# Boeing Service Bulletin 757-54-0036: Revision 1

- Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2012-1109; AD 2013-10-02 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Boeing Service Bulletin 757-54-0036](https://openairdocs.org/service-documents/boeing/sb-757-54-0036.md)
- Title as filed: U.S. DOT/FAA - Service Information - 1
- Pages: 38
- PDF: https://openairdocs.org/files/sha256/33/d1/33d1aa6e5c55f9f31f836b22918fe7ad88b45b5ebd03fd325d0b76628b62b0cb
- Page: https://openairdocs.org/service-documents/boeing/sb-757-54-0036/file/33d1aa6e5c55

## Text

Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

May 14, 1998
Revision 1:  July 31, 2006 757-54-0036
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 1 of 38
 
 
 
Commercial
Airplane
Group 757
Service Bulletin
Number: 757-54-0036
Date: May 14, 1998
Revision 1: July 31, 2006
ATA System: 5451 5741
SUBJECT: NACELLES/PYLONS - NACELLE STRUT - UPPER LINK REPLACEMENT - STRUT 
IMPROVEMENT PROGRAM - PRATT AND WHITNEY POWERED AIRPLANES
BOEING PROPRIETARY, CONFIDENTIAL, AND/OR TRADE SECRET
Copyright © 1998 The Boeing Company
Unpublished Work - All Rights Reserved
Boeing claims copyright in each page of this document only to the extent that the page contains copyrightable 
subject matter.  Boeing also claims copyright in this document as a compilation and/or collective work.
This document includes proprietary information owned by The Boeing Company and/or one or more third 
parties.  Treatment of the document and the information it contains is governed by contract with Boeing.  For 
more information, contact The Boeing Company, P.O. Box 3707, Seattle, Washington 98124.
Boeing, 707, 717, 727, 737, 747, 757, 767, 777, BBJ, BOEING BUSINESS JET, DC-8, DC-9, DC-10, MD-10, 
MD-11, MD-80, MD-90, the Boeing logo and the Boeing livery are among the trademarks owned by Boeing or 
its subsidiaries. No intellectual property license (express or implied) is granted in connection with this document 
or otherwise.

### Page 2

BLANK PAGE
May 14, 1998
Revision 1:  July 31, 2006 757-54-0036
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 2 of 38
BOEING SERVICE BULLETIN 757-54-0036
 
 
BLANK PAGE

### Page 3

Table of Contents
May 14, 1998
Revision 1:  July 31, 2006 757-54-0036
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 3 of 38
BOEING SERVICE BULLETIN 757-54-0036
 
 
Table of Contents
Revision Transmittal Sheet .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 5
Summary .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 7
1. PLANNING INFORMATION .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  11
A. Effectivity .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  11
1. Airplanes   .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  11
2. Spares Affected .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  13
B. Concurrent Requirements  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .   .  13
C. Reason .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  13
D. Description .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  14
E. Compliance.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .   .  .  .  .  14
F. Approval .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  15
G. Manpower   .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .   .  .  .  .  15
H. Weight and Balance Changes  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  15
I. Electrical Load Data  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .   .  .  .  15
J. References .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .   .  .  .  .  15
1. Existing Data: .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  15
2. Data supplied with this Service Bulletin:   .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  16
3. Installation Drawings Used in the Preparation of this Service Bulletin: .  .  .  .  .  .  .  .  .  .  16
4. Process Data: .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .   .  16
K. Publications Affected .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  16
L. Interchangeability and Intermixability of Parts  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  16
2. MATERIAL INFORMATION .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  17
A. Material - Price and Availability.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  17
B. Industry Support Information .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .   .  17
C. Parts Necessary For Each Airplane  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  17
1. Kits/Parts: .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  17
2. Parts and Materials Supplied by the Operator:  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  18
3. Parts Modified and Reidentified:   .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  18
4. Parts Removed and Not Replaced: .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  18
D. Parts Necessary to Change Spares  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  18
E. Special Tooling - Price and Availability.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .   19
F. Special Tooling Necessary to do this Service Bulletin .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  19
3. ACCOMPLISHMENT INSTRUCTIONS .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  21
A. GENERAL INFORMATION   .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  21
B. WORK INSTRUCTIONS .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  21
FIGURE  1:   ACCESS .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  23
FIGURE  2:   DISCONNECT WIRE BUNDLES (ENGINE NO. 1 SIDE ONLY).  .  .  .  .  .  .  .  .  .  .  .  .  .  25
FIGURE  3:   REMOVAL AND MODIFICATION OF THE BRACKET ASSEMBLY.  .  .  .  .  .  .  .  .  .  .  .  27
FIGURE  4:   INSTALL THE BRACKET ASSEMBLY.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  29
FIGURE  5:   MODIFICATION OF THE STRUT PANEL ASSEMBLY  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  31
FIGURE  6:   REPLACE THE ELECTRICAL BRACKET (ENGINE NO. 1 SIDE ONLY) .  .  .  .  .  .  .  .  .  35
FIGURE  7:   CUT THE GAP COVER INSTALLATION   .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  36
APPENDIX  A: EXISTING PARTS ACCOUNTABILITY  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  37

### Page 4

Table of Contents
May 14, 1998
Revision 1:  July 31, 2006 757-54-0036
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 4 of 38
BOEING SERVICE BULLETIN 757-54-0036
 
 
BLANK PAGE

### Page 5

May 14, 1998
Revision 1:  July 31, 2006 757-54-0036
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 5 of 38
 
 
 
Commercial
Airplane
Group 757
Service Bulletin
Number: 757-54-0036 Revision Transmittal Sheet
Date: May 14, 1998
Revision 1: July 31, 2006
ATA System: 5451 5741
SUBJECT: NACELLES/PYLONS - NACELLE STRUT - UPPER LINK REPLACEMENT - STRUT 
IMPROVEMENT PROGRAM - PRATT AND WHITNEY POWERED AIRPLANES
This Revision includes all pages of the service bulletin.
COMPLIANCE INFORMATION RELATED TO THIS REVISION
Federal Aviation Administration (FAA) Airworthiness Directive 2003-18-05 is related to this service bulletin.
No more work is necessary on airplanes changed as shown in the original issue of this service bulletin.
REASON FOR REVISION
This revision is sent to do the following:
— Add airplane NA001 to the effectivity
— In Figure 5, correct the number of rivets installed in the circle note table
— In Figure 5, clarify which hole to measure from to locate the coverplate
Paragraph 1.A., Effectivity, shows changes of airplane operators.  Each operator should examine the Effectivity 
paragraph for changes.
Vertical lines are put on the left edge of each page, except in Paragraph 1.A., Effectivity, to show the location 
of important changes.
Pages with no vertical lines have no important changes.
REVISION HISTORY
Original Issue: May 14, 1998
Revision 1: July 31, 2006

### Page 6

May 14, 1998
Revision 1:  July 31, 2006 757-54-0036
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 6 of 38
BOEING SERVICE BULLETIN 757-54-0036
 
 
BLANK PAGE

### Page 7

May 14, 1998
Revision 1:  July 31, 2006 757-54-0036
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 7 of 38
 
 
 
Commercial
Airplane
Group 757
Service Bulletin
Number: 757-54-0036 Summary
Date: May 14, 1998
Revision 1: July 31, 2006
ATA System: 5451 5741
SUBJECT: NACELLES/PYLONS - NACELLE STRUT - UPPER LINK REPLACEMENT - STRUT 
IMPROVEMENT PROGRAM - PRATT AND WHITNEY POWERED AIRPLANES
CONCURRENT REQUIREMENTS
None
BACKGROUND
The Federal Aviation Administration (FAA) has issued an Airworthiness Directive (AD) which requires 
incorporation of this service bulletin.
The structural changes given in this service bulletin will increase the strength and durability of the upper link 
installation.  The increase in the strength and durability will give the structural component the damage tolerance 
rating necessary for continued operations without special inspections and/or scheduled component 
replacement.
A structural reassessment and a review of the structural inspection planning data (SIPD) document were 
completed for the 757 airplane.  Data from flight tests, fatigue tests, and in-service experience were used to 
complete the reassessment and review.  The flight test data included the results from tests on the 747, 757, and 
767 airplanes and found the operational loads of the nacelle were higher than those used during the initial 
design.  With consideration given to the higher loads, analysis of the fatigue test data shows that fatigue cracks 
can occur before the structure gets to the design life goal for the 757 airplane.  Also, the higher loads can cause 
the length of a crack to increase at a much faster rate than initially shown for the strut structure.  The structural 
integrity of the upper link is an important component in the damage tolerance criteria for the wing to strut.  Boeing 
has no reports of cracks at this time.
As a result of the structural reassessment and review of the SIPD document, components of the strut and wing 
were identified for design changes.
As part of a service bulletin validation program, this change was completed on airplane NC024 before the 
release of Revision 00.  (Airplane NC024 has the configuration of a Group 1 airplane.)
NOTE:The related service bulletin is 757-54-0034.
ACTION (PRR 54687-1R)
Hold the engine and strut.  Remove access panels.  Disconnect the duct leak detector in the leading edge.  
Disconnect wire bundles for Engine Number 1.  Remove the wire support bracket attached to the Upper Link.  
Remove and discard the Upper Link.

### Page 8

May 14, 1998
Revision 1:  July 31, 2006 757-54-0036
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 8 of 38
BOEING SERVICE BULLETIN 757-54-0036
 
 
Make a change to the wire support bracket attached to the Upper Link.  Make a change to the leading edge of 
the gap cover installation and replace an electrical bracket on the gap cover installation. 
Replace the Upper Link.  Install the wire support brackets, and the access panels.  Remove the support from 
the engine and strut.  Do the test of the duct leak detector.  Put the airplane back in a serviceable condition.
EFFECTIVITY
See Paragraph 1.A., Effectivity
COMPLIANCE
Boeing recommends Group 1 (passenger) airplanes do the change no later than 27,000 flight cycles and Group 
2 (freighter) airplanes do the change no later than 29,000 flight cycles
INDUSTRY SUPPORT INFORMATION
Boeing Industry Support information is provided in Program Letter 6-1151-757/767PGM-120 to be released May 
30, 1998.  Additional copies of program letters are available from Boeing Product Assurance Contracts.
MANPOWER
Total Man-hours - 45 for each engine 
Elapsed Time - 22.5 Hours
MATERIAL INFORMATION
Boeing Supplied Kits
Refer to Paragraph 2.A., Material - Price and Availability.

### Page 9

May 14, 1998
Revision 1:  July 31, 2006 757-54-0036
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 9 of 38
BOEING SERVICE BULLETIN 757-54-0036
 
 
FWD
THE GAP COVER
DOUBLER ON
INSTALL A
THE BRACKETS
MODIFICATIONS TO
UPPER LINK. MAKE
REMOVE AND REPLACE
R91110

### Page 10

May 14, 1998
Revision 1:  July 31, 2006 757-54-0036
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 10 of 38
BOEING SERVICE BULLETIN 757-54-0036
 
 
BLANK PAGE

### Page 11

May 14, 1998
Revision 1:  July 31, 2006 757-54-0036
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 11 of 38
 
 
 
Commercial
Airplane
Group 757
Service Bulletin
Number: 757-54-0036
Date: May 14, 1998
Revision 1: July 31, 2006
ATA System: 5451 5741
SUBJECT: NACELLES/PYLONS - NACELLE STRUT - UPPER LINK REPLACEMENT - STRUT 
IMPROVEMENT PROGRAM - PRATT AND WHITNEY POWERED AIRPLANES
1. PLANNING INFORMATION
A. Effectivity
1. Airplanes
Refer to Service Bulletin Index Document D624N001, Part 3 for Airplane Variable Number, Line 
Number, and Serial Number data..
This service bulletin is for the airplanes shown below.   Refer to PRR54687-1R for data about this 
change
Airplane models:
757-200 757-200PF
IDENTIFICATION BY CUSTOMER, CUSTOMER CODE, GROUP AND VARIABLE NUMBER
AEROMEXICO  (AMX)
1 NC068 NC070–NC071 NE301
AIR ITALY  (RIT)
1 NE162–NE164
AMERICAN AIRLINES  (AAL)
1 NC075–NC076
ASTRAEUS, LTD.  (AUA)
1 NC052 NC067
BOEING  (TBC)
1 NA001
GROUP CONFIGURATION DESCRIPTION
1 - 757 Passenger Airplanes
2 - 757 Freighter Airplanes

### Page 12

May 14, 1998
Revision 1:  July 31, 2006 757-54-0036
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 12 of 38
BOEING SERVICE BULLETIN 757-54-0036
 
 
CONDOR  (CDF)
1N E 1 6 6
DELTA AIR LINES  (DAL)
1 NA501–NA586 NB001–NB004
EOS AIRLINES, INC.  (EPX)
1 NC056 NC072–NC073
ETHIOPIAN AIRLINES  (ETH)
1 NE201–NE204
2 NC951
FAR EASTERN AIR TRANSPORT  (FAT)
1 NC051 NE302
FISCHER AIR POLAND  (FSP)
1 NB167 NC057
MEXICANA  (CMA)
1N E 1 6 1
NORTHWEST AIRLINES  (NWA)
1 NC001–NC033 NE311–NE325
ROYAL AIR MAROC  (RAM)
1 NC041–NC042
SAUDI ROYAL FLIGHT  (SRF)
1N B 1 6 8
SHANGHAI AIRLINES  (SHA)
1 NE001–NE007
SUNEXPRESS  (SNS)
1 NC066 NC069
TACV-CABO VERDE AIRLINES  (TCV)
1 NC074
UNITED AIRLINES  (UAL)
1 NE011–NE088 NE092–NE094 NE141–NE150
UPS  (UPS)
2 NC901–NC935
UZBEKISTAN AIRWAYS  (UZB)
1 NC151
VIM AVIA  (VIM)
1 NE165 NE167–NE177

### Page 13

May 14, 1998
Revision 1:  July 31, 2006 757-54-0036
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 13 of 38
BOEING SERVICE BULLETIN 757-54-0036
 
 
IDENTIFICATION BY VARIABLE NUMBER
2. Spares Affected
Examine your spares supply for the parts or components identified in Appendix A, Existing Parts 
Accountability.  If any parts or components are found, refer to Appendix A, Existing Parts 
Accountability.
B. Concurrent Requirements
None
C. Reason
The Federal Aviation Administration (FAA) has issued an Airworthiness Directive (AD) which requires 
incorporation of this service bulletin.
The structural changes given in this service bulletin will increase the strength and durability of the 
upper link installation.  The increase in the strength and durability will give the structural component 
the damage tolerance rating necessary for continued operations without special inspections and/or 
scheduled component replacement.
Variable  Group
NA001 1
NA501–NA586 1
NB001–NB004 1
NB166–NB168 1
NC001–NC033 1
NC041–NC042 1
NC051–NC052 1
NC056–NC057 1
NC066–NC076 1
NC151 1
NC901–NC935 2
NC951 2
NE001–NE007 1
NE011–NE088 1
NE091–NE094 1
NE141–NE150 1
NE161–NE177 1
NE201–NE204 1
NE301–NE302 1
NE311–NE325 1

### Page 14

May 14, 1998
Revision 1:  July 31, 2006 757-54-0036
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 14 of 38
BOEING SERVICE BULLETIN 757-54-0036
 
 
A structural reassessment and a review of the structural inspection planning data (SIPD) document 
were completed for the 757 airplane.  Data from flight tests, fatigue tests, and in-service experience 
were used to complete the reassessment and review.  The flight test data included the results from 
tests on the 747, 757, and 767 airplanes and found the operational loads of the nacelle were higher 
than those used during the initial design.  With consideration given to the higher loads, analysis of the 
fatigue test data shows that fatigue cracks can occur before the structure gets to the design life goal 
for the 757 airplane.  Also, the higher loads can cause the length of a crack to increase at a much 
faster rate than initially shown for the strut structure.  The structural integrity of the upper link is an 
important component in the damage tolerance criteria for the wing to strut.  Boeing has no reports of 
cracks at this time.
As a result of the structural reassessment and review of the SIPD document, components of the strut 
and wing were identified for design changes.
As part of a service bulletin validation program, this change was completed on airplane NC024 before 
the release of Revision 00.  (Airplane NC024 has the configuration of a Group 1 airplane.)
NOTE:
1. The related Service Bulletin is 757-54-0034.
2. Because of common access, this is a convinient time to do the modifications in the area 
of the upper link shown in service bulletins 757-54-0026 and 757-54-0027.
This revision is sent to do the following:
— Add airplane NA001 to the effectivity
— In Figure 5, correct the number of rivets installed in the circle note table
— In Figure 5, clarify which hole to measure from to locate the coverplate
D. Description
The airplane effectivity is divided in 2 groups.  Group 1 are passenger airplanes, Group 2 are Package 
Freighter airplanes.
Hold the engine and strut.  Remove access panels.  Disconnect the duct leak detector in the leading 
edge.  Disconnect wire bundles for Engine Number 1.  Remove the wire support bracket attached to 
the Upper Link.  Remove and discard the Upper Link.
Make a change to the wire support bracket attached to the Upper Link.  Make a change to the leading 
edge of the gap cover installation and replace an electrical bracket on the gap cover installation. 
Replace the Upper Link.  Install the wire support brackets, and the access panels.  Remove the 
support from the engine and strut.  Do the test of the duct leak detector.  Put the airplane back in a 
serviceable condition.
Revision 1 -  No more work is necessary on airplanes changed as shown in the original issue of this 
service bulletin.
E. Compliance
Federal Aviation Administration (FAA) Airworthiness Directive 2003-18-05 is related to this service 
bulletin.

### Page 15

May 14, 1998
Revision 1:  July 31, 2006 757-54-0036
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 15 of 38
BOEING SERVICE BULLETIN 757-54-0036
 
 
Boeing recommends Group 1 airplanes incorporate the change no later than 27,000 flight cycles, and 
Group 2 airplanes incorporate the change no later than 29,000 flight cycles.
F. Approval
This service bulletin was examined by the Federal Aviation Administration (FAA).  The changes 
specified in this service bulletin comply with the applicable Federal Aviation Regulations (FAR) and 
are FAA approved.  This service bulletin and the FAA approval were based on the airplane in its 
original Boeing delivery configuration or as modified by other FAA approved Boeing changes.
This service bulletin has been approved by the FAA.  In addition, the Manager of the FAA Seattle 
Aircraft Certification Office approves the modification defined in this service bulletin as an alternative 
method of compliance to the modification requirements of paragraph (b), (d), and (g)  of AD 2003-18-
05 for Boeing Service Bulletin 757-54-0036 only.  All provisions of AD 2003-18-05  that are not 
specifically referenced in the above statement remain fully applicable and must be complied with.
If an airplane has a non-Boeing modification or repair that affects a component or system also affected 
by this service bulletin, the operator is responsible for obtaining appropriate regulatory agency 
approval before incorporating this service bulletin.
G. Manpower
Approximately 90  man-hours and 4 persons are necessary to do this change for each airplane.
This estimate is for direct labor only, done by an experienced crew.  Adjust the estimate with operator 
man-hour data if necessary.  The estimate does not include lost time.  These are some examples of 
lost time:
— Time to adjust to the workplace
— Time to schedule the work
— Time to examine the work
— Time to cure the materials
— Time to make the parts
— Time to find the tools.
H. Weight and Balance Changes
I. Electrical Load Data
Not changed
J. References
1. Existing Data:
a. Engineering Change Memo PRR 54687-1R  
b. Boeing Program Letter 6-1151-757/767-120
Airplane Change in Weight (Pounds) Change in Moment (Pound-Inches)
Group 1 (Passenger) +53.1 +51,507
Group 2 (Package Freighter) +39.9 +38,703

### Page 16

May 14, 1998
Revision 1:  July 31, 2006 757-54-0036
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 16 of 38
BOEING SERVICE BULLETIN 757-54-0036
 
 
c. 757 Maintenance Manual (AMM) Subject 26-18-01/400, 54-51-02/400, 71-00-00/200
d. 757 Structural Repair Manual (SRM) Subject 51-70-16
e. Boeing Standard Wiring Practices Manual (BSWPM) 20-10-11, 20-10-12
f. Boeing Standard Overhaul Practices Manual (BSOPM) 20-50-11
g. Boeing Service Bulletin 757-54-0026, "Nacelles/Pylons - Strut - Mid Spar Bushing, Strut 
Fitting Bushing, and Wing Fitting Bushing Inspection and Replacement."
h. Boeing Service Bulletin 757-54-0027, "Nacelles/Pylons - Pylon Attach Pins/Bolts - Diagonal 
Brace Fuse Pins and Upper link Fuse Pins - Inspection and Replacement".
i. Boeing Service Bulletin 757-54-0034, "Nacelles/Pylons - Pratt and Whitney PW2000 
Powered Airplanes - Nacelle Strut and Wing Structure Improvement".
j. FAA Airworthiness Directive 2003-18-05.
2. Data supplied with this Service Bulletin:
None
3. Installation Drawings Used in the Preparation of this Service Bulletin:
These drawings were used to prepare this service bulletin.  These drawings are not necessary 
to make the specified changes, and are not supplied with this service bulletin.  These drawings 
may not be applicable to all airplane configurations or operators.
4. Process Data:
None
K. Publications Affected
L. Interchangeability and Intermixability of Parts
Refer to Appendix A, Existing Parts Accountability, for interchangeability and intermixability 
information.
Drawing Number Title
114N1801 Gap Cover Installation, Wing, Leading Edge
311N3050 Strut Installation - PW2000 Engines
313N3004 Fairing Underwing Installation - Strut, PW2000
316N3190 Bracket Installation - System Support Strut to Wing
Publication Chapter-Section
757 Structural Repair Manual 54-51
757 Illustrated Parts Catalog 54-51, 54-52, 57-41
Component Maintenance Manual 54-50

### Page 17

May 14, 1998
Revision 1:  July 31, 2006 757-54-0036
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 17 of 38
BOEING SERVICE BULLETIN 757-54-0036
 
 
2. MATERIAL INFORMATION
A. Material - Price and Availability
Boeing supplies the kits, at no charge, shown in Paragraph 2.C., Parts Necessary For Each Airplane.  
See Boeing Program Letter 6-1151-757/767PGM-120.  Supply data can be given if requested. Send 
purchase orders and letters about the supply data to the Director of Spares and refer to this service 
bulletin number.
B. Industry Support Information
Boeing Industry Support information is provided in Program Letter (6-1151-757/767PGM-120).  
Additional copies of program letters are available from Boeing Product Assurance Contracts.
C. Parts Necessary For Each Airplane
1. Kits/Parts:
To get the kits shown below, refer to Paragraph 2.A., Material - Price and Availability.
NOTE:One top kit and the items shown in Paragraph 2.A.2., Parts and Materials Supplied by the 
Operator, are necessary for each airplane.
012N8042- TOP KIT - 757 STRUT IMPROVEMENT PROGRAM - PRATT AND WHITNEY
-64 -63 -62 -61 -45 -44
Quantity Part Number/ Specification Name
. . . . . - 012N8042-44 Top Kit, Upper Link - Passenger
. . . . - . 012N8042-45 Top Kit, Upper Link - Package Freighter
. . . - . 1 012N8042-61 Subkit, Upper Link 
. . - . . 1 012N8042-62 Subkit, Upper Link
. - . . 1 . 012N8042-63 Subkit, Upper Link
- . . . 1 . 012N8042-64 Subkit, Upper Link
. . 1 1 . . 311N3710-11 Upper Link
1 1 . . . . 311N3710-9 Upper Link
. 1 . 1 . . 313N3210-33 Cover Panel
1 . 1 . . . 313N3210-34 Cover Panel
. 1 . 1 . . 313N3210-35 Doubler
1 . 1 . . . 313N3210-36 Doubler
. . 4 4 . . 316N3191-31 Pad
4 4 . . . . 316N3191-32 Pad
51 51 51 51 . . BACR15BA5D6 Rivet
. 3 . 3 . . BACR15FT6D3 Rivet - Blind
. 3 . 3 . . BACR15FT7D4 Rivet - Blind
4 . . . . . NAS1802-3-8 Screw

### Page 18

May 14, 1998
Revision 1:  July 31, 2006 757-54-0036
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 18 of 38
BOEING SERVICE BULLETIN 757-54-0036
 
 
2. Parts and Materials Supplied by the Operator:
(a) See the Qualified Products List at the end of the Boeing Material Specification (BMS) for 
supplier data.
3. Parts Modified and Reidentified:
Refer to Appendix A, Existing Parts Accountability.
4. Parts Removed and Not Replaced:
Refer to Appendix A, Existing Parts Accountability.
D. Parts Necessary to Change Spares
None
. 2 . . . . NAS1802-3-9 Screw
. 1 . 1 . . 312N5855U8 Bracket
(a) The kit has more parts than are necessary for installation. Discard parts that are not used or keep the 
      parts for spares.
Quantity Part Number (Specification) Name
As necessary - Alodine
As necessary BMS 10-11, Type I Primer
As necessary BMS 5-95 Sealant
As necessary RTV 174 (a), (b) Adhesives
(a)  Optional:  RTV 102
                       RTV 108
                       RTV 157
General Electric Company  (V 01139)
        - Silicon Products Business Dept.
Hudson River Road
Waterford, New York 12188
(b)  Optional:  DC Q3-7063
                       DC 1200 RTV Prime Coat Red or Clear
Dow Corning (V 71984)
3901 S. Saginaw Road
Midland, Michigan 48641-2721
012N8042- TOP KIT - 757 STRUT IMPROVEMENT PROGRAM - PRATT AND WHITNEY
-64 -63 -62 -61 -45 -44
Quantity Part Number/ Specification Name

### Page 19

May 14, 1998
Revision 1:  July 31, 2006 757-54-0036
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 19 of 38
BOEING SERVICE BULLETIN 757-54-0036
 
 
E. Special Tooling - Price and Availability
None
F. Special Tooling Necessary to do this Service Bulletin
No special tools or equipment are necessary to do the change in this service bulletin.  But, 
maintenance and overhaul tools in the manuals given in Paragraph 1.J., References, can be 
necessary.  Examine operator  tool supply to make sure all necessary tools are available.

### Page 20

May 14, 1998
Revision 1:  July 31, 2006 757-54-0036
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 20 of 38
BOEING SERVICE BULLETIN 757-54-0036
 
 
BLANK PAGE

### Page 21

May 14, 1998
Revision 1:  July 31, 2006 757-54-0036
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 21 of 38
BOEING SERVICE BULLETIN 757-54-0036
 
 
3. ACCOMPLISHMENT INSTRUCTIONS
A. GENERAL INFORMATION
CAUTION: KEEP THE WORK AREA, WIRES AND ELECTRICAL BUNDLES CLEAN OF METAL
PARTICLES OR CONTAMINATION WHEN YOU USE TOOLS.  UNWANTED
MATERIAL, METAL PARTICLES OR CONTAMINATION CAUGHT IN WIRE BUNDLES
CAN CAUSE DAMAGE TO THE BUNDLES.  DAMAGED WIRE BUNDLES CAN CAUSE
SPARKS OR OTHER ELECTRICAL DAMAGE.
NOTE:
1. Manual titles are referred to by acronyms.  Refer to Paragraph 1.J., References, for 
definition of the acronyms.
2. Obey all of the warnings and cautions given in the specified manual sections.
3. Unless shown differently, these dimensions and tolerances are used:
— Linear dimensions are in inches
— Tolerance on linear dimensions, other than rivet and bolt edge margins, is plus or 
minus 0.03 inch.
— Tolerance on rivet and bolt edge margin is plus or minus 0.05 inch
— Angular tolerance is plus or minus 2 degrees
— Hole dimensions for standard solid rivets are given in 757 Structural Repair Manual, 
Chapter 51
— Torque limits to tighten nuts and bolts are given in 757 Structural Repair Manual, 
Chapter 51.
4. For approved fastener and process material substitutions, refer to 757 Structural Repair 
Manual, Chapter 51,  Alternate fasteners are given in 757 Structural Repair Manual 
Chapter 51 and Boeing Drawing 65-88700.
5. Refer to the Boeing Standard Wiring Practices Manuals 20-10-11 and 20-10-12 for the 
wire installation procedures.
6. If the length of fasteners specified in this service bulletin do not meet the installation 
standards, fasteners of the same specification, or an approved substitute, one grip length 
longer or shorter may be used.
B. WORK INSTRUCTIONS
1. Get access to the Upper Link.  Do the "Prepare to Remove the Fuse Pins" up to removal of the 
underwing fairings shown in 757 AMM 54-51-02/400 or operators equivalent procedure.  
2. Remove the gap cover installation and disconnect wires as shown in Figure 1.
3. Continue to do the "Prepare to Remove the Fuse Pins" shown in 757 AMM 54-51-02/400 or 
operators equivalent procedure.  
4. Engine No. 1 side only:  Detach wire bundles as shown in Figure 2.  
5. Remove and make a change to the Bracket Assembly on the Upper Link as shown in Figure 3.

### Page 22

May 14, 1998
Revision 1:  July 31, 2006 757-54-0036
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 22 of 38
BOEING SERVICE BULLETIN 757-54-0036
 
 
6. Remove and keep the Fuse Pins, bolts and related parts for the Upper Link as shown in 757 AMM 
54-51-02/400.    
7. Remove and discard the Upper Link.  
8. Group 1:  Install the new Upper Link, 311N3710-11.  Install the kept Fuse Pins, bolts and related 
parts as shown in 757 AMM 54-51-02/400 or operators equivalent procedure, or Service Bulletin 
757-54-0027.
9. Group 2:  Install the new Upper Link, 311N3710-9.  Install the kept Fuse Pins, bolts and related 
parts as shown in 757 AMM 54-51-02/400 or operators equivalent procedure, or Service Bulletin 
757-54-0027.  
10. Install the Bracket Assembly as shown in Figure 4. 
11. Engine No. 1 side only:  Install the wire bundles on the Bracket Assemblies in the same locations 
they were removed from.  Use clamps and fasteners removed previous.  Refer to Figure 2.
12. Make a change to the strut panel assembly as shown in  Figure 5. 
13. Engine No. 1 side only:  Replace an electrical bracket on the gap cover installation as shown in 
Figure 6.
14. Cut  the leading edge of the gap cover installation to match the strut cover plate as shown in 
Figure 7.
15. Close access as shown in 757 AMM 54-51-02/400 or operators equivalent procedure.  Do the 
steps in "Put the Airplane Back To It's Usual Condition" up to "Install the applicable access panel, 
511KT  or,  611KT.
16. Install the gap cover installation and wires removed in Figure 1.
17. Continue to do the "Put the Airplane Back To It's Usual Condition" shown in 757 AMM 54-51-02/
400 or operators equivalent procedure. 
18. Do an operational check of Engine No. 1.  Refer to 757 AMM 71-00-00/200 or operators 
equivalent procedure. 
19. Do the test of Detector Installation as shown in 757 AMM 26-18-01/400 or operators equivalent 
procedure.
20. Restore the airplane to a servicable condition.

### Page 23

FIGURE 1: ACCESS
May 14, 1998
Revision 1:  July 31, 2006 757-54-0036
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 23 of 38
BOEING SERVICE BULLETIN 757-54-0036
 
 
FIGURE  1:   ACCESS
A
A
FWD
2
WIRE BUNDLE
DETECTOR
DUCT LEAK1
1 DETECTOR
DUCT LEAK
(TYPICAL)
GAP COVER
INSTALLATION
3
MOUNTING CLAMP (TYPICAL)
A-A
LOOP DUCT LEAK DETECTOR
DETECTOR
LEFT SIDE SHOWN
RIGHT SIDE OPPOSITE
R91713
(SHEET 1 OF 2)

### Page 24

FIGURE 1: ACCESS
May 14, 1998
Revision 1:  July 31, 2006 757-54-0036
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 24 of 38
BOEING SERVICE BULLETIN 757-54-0036
 
 
The step numbers shown below agree with the numbers shown in the circle symbols in the figure.
STEP TASK NAME QTY NOTES
1 Disconnect Duct Leak Detector 2 Refer to AMM 26-18-01/400. Disconnect 
the Duct Leak Detector.   Minimum bend 
radius is 1 inch.
2 Remove/ Keep Fastener Engine No. 1 side:  Quantity 4        
Engine No. 2 side:  Quantity 3 
Detach Wire Bundle 1 Detach wire bundle from clamps
3 Remove/ Keep Gap Cover Installation 1
Fastener -
(SHEET 2 OF 2)

### Page 25

FIGURE 2: DISCONNECT WIRE BUNDLES (ENGINE NO. 1 SIDE ONLY)
May 14, 1998
Revision 1:  July 31, 2006 757-54-0036
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 25 of 38
BOEING SERVICE BULLETIN 757-54-0036
 
 
FIGURE  2:   DISCONNECT WIRE BUNDLES (ENGINE NO. 1 SIDE ONLY)
FWD
5
2 CLAMP(12 LOCATIONS)
CLAMP
1 TYPICAL
3
4 WIRE BUNDLE
5
WIRE BUNDLE
LEFT SIDE ONLY
R92286
(SHEET 1 OF 2)

### Page 26

FIGURE 2: DISCONNECT WIRE BUNDLES (ENGINE NO. 1 SIDE ONLY)
May 14, 1998
Revision 1:  July 31, 2006 757-54-0036
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 26 of 38
BOEING SERVICE BULLETIN 757-54-0036
 
 
The step numbers shown below agree with the numbers shown in the circle symbols in the figure.
STEP TASK NAME QTY NOTES
1 Record Location - Record the locations of the wire bundles 
and clamps
2 Remove/ Keep Fastener 12
Disconnect Clamp 12
3 Remove/ Keep Clamp - Remove as necessary
4 Move Wire Bundle 2 Move the Wire Bundles to the inboard side 
of the Upper Link.
5 Disconnect Wire Bundle 2
Put Cap 7 Put caps on the connectors
(SHEET 2 OF 2)

### Page 27

FIGURE 3: REMOVAL AND MODIFICATION OF THE BRACKET ASSEMBLY
May 14, 1998
Revision 1:  July 31, 2006 757-54-0036
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 27 of 38
BOEING SERVICE BULLETIN 757-54-0036
 
 
FIGURE  3:   REMOVAL AND MODIFICATION OF THE BRACKET ASSEMBLY
UPPER LINK
DO NOT REMOVE
CLARITY)
(EXPLODED FOR
PAD BRACKET
ASSEMBLY
(2 LOCATIONS)
SPACER (2 LOCATIONS)CLAMP
(2 LOCATIONS)
SCREW
PAD
UPPER LINK
LEFT SIDE
1
2
1
2
SPACER
BRACKET
ASSEMBLY
SCREW
(2 LOCATIONS)
SCREW
(2 LOCATIONS)
RIGHT SIDE
R92685
(SHEET 1 OF 2)

### Page 28

FIGURE 3: REMOVAL AND MODIFICATION OF THE BRACKET ASSEMBLY
May 14, 1998
Revision 1:  July 31, 2006 757-54-0036
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 28 of 38
BOEING SERVICE BULLETIN 757-54-0036
 
 
The step numbers shown below agree with the numbers shown in the circle symbols in the figure.
STEP TASK NAME QTY NOTES
1 Remove/ Keep Bracket Assembly 2 Make a note of the location of the bracket 
on the Upper Link
(a) Screw -
2 Remove/ Discard Spacer 4 Group 2 only
(a) Group 1: Remove/Keep
Group 2: Remove/Discard
(SHEET 2 OF 2)

### Page 29

FIGURE 4: INSTALL THE BRACKET ASSEMBLY
May 14, 1998
Revision 1:  July 31, 2006 757-54-0036
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 29 of 38
BOEING SERVICE BULLETIN 757-54-0036
 
 
FIGURE  4:   INSTALL THE BRACKET ASSEMBLY
UPPER LINK
(4 LOCATIONS)
PAD
B
B
A SCREW
(2 LOCATIONS)
1
1
(4 LOCATIONS)
PAD
ASSEMBLY
BRACKET2
UPPER LINK
2
LEFT SIDE
CLAMP
(2 LOCATIONS)
(2 LOCATIONS)
SCREW
(2 LOCATIONS)
SCREW
ASSEMBLY
BRACKET
EXPLODED FOR
CLARITY
RIGHT SIDE
R94275
(SHEET 1 OF 2)

### Page 30

FIGURE 4: INSTALL THE BRACKET ASSEMBLY
May 14, 1998
Revision 1:  July 31, 2006 757-54-0036
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 30 of 38
BOEING SERVICE BULLETIN 757-54-0036
 
 
The step numbers shown below agree with the numbers shown in the circle symbols in the figure. 
The codes shown below agree with the letter shown in the upper left corner of the fastener symbols in the figure.  
A number in the lower right corner gives the grip length of the fastener.
STEP TASK NAME PART NUMBER QTY NOTES
1 Apply Adhesive RTV 174 - (a)
Install Pad Group 1: 316N3191-31 8
Group 2: 316N3191-32 8
2 Install Bracket (kept) 2 Install the bracket in the same location 
on the new Upper Link as the old 
bracket was to the old Upper Link. 
(a) Optional: RTV 102, RTV 108, RTV 157, DC Q3-7063,  or DC 1200 RTV Prime Coat Red or Clear
CODE NAME PART NUMBER NOTES
A Screw NAS1802-3-9 Engine No. 1 side
B Screw NAS1802-3-8 Engine No. 2 side
(SHEET 2 OF 2)

### Page 31

FIGURE 5: MODIFICATION OF THE STRUT PANEL ASSEMBLY
May 14, 1998
Revision 1:  July 31, 2006 757-54-0036
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 31 of 38
BOEING SERVICE BULLETIN 757-54-0036
 
 
FIGURE  5:   MODIFICATION OF THE STRUT PANEL ASSEMBLY
(ONE LOCATION)
FASTENER HOLE
EXISTING 8/64TH
1
1
12.75
13.25
PANEL ASSEMBLY
FWD LEFT SIDE SHOWN
RIGHT SIDE OPPOSITE
PANEL
ASSEMBLY
1.96
3
COVER PLATE2
3
R92956
(SHEET 1 OF 4)

### Page 32

FIGURE 5: MODIFICATION OF THE STRUT PANEL ASSEMBLY
May 14, 1998
Revision 1:  July 31, 2006 757-54-0036
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 32 of 38
BOEING SERVICE BULLETIN 757-54-0036
 
 
PANEL 3
PANEL 2
65
PANEL ASSEMBLY
8 9 DOUBLER
7 9 TRIM AREA
PANEL ASSEMBLY ROTATED 180 DEGREES
(UPSIDE DOWN ON BENCH)
PANEL ASSEMBLY
(UPSIDE DOWN ON BENCH)
PANEL ASSEMBLY ROTATED 180 DEGREES
48 LOCATIONS
COVER PLATE
DOUBLER4
R93047
(SHEET 2 OF 4)

### Page 33

FIGURE 5: MODIFICATION OF THE STRUT PANEL ASSEMBLY
May 14, 1998
Revision 1:  July 31, 2006 757-54-0036
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 33 of 38
BOEING SERVICE BULLETIN 757-54-0036
 
 
STRUT PANEL ASSEMBLY
A
A
10
10
10
10
DOUBLER
SEALANT12
COVER PLATE
DOUBLER
PANEL ASSEMBLY
SEALANT
(46 LOCATIONS)
RIVET
PANEL ASSEMBLY
COVER PLATE
A-A
DOUBLER
SEALANT11
SEALANT11
PANEL ASSEMBLY
R94478
(SHEET 3 OF 4)

### Page 34

FIGURE 5: MODIFICATION OF THE STRUT PANEL ASSEMBLY
May 14, 1998
Revision 1:  July 31, 2006 757-54-0036
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 34 of 38
BOEING SERVICE BULLETIN 757-54-0036
 
 
The step numbers shown below agree with the numbers shown in the circle symbols in the figure.
STEP TASK NAME PART NUMBER QTY NOTES
Panel 1:
1 Mark Middle Point 1 Measure the distance from the 
center of the first fastener hole to 
the middle point between the 
specified fasteners.
2 Put Cover Plate 313N3210-33,-34 
opposite
1 Put the doubler on the panel 
assembly.
3 Drill Hole            - 2 0.159 to 0.171 inch diameter.  
Keep a minimum 2D edge margin 
for the fasteners.
Panel 2:
4 Put Doubler 313N3210-35, -36 
opposite
1 Put the doubler on the panel 
assembly. 
5 Drill Hole            - 46 0.159 to 0.171 inch diameter.  
Keep a minimum 2D edge margin, 
and a 4D to 6D distance between 
fasteners. 
Countersi
nk
Hole            - 46 100 degree countersink the cover 
plate
6 Remove Cover Plate            - 1
Deburr Hole            - 46
Panel 3:
7 Mark Panel Assembly            - - Mark to match the hole in the 
doubler.
8 Remove Doubler            - 1
Deburr Hole            - 46
9 Cut Panel Assembly            - 1 Cut the panel assembly to match 
the hole in the doubler.  Refer to 
757 SRM 51-70-16.
Panel 4:
10 Apply Sealant BMS 5-95 -
Install Cover Plate 313N3210-33, -34 
opposite
1 Refer to 757 SRM 51-70-16.
Doubler 313N3210-35, -36 
opposite
1
Rivet BACR15BA5D6 46
11 Apply Sealant BMS 5-95 - Fillet Seal 
12 Apply Sealant BMS 5-95 - Aerosmooth as shown in BSOPM 
20-50-11.  Apply to the inboard, 
outboard and forward sides of the 
cover plate. 
(SHEET 4 OF 4)

### Page 35

FIGURE 6: REPLACE THE ELECTRICAL BRACKET (ENGINE NO. 1 SIDE ONLY)
May 14, 1998
Revision 1:  July 31, 2006 757-54-0036
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 35 of 38
BOEING SERVICE BULLETIN 757-54-0036
 
 
FIGURE  6:   REPLACE THE ELECTRICAL BRACKET (ENGINE NO. 1 SIDE ONLY)
The step numbers shown below agree with the numbers shown in the circle symbols in the figure.
STEP TASK NAME PART NUMBER QTY NOTES
1 Remove/ 
Keep 
Clamp          - 1
2 Remove Bracket          - 1
3 Drill Bracket 312N5855U8 3 Drill to match old bracket.  Align the 
top of the old and new brackets.
4 Apply Sealant BMS 5-95 -
Install Bracket          - 1
Fastener (a) 3
5 Install Clamp (kept)          - 1
(a) Install BACR15FT6D3 or BACR15FT7D4 as necessary to fit existing hole.
2
GAP COVER
INSTALLATION
BRACKET
2 3 4
2 4 FASTENER
1 5 CLAMP
R93146
(SHEET 1 OF 1)

### Page 36

FIGURE 7: CUT THE GAP COVER INSTALLATION
May 14, 1998
Revision 1:  July 31, 2006 757-54-0036
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 36 of 38
BOEING SERVICE BULLETIN 757-54-0036
 
 
FIGURE  7:   CUT THE GAP COVER INSTALLATION
The step numbers shown below agree with the numbers shown in the circle symbols in the figure.
STEP TASK NAME PART NUMBER QTY NOTES
1 Put Gap Cover          - 1 Put the Gap Cover in position on the 
strut panel assembly
2 Mark Gap Cover          - 1
3 Mark Gap Cover          - 2
4 Cut Gap Cover          - 1
5 Apply Alodine          - -
Primer BMS 10-11 Type I  - 2 layers
AA
5.505.50
PLATE
COVER
2
0.20
0.30
(TYPICAL)
0.50 R MIN
A-A
STRUT
1 GAP COVER
0.202
54
2 LOCATIONS
3
ASSEMBLY
GAP COVER
R93185
(SHEET 1 OF 1)

### Page 37

APPENDIX A: EXISTING PARTS ACCOUNTABILITY
May 14, 1998
Revision 1:  July 31, 2006 757-54-0036
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 37 of 38
BOEING SERVICE BULLETIN 757-54-0036
 
 
APPENDIX  A: EXISTING PARTS ACCOUNTABILITY
The parts shown below are changed as shown in this service bulletin.  The Quantity is the number of parts 
changed on each airplane.  Components or subassembly parts are indented.  The Quantity of the indented part 
is the number of parts used on the next higher assembly.
Existing Part Number RUC Name QTY New Part Number PNC RC
311N3710-( ) (a) DIS Upper Link Assembly 2 311N3710-11 R,S A
311N3710-3 (b) DIS Upper Link Assembly 2 311N3710-9 R,S A
114N1804 -( ) RWK Nose Panel 1 114N1804-39, -40 
Opposite
N,S A
313N3004-( ) RWK Fairing Underwing 1 313N3004-141A, -
142A Opposite
SA
.313N3210-( ) RWK Panel Assembly 1 313N3210-31, -32 
Opposite
SA
316N3190-1 (a) RWK Bracket Installation 1 316N3190-5 S A
.316N3191-18 RWK Bracket 1 316N3191-23 R,S A
..316N3191-7 DIS Pad 2 316N3191-31 R,S A
.316N3191-20 RWK Bracket 2 316N3191-25 R,S A
..316N3191-7 DIS Pad 1 316N3191-31 R,S A
316N3190-2 (a) RWK Bracket Installation 1 316N3190-6 S A
.316N3191-8 RWK Bracket 1 316N3191-24 R,S A
..316N3191-7 DIS Pad 2 316N3191-31 R,S A
.316N3191-9 RWK Bracket 2 316N3191-26 R,S A
..316N3191-7 DIS Pad 1 316N3191-31 R,S A
316N3190-3 (b) RWK Bracket Installation 1 316N3190-7 S A
.316N3191-18 RWK Bracket 1 316N3191-27 R,S A
..316N3191-7 DIS Pad 2 316N3191-32 R,S A
.316N3191-20 RWK Bracket 2 316N3191-29 R,S A
..316N3191-7 DIS Pad 1 316N3191-32 R,S A
.316N3191-21 DIS Spacer 2 - - B
.NAS1802-3-15 DIS Screw 2 NAS1802-3-9 R,S A
316N3190-4 (b) RWK Bracket Installation 1 316N3190-8 S A
.316N3191-8 RWK Bracket 1 316N3191-28 R,S A
..316N3191-7 DIS Pad 2 316N3191-32 R,S A
.316N3191-9 RWK Bracket 2 316N3191-30 R,S A
..316N3191-7 DIS Pad 1 316N3191-32 R,S A
.316N3191-22 DIS Spacer 2 - - B
.NAS1802-3-14 DIS Screw 2 NAS1802-3-8 R,S A
BACR15BA5D5 (a,b) DIS Rivet 48 BACR15BA5D6 R,S A
(a)  Group 1
(b)  Group 2

### Page 38

APPENDIX A: EXISTING PARTS ACCOUNTABILITY
May 14, 1998
Revision 1:  July 31, 2006 757-54-0036
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 38 of 38
BOEING SERVICE BULLETIN 757-54-0036
 
 
RUC Recommended Use Code
DIS - Discard the part.
- Keep the part if there are other uses for it.
RWK - Make the change given in this service bulletin.
PNC Part Number Code
N - There is no equivalent Boeing part number for the changed part.  Identify on the 
part that the change given in this service bulletin was made.
R - This is the part number after the change given in this service bulletin.
S - This is the part number for the new equivalent or replacement part.
- To get a new part, use this part number in your order.
- This is the part number after the change given in this service bulletin.
- This part is used in production.
RC Replacement Code
A - Do not use the existing part to replace the new or changed part.
B - This part is removed from the airplane.  This part has no replacement.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
