# Boeing Service Bulletin 767-57-0068: Revision 1

- Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2010-0957; AD 2011-12-11 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Boeing Service Bulletin 767-57-0068](https://openairdocs.org/service-documents/boeing/sb-767-57-0068.md)
- Title as filed: U.S. DOT/FAA - Service Bulletin (SB-767-57-0068-00)
- Pages: 19
- PDF: https://openairdocs.org/files/sha256/29/0d/290d0d60bf87520fc9a3756a80488e4b78a8c9b37676dc33631d32154c835625
- Page: https://openairdocs.org/service-documents/boeing/sb-767-57-0068/file/290d0d60bf87

## Text

Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Commercial
Airplane
Group
767
Service Bulletin
Number: 767-57-0068 SummaryDate: September 16, 1999
ATA System: 5740 2781 2811
SUBJECT: WINGS - Leading Edge and Leading Edge Devices - Slat Track Housing Electrostatic Bond
Rework
CONCURRENT REQUIREMENTS
None
BACKGROUND
Accomplishment of this service bulletin will provide
an improved electrostatic bond path for the number
5 and 8 inboard slat track housing drain tube
assemblies.
A production change (PRRB12900-133) was
incorporated at Boeing to install a new slat track
housing drain tube assembly for the number 5 and 8
inboard slat track. The purpose of this change was
to prevent possible fuel leaks at these locations.
After production incorporation of the new drain tube
assemblies, Boeing determined that the installation
did not meet current required bonding specifications.
Incorporation of this service bulletin will ensure
proper bonding of the number 5 and 8 inboard slat
track drain tube assemblies.
ACTION (PRRB13024)
Open the main tank and dry bay access panels.
Remove the bonding jumper assembly from the
number 5 and 8 inboard slat track housing drain
tube installations. Remove and replace the
fasteners common to drain tube doubler assembly.
Install bonding jumper brackets to the rib stiffeners.
Install bonding jumpers between the drain tube
assemblies and the brackets installed on the rib
stiffeners. Close the main tank and dry bay access
panels.
EFFECTIVITY
All 767 airplanes line numbers 672 through 757.
COMPLIANCE
Boeing recommends this service bulletin be
completed within 5000 flight-cycles or 22 months,
whichever is earlier from the release date of this
service bulletin.
INDUSTRY SUPPORT INFORMATION
Boeing warranty remedies are available for
airplanes in warranty as of September 29, 1998.
Please refer to Paragraph 2.B., Industry Support
Information.
MANPOWER
Total Elapsed Time
Per Airplane Man-Hours (Hours)
25 7.5
MATERIAL INFORMATION
Boeing Supplied Kits/Parts
Refer to Paragraph 2.A., Material - Price and
Availability.
767-57-0068
Summary Page 1 of 2

### Page 2

BOEING SERVICE BULLETIN 767-57-0068
RIB NO. 9
WING LOWER
SKIN
HOUSING
SLAT TRACK
FRONT SPAR
A
ASEE
DOUBLER ASSEMBLY
TO THE DRAIN TUBE
THE FASTENERS COMMON
REMOVE AND REPLACE
REMOVE AND REPLACE EXISTING
BONDING JUMPER AND CLAMPS
INSTALL NEW BONDING
JUMPER AND BRACKET
FWD INBD
UP
S96564
September 16, 1999 767-57-0068
Summary Page 2 of 2

### Page 3

Commercial
Airplane
Group
767
Service Bulletin
Number: 767-57-0068
Date: September 16, 1999
ATA System: 5740 2781 2811
SUBJECT: WINGS - Leading Edge and Leading Edge Devices - Slat Track Housing Electrostatic Bond
Rework
1. PLANNING INFORMATION
A. Effectivity
1. Airplanes
Refer to Service Bulletin Index Document D624T001, Part 3 for Airplane Variable Number, Line
Number, and Serial Number data.
This service bulletin is for the airplanes shown below. An equivalent change is on subsequent
production airplanes. Refer to PRRB13024 for data about this change.
Airplane Models:
767-300 767-300F
IDENTIFICATION BY CUSTOMER, CUSTOMER CODE, GROUP AND VARIABLE NUMBER
AEROMEXICO (AMX)
VS211
AIR DO (HIA)
VS176
AIR MADAGASCAR (MAD)
VS316
AIR NEW ZEALAND (ANZ)
VN658
AIR 2000 (ATZ)
VS216
ALITALIA (ALI)
VS366-VS367 VS401
ALL NIPPON AIRWAYS (ANA)
VR401
AMERICAN AIRLINES (AAL)
VS196-VS203
ASIANA AIRLINES (AAR)
VR426
September 16, 1999 767-57-0068
Page 1 of 16

### Page 4

BOEING SERVICE BULLETIN 767-57-0068
BOEING (TBC)
VY999
BRITANNIA AIRWAYS (BRI)
VS051-VS054
BRITISH AIRWAYS (BAB)
VS246-VS248
CITY BIRD (CBD)
VS177
DELTA AIR LINES (DAL)
VN274-VN276 VR471-VR472 VS066-VS070 VS073-VS078 VS266-VS272
ETHIOPIAN AIRLINES (ETH)
VS306
JAPAN AIRLINES (JAL)
VK016 VK186 VR461
KLM - ROYAL DUTCH AIRLINES (KLM)
VS136
LAN PERU (LPU)
VN970
LANCHILE AIRLINES (LAN)
VR251 VS131-VS133
LAPA ARGENTINA (LAZ)
VS111
LAUDA AIR (LAL)
VS301
LTU (LTU)
VS061
QANTAS (QAN)
VS186-VS187
SHANGHAI AIRLINES (SHA)
VR421
SKYMARK AIRLINES (SKM)
VS261-VS262
TWA (TWA)
VS206-VS207
UNITED AIRLINES (UAL)
VS091-VS096
UPS (UPS)
VR201-VR207 VW719-VW721
September 16, 1999 767-57-0068
2

### Page 5

BOEING SERVICE BULLETIN 767-57-0068
IDENTIFICATION BY VARIABLE NUMBER
VK016 VK186 VN274-VN276 VN658 VN970 VR201-VR207
VR251 VR401 VR421 VR426 VR461 VR471-VR472
VS051-VS054 VS061 VS066-VS070 VS073-VS078 VS091-VS096 VS111
VS131-VS133 VS136 VS176-VS177 VS186-VS187 VS196-VS203 VS206-VS207
VS211 VS216 VS246-VS248 VS261-VS262 VS266-VS272 VS301
VS306 VS316 VS366-VS367 VS401 VW719-VW721 VY999
2. Spares Affected
None
September 16, 1999 767-57-0068
3

### Page 6

BOEING SERVICE BULLETIN 767-57-0068
B. Concurrent Requirements
None
C. Reason
Accomplishment of this service bulletin will provide an improved electrostatic bond path for the
number 5 and 8 inboard slat track housing drain tube assemblies.
A production change (PRRB12900-133) was incorporated at Boeing to install a new slat track
housing drain tube assembly for the number 5 and 8 inboard slat track. The purpose of this change
was to prevent possible fuel leaks at these locations. After production incorporation of the new drain
tube assemblies, Boeing determined that the installation did not meet current required bonding
specifications.
Incorporation of this service bulletin will ensure proper bonding of the number 5 and 8 inboard slat
track drain tube assemblies.
D. Description
Open the main tank and dry bay access panels. Remove the bonding jumper assembly from the
number 5 and 8 inboard slat track housing drain tube installations. Remove and replace the
fasteners common to drain tube doubler assembly. Install bonding jumper brackets to the rib
stiffeners. Install bonding jumpers between the drain tube assemblies and the brackets installed on
the rib stiffeners. Close the main tank and dry bay access panels.
An evaluation form is attached to this service bulletin. Please use this form to tell us what you think
of the quality of this service bulletin.
E. Compliance
Boeing recommends this service bulletin be completed within 5000 flight-cycles or 22 months,
whichever is earlier from the release date of this service bulletin.
F. Approval
This service bulletin was examined by the Federal Aviation Administration (FAA). The changes
specified in this service bulletin comply with the applicable Federal Aviation Regulations (FAR) and
are FAA approved. This service bulletin and the FAA approval were based on the airplane in its
original Boeing delivery configuration or as modified by other FAA approved Boeing changes.
If an airplane has a non-Boeing modification or repair that affects a component or system also
affected by this service bulletin, the operator is responsible for obtaining appropriate regulatory
agency approval before incorporating this service bulletin.
September 16, 1999 767-57-0068
4

### Page 7

BOEING SERVICE BULLETIN 767-57-0068
G. Manpower
The table below shows an estimate of the man-hours necessary to do this change for each airplane.
This estimate is for direct labor only, done by an experienced crew. Adjust the estimate with operator
man-hour data if necessary. The estimate does not include lost time. These are some examples of
lost time:
- Time to adjust to the workplace
- Time to schedule the work
- Time to examine the work
- Time to cure the materials
- Time to make the parts
- Time to find the tools.
Task Number of Persons Man-Hours Elapsed Time (Hours)
Open Main Tank and
Dry Bay Access Panels
4 13 3.25
Remove and Install
Bonding Assembly
2 2 1
Close Main Tank
Access Panels / Refuel
4 7 1.75
Perform Leak Check 2 2 1
Close Dry Bay Access
Panels
2 1 .5
TOTAL FOR EACH AIRPLANE 25 7.5
H. Weight and Balance Changes
Change in Weight Change in Moment
Airplane (Pounds) (Pound-Inches)
+ 0.4 lbs + 364.0 lb-in
I. Electrical Load Data
Not changed
September 16, 1999 767-57-0068
5

### Page 8

BOEING SERVICE BULLETIN 767-57-0068
J. References
1. Existing Data:
a. Engineering Change Memo PRRB13024
b. 767 Maintenance Manual (AMM) Subject 12-11-01, 28-11-00 and 28-26-00
c. Boeing Standard Wiring Practices Manual (BSWPM) 20-20-00
d. Boeing Standard Overhaul Practices Manual (BSOPM) 20-11-03, 20-41-02, 20-43-03, and
20-50-19
2. Data supplied with this service bulletin:
None
3. Installation Drawings Used in the Preparation of This Service Bulletin:
Drawing Number Title
112T2019 Drain Tube Installation
112T5090 Rib Installation
These drawings were used to prepare this service bulletin. These drawings are not necessary to
make the specified changes, and are not supplied with this service bulletin. These drawings may
not be applicable to all airplane configurations or operators.
K. Publications Changed
Publication Chapter-Section
767 Illustrated Parts Catalog 57-40
767 Maintenance Manual 12-21, 28-11
L. Interchangeability and Intermixability of Parts
None
September 16, 1999 767-57-0068
6

### Page 9

BOEING SERVICE BULLETIN 767-57-0068
2. MATERIAL INFORMATION
A. Material - Price and Availability
Boeing can supply the kits shown in Paragraph 2.C., Parts Necessary For Each Airplane, as shown
below. If there is a limit in the quantity (QTY) of kits, a supply sequence is given by Spares.
Unit Price thru
Kit Number Name Date QTY Jan 31/00
015T1623-1 Top Kit Nov 9/99 87 $ 322.00
The kits are subject to the terms and conditions of the Boeing standard purchase order
acknowledgment. After the Unit Price date, new price data is applicable. Prices are in United States
dollars. Terms: Net 30 days.
Send purchase orders and letters about the supply data to the Director of Spares and refer to this
service bulletin number.
B. Industry Support Information
Boeing warranty remedies are available for 767 airplanes in warranty as of September 29, 1998. For
man-hour reimbursement for airplanes in warranty as of that date, send a warranty claim to Boeing
Product Assurance Contracts. The kits for airplanes in warranty as of that date will be supplied at no
charge. Send a purchase order for the kits to Boeing Spares. Please refer to this service bulletin
number and reference the airplane variable number in your purchase order.
C. Parts Necessary For Each Airplane
1. Kits:
To get the kits shown below, refer to Paragraph 2.A., Material - Price and Availability.
NOTE: One top kit and the items shown in Paragraph 2.C.2., Parts and Materials Supplied by the
Operator, are necessary for each airplane.
015T1623 TOP KIT - SLAT TRACK HOUSING ELECTROSTATIC
BONDING
-2 -1
Quantity Part Number Name
. - 015T1623-1 Top Kit
- 2 015T1623-2 Sub Kit
1 . 287T0020-325 Bracket
12 . BACB30FP6A4 Bolt
12 . BACC30M6 Collar
1 . BACJ40AC44-6 Jumper
1 . BACJ40AC44-8 Jumper
2 . BACN10YR3CD Nut
1 . BACN10YR3CM Nut
4 . BACR15FT6AD6 Rivet
1 . BACS12GU3K8 Screw
1 . BACS12GU3K9 Screw
September 16, 1999 767-57-0068
7

### Page 10

BOEING SERVICE BULLETIN 767-57-0068
(Continued)
015T1623 TOP KIT - SLAT TRACK HOUSING ELECTROSTATIC
BONDING
-2 -1
Quantity Part Number Name
4 . NAS1149C0316R Washer
2 . NAS1149C0363R Washer
5 . NAS1149D0316H Washer
2 . NAS1149D0363H Washer
1 . AN735C8 Clamp,
1 . AN735DC8 Clamp,
(a) The kit has more parts than are necessary for installation. Discard
parts that are not used or keep the parts for spares.
(c) If grip length shown is not available at Boeing, fasteners supplied in
kits may be one grip length longer than indicated.
2. Parts and Materials Supplied by the Operator:
QTY Part Number {Specification} Name
8 ounces BMS 10-20 Type II (a) Primer
8 ounces BMS 5-45 Class C (a) Sealant
(a) See the Qualified Products List at the end of the Boeing Material
Specification (BMS) for supplier data.
D. Parts Necessary to Change Spares
None
E. Existing Parts Accountability
None
F. Special Tooling - Price and Availability
None
G. Special Tooling Necessary to do this Service Bulletin
No special tools or equipment are necessary to do the change in this service bulletin. But,
maintenance and overhaul tools in the manuals given in Paragraph 1.J., References, can be
necessary. Examine operator tool supply to make sure all necessary tools are available.
September 16, 1999 767-57-0068
8

### Page 11

BOEING SERVICE BULLETIN 767-57-0068
3. ACCOMPLISHMENT INSTRUCTIONS
GENERAL NOTES
1. The paragraphs identified with a letter give the general work instructions and the necessary tests.
The instructions identified with numbers on the figures give the recommended sequence of steps.
2. Unless shown differently, these dimensions and tolerances are used:
- Linear dimensions are in inches
- Tolerance on linear dimensions, other than rivet and bolt edge margins, is plus or minus 0.03
inch
- Tolerance on rivet and bolt edge margin is plus or minus 0.05 inch
- Angular tolerance is plus or minus 2 degrees
- Hole dimensions for standard solid rivets are given in 767 Structural Repair Manual, Chapter 51
- Torque limits to tighten nuts and bolts are given in 767 Structural Repair Manual, Chapter 51.
3. Alternative fasteners are given in 767 Structural Repair Manual, Chapter 51.
4. Obey all of the warnings and cautions given in the specified manual sections.
5. As an alternative to the Boeing specified manuals, operators equivalent procedures can be used.
WORK INSTRUCTIONS
A. Defuel the main tanks as specified in 767 AMM 28-26-00.
B. Open the main tank and dry bay access panels listed below as specified in 767 AMM 28-11-00, to
access the number 5 and 8 inboard slat track housing drain tube assembly.
Panel Number Location
533AB Left Wing Dry Bay
633AB Right Wing Dry Bay
532FB Left Wing Main Tank
632FB Right Wing Main Tank
C. Replace the bonding jumper assembly for the number 5 and 8 inboard slat track housing drain
tube installation as shown in Figure 1.
D. Close the main tank access panels listed below as specified in 767 AMM 28-11-00.
Panel Number Location
532FB Left Wing Main Tank
632FB Right Wing Main Tank
September 16, 1999 767-57-0068
9

### Page 12

BOEING SERVICE BULLETIN 767-57-0068
E. Refuel the main tanks as specified in 767 AMM 12-11-01.
NOTE: A minimum of 4400 gallons of fuel is required in each wing tank to adequately check for
fuel leaks of the slat track drain tube assembly.
F. Perform a visual inspection of the number 5 and 8 inboard slat track housing drain tube opening,
located in the dry bay to make sure there are no fuel leaks.
G. Close the dry bay access panels listed below as specified in 767 AMM 28-11-00.
Panel Number Location
533AB Left Wing Dry Bay
633AB Right Wing Dry Bay
H. Put the airplane back to a serviceable condition.
September 16, 1999 767-57-0068
10

### Page 13

BOEING SERVICE BULLETIN 767-57-0068
FIGURE TABLE OF CONTENTS
Title Page
FIGURE 1. INBOARD SLAT TRACK DRAIN TUBE ELECTROSTATIC BOND
REWORK .................................................... 1 2
September 16, 1999 767-57-0068
11

### Page 14

BOEING SERVICE BULLETIN 767-57-0068
RIB NO. 9
WING LOWER
SKIN
HOUSING
SLAT TRACK
FRONT SPAR
DSEE
BSEE
A
ASEE
FWD INBD
UP
S96566
FIGURE 1. INBOARD SLAT TRACK DRAIN TUBE ELECTROSTATIC BOND REWORK
September 16, 1999 SHEET 1 OF 5 767-57-0068
12

### Page 15

BOEING SERVICE BULLETIN 767-57-0068
D
C1 2 3 4
7
5
A−A
HOSE
FLEX
B
DRAIN
TUBE
SEE C
FWD
UP
C
E
.90
+/−0.10
(12 LOCATIONS)
JUMPER (b)
BONDING
ASSEMBLY
DOUBLER BRACKET
(4 LOCATIONS)
FWD
A
A
FWD INBD
UP
+/−0.10
4.20
S96671
FIGURE 1. INBOARD SLAT TRACK DRAIN TUBE ELECTROSTATIC BOND REWORK
September 16, 1999 SHEET 2 OF 5 767-57-0068
13

### Page 16

BOEING SERVICE BULLETIN 767-57-0068
WASHER B
WASHER C
WASHER E
WASHER F
CLAMP A
JUMPER A
WASHER D
CLAMP B
BONDING JUMPER B
WASHER DWASHER A
JUMPER A
WASHER A
SCREW
NUT
BONDING
A
SCREW
B
BONDING 76 NUT
BONDING
D
ASSEMBLY
COUPLING
BONDING
76
S96762
FIGURE 1. INBOARD SLAT TRACK DRAIN TUBE ELECTROSTATIC BOND REWORK
September 16, 1999 SHEET 3 OF 5 767-57-0068
14

### Page 17

BOEING SERVICE BULLETIN 767-57-0068
The step numbers shown below agree with the numbers shown in the circle symbols in the figure.
The QTY numbers shown below are the numbers of parts necessary for one side of the airplane.
STEP TASK NAME PART NUMBER QTY NOTES
1 Remove /
Discard
Fasteners --- 12 from the doubler assembly by alternating
fastener removal, removing and installing
only 6 fasteners at a time. Alternating the
fastener removal and installation will
maintain the doubler assembly fuel seal
and prevent the potential of misalignment
during the drill and ream procedures.
2 Drill /
Ream
Holes 12 in the doubler assembly as indicated.
3 Install Fasteners --- 12 in the doubler assembly as indicated.
4 Apply Fillet Seal BMS 5-45 - to both ends of the (12) fasteners installed
in the doubler assembly. Refer to BSOPM
20-50-19.Class B
5 Install Bracket 287T0020-325 1 to the rib 9 stiffener as indicated. Refer to
BSOPM 20-11-03 and BSWPM 20-20-00
for bonding requirements.Fasteners --- 4
6 Remove /
Discard
Bonding Clamp AN735D8 2
Bonding Jumper BACJ40A20-6 1
Fasteners --- 2
7 Install Bonding
Clamp
"A" AN735DC8 1 Designated (electrostatic) bond path.
Prepare fay surface bond and install parts
per BSWPM 20-20-00, except fillet seal
bonding clamps with BMS 5-45, Class B.
Refer to BSOPM 20-50-19. Ensure entire
bond surface is free of finish. Use cleaning
procedure 1, 2 or 3 as applicable if finish is
present or cleaning procedure 5 if surface
is bare. Refer to BSWPM 20-20-00. Apply
alodine 600 and BMS 10-20, Type II to any
bare metal areas remaining after the
bonding clamps and fillet seal is installed.
Refer to BSOPM 20-43-03 and 20-41-02.
Reference Note (a) for bonding jumper "A"
and "B" installation sequence. Verify
resistance does not exceed .010 OHMS.
Measure the resistance from the rib 9
stiffener at least .25 inches away from the
bonding bracket to the slat track drain can
at least .25 inches away from the bonding
jumper attachment. Refer to BSWPM
20-20-00 and BSOPM 20-11-03.
Bonding
Clamp
"B" AN735C8 1
Bonding
Jumper
"A" BACJ40AC44-6 1
Bonding
Jumper
"B" BACJ40AC44-8 1
Fasteners --- 3
(a) Install bonding jumper "A" with the terminal end marked by a red band to bonding clamp "B" and
connect the terminal end marked with a blue band to bonding clamp "A". Install bonding jumper
"B" with the terminal end marked by a red band to the bracket installed on the rib 9 stiffener and
connect the terminal end marked with a blue band to bonding clamp "A".
FIGURE 1. INBOARD SLAT TRACK DRAIN TUBE ELECTROSTATIC BOND REWORK
September 16, 1999 SHEET 4 OF 5 767-57-0068
15

### Page 18

BOEING SERVICE BULLETIN 767-57-0068
The codes shown below agree with the letter shown in the upper left corner of the fastener symbols in the
figure. A number in the lower right corner gives the grip length of the fastener.
COUNTERSINK
(OPTIONAL)EXAMPLE OF FASTENER CODE LENGTH/GRIP
FASTENER
7
6F
(OPTIONAL)
DIAMETER
FASTENER
(OPTIONAL)
F = FAR SIDE
N = NEAR SIDE
HEAD LOCATIONLETTER CODE
D
C
B53324
CODE NAME PART NUMBER HOLE DIA NOTES
A Screw BACS12GU3K8 ---
Washer "A" NAS1149D0316H
Washer "B" NAS1149D0363H
Washer "C" NAS1149D0316H Use two washers if and as required to
prevent crushing of drain tube.
Nut BACN10YR3CD
B Screw BACS12GU3K9 ---
Washer "D" NAS1149C0316R
Washer "E" NAS1149C0363R
Washer "F" NAS1149C0316R Use two washers if and as required to
prevent crushing of drain tube.
Nut BACN10YR3CM
C Bolt BACB30FP6A4 0.1991 - 0.2011
Collar BACC30M6
D Rivet BACR15FT6AD6 0.191 - 0.202
E Washer NAS1149D0316H ---
Nut BACN10YR3CD
FIGURE 1. INBOARD SLAT TRACK DRAIN TUBE ELECTROSTATIC BOND REWORK
September 16, 1999 SHEET 5 OF 5 767-57-0068
16

### Page 19

Commercial
Airplane
Group
767
Service Bulletin
Number: 767-57-0068 Evaluation FormDate: September 16, 1999
ATA System: 5740 2781 2811
Prepared By: Robert Mehring
SUBJECT: WINGS - Leading Edge and Leading Edge Devices - Slat Track Housing Electrostatic Bond
Rework
Use this evaluation form to tell us what you think of the quality of this service bulletin. We will use the data
that you give us to improve the quality of our service bulletins.
NOTE: Please do not use this evaluation form to tell us to make changes to your manuals. To make these
changes, please use a Publication Change Request (PCR) form.
Please give us this data:
(If necessary, please use the other side. Thank you for the time you used to give us your comments.)
OPERATOR: TODAY'S DATE:
PREPARED BY: TITLE:
ORGANIZATION: TELEX CODE:
TELEPHONE NUMBER: BASE:
Please rate the quality of this service bulletin: (good) 4321 (poor)
Please rate the quality of the illustrations: (good) 4321 (poor)
Will you do the change given by this service bulletin? Yes No If not, please explain:
Is this service bulletin easy to understand? Yes No If not, please explain:
Is this service bulletin easy to use? Yes No If not, please explain:
Are the Planning Information, Material Information, and
Accomplishment Instructions accurate? Yes No If not, please explain:
Is the Manpower estimate accurate? Yes No If not, please explain:
Give the completed evaluation form to your Boeing Field Service Representative or send the evaluation form
directly to this address:
Manager
Service Bulletin Engineering
Boeing Commercial Airplane Group
P.O. Box 3707, Mail Stop 2H-37
Seattle, WA 98124-2207

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.