# Boeing Service Bulletin 757-57-0061: U.S. DOT/FAA - Service Bulletin - SB-757-57-0061-01

- Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2011-1094; AD 2013-07-08 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Boeing Service Bulletin 757-57-0061](https://openairdocs.org/service-documents/boeing/sb-757-57-0061.md)
- Title as filed: U.S. DOT/FAA - Service Bulletin - SB-757-57-0061-01
- Pages: 55
- PDF: https://openairdocs.org/files/sha256/ae/f9/aef9703d58033405d0db7046b9c29f88a8489f0fee0e37cd9f43460dfbc13f5c
- Page: https://openairdocs.org/service-documents/boeing/sb-757-57-0061/file/aef9703d5803

## Text

Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

February 06, 2003
Revision 1:  May 24, 2007 757-57-0061
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 1 of 55
 
 
 
Commercial
Airplane
Group 757
Service Bulletin
Number: 757-57-0061
Date: February 06, 2003
Revision 1 May 24, 2007
ATA System: 5710 2810
SUBJECT: WINGS - Center Wing Box  -  Inspection of the Application of Secondary Fuel Barrier 
on the Front Spar and Upper Panel (-300 Series)
BOEING PROPRIETARY, CONFIDENTIAL, AND/OR TRADE SECRET
Copyright © 2003 The Boeing Company
Unpublished Work - All Rights Reserved
Boeing claims copyright in each page of this document only to the extent that the page contains copyrightable 
subject matter.  Boeing also claims copyright in this document as a compilation and/or collective work.
This document includes proprietary information owned by The Boeing Company and/or one or more third 
parties.  Treatment of the document and the information it contains is governed by contract with Boeing.  For 
more information, contact The Boeing Company, P.O. Box 3707, Seattle, Washington 98124.
Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, BBJ, DC-8, DC-9, 
DC-10, MD-10, MD-11, MD-80, MD-88, MD-90, and the red-white-and-blue Boeing livery are all trademarks 
owned by The Boeing Company;  and no trademark license is granted in connection with this document unless 
provided in writing by Boeing.

### Page 2

BLANK PAGE
February 06, 2003
Revision 1:  May 24, 2007 757-57-0061
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 2 of 55
BOEING SERVICE BULLETIN 757-57-0061
 
 
BLANK PAGE

### Page 3

Table of Contents
February 06, 2003
Revision 1:  May 24, 2007 757-57-0061
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 3 of 55
BOEING SERVICE BULLETIN 757-57-0061
 
 
Table of Contents
Revision Transmittal Sheet .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 5
Summary .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 7
1. PLANNING INFORMATION .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  11
A. Effectivity .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  11
1. Airplanes   .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  11
2. Spares Affected .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  12
B. Concurrent Requirements  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .   .  12
C. Reason .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  12
D. Description .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  13
E. Compliance.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .   .  .  .  .  13
F. Approval .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  13
G. Manpower   .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .   .  .  .  .  14
H. Weight and Balance Changes  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  15
I. Electrical Load Data  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .   .  .  .  15
J. References .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .   .  .  .  .  15
1. Existing Data: .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  15
2. Data supplied with this Service Bulletin:   .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  15
3. Installation Drawings Used in the Preparation of this Service Bulletin: .  .  .  .  .  .  .  .  .  .  16
K. Publications Affected .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  16
L. Interchangeability and Intermixability of Parts  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  16
2. MATERIAL INFORMATION .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  17
A. Material - Price and Availability.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  17
B. Industry Support Information .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .   .  17
C. Parts Necessary For Each Airplane  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  17
1. Kits/Parts: .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  17
2. Parts and Materials Supplied by the Operator:  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  17
3. Parts Modified and Reidentified:   .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  17
4. Parts Removed and Not Replaced: .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  17
D. Parts Necessary to Change Spares  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  17
E. Special Tooling - Price and Availability.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .   18
F. Special Tooling Necessary to do this Service Bulletin .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  18
3. ACCOMPLISHMENT INSTRUCTIONS .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  19
A. GENERAL INFORMATION   .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  19
B. WORK INSTRUCTIONS .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  19
FIGURE  1: Open Access - Air Conditioning Duct Removal - Group 1, Group 2 and Group 3 .  .  .  .  .  .  29
FIGURE  2: Inspection - Secondary Fuel Barrier - Front Spar - Group 1 and Group 3, Configuration 1 .  30
FIGURE  3: Inspection - Secondary Fuel Barrier - Upper Panel - Group 1 and Group 3, Configuration 1 35
FIGURE  4: Inspection - Thickness Measurements - Front Spar - Group 1 and Group 3  .  .  .  .  .  .  .  .  42
FIGURE  5: Inspection - Thickness Measurements - Upper Panel - Group 1 and Group 3  .  .  .  .  .  .  .  45
FIGURE  6: Inspection and Application of the Secondary Fuel Barrier - Group 2  .  .  .  .  .  .  .  .  .  .  .  .  50
FIGURE  7: Close Access - Air Conditioning Duct Installation - Group 1, Group 2 and Group 3.  .  .  .  .  52
APPENDIX  A: Record of Thickness Measurements .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  5 3

### Page 4

Table of Contents
February 06, 2003
Revision 1:  May 24, 2007 757-57-0061
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 4 of 55
BOEING SERVICE BULLETIN 757-57-0061
 
 
BLANK PAGE

### Page 5

February 06, 2003
Revision 1:  May 24, 2007 757-57-0061
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 5 of 55
 
 
 
Commercial
Airplane
Group 757
Service Bulletin
Number: 757-57-0061 Revision Transmittal Sheet
Date: February 06, 2003
Revision 1: May 24, 2007
ATA System: 5710 2810
SUBJECT: WINGS - Center Wing Box  -  Inspection of the Application of Secondary Fuel Barrier 
on the Front Spar and Upper Panel (-300 Series)
This Revision includes all pages of the service bulletin.
COMPLIANCE INFORMATION RELATED TO THIS REVISION
More work is necessary on airplanes changed as shown in the initial release of this service bulletin.
REASON FOR REVISION
Revision 1 is sent to add a group of airplanes that may have been delivered with improperly mixed secondary 
fuel vapor barrier sealant and to provide new thickness measurement inspection limits. This revision also 
corrects and clarifies inspection points on the front spar and top surface of the Center Wing Box.
Paragraph 1.E., Compliance, has been changed from 4 years to 5 years in order to align better with heavy 
maintenance checks.
Paragraph 1.A., Effectivity, shows changes of airplane operators.  Each operator should examine the Effectivity 
paragraph for changes.
Vertical lines are put on the left edge of each page, except in Paragraph 1.A., Effectivity, to show the location 
of important changes.
Pages with no vertical lines have no important changes.
The data given in Information Notice 757-57-0061 R00 IN01 is included in this revision.  The Information Notice 
advised operators about the errors in Paragraph 2.F., Special Tooling Necessary to do this Service Bulletin.
REVISION HISTORY
Original Issue: February 6, 2003
Revision 1: May 24, 2007

### Page 6

February 06, 2003
Revision 1:  May 24, 2007 757-57-0061
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 6 of 55
BOEING SERVICE BULLETIN 757-57-0061
 
 
BLANK PAGE

### Page 7

February 06, 2003
Revision 1:  May 24, 2007 757-57-0061
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 7 of 55
 
 
 
Commercial
Airplane
Group 757
Service Bulletin
Number: 757-57-0061 Summary
Date: February 06, 2003
Revision 1 May 24, 2007
ATA System: 5710 2810
SUBJECT: WINGS - Center Wing Box  -  Inspection of the Application of Secondary Fuel Barrier 
on the Front Spar and Upper Panel (-300 Series)
CONCURRENT REQUIREMENTS
None.
BACKGROUND
Inspections of the Wing Center Section at Boeing did not find the Secondary Fuel Barrier applied to the outboard 
corners of the front spar.  More inspections found defective examples of the Secondary Fuel Barrier applied 
along the front spar and the upper panel.
The Secondary Fuel Barrier is applied to areas of the center section that are subject to cabin pressure.  When 
the secondary fuel barrier is applied satisfactorily, it protects the pressurized cabin areas from fuel leaks or 
fumes.  If the secondary fuel barrier is defective, fuel or fumes can leak through fastener holes or cracks in the 
structure and pass into the passenger compartment.  There are no reports of fuel leaks or fumes in the 
passenger compartment.
This service bulletin will examine where and how the Secondary Fuel Barrier is applied to the front spar and 
upper panel.  The inspections will identify locations where the secondary fuel barrier is not satisfactory.  A new 
layer of secondary fuel barrier will be applied if it is necessary.  A satisfactory secondary fuel barrier will keep 
fuel leaks or fumes out of the pressurized cabin.
Boeing Service Related Problem (SRP) 757-SRP-28-0067 is related to this service bulletin.

### Page 8

February 06, 2003
Revision 1:  May 24, 2007 757-57-0061
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 8 of 55
BOEING SERVICE BULLETIN 757-57-0061
 
 
ACTION
Get access to the front spar and the top of the Wing Center Section by removal of the seats, floor covers, floor 
panels and cabin lining at, or adjacent to, Body Stations (BS) 900 thru 1040.  If necessary, remove the bulkhead 
lining for more access.
Examine the specified locations where the Secondary Fuel Barrier is applied.  Look for examples of missing, 
peeled, non-continuous or non-transparent secondary fuel barrier.  Make sure the applied thickness of the 
secondary fuel barrier is between the specified limits.  Remove the corrosion inhibitor compound if it is 
necessary, then clean the area where the new layer of secondary fuel barrier will be applied.  Install all the 
components that were removed for access.  Do system tests as necessary.
EFFECTIVITY
Airplane Model 757-300; Line numbers 804 thru 964; divided into three groups.
COMPLIANCE
Boeing recommends the inspection of the Secondary Fuel Barrier at the next regularly scheduled heavy 
maintenance check.  Apply the secondary fuel barrier, if it is necessary, no later than five years after the release 
of this service bulletin.
INDUSTRY SUPPORT INFORMATION
Boeing warranty remedies are available for airplanes in warranty as of September 22, 2000.    Please refer to 
Paragraph 2.B., Industry Support Information.
MANPOWER
See Paragraph 1.G Manpower.
MATERIAL INFORMATION
Operator Supplied Parts/Materials.
Refer to Paragraph 2.A., Material - Price and Availability.

### Page 9

February 06, 2003
Revision 1:  May 24, 2007 757-57-0061
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 9 of 55
BOEING SERVICE BULLETIN 757-57-0061
 
 
900
STA
1040
STA
NEW LAYER OF SECONDARY FUEL BARRIER.
IF DEFECTIVE, REMOVE AND APPLY A
SECONDARY FUEL BARRIER.
SPAR FOR DEFECTIVE APPLICATION OF
EXAMINE THE UPPER PANEL AND FRONT
V87883

### Page 10

February 06, 2003
Revision 1:  May 24, 2007 757-57-0061
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 10 of 55
BOEING SERVICE BULLETIN 757-57-0061
 
 
BLANK PAGE

### Page 11

February 06, 2003
Revision 1:  May 24, 2007 757-57-0061
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 11 of 55
 
 
 
Commercial
Airplane
Group 757
Service Bulletin
Number: 757-57-0061
Date: February 06, 2003
Revision 1: May 24, 2007
ATA System: 5710 2810
SUBJECT: WINGS - Center Wing Box  -  Inspection of the Application of Secondary Fuel Barrier 
on the Front Spar and Upper Panel (-300 Series)
1. PLANNING INFORMATION
A. Effectivity
1. Airplanes
Refer to Service Bulletin Index Document D6-24N001 Part 3 for Airplane Variable Number, Line 
Number, and Serial Number data.
Airplane models:
757-300
IDENTIFICATION BY CUSTOMER, CUSTOMER CODE, GROUP AND VARIABLE NUMBER
ARKIA ISRAELI AIRLINES  (ARK)
3 NU731–NU732
GROUP CONFIGURATION DESCRIPTION
1 - 757-300 Airplanes that must complete the whole 
bulletin
2 - 757-300 Airplanes that only require inspection 
of the front spar center section.
3 - 757-300 Airplanes previously in Group 1 that 
could have fuel vapor barrier material applied 
that was thinned with lacquer thinner.
1 Group 3 Airplanes that have not incorporated 
the previous release of service bulletin 757-57-
0061.
2 Group 3 Airplanes that have incorporated the 
previous release of service bulletin 757-57-
0061.

### Page 12

February 06, 2003
Revision 1:  May 24, 2007 757-57-0061
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 12 of 55
BOEING SERVICE BULLETIN 757-57-0061
 
 
CONDOR  (CDF)
1 NU701–NU705 NU721–NU723 NU728
3 NU724–NU727
THOMAS COOK AIRLINES UK  (JMA)
2 NL001–NL002
IDENTIFICATION BY VARIABLE NUMBER
2. Spares Affected
None.
B. Concurrent Requirements
None.
C. Reason
Inspections of the Wing Center Section at Boeing did not find the Secondary Fuel Barrier applied to 
the outboard corners of the front spar.  More inspections found defective examples of the Secondary 
Fuel Barrier applied along the front spar and the upper panel.
The Secondary Fuel Barrier is applied to areas of the center section that are subject to cabin pressure.  
When the secondary fuel barrier is applied satisfactorily, it protects the pressurized cabin areas from 
fuel leaks or fumes.  If the secondary fuel barrier is defective, fuel or fumes can leak through fastener 
holes or cracks in the structure and pass into the passenger compartment.  There are no reports of 
fuel leaks or fumes in the passenger compartment.
This service bulletin will examine where and how the Secondary Fuel Barrier is applied to the front 
spar and upper panel.  The inspections will identify locations where the secondary fuel barrier is not 
satisfactory.  A new layer of secondary fuel barrier will be applied if it is necessary.  A satisfactory 
secondary fuel barrier will keep fuel leaks or fumes out of the pressurized cabin.
NOTE: A satisfactory secondary fuel barrier is described in the Accomplishment Instructions, 
Part III - Inspection of the Secondary Fuel Barrier - Group 1, Group 2 and Group 3 -
Configuration 1.
Boeing Service Related Problem (SRP) 757-SRP-28-0067 is related to this service bulletin.
Variable  Group
NL001–NL002 2
NU701–NU705 1
NU721–NU723 1
NU724–NU727 3
NU728 1
NU731–NU732 3

### Page 13

February 06, 2003
Revision 1:  May 24, 2007 757-57-0061
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 13 of 55
BOEING SERVICE BULLETIN 757-57-0061
 
 
Revision 1 is sent to add a group of airplanes that may have been delivered with improperly mixed 
secondary fuel vapor barrier sealant and to provide new thickness measurement inspection limits.  
This revision includes the correct special tooling requirements for the accomplishment of the service 
bulletin, and provides clarifications and corrections to inspection points on the Front Spar and Upper 
Panel.  
D. Description
Get access to the front spar and the top of the Wing Center Section by removal of the seats, floor 
covers, floor panels and cabin lining at, or adjacent to, Body Stations (BS) 900 thru 1040.  If 
necessary, remove the bulkhead lining for more access.
Examine the specified locations where the Secondary Fuel Barrier is applied.  Look for examples of 
missing, peeled, non-continuous or non-transparent secondary fuel barrier.  Make sure the applied 
thickness of the secondary fuel barrier is between the specified limits.  Remove the corrosion inhibitor 
compound if it is necessary, then clean the area where the new layer of secondary fuel barrier will be 
applied.  Install all the components that were removed for access.  Do system tests as necessary.
The airplane effectivity is divided into three groups.  The airplanes in Group 1 and Group 3, 
Configuration 1 must complete all of the service bulletin.  The airplanes in Group 2 will only do work 
on the Front Spar. The airplanes in Group 3, Configuration 2 must be checked to determine if the 
vapor barrier meets the new thickness requirements. 
Revision 1 - More work is necessary on airplanes changed as shown in the initial release of this 
service bulletin.  The airplanes in Group 3, Configuration 2 must be checked to determine if the vapor 
barrier meets the new thickness requirements.  
PLEASE SEND A REPORT OF YOUR INSPECTION PROGRAM.  ALSO, SEND THE INSPECTION 
RESULTS WHEN EACH INSPECTION IS COMPLETE
Send your report to:
BOEING COMMERCIAL AIRPLANES GROUP
ATTENTION:  MANAGER, AIRLINE SUPPORT
E. Compliance
Boeing recommends the inspection of the Secondary Fuel Barrier at the next regularly scheduled 
heavy maintenance check.  Apply the secondary fuel barrier, if it is necessary, no later than five years 
after the release of this service bulletin.
F. Approval
This service bulletin was examined by the Federal Aviation Administration (FAA). The changes 
specified in this service bulletin comply with the applicable regulations and are FAA approved, as well 
as European Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/
JAA approved airplanes listed in the service bulletin effectivity.  This service bulletin and its approval 
were based on the airplane in its original Boeing delivery configuration or as modified by other 
approved Boeing changes.
If an airplane has a non-Boeing modification or repair that affects a component or system also affected 
by this service bulletin, the operator is responsible for obtaining appropriate regulatory agency 
approval before incorporating this service bulletin.

### Page 14

February 06, 2003
Revision 1:  May 24, 2007 757-57-0061
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 14 of 55
BOEING SERVICE BULLETIN 757-57-0061
 
 
NOTE: Joint Airworthiness Requirements (JAR) compliance status may be found in the Service
Bulletin Index, Part 1.
G. Manpower
The table below shows an estimate of the task-hours necessary to do this bulletin for each airplane.  
This estimate is for direct labor only, done by an experienced crew.  Adjust the estimate with operator 
task-hour data if necessary.  The estimate does not include lost time.  These are some examples of 
lost time:
— Time to adjust to the workplace
— Time to schedule the work
— Time to examine the work
— Time to cure the materials
— Time to make the parts
— Time to find the tools.
Group 1 and Group 3, Configuration 1 ONLY
Group 2 ONLY
Group 3, Configuration 2 ONLY
Task
Number of 
Persons Task-Hours Elapsed Hours
Open Access 2 13.0 6.5
Inspection 2 8.0 4.0
Thickness Measurement 1  6.0 6.0
Secondary Fuel Barrier 
Application
1  6.5  6.5
Close Access 2 15.0  7.5
TOTAL FOR EACH AIRPLANE 48.5 30.5
Task
Number of 
Persons Task-Hours Elapsed Hours
Open Access 2 4.0 2.0
Inspection 2 8.0 4.0
Secondary Fuel Barrier 
Application
1  6.5  6.5
Close Access 2  6.0  3.0
TOTAL FOR EACH AIRPLANE 24.5 15.5
Task
Number of 
Persons Task-Hours Elapsed Hours
Open Access 2 13.0 6.5
Thickness Measurement 1  6.0 6.0

### Page 15

February 06, 2003
Revision 1:  May 24, 2007 757-57-0061
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 15 of 55
BOEING SERVICE BULLETIN 757-57-0061
 
 
H. Weight and Balance Changes
I. Electrical Load Data
Not changed.
J. References
1. Existing Data:
a. Miscellaneous Retrofit Requirement (MRR) MRR 5574-1067
b. Service Related Problem (SRP) 757-SRP-28-0067
c. Boeing Document D6-56722, Customer Cost Benefit Methodology Guide
d. 757 Maintenance Manual (AMM) Subjects 20-10-11, 20-10-12, 21-00-00, 21-00-01,
21-21-00, 21-23-06, 24-41-00, 25-21-02, 25-25-01, 25-27-01, 25-50-03, 25-50-04,
28-11-00, 36-00-00 and 53-01-01.
e. 757 Structural Repair Manual (SRM) Subject 57-10-10
f. Boeing Standard Overhaul Practices Manual (BSOPM) 20-41-05, 20-50-19 and 20-60-01
g. 757 Maintenance Planning Document (MPD) Item Number CP53-124-01I
h. FAA Airworthiness Directive 98-19-05, Amendment 39-10747
i. Boeing Parts Standards Document D-590
j. Boeing Drawing  65-88700 
2. Data supplied with this Service Bulletin:
None.
Secondary Fuel Barrier 
Application
1  6.5  6.5
Close Access 2 15.0  7.5
TOTAL FOR EACH AIRPLANE 40.5 26.5
Airplane
Change in Weight 
(Pounds)
Change in Moment 
(Pound-Inches)
757-300 + 1 + 1, 000
Task
Number of 
Persons Task-Hours Elapsed Hours

### Page 16

February 06, 2003
Revision 1:  May 24, 2007 757-57-0061
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 16 of 55
BOEING SERVICE BULLETIN 757-57-0061
 
 
3. Installation Drawings Used in the Preparation of this Service Bulletin:
These drawings were used to prepare this service bulletin.  These drawings are not necessary 
to make the specified changes, and are not supplied with this service bulletin.  These drawings 
may not be applicable to all airplane configurations or operators.
K. Publications Affected
None.
L. Interchangeability and Intermixability of Parts
Accomplishment of this service bulletin does not affect interchangeability or intermixability of parts.
Drawing Number Title
110N0004 Seal Application - Secondary Fuel Barrier Coating, Wing, Center 
Section
112N2010 Terminal Fitting Installation - Wing / Body Joint, Front Spar
144N2101 Bulkhead Installation, Front Spar Body Station 900
140N3002 Corrosion Inhibiting Compound Instl - Fuselage

### Page 17

February 06, 2003
Revision 1:  May 24, 2007 757-57-0061
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 17 of 55
BOEING SERVICE BULLETIN 757-57-0061
 
 
2. MATERIAL INFORMATION
A. Material - Price and Availability
None.
B. Industry Support Information
Boeing warranty remedies are available for 757 airplanes in warranty as of September 22, 2000.  For 
inspection man-hour reimbursement for airplanes in warranty as of that date, send a warranty claim 
to Boeing Commercial Airplanes Group - Warranties.  If the condition described in this service bulletin 
is found during the inspection for airplanes in warranty as of that date and additional man-hours and 
kits, parts, and/or special tools are required, send a warranty claim to Boeing Commercial Airplanes 
Group - Warranties.  Please refer to this service bulletin number and reference the airplane variable 
numbers in your purchase order.
C. Parts Necessary For Each Airplane
1. Kits/Parts:
None.
2. Parts and Materials Supplied by the Operator:
3. Parts Modified and Reidentified:
None.
4. Parts Removed and Not Replaced:
None.
D. Parts Necessary to Change Spares
None.
Part Number / Specification QTY Name Notes
180 to 400 grit 20 Sheets Abrasive Paper, Aluminum Oxide
BMS 5-81, Type II 40 oz. Sealant, Secondary Fuel Barrier (a)
BMS 3-23, Type II, Class 2 1 Pint Organic Corrosion Inhibiting Compound (a)
BMS 3-29 1 Pint Advanced Organic Corrosion Inhibiting 
Compounds (CIC)
(a)
BMS 3-35 1 Pint Heavy Duty Corrosion Inhibiting Compound (a)
BMS 10-11, Type I 1 Pint Chemical and Solvent Resistant Finish (a)
BMS 5-95, Type 1, Class B-1/2, 
B-2 or B-4
1 Pint Pressure and Environmental Sealant - 
Chromate Type
(a) (b)
(a)  See the Qualified Products List at the end of the Boeing Material Specification (BMS) for supplier 
data.
(b)  Refer to BSOPM 20-50-19

### Page 18

February 06, 2003
Revision 1:  May 24, 2007 757-57-0061
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 18 of 55
BOEING SERVICE BULLETIN 757-57-0061
 
 
E. Special Tooling - Price and Availability
The operator can supply the tools shown in Paragraph 2.F., Special Tooling Necessary to do this 
Service Bulletin.  Tool price and supply data are not given.
F. Special Tooling Necessary to do this Service Bulletin
To get the Non-Conductive Coating Thickness Gage shown below, refer to Paragraph 2.E., Special 
Tooling - Price and Availability.  Maintenance and overhaul tools in the manuals shown in Paragraph 
1.J., References, can also be necessary.  Examine operator tool supply to make sure all necessary 
tools are available.
Tool Number Name
602-816 Dualscope MP20     (a) (b)
602-128 ETA 3.3H Probe     (a) (b)
(a) The Dualscope with probe are an example of a Non-Conductive Coating 
Thickness Gage (NCCTG).  The use of any NCCTG is permitted, but it must 
have a thickness range from 0.001 - 0.045 inches.
(b) Fisher Technology (9U437)
750 Marshall Phelps Rd.
Windsor, CT 06095-2199

### Page 19

February 06, 2003
Revision 1:  May 24, 2007 757-57-0061
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 19 of 55
BOEING SERVICE BULLETIN 757-57-0061
 
 
3. ACCOMPLISHMENT INSTRUCTIONS
A. GENERAL INFORMATION
NOTE:
1. Manual titles are referred to by acronyms.  Refer to Paragraph 1.J., References, for 
definition of the acronyms.
2. Obey all of the warnings and cautions given in the specified manual sections.
3. The work instructions are divided into work packages.  Task-Hours and Elapsed-Hours 
for each package are given in Paragraph 1.G., Manpower.  You can do each work 
package independently.
4. Unless shown differently, these dimensions and tolerances are used:
— Linear dimensions are in inches
— Tolerance on linear dimensions, other than rivet and bolt edge margins, is plus or 
minus 0.03 inch.
— Tolerance on rivet and bolt edge margin is plus or minus 0.05 inch
— Angular tolerance is plus or minus 2 degrees
— Hole dimensions for standard solid rivets are given in 757 Structural Repair 
Manual, Chapter 51
— Torque limits to tighten nuts and bolts are given in 757 Structural Repair Manual, 
Chapter 51.
5. For approved fastener and process material substitutions, refer to 757 Structural Repair 
Manual, Chapter 51,  Alternate fasteners are given in 757 Structural Repair Manual 
Chapter 51 and Boeing Drawing 65-88700
6. Refer to the Boeing Standard Wiring Practices Manuals 20-10-11 and 20-10-12 for the 
wire installation procedures.
7. If the length of fasteners specified in this service bulletin do not meet the installation 
standards, fasteners of the same specification, or an approved substitute, one grip 
length longer or shorter may be used.
8. Detailed Visual Inspection - An intensive examination of a specific item, installation or 
assembly to detect damage, failure or irregularity.  Available lighting is normally 
supplemented with a direct source of good lighting at an intensity deemed appropriate.  
Inspection aids such as mirrors, magnifying lenses, etc. may be necessary.  Surface 
cleaning and elaborate access procedures may be required.
B. WORK INSTRUCTIONS
1. For Group 1, Group 2 and Group 3, Configuration 1 airplanes, do Part I through Part VIII as 
applicable.
2. For Group 3, Configuration 2 airplanes, do Part IX.
PART I - Open Access - Group 1 and Group 3, Configuration 1
1. Supply external power to the airplane, as given in AMM 24-41-00.

### Page 20

February 06, 2003
Revision 1:  May 24, 2007 757-57-0061
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 20 of 55
BOEING SERVICE BULLETIN 757-57-0061
 
 
2. Release the pressure from the pneumatic system; refer to AMM 36-00-00.
3. Set the L And R Pack selectors to the OFF position, on the pilot’s overhead panel P5.  Refer to 
AMM 21-00-00.
a. Make sure the PACK OFF lights come on.
b. Put a DO-NOT-OPERATE tag on the selectors.
4. Set the L And R RECIRC FAN switch-lights to the OFF position, on the pilot’s overhead panel 
P5.  Refer to AMM 21-00-01.
a. Make sure the INOP lights go on, and the ON lights go off.
b. Put a DO-NOT-OPERATE tag on the switch-lights.
5. Get access to the forward side of the Front Spar and the Upper Panel of the Wing Center Section.
a. Between BS 900 and 1040, remove:
(1) The passenger seats, as referenced in AMM 25-25-01.
(2) The floor covering, as referenced in AMM 25-27-01.
(3) The floor panels, as referenced in AMM 25-50-04 and 53-01-01.
(4) The sidewall lining (panels and carpet risers), as referenced in AMM 25-21-02.
b. Remove the air conditioning ducts from the mix manifold at the locations shown in Figure 1.
c. Remove the aft bulkhead lining from the forward cargo compartment, as referenced in
AMM 25-50-03.
PART II - Open Access - Group 2
1. Supply external power to the airplane, as given in AMM 24-41-00.
2. Release the pressure from the pneumatic system; refer to AMM 36-00-00.
3. Set the L And R Pack selectors to the OFF position, on the pilot’s overhead panel P5.  Refer to 
AMM 21-00-00.
a. Make sure the PACK OFF lights come on.
b. Put a DO-NOT-OPERATE tag on the selectors.
4. Set the L And R RECIRC FAN switch-lights to the OFF position, on the pilot’s overhead panel 
P5.  Refer to AMM 21-00-01.
a. Make sure the INOP lights go on, and the ON lights go off.
b. Put a DO-NOT-OPERATE tag on the switch-lights.

### Page 21

February 06, 2003
Revision 1:  May 24, 2007 757-57-0061
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 21 of 55
BOEING SERVICE BULLETIN 757-57-0061
 
 
5. Get access to the forward side of the Front Spar and the Upper Panel of the Wing Center Section.
a. Remove the air conditioning ducts from the mix manifold at the locations shown in Figure 1.
b. Remove the aft bulkhead lining from the forward cargo compartment, as referenced in
AMM 25-50-03.
Part III - Inspection of the Secondary Fuel Barrier - Group 1, Group 2 and Group 3, 
Configuration 1
1. Do a Detailed Visual Inspection of the Front Spar and the Upper Panel.  Refer to Figure 2 and 
Figure 3 for the specified location of the application.
a. Look for signs of missing, peeled, non-continuous or non-transparent secondary fuel barrier.   
(1) If  no defective surfaces are found, the secondary fuel barrier is permitted.  Continue to 
examine in Paragraph 1.b.
(2) If  defective surfaces are found, the secondary fuel barrier is NOT permitted.  Record 
the location.  Repair as given in Part V - Repair of the Secondary Fuel Barrier - Group 
1, Group 2 and Group 3, Configuration 1.
b. Look for small air bubbles, air pockets or blister-like areas, or solid particles in the secondary 
fuel barrier or between the secondary fuel barrier and the structure.
(1) If no defective surfaces are found, the secondary fuel barrier is permitted. Continue to 
examine the surface as directed in Paragraph 1.c.
(2) If some small air bubbles or non-metallic solid particles are found, they must NOT break 
the continuity of the application of the secondary fuel barrier.  If there are no more than 
2 (two) occurrences in a 12 inch by 12 inch area the application is permitted. Continue 
to examine the surface as directed in Paragraph 1.c if this statement is correct.
(3) Air pockets or blister-like areas between the secondary fuel barrier and the structure 
are NOT permitted.  Record the location and repair as given in Part V – Repair of the 
Secondary Fuel Barrier – Group 1, Group 2 and Group 3, Configuration 1.
NOTE: Solid metallic particles are not acceptable.  Record the location and repair as
given in Part V – Repair of the Secondary Fuel Barrier – Group 1, Group 2 and
Group 3, Configuration 1.
(4) If small air bubbles, air pockets or non-metallic solid particles break the continuity of the 
application of the secondary fuel barrier, the application is NOT permitted. Record the 
location. Repair as given in Part V - Repair of the Secondary Fuel Barrier - Group 1, 
Group 2 and Group 3, Configuration 1. Continue to examine in the surface as directed 
in Paragraph 1.c.
c. Look for fillet sealant, primer, corrosion inhibiting compound or other finishes that are 
applied on top of the Secondary Fuel Barrier.
(1) If no defective surfaces are found, the secondary fuel barrier is permitted.  Continue to 
do the Accomplishment Instructions.

### Page 22

February 06, 2003
Revision 1:  May 24, 2007 757-57-0061
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 22 of 55
BOEING SERVICE BULLETIN 757-57-0061
 
 
(2) If defective surfaces are found, and the structure below can be seen, it is a permitted 
secondary fuel barrier.  Continue to do the Accomplishment Instructions.
(3) If defective surfaces are found, but the structure below cannot be seen, it is NOT a 
permitted secondary fuel barrier.  Record the location and repair as given in
Part V - Repair of the Secondary Fuel Barrier - Group 1and Group 3, Configuration 1.
d. Look for missing fillet (cap) seals common to the fastener locations shown in Figure 2,
View J-J.
(1) If all the locations are cap sealed, no work is necessary.  Continue to do the 
Accomplishment Instructions.
(2) If there are locations that are not cap sealed, record the location.  Repair as given in 
Part V - Repair of the Secondary Fuel Barrier - Group 1 and Group 3, Configuration 1.
Part IV - Thickness Measurement Inspection - Group 1 and Group 2 
1. Measure the thickness of the secondary fuel barrier applied to the locations specified in Figures 
4 and 5.
2. Make sure the thickness is 0.007 - 0.022 inch.  (This includes a 0.002 inch layer of primer.)  Refer 
to Figure 2.
a. If the thickness is less than 0.007 inch, apply more Secondary Fuel Barrier as given in
Part X - Application of More Secondary Fuel Barrier.
b. If the thickness is more than 0.022 inch, it must have a transparent quality.  A transparent 
quality makes it easy to see a crack that starts below the structure.  An applied secondary 
fuel barrier that is not transparent must be removed.  Repair as given in Part V - Repair of 
Secondary Fuel Barrier - Group 1, Group 2 and Group 3, Configuration 1.
c. If the thickness is more than 0.042 inch, the secondary fuel barrier is NOT permitted.  Repair 
as given in Part V - Repair of the Secondary Fuel Barrier - Group 1, Group 2 and Group 3, 
Configuration 1.
NOTE: Do NOT measure on top of the other sealants.  There is no limit to the thickness of
secondary fuel barrier applied on top of BMS 5-95 (Pressure and Environmental
Sealant, Chromate Type) and BMS 5-142 (Low -Density Sealant).
3. Record the thickness data in the Inspection Worksheets given in Appendix A and keep the 
worksheet with the airplane maintenance records for future reference.
Part IV(a) - Thickness Measurement Inspection - Group 3, Configuration 1
1. Measure the thickness of the secondary fuel barrier applied to the locations specified in Figure 4 
and Figure 5.
NOTE: The thickness measurements below includes a 0.002 inch layer of primer.
a. If the thickness is less than 0.007 inch, apply a minimum of 0.005 inch new Secondary Fuel 
Barrier as given in Part X - Application of More Secondary Fuel Barrier.

### Page 23

February 06, 2003
Revision 1:  May 24, 2007 757-57-0061
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 23 of 55
BOEING SERVICE BULLETIN 757-57-0061
 
 
b. If the thickness is greater than 0.012 inch, but less than or equal to 0.017 inch, apply a 
minimum of 0.005 inch new Secondary Fuel Barrier as given in Part X - Application of More 
Secondary Fuel Barrier.
NOTE: Thicknesses between 0.007 inch and 0.012 inch do not require the application of
the additional 0.005 inch secondary fuel barrier.  Overcoating is allowed in this
thickness range to make the repair of adjacent areas more efficient.
c. If the thickness is greater than 0.017 inch, but less than or equal to 0.037 inch it must have 
a transparent quality and it must be overcoated with a minimum of 0.005 inch of new 
Secondary Fuel Barrier as given in Part X - Application of More Secondary Fuel Barrier.  
NOTE: A transparent quality makes it easy to see a crack in the structure.  An applied
secondary fuel barrier that is not transparent must be removed.  Repair as given in
Part V - Repair of Secondary Fuel Barrier - Group 1, Group 2 and Group 3 -
Configuration 1.
d. If the thickness is more than 0.037 inch, the secondary fuel barrier is NOT permitted.  Repair 
as given in Part VI - Repair of the Secondary Fuel Barrier - Group 1, Group 2 and Group 3 
- Configuration 1.
NOTE: Do NOT measure on top of the other sealants.  There is no limit to the thickness of
secondary fuel barrier applied on top of BMS 5-95 (Pressure and Environmental
Sealant, Chromate Type) and BMS 5-142 (Low -Density Sealant).
2. Record the thickness data in the Inspection Worksheets given in Appendix A and keep the 
worksheet with the airplane maintenance record for future reference.
Part V - Repair of the Secondary Fuel Barrier - Group 1, Group 2 and Group 3, Configuration 1
1. Repair the Secondary Fuel Barrier at the locations noted in Part III - Inspection of the Secondary 
Fuel Barrier - Group 1, Group 2 and Group 3, Configuration 1; and in Part IV - Thickness 
Measurement Inspection - Group 1 and Group 2; and in Part IV(a) - Thickness Measurement 
Inspection - Group 3, Configuration 1.
a. Remove the secondary fuel barrier as given in AMM 28-11-00..
NOTE: 757 AMM 28-11-00 does not directly address removal of large areas of BMS 5-81
sealant. It is permissible to remove the bulk of the sealant with the use of plastic or
wooden scrapers. Boeing production typically uses plastic scrapers.
b. If not already applied, apply a cap seal to the top side of the fasteners as specified in 
BSOPM 20-50-19.  Refer to Figure 2, View J-J.
c. Apply the secondary fuel barrier as given in AMM 28-11-00.
Part VI - Inspection and Application of the Secondary Fuel Barrier - Group 2
1. Do a Detailed Visual Inspection of the Front spar and the Upper Panel to ensure that the 
application covers the minimum area specified in Figure 6.
a. Make sure the Secondary Fuel Barrier is applied a minimum of 1.50 inches below the lowest 
fastener that passes through the front spar web and the lower chord.

### Page 24

February 06, 2003
Revision 1:  May 24, 2007 757-57-0061
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 24 of 55
BOEING SERVICE BULLETIN 757-57-0061
 
 
b. If the Secondary Fuel Barrier does not cover the minimum specified area, apply as given in 
AMM 28-11-00.
Part VII - Close Access - Group 1 and Group 3 - Configuration 1
1. Close access to the forward side of the Front Spar and the Upper Panel of the Wing Center 
Section.
a. Install the air conditioning ducts on the mix manifold as shown in Figure 7.
b. Do a leak test of the air conditioning ducts as given in AMM 21-23-06 "Do the Riser Duct 
Installation Test", except feel for leaks at the duct joints at the mix manifold, and at the riser 
duct.
c. Install  the aft bulkhead lining from the forward cargo compartment, as referenced in
AMM 25-50-03.
d. Between BS 900 and 1040, install:
(1) The sidewall lining (panels and carpet risers), as referenced in AMM 25-21-02.
(2) The floor panels, as referenced in AMM 25-50-04 and 53-01-01.
(3) The floor covering, as referenced in AMM 25-27-01.
(4) The passenger seats, as referenced in AMM 25-25-01.
2. Set the L And R RECIRC FAN switch-lights to the ON position, on the pilot’s overhead panel P5.  
Refer to AMM 21-00-01.
a. Remove the DO-NOT-OPERATE tag from the switch-lights.
b. Make sure the INOP lights go off, and the ON lights go on.
3. Set the L And R Pack selectors to the ON position, on the pilot’s overhead panel P5.  Refer to 
AMM 21-00-00.
a. Remove the DO-NOT-OPERATE tag from the selectors.
b. Make sure the PACK OFF lights go off.
4. Put the pneumatic system back to service condition.  Refer to AMM 36-00-00.
5. Put the electrical power back to service condition, as given in AMM 24-41-00.
6. Put the airplane back to a serviceable condition.
Part VIII - Close Access - Group 2
1. Close access to the forward side of the Front Spar and the Upper Panel of the Wing Center 
Section.
a. Install the air conditioning ducts on the mix manifold as shown in Figure 7.

### Page 25

February 06, 2003
Revision 1:  May 24, 2007 757-57-0061
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 25 of 55
BOEING SERVICE BULLETIN 757-57-0061
 
 
b. Do a leak test of the air conditioning ducts as given in AMM 21-23-06 "Do the Riser Duct 
Installation Test", except feel for leaks at the duct joints at the mix manifold, and at the riser 
duct.
c. Install  the aft bulkhead lining from the forward cargo compartment, as referenced in
AMM 25-50-03.
2. Set the L And R RECIRC FAN switch-lights to the ON position, on the pilot’s overhead panel P5.  
Refer to AMM 21-00-01.
a. Remove the DO-NOT-OPERATE tag from the switch-lights.
b. Make sure the INOP lights go off, and the ON lights go on.
3. Set the L And R Pack selectors to the ON position, on the pilot’s overhead panel P5.  Refer to 
AMM 21-00-00.
a. Remove the DO-NOT-OPERATE tag from the selectors.
b. Make sure the PACK OFF lights go off.
4. Put the pneumatic system back to service condition.  Refer to AMM 36-00-00.
5. Put the electrical power back to service condition, as given in AMM 24-41-00.
6. Put the airplane back to a serviceable condition.
PART IX - Thickness Measurement Inspection - Group 3 - Configuration 2 Airplanes
1. Review the maintenance records for the airplane to determine if there was a minimum of 0.005 
inch new Secondary Fuel Barrier applied.  If a minimum of 0.005 inch new Secondary Fuel Barrier 
was applied, then no further action is required in that area.
2. If the thickness of the Secondary Fuel Barrier can not be determined from the maintenance 
records, or if there was not a minimum of 0.005 inch of new Secondary Fuel Barrier added, then 
go to Step 3.
3. Supply external power to the airplane, as given in AMM 24-41-00.
4. Release the pressure from the pneumatic system; refer to AMM 36-00-00.
5. Set the L And R Pack selectors to the OFF position, on the pilot’s overhead panel P5.  Refer to 
AMM 21-00-00.
a. Make sure the PACK OFF lights come on.
b. Put a DO-NOT-OPERATE tag on the selectors.
6. Set the L And R RECIRC FAN switch-lights to the OFF position, on the pilot’s overhead panel 
P5.  Refer to AMM 21-00-01.
a. Make sure the INOP lights go on, and the ON lights go off.

### Page 26

February 06, 2003
Revision 1:  May 24, 2007 757-57-0061
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 26 of 55
BOEING SERVICE BULLETIN 757-57-0061
 
 
b. Put a DO-NOT-OPERATE tag on the switch-lights.
7. Get access to the forward side of the Front Spar and the Upper Panel of the Wing Center Section.
a. Between BS 900 and 1040, remove:
(1) The passenger seats, as referenced in AMM 25-25-01.
(2) The floor covering, as referenced in AMM 25-27-01.
(3) The floor panels, as referenced in AMM 25-50-04 and 53-01-01.
(4) The sidewall lining (panels and carpet risers), as referenced in AMM 25-21-02.
b. Remove the air conditioning ducts from the mix manifold at the locations shown in Figure 1.
c. Remove the aft bulkhead lining from the forward cargo compartment, as referenced in
AMM 25-50-03.
8. Measure the thickness of the secondary fuel barrier applied to the locations specified in Figure 4 
and Figure 5.
NOTE: The thickness measurements below includes a 0.002 inch layer of primer.
a. If the thickness is less than 0.007 inch, apply a minimum of 0.005 inch new Secondary Fuel 
Barrier as given in Part X - Application of More Secondary Fuel Barrier.   
b. If the thickness is greater than 0.012 inch, but less than or equal to 0.017 inch, apply a 
minimum of 0.005 inch new Secondary Fuel Barrier as given in Part X - Application of More 
Secondary Fuel Barrier.
NOTE: Thicknesses between 0.007 inch and 0.012 inch do not require the application of
the additional 0.005 inch secondary fuel barrier.  Overcoating is allowed in this
thickness range to make the repair of adjacent areas more efficient.
c. If the thickness is greater than 0.017 inch, but less than or equal to 0.037 inch it must have 
a transparent quality and it must be overcoated with a minimum of 0.005 inch of new 
Secondary Fuel Barrier as given in Part X - Application of More Secondary Fuel Barrier.  
NOTE: A transparent quality makes it easy to see a crack in the structure.  An applied
secondary fuel barrier that is not transparent must be removed.  Repair as given in
Step 10.
d. If the thickness is more than 0.037 inch, the secondary fuel barrier is NOT permitted.  Repair 
as given in Step 10.
NOTE: Do NOT measure on top of the other sealants.  There is no limit to the thickness of
secondary fuel barrier applied on top of BMS 5-95 (Pressure and Environmental
Sealant, Chromate Type) and BMS 5-142 (Low -Density Sealant).
9. Record the thickness data in the Inspection Worksheets given in Appendix A and keep the 
worksheet with the airplane maintenance records for future reference.

### Page 27

February 06, 2003
Revision 1:  May 24, 2007 757-57-0061
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 27 of 55
BOEING SERVICE BULLETIN 757-57-0061
 
 
10. Repair the Secondary Fuel Barrier where removal and reapplication is required.
a. Remove the secondary fuel barrier as given in AMM 28-11-00.
NOTE: 757 AMM 28-11-00 does not directly address removal of large areas of BMS 5-81
sealant. It is permissible to remove the bulk of the sealant with the use of plastic or
wooden scrapers. Boeing production typically uses plastic scrapers.
b. If not already applied, apply a cap seal to the top side of the fasteners as specified in 
BSOPM 20-50-19.  Refer to Figure 2, View J-J.
c. Apply the secondary fuel barrier as given in AMM 28-11-00.
11. Close access to the forward side of the Front Spar and the Upper Panel of the Wing Center 
Section.
a. Install the air conditioning ducts on the mix manifold as shown in Figure 7.
b. Do a leak test of the air conditioning ducts as given in AMM 21-23-06 "Do the Riser Duct 
Installation Test", except feel for leaks at the duct joints at the mix manifold, and at the riser 
duct.
c. Install  the aft bulkhead lining from the forward cargo compartment, as referenced in
AMM 25-50-03.
d. Between BS 900 and 1040, install:
(1) The sidewall lining (panels and carpet risers), as referenced in AMM 25-21-02.
(2) The floor panels, as referenced in AMM 25-50-04 and 53-01-01.
(3) The floor covering, as referenced in AMM 25-27-01.
(4) The passenger seats, as referenced in AMM 25-25-01.
12. Set the L And R RECIRC FAN switch-lights to the ON position, on the pilot’s overhead panel P5.  
Refer to AMM 21-00-01.
a. Remove the DO-NOT-OPERATE tag from the switch-lights.
b. Make sure the INOP lights go off, and the ON lights go on.
13. Set the L And R Pack selectors to the ON position, on the pilot’s overhead panel P5.  Refer to 
AMM 21-00-00.
a. Remove the DO-NOT-OPERATE tag from the selectors.
b. Make sure the PACK OFF lights go off.
14. Put the pneumatic system back to service condition.  Refer to AMM 36-00-00.
15. Put the electrical power back to service condition, as given in AMM 24-41-00.

### Page 28

February 06, 2003
Revision 1:  May 24, 2007 757-57-0061
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 28 of 55
BOEING SERVICE BULLETIN 757-57-0061
 
 
16. Put the airplane back to a serviceable condition.
PART X - Application of More Secondary Fuel Barrier
1. Lightly sand the area with 180 grit aluminum oxide or finer abrasive paper.  Remove as little of 
the sealant film as possible.  Do not sand to bare metal.
2. Remove residue with clean wipers.
3. Prepare the secondary fuel barrier sealant (BMS 5-81, Type II) as given in AMM 28-11-00.
4. Apply one or two layers of BMS 5-81, Type II sealant with a flat, bristle brush.  Take all reasonable 
precautions to prevent or minimize sag areas.
a. For horizontal surfaces, let the sealant dry a minimum of 1/2 hour between layers.
b. For vertical surfaces, let the sealant dry a minimum of 2 hours between layers.
5. Refer to AMM 28-11-00 for cure rates.

### Page 29

FIGURE 1: Open Access - Air Conditioning Duct Removal - Group 1, Group 2 and Group 3
February 06, 2003
Revision 1:  May 24, 2007 757-57-0061
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 29 of 55
BOEING SERVICE BULLETIN 757-57-0061
 
 
FIGURE  1: Open Access - Air Conditioning Duct Removal - Group 1, Group 2 and Group 3
The step numbers shown below agree with the numbers shown in the circle symbols in the figure.  The QTY 
numbers shown below are the number of parts necessary for one airplane.
STEP TASK NAME REFERENCES QTY NOTES
1 Disconnect Duct Assembly 21-21-00 2 At each end; put covers over all open duct ends.
2 Remove Duct Assembly - 2 -
FWD
COMPARTMENT
TO PASSENGER
(2 EACH SIDE)
1 2
CONNECTOR
SERVICE
GROUND AIR
MIX MANIFOLD
V88483
(SHEET 1 OF 1)

### Page 30

FIGURE 2: Inspection - Secondary Fuel Barrier - Front Spar - Group 1 and Group 3, Configuration 1
February 06, 2003
Revision 1:  May 24, 2007 757-57-0061
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 30 of 55
BOEING SERVICE BULLETIN 757-57-0061
 
 
FIGURE  2: Inspection - Secondary Fuel Barrier - Front Spar - Group 1 and Group 3, Configuration 1
FWD
900
STA
0
BL
45.50
RBL
45.50
LBL
900
STA
1 SPARFRONT
A
A
BB
0
BL
24.75
LBL
24.75
RBL
45.50
LBL
45.50
RBL
A-A
G
C
JJ
F
70.50
RBL
70.50
LBL
3 FUEL BARRIERSECONDARY2
V87884
II
D
D
C G
E
E
F
H
H
(SHEET 1 OF 5)

### Page 31

FIGURE 2: Inspection - Secondary Fuel Barrier - Front Spar - Group 1 and Group 3, Configuration 1
February 06, 2003
Revision 1:  May 24, 2007 757-57-0061
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 31 of 55
BOEING SERVICE BULLETIN 757-57-0061
 
 
FUEL BARRIER
SECONDARYFUEL BARRIER
SECONDARY
TYPICAL
C-C
FUEL BARRIER
SECONDARY
LOWER CHORD
CAP SEAL
TYPICAL
D-D
FUEL BARRIER
SECONDARY
SPAR WEB
FRONT
FRONT SPAR MIN
1.50
INBDUPPER PANEL
FITTING
SHEAR
23
23
MIN
1.00
TYPICAL
B-B
2 3
FWD
MIN
1.0
MIN
1.0
MIN
1.0
MIN
1.0
FITTING
SIDE 2 3
FWD
V87885
(SHEET 2 OF 5)

### Page 32

FIGURE 2: Inspection - Secondary Fuel Barrier - Front Spar - Group 1 and Group 3, Configuration 1
February 06, 2003
Revision 1:  May 24, 2007 757-57-0061
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 32 of 55
BOEING SERVICE BULLETIN 757-57-0061
 
 
1.00
MIN
TYPICAL OUTBOARD OF BBL 45.50
E-E
FUEL BARRIER
SECONDARY
1.50
TYPICAL INBOARD OF BBL 45.50
F-F
FUEL BARRIER
SECONDARY
1.00
MIN
FUEL BARRIER
SECONDARY
TYPICAL
G-G
MIN
1.00
FRONT SPAR
SKIN
LOWER CHORD
FRONT SPAR
1.00
MINSTIFFENER
SPAR
FRONT
CHORD-BODY
23
FWD
STIFFENER
SPAR
FRONT
CHORD-BODY
23
FWD
23
INBD
FWD
FITTING
SIDE
0.50 MIN
V87886
(SHEET 3 OF 5)

### Page 33

FIGURE 2: Inspection - Secondary Fuel Barrier - Front Spar - Group 1 and Group 3, Configuration 1
February 06, 2003
Revision 1:  May 24, 2007 757-57-0061
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 33 of 55
BOEING SERVICE BULLETIN 757-57-0061
 
 FUEL BARRIER
SECONDARY
OF BBL 45.50
TYPICAL OUTBOARD
H-H
MIN
0.50
FUEL BARRIER
SECONDARY
FRONT SPAR WEB
TYPICAL
I-I
STIFFENER
1.00
MIN
1.00
MIN
FUEL BARRIER
SECONDARY
INBD
FWD
4 (7 PLACES)CAP SEAL
TYPICAL
J-J
23
FWD
23
FWD
CHORD
ANGLE
SPLICE
SPAR
FRONT
32
N78545
(SHEET 4 OF 5)

### Page 34

FIGURE 2: Inspection - Secondary Fuel Barrier - Front Spar - Group 1 and Group 3, Configuration 1
February 06, 2003
Revision 1:  May 24, 2007 757-57-0061
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 34 of 55
BOEING SERVICE BULLETIN 757-57-0061
 
 
The step numbers shown below agree with the numbers shown in the circle symbols in the figure.  The QTY 
numbers shown below are the number of parts necessary for one airplane.
STEP TASK NAME REFERENCES QTY NOTES
1 Clean Front Spar - Remove dirt/debris from the area
2 Identify Secondary Fuel Barrier Visual Inspection - (a)
3
Examine Front Spar Detailed Visual 
Inspection
-( b )  ( c )
Remove                        Corrosion 
Inhibiting 
Compound
BMS 3-23 or           
BMS 3-29 or 
BMS 3-35
- This is only necessary if 
it is difficult to identify a 
layer of Secondary Fuel 
Barrier.  Refer to 
BSOPM 20-41-05 and 
20-60-01 for removal.
4 Verify Cap Seal 7 See View J-J
     (a) Look for a glossy finish, a clear to brown (or yellow) color, and a rubber-like texture.
     (b) Use a flashlight.  Hold it 10 to 20 degrees to the inspection area.
     (c) Look for defective layers of secondary fuel barrier as specified in Part III - Inspection of the 
Secondary Fuel Barrier - Group 1, in the Work Instructions.
(SHEET 5 OF 5)

### Page 35

FIGURE 3: Inspection - Secondary Fuel Barrier - Upper Panel - Group 1 and Group 3, Configuration 1
February 06, 2003
Revision 1:  May 24, 2007 757-57-0061
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 35 of 55
BOEING SERVICE BULLETIN 757-57-0061
 
 
FIGURE  3: Inspection - Secondary Fuel Barrier - Upper Panel - Group 1 and Group 3, Configuration 1
FWD
900
STA
1040
STA
0
BL
24.75
RBL
45.50
RBL
70.50
RBL
24.75
LBL
45.50
LBL
70.50
LBL
900
STA
1TOP PANEL
208.1
WL
1040
STA
V87887
B
E
E
H
H
D
D
B
C
C
A
A
G
G
M
M
O
O
P
P
N
N
(SHEET 1 OF 7)

### Page 36

FIGURE 3: Inspection - Secondary Fuel Barrier - Upper Panel - Group 1 and Group 3, Configuration 1
February 06, 2003
Revision 1:  May 24, 2007 757-57-0061
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 36 of 55
BOEING SERVICE BULLETIN 757-57-0061
 
 
RIGHT SIDE SHOWN, LEFT SIDE SAME
A-A
TYPICAL EDGE
PANEL
CHORD UPPER
PANEL
SKIN
PLUS
MIN
1.00
STA 975.5 TO 1040
TYPICAL BEAM
B-B
LOWER CHORD
FLOOR BEAM
WEB
BEAM
FLOOR
PANEL
UPPER
C-C
ASSEMBLY
PLUG
MIN
0.50
PANEL
UPPER
TYPICAL ALL BRACKETS
D-D
PANEL
UPPER
BRACKET
SUPPORT
MIN
1.00
MIN
0.75 2 3
BEAM
CREASE
32
2 3
INBD
FWD
32
FWD
FUEL BARRIER
SECONDARY
FUEL BARRIER
SECONDARY
FUEL BARRIER
SECONDARY
FUEL BARRIER
SECONDARY
V87888
(SHEET 2 OF 7)

### Page 37

FIGURE 3: Inspection - Secondary Fuel Barrier - Upper Panel - Group 1 and Group 3, Configuration 1
February 06, 2003
Revision 1:  May 24, 2007 757-57-0061
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 37 of 55
BOEING SERVICE BULLETIN 757-57-0061
 
 
E-E
F-F
RIGHT SIDE SAME
LEFT SIDE SHOWN,
G-G
SPLICE
LONGERON
AND SEALANT
COMPOUND
EXISTING
FF
BEAM
STUB
MIN
1.00
PANEL
UPPER
CHORD
PLUS
MIN
0.25
2 3
70.50
RBL
70.50
RBL
INBD
FWD
PANEL
UPPER
BEAM
STUB
CHORD
PLUS 2 3
INBD
MIN
2.00
INBD
900
STA
SKIN
BODY
CHORD
PLUS
FRAME
PANEL
UPPER
SPAR
FRONT
2 3
208.10
WL
FUEL BARRIER
SECONDARY
FUEL BARRIER
SECONDARY
FUEL BARRIER
SECONDARY
SEALANT
EXISTING
V87889
(SHEET 3 OF 7)

### Page 38

FIGURE 3: Inspection - Secondary Fuel Barrier - Upper Panel - Group 1 and Group 3, Configuration 1
February 06, 2003
Revision 1:  May 24, 2007 757-57-0061
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 38 of 55
BOEING SERVICE BULLETIN 757-57-0061
 
 
INBD
FWD
PANEL
UPPER
REAR SPAR
1.00 MIN
1.00 MIN MIN1.00
MIN
1.00
1040
STA
FRAME
FITTING
KICK
2 3
MIN
2.00
MIN
1.00
MIN
1.00
70.50
LBL
PANEL
UPPER
KICK FITTING
FRAME
UPPER CHORD
REAR SPAR
1040
STA
2 3
70.50
LBL
45.50
LBL
24.75
LBL
0
BL
BEAM
FLOOR
CHORD
PLUSPANEL
UPPER
1024
STA
MIN
1.00
BEAM
FLOOR
BEAM
FLOOR
1040
STA
INBD
FWD
2 3
2 3
DO NOT BLOCK
DRAIN PATH -
OF KICK FITTING
TYPICAL OUTSIDE WALLS
I-I
SEALANT
EXISTING
H-H
J-J
FRAME
V87890
L
L
K
K
I
I
JJ
(SHEET 4 OF 7)

### Page 39

FIGURE 3: Inspection - Secondary Fuel Barrier - Upper Panel - Group 1 and Group 3, Configuration 1
February 06, 2003
Revision 1:  May 24, 2007 757-57-0061
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 39 of 55
BOEING SERVICE BULLETIN 757-57-0061
 
 
MIN
1.00MIN1.00
SPAR
REAR
1040
STA
FITTING
KICK
PANEL
UPPER
SPACER
FRAME
SEAL
INJECTION
FILLET AND
EXISTING
FWD
2 3
FWD
SPAR
REARPANEL
UPPER
BEAM WEB
FLOORFITTING
SEAL
PRE-PACK
DECK
PRESSURE
ANGLE
ATTACH
1040
STA
MIN
1.00
MIN
1.00
2 3
DO NOT BLOCK
DRAIN PATH -
FWD
2 3
SEAL
INJECTION
FILLET AND
EXISTING
PANEL
UPPER
PLUS CHORD
DOUBLE
MIN
1.00
MIN
0.75
SPAR
FRONT
900
STA
DO NOT BLOCK
DRAIN PATH -
RIGHT SIDE SAME
LEFT SIDE SHOWN,
M-M
OF KICK FITTING
TYPICAL, INSIDE WALLS
K-K
L-L
MIN
1.00
MIN
2.00
MIN
0.75
PANEL
UPPER
SEAL
INJECTION
FILLET AND
EXISTING 1040
STA
2 3
MIN
2.00
PLUS CHORD
DOUBLE
SPAR
REAR
RIGHT SIDE SAME
LEFT SIDE SHOWN,
N-N
FWD
V87891
(SHEET 5 OF 7)

### Page 40

FIGURE 3: Inspection - Secondary Fuel Barrier - Upper Panel - Group 1 and Group 3, Configuration 1
February 06, 2003
Revision 1:  May 24, 2007 757-57-0061
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 40 of 55
BOEING SERVICE BULLETIN 757-57-0061
 
 
24.75
RBL
208.1
WL
MIN
1.00
BEAM
FLOOR
UPPER PANEL
TYPICAL FROM STA 900 TO STA 975.5
O-O
MIN
1.00
MIN
1.00
FITTING
TENSION
UPPER PANEL
BEAM
FLOOR
(15 PLACES)
TYPICAL AT TENSION TIE FITTINGS
P-P
2 3
2 3
N78557
(SHEET 6 OF 7)

### Page 41

FIGURE 3: Inspection - Secondary Fuel Barrier - Upper Panel - Group 1 and Group 3, Configuration 1
February 06, 2003
Revision 1:  May 24, 2007 757-57-0061
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 41 of 55
BOEING SERVICE BULLETIN 757-57-0061
 
 
The step numbers shown below agree with the numbers shown in the circle symbols in the figure.  The QTY 
numbers shown below are the number of parts necessary for one airplane.
STEP TASK NAME REFERENCES QTY NOTES
1 Clean Upper Panel - Remove dirt/debris from the area
2 Identify Secondary Fuel Barrier Visual Inspection - (a)
3
Examine Upper Panel Detailed Visual 
Inspection
-( b )  ( c )
Remove Corrosion 
Inhibiting 
Compound
BMS 3-23 or           
BMS 3-29 or
BMS 3-35
- This  is only necessary if 
it is difficult to identify a 
layer of Secondary Fuel 
Barrier.  Refer to 
BSOPM 20-41-05 and 
20-60-01 for removal.
     (a) Look for a glossy finish, clear to brown (or yellow) color, and a rubber-like texture.
     (b) Use a flashlight.  Hold it 10 to 20 degrees to the inspection area.
     (c) Look for defective layers of secondary fuel barrier as specified in Part III - Inspection of the 
Secondary Fuel Barrier - Group 1, in the Work Instructions.
(SHEET 7 OF 7)

### Page 42

FIGURE 4: Inspection - Thickness Measurements - Front Spar - Group 1 and Group 3
February 06, 2003
Revision 1:  May 24, 2007 757-57-0061
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 42 of 55
BOEING SERVICE BULLETIN 757-57-0061
 
 
FIGURE  4: Inspection - Thickness Measurements - Front Spar - Group 1 and Group 3
BFAW (BODY FRAME ASSEMBLY WEB)
BFS (BODY FRAME STIFFENER)
FSS (FRONT SPAR STIFFENER)
FSW (FRONT SPAR WEB)
INSPECTION POINTS
(SEE APPENDIX A)
A
A
B
C
C
B
FWD
0
BL
70.50
RBL
70.50
LBL
900
STA
1
FSW 1
FSS 5
FSS 1
BFAW 2
FSS 10
FSS 6
BFS 4
BFS 3
FSS 15
FSS 11
FSS 20
FSS 16
FSS 25
FSS 21
FSS 26
FSS 30
FRONT SPAR
FSS 35
FSS 31
FSS 40
FSS 36
FSW INSPECTION POINTS)
(TYPICAL BETWEEN
5.0
4.0
FSS 46
FSS 41
FSS 45
FSS 50
FSS 55
FSS 51
FSS 59
14
FSW
BFS 2
FSS 64
BFS 1
BFAW 1
FSS 60
FSS 56
900
STA
V87892
(SHEET 1 OF 3)

### Page 43

FIGURE 4: Inspection - Thickness Measurements - Front Spar - Group 1 and Group 3
February 06, 2003
Revision 1:  May 24, 2007 757-57-0061
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 43 of 55
BOEING SERVICE BULLETIN 757-57-0061
 
 
TYPICAL FSW
(14 PLACES)
X
X/2
0.5
FRONT SPAR WEB
TYPICAL FSS
(64 PLACES)
STIFFENER
STIFFENER
TYPICAL
A-A
TYPICAL
C-C
FRAME
ASSY
SEAL
CAP
SKIN
FRONT
SPAR
TYPICAL
D-D
X
X/2
SPAR
(2 PLACES)
TYPICAL BFAW
FRONT
ASSY
FRAME
X
X/2
UPPER
PANEL
TYPICAL
B-B
(4 PLACES)
TYPICAL BFS
FRAME
FRONT
(TYPICAL)
STRINGER
ASSY
SKIN
(TYPICAL)
CAP SEAL SPAR
OF STIFFENER ONLY
INSPECT THIS SIDE
D
D
FWD
INBDFWD
1212
12
12
V87893
(SHEET 2 OF 3)

### Page 44

FIGURE 4: Inspection - Thickness Measurements - Front Spar - Group 1 and Group 3
February 06, 2003
Revision 1:  May 24, 2007 757-57-0061
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 44 of 55
BOEING SERVICE BULLETIN 757-57-0061
 
 
The step numbers shown below agree with the numbers shown in the circle symbols in the figure.  The QTY 
numbers shown below are the number of parts necessary for one airplane.              
STEP TASK NAME REFERENCES QTY NOTES
1 Clean Front Spar Remove dirt/debris from the area
2
Measure/
Make Sure/ 
Record
Secondary Fuel 
Barrier
(a) (b) (c)
Front Spar Web FSW 14 See View A-A
Front Spar 
Stiffeners
FSS 64 See View A-A
Body Frame Assy 
Web
BFAW 2 See View B-B
Body Frame 
Stiffener
BFS 4 See Views C-C and D-D
     (a) Use a Non-Conductive Coating Thickness Gage to measure the thickness of the applied sec-
ondary fuel barrier.  (Refer to Paragraph 2.F., Special Tooling Necessary to do this Service Bul-
letin.)
     (b) Deleted - See Accomplishment Instructions for thickness limits.
     (c) Record the measurements on the Inspection Worksheets in Appendix A.
(SHEET 3 OF 3)

### Page 45

FIGURE 5: Inspection - Thickness Measurements - Upper Panel - Group 1 and Group 3
February 06, 2003
Revision 1:  May 24, 2007 757-57-0061
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 45 of 55
BOEING SERVICE BULLETIN 757-57-0061
 
 
FIGURE  5: Inspection - Thickness Measurements - Upper Panel - Group 1 and Group 3
FWD
E
E
A
A
C
C
900
STA
0
BL
24.75
RBL
45.50
RBL
70.50
RBL
24.75
LBL
45.50
LBL
70.50
LBL
900
STA
TOP PANEL
1040
STA
208.1
WL
1040
STA
LSOB (LEFT SIDE OF BODY)
RSOB (RIGHT SIDE OF BODY)
INSPECTION POINTS
FB (FLOOR BEAM)
LTP (LEFT TOP PANEL)
RTP (RIGHT TOP PANEL)
(SEE APPENDIX A)
LSOB 10
LSOB 1
FB 50
FB 41
LTP 8
LTP 5
FB 40
LTP 4
FB 31
LTP 1
FB 21
FB 30
RTP 14
RTP 11
FB 20
FB 11
FB 10
RTP 10
RTP 7
FB 1
RSOB 1
RSOB 10
1
RTP 1
RTP 6
LTP 9
LTP 14
V87894
(SHEET 1 OF 5)

### Page 46

FIGURE 5: Inspection - Thickness Measurements - Upper Panel - Group 1 and Group 3
February 06, 2003
Revision 1:  May 24, 2007 757-57-0061
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 46 of 55
BOEING SERVICE BULLETIN 757-57-0061
 
 
5.0
5.0
3.0
3.0
11.0
13.0
(TYPICAL)
11.0
(TYPICAL)
13.0
TYPICAL FLOOR BEAM INSPECTION POINT
UPPER PANEL
B-B
FLOOR BEAM
0.50
OF THE WEB ONLY
INSPECT THIS SIDE
B
B
FWD
INBD
900
STA
920
STA
940
STA
960
STA
984
STA
996
STA
1020
STA
1032.3
STA
1040
STA
INSPECTION POINTS
TYPICAL FLOOR BEAM
A-A
FLOOR BEAM
10 PLACES PER
21
21
V87895
(SHEET 2 OF 5)

### Page 47

FIGURE 5: Inspection - Thickness Measurements - Upper Panel - Group 1 and Group 3
February 06, 2003
Revision 1:  May 24, 2007 757-57-0061
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 47 of 55
BOEING SERVICE BULLETIN 757-57-0061
 
 
PANEL
UPPER
5.0
C-C
PLUS
CHORD
LEFT SIDE SHOWN, RIGHT SIDE OPPOSITE
TYPICAL SIDE-OF-BODY INSPECTION POINTS
10 PLACES
BEAM
STUB
LSOB 10LSOB 1
1020
STA
1000
STA
980
STA
960
STA
920
STA SPAR
REARFRONT
SPAR
5.0
3.0
(TYPICAL)
11.0
13.0
(TYPICAL)
3.0
11.0
13.0
BEAM
CREASE
CHORD
PLUS
SKIN
BODY 0.5
CENTER SECTION
UPPER PANEL OF
D-D
940
STA
D
D
FWD
INBD
UP
INBD
21
21
V87896
(SHEET 3 OF 5)

### Page 48

FIGURE 5: Inspection - Thickness Measurements - Upper Panel - Group 1 and Group 3
February 06, 2003
Revision 1:  May 24, 2007 757-57-0061
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 48 of 55
BOEING SERVICE BULLETIN 757-57-0061
 
 
(16 PLACES)
TYPICAL UPPER PANEL INSPECTION POINTS
FLOOR
BEAM
FLOOR
BEAM PANEL
E-E
SPAR
REAR996STA984STA
FB
UPPERTO FLOOR BEAM WEB
FLOOR BEAM WEB
TYPICAL
X/2
X
26.0
24.0
26.0
24.0
(TYPICAL)
RBL
24.75
RBL
45.50
FWD
21
V87897
(SHEET 4 OF 5)

### Page 49

FIGURE 5: Inspection - Thickness Measurements - Upper Panel - Group 1 and Group 3
February 06, 2003
Revision 1:  May 24, 2007 757-57-0061
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 49 of 55
BOEING SERVICE BULLETIN 757-57-0061
 
 
The step numbers shown below agree with the numbers shown in the circle symbols in the figure.  The QTY 
numbers shown below are the number of parts necessary for one airplane.
STEP TASK NAME REFERENCES QTY NOTES
1 Clean Front Spar and Upper Panel Remove dirt/debris from the area
2
Measure/
Make Sure/ 
Record
Secondary Fuel 
Barrier
- (a) (b) (c)
Floor Beam FB 50 10 locations each, on the 
right and left side.  See 
View A-A and B-B
Side of Body RSOB and LSOB 20 10 locations each, on the 
right and left side.  See 
Views C-C and D-D
Upper Panel RTP and LTP 16 8 locations each, on the 
right and left side.  See 
View E-E
     (a) Use a Non-Conductive Coating Thickness Gage to measure the thickness of the applied sec-
ondary fuel barrier.  (Refer to Paragraph 2.F., Special Tooling Necessary to do this Service Bul-
letin.)
     (b) Deleted - See Accomplishment Instructions for thickness limits.
     (c) Record the measurements on the Inspection Worksheets in Appendix A.
(SHEET 5 OF 5)

### Page 50

FIGURE 6: Inspection and Application of the Secondary Fuel Barrier - Group 2
February 06, 2003
Revision 1:  May 24, 2007 757-57-0061
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 50 of 55
BOEING SERVICE BULLETIN 757-57-0061
 
 
FIGURE  6: Inspection and Application of the Secondary Fuel Barrier - Group 2
FUEL BARRIER
SECONDARY
LOWER CHORD
FRONT SPAR
SPAR WEB
FRONT
MIN
1.5
TO FRONT SPAR WEB AND LOWER CHORD
TYPICAL MINIMUM COVERAGE COMMON
B-B
A-A
MIN
1.5
FWD
FWD
1
FRONT SPAR WEBLOWER CHORD
FRONT SPAR
166
WLSPAR
FRONTALLOWED
OVERSPRAY
0
BL
24.75
RBL
45.50
RBL
70.50
RBL
24.75
LBL
45.50
LBL
70.50
LBL
900
STA
900
STA
0
BL
24.75
LBL
24.75
RBL
1
V87898B
B
A
A
(SHEET 1 OF 2)

### Page 51

FIGURE 6: Inspection and Application of the Secondary Fuel Barrier - Group 2
February 06, 2003
Revision 1:  May 24, 2007 757-57-0061
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 51 of 55
BOEING SERVICE BULLETIN 757-57-0061
 
 
The step numbers shown below agree with the numbers shown in the circle symbols in the figure.  The QTY 
numbers shown below are the number of parts necessary for one airplane.
STEP TASK NAME PART NUMBER QTY NOTES
1 Measure / Make Sure Secondary Fuel Barrier BMS 5-81 - It must be a minimum of 1.50 inches
(SHEET 2 OF 2)

### Page 52

FIGURE 7: Close Access - Air Conditioning Duct Installation - Group 1, Group 2 and Group 3
February 06, 2003
Revision 1:  May 24, 2007 757-57-0061
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 52 of 55
BOEING SERVICE BULLETIN 757-57-0061
 
 
FIGURE  7: Close Access - Air Conditioning Duct Installation - Group 1, Group 2 and Group 3
The step numbers shown below agree with the numbers shown in the circle symbols in the figure.  The QTY 
numbers shown below are the number of parts necessary for one airplane.
STEP TASK NAME REFERENCES QTY NOTES
1 Install Duct Assembly 21-21-00 2 -
2 Connect Duct Assembly - 2 At each end; put covers over all open duct ends.
FWD
COMPARTMENT
TO PASSENGER
(2 EACH SIDE)
1 2
CONNECTOR
SERVICE
GROUND AIR
MIX MANIFOLD
V88491
(SHEET 1 OF 1)

### Page 53

APPENDIX A: Record of Thickness Measurements
February 06, 2003
Revision 1:  May 24, 2007 757-57-0061
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 53 of 55
BOEING SERVICE BULLETIN 757-57-0061
 
 
APPENDIX  A: Record of Thickness Measurements
Record the thickness measurements from Figures 3 and 4 on the following worksheets.
FRONT SPAR - STIFFENERS (FSS)
FRONT SPAR - WEB (FSW)
BODY FRAME - STIFFENER (BFS)
BODY FRAME ASSEMBLY WEB (BFAW)
FSS 1 0.              in. FSS 17 0.              in. FSS 33 0.              in. FSS 49 0.              in.
FSS 2 0.              in. FSS 18 0.              in. FSS 34 0.              in. FSS 50 0.              in.
FSS 3 0.              in. FSS 19 0.              in. FSS 35 0.              in. FSS 51 0.              in.
FSS 4 0.              in. FSS 20 0.              in. FSS 36 0.              in. FSS 52 0.              in.
FSS 5 0.              in. FSS 21 0.              in. FSS 37 0.              in. FSS 53 0.              in.
FSS 6 0.              in. FSS 22 0.              in. FSS 38 0.              in. FSS 54 0.              in.
FSS 7 0.              in. FSS 23 0.              in. FSS 39 0.              in. FSS 55 0.              in.
FSS 8 0.              in. FSS 24 0.              in. FSS 40 0.              in. FSS 56 0.              in.
FSS 9 0.              in. FSS 25 0.              in. FSS 41 0.              in. FSS 57 0.              in.
FSS 10 0.              in. FSS 26 0.              in. FSS 42 0.              in. FSS 58 0.              in.
FSS 11 0.              in. FSS 27 0.              in. FSS 43 0.              in. FSS 59 0.              in.
FSS 12 0.              in. FSS 28 0.              in. FSS 44 0.              in. FSS 60 0.              in.
FSS 13 0.              in. FSS 29 0.              in. FSS 45 0.              in. FSS 61 0.              in.
FSS 14 0.              in. FSS 30 0.              in. FSS 46 0.              in. FSS 62 0.              in.
FSS 15 0.              in. FSS 31 0.              in. FSS 47 0.              in. FSS 63 0.              in.
FSS 16 0.              in. FSS 32 0.              in. FSS 48 0.              in. FSS 64 0.              in.
FSW 1 0.              in. FSW 8 0.              in.
FSW 2 0.              in. FSW 9 0.              in.
FSW 3 0.              in. FSW 10 0.              in.
FSW 4 0.              in. FSW 11 0.              in.
FSW 5 0.              in. FSW 12 0.              in.
FSW 6 0.              in. FSW 13 0.              in.
FSW 7 0.              in. FSW 14 0.              in.
Left Side Right Side
BFS 3 0.             in. BFS 1 0.             in.
BFS 4 0.             in. BFS 2 0.             in.
Left Side Right Side
BFAW 2 0.              in. BFAW 1 0.             in.

### Page 54

APPENDIX A: Record of Thickness Measurements
February 06, 2003
Revision 1:  May 24, 2007 757-57-0061
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 54 of 55
BOEING SERVICE BULLETIN 757-57-0061
 
 
SIDE OF BODY (SOB)
UPPER PANEL (TP)
Left Side Right Side
LSOB 1 0.                  in. RSOB 1 0.                  in.
LSOB 2 0.                  in. RSOB 2 0.                  in.
LSOB 3 0.                  in. RSOB 3 0.                  in.
LSOB 4 0.                  in. RSOB 4 0.                  in.
LSOB 5 0.                  in. RSOB 5 0.                  in.
LSOB 6 0.                  in. RSOB 6 0.                  in.
LSOB 7 0.                  in. RSOB 7 0.                  in.
LSOB 8 0.                  in. RSOB 8 0.                  in.
LSOB 9 0.                  in. RSOB 9 0.                  in.
LSOB 10 0.                  in. RSOB 10 0.                  in.
Left Side Right Side
LTP 1 0.                  in. RTP 1 0.                  in.
LTP 2 0.                  in. RTP 2 0.                  in.
LTP 3 0.                  in. RTP 3 0.                  in.
LTP 4 0.                  in. RTP 4 0.                  in.
LTP 5 0.                  in. RTP 5 0.                  in.
LTP 6 0.                  in. RTP 6 0.                  in.
LTP 7 0.                  in. RTP 7 0.                  in.
LTP 8 0.                  in. RTP 8 0.                  in.
LTP 9 0.                  in. RTP 9 0.                  in.
LTP 10 0.                  in. RTP 10 0.                  in.
LTP 11 0.                  in. RTP 11 0.                  in.
LTP 12 0.                  in. RTP 12 0.                  in.
LTP 13 0.                  in. RTP 13 0.                  in.
LTP 14 0.                  in. RTP 14 0.                  in.

### Page 55

APPENDIX A: Record of Thickness Measurements
February 06, 2003
Revision 1:  May 24, 2007 757-57-0061
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 55 of 55
BOEING SERVICE BULLETIN 757-57-0061
 
 
FLOOR BEAM (FB)
FB 1 0.            FB 11 0.               FB 21 0.            FB 31 0.            FB 41 0.            
FB 2 0.            FB 12 0.            FB 22 0.            FB 32 0.            FB 42 0.            
FB 3 0.            FB 13 0.            FB 23 0.            FB 33 0.            FB 43 0.            
FB 4 0.            FB 14 0.            FB 24 0.            FB 34 0.            FB 44 0.            
FB 5 0.            FB 15 0.            FB 25 0.            FB 35 0.            FB 45 0.            
FB 6 0.            FB 16 0.            FB 26 0.            FB 36 0.            FB 46 0.            
FB 7 0.            FB 17 0.            FB 27 0.            FB 37 0.            FB 47 0.            
FB 8 0.            FB 18 0.            FB 28 0.            FB 38 0.            FB 48 0.            
FB 9 0.            FB 19 0.            FB 29 0.            FB 39 0.            FB 49 0.            
FB 10 0.            FB 20 0.            FB 30 0.            FB 40 0.            FB 50 0.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
