# Boeing Special Attention Service Bulletin 757-30-0020: U.S. DOT/FAA -SB-757-30-0020-03

- Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2012-0421; AD 2012-25-03 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Boeing Special Attention Service Bulletin 757-30-0020](https://openairdocs.org/service-documents/boeing/sb-757-30-0020.md)
- Title as filed: U.S. DOT/FAA -SB-757-30-0020-03
- Pages: 52
- PDF: https://openairdocs.org/files/sha256/06/54/0654e8cfbb73e5086b93474c29938c67a27e7a62966f2b1429598c6737238b41
- Page: https://openairdocs.org/service-documents/boeing/sb-757-30-0020/file/0654e8cfbb73

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Commercial 
Airplanes
757
Service Bulletin
SPECIAL ATTENTION
Number: 757-30-0020
Original Issue: July 19, 2006
Revision 3: December 16, 2011
ATA System: 3041 5611
SUBJECT: ICE AND RAIN PROTECTION - Flight Compartment Window Anti-Icing - Windshield
Inspection and Replacement
Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15
CFR 730-774). An export license may be required before it is used for development, production or use by foreign
persons from specific countries. The controller of this data has the individual responsibility to abide by all export
laws.
9E991ECCN:
BOEING PROPRIETARY, CONFIDENTIAL, AND/OR TRADE SECRET
Copyright © 2006 The Boeing Company
Unpublished Work - All Rights Reserved
Boeing claims copyright in each page of this document only to the extent that the page contains copyrightable
subject matter. Boeing also claims copyright in this document as a compilation and/or collective work.
This document includes proprietary information owned by The Boeing Company and/or one or more third parties.
Treatment of the document and the information it contains is governed by contract with Boeing. For more
information, contact The Boeing Company, P.O. Box 3707, Seattle, Washington 98124.
Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner,
BBJ, DC-8, DC-9, DC-10, KC-10, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8A, Poseidon and the
Boeing livery are all trademarks owned by The Boeing Company; and no trademark license is granted in
connection with this document unless provided in writing by Boeing.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 19, 2006
757-30-0020Revision 3: December 16, 2011
1 of 52
4.0

### Page 2

BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 19, 2006
757-30-0020Revision 3: December 16, 2011
2 of 52
BOEING SERVICE BULLETIN 757-30-0020
BLANK PAGE

### Page 3

Table of Contents
Revision Transmittal Sheet ............................................ 5
Summary ...................................................... 7
1. PLANNING INFORMATION ........................................ 1 1
A. Effectivity ............................................... 1 1
1. Airplanes ............................................ 1 1
2. Spares Affected ........................................ 1 2
B. Concurrent Requirements ...................................... 1 2
C. Reason ................................................ 1 2
D. Description .............................................. 1 3
E. Compliance .............................................. 1 3
F. Approval ............................................... 1 7
G. Manpower .............................................. 1 7
H. Weight and Balance Changes .................................... 1 9
I. Electrical Load Data ......................................... 1 9
J. References .............................................. 1 9
1. Existing Data: ......................................... 1 9
2. Data supplied with this Service Bulletin: ........................... 1 9
3. Installation Drawings Used in the Preparation of this Service Bulletin: ........... 1 9
K. Publications Affected ........................................ 1 9
L. Interchangeability and Intermixability of Parts ........................... 2 0
2. MATERIAL INFORMATION ........................................ 2 1
A. Material - Price and Availability ................................... 2 1
B. Industry Support Information .................................... 2 1
C. Parts Necessary For Each Airplane ................................. 2 1
1. Kits/Parts: ........................................... 2 1
2. Parts and Materials Supplied by the Operator: ........................ 2 3
3. Parts Modified and Reidentified: ............................... 2 4
4. Parts Removed and Not Replaced: .............................. 2 4
D. Parts Necessary to Change Spares ................................. 2 4
E. Special Tooling - Price and Availability ............................... 2 4
F. Special Tooling Necessary to do this Service Bulletin ....................... 2 5
3. ACCOMPLISHMENT INSTRUCTIONS .................................. 2 7
A. GENERAL INFORMATION ..................................... 2 7
B. WORK INSTRUCTIONS ....................................... 2 8
FIGURE 1: INSPECTION OF THE LEFT WINDSHIELD ......................... 3 1
FIGURE 2: INSPECTION OF THE RIGHT WINDSHIELD ........................ 3 7
FIGURE 3: CUT THE BULB SEAL FOR THE LEFT WINDSHIELD ................... 4 3
FIGURE 4: CHANGES TO THE WIRING FOR THE WINDOW HEAT ON THE LEFT WINDSHIELD . 45
FIGURE 5: WIRE ROUTING FOR THE WINDOW HEAT ON THE LEFT WINDSHIELD ........ 4 7
FIGURE 6: CUT THE BULB SEAL FOR THE RIGHT WINDSHIELD ................... 4 8
FIGURE 7: CHANGES TO THE WIRING FOR THE WINDOW HEAT ON THE RIGHT WINDSHIELD . 50
FIGURE 8: WIRE ROUTING FOR THE WINDOW HEAT ON THE RIGHT WINDSHIELD ....... 5 2
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 19, 2006
757-30-0020Revision 3: December 16, 2011
3 of 52
BOEING SERVICE BULLETIN 757-30-0020

### Page 4

BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 19, 2006
757-30-0020Revision 3: December 16, 2011
4 of 52
BOEING SERVICE BULLETIN 757-30-0020
BLANK PAGE

### Page 5

Commercial 
Airplanes
757
Service Bulletin
SPECIAL ATTENTION
Revision Transmittal SheetNumber: 757-30-0020Original Issue: July 19, 2006
Revision 3: December 16, 2011
ATA System: 3041 5611
SUBJECT: ICE AND RAIN PROTECTION - Flight Compartment Window Anti-Icing - Windshield
Inspection and Replacement
This revision includes all pages of the service bulletin.
COMPLIANCE INFORMATION RELATED TO THIS REVISION
Federal Aviation Administration (FAA) Airworthiness Directive AD 2010-15-01 is related to this service bulletin.
More work is necessary on airplanes inspected in accordance with the original issue or Revision 1 of this service
bulletin.
No more work is necessary on airplanes inspected in accordance with Revision 2 of this service bulletin.
No more work is necessary on airplanes that have done the terminating action in accordance with the original
issue or Revision 1 or Revision 2 of this service bulletin.
REASON FOR REVISION
This revision is sent to add Federal Aviation Administration (FAA) Airworthiness Directive AD 2010-15-01 and
change the text in the Compliance Table.
Terminology has been changed in the Work Instructions to agree with the terminology defined in Paragraph
3.A., General Information - Notes.
These sections were changed:
1. In Summary and Paragraph 1.E., Compliance, added FAA AD 2010-15-01.
2. In Paragraph 1.D., Description, added terminating action statement.
3. In Paragraph 1.E., Compliance, changed the text in the Compliance Table.
4. In Paragraph 1.F., Approval, added Alternative Method Of Compliance (AMOC) paragraph.
5. In Paragraph 1.J.1, Existing Data, changed a Standard Wiring Practices Manual (SWPM) reference and
added an Airplane Maintenance Manual (AMM) reference.
6. In Paragraph 2.A., Material - Price and Availability, updated kit price and availability.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 19, 2006
757-30-0020Revision 3: December 16, 2011
5 of 52

### Page 6

7. In Paragraph 2.C.1., Kit/Parts, added new windshield part numbers and serial numbers to the kit table.
8. In Paragraph 2.E., Special Tooling - Price and Availability, updated tool kit price.
9. In FIGURE 1 and FIGURE 2:
a. Removed circle notes 6 and 7 and changed the illustrations.
b. Footnotes, added an AMM reference.
10. In FIGURE 3, added new step and circle note.
11. In FIGURE 4 and FIGURE 7, flagnote tables, changed a SWPM reference.
The data given in Information Notice 757-30-0020 IN 01 is included in this revision.
Vertical lines are put on the left edge of each page, except in Paragraph 1.A., Effectivity, to show the location
of important changes.
Pages with no vertical lines have no important changes.
REVISION HISTORY
July 19, 2006Original Issue:
December 19, 2007Revision 1:
March 31, 2010Revision 2:
December 16, 2011Revision 3:
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 19, 2006
757-30-0020Revision 3: December 16, 2011
6 of 52
BOEING SERVICE BULLETIN 757-30-0020

### Page 7

Commercial 
Airplanes
757
Service Bulletin
SPECIAL ATTENTION
SummaryNumber: 757-30-0020Original Issue: July 19, 2006
Revision 3: December 16, 2011
ATA System: 3041 5611
SUBJECT: ICE AND RAIN PROTECTION - Flight Compartment Window Anti-Icing - Windshield
Inspection and Replacement
BOEING RECOMMENDS THAT EACH OPERATOR EXAMINE THIS SERVICE BULLETIN IMMEDIATELY.
CONCURRENT REQUIREMENTS
None
BACKGROUND
This service bulletin gives instructions to do a detailed inspection of the electrical connections on the left and
the right windshields. Instructions are also given to replace the windshields and make changes to their related
wire bundles. A new windshield design is available that uses a different electrical connection.
Boeing received nine reports from eight operators of electrical arcs at the terminal blocks of the flight compartment
windows. More than one of these reports included data to show that the results of the arcs were open flame
incidents. One operator found an indication of damage at a terminal and tightened a loose connection. The
terminal had internal damage that could not be seen. Less than six months after the connection was tightened
there was a report from the operator of an open flame incident on the same windshield.
The electrical connections on the windows are made with lugs that are attached with screws. The windshield is
the number 1 window in the flight compartment. All of the windows in the flight compartment are electrically
heated. The windshield gets a much larger electrical load.
An investigation found that the cause of the electrical arcs is loose terminal connections. A loose connection
increases the heat at the terminal which can cause damage to the internal solder joint. Damaged solder joints
are the primary cause for the electrical arcs. The primary causes of loose connections are the incorrect torque
of the screw or an incorrectly installed screw.
The detailed inspection given in this service bulletin is to look for damage or a loose electrical connection on
the windshield. If there are indications of electrical arcs or damage to the electrical connection, the windshield
is replaced. If there is a loose electrical connection, the correct torque is applied to tighten it. If a connection
cannot be tightened to the correct torque, the windshield is replaced. When a windshield with an electrical
connection that uses pins and sockets is installed, the related wire bundle on the airplane is changed.
When the changes given in this bulletin are done, the windshields will have better electrical connections. The
new connections are made with pins and sockets. The pin and socket connections will prevent the risk of electrical
arcs as a result of loose connections.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 19, 2006
757-30-0020Revision 3: December 16, 2011
7 of 52

### Page 8

Boeing Service Related Problems (SRP) 757-SRP-30-0031 and 757-SRP-56-0015 are related to this service
bulletin.
ACTION (PRR 54530-265S)
In the flight compartment, do a detailed inspection of the J1, J4 and J5 lugs and terminals on the left and the
right windshields. Replace windshields that use screws and lugs for the electrical connections with a windshield
that uses pins and sockets for the electrical connections. Cut the bulb seal to give clearance for terminals on
the new windshield. Change the related wire bundle.
EFFECTIVITY
757-300 Airplanes. Refer to Paragraph 1.A., Effectivity., Airplanes for the list of affected airplanes.
COMPLIANCE
Federal Aviation Administration (FAA) Airworthiness Directive AD 2010-15-01 is related to this service bulletin.
See Service Bulletin Paragraph 1.E., Compliance for compliance information.
INDUSTRY SUPPORT INFORMATION
Boeing warranty remedies are not available for the configuration changes given in this service bulletin.
MANPOWER
Elapsed HoursTotal Task HoursWork Package
1.51.5Work Package 1 - Detailed Inspection of the Left Wind-
shield
1.51.5Work Package 2 - Detailed Inspection of the Right Wind-
shield
4.758.5Work Package 3 - Left Windshield Replacement and
Wiring Change
4.758.5Work Package 4 - Right Windshield Replacement and
Wiring Change
MATERIAL INFORMATION
Boeing Supplied Kits/Parts
Refer to Paragraph 2.A., Material - Price and Availability.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 19, 2006
757-30-0020Revision 3: December 16, 2011
8 of 52
BOEING SERVICE BULLETIN 757-30-0020

### Page 9 (OCR)

BOEING SERVICE BULLETIN 757-30-0020
WORK PACKAGE 4:
CUT THE BULB SEAL AND
REPLACE THE RIGHT WINDSHIELD.
CHANGE THE RELATED WIRING.
WORK PACKAGE 2:
INSPECT THE RIGHT WINDSHIELD
WORK PACKAGE 3:
CUT THE BULB SEAL AND
REPLACE THE LEFT WINDSHIELD.
CHANGE THE RELATED WIRING.
WORK PACKAGE 1:  485171
INSPECT THE LEFT WINDSHIELD
Original Issue: July 19, 2006
Revision 3: December 16, 2011  757-30-0020
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.  9 of 52

### Page 10

BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 19, 2006
757-30-0020Revision 3: December 16, 2011
10 of 52
BOEING SERVICE BULLETIN 757-30-0020
BLANK PAGE

### Page 11

Commercial 
Airplanes
757
Service Bulletin
SPECIAL ATTENTION
Number: 757-30-0020
Original Issue: July 19, 2006
Revision 3: December 16, 2011
ATA System: 3041 5611
SUBJECT: ICE AND RAIN PROTECTION - Flight Compartment Window Anti-Icing - Windshield
Inspection and Replacement
BOEING RECOMMENDS THAT EACH OPERATOR EXAMINE THIS SERVICE BULLETIN IMMEDIATELY.
1.    PLANNING INFORMATION
A. Effectivity
1. Airplanes
Refer to Service Bulletin Index Document D624N001 Part 3 for Airplane Variable Number, Line
Number, and Serial Number data.
This service bulletin is for the airplanes shown below. An equivalent change is on subsequent
production airplanes. Refer to PRR 54530-265S for data about this change.
DESCRIPTIONCONFIGURATIONGROUP
Airplanes with windshields that use screw and lug electrical
connections.
-1
Airplane Models:
757-300
GroupVariable Number
1NL001 - NL002
1NL006 - NL017
1NL101 - NL109
1NL141
1NL601 - NL616
1NU701 - NU705
1NU721 - NU728
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 19, 2006
757-30-0020Revision 3: December 16, 2011
11 of 52

### Page 12

GroupVariable Number
1NU731 - NU732
2. Spares Affected
Examine your spares supply for the parts or components identified in Paragraph 2.C., Parts
Necessary for Each Airplane. If any parts or components are found, refer to Paragraph 2.C. for
the recommended use.
B. Concurrent Requirements
None
C. Reason
This service bulletin gives instructions to do a detailed inspection of the electrical connections on the
left and the right windshields. Instructions are also given to replace the windshields and make changes
to their related wire bundles. A new windshield design is available that uses a different electrical
connection.
Boeing received nine reports from eight operators of electrical arcs at the terminal blocks of the flight
compartment windows. More than one of these reports included data to show that the results of the
arcs were open flame incidents. One operator found an indication of damage at a terminal and tightened
a loose connection. The terminal had internal damage that could not be seen. Less than six months
after the connection was tightened there was a report from the operator of an open flame incident on
the same windshield.
The electrical connections on the windows are made with lugs that are attached with screws. The
windshield is the number 1 window in the flight compartment. All of the windows in the flight compartment
are electrically heated. The windshield gets a much larger electrical load.
An investigation found that the cause of the electrical arcs is loose terminal connections. A loose
connection increases the heat at the terminal which can cause damage to the internal solder joint.
Damaged solder joints are the primary cause for the electrical arcs. The primary causes of loose
connections are the incorrect torque of the screw or an incorrectly installed screw.
The detailed inspection given in this service bulletin is to look for damage or a loose electrical connection
on the windshield. If there are indications of electrical arcs or damage to the electrical connection, the
windshield is replaced. If there is a loose electrical connection, the correct torque is applied to tighten
it. If a connection cannot be tightened to the correct torque, the windshield is replaced. When a windshield
with an electrical connection that uses pins and sockets is installed, the related wire bundle on the
airplane is changed.
When the changes given in this bulletin are done, the windshields will have better electrical connections.
The new connections are made with pins and sockets. The pin and socket connections will prevent
the risk of electrical arcs as a result of loose connections.
Boeing Service Related Problems (SRP) 757-SRP-30-0031 and 757-SRP-56-0015 are related to this
service bulletin.
Revision 1 was sent to change the No.1 Windshield Assembly part numbers supplied in the Top Kits.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 19, 2006
757-30-0020Revision 3: December 16, 2011
12 of 52
BOEING SERVICE BULLETIN 757-30-0020

### Page 13

Revision 2 was sent to tell operators that have not done the terminating action in the compliance of
this service bulletin that they will need to also inspect the J1 and J4 windshield lugs and terminals.
Revision 3 is sent to add Federal Aviation Administration (FAA) Airworthiness Directive AD 2010-15-01
and change the text in the Compliance Table.
Terminology has been changed in the Work Instructions to agree with the terminology defined in
Paragraph 3.A., General Information - Notes.
The data given in Information Notice 757-30-0020 IN 01 is included in this revision.
D. Description
In the flight compartment, a detailed inspection is done of the left and the right windshields. A windshield
that uses pin and socket electrical connections is installed. The bulb seal is cut to give clearance for
terminals that are on the new windshield. When a windshield that uses the pin and socket electrical
connections is installed, the related wire bundle is also changed.
The changes in this service bulletin will not change the Engine Indication and Crew Alerting System
(EICAS).
Revision 1 - No more work is necessary on airplanes inspected as shown in original issue of this service
bulletin.
Revision 2 - More work is necessary on airplanes inspected as shown in the original issue and Revision
1 of this service bulletin.
Revision 3 - More work is necessary on the airplanes inspected in accordance with the original issue
or Revision 1 of this service bulletin.
No more work is necessary on airplanes inspected in accordance with Revision 2 of this service bulletin.
No more work is necessary on airplanes that have done the terminating action in accordance with the
original issue or Revision 1 or Revision 2 of this service bulletin.
The work in this service bulletin is done in the maintenance zone(s) given below.
Affected Maintenance Zones
ZoneModel
211, 212757-300
E. Compliance
Federal Aviation Administration (FAA) Airworthiness Directive AD 2010-15-01 is related to this service
bulletin.
Boeing recommends that the inspection given in this service bulletin be done within 500 flight hours or
150 days after the effective date of AD 2010-15-01 .
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 19, 2006
757-30-0020Revision 3: December 16, 2011
13 of 52
BOEING SERVICE BULLETIN 757-30-0020

### Page 14

Compliance Table:
Repeat Interval (Whichever
Occurs Later)
Compliance Time
(Whichever Occurs First)
ActionCondition
Terminating action for this
bulletin.
----Replace with wind-
shield that uses pins
and sockets for window
heat power connection
in accordance with Ac-
complishment Instruc-
tions Work Packages 3
and 4.
Windshield that uses
screws and lugs for
window heat power
connection.
Every 6000 flight hours or 24
months until windshield is re-
placed with windshield that
used pins and sockets for
window heat power connec-
tion in accordance with Ac-
complishment Instructions
Work Packages 3 and 4.
Within 500 flight hours or 150
days, after the effective date
of AD 2010-15-01.
Do the actions that fol-
low for J1, J4 and J5
window heat power
connections:
1. Inspect the shipside
wiring and terminal lug
(including cover), look
for signs of melted or
discolored insulation.
PPG Windshield that
uses screws and lugs
for window heat power
connection.
2. Inspect the window
terminal blocks, look for
signs of melting, distor-
tion or cracking.
3. Inspect the window
heat power connection
for evidence of cross
threading by making
sure the terminal lug is
parallel with the window
terminal block.
4. Inspect the terminal
lug for looseness.
5. Address the inspec-
tion findings as de-
scribed in Inspection
Conditions 1 thru 4.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 19, 2006
757-30-0020Revision 3: December 16, 2011
14 of 52
BOEING SERVICE BULLETIN 757-30-0020

### Page 15

Compliance Table:
Repeat Interval (Whichever
Occurs Later)
Compliance Time
(Whichever Occurs First)
ActionCondition
Every 12,000 flight hours or
48 months until windshield is
replaced with windshield that
used pins and sockets for
window heat power connec-
tion in accordance with Ac-
complishment Instructions
Work Packages 3 and 4.
Within 500 flight hours or 150
days, after the effective date
of AD 2010-15-01.
Do the actions that fol-
low for J1, J4 and J5
window heat power
connections:
1. Inspect the shipside
wiring and terminal lug
(including cover), look
for signs of melted or
discolored insulation.
GKN Windshield that
uses screws and lugs
for window heat power
connection.
2. Inspect the window
terminal blocks, look for
signs of melting, distor-
tion or cracking.
3. Inspect the window
heat power connection
for evidence of cross
threading by making
sure the terminal lug is
parallel with the window
terminal block.
4. Inspect the terminal
lug for looseness.5.
Address the inspection
findings as described in
Inspection Conditions 1
thru 4.
----Before further flight.1. Repair or replace
shipside wiring as nec-
essary. Refer to Stan-
dard Wiring Practices
Manual SWPM 20-10-
13 as an accepted pro-
cedure.
Inspection Condition 1
- If the inspection re-
veals one or more signs
of the following:
1. Melted shipside wire
insulation.
2. Discolored shipside
wire insulation.3. Melt-
ed terminal lug.4. Melt-
ed cover.
2. If the terminal lug
has melted replace the
shipside terminal lug
and windshield in accor-
dance with Work Pack-
age 1, step 2, or Work
Package 2, step 2; as
applicable.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 19, 2006
757-30-0020Revision 3: December 16, 2011
15 of 52
BOEING SERVICE BULLETIN 757-30-0020

### Page 16

Compliance Table:
Repeat Interval (Whichever
Occurs Later)
Compliance Time
(Whichever Occurs First)
ActionCondition
----Before further flight.1. Replace windshield
in accordance with
Work Package 1, step
2, or Work Package 2,
step 2; as applicable.
Inspection Condition 2
- If the inspection re-
veals one or more signs
of the following:
1. Melted window termi-
nal block.
2. Distorted or cracked
window terminal block.
----Before further flight.1. Inspect the terminal
for looseness. If the
cross threaded terminal
is loose: torque the ter-
minal screw to 25-30 in-
lb.
Inspection Condition 3
- If the inspection re-
veals evidence that the
window heat power
connection is cross
threaded.
2. Re-inspect terminal
lug for looseness.
3. If terminal lug is still
loose replace wind-
shield in accordance
with Work Package 1,
step 2 or Work Pack-
age 2, step 2; as appli-
cable.
----Within 500 flight hours or 150
days after the inspection.
4. If terminal lug is tight,
replace windshield in
accordance with Work
Package 1, step 2, or
Work Package 2, step
2; as applicable.
----Before further flight.1. Torque the terminal
screw to 25-30 in-lb.
Inspection Condition 4
- If the inspection re-
veals the terminal lug is
loose.
2. Re-inspect terminal
lug for looseness.
3. If terminal lug is still
loose then disassem-
ble, inspect and re-
assemble the electrical
connection in accor-
dance with Package 1,
step 2, or Work Pack-
age 2, step 2; as appli-
cable.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 19, 2006
757-30-0020Revision 3: December 16, 2011
16 of 52
BOEING SERVICE BULLETIN 757-30-0020

### Page 17

Compliance Table:
Repeat Interval (Whichever
Occurs Later)
Compliance Time
(Whichever Occurs First)
ActionCondition
----Within 150 days or 500 flight
hours, after the reassembly
of the windshield heat power
connection. (a)
Do a detailed inspec-
tion and corrective ac-
tions if necessary in ac-
cordance with Work
Package 1, step 2, or
Work Package 2, step
2; as applicable.
Window heat power
connection is reassem-
bled (on windshields
that use screws and
lugs for window heat
power connection).
OR
If the windshield is re-
placed with same type
windshield that uses
screws and lugs for
window heat power
connection.
(a) The initial inspection after installing a new window or a new terminal screw is to verify that the window
heat power connection is correctly made. An improperly installed screw (under torqued or cross threaded)
can be identified regardless of the time since installation. If a screw is properly installed and torqued,
there is no evidence that it will loosen over time. The inspection steps outlined in this Service Bulletin
should be followed. Refer to either condition "Window heat power connection is reassembled" or "wind-
shield is replaced with the same type windshield" in the Compliance Table for inspection requirements.
F. Approval
This service bulletin was examined by the Federal Aviation Administration (FAA). The changes specified
in this service bulletin comply with the applicable regulations and are FAA approved, as well as European
Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/JAA approved
airplanes listed in the service bulletin effectivity. This service bulletin and its approval were based on
the airplane in its original Boeing delivery configuration or as modified by other approved Boeing
changes.
If an airplane has a non-Boeing modification or repair that affects a component or system also affected
by this service bulletin, the operator is responsible for obtaining appropriate regulatory agency approval
before incorporating this service bulletin.
In addition, the Manager of the FAA Seattle Aircraft Certification Office approves the action (i.e. inspection
or modification) defined in this service bulletin as an alternative method of compliance to the requirements
of paragraphs (f), (g), (h) and (i) of AD 2010-15-01. All provisions of AD 2010-15-01 that are not
specifically referenced in the above statement remain fully applicable and must be complied with.
G. Manpower
The table below shows an estimate of the task-hours necessary to do this inspection or change one
window for each airplane. This estimate is for direct labor only, done by an experienced crew. Adjust
the estimate with operator task-hour data if necessary. The estimate does not include lost time. These
are some examples of lost time:
— Time to adjust to the workplace
— Time to schedule the work
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 19, 2006
757-30-0020Revision 3: December 16, 2011
17 of 52
BOEING SERVICE BULLETIN 757-30-0020

### Page 18

— Time to examine the work
— Time to cure the materials
— Time to make the parts
— Time to find the tools.
Work Package 1 - Inspection of the Left Windshield
Elapsed HoursTask-HoursNumber of Per-
sons
Task
1.501.501FIGURE 1
1.501.50Total per Windshield
Work Package 2 - Inspection of the Right Windshield
Elapsed HoursTask-HoursNumber of Per-
sons
Task
1.501.501FIGURE 2
1.501.50Total per Windshield
Work Package 3 - Replacement of the Left Windshield and Changes to the Related Wiring
Elapsed HoursTask-HoursNumber of Per-
sons
Task
0.501.02Access
1.252.52Remove the Left Windshield
0.250.251FIGURE 3 - Cut the Bulb Seal
0.500.501FIGURE 4 and FIGURE 5 -
Change the Wiring
1.53.02Install the Left Windshield
0.250.251Tests
0.501.02Close
4.758.5Total per Windshield
Work Package 4 - Replacement of the Right Windshield and Changes to the Related Wiring
Elapsed HoursTask-HoursNumber of Per-
sons
Task
0.501.02Access
1.252.52Remove the Right Windshield
0.250.251FIGURE 6 - Cut the Bulb Seal
0.500.501FIGURE 7 and FIGURE 8 -
Change the Wiring
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 19, 2006
757-30-0020Revision 3: December 16, 2011
18 of 52
BOEING SERVICE BULLETIN 757-30-0020

### Page 19

Work Package 4 - Replacement of the Right Windshield and Changes to the Related Wiring
Elapsed HoursTask-HoursNumber of Per-
sons
Task
1.53.02Install the Right Windshield
0.250.251Tests
0.501.02Close
4.758.5Total per Windshield
H. Weight and Balance Changes
None
I. Electrical Load Data
Not changed
J. References
1. Existing Data:
a. Engineering Change Memo PRR 54530-265S
b. Boeing Service Related Problem (SRP) 757-SRP-30-0031, 757-SRP-56-0015
c. Federal Aviation Administration (FAA) Airworthiness Directive (AD) 2010-15-01
d. Standard Overhaul Practices Manual (SOPM) 20-41-02, 20-43-03, 20-50-10
e. Standard Wiring Practices Manual (SWPM) 20-10-11, 20-10-12, 20-10-13, 20-10-18, 20-10-19,
20-20-00, 20-30-11, 20-64-16, 20-64-18
f. 757 Aircraft Maintenance Manual (AMM) 30-41-00, 56-11-01
g. Wiring Diagram 30-41-11, 30-41-12
2. Data supplied with this Service Bulletin:
None.
3. Installation Drawings Used in the Preparation of this Service Bulletin:
None
K. Publications Affected
1. Publications
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 19, 2006
757-30-0020Revision 3: December 16, 2011
19 of 52
BOEING SERVICE BULLETIN 757-30-0020

### Page 20

Chapter-SectionPublication
30-41, 56-11757 Maintenance Manual
30-41757 Wiring Diagram Manual
56-11757 Illustrated Parts Catalog
2. Damage Tolerance Based Structural Inspections:
Boeing has evaluated the repairs and/or changes in this service bulletin for effects on Fatigue
Critical Structure (FCS) and for changes to Damage Tolerance Inspections (DTI) required in the
Maintenance Program. This service bulletin does not affect FCS, therefore DTIs are not necessary.
L. Interchangeability and Intermixability of Parts
Refer to Paragraph 2.C., Parts Necessary for Each Airplane, for interchangeability and intermixability
information.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 19, 2006
757-30-0020Revision 3: December 16, 2011
20 of 52
BOEING SERVICE BULLETIN 757-30-0020

### Page 21

2.    MATERIAL INFORMATION
A. Material - Price and Availability
Boeing can supply the kits shown in Paragraph 2.C., Parts Necessary for Each Airplane. Operators
are encouraged to share schedule requirements with Boeing for incorporation of the service bulletin.
The kits are subject to the terms and conditions of the Boeing standard purchase order acknowledgment.
Prices are in United States Dollars. Terms: Net 30 days.
Reference this service bulletin and submit your purchase order by one of these methods:
1. Order on-line via ATA Spec 2000 or The Boeing PART Page
2. Fax to (206) 662-7145
REFER TO THE BOEING PART PAGE ON MYBOEINGFLEET.COM OR CONTACT FIRST RESPONDER
AT FR@BOEING.COM FOR THE LATEST REORDER LEAD TIME (ROLT) AND PRICE INFORMATION
Unit Price as of
the Revision 03
date of this Ser-
vice Bulletin (US
Dollars)
ROLT as of the
Revision 03 date
of this Service
Bulletin (Calendar
Days)
NameKit Number
$18,647.00130Top Kit - Left Windshield - PPG with hy-
drophobic coating
012N8926-13
$18,647.00130Top Kit - Right Windshield - PPG with hy-
drophobic coating
012N8926-14
B. Industry Support Information
Boeing warranty remedies are not available for the configuration changes given in this service bulletin.
C. Parts Necessary For Each Airplane
1. Kits/Parts:
To get the kits/parts shown below, refer to Paragraph 2.A., Material - Price and Availability.
NOTE: Two top kits and the items shown in Paragraph 2.C.2., Parts and Materials Supplied by
the Operator, are necessary for each airplane.
Kit 012N8926
NotesNameQTYNew Part Num-
ber -13-14
Top Kit - Left Windshield, PPG with Hy-
drophobic coating
-.012N8926-13
Top Kit - Right Windshield, PPG with Hy-
drophobic coating
.-012N8926-14
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 19, 2006
757-30-0020Revision 3: December 16, 2011
21 of 52
BOEING SERVICE BULLETIN 757-30-0020

### Page 22

Kit 012N8926
NotesNameQTYNew Part Num-
ber -13-14
(a) (b) (c)
(d) (f)
(h) (j) (l)
(m)
PPG Windshield Assembly - Left, with Hy-
drophobic coating
1.141W7400-43
(a) (b) (c)
(e) (g) (i)
(k) (l)
(m)
PPG Windshield Assembly - Right, with
Hydrophobic coating
.1141W7400-44
Wire Kit - Flight Deck Window Heat - Wire
Assembly W2304
1.280N3355-1
Wire Kit - Flight Deck Window Heat - Wire
Assembly W2314
.1280N3355-2
(a) Discard the existing part.
(b) This part is used in production.
(c) You cannot use the existing part to replace the new or changed part.
(d) As an option operators can install Left Windshield part number 141T4801-59.
(e) As an option operators can install Right Windshield part number 141T4801-60.
(f) As an option operators can install Left Windshield part number 141W7400-31 or
141W7400-33 with serial numbers 04001Hxxxx thru 05365Hxxxx or with serial
numbers 04001Rxxxx through 05365Rxxxx.
(g) As an option operators can install Right Windshield part number 141W7400-32 or
141W7400-34 with serial numbers 04001Hxxxx thru 05365Hxxxx or with serial
numbers 04001Rxxxx thru 05365Rxxxx.
(h) As an option operators can install Left Windshield part number 141W7400-37 or
141W7400-39 with serial numbers 06001Hxxxx thru 06338Hxxxx or with serial
numbers 06001Rxxxx thru 06338Rxxxx.
(i) As an option operators can install Right Windshield part number 141W7400-38 or
141W7400-40 with serial numbers 06001Hxxxx thru 06338Hxxxx or with serial
numbers 06001Rxxxx thru 06338Rxxxx.
(j) As an option operators can install Left Windshield part number 141W7400-35 or
141W7400-41.
(k) As an option operators can install Right Windshield part number 141W7400-36 or
141W7400-42.
(l) PPG Aerospace - Transparencies Div Glass (V53117) P.O. Box 2200 1719 U.S.
Highway 72 East Huntsville, AL 35811-9660
(m) Serial numbers with letter H or R are acceptable. Serial numbers with letter H, are
new parts for Boeing production/spares. Serial numbers with letter R are parts rebuilt
by PPG.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 19, 2006
757-30-0020Revision 3: December 16, 2011
22 of 52
BOEING SERVICE BULLETIN 757-30-0020

### Page 23

Kit 280N3355
NotesNameQTYNew Part Number
-1-2-101-102
Wire Kit - Flight Deck Window
Heat
-...280N3355-1
Wire Kit - Flight Deck Window
Heat
.-..280N3355-2
Kit, Wire Bundle1.-.280N3355-101
W2304
Kit, Wire BundleW2314.1.-280N3355-102
BMS 13-52 Expandable Sleeve..1.280N3355-10103
BMS 13-52 Expandable Sleeve...1280N3355-10203
(a)Wire Identified W2304-0001-12..1.-
(b)Wire Identified W2304-0002-12..1.-
(a)Wire Identified W2314-0001-12...1-
(b)Wire Identified W2314-0002-12...1-
(c)Terminal Lug..33BACT12AC-12
(c)Socket Contact..33M39029/57-359
(a) BMS 13-60, Type 1, Class 1, AWG 12, length 66 inches
(b) BMS 13-60, Type 1, Class 1, AWG 12, length 33 inches
(c) There are more parts than are necessary.
2. Parts and Materials Supplied by the Operator:
NotesNameQTYPart Number /
Specification
(a) (b) (c)Lacing Tape, Red10 feetBMS 13-54
(a) (b) (d)Lacing Tape, Green10 feetBMS 13-54
(a) Type 3, Class 1
(b) Gudebrod Incorporated (V82110) Griffith Towers PO Box 357 Pottstown,
PA 19464
(c) BACS38K5C, red Tie Strap is optional. See the Qualified Products List at
the end of the Boeing Material Specification (BMS) for the supplier data.
(d) BACS38K5F, green Tie Strap is optional. See the Qualified Products List
at the end of the Boeing Material Specification (BMS) for the supplier data.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 19, 2006
757-30-0020Revision 3: December 16, 2011
23 of 52
BOEING SERVICE BULLETIN 757-30-0020

### Page 24

3. Parts Modified and Reidentified:
The parts shown below are changed as shown in this service bulletin. The quantity (QTY) is the
number of parts changed on each airplane.
NotesNew Part NumberNameQTYExisting Part
Number
(a) (b)-Glareshield1233N8300-( )
(a) Make the change given in this service bulletin.
(b) There is no equivalent Boeing part number for the changed part. Identify
on the part that the change given in this service bulletin was made.
4. Parts Removed and Not Replaced:
None
D. Parts Necessary to Change Spares
None
E. Special Tooling - Price and Availability
Boeing can supply the tool(s) shown in Paragraph 2.F., Special Tooling Necessary to do this Service
Bulletin. Operators are encouraged to share schedule requirements with Boeing for incorporation of
the service bulletin. The tool(s) are subject to the terms and conditions of the Boeing standard purchase
order acknowledgement. Prices are in United States Dollars. Terms: Net 30 days.
Reference this service bulletin number and submit your purchase order by one of these methods:
1. Order on-line via ATA Spec 2000 or Boeing Part Page
2. Fax to (206) 662-7145
REFER TO THE BOEING PART PAGE ON MY BOEING FLEET.COM OR CONTACT FIRST
RESPONDER AT FR@BOEING.COM FOR THE LATEST REORDER LEAD TIME (ROLT)
AND PRICE INFORMATION
Purchase Data:
Unit Price as of
the Revision 03
date of this Ser-
vice Bulletin (US
Dollars)
NameTool Kit Number
$766.00Windshield Handling SlingA56001-2 (part of
Sling Set A56001-
15)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 19, 2006
757-30-0020Revision 3: December 16, 2011
24 of 52
BOEING SERVICE BULLETIN 757-30-0020

### Page 25

F. Special Tooling Necessary to do this Service Bulletin
To get the tools shown below, refer to Paragraph 2.E., Special Tooling - Price and Availability.
Maintenance and overhaul tools in the manuals shown in Paragraph 1.J., References, can also be
necessary. Examine operator tool supply to make sure all necessary tools are available.
NameTool Kit Number
Windshield Handling SlingA56001-2 (part of
Sling Set A56001-15)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 19, 2006
757-30-0020Revision 3: December 16, 2011
25 of 52
BOEING SERVICE BULLETIN 757-30-0020

### Page 26

BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 19, 2006
757-30-0020Revision 3: December 16, 2011
26 of 52
BOEING SERVICE BULLETIN 757-30-0020
BLANK PAGE

### Page 27

3.    ACCOMPLISHMENT INSTRUCTIONS
A. GENERAL INFORMATION
CAUTION: KEEP THE WORK AREA, WIRES AND ELECTRICAL BUNDLES CLEAN OF METAL
PARTICLES OR CONTAMINATION WHEN YOU USE TOOLS. UNWANTED MATERIAL,
METAL PARTICLES OR CONTAMINATION CAUGHT IN WIRE BUNDLES CAN CAUSE
DAMAGE TO THE BUNDLES. DAMAGED WIRE BUNDLES CAN CAUSE SPARKS OR
OTHER ELECTRICAL DAMAGE.
NOTE: 1. Manual titles are referred to by acronyms. Refer to Paragraph 1.J., References, for
definition of the acronyms.
2. Obey all of the warnings and cautions given in the specified manual sections.
3. The work instructions are divided into work packages. Task Hours and Elapsed Hours
for each package are given in Paragraph 1.G., Manpower. You can do each work
package independently.
4. Unless shown differently, these dimensions and tolerances are used:
– Linear dimensions are in inches
– Hole dimensions for standard solid rivets and fasteners are in Structural Repair
Manual (SRM) Chapter 51
5. Refer to the SWPM 20-10-11 and SWPM 20-10-12 for the wire installation procedures,
and SWPM 20-10-19 for the wire separation requirements, as accepted procedures.
6. A Detailed Inspection is defined as: An intensive examination of a specific item,
installation, or assembly to detect damage, failure, or irregularity. Available lighting
is normally supplemented with a direct source of good lighting at an intensity deemed
appropriate. Inspection aids such as mirrors, magnifying lenses, etc. may be
necessary. Surface cleaning and elaborate procedures may be required.
7. These work instructions refer to procedures included in other Boeing documents.
When the words "refer to" are used and the operator has an accepted alternative
procedure, the accepted alternative procedure can be used. When the words "in
accordance with" are included in the instruction, the procedure in the Boeing document
must be used.
8. If it is necessary to remove more parts for access, you can remove those parts. If
you can get access without removing identified parts, it is not necessary to remove
all of the identified parts. Jacking and shoring limitations must be observed.
9. Where the work instructions include installation of a kept part, a new or serviceable
part with the same part number can be installed as an alternative to the kept part.
The removed part can be discarded if a new or serviceable part is installed.
10. This service bulletin includes functional test procedures for the systems changed by
this service bulletin. More functional tests can possibly be necessary in accordance
with standard maintenance practices because of interruption to other airplane systems.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 19, 2006
757-30-0020Revision 3: December 16, 2011
27 of 52
BOEING SERVICE BULLETIN 757-30-0020

### Page 28

B. WORK INSTRUCTIONS
WORK PACKAGE 1 - INSPECTION OF THE LEFT WINDSHIELD
WARNING: BEFORE YOU DO MAINTENANCE ON THE WINDSHIELD HEAT SYSTEM, OPEN THE
CIRCUIT BREAKER GIVEN IN THE STEP THAT FOLLOWS. IF THIS CIRCUIT BREAKER
IS NOT OPEN, YOU CAN GET AN ELECTRICAL SHOCK WHEN YOU TOUCH THE
TERMINAL.
1. Open the applicable circuit breaker shown below and attach a DO-NOT-CLOSE tag to it:
Circuit BreakerNamePositionPanel
C391WINDOW HTR 1LC13P70
2. Do a detailed inspection of the left windshield and any corrective actions if necessary, in accordance
with FIGURE 1.
3. Remove the DO-NOT-CLOSE tag and close the applicable circuit breaker shown below:
Circuit BreakerNamePositionPanel
C391WINDOW HTR 1LC13P70
WORK PACKAGE 2 - INSPECTION OF THE RIGHT WINDSHIELD
WARNING: BEFORE YOU DO MAINTENANCE ON THE WINDSHIELD HEAT SYSTEM, OPEN THE
CIRCUIT BREAKER GIVEN IN THE STEP THAT FOLLOWS. IF THIS CIRCUIT BREAKER
IS NOT OPEN, YOU CAN GET AN ELECTRICAL SHOCK WHEN YOU TOUCH THE
TERMINAL.
1. Open this circuit breaker and attach a DO-NOT-CLOSE tag to it:
Circuit BreakerNamePositionPanel
C392WINDOW HTR 1RJ2P37
2. Do a detailed inspection of the right windshield and any corrective actions if necessary, in
accordance with FIGURE 2.
3. Remove the DO-NOT-CLOSE tag and close this circuit breaker:
Circuit BreakerNamePositionPanel
C392WINDOW HTR 1RJ2P37
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 19, 2006
757-30-0020Revision 3: December 16, 2011
28 of 52
BOEING SERVICE BULLETIN 757-30-0020

### Page 29

WORK PACKAGE 3 - REPLACEMENT OF THE LEFT WINDSHIELD AND CHANGES TO THE
RELATED WIRE BUNDLE
WARNING: THE WINDOW HEAT SYSTEM MUST BE DISARMED WHEN YOU REMOVE THE
WINDOWS. IF THE WINDOW POWER IS ON, YOU CAN GET AN ELECTRICAL SHOCK
WHEN YOU TOUCH THE WINDOW. THE SHOCK CAN CAUSE INJURY TO PERSONS.
1. Open this circuit breaker and attach a DO-NOT-CLOSE tag:
Circuit BreakerNamePositionPanel
C391WINDOW HTR 1LC13P70
2. Remove the left windshield. Use the windshield handling sling, A56001-2. Refer to 757 AMM
56-11-01 as an accepted procedure.
3. Cut the bulb seal for the left windshield in accordance with FIGURE 3.
4. Change the wiring for the window heat on the left windshield in accordance with FIGURE 4 and
FIGURE 5.
5. Do a continuity test of the new wires.
6. Install the left windshield. Use the windshield handling sling, A56001-2. Refer to 757 AMM 56-11-01
as an accepted procedure. At the operator's choice, use one of the windshields shown below:
Part of Top KitPart NumberDescription
012N8926-13141W7400-43Left Windshield with Hy-
drophobic Coating
7. Remove the DO-NOT-CLOSE tag and close this circuit breaker.
Circuit BreakerNamePositionPanel
C391WINDOW HTR 1LC13P70
8. Do the test "Operational Test - Flight Compartment Window Anti-Icing System". Refer to 757 AMM
30-41-00 as an accepted procedure.
9. Put the airplane in a serviceable condition.
WORK PACKAGE 4 - REPLACEMENT OF THE RIGHT WINDSHIELD AND CHANGES TO THE
RELATED WIRE BUNDLE
WARNING: THE WINDOW HEAT SYSTEM MUST BE DISARMED WHEN YOU REMOVE THE
WINDOWS. IF THE WINDOW POWER IS ON, YOU CAN GET AN ELECTRICAL SHOCK
WHEN YOU TOUCH THE WINDOW. THE SHOCK CAN CAUSE INJURY TO PERSONS.
1. Open this circuit breaker and attach a DO-NOT-CLOSE tag:
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 19, 2006
757-30-0020Revision 3: December 16, 2011
29 of 52
BOEING SERVICE BULLETIN 757-30-0020

### Page 30

Circuit BreakerNamePositionPanel
C392WINDOW HTR 1RJ2P37
2. Remove the right windshield. Use the windshield handling sling, A56001-2. Refer to 757 AMM
56-11-01 as an accepted procedure.
3. Cut the bulb seal for the right windshield in accordance with FIGURE 6.
4. Change the window heat wiring for the right windshield in accordance with FIGURE 7 and FIGURE
8.
5. Do a continuity test of the new wires.
6. Install the right windshield. Use the windshield handling sling, A56001-2. Refer to 757 AMM
56-11-01 as an accepted procedure. At the operator's choice, use one of the windshields shown
below:
Part of Top KitPart NumberDescription
012N8926-14141W7400-44Right Windshield with Hy-
drophobic Coating
7. Remove the DO-NOT-CLOSE tag and close this circuit breaker:
Circuit BreakerNamePositionPanel
C392WINDOW HTR 1RJ2P37
8. Do the test "Operational Test - Flight Compartment Window Anti-Icing System". Refer to 757 AMM
30-41-00 as an accepted procedure.
9. Put the airplane in a serviceable condition.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 19, 2006
757-30-0020Revision 3: December 16, 2011
30 of 52
BOEING SERVICE BULLETIN 757-30-0020

### Page 31 (OCR)

BOEING SERVICE BULLETIN 757-30-0020
3 SCREW
3) SCREW
/ TERMINAL
BLOCK,
LUG,
LUG  W2304  BLOCK,  TERMINAL  LUG  WIRING
LUG,
WIRING
TERMINAL
BLOCK,
LUG,
WIRING  ) SCREW
J5
2 LUG
INBD
TB5028  " FWD  485157
FIGURE 1: INSPECTION OF THE LEFT WINDSHIELD
(SHEET 1 OF 6)
Original Issue: July 19, 2006
Revision 3 December 16, 2011  757-30-0020
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.  31 of 52

### Page 32 (OCR)

BOEING SERVICE BULLETIN 757-30-0020
LUG
(WB0710
LUG  LUG PARALLEL  TO TERMINAL  SHOWN)  LUG NOT PARALLEL  TO TERMINAL
(WB0710
SHOWN)
TERMINAL  TERMINAL
ACCEPTABLE  NOT ACCEPTABLE
LUG PARALLEL TO TERMINAL  LUG NOT PARALLEL TO TERMINAL
WALLACE AND BLACK LUG
LUG PARALLEL TO  LUG NOT PARALLEL
TERMINAL AND  LUG  TO TERMINAL AND
O-RING EVENLY  / (CWCO1-1210  O-RING NOT EVENLY  LUG
COMPRESSED  SHOWN)  COMPRESSED  / (CWCO1-1210
SHOWN)
TERMINAL  TERMINAL
ACCEPTABLE  NOT ACCEPTABLE
LUG PARALLEL TO TERMINAL  LUG NOT PARALLEL TO TERMINAL
CORY / TRI-STAR LUG
FIGURE 1: INSPECTION OF THE LEFT WINDSHIELD
(SHEET 2 OF 6)
Original Issue: July 19, 2006
Revision 3 December 16, 2011  BOEING PROPRIETARY -  757-30-0020
Copyright © Unpublished Work - See page 1 for details.  32 of 52

### Page 33 (OCR)

BOEING SERVICE BULLETIN 757-30-0020
COVER
345 SCREW
LUG
12 34
LOCKWASHER
TERMINAL
WALLACE AND BLACK LUG
2) 35
COVER
3(4) 5) SCREW
LUG
4)5
LOCKWASHER
O-RING
TERMINAL
CORY / TRI-STAR LUG  1673473
FIGURE 1: INSPECTION OF THE LEFT WINDSHIELD
(SHEET 3 OF 6)
Original Issue: July 19, 2006
Revision 3 December 16, 2011  757-30-0020
Copyright © Unpublished Work - See page 1 for details.  BOEING PROPRIETARY -  33 of 52

### Page 34

The step numbers shown below agree with the numbers shown in the circle symbols in the figure.
MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
at the J1, J4 and J5
connection. (a)
3J1, J4, J5Terminal BlockInspect1
(b)3-LugInspect
(c)3WIRE BUNDLE W2304WiringInspect
3-CoverRemove / Keep2
to make sure it is a
tight connection. (d)
(e) (f) (g)
3-LugInspect
not necessary if the
lug is loose. (h)
3-CoverInstall (Kept)
CAUTION: DO NOT OVER TIGHTEN. THE TERMINAL CAN BE DAMAGED BY TOO MUCH FORCE. A
DAMAGED TERMINAL WILL REQUIRE THE REPLACEMENT OF THE WINDOW.
to 25 to 30 inch
pounds of torque.
Refer to SWPM 20-
64-16 as an accept-
ed procedure. (i) (j)
3-ScrewTorque3
to make sure the
connection is tight.
3-LugInspect
not necessary if the
lug cannot be tight-
ened.
3-CoverInstall (Kept)
to make sure the
screw is installed
and there is no dam-
age to terminal, lug
or screw.
3-ScrewRemove4
3-WasherRemove
3-O-ringRemove
to make sure the
terminal or lug is not
damaged. (k)
3J1, J4, J5TerminalInspect
(l)3-LugInspect
FIGURE 1: INSPECTION OF THE LEFT WINDSHIELD
(SHEET 4 OF 6)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 19, 2006
757-30-0020Revision 3 December 16, 2011
34 of 52
BOEING SERVICE BULLETIN 757-30-0020

### Page 35

MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
CAUTION: DO NOT OVER TIGHTEN. THE TERMINAL CAN BE DAMAGED BY TOO MUCH FORCE. A
DAMAGED TERMINAL WILL REQUIRE THE REPLACEMENT OF THE WINDOW.
to make sure lug is
assembled to termi-
nal with new, undam-
aged and correct
hardware. (m) (n)
3-ScrewInstall (New)5
3-WasherInstall (New)
(o)3-O-ringInstall (New)
to 25 to 30 inch
pounds of torque.
Refer to SWPM 20-
64-16 as an accept-
ed procedure. (p)
3-ScrewTorque
3-CoverInstall (Kept)
(a) If the terminal block has melted, distorted or cracked, replace the windshield; refer to 757 AMM 56-11-01
as an accepted procedure.
(b) If the terminal lug or cover has melted, replace the shipside terminal lug, refer to SWPM 20-64-16 ; and
replace the windshield, refer to 757 AMM 56-11-01 as an accepted procedure.
(c) If the shipside wire insulation is melted or discolored, then repair or replace shipside wiring as necessary.
Refer to Standard Wiring Practices Manual SWPM 20-10-13 as an accepted procedure.
(d) If the terminal lug moves while applying light manual pressure to the strain-relief on the lug, then the screw
that attaches it must be tightened. There are four causes for a loose terminal. 1-The screw is not tightened
to the correct torque. 2-The terminal is damaged. 3-The incorrect screw is installed. The correct screw
part number is given in SWPM 20-64-16. 4-The screw is cross threaded.
(e) If the lug is not parallel with the terminal, then the screw is cross threaded. Check for lug alignment, the
lug and terminal must be viewed from the side. It may be necessary to view the lug and terminal from the
exterior side of the window.
(f) If the lug shows signs of arcing, blueing, overheating or melting, replace the lug, refer to SWPM 20-64-
16 ; and replace the windshield, refer to 757 AMM 56-11-01 as an accepted procedure.
(g) If the lug is installed correctly, is tight, and is parallel to the terminal block, install the cover. No more work
is necessary.
(h) If the lug is loose, do step 3.
(i) The screw is only tightened if the lug is loose. If it is the correct screw and it cannot be tightened to 25 to
30 inch pounds, do steps 4 and 5.
(j) If the cross threaded screw can not be tightened, replace the window. Refer to 757 AMM 56-11-01 as an
accepted procedure.
FIGURE 1: INSPECTION OF THE LEFT WINDSHIELD
(SHEET 5 OF 6)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 19, 2006
757-30-0020Revision 3 December 16, 2011
35 of 52
BOEING SERVICE BULLETIN 757-30-0020

### Page 36

MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
(k) If the terminal block mating surface has contamination, clean surface. Refer to SWPM 20-20-00 Cleaning
Method 5 as an accepted procedure. If the terminal shows signs of arcing, blueing, overheating, pitting
corrosion or other surface damage, the window must be replaced. Refer to 757 AMM 56-11-01 as an
accepted procedure.
(l) If the mating surface on the terminal lug has contamination, clean surface. Refer to SWPM 20-20-00
Cleaning Method 5 as an accepted procedure. If the lug cannot be cleaned or shows signs of arcing,
blueing, overheating, pitting corrosion or other surface damage, the lug must be replaced. Refer to SWPM
20-64-16 as an accepted procedure.
(m) Reassemble the lug to the terminal with a new screw, lock washer and o-ring. Make sure the o-ring is in-
stalled prior to assemble of the lug to the terminal. Refer to SWPM 20-64-16 as an accepted procedure.
(n) Make sure the screw has been aligned correctly.
(o) A new o-ring is only available for the CWC01-1210 lug. Refer to SWPM 20-64-16 for the correct screw,
washer and o-ring.
(p) Do step 2 to make sure the screw has been installed correctly and is a tight connection.
FIGURE 1: INSPECTION OF THE LEFT WINDSHIELD
(SHEET 6 OF 6)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 19, 2006
757-30-0020Revision 3 December 16, 2011
36 of 52
BOEING SERVICE BULLETIN 757-30-0020

### Page 37 (OCR)

BOEING SERVICE BULLETIN 757-30-0020
) SCREW
LUG
LUG
TERMINAL  W2314  TERMINAL
BLOCK,  BLOCK,
WIRING  LUG,  WIRING  LUG,
) SCREW  TERMINAL
BLOCK,
J5  LUG,
WIRING
(2) LUG
INBD <
FWD ‹  TB5038
FIGURE 2: INSPECTION OF THE RIGHT WINDSHIELD
(SHEET 1 OF 6)
Original Issue: July 19, 2006
Revision 3 December 16, 2011  BOEING PROPRIETARY -  757-30-0020
Copyright © Unpublished Work - See page 1 for details.  37 of 52

### Page 38 (OCR)

BOEING SERVICE BULLETIN 757-30-0020
LUG
LUG  LUG PARALLEL  TO TERMINAL  SHOWN)  (WB0710  LUG NOT PARALLEL  TO TERMINAL
(WB0710
SHOWN)
TERMINAL  TERMINAL
ACCEPTABLE  NOT ACCEPTABLE
LUG PARALLEL TO TERMINAL  LUG NOT PARALLEL TO TERMINAL
WALLACE AND BLACK LUG
LUG PARALLEL TO  LUG NOT PARALLEL
TERMINAL AND  LUG  TO TERMINAL AND
O-RING EVENLY  / (CWC01-1210  O-RING NOT EVENLY  LUG
COMPRESSED  SHOWN)  COMPRESSED  (CWC01-1210
SHOWN)
TERMINAL  TERMINAL
ACCEPTABLE  NOT ACCEPTABLE
LUG PARALLEL TO TERMINAL  LUG NOT PARALLEL TO TERMINAL
CORY / TRI-STAR LUG
FIGURE 2: INSPECTION OF THE RIGHT WINDSHIELD
(SHEET 2 OF 6)
Original Issue: July 19, 2006
Revision 3 December 16, 2011  BOEING PROPRIETARY -  757-30-0020
Copyright © Unpublished Work - See page 1 for details.  38 of 52

### Page 39 (OCR)

BOEING SERVICE BULLETIN 757-30-0020
COVER
34€ SCREW
LUG
(2) 3) 4)
LOCKWASHER
TERMINAL
WALLACE AND BLACK LUG
13€
COVER
3AG SCREW
LUG
4X  12 3 4
LOCKWASHER
45
O-RING
TERMINAL
CORY / TRI-STAR LUG  1676457
FIGURE 2: INSPECTION OF THE RIGHT WINDSHIELD
(SHEET 3 OF 6)
Original Issue: July 19, 2006
Revision 3 December 16, 2011  757-30-0020
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.  39 of 52

### Page 40

The step numbers shown below agree with the numbers shown in the circle symbols in the figure.
MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
at the J1, J4 and J5
connection. (a)
3J1, J4, J5Terminal BlockInspect1
(b)3-LugInspect
(c)3WIRE BUNDLE W2314WiringInspect
3-CoverRemove / Keep2
to make sure it is a
tight connection. (d)
(e) (f) (g)
3-LugInspect
not necessary if the
lug is loose. (h)
3-CoverInstall (Kept)
CAUTION: DO NOT OVER TIGHTEN. THE TERMINAL CAN BE DAMAGED BY TOO MUCH FORCE. A
DAMAGED TERMINAL WILL REQUIRE THE REPLACEMENT OF THE WINDOW.
to 25 to 30 inch
pounds of torque.
Refer to SWPM 20-
64-16 as an accept-
ed procedure. (i) (j)
3-ScrewTorque3
to make sure the
connection is tight.
3-LugInspect
not necessary if the
lug cannot be tight-
ened.
3-CoverInstall (Kept)
to make sure the
screw is installed
and there is no dam-
age to terminal, lug
or screw.
3-ScrewRemove4
3-WasherRemove
3-O-ringRemove
to make sure the
terminal or lug is not
damaged. (k)
3J1, J4, J5TerminalInspect
(l)3-LugInspect
FIGURE 2: INSPECTION OF THE RIGHT WINDSHIELD
(SHEET 4 OF 6)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 19, 2006
757-30-0020Revision 3 December 16, 2011
40 of 52
BOEING SERVICE BULLETIN 757-30-0020

### Page 41

MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
CAUTION: DO NOT OVER TIGHTEN. THE TERMINAL CAN BE DAMAGED BY TOO MUCH FORCE. A
DAMAGED TERMINAL WILL REQUIRE THE REPLACEMENT OF THE WINDOW.
to make sure lug is
assembled to termi-
nal with new, undam-
aged and correct
hardware. (m) (n)
3-ScrewInstall (New)5
3-WasherInstall (New)
(o)3-O-ringInstall (New)
to 25 to 30 inch
pounds of torque.
Refer to SWPM 20-
64-16 as an accept-
ed procedure. (p)
3-ScrewTorque
3-CoverInstall (Kept)
(a) If the terminal block has melted, distorted or cracked, replace the windshield; refer to 757 AMM 56-11-01
as an accepted procedure.
(b) If the terminal lug or cover has melted, replace the shipside terminal lug, refer to SWPM 20-64-16 ; and
replace the windshield, refer to 757 AMM 56-11-01 as an accepted procedure.
(c) If the shipside wire insulation is melted or discolored, then repair or replace shipside wiring as necessary.
Refer to Standard Wiring Practices Manual SWPM 20-10-13 as an accepted procedure.
(d) If the terminal lug moves while applying light manual pressure to the strain-relief on the lug, then the screw
that attaches it must be tightened. There are four causes for a loose terminal. 1-The screw is not tightened
to the correct torque. 2-The terminal is damaged. 3-The incorrect screw is installed. The correct screw
part number is given in SWPM 20-64-16. 4-The screw is cross threaded.
(e) If the lug is not parallel with the terminal, then the screw is cross threaded. Check for lug alignment, the
lug and terminal must be viewed from the side. It may be necessary to view the lug and terminal from the
exterior side of the window.
(f) If the lug shows signs of arcing, blueing, overheating or melting, replace the lug, refer to SWPM 20-64-
16; and replace the windshield, refer to 757 AMM 56-11-01 as an accepted procedure.
(g) If the lug is installed correctly, is tight, and is parallel to the terminal block, install the cover. No more work
is necessary.
(h) If the lug is loose, do step 3.
(i) The screw is only tightened if the lug is loose. If it is the correct screw and it cannot be tightened to 25 to
30 inch pounds, do steps 4 and 5.
(j) If the cross threaded screw can not be tightened, replace the window. Refer to 757 AMM 56-11-01 as an
accepted procedure.
FIGURE 2: INSPECTION OF THE RIGHT WINDSHIELD
(SHEET 5 OF 6)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 19, 2006
757-30-0020Revision 3 December 16, 2011
41 of 52
BOEING SERVICE BULLETIN 757-30-0020

### Page 42

MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
(k) If the terminal block mating surface has contamination, clean surface. Refer to SWPM 20-20-00 Cleaning
Method 5 as an accepted procedure. If the terminal shows signs of arcing, blueing, overheating, pitting
corrosion or other surface damage, the window must be replaced. Refer to 757 AMM 56-11-01 as an
accepted procedure.
(l) If the mating surface on the terminal lug has contamination, clean surface. Refer to SWPM 20-20-00
Cleaning Method 5 as an accepted procedure. If the lug cannot be cleaned or shows signs of arcing,
blueing overheating, pitting corrosion or other surface damage, the lug must be replaced. Refer to SWPM
20-64-16 as an accepted procedure.
(m) Reassemble the lug to the terminal with a new screw, lock washer and o-ring. Make sure the o-ring is in-
stalled prior to assemble of the lug to the terminal. Refer to SWPM 20-64-16 as an accepted procedure.
(n) Make sure the screw has been aligned correctly.
(o) A new o-ring is only available for the CWC01-1210 lug. Refer to SWPM 20-64-16 for the correct screw,
washer and o-ring.
(p) Do step 2 to make sure the screw has been installed correctly and is a tight connection.
FIGURE 2: INSPECTION OF THE RIGHT WINDSHIELD
(SHEET 6 OF 6)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 19, 2006
757-30-0020Revision 3 December 16, 2011
42 of 52
BOEING SERVICE BULLETIN 757-30-0020

### Page 43

CAUTION: DO NOT CUT THE STRUCTURE BELOW THE BULB SEAL. THE WINDOW SILL IS A HIGH
MOISTURE AREA AND MOISTURE CAN CAUSE CORROSION IF THE FINISH IS DAMAGED.
DAMAGE TO THE FINISH MUST BE REPAIRED.
The flag note numbers shown below agree with the numbers shown in the flag symbols in the figure.
MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
to clear the new termi-
nal. (a)
-233T8300-7Bulb SealCut1
(b)--GlareshieldIdentify2
FIGURE 3: CUT THE BULB SEAL FOR THE LEFT WINDSHIELD
(SHEET 1 OF 2)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 19, 2006
757-30-0020Revision 3 December 16, 2011
43 of 52
BOEING SERVICE BULLETIN 757-30-0020

### Page 44

MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
(a) If the finish below the bulb seal is damaged, it must be sealed with chemical treatment and
primer. Refer to Standard Overhaul Practices Manual SOPM 20-41-02 and SOPM 20-43-
03 as accepted procedures.
(b) Part mark with service bulletin number before new windshield is installed. Refer to SOPM
20-50-10 as an accepted procedure.
FIGURE 3: CUT THE BULB SEAL FOR THE LEFT WINDSHIELD
(SHEET 2 OF 2)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 19, 2006
757-30-0020Revision 3 December 16, 2011
44 of 52
BOEING SERVICE BULLETIN 757-30-0020

### Page 45 (OCR)

BOEING SERVICE BULLETIN 757-30-0020
W2304
+ A-AA +
D3322
+ A-AB +
D3324
- A-AC -
D3326
TB5028
STA 225  B35 LEFT WINDOW 1
WL 225
LBL 37
- 0001-12  =1
- 0002-12
J5
B35 LEFT WINDOW 1
REFERENCE: WIRING DIAGRAM 30-41-11
- ADDED WIRE OR NEW ROUTING
+ DELETED WIRE OR FORMER ROUTING
485160
FIGURE 4: CHANGES TO THE WIRING FOR THE WINDOW HEAT ON THE LEFT WINDSHIELD
(SHEET 1 OF 2)
Original Issue: July 19, 2006
Revision 3 December 16, 2011  757-30-0020
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.  45 of 52

### Page 46

The flag note numbers shown below agree with the numbers shown in the flag symbols in the figure.
MORE DATAQTYIDENTIFICATIONNAMEFLAG
NOTE
1BMS 13-60, Type 1,
Class 1, AWG 12
Wire1
1BMS 13-60, Type 1,
Class 1, AWG 12
Wire2
or optional BACS38K5C Tie Strap.-BMS 13-54, Type 3,
Class 1, Red
Lacing Tape
Red is for left channel separation.
Refer to Standard Wiring Practices
Manual SWPM 20-10-19 as an ac-
cepted procedure.
Refer to SWPM 20-10-18 as an ac-
cepted procedure.
2280N3355-10103Sleeve3
Refer to SWPM 20-64-18  as an
accepted procedure. (a)
2M39029/57-359Socket Contact4
Refer to SWPM 20-30-11 as an ac-
cepted procedure.
2BACT12AC-12Terminal Lug5
(a) Isopropyl alcohol is applied to the installation tool and on the contact before installation of the
contact. Isopropyl alcohol is a lubricant that helps with installation of the contact in the con-
nector.
FIGURE 4: CHANGES TO THE WIRING FOR THE WINDOW HEAT ON THE LEFT WINDSHIELD
(SHEET 2 OF 2)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 19, 2006
757-30-0020Revision 3 December 16, 2011
46 of 52
BOEING SERVICE BULLETIN 757-30-0020

### Page 47 (OCR)

BOEING SERVICE BULLETIN 757-30-0020
NH00 - 0000t00
W2304
W2304
J5
-TB5028
INBD
" FWD  485162
FIGURE 5: WIRE ROUTING FOR THE WINDOW HEAT ON THE LEFT WINDSHIELD
(SHEET 1 OF 1)
Original Issue: July 19, 2006
Revision 3 December 16, 2011l  757-30-0020
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.  47 of 52

### Page 48

CAUTION: DO NOT CUT THE STRUCTURE BELOW THE BULB SEAL. THE WINDOW SILL IS A HIGH
MOISTURE AREA AND MOISTURE CAN CAUSE CORROSION IF THE FINISH IS DAMAGED.
DAMAGE TO THE FINISH MUST BE REPAIRED.
The step numbers shown below agree with the numbers shown in the circle symbols in the figure.
MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
to clear the new termi-
nal. (a)
-233T8300-8Bulb SealCut1
(b)--GlareshieldIdentify2
(a) If the finish below the bulb seal is damaged, it must be sealed with chemical treatment and
primer. Refer to Standard Overhaul Practices Manual SOPM 20-41-02 and SOPM 20-43-
03, if necessary.
FIGURE 6: CUT THE BULB SEAL FOR THE RIGHT WINDSHIELD
(SHEET 1 OF 2)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 19, 2006
757-30-0020Revision 3 December 16, 2011
48 of 52
BOEING SERVICE BULLETIN 757-30-0020

### Page 49

MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
(b) Part mark with service bulletin number before new windshield is installed. Refer to SOPM
20-50-10 as an accepted procedure.
FIGURE 6: CUT THE BULB SEAL FOR THE RIGHT WINDSHIELD
(SHEET 2 OF 2)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 19, 2006
757-30-0020Revision 3 December 16, 2011
49 of 52
BOEING SERVICE BULLETIN 757-30-0020

### Page 50 (OCR)

BOEING SERVICE BULLETIN 757-30-0020
W2314
+ A-AA +
D3270
4 A-AB +
D3272
+ A-AC +17
D3274
TB5038
STA 223  B38 RIGHT WINDOW 1
WL 230
RBL 40
0001-12 -  =1
J1
0002-12
J5
B38 RIGHT WINDOW 1
REFERENCE: WIRING DIAGRAM 30-41-12
ADDED WIRE OR NEW ROUTING
FAT DELETED WIRE OR FORMER ROUTING
FIGURE 7: CHANGES TO THE WIRING FOR THE WINDOW HEAT ON THE RIGHT WINDSHIELD
(SHEET 1 OF 2)
Original Issue: July 19, 2006
Revision 3 December 16, 2011  BOEING PROPRIETARY -  757-30-0020
Copyright © Unpublished Work - See page 1 for details.  50 of 52

### Page 51

The flag note numbers shown below agree with the numbers shown in the flag symbols in the figure.
MORE DATAQTYIDENTIFICATIONNAMEFLAG
NOTE
1BMS 13-60, Type 1,
Class 1, AWG 12
Wire1
1BMS 13-60, Type 1,
Class 1, AWG 12
Wire2
or optional BACS38K5F Tie Strap.BMS 13-54, Type 3,
Class 1, Green
Lacing Tape
Green is for right channel separation.
Refer to Standard Wiring Practices
Manual SWPM 20-10-19 as an accept-
ed procedure.
Refer to SWPM 20-10-18 as an accept-
ed procedure.
2280N3355-10203Sleeve3
Refer to SWPM 20-64-18  as an ac-
cepted procedure. (a)
2M39029/57-359Socket Contact4
Refer to SWPM 20-30-11 as an accept-
ed procedure.
2BACT12AC-12Terminal Lug5
(a) Isopropyl alcohol is applied to the installation tool and on the contact before installation of the
contact. Isopropyl alcohol is a lubricant that helps with installation of the contact in the connector.
FIGURE 7: CHANGES TO THE WIRING FOR THE WINDOW HEAT ON THE RIGHT WINDSHIELD
(SHEET 2 OF 2)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 19, 2006
757-30-0020Revision 3 December 16, 2011
51 of 52
BOEING SERVICE BULLETIN 757-30-0020

### Page 52 (OCR)

BOEING SERVICE BULLETIN 757-30-0020
W2314
W2314
J5
TB5038
INBD
FWD •  485170
FIGURE 8: WIRE ROUTING FOR THE WINDOW HEAT ON THE RIGHT WINDSHIELD
(SHEET 1 OF 1)
Original issue: July 19, 2006
Revision 3 December 16, 2011  757-30-0020
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.  52 of 52

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
