# Boeing Service Bulletin 757-54-0003: Revision 1

- Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2013-0326; AD 2014-05-13 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Boeing Service Bulletin 757-54-0003](https://openairdocs.org/service-documents/boeing/sb-757-54-0003.md)
- Title as filed: U.S. DOT/FAA - SB-757-54-0003-01
- Pages: 14
- PDF: https://openairdocs.org/files/sha256/5a/fc/5afc55d7f1bc1a9e6f842b12cba687d323f4d2715b4bf911e3569c44f22149a5
- Page: https://openairdocs.org/service-documents/boeing/sb-757-54-0003/file/5afc55d7f1bc

## Text

This text is OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1 (OCR)

(MASTER COPIED!  SEF 5 1095
BOEING
BOEING COMMERCIAL AIRPLANE COMPANY P.O. BOX 3707 SEATTLE, WASHINGTON 98124
757
REVISION TRANSMITTAL SHEET
Boeing Service Bulletin 757-54-0003
This sheet transmits REVISION 1 dated August 30, 1985
of Service Bulletin 757-54-0003, NACELLES/PYLONS - UPPER
LINK BACKUP STRUCTURE MODIFICATION".
NOTE: This revision constitutes a complete reissue.
SUMMARY
This revision is issued to provide tooling information which may be
helpful in  accomplishing this bulletin.  In addition, Notice of Status
Change 757-54-0003NSC1 has been incorporated.
Airplanes modified per the previous release of this service bulletin do
not require additional work.
A revision bar in the left margin along with this revision number and
date indicates a change. Absence of a revision bar on a page bearing a
'revised' notice means only that existing copy has been moved or that a
minor typographical error has been corrected.
REVISION HISTORY
Original Issue:  December 14, 1984
Revision 1:  August 30, 1985

### Page 2 (OCR)

BOEING 757
BOEING COMMERCIAL AIRPLANE COMPANY
SUBJECT: NACELLES/PYLONS - UPPER LINK
BACKUP STRUCTURE MODIFICATION
BACKGROUND
SERVICE BULLETIN
SUMMARY
P.O. BOX 3707 SEATTLE, WASHINGTON 98124
ATA: 5451  NO: 757-54-0003
DATE: December 14, 1984
REVISION 1: August 30, 1985
EFFECTIVITY
Fatigue  tests and analysis at Boeing  Line Numbers 2 through 30 and 32
show that cracks can  occur in the  through 34.
horizontal flanges  of the  nacelle
strut upper link attachment fitting,  MANPOWER
mid-bulkhead where the  fitting
attaches,  and the  center  chord  Total Man-Hours - 142
vertical  flange forward  of  the
attachment.  Elapsed Time - 27 Hours
Crack progression in this area could  MATERIAL INFORMATION
affect the integrity of the upper link
attachment  and,  consequently,  the  Kit  Delivery  Price
fail-safe design of the strut-to-wing
attachment.  012N8258-1  Available  No Charge
ACTION (PRR N53101)
Prior to accumulation of 6000 flight
cycles, modify the nacelle strut upper
spar at the affected areas to prevent
cracking.
See  Paragraph I. F. for applicable
terms and conditions.
CRACKS
Modification consists of  fastener  LINK
installation changes at the attachment  FITTING  ATTACHMENT  - UPPER
of the upper link attach fitting  to  LINK
STRUT UPPER
the mid-bulkhead and replacement of a  SPAR WEB
stiffener on the lower side of the
CRACK!
upper spar weo, just forward of the  SPAR
oulkhead, on the left and right struts.  CENTER
CHORD
On the left strut only, replacement of
a pulley bracket assembly is required
to  eliminate attachment  of  the
assembly to the vertical flange of the  LEFT STRUT SHOWN
center chord.  RIGHT STRUT OPPOSITE
On both struts, replacement of the
insulation blankets and replacement of
one heat shield, and rework of the
other, is required to accommodate the
modification.
SECTION A-A
Summary Page 1 of 1

### Page 3 (OCR)

BOEING
BOEING COMMERCIAL AIRPLANE COMPANY P.O. BOX 3707 SEATTLE, WASHINGTON 98124
SERVICE BULLETIN
ATA  NO: 757-54-0003
SYSTEM: 5451  DATE: December 14, 1984
757  REVISION 1: August 30, 1985
SUBJECT: NACELLES/PYLONS - UPPER LINK BACKUP STRUCTURE MODIFICATION
PLANNING INFORMATION
Effectivity
1.  Airplanes Affected
See Service Bulletin Index Part 3 for cross reference of
Variable Number to Airplane Serial Number.
An equivalent change will be incorporated in production in
accordance with PRR N53101 on applicable airplanes other
than those listed below.
LISTING BY CUSTOMER CODE AND VARIABLE NUMBER
BAB NA201-NA204 NA206-NA213
EAL NA002-NA016
INT NA205  NA214
MON NA401-NA403
LISTING BY VARIABLE NUMBER
NA002-NA016 NA201-NA214 NA401-NA403
2.  Spares Affected
None
Dec 14/84  757-54-0003
REV. 1: Aug 30/85  Page 1 of 11

### Page 4 (OCR)

BOEING SERVICE BULLETIN 757-54-0003
B.  Reason
Modification of the nacelle strut at and adjacent to the
attachment of the upper link will reduce the possibility of
fatigue cracks. Crack progression in this area could affect the
integrity of the attachment of the upper link and, consequently,
the fail-safe design of the strut-to-wing attachment.
During fatigue tests at Boeing, cracks were found in the upper
link attach fitting horizontal flange and the upper horizontal
flange of the mid-bulkhead. Several of the fasteners attaching
the fitting to the bulkhead were fractured. A crack was also
found at one of two fastener holes in the vertical flange of the
left strut upper spar center chord where a thrust control pulley
Analysis shows that the horizontal flange cracks and fractured
fasteners  resulted from clamp-up and cyclic stresses during
flight. The cyclic stresses were accentuated by inadequate fit
of the tension fasteners through the vertical flange of the
attach fitting and the mid-bulkhead. The crack in the chord
vertical flange at the pulley bracket fastener hole was caused by
vertical bending load in the chord. The load initiates at a
change in the chord axial load path and  is insufficiently
supported by the one-piece stiffener under the spar upper web
forward of the mid-bulkhead.
Revision l is issued to provide tooling information which may be
helpful in accomplishing this bulletin. In addition, Notice of
Status Change 757-54-0003NSC1 has been incorporated.
C.  Description
Prior to accumulation of 6000 flight cycles, modify the fastener
installation at the attach fitting for the upper link and replace
a web stiffener forward of the fitting on the left and right
nacelle struts.
On the left nacelle strut, also replace the thrust control system
pulley bracket assembly with one that does not attach to the
strut center chord vertical flange.
Oversizing the eight link fitting attach holes in the
mid-bulkhead upper horizontal flange and installing bushings
which protrude below the flange will prevent flange clamp-up from
the attach bolts,
Replacement of the two fasteners through the lower vertical
flange of the link attach fitting and the mating flanges of the
bulkhead with  sleeve bolts will provide  the necessary
interference fit to accommodate the vertical loads in the fitting.
Dec 14/84  757-54-0003
REV. 1: Aug 30/85  2

### Page 5 (OCR)

BOEING SERVICE BULLETIN 757-54-0003
On the lower side of the upper spar web forward of the link
attach fitting, replacement of the one-piece stiffener with a
two-piece stiffener will minimize chord bending load.
On the left strut after replacement of the pulley bracket
assembly, the two vacated assembly attach holes in the center
chord vertical flange are filled with sleeve bolts.
On both struts, replacement of the stiffener requires replacement
of the two insulation blankets and forward heat shield and rework
NOTES: 1. Concurrent incorporation of Boeing Service Bulletin
757-54-2 is suggested on commonly affected airplanes
in the interest of airplane down time savings.
2.  Operators may find it convenient to use tool
ME311N5178 to perform the above counterboring and
oversizing operations.
Attached to this service bulletin is an Evaluation
Form provided for the purpose of communicating
information to the Boeing organization responsible
for the service bulletin and its contents. The data
you provide will be used to improve the Boeing
Service Bulletin Program.
Please forward this form to your Boeing Field Service
Representative or mail directly to:
Boeing Commercial Airplane Company
P. 0. Box 3707
Seattle, Washington 98124
Attention: Manager,
Service Bulletin Engineering
Dec 14/84  757-54-0003
REV. 1: Aug 30/85  3

### Page 6 (OCR)

BOEING SERVICE BULLETIN 757-54-0003
D.  ApprovaL
This service bulletin has been reviewed by the Federal Aviation
Administration (FAA) and the modifications herein comply with the
applicable Federal Aviation Regulations (FAR's) and are FAA
APPROVED.
E•  Manpower
Approximately 142 man-hours and  a crew of 6 are required to
accomplish this modification per airplane.
The following breakdown of manpower requirements is suggested as
a guide to assist operators in planning and accomplishing this
experienced crew. It does not include setup, lost time.  modification. This estimate is for direct labor performed by an  familiarization, cure time, tool acquisition, or
Factor this estimate as necessary based on your own experience.
Elapsed
Time
Operation  Crew Size  Man-Hours  (Hours)
Access  48  8
Modification  4  40  10
Restoration and
Operational Check  6  54  9
TOTAL PER AIRPLANE  142  27
Dec 14/84  757-54-0003

### Page 7 (OCR)

BOEING SERVICE BULLETIN 757-54-0003
Material - Price and Availability
The kit identified  in Paragraph II.A may be obtained from Boeing
within the terms and conditions defined below. After expiration of
the quotation, price and delivery data will be provided upon request.
The delivery quotation below indicates the date when initial kits
will be available. When source capacity is limited and tooling or
material availability is the pacing factor, operator purchase orders
will receive an allocation from the available quantities based on
receipt date of purchase order by the Spares Department and based on
operator's planned modification schedules. Therefore, operators are
requested to include planned dates of incorporation on their purchase
order.
Kit Number  Description  Delivery  Unit Price
012N8258-1  Kit  Available  No Charge
Date December 14, 1984
The prices quoted are subject to the terms and conditions of Boeing's
standard purchase order acknowledgement. Quotations are subject to
acceptance within 120 days from date hereon. Prices quoted in United
States Dollars. Terms: Net 30 days.
Items offered at "No Charge" are subject to charge after expiration of
the 120-day period.
Address  purchase  orders and correspondence  pertaining to
quotation to Director of Spares, and refer to this service bulletin
number.
G. Tooling - Price and Availability
The tooling identified in Paragraph II.C may be rented from Boeing.
ddress correspondence pertaining to tools to Director of Spares,
cefer to this service bulletin number, and provide the period of
intended possession on your purchase order.
When source capacity is limited, tool allocation will be based on
receipt date of purchase order and operator's planned modification
schedule.
Kit Number  Description  Rent/Day  Rent/Month
ME311N5178  Kit Tool-Strut  $237.00 (a)  $2,368.00 (a)
Fatigue Rework
(a) A $15.00 handling charge is applied to all rentals.
Operators may, at their option, fabricate their own tool to alleviate
any constraints that may be caused by tool allocation.  Therefore,
tool drawing is being supplied in support of this service bulletin.
Dec 14/84  757-54-0003
REV. 1: Aug 30/85  5

### Page 8 (OCR)

BOEING SERVICE BULLETIN 757-54-0003
Weight and Balance
Change in  Change in
Weight  Moment
(Pounds)  (Pound-Inches)
+4.0  +3107.0
References
1 •  Existing Data:
a•  Engineering Change Memo PRR 53101
b.  757 Maintenance Manual Subjects 06-43-00, 07-11-01,
29-11-00, 36-00-00, 36-11-15 and 54-51-02
C.  Boeing  Service Bulletin 757-54-2 "Nacelle/Pylon -
Strut Access Door/Panel Attachment Modification.
2.  Data supplied in support of this service bulletin:
Drawing No.  Sheet DCN  ADCN  Title
012N8258  PL  B  2*,3*  Spar Installation -
Upper Nacelle Strut
012N8258  1  1,2*,3*  Spar Installation -
Upper Nacelle Strut
ME311N5178*  1  F  Kit Tool - Strut Fatigue
Rework
Supplied in support of Revision l of this bulletin.
Process Data:
Boeing Process Specifications that are listed on drawings
supplied  in support of this service bulletin are not
detailed in this service bulletin since they are common
practices  which can be accomplished in accordance with
operator's normal procedures.
Publications Affected
Publication  Chapter/Section
757 Structural Repair Manual......  ...  54-50
Dec 14/84  757-54-0003
REV. 1: Aug 30/85

### Page 9 (OCR)

BOEING SERVICE BULLETIN 757-54-0003
II.  MATERIAL INFORMATION
A.  Parts Required Per Airplane
1.  The following kit may be obtained as noted in Paragraph I.F.
NOTE: Only one kit and operator furnished materials listed
in Paragraph II.A.2 are required to modify each
airplane.
012N8258 - KIT, SPAR INSTALLATION - UPPER NACELLE STRUT
-1
Quantity  Part Number  Nomenclature
012N8258-1  Kit, Spar Installation -
Upper Nacelle Strut
012N8258-2 (a)  Kit
(a)  Contains all  parts  shipped to operator.  See drawing
supplied with bulletin for contents of kit.
2.  The following materials are to be furnished by the operator.
Part Number or
Quantity  Specification  Nomenclature
As Required  BMS 10-11, Type I  Primer
As Required  DC93-006 (a)  Sealant
(a)  Dow Corning Corp. (V71984)
3901 South Saginaw Road
Midland, Michigan 48641
Parts Required to Modify Spares
None
C.  Special Tools and Equipment Required
The following tools may be obtained as noted in Paragraph I.G.
ME311N5178  "Kit Tool - Strut Fatigue Rework"
D.  Existing Parts Accountability
None
Dec 14/84  757-54-0003
REV. 1: Aug 30/85  7

### Page 10 (OCR)

BOEING SERVICE BULLETIN 757-54-0003
THIS PAGE INTENTIONALLY LEFT BLANK
Dec 14/84  757~54~0003

### Page 11 (OCR)

BOEING SERVICE BULLETIN 757-54-0003
III.  ACCOMPLISHMENT INSTRUCTIONS
NOTE: The  following paragraphs outline the general accomplishment
instructions and test requirements.  The suggested sequence of
operations and detailed accomplishment instructions are indicated
by circle notes on the figures.
A.  Stabilize the airplane on jacks at wing and body Jack Points A,
B, C and D per 757 Maintenance Manual Subject 07-11-01 to prevent
movement during modification.
B•  Support weight of engine and strut per 757 Maintenance Manual
Subject 54-51-02 to remove all load from the upper link
attachment to the strut. If engine is removed for any reason,
support weight of strut.
C.  Depressurize pneumatic system per 757 Maintenance Manual Subject
36-00-00 and  install DO-NOT-OPERATE placards on all pneumatic
system controls.
D.  Depressurize  the left and right hydraulic systems per 757
Maintenance Manual Subject 29-11-00.
E.  Open all affected electrical circuit breakers on the Pll overhead
panel and install DO-NOT-CLOSE placards.
or open access panels per 757 Maintenance Manual Subject
06-43-00 to obtain access to the upper and lower side of the
strut upper spar web at and immediately forward of the
upper link attachment to the strut.
At the upper side of the strut upper spar between Power Plant
Stations 152 and 180, remove system cables and plumbing, as
required, for access to the spar web.
In the same area below the spar web, remove the pneumatic system
precooler  and ducting, as required, per 757 Maintenance Manual
Subject 36-11-15.
Modify the spar structure per Figure 1.
J.  Upon completion of modification, reinstall the precooler and all
ducting, plumbing and cables removed for access.
K.  Remove engine or strut supports, lower airpiane and remove jacks,
pressurize pneumatic and hydraulic systems, restore electrical
power and check operation of affected systems.
L•  Reinstall or close all access panels.
Dec 14/84  757-54-0003
REV. 1: Aug 30/85  9

### Page 12 (OCR)

BOEING SERVICE BULLETIN 757-54-0003
LINK
ATTACHMENT
FITTING  - UPPER
LINK
STRUT UPPER
SPAR WEB
SPAR
CENTER  • STA
CHORD  174.30
MID-BULKHEAD
•STA  00
OX  162.80
LEFT STRUT SHOWN
RIGHT STRUT OPPOSITE
STA
162,80
STA  OWDO
SECTION A-A  174.30
FIGURE 1. ENGINE STRUT MODIFICATION
Dec 14/84  757-54-0003
10

### Page 13 (OCR)

BOEING SERVICE BULLETIN 757-54-0003
NOTE: The following steps describe a suggested sequence of rework at
each location  affected by the modification.  See Drawing
012N8258, provided with this bulletin, for detailed instructions.
) At the lower side of the strut upper spar web, remove the heat shields
and insulation blankets between Stations 153.90 and 174.30. Discard
the blankets and forward heat shield. Rework the aft heat shield per
the drawing.
At the upper link attach fitting, remove eight fasteners through the
fitting horizontal flange and the mid-bulkhead upper flange one at a
time and counterbore the bulkhead flange. Install bushings in the
bulkhead flange and install attach fastener before reworking next
fastener hole.
NOTE: Operators may find it convenient to use tool ME311N5178 to
perform the above counterboring and oversizing operations.
3 At the lower vertical flange of the link attach fitting, replace the
two existing fasteners attaching the fitting to the mid-bulkhead with
sleeve bolts, one at a time.
4 On the lower side of the upper spar web at Station 162.80, replace the
existing one-piece stiffener with a two-piece stiffener.
5 On the left strut only, replace the thrust control system pulley
bracket assembly with a new assembly that fastens to the inboard flange
of the spar center chord, instead of the chord vertical flange. Fill
the two vacated attach holes in the vertical flange with sleeve bolts.
Install new insulation blankets, new forward heat shield and reworked
aft heat shield on lower surface of spar web.
FIGURE 1. ENGINE STRUT MODIFICATION
Dec 14/84  757-54-0003
REV. 1: Aug 30/85  11

### Page 14 (OCR)

BOEING
SERVICE BULLETIN
EVALUATION FORM
THIS EVALUATION FORM IS PROVIDED FOR THE PURPOSE OF COMMUNICATING INFORMATION TO
THE BOEING ORGANIZATION RESPONSIBLE FOR SERVICE BULLETINS AND THEIR CONTENT. THE
DATA YOU PROVIDE WILL BE USED TO IMPROVE THE BOEING SERVICE BULLETIN PROGRAM.
NOTE: THIS FORM IS NOT INTENDED TO BE USED FOR REQUESTING SERVICE BULLETIN
INCORPORATION INTO BOEING TECHNICAL MANUALS.
S/B NO.:  757-54-0003 (REV. 1)  S/B DATED:  AUGUST 30, 1985
TITLE:  NACELLES/PYLONS - UPPER LINK BACKUP
STRUCTURE MODIFICATION
OPERATOR:  AIRPLANES AFFECTED  per S/B effectivity list
(check one) :  per corrected list below:
PREPARED BY:  TITLE:  DATE:
ORGANIZATION:  - TELEX CODE:
EVALUATION:
check ONE of the following  check ONE of the following
five circles  AND  seven circles.
- Inspection
- Will accomplish
- Partial incorporation
- Being accomplished
- Complete incorporation
- Have accomplished
- Service bulletin intent
- Uneconomical
- Will not accomplish
- Service experience does not justify
- Decision deferred (explain)
- Other (explain below)
COMMENTS: Bulletin Quality, Suggested Improvements, Other.
FOR ADDITIONAL COMMENTS USE REVERSE SIDE
Please forward this form to your Boeing Field Service Representative or mail
directly to:
Boeing Commercial  Attention: R. A. Bohn
Airplane Company  Manager,
P.O. Box 3707  Service Bulletin Engineering
Seattle, WA 98124  Mail Stop 02-49

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
