# Boeing Service Bulletin 767-27-0205: U.S. DOT/FAA - Service Bulletin - SB-767-27-0205-02

- Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2005-22523; AD 2013-05-07 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Boeing Service Bulletin 767-27-0205](https://openairdocs.org/service-documents/boeing/sb-767-27-0205.md)
- Title as filed: U.S. DOT/FAA - Service Bulletin - SB-767-27-0205-02
- Pages: 24
- PDF: https://openairdocs.org/files/sha256/54/c9/54c97c99cb01b3f90425d3d64286b40b75a5a433783461299a6e770be990fa99
- Page: https://openairdocs.org/service-documents/boeing/sb-767-27-0205/file/54c97c99cb01

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Commercial 
Airplanes
767
Service Bulletin
Number: 767-27-0205
Original Issue: January 27, 2005
Revision 2: August 30, 2011
ATA System: 2731
SUBJECT: FLIGHT CONTROLS - Elevator Control System - Seal Block Drain Hole Inspection
Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15
CFR 730-774). An export license may be required before it is used for development, production or use by foreign
persons from specific countries. The controller of this data has the individual responsibility to abide by all export
laws.
9E991ECCN:
BOEING PROPRIETARY, CONFIDENTIAL, AND/OR TRADE SECRET
Copyright © 2005 The Boeing Company
Unpublished Work - All Rights Reserved
Boeing claims copyright in each page of this document only to the extent that the page contains copyrightable
subject matter. Boeing also claims copyright in this document as a compilation and/or collective work.
This document includes proprietary information owned by The Boeing Company and/or one or more third parties.
Treatment of the document and the information it contains is governed by contract with Boeing. For more
information, contact The Boeing Company, P.O. Box 3707, Seattle, Washington 98124.
Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner,
BBJ, DC-8, DC-9, DC-10, KC-10, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8A, Poseidon and the
Boeing livery are all trademarks owned by The Boeing Company; and no trademark license is granted in
connection with this document unless provided in writing by Boeing.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: January 27, 2005
767-27-0205Revision 2: August 30, 2011
1 of 24
3.0

### Page 2

BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: January 27, 2005
767-27-0205Revision 2: August 30, 2011
2 of 24
BOEING SERVICE BULLETIN 767-27-0205
BLANK PAGE

### Page 3

Table of Contents
Revision Transmittal Sheet ............................................ 5
Summary ...................................................... 7
1. PLANNING INFORMATION ........................................ 1 1
A. Effectivity ............................................... 1 1
1. Airplanes ............................................ 1 1
2. Spares Affected ........................................ 1 1
B. Concurrent Requirements ...................................... 1 1
C. Reason ................................................ 1 2
D. Description .............................................. 1 2
E. Compliance .............................................. 1 2
F. Approval ............................................... 1 3
G. Manpower .............................................. 1 3
H. Weight and Balance Changes .................................... 1 4
I. Electrical Load Data ......................................... 1 4
J. References .............................................. 1 4
1. Existing Data: ......................................... 1 4
2. Data supplied with this Service Bulletin: ........................... 1 4
3. Installation Drawings Used in the Preparation of this Service Bulletin: ........... 1 4
K. Publications Affected ........................................ 1 4
L. Interchangeability and Intermixability of Parts ........................... 1 5
2. MATERIAL INFORMATION ........................................ 1 7
A. Material - Price and Availability ................................... 1 7
B. Industry Support Information .................................... 1 7
C. Parts Necessary For Each Airplane ................................. 1 7
1. Kits/Parts: ........................................... 1 7
2. Parts and Materials Supplied by the Operator: ........................ 1 7
3. Parts Modified and Reidentified: ............................... 1 7
4. Parts Removed and Not Replaced: .............................. 1 7
D. Parts Necessary to Change Spares ................................. 1 7
E. Special Tooling - Price and Availability ............................... 1 7
F. Special Tooling Necessary to do this Service Bulletin ....................... 1 7
3. ACCOMPLISHMENT INSTRUCTIONS .................................. 1 9
A. GENERAL INFORMATION ..................................... 1 9
B. WORK INSTRUCTIONS ....................................... 2 0
FIGURE 1: GENERAL VISUAL INSPECTION AND CLEANING OF THE FLANGED TUBES AND DRAIN
HOLES ............................................. 2 1
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: January 27, 2005
767-27-0205Revision 2: August 30, 2011
3 of 24
BOEING SERVICE BULLETIN 767-27-0205

### Page 4

BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: January 27, 2005
767-27-0205Revision 2: August 30, 2011
4 of 24
BOEING SERVICE BULLETIN 767-27-0205
BLANK PAGE

### Page 5

Commercial 
Airplanes
767
Service Bulletin
Revision Transmittal SheetNumber: 767-27-0205Original Issue: January 27, 2005
Revision 2: August 30, 2011
ATA System: 2731
SUBJECT: FLIGHT CONTROLS - Elevator Control System - Seal Block Drain Hole Inspection
This revision includes all pages of the service bulletin.
COMPLIANCE INFORMATION RELATED TO THIS REVISION
Federal Aviation Administration (FAA) Notice of Proposed Rule Making NPRM 2005-NM-058-AD, is related to
this service bulletin.
No more work is necessary on the airplane(s) inspected in accordance with the original issue or revision 1 of
this service bulletin. Continue to accomplish the repeat inspection at the intervals given in Paragraph 1.E.,
Compliance.
REASON FOR REVISION
Revision 2 is sent to limit the effectivity of this service bulletin. Airplanes after line number 974 have a configuration
that is not affected if debris blocks the drain hole in the flanged tube.
These sections were changed:
1. Summary, Compliance: NPRM data is added.
2. Summary, Action: Changed to specify a general visual inspection.
3. Paragraph 1.A., Effectivity: A paragraph about the Production Revision Record (PRR) is added.
4. Paragraph 1.B., Concurrent Requirements: changed to give revision levels of the concurrent service bulletin.
5. Paragraph 1.D., Description: Changed to specify a general visual inspection.
6. Paragraph 1.E., Compliance: Changed to give compliance time by condition. The compliance data for
airplanes not affected by the concurrent service bulletin are removed. A reference to the NPRM is added.
7. Paragraph 1.J., References: A reference to the NPRM is added.
8. Paragraph 1.K., Publications Affected: The Damage Tolerance Inspection evaluation statement is added.
9. Paragraph 3.A., General Information: New notes are added.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: January 27, 2005
767-27-0205Revision 2: August 30, 2011
5 of 24

### Page 6

10. Paragraph 3.B., Work Instructions: Step 2 is updated to specify a general visual inspection.
11. Paragraph 3.B., Work Instructions: Step 4 is deleted because it is redundant to paragraph 1.E., Compliance.
12. Figure 1: The title is updated to indicate a general visual inspection. Instructions in the Notes column of the
step table are updated to specify a general visual inspection.
Vertical lines are put on the left edge of each page, except in Paragraph 1.A., Effectivity, to show the location
of important changes.
Pages with no vertical lines have no important changes.
REVISION HISTORY
January 27, 2005Original Issue:
February 12, 2009Revision 1:
August 30, 2011Revision 2:
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: January 27, 2005
767-27-0205Revision 2: August 30, 2011
6 of 24
BOEING SERVICE BULLETIN 767-27-0205

### Page 7

Commercial 
Airplanes
767
Service Bulletin
SummaryNumber: 767-27-0205Original Issue: January 27, 2005
Revision 2: August 30, 2011
ATA System: 2731
SUBJECT: FLIGHT CONTROLS - Elevator Control System - Seal Block Drain Hole Inspection
CONCURRENT REQUIREMENTS
Refer to Paragraph 1.B., Concurrent Requirements.
BACKGROUND
The related 767-200, 767-300, and 767-300F Boeing service bulletin is 767-27-0204.
The inspection given in this service bulletin will make sure that frozen moisture cannot collect in the aft pressure
seals for the elevator control cables.
The aft pressure seals for the elevator control cables help to keep the cabin pressurized. Two flanged tubes
hold the pressure seals to the rear bulkhead. A small drain hole in each of the two flanged tubes keeps moisture
away from the seals when the cabin is pressurized. If the drain hole is blocked, moisture can collect in the tubes.
If this occurs, the moisture can freeze when the external temperature decreases during high-altitude flight. This
frozen moisture can cause high resistance to the movement of the control cables through the aft pressure seals.
This service bulletin gives instructions for a repetitive inspection of the two flanged tubes and drain holes.
Boeing Service Related Problem (SRP) 767-SRP-27-0185 is related to this service bulletin. Refer to Boeing
service Letter 767-SL-27-129 for customer reports about this problem.
ACTION (PRR B12901-43S)
Remove the pressure seals from the flanged tubes for elevator control cables E1A and E1B. Do a general visual
inspection of the flanged tubes and drain holes to make sure they are clean. If necessary, clean the inside of
the flanged tube and the drain hole on each of the two flanged tubes. Install and adjust the pressure seals. Do
this procedure again at the specified interval.
EFFECTIVITY
767-400ER Airplane(s). Refer to Paragraph 1.A.1., Airplanes, for the list of affected airplane(s).
COMPLIANCE
Federal Aviation Administration (FAA) Notice of Proposed Rule Making NPRM 2005-NM-058-AD, is related to
this service bulletin.
Refer to Paragraph 1.E., Compliance.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: January 27, 2005
767-27-0205Revision 2: August 30, 2011
7 of 24

### Page 8

INDUSTRY SUPPORT INFORMATION
Boeing warranty remedies are not available for the maintenance procedure given in this service bulletin.
MANPOWER
Elapsed HoursTotal Task HoursAirplanes
1.51.5All
MATERIAL INFORMATION
None.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: January 27, 2005
767-27-0205Revision 2: August 30, 2011
8 of 24
BOEING SERVICE BULLETIN 767-27-0205

### Page 9 (OCR)

BOEING SERVICE BULLETIN 767-27-0205
PRESSURE SEALS
STA  STA
STA  1605  1582
1629
ELEVATOR CONTROL
CABLE E1A
INSPECT THE FLANGED
ELEVATOR CONTROL  TUBES AND DRAIN HOLES
CABLE E1B
STRINGER 20 -
• PRESSURE
BULKHEAD
STRINGER 22
UP
498811
Original Issue: January 27, 2005
Revision 2: August 30, 2011  767-27-0205
Copyright © Unpublished Work - See page 1 for details.  BOEING PROPRIETARY -  9 of 24

### Page 10

BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: January 27, 2005
767-27-0205Revision 2: August 30, 2011
10 of 24
BOEING SERVICE BULLETIN 767-27-0205
BLANK PAGE

### Page 11

Commercial 
Airplanes
767
Service Bulletin
Number: 767-27-0205
Original Issue: January 27, 2005
Revision 2: August 30, 2011
ATA System: 2731
SUBJECT: FLIGHT CONTROLS - Elevator Control System - Seal Block Drain Hole Inspection
1.    PLANNING INFORMATION
A. Effectivity
1. Airplanes
This service bulletin is for the airplane(s) shown below. Refer to PRR B12901-43S for data about
this change.
Refer to Service Bulletin Index Document D624T001 Part 3 for Airplane Variable Number, Line
Number, and Serial Number data.
DESCRIPTIONCONFIGURATIONGROUP
767-400ER airplanes line number 758-965-1
Airplane Models:
767-400ER
GroupVariable Number
1VQ001 - VQ021
1VQ071 - VQ086
1VQ111
2. Spares Affected
None.
B. Concurrent Requirements
DescriptionService BulletinCompany
Elevator Control Cable Aft Pressure Bulk-
head Seal Shield Flanged Tube Installation
767-27A0219, Original Issue, or Revi-
sion 1
The Boeing Company
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: January 27, 2005
767-27-0205Revision 2: August 30, 2011
11 of 24

### Page 12

C. Reason
The related 767-200, 767-300, and 767-300F Boeing service bulletin is 767-27-0204.
The inspection given in this service bulletin will make sure that frozen moisture cannot collect in the
aft pressure seals for the elevator control cables.
The aft pressure seals for the elevator control cables help to keep the cabin pressurized. Two flanged
tubes hold the pressure seals to the rear bulkhead. A small drain hole in each of the two flanged tubes
keeps moisture away from the seals when the cabin is pressurized. If the drain hole is blocked, moisture
can collect in the tubes. If this occurs, the moisture can freeze when the external temperature decreases
during high-altitude flight. This frozen moisture can cause high resistance to the movement of the
control cables through the aft pressure seals.
This service bulletin gives instructions for a repetitive inspection of the two flanged tubes and drain
holes.
Boeing Service Related Problem (SRP) 767-SRP-27-0185 is related to this service bulletin. Refer to
Boeing service Letter 767-SL-27-129 for customer reports about this problem.
Revision 1 is sent to change the service bulletin number 767-27A0193 to 767-27A0219. This is necessary
because the tube design in 767-27A0219 has replaced the design in 767-27A0193.
Revision 2 is sent to limit the effectivity of this service bulletin. Airplanes after line number 974 have a
configuration that is not affected if debris blocks the drain hole in the flanged tube.
D. Description
Remove the pressure seals from the flanged tubes for elevator control cables E1A and E1B. Do a
general visual inspection of the flanged tubes and drain holes to make sure they are clean. If necessary,
clean the inside of the flanged tube and the drain hole on each of the two flanged tubes. Install and
adjust the pressure seals. Do this procedure again at the specified interval.
Revision 1 - No more work is necessary on airplanes changed as shown in the original issue of this
service bulletin.
Revision 2 - No more work is necessary on airplanes inspected in accordance with the original issue
or revision 1 of this service bulletin. Continue to accomplish the repeat inspection at the intervals given
in Paragraph 1.E., Compliance.
The work in this service bulletin is done in the maintenance zone(s) given below.
Affected Maintenance Zones
ZoneModel
311767-400ER
E. Compliance
Federal Aviation Administration (FAA) Notice of Proposed Rule Making NPRM 2005-NM-058-AD, is
related to this service bulletin.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: January 27, 2005
767-27-0205Revision 2: August 30, 2011
12 of 24
BOEING SERVICE BULLETIN 767-27-0205

### Page 13

Boeing recommends that operators accomplish this bulletin as specified in Table 1 below.
Table 1: Compliance Time
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
24 monthsWithin 24 months after the accom-
plishment of the original issue or
Revision 1 of service bulletin 767-
27A0219.
Do the general visual
inspection of the
flanged tubes and
drain holes in accor-
dance with the Accom-
plishment Instructions
All Airplanes
-Before further flightClean the flanged
tube in accordance
with the Accomplish-
ment Instructions
The inspection finds dirt,
loose particles, or block-
age in a flanged tube
-Before further flightClean the drain hole
in accordance with the
Accomplishment In-
structions
The inspection finds dirt,
loose particles, or block-
age in a drain hole
F. Approval
This service bulletin was examined by the Federal Aviation Administration (FAA). The changes specified
in this service bulletin comply with the applicable regulations and are FAA approved, as well as European
Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/JAA approved
airplanes listed in the service bulletin effectivity. This service bulletin and its approval were based on
the airplane in its original Boeing delivery configuration or as modified by other approved Boeing
changes.
If an airplane has a non-Boeing modification or repair that affects a component or system also affected
by this service bulletin, the operator is responsible for obtaining appropriate regulatory agency approval
before incorporating this service bulletin.
G. Manpower
The table below shows an estimate of the task-hours necessary to do this change for each airplane.
This estimate is for direct labor only, done by an experienced crew. Adjust the estimate with operator
task-hour data if necessary. The estimate does not include lost time. These are some examples of lost
time:
— Time to adjust to the workplace
— Time to schedule the work
— Time to examine the work
— Time to cure the materials
— Time to make the parts
— Time to find the tools.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: January 27, 2005
767-27-0205Revision 2: August 30, 2011
13 of 24
BOEING SERVICE BULLETIN 767-27-0205

### Page 14

Elapsed
Hours
Task-
Hours
Number of
Persons
Task
0.250.251Open Access
0.500.501Inspect Flanged Tubes
0.500.501Clean Flanged Tubes
0.250.251Close Access
1.501.50TOTAL FOR EACH AIRPLANE
H. Weight and Balance Changes
None.
I. Electrical Load Data
Not changed.
J. References
1. Existing Data:
a. Engineering Change Memo PRR B12901-43S
b. Boeing Service Bulletin 767-27-0204, 767-27A0193, 767-27A0219
c. Boeing Service Letter 767-SL-27-129
d. Boeing Service Related Problem (SRP) 767-SRP-27-0185
e. Federal Aviation Administration (FAA) Notice of Proposed Rule Making (NPRM)
2005-NM-058-AD
f. 767-400 Aircraft Maintenance Manual (AMM) 06-42-00, 20-10-04
2. Data supplied with this Service Bulletin:
None.
3. Installation Drawings Used in the Preparation of this Service Bulletin:
None.
K. Publications Affected
1. Publications:
None.
2. Damage Tolerance Based Structural Inspections:
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: January 27, 2005
767-27-0205Revision 2: August 30, 2011
14 of 24
BOEING SERVICE BULLETIN 767-27-0205

### Page 15

Boeing has evaluated the repairs and/or changes in this service bulletin for effects on Fatigue
Critical Structure (FCS) and for changes to Damage Tolerance Inspections (DTI) required in the
Maintenance Program. This service bulletin does not affect FCS, therefore DTIs are not necessary.
L. Interchangeability and Intermixability of Parts
Accomplishment of this service bulletin does not affect interchangeability or intermixability of parts.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: January 27, 2005
767-27-0205Revision 2: August 30, 2011
15 of 24
BOEING SERVICE BULLETIN 767-27-0205

### Page 16

BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: January 27, 2005
767-27-0205Revision 2: August 30, 2011
16 of 24
BOEING SERVICE BULLETIN 767-27-0205
BLANK PAGE

### Page 17

2.    MATERIAL INFORMATION
A. Material - Price and Availability
None.
B. Industry Support Information
Boeing warranty remedies are not available for the inspection and/or maintenance procedures given
in this service bulletin.
C. Parts Necessary For Each Airplane
1. Kits/Parts:
None.
2. Parts and Materials Supplied by the Operator:
None.
3. Parts Modified and Reidentified:
None.
4. Parts Removed and Not Replaced:
None.
D. Parts Necessary to Change Spares
None.
E. Special Tooling - Price and Availability
None.
F. Special Tooling Necessary to do this Service Bulletin
No special tools or equipment are necessary to do the change in this service bulletin. But, maintenance
and overhaul tools in the manuals given in Paragraph 1.J., References, can be necessary. Examine
operator tool supply to make sure all necessary tools are available.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: January 27, 2005
767-27-0205Revision 2: August 30, 2011
17 of 24
BOEING SERVICE BULLETIN 767-27-0205

### Page 18

BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: January 27, 2005
767-27-0205Revision 2: August 30, 2011
18 of 24
BOEING SERVICE BULLETIN 767-27-0205
BLANK PAGE

### Page 19

3.    ACCOMPLISHMENT INSTRUCTIONS
A. GENERAL INFORMATION
CAUTION: KEEP THE WORK AREA, WIRES AND ELECTRICAL BUNDLES CLEAN OF METAL
PARTICLES OR CONTAMINATION WHEN YOU USE TOOLS. UNWANTED MATERIAL,
METAL PARTICLES OR CONTAMINATION CAUGHT IN WIRE BUNDLES CAN CAUSE
DAMAGE TO THE BUNDLES. DAMAGED WIRE BUNDLES CAN CAUSE SPARKS OR
OTHER ELECTRICAL DAMAGE.
NOTE: 1. Manual titles are referred to by acronyms. Refer to Paragraph 1.J., References, for
definition of the acronyms.
2. Obey all of the warnings and cautions given in the specified manual sections.
3. Unless shown differently, these dimensions and tolerances are used:
— Torque limits to tighten nuts and bolts are given in 767 Structural Repair Manual,
Chapter 51.
4. Use the approved fastener and process material substitutions in accordance with
SRM Chapter 51.
5. If the length of any fastener specified in this service bulletin does not meet installation
standards given in SRM Chapter 51, then a fastener of the same specification, or
an approved substitute, with a length which meets the installation standards given
in SRM Chapter 51 may be used. In addition, washers may be installed for fastener
grip length in accordance with SRM Chapter 51.
6. These work instructions refer to procedures included in other Boeing documents.
When the words "refer to" are used and the operator has an accepted alternative
procedure, the accepted alternative procedure can be used. When the words "in
accordance with" are included in the instruction, the procedure in the Boeing document
must be used.
7. If it is necessary to remove more parts for access, you can remove those parts. If
you can get access without removing identified parts, it is not necessary to remove
all of the identified parts. Jacking and shoring limitations must be observed.
8. Where the work instructions include installation of a kept part, a new or serviceable
part with the same part number can be installed as an alternative to the kept part.
The removed part can be discarded if a new or serviceable part is installed.
9. A General Visual Inspection is defined as: A visual examination of an interior or
exterior area, installation or assembly to detect obvious damage, failure or irregularity.
This level of inspection is made from within touching distance unless otherwise
specified. A mirror may be necessary to enhance visual access to all exposed surfaces
in the inspection area. This level of inspection is made under normally available
lighting conditions such as daylight, hangar lighting, flashlight or drop-light and may
require removal or opening of access panels or doors. Stands, ladders or platforms
may be required to gain proximity to the area being checked.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: January 27, 2005
767-27-0205Revision 2: August 30, 2011
19 of 24
BOEING SERVICE BULLETIN 767-27-0205

### Page 20

B. WORK INSTRUCTIONS
1. Get access to the work area through door 312AR. Refer to 767-400 AMM 06-42-00 as an accepted
procedure.
2. Do the general visual inspection and cleaning of the flanged tubes and drain holes in accordance
with FIGURE 1.
3. Put the airplane back to a serviceable condition.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: January 27, 2005
767-27-0205Revision 2: August 30, 2011
20 of 24
BOEING SERVICE BULLETIN 767-27-0205

### Page 21 (OCR)

BOEING SERVICE BULLETIN 767-27-0205
STA
1582
PRESSURE
BULKHEAD
SEE
UP
FWD
498851
FIGURE 1: GENERAL VISUAL INSPECTION AND CLEANING OF THE FLANGED TUBES AND DRAIN
HOLES
(SHEET 1 OF 4)
Original Issue: January 27, 2005
Revision 2 August 30, 2011  BOEING PROPRIETARY -  767-27-0205
Copyright © Unpublished Work - See page 1 for details.  21 of 24

### Page 22 (OCR)

BOEING SERVICE BULLETIN 767-27-0205
SEE ®-
CABLES
→ FWD
STA  STA
STA
1605  1582
ELEVATOR  1629
CONTROL
CABLE E1A
ELEVATOR
CONTROL
CABLE E1B
STRINGER 20-
PRESSURE
BULKHEAD
STRINGER 22-
DUCT LEAK
DETECTOR
LOOPS
SUP
→ FWD  498907
FIGURE 1: GENERAL VISUAL INSPECTION AND CLEANING OF THE FLANGED TUBES AND DRAIN
HOLES
(SHEET 2 OF 4)
Original Issue: January 27, 2005
Revision 2 August 30, 2011  767-27-0205
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.  22 of 24

### Page 23 (OCR)

BOEING SERVICE BULLETIN 767-27-0205
CABLES
UP
→FWD
AFT
— INBD
A—A
The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for each airplane.
FIGURE 1: GENERAL VISUAL INSPECTION AND CLEANING OF THE FLANGED TUBES AND DRAIN
HOLES
(SHEET 3 OF 4)
Original Issue: January 27, 2005
Revision 2 August 30, 2011  BOEING PROPRIETARY -  767-27-0205
Copyright © Unpublished Work - See page 1 for details.  23 of 24

### Page 24

CAUTION: THE DUCT LEAK DETECTOR LOOPS THAT ARE NEAR THE WORK AREA CAN BECOME
DAMAGED IF YOU BEND OR DISCONNECT THEM.
NOTESQTYNAMETASKSTEP
Refer to 767-400 AMM 20-10-04 as an accepted procedure.2Pressure SealRemove / Keep1
Do a general visual inspection of the flanged tube for dirt,
loose particles, or blockage.
2Flanged TubeInspect2
DO NOT USE WATER OR SOLVENTS
Do this step if the general visual inspection finds dirt, loose
particles, or blockage in the flanged tube. Use a brush that
will not cause damage to plastic surfaces or control cables.
As an alternative, you can use a lint free cloth.
2Flanged TubeClean3
Do a general visual inspection of the drain hole for dirt, loose
particles, or blockage.
2Drain HoleInspect4
DO NOT USE WATER OR SOLVENTS
Do this step if the general visual inspection finds dirt, loose
particles, or blockage in the drain hole. Use a brush that will
not cause damage to plastic surfaces or control cables. As
an alternative, you can use a lint free cloth.
2Drain HoleClean5
Refer to 767-400 AMM 20-10-04 as an accepted procedure.2Pressure SealInstall (kept)6
FIGURE 1: GENERAL VISUAL INSPECTION AND CLEANING OF THE FLANGED TUBES AND DRAIN
HOLES
(SHEET 4 OF 4)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: January 27, 2005
767-27-0205Revision 2 August 30, 2011
24 of 24
BOEING SERVICE BULLETIN 767-27-0205

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
