceable part may be installed in place of a new part if the part has been dye penetrant inspected
since it was last removed from service and no crack was found. Refer to 747-8 AMM 71-21-03 as an ac-
cepted procedure.
(f) If run-on torque is not between 70 and 600 inch-pounds, install a new barrel nut with part number SL4750NA
and repeat run-on torque check.
(g) Discard. Reuse of barrel nuts P/N SL4081C14SP1 removed per this service bulletin is prohibited.
FIGURE 4: ENGINE 1 AND 2 FORWARD ENGINE MOUNT BARREL NUT NUT-BY-NUT REPLACEMENT
(SHEET 6 OF 6)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 30, 2014
747-71-2332Revision 1 May 28, 2015
49 of 67
BOEING SERVICE BULLETIN 747-71-2332

### Page 50 (OCR)

BOEING SERVICE BULLETIN 747-71-2332
FWD
FIGURE 5: ENGINE 3 AND 4 FORWARD ENGINE MOUNT BARREL NUT NUT-BY-NUT REPLACEMENT
(SHEET 1 OF 6)
Original Issue: May 30, 2014
Revision 1 May 28, 2015  Export Controlled ECCN: 9E991 - BOEING  PROPRIETARY - Copyright © Unpublished  747-71-2332
Work - See page 1 for details.  50 of 67

### Page 51 (OCR)

BOEING SERVICE BULLETIN 747-71-2332
STRUT
•BULKHEAD
ND
FORWARD
ENGINE MOUNT
LOCATION D
D AND E  LOCATION B
LOCATION A
AND  LOCATION C
AND E
FORWARD
ENGINE MOUNT
AND  2335102
FIGURE 5: ENGINE 3 AND 4 FORWARD ENGINE MOUNT BARREL NUT NUT-BY-NUT REPLACEMENT
(SHEET 2 OF 6)
Original Issue: May 30, 2014
Revision 1 May 28, 2015  Export Controlled ECCN: 9E991 - BOEING  747-71-2332
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.  51 of 67

### Page 52 (OCR)

BOEING SERVICE BULLETIN 747-71-2332
BOLT.
13 4
WASHER 4)
BARREL
NUT
BOLT_
•1800
RETAINER  WASHER 7
BARREL
NUT
BEFORE
(TYPICAL)
RETAINER
AFTER
(TYPICAL)
2335104
FIGURE 5: ENGINE 3 AND 4 FORWARD ENGINE MOUNT BARREL NUT NUT-BY-NUT REPLACEMENT
(SHEET 3 OF 6)
Original Issue: May 30, 2014
Revision 1 May 28, 2015  Export Controlled ECCN: 9E991 - BOEING  PROPRIETARY - Copyright © Unpublished  747-71-2332
Work - See page 1 for details.  52 of 67

### Page 53

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for this figure.
More DataQtyIdentificationNameTaskStep
CAUTION: ALL THE STEPS BELOW MUST BE DONE AT EACH BOLT LOCATION. ALL STEPS MUST
BE REPEATED AT EACH BOLT LOCATION. ALL STEPS MUST BE ACCOMPLISHED FIRST
AT BOLT LOCATION A, THEN ALL STEPS AT BOLT LOCATION B, THEN ALL STEPS AT
BOLT LOCATION C AND THEN ALL STEPS AT BOLT LOCATION D. THIS ORDER MUST BE
FOLLOWED.
Loosen bolt approxi-
mately 3-4 turns.
1BACB30US14-31MBOLTLoosen1
(a)2-MARKING LACQUERInspect2
CAUTION: DO NOT APPLY MORE THAN THE MAXIMUM SPECIFIED TORQUE WHEN YOU TIGHTEN
THE FASTENERS. DAMAGE TO THE PARTS MAY OCCUR IF TOO MUCH TORQUE IS AP-
PLIED.
(b) Inspect bolt loca-
tions that have not
been loosened or
had a new barrel nut
installed.
-BACB30US14-31MBOLTInspect3
(c) Clean off broken
torque stripe.
-BACB30US14-31MBOLTClean
(c) Torque to 3300-
3500 inch-pounds.
-BACB30US14-31MBOLTTorque
(c) Apply torque
stripe to bolt head,
washer, and strut
bulkhead.
--MARKING LACQUERApply
1BACB30US14-31MBOLTRemove / Keep4
1BACW10BP14ACUWASHERRemove / Keep
(g)1SL4081C14SP1BARREL NUTRemove
1SLR4124C14RETAINERRemove / Keep
FIGURE 5: ENGINE 3 AND 4 FORWARD ENGINE MOUNT BARREL NUT NUT-BY-NUT REPLACEMENT
(SHEET 4 OF 6)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 30, 2014
747-71-2332Revision 1 May 28, 2015
53 of 67
BOEING SERVICE BULLETIN 747-71-2332

### Page 54

More DataQtyIdentificationNameTaskStep
Remove any grease
from the forward en-
gine mount. Remove
broken marking lac-
quer on the strut
bulkhead from the
torque stripe across
the bolt head, wash-
er and strut bulk-
head.
1-FORWARD ENGINE
MOUNT
Clean5
Remove any grease.1-BARREL NUT BORESClean
Remove any grease.1-BOLT HOLEClean
(d)--NEVER-SEEZ PURE
NICKEL SPECIAL AN-
TI-SEIZE
Apply6
(e) No grip length
substitution allowed.
1BACB30US14-31MBOLTInstall (New)7
1BACW10BP14ACUWASHERInstall (Kept)
1SL4750NABARREL NUTInstall (New)
1SLR4124C14RETAINERInstall (Kept)
Do run-on torque
check of 70-600
inch-pounds. (f)
1BACB30US14-31MBOLTTorque8
CAUTION: DO NOT APPLY MORE THAN THE MAXIMUM SPECIFIED TORQUE WHEN YOU TIGHTEN
THE FASTENERS. DAMAGE TO THE PARTS MAY OCCUR IF TOO MUCH TORQUE IS AP-
PLIED.
Torque to 3300-
3500 inch-pounds.
1BACB30US14-31MBOLTTorque9
Update maintenance
records to show that
the barrel nut has
been replaced at this
location.
1BACB30US14-31MBOLTIdentify10
(a)2-MARKING LACQUERInspect11
(a) Perform a general visual inspection for a break in the torque stripes between the front engine mount
hanger and the strut bulkhead. Refer to CONDITION 2.2.1 and CONDITION 2.2.2 for disposition of findings.
(b) Perform a general visual inspection for a break in the torque stripes on the bolt head, washer, and strut
bulkhead. Refer to Footnote (c) for disposition of findings.
FIGURE 5: ENGINE 3 AND 4 FORWARD ENGINE MOUNT BARREL NUT NUT-BY-NUT REPLACEMENT
(SHEET 5 OF 6)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 30, 2014
747-71-2332Revision 1 May 28, 2015
54 of 67
BOEING SERVICE BULLETIN 747-71-2332

### Page 55

More DataQtyIdentificationNameTaskStep
(c) These steps are only required if a broken torque stripe on the bolt head, washer, and strut bulkhead is
found. These steps are only required at the location of the broken torque stripe.
(d) Apply anti-seize compound to only the threads of the bolt and the threads of the barrel nut. Do not apply
compound to exterior cylindrical portion of barrel nut. Refer to SOPM 20-50-07 as an acceptable procedure.
(e) A serviceable part may be installed in place of a new part if the part has been dye penetrant inspected
since it was last removed from service and no crack was found. Refer to 747-8 AMM 71-21-03 as an ac-
cepted procedure.
(f) If run-on torque is not between 70 and 600 inch-pounds, install a new barrel nut with part number SL4750NA
and repeat run-on torque check.
(g) Discard. Reuse of barrel nuts P/N SL4081C14SP1 removed per this service bulletin is prohibited.
FIGURE 5: ENGINE 3 AND 4 FORWARD ENGINE MOUNT BARREL NUT NUT-BY-NUT REPLACEMENT
(SHEET 6 OF 6)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 30, 2014
747-71-2332Revision 1 May 28, 2015
55 of 67
BOEING SERVICE BULLETIN 747-71-2332

### Page 56 (OCR)

BOEING SERVICE BULLETIN 747-71-2332
ORIENTATION SAME FOR ALL ENGINE LOCATIONS
ORIENTATION SAME FOR
ALL ENGINE LOCATIONS
FWD  2337916
FIGURE 6: FORWARD ENGINE MOUNT BARREL NUT TORQUE AND TORQUE STRIPE APPLICATION
(SHEET 1 OF 3)
Original Issue: May 30, 2014
Revision 1 May 28, 2015  Export Controlled ECCN: 9E991 - BOEING  PROPRIETARY - Copyright © Unpublished  747-71-2332
Work - See page 1 for details.  56 of 67

### Page 57 (OCR)

BOEING SERVICE BULLETIN 747-71-2332
WD
ORIENTATION SAME FOR ALL ENGINE LOCATIONS
4 LOCATIONS 12
ORIENTATION SAME FOR
ALL ENGINE LOCATIONS
2337915
FIGURE 6: FORWARD ENGINE MOUNT BARREL NUT TORQUE AND TORQUE STRIPE APPLICATION
(SHEET 2 OF 3)
Original Issue: May 30, 2014
Revision 1 May 28, 2015  PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  747-71-2332
Work - See page 1 for details.  57 of 67

### Page 58

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for each engine.
More DataQtyIdentificationNameTaskStep
CAUTION: DO NOT APPLY MORE THAN THE MAXIMUM SPECIFIED TORQUE WHEN YOU TIGHTEN
THE FASTENERS. DAMAGE TO THE PARTS MAY OCCUR IF TOO MUCH TORQUE IS AP-
PLIED.
(a)4BACB30US14-31MBOLTTorque1
(b)4-MARKING LACQUERApply2
(a) Torque to 3300-3500 inch-pounds and hold for a minimum of 3 seconds. Torque may be applied to the
bolts in any sequence.
(b) Apply torque stripe to bolt head, washer, and strut bulkhead at all 4 locations.
FIGURE 6: FORWARD ENGINE MOUNT BARREL NUT TORQUE AND TORQUE STRIPE APPLICATION
(SHEET 3 OF 3)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 30, 2014
747-71-2332Revision 1 May 28, 2015
58 of 67
BOEING SERVICE BULLETIN 747-71-2332

### Page 59

BARREL NUT ULTRASONIC (UT) INSPECTION
1. PURPOSE
a. Use this ultrasonic procedure to detect cracks in the four barrel nuts of the forward engine mount.
This procedure will detect a crack that completely severs one side of the barrel nut.
2. EQUIPMENT
a. Instrument
(1) Use an ultrasonic flaw detector.
(2) A GE USM Go was used to develop this procedure, alternate instruments can be used.
b. Transducer
(1) Use a transducer that:
(a) Operates at 10 MHz.
(b) Is cylindrical in shape.
(c) Has a case diameter of 0.31 inch (7.9 mm), or less.
(d) Has a top mount micro-dot connector.
(e) Has a minimum length of 0.50 inch (12.7 mm) and a maximum length of 1.0 inch (25
mm), not including the connector.
(f) Does not have a delay line.
(2) The transducer that follows was used to help prepare this procedure but, alternate transducers
can be used:
(a) Gamma, 10.0 MHz/.187" P/N 389-084-180; GE Inspection Technologies.
c. Transducer Extension Handle
(1) Two transducer extension handles are recommended to help get access to the inspection
area. It is difficult to reach the inspection areas without the extensions.
(a) A 2 inch long (51 mm) extension handle is recommended to help examine the right and
left barrel nuts on the forward side and the right barrel nut on the aft side of the forward
engine mount. The transducer extension handle that follows was used to help prepare
this procedure but, alternate handles can be used:
1) SPC-604FX-2; EC-NDT
APPENDIX A:  ULTRASONIC (UT) INSPECTION PROCEDURE
(SHEET 1 OF 7)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 30, 2014
747-71-2332Revision 1 May 28, 2015
59 of 67
BOEING SERVICE BULLETIN 747-71-2332

### Page 60

(b) An 8 inch long (203 mm), flexible shaft, extension handle is recommended to help examine
the left barrel nut on the aft side of the forward engine mount. This extension handle is
used because the position of the de-icing duct on the left side of the engine restricts the
access to the barrel nut. The transducer extension handle that follows was used to help
prepare this procedure but, alternate handles can be used:
1) SPC-604FX-8; EC-NDT
d. Reference Standard
(1) Use an un-installed new or serviceable forward engine mount barrel nut for a reference
standard to calibrate the equipment.
(2) The barrel nuts are made from Inconel 718.
(3) The barrel nuts are 1.5 inches (38.1 mm) long.
3. PREPARATION FOR INSPECTION
a. Identify and get access to the inspection area on the airplane. Refer to the service bulletin.
b. Remove all dirt and grease from the inspection area that the transducer will touch.
c. Select the reference standard that will be used to calibrate the equipment. See para. 2.d. to select
the reference standard.
4. INSTRUMENT CALIBRATION
a. Connect the transducer to the instrument.
b. Set the instrument frequency to 10 MHz, or a broadband setting that includes 10 MHz.
c. Set the initial pulse to 0% full screen width. See Appendix A Figure A1.
d. If the material velocity can be adjusted on the instrument, set the velocity to 0.224
inches/microsecond (5.69 mm/microsecond).
e. Set the display to show a 2 inch (51 mm) screen range.
f. Identify the inspection area.
g. Select the optional transducer extension recommended for the applicable location of the barrel
nut to be examined. See Para. 2.c. (Transducer Extension Handle).
h. Put couplant on the flat surface of an un-installed new or serviceable barrel nut.
i. Put the transducer on the center of the barrel nut. (see Appendix A Figure A1, Detail I and Appendix
A Figure A2)
APPENDIX A:  ULTRASONIC (UT) INSPECTION PROCEDURE
(SHEET 2 OF 7)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: May 30, 2014
747-71-2332Revision 1 May 28, 2015
60 of 67
BOEING SERVICE BULLETIN 747-71-2332

The text continues at https://openairdocs.org/service-documents/boeing/sb-747-71-2332/file/cd3e3ba0d0c6.md?from=61

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.