# Boeing Special Attention Service Bulletin 757-30-0020: U.S. DOT/FAA - Service Bulletin (757) (2)

- Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2008-0274, the docket of AD 2010-15-01. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Boeing Special Attention Service Bulletin 757-30-0020](https://openairdocs.org/service-documents/boeing/sb-757-30-0020.md)
- Title as filed: U.S. DOT/FAA - Service Bulletin (757) (2)
- Pages: 48
- PDF: https://openairdocs.org/files/sha256/00/ce/00cee092e75bb9f59d3e59264f151b8f0e5198ebad7baf483d7b29e1d0049656
- Page: https://openairdocs.org/service-documents/boeing/sb-757-30-0020/file/00cee092e75b

## Text

Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

July 19, 2006
Revision 2:  March 31, 2010 757-30-0020
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 1 of 48
 
 
 
Commercial
Airplane
Group 757
SPECIAL ATTENTION
Service Bulletin
Number: 757-30-0020
Date: July 19, 2006
Revision 2: March 31, 2010
ATA System: 3041 5611
SUBJECT: ICE AND RAIN PROTECTION -  Flight Compartment Window Anti-Icing - Windshield 
Inspection and Replacement
BOEING PROPRIETARY, CONFIDENTIAL, AND/OR TRADE SECRET
Copyright © 2006 The Boeing Company
Unpublished Work - All Rights Reserved
Boeing claims copyright in each page of this document only to the extent that the page contains copyrightable 
subject matter.  Boeing also claims copyright in this document as a compilation and/or collective work.
This document includes proprietary information owned by The Boeing Company and/or one or more third 
parties.  Treatment of the document and the information it contains is governed by contract with Boeing.  For 
more information, contact The Boeing Company, P.O. Box 3707, Seattle, Washington 98124.
Boeing, 707, 717, 727, 737, 747, 757, 767, 777, BBJ, BOEING BUSINESS JET, DC-8, DC-9, DC-10, MD-10, 
MD-11, MD-80, MD-90, the Boeing logo and the Boeing livery are among the trademarks owned by Boeing or 
its subsidiaries. No intellectual property license (express or implied) is granted in connection with this document 
or otherwise.

### Page 2

BLANK PAGE
July 19, 2006
Revision 2:  March 31, 2010 757-30-0020
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 2 of 48
BOEING SERVICE BULLETIN 757-30-0020
 
 
BLANK PAGE

### Page 3

Table of Contents
July 19, 2006
Revision 2:  March 31, 2010 757-30-0020
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 3 of 48
BOEING SERVICE BULLETIN 757-30-0020
 
 
Table of Contents
Revision Transmittal Sheet .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 5
Summary .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 7
1. PLANNING INFORMATION .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  11
A. Effectivity .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  11
1. Airplanes   .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  11
2. Spares Affected .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  12
B. Concurrent Requirements  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .   .  12
C. Reason .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  12
D. Description .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  13
E. Compliance.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .   .  .  .  .  14
F. Approval .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  17
G. Manpower   .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .   .  .  .  .  17
H. Weight and Balance Changes  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  18
I. Electrical Load Data  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .   .  .  .  19
J. References .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .   .  .  .  .  19
1. Existing Data: .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  19
2. Data supplied with this Service Bulletin:   .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  19
3. Installation Drawings Used in the Preparation of this Service Bulletin: .  .  .  .  .  .  .  .  .  .  19
K. Publications Affected .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  19
L. Interchangeability and Intermixability of Parts  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  20
2. MATERIAL INFORMATION .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  21
A. Material - Price and Availability.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  21
B. Industry Support Information .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .   .  21
C. Parts Necessary For Each Airplane  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  22
1. Kits/Parts: .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  22
2. Parts and Materials Supplied by the Operator:  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  24
3. Parts Modified and Reidentified:   .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  24
4. Parts Removed and Not Replaced: .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  24
D. Parts Necessary to Change Spares  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  24
E. Special Tooling - Price and Availability.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .   25
F. Special Tooling Necessary to do this Service Bulletin .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  25
3. ACCOMPLISHMENT INSTRUCTIONS .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  27
A. GENERAL INFORMATION   .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  27
B. WORK INSTRUCTIONS .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  28
FIGURE  1: INSPECTION OF THE LEFT WINDSHIELD   .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  31
FIGURE  2: INSPECTION OF THE RIGHT WINDSHIELD.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  36
FIGURE  3: CUT THE BULB SEAL FOR THE LEFT WINDSHIELD   .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  41
FIGURE  4: CHANGES TO THE WIRING FOR THE WINDOW HEAT ON THE LEFT WINDSHIELD  .  42
FIGURE  5: WIRE ROUTING FOR THE WINDOW HEAT ON THE LEFT WINDSHIELD .  .  .  .  .  .  .  .  44
FIGURE  6: CUT THE BULB SEAL FOR THE RIGHT WINDSHIELD  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  45
FIGURE  7: CHANGES TO THE WIRING FOR THE WINDOW HEAT ON THE RIGHT WINDSHIELD   46
FIGURE  8: WIRE ROUTING FOR THE WINDOW HEAT ON THE RIGHT WINDSHIELD  .  .  .  .  .  .  .  48

### Page 4

Table of Contents
July 19, 2006
Revision 2:  March 31, 2010 757-30-0020
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 4 of 48
BOEING SERVICE BULLETIN 757-30-0020
 
 
BLANK PAGE

### Page 5

Original Issue: July 19, 2006
Revision 2:  March 31, 2010 757-30-0020
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 5 of 48
 
 
 
Commercial
Airplanes
757
SPECIAL ATTENTION
Service Bulletin
Number: 757-30-0020 Revision Transmittal Sheet
Original Issue: July 19, 2006
Revision 2: March 31, 2010
ATA System: 3041 5611
SUBJECT: ICE AND RAIN PROTECTION -  Flight Compartment Window Anti-Icing - Windshield 
Inspection and Replacement
This Revision includes all pages of the service bulletin.
COMPLIANCE INFORMATION RELATED TO THIS REVISION
More work is necessary on airplanes changed as shown in the original issue and Revision 1 of this service 
bulletin.
Operators that have not done the terminating action in the compliance of this service bulletin will now need to 
also inspect the J1 and J4 windshield lugs and terminals.
REASON FOR REVISION
This revision is sent to tell operators that have not done the terminating action in the compliance of this service 
bulletin that they will need to also inspect the J1 and J4 windshield lugs and terminals.
These sections were changed:
1. Summary Background, Planning Information 1.D., Reason and 1.J.1., Existing Data, Service Related 
Problem (SRP) 757-SRP-30-0031 has been added.
2. Summary Action and Planning Information 1.D., Description, have been changed to add the inspection of 
the J1 and J4 lugs and terminals.
3. Summary Compliance and Planning Information 1.E., Compliance, a statement has been added to say the 
Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to this 
service bulletin.
4. In Planning Information 1.E., Compliance, the compliance table has been changed to add the inspection 
of windshield J1 and J4 lugs and terminals.
5. In Planning Information 1.G., Manpower, manpower tables have been changed to add the time for 
inspection of the J1 and J4 lugs and terminals.
6. In Planning Information 1.J.1., Existing Data, Standard Wiring Practices Manual (SWPM) reference 20-64-
16 and Illustrated Parts Catalog (IPC) reference 30-41-52 have been added.

### Page 6

Original Issue: July 19, 2006
Revision 2:  March 31, 2010 757-30-0020
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 6 of 48
BOEING SERVICE BULLETIN 757-30-0020
 
 
7. In Planning Information 1.K.2., Publications Affected, Damage Tolerance Based Structural Inspection 
evaluation Statement has been added.
8. In the Material Information 2.C.1., the kit table has been changed to show that the 280N3355-1 wire kit 
contains the -101 kit and the 280N3355-2 wire kit contains the -102 kit.
9. In the Work Instructions 3.B., step 3 of Work Packages 1 and 2 has been changed to add new compliance 
time thresholds for windshield inspections.
10. In Figure 1 and Figure 2 the illustrations have been changed to add the inspection of the J1 and J4 lugs 
and terminals.
11. In Figure 1 and Figure 2 new illustrations have been added to show the correct alignment of the lug on the 
terminal.
12. In Figure 1 and Figure 2, step 2, the step table note has changed to show another cause of a loose terminal. 
The Standard Overhaul Practices Manual (SOPM) reference 20-43-03 has been changed to Standard 
Wiring Practices Manual (SWPM) reference 20-64-16 and Illustrated Parts Catalog (IPC) reference 30-41-
52 has been added. New steps have been added to give instructions to inspect the screw if it cannot be 
tightened in step 3.
13. Figure 6, in the illustration, circle note 2 has been moved to point to an area near the bulb seal. This is the 
area where the part mark can be applied.
Paragraph 1.A., Effectivity, shows changes of airplane operators.  Each operator should examine the Effectivity 
paragraph for changes.
Vertical lines are put on the left edge of each page, except in Paragraph 1.A., Effectivity, to show the location 
of important changes.
Pages with no vertical lines have no important changes.
REVISION HISTORY
Original Issue: July 19, 2006
Revision 1: December 19, 2007
Revision 2:

### Page 7

Original Issue: July 19, 2006
Revision 2:  March 31, 2010 757-30-0020
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 7 of 48
 
 
 
Commercial
Airplanes
757
SPECIAL ATTENTION
Service Bulletin
Number: 757-30-0020 Summary
Original Issue: July 19, 2006
Revision 2: March 31, 2010
ATA System: 3041 5611
SUBJECT: ICE AND RAIN PROTECTION -  Flight Compartment Window Anti-Icing - Windshield 
Inspection and Replacement
BOEING RECOMMENDS THAT EACH OPERATOR EXAMINE THIS SERVICE BULLETIN IMMEDIATELY.
CONCURRENT REQUIREMENTS
None
BACKGROUND
This service bulletin gives instructions to do an inspection of the electrical connections on the left and the right 
windshields.  Instructions are also given to replace the windshields and make changes to their related wire 
bundles.  A new windshield design is available that uses a different electrical connection.
Boeing received nine reports from eight operators of electrical arcs at the terminal blocks of the flight 
compartment windows.  More than one of these reports included data to show that the results of the arcs were 
open flame incidents.  One operator found an indication of damage at a terminal and tightened a loose 
connection.  The terminal had internal damage that could not be seen.  Less than six months after the 
connection was tightened there was a report from the operator of an open flame incident on the same 
windshield.
The electrical connections on the windows are made with lugs that are attached with screws.  The windshield 
is the number 1 window in the flight compartment.  All of the windows in the flight compartment are electrically 
heated.  The windshield gets a much larger electrical load. 
An investigation found that the cause of the electrical arcs is loose terminal connections.  A loose connection 
increases the heat at the terminal which can cause damage to the internal solder joint.  Damaged solder joints 
are the primary cause for the electrical arcs.  The primary causes of loose connections are the incorrect torque 
of the screw or an incorrectly installed screw.
The inspection given in this service bulletin is to look for damage or a loose electrical connection on the 
windshield.  If there are indications of electrical arcs or damage to the electrical connection, the windshield is 
replaced.  If there is a loose electrical connection, the correct torque is applied to tighten it.  If a connection 
cannot be tightened to the correct torque, the windshield is replaced.  When a windshield with an electrical 
connection that uses pins and sockets is installed, the related wire bundle on the airplane is changed.

### Page 8

Original Issue: July 19, 2006
Revision 2:  March 31, 2010 757-30-0020
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 8 of 48
 
 
When the changes given in this bulletin are done, the windshields will have better electrical connections.  The 
new connections are made with pins and sockets.  The pin and socket connections will prevent the risk of 
electrical arcs as a result of loose connections.
Boeing Service Related Problems (SRP) 757-SRP-30-0031 and 757-SRP-56-0015 are related to this service 
bulletin.
ACTION (PRR 54530-265S)
In the flight compartment, do an inspection of the J1, J4 and J5 lugs and terminals on the left and the right 
windshields.  Replace windshields that use screws and lugs for the electrical connections with a windshield that 
uses pins and sockets for the electrical connections.  Cut the bulb seal to give clearance for terminals on the 
new windshield.  Change the related wire bundle.
EFFECTIVITY
All 757-300 Airplanes. Refer to Paragraph 1.A.1., Airplanes for the list of affected airplanes.  
COMPLIANCE
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to this service 
bulletin.  The Airworthiness Directive will make the compliance tasks and times given in this service bulletin 
mandatory.
See Service Bulletin Paragraph 1.E. for compliance information.
INDUSTRY SUPPORT INFORMATION
Boeing warranty remedies are not available for the configuration changes given in this service bulletin.
MANPOWER
MATERIAL INFORMATION
Boeing Supplied Kits/Parts
Refer to Paragraph 2.A., Material - Price and Availability.
Work Package Total Task Hours Elapsed Hours
Work Package 1 - Inspection of the Left Windshield 1.5 1.5
Work Package 2 - Inspection of the Right Windshield 1.5 1.5
Work Package 3 - Left Windshield Replacement and 
Wiring Change 
8.5 4.75
Work Package 4 - Right Windshield Replacement and 
Wiring Change 
8.5 4.75

### Page 9

Original Issue: July 19, 2006
Revision 2:  March 31, 2010 757-30-0020
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 9 of 48
BOEING SERVICE BULLETIN 757-30-0020
 
 
485171
CUT THE BULB SEAL AND
CUT THE BULB SEAL AND
WORK PACKAGE 1:
INSPECT THE LEFT WINDSHIELD
REPLACE THE LEFT WINDSHIELD.
CHANGE THE RELATED WIRING.
WORK PACKAGE 3:
WORK PACKAGE 2:
INSPECT THE RIGHT WINDSHIELD
CHANGE THE RELATED WIRING.
REPLACE THE RIGHT WINDSHIELD.
WORK PACKAGE 4:

### Page 10

Original Issue: July 19, 2006
Revision 2:  March 31, 2010 757-30-0020
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 10 of 48
BOEING SERVICE BULLETIN 757-30-0020
 
 
BLANK PAGE

### Page 11

Original Issue: July 19, 2006
Revision 2:  March 31, 2010 757-30-0020
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 11 of 48
 
 
 
Commercial
Airplanes
757
SPECIAL ATTENTION
Service Bulletin
Number: 757-30-0020
Original Issue: July 19, 2006
Revision 2: March 31, 2010
ATA System: 3041 5611
SUBJECT: ICE AND RAIN PROTECTION -  Flight Compartment Window Anti-Icing - Windshield 
Inspection and Replacement
BOEING RECOMMENDS THAT EACH OPERATOR EXAMINE THIS SERVICE BULLETIN IMMEDIATELY.
1. PLANNING INFORMATION
A. Effectivity
1. Airplanes
Refer to Service Bulletin Index Document D624N001 Part 3 for Airplane Variable Number, Line 
Number, and Serial Number data.
This service bulletin is for the airplanes shown below.  An equivalent change is on subsequent 
production airplanes.  Refer to PRR 54530-265S for data about this change.
Airplane models:
757-300
IDENTIFICATION BY CUSTOMER, CUSTOMER CODE, GROUP AND VARIABLE NUMBER
ARKIA ISRAELI AIRLINES  (ARK)
1 NU731–NU732
BOEING CAPITAL CORPORATION  (ZMF)
1 NL006 NL008 NL016–NL017
CONDOR  (CDF)
1 NU701–NU705 NU721–NU728
CONTINENTAL AIRLINES  (CAL)
1 NL007 NL009–NL015 NL101–NL109
GROUP CONFIGURATION DESCRIPTION
1 - Airplanes with windshields that use screw and 
lug electrical connections.

### Page 12

Original Issue: July 19, 2006
Revision 2:  March 31, 2010 757-30-0020
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 12 of 48
BOEING SERVICE BULLETIN 757-30-0020
 
 
ICELANDAIR  (ICE)
1 NL141
NORTHWEST AIRLINES  (NWA)
1 NL601–NL616
THOMAS COOK AIRLINES UK  (JMA)
1 NL001–NL002
IDENTIFICATION BY VARIABLE NUMBER
2. Spares Affected
Examine your spares supply for the parts or components identified in Paragraph 2.C., Parts 
Necessary for Each Airplane.  If any parts or components are found, refer to Paragraph 2.C. for 
the recommended use.
B. Concurrent Requirements
None
C. Reason
This service bulletin gives instructions to do an inspection of the electrical connections on the left and 
the right windshields.  Instructions are also given to replace the windshields and make changes to their 
related wire bundles.  A new windshield design is available that uses a different electrical connection.
Boeing received nine reports from eight operators of electrical arcs at the terminal blocks of the flight 
compartment windows.  More than one of these reports included data to show that the results of the 
arcs were open flame incidents.  One operator found an indication of damage at a terminal and 
tightened a loose connection.  The terminal had internal damage that could not be seen.  Less than 
six months after the connection was tightened there was a report from the operator of an open flame 
incident on the same windshield.
The electrical connections on the windows are made with lugs that are attached with screws.  The 
windshield is the number 1 window in the flight compartment.  All of the windows in the flight 
compartment are electrically heated.  The windshield gets a much larger electrical load. 
Variable  Group
NL001–NL002 1
NL006–NL017 1
NL101–NL109 1
NL141 1
NL601–NL616 1
NU701–NU705 1
NU721–NU728 1
NU731–NU732 1

### Page 13

Original Issue: July 19, 2006
Revision 2:  March 31, 2010 757-30-0020
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 13 of 48
BOEING SERVICE BULLETIN 757-30-0020
 
 
An investigation found that the cause of the electrical arcs is loose terminal connections.  A loose 
connection increases the heat at the terminal which can cause damage to the internal solder joint.  
Damaged solder joints are the primary cause for the electrical arcs.  The primary causes of loose 
connections are the incorrect torque of the screw or an incorrectly installed screw.
The inspection given in this service bulletin is to look for damage or a loose electrical connection on 
the windshield.  If there are indications of electrical arcs or damage to the electrical connection, the 
windshield is replaced.  If there is a loose electrical connection, the correct torque is applied to tighten 
it.  If a connection cannot be tightened to the correct torque, the windshield is replaced.  When a 
windshield with an electrical connection that uses pins and sockets is installed, the related wire bundle 
on the airplane is changed.
When the changes given in this bulletin are done, the windshields will have better electrical 
connections.  The new connections are made with pins and sockets.  The pin and socket connections 
will prevent the risk of electrical arcs as a result of loose connections.
Boeing Service Related Problems (SRP) 757-SRP-30-0031 and 757-SRP-56-0015 are related to this 
service bulletin.
Revision 1 was sent to change the No.1 Windshield Assembly part numbers supplied in the Top Kits.
Revision 2 is sent to tell operators that have not done the terminating action in the compliance of this 
service bulletin that they will need to also inspect the J1 and J4 windshield lugs and terminals.
D. Description
In the flight compartment, an inspection is done of the left and the right windshields.  A windshield that 
uses pin and socket electrical connections is installed.  The bulb seal is cut to give clearance for 
terminals that are on the new windshield.  When a windshield that uses the pin and socket electrical 
connections is installed, the related wire bundle is also changed.
The changes in this service bulletin will not change the Engine Indication and Crew Alerting System 
(EICAS).
Revision 1 - No more work is necessary on airplanes changed as shown in original issue of this service 
bulletin.
Revision 2 - More work is necessary on airplanes changed as shown in the original issue and Revision 
1 of this service bulletin.

### Page 14

Original Issue: July 19, 2006
Revision 2:  March 31, 2010 757-30-0020
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 14 of 48
BOEING SERVICE BULLETIN 757-30-0020
 
 
E. Compliance
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to 
this service bulletin.  The Airworthiness Directive will make the compliance tasks and times given in 
this service bulletin mandatory.
Compliance Table:
Condition Action
Compliance Time
(Whichever Occurs First)
Repeat Interval 
(Not to Exceed)
Windshield that uses 
screws and lugs for window 
heat power connection.
Replace with windshield 
that uses pins and 
sockets for window heat 
power connection in 
accordance with 
Accomplishment 
Instructions Work 
Packages 3 and 4.
                   ----  Terminating action 
for this bulletin.
PPG Windshield that uses 
screws and lugs for window 
heat power connection.
Do the actions that follow 
for J1, J4 and J5 window 
heat power connections:
1. Inspect the shipside 
wiring and terminal lug 
(including cap) look for 
signs of melted or 
discolored insulation.
2. Inspect the window 
terminal blocks, look for 
signs of melting or 
distortion.
3. Inspect the window 
heat power connection for 
evidence of cross 
threading by making sure 
the terminal lug is parallel 
with the window terminal 
block.
4. Inspect the terminal lug 
for looseness.
5. Address the inspection 
findings as described in 
Inspection Conditions 1 
thru 4.
Within 500 flight hours or 
150 days, whichever occurs 
earlier, after the date of 
Revision 2 to the service 
bulletin.
Every 6000 flight 
hours or 24 months 
until windshield is 
replaced with 
windshield that 
used pins and 
sockets for window 
heat power 
connection in 
accordance with 
Accomplishment 
Instructions Work 
Packages 3 and 4.

### Page 15

Original Issue: July 19, 2006
Revision 2:  March 31, 2010 757-30-0020
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 15 of 48
 
 
GKN Windshield that uses 
screws and lugs for window 
heat power connection.
Do the actions that follow 
for J1, J4 and J5 window 
heat power connections:
1. Inspect the shipside 
wiring and terminal lug 
(including cap) look for 
signs of melted or 
discolored insulation.
2. Inspect the window 
terminal blocks, look for 
signs of melting or 
distortion.
3. Inspect the window 
heat power connection for 
evidence of cross 
threading by making sure 
the terminal lug is parallel 
with the window terminal 
block.
4. Inspect the terminal lug 
for looseness.
5. Address the inspection 
findings as described in 
Inspection Conditions 1 
thru 4.
Within 500 flight hours or 
150 days, whichever occurs 
earlier, after the date of 
Revision 2 to the service 
bulletin.
Every 12,000 flight 
hours or 48 months 
until windshield is 
replaced with 
windshield that 
used pins and 
sockets for window 
heat power 
connection in 
accordance with 
Accomplishment 
Instructions Work 
Packages 3 and 4.
Inspection Condition 1 - If 
the inspection reveals one 
or more signs of the 
following:
1. Melted shipside wire 
insulation.
2. Discolored shipside wire 
insulation.
3. Melted terminal lug.
4. Melted cap.
1. Repair or replace 
shipside wiring as 
necessary. Refer to 
Standard Wiring Practices 
Manual SWPM 20-10-13 
as an accepted 
procedure.
2. If the terminal lug has 
melted replace the 
shipside terminal lug and 
windshield in accordance 
with Work Package 1, 
step 3. Work Package 2, 
step 3.
Before further flight.               ----
Compliance Table:
Condition Action
Compliance Time
(Whichever Occurs First)
Repeat Interval 
(Not to Exceed)

### Page 16

Original Issue: July 19, 2006
Revision 2:  March 31, 2010 757-30-0020
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 16 of 48
 
 
Inspection Condition 2 - If 
the inspection reveals one 
or more signs of the 
following:
1. Melted window terminal 
block.
2. Distorted or cracked 
window terminal block.
1. Replace windshield in 
accordance with Work 
Package 1, step 3. and 
Work Package 2, step 3.
Before further flight.               ----
Inspection Condition 3 - If 
the inspection reveals 
evidence that the window 
heat power connection is 
cross threaded.
1. Inspect the terminal for 
looseness. If the cross 
threaded terminal is loose: 
torque the terminal screw 
to 25-30 in-lb.
2. Re-inspect terminal lug 
for looseness.
3. If terminal lug is still 
loose replace windshield 
in accordance with Work 
Package 1, step 3. and 
Work Package 2. step 3.
Before further flight.               ----
              
        
4. If terminal lug is tight, 
replace windshield in 
accordance with Work 
Package 1, step 3. and 
Work Package 2. step 3.
Within 150 days or 500 flight 
hours, whichever occurs 
earlier after the inspection.
              ----
Inspection Condition 4 - If 
the inspection reveals the 
terminal lug is loose.
1. Torque the terminal 
screw to 25-30 in-lb.
2. Re-inspect terminal lug 
for looseness.
3. If terminal lug is still 
loose.
Before further flight.               ----
Compliance Table:
Condition Action
Compliance Time
(Whichever Occurs First)
Repeat Interval 
(Not to Exceed)

### Page 17

Original Issue: July 19, 2006
Revision 2:  March 31, 2010 757-30-0020
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 17 of 48
BOEING SERVICE BULLETIN 757-30-0020
 
 
F. Approval
This service bulletin was examined by the Federal Aviation Administration (FAA). The changes 
specified in this service bulletin comply with the applicable regulations and are FAA approved, as well 
as European Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/
JAA approved airplanes listed in the service bulletin effectivity.  This service bulletin and its approval 
were based on the airplane in its original Boeing delivery configuration or as modified by other 
approved Boeing changes.
If an airplane has a non-Boeing modification or repair that affects a component or system also affected 
by this service bulletin, the operator is responsible for obtaining appropriate regulatory agency 
approval before incorporating this service bulletin.
G. Manpower
The table below shows an estimate of the task-hours necessary to do this inspection or change one 
window for each airplane.  This estimate is for direct labor only, done by an experienced crew.  Adjust 
the estimate with operator task-hour data if necessary.  The estimate does not include lost time.  
These are some examples of lost time:
— Time to adjust to the workplace
— Time to schedule the work
— Time to examine the work
— Time to cure the materials
— Time to make the parts
If the windshield is replaced 
with same type windshield 
that uses screws and lugs 
for window heat power 
connection.
OR
Window heat power 
connection is reassembled 
(on windshields that use 
screws and lugs for window 
heat power connection).
Do a detailed inspection in 
accordance with 
Accomplishment 
Instructions Work 
Package 1, step 2. and 
Work Package 2, step 2.
Within 150 days or 500 flight 
hours, whichever occurs 
earlier after installation of 
the same windshield type 
(a).
              ----
(a) The initial inspection after installing a new window or a new terminal screw is to verify that the window 
heat power connection is correctly made. An improperly installed screw (under torqued or cross threaded) 
can be identified regardless of the time since installation. If a screw is properly installed and torqued, there 
is no evidence that it will loosen over time. The inspection steps outlined in this Service Bulletin should be 
followed. Refer to either condition "Window heat power connection is reassembled" or "windshield is 
replaced with the same type windshield" in the Compliance Table for inspection requirements.
Compliance Table:
Condition Action
Compliance Time
(Whichever Occurs First)
Repeat Interval 
(Not to Exceed)

### Page 18

Original Issue: July 19, 2006
Revision 2:  March 31, 2010 757-30-0020
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 18 of 48
BOEING SERVICE BULLETIN 757-30-0020
 
 
— Time to find the tools.
H. Weight and Balance Changes
None
Work Package  1 - Inspection of the Left Windshield
Task
Number of 
Persons Task-Hours Elapsed Hours
Figure 1 1 1.50 1.50
Total per Windshield 1.50 1.50
Work Package  2 - Inspection of the RIght Windshield
Task
Number of 
Persons Task-Hours Elapsed Hours
Figure 2 1 1.50 1.50
Total per Windshield 1.50 1.50
Work Package  3 - Replacement of the Left Windshield and Changes to the Related Wiring
Task
Number of 
Persons Task-Hours Elapsed Hours
Access 2 1.0 0.50
Remove the Left Windshield 2 2.5 1.25
Figure 3 - Cut the Bulb Seal 1 0.25 0.25
Figures 4 and 5 - Change the 
Wiring
1 0.50 0.50
Install the Left Windshield 2 3.0 1.5
Tests 1 0.25 0.25
Close 2 1.0 0.50
Total per Windshield 8.5 4.75
Work Package  4 - Replacement of the Right Windshield and Changes to the Related Wiring
Task
Number of 
Persons Task-Hours Elapsed Hours
Access 2 1.0 0.50
Remove the Right Windshield 2 2.5 1.25
Figure 6 - Cut the Bulb Seal 1 0.25 0.25
Figures 7 and 8 - Change the 
Wiring
1 0.50 0.50
Install the Right Windshield 2 3.0 1.5
Tests 1 0.25 0.25
Close 2 1.0 0.50
Total per Windshield 8.5 4.75

### Page 19

Original Issue: July 19, 2006
Revision 2:  March 31, 2010 757-30-0020
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 19 of 48
BOEING SERVICE BULLETIN 757-30-0020
 
 
I. Electrical Load Data
Not changed
J. References
1. Existing Data:
a. Engineering Change Memo PRR 54530-265S
b. Boeing Service  Related Problem (SRP)  757-SRP-30-0031, 757-SRP-56-0015
c. 757 Aircraft Maintenance Manual (AMM)  30-41-00, 56-11-01
d. Wiring Diagram 30-41-11, 30-41-12
e. Standard Wiring Practices Manual (SWPM)  20-10-11, 20-10-12, 20-10-13, 20-10-18, 
20-10-19, 20-20-00, 20-30-11, 20-63-19, 20-64-16
f. Standard Overhaul Practices Manual (SOPM)  20-41-02, 20-43-03, 20-50-10
g. 757 Illustrated Parts Catalog (IPC)  30-41-52
h. Boeing Service Bulletin 767-56-0012
2. Data supplied with this Service Bulletin:
None
3. Installation Drawings Used in the Preparation of this Service Bulletin:
None
K. Publications Affected
1. Publications
2. Damage Tolerance Based Structural Inspections:
Boeing has evaluated the repairs and/or changes in this service bulletin for effects on Fatigue 
Critical Structure (FCS) and for changes to Damage Tolerance Inspections (DTI) required in the 
Maintenance Program. This service bulletin does not affect FCS, therefore DTIs are not 
necessary.
Publication Chapter-Section
757 Maintenance Manual 30-41, 56-11
757 Wiring Diagram Manual 30-41
757 Illustrated Parts Catalog 56-11

### Page 20

Original Issue: July 19, 2006
Revision 2:  March 31, 2010 757-30-0020
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 20 of 48
BOEING SERVICE BULLETIN 757-30-0020
 
 
L. Interchangeability and Intermixability of Parts
Refer to Paragraph 2.C., Parts Necessary For Each Airplane, for interchangeability and intermixability 
information.

### Page 21

July 19, 2006
Revision 2:  March 31, 2010 757-30-0020
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 21 of 48
BOEING SERVICE BULLETIN 757-30-0020
 
 
2. MATERIAL INFORMATION
A. Material - Price and Availability
Boeing can supply the kits shown in Paragraph 2.C., Parts Necessary For Each Airplane as shown 
below.  Kit availability is shown in the Reorder Lead Time (ROLT).  ROLT is calculated from the date 
Boeing gets the purchase order.
The kits are subject to the terms and conditions of the Boeing standard purchase order 
acknowledgment.  After the Unit Price date, new price and ROLT data is applicable.  Prices are in 
United States dollars.  Terms: Net 30 days.
Reference this service bulletin and submit your purchase order by one of the methods that follow:  
1. Order on-line via ATA Spec 2000 or Boeing Part Page
2. Fax to (206) 662-7145
3. Spares Customer Support - MC 36-65
Boeing Spares Department
P.O. Box 3707
Seattle, Washington   98124-2207  USA
B. Industry Support Information
Boeing warranty remedies are not available for the configuration changes given in this service bulletin.
Kit Number Name
ROLT 
(Weeks)
Unit Price thru
Dec 31/07
012N8926-13 Top Kit - Left Windshield - PPG with 
hydrophobic coating
19 $16,480.00
012N8926-14 Top Kit - Right Windshield - PPG 
with hydrophobic coating
19 $16,480.00

### Page 22

July 19, 2006
Revision 2:  March 31, 2010 757-30-0020
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 22 of 48
BOEING SERVICE BULLETIN 757-30-0020
 
 
C. Parts Necessary For Each Airplane
1. Kits/Parts:
To get the kits/parts shown below, refer to Paragraph 2.A., Material - Price and Availability.
NOTE: Two top kits and the items shown in Paragraph 2.C.2., Parts and Materials Supplied by
the Operator, are necessary for each airplane.
Kit 012N8926                        
New Part 
Number Name Notes-14 -13
012N8926-13 . - Top Kit - Left Windshield,  PPG with 
Hydrophobic coating
012N8926-14 - . Top Kit - Right Windshield, PPG with 
Hydrophobic coating
141W7400-43 . 1 PPG Windshield Assembly - Left, with 
Hydrophobic coating
(a) (b) 
(c) (d) (f) 
(h) (j)
141W7400-44 1 . PPG Windshield Assembly - Right, with 
Hydrophobic coating
(a) (b) 
(c) (e) 
(g) (i) (j)
280N3355-1 . 1 Wire Kit - Flight Deck Window Heat  - Wire 
Assembly W2304
280N3355-2 1 . Wire Kit - Flight Deck Window Heat - Wire 
Assembly W2314
(a) Discard the existing part.
(b) This part is used in production.
(c) You cannot use the existing part to replace the new or changed part.
(d) As an option operators can install Left Windshield part number 141T4801-59 with 
serial numbers 04001Hxxxx through 05365Hxxxx.
(e) As an option operators can install Right Windshield part number 141T4801-60 with 
serial numbers 04001Hxxxx through 05365Hxxxx.
(f) As an option operators can install Left Windshield part number 141W7400-31 or 
141W7400-33 with serial numbers 04001Hxxxx through 05365Hxxxx.
(g) As an option operators can install Right Windshield part number 141W7400-32 or 
141W7400-34 with serial numbers 04001Hxxxx through 05365Hxxxx.
(h) As an option operators can install Left Windshield part number 141W7400-35 or 
141W7400-41.
(i) As an option operators can install Right Windshield part number 141W7400-36 or 
141W7400-42.
(J) PPG Aerospace - Transparencies Div Glass  (V53117)
     P.O. Box 2200
     1719 U.S. Highway 72 East    
     Huntsville, AL 35811-9660

### Page 23

July 19, 2006
Revision 2:  March 31, 2010 757-30-0020
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 23 of 48
BOEING SERVICE BULLETIN 757-30-0020
 
 
Kit 280N3355                        
New Part 
Number
QTY
Name Notes-102 -101 -2 -1
280N3355-1 . . . - Wire Kit - Flight Deck Window 
Heat
280N3355-2 . . - . Wire Kit - Flight Deck Window 
Heat
280N3355-101 . - . 1 Kit, Wire Bundle
W2304
280N3355-102 - . 1 . Kit, Wire Bundle
W2314
280N3355-10103 . 1 . . BMS 13-52 Expandable Sleeve
280N3355-10203 1 . . . BMS 13-52 Expandable Sleeve
- . 1 . . Wire Identified  W2304-0001-12 (a)
- . 1 . . Wire Identified  W2304-0002-12 (b)
- 1 . . . Wire Identified  W2314-0001-12 (a)
- 1 . . . Wire Identified  W2314-0002-12 (b)
BACT12AC-12 3 3 . . Terminal Lug (c)
M39029/57-359 3 3 . . Socket Contact (c)
(a) BMS 13-60, Type 1, Class 1, AWG 12, length 66 inches
(b) BMS 13-60, Type 1, Class 1, AWG 12, length 33 inches
(c) There are more parts than are necessary.

### Page 24

July 19, 2006
Revision 2:  March 31, 2010 757-30-0020
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 24 of 48
BOEING SERVICE BULLETIN 757-30-0020
 
 
2. Parts and Materials Supplied by the Operator:
3. Parts Modified and Reidentified:
The parts shown below are changed as shown in this service bulletin.  The quantity (QTY) is the 
number of parts changed on each airplane.
4. Parts Removed and Not Replaced:
None
D. Parts Necessary to Change Spares
None
Part Number / 
Specification QTY Name Notes
BMS 13-54 10 feet Lacing Tape, Red (a) (b) (c) 
BMS 13-54 10 feet Lacing Tape, Green (a) (b) (d)
(a)  Type 3, Class 1
(b)  Gudebrod Incorporated (V82110)
       Griffith Towers 
       PO Box 357
       Pottstown, PA 19464
(c)  BACS38K5C, red Tie Strap is optional.  See the Qualified Products List at 
the end of the Boeing Material Specification (BMS) for the supplier data.
(d)  BACS38K5F, green Tie Strap is optional.  See the Qualified Products List 
at the end of the Boeing Material Specification (BMS) for the supplier data.
Existing Part 
Number QTY Name New Part Number Notes
233N8300-( ) 1 Glareshield - (a) (b)
(a)  Make the change given in this service bulletin.
(b) There is no equivalent Boeing part number for the changed part.  Identify on 
the part that the change given in this service bulletin was made.

### Page 25

July 19, 2006
Revision 2:  March 31, 2010 757-30-0020
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 25 of 48
BOEING SERVICE BULLETIN 757-30-0020
 
 
E. Special Tooling - Price and Availability
Boeing can supply the tools shown in Paragraph 2.F., Special Tooling Necessary to do this Service 
Bulletin.  Send a Purchase Order to the Director of Spares.  Give this service bulletin number and the 
date the tools will be used.
The kits are subject to the terms and conditions of the Boeing standard purchase order 
acknowledgement.  After the Price date, new price data is applicable.  Prices are in United States 
dollars.  Terms:  Net 30 days.
Reference this service bulletin number and submit purchase order by one of the methods that follow:
1. Order on-line via ATA Spec 2000 or Boeing Part Page
2. Fax to (206) 662-7145
3. Spares Customer Support - MC 36-65
Boeing Spares Department
P.O. Box 3707
Seattle, Washington 98124-2207  USA
(Service Bulletin 757-30-0020)
F. Special Tooling Necessary to do this Service Bulletin
To get the tools shown below, refer to Paragraph 2.E., Special Tooling - Price and Availability.  
Maintenance and overhaul tools in the manuals shown in Paragraph 1.J., References, can also be 
necessary.  Examine operator tool supply to make sure all necessary tools are available.
Purchase Data:
Tool Kit Number Name
Unit Price
  thru Dec 31/07
A56001-2 (part of Sling Set
A56001-15)
Windshield Handling Sling $625.00
Tool Kit Number Name
A56001-2 (part of 
Sling Set A56001-15)
Windshield Handling Sling

### Page 26

July 19, 2006
Revision 2:  March 31, 2010 757-30-0020
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 26 of 48
BOEING SERVICE BULLETIN 757-30-0020
 
 
BLANK PAGE

### Page 27

Original Issue: July 19, 2006
Revision 2:  March 31, 2010 757-30-0020
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 27 of 48
BOEING SERVICE BULLETIN 757-30-0020
 
 
3. ACCOMPLISHMENT INSTRUCTIONS
A. GENERAL INFORMATION
CAUTION: KEEP THE WORK AREA, WIRES AND ELECTRICAL BUNDLES CLEAN OF METAL
PARTICLES OR CONTAMINATION WHEN YOU USE TOOLS.  UNWANTED
MATERIAL, METAL PARTICLES OR CONTAMINATION CAUGHT IN WIRE BUNDLES
CAN CAUSE DAMAGE TO THE BUNDLES.  DAMAGED WIRE BUNDLES CAN CAUSE
SPARKS OR OTHER ELECTRICAL DAMAGE.
NOTE:
1. Manual titles are referred to by acronyms.  Refer to Paragraph 1.J., References, for 
definition of the acronyms.
2. Obey all of the warnings and cautions given in the specified manual sections.
3. The work instructions are divided into work packages.  Task-Hours and Elapsed-Hours 
for each package are given in Paragraph 1.G., Manpower.  You can do each work 
package independently.
4. Unless shown differently, these dimensions and tolerances are used:
— Linear dimensions are in inches
— Torque limits to tighten nuts and bolts are given in 757 Structural Repair Manual, 
Chapter 51.
5. Refer to Standard Wiring Practices Manual SWPM 20-10-11 and SWPM 20-10-12 for 
the wire installation procedures.
6. A Detailed Inspection is defined as:  An intensive examination of a specific item, 
installation, or assembly to detect damage, failure, or irregularity.  Available lighting is 
normally supplemented with a direct source of good lighting at an intensity deemed 
appropriate.  Inspection aids such as mirrors magnifying lenses, etc. may be necessary.  
Surface cleaning and elaborate procedures may be required.
7. These work instructions refer to procedures included on other Boeing documents.  
When the words "refer to" are used and the operator has an accepted alternative 
procedure, the accepted alternative procedure can be used.  When the words "in 
accordance with" are included in the instruction, the procedure in the Boeing document 
must be used.

### Page 28

Original Issue: July 19, 2006
Revision 2:  March 31, 2010 757-30-0020
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 28 of 48
BOEING SERVICE BULLETIN 757-30-0020
 
 
B. WORK INSTRUCTIONS
WORK PACKAGE 1 - INSPECTION OF THE LEFT WINDSHIELD
WARNING: BEFORE YOU DO MAINTENANCE ON THE WINDSHIELD HEAT SYSTEM, OPEN
THE CIRCUIT BREAKER GIVEN IN THE STEP THAT FOLLOWS.  IF THIS CIRCUIT
BREAKER IS NOT OPEN, YOU CAN GET AN ELECTRICAL SHOCK WHEN YOU
TOUCH THE TERMINAL.
1. Open the applicable circuit breaker shown below and attach a DO-NOT-CLOSE tag to it:
2. Do an inspection of the left windshield as given in Figure 1.  
3. If the left windshield is not in a serviceable condition, replace it before the subsequent revenue 
flight.  Refer to 757 AMM 56-11-01 as an accepted procedure.
4. Remove the DO-NOT-CLOSE tag and close the applicable circuit breaker shown below:
WORK PACKAGE 2 - INSPECTION OF THE RIGHT WINDSHIELD
WARNING: BEFORE YOU DO MAINTENANCE ON THE WINDSHIELD HEAT SYSTEM, OPEN
THE CIRCUIT BREAKER GIVEN IN THE STEP THAT FOLLOWS.  IF THIS CIRCUIT
BREAKER IS NOT OPEN, YOU CAN GET AN ELECTRICAL SHOCK WHEN YOU
TOUCH THE TERMINAL.
1. Open this circuit breaker and attach a DO-NOT-CLOSE tag to it:
2. Do an inspection of the right windshield as given in Figure 2.   
3. If the right windshield is not in a serviceable condition, replace it before the subsequent revenue 
flight.  Refer to 757 AMM 56-11-01 as an accepted procedure. 
4. Remove the DO-NOT-CLOSE tag and close this circuit breaker:
WORK PACKAGE 3 - REPLACEMENT OF THE LEFT WINDSHIELD AND CHANGES TO THE 
RELATED WIRE BUNDLE
WARNING: THE WINDOW HEAT SYSTEM MUST BE DISARMED WHEN YOU REMOVE THE
Panel Position Name Circuit Breaker
P70 C13 WINDOW HTR 1L C391
Panel Position Name Circuit Breaker
P70 C13 WINDOW HTR 1L C391
Panel Position Name Circuit Breaker
P37 J2 WINDOW HTR 1R C392
Panel Position Name Circuit Breaker
P37 J2 WINDOW HTR 1R C392

### Page 29

Original Issue: July 19, 2006
Revision 2:  March 31, 2010 757-30-0020
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 29 of 48
BOEING SERVICE BULLETIN 757-30-0020
 
 
WINDOWS. IF THE WINDOW POWER IS ON, YOU CAN GET AN ELECTRICAL
SHOCK WHEN YOU TOUCH THE WINDOW. THE SHOCK CAN CAUSE INJURY TO
PERSONS.
1. Open this circuit breaker and attach a DO-NOT-CLOSE tag:
2. Remove the left windshield.   Use the windshield handling sling, A56001-2.  Refer to 757 AMM 
56-11-01 as an accepted procedure. 
3. Cut the bulb seal for the left windshield as given in Figure 3.
4. Change the wiring for the window heat on the left windshield as given in Figure 4 and Figure 5.
5. Do a continuity test of the new wires.
6. Install the left windshield.  Use the windshield handling sling, A56001-2.  Refer to 757 AMM 
56-11-01 as an accepted procedure.  At the operator’s choice, use one of the windshields shown 
below:
7. Remove the DO-NOT-CLOSE tag and close this circuit breaker.
8. Do the test "Operational Test - Flight Compartment Window Anti-Icing System" as given in 757 
AMM 30-41-00 as an accepted procedure.
9. Put the airplane in a serviceable condition.
WORK PACKAGE 4 - REPLACEMENT OF THE RIGHT WINDSHIELD AND CHANGES TO THE 
RELATED WIRE BUNDLE
WARNING: THE WINDOW HEAT SYSTEM MUST BE DISARMED WHEN YOU REMOVE THE
WINDOWS. IF THE WINDOW POWER IS ON, YOU CAN GET AN ELECTRICAL
SHOCK WHEN YOU TOUCH THE WINDOW. THE SHOCK CAN CAUSE INJURY TO
PERSONS.
1. Open this circuit breaker and attach a DO-NOT-CLOSE tag:
Panel Position Name Circuit Breaker
P70 C13 WINDOW HTR 1L C391
Description Part Number Part of Top Kit
Left Windshield with 
Hydrophobic Coating
141W7400-43 012N8926-13
Panel Position Name Circuit Breaker
P70 C13 WINDOW HTR 1L C391
Panel Position Name Circuit Breaker
P37 J2 WINDOW HTR 1R C392

### Page 30

Original Issue: July 19, 2006
Revision 2:  March 31, 2010 757-30-0020
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 30 of 48
BOEING SERVICE BULLETIN 757-30-0020
 
 
2. Remove the right windshield.   Use the windshield handling sling, A56001-2.  Refer to 757 AMM 
56-11-01 as an accepted procedure.
3. Cut the bulb seal for the right windshield as given in Figure 6.
4. Change the window heat wiring for the right windshield as given in Figure 7 and Figure 8.
5. Do a continuity test of the new wires.
6. Install the right windshield.  Use the windshield handling sling, A56001-2.  Refer to 757 AMM 
56-11-01 as an accepted procedure.  At the operator’s choice, use one of the windshields shown 
below: 
7. Remove the DO-NOT-CLOSE tag and close this circuit breaker:
8. Do the test "Operational Test - Flight Compartment Window Anti-Icing System". Refer to 757 
AMM 30-41-00 as an accepted procedure.
9. Put the airplane in a serviceable condition.
Description Part Number Part of Top Kit
Right Windshield with 
Hydrophobic Coating
141W7400-44 012N8926-14
Panel Position Name Circuit Breaker
P37 J2 WINDOW HTR 1R C392

### Page 31

FIGURE 1: INSPECTION OF THE LEFT WINDSHIELD
Original Issue: July 19, 2006
Revision 2:  March 31, 2010 757-30-0020
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 31 of 48
BOEING SERVICE BULLETIN 757-30-0020
 
 
FIGURE  1: INSPECTION OF THE LEFT WINDSHIELD
FWD
INBD
TERMINAL
BLOCK,
CONNECTOR
1
SCREW3
J5
2 LUG
J4J1
TB5028
W2304
2
LUG
SCREW3
4
5
1 TERMINAL
BLOCK,
CONNECTOR
4
5
2
LUG
SCREW3
4
5
1 TERMINAL
BLOCK,
CONNECTOR
485157
(SHEET 1 OF 5)

### Page 32

FIGURE 1: INSPECTION OF THE LEFT WINDSHIELD
Original Issue: July 19, 2006
Revision 2:  March 31, 2010 757-30-0020
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 32 of 48
BOEING SERVICE BULLETIN 757-30-0020
 
 
LUG PARALLEL
TO TERMINALLUG
(WB0710
SHOWN)
TERMINAL
LUG NOT PARALLEL
TO TERMINAL
LUG
(WB0710
SHOWN)
TERMINAL
WALLACE AND BLACK LUG
TERMINAL TERMINAL
LUG
(CWC01-1210
SHOWN)
LUG
(CWC01-1210
SHOWN)
LUG NOT PARALLEL
TO TERMINAL AND
O-RING NOT EVENLY
COMPRESSED
LUG PARALLEL TO
TERMINAL AND
O-RING EVENLY
COMPRESSED
ACCEPTABLE 
LUG PARALLEL TO TERMINAL
NOT ACCEPTABLE 
LUG NOT PARALLEL TO TERMINAL
CORY / TRI-STAR LUG
ACCEPTABLE 
LUG PARALLEL TO TERMINAL
NOT ACCEPTABLE 
LUG NOT PARALLEL TO TERMINAL
1650858
(SHEET 2 OF 5)

### Page 33

FIGURE 1: INSPECTION OF THE LEFT WINDSHIELD
Original Issue: July 19, 2006
Revision 2:  March 31, 2010 757-30-0020
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 33 of 48
BOEING SERVICE BULLETIN 757-30-0020
 
 
TERMINAL
LUG
SCREW
LOCKWASHER
COVER
SCREW
LOCKWASHER
COVER
O-RING
WALLACE AND BLACK LUG
LUG
TERMINAL
1
1
543
5
54
543
5
54
5
CORY / TRI-STAR LUG
4 2 4 6 7
4
1 2 4 6
1 4
1 3
1673473
(SHEET 3 OF 5)

### Page 34

FIGURE 1: INSPECTION OF THE LEFT WINDSHIELD
Original Issue: July 19, 2006
Revision 2:  March 31, 2010 757-30-0020
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 34 of 48
BOEING SERVICE BULLETIN 757-30-0020
 
 
The step numbers shown below agree with the numbers shown in the circle symbols in the figure.  
STEP TASK NAME IDENTIFICATION QTY MORE DATA
1
Inspect Terminal Block J1, J4, J5 3 At the J1, J4 and J5 connection
Connector - 3
Wiring Wire bundle W2304 3
NOTE: If the terminal lug or cap has melted, replace the shipside terminal lug and windshield.
NOTE: If the terminal block has melted, distorted or cracked, replace the windshield.
NOTE: If the shipside wire insulation has melted or discolored, then repair or replace shipside
wiring as necessary. Refer to Standard Wiring Practices Manual SWPM 20-10-13 as
an accepted procedure.
2
Inspect Lug - 3 to make sure it is a 
tight connection.
NOTE: If the terminal lug moves while applying light manual pressure to the strain-relief on
lug, then the screw that attaches it must be tightened.  There are four causes for a
loose terminal.
1-The screw is not tightened to the correct torque.
2-The terminal is damaged.
3-The incorrect screw is installed. The correct screw part number is given in SWPM
20-64-16 and Illustrated Parts Catalog 757 IPC 30-41-52.
4-The screw is cross threaded.
NOTE: If the lug is not parallel with the terminal, then the screw is cross threaded. Check for
lug alignment, the lug and terminal must be viewed from the side. It may be
necessary to view the lug and terminal from the exterior side of the window.
NOTE: If the lug shows signs of arcing, blueing, overheating or melting, replace the lug and
windshield.
CAUTION: DO NOT OVER TIGHTEN.  THE TERMINAL CAN BE DAMAGED BY TOO MUCH
FORCE.  A DAMAGED TERMINAL WILL REQUIRE THE REPLACEMENT OF THE
WINDOW
3
Torque Screw - 3 to 25 to 30 inch pounds of torque. 
Refer to SWPM 20-64-16 as an 
accepted procedure. 
Inspect Lug 3 to make sure the connection is 
tight. 
NOTE: The screw is only tightened if the lug is loose.  If it is the correct screw and it cannot
be tightened to 25 to 30 inch pounds, do steps 4 and 5.
NOTE: If the cross threaded screw can not be tightened, replace the window.
(SHEET 4 OF 5)

### Page 35

FIGURE 1: INSPECTION OF THE LEFT WINDSHIELD
Original Issue: July 19, 2006
Revision 2:  March 31, 2010 757-30-0020
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 35 of 48
BOEING SERVICE BULLETIN 757-30-0020
 
 
4
Remove/
Keep
Cover - 3
Remove Screw - 3 To make sure the correct screw is 
installed and there is no damage to 
terminal, lug or screw.Washer - 3
Inspect Terminal J1, J4, J5 3 To make sure the terminal or lug is 
not damaged.Lug - 3
NOTE: If the terminal block mating surface has contamination, clean surface. Refer to SWPM
20-20-00 Cleaning Method 5 as an accepted procedure. If the terminal shows signs
of arcing, blueing or overheating, the window must be replaced.
NOTE: If the mating surface on the terminal lug has contamination, clean surface. Refer to
SWPM 20-20-00 Cleaning Method 5 as an accepted procedure. If the lug cannot be
cleaned or shows signs of arcing, blueing or overheating, the lug must be replaced.
CAUTION: DO NOT OVER TIGHTEN.  THE TERMINAL CAN BE DAMAGED BY TOO MUCH
FORCE.  A DAMAGED TERMINAL WILL REQUIRE THE REPLACEMENT OF THE
WINDOW
5
Install 
(New)
Screw - 3 To make sure lug is assembled to 
terminal with new, undamaged and 
correct hardware.Washer - 3
O-ring - 3
NOTE: Reassemble the lug to the terminal with a new screw, lock washer and o-ring. Make
sure the o-ring is installed prior to assemble of the lug to the terminal. A new o-ring is
only available for the CWC01-1210 lug. Refer to SWPM 20-64-16 or 757 IPC
30-41-52 for the correct screw, washer and o-ring.
NOTE: Make sure the screw has been aligned correctly.
Torque Screw - 3 To 25 to 30 inch pounds of torque. 
Refer to SWPM 20-64-16 as an 
accepted procedure.
NOTE: Do step 2 to make sure the screw has been installed correctly and is a tight
connection.
    6 Inspect Lug - 3 Apply light manual pressure to 
strain-relief on lug.
NOTE: If the lug moves with light manual pressure, replace the windshield.
STEP TASK NAME IDENTIFICATION QTY MORE DATA
(SHEET 5 OF 5)

### Page 36

FIGURE 2: INSPECTION OF THE RIGHT WINDSHIELD
Original Issue: July 19, 2006
Revision 2:  March 31, 2010 757-30-0020
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 36 of 48
BOEING SERVICE BULLETIN 757-30-0020
 
 
FIGURE  2: INSPECTION OF THE RIGHT WINDSHIELD
FWD
INBD
TERMINAL
BLOCK,
CONNECTOR
1
LUG2
J5
3 SCREW
J1J4
W2314
TB5038
4
5
SCREW3
4
5
1
TERMINAL
BLOCK,
CONNECTOR
2
LUG
SCREW3
4
5
2
LUG 1
TERMINAL
BLOCK,
CONNECTOR
485158
(SHEET 1 OF 5)

### Page 37

FIGURE 2: INSPECTION OF THE RIGHT WINDSHIELD
Original Issue: July 19, 2006
Revision 2:  March 31, 2010 757-30-0020
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 37 of 48
BOEING SERVICE BULLETIN 757-30-0020
 
 
LUG PARALLEL
TO TERMINALLUG
(WB0710
SHOWN)
TERMINAL
LUG NOT PARALLEL
TO TERMINAL
LUG
(WB0710
SHOWN)
TERMINAL
WALLACE AND BLACK LUG
TERMINAL TERMINAL
LUG
(CWC01-1210
SHOWN)
LUG
(CWC01-1210
SHOWN)
LUG NOT PARALLEL
TO TERMINAL AND
O-RING NOT EVENLY
COMPRESSED
LUG PARALLEL TO
TERMINAL AND
O-RING EVENLY
COMPRESSED
ACCEPTABLE 
LUG PARALLEL TO TERMINAL
NOT ACCEPTABLE 
LUG NOT PARALLEL TO TERMINAL
CORY / TRI-STAR LUG
ACCEPTABLE 
LUG PARALLEL TO TERMINAL
NOT ACCEPTABLE 
LUG NOT PARALLEL TO TERMINAL
1650857
(SHEET 2 OF 5)

### Page 38

FIGURE 2: INSPECTION OF THE RIGHT WINDSHIELD
Original Issue: July 19, 2006
Revision 2:  March 31, 2010 757-30-0020
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 38 of 48
BOEING SERVICE BULLETIN 757-30-0020
 
 
TERMINAL
LUG
SCREW
LOCKWASHER
COVER
SCREW
LOCKWASHER
COVER
O-RING
WALLACE AND BLACK LUG
LUG
TERMINAL
1
1
543
5
54
543
5
54
5
CORY / TRI-STAR LUG
4 2 4 6 7
4
1 2 4 6
1 4
1 3
1676457
(SHEET 3 OF 5)

### Page 39

FIGURE 2: INSPECTION OF THE RIGHT WINDSHIELD
Original Issue: July 19, 2006
Revision 2:  March 31, 2010 757-30-0020
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 39 of 48
BOEING SERVICE BULLETIN 757-30-0020
 
 
The step numbers shown below agree with the numbers shown in the circle symbols in the figure.  
STEP TASK NAME IDENTIFICATION QTY MORE DATA
1
Inspect Terminal Block J1, J4, J5 3 At the J1, J4 and J5 connection
Connector - 3
Wiring Wire bundle W2304 3
NOTE: If the terminal lug or cap has melted, replace the shipside terminal lug and windshield.
NOTE: If the terminal block has melted, distorted or cracked, replace the windshield.
NOTE: If the shipside wire insulation has melted or discolored, then repair or replace shipside
wiring as necessary. Refer to Standard Wiring Practices Manual SWPM 20-10-13 as
an accepted procedure.
2
Inspect Lug - 3 to make sure it is a 
tight connection.
NOTE: If the terminal lug moves while applying light manual pressure to the strain-relief on
lug, then the screw that attaches it must be tightened.  There are four causes for a
loose terminal.
1-The screw is not tightened to the correct torque.
2-The terminal is damaged.
3-The incorrect screw is installed. The correct screw part number is given in SWPM
20-64-16 and Illustrated Parts Catalog 757 IPC 30-41-52.
4-The screw is cross threaded.
NOTE: If the lug is not parallel with the terminal, then the screw is cross threaded. Check for
lug alignment, the lug and terminal must be viewed from the side. It may be
necessary to view the lug and terminal from the exterior side of the window.
NOTE: If the lug shows signs of arcing, blueing, overheating or melting, replace the lug and
windshield.
CAUTION: DO NOT OVER TIGHTEN.  THE TERMINAL CAN BE DAMAGED BY TOO MUCH
FORCE.  A DAMAGED TERMINAL WILL REQUIRE THE REPLACEMENT OF THE
WINDOW
3
Torque Screw - 3 to 25 to 30 inch pounds of torque. 
Refer to SWPM 20-64-16 as an 
accepted procedure. 
Inspect Lug 3 to make sure the connection is 
tight. 
NOTE: The screw is only tightened if the lug is loose.  If it is the correct screw and it cannot
be tightened to 25 to 30 inch pounds, do steps 4 and 5.
NOTE: If the cross threaded screw can not be tightened, replace the window.
(SHEET 4 OF 5)

### Page 40

FIGURE 2: INSPECTION OF THE RIGHT WINDSHIELD
Original Issue: July 19, 2006
Revision 2:  March 31, 2010 757-30-0020
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 40 of 48
BOEING SERVICE BULLETIN 757-30-0020
 
 
4
Remove/
Keep
Cover - 3
Remove Screw - 3 To make sure the correct screw is 
installed and there is no damage to 
terminal, lug or screw.Washer - 3
Inspect Terminal J1, J4, J5 3 To make sure the terminal or lug is 
not damaged.Lug - 3
NOTE: If the terminal block mating surface has contamination, clean surface. Refer to SWPM
20-20-00 Cleaning Method 5 as an accepted procedure. If the terminal shows signs
of arcing, blueing or overheating, the window must be replaced.
NOTE: If the mating surface on the terminal lug has contamination, clean surface. Refer to
SWPM 20-20-00 Cleaning Method 5 as an accepted procedure. If the lug cannot be
cleaned or shows signs of arcing, blueing or overheating, the lug must be replaced.
CAUTION: DO NOT OVER TIGHTEN.  THE TERMINAL CAN BE DAMAGED BY TOO MUCH
FORCE.  A DAMAGED TERMINAL WILL REQUIRE THE REPLACEMENT OF THE
WINDOW
5
Install 
(New)
Screw - 3 To make sure lug is assembled to 
terminal with new, undamaged and 
correct hardware.Washer - 3
O-ring - 3
NOTE: Reassemble the lug to the terminal with a new screw, lock washer and o-ring. Make
sure the o-ring is installed prior to assemble of the lug to the terminal. A new o-ring is
only available for the CWC01-1210 lug. Refer to SWPM 20-64-16 or 757 IPC
30-41-52 for the correct screw, washer and o-ring.
NOTE: Make sure the screw has been aligned correctly.
Torque Screw - 3 To 25 to 30 inch pounds of torque. 
Refer to SWPM 20-64-16 as an 
accepted procedure.
NOTE: Do step 2 to make sure the screw has been installed correctly and is a tight
connection.
    6 Inspect Lug - 3 Apply light manual pressure to 
strain-relief on lug.
NOTE: If the lug moves with light manual pressure, replace the windshield.
STEP TASK NAME IDENTIFICATION QTY MORE DATA
(SHEET 5 OF 5)

### Page 41

FIGURE 3: CUT THE BULB SEAL FOR THE LEFT WINDSHIELD
July 19, 2006
Revision 2:  March 31, 2010 757-30-0020
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 41 of 48
BOEING SERVICE BULLETIN 757-30-0020
 
 
FIGURE  3: CUT THE BULB SEAL FOR THE LEFT WINDSHIELD 
The flag note numbers shown below agree with the numbers shown in the flag symbols in the figure.
STEP TASK NAME IDENTIFICATION QTY MORE DATA
CAUTION: DO NOT CUT THE STRUCTURE BELOW THE BULB SEAL.  THE WINDOW
SILL IS A HIGH MOISTURE AREA AND MOISTURE CAN CAUSE CORROSION
IF THE FINISH IS DAMAGED.  DAMAGE TO THE FINISH MUST BE REPAIRED. 
1
Cut Bulb Seal 233T8300-7 - to clear the new 
terminal.
NOTE: If the finish below the bulb seal is damaged, it must be sealed with chemical
treatment and primer.  Refer to Standard Overhaul Practices Manual
SOPM 20-41-02 and SOPM 20-43-03 as accepted procedures.
GLARESHIELD
BULB SEAL
1 1.201.40
485159
(SHEET 1 OF 1)

### Page 42

FIGURE 4: CHANGES TO THE WIRING FOR THE WINDOW HEAT ON THE LEFT WINDSHIELD
Original Issue: July 19, 2006
Revision 2:  March 31, 2010 757-30-0020
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 42 of 48
BOEING SERVICE BULLETIN 757-30-0020
 
 
FIGURE  4: CHANGES TO THE WIRING FOR THE WINDOW HEAT ON THE LEFT WINDSHIELD 
=1
D3322
=1
=1
D3326
D3324
A-AC
B35 LEFT WINDOW 1
=1
J5
0002-12
B35 LEFT WINDOW 1
=1
J1
TB5028
STA 225
WL 225
LBL 37
0001-12
W2304
1
2
A-AA
A-AB
4
4
5
5
3
3
2
1
ADDED WIRE OR NEW ROUTING
DELETED WIRE OR FORMER ROUTING
REFERENCE: WIRING DIAGRAM 30-41-11
485160
(SHEET 1 OF 2)

### Page 43

FIGURE 4: CHANGES TO THE WIRING FOR THE WINDOW HEAT ON THE LEFT WINDSHIELD
Original Issue: July 19, 2006
Revision 2:  March 31, 2010 757-30-0020
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 43 of 48
BOEING SERVICE BULLETIN 757-30-0020
 
 
The flag note numbers shown below agree with the numbers shown in the flag symbols in the figure.
FLAG 
NOTE NAME IDENTIFICATION QTY MORE DATA
1 Wire BMS 13-60, Type 1, 
Class 1, AWG 12
1
2 Wire BMS 13-60, Type 1, 
Class 1, AWG 12
1
Lacing Tape BMS 13-54, Type 3, 
Class 1, Red
      - or optional BACS38K5C Tie Strap.
Red is for left channel separation.  
Refer to Standard Wiring Practices 
Manual SWPM 20-10-19 as an 
accepted procedure.
3 Sleeve 280N3355-10103 2 Refer to SWPM 20-10-18 as an 
accepted procedure.
4 Socket Contact M39029/57-359 2 Refer to SWPM 20-63-19 as an 
accepted procedure.
NOTE: Isopropyl alcohol is applied to the installation tool and on the contact before
installation of the contact. Isopropyl alcohol is a lubricant that helps with
installation of the contact in the connector.
5 Terminal Lug BACT12AC-12 2 Refer to SWPM 20-30-11 as an 
accepted procedure.
(SHEET 2 OF 2)

### Page 44

FIGURE 5: WIRE ROUTING FOR THE WINDOW HEAT ON THE LEFT WINDSHIELD
July 19, 2006
Revision 2:  March 31, 2010 757-30-0020
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 44 of 48
BOEING SERVICE BULLETIN 757-30-0020
 
 
FIGURE  5: WIRE ROUTING FOR THE WINDOW HEAT ON THE LEFT WINDSHIELD
FWD
INBD
W2304
W2304
J1
TB5028
J5
485162
(SHEET 1 OF 1)

### Page 45

FIGURE 6: CUT THE BULB SEAL FOR THE RIGHT WINDSHIELD
Original Issue: July 19, 2006
Revision 2:  March 31, 2010 757-30-0020
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 45 of 48
BOEING SERVICE BULLETIN 757-30-0020
 
 
FIGURE  6: CUT THE BULB SEAL FOR THE RIGHT WINDSHIELD
The step numbers shown below agree with the numbers shown in the circle symbols in the figure. 
STEP TASK NAME IDENTIFICATION QTY MORE DATA
CAUTION: DO NOT CUT THE STRUCTURE BELOW THE BULB SEAL.  THE WINDOW
SILL IS A HIGH MOISTURE AREA AND MOISTURE CAN CAUSE CORROSION
IF THE FINISH IS DAMAGED.  DAMAGE TO THE FINISH MUST BE REPAIRED. 
1
Cut Bulb Seal 233T8300-8 - to clear the new 
terminal.
NOTE: If the finish below the bulb seal is damaged, it must be sealed with chemical
treatment and primer.  Refer to Standard Overhaul Practices Manual SOPM
20-41-02 and 20-43-03, if necessary.
2 Identify Glareshield - (a)
(a) Part mark with service bulletin number before new windshield is installed. Refer to SOPM 
20-50-10 as an accepted procedure.
1.401
BULB SEAL
1.20
2
485163
(SHEET 1 OF 1)

### Page 46

FIGURE 7: CHANGES TO THE WIRING FOR THE WINDOW HEAT ON THE RIGHT WINDSHIELD
Original Issue: July 19, 2006
Revision 2:  March 31, 2010 757-30-0020
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 46 of 48
BOEING SERVICE BULLETIN 757-30-0020
 
 
FIGURE  7: CHANGES TO THE WIRING FOR THE WINDOW HEAT ON THE RIGHT WINDSHIELD 
A-AB
A-AA
2
1
0001-12
J1
=1
0002-12
J5
=1
A-AC =1
=1
=1
W2314
D3270
D3272
D3274
TB5038
STA 223
WL 230
RBL 40
B38 RIGHT WINDOW 1
B38 RIGHT WINDOW 1
1
2
3
3
5
5
4
4
ADDED WIRE OR NEW ROUTING
DELETED WIRE OR FORMER ROUTING
REFERENCE: WIRING DIAGRAM 30-41-12
485169
(SHEET 1 OF 2)

### Page 47

FIGURE 7: CHANGES TO THE WIRING FOR THE WINDOW HEAT ON THE RIGHT WINDSHIELD
Original Issue: July 19, 2006
Revision 2:  March 31, 2010 757-30-0020
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 47 of 48
BOEING SERVICE BULLETIN 757-30-0020
 
 
The flag note numbers shown below agree with the numbers shown in the flag symbols in the figure.
FLAG 
NOTE NAME IDENTIFICATION QTY MORE DATA
1 Wire BMS 13-60, Type 1, 
Class 1, AWG 12
1
2 Wire BMS 13-60, Type 1, 
Class 1, AWG 12
1
Lacing Tape BMS 13-54, Type 3, 
Class 1, Green
or optional BACS38K5F Tie Strap.
Green is for right channel separation.  
Refer to Standard Wiring Practices 
Manual SWPM 20-10-19 as an 
accepted procedure.
3 Sleeve 280N3355-10203 2 Refer to SWPM 20-10-18 as an 
accepted procedure.
4 Socket Contact M39029/57-359 2 Refer to SWPM 20-63-19 as an 
accepted procedure.
NOTE: Isopropyl alcohol is applied to the installation tool and on the contact before
installation of the contact. Isopropyl alcohol is a lubricant that helps with
installation of the contact in the connector.
5 Terminal Lug BACT12AC-12 2 Refer to SWPM 20-30-11 as an 
accepted procedure.
(SHEET 2 OF 2)

### Page 48

FIGURE 8: WIRE ROUTING FOR THE WINDOW HEAT ON THE RIGHT WINDSHIELD
July 19, 2006
Revision 2:  March 31, 2010 757-30-0020
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 48 of 48
BOEING SERVICE BULLETIN 757-30-0020
 
 
FIGURE  8: WIRE ROUTING FOR THE WINDOW HEAT ON THE RIGHT WINDSHIELD
J1
J5
FWD
INBD
TB5038
W2314
W2314
485170
(SHEET 1 OF 1)

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
