# Boeing Service Bulletin 767-31-0101: No revision named

- Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2011-0382; AD 2011-25-11 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Boeing Service Bulletin 767-31-0101](https://openairdocs.org/service-documents/boeing/sb-767-31-0101.md)
- Title as filed: U.S. DOT/FAA - Service Bulletin (6)
- Pages: 35
- PDF: https://openairdocs.org/files/sha256/c6/e3/c6e362fbe473512a23cd05af1cee44a7b9002efadf600d60cb1dc1b36cf09fc5
- Page: https://openairdocs.org/service-documents/boeing/sb-767-31-0101/file/c6e362fbe473

## Text

Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Commercial
Airplane
Group
767
Service Bulletin
Number: 767-31-0101 SummaryDate: July 6, 2000
ATA System: 3141
SUBJECT: INDICATING/RECORDING SYSTEMS - Central Computers - Engine Indication And Crew
Alerting System - EICAS Computer Replacement And Wire Change - Pratt And Whitney
JT9D-( ) Engines
CONCURRENT REQUIREMENTS
None.
BACKGROUND
This service bulletin gives instructions to replace the
two Engine Indication and Crew Alerting System
(EICAS) computers. The new computers allow
loadable Operational Program Software (OPS) and
Operational Program Configuration (OPC) software
installation via a portable data loader (PDL) or an
airborne data loader (ADL).
The new EICAS computers allow the use of OPC
software to change the configuration of options
selected by the customer. Loadable OPC software
eliminates the requirement to change program pin
wiring to make customer options.
The new EICAS computers have increased
capacity, support optional Future Air Navigation
System (FANS) features, and comply with
Amendment No. 121-266 [Docket No. 28109],
"Revisions to Digital Flight Data Recorder Rules".
The related Rockwell/Collins Service Bulletin is
EAP-701A-31-AM.
Boeing Service Letter 767-SL-31-036A is related to
this service bulletin.
ACTION (PRR B12710, PRR B13058)
In the E8 rack, replace the left and right EICAS
computers. Make wire changes in the E8 shelf.
Change left and right EICAS computer connector
keying on the E-8 shelf. Load EICAS OPS and OPC
software into both left and right EICAS computers.
Do an operational test of the EICAS computers.
EFFECTIVITY
All 767 airplanes line positions 1 - 329 with Pratt and
Whitney JT9D-( ) engines.
The effectivity is broken up into three major groups
for convenience.
COMPLIANCE
No compliance time is given.
INDUSTRY SUPPORT INFORMATION
Boeing warranty remedies are not available for the
configuration changes given in this service bulletin.
MANPOWER
Total
Man-hours
Elapsed Time
(Hours)
9.50 4.75
The change to the EICAS computers as given in the
Rockwell/Collins service bulletin is not included.
MATERIAL INFORMATION
Operator Supplied Parts
767-31-0101
Summary Page 1 of 2

### Page 2

BOEING SERVICE BULLETIN 767-31-0101
REPLACE LEFT AND RIGHT
EICAS COMPUTERS IN E8 RACK
FWD
MAIN EQUIPMENT CENTER
EICAS SHELF WIRES
MAKE CHANGES TO
S52262
July 6, 2000 767-31-0101
Summary Page 2 of 2

### Page 3

Commercial
Airplane
Group
767
Service Bulletin
Number: 767-31-0101
Date: July 6, 2000
ATA System: 3141
SUBJECT: INDICATING/RECORDING SYSTEMS - Central Computers - Engine Indication And Crew
Alerting System - EICAS Computer Replacement And Wire Change - Pratt And Whitney
JT9D-( ) Engines
1. PLANNING INFORMATION
A. Effectivity
1. Airplanes
Refer to Service Bulletin Index Document D624T001, Part 3 for Airplane Variable Number, Line
Number, and Serial Number data.
This service bulletin is for the airplanes shown below. An equivalent change is on subsequent
production airplanes. Refer to PRR B12710 and PRR B13058 for data about this change.
Airplane Models:
767-200 767-300
IDENTIFICATION BY CUSTOMER, CUSTOMER CODE, GROUP AND VARIABLE NUMBER
ABX AIR (ABX)
1 VA803 VA807-VA809
AIR CANADA (ACN)
1 VA701-VA719 VB001-VB002 VB201-VB202
AIR CHINA (BEJ)
2 VE064-VE065 VE083-VE084
AIR GABON (GBN)
1 VE021
BOEING (TBC)
2 VA001
C-S AVIATION SERVICES (CSV)
3 VE041
EL AL ISRAEL AIRLINES (ELA)
1 VB281-VB282
2 VB283-VB284
ETHIOPIAN AIRLINES (ETH)
2 VE001-VE002
JAPAN AIRLINES (JAL)
1 VB371-VB373 VK001-VK011 VK021-VK022
July 6, 2000 767-31-0101
Page 1 of 26

### Page 4

BOEING SERVICE BULLETIN 767-31-0101
QANTAS (QAN)
2 VE061-VE063 VE066-VE069
SOUTH AFRICAN AIRWAYS (SAA)
1 VE022-VE023
TWA (TWA)
1 VA801-VA802 VA804-VA806 VA810 VB301-VB302
UNITED AIRLINES (UAL)
1 VA002-VA020
IDENTIFICATION BY VARIABLE NUMBER
GROUP 1
VA002-VA020 VA701-VA719 VA801-VA810 VB001-VB002 VB201-VB202 VB281-VB282
VB301-VB302 VB371-VB373 VE021-VE023 VK001-VK011 VK021-VK022
GROUP 2
VA001 VB283-VB284 VE001-VE002 VE061-VE069 VE083-VE084
GROUP 3
VE041
2. Spares
Examine your spares supply for the parts identified in Paragraph 2.E., Existing Parts
Accountability. If any parts are found, refer to Paragraph 2.E., Existing Parts Accountability, for
the recommended use.
July 6, 2000 767-31-0101
2

### Page 5

BOEING SERVICE BULLETIN 767-31-0101
B. Concurrent Requirements
None.
C. Reason
This service bulletin gives instructions to replace the two Engine Indication and Crew Alerting System
(EICAS) computers. The new computers allow loadable Operational Program Software (OPS) and
Operational Program Configuration (OPC) software installation via a portable data loader (PDL) or an
airborne data loader (ADL).
The new EICAS computers allow the use of OPC software to change the configuration of options
selected by the customer. Loadable OPC software eliminates the requirement to change program pin
wiring to make customer options.
The new EICAS computers have increased capacity, support optional Future Air Navigation System
(FANS) features, and comply with Amendment No. 121-266 [Docket No. 28109], "Revisions to Digital
Flight Data Recorder Rules".
The related Rockwell/Collins Service Bulletin is EAP-701A-31-AM.
Boeing Service Letter 767-SL-31-036A is related to this service bulletin.
D. Description
In the E8 rack, replace the left and right EICAS computers. Make wire changes in the E8 shelf.
Change left and right EICAS computer connector keying on the E-8 shelf. Load EICAS OPS and
OPC software into both left and right EICAS computers. Do an operational test of the EICAS
computers.
NOTE: Some service bulletins with EICAS program pin changes are not usable after this change is
done. Operators must contact Boeing for the OPC diskette that accomplishes the equivalent
of those program pin changes.
The changes in this service bulletin will change the EICAS.
An evaluation form is attached to this service bulletin. Please use this form to tell us what you think
of the quality of this service bulletin.
E. Compliance
No compliance time is given.
July 6, 2000 767-31-0101
3

### Page 6

BOEING SERVICE BULLETIN 767-31-0101
F. Approval
This service bulletin was examined by the Federal Aviation Administration (FAA). The changes
specified in this service bulletin comply with the applicable Federal Aviation Regulations (FAR) and
are FAA approved. This service bulletin and the FAA approval were based on the airplane in its
original Boeing delivery configuration or as modified by other FAA approved Boeing changes.
If an airplane has a non-Boeing modification or repair that affects a component or system also
affected by this service bulletin, the operator is responsible for obtaining appropriate regulatory
agency approval before incorporating this service bulletin.
G. Manpower
The table below shows an estimate of the man-hours necessary to do this change for each airplane.
This estimate is for direct labor only, done by an experienced crew. Adjust the estimate with operator
man-hour data if necessary. The estimate does not include lost time. These are some examples of
lost time:
- Time to adjust to the workplace
- Time to schedule the work
- Time to examine the work
- Time to cure the materials
- Time to make the parts
- Time to find the tools.
Task Number of Persons Man-Hours Elapsed Time (Hours)
Open Access 2 0.5 0.25
Change 2 5.5 2.75
Close Access 2 0.5 0.25
Test 2 3.0 1.50
TOTAL FOR EACH AIRPLANE 9.5 4.75
The change to the EICAS computers as given in Collins Service Bulletin EAP-701A-31-AM is not
included.
July 6, 2000 767-31-0101
4

### Page 7

BOEING SERVICE BULLETIN 767-31-0101
H. Weight and Balance Changes
Airplane Group and Model
Change in Weight
(Pounds)
Change in Moment
(Pound-Inches)
Group 1
-200 airplanes -12.2 -3,123.0
-300 airplanes -12.2 -1,647.0
Group 2
-200 airplanes -12.2 -3,123.0
-300 airplanes N/A N/A
Group 3
-200 airplanes -12.2 -3,123.0
-300 airplanes N/A N/A
I. Electrical Load Data
Not changed.
J. References
1. Existing Data:
a. Engineering Change Memo PRR B12710 and PRR B13058
b. 767 Maintenance Manual (AMM) Subjects 20-41-01, 24-22-00, 31-41-02, 71-00-00/201
c. 767 Wiring Diagrams 31-41-15, 31-41-18
d. Boeing Standard Wiring Practices Manual (BSWPM) 20-10-11, 20-10-12, 20-10-14, 20-10-19,
20-30-11, 20-71-14, 20-90-11
e. Collins Service Bulletin EAP-701A-31-AM*
f. Boeing Service Letter 767-SL-31-036A, dated August 21, 1998.
g. Amendment No. 121-266 [Docket No. 28109], Revisions to Digital Flight Data Recorder Rules
* The supplier was told to send copies of the service bulletin to each operator.
2. Data supplied with this service bulletin:
None.
3. Installation Drawings:
None.
July 6, 2000 767-31-0101
5

### Page 8

BOEING SERVICE BULLETIN 767-31-0101
K. Publications Changed
Publication Chapter-Section
767 FAA Approved Airplane Flight Manual *
767 Operations Manual Chapter 21
767 Maintenance Manual 23-21, 23-42, 23-43, 23-46, 31-41, 32-09,
32-61
767 Fault Isolation Manual 23-21, 31-41, 32-09, 71 EICAS Message Index
767 Ramp Maintenance Manual 31-03, 31-04, 31-05, 32-21
Overhaul Manual 3, 4, 9, 21, 22
767 Illustrated Parts Catalog 31-41
* This change affects Section 1 of the FAA Approved Airplane Flight Manual. Operators will receive
applicable data.
L. Interchangeability and Intermixability
Refer to Paragraph 2.E., Existing Parts Accountability, for interchangeability and intermixability
information.
July 6, 2000 767-31-0101
6

### Page 9

BOEING SERVICE BULLETIN 767-31-0101
2. MATERIAL INFORMATION
A. Material - Price and Availability
The operator can supply the parts and materials shown in Paragraph 2.C., Parts Necessary For Each
Airplane, and Paragraph 2.D., Parts Necessary to Change Spares. Refer to Collins Service Bulletin
EAP-701A-31-AM. The OPC diskette can be ordered through Boeing Spares.
B. Industry Support Information
Boeing warranty remedies are not available for the configuration changes given in this service
bulletin.
C. Parts Necessary For Each Airplane
Parts and Materials Supplied by the Operator:
Quantity Part Number (Specification) Name
2 S242N701-1001 (a) EICAS computer
30 feet BMS 13-54, Type 1, Class 1, Finish C,
Grade B, (b) (c)
Lacing Tape, White
4 feet RT876 (d) Sleeving, Yellow Thermofit, 1/8 inch
diameter
6 M39029/11-145 (b) Terminal Block Contact
5 feet BMS 13-48, Type 10, Class 1, AWG
22
Wire (b)
1 242T7001-2XXX (e) OPC diskette
1 831-4565-102 (f) OPS diskette
(a) Get EICAS computers S242N701-1001 from S242N701-30X (Collins Part Number
622-6087-10X). See Collins Service Bulletin EAP-701A-31-AM to get the new EICAS
computers or contact Collins at the address given below.
Rockwell Collins Incorporated (V4V792)
Air Transport Division
400 Collins Road N.E.
Cedar Rapids, Iowa 52498
Phone (319) 295-5000
(b) See the Qualified Products List at the end of the Boeing Material Specification (BMS) for
supplier data.
(c) Gudebrod Incorporated (V82110)
Griffith Towers P.O. Box 357
Pottstown, PA 19464-5568
(d) Raychem Corporation (V06090)
300 Constitution Drive
Menlo Park, CA 94025-1111
(e) Refer to Appendix A in this service bulletin for the applicable part number of the OPC
diskette.
(f) Refer to (a) above for manufacturer and address.
July 6, 2000 767-31-0101
7

### Page 10

BOEING SERVICE BULLETIN 767-31-0101
D. Parts Necessary to Change Spares
See the Collins Service Bulletin EAP-701A-31-AM to change spare EICAS computers. Get OPC
software from Boeing Spares organization.
E. Existing Parts Accountability
The parts shown below are changed as shown in this service bulletin. Quantity is the number of parts
changed on each airplane.
Existing Part Number RUC Name Quantity New Part Number PNC RC
S242N701-30X
(Collins part number
622-6087-10X)
RW1 EICAS Computer 2 S242N701-1001
(Collins part number
822-1033-100)
S A
RUC Recommended Use Code
RW1 - Make the change given in Collins Service Bulletin EAP-701A-31-AM.
PNC Part Number Code
S - This is the part number for the new equivalent or replacement part.
- To get a new part, use this part number in your order.
RC Replacement Code
A - Do not use the existing part to replace the new or changed part.
- The existing part is not interchangeable or intermixable with the new part.
F. Special Tooling - Price and Availability
None
G. Special Tooling Necessary to do This Bulletin
No special tools or equipment are necessary to do the change in this service bulletin. But,
maintenance and overhaul tools in the manuals given in Paragraph 1.J., References, can be
necessary. Examine operator tool supply to make sure all necessary tools are available.
July 6, 2000 767-31-0101
8

### Page 11

BOEING SERVICE BULLETIN 767-31-0101
3. ACCOMPLISHMENT INSTRUCTIONS
GENERAL NOTES
1. The paragraphs identified with a letter give the general work instructions and the necessary tests.
The instructions identified with numbers on the figures give the recommended sequence of steps.
2. Refer to the Boeing Standard Wiring Practices Manuals 20-10-11 and 20-10-12 for the wire
installation procedures and 20-10-19 for wire separation.
3. Obey all of the warnings and cautions given in the specified manual sections.
4. Some service bulletins with EICAS program pin changes are not usable after this change is done.
Operators must contact Boeing for the OPC diskette that accomplishes the equivalent of those
program pin changes.
5. The Accomplishment Instructions are divided into two parts as follows:
- Part I - Instructions to compare the EICAS readouts to those given in Appendix A are given.
These instructions will make sure the applicable software is used for this change.
- Part II - Instructions to replace the EICAS computers, make wire changes and load the new
software are given.
WORK INSTRUCTIONS
PART I - EICAS READOUT COMPARISON
A. On the P9 panel, move the EICAS DSP "COMPUTER" switch to "L".
B. On the P61 panel, press the EICAS MAINT Panel "CONF/MCDP" button.
C. Compare the "PROG PINS" and "SUPL PINS" readouts displayed on the lower EICAS display
with the LEFT PROG PINS and SUPL PINS information in Appendix A for the applicable
effectivity. If the EICAS readouts do not agree with those given in Appendix A, supply the PROG
PINS and SUPL PINS data to The Boeing Company to get the correct OPC software part number.
NOTE: For airplanes with EICAS part numbers S242N701-301 through -306, the "SUPL PINS"
readout is not applicable. It is only necessary to make sure that the left EICAS "PROG
PINS" readout agrees with Appendix A.
D. On the P9 panel, move the EICAS DSP "COMPUTER" switch to "AUTO".
PART II - SOFTWARE LOADABLE EICAS COMPUTER CHANGE
A. Remove the electrical power from the airplane circuits as given in 767 AMM Subject 24-22-00.
Attach DO-NOT-CLOSE tags to opened circuit breakers and DO-NOT-OPERATE tags to
applicable switches. Use an independent power source for lighting.
B. Gain access to the E8 shelf in the main equipment center.
C. Remove the left and right EICAS computers as shown in Figure 1.
D. Remove and/or tape and stow W1035 wires, even if they are installed at locations other than
shown in Figure 2.
E. Make changes to W1037 wires, if installed as shown in Figure 3.
July 6, 2000 767-31-0101
9

### Page 12

BOEING SERVICE BULLETIN 767-31-0101
F. On the E8 shelf, make changes to the left and right EICAS computer connector keying as shown
in Figure 4.
G. Install the new left and right EICAS computers as shown in Figure 5.
H. Remove DO-NOT-CLOSE tags from circuit breakers and DO-NOT-OPERATE tags from switches
installed in Step A. Supply the electrical power to the airplane circuits as given in 767 AMM
24-22-00.
I. Install the OPC software for the left and right EICAS computers. Refer to Appendix A in this
service bulletin and the instructions below. Load the left EICAS computer first. Load the right
EICAS computer second.
1. Make sure that the PDL ON/OFF switch is in the OFF position.
2. Open the circuit breakers shown below:
Circuit Breaker Name Panel Location
C4078 EICAS CMPTR L P11-2 J02
C4079 EICAS CMPTR R P11-5 J29
3. Set the airplane parking brake.
WARNING: ELECTRICAL SHOCK HAZARD. THE CONNECTION AND REMOVAL OF THE
PORTABLE DATA LOADER (PDL) INTERFACE CABLE CAN CAUSE AN
ELECTRICAL SHOCK. DAMAGE TO PEOPLE AND EQUIPMENT CAN
OCCUR. MAKE SURE THAT THE EICAS COMPUTER CIRCUIT BREAKERS
SPECIFIED IN STEPS 2, 12, AND 22 ARE OPEN BEFORE THE PDL
INTERFACE CABLE IS CONNECTED OR REMOVED.
4. Connect the Portable Data Loader (PDL) interface cable to the ARINC 615 connector on the
front face of the left EICAS computer (M10181).
5. Close the circuit breakers shown below:
Circuit Breaker Name Panel Location
C1170 LANDING GEAR AIR/GND SYS 2 P11-6 U23 or U24
C1175 LDG GEAR POS SYS 1 P11-4 C30
C1179 PARKING BRAKE VLV P6-1 F4
C1182 LANDING GEAR AIR/GND SYS 1 P11-3 U15
6. Obtain the applicable EICAS OPC software part number diskette for the airplane effectivity.
Refer to Appendix A.
July 6, 2000 767-31-0101
10

### Page 13

BOEING SERVICE BULLETIN 767-31-0101
7. Close the circuit breaker shown below:
Circuit Breaker Name Panel Location
C4078 EICAS CMPTR L P11-2 J02
8. Put the PDL ON/OFF switch in the ON position. Make sure that the PDL is powered.
9. Install the OPC diskette into the PDL and follow the normal data load procedures given by the
PDL supplier.
10. Make sure that the data loader indicates that the load is in progress.
NOTE: The load process can take one to two minutes to begin.
11. After three to four minutes, make sure that the Data Loader indicates that the load is complete.
Put the ON/OFF switch on the PDL in the OFF position.
12. Open the circuit breaker shown below:
Circuit Breaker Name Panel Location
C4078 EICAS CMPTR L P11-2 J02
13. Remove the PDL interface cable from the left EICAS computer . Install the connector dust
cover to the front face of the left EICAS computer.
14. Connect the PDL interface cable to the ARINC 615 connector on the front face of the right
EICAS computer (M10182).
15. Make sure that the circuit breakers shown below are closed:
Circuit Breaker Name Panel Location
C1170 LANDING GEAR AIR/GND SYS 2 P11-6 U23 or U24
C1175 LDG GEAR POS SYS 1 P11-4 C30
C1179 PARKING BRAKE VLV P6-1 F4
C1182 LANDING GEAR AIR/GND SYS 1 P11-3 U15
16. Make sure that the airplane parking brake is set.
17. Close the circuit breaker shown below:
Circuit Breaker Name Panel Location
C4079 EICAS CMPTR R P11-5 J29
18. Put the PDL ON/OFF switch in the ON position. Make sure that the PDL is powered.
19. Install the OPC diskette into the PDL and follow the normal data load procedures given by the
PDL supplier.
20. Make sure that the data loader indicates that the load is in progress.
July 6, 2000 767-31-0101
11

### Page 14

BOEING SERVICE BULLETIN 767-31-0101
NOTE: The load process can take one to two minutes to begin.
21. After three to four minutes, make sure that the Data Loader indicates that the load is complete.
Put the ON/OFF switch on the PDL in the OFF position.
22. Open the circuit breaker shown below:
Circuit Breaker Name Panel Location
C4079 EICAS CMPTR R P11-5 J29
23. Remove the PDL interface cable from the right EICAS computer . Install the connector dust
cover to the front face of the right EICAS computer.
J. Do this test:
1. Make sure that the circuit breakers shown below are closed:
Circuit Breaker Name Panel Location
C1182 LANDING GEAR AIR/GND SYS 1 P11-3 U15
C1170 LANDING GEAR POSITION
AIR/GND SYS 2
P11-6 U23 OR U24
C1175 LANDING GEAR POSITION
AIR/GND SYS 1
P11-4 C30
C4078 EICAS COMPTR-L P11-2 J2
C4079 EICAS COMPTR-R P11-5 J29
C4081 EICAS UPPER DSPL P11-2 J3
C4082 EICAS LOWER DSPL P11-5 J30
C4094 EICAS DSPL SELECT P11-5 J32
C4189 EICAS DSPL SW P11-5 J31
C0565 WARN ELEX A P11-5 J34
C0566 WARN ELEX B P11-1 B18
C0567 AURAL WARN SPKR L P11-1 B16
C0568 AURAL WARN SPKR R P11-5 H35
C1179 PARKING BRAKE VLV P6-1 F4
2. Make sure that the airplane parking brake is set.
3. Prepare and start left and right engines for usual operation as given in 767 AMM 71-00-00/201.
4. Make sure that the STANDBY ENGINE INDICATOR is powered and the front panel switch is in
"AUTO".
5. On the P9 panel, move the EICAS DSP "COMPUTER" switch to "L".
6. Make sure that the left and right engine parameters are displayed on the primary and
secondary engine displays.
7. On the P61 panel, press the EICAS MAINT Panel "TEST" button.
July 6, 2000 767-31-0101
12

### Page 15

BOEING SERVICE BULLETIN 767-31-0101
8. Make sure that each event shown below occurs:
a. On the P7 panel, the Master CAUTION lighted switches illuminate.
b. An "OWL" aural and "SIREN" aural occur at the same time.
c. On the P1 panel, the standby engine indicator displays for the L and R EGT are not
blanked.
d. The test format is displayed on each EICAS display unit with "LEFT EICAS COMPUTER" at
the top of the screen.
e. "TEST IN PROGRESS" is displayed for approximately 5 seconds. The message is then
replaced by the message "SELF TEST COMPLETE".
f. Make sure "NO INTERFACE FAULTS" is displayed at the upper left corner of test page.
g. Make sure "NO INTERNAL FAULTS" is displayed at the upper left corner of test page.
NOTE: If "Program Pin Error" is displayed, compare the program pin codes displayed on
the test page to those given in Appendix B. If the PROG PINS code display is not
the same, it is necessary to examine the wiring. The changes made on the
airplane must be the same as given in the applicable wiring changes shown.
9. On the P9 panel, move the EICAS DSP "COMPUTER" switch to "R".
10. Make sure that each item given below is displayed on the EICAS upper and lower displays.
a. The test format is displayed on each EICAS display unit with "RIGHT EICAS COMPUTER"
at the top of the screen.
b. The message "SELF TEST COMPLETE" is displayed at the upper left corner of the test
page.
c. "NO INTERFACE FAULTS" is displayed at the upper left corner of the test page.
d. "NO INTERNAL FAULTS" is displayed at the upper left corner of the test page.
NOTE: If "Program Pin Error" is displayed, compare the program pin codes displayed on
the test page to those given in Appendix C. If the PROG PINS code display is not
the same, it is necessary to examine the wiring. The changes made on the
airplane must be the same as given in the applicable wiring changes shown.
11. PRESS either Master CAUTION/WARNING lighted switch on the P7 panel.
12. Make sure that both Master CAUTION lights on the P7 panel are off.
July 6, 2000 767-31-0101
13

### Page 16

BOEING SERVICE BULLETIN 767-31-0101
13. On the P9 panel, move the EICAS DSP "COMPUTER" switch to "L".
14. On the P61 panel, press and release the EICAS MAINT Panel "TEST" button.
15. Make sure that the left and right engine parameters are displayed on the primary and
secondary engine displays.
16. Perform normal engine shutdown on left and right engines as given in 767 AMM 71-00-00/201.
17. Make sure that the PRIMARY engine format is displayed on the Upper display and
SECONDARY engine format is displayed on the Lower display.
18. On the P61 panel, press the EICAS MAINT Panel "CONF/MCDP" button.
19. Make sure that the EICAS CONFIGURATION on the CONF/MCDP maintenance page reads
as follows:
a. H/W P/N S242N701-1001
b. OPS P/N 3170-COL-DE0-03
NOTE: If the OPS part number readout is not the same as this part number, it is necessary
to load the OPS software again. Refer to 767 AMM 31-41-02/201. The OPS
diskette is available, if necessary, from Collins.
c. OPC P/N (31XX-BCG-00X-XX)
NOTE: See Appendix A for the applicable OPC P/N. If the OPC part number display is not
the same as the part number given in Appendix A, it is necessary to load the
EICAS computer with the correct software. The procedure is given in these
Accomplishment Instructions.
d. PROG PINS (XXXX)
NOTE: See Appendix B for the applicable PROG PINS. If the PROG PINS code display is
not the same as the code given in Appendix B, it is necessary to examine the
wiring. The changes made on the airplane must be the same as given in the
applicable wiring changes.
20. On the P9 panel, move the EICAS DSP "COMPUTER" switch to "R".
July 6, 2000 767-31-0101
14

### Page 17

BOEING SERVICE BULLETIN 767-31-0101
21. Make sure that the EICAS CONFIGURATION is as follows:
a. H/W P/N S242N701-1001
b. OPS P/N 3170-COL-DE0-03
NOTE: If the OPS part number readout is not the same as this part number, it is necessary
to load the OPS software again. Refer to 767 AMM 31-41-02/201. The OPS
diskette is available, if necessary, from Collins.
c. OPC P/N (31XX-BCG-00X-XX)
NOTE: See Appendix A for the applicable OPC P/N. If the OPC part number display is not
the same as the part number given in Appendix A, it is necessary to load the
EICAS computer with the correct software. The procedure is given in these
Accomplishment Instructions.
d. PROG PINS (XXXX)
NOTE: See Appendix C for the applicable PROG PINS. If the PROG PINS code display
is not the same as the code given in Appendix C, it is necessary to examine the
wiring. The changes made on the airplane must be the same as given in the
applicable wiring changes shown.
22. On the P9 panel, press the EICAS DSP "ENGINE" button.
23. Make sure that the EICAS ALERT messages shown below are NOT displayed on the upper
EICAS display:
- EICAS DISPLAY
- EICAS CONT PNL
24. On the P9 panel, press the EICAS DSP "STATUS" button.
25. Make sure that the EICAS status messages shown below are NOT displayed on the lower
EICAS display:
- L EICAS CMPTR
- R EICAS CMPTR
- EICAS DISAGREE
- EICAS SOFTWARE
NOTE: If an "EICAS SOFTWARE" message is displayed, there is a disagree between the left
and the right EICAS software versions. Check the OPC and OPS software part
numbers for the left and right EICAS computers on the CONF/MCDP page and reload
the software accordingly.
26. On the P61 panel, press the EICAS MAINT Panel "ECS/MSG" button.
July 6, 2000 767-31-0101
15

### Page 18

BOEING SERVICE BULLETIN 767-31-0101
27. Make sure that the message "EICAS BITE" is NOT displayed on the lower EICAS indicator.
28. On the P9 panel, move the EICAS DSP "COMPUTER" switch to "L".
29. Make sure that the EICAS ALERT messages shown below are NOT displayed on the upper
EICAS display:
- EICAS DISPLAY
- EICAS CONT PNL
30. On the P9 panel, press the EICAS DSP "STATUS" button.
31. Make sure that the EICAS status messages shown below are NOT displayed on the lower
EICAS display:
- L EICAS CMPTR
- R EICAS CMPTR
- EICAS DISAGREE
- EICAS SOFTWARE
NOTE: If an "EICAS SOFTWARE" message is displayed, there is a disagree between the left
and the right EICAS software versions. Check the OPC and OPS software part
numbers for the left and right EICAS computers on the CONF/MCDP page and reload
the software accordingly.
32. On the P61 panel, press the EICAS MAINT Panel "ECS/MSG" button.
33. Make sure that the message "EICAS BITE" is NOT displayed on the lower EICAS display.
34. On the P9 panel, move the EICAS DSP "COMPUTER" switch to "AUTO".
K. Put the airplane back into serviceable condition.
July 6, 2000 767-31-0101
16

### Page 19

BOEING SERVICE BULLETIN 767-31-0101
FIGURE TABLE OF CONTENTS
Title Page
FIGURE 1. EICAS COMPUTER REMOVAL ................................ 1 8
FIGURE 2. LEFT EICAS COMPUTER - W1035 WIRE REMOVALS ............. 1 9
FIGURE 3. RIGHT EICAS COMPUTER - W1037 WIRE REMOVALS ............ 2 2
FIGURE 4. EICAS COMPUTER S242N701-1001 CONNECTOR KEYING
CHANGE.................................................. 2 5
FIGURE 5. EICAS COMPUTER INSTALLATION . . .......................... 2 6
July 6, 2000 767-31-0101
17

### Page 20

BOEING SERVICE BULLETIN 767-31-0101
1FWD
MAIN EQUIPMENT CENTER
S52263
CAUTION: USE THE PRECAUTIONS FOR ELECTROSTATIC DISCHARGE ON THE EICAS
COMPUTERS AS GIVEN IN 767 AMM 20-41-01. ELECTROSTATIC DISCHARGE CAN
CAUSE DAMAGE TO THE EICAS COMPUTERS.
The step number shown below agrees with the number shown in the circle symbol in the figure.
STEP TASK NAME PART NUMBER QTY NOTES
1 Remove EICAS Computer S242N701-30x 2 767 AMM 31-41-02.
FIGURE 1. EICAS COMPUTER REMOVAL
July 6, 2000 SHEET 1 OF 1 767-31-0101
18

### Page 21

BOEING SERVICE BULLETIN 767-31-0101
EXISTING WIRE
DELETED WIRE OR FORMER ROUTING
21
REFERENCE: 767 WIRING DIAGRAM 31−41−15
TB239
TB239
W1035−043−24
W1035−081−22
W1035−071−22
W1035−089−22
W1035−092−22
W1035−073−22
W1035−074−22
W1035−083−22
Z8
Z7
W1035−059−22
W1035−058−22
W1035−068−22
W1035−082−22
W1035−076−22
W1035−069−22
W1035−086−22
Z9W1035−084−22
W1035−070−22
COMPUTER
L EICAS
M10181
XC13
XC14
XB18
K9
K6
E13
W1035−041−24
W1035−042−24
W1035−036−24
D881B
D881E
W1035−037−24
W1035−046−24
W1035−045−24
G1
J8
K1
XB19
XC17
XC18
XC12
XC11
W1035−040−24
W1035−039−24
D881A
K9
K1
XC15
XC16
XB20
K12
J12
D8
D881D
W1035−044−24
W1035−038−24
D881F
XC19W1035−047−24
W1035−035−24 XB17
J5
XB16
XB15
XB14
W1035−034−24
W1035−033−24
W1035−032−24
D881B
B6
D11
D3
C6
S52264
FIGURE 2. LEFT EICAS COMPUTER - W1035 WIRE REMOVALS
July 6, 2000 SHEET 1 OF 3 767-31-0101
19

### Page 22

BOEING SERVICE BULLETIN 767-31-0101
DELETED WIRE OR FORMER ROUTING
EXISTING WIRE
ADDED WIRE OR NEW ROUTING
2
W1035−100−22
W1035−085−22
REFERENCE: 767 WIRING DIAGRAM 31−41−15COMPUTER
L EICAS
M10181
TB239
Z7
TB239
W1035−050−24 W1035−079−22
D881E
XD12J1
D881F
Z9W1035−072−22XB12W1035−030−24D8
W1035−057−22
D881B
XB13
XA20
XA19
W1035−031−24
W1035−028−24
W1035−027−24
C9
F6
F10
S52266
FIGURE 2. LEFT EICAS COMPUTER - W1035 WIRE REMOVALS
July 6, 2000 SHEET 2 OF 3 767-31-0101
20

### Page 23

BOEING SERVICE BULLETIN 767-31-0101
DELETED WIRE OR FORMER ROUTING
EXISTING WIRE
ADDED WIRE OR NEW ROUTING
3
REFERENCE: 767 WIRING DIAGRAM 31−41−18
W1035−97−24
D881E
W1035−98−24
W1035−96−24
W1035−112−24
D9
J7
H7
G12
TB239
L EICAS COMPUTER
M10181
Z38
D881F
D881D
S52284
The flag note numbers shown below agree with the numbers shown in the flag symbols in the figure. The
QTY numbers shown below are the number of parts necessary for the left EICAS computer on one
airplane.
FLAG
NOTE NAME PART NUMBER QTY NOTES
1 - - - Wires become spare. No action necessary.
2 Wire - - Delete, if installed, no matter where wires
are currently terminated.
3 Sleeving RT876, 1/8 inch
diameter, 3 inches
- Tape and stow wire, if installed near TB239.
BSWPM 20-30-11 and 20-10-14.
Lacing Tape BMS 13-54, Type 3,
Class 1, Grade B,
Finish C.
- Color White - BSWPM 20-10-11.
FIGURE 2. LEFT EICAS COMPUTER - W1035 WIRE REMOVALS
July 6, 2000 SHEET 3 OF 3 767-31-0101
21

### Page 24

BOEING SERVICE BULLETIN 767-31-0101
EXISTING WIRE
DELETED WIRE OR FORMER ROUTING
21
REFERENCE: 767 WIRING DIAGRAM 31−41−15
M10182
TB239
TB239
W1037−092−22
W1037−069−22
W1037−049−22
W1037−055−22
W1037−068−22
W1037−062−22
W1037−073−22
W1037−081−22
Z37W1037−056−22
W1037−061−22 Z33
XB29W1037−028−24
XC27W1037−036−24
XC28W1037−037−24
G1
K1
J8
D883E
XC25
XC26
XB30
W1037−034−24
W1037−035−24
W1037−029−24
XC29W1037−038−24J5
D883F
D883D
K12
J12
W1037−030−24 XC21
D8
D883A
Z31
W1037−060−22
XC22W1037−031−24
XC23W1037−032−24
XB27W1037−026−24
K1
K9
D883B
K9
B6
W1037−058−22XC24W1037−033−24K6
W1037−076−22XB28W1037−027−24E13
C6 W1037−057−22XB24W1037−023−24
W1037−048−22XB26W1037−025−24D11
W1037−070−22XB25W1037−024−24D3
COMPUTER
R EICAS
S52285
FIGURE 3. RIGHT EICAS COMPUTER - W1037 WIRE REMOVALS
July 6, 2000 SHEET 1 OF 3 767-31-0101
22

### Page 25

BOEING SERVICE BULLETIN 767-31-0101
ADDED WIRE OR NEW ROUTING
EXISTING WIRE
DELETED WIRE OR FORMER ROUTING
3 3
4
2
REFERENCE: 767 WIRING DIAGRAM 31−41−15
W1037−079−22
W1037−072−22
TB239
Z37
Z31
R EICAS
M10182
COMPUTER
TB239
J1 W1037−050−22 XD22W1037−041−24
D883E
D883F
D8 W1037−059−22 XB22W1037−021−24
W1037−047−22XB23
XA30
XA29
W1037−022−24
W1037−019−24
W1037−018−24
D883B
C9
F6
F10
S52301
FIGURE 3. RIGHT EICAS COMPUTER - W1037 WIRE REMOVALS
July 6, 2000 SHEET 2 OF 3 767-31-0101
23

### Page 26

BOEING SERVICE BULLETIN 767-31-0101
DELETED WIRE OR FORMER ROUTING
EXISTING WIRE
ADDED WIRE OR NEW ROUTING
5
W1037−097−24
W1037−098−24
W1037−096−24
W1037−086−24
D883E
D9
J7
H7
G12
TB239
R EICAS COMPUTER
M10182
D883F
D883D
Z38
REFERENCE: 767 WIRING DIAGRAM 31−41−18
S52300
The flag note numbers shown below agree with the numbers shown in the flag symbols in the figure. The
QTY numbers shown below are the number of parts necessary for the right EICAS computer on one
airplane.
FLAG
NOTE NAME PART NUMBER QTY NOTES
1 - - - Wires become spare. No action necessary.
2 Wire - - Delete, if installed, no matter where wires
are currently terminated.
3 Terminal Block
Contact
M39029/11-145 2 BSWPM 20-90-11
4 Wire BMS 13-48, Type
10, Class 1, AWG 22
1 Install or connect wire if not installed. Cut
and code new wire, if necessary, as given in
your own procedures. Identify the new wire
as given in BSWPM 20-10-11.
5 Sleeving RT876, 1/8 inch
diameter, 3 inches
- Tape and stow wire, if installed near TB239.
BSWPM 20-30-11 and 20-10-14.
Lacing Tape BMS 13-54, Type 3,
Class 1, Grade B,
Finish C.
- Color White - BSWPM 20-10-11.
FIGURE 3. RIGHT EICAS COMPUTER - W1037 WIRE REMOVALS
July 6, 2000 SHEET 3 OF 3 767-31-0101
24

### Page 27

BOEING SERVICE BULLETIN 767-31-0101
DARK AREA REPRESENTS THE POST
654321
LEFT POST RIGHT POST
CENTER POST
S52303
CODE
NUMBER
RECEPTACLE SHELL PLUG SHELL Refer to BSWPM
20-71-14 for
connector keying
change.
Left Post Center
Post
Right
Post
Left Post Center
Post
Right
Post
63 2 3 2 3 2 3
FIGURE 4. EICAS COMPUTER S242N701-1001 CONNECTOR KEYING CHANGE
July 6, 2000 SHEET 1 OF 1 767-31-0101
25

### Page 28

BOEING SERVICE BULLETIN 767-31-0101
1FWD
MAIN EQUIPMENT CENTER
S52305
CAUTION: USE THE PRECAUTIONS FOR ELECTROSTATIC DISCHARGE ON THE EICAS
COMPUTERS AS GIVEN IN 767 AMM 20-41-01. ELECTROSTATIC DISCHARGE CAN
CAUSE DAMAGE TO THE EICAS COMPUTERS.
The step number shown below agrees with the number shown in the circle symbol in the figure. The
QTY numbers shown below are the number of parts necessary for one airplane.
STEP TASK NAME PART NUMBER QTY NOTES
1 Install EICAS Computer S242N701-1001 2 767 AMM 31-41-02.
FIGURE 5. EICAS COMPUTER INSTALLATION
July 6, 2000 SHEET 1 OF 1 767-31-0101
26

### Page 29

BOEING SERVICE BULLETIN 767-31-0101
APPENDIX A. OPC PART NUMBER BY CUSTOMER EFFECTIVITY
Service Bulletin Effectivity L Prog Pins Supl Pin OPC S/W P/N Diskette Set P/N
767-31-0101 (Group 1)
VA002-VA020 8C250302 2000 3104-BCG-006-E3 242T7001-2023
VA701-VA707 8C2900A2 0000 310C-BCG-006-F8 242T7001-2038
VA708-VA710 8C2940A3 0000 3101-BCG-006-G4 242T7001-2044
VA711-VA719 8C2942A2 0000 3100-BCG-006-G5 242T7001-2045
VA801-VA810 8C250BE2 0000 3102-BCG-006-E5 242T7001-2025
VB001-VB002 8C2903AB 0000 310D-BCG-006-F9 242T7001-2039
VB201-VB202 8C2900A2 0000 310C-BCG-006-F8 242T7001-2038
VB281-VB282 8C290932 0000 3105-BCG-006-G0 242T7001-2040
VB301-VB302 8C250323 0000 3103-BCG-006-E4 242T7001-2024
VB371-VB373 8C2103AA 0000 310A-BCG-00M-21 242T7001-2181
VE021-VE023 TBD TBD TBD TBD
VK001-VK011 8C2143AB 0000 3104-BCG-006-D2 242T7001-2012
VK021-VK022 8C2143AB 0000 3104-BCG-006-D2 242T7001-2012
767-31-0101 (Group 2)
VA001 4A211182 0000 3179-BCG-00M-A1 242T7001-2228
VB283-VB284 4A294B32 0000 310A-BCG-006-H0 242T7001-2050
VE001-VE002 4A294322 0000 3103-BCG-006-G6 242T7001-2046
VE061-VE063 4A296BA3 A000 310D-BCG-006-H7 242T7001-2057
VE064-VE065 4A216BA2 0000 310F-BCG-006-D9 242T7001-2019
VE066-VE068 4A296BA3 A000 310D-BCG-006-H7 242T7001-2057
VE069 4A296BA3 E000 3102-BCG-006-H8 242T7001-2058
VE083-VE084 4A216BA2 0000 310F-BCG-006-D9 242T7001-2019
767-31-0101 (Group 3)
VE041 TBD TBD TBD TBD
NOTE: To be determined (TBD) is shown if Boeing did not receive program pin confirmation. If TBD is shown,
supply the PROG PINS and SUPL PIN data to The Boeing Company to get the correct OPC software part
number and diskette set part number.
APPENDIX A. OPC PART NUMBER BY CUSTOMER EFFECTIVITY
July 6, 2000 767-31-0101
Page A1 of 1

### Page 30

(No text on this page.)

### Page 31

BOEING SERVICE BULLETIN 767-31-0101
APPENDIX B. SERVICE BULLETIN GROUP TO PROGRAM PINS - LEFT EICAS COMPUTER
SERVICE
BULLETIN
GROUP
PROGRAM
PINS
1 8C22
2 4A22
3 CE22
APPENDIX B. SERVICE BULLETIN GROUP TO PROGRAM PINS - LEFT EICAS COMPUTER
July 6, 2000 767-31-0101
Page B1 of 1

### Page 32

(No text on this page.)

### Page 33

BOEING SERVICE BULLETIN 767-31-0101
APPENDIX C. SERVICE BULLETIN GROUP TO PROGRAM PINS - RIGHT EICAS COMPUTER
SERVICE
BULLETIN
GROUP
PROGRAM
PINS
1 8423
2 4223
3 C623
APPENDIX C. SERVICE BULLETIN GROUP TO PROGRAM PINS - RIGHT EICAS COMPUTER
July 6, 2000 767-31-0101
Page C1 of 1

### Page 34

(No text on this page.)

### Page 35

Commercial
Airplane
Group
767
Service Bulletin
Number: 767-31-0101 Evaluation FormDate: July 6, 2000
ATA System: 3141
Prepared By: JTS
SUBJECT: INDICATING/RECORDING SYSTEMS - Central Computers - Engine Indication And Crew
Alerting System - EICAS Computer Replacement And Wire Change - Pratt And Whitney
JT9D-( ) Engines
Use this evaluation form to tell us what you think of the quality of this service bulletin. We will use the data
that you give us to improve the quality of our service bulletins.
NOTE: Please do not use this evaluation form to tell us to make changes to your manuals. To make these
changes, please use a Publication Change Request (PCR) form.
Please give us this data:
(If necessary, please use the other side. Thank you for the time you used to give us your comments.)
OPERATOR: TODAY'S DATE:
PREPARED BY: TITLE:
ORGANIZATION: TELEX CODE:
TELEPHONE NUMBER: BASE:
Please rate the quality of this service bulletin: (good) 4321 (poor)
Please rate the quality of the illustrations: (good) 4321 (poor)
Will you do the change given by this service bulletin? Yes No If not, please explain:
Is this service bulletin easy to understand? Yes No If not, please explain:
Is this service bulletin easy to use? Yes No If not, please explain:
Are the Planning Information, Material Information, and
Accomplishment Instructions accurate? Yes No If not, please explain:
Is the Manpower estimate accurate? Yes No If not, please explain:
Give the completed evaluation form to your Boeing Field Service Representative or send the evaluation form
directly to this address:
Manager
Service Bulletin Engineering
Boeing Commercial Airplane Group
P.O. Box 3707, Mail Stop 2H-37
Seattle, WA 98124-2207

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
