# Boeing Service Bulletin 777-24-0075: Boeing - Service Bulletin

- Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2013-0368; AD 2014-11-01 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Boeing Service Bulletin 777-24-0075](https://openairdocs.org/service-documents/boeing/sb-777-24-0075.md)
- Title as filed: Boeing - Service Bulletin
- Pages: 125
- PDF: https://openairdocs.org/files/sha256/0a/4b/0a4bd23e2da7097b55ed39a2ded54d4932b24e556cf57d7fc34004073e24aa84
- Page: https://openairdocs.org/service-documents/boeing/sb-777-24-0075/file/0a4bd23e2da7

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Commercial 
Airplanes
777
Service Bulletin
Number: 777-24-0075
Original Issue: August 21, 2003
Revision 3: August 26, 2010
ATA System: 2400
SUBJECT: ELECTRICAL POWER - General - Install the Passenger Compartment Electrical Power
Isolation Switches (Complete)
Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15
CFR 730-774). An export license may be required before it is used for development, production or use by foreign
persons from specific countries. The controller of this data has the individual responsibility to abide by all export
laws.
9E991ECCN:
BOEING PROPRIETARY, CONFIDENTIAL, AND/OR TRADE SECRET
Copyright © 2003 The Boeing Company
Unpublished Work - All Rights Reserved
Boeing claims copyright in each page of this document only to the extent that the page contains copyrightable
subject matter. Boeing also claims copyright in this document as a compilation and/or collective work.
This document includes proprietary information owned by The Boeing Company and/or one or more third parties.
Treatment of the document and the information it contains is governed by contract with Boeing. For more
information, contact The Boeing Company, P.O. Box 3707, Seattle, Washington 98124.
Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner,
BBJ, DC-8, DC-9, DC-10, KC-10, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8A, Poseidon and the
Boeing livery are all trademarks owned by The Boeing Company; and no trademark license is granted in
connection with this document unless provided in writing by Boeing.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 21, 2003
777-24-0075Revision 3: August 26, 2010
1 of 125
2.0

### Page 2

BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 21, 2003
777-24-0075Revision 3: August 26, 2010
2 of 125
BOEING SERVICE BULLETIN 777-24-0075
BLANK PAGE

### Page 3

Table of Contents
Revision Transmittal Sheet ............................................ 5
Summary ...................................................... 7
1. PLANNING INFORMATION ........................................ 1 1
A. Effectivity ............................................... 1 1
1. Airplanes ............................................ 1 1
2. Spares Affected ........................................ 1 3
B. Concurrent Requirements ...................................... 1 3
C. Reason ................................................ 1 6
D. Description .............................................. 1 7
E. Compliance .............................................. 1 9
F. Approval ............................................... 2 0
G. Manpower .............................................. 2 0
H. Weight and Balance Changes .................................... 2 2
I. Electrical Load Data ......................................... 2 2
J. References .............................................. 2 3
1. Existing Data: ......................................... 2 3
2. Data supplied with this Service Bulletin: ........................... 2 4
3. Installation Drawings Used in the Preparation of this Service Bulletin: ........... 2 4
K. Publications Affected ........................................ 2 4
L. Interchangeability and Intermixability of Parts ........................... 2 5
2. MATERIAL INFORMATION ........................................ 2 7
A. Material - Price and Availability ................................... 2 7
B. Industry Support Information .................................... 2 8
C. Parts Necessary For Each Airplane ................................. 2 8
1. Kits/Parts: ........................................... 2 8
2. Parts and Materials Supplied by the Operator: ........................ 3 6
3. Parts Modified and Reidentified: ............................... 3 6
4. Parts Removed and Not Replaced: .............................. 3 6
D. Parts Necessary to Change Spares ................................. 3 6
E. Special Tooling - Price and Availability ............................... 3 6
F. Special Tooling Necessary to do this Service Bulletin ....................... 3 6
3. ACCOMPLISHMENT INSTRUCTIONS .................................. 3 7
A. GENERAL INFORMATION ..................................... 3 7
B. WORK INSTRUCTIONS ....................................... 3 7
FIGURE 1: CHANGE THE AIRPLANE WIRING - GROUP 1 ....................... 5 3
FIGURE 2: CHANGE THE AIRPLANE WIRING - GROUP 2 ....................... 5 7
FIGURE 3: CHANGE THE AIRPLANE WIRING - GROUP 3 ....................... 6 2
FIGURE 4: CHANGE THE AIRPLANE WIRING - GROUP 4 ....................... 6 7
FIGURE 5: CHANGE THE AIRPLANE WIRING - GROUP 5 ....................... 7 2
FIGURE 6: CHANGE THE AIRPLANE WIRING - GROUP 6 ....................... 7 7
FIGURE 7: CHANGE THE AIRPLANE WIRING - GROUP 7 ....................... 8 2
FIGURE 8: CHANGE THE AIRPLANE WIRING - GROUP 8 ....................... 9 1
FIGURE 9: AIRPLANE WIRE ROUTING - ALL GROUPS ........................ 9 6
FIGURE 10: SUPPLEMENTAL AIRPLANE WIRE ROUTING - GROUPS 2 THRU 8 AND 10 ..... 1 0 2
FIGURE 11: P101 PANEL WIRE ROUTING - GROUP 6 ......................... 1 1 1
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 21, 2003
777-24-0075Revision 3: August 26, 2010
3 of 125
BOEING SERVICE BULLETIN 777-24-0075

### Page 4

FIGURE 12: P101 PANEL WIRE ROUTING - GROUP 7 ......................... 1 1 3
FIGURE 13: CHANGE THE AIRPLANE WIRING - GROUP 9 ...................... 1 1 5
FIGURE 14: CHANGE THE AIRPLANE WIRING - GROUP 10 ...................... 1 1 9
FIGURE 15: P101 PANEL WIRE ROUTING - GROUP 10 ........................ 1 2 4
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 21, 2003
777-24-0075Revision 3: August 26, 2010
4 of 125
BOEING SERVICE BULLETIN 777-24-0075

### Page 5

Commercial 
Airplanes
777
Service Bulletin
Revision Transmittal SheetNumber: 777-24-0075Original Issue: August 21, 2003
Revision 3: August 26, 2010
ATA System: 2400
SUBJECT: ELECTRICAL POWER - General - Install the Passenger Compartment Electrical Power
Isolation Switches (Complete)
This revision includes all pages of the service bulletin.
COMPLIANCE INFORMATION RELATED TO THIS REVISION
No more work is necessary on airplanes changed in accordance with the original issue, Revision 1 or Revision
2 of this service bulletin.
REASON FOR REVISION
This revision is sent to tell operators that airplanes WB614 and WB615 are moved from Group 6 to a new Group
10, to correct the configuration of the relay bracket in the P101 panel. Also, this revision adds the identification
tapes in the figures.
Terminology has been changed in the Work Instructions to agree with the terminology defined in Paragraph
3.A., General Information - Notes.
These sections were changed:
1. In Summary, Compliance and Paragraph 1.E., Compliance, added Federal Aviation Administration (FAA)
Airworthiness Directive (AD) data.
2. In Summary, Action and Paragraph 1.D., Description, added Group 10 data.
3. In Summary, Manpower, and paragraph 1.G., Manpower, added Group 10 manpower data.
4. In paragraph 1.B., Concurrent Requirements and Paragraph 3.B., Work Instructions, step 3, changed GE
Aviation service bulletin data.
5. In Paragraph 1.D., Description, added Affected Maintenance Zones table.
6. In Paragraph 1.H., Weight and Balance Changes, added Group 10 data.
7. In Paragraph 1.J.1., Existing Data, added reference data.
8. In Paragraph 1.K., Publications Affected , added drawing data.
9. In Paragraph 2., Material - Price and Availability, added Group 10 data.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 21, 2003
777-24-0075Revision 3: August 26, 2010
5 of 125

### Page 6

10. In Paragraph 2.C.2., Parts and Materials Supplied by the Operator, Parts and Materials Supplied by the
Operator table, added identification tape data and notes (b) and (c).
11. In Paragraph 3.B., Work Instructions, step 2 and 4, added Group 10 data.
12. In Figures 1 thru 8 and 13, flag note table, added flag notes for identification tapes.
13. In Figures 9 and 10, step table, added strap part numbers.
14. In Figure 10:
a. Added Group 10 applicability.
b. Sheet 7, added the text "TYPICAL".
15. In Figures 11 and 12, step table, added note (a).
16. Added new Figures 14 and 15 to do wiring changes for Group 10 airplanes.
The data given in Information Notice 777-24-0075 IN 02 is included in this revision.
Vertical lines are put on the left edge of each page, except in Paragraph 1.A., Effectivity, to show the location
of important changes.
Pages with no vertical lines have no important changes.
REVISION HISTORY
August 21, 2003Original Issue:
December 11, 2003Revision 1:
October 05, 2006Revision 2:
August 26, 2010Revision 3:
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 21, 2003
777-24-0075Revision 3: August 26, 2010
6 of 125
BOEING SERVICE BULLETIN 777-24-0075

### Page 7

Commercial 
Airplanes
777
Service Bulletin
SummaryNumber: 777-24-0075Original Issue: August 21, 2003
Revision 3: August 26, 2010
ATA System: 2400
SUBJECT: ELECTRICAL POWER - General - Install the Passenger Compartment Electrical Power
Isolation Switches (Complete)
CONCURRENT REQUIREMENTS
Refer to Paragraph 1.B., Concurrent Requirements.
BACKGROUND
The change described in this service bulletin will provide new switches on the flight deck than can remove power
from the cabin systems if smoke or flames occur. Smoke and flames in the passenger cabin can cause injury
to the passenger and damage the safety critical cabin equipments.
We have received numerous reports of smoke or flames in the passenger cabin related to the wiring for the
passenger cabin in-flight entertainment system, cabin lighting and passenger seats. It is not easy to remove the
electrical power to these systems to stop the smoke or flames.
Two switches can be installed to remove power from some of the passenger cabin electrical systems. When
selected OFF, the IFE/PASS SEATS switch will remove power from all the components of the IFE (in-flight
entertainment) system and the passenger seats (seat motor power, personal computer power outlets and
telephones).
When selected OFF, the CABIN/UTILITY switch will remove power from all the galleys, the ground service bus
(except the main and APU battery chargers and left forward fuel pump), the utility busses, the gasper air fan,
the fluorescent cabin lighting and the beacon, wing and logo lights. While the switch is off, the nights lights, the
supplemental nights lights, the reading lights, the attendant work lights and some of the galley and crew rest
lights will be turned on.
Boeing Service Related Problem (SRP) 777-SRP-24-0091 is related to this service bulletin.
ACTION (PRR 61887)
In the main equipment center, 15 new wires are routed from the P110 panel to the P210 panel. Three new wires
are routed from the P210 panel to the P320 panel. One new wire is routed from the P110 panel aft and up to
the P101 panel. For Group 6 and 10 airplanes only, one new relay and four new wires are installed in the P101
panel. For Group 7 airplanes only, two new relays and 10 new wires are installed in the P101 panel. The hardware
and software is changed in the P110 panel, P210 panel and P320 panel as specified in the GE Aviation service
bulletins. A test of the IFE/PASS SEATS and the CABIN UTILITY switches is done.
Refer to these GE Aviation service bulletins to determine specific applicability of the concurrent required GE
Aviation service bulletins. Use the revision level of the dated service bulletins or a later FAA approved revision.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 21, 2003
777-24-0075Revision 3: August 26, 2010
7 of 125

### Page 8

Power PanelRevision and DateGE Aviation Service Bul-
letin
Reference OnlyRev. 0, Dated July 04, 2003ELMS-24-AAL
Reference OnlyRev. 0, Dated July 04, 2003ELMS-24-AAR
Reference OnlyRev. 1, Dated February 23, 2004ELMS-24-AFA
Reference OnlyRev. 1, Dated February 25, 2004ELMS-24-ANA
Reference OnlyRev. 1, Dated February 19, 2004ELMS-24-BAB
Reference OnlyRev. 0, Dated July 04, 2003ELMS-24-BEJ
Reference OnlyRev. 0, Dated July 04, 2003ELMS-24-CAL
Reference OnlyRev. 1, Dated March 01, 2004ELMS-24-CAT
Reference OnlyRev. 0, Dated July 04, 2003ELMS-24-DAL
Reference OnlyRev. 1, Dated January 16, 2004ELMS-24-EAD
Reference OnlyRev. 1, Dated March 01, 2004ELMS-24-EGP
Reference OnlyRev. 1, Dated February 19, 2004ELMS-24-EIY
Reference OnlyRev. 0, Dated July 04, 2003ELMS-24-ELA
Reference OnlyRev. 1, Dated February 19, 2004ELMS-24-ILF
Reference OnlyRev. 1, Dated March 01, 2004ELMS-24-JAL
Reference OnlyRev. 3, Dated May 23, 2005ELMS-24-JAS
Reference OnlyRev. 1, Dated March 01, 2004ELMS-24-KAL
Reference OnlyRev. 0, Dated July 04, 2003ELMS-24-KUW
Reference OnlyRev. 1, Dated March 01, 2004ELMS-24-LAL
Reference OnlyRev. 1, Dated February 19, 2004ELMS-24-MAS
Reference OnlyRev. 0, Dated July 04, 2003ELMS-24-S160
Reference OnlyRev. 1, Dated February 23, 2004ELMS-24-SIA
Reference OnlyRev. 1, Dated February 19, 2004ELMS-24-SVA
Reference OnlyRev. 1, Dated May 24, 2004ELMS-24-SKL
Reference OnlyRev. 1, Dated March 01, 2004ELMS-24-TII
EFFECTIVITY
777-200/300 Airplanes. Refer to Paragraph 1.A.1., Airplanes, for the list of affected airplanes.
COMPLIANCE
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive (AD) related to this
service bulletin. The Airworthiness Directive will make the compliance tasks and times given in this service
bulletin mandatory.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 21, 2003
777-24-0075Revision 3: August 26, 2010
8 of 125
BOEING SERVICE BULLETIN 777-24-0075

### Page 9

Boeing recommends that this service bulletin be done within 60 months from the effective date of an applicable
Airworthiness Directive.
INDUSTRY SUPPORT INFORMATION
Boeing warranty remedies are not available for the configuration changes given in this service bulletin.
MANPOWER
Elapsed HoursTotal Task HoursAirplanes
17.034.0Groups 1 and 9
17.7535.5Group 2
17.535.0Group 3
17.535.0Group 4
17.2534.5Group 5
17.7535.5Groups 6 and 10
20.040.0Group 7
17.5035.0Group 8
The change to the P110, P210 and P320 panels as given in the GE Aviation service bulletins is not included.
Refer to the airplane specific service bulletins to get the man-hours necessary for each panel.
MATERIAL INFORMATION
Boeing Supplied Kits/Parts.
Refer to Paragraph 2.A., Material - Price and Availability.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 21, 2003
777-24-0075Revision 3: August 26, 2010
9 of 125
BOEING SERVICE BULLETIN 777-24-0075

### Page 10 (OCR)

BOEING SERVICE BULLETIN 777-24-0075
P101 PANEL  CHANGE THE P210 RIGHT  ROUTE THREE NEW WIRES
GROUP 6 AND 10 AIRPLANES  POWER MANAGEMENT PANEL  FROM THE P210 PANEL TO
-INSTALL ONE NEW RELAY AND  HARDWARE AND SOFTWARE  THE P320 PANEL
FOUR NEW WIRES  ROUTE ONE
GROUP 7 AIRPLANES  E1/E2 RACK  NEW WIRE
-INSTALL TWO NEW RELAYS  FROM THE
AND 10 NEW WIRES  P110 PANEL
TO THE P101
PANEL
SEE
FWD K
ROUTE 15 NEW WIRES
FROM THE P110 PANEL
TO THE P210 PANEL
MAIN EQUIPMENT CENTER
ACCESS DOOR, 117AL
DO A TEST OF THE IFE/PASS SEATS
AND CABIN UTILITY SWITCHES
CHANGE THE P320 GROUND
SERVICE HANDLING POWER
PANEL HARDWARE AND  CHANGE THE P110 LEFT
SOFTWARE  POWER MANAGEMENT PANEL
FWD  HARDWARE AND SOFTWARE
ELECTRICAL
BATTERY  APU
IFE/PASS  CABIN  ON  ON  START  MAIN EQUIPMENT CENTER
SEATS  UTILITY
ON  ON
OFF  OFF
ON  FAULT
OFF
L BUS TIE  R BUS TIE
AUTO  AUTO  SEE
ISLN  SECONDARY  PRIMARY
EXT PWR  EXT PWR
R
GEN  GEN
CTRL  CTRL
BACKUP GEN
OFF
FWD  OVERHEAD PANEL, P5
DRIVE DISC -
FLIGHT COMPARTMENT  W14812
Original Issue: August 21, 2003
Revision 3: August 26, 2010  777-24-0075
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.  10 of 125

### Page 11

Commercial 
Airplanes
777
Service Bulletin
Number: 777-24-0075
Original Issue: August 21, 2003
Revision 3: August 26, 2010
ATA System: 2400
SUBJECT: ELECTRICAL POWER - General - Install the Passenger Compartment Electrical Power
Isolation Switches (Complete)
1.    PLANNING INFORMATION
A. Effectivity
1. Airplanes
Refer to Service Bulletin Index Document D6-24W001 Part 3 for Airplane Variable Number, Line
Number, and Serial Number data.
This service bulletin is for the airplanes shown below. An equivalent change is on subsequent
production airplanes. Refer to PRR 61887 for data about this change.
DESCRIPTIONCONFIGURATIONGROUP
777-200/-300 airplanes with different wire changes using Top Kit
005W3198-3.
-1
777-200 airplanes with different wire changes using Top Kit
005W3198-6.
-2
777-200 airplanes with different wire changes using Top Kit
005W3198-7.
-3
777-200 airplanes with different wire changes using Top Kit
005W3198-8.
-4
777-200 airplanes with different wire changes using Top Kit
005W3198-9.
-5
777-200/-300 airplanes with different wire changes using Top Kit
005W3198-10.
-6
777-200 airplanes with different wire changes using Top Kit
005W3198-12.
-7
777-200 airplanes with different wire changes using Top Kit
005W3198-13.
-8
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 21, 2003
777-24-0075Revision 3: August 26, 2010
11 of 125

### Page 12

DESCRIPTIONCONFIGURATIONGROUP
777-200 airplanes with a different connector part number at D11042P.-9
777-300 airplanes with different wire changes using Top Kit
005W3198-10.
-10
Airplane Models:
777-200, 777-300
GroupVariable Number
1WA001
1WA101 - WA104
9WA210 - WA212
1WA221 - WA223
1WA231 - WA232
1WA241 - WA250
1WB016 - WB021
1WB031 - WB036
2WB037 - WB044
1WB105 - WB106
3WB133 - WB135
1WB151 - WB153
1WB161 - WB169
4WB170 - WB173
1WB181 - WB188
1WB231 - WB239
1WB271 - WB272
5WB276 - WB286
5WB291 - WB301
1WB306 - WB307
1WB311 - WB327
6WB336 - WB337
3WB366 - WB367
1WB371 - WB386
1WB406
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 21, 2003
777-24-0075Revision 3: August 26, 2010
12 of 125
BOEING SERVICE BULLETIN 777-24-0075

### Page 13

GroupVariable Number
1WB411 - WB413
1WB416 - WB433
1WB446 - WB447
7WB448 - WB452
1WB476
3WB481
8WB482 - WB484
9WB501 - WB507
9WB531 - WB535
3WB551 - WB554
9WB591 - WB595
9WB601 - WB606
6WB611 - WB613
10WB614 - WB615
9WB631 - WB632
9WB636 - WB637
1WC051 - WC067
3WC101 - WC103
1WC111
2. Spares Affected
None.
B. Concurrent Requirements
The service bulletin(s) listed below must be done before or at the same time as this service bulletin:
DescriptionService BulletinCompany
Changes the operation of the cabin lighting sys-
tem when the CABIN/UTILITY switch is installed.
777-23-0175 Original Issue thru
Revision 2
Boeing
Installs new switches on the flight deck that can
remove power from the cabin systems if smoke
or flames occur.
777-24-0074 Original Issue thru
Revision 1
Boeing
Changes the ELMS OPS and OPC software to
decrease the number of ELMS P110 Panel,
ELMS P210 Panel and ELMS P310 Panel EICAS
status messages.
777-24-0087 Original Issue thru
Revision 2
Boeing
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 21, 2003
777-24-0075Revision 3: August 26, 2010
13 of 125
BOEING SERVICE BULLETIN 777-24-0075

### Page 14

DescriptionService BulletinCompany
Changes the hardware and software for the
cabin services system (CSS), from version 1
(CSS v1) configuration to version 2 (CSS v2)
configuration. (a)
777-23-0142 Original IssueBoeing
(a) Airplanes WA221-WA222, WB151-WB153, WB161-WB164, WB181-WB183 only.
The GE Aviation service bulletins listed below must be done to complete this change. Use the revision
level of the dated service bulletins or a later FAA approved revision.
Power PanelRevision and DateGE Aviation Service Bul-
letin
P320Rev. 5, Dated April 28, 20064000ELM-24-435
P320Rev. 0, Dated April 15, 20034000ELM-24-556
P320Rev. 0, Dated May 09, 20034000ELM-24-619
P110Rev. 0, Dated April 11, 20035000ELM-24-450
P110Rev. 0, Dated April 11, 20035000ELM-24-454
P110Rev. 1, Dated June 30, 20065000ELM-24-477
P110Rev. 1, Dated December 21, 20055000ELM-24-516
P110Rev. 0, Dated April 15, 20035000ELM-24-554
P110Rev. 3, Dated June 30, 20065000ELM-24-558
P110Rev. 1, Dated March 03, 20055000ELM-24-562
P110Rev. 1, Dated May 31, 20055000ELM-24-564
P110Rev. 1, Dated June 01, 20055000ELM-24-565
P110Rev. 0, Dated May 09, 20035000ELM-24-617
P110Rev. 0, Dated April 22, 20035000ELM-24-451
P110Rev. 2, Dated December 12, 20055000ELM-24-514
P110Rev. 1, Dated April 19, 20055200ELM-24-563
P110Rev. 0, Dated April 24, 20035260ELM-24-557
P110Rev. 0, Dated May 06, 20035500ELM-24-464
P110Rev. 0, Dated April 22, 20035500ELM-24-466
P110Rev. 0, Dated July 07, 20035500ELM-24-487
P110Rev. 2, Dated December 20, 20055500ELM-24-488
P110Rev. 0, Dated April 11, 20035500ELM-24-489
P110Rev. 1, Dated February 23, 20055500ELM-24-490
P110Rev. 1, Dated December 7, 20055500ELM-24-547
P110Rev. 0, Dated April 15, 20035501ELM-24-548
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 21, 2003
777-24-0075Revision 3: August 26, 2010
14 of 125
BOEING SERVICE BULLETIN 777-24-0075

### Page 15

Power PanelRevision and DateGE Aviation Service Bul-
letin
P210Rev. 1, Dated June 12, 20066000ELM-24-461
P210Rev. 2, Dated November 25, 20056000ELM-24-459
P210Rev. 0, Dated April 15, 20036000ELM-24-555
P210Rev. 5, Dated May 4, 20066000ELM-24-567
P210Rev. 5, Dated January 23, 20066000ELM-24-571
P210Rev. 2, Dated October 26, 20046000ELM-24-572
P210Rev. 1, Dated December 12, 20056000ELM-24-574
P210Rev. 0, Dated May 06, 20036000ELM-24-579
P210Rev. 0, Dated April 29, 20036000ELM-24-580
P210Rev. 1, Dated June 12, 20066000ELM-24-588
P210Rev. 0, Dated July 08, 20036000ELM-24-592
P210Rev. 0, Dated April 30, 20036000ELM-24-597
P210Rev. 1, Dated June 14, 20056000ELM-24-604
P210Rev. 0, Dated May 09, 20036000ELM-24-618
P210Rev. 4, Dated December 12, 20056000ELM-24-624
P210Rev. 0, Dated April 30, 20036050ELM1-24-594
P210Rev. 0, Dated April 16, 20036089ELM1-24-595
P210Rev. 1, Dated December 21, 20056000ELM-24-440
P210Rev. 1, Dated February 17, 20056000ELM-24-456
P210Rev. 0, Dated April, 20036000ELM-24-457
P210Rev. 2, Dated March 01, 20056000ELM-24-460
P210Rev. 3, Dated December 22, 20056000ELM-24-545
P210Rev. 0, Dated April 29, 20036200ELM-24-578
P210Rev. 1, Dated January 20, 20056200ELM-24-586
P210Rev. 0, Dated April 16, 20036200ELM-24-591
P210Rev. 0, Dated July 08, 20036200ELM-24-596
P210Rev. 0, Dated May 06, 20036200ELM-24-607
P210Rev. 1, Dated September 11, 20066200ELM-24-608
P210Rev. 0, Dated May 07, 20036200ELM-24-609
P210Rev. 0, Dated May 08, 20036200ELM-24-611
P210Rev. 0, Dated May 08, 20036200ELM-24-612
P210Rev. 0, Dated May 02, 20036205ELM6-24-605
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 21, 2003
777-24-0075Revision 3: August 26, 2010
15 of 125
BOEING SERVICE BULLETIN 777-24-0075

### Page 16

Power PanelRevision and DateGE Aviation Service Bul-
letin
P210Rev. 1, Dated July 28, 20056206ELM4-24-598
P210Rev. 0, Dated May 01, 20036214ELM3-24-602
P210Rev. 1, Dated November 22, 20056221ELM3-24-606
P210Rev. 0, Dated April 29, 20036230ELM1-24-593
P210Rev. 0, Dated April 29, 20036236ELM3-24-583
P210Rev. 0, Dated May 01, 20036241ELM1-24-599
P210Rev. 0, Dated April 16, 20036243ELM2-24-589
P210Rev. 0, Dated May 07, 20036247ELM1-24-610
P210Rev. 0, Dated April 15, 20036250ELM1-24-584
P210Rev. 1, Dated June 30, 20066252ELM1-24-600
P210Rev. 0, Dated July 08, 20036253ELM1-24-585
P210Rev. 0, Dated April 22, 20036500ELM-24-492
P210Rev. 2, Dated June 30, 20066500ELM-24-493
P210Rev. 2, Dated December 23, 20056500ELM-24-494
P210Rev. 1, Dated October 25, 20046500ELM-24-495
P210Rev. 0, Dated April 11, 20036500ELM-24-496
P210Rev. 2, Dated November 28, 20056500ELM-24-497
P210Rev. 0, Dated April 14, 20036507ELM-24-499
P210Rev. 0, Dated April 14, 20036500ELM-24-501
P210Rev. 1, Dated December 23, 20056500ELM-24-502
P210Rev. 1, Dated June 30, 20066501ELM-24-500
P210Rev. 0, Dated April 14, 20036501ELM-24-503
P210Rev. 0, Dated April 14, 20036501ELM-24-504
P210Rev. 0, Dated April 14, 20036501ELM-24-505
P210Rev. 0, Dated April 14, 20036502ELM-24-506
P210Rev. 1, Dated December 12, 20056503ELM-24-507
P210Rev. 0, Dated April 14, 20036506ELM-24-508
P210Rev. 0, Dated April 14, 20036508ELM-24-509
C. Reason
The change described in this service bulletin will provide new switches on the flight deck than can
remove power from the cabin systems if smoke or flames occur. Smoke and flames in the passenger
cabin can cause injury to the passenger and damage the safety critical cabin equipments.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 21, 2003
777-24-0075Revision 3: August 26, 2010
16 of 125
BOEING SERVICE BULLETIN 777-24-0075

### Page 17

We have received numerous reports of smoke or flames in the passenger cabin related to the wiring
for the passenger cabin in-flight entertainment system, cabin lighting and passenger seats. It is not
easy to remove the electrical power to these systems to stop the smoke or flames.
Two switches can be installed to remove power from some of the passenger cabin electrical systems.
When selected OFF, the IFE/PASS SEATS switch will remove power from all the components of the
IFE (in-flight entertainment) system and the passenger seats (seat motor power, personal computer
power outlets and telephones).
When selected OFF, the CABIN/UTILITY switch will remove power from all the galleys, the ground
service bus (except the main and APU battery chargers and left forward fuel pump), the utility busses,
the gasper air fan, the fluorescent cabin lighting and the beacon, wing and logo lights. While the switch
is off, the nights lights, the supplemental nights lights, the reading lights, the attendant work lights and
some of the galley and crew rest lights will be turned on.
Boeing Service Related Problem (SRP) 777-SRP-24-0091 is related to this service bulletin.
Revision 1 was sent to add airplanes WA221-WA222, WB151-WB153, WB161-WB164 and
WB181-WB183 to Group 1 of the service bulletin effectivity. The prior or concurrent service bulletin
requirements have been changed to include the Boeing service bulletin 777-23-0142.
Revision 2 was sent to remove the test of the door heaters and add a check of the left and right utility
bus. References to GE Aviation service bulletin 5000ELM-24-379 have been removed because the
intent of the changes described in the bulletin were incorporated prior to the delivery of airplanes
WA210-WA212. Airplanes WA210-WA212, WB501-WB507, WB531-WB535, WB591-WB595,
WB601-WB606, WB631-WB632, WB636-WB637 have been moved to new Group 9 because these
airplanes use a different contact part number on connector D11042P.
Revision 3 is sent to tell operators that airplanes WB614 and WB615 are moved from Group 6 to a
new Group 10, to correct the configuration of the relay bracket in the P101 panel. Also, this revision
adds the identification tapes in the figures.
Terminology has been changed in the Work Instructions to agree with the terminology defined in
Paragraph 3.A., General Information - Notes.
The data given in Information Notice 777-24-0075 IN 02 is included in this revision.
D. Description
In the main equipment center, 15 new wires are routed from the P110 panel to the P210 panel. Three
new wires are routed from the P210 panel to the P320 panel. One new wire is routed from the P110
panel aft and up to the P101 panel. For Group 6 and 10 airplanes only, one new relay and four new
wires are installed in the P101 panel. For Group 7 airplanes only, two new relays and 10 new wires
are installed in the P101 panel. The hardware and software is changed in the P110 panel, P210 panel
and P320 panel as specified in the GE Aviation service bulletins. A test of the IFE/PASS SEATS and
the CABIN UTILITY switches is done.
Accomplishment of this service bulletin changes the flight deck and/or operations of the airplane. Refer
to Paragraph 1.K., Publications Affected.
The airplane effectivity is divided into 10 groups. The groups are based on differences in the airplane
wire changes required to make this change.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 21, 2003
777-24-0075Revision 3: August 26, 2010
17 of 125
BOEING SERVICE BULLETIN 777-24-0075

### Page 18

Refer to these GE Aviation service bulletins to determine specific applicability of the concurrent required
GE Aviation service bulletins. Use the revision level of the dated service bulletins or a later FAA approved
revision.
Power PanelRevision and DateGE Aviation Service Bul-
letin
Reference OnlyRev. 0, Dated July 04, 2003ELMS-24-AAL
Reference OnlyRev. 0, Dated July 04, 2003ELMS-24-AAR
Reference OnlyRev. 1, Dated February 23, 2004ELMS-24-AFA
Reference OnlyRev. 1, Dated February 25, 2004ELMS-24-ANA
Reference OnlyRev. 1, Dated February 19, 2004ELMS-24-BAB
Reference OnlyRev. 0, Dated July 04, 2003ELMS-24-BEJ
Reference OnlyRev. 0, Dated July 04, 2003ELMS-24-CAL
Reference OnlyRev. 1, Dated March 01, 2004ELMS-24-CAT
Reference OnlyRev. 0, Dated July 04, 2003ELMS-24-DAL
Reference OnlyRev. 1, Dated January 16, 2004ELMS-24-EAD
Reference OnlyRev. 1, Dated March 01, 2004ELMS-24-EGP
Reference OnlyRev. 1, Dated February 19, 2004ELMS-24-EIY
Reference OnlyRev. 0, Dated July 04, 2003ELMS-24-ELA
Reference OnlyRev. 1, Dated February 19, 2004ELMS-24-ILF
Reference OnlyRev. 1, Dated March 01, 2004ELMS-24-JAL
Reference OnlyRev. 3, Dated May 23, 2005ELMS-24-JAS
Reference OnlyRev. 1, Dated March 01, 2004ELMS-24-KAL
Reference OnlyRev. 0, Dated July 04, 2003ELMS-24-KUW
Reference OnlyRev. 1, Dated March 01, 2004ELMS-24-LAL
Reference OnlyRev. 1, Dated February 19, 2004ELMS-24-MAS
Reference OnlyRev. 0, Dated July 04, 2003ELMS-24-S160
Reference OnlyRev. 1, Dated February 23, 2004ELMS-24-SIA
Reference OnlyRev. 1, Dated February 19, 2004ELMS-24-SVA
Reference OnlyRev. 1, Dated May 24, 2004ELMS-24-SKL
Reference OnlyRev. 1, Dated March 01, 2004ELMS-24-TII
Revision 1 - No more work is necessary on airplanes changed as shown in the initial release of this
service bulletin.
Revision 2 - No more work is necessary on airplanes changed as shown in Revision 1 of this service
bulletin.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 21, 2003
777-24-0075Revision 3: August 26, 2010
18 of 125
BOEING SERVICE BULLETIN 777-24-0075

### Page 19

Revision 3 - No more work is necessary on airplanes changed in accordance with the original issue,
Revision 1 or Revision 2 of this service bulletin.
The work in this service bulletin is done in the maintenance zone(s) given below.
Group 1:
Affected Maintenance Zones
ZoneModel
117, 118777-200
Group 2, 4-5, 7-8:
Affected Maintenance Zones
ZoneModel
117, 118, 223777-200
Group 3, 6:
Affected Maintenance Zones
ZoneModel
117, 118, 223777-200, 777-300
Group 9:
Affected Maintenance Zones
ZoneModel
117, 118777-200, 777-300
Group 10:
Affected Maintenance Zones
ZoneModel
117, 118, 223777-300
E. Compliance
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive (AD) related
to this service bulletin. The Airworthiness Directive will make the compliance tasks and times given in
this service bulletin mandatory.
Boeing recommends that this service bulletin be done within 60 months from the effective date of an
applicable Airworthiness Directive.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 21, 2003
777-24-0075Revision 3: August 26, 2010
19 of 125
BOEING SERVICE BULLETIN 777-24-0075

### Page 20

F. Approval
This service bulletin was examined by the Federal Aviation Administration (FAA). The changes specified
in this service bulletin comply with the applicable regulations and are FAA approved, as well as European
Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/JAA approved
airplanes listed in the service bulletin effectivity. This service bulletin and its approval were based on
the airplane in its original Boeing delivery configuration or as modified by other approved Boeing
changes.
If an airplane has a non-Boeing modification or repair that affects a component or system also affected
by this service bulletin, the operator is responsible for obtaining appropriate regulatory agency approval
before incorporating this service bulletin.
G. Manpower
The table below shows an estimate of the task-hours necessary to do this change for each airplane.
This estimate is for direct labor only, done by an experienced crew. Adjust the estimate with operator
task-hour data if necessary. The estimate does not include lost time. These are some examples of lost
time:
— Time to adjust to the workplace
— Time to schedule the work
— Time to examine the work
— Time to cure the materials
— Time to make the parts
— Time to find the tools.
Elapsed HoursTask-HoursNumber of PersonsTask (Groups 1 and 9)
2.04.02Open Access
7.014.02Change
2.04.02Close Access
6.012.02Test
17.034.0TOTAL FOR EACH AIRPLANE
Elapsed HoursTask-HoursNumber of PersonsTask (Group 2)
2.04.02Open Access
7.7515.52Change
2.04.02Close Access
6.012.02Test
17.7535.5TOTAL FOR EACH AIRPLANE
Elapsed HoursTask-HoursNumber of PersonsTask (Group 3)
2.04.02Open Access
7.515.02Change
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 21, 2003
777-24-0075Revision 3: August 26, 2010
20 of 125
BOEING SERVICE BULLETIN 777-24-0075

### Page 21

Elapsed HoursTask-HoursNumber of PersonsTask (Group 3)
2.04.02Close Access
6.012.02Test
17.535.0TOTAL FOR EACH AIRPLANE
Elapsed HoursTask-HoursNumber of PersonsTask (Group 4)
2.04.02Open Access
7.515.02Change
2.04.02Close Access
6.012.02Test
17.535.0TOTAL FOR EACH AIRPLANE
Elapsed HoursTask-HoursNumber of PersonsTask (Group 5)
2.04.02Open Access
7.2514.52Change
2.04.02Close Access
6.012.02Test
17.2534.5TOTAL FOR EACH AIRPLANE
Elapsed HoursTask-HoursNumber of PersonsTask (Groups 6 and 10)
2.04.02Open Access
7.7515.52Change
2.04.02Close Access
6.012.02Test
17.7535.5TOTAL FOR EACH AIRPLANE
Elapsed HoursTask-HoursNumber of PersonsTask (Group 7)
2.04.02Open Access
10.020.02Change
2.04.02Close Access
6.012.02Test
20.040.0TOTAL FOR EACH AIRPLANE
Elapsed HoursTask-HoursNumber of PersonsTask (Group 8)
2.04.02Open Access
7.515.02Change
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 21, 2003
777-24-0075Revision 3: August 26, 2010
21 of 125
BOEING SERVICE BULLETIN 777-24-0075

### Page 22

Elapsed HoursTask-HoursNumber of PersonsTask (Group 8)
2.04.02Close Access
6.012.02Test
17.535.0TOTAL FOR EACH AIRPLANE
The change to the P110, P210 and P320 panels as given in the GE Aviation service bulletins is not
included. Refer to the airplane specific service bulletins to get the man-hours necessary for each panel.
H. Weight and Balance Changes
Change in Moment
(Pound-Inches)
Change in Weight
(Pounds)
Airplane
+690.8+2.2Group 1, 777-200
+228.2+2.2Group 1, 777-300
+879.2+2.8Group 2, 777-200
+753.4+2.4Group 3, 777-200
+249.6+2.4Group 3, 777-300
+753.4+2.4Group 4, 777-200
+753.4+2.4Group 5, 777-200
+785.0+2.5Group 6 , 777-200
+260.0+2.5Group 6, 777-300
+942.0+3.0Group 7, 777-200
+753.4+2.4Group 8, 777-200
+690.8+2.2Group 9, 777-200
+260.0+2.5Group 10, 777-300
I. Electrical Load Data
The electrical loads for these circuit breakers do not change. These circuit breakers change electrical
busses as shown in the last two columns of the following table. The actual electrical loads for these
circuit breakers can be found in the current copy of the electrical load analysis for the airplane. Some
airplanes will not have all of these circuit breakers. Change the electrical bus data only for the circuit
breakers installed on the airplane.
Post S/B Bus LocationPre S/B Bus LocationNomenclatureCircuit Breaker
L MAIN AC Sec 2, Phase AL MAIN AC Sec 1,
Phase A
Landscape CameraC23423
L MAIN AC Sec 2, Phase AL MAIN AC Sec 1,
Phase A
CTUC23430
L MAIN AC Sec 2, Phase AL MAIN AC Sec 1,
Phase B
UHF RC23432
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 21, 2003
777-24-0075Revision 3: August 26, 2010
22 of 125
BOEING SERVICE BULLETIN 777-24-0075

### Page 23

Post S/B Bus LocationPre S/B Bus LocationNomenclatureCircuit Breaker
L MAIN AC Sec 2, Phase AL MAIN AC Sec 1,
Phase C
UHF LC23434
R Utility, Phase BR Utility, Phase CM1/M2 Galley HandsetsC23450
L MAIN AC Sec 2, Phase AL MAIN AC Sec 1,
Phase A
Cabin File ServerC23454
R Utility, Phase BR Utility, Phase CFax MachineC23455
R Utility, Phase BR Utility, Phase ACabin Unit/HolsterC23460
R Utility, Phase BR Utility, Phase APhones F/CC23468
L MAIN AC Sec 2, Phase AL MAIN AC Sec 1,
Phase B
BCC PrinterC23473
L MAIN AC Sec 2, Phase AL MAIN AC Sec 1,
Phase B
Crew Rest Powered SeatsC25429
J. References
1. Existing Data:
a. Engineering Change Memo PRR 61887
b. Boeing Service Bulletin 777-23-0142, 777-23-0175, 777-24-0074, 777-24-0087
c. Boeing Service Related Problem (SRP) 777-SRP-24-0091
d. Standard Overhaul Practices Manual (SOPM) 20-50-10
e. Standard Wiring Practices Manual (SWPM) 20-10-11, 20-10-12, 20-10-19, 20-30-12, 20-30-16,
20-60-06, 20-61-11, 20-81-16, 20-81-22, 20-90-15
f. 777 Aircraft Maintenance Manual (AMM) 12-11-01, 23-32-00, 23-32-20, 24-22-00, 24-31-02,
24-31-06, 25-21-06, 31-61-00, 33-21-00, 33-31-00, 33-44-00
g. 777 Wiring Diagram Manual (WDM) 23-32-02, 23-32-11, 23-32-71, 24-51-41
h. GE Aviation Service Bulletin 4000ELM-24-435, 4000ELM-24-556, 4000ELM-24-619,
5000ELM-24-450, 5000ELM-24-451, 5000ELM-24-454, 5000ELM-24-477, 5000ELM-24-514,
5000ELM-24-516, 5000ELM-24-554, 5000ELM-24-558, 5000ELM-24-562, 5000ELM-24-564,
5000ELM-24-565, 5000ELM-24-617, 5200ELM-24-563, 5260ELM-24-557, 5500ELM-24-464,
5500ELM-24-466, 5500ELM-24-487, 5500ELM-24-488, 5500ELM-24-489, 5500ELM-24-490,
5500ELM-24-547, 5501ELM-24-548, 6000ELM-24-440, 6000ELM-24-456, 6000ELM-24-457,
6000ELM-24-459, 6000ELM-24-460, 6000ELM-24-461, 6000ELM-24-545, 6000ELM-24-555,
6000ELM-24-567, 6000ELM-24-571, 6000ELM-24-572, 6000ELM-24-574, 6000ELM-24-579,
6000ELM-24-580, 6000ELM-24-588, 6000ELM-24-592, 6000ELM-24-597, 6000ELM-24-604,
6000ELM-24-618, 6000ELM-24-624, 6050ELM1-24-594, 6089ELM1-24-595, 6200ELM-24-578,
6200ELM-24-586, 6200ELM-24-591, 6200ELM-24-596, 6200ELM-24-607, 6200ELM-24-608,
6200ELM-24-609, 6200ELM-24-611, 6200ELM-24-612, 6205ELM6-24-605, 6206ELM4-24-598,
6214ELM3-24-602, 6221ELM3-24-606, 6230ELM1-24-593, 6236ELM3-24-583,
6241ELM1-24-599, 6243ELM2-24-589, 6247ELM1-24-610, 6250ELM1-24-584,
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 21, 2003
777-24-0075Revision 3: August 26, 2010
23 of 125
BOEING SERVICE BULLETIN 777-24-0075

### Page 24

6252ELM1-24-600, 6253ELM1-24-585, 6500ELM-24-492, 6500ELM-24-493, 6500ELM-24-494,
6500ELM-24-495, 6500ELM-24-496, 6500ELM-24-497, 6500ELM-24-501, 6500ELM-24-502,
6501ELM-24-500, 6501ELM-24-503, 6501ELM-24-504, 6501ELM-24-505, 6502ELM-24-506,
6503ELM-24-507, 6506ELM-24-508, 6507ELM-24-499, 6508ELM-24-509, ELMS-24-AAL,
ELMS-24-AAR, ELMS-24-AFA, ELMS-24-ANA, ELMS-24-BAB, ELMS-24-BEJ, ELMS-24-CAL,
ELMS-24-CAT, ELMS-24-DAL, ELMS-24-EAD, ELMS-24-EGP, ELMS-24-EIY, ELMS-24-ELA,
ELMS-24-ILF, ELMS-24-JAL, ELMS-24-JAS, ELMS-24-KAL, ELMS-24-KUW, ELMS-24-LAL,
ELMS-24-MAS, ELMS-24-S160, ELMS-24-SIA, ELMS-24-SKL, ELMS-24-SVA, ELMS-24-TII
2. Data supplied with this Service Bulletin:
None.
3. Installation Drawings Used in the Preparation of this Service Bulletin:
TitleDrawing Number
Wire Bundle Installation - Bulkhead (STA 332.5)288W4106
Wire Bundle Installation - L.S. Passenger Floor (STA 379-469)288W4111
Wire Bundle Installation - L.S. Cab Floor and Forward Passenger
Floor (STA 209.5-379.0)
288W4115
Wire Bundle Installation - R.S. Cab Floor and Forward Passenger
Floor (STA 209.5-379.0)
288W4116
Wire Bundle Installation - L.S. Crown (STA 246.0-427.0)288W4121
Wire Bundle Installation - L.S. Crown (STA 427.0-652.0)288W4131
Wire Bundle Installation - L.S. Overhead (41 Section)288W4185
Wire Bundle Installation - Purser Station288W5541
Wire Bundle Instl - P101 Panel288W9101
These drawings were used to prepare this service bulletin. These drawings are not necessary to
make the specified changes, and are not supplied with this service bulletin. These drawings may
not be applicable to all airplane configurations or operators.
K. Publications Affected
1. Publications:
Chapter-SectionPublication
1.21, 6.10, 6.20, 6.30, NNC.6777 Operations Manual
23-32777 Aircraft Maintenance Manual
23-18, 23-32, 23-32, 24-51, 25-25777 Wiring Diagram Manual
23-32, 24-51777 Schematic Diagram Manual
2. Damage Tolerance Based Structural Inspections:
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 21, 2003
777-24-0075Revision 3: August 26, 2010
24 of 125
BOEING SERVICE BULLETIN 777-24-0075

### Page 25

Boeing has evaluated the repairs and/or changes in this service bulletin for effects on Fatigue
Critical Structure (FCS) and for changes to Damage Tolerance Inspections (DTI) required in the
Maintenance Program. This service bulletin does not affect FCS, therefore DTIs are not necessary.
L. Interchangeability and Intermixability of Parts
Refer to Paragraph 2.C., Parts Necessary for Each Airplane, for interchangeability and intermixability
information.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 21, 2003
777-24-0075Revision 3: August 26, 2010
25 of 125
BOEING SERVICE BULLETIN 777-24-0075

### Page 26

BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 21, 2003
777-24-0075Revision 3: August 26, 2010
26 of 125
BOEING SERVICE BULLETIN 777-24-0075
BLANK PAGE

### Page 27

2.    MATERIAL INFORMATION
A. Material - Price and Availability
Boeing can supply the kits shown in Paragraph 2.C., Parts Necessary for Each Airplane as shown
below. Kits/Parts availability is shown in the Reorder Lead Time (ROLT). ROLT is calculated from the
date Boeing gets the purchase order.
Groups 1 and 9:
Unit Price thru
Feb 28/06
ROLT (Weeks)NameKit Number
$1,873.0024Top Kit005W3198-3
Group 2:
Unit Price thru
Feb 28/06
ROLT (Weeks)NameKit Number
$2,447.0024Top Kit005W3198-6
Group 3:
Unit Price thru
Feb 28/06
ROLT (Weeks)NameKit Number
$2,169.0024Top Kit005W3198-7
Group 4:
Unit Price thru
Feb 28/06
ROLT (Weeks)NameKit Number
$2,186.0024Top Kit005W3198-8
Group 5:
Unit Price thru
Feb 28/06
ROLT (Weeks)NameKit Number
$2,186.0024Top Kit005W3198-9
Groups 6 and 10:
Unit Price thru
Feb 28/06
ROLT (Weeks)NameKit Number
$2,666.0024Top Kit005W3198-10
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 21, 2003
777-24-0075Revision 3: August 26, 2010
27 of 125
BOEING SERVICE BULLETIN 777-24-0075

### Page 28

Group 7:
Unit Price thru
Feb 28/06
ROLT (Weeks)NameKit Number
$4,330.0024Top Kit005W3198-12
Group 8:
Unit Price thru
Feb 28/06
ROLT (Weeks)NameKit Number
$2,170.0024Top Kit005W3198-13
The kits are subject to the terms and conditions of the Boeing standard purchase order acknowledgment.
After the Unit Price date, new price and ROLT data is applicable. Prices are in United States dollars.
Terms: Net 30 days.
Reference this service bulletin and submit your purchase order by one of the methods that follow:
1. Order on-line via ATA Spec 2000 or Boeing Part Page
2. Fax to (206) 662-7145
3. Mail to:
Spares Customer Support - MC 36-65
Boeing Spares Department
P.O. Box 3707
Seattle, Washington 98124-2207 USA
B. Industry Support Information
Boeing warranty remedies are not available for the configuration changes given in this service bulletin.
C. Parts Necessary For Each Airplane
1. Kits/Parts:
To get the kits/parts shown below, refer to Paragraph 2.A., Material - Price and Availability.
NOTE: One top kit and the items shown in Paragraph 2.C.2., Parts and Materials Supplied by
the Operator, are necessary for each airplane.
Kit 005W3198
NotesExisting Part
Number
NameQTYNew Part Number
-3-6-7-8-9-10
(a)Top Kit (Groups 1 and 9)-.....005W3198-3
(a)Top Kit (Group 2).-....005W3198-6
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 21, 2003
777-24-0075Revision 3: August 26, 2010
28 of 125
BOEING SERVICE BULLETIN 777-24-0075

### Page 29

Kit 005W3198
NotesExisting Part
Number
NameQTYNew Part Number
-3-6-7-8-9-10
(a)Top Kit (Group 3)..-...005W3198-7
(a)Top Kit (Group 4)...-..005W3198-8
(a)Top Kit (Group 5)....-.005W3198-9
(a)Top Kit (Groups 6 and 10).....-005W3198-10
Marker.....1005W3198-1001
Wire Kit1.....280W5108-1
Wire Kit.1....280W5108-4
Wire Kit..1...280W5108-5
Wire Kit...1..280W5108-6
Wire Kit....1.280W5108-7
Wire Kit.....1280W5108-8
Strap.9010101010BACS38K1
Strap606060606060BACS38K1B
Strap909090909090BACS38K1E
Strap.30....BACS38K2
Strap202020202020BACS38K2B
Strap303030303030BACS38K7E
(a) There are more parts than are necessary.
Kit 005W3198
NotesExisting Part
Number
NameQTYNew Part Number
-12-13
(a)Top Kit (Group 7)-.005W3198-12
(a)Top Kit (Group 8).-005W3198-13
Marker1.005W3198-1201
Wire Kit1.280W5108-10
Wire Kit.1280W5108-11
Washer2.AN960-D4L
Nutplate2.BACN10NW1
Strap1010BACS38K1
Strap6060BACS38K1B
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 21, 2003
777-24-0075Revision 3: August 26, 2010
29 of 125
BOEING SERVICE BULLETIN 777-24-0075

### Page 30

Kit 005W3198
NotesExisting Part
Number
NameQTYNew Part Number
-12-13
Strap9090BACS38K1E
Strap..BACS38K2
Strap2020BACS38K2B
Strap3030BACS38K7E
Screw2.NAS1801-04-8
(a) There are more parts than are necessary.
Kit 280W5108
NotesExisting Part
Number
NameQTYNew Part Number
-1-4-5-6-7-8
(a)Wire Kit-.....280W5108-1
(a)Wire Kit.-....280W5108-4
(a)Wire Kit..-...280W5108-5
(a)Wire Kit...-..280W5108-6
(a)Wire Kit....-.280W5108-7
(a)Wire Kit.....-280W5108-8
Kit (W4116)111111280W5108-101
Kit (W4236)111111280W5108-102
Kit (W6223).1....280W5108-104
Kit (W6943).1....280W5108-105
Kit (W6120)..1.11280W5108-108
Kit (W6120).1....280W5108-109
Kit (W6120)...1..280W5108-110
Kit (W6120)1.....280W5108-113
Kit (W6220)111111280W5108-115
Kit (W1011).1....280W5108-118
Kit (W1011).....1280W5108-120
Kit (W1011)....1.280W5108-122
Kit (W1011)..1...280W5108-123
Kit (W1011)...1..280W5108-124
Kit (Spares)111111280W5108-201
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 21, 2003
777-24-0075Revision 3: August 26, 2010
30 of 125
BOEING SERVICE BULLETIN 777-24-0075

### Page 31

Kit 280W5108
NotesExisting Part
Number
NameQTYNew Part Number
-1-4-5-6-7-8
(a) There are more parts than are necessary.
Kit 280W5108
NotesExisting Part
Number
NameQTYNew Part Number
-10-11-101-102-104-105
(a)Wire Kit-.....280W5108-10
(a)Wire Kit.-....280W5108-11
Kit (W4116)11-...280W5108-101
Kit (W4236)11.-..280W5108-102
Kit (W6223)....-.280W5108-104
Kit (W6943).....-280W5108-105
Kit (W4232)1.....280W5108-106
Kit (W6120)1.....280W5108-107
Kit (W6120).1....280W5108-108
Kit (W6220)1.....280W5108-114
Kit (W6220).1....280W5108-115
Kit (W1011)1.....280W5108-117
Kit (W1011).1....280W5108-121
Kit (Spares)11....280W5108-201
Identification Tape..1...280W5108-10101
Identification Tape..1...280W5108-10102
Tie-wrap..1...280W5108-10103
Wire...1..280W5108-102W
Identification Tape...1..280W5108-10201
Tie-wrap...1..280W5108-10202
Wire....1.280W5108-104W
Tie-wrap....1.280W5108-10401
Identification Tape....1.280W5108-10402
Identification Tape....1.280W5108-10403
Wire.....1280W5108-105W
Tie-wrap.....1280W5108-10501
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 21, 2003
777-24-0075Revision 3: August 26, 2010
31 of 125
BOEING SERVICE BULLETIN 777-24-0075

### Page 32

Kit 280W5108
NotesExisting Part
Number
NameQTYNew Part Number
-10-11-101-102-104-105
Identification Tape.....1280W5108-10502
Contact, Pin...111BACC47CN1S
Contact, Socket....1.BACC47CP1S
Contact, Pin.....3M39029-1-101
Terminal Block.....1S280W555-108
(a) There are more parts than are necessary.
Kit 280W5108
NotesExisting Part
Number
NameQTYNew Part Number
-106-107-108-109-110-113
Kit-.....280W5108-106
Kit.-....280W5108-107
Kit..-...280W5108-108
Kit...-..280W5108-109
Kit....-.280W5108-110
Kit.....-280W5108-113
Identification Tape1.....280W5108-10601
Wire.1....280W5108-107W
Tie-wrap.1....280W5108-10701
Identification Tape.1....280W5108-10702
Identification Tape.1....280W5108-10703
Wire..1...280W5108-108W
Tie-wrap..1...280W5108-10801
Identification Tape..1...280W5108-10802
Identification Tape..1...280W5108-10803
Wire...1..280W5108-109W
Tie-wrap...1..280W5108-10901
Identification Tape...1..280W5108-10902
Identification Tape...1..280W5108-10903
Wire....1.280W5108-110W
Tie-wrap....1.280W5108-11001
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 21, 2003
777-24-0075Revision 3: August 26, 2010
32 of 125
BOEING SERVICE BULLETIN 777-24-0075

### Page 33

Kit 280W5108
NotesExisting Part
Number
NameQTYNew Part Number
-106-107-108-109-110-113
Identification Tape....1.280W5108-11002
Identification Tape....1.280W5108-11003
Wire.....1280W5108-113W
Tie-wrap.....1280W5108-11301
Identification Tape.....1280W5108-11302
Contact, Pin.55656BACC47CN1S
Contact, Socket.1112.BACC47CP1S
Splice.31111BACT12C12
Sleeve.31111D436-39
Kit 280W5108
NotesExisting Part
Number
NameQTYNew Part Number
-114-115-117-118-120-121
Kit-.....280W5108-114
Kit.-....280W5108-115
Kit..-...280W5108-117
Kit...-..280W5108-118
Kit....-.280W5108-120
Kit.....-280W5108-121
Wire1.....280W5108-114W
Tie-wrap1.....280W5108-11401
Identification Tape1.....280W5108-11402
Identification Tape1.....280W5108-11403
Identification Tape1.....280W5108-11404
Identification Tape1.....280W5108-11405
Identification Tape1.....280W5108-11406
Wire.1....280W5108-115W
Tie-wrap.1....280W5108-11501
Identification Tape.1....280W5108-11502
Identification Tape.1....280W5108-11503
Identification Tape.1....280W5108-11504
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 21, 2003
777-24-0075Revision 3: August 26, 2010
33 of 125
BOEING SERVICE BULLETIN 777-24-0075

### Page 34

Kit 280W5108
NotesExisting Part
Number
NameQTYNew Part Number
-114-115-117-118-120-121
Identification Tape.1....280W5108-11505
Wire..1...280W5108-117W
Identification Tape..1...280W5108-11701
Identification Tape..1...280W5108-11702
Identification Tape..1...280W5108-11703
Identification Tape..1...280W5108-11704
Identification Tape..1...280W5108-11705
Identification Tape..1...280W5108-11706
Tie-wrap..1...280W5108-11707
Wire...1..280W5108-118W
Tie-wrap...1..280W5108-11801
Identification Tape...1..280W5108-11802
Identification Tape...1..280W5108-11803
Wire....1.280W5108-120W
Identification Tape....1.280W5108-12001
Identification Tape....1.280W5108-12002
Identification Tape....1.280W5108-12003
Tie-wrap....1.280W5108-12004
Wire.....1280W5108-121W
Identification Tape.....1280W5108-12101
Identification Tape.....1280W5108-12102
Tie-wrap.....1280W5108-12103
Connector..1...BACC45FN18-31P10
Connector1.....BACC45FT18A31S10
(a)Contact, Pin10103111BACC47CN1S
Contact, Pin33....BACC47CN2A
Contact, Socket3.111.BACC47CP1S
Splice31..1.BACT12C12
(a)Sleeve42..1.D436-39
Contact, Pin..2.32M39029-1-101
Relay Socket..2.1.RSE120180
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 21, 2003
777-24-0075Revision 3: August 26, 2010
34 of 125
BOEING SERVICE BULLETIN 777-24-0075

### Page 35

Kit 280W5108
NotesExisting Part
Number
NameQTYNew Part Number
-114-115-117-118-120-121
Terminal Block....11S280W555-104
Contact, Pin..5...S280W555-916
Relay..2.1.XD4N
Contact..8.42316-2020-192
End Cap11....324485
(a) There are more parts than are necessary.
Kit 280W5108
NotesExisting Part
Number
NameQTYNew Part Number
-122-123-124-201
Kit-...280W5108-122
Kit.-..280W5108-123
Kit..-.280W5108-124
Kit...-280W5108-201
Wire1...280W5108-122W
Identification Tape1...280W5108-12201
Identification Tape1...280W5108-12202
Identification Tape1...280W5108-12203
Tie-wrap1...280W5108-12204
Wire.1..280W5108-123W
Identification Tape.1..280W5108-12301
Identification Tape.1..280W5108-12302
Tie-wrap.1..280W5108-12303
Wire..1.280W5108-124W
Identification Tape..1.280W5108-12401
Identification Tape..1.280W5108-12402
Tie-wrap..1.280W5108-12403
Contact, Pin1113BACC47CN1S
Contact, Pin...1BACC47CN2A
Contact, Socket...2BACC47CP1S
Splice...3BACT12C12
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 21, 2003
777-24-0075Revision 3: August 26, 2010
35 of 125
BOEING SERVICE BULLETIN 777-24-0075

### Page 36

Kit 280W5108
NotesExisting Part
Number
NameQTYNew Part Number
-122-123-124-201
Sleeve...3D436-39
Contact, Pin3221M39029-1-101
Terminal Block.1..S280W555-104
Contact, Pin...2S280W555-916
Contact2222316-2020-192
End Cap...1324485
2. Parts and Materials Supplied by the Operator:
NotesNameQTYPart Number / Specification
(a)Contact, Pin2BACC47CN2A
(a)Contact, Socket10BACC47CP2A
(b) (c)Identification Tape1BACT19C-T
(a) See the Qualified Products List at the end of the Boeing Material Specification (BMS)
for supplier data.
(b) For P101 panel change. Group 10 airplanes only.
(c) Spares Customer Support - MC 36-65 Boeing Spares Department P.O. Box 3707
Seattle, Washington 98124-2207 USA.
3. Parts Modified and Reidentified:
None.
4. Parts Removed and Not Replaced:
None.
D. Parts Necessary to Change Spares
None.
E. Special Tooling - Price and Availability
None.
F. Special Tooling Necessary to do this Service Bulletin
No special tools or equipment are necessary to do the change in this service bulletin. But, maintenance
and overhaul tools in the manuals given in Paragraph 1.J., References, can be necessary. Examine
operator tool supply to make sure all necessary tools are available.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 21, 2003
777-24-0075Revision 3: August 26, 2010
36 of 125
BOEING SERVICE BULLETIN 777-24-0075

### Page 37

3.    ACCOMPLISHMENT INSTRUCTIONS
A. GENERAL INFORMATION
CAUTION: KEEP THE WORK AREA, WIRES AND ELECTRICAL BUNDLES CLEAN OF METAL
PARTICLES OR CONTAMINATION WHEN YOU USE TOOLS. UNWANTED MATERIAL,
METAL PARTICLES OR CONTAMINATION CAUGHT IN WIRE BUNDLES CAN CAUSE
DAMAGE TO THE BUNDLES. DAMAGED WIRE BUNDLES CAN CAUSE SPARKS OR
OTHER ELECTRICAL DAMAGE.
NOTE: 1. The instructions identified in Paragraph 3.B., Work Instructions and the Figure(s)
give the recommended sequence of steps. The sequence of steps to do this service
bulletin can be changed.
2. Manual titles are referred to by acronyms. Refer to Paragraph 1.J., References, for
definition of the acronyms.
3. Obey all of the warnings and cautions given in the specified manual sections.
4. Refer to the Boeing Standard Wiring Practices Manuals SWPM 20-10-11, SWPM
20-10-12 and SWPM 20-10-19 for the wire installation procedures.
5. If the length of fasteners specified in this service bulletin do not meet the installation
standards, fasteners of the same specification, or an approved substitute, one grip
length longer or shorter may be used.
6. These work instructions refer to procedures included on other Boeing documents.
When the words "refer to" are used and the operator has an accepted alternative
procedure, the accepted alternative procedure can be used. When the words "in
accordance with" are included in the instruction, the procedure in the Boeing document
must be used.
B. WORK INSTRUCTIONS
1. Remove the electrical power from the airplane. Refer to 777 AMM 24-22-00, Remove Electrical
Power as an accepted procedure.
2. Make a change to the airplane wiring in accordance with the figures that follow:
– FIGURE 1 and FIGURE 9 (Group 1).
– FIGURE 2, FIGURE 9 and FIGURE 10 (Group 2).
– FIGURE 3, FIGURE 9 and FIGURE 10 (Group 3).
– FIGURE 4, FIGURE 9 and FIGURE 10 (Group 4).
– FIGURE 5, FIGURE 9 and FIGURE 10 (Group 5).
– FIGURE 6, FIGURE 9, FIGURE 10 and FIGURE 11 (Group 6).
– FIGURE 7, FIGURE 9, FIGURE 10 and FIGURE 12 (Group 7).
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 21, 2003
777-24-0075Revision 3: August 26, 2010
37 of 125
BOEING SERVICE BULLETIN 777-24-0075

### Page 38

– FIGURE 8, FIGURE 9 and FIGURE 10 (Group 8).
– FIGURE 9 and FIGURE 13 (Group 9).
– FIGURE 9, FIGURE 10, FIGURE 14 and FIGURE 15 (Group 10).
3. Make the changes to the ELMS panels P110, P210 and P320 in accordance with the GE Aviation
Service Bulletins shown below. The bulletins in the table are for reference and give the specific
service bulletins applicable for each airplane. Use the revision level of the dated service bulletins
or a later FAA approved revision.
Power PanelRevision and DateGE Aviation Service Bul-
letin
P320Rev. 5, Dated April 28, 20064000ELM-24-435
P320Rev. 0, Dated April 15, 20034000ELM-24-556
P320Rev. 0, Dated May 09, 20034000ELM-24-619
P110Rev. 0, Dated April 11, 20035000ELM-24-450
P110Rev. 0, Dated April 11, 20035000ELM-24-454
P110Rev. 1, Dated June 30, 20065000ELM-24-477
P110Rev. 1, Dated December 21, 20055000ELM-24-516
P110Rev. 0, Dated April 15, 20035000ELM-24-554
P110Rev. 3, Dated June 30, 20065000ELM-24-558
P110Rev. 1, Dated March 03, 20055000ELM-24-562
P110Rev. 1, Dated May 31, 20055000ELM-24-564
P110Rev. 1, Dated June 01, 20055000ELM-24-565
P110Rev. 0, Dated May 09, 20035000ELM-24-617
P110Rev. 0, Dated April 22, 20035000ELM-24-451
P110Rev. 2, Dated December 12, 20055000ELM-24-514
P110Rev. 1, Dated April 19, 20055200ELM-24-563
P110Rev. 0, Dated April 24, 20035260ELM-24-557
P110Rev. 0, Dated May 06, 20035500ELM-24-464
P110Rev. 0, Dated April 22, 20035500ELM-24-466
P110Rev. 0, Dated July 07, 20035500ELM-24-487
P110Rev. 2, Dated December 20, 20055500ELM-24-488
P110Rev. 0, Dated April 11, 20035500ELM-24-489
P110Rev. 1, Dated February 23, 20055500ELM-24-490
P110Rev. 1, Dated December 7, 20055500ELM-24-547
P110Rev. 0, Dated April 15, 20035501ELM-24-548
P210Rev. 1, Dated June 12, 20066000ELM-24-461
P210Rev. 2, Dated November 25, 20056000ELM-24-459
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 21, 2003
777-24-0075Revision 3: August 26, 2010
38 of 125
BOEING SERVICE BULLETIN 777-24-0075

### Page 39

Power PanelRevision and DateGE Aviation Service Bul-
letin
P210Rev. 0, Dated April 15, 20036000ELM-24-555
P210Rev. 5, Dated May 4, 20066000ELM-24-567
P210Rev. 5, Dated January 23, 20066000ELM-24-571
P210Rev. 2, Dated October 26, 20046000ELM-24-572
P210Rev. 1, Dated December 12, 20056000ELM-24-574
P210Rev. 0, Dated May 06, 20036000ELM-24-579
P210Rev. 0, Dated April 29, 20036000ELM-24-580
P210Rev. 1, Dated June 12, 20066000ELM-24-588
P210Rev. 0, Dated July 08, 20036000ELM-24-592
P210Rev. 0, Dated April 30, 20036000ELM-24-597
P210Rev. 1, Dated June 14, 20056000ELM-24-604
P210Rev. 0, Dated May 09, 20036000ELM-24-618
P210Rev. 4, Dated December 12, 20056000ELM-24-624
P210Rev. 0, Dated April 30, 20036050ELM1-24-594
P210Rev. 0, Dated April 16, 20036089ELM1-24-595
P210Rev. 1, Dated December 21, 20056000ELM-24-440
P210Rev. 1, Dated February 17, 20056000ELM-24-456
P210Rev. 0, Dated April, 20036000ELM-24-457
P210Rev. 2, Dated March 01, 20056000ELM-24-460
P210Rev. 3, Dated December 22, 20056000ELM-24-545
P210Rev. 0, Dated April 29, 20036200ELM-24-578
P210Rev. 1, Dated January 20, 20056200ELM-24-586
P210Rev. 0, Dated April 16, 20036200ELM-24-591
P210Rev. 0, Dated July 08, 20036200ELM-24-596
P210Rev. 0, Dated May 06, 20036200ELM-24-607
P210Rev. 1, Dated September 11, 20066200ELM-24-608
P210Rev. 0, Dated May 07, 20036200ELM-24-609
P210Rev. 0, Dated May 08, 20036200ELM-24-611
P210Rev. 0, Dated May 08, 20036200ELM-24-612
P210Rev. 0, Dated May 02, 20036205ELM6-24-605
P210Rev. 1, Dated July 28, 20056206ELM4-24-598
P210Rev. 0, Dated May 01, 20036214ELM3-24-602
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 21, 2003
777-24-0075Revision 3: August 26, 2010
39 of 125
BOEING SERVICE BULLETIN 777-24-0075

### Page 40

Power PanelRevision and DateGE Aviation Service Bul-
letin
P210Rev. 1, Dated November 22, 20056221ELM3-24-606
P210Rev. 0, Dated April 29, 20036230ELM1-24-593
P210Rev. 0, Dated April 29, 20036236ELM3-24-583
P210Rev. 0, Dated May 01, 20036241ELM1-24-599
P210Rev. 0, Dated April 16, 20036243ELM2-24-589
P210Rev. 0, Dated May 07, 20036247ELM1-24-610
P210Rev. 0, Dated April 15, 20036250ELM1-24-584
P210Rev. 1, Dated June 30, 20066252ELM1-24-600
P210Rev. 0, Dated July 08, 20036253ELM1-24-585
P210Rev. 0, Dated April 22, 20036500ELM-24-492
P210Rev. 2, Dated June 30, 20066500ELM-24-493
P210Rev. 2, Dated December 23, 20056500ELM-24-494
P210Rev. 1, Dated October 25, 20046500ELM-24-495
P210Rev. 0, Dated April 11, 20036500ELM-24-496
P210Rev. 2, Dated November 28, 20056500ELM-24-497
P210Rev. 0, Dated April 14, 20036507ELM-24-499
P210Rev. 0, Dated April 14, 20036500ELM-24-501
P210Rev. 1, Dated December 23, 20056500ELM-24-502
P210Rev. 1, Dated June 30, 20066501ELM-24-500
P210Rev. 0, Dated April 14, 20036501ELM-24-503
P210Rev. 0, Dated April 14, 20036501ELM-24-504
P210Rev. 0, Dated April 14, 20036501ELM-24-505
P210Rev. 0, Dated April 14, 20036502ELM-24-506
P210Rev. 1, Dated December 12, 20056503ELM-24-507
P210Rev. 0, Dated April 14, 20036506ELM-24-508
P210Rev. 0, Dated April 14, 20036508ELM-24-509
4. Do this continuity check:
GroupResultPanelPinConnectorPanelPinConnector
ToFrom
AllContinuityP21024D21037PP2106D21021P
AllContinuity26
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 21, 2003
777-24-0075Revision 3: August 26, 2010
40 of 125
BOEING SERVICE BULLETIN 777-24-0075

### Page 41

GroupResultPanelPinConnectorPanelPinConnector
ToFrom
AllContinuity28
AllContinuity29
AllContinuity30
AllContinuity31
AllContinuityP11018D11032PP2106D21021P
AllContinuityP1107D11037PP11018D11032P
AllContinuity11
AllContinuity15
AllContinuity18
AllContinuity19
1, 2 and 7Continuity26
2, 3, 4, 5, 6,
7, 8 and 10
ContinuityP1017D01309PP11018D11032P
4ContinuityP1019D01309PP11026D11037P
4OpenP1019D01309PP1017D01309P
6, 8 and 10ContinuityP1019D01309PP1017D01309P
4, 5, 6 and 10ContinuityP10119D01396PP1017D01309P
3 and 8ContinuityP1016D01396PP1017D01309P
2ContinuityPWS13S23364P1017D01309P
7ContinuityP1012D01396PP1017D01390P
7ContinuityP1015D01396PP1017D01390P
AllContinuityP32010D32012PP21028D21027P
AllContinuity1129
AllContinuity1230
5. Supply the electrical power to the airplane. Refer to 777 AMM 24-22-00, Supply Electrical Power
as an accepted procedure.
6. For all airplanes except WB406 and WB476, do this test of the passenger cabin systems:
a. Prepare for the test.
(1) See that the following circuit breakers on the P210 panel are closed:
NOTE: This list is all inclusive. Operators should compare this list to the Wiring Diagram
Manual Equipment List (ELI) to find the breakers installed on a specific airplane.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 21, 2003
777-24-0075Revision 3: August 26, 2010
41 of 125
BOEING SERVICE BULLETIN 777-24-0075

### Page 42

NotesNumber, Location, Name
C21608, G2, R LAV/GLY FAN CTRL
C23354, C27, NATS PWR
C23356, A5, IFE ZIA 1
C23359, B2, IFE ZIA 4
C23401, D27, MULTP AUDIO ENTMT CTRL
C23403, E5, VIDEO PGMS & CTRL
C23405, C13, CABIN PRINTER
C23413, C1, VIDEO DISTR 4
C23421, D12, VIDEO DISTR 5
C23422, D13, VIDEO DISTR 6
C23430, C6, CABIN TELECOMMUNICATION UNIT
C23455, D23, FAX MACHINE
C23460, A23, CABIN UNIT/HOLSTER
C23461, D22 , TFTS MPU & XMTR.RCRV
C23462, C7, VIDEO DISTR 1A
C23468, A23, PHONES F/C
C23469, B23, PHONES B/C
C23470, B22, PHONES ECON
C23471, E8, VIDEO PGMS & CTRL B
C23472, B26, PHONES
C23473, D3, BCC PRINTER
C23616, H8, ENTMT CTRL R
C23644, H7, PASSENGER TELEPHONE 2
C23650, J10, CTM/HOLSTER
C23658, G12, IFE MASTER CTRL
C24451, B19, FLT DK SW PWR DISTR 1
C24451, B19, FLIGHT DECK CONTROL
C24452, D14, FLT DK SW PWR DISTR 2
C24452, D14, FLIGHT DECK CONTROL SUP
C24688, G13, IFE SEATS DECK SW
C25312, F10, PAX SEAT R
C25314, F13, PAX SEAR C
C25315, F7, PAX SEAT 2R
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 21, 2003
777-24-0075Revision 3: August 26, 2010
42 of 125
BOEING SERVICE BULLETIN 777-24-0075

### Page 43

NotesNumber, Location, Name
C25316, F4, PAX SEAR 2C
C25320, A21, IN-SEAT POWER OUTLETS ZONE 1
C25329, C24, IN SEAT POWER OUTLET ZONE 3
C25429, D4, CREW REST POWER SEAT
(2) See that the following circuit breakers on the P110 panel are closed:
NOTE: This list is all inclusive. Operators should compare this list to the Wiring Diagram
Manual Equipment List (ELI) to find the breakers installed on a specific airplane.
NotesNumber, Location, Name
C23355, D21, VIDEO ON DEMAND
C23357, A24, IFE ZIA 2
C23358, A27, IFE ZIA 3
C23401, D27, MULTP AUDIO ENTMT CTRL
C23407, F28, VIDEO DISTR 1
C23408, E23, VIDEO DISTR 2
C23409, C21, VIDEO DISTR 3
C23641, G23, ENTMT CTRL L
C23643, H15, PASSENGER TELEPHONE 1
C25311, F16, PAX SEAT L
C25317, F19, PAX SEAT 2L
(3) On the P5 panel, select the IFE/PASS SEATS switch to the ON position.
(4) For all airplanes except WA001, WA101-WA104 and WB501-WB507, in the purser work
station/video control center, select the IFE master power switch to the OFF position and
wait for two minutes.
(5) For all airplanes except WA001, WA101-WA104 and WB501-WB507, in the purser work
station/video control center, select the IFE master power switch to the ON position. All
IFE system components should now be serviceable.
b. Do this test of the IFE electrical power.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 21, 2003
777-24-0075Revision 3: August 26, 2010
43 of 125
BOEING SERVICE BULLETIN 777-24-0075

### Page 44

(1) In the purser work station/video control center, see that the cabin maintenance terminal
(Matsushita system) or the primary access terminal (Rockwell system) has electrical
power. This step does a check that circuit breaker C23403 has electrical power and is
connected to D21021, pin 1.
(2) For airplanes with a cabin printer, see that the cabin printer (in the purser work station/video
control center) has power (LED is on). This step does a check that circuit breaker C23405
has electrical power and is connected to D21021, pin 3.
(3) See that the video entertainment player 1 (in the purser work station/video control center)
has power (LED is on). For all airplanes except WB016-WB021, WB031-WB044,
WB311-WB327, WB411-WB413, WB416-WB433, WB446-WB447, WB601-WB606 and
WC051-WC067, this step does a check that circuit breaker C23471 has electrical power
and is connected to D21021, pin 14. For airplanes WB016-WB021, WB031-WB044,
WB311-WB327, WB411-WB413, WB416-WB433, WB446-WB447, WB601-WB606 and
WC051-WC067 this step does a check that circuit breaker C23355, phase A is connected
to the electrical power.
(4) See that the Enhanced Area Distribution Box (EADB) 1 has power. Refer to 777 AMM
23-32-20, as an accepted procedure, to get the location of the area distribution box 1.
Refer to 777 AMM 25-21-06, Main Ceiling Panel Removal as an accepted procedure, to
remove a ceiling panel. This step does a check that circuit breaker C23356, phase A is
connected to the electrical power.
NOTE: One method to check for power is to see that the LED (if installed) is on. An
alternative is to check the seat IFE has power.
(5) For all airplanes except WB446-WB452 and WB591-WB595, see that the EADB 2 has
power. Refer to 777 AMM 23-32-20, as an accepted procedure, to get the location of the
area distribution box 2. Refer to 777 AMM 25-21-06, Main Ceiling Panel Removal as an
accepted procedure, to remove a ceiling panel. This step does a check that circuit breaker
C23356, phase C is connected to the electrical power.
NOTE: One method to check for power is to see that the LED (if installed) is on. An
alternative is to check the seat IFE has power.
(6) See that the EADB 3 has power. Refer to 777 AMM 23-32-20, as an accepted procedure
to get the location of the area distribution box 3. Refer to 777 AMM 25-21-06, Main Ceiling
Panel Removal as an accepted procedure to remove a ceiling panel. This step does a
check that circuit breaker C23357, phase B is connected to the electrical power.
NOTE: One method to check for power is to see that the LED (if installed) is on. An
alternative is to check the seat IFE has power.
(7) See that the EADB 4 has power. Refer to 777 AMM 23-32-20, as an accepted procedure
to get the location of the area distribution box 4. Refer to 777 AMM 25-21-06, Main Ceiling
Panel Removal as an accepted procedure, to remove a ceiling panel. This step does a
check that circuit breaker C23357, phase A is connected to the electrical power.
NOTE: One method to check for power is to see that the LED (if installed) is on. An
alternative is to check the seat IFE has power.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 21, 2003
777-24-0075Revision 3: August 26, 2010
44 of 125
BOEING SERVICE BULLETIN 777-24-0075

### Page 45

(8) See that the EADB 5 has power. Refer to 777 AMM 23-32-20, as an accepted procedure
to get the location of the area distribution box 5. Refer to 777 AMM 25-21-06, Main Ceiling
Panel Removal as an accepted procedure, to remove a ceiling panel. This step does a
check that circuit breaker C23358, phase C is connected to the electrical power.
NOTE: One method to check for power is to see that the LED (if installed) is on. An
alternative is to check the seat IFE has power.
(9) For all airplanes except WB591-WB595, see that the EADB 6 has power. Refer to 777
AMM 23-32-20 as an accepted procedure, to get the location of the area distribution box
4. Refer to 777 AMM 25-21-06, Main Ceiling Panel Removal as an accepted procedure,
to remove a ceiling panel. For airplanes except WB501-WB507 and WB601-WB637, this
step does a check that circuit breaker C23359, phase B is connected to electrical power.
For airplanes WB501-WB507 and WB601-WB637, this step does a check that circuit
breaker C23358, phase B, is connected to the electrical power.
NOTE: One method to check for power is to see that the LED (if installed) is on. An
alternative is to check the seat IFE has power.
(10) See that the EADB 7 has power. Refer to 777 AMM 23-32-20, as an accepted procedure
to get the location of the area distribution box 7. Refer to 777 AMM 25-21-06, Main Ceiling
Panel Removal as an accepted procedure, to remove a ceiling panel. This step does a
check that circuit breaker C23359, phase C is connected to the electrical power.
NOTE: One method to check for power is to see that the LED (if installed) is on. An
alternative is to check the seat IFE has power.
(11) For airplanes WB501-WB507 and WB601-WB637, see that the EADB 8 has power. Refer
to 777 AMM 25-21-06, Main Ceiling Panel Removal as an accepted procedure, to remove
a ceiling panel. This step does a check that circuit breaker C23359, phase B is connected
to the electrical power.
NOTE: One method to check for power is to see that the LED (if installed) is on. An
alternative is to check the seat IFE has power.
(12) On the E2-4 shelf, see that either the Cabin Passenger Management Unit (CPMU), the
CPMU Memory Expansion Unit (CMEU) or the Passenger Entertainment System Controller
- Audio (PESC-A) are powered (at least one LED is on). This step does a check that
circuit breaker C23401 is connected to the electrical power.
NOTE: One method to check for power to the CMEU is to see that the LED (if installed)
is on. An alternative is to check the CMEU fan has power.
(13) For airplanes WA221-WA223, WA231-WA232, WB181-WB188, WB231-WB239,
WB531-WB535 and WB611-WB615, see that the CD Player(s) is powered (at least one
LED is on). This step checks that circuit breaker C23355, phase A, is connected to the
electrical power
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 21, 2003
777-24-0075Revision 3: August 26, 2010
45 of 125
BOEING SERVICE BULLETIN 777-24-0075

### Page 46

(14) For airplanes WB276-WB286 and WB291-WB301, see that the power supply fan in the
purser work station/video control center is running. This checks that circuit breaker C23355,
phase B, is connected to the electrical power.
(15) On the E2-4 shelf, see that the Passenger In-flight Information Computer is powered.
This checks that circuit breaker C23616 is connected to the electrical power.
(16) Turn on the passenger video entertainment system. Refer to 777 AMM 23-32-20, Power
On the Video Entertainment System as an accepted procedure. See that all the projectors
and monitors are on. This step checks that circuit breakers C23462, C23407, C23408,
C23409, C23413, C23421 and C23422, if applicable, are connected to the electrical
power.
c. For all airplanes except WA001, WA101-WA104, WA221, WA223, WA231-WA232,
WB271-WB272, WB366-WB367, WB411-WB413, WB481, WB501-WB507, WB531-WB535
and WB591-WB595 do this passenger seat power test.
(1) On the seat rows aft of door 1 left, use the seat switches to see that the seats are powered.
This step checks that circuit breaker C25311 is connected to the electrical power.
NOTE: Airplanes WA001, WA101-WA104, WA221, WA223, WA231-WA232,
WB366-WB367, WB411-WB413, WB481 and WB501-WB507 have this circuit
breaker installed. The circuit breaker is for provisions only and has a collar and
an INOP label installed.
(2) On the center seat rows aft of door 1, use the seat switches to see that the seats are
powered. This step checks that circuit breaker C25314 is connected to the electrical
power.
NOTE: Airplanes WA001, WA101-WA104, WA221, WA223, WA231-WA232,
WB366-WB367, WB411-WB413, WB481 and WB501-WB507 have this circuit
breaker installed. The circuit breaker is for provisions only and has a collar and
an INOP label installed.
(3) On the seat rows aft of door 1 right, use the seat switches to see that the seats are
powered. This step checks that circuit breaker C25312 is connected to the electrical
power.
NOTE: Airplanes WA001, WA101-WA104, WA221, WA223, WA231-WA232,
WB366-WB367, WB411-WB413, WB481 and WB501-WB507 have this circuit
breaker installed. The circuit breaker is for provisions only and has a collar and
an INOP label installed.
(4) For airplanes WA246-WA250, WB105, WB161-WB173, WB181-WB188, WB276-WB286,
WB306-WB307, WB311-WB327, WB371-WB386, WB416-WB433, WB446-WB447,
WB611-WB615, WB631-WB632, WC051-WC067 and WC101-WC103, on the seat rows
aft of door 2 left, use the seat switches to see that the seats are powered. This step
checks that circuit breaker C25317 is connected to the electrical power.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 21, 2003
777-24-0075Revision 3: August 26, 2010
46 of 125
BOEING SERVICE BULLETIN 777-24-0075

### Page 47

NOTE: Airplanes WA001, WA101-WA104, WB106, WB231-WB239, WB291-WB301,
WB336-WB337, WB366-WB367 and WB636-WB637 have this circuit breaker
installed. The circuit breaker is for provisions only and has a collar and an INOP
label installed.
(5) For airplanes WA246-WA250, WB105, WB161-WB173, WB181-WB188, WB276-WB286,
WB306-WB307, WB311-WB327, WB371-WB386, WB416-WB433, WB446-WB447,
WB611-WB615, WB631-WB632, WC051-WC067 and WC101-WC103, on the center
seat rows aft of door 2, use the seat switches to see that the seats are powered. This
step checks that circuit breaker C25316 is connected to the electrical power.
NOTE: Airplanes WA001, WA101-WA104, WB106, WB231-WB239, WB291-WB301,
WB336-WB337, WB366-WB367 and WB636-WB637 have this circuit breaker
installed. The circuit breaker is for provisions only and has a collar and an INOP
label installed.
(6) For airplanes WA246-WA250, WB105, WB161-WB173, WB181-WB188, WB276-WB286,
WB306-WB307, WB311-WB327, WB371-WB386, WB416-WB433, WB446-WB447,
WB611-WB615, WB631-WB632, WC051-WC067 and WC101-WC103, on the seat rows
aft of door 2 right, use the seat switches to see that the seats are powered. This step
checks that circuit breaker C25315 is connected to the electrical power.
NOTE: Airplanes WA001, WA101-WA104, WB106, WB231-WB239, WB291-WB301,
WB336-WB337, WB366-WB367 and WB636-WB637 have this circuit breaker
installed. The circuit breaker is for provisions only and has a collar and an INOP
label installed.
d. For airplanes WB187-WB188, WB231-WB239, WB371-WB386, WB416-WB433,
WB446-WB452, WB503-WB504, WB601-WB606, WB611-WB615, WC051-WC067 and
WC101-WC103, do this test of the in seat power outlets.
(1) On the seat rows aft of door 1, see that the PC power outlets have electrical power. See
that LED is illuminated. This step checks that the circuit breaker C25320 is connected to
the electrical power.
NOTE: Airplanes WA001, WA101-WA104, WB037-WB044, WB181-WB186,
WB501-WB502 and WB505-WB507 have this circuit breaker installed. The
circuit breaker is for provisions only and has a collar and an INOP label installed.
(2) For airplanes WB371-WB386, WB416-WB433, WB46-WB452, WB503-WB504 and
WC051-WC067, on the seat rows aft of door 2, see that the PC power outlets have
electrical power. See that LED is illuminated. This step checks that the circuit breaker
C25321 is connected to the electrical power.
NOTE: Airplanes WA001, WA101-WA104, WB037-WB044, WB501-WB502,
WB505-WB507 and WC101-WC103 have this circuit breaker installed. The
circuit breaker is for provisions only and has a collar and an INOP label installed.
(3) For airplanes WB446-WB452, on the seat rows aft of row 21, see that the PC power
outlets have electrical power. See that LED is illuminated. This step checks that the circuit
breaker C25329 is connected to the electrical power.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 21, 2003
777-24-0075Revision 3: August 26, 2010
47 of 125
BOEING SERVICE BULLETIN 777-24-0075

### Page 48

NOTE: Airplanes WA001 and WA101-WA104, have this circuit breaker installed. The
circuit breaker is for provisions only and has a collar and an INOP label installed.
e. For all airplanes except WA210-WA212, WB037-WB044, WB336-WB337, WB366-WB367,
WB411-WB413, WB531-WB535 and WB591-WB595, do this test of the passenger telephones.
(1) Try to make a phone call from either a wall mount telephone or an in-seat telephone. If
a call can be made, or a busy signal is heard, the system is serviceable. This step checks
that circuit breaker C23430 is connected to the electrical power. Circuit breaker C23430
powers the cabin telecommunications unit.
NOTE: Airplanes WB037-WB044, WB336-WB337, WB366-WB367 and WB411-WB413
have this circuit breaker installed. The circuit breaker is for provisions only and
has a collar and an INOP label installed.
f. Do this test of the IFE/PASS SEATS switch.
(1) On the P5 panel, select the IFE/PASS SEATS switch to OFF.
(2) Make sure that all the IFE equipment in the purser work station or video control center
no longer has electrical power. Some components may have battery backup units. For
these components it may take several minutes before the electrical power is removed.
(3) Make sure that the overhead video system is off (electrical power is removed).
(4) Make sure that all the passenger control units on the passenger seats are off (electrical
power is removed).
(5) For all airplanes with PC power outlets, make sure that all the PC power outlets do not
have electrical power. See that LEDs are not illuminated.
(6) For airplanes with powered seats, make sure the powered seats do not operate (electrical
power is removed).
(7) For airplanes with wall mounted telephones, make sure that the telephone does not
operate. Swipe a valid credit card through the card reader. Make sure that no dial tone
can be heard.
(8) On the P5 panel, select the IFE/PASS SEATS switch to ON.
g. For all airplanes except WA001, WA101-WA104 and WB501-WB507, do this test of the purser
work station/video control center IFE master power switch.
(1) Select the IFE master power switch to the ON position.
(2) See that the overhead video system is on. Refer to 777 AMM 23-32-00, Power On the
Video Entertainment System as an accepted procedure.
(3) Select the IFE master power switch to the OFF position.
(4) See that the overhead video system is off.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 21, 2003
777-24-0075Revision 3: August 26, 2010
48 of 125
BOEING SERVICE BULLETIN 777-24-0075

### Page 49

(5) Make sure that all the passenger control units on the passenger seats are off (electrical
power is removed).
(6) For all airplanes with PC power outlets, make sure that all the PC power outlets have
electrical power. See that LEDs are illuminated.
(7) For airplanes with powered seats, make sure the powered seats operate (electrical power
is available).
(8) For airplanes with wall mounted telephones, make sure that the telephones operate.
Swipe a valid credit card through the card reader. Make sure that a dial tone can be
heard.
(9) For airplanes WB037-WB044, see that these switches are serviceable (the switch is
illuminated).
— PC/SEAT POWER ISOLATION SWITCH MCU 1
— PC/SEAT POWER ISOLATION SWITCH MCU 2
— PC/SEAT POWER ISOLATION
— SEAT/PC PWR FAULT
(10) Select the IFE master power switch to the ON position.
7. Do this test of the CABIN/UTIL switch:
a. See that the following circuit breakers on the P110 panel are closed:
NotesNumber, Location, Name
C21444, A07, L DR 1 HTR
C21446, B07, L DR 2 HTR
C21448, C07, L DR 3 HTR
C21450, C08, L DR 4 HTR
777-300 only.C21454, C09, L DR 5 HTR
C28307, E05, L FWD FUEL BOOST PUMP
b. See that the following circuit breakers on the P210 panel are closed:
NotesNumber, Location, Name
C21445, A25, R DR 1 HTR
C21447, A24, R DR 2 HTR
C21449, D28, R DR 3 HTR
C21451, B25, R DR 4 HTR
777-300 only.C21455, B21, R DR 5 HTR
C33486, E09, RED ANTI-COLL LTS
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 21, 2003
777-24-0075Revision 3: August 26, 2010
49 of 125
BOEING SERVICE BULLETIN 777-24-0075

### Page 50

NotesNumber, Location, Name
C33636, M11, RED ANTI-COLL LTS CTRL
c. See that the following circuit breakers on the P310 panel are closed:
NotesNumber, Location, Name
C24620, M02, MN BAT CHARGER
d. See that the following circuit breakers on the P320 panel are closed:
NotesNumber, Location, Name
C24300, K09, MN BAT CHARGER PWR
C24301, K12, APU BAT CHARGER PWR
C33416, G02, CABIN LTS FWD R
C28301, G09, L FWD FUEL BOOST PUMP GND
SVCE
C33417, L02, CABIN LTS FWD L
C33418, H04, CABIN LTS MID FWD R
C33419, L06, CABIN LTS MID FWD L
C33420, H09, CABIN LTS MID AFT R
C33421, L10, CABIN LTS MID AFT L
C33422, G03, CABIN LTS AFT R
C33423, L07, CABIN LTS AFT L
C33518, J12, E/E EQUIP CTR LTS
e. See that the following circuit breakers on the P49 panel are closed:
NotesNumber, Location, Name
C24622, A01, APU BAT CHARGER
f. On the P5 panel, see that the CABIN/UTIL switch is selected to the ON position.
g. On the EICAS, select the Electrical Maintenance page 2/2. See that the L UTIL and R UTIL
bus are powered. Refer to 777 AMM 31-61-00, as an accepted procedure for the system
description of the Primary Display System and the Electrical Synoptic.
h. Do a test of the sidewall lights and indirect ceiling lights. Refer to 777 AMM 33-21-00,
Passenger Compartment Illumination - Operational Test as an accepted procedure. This step
makes sure that all phases of the ground service bus, sections 1 and 2, have electrical power.
It is not necessary to do the test for the night lights.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 21, 2003
777-24-0075Revision 3: August 26, 2010
50 of 125
BOEING SERVICE BULLETIN 777-24-0075

### Page 51

i. Do a test of the forward equipment center lights. Refer to 777 AMM 33-31-00, Service and
Cargo Loading Lights - Operational Test of the Forward and Main Equipment Center Lights
as an accepted procedure. This step makes sure the 28V AC ground service buses have
electrical power.
j. Do a test of the red anti-collision lights on the upper and lower body. Refer to 777 AMM
33-44-00, Anti-Collision Lights - Operational Test as an accepted procedure. It is only necessary
to do a test of the upper and lower anti-collision lights. This step makes sure there is electrical
power on the right main AC bus.
k. On the P5 panel, select the CABIN/UTIL switch to the OFF position.
l. On the EICAS, select the Electrical Maintenance page 2/2. See that the L UTIL and R UTIL
bus are not powered. Refer to 777 AMM 31-61-00, as an accepted procedure for the system
description of the Primary Display System and the Electrical Synoptic.
NOTE: Depending on the load shed configuration, it can take up to two minutes for the utility
bus to come online.
m. Do a test of the sidewall lights and indirect ceiling lights. Refer to 777 AMM 33-21-00,
Passenger Compartment Illumination - Operational Test as an accepted procedure. The lights
should not come on. This step makes sure that all phases of the ground service bus, sections
1 and 2, do not have electrical power. It is not necessary to do the test for the night lights.
n. See that the passenger seat reading lights, attendant work lights, night lights and supplemental
night lights are all on. For airplanes with a crew rest area, at least one reading light in the crew
rest area should be on. This step does a check of the new cabin management system (CMS)
database (refer to SB 777-23-0175).
o. Do a test of the forward equipment center lights. Refer to 777 AMM 33-31-00, Service and
Cargo Loading Lights - Operational Test of the Forward and Main Equipment Center Lights
as an accepted procedure. The lights should not come on. This step makes sure the 28V AC
ground service buses do not have electrical power.
p. Do a test of the red anti-collision lights on the upper and lower body. Refer to 777 AMM
33-44-00, Anti-Collision Lights - Operational Test as an accepted procedure. It is only necessary
to do a test of the upper and lower anti-collision lights. The lights should not come on. This
step makes sure there is no electrical power on the right main AC bus.
q. Do a test of the main battery charger operation. Refer to 777 AMM 24-31-02, Main Battery
Charger Installation Test as an accepted procedure.
r. Do a test of the APU battery charger operation. Refer to 777 AMM 24-31-06, APU Battery
Charger Installation Test as an accepted procedure.
s. Do this test of the left forward fuel boost pump operation:
WARNING: DO NOT OPERATE ANY FUEL PUMP IF THE AMBER PRESS LIGHT COMES
ON AND STAYS ON. FUEL VAPORS IN THE TANK MAY IGNITE AND CAUSE
A FIRE OR EXPLOSION.
(1) To operate any of the fuel pumps, you must be in the flight compartment to continuously
monitor the fuel quantity and the low pressure indication in the applicable tank.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 21, 2003
777-24-0075Revision 3: August 26, 2010
51 of 125
BOEING SERVICE BULLETIN 777-24-0075

### Page 52

Immediately set the applicable fuel pump switch-light to OFF if the amber PRESS light
comes on and stays on.
(2) Make sure there is a minimum of 6,000 LB (2,700 KGS) in the left main fuel tank.
NOTE: This fuel quantity is necessary to prevent dry operation of the fuel pump.
If it necessary to refuel the fuel tanks, refer to 777 AMM 12-11-01 as an accepted
procedure.
(3) On the P5 panel, push the L FWD PUMP switch-light to the ON position.
(4) On the P5 panel, make sure the left forward fuel boost pump PRESS light goes off. The
PRESS light can take up to 20 seconds to go off.
(5) On the EICAS display, see that the FUEL PUMP L FWD message is not displayed.
(6) On the P5 panel, push the L FWD PUMP switch-light to the OFF position.
(7) On the P5 panel, make sure the left forward fuel boost pump PRESS light comes on. The
PRESS light can take up to 20 seconds to come on.
t. On the P5 panel, see that the CABIN/UTIL switch is selected to the ON position.
8. Put the airplane back to a serviceable condition.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 21, 2003
777-24-0075Revision 3: August 26, 2010
52 of 125
BOEING SERVICE BULLETIN 777-24-0075

### Page 53 (OCR)

BOEING SERVICE BULLETIN 777-24-0075
AE 405
POS 14
(J32)  18  • W4116-1908-20  18
D11032P  D4381 J
(J42)  W4236-0501-20  SP245
D11042P
10
W4236-0507-20
SP396
(5 LOCATIONS)
W6120-0023-20  → W4236
15  - W6120-0013-20  SP245  7W4116
11  - W6120-0024-20
18  - W6120-0006-20
19  - W6120-0007-20
26  - W6120-0032-20
XX+W6120-0190-20+
(J37)  D11037P
P110 POWER
MANAGEMENT PANEL-LEFT  D1 309P
POS 1  P101 POWER
INTEG DIST PNL  W14912
DOOR 1
FIGURE 1: CHANGE THE AIRPLANE WIRING - GROUP 1
(SHEET 1 OF 4)
Original Issue: August 21, 2003
Revision 3 August 26, 2010  BOEING PROPRIETARY -  777-24-0075
Copyright © Unpublished Work - See page 1 for details.  53 of 125

### Page 54 (OCR)

BOEING SERVICE BULLETIN 777-24-0075
AP0461
POS 071
4W6220-0049-20 +
• W6220-0120-20  D1 306P
J  D21021P  P101  DIS INTG
PNL-DOOR 1
(J21)  13
W6220-0121-20
W6220-0122-20
W6220-0123-20  SP396
W6220-0124-20
W6220-0125-20
W6220-0126-20
D21037P  (6 LOCATIONS)  AP1462
(J37)  12
W6220-8997-14  35
D1100P  J
30  W6220-0073-20  12
29  W6220-0072-20  11
28  W6220-0071-20  10
J  D21027P  (3 LOCATIONS)  D32012P  J (J12)
(J27)  (3 LOCATIONS)
P210  PWR  15  P320  POWER
MGMT PNL-RIGHT  PANEL- SRVC/
GRND HANDLING
• ADDED WIRE OR NEW ROUTING
+ DELETED WIRE OR FORMER ROUTING  EXISTING WIRE  W15143
REFERENCE: 777 WDM 23-32-02, 777 WDM 24-51-41
FIGURE 1: CHANGE THE AIRPLANE WIRING - GROUP 1
(SHEET 2 OF 4)
Original Issue: August 21, 2003
Revision 3 August 26, 2010  BOEING PROPRIETARY -  777-24-0075
Copyright © Unpublished Work - See page 1 for details.  54 of 125

### Page 55

The flag note numbers shown below agree with the numbers shown in the flag symbols in the figure.
NOTESQTYPART NUMBERNAMEFLAG
NOTE
Refer to SWPM 20-61-11 as an accepted
procedure.
15BACC47CN1SContact, Pin1
Refer to SWPM 20-30-12 as an accepted
procedure.
2BACT12C12Splice2
Refer to SWPM 20-30-12 as an accepted
procedure.
2D436-39Sleeve3
Refer to SWPM 20-61-11 as an accepted
procedure.
5BACC47CN2AContact, Pin4
All airplanes except WB105-WB106, WB371-WB386, WB406, WB411-WB413, WB416-WB433,
WB446-WB447, WB476, WC051-WC067, WC111.
5
Airplanes WB151-WB153, WB446-WB447.6
Refer to SWPM 20-30-16 as an accepted
procedure.
1324485End Cap7
Replace the existing identification tape
within 6 inches of equipment if necessary.
Refer to SWPM 20-10-11 as an accepted
procedure.
1280W5108-10101Identification Tape8
Replace the existing identification tape
within 6 inches of equipment if necessary.
Refer to SWPM 20-10-11 as an accepted
procedure.
1280W5108-10102Identification Tape9
Replace the existing identification tape
within 6 inches of equipment if necessary.
Refer to SWPM 20-10-11 as an accepted
procedure.
1280W5108-10201Identification Tape10
Replace the existing identification tape
within 6 inches of equipment if necessary.
Refer to SWPM 20-10-11 as an accepted
procedure.
1280W5108-11302Identification Tape11
Replace the existing identification tape
within 6 inches of equipment if necessary.
Refer to SWPM 20-10-11 as an accepted
procedure.
1280W5108-11502Identification Tape12
Replace the existing identification tape
within 6 inches of equipment if necessary.
Refer to SWPM 20-10-11 as an accepted
procedure.
1280W5108-11503Identification Tape13
FIGURE 1: CHANGE THE AIRPLANE WIRING - GROUP 1
(SHEET 3 OF 4)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 21, 2003
777-24-0075Revision 3 August 26, 2010
55 of 125
BOEING SERVICE BULLETIN 777-24-0075

### Page 56

NOTESQTYPART NUMBERNAMEFLAG
NOTE
Replace the existing identification tape
within 6 inches of equipment if necessary.
Refer to SWPM 20-10-11 as an accepted
procedure.
1280W5108-11504Identification Tape14
Replace the existing identification tape
within 6 inches of equipment if necessary.
Refer to SWPM 20-10-11 as an accepted
procedure.
1280W5108-11505Identification Tape15
FIGURE 1: CHANGE THE AIRPLANE WIRING - GROUP 1
(SHEET 4 OF 4)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 21, 2003
777-24-0075Revision 3 August 26, 2010
56 of 125
BOEING SERVICE BULLETIN 777-24-0075

### Page 57 (OCR)

BOEING SERVICE BULLETIN 777-24-0075
AE 405
POS 14
(J32)  18  - W4116-1908-20  18
D11032P  D4381 J  P
(J42)  W4236-0501-20  SP245
D11042P
112
W4236-0507-20
SP396
15  • W6120-0013-20  - W4236
•(5 LOCATIONS)
7  - W6120-0023-20  IW4116
11  - W6120-0024-20  SP245
18  - W6120-0006-20
19  • W6120-0007-20
26  - W6120-0190-20
AP0421
(J37)  D11037P
P110 POWER  W6120-0032-20
MANAGEMENT PANEL-LEFT
D1 309P
POS 1  P101 DIST  W15228
INTG PNL-DR 1
FIGURE 2: CHANGE THE AIRPLANE WIRING - GROUP 2
(SHEET 1 OF 5)
Original Issue: August 21, 2003
Revision 3 August 26, 2010  BOEING PROPRIETARY -  777-24-0075
Copyright © Unpublished Work - See page 1 for details.  57 of 125

### Page 58 (OCR)

BOEING SERVICE BULLETIN 777-24-0075
AP0461
POS 07
+W6220-0049-20 +4  8
• W6220-0120-20  D1 306P
D21021P  P101  DIS INTG
PNL-DOOR 1
(J21)  16
30  W6220-0121-20
24  W6220-0122-20
W6220-0123-20  * SP396
W6220-0124-20
W6220-0125-20
29  W6220-0126-20
D21037P  (6 LOCATIONS)  AP1462
(J37)
W6220-8997-14  35
D1100P
30  W6220-0073-201  12
29  W6220-0072-20-  11
28  W6220-0071-20-  10
J  D21027P  (3 LOCATIONS)  D32012P  J (J12)
(J27)  (3 LOCATIONS)
P210  PWR  18  P320  POWER
MGMT PNL-RIGHT  PANEL- SRVC/  W15230
GRND HANDLING
FIGURE 2: CHANGE THE AIRPLANE WIRING - GROUP 2
(SHEET 2 OF 5)
Original Issue: August 21, 2003
Revision 3 August 26, 2010  BOEING PROPRIETARY -  777-24-0075
Copyright © Unpublished Work - See page 1 for details.  58 of 125

### Page 59 (OCR)

BOEING SERVICE BULLETIN 777-24-0075
AP0421  AP0461
POS 01  POS 08
W1011-0278-20
D1 309J  D1396J
20
P101 DISTRIBUTION INTEGRATION PANEL
AP0291
POS 21
W6223-0208-20
D603 J  P
(3 LOCATIONS)
W6943-0674-20  UA25
TB6943
5< 13  - W6943-0009-20  UA37
TB6943
UB37  W6943-0638-20
S23364 SW-CTU  TB6943
ENABLE/DISABLE
- ADDED WIRE OR NEW ROUTING
+ DELETED WIRE OR FORMER ROUTING  - EXISTING WIRE  W15246
REFERENCE: 777 WDM 23-32-02, 777 WDM 24-51-41
FIGURE 2: CHANGE THE AIRPLANE WIRING - GROUP 2
(SHEET 3 OF 5)
Original Issue: August 21, 2003
Revision 3 August 26, 2010  777-24-0075
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.  59 of 125

### Page 60

The flag note numbers shown below agree with the numbers shown in the flag symbols in the figure.
NOTESQTYPART NUMBERNAMEFLAG
NOTE
Refer to SWPM 20-61-11 as an accepted
procedure.
18BACC47CN1SContact, Pin1
Refer to SWPM 20-61-11 as an accepted
procedure.
2BACC47CP1SContact, Socket2
Refer to SWPM 20-30-12 as an accepted
procedure.
2BACT12C12Splice3
Refer to SWPM 20-30-12 as an accepted
procedure.
2D436-39Sleeve4
Refer to SWPM 20-90-15 as an accepted
procedure.
1S280W555-108Terminal Block5
Refer to SWPM 20-90-15 as an accepted
procedure.
3M39029-1-101Contact, Pin6
Refer to SWPM 20-61-11 as an accepted
procedure.
5BACC47CN2AContact, Pin7
Refer to SWPM 20-30-16 as an accepted
procedure.
1324485End Cap8
Refer to SWPM 20-61-11 as an accepted
procedure.
1BACC47CP2AContact, Socket9
Replace the existing identification tape
within 6 inches of equipment if necessary.
Refer to SWPM 20-10-11 as an accepted
procedure.
1280W5108-10101Identification Tape10
Replace the existing identification tape
within 6 inches of equipment if necessary.
Refer to SWPM 20-10-11 as an accepted
procedure.
1280W5108-10102Identification Tape11
Replace the existing identification tape
within 6 inches of equipment if necessary.
Refer to SWPM 20-10-11 as an accepted
procedure.
1280W5108-10201Identification Tape12
Replace the existing identification tape
within 6 inches of equipment if necessary.
Refer to SWPM 20-10-11 as an accepted
procedure.
1280W5108-10902Identification Tape13
Replace the existing identification tape
within 6 inches of equipment if necessary.
Refer to SWPM 20-10-11 as an accepted
procedure.
1280W5108-10903Identification Tape14
FIGURE 2: CHANGE THE AIRPLANE WIRING - GROUP 2
(SHEET 4 OF 5)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 21, 2003
777-24-0075Revision 3 August 26, 2010
60 of 125
BOEING SERVICE BULLETIN 777-24-0075

The text continues at https://openairdocs.org/service-documents/boeing/sb-777-24-0075/file/0a4bd23e2da7.md?from=61

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
