# Boeing Service Bulletin 767-21-0235: Revision 1

- Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2013-0797; AD 2017-01-09 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Boeing Service Bulletin 767-21-0235](https://openairdocs.org/service-documents/boeing/sb-767-21-0235.md)
- Title as filed: U.S. DOT/FAA - SB-767-21-0235-01
- Pages: 56
- PDF: https://openairdocs.org/files/sha256/f5/b0/f5b0d04ce35ad2ad36dfc7ee016dd3daac79bffd9e76a5f94dbf1e2b5ab19476
- Page: https://openairdocs.org/service-documents/boeing/sb-767-21-0235/file/f5b0d04ce35a

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Commercial 
Airplanes
767
Service Bulletin
Number: 767-21-0235
Original Issue: October 08, 2009
Revision 1: July 29, 2011
ATA System: 2158
SUBJECT: AIR CONDITIONING - Cooling - Freighter Equipment Cooling System 3-Way Valve
Control Logic Change
Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15
CFR 730-774). An export license may be required before it is used for development, production or use by foreign
persons from specific countries. The controller of this data has the individual responsibility to abide by all export
laws.
9E991ECCN:
BOEING PROPRIETARY, CONFIDENTIAL, AND/OR TRADE SECRET
Copyright © 2009 The Boeing Company
Unpublished Work - All Rights Reserved
Boeing claims copyright in each page of this document only to the extent that the page contains copyrightable
subject matter. Boeing also claims copyright in this document as a compilation and/or collective work.
This document includes proprietary information owned by The Boeing Company and/or one or more third parties.
Treatment of the document and the information it contains is governed by contract with Boeing. For more
information, contact The Boeing Company, P.O. Box 3707, Seattle, Washington 98124.
Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner,
BBJ, DC-8, DC-9, DC-10, KC-10, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8A, Poseidon and the
Boeing livery are all trademarks owned by The Boeing Company; and no trademark license is granted in
connection with this document unless provided in writing by Boeing.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: October 08, 2009
767-21-0235Revision 1: July 29, 2011
1 of 56
2.0

### Page 2

BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: October 08, 2009
767-21-0235Revision 1: July 29, 2011
2 of 56
BOEING SERVICE BULLETIN 767-21-0235
BLANK PAGE

### Page 3

Table of Contents
Revision Transmittal Sheet ............................................ 5
Summary ...................................................... 7
1. PLANNING INFORMATION ........................................ 1 1
A. Effectivity ............................................... 1 1
1. Airplanes ............................................ 1 1
2. Spares Affected ........................................ 1 2
B. Concurrent Requirements ...................................... 1 2
C. Reason ................................................ 1 2
D. Description .............................................. 1 3
E. Compliance .............................................. 1 3
F. Approval ............................................... 1 3
G. Manpower .............................................. 1 4
H. Weight and Balance Changes .................................... 1 5
I. Electrical Load Data ......................................... 1 5
J. References .............................................. 1 5
1. Existing Data .......................................... 1 5
2. Data supplied with this Service Bulletin ............................ 1 5
3. Installation Drawings Used in the Preparation of this Service Bulletin ............ 1 6
K. Publications Affected ........................................ 1 6
L. Interchangeability and Intermixability of Parts ........................... 1 6
2. MATERIAL INFORMATION ........................................ 1 7
A. Material - Price and Availability ................................... 1 7
B. Industry Support Information .................................... 1 7
C. Parts Necessary For Each Airplane ................................. 1 8
1. Kits/Parts ............................................ 1 8
2. Parts and Materials Supplied by the Operator ........................ 1 9
3. Parts Modified and Reidentified ................................ 1 9
4. Parts Removed and Not Replaced .............................. 1 9
D. Parts Necessary to Change Spares ................................. 1 9
E. Special Tooling - Price and Availability ............................... 1 9
F. Special Tooling Necessary to do this Service Bulletin ....................... 1 9
3. ACCOMPLISHMENT INSTRUCTIONS .................................. 2 1
A. GENERAL INFORMATION ..................................... 2 1
B. WORK INSTRUCTIONS ....................................... 2 1
FIGURE 1: P36 LEFT MISCELLANEOUS ELECTRICAL EQUIPMENT PANEL WIRE BUNDLE W0176 -
ROUTING [Group 1] ...................................... 3 1
FIGURE 2: P36 LEFT MISCELLANEOUS ELECTRICAL EQUIPMENT PANEL WIRE BUNDLE W0176 -
WIRING CHANGES [Group 1] ................................. 3 7
FIGURE 3: P36 LEFT MISCELLANEOUS ELECTRICAL EQUIPMENT PANEL WIRE BUNDLES W0176
AND W0184 - ROUTING [Group 2-3] ............................. 3 9
FIGURE 4: P36 LEFT MISCELLANEOUS ELECTRICAL EQUIPMENT PANEL WIRE BUNDLE W0176 -
WIRING CHANGES [Group 2] ................................. 4 5
FIGURE 5: P36 LEFT MISCELLANEOUS ELECTRICAL EQUIPMENT PANEL WIRE BUNDLE W0176 -
WIRING CHANGES [Group 3] ................................. 4 7
FIGURE 6: P36 LEFT MISCELLANEOUS ELECTRICAL EQUIPMENT PANEL WIRE BUNDLE W0184 -
WIRING CHANGES [Group 2] ................................. 4 9
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: October 08, 2009
767-21-0235Revision 1: July 29, 2011
3 of 56
BOEING SERVICE BULLETIN 767-21-0235

### Page 4

FIGURE 7: P36 LEFT MISCELLANEOUS ELECTRICAL EQUIPMENT PANEL WIRE BUNDLE W0184 -
WIRING CHANGES [Group 3] ................................. 5 1
FIGURE 8: P36 LEFT MISCELLANEOUS ELECTRICAL EQUIPMENT PANEL NEW RELAY - INSTALLATION
.................................................. 5 3
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: October 08, 2009
767-21-0235Revision 1: July 29, 2011
4 of 56
BOEING SERVICE BULLETIN 767-21-0235

### Page 5

Commercial 
Airplanes
767
Service Bulletin
Revision Transmittal SheetNumber: 767-21-0235Original Issue: October 08, 2009
Revision 1: July 29, 2011
ATA System: 2158
SUBJECT: AIR CONDITIONING - Cooling - Freighter Equipment Cooling System 3-Way Valve
Control Logic Change
This revision includes all pages of the service bulletin.
COMPLIANCE INFORMATION RELATED TO THIS REVISION
No more work is necessary on the airplane(s) changed in accordance with the original issue of this service
bulletin.
REASON FOR REVISION
This revision is sent to tell operators that when they do the change in the P36 left miscellaneous electrical
equipment panel electrical power must be removed from the airplane.
These sections are changed:
1. Accomplishment Instructions:
a. Paragraph B., Work Instructions: A step is added to remove electrical power from the airplane.
b. Paragraph B., Work Instructions: A step is added to supply electrical power to the airplane.
Vertical lines are put on the left edge of each page, except in Paragraph 1.A., Effectivity, to show the location
of important changes.
Pages with no vertical lines have no important changes.
REVISION HISTORY
October 08, 2009Original Issue:
July 29, 2011Revision 1:
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: October 08, 2009
767-21-0235Revision 1: July 29, 2011
5 of 56

### Page 6

BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: October 08, 2009
767-21-0235Revision 1: July 29, 2011
6 of 56
BOEING SERVICE BULLETIN 767-21-0235
BLANK PAGE

### Page 7

Commercial 
Airplanes
767
Service Bulletin
SummaryNumber: 767-21-0235Original Issue: October 08, 2009
Revision 1: July 29, 2011
ATA System: 2158
SUBJECT: AIR CONDITIONING - Cooling - Freighter Equipment Cooling System 3-Way Valve
Control Logic Change
CONCURRENT REQUIREMENTS
None.
BACKGROUND
This service bulletin gives instructions to install a relay and related wiring in the P36 panel to change the control
logic for the equipment cooling 3-way valve on freighter airplanes. The logic is changed to make the 3-way valve
close when the Electrical/Electronic (E/E) cooling system is put in STBY mode, when selected from the P5
overhead panel in the flight compartment. This will result in the continued supply of cooled air to the flight
compartment avionic equipment. If this service bulletin is not done, a loss of air flow from the Air Conditioning
(A/C) packs could occur and result in a loss of the displays in the flight compartment.
A 767-300F operator experienced an air turn-back event caused by the loss of one of the first officer’s primary
displays and the loss of color on two of the captain’s primary displays. The display problems were followed by
electrical burning smells in the flight compartment, which was found to be the result of an overheat condition
from a decreased supply of cooling air to the avionic equipment in the flight compartment. The cause of the
occurrence was found to be ice accumulation in the supply line orifice, which was sufficient in quantity to block
the conditioned air flow to the flight compartment. The icing condition is found to start during ground operations
in high humidity environments and when the cooling packs are selected to full cold. The packs cannot fully
remove all moisture from the air in high humidity environments which subsequently causes small quantities of
airborne ice crystals in the released air flow. After a period of time, the ice crystals cause frost to collect on the
internal walls of the A/C ducts. If a large quantity of frost collects in the ducts and is not cleared, the frost becomes
ice. The combination of one cooling pack in operation above freezing and the other cooling pack in operation
below freezing, in humid environments, increases the amount of frost that can accumulate. To give continuous
cooling to the flight compartment avionic equipment, Boeing has made changes to the control logic for the
equipment cooling 3-way valve, which will give the pilots the option to select to have replacement cooling airflow
supplied from the E/E cooling system, if the airflow from the A/C packs becomes unavailable or not sufficient.
The changes make the operation of the valve close when the E/E cooling system is put in the STBY mode when
selected from the flight compartment.
Accomplishment of this service bulletin installs a relay in the lower section of the P36 Left Miscellaneous Electrical
Equipment Panel, with related wiring changes to change the operation of the 3-way valve when the E/E cooling
system is selected to the STBY mode from the flight compartment. This gives the pilots the option to choose an
alternative supply of cooling airflow to prevent overheating of the avionic equipment in the flight compartment.
Boeing Service Related Problem (SRP) 767-SRP-21-0173 is related to this service bulletin.
Boeing Fleet Team Digest (FTD) 767 FTD 21-08002 and 767 FTD 21-08001 are related to this service bulletin.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: October 08, 2009
767-21-0235Revision 1: July 29, 2011
7 of 56

### Page 8

ACTION (PRR B12900-255)
Group 1:
Get access and prepare the airplane to do work in the P36 Left Miscellaneous Electrical Equipment Panel in
the Main Equipment Center (MEC). Add new wires and replace a wire in wire bundle W0176 and install a new
relay in the lower section of the panel. Do a functional test of the system.
Group 2-3:
Get access and prepare the airplane to do work in the P36 Left Miscellaneous Electrical Equipment Panel in
the Main Equipment Center (MEC). Add new wires and replace wires in wire bundles W0176 and W0184 and
install a new relay in the lower section of the panel. Do a functional test of the system.
EFFECTIVITY
767-300F Airplanes. Refer to Paragraph 1.A., Effectivity for the list of affected airplanes.
COMPLIANCE
No compliance time is given.
INDUSTRY SUPPORT INFORMATION
Boeing warranty remedies are not available for the configuration changes given in this service bulletin.
MANPOWER
Elapsed HoursTotal Task HoursAirplanes
4.957.60Group 1
6.859.50Group 2 and 3
MATERIAL INFORMATION
Boeing Supplied Kits/Parts.
Refer to Paragraph 2.A., Material - Price and Availability.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: October 08, 2009
767-21-0235Revision 1: July 29, 2011
8 of 56
BOEING SERVICE BULLETIN 767-21-0235

### Page 9 (OCR)

BOEING SERVICE BULLETIN 767-21-0235
GROUP 1:
ADD WIRES AND REPLACE A
WIRE IN WIRE BUNDLE W0176
IN THE P36 MISCELLANEOUS
ELECTRICAL EQUIPMENT
PANEL. INSTALL A NEW RELAY
IN THE LOWER SECTION OF
THE PANEL.
GROUP 2 AND 3:
ADD WIRES AND REPLACE
WIRES IN WIRE BUNDLES
W0176 AND W0184 IN THE P36
MISCELLANEOUS ELECTRICAL
EQUIPMENT PANEL. INSTALL A
NEW RELAY IN THE LOWER
SECTION OF THE PANEL.
MAIN EQUIPMENT CENTER (MEC)  1850353
(TYPICAL)
Original Issue: October 08, 2009
Revision 1: July 29, 2011  767-21-0235
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.  9 of 56

### Page 10

BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: October 08, 2009
767-21-0235Revision 1: July 29, 2011
10 of 56
BOEING SERVICE BULLETIN 767-21-0235
BLANK PAGE

### Page 11

Commercial 
Airplanes
767
Service Bulletin
Number: 767-21-0235
Original Issue: October 08, 2009
Revision 1: July 29, 2011
ATA System: 2158
SUBJECT: AIR CONDITIONING - Cooling - Freighter Equipment Cooling System 3-Way Valve
Control Logic Change
1.    PLANNING INFORMATION
A. Effectivity
1. Airplanes
This service bulletin is for the airplanes shown below. An equivalent change is on subsequent
production airplanes. Refer to PRR B12900-255 for data about this change.
Refer to Service Bulletin Index Document D624T001 Part 3 for Airplane Variable Number, Line
Number, and Serial Number data.
DESCRIPTIONCONFIGURATIONGROUP
767-300F airplanes, delivered with a General Market Freighter
configuration, that have P36 panel wiring differences.
-1
767-300F airplanes, delivered with a Manual Freighter configuration,
that have P36 panel wiring differences.
-2
767-300F airplanes, delivered with a Manual Freighter configuration,
that have P36 panel wiring differences.
-3
Airplane Models:
767-300F
GroupVariable Number
2VR201 - VR211
1VR251
1VR256 - VR260
1VT501
1VT511 - VT513
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: October 08, 2009
767-21-0235Revision 1: July 29, 2011
11 of 56

### Page 12

GroupVariable Number
1VT521 - VT523
1VT531 - VT533
3VW701 - VW721
1VW851
2. Spares Affected
None.
B. Concurrent Requirements
None.
C. Reason
This service bulletin gives instructions to install a relay and related wiring in the P36 panel to change
the control logic for the equipment cooling 3-way valve on freighter airplanes. The logic is changed to
make the 3-way valve close when the Electrical/Electronic (E/E) cooling system is put in STBY mode,
when selected from the P5 overhead panel in the flight compartment. This will result in the continued
supply of cooled air to the flight compartment avionic equipment. If this service bulletin is not done, a
loss of air flow from the Air Conditioning (A/C) packs could occur and result in a loss of the displays in
the flight compartment.
A 767-300F operator experienced an air turn-back event caused by the loss of one of the first officer’s
primary displays and the loss of color on two of the captain’s primary displays. The display problems
were followed by electrical burning smells in the flight compartment, which was found to be the result
of an overheat condition from a decreased supply of cooling air to the avionic equipment in the flight
compartment. The cause of the occurrence was found to be ice accumulation in the supply line orifice,
which was sufficient in quantity to block the conditioned air flow to the flight compartment. The icing
condition is found to start during ground operations in high humidity environments and when the cooling
packs are selected to full cold. The packs cannot fully remove all moisture from the air in high humidity
environments which subsequently causes small quantities of airborne ice crystals in the released air
flow. After a period of time, the ice crystals cause frost to collect on the internal walls of the A/C ducts.
If a large quantity of frost collects in the ducts and is not cleared, the frost becomes ice. The combination
of one cooling pack in operation above freezing and the other cooling pack in operation below freezing,
in humid environments, increases the amount of frost that can accumulate. To give continuous cooling
to the flight compartment avionic equipment, Boeing has made changes to the control logic for the
equipment cooling 3-way valve, which will give the pilots the option to select to have replacement
cooling airflow supplied from the E/E cooling system, if the airflow from the A/C packs becomes
unavailable or not sufficient. The changes make the operation of the valve close when the E/E cooling
system is put in the STBY mode when selected from the flight compartment.
Accomplishment of this service bulletin installs a relay in the lower section of the P36 Left Miscellaneous
Electrical Equipment Panel, with related wiring changes to change the operation of the 3-way valve
when the E/E cooling system is selected to the STBY mode from the flight compartment. This gives
the pilots the option to choose an alternative supply of cooling airflow to prevent overheating of the
avionic equipment in the flight compartment.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: October 08, 2009
767-21-0235Revision 1: July 29, 2011
12 of 56
BOEING SERVICE BULLETIN 767-21-0235

### Page 13

Revision 1 is sent to tell operators that when they do the change in the P36 left miscellaneous electrical
equipment panel electrical power must be removed from the airplane.
Boeing Service Related Problem (SRP) 767-SRP-21-0173 is related to this service bulletin.
Boeing Fleet Team Digest (FTD) 767 FTD 21-08002 and 767 FTD 21-08001 are related to this service
bulletin.
D. Description
Group 1:
Get access and prepare the airplane to do work in the P36 Left Miscellaneous Electrical Equipment
Panel in the Main Equipment Center (MEC). Make changes to wire bundle W0176 and install a new
relay in the lower section of the panel. Do a functional test of the system.
Group 2-3:
Get access and prepare the airplane to do work in the P36 Left Miscellaneous Electrical Equipment
Panel in the Main Equipment Center (MEC). Make changes to wire bundles W0176 and W0184 and
install a new relay in the lower section of the panel. Do a functional test of the system.
Revision 1 - No more work is necessary on airplanes changed in accordance with the original issue of
this service bulletin.
The work in this service bulletin is done in the maintenance zone(s) given below.
Affected Maintenance Zones
ZoneModel
119767-300F
E. Compliance
No compliance time is given.
F. Approval
This service bulletin was examined by the Federal Aviation Administration (FAA). The changes specified
in this service bulletin comply with the applicable regulations and are FAA approved, as well as European
Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/JAA approved
airplanes listed in the service bulletin effectivity. This service bulletin and its approval were based on
the airplane in its original Boeing delivery configuration or as modified by other approved Boeing
changes.
If an airplane has a non-Boeing modification or repair that affects a component or system also affected
by this service bulletin, the operator is responsible for obtaining appropriate regulatory agency approval
before incorporating this service bulletin.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: October 08, 2009
767-21-0235Revision 1: July 29, 2011
13 of 56
BOEING SERVICE BULLETIN 767-21-0235

### Page 14

G. Manpower
The table below shows an estimate of the task hours necessary to do this service bulletin for each
airplane. This estimate is for direct labor only, done by an experienced crew. Adjust the estimate with
operator task hour data if necessary. The estimate does not include lost time. These are some examples
of lost time:
 Time to adjust to the workplace
 Time to schedule the work
 Time to inspect the work
 Time to cure the materials
 Time to make the parts
 Time to find the tools
Group 1:
Elapsed HoursTask HoursNumber of Per-
sons
Task
0.500.501Open Access and
Prepare Airplane
-FIGURE 1 (Routing
Only)
2.655.302FIGURE 2
0.300.301FIGURE 8
1.001.001Test
0.500.501Close Access
4.957.60TOTAL FOR EACH AIRPLANE
Group 2:
Elapsed HoursTask HoursNumber of Per-
sons
Task
0.500.501Open Access and
Prepare Airplane
-FIGURE 3 (Routing
Only)
2.655.302FIGURE 4
1.901.901FIGURE 6
0.300.301FIGURE 8
1.001.001Test
0.500.501Close Access
6.859.50TOTAL FOR EACH AIRPLANE
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: October 08, 2009
767-21-0235Revision 1: July 29, 2011
14 of 56
BOEING SERVICE BULLETIN 767-21-0235

### Page 15

Group 3:
Elapsed HoursTask HoursNumber of Per-
sons
Task
0.500.501Open Access and
Prepare Airplane
-FIGURE 3 (Routing
Only)
2.655.302FIGURE 5
1.901.901FIGURE 7
0.300.301FIGURE 8
1.001.001Test
0.500.501Close Access
6.859.50TOTAL FOR EACH AIRPLANE
H. Weight and Balance Changes
None.
I. Electrical Load Data
Not changed.
J. References
1. Existing Data
a. Engineering Change Memo PRR B12900-255
b. Boeing Service Related Problem (SRP) 767-SRP-21-0173
c. Standard Overhaul Practices Manual (SOPM) 20-50-05, 20-50-10
d. Standard Wiring Practices Manual (SWPM) 20-10-11, 20-10-11, 20-10-12, 20-10-19, 20-20-00,
20-20-10, 20-81-12, 20-81-19, 20-81-22, 20-90-11
e. 767 Aircraft Maintenance Manual (AMM) 06-41-00, 31-01-36, 32-09-02
f. 767 Fleet Team Digest (FTD) 21-08001, 21-08002
g. 767 Wiring Diagram Manual (WDM) 21-58-16
2. Data supplied with this Service Bulletin
None.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: October 08, 2009
767-21-0235Revision 1: July 29, 2011
15 of 56
BOEING SERVICE BULLETIN 767-21-0235

### Page 16

3. Installation Drawings Used in the Preparation of this Service Bulletin
TitleDrawing Number
MODULAR WIRE BUNDLE INSTALLATION P36, MISCELLA-
NEOUS RELAY PANEL, LEFT
288T2036
This drawing was used to prepare this service bulletin. This drawing is not necessary to make the
specified changes and is not supplied with this service bulletin. This drawing may not be applicable
to all airplane configurations or operators.
K. Publications Affected
1. Publications:
Chapter-SectionPublication
21-58767 Wiring Diagram Manual
21-58767 Illustrated Parts Catalog
2. Damage Tolerance Based Structural Inspections:
Boeing has evaluated the repairs and/or changes in this service bulletin for effects on Fatigue
Critical Structure (FCS) and for changes to Damage Tolerance Inspections (DTI) required in the
Maintenance Program. This service bulletin does not affect FCS, therefore DTIs are not necessary.
L. Interchangeability and Intermixability of Parts
Accomplishment of this service bulletin does not affect interchangeability or intermixability of parts.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: October 08, 2009
767-21-0235Revision 1: July 29, 2011
16 of 56
BOEING SERVICE BULLETIN 767-21-0235

### Page 17

2.    MATERIAL INFORMATION
A. Material - Price and Availability
Boeing can supply the kits shown in Paragraph 2.C., Parts Necessary for Each Airplane as shown
below. If there is a limit to the quantity (QTY) of available kits, a supply sequence is given by Spares.
More kits become available as shown in the Reorder Lead Time (ROLT). ROLT is calculated from the
date Boeing gets the purchase order.
Group 1:
Unit Price thru
May 31/10
ROLT
(Weeks)
QTYDateNameKit Number
$715.00185Jun 15/09Top Kit - 3-Way Valve
Logic Modification
015T1839-1
4Jul 14/09
Group 2-3:
Unit Price thru
May 31/10
ROLT
(Weeks)
QTYDateNameKit Number
$955.00185Jun 23/09Top Kit - 3-Way Valve
Logic Modification
015T1839-2
5Jul 08/09
5Jul 22/09
1Aug 05/09
The kits are subject to the terms and conditions of the Boeing standard purchase order acknowledgment.
After the Unit Price date, new price and ROLT data is applicable. Prices are in United States dollars.
Terms: Net 30 days.
Reference this service bulletin and submit your purchase order by one of the methods that follow:
1. Order on-line via ATA Spec 2000 or Boeing Part Page
2. Fax to (206) 662-7145
3. Mail to:
Spares Customer Support - MC 36-65
Boeing Spares Department
P.O. Box 3707
Seattle, Washington 98124-2207 USA
B. Industry Support Information
Boeing warranty remedies are not available for the configuration changes given in this service bulletin.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: October 08, 2009
767-21-0235Revision 1: July 29, 2011
17 of 56
BOEING SERVICE BULLETIN 767-21-0235

### Page 18

C. Parts Necessary For Each Airplane
1. Kits/Parts
To get the kits/parts shown below, refer to Paragraph 2.A., Material - Price and Availability.
NOTE: One top kit and the items shown in Paragraph 2.C.2., Parts and Materials Supplied by
the Operator, are necessary for each airplane.
Kit 015T1839
NotesNameQTYNew Part Number
-2-1
Top Kit - 3-Way
Valve Logic Modifi-
cation
.-015T1839-1
Top Kit - 3-Way
Valve Logic Modifi-
cation
-.015T1839-2
ASSY -101
(W0176)
11289T1162-101
ASSY -102
(W0184)
1.289T1162-102
LACING TAPE -
RED (135C) 100
FT
11289T9001-21
LACING TAPE -
BLUE (135C) 100
FT
1.289T9001-61
RELAY11BACR13CF2A
TAPE, ID22BACT19J4
Kit 289T1162
NotesNameQTYNew Part Number
-102-101
ASSY -101
(W0176)
.-289T1162-101
ASSY -102
(W0184)
-.289T1162-102
ID TAPE - CON-
NECTOR
.1289T1162-10101
WIRE - RAW MA-
TERIAL
.1289T1162-101W
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: October 08, 2009
767-21-0235Revision 1: July 29, 2011
18 of 56
BOEING SERVICE BULLETIN 767-21-0235

### Page 19

Kit 289T1162
NotesNameQTYNew Part Number
-102-101
WIRE - RAW MA-
TERIAL
1.289T1162-102W
CONTACT, SOCK-
ET
.4BACC47DJ1
CONTACT, SOCK-
ET
.1BACC47ER1
RELAY SOCKET.1BACS16X1A
CONTACT, PIN,
CRIMP REMOV-
ABLE, PER MIL-C-
39029/11
43M39029/11-145
2. Parts and Materials Supplied by the Operator
None.
3. Parts Modified and Reidentified
None.
4. Parts Removed and Not Replaced
None.
D. Parts Necessary to Change Spares
None.
E. Special Tooling - Price and Availability
None.
F. Special Tooling Necessary to do this Service Bulletin
No special tools or equipment are necessary to do the change in this service bulletin. But, maintenance
and overhaul tools in the manuals given in Paragraph 1.J., References, can be necessary. Examine
operator tool supply to make sure all necessary tools are available.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: October 08, 2009
767-21-0235Revision 1: July 29, 2011
19 of 56
BOEING SERVICE BULLETIN 767-21-0235

### Page 20

BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: October 08, 2009
767-21-0235Revision 1: July 29, 2011
20 of 56
BOEING SERVICE BULLETIN 767-21-0235
BLANK PAGE

### Page 21

3.    ACCOMPLISHMENT INSTRUCTIONS
A. GENERAL INFORMATION
CAUTION: KEEP THE WORK AREA, WIRES AND ELECTRICAL BUNDLES CLEAN OF METAL
PARTICLES OR CONTAMINATION WHEN YOU USE TOOLS. UNWANTED MATERIAL,
METAL PARTICLES OR CONTAMINATION CAUGHT IN WIRE BUNDLES CAN CAUSE
DAMAGE TO THE BUNDLES. DAMAGED WIRE BUNDLES CAN CAUSE SPARKS OR
OTHER ELECTRICAL DAMAGE.
NOTE: 1. Manual titles are referred to by acronyms. Refer to Paragraph 1.J., References, for
definition of the acronyms.
2. Obey all of the warnings and cautions given in the specified manual sections.
3. Refer to the SWPM 20-10-11 and SWPM 20-10-12 for the wire installation procedures
and SWPM 20-10-19 for the wire separation requirements, as accepted procedures.
4. These work instructions refer to procedures included in other Boeing documents.
When the words "refer to" are used and the operator has an accepted alternative
procedure, the accepted alternative procedure can be used. When the words "in
accordance with" are included in the instruction, the procedure in the Boeing document
must be used.
B. WORK INSTRUCTIONS
1. Get access to the Flight Compartment and open the Main Equipment Center (MEC) access door,
119AL, to get access to the MEC. Refer to 767 AMM 06-41-00.
2. Remove electrical power from the airplane. Refer to 767 AMM 24-22-00 as an accepted procedure.
3. In the Flight Compartment and MEC, open the circuit breakers specified in the tables below and
attach 'DO-NOT-CLOSE' tags.
MAIN POWER DISTRIBUTION PANEL
NumberNameLocationPanel
C00331CB-EQUIP COOL FAN SPLY 1H018P6-3
CIRCUIT BREAKER PANEL ASSEMBLY
NumberNameLocationPanel
C00654CB-EQUIP COOLING SUPPLY FAN 1P011P11-3
4. Open the P36 Left Miscellaneous Electrical Equipment Panel to get access to the wiring and
electrical equipment. Refer to 767 AMM 31-01-36.
5. Group 1:
Make changes to wire bundle W0176 in accordance with FIGURE 1 and FIGURE 2.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: October 08, 2009
767-21-0235Revision 1: July 29, 2011
21 of 56
BOEING SERVICE BULLETIN 767-21-0235

### Page 22

6. Group 2-3:
Make changes to wire bundles W0176 and W0184 in accordance with:
Group 2:
FIGURE 3, FIGURE 4 and FIGURE 6.
Group 3:
FIGURE 3, FIGURE 5 and FIGURE 7.
7. Install a new relay in the lower section of P36 Left Miscellaneous Electrical Equipment Panel in
accordance with FIGURE 8.
8. Close the P36 Left Miscellaneous Electrical Equipment Panel.
9. In the Flight Compartment and the MEC, remove the 'DO-NOT-CLOSE' tags and close the circuit
breakers specified in the tables below.
MAIN POWER DISTRIBUTION PANEL
NumberNameLocationPanel
C00331CB-EQUIP COOL FAN SPLY 1H018P6-3
CIRCUIT BREAKER PANEL ASSEMBLY
NumberNameLocationPanel
C00654CB-EQUIP COOLING SUPPLY FAN 1P011P11-3
10. Supply electrical power to the airplane. Refer to 767 AMM 24-22-00 as an accepted procedure.
11. Do the test as follows:
Group 1:
a. Make sure the airplane is powered, the engines are OFF and the air conditioning packs are
OFF.
b. Make sure the Air/Ground Relay System is in GROUND mode. Or to put the Air/Ground Relay
System in GROUND mode, refer to 767 AMM 32-09-02 as an accepted procedure.
c. In the MEC, make sure the circuit breakers specified in the table below are closed:
CIRCUIT BREAKER PANEL ASSEMBLY
NumberNameLocationPanel
C00653LEFT PACK FLOW CONTA013P11-1
C00704RIGHT PACK FLOW CONTA026P11-4
C00688EQUIPMENT COOLING STANDBYB008P11-1
C00679EQUIP COOL OVERRIDEC019P11-4
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: October 08, 2009
767-21-0235Revision 1: July 29, 2011
22 of 56
BOEING SERVICE BULLETIN 767-21-0235

### Page 23

CIRCUIT BREAKER PANEL ASSEMBLY
NumberNameLocationPanel
C01175LDG GR POS AIR/GND SYS 1C030P11-4
C01426ENGINE SPEED SENSE L2D016P11-1
C01427ENGINE SPEED SENSE R2D017P11-1
d. In the Flight Compartment, set the Equipment Cooling rotary switch on the P5 overhead panel
to AUTO.
e. Disconnect connector (D20366) to Equipment Cooling Temperature Control switch (S868) at
STA 208, WL 172 and RBL 60.
f. Install a jumper from pin 1 of connector (D20366) to pin 2 of connector (D20366).
g. Make sure the 3-way valve is in the condition specified in the table below:
Equipment NumberNameCondition
V90MANIFOLD INTERCONNECT VALVECLOSED (A-B)
h. Disconnect connector (D2770) from the Left Flow Control Valve (V16).
NOTE: This simulates the Left Pack is ON.
i. Make sure the 3-way valve is in the condition specified in the table below:
Equipment NumberNameCondition
V90MANIFOLD INTERCONNECT VALVECLOSED (A-B)
j. In the MEC, select and hold all four (4) test switches on the N2 Engine Speed Card Assemblies
(M1092) Right and (M1093) Left on the P50 Panel, in the 'TEST' position.
NOTE: This simulates left and right engines ON. Two of these test switches are momentary
toggle switches and must be manually held in the 'TEST' position during all of this
test procedure by the person at the P50 Panel. For this test procedure to give correct
results, make sure these two test switches are not released from the 'TEST' position
until this procedure is complete.
k. Make sure the 3-way valve is in the condition specified in the table below:
Equipment NumberNameCondition
V90MANIFOLD INTERCONNECT VALVECLOSED (A-B)
l. Release all four (4) test switches on the N2 Engine Speed Card Assemblies (M1092) Right
and (M1093) Left on the P50 Panel.
m. Make sure the 3-way valve is in the condition specified in the table below:
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: October 08, 2009
767-21-0235Revision 1: July 29, 2011
23 of 56
BOEING SERVICE BULLETIN 767-21-0235

### Page 24

Equipment NumberNameCondition
V90MANIFOLD INTERCONNECT VALVECLOSED (A-B)
n. Disconnect connector (D1276) from the Right Flow Control Valve (V17).
NOTE: This simulates the Right Pack is ON.
o. Make sure the 3-way valve is in the condition specified in the table below:
Equipment NumberNameCondition
V90MANIFOLD INTERCONNECT VALVECLOSED (A-B)
p. Select and hold all four (4) test switches on the N2 Engine Speed Card Assemblies (M1092)
Right and (M1093) Left on the P50 Panel, in the 'TEST' position.
NOTE: This simulates left and right engines ON. Two of these test switches are momentary
toggle switches and must be manually held in the 'TEST' position during all of this
test procedure by the person at the P50 Panel. For this test procedure to give correct
results, make sure these two test switches are not released from the 'TEST' position
until this procedure is complete.
CAUTION: EQUIPMENT IN THE FLIGHT COMPARTMENT WILL NOT BE COOLED WHEN
THE MANIFOLD INTERCONNECT VALVE CONFIGURES TO THE 'OPEN (C-B)'
CONDITION, AS THE COOLING PACKS ARE NOT IN OPERATION DURING THIS
TEST. DAMAGE TO THE FLIGHT COMPARTMENT EQUIPMENT COULD OCCUR
IF THE VALVE IS KEPT OPEN FOR MORE THAN 5 MINUTES.
q. Make sure the 3-way valve is in the condition specified in the table below:
Equipment NumberNameCondition
V90MANIFOLD INTERCONNECT VALVEOPEN (C-B)
r. Set the Equipment Cooling rotary switch on the P5 overhead panel to STBY.
s. Make sure the 3-way valve is in the condition specified in the table below:
Equipment NumberNameCondition
V90MANIFOLD INTERCONNECT VALVECLOSED (A-B)
t. Set the Equipment Cooling rotary switch on the P5 overhead panel to OVRD.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: October 08, 2009
767-21-0235Revision 1: July 29, 2011
24 of 56
BOEING SERVICE BULLETIN 767-21-0235

### Page 25

CAUTION: EQUIPMENT IN THE FLIGHT COMPARTMENT WILL NOT BE COOLED WHEN
THE MANIFOLD INTERCONNECT VALVE CONFIGURES TO THE 'OPEN (C-B)'
CONDITION, AS THE COOLING PACKS ARE NOT IN OPERATION DURING THIS
TEST. ALSO, EQUIPMENT IN THE MEC WILL BE NOT COOLED WHEN THE
EQUIPMENT COOLING ROTARY SWITCH IS SET TO THE 'OVRD' POSITION AS
THE E/E COOLING FANS ARE SHUTOFF. DAMAGE TO THE FLIGHT
COMPARTMENT INSTRUMENTS AND MEC EQUIPMENT COULD OCCUR IF
THE EQUIPMENT COOLING ROTARY SWITCH IS SET IN THE 'OVRD' POSITION
FOR MORE THAN 5 MINUTES.
u. Make sure the 3-way valve is in the condition specified in the table below:
Equipment NumberNameCondition
V90MANIFOLD INTERCONNECT VALVEOPEN (C-B)
v. Set the Equipment Cooling rotary switch on the P5 overhead panel to AUTO.
CAUTION: EQUIPMENT IN THE FLIGHT COMPARTMENT WILL NOT BE COOLED WHEN
THE MANIFOLD INTERCONNECT VALVE CONFIGURES TO THE 'OPEN (C-B)'
CONDITION, AS THE COOLING PACKS ARE NOT IN OPERATION DURING THIS
TEST. DAMAGE TO THE FLIGHT COMPARTMENT EQUIPMENT COULD OCCUR
IF THE VALVE IS KEPT OPEN FOR MORE THAN 5 MINUTES.
w. Make sure the 3-way valve is in the condition specified in the table below:
Equipment NumberNameCondition
V90MANIFOLD INTERCONNECT VALVEOPEN (C-B)
x. Release all four (4) test switches on the N2 Engine Speed Card Assemblies (M1092) Right
and (M1093) Left on the P50 Panel.
y. Make sure the 3-way valve is in the condition specified in the table below:
Equipment NumberNameCondition
V90MANIFOLD INTERCONNECT VALVECLOSED (A-B)
z. Connect connector (D2770) back on to the Left Flow Control Valve (V16).
aa. Connect connector (D1276) back on to the Right Flow Control Valve (V17).
ab. Remove the jumper from pin 1 and pin 2 in Connector (D20366).
ac. Connect connector (D20366) back on to Equipment Cooling Temperature Control Switch
(S868) at STA 208, WL 172, and RBL 60.
ad. Put the airplane back to the configuration before the test.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: October 08, 2009
767-21-0235Revision 1: July 29, 2011
25 of 56
BOEING SERVICE BULLETIN 767-21-0235

### Page 26

Group 2-3:
a. Make sure the airplane is powered, the engines are OFF and the air conditioning packs are
OFF.
b. Make sure the Air/Ground Relay System is in GROUND mode. Or to put the Air/Ground Relay
System in GROUND mode, refer to 767 AMM 32-09-02 as an accepted procedure.
c. In the MEC, make sure the circuit breakers specified in the table below are closed:
CIRCUIT BREAKER PANEL ASSEMBLY
NumberNameLocationPanel
C00653LEFT PACK FLOW CONTA013P11-1
C00704RIGHT PACK FLOW CONTA026P11-4
C00688EQUIPMENT COOLING STANDBYB008P11-1
C00679EQUIP COOL OVERRIDEC019P11-4
C01175LDG GR POS AIR/GND SYS 1C030P11-4
C01426ENGINE SPEED SENSE L2D016P11-1
C01427ENGINE SPEED SENSE R2D017P11-1
d. In the Flight Compartment, set the Equipment Cooling rotary switch on the the P5 overhead
panel to AUTO.
e. Disconnect connector (D20366) to Equipment Cooling Temperature Control switch (S868) at
STA 208, WL 172 and RBL 60.
f. Install a jumper from pin 1 of connector (D20366) to pin 2 of connector (D20366).
g. Make sure the 3-way valve is in the condition specified in the table below:
Equipment NumberNameCondition
V90MANIFOLD INTERCONNECT VALVECLOSED (A-B)
h. Disconnect connector (D2770) from the Left Flow Control Valve (V16).
NOTE: This simulates the Left Pack is ON.
i. Make sure the 3-way valve is in the condition specified in the table below:
Equipment NumberNameCondition
V90MANIFOLD INTERCONNECT VALVECLOSED (A-B)
j. In the MEC, select and hold all four (4) test switches on the N2 Engine Speed Card Assemblies
(M1092) Right and (M1093) Left on the P50 Panel, in the 'TEST' position.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: October 08, 2009
767-21-0235Revision 1: July 29, 2011
26 of 56
BOEING SERVICE BULLETIN 767-21-0235

### Page 27

NOTE: This simulates left and right engines ON. Two of these test switches are momentary
toggle switches and must be manually held in the 'TEST' position during all of this
test procedure by the person at the P50 Panel. For this test procedure to give correct
results, make sure these two test switches are not released from the 'TEST' position
until this procedure is complete.
CAUTION: EQUIPMENT IN THE FLIGHT COMPARTMENT WILL NOT BE COOLED WHEN
THE MANIFOLD INTERCONNECT VALVE CONFIGURES TO THE 'OPEN (C-B)'
CONDITION, AS THE COOLING PACKS ARE NOT IN OPERATION DURING THIS
TEST. DAMAGE TO THE FLIGHT COMPARTMENT EQUIPMENT COULD OCCUR
IF THE VALVE IS KEPT OPEN FOR MORE THAN 5 MINUTES.
k. Make sure the 3-way valve is in the condition specified in the table below:
Equipment NumberNameCondition
V90MANIFOLD INTERCONNECT VALVEOPEN (C-B)
l. Set the Equipment Cooling rotary switch on the P5 overhead panel to STBY.
m. Make sure the 3-way valve is in the condition specified in the table below:
Equipment NumberNameCondition
V90MANIFOLD INTERCONNECT VALVECLOSED (A-B)
n. Set the Equipment Cooling rotary switch on the P5 overhead panel to OVRD.
CAUTION: EQUIPMENT IN THE FLIGHT COMPARTMENT WILL NOT BE COOLED WHEN
THE MANIFOLD INTERCONNECT VALVE CONFIGURES TO THE 'OPEN (C-B)'
CONDITION, AS THE COOLING PACKS ARE NOT IN OPERATION DURING THIS
TEST. ALSO, EQUIPMENT IN THE MEC WILL BE NOT COOLED WHEN THE
EQUIPMENT COOLING ROTARY SWITCH IS SET TO THE 'OVRD' POSITION AS
THE E/E COOLING FANS ARE SHUTOFF. DAMAGE TO THE FLIGHT
COMPARTMENT INSTRUMENTS AND MEC EQUIPMENT COULD OCCUR IF
THE EQUIPMENT COOLING ROTARY SWITCH IS SET IN THE 'OVRD' POSITION
FOR MORE THAN 5 MINUTES.
o. Make sure the 3-way valve is in the condition specified in the table below:
Equipment NumberNameCondition
V90MANIFOLD INTERCONNECT VALVEOPEN (C-B)
p. Set the Equipment Cooling rotary switch on the P5 overhead panel to AUTO.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: October 08, 2009
767-21-0235Revision 1: July 29, 2011
27 of 56
BOEING SERVICE BULLETIN 767-21-0235

### Page 28

CAUTION: EQUIPMENT IN THE FLIGHT COMPARTMENT WILL NOT BE COOLED WHEN
THE MANIFOLD INTERCONNECT VALVE CONFIGURES TO THE 'OPEN (C-B)'
CONDITION, AS THE COOLING PACKS ARE NOT IN OPERATION DURING THIS
TEST. DAMAGE TO THE FLIGHT COMPARTMENT EQUIPMENT COULD OCCUR
IF THE VALVE IS KEPT OPEN FOR MORE THAN 5 MINUTES.
q. Make sure the 3-way valve is in the condition specified in the table below:
Equipment NumberNameCondition
V90MANIFOLD INTERCONNECT VALVEOPEN (C-B)
r. Release all four (4) test switches on the N2 Engine Speed Card Assemblies (M1092) Right
and (M1093) Left on the P50 Panel.
s. Make sure the 3-way valve is in the condition specified in the table below:
Equipment NumberNameCondition
V90MANIFOLD INTERCONNECT VALVECLOSED (A-B)
t. Disconnect connector (D1276) from the Right Flow Control Valve (V17).
NOTE: This simulates the Right Pack is ON.
u. Connect connector (D2770) back on to the Left Control Valve (V16).
v. Make sure the 3-way valve is in the condition specified in the table below:
Equipment NumberNameCondition
V90MANIFOLD INTERCONNECT VALVECLOSED (A-B)
w. Select and hold all four (4) test switches on the N2 Engine Speed Card Assemblies (M1092)
Right and (M1093) Left on the P50 Panel, in the 'TEST' position.
NOTE: This simulates left and right engines ON. Two of these test switches are momentary
toggle switches and must be manually held in the 'TEST' position during all of this
test procedure by the person at the P50 Panel. For this test procedure to give correct
results, make sure these two test switches are not released from the 'TEST' position
until this procedure is complete.
CAUTION: EQUIPMENT IN THE FLIGHT COMPARTMENT WILL NOT BE COOLED WHEN
THE MANIFOLD INTERCONNECT VALVE CONFIGURES TO THE 'OPEN (C-B)'
CONDITION, AS THE COOLING PACKS ARE NOT IN OPERATION DURING THIS
TEST. DAMAGE TO THE FLIGHT COMPARTMENT EQUIPMENT COULD OCCUR
IF THE VALVE IS KEPT OPEN FOR MORE THAN 5 MINUTES.
x. Make sure the 3-way valve is in the condition specified in the table below:
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: October 08, 2009
767-21-0235Revision 1: July 29, 2011
28 of 56
BOEING SERVICE BULLETIN 767-21-0235

### Page 29

Equipment NumberNameCondition
V90MANIFOLD INTERCONNECT VALVEOPEN (C-B)
y. Set the Equipment Cooling rotary switch on the P5 overhead panel to STBY.
z. Make sure the 3-way valve is in the condition specified in the table below:
Equipment NumberNameCondition
V90MANIFOLD INTERCONNECT VALVECLOSED (A-B)
aa. Set the equipment cooling rotary switch on the P5 overhead panel to OVRD.
CAUTION: EQUIPMENT IN THE FLIGHT COMPARTMENT WILL NOT BE COOLED WHEN
THE MANIFOLD INTERCONNECT VALVE CONFIGURES TO THE 'OPEN (C-B)'
CONDITION, AS THE COOLING PACKS ARE NOT IN OPERATION DURING THIS
TEST. ALSO, EQUIPMENT IN THE MEC WILL BE NOT COOLED WHEN THE
EQUIPMENT COOLING ROTARY SWITCH IS SET TO THE 'OVRD' POSITION AS
THE E/E COOLING FANS ARE SHUTOFF. DAMAGE TO THE FLIGHT
COMPARTMENT INSTRUMENTS AND MEC EQUIPMENT COULD OCCUR IF
THE EQUIPMENT COOLING ROTARY SWITCH IS SET IN THE 'OVRD' POSITION
FOR MORE THAN 5 MINUTES.
ab. Make sure the 3-way valve is in the condition specified in the table below:
Equipment NumberNameCondition
V90MANIFOLD INTERCONNECT VALVEOPEN (C-B)
ac. Set the Equipment Cooling rotary switch on the P5 overhead panel to AUTO.
CAUTION: EQUIPMENT IN THE FLIGHT COMPARTMENT WILL NOT BE COOLED WHEN
THE MANIFOLD INTERCONNECT VALVE CONFIGURES TO THE 'OPEN (C-B)'
CONDITION, AS THE COOLING PACKS ARE NOT IN OPERATION DURING THIS
TEST. DAMAGE TO THE FLIGHT COMPARTMENT EQUIPMENT COULD OCCUR
IF THE VALVE IS KEPT OPEN FOR MORE THAN 5 MINUTES.
ad. Make sure the 3-way valve is in the condition specified in the table below:
Equipment NumberNameCondition
V90MANIFOLD INTERCONNECT VALVEOPEN (C-B)
ae. Release all four (4) test switches on the N2 Engine Speed Card Assemblies (M1092) Right
and (M1093) Left on the P50 Panel.
af. Make sure the 3-way valve is in the condition specified in the table below:
Equipment NumberNameCondition
V90MANIFOLD INTERCONNECT VALVECLOSED (A-B)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: October 08, 2009
767-21-0235Revision 1: July 29, 2011
29 of 56
BOEING SERVICE BULLETIN 767-21-0235

### Page 30

ag. Connect connector (D1276) back on to Right Flow Control Valve (V17).
ah. Remove the jumper from pin 1 and pin 2 in Connector (D20366).
ai. Connect connector (D20366) back on to Equipment Cooling Temperature Control Switch
(S868) at STA 208, WL 172, and RBL 60.
aj. Put the airplane back to the configuration before the test.
12. Close the MEC access door, 119AL.
13. Put the airplane back to a serviceable condition.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: October 08, 2009
767-21-0235Revision 1: July 29, 2011
30 of 56
BOEING SERVICE BULLETIN 767-21-0235

### Page 31

This Figure applies only to: Group 1.
FIGURE 1: P36 LEFT MISCELLANEOUS ELECTRICAL EQUIPMENT PANEL WIRE BUNDLE W0176 -
ROUTING
(SHEET 1 OF 6)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: October 08, 2009
767-21-0235Revision 1 July 29, 2011
31 of 56
BOEING SERVICE BULLETIN 767-21-0235

### Page 32 (OCR)

BOEING SERVICE BULLETIN 767-21-0235
P36 LEFT MISCELLANEOUS
ELECTRICAL EQUIPMENT PANEL  (TYPICAL)  1850386
FIGURE 1: P36 LEFT MISCELLANEOUS ELECTRICAL EQUIPMENT PANEL WIRE BUNDLE W0176 -
ROUTING
(SHEET 2 OF 6)
Original Issue: October 08, 2009
Revision 1 July 29, 2011  BOEING PROPRIETARY -  767-21-0235
Copyright © Unpublished Work - See page 1 for details.  32 of 56

### Page 33 (OCR)

BOEING SERVICE BULLETIN 767-21-0235
D21731
W0176
LOWER SECTION, REAR  1852171
FIGURE 1: P36 LEFT MISCELLANEOUS ELECTRICAL EQUIPMENT PANEL WIRE BUNDLE W0176 -
(SHEET 3 OF 6)
Original Issue: October 08, 2009
Revision 1 July 29, 2011  BOEING PROPRIETARY -  767-21-0235
Copyright © Unpublished Work - See page 1 for details.  33 of 56

### Page 34 (OCR)

BOEING SERVICE BULLETIN 767-21-0235
TB216
TB218
TB220 -
W0176
W0176
(TYPICAL)  C  1850900
FIGURE 1: P36 LEFT MISCELLANEOUS ELECTRICAL EQUIPMENT PANEL WIRE BUNDLE W0176 -
ROUTING
(SHEET 4 OF 6)
Original Issue: October 08, 2009
Revision 1 July 29, 2011  767-21-0235
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.  34 of 56

### Page 35 (OCR)

BOEING SERVICE BULLETIN 767-21-0235
W0176
W0176
1852604
FIGURE 1: P36 LEFT MISCELLANEOUS ELECTRICAL EQUIPMENT PANEL WIRE BUNDLE W0176 -
(SHEET 5 OF 6)
Original Issue: October 08, 2009
Revision 1 July 29, 2011  BOEING PROPRIETARY -  767-21-0235
Copyright © Unpublished Work - See page 1 for details.  35 of 56

### Page 36 (OCR)

BOEING SERVICE BULLETIN 767-21-0235
W0176
W0176
TOP PANEL
(TYPICAL)
_W0176
D21730
(REF)
(ROTATED 180 ° TYPICAL)  1853236
FIGURE 1: P36 LEFT MISCELLANEOUS ELECTRICAL EQUIPMENT PANEL WIRE BUNDLE W0176 -
ROUTING
(SHEET 6 OF 6)
Original Issue: October 08, 2009
Revision 1 July 29, 2011  767-21-0235
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.  36 of 56

### Page 37 (OCR)

BOEING SERVICE BULLETIN 767-21-0235
This Figure applies only to: Group 1.
W0176
→ 4 LOCATIONS  → 3 LOCATIONS
A2 OAC-24-  XA17
→ W0184
TB218
АЗ
1W0176
Х1  - OAD-24-  Z14  → W0184
TB216
X2  • OAE-24 •  YC11  W0180
→W0184
D21731  TB220
K10717
MANFLD INT
VLV STDBY RLY
• 24C-24•
4+24C-24+H
D21730
K10355 L&R
ENG NZ<50% RLY
P36 LEFT MISCELLANEOUS ELECTRICAL EQUIP PANEL
- ADDED WIRE OR NEW ROUTING
+ DELETED WIRE OR FORMER ROUTING
- EXISTING WIRE  1850908
REFERENCE: 767 WDM 21-58-16.
The flag note numbers shown below agree with the numbers shown in the flag symbols in the figure.
NOTE: Use the parts supplied in wire kit 289T1162-101 and top kit 015T1839-1 to do the work in this Figure.
FIGURE 2: P36 LEFT MISCELLANEOUS ELECTRICAL EQUIPMENT PANEL WIRE BUNDLE W0176 -
WIRING CHANGES
(SHEET 1 OF 2)
Original Issue: October 08, 2009
Revision 1 July 29, 2011  BOEING PROPRIETARY -  767-21-0235
Copyright © Unpublished Work - See page 1 for details.  37 of 56

### Page 38

MORE DATAQTYIDENTIFICATIONNAME
FLAG
NOTE
Refer to the wire kit cut and code
table, to identify the wires as
shown and to cut to the necessary
lengths.
-289T1162-101WWIRE - RAW MATERIAL1
Refer to SWPM 20-90-11 as an
accepted procedure.
3M39029/11-145CONTACT, PIN, CRIMP
REMOVABLE, PER MIL-C-
39029/11
2
Refer to SWPM 20-81-12 and
SWPM 20-81-22 as accepted pro-
cedures.
1BACS16X1ARELAY SOCKET3
Refer to SWPM 20-81-12 as an
accepted procedure.
4BACC47DJ1CONTACT, SOCKET4
Refer to SWPM 20-81-19 as an
accepted procedure.
1BACC47ER1CONTACT, SOCKET5
Identified as D21731 M/W K10717.
Install within 6 inches of equip-
ment.
1289T1162-10101ID TAPE - CONNECTOR6
Use to tie the wire bundle. Refer
to SWPM 20-10-11 as an accepted
procedure.
-289T9001-21LACING TAPE - RED
(135C) 100 FT
7
WIRE KIT - CUT AND CODE AS NECESSARY - 289T1162-101W
NOTESMATERIAL SPECIFICATIONLENGTH
(INCHES)
TYPE
CODE
GAGE
COLOR
WIRE #WBA #
BMS 13-48, TYPE 11, CLASS 1, AWG 24120PK2424CW0176
BMS 13-48, TYPE 11, CLASS 1, AWG 24120PK240ACW0176
BMS 13-48, TYPE 11, CLASS 1, AWG 24120PK240ADW0176
BMS 13-48, TYPE 11, CLASS 1, AWG 24120PK240AEW0176
FIGURE 2: P36 LEFT MISCELLANEOUS ELECTRICAL EQUIPMENT PANEL WIRE BUNDLE W0176 -
WIRING CHANGES
(SHEET 2 OF 2)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: October 08, 2009
767-21-0235Revision 1 July 29, 2011
38 of 56
BOEING SERVICE BULLETIN 767-21-0235

### Page 39

This Figure applies only to: Group 2-3.
FIGURE 3: P36 LEFT MISCELLANEOUS ELECTRICAL EQUIPMENT PANEL WIRE BUNDLES W0176 AND
W0184 - ROUTING
(SHEET 1 OF 6)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: October 08, 2009
767-21-0235Revision 1 July 29, 2011
39 of 56
BOEING SERVICE BULLETIN 767-21-0235

### Page 40 (OCR)

BOEING SERVICE BULLETIN 767-21-0235
P36 LEFT MISCELLANEOUS
LECTRICAL EQUIPMENT PANEL  (TYPICAL)  1850904
FIGURE 3: P36 LEFT MISCELLANEOUS ELECTRICAL EQUIPMENT PANEL WIRE BUNDLES W0176 AND
W0184 - ROUTING
(SHEET 2 OF 6)
Original Issue: October 08, 2009
Revision 1 July 29, 2011  BOEING PROPRIETARY -  767-21-0235
Copyright © Unpublished Work - See page 1 for details.  40 of 56

### Page 41 (OCR)

BOEING SERVICE BULLETIN 767-21-0235
D21731
W0176
LOWER SECTION, REAR  1853935
(TYPICAL)
FIGURE 3: P36 LEFT MISCELLANEOUS ELECTRICAL EQUIPMENT PANEL WIRE BUNDLES W0176 AND
W0184 - ROUTING
(SHEET 3 OF 6)
Original Issue: October 08, 2009
Revision 1 July 29, 2011  Copyright © Unpublished Work - See page 1 for details.  BOEING PROPRIETARY -  767-21-0235  41 of 56

### Page 42 (OCR)

BOEING SERVICE BULLETIN 767-21-0235
TB216
W0184
TB218
TB220 -
W0176
W0176
(TYPICAL)  1850905
FIGURE 3: P36 LEFT MISCELLANEOUS ELECTRICAL EQUIPMENT PANEL WIRE BUNDLES W0176 AND
W0184 - ROUTING
(SHEET 4 OF 6)
Original Issue: October 08, 2009
Revision 1 July 29, 2011  BOEING PROPRIETARY -  767-21-0235
Copyright © Unpublished Work - See page 1 for details.  42 of 56

### Page 43 (OCR)

BOEING SERVICE BULLETIN 767-21-0235
W0176
W0176
(TYPICAL)  D  1853936
FIGURE 3: P36 LEFT MISCELLANEOUS ELECTRICAL EQUIPMENT PANEL WIRE BUNDLES W0176 AND
W0184 - ROUTING
(SHEET 5 OF 6)
Original Issue: October 08, 2009
Revision 1 July 29, 2011  BOEING PROPRIETARY -  767-21-0235
Copyright © Unpublished Work - See page 1 for details.  43 of 56

### Page 44 (OCR)

BOEING SERVICE BULLETIN 767-21-0235
W0176
W0176
TOP PANEL
(TYPICAL)
W0176
D21730
(REF)
(ROTATED 180° TYPICAL)  1853937
FIGURE 3: P36 LEFT MISCELLANEOUS ELECTRICAL EQUIPMENT PANEL WIRE BUNDLES W0176 AND
W0184 - ROUTING
(SHEET 6 OF 6)
Original Issue: October 08, 2009
Revision 1 July 29, 2011  767-21-0235
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.  44 of 56

### Page 45 (OCR)

BOEING SERVICE BULLETIN 767-21-0235
This Figure applies only to: Group 2.
W0176
→ 4 LOCATIONS  → 3 LOCATIONS
A2 OAC-24-  XA1
→ W0184
TB218
АЗ
Х1  - OAD-24-  Z8  -W0184
TB216
X2  • OAE-24 •  YC11  W0180
D21731  TB220  → W0184
K10717
MANFLD INT
VLV STDBY RLY
• 24C-24•
4+24C-24+H
D21730
K10355 L&R
ENG NZ<50% RLY
P36 LEFT MISCELLANEOUS ELECTRICAL EQUIP PANEL
- ADDED WIRE OR NEW ROUTING
+ DELETED WIRE OR FORMER ROUTING
- EXISTING WIRE  1850911
REFERENCE: 767 WDM 21-58-16.
The flag note numbers shown below agree with the numbers shown in the flag symbols in the figure.
NOTE: Use the parts supplied in wire kit 289T1162-101 and top kit 015T1839-2 to do the work in this Figure.
FIGURE 4: P36 LEFT MISCELLANEOUS ELECTRICAL EQUIPMENT PANEL WIRE BUNDLE W0176 -
WIRING CHANGES
(SHEET 1 OF 2)
Original Issue: October 08, 2009
Revision 1 July 29, 2011  BOEING PROPRIETARY -  767-21-0235
Copyright © Unpublished Work - See page 1 for details.  45 of 56

### Page 46

MORE DATAQTYIDENTIFICATIONNAME
FLAG
NOTE
Refer to the wire kit cut and code
table, to identify the wires as
shown and to cut to the necessary
lengths.
-289T1162-101WWIRE - RAW MATERIAL1
Refer to SWPM 20-90-11 as an
accepted procedure.
3M39029/11-145CONTACT, PIN, CRIMP
REMOVABLE, PER MIL-C-
39029/11
2
Refer to SWPM 20-81-12 and
SWPM 20-81-22 as accepted pro-
cedures.
1BACS16X1ARELAY SOCKET3
Refer to SWPM 20-81-12 as an
accepted procedure.
4BACC47DJ1CONTACT, SOCKET4
Refer to SWPM 20-81-19 as an
accepted procedure.
1BACC47ER1CONTACT, SOCKET5
Identified as D21731 M/W K10717.
Install within 6 inches of equip-
ment.
1289T1162-10101ID TAPE - CONNECTOR6
Use to tie the wire bundle. Refer
to SWPM 20-10-11 as an accepted
procedure.
-289T9001-21LACING TAPE - RED
(135C) 100 FT
7
WIRE KIT - CUT AND CODE AS NECESSARY - 289T1162-101W
NOTESMATERIAL SPECIFICATIONLENGTH
(INCHES)
TYPE
CODE
GAGE
COLOR
WIRE #WBA #
BMS 13-48, TYPE 11, CLASS 1, AWG 24120PK2424CW0176
BMS 13-48, TYPE 11, CLASS 1, AWG 24120PK240ACW0176
BMS 13-48, TYPE 11, CLASS 1, AWG 24120PK240ADW0176
BMS 13-48, TYPE 11, CLASS 1, AWG 24120PK240AEW0176
FIGURE 4: P36 LEFT MISCELLANEOUS ELECTRICAL EQUIPMENT PANEL WIRE BUNDLE W0176 -
WIRING CHANGES
(SHEET 2 OF 2)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: October 08, 2009
767-21-0235Revision 1 July 29, 2011
46 of 56
BOEING SERVICE BULLETIN 767-21-0235

### Page 47 (OCR)

BOEING SERVICE BULLETIN 767-21-0235
This Figure applies only to: Group 3.
W0176
→ 4 LOCATIONS  → 3 LOCATIONS
A2 - 0AC-24-  XA1
→ W0184
TB218
АЗ
Х1  - OAD-24-  Z14  1W0184
TB216
X2  • OAE-24 •  YC11 -  W0180
\ W0184
D21731  TB220
K10717
MANFLD INT
VLV STDBY RLY
• 24C-24•
4+24C-24+H
D21730
K10355 L&R
ENG NZ<50% RLY
P36 LEFT MISCELLANEOUS ELECTRICAL EQUIP PANEL
- ADDED WIRE OR NEW ROUTING
+ DELETED WIRE OR FORMER ROUTING
- EXISTING WIRE  1850914
REFERENCE: 767 WDM 21-58-16.
The flag note numbers shown below agree with the numbers shown in the flag symbols in the figure.
NOTE: Use the parts supplied in wire kit 289T1162-101 and top kit 015T1839-2 to do the work in this Figure.
FIGURE 5: P36 LEFT MISCELLANEOUS ELECTRICAL EQUIPMENT PANEL WIRE BUNDLE W0176 -
WIRING CHANGES
(SHEET 1 OF 2)
Original Issue: October 08, 2009
Revision 1 July 29, 2011  BOEING PROPRIETARY -  767-21-0235
Copyright © Unpublished Work - See page 1 for details.  47 of 56

### Page 48

MORE DATAQTYIDENTIFICATIONNAME
FLAG
NOTE
Refer to the wire kit cut and code
table, to identify the wires as
shown and to cut to the necessary
lengths.
-289T1162-101WWIRE - RAW MATERIAL1
Refer to SWPM 20-90-11 as an
accepted procedure.
3M39029/11-145CONTACT, PIN, CRIMP
REMOVABLE, PER MIL-C-
39029/11
2
Refer to SWPM 20-81-12 and
SWPM 20-81-22 as accepted pro-
cedures.
1BACS16X1ARELAY SOCKET3
Refer to SWPM 20-81-12 as an
accepted procedure.
4BACC47DJ1CONTACT, SOCKET4
Refer to SWPM 20-81-19 as an
accepted procedure.
1BACC47ER1CONTACT, SOCKET5
Identified as D21731 M/W K10717.
Install within 6 inches of equip-
ment.
1289T1162-10101ID TAPE - CONNECTOR6
Use to tie the wire bundle. Refer
to SWPM 20-10-11 as an accepted
procedure.
-289T9001-21LACING TAPE - RED
(135C) 100 FT
7
WIRE KIT - CUT AND CODE AS NECESSARY - 289T1162-101W
NOTESMATERIAL SPECIFICATIONLENGTH
(INCHES)
TYPE
CODE
GAGE
COLOR
WIRE #WBA #
BMS 13-48, TYPE 11, CLASS 1, AWG 24120PK2424CW0176
BMS 13-48, TYPE 11, CLASS 1, AWG 24120PK240ACW0176
BMS 13-48, TYPE 11, CLASS 1, AWG 24120PK240ADW0176
BMS 13-48, TYPE 11, CLASS 1, AWG 24120PK240AEW0176
FIGURE 5: P36 LEFT MISCELLANEOUS ELECTRICAL EQUIPMENT PANEL WIRE BUNDLE W0176 -
WIRING CHANGES
(SHEET 2 OF 2)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: October 08, 2009
767-21-0235Revision 1 July 29, 2011
48 of 56
BOEING SERVICE BULLETIN 767-21-0235

### Page 49

This Figure applies only to: Group 2.
REFERENCE: 767 WDM 21-58-16.
The flag note numbers shown below agree with the numbers shown in the flag symbols in the figure.
NOTE: Use the parts supplied in wire kit 289T1162-102 and top kit 015T1839-2 to do the work in this Figure.
MORE DATAQTYIDENTIFICATIONNAME
FLAG
NOTE
Refer to the wire kit cut and code
table, to identify the wires as
shown and to cut to the necessary
lengths.
-289T1162-102WWIRE - RAW MATERIAL1
Refer to SWPM 20-90-11 as an
accepted procedure.
4M39029/11-145CONTACT, PIN, CRIMP
REMOVABLE, PER MIL-C-
39029/11
2
FIGURE 6: P36 LEFT MISCELLANEOUS ELECTRICAL EQUIPMENT PANEL WIRE BUNDLE W0184 -
WIRING CHANGES
(SHEET 1 OF 2)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: October 08, 2009
767-21-0235Revision 1 July 29, 2011
49 of 56
BOEING SERVICE BULLETIN 767-21-0235

### Page 50

MORE DATAQTYIDENTIFICATIONNAME
FLAG
NOTE
Use to tie the wire bundle. Refer
to SWPM 20-10-11 as an accepted
procedure.
-289T9001-61LACING TAPE - BLUE
(135C) 100 FT
3
WIRE KIT - CUT AND CODE AS NECESSARY - 289T1162-102W
NOTESMATERIAL SPECIFICATIONLENGTH
(INCHES)
TYPE
CODE
GAGE
COLOR
WIRE #WBA #
BMS 13-48, TYPE 11, CLASS 1, AWG 2460PK2409DW0184
BMS 13-48, TYPE 11, CLASS 1, AWG 2460PK24593W0184
FIGURE 6: P36 LEFT MISCELLANEOUS ELECTRICAL EQUIPMENT PANEL WIRE BUNDLE W0184 -
WIRING CHANGES
(SHEET 2 OF 2)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: October 08, 2009
767-21-0235Revision 1 July 29, 2011
50 of 56
BOEING SERVICE BULLETIN 767-21-0235

### Page 51

This Figure applies only to: Group 3.
REFERENCE: 767 WDM 21-58-16.
The flag note numbers shown below agree with the numbers shown in the flag symbols in the figure.
NOTE: Use the parts supplied in wire kit 289T1162-102 and top kit 015T1839-2 to do the work in this Figure.
MORE DATAQTYIDENTIFICATIONNAME
FLAG
NOTE
Refer to the wire kit cut and code
table, to identify the wires as
shown and to cut to the necessary
lengths.
-289T1162-102WWIRE - RAW MATERIAL1
Refer to SWPM 20-90-11 as an
accepted procedure.
4M39029/11-145CONTACT, PIN, CRIMP
REMOVABLE, PER MIL-C-
39029/11
2
FIGURE 7: P36 LEFT MISCELLANEOUS ELECTRICAL EQUIPMENT PANEL WIRE BUNDLE W0184 -
WIRING CHANGES
(SHEET 1 OF 2)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: October 08, 2009
767-21-0235Revision 1 July 29, 2011
51 of 56
BOEING SERVICE BULLETIN 767-21-0235

### Page 52

MORE DATAQTYIDENTIFICATIONNAME
FLAG
NOTE
Use to tie the wire bundle. Refer
to SWPM 20-10-11 as an accepted
procedure.
-289T9001-61LACING TAPE - BLUE
(135C) 100 FT
3
WIRE KIT - CUT AND CODE AS NECESSARY - 289T1162-102W
NOTESMATERIAL SPECIFICATIONLENGTH
(INCHES)
TYPE
CODE
GAGE
COLOR
WIRE #WBA #
BMS 13-48, TYPE 11, CLASS 1, AWG 2460PK2409DW0184
BMS 13-48, TYPE 11, CLASS 1, AWG 2460PK24593W0184
FIGURE 7: P36 LEFT MISCELLANEOUS ELECTRICAL EQUIPMENT PANEL WIRE BUNDLE W0184 -
WIRING CHANGES
(SHEET 2 OF 2)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: October 08, 2009
767-21-0235Revision 1 July 29, 2011
52 of 56
BOEING SERVICE BULLETIN 767-21-0235

### Page 53

FIGURE 8: P36 LEFT MISCELLANEOUS ELECTRICAL EQUIPMENT PANEL NEW RELAY - INSTALLATION
(SHEET 1 OF 4)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: October 08, 2009
767-21-0235Revision 1 July 29, 2011
53 of 56
BOEING SERVICE BULLETIN 767-21-0235

### Page 54 (OCR)

BOEING SERVICE BULLETIN 767-21-0235
P36 LEFT MISCELLANEOUS
ELECTRICAL EQUIPMENT PANEL  (TYPICAL)  1850907
FIGURE 8: P36 LEFT MISCELLANEOUS ELECTRICAL EQUIPMENT PANEL NEW RELAY - INSTALLATION
(SHEET 2 OF 4)
Original Issue: October 08, 2009
Revision 1 July 29, 2011  BOEING PROPRIETARY -  767-21-0235
Copyright © Unpublished Work - See page 1 for details.  54 of 56

### Page 55 (OCR)

BOEING SERVICE BULLETIN 767-21-0235
LOWER SECTION, FRONT (TYPICAL)
O 091010
LOWER SECTION, REAR (TYPICAL)  1850933
The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for each airplane.
FIGURE 8: P36 LEFT MISCELLANEOUS ELECTRICAL EQUIPMENT PANEL NEW RELAY - INSTALLATION
(SHEET 3 OF 4)
Original Issue: October 08, 2009
Revision 1 July 29, 2011  BOEING PROPRIETARY -  767-21-0235
Copyright © Unpublished Work - See page 1 for details.  55 of 56

### Page 56

MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
as D21731. Refer to
SOPM 20-50-10 as
an accepted proce-
dure.
1BACT19J4TAPE, IDIdentify1
Identified as
D21731. Refer to
SOPM 20-50-05 as
an accepted proce-
dure.
1BACT19J4TAPE, IDInstall (New)
(a)1BACR13CF2ARELAYInstall (New)2
as K10717. Refer to
SOPM 20-50-10 as
an accepted proce-
dure.
1BACT19J4TAPE, IDIdentify3
Identified as
K10717. Refer to
SOPM 20-50-05 as
an accepted proce-
dure.
1BACT19J4TAPE, IDInstall (New)
(a) If the bonding jumper is removed for relay installation, the bonding jumper must be installed and tested
after the relay is installed. Refer to SWPM 20-20-00 and SWPM 20-20-10 as accepted procedures to install
and test the bonding jumper.
FIGURE 8: P36 LEFT MISCELLANEOUS ELECTRICAL EQUIPMENT PANEL NEW RELAY - INSTALLATION
(SHEET 4 OF 4)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: October 08, 2009
767-21-0235Revision 1 July 29, 2011
56 of 56
BOEING SERVICE BULLETIN 767-21-0235

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.